PROFESSIONAL SERVICES CONTRACT BETWEEN
THE CITY OF HUNTINGTON BEACH AND
HDR ENGINEERING, INC.
FOR
ON CALL WATER AND ENGINEERING SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and HDR ENGINEERING, INC., a Nebraska corporation hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to provide on call water and engineering services; and
Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and
CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:
1. SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT."
CONSULTANT hereby designates Aaron Meilleur who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement.
CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement.
agree/ surfinet/professional svcs mayor 1 of 11
10/12
TERM; TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT are to commence on May 21st, - 2018 _(the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.
In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein.
COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed One Million Dollars ($1,000,000).
5. EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained.
METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B." agree/ surfinet/professional sves mayor 2 of 11
10/12
7. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit.
HOLD HARMLESS
CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT.
9. PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars agree/ surfnet/professional svcs mayor 3 of 11
10/12
($1,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not contain a self-insured retention without the express written consent of CITY; however an insurance policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims-made policy shall be acceptable if the policy further provides that:
A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements).
B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims.
CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement.
If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY.
10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall:
agree/ surfnet/professional svcs mayor 4 of 11
10/12
A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and
C. shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium.
CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY.
The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required.
11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder.
12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner.
CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall agree/ surfnet/professional sves mayor 5 of 11
10/12
be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.
13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove.
14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement.
15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code.
16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or agree/ surfinet/professional scs mayor 6 of11
10/12
other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U.S. certified mail-return receipt requested:
ТО CITY: TO CONSULTANT:
City of Huntington Beach HDR Engineering, Inc.
ATTN: Duncan Lee Attn: Aaron Meilleur
2000 Main Street 3230 El Camino Real, Suite 200
Huntington Beach, CA 92648 Irvine, CA 92602-1377
(213) 239-5840
17. CONSENT
When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event.
18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties.
19. SECTION HEADINGS
The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement.
20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining agree/ surfinet/professional sves mayor 7 of 11
10/12
covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law.
21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it.
22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification.
23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for agree/ surfinet/professional svcs mayor 8 of 11
10/12
CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT.
24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party.
25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive.
26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.
27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.
28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this agree/ surfnet/professional svcs mayor 9 of 11
10/12
Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, factor circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.
29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.
This Agreement shall expire when terminated as provided herein.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.
agree/ surfinet/professional scs mayor 10 of 11
10/12
CONSULTANT,
CITY OF HUNTINGTON BEACH, a
HDR Engineering, Inc. municipal corporation of the state of COMPANY NAME California
A Nebraska Corporation
Nichel they
22Cale Mayor
By:
Aaron M. Meilleur Nobm Istanislich
print name City Clerk 5.24.188=
ITS: (circle one Chairman/President/Vice President
INITIATED AND APPROVED:
AND
My Bonnie 8. Ludion
udror
print name
ITS: (circle one) Secretary/Chief Financial Officer/Asst.
Secretary - Treasurer REVIEWED AND APPROVED:
handle Donat
1y City Manager
APPROVED AS TO FORM
agree/ surfnet/professional scs mayor 11 of 1l
10/12
EXHIBIT "A"
STATEMENT OF WORK: (Narrative of work to be performed)
CONSULTANT shall provide consulting services on an 'as-needed' basis for projects to be determined during the term of the agreement. During the term of the agreement, CITY may elect to solicit proposals from CONSULTANT. CITY shall issue task order for each project based upon the scope of services, work schedule, and fee proposal submitted to CITY for its review and approval.
B. CONSULTANT'S DUTIES AND RESPONSIBILITIES:
CONSULTANT'S duties and responsibilities shall be per CONSULTANT'S Statement of Qualification (Exhibit A), consistent with the City of Huntington Beach Request for Qualifications for On Call Water and Engineering Consulting Services. Upon award, and the contract period, if CONSULTANT chooses to assign different personnel to the project, CONSULTANT must submit the names and qualifications of these staff to CITY for approval before commencing work.
C. CITY'S DUTIES AND RESPONSIBILITIES:
1. Furnish scope of work request for each project.
2. Furnish construction plans and specifications to the CONSULTANT.
D. WORK PROGRAM/PROJECT SCHEDULE:
A project schedule will be developed for each project assigned by CITY.
EXHIBIT A
CITY OF HUN CIGTON BEACH
Statement of Qualifications
On-Call Water Engineering
& Professional Consulting
Services
Service Category A: Water Engineering
Public Works Department
HR
January 11
2018
Item 15. - 147 HB - 360-
A Cover Letter
HB -361- Item 15. - 148
HR
January 11, 2018
City Clerk's Office, 2nd Floor
City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
RE: On-Call Water Engineering & Professional Consulting Services, Service Category A.
Water Engineering
Dear Selection Committee,
HDR Engineering, Inc. (HDR) understands that the City of Huntington Beach (City) is a very complete and complex organization that provides a full spectrum of water services to a service area of over 200,000. HDR is excited to submit our qualifications for On- Call Water Engineering & Professional Consulting Services (Service Category A). We are currently working with your staff on several pipeline corrosion assessment projects bringing a history working with your staff. We are prepared to assist you in all aspects and areas of your organization and to work collaboratively with you and your staff to deliver efficient and implementable designs.
Selecting HDR will provide the City with the following benefits:
• Local team with similar experience - Steve Friedman, PE, our proposed Project Manager, has successfully managed similar on-calls in Southern California for 24 years including on-calls with the Metropolitan Water District of Southern California and Eastern Municipal Water District. He will lead a team of local experts who bring a wide variety of similar project experience. Our local task leads Amy Omae, PE, LEED AP, Brien Clark, PE and Dan Ellison, PE have served in similar roles and will leverage their lessons learned for successful project delivery.
• Proven approach to corrosion engineering - HDR has been and continues to be a leader in the field of tank inspections, cathodic protection evaluations, and condition assessments. HDR focuses on corrosion engineering, corrosivity studies, and coating- related services to assist architects/engineers and owners in designing, constructing, and operating structures with low maintenance costs and long trouble-free lives. • A best-value approach to all task orders - As you may be aware from our previous work, we put the City's best interests first; either through our competitive rates, project approach, or collaborative approach with City staff. To help ensure a high quality, best value product, all of our work goes through an established and proven internal quality control process. This approach keeps project designs on track resulting in project savings.
hdrinc.com
3230 El Camino Real, Suite 200, Irvine, CA 92602-1377
T 714.730.2300 F 714.730.2301
Item 15. - 149 HB -362-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Cover Letter HOR Service Category A. Water Engineering
We look forward to continuing our working relationship with the City. Please contact our project manager, Steve Friedman at 949) 533-6239, should you have any questions regarding our SOQ.
