Cities Index.
Att#2 Staff PowerPoint Presentation 2021.11.16

City Council/Public Financing Authority
March 1, 2022

Document
Att#2 Staff PowerPoint Presentation 2021.11.16
Meeting
March 1, 2022
Body
City Council/Public Financing Authority
Original file
5.2 MB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

CITY COUNCIL

PRESENTATION
NOVEMBER 16,2021
PRESENTED BY: RJM DESIGN GROUP

PROJECT PURPOSE
TimelinePurpose Background Outreach Conceptual Plan City Council

TO DEVELOP AN EDISON PARK

CONCEPTUAL PLAN THAT WILL GUIDE

CURRENT AND FUTURE PARK AND
RECREATION DEVELOPMENT;

BASED ON COMMUNITY-WIDE
INPUT + PROFESSIONAL ANALYSIS

PROJECT TIMELINE
TimelinePurpose Background Outreach Conceptual Plan City Council • BACKGROUND DATA

COLLECTION
• SITE INVENTORY AND ANALYSIS
• OPPORTUNITIES AND

CONSTRAINTS

PROFESSIONAL

ANALYSIS
• PROJECT WEBSITE
• VIRTUAL ONLINE SURVEYS
• IN PERSON COMMUNITY
WORKSHOP + DESIGN

CHARRETTE
• VIRTUAL ONLINE FEEDBACK
SURVEY

COMMUNITY
OUTREACH • CONSENSUS BUBBLE DIAGRAM
• PRELIMINARY CONCEPTUAL PLAN
• REFINED CONCEPTUAL PLAN
• COMMUNITY & LIBRARY SERVICES

COMMISSION
• FINAL RECOMMENDATIONS TO

CITY COUNCIL

CONCEPTUAL
PLAN

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council

OUTREACH

ADVERTISING
• PROJECT WEBSITE bit.ly/hbedisonpark
• CITY WEBSITE, CITY FACEBOOK / SOCIAL MEDIA
• COUNCIL MEETINGS & CM NEWSLETTER
• VARIOUS COMMUNITY GROUPS CONTACTED
• COMMUNITY & LIBRARY SERVICES COMMISSION
(MEETING NOTICES MAILED / LOCAL NEWSPAPERS)
• FLYERS AT COMMUNITY CENTER

VIRTUAL

ONLINE SURVEY
#1

VIRTUAL

ONLINE SURVEY
#2

IN PERSON

COMMUNITY

WORKSHOP

IN PERSON

COMMUNITY
DESIGN

CHARRETTE

VIRTUAL
ONLINE

FEEDBACK
SURVEY

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council • SURVEY 1 - 160 PARTICIPANTS
• SURVEY 2 – 295 PARTICIPANTS
• COMMUNITY WORKSHOP – 10 PARTICIPANTS
• COMMUNITY DESIGN CHARRETTE – 45 PARTICIPANTS
• FEEDBACK SURVEY – 90 PARTICIPANTS
• FEEDBACK COMMENTS – 23 PARTICIPANTS
• WEBSITE VIEWS – 4, 034
623 TOTAL PARTICIPANTS

VIRTUAL

ONLINE SURVEY
#1

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council

1. How do you recreate at Edison Park?

2. What do you like most about Edison Park and why?

3. What do you dislike most about Edison Park and why?

4. What are the most important improvements the Community and Library Services Department can make at Edison Park?

5. What are your most preferred amenities you would like to see at Edison Park?

VIRTUAL

ONLINE SURVEY
#1 RESULTS

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council What are your
most preferred
amenities you
would like to see
at Edison Park?

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council

VIRTUAL

ONLINE SURVEY
#2

1. What are the most important ACTIVE recreation amenities / facilities (new or existing) you would like to see at Edison Park?

2. What are the most important PASSIVE recreation amenities / facilities (new or existing) you would like to see at Edison Park?

