14320 Albers Way
Chino, CA 91710
We think about a better world (909) 993-5470 Office www.elecnorbelco.com (909) 993-5476 Fax CA License 738518

1/24/2022

City of Huntington Beach Serial No. 14-0605-004
2000 Main Street
Huntington Beach, CA 92648

Attention: Mr. Brian Polivka, Contract Administrator

Reference: Downtown Fiber Optic Communications
City of Huntington Beach Project CC No. 1621
Belco Job No. 14-0605

Subject: PCO 1.00R2 Yorktown to City Hall Fiber Route Revision, Installation of 144 SMFO in City Hall Basement, and Upgrade of 12 SMFO Drop Cable to 24 SMFO, Confirmation of Additive Alternate Bid Pricing

Dear Mr. Polivka:

Please consider the following as our price proposal for the Yorktown to City Hall Fiber Revision, Installation of 144 SMFO in the City Hall Basement Floor Plan Improvement Plans, and upgrade of the 12 SMFO drop cables in the Additive Alternate bid item to 24 SMFO. This pricing includes installing new conduit from the fiber vault on Yorktown Ave (contract work) to the existing pull box on Yorktown Ave, and installing an additional 144 SMFO into the existing conduit from this box to the City Hall basement (plan page 2 of 7, Fiber Optics Installation project) . Belco will install new 144 SMFO and the necessary equipment, in existing conduit, to the City Hall basement and terminate at the existing server rack as shown on t he attached plans (sheet A -26, Partial Basement-Admin & Develop. Bldg.) . Belco will also upgrade the specified 12 SMFO drop cables to 24 SMFO drop cables as shown on the ArchSplice Revision for the additive alternate bid item.

Our price for this work is: $23,803.52.

Belco is also confirming the price submitted in the original bid proposal for the additive alternate bid item: $85,000.000

The total for both of these items of work is: $108,803.52.

If this price is acceptable, please sign and return this change order for implementation.

Should you have any questions or concerns, please do not hesitate to contact me at (909) 993-5470 ext. 234.

Sincerely,
Elecnor Belco Electric, Inc.

Doug McWhorter
Project Manager