Sincerely,
HDR
Steve Friedman
Aaron Meilleur, PE Steve Friedman, PE, PMP, BCE
Vice President Project Manager
Proposal At-A-Glance:
Point of Contact/Project Manager:
• Cover Letter Page 1
• Vendor Application Form Steve Friedman, PE, PMP, BCEE • Pre-Qualification Form 3230 El Camino Real, Suite 200 • Firm Qualification Page 3 Irvine, CA 92602-1377
• Appendix:
Main: 714.730.2300
Amendment No. 1 Page 16
Acknowledgement Direct: 714.368.5634
Cell: 949.533.6239
Key Staff Resume Page 17 Email: [email protected] • Cost Proposal/Rate Sheet (included under
separate cover)
HB -363- Item 15. - 150
B Vendor
Application
Form
Item 15. - 151 HB -364-
REQUEST FOR PROPOSAL
VENDOR APPLICATION FORM
TYPE OF APPLICANT: • NEW CURRENT VENDOR
Legal Contractual Name of Corporation: HDR Engineering, Inc.
Contact Person for Agreement: Aaron Meilleur
Corporate Mailing Address: 3230 El Camino Real, Suite 200 Irvine, CA 92602-1377
City, State and Zip Code:
E-Mail Address: [email protected]
213.239.5840 Fax: 714.730.2301
Phone:
Contact Person for Proposals: Steve Friedman
Title: Project Manager E-Mail Address: [email protected] 714.368.5634 Business Fax: 714.730.2301
Business Telephone:
Is your business: (check one)
• NON PROFIT CORPORATION • FOR PROFIT CORPORATION
Is your business: (check one)
• CORPORATION
• INDIVIDUAL EUNICORONA SOCIETIE
• PARTNERSHIP
1 of 2
- HB - 365-= - Item 15. - 152
Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Kip Field So. Cal Area Manager 714.730.2400
Aaron Meilleur So. Cal Water Business Grp. Mgr. 213.239.5840 47-0680568
Federal Tax Identification Number:
A295855
City of Huntington Beach Business License Number:
(If none, you must obtain a Huntington Beach Business License upon award of contract.) 04/30/2018
City of Huntington Beach Business License Expiration Date:
2 of 2
Item 15. - 153 - HB -366-=
C Pre-
Qualification
Form
HB -367- Item 15. - 154
EXHIBIT A: PRE-QUALIFICATION FORM
ON-CALL WATER ENGINEERING & PROFESSIONAL CONSULTING SERVICES SERVICE CATEGORY PROPOSING? Y/N
(circle)
A. Water Engineering (Yes) No
trial) Consultane is willing lo execute the Agreement as drafted (Sce Appendix B). (Initial) Consultant is able to provide the insurance as required (See Appendix C).
Firm Name: HDR Engineering, Inc
Firm Address: 3230 El Camino Real, Suite 200, Irvine, CA 92602-1377 Bable
Signature: Date: 01/09/2018
Item 15. - 155 HB -368-
D Service
Category
A. Water
Engineering
HB -369- Item 15. - 156
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
At-a-Glance Firm Qualifications
• HDR Engineering, Inc. (HDR) is an HDR specializes in manners of conveyance employee-owned corporation.
meeting the varied water and storage.
• Founded in 1917 in Omaha, Nebraska
• California Secretary of State Registration: infrastructure needs of our clients worldwide. Since our KEY PERSONNEL/
06/18/1985 (#1279161) STAFFING
inception in 1917, our teams
Location of Company Office: have emphasized technical The key to efficient project 225 innovation, cost-effectiveness, delivery is assigning 10,000
& Corporate headquarters is qualified professional staff located in Omana, Nebraska and attentive client service Employees Offices
who can deliver results.
WORLDWIDE for 100 years. We provide
full service, multi-disciplinary We have established good services for a wide range working relationships with
14 /offices throughout California many municipalities and will of water infrastructure
projects including treatment bring those resources to the 1960 City to support tasks under
plants, distribution systems,
• Locally: 831 employees in California conveyance storage facilities, this contract. As specific CA Practice
opens! • Nationally: 9,894 employees and large equipment tasks are defined, we will • Southern California: 413 employees find the right technical such as pumps, turbines,
and control systems. We staff, either from within our
Total Number of Employees in CA
have worked with some team, or by engaging the
of the nation's largest appropriate specialized staff.
water agencies delivering The City requires a highly
complex engineering and qualified, locally based,
831 employees
business solutions. capable team of experts that
As a Regional Business can help the District define,
We consistently rank high in Engineering
News-Record's (ENR's) Top 500 Water and Enterprise providing plan, design, and implement Water Design firms in the nation. engineering and architectural your CIP projects. HDR is consulting in Southern proposing an experienced
# 8 # 3 team of fully committed
Dams & Reservoirs California since 1960, HDR's
Top 500 staff and subconsultants
Design Firms services encompass planning,
# 9 that will work in partnership
Top 20 in Water design, and construction
Treatment management for water with the City staff. Our # 6 & Desalination
Water Plants agencies throughout the City's history of partnering with other agencies, such
# 9 service area. Over the years,
# 6 Top 25 in HDR has expanded to seven as Metropolitan Water Sewer & Wastewater
Waste District and the City of
Treatment Plants Southern California offices:
Riverside, Claremont, San Los Angeles Bureau of
# 6 #10 Sanitation and Bureau of
Top 50 in Diego, Irvine, Los Angeles,
Water Supply Top 25 in Sanitary Engineering demonstrates Storm Sewer Long Beach, and Ventura.
HDR's Irvine office is located commitment to provide the # 7 # 18 within 17 miles of the City's right talent at the right time Top 20 in Top 20 Water
Water Treatment/ office. HDR's Water Group to deliver your projects.