3. What are the most important MAINTENANCE / SITE
improvements (new or existing) you would like to see at Edison Park?

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council T op Active
Recreation
Improvements
Aquatics / Pool /
Splashpad
T ennis Courts
Skate Park / Skate Spot
Pickleball Courts
Basketball Courts
T op Passive
Recreation
Improvements
Restrooms
Playground (Equipment
/ Surfacing)
Community Center /
Recreation Classes
Trees / Landscape
Dog Area / Dog Park
T op Maintenance /
Site Improvements
Cleanliness
Security
Maintenance
Update / Renovate
Trash / Receptacles

VIRTUAL

ONLINE SURVEY
#2 RESULTS

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council

IN PERSON

COMMUNITY

WORKSHOP
T op Active Recreation
Improvements
Skate Spot / Skate Park
Basketball Courts
Climbing Wall
Pickleball Courts
Aquatics/Pool/Splash Pad, Batting
Cages, Pump Track, Softball Fields,
Sports Fields, Running Track
T op Passive Recreation
Improvements
Community Center / Recreation
Classes
Community Garden
Playground (Equipment / Surfacing)
Restrooms
Bike Paths, Exercise Areas, Picnic
Areas, Trash Receptacles,
Trees/Landscape, Walking Paths
T op Maintenance / Site
Improvements
Cleanliness
Security
Maintenance
Parking
Trash / Receptacles

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council

IN PERSON

COMMUNITY
DESIGN

CHARRETTE
Consensus
Master
Planning
Site
Analysis
Site
Awareness
T our
Group
Discussions
Design
Charrette

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council

IN PERSON

COMMUNITY
DESIGN

CHARRETTE

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council

IN PERSON

COMMUNITY
DESIGN

CHARRETTE
• Participants divided into 6 groups
• As a group, draw and/or model
your ideas for the park master
plan on the group template

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council 6 GROUP PLANS 6 GROUP BUBBLE
PLANS
1 GROUP

COMPOSITE
PLAN

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council GROUP

COMPOSITE
PLAN

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council GROUP

CONSENSUS
PLAN

COMMUNITY OUTREACH
TimelinePurpose Background Outreach Conceptual Plan City Council 90 PARTICIPANTS
• 51 DID NOT PARTICIPATE IN PREVIOUS OUTREACH

OPPORTUNITIES
• 39 DID PARTICIPATE
• TOP COMMENTS RELATED TO:
• TENNIS COURTS
• SKATEPARK
• PICKLEBALL

VIRTUAL
ONLINE

FEEDBACK
SURVEY
• PUMP TRACK
• OPEN SPACE
• TOT LOT

CONCEPTUAL PLAN
TimelinePurpose Background Outreach Conceptual Plan City Council

UTILIZE GROUP

PLAN TEMPLATE

CONCEPTUAL PLAN
TimelinePurpose Background Outreach Conceptual Plan City Council • 57 new parking stalls, reconfigured parking
lot
• 8 dedicated pickleball courts
• 8 dual-use pickleball courts overlaid on 2
tennis courts
• 4 half-court & 4 full-court basketball courts
• New dog area
• Expanded tot lot
• Expanded skate spot
• New pump track
• Maintain parallel parking on Hamilton Ave
• Maintain existing Edison HS crosswalk
• Install a new crosswalk at Stillwell Dr

CONCEPTUAL
PLAN

OPTION A

TENNIS / PICKLEBALL COURT LAYOUT
TimelinePurpose Background Outreach Conceptual Plan City Council 2 pickleball courts
on 1 tennis courts
4 pickleball courts
on 1 tennis courts
WHAT’S A PUMP TRACK?
TimelinePurpose Background Outreach Conceptual Plan City Council

REFINEMENTS TO CONCEPTUAL PLAN A
• The Community & Library Services Commission unanimously approved “Conceptual Plan A” as the recommend upgrade for Edison Park
• However, based on additional feedback received from youth sports groups, staff worked with RJM to develop an alternative concept that incorporates additional dedicated soccer space into the concept plan TimelinePurpose Background Outreach Conceptual Plan City Council