Transmission Supply Top Design HDR's team exceeds the
Lines/Aqueducts Firms in Environment provides advanced expertise in the full cycle of water RFP requirements and is
# 9 # 13 organized around major
Top 10 in Top 200 management, from water
Engineering/ Environmental deliverables and areas of
Design Work Firms supply to treatment, and all
03 Item 15. - 157 HB -370-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category HDR Water Engineering
expertise. Our team has the
resources, tools, experience,
and commitment to be an
effective partner for the
City in implementing its CIP
projects effectively.
The organization of our team,
a table of qualifications of our
key staff, and resumes for key
team members are provided.
Resumes for additional
technical support staff are
available upon request. GTON
PRINCIPAL-IN-CHARGE
Aaron Meilleur, PE
PROJECT MANAGER QA/QC
Steve Friedman, PE, Kevin Calderwood, PE
PMP, BCEE John Koreny, PE, PHG, PEG
TASK ORDER MANAGERS Graham Bell, PhD, PE, FACE
Steve Friedman, PE, PMP, BCEE Lee Frederiksen, PE
Amy Omae, PE, LEED AP *
Brien Clark, PE *
Dan Ellison, PE *
CORROSION CONTROL/
WATER PIPELINE ENGINEERING PUMP/BOOSTER STATIONS CONDITION ASSESSMENT & REHAB CATHODIC PROTECTION Steve Friedman, PE, PMP, BCEE James Wang, PE Dave Spencer, PE Brien Clark, PE * Dan Ellison, PE Steve Friedman, PE, PMP, BCEE Dan Ellison, PE Erika Perez, EIT * Eric Scherch, PE
WELLS RESERVOIRS/TANKS ELECTRICAL/I&C STRUCTURAL CEQA/NEPA ENVIRONMENTAL Andrew Cherene, PG, CHG Janelle Moyer, PE, CEM, ENV SP Ray Genato, PE Tom Hamlin, PE Ingrid Eich Steve Friedman, PE, PMP, BCEE James Wang, PE Adam Nichols, PE
CADD ARCHITECTURAL CONSTRUCTION CONSTRUCTION RIGHT-OF-WAY Daniel Celaya Martin Ramirez, RA Len Bystrum, PE Len Beystrum, PE Jennifer Cole Jon Rohrer, PE Jon Rohrer, PE
Resume included in appendix
HB -371- Item 15. - 158
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
EB
Staff Education and Skill Set Fit Experience
Professional Registration
Principal-in-Charge
• Professional Engineer - Civil
• Pure Water Program's North City
C62473 California
Conveyance System (NCCS) Civil
• Professional Engineer - 38518 Engineering Services, San Diego, CA Washington
• Michelson Water Reclamation Plant
Aaron Meilleur, PE • Professional Engineer - 15215 Biosolids and Energy Recovery Facilities • Principal-in-Charge
Years of Experience: 22 Hawaii
Construction Management Support,
• Bachelor of Science Civil Irvine, CA
Engineering United States • Valley Sanitary District Requa Interceptor Military Academy, West Point Design, Indio, CA
Naval Academy
Project Manager/Point of Contact
• Professional Engineer - Civil • Metropolitan Water District - Water 055566 California
Treatment and Pipeline On-Call Services
• Project Management • City of Corona Mangular Blending Professional 293170 California • Project Manager/
Steve Friedman, PE, Point of Contact, Task Facility
• Master of Science Civil
PMP, BCEE Order Manager, Water • P-1045: New Potable Water Conveyance Engineering University of Pipeline Lead, Pump/ On-Board Marine Corps Base Years of Experience: 24
California, Berkeley Booster Stations Lead • Southeast Recycled Water Pipeline - • Bachelor of Science Civil
Central Basin Municipal Water District
Engineering University of
California, Berkeley
Task Order Managers
• Professional Engineer - Civil
76824 California
• Mesa Water District - Pipeline Integrity
• LEED Accredited Professional
Program
Amy Omae, PE, 10328834
• Irvine Ranch Water District - Water
LEED AP • Master of Science • Task Order Manager
Reliability Study
Years of Experience: 13 Environmental Engineering
• P-1046: New Potable Water Conveyance
University of Miami
On-Board Marine Corps Base
• Bachelor of Science Chemistry
University of Miami
05 Item 15. - 159 HB -372-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
Staff Education and Skill Set Fit Experience
Professional Registration
Task Order Managers
• City of Huntington Beach - 30-
• Professional Engineer - inch Yorktown Transmission Main Chemical CH 6291 California Rehabilitation
• NACE Cathodic Protection • Task Order Manager, • Eastern Municipal Water District Brien Clark, PE Specialist 17978 Corrosion Control/ - Winchester Recycled Water Years of Experience: 17 • Bachelor of Science Chemical Cathodic Protection Transmission Pipeline Corrosion Engineering California Lead Assessment
Polytechnic State University, • Western Municipal Water District - Pomona Nondestructive Condition Assessment
alternatives for the Mills Gravity Pipeline
• Professional Engineer - Civil • California Water Service Company C38094 California - Rancho Dominguez Groundwater
• Structural Engineer 53020 Optimization Study
California • As-Needed Wastewater Condition
Dan Ellison, PE
• Bachelor of Science Civil • Task Order Manager Assessment of Wastewater Facilities, Years of Experience: 36 City of San Diego
Engineering University of Utah
• Master of Business Admin • WRF 4471 Leveraging Data from Non- Finance Univer of Southern Destructive Examinations to Help Select California Ferrous Water Mains for Renewal
arteam Members
• WRF 4471 Leveraging Data from Non-
• Professional Engineer C66885 Destructive Examinations to Help Select California Ferrous Water Mains for Renewal
Dave Spencer, PE • Bachelor of Science Civil • Condition Assessment • City of San Diego Metropolitan Years of Experience: 16 Engineering California & Rehab Wastewater Department (MWWD) Polytechnic State University, Emergency Engineer
San Luis Obispo • County of San Diego Inflow and
Infiltration Study San Diego County CA
• Registered Professional
Geologist 8580 California
• Hydro-Geologist 974 • Antelope Valley Water Bank - Willow California Springs Aquifer Storage and Recharge
Andrew Cherene, PG,
• Master of Science Earth • City of Santa Monica, Olympic Well Field CHG • Wells
Sciences University of • Port of Long Beach - Pier B Pump Station Years of Experience: 14
California, San Diego Upgrade/North Harbor District Storm • Bachelor of Science Earth Drain Improvement
Sciences University of
California, San Diego
HB -373- Item 15. - 160
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
Staff Education and Skill Set Fit Experience
Professional Registration
evleam Member
• Professional Engineer - Civil • Goleta Wastewater Treatment Plant 81123, California Upgrade, Goleta Sanitary District, CA • Master of Science, • Pump/Booster • Edward C. Little Water Recycling Facility James Wang, PE Environmental Engineering, Stations Expansion Design-Build Services, West Years of Experience: 21 University of Windsor, Ontario, • Reservoirs/Tanks Basin Municipal Water District Canada • Pipelines • Project P-1046, Waste Water
• Bachelor of Civil Engineering, Conveyance Marine Corps Base, Camp Civil & Environmental Engineer Pendleton, CA
• City of Huntington Beach - Pipeline
Annual Corrosion Survey
• Engineer in Training, California • Western Municipal Water District - • Bachelor of Science Chemical Nondestructive Condition Assessment Erika Perez, EIT • Corrosion Control/
Engineering California State alternatives for the Mills Gravity Pipeline Years of Experience: 8 Cathodic Protection
Polytechnic University, • Eastern Municipal Water District Pomona - Winchester Recycled Water
Transmission Pipeline Corrosion
Assessment
PROJECT EXPERIENCE AND
REFERENCES
The following references and
associated project descriptions
demonstrate innovative
solutions that may be applied
to your projects' challenges.
These projects represent
successful partnerships
with our clients-reaching
performance goals and
delivering within the required
schedule. For each reference
project, we have included a
project description detailing
the services provided, as well
as an organization contact
name, phone number, and
e-mail address.
07 Item 15. - 161 HB -374-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
Annual Corrosion Pipeline Survey (2013-2017)
City of Huntington Beach, Huntington Beach, CA
HDR has provided condition which included the 6-inch
assessment and corrosion and 12-inch Algonquin Sewer Reference engineering services for the List Stations, two (2) 8-inch City of Huntington Beach's five Welded Steel Pipelines at City of Huntington Beach (5) pipeline systems. Huntington Harbor Channel, Mr. Andrew Ferrigno and the Warner Avenue GCP. 714.536.5511
The five (5) systems, include [email protected] eleven (11) pipelines, 138 Scope of services included
test stations, 34 insulating records review; pipeline
joint (IJ) test stations, 35 condition assessment survey Key Team Members cathodic protection sacrificial of all corrosion monitoring anode beds, and 3 rectifiers. test stations, CP rectifiers, Brien Clark (Project Manager/ In addition to the facilities performing instant Off survey Project Engineer); Erika Perez of all impressed current (EIT)
tested in 2012, HDR included
new facilities that were systems, minor repairs at
subsequently added including rectifiers and corrosion
the Huntington Beach Utility monitoring test stations, maintenance and cleaning of monitoring Slip Lined 30- all CP test stations; provide a Yard, the 12-inch Harbor
Crossing, and the 30-inch inch DIP within the 42-steel written report with findings and recommendations for future
Yorktown Pipeline cathodic pipeline (special CP probes), coordinating with City on corrosion control.
protection systems. In 2017,
the City added five additional locating missing CP test pipelines to the annual survey, stations, and performing minor Mangular Blending Facility (2012)
City of Corona, California Dept. of Water & Power, Corona, CA The City of Corona (City) produce monochloramines for
selected HDR to design the disinfection; and improvements Reference new Mangular Blending to the existing facility blend City of Corona, Dept. of Water Facility which includes a well water with treated water. & Power dual zone Booster Pumping Energy saving components Mr. Vernon Weisman PE Station (BPS) with a total firm are also incorporated such 951.739.4912 capacity of 5000 gpm using as a micro-turbine at the
[email protected]
five pumps (two 100 HP and blending location and solar
three 150 HP). Additional panels on the neighboring dual components include provisions reservoir roofs.
for emergency power; chemical Key Team Members
facilities to inject sodium Steve Friedman (PM); James
hypochlorite and ammonia to Wang (PE)
HB -375- Item 15. - 162
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
P-1045 New Potable Water Conveyance (2012-2015)
Navy Facilities Engineering Command (NAVFAC) Southwest, Camp Pendleton, CA HDR served as Designer-of- • Five separate Horizontal
Record for Project P-1045, Directional Drill locations Reference which included installation under environmental and
(Both Projects: P-1045 and 1046)
of new water conveyance, cultural boundaries and
NAVFAC Southwest
pumping, and storage facilities beneath Caltrans and
Mr. Steve Rosenstein
at Marine Corps Base Camp Railroad rights-of-way with
619.532.1500
Pendleton (MCBCP). The new a total distance of about
[email protected]
facilities provide enhanced 10,000 feet.
infrastructure throughout • Two potable water pumping
the MCBCP. HDR provided stations with capacities of
preliminary and final design, 670,000 gallons per day Key Team Members along with engineering services and 2 million gallons per day Steve Friedman (PM for both during construction. The • 2 MG potable water projects); Amy Omae (Task Lead); project was completed as storage tank Ray Genato (Electrical/I&C); design-build with Filanc as the James Wang (Pump Stations and P1045 contractor. HDR's pipeline design work Pipelines) included alignment design,
The project included: pipeline sizing calculations, design, alignment design, scour analysis, hydraulic multiple horizontal directional • 136,000 feet of 14 and
24-inch HDPE potable analyses, valve location drilling designs, and permit water pipe determinations, trench application support.
P-1046A North Area Wastewater Conveyance (2014-2016)
Navy Facilities Engineering Command (NAVFAC) Southwest, Camp Pendleton, CA HDR also served as Designer- • 7,000 feet of gravity sewer Similar to the P-1045 project, of-Record for Project P-1046A, manhole and pipe capacity HDR's pipeline design which included installation of increase from 8-inch to work for P-1046A included new wastewater conveyance 10-inch; approximately alignment design, pipeline and pumping facilities at 2,500 feet was upsized by sizing calculations, hydraulic MCBCP. HDR provided pipe bursting. analyses, valve location preliminary and final design, • Four new lift stations and determinations, trench design, along with engineering one lift station upgrade with alignment design, and permit services during construction. capacities ranging from application support.