CONCEPTUAL PLAN
TimelinePurpose Background Outreach Conceptual Plan City Council

CONCEPTUAL
PLAN

OPTION B
•3rd dedicated U10 soccer
field added to the SCE
corridor along Hamilton
Avenue

ADDITIONAL NEIGHBOR CONCERNS RAISED
• In the days after the concept plans for Edison Park were published, staff received feedback from several neighboring residents to Edison Park citing additional concerns:

1. Addition of the 57-space parking stall along Stillwell Drive may result in neighborhood impacts, and the loss of mature trees

2. Sports courts (pickleball, tennis, and basketball) along Magnolia Street would result in the removal of several large eucalyptus trees

3. Full-sized soccer field overlay on softball fields would create a more intense use, and result in the removal of mature trees
TimelinePurpose Background Outreach Conceptual Plan City Council

CONCEPTUAL PLAN
TimelinePurpose Background Outreach Conceptual Plan City Council 1 3
2 1. 57-space parking lot addition would
intensify use of the park, and eliminate
mature trees

2. Sports courts would result in removal of
eucalyptus trees

3. Soccer field overlay on softball fields
would result in an intensified use, and
eliminate mature trees

AREAS OF

RESIDENTS

CONCERN

CONCERNS ASSESSED, RESPONSE OPTION DEVELOPED
• Proposed parking lot on Stillwell Drive was added based on community feedback, however, the parking facility could be removed
• Staff would assess offsite parking alternatives to address peak park usage times • Given site constraints at Edison Park, and the demand for active recreation components like pickleball, tennis, basketball, and soccer, the removal of trees in select locations will be necessary to meet the community’s needs • Of note, the proposed plan to upgrade Edison Park includes the addition of more than 200 new trees
• Also, if there are particular trees of interest at Edison park, the Public Works team has assessed that tree relocation efforts can be engaged
TimelinePurpose Background Outreach Conceptual Plan City Council

CONCEPTUAL PLAN
TimelinePurpose Background Outreach Conceptual Plan City Council

CONCEPTUAL
PLAN

OPTION C
• T o address the concerns raised, a
third Conceptual Plan Option C
was developed
• In this plan, the 57-stall parking area
and dedicated dog area located
along Stillwell Drive are removed

NEXT STEPS
TimelinePurpose Background Outreach Conceptual Plan City Council A • PERFORM AND PREPARE COMPUTER / CAD AERIAL TOPOGRAPHIC SITE SURVEY B
• COMPUTER / CAD DRAFT CONCEPTUAL PLAN ON CAD SITE SURVEY WITH

EXISTING SITE ELEMENTS, UTILITIES, FACILITIES, AMENITIES, BUILDINGS AND TREES

IDENTIFIED
C
• PERFORM SITE GEOTECHNICAL AND ENGINEERING STUDIES BASED ON

CONCEPTUAL PLAN TO CONFIRM FEASIBILITY OF DESIGN
D
• REFINE CONCEPTUAL PLAN BASED ON ENGINEERING INFORMATION, CITY PLAN

CHECK DESIGN REQUIREMENTS, PROGRAMMING NEEDS, COMMUNITY OUTREACH E
• PREPARE DESIGN DEVELOPMENT PLANS AND DETAILS BASED ON REFINED

CONCEPTUAL PLAN AND COMMUNITY INPUT

DESIGN DEVELOPMENT AND GEOTECHNICAL / ENGINEERING ANALYSIS

CITY COUNCIL OPTIONS
• Option A: Select the Edison Park reconfiguration conceptual plan as approved by the Community & Library Services Commission, and authorize staff to move forward with initiating development of the design and bid package for construction of the updated facility.
• Option B: Select the revised Edison Park reconfiguration conceptual plan, exhibited as Option B, and authorize staff to move forward with initiating development of the design and bid package for construction of the updated facility. • Option C: Select the revised Edison Park reconfiguration conceptual plan, exhibited as Option C, and authorize staff to move forward with initiating development of the design and bid package for construction of the updated facility.

TimelinePurpose Background Outreach Conceptual Plan City Council

THANK YOU

← All documents from this meeting