The P-1046A project was 500,000 gallons per day up
completed as design-build to nearly 2 mgd
with Reyes. • Emergency overflow storage
for four lift stations
The project included: • Demolition of existing lift
• 28,500 feet of 6-inch stations and a 1.5 mgd
through 20-inch HDPE wastewater treatment plant.
wastewater forcemain
09 Item 15. - 163 HB -376-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services| Service Category Water Engineering
WRF 4471: Leveraging Data from Non-Destructive Examinations to Help Select Ferrous Water Mains for Renewal (2014-2016) Various Agencies including Los Angeles DWP, United States Reference
Water Research Foundation
(WRF)
Mr. Frank Blaha, Sr. Account
Manager
303.347.6244
Key Team Members
Dave Spencer (Technical Lead);
Dan Ellison (PM); Brien Clark
Under a tailored collaboration • Push-in video/audio probe (Corrosion/Cathodic Protection), effort, HDR recently completed (Wachs Water Service) Eric Scherch (Analyst) WRF Project 4471 with • In-pipe remote field
project sponsors Los Angeles electromagnetic scanning Beginning in May 2015, HDR Department of Water and applied the technologies
• Acoustic velocity pipe wall
Power (LADWP), Seattle Public on mains within the five
Utilities, Fairfax Water, Denver analysis (Echologics)
sponsoring utilities (LA,
Water, and DC Water. The goal • External scanning with
Seattle, Denver, Fairfax, and
of the project is to leverage broadband electromagnetic DC). In the final phase of the
current NDE (Non-destructive tool (Rock Solid)
project, the benefits of the
Examination) technology to Internal scanning with testing were assessed by help determine when select broadband electromagnetic comparing the projected life ferrous water mains should be tool (Rock Solid) expectancies of mains, both renewed. Traditionally, water with and without the field utilities relied on pipeline leak Following data collection of the test data. The differences
and break data to determine technologies, portions of the in confidence provided by when pipeline renewal was mains were exhumed, visually
the various models were
needed. In recent years, several inspected, photographed also assessed.
devices have been introduced and cataloged as to its
that can find structural defects actual condition, including or pinpoint leaks. However, taking corrosion pit and wall the cost of using these tools thickness measurements,
can be relatively expensive and and compared to the NDE the results can be varied. The technology inspection results. project included the testing Initial results showed that 75% of five different inspection of the main had no appreciable technologies side-by-side on corrosion. Only a portion of cast iron main in Los Angeles. unlined pipe dating to 1933 Technologies included: needed to be replaced.
HB -377- Item 15. - 164
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
Water Reliability Study (2014-2017)
Irvine Ranch Water District (IRWD), Irvine, CA
Reference
IRWD
Mr. Paul Cook, General
Manager
949.453.5300
[email protected]
V Key Team Members
Amy Omae (Project Engineer),
John Koreny (QAQC)
Irvine Ranch Water District analysis. With recent findings projects demands supply (IRWD) takes a diligent in climate change research and storage needs based approach to developing a and the projected reliability of on an assumed pattern of reliable and resilient water imported water sources the future climate. Recent climate supply system to serve district needed to reassess its change research and projected its growing community. definition of risk and level of reliability of imported water Assuming that planned capital service expectations to develop resources were incorporated improvement projects are improved and robust mitigation into the analysis. Level of constructed, IRWD has secured strategies. With the potential service expectations were a surplus of water that provides for emergency conditions to be established and mitigation sufficient supply under more severe than historic data strategies developed. This normal operating conditions could predict an updated model analysis provides justification through build-out. Through was required. HDR provided for future operational and the Water Reliability Study, modeling and evaluation of capital water reliability IRWD sought to identify and local and imported water improvements and investments evaluate a variety of drought supply reliability under a from both a local and and emergency scenarios that variety of emergency scenarios. regional perspective. could threaten the IRWD's The comprehensive resource
ability to deliver water to its and supply distribution model customers and put into place simulates and optimizes
a prioritized portfolio of sound deliveries and storage of and cost-effective responses. potable water taking into The Water Reliability Study account hydraulic constraints focuses on IRWD's ability to associated with the delivery maintain a minimum level system. Using an indexed
of service under various sequential Monte Carlo
emergency scenarios based on simulation and 83 years of a rigorous and transparent risk historical hydrology the model 11 Item 15. - 165 HB - 378-
HDR
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services| Service Category Water Engineering
Mesa Water District (Mesa) Pipeline Integrity (2017-2022) Mesa Water District, Costa Mesa, CA
Reference
EDS - Remaining Wall
100% Mesa Water District,
90% Ms. Karyn Igar, PE
80% 949.207.5452
3 70%6 [email protected]
60%
50% Unhealthy Healthy
Remaining
40% Key Team Members
30%
Dave Spencer (Condition
20% Active Active
Corrosion Corrosion Assessment), Amy Omae (PM)
10%
Dan Ellison (PE), Eric Scherch
0%
1 3 6 8 9 (PE), Brien Clark (Cathodic
Protection)
Inner Wall Location Outer
Mesa Water District (Mesa average. Therefore, even Based on the results of this Water) owns 317 miles of though some pipes have been analysis, it was determined water main pipelines. As the operating for over 90 years, that most of the system has system continues to age and it is believed that substantial significant remaining useful deteriorate, investments will portions of the system may life saving approximately $230 be required to sustain desired still have significant remaining million in capital investments. levels of service. In 2013, Mesa useful life. A condition based decision Water completed a Master making process was developed
Plan which used an age- In 2014, Mesa Water began to identify pipeline that collecting and testing water warranted near term renewal based analysis that estimated
approximately $300 million mains using both destructive or more detailed condition and non-destructive assessment. Mesa Water's
of pipeline replacement would
be needed over the next 30 technologies. In 2017, Mesa pipeline testing program was years. Historically, Mesa Water Water hired HDR to: also refined to focus on more has not needed to replace • Estimate the remaining cost effective opportunity considerable quantities of useful life of Mesa condition assessment pipeline. Therefore, such an Water's pipelines based techniques which will save investment level would result on measured pipeline Mesa Water approximately in a significant increase in properties, rather than using $100,000 per year in pipeline water rates. an age-based approach, testing. Over the next four • Identify specific pipes that years, HDR will continue to Mesa Water pipelines have work with Mesa Water to
require replacement, and
performed well with break refine the Pipeline Integrity • Continuously refine
rates similar to other water Program to focus limited
the testing program to
systems in Southern California resources on the right pipe, and approximately four times provide the most value to
the ratepayers at the right time, using the
better than the national right technology.
HB -379- Item 15. - 166
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category Water Engineering
UNDERSTANDING AND closely with City staff to drinking water projects as METHODOLOGY conduct corrosion assessment HDR's Southern California The City of Huntington Beach surveys on the City's existing Water Market Sector Leader. (City) serves over 200,000 cathodic protection system
Steve is based locally in the
residents with safe and reliable and recommend corrosion drinking water. The City's protection work to maintain HDR Irvine office, which is potable water infrastructure distribution system integrity. only 17 miles from the City's In these surveyed areas, we office. As the Project Manager, consists of groundwater wells,
he will oversee a team of task
storage reservoirs, pump are familiar with your existing system, pipe condition, and leaders to effectively manage stations, pressure regulating
the as-needed engineering
facilities, and about 500 miles potential work needed to begin services required by the City.
of pipeline. New groundwater right away.
Steve has managed large
wells are being constructed to
increase the City's available HDR has a proven design teams from planning, track record of design, and construction.
drinking water supply. Existing
providing custom He is an experienced Project
storage and pressure regulating
and collaborative solutions to Manager and devoted to
facilities as well as the pipeline
complex projects. We will work providing a quality product distribution system must be
closely with City staff to ensure by implementing necessary maintained, upgraded, and if
the correct and efficient action quality assurance procedures necessary, replaced.
is implemented. The City will for successful delivery.
The majority of the City's pipe furnish a task order or scope of work request for each project, Based on our experience with distribution system is asbestos other as-needed contracts, cement (AC) material that is and HDR is prepared to start over 50 years old, portions of immediately upon your Notice we understand that projects which are buried in corrosive to Proceed. We have assigned can vary widely in size, one of HDR's most capable complexity, and scope.
soils below sea level and in
contact with saltwater. The Project Managers, Steve Our approach, effort, and fee will reflect the need for
condition of the City's aging Friedman, PE, to lead this pipelines should be assessed to effort. He has worked on past flexibility. Close coordination and communication with the
determine whether it needs to as-needed engineering
be rehabilitated or replaced. For contracts and has extensive City and the project team is experience on a variety of required for successful delivery the past 6 years, HDR's worked
Steve Friedman, PE, PMP, BCEE Steve Friedman has
Project Manager and Point of Contact personally always done the utmost to provide excellent
With 24 years of experience, Steve brings the following client service. His organized, benefits to the City: straightforward approach
• Led A&E teams in the planning and design of over and responsiveness to requests have been a cornerstone to his performance.
$250M worth of water infrastructure
His assistance with our public outreach
• Designed 50 miles of pipeline ranging between 6-inches program really made a difference in and 66-inches in diameter. advancing a high profile project. / • Career emphasis in the heavily-urbanized areas of personally look forward to working Southern California with Steve on other projects in the near future."
• Managed nearly 20 water system and conveyance - Erik Jorgensen, PE design projects Eastern Municipal Water District
Senior Civil Engineer
Item 15. - 167 HB -380-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category HDR Water Engineering
a clear, direct understanding. Pipeline Integrity Program.
Define Objectives
Review Project Documents She has also been involved
1 Understand Project Steve will then identify the
Meet with District Statf in the design of several
Define Objectives appropriate Task Order
pump stations and pipelines.
Right Team/ Task Order Manager Manager, technical staff, and Right Solution LeProject Leverage Resources for • James Wang, PE (Irvine, QA/QC team members. We
Proven Approach to Develop Work Plans CA) has managed several will develop a detailed task
order scope, schedule, and fee projects and been the lead Execution and Delivery
that are understandable and designer to rehabilitate
Quick Response to Unique Tasks
Design/Modeling/CADD/Construction Services several pump stations Clear Communication achievable. Our scope of work
assumptions will be discussed and develop design
Track and Review with the City's project manager plans, specifications, and Real Time Budget & Schedule
Look Ahead Milestones to so that deliverable and cost estimates (PS&E) Quality Reviews
Issue Resolution performance expectations are documents for pipelines, Review and Learn transparent and agreed upon. groundwater wells, and Lessons Leamed
5 Client Report Card Schedule is often critical to storage reservoirs.
Team Meetings
Document and Distribute Best Practicess fast-tracked projects and a • Brien Clark, PE (Claremont,
detailed project schedule will
Work plan for task orders. CA) has familiarity with the be prepared for each task order
City of Huntington Beach.
of any task order, particularly in a format acceptable to the City to complete projects on He has worked on projects
multi-disciplinary projects.
with the City including the
We believe it is important to time and within budget. The Yorktown Transmission
have those who will ultimately task order proposal will be Main Rehabilitiation and
own and operate the facilities submitted to the City for review is currently working with
to be involved in the project and negotiated to finalize the the annual corrosion
during its development. Our scope, fee, and schedule.
assessment surveys along
methodology to address
For as-needed task orders, side Erika Perez, EIT
and execute each task order
flexibility and adaptability (Claremont, CA)
will follow the work plan
is critical for successful
shown above. • Dave Spencer, PE (San
execution. Our team includes
professionals locally-based Diego, CA) is a contributing We have extensive
author for American
experience with in southern California with
Water Works Association
performing multiple, a wide range of experience
(AWWA) M77: Condition
simultaneous task and qualifications that are
Assessment of Water Mains
orders for on-call contracts. dedicated to providing high- and a technical lead for
Upon receipt of each task level service and being
Water Research Foundation
order, our Project Manager, responsive to your needs. A (WRF) studies on condition
Steve Friedman, will meet with few of the key team members assessment for metallic and
the City's key stakeholders to are identified.
asbestos cement pipe.
understand the needs, drivers,
• Amy Omae, PE (Irvine,
schedules, and issues related to • Andrew Cherene, PG,
CA) is currently managing
the task order to clearly define CHG (Long Beach, CA)
a project for the City's
the project objectives. For small has effectively managed neighbor, Mesa Water
projects, this may several drilling programs and
District, to determine
accomplished with a phone call designs for installation of the remaining useful life
or a few email exchanges. For groundwater wells and test of their existing pipeline
more complex tasks, in-person water supply wells.
meetings are generally best for infrastructure as part of the HB -381- Item 15. - 168
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Service Category HOR Water Engineering
Each proposal will At each project kick-off exceed expectations. Our identify those meeting, we will identify intent is to remain with the individuals that will relevant stakeholders, review project until its implementation be made available to procedures and design and beyond so that we confirm the City for the duration of requirements, and establish the work was successfully each task order. Our team will clear lines of communication delivered. Our commitment to be tailored to each task order and authority. During project your project and involvement to optimize efficient execution execution, HDR staff will through its development and and successful completion. be present for all necessary implementation will allow us to Steve will assign Task Order meetings and prepare address any issues or Managers, who will identify the detailed notes, progress discrepancies that should arise needed skills and obtain the reports, and interim work in design, construction, commitment from team products as required. All or operation. members, including specialized deliverables will be reviewed Example scopes of work
subconsultants, to prepare an by HDR's independent QA/
are shown in the figure
organizational chart for QC team to verify accuracy
approval by the City's and completeness prior below for typical task orders to submission to the City for engineering services
project manager.
for review. provided during planning/
preliminary design, design,
HDR strives to and construction.
provide the City with
excellent service and
EXAMPLE SCOPE OF WORK FOR TYPICAL TASK ORDERS
Our task order scope of services For a design project, a typical • Easement Acquisition are detailed and thorough, outlining scope of work may include the and Permitting exactly what will be accomplished. following tasks: • Bidding Assistance • Preparation of As-Built Drawings
A typical outline for a preliminary • Project Management and Meetings For a construction management
design report may include:
• Survey Work or engineering services during
• Basis of Design (Design Criteria) • Basemap Preparation: datum, construction project, a typical
• Preliminary Alternatives basis of bearing, utility locations, • Identify Potential Major scope of work may include the potholing, right-of-way following tasks:
Utility Conflicts • Geotechnical Investigation
• Identify Traffic and (provided by the District) • Project Management and Transit Concerns • Environmental Documentation
Construction Progress Meetings
• Identify Construction Concerns
• CEQA Process (provided by the • Bidding Assistance
• Identify Local Agency and District) • Inspection
Stakeholder Concerns • Stormwater Pollution Prevention • Field Engineering • Pipeline Material Selection Plan & Permitting • Submittal Reviews • Identify type of specifications • Preparation of Contract Drawings • RFI Responses • Construction Methods • Change Order Review
and Specifications for 30%, 60%,
• Environmental Concerns • As-Built Development
90% and Final Plans
• Schedule • Coordination with Stakeholders • O&M Manuals • Preliminary Construction and Local Agencies • Warranty Inspection Cost Estimate
15 Item 15. - 169 HB -382-
Appendix:
Addendum 1
(Acknowledgement)
Key Staff
Resumes
HB -383- Item 15. - 170
City of Huntington Beach
Public Works Department
2000 Main Street
Tel. (714) 960-8820
ADDENDUM NUMBER ONE
For
RFQs - Water, Plan Check, Ocean, Architectural, Transportation, Construction Management, Materials, Civil
in the
CITY OF HUNTINGTON BEACH
November 29, 2017
Notice To All:
City of Huntington Beach has extended the due date from January 4, 4:00 pm 2018 to January 11', 4:00 pm 2018 for eight (8) Request For Qualifications (RFQ) for various rofessional services (Water, Plan Check, Ocean, Architectural, Transportation, Constructior Management, Materials, Civil)
This is to acknowledge receipt and review of Addendum Number One, dated November 29, 2017.
HDR Engineering, Inc
Company Name
01/09/2018
Date
All bidders must acknowledge and include the receipt of this Addendum with your RFQ packages.
CC1392, Addendum No. 1 Page 1
Item 15. - 171 HB -384-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix: HDR Service Category A. Water Engineering
Steve Friedman, PE, PMP, BCEE
Project Manager, Point of Contract
Steve has 22 years of experience in engineering planning and design of water, recycled water, industrial waste, and wastewater facilities. His background includes a variety of project types that consist of transmission and distribution system piping, wastewater treatment plant upgrades, pumping stations, pressure control stations, and water treatment. He has provided a wide range of services during construction including office engineering, observation and construction management
EDUCATION
Master of Science, Civil
His project management skills have been honed through the successful Engineering, University
delivery of multidiscipline infrastructure projects in southern California and of California at Berkeley,
across the US - he is one of HDR's most experienced project managers. 1994
He will provide consistent guidance to HDR project teams, and manage Bachelor of Science, Civil
the overall contract to deliver on the scope objectives while maintaining Engineering, University
of California at Berkeley, schedule and budget.
1993
RELEVANT EXPERIENCE
REGISTRATIONS
Professional Engineer - Metropolitan Water District, Water City of Corona Department of Civil, California, United Treatment and Pipeline On-Call Water and Power, Mangular States, No. 055566 Services, Los Angeles, CA Blending Facility, Corona, CA Project Management Project Manager. Steve has Project Manager. Designed Professional, California, managed this on-call contract for a new 5,000 gpm dual zone United States, No. Metropolitan since the end of 2013. booster pumping station, which 293170 Since that time, he has selected included a building to house Risk Assessment the appropriate project team and 1060- and 1220-Zone pumps, Methodology for Water, managed the contract for four and emergency generator, site California different task orders. He is currently security, chemical facilities PROFESSIONAL the project manager for one task to inject sodium hypochlorite MEMBERSHIPS order; providing UPS replacement and ammonia to produce California Water at all five Colorado River Aqueduct monochloramines for disinfection, Environment Association blending station improvements, and Pumping Stations.
Water Environment noise abatement. Energy saving
NAVFAC Camp Pendleton, P-1045:
Federation components were incorporated,
New Potable Water Conveyance
American Water Works which included a micro-turbine
On-Board Marine Corps Base, San
Association, Water Reuse Diego, CA at the blending location and solar Committee/Secretary panels on the neighboring dual
Project Manager. This projects
WateReuse Association connect the north and south base reservoir roofs. systems to increase the overall City of Newport Beach, Industrial reliability of the MCB Camp Way Water Transmission Main Pendleton water systems. The Replacement, Newport Beach, CA project is comprised of over 31 Managed the routing study, miles of new pipelines, 3 pumping design, bidding, and construction stations, and a storage reservoir. engineering services for the replacement of a 2,000 linear feet
HB -385- Item 15. - 172
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
STEVE FRIEDMAN (CONTINUED)
(LF) of 14-inch-diameter water main of Newport Beach, City of Irvine, located in Industrial Way between and several other consulting firms.
Superior Avenue and Newport Developer driven schedules required Boulevard, and a 30-inch-diameter three separate bid packages that water main that traverses the city's further complicated the project. The general services department. The total estimated construction cost two existing water mains were for this project is approximately $9 replaced with a single 36-inch- million.
diameter water main within the Poseidon, Carlsbad Desalination Caltrans and City of Costa Mesa Plant Intake Facilities Preliminary public street right-of-way. The Design, Carlsbad, CA
project also consisted of designing Project Manager. Steve oversaw a new 8-inch-diameter water main a diverse design team to prepare to connect from the replaced water preliminary design and contract main to an existing water main. documents for design build City of Pomona, Perchlorate procurement of the Carlsbad Treatment System, Pomona, CA Desalination Plant's new intake Project Manager. Managed facility. It consists of a new 198 the design, construction, start mgd (368 cfs) water pumping up, acceptance testing and station, modifications to the permitting assistance for a 16.6 existing 127 mgd (235 cfs) process MGD perchlorate anion exchange water pumping station, a new treatment plant. Design included fish screening structure with a providing intermediate pumping 1,000 feet long 24-inch diameter to deliver the finished water to fish return pipeline, and two large Reservoir 6, redundancy of process diameter pipeline designs: 500 feet equipment, security for the facility, of 72-inch pipeline and 100 feet and incorporation of the system of 84- inch pipe. Special features operation into the City's SCADA include a shoring design for deep network and with the existing AEP excavation and high groundwater, processes. an electrical building for the 1,000
Irvine Ranch Water District, IRWD- horsepower pumping system, Shady Canyon Offsite Pipelines ingress/egress modifications to the (Bonita Canyon), Irvine, CA existing plant, and environmental.
Project manager for design, bidding, The team also prepared twenty and construction engineering conceptual alternatives under client services for four miles of 24-inch- direction for permitting approval in accordance with the Ocean Plan
diameter and one mile of
36-inch-diameter recycled water Amendment.
transmission mains, two miles of
16-inch-diameter domestic water
transmission main, and a half mile
of 15-inch-diameter sewer line. The
design required close coordination
with The Irvine Company, City
19 Item 15. - 173 HB -386-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
Amy Omae, PE, LEED AP
Task Order Manager
Amy is a proven project manager with extensive experience in water and wastewater master planning, design, and engineering services during construction projects throughout Southern California. Her expertise is in the design of treatment plant processes, pipeline alignments, mechanical pumping systems, pilot testing and research, alternative technology evaluations, mass balance and financial model development, data analysis EDUCATION for technically based local limits, quality assurance, and field engineering Master of Science, services during construction.
Environmental
Engineering (Civil RELEVANT EXPERIENCE
Engineering with cultural boundaries and beneath
NAVFAC P1046 North Area Waste
Environmental Emphasis),
Water Conveyance Project Design Caltrans and Railroad rights-of- University of Miami,
and Construction Services, Camp way with a total distance of about 2006
Pendleton, CA 10,000 feet, four new lift stations
Bachelor of Science,
Responsible for the design of and one lift station upgrade with Chemistry (Chemistry
and Environmental Health the Tributary Area Pump Station capacities ranging from 500,000 Science), University of 9 (TAPS9), decommissioning gpd up to nearly 2 mgd, emergency Miami, 2004 and demolition of the Sanitation overflow storage for four lift Treatment Plant 9 (STP9), and stations, demolition of existing lifts
REGISTRATIONS
Professional Engineer - QA/QC review. HDR served stations and a 1.5 mgd wastewater Civil, California, United as Designer-of-Record for the treatment plant.
States, No. 76824 installation of new wastewater Irvine Ranch Water District, Water LEED Accredited conveyance, pumping, and storage Supply Reliability Evaluation, Professional, United facilities at Marine Corps Base Irvine, CA States National Camp Pendleton (MCBCP) in San Project Engineer. Prepared a Water Registration, No. Diego. The new facilities provide Supply Reliability Evaluation report 10328834 enhanced infrastructure to convey
for the Irvine Ranch Water District
PROFESSIONAL increased sewage flows throughout (IRWD). HDR evaluated several MEMBERSHIPS the camp and convey wastewater potential future water supply American Society of to the Southern Regional Tertiary scenarios. Provided modeling and Civil Engineers (ASCE), Treatment Plant (SRTTP). HDR
evaluation of local and imported
Associate Member,
provided preliminary and final water supply reliability under a 2007-2017
design along with engineering variety of emergency scenarios Water Environment services during construction. The
based on a rigorous and transparent
Federation, Member, P-1046A project includes 28,500
probability of risk analysis. Recent
2011-2017
feet of 6-inch through 20-inch climate change research and Asian American HDPE wastewater force main, 7,000
projected reliability of imported
Architects / Engineers feet of gravity sewer manhole and water resources were incorporated
Association (AAa/e),
pipe capacity increase from 8-inch into the analysis. Level of service Member, 2014-2017
to 10-inch, approximately 2,500 expectations were established and WateReuse, Member, feet is upsized by pipe bursting, five mitigation strategies developed.
2015-2017
separate Horizontal Directional Drill
locations under environmental and
HB -387- Item 15. - 174
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
AMY OMAE (CONTINUED)
Mesa Water District, Pipeline design, and field engineering. HDR Integrity Testing Program, Costa performed the conceptual design, Mesa, CA preliminary design, and final
Responsible for managing the design, and provided engineering overall project and defined tasks services during construction of for this as-needed consulting the Michelson Water Reclamation services contract. Mesa Water Plant Phase 2 expansion to 33 mgd.
District performed an age-based Improvements included influent assessment for over 300 miles sewers, headworks, expansion of water distribution piping, of the primary sedimentation which resulted in an estimated tanks, new primary effluent replacement cost of $300 million pumping station and flow control, within the next 30 years. Because modified flow equalization basins, their break rates were not consistent secondary treatment expansion with this forecast, HDR was with membrane bioreactors
selected to assist Mesa Water in the (MBR), new high-rate clarifier determining the remaining useful to treat filter backwash, effluent life of their water main pipeline by filtration, new ultraviolet (UV) evaluating historical data, identifying disinfection system, reclaimed water the appropriate test methodology, pumping, modifications to chlorine and continuously refining the testing contact basins, chemical feed program to focus Mesa Water's systems, new pumping and other rehabilitation and replacement ancillary facilities, and electrical efforts and provide the most value modifications.
to customers. The scope expanded City of San Mateo, Clean Water to include performing a survey of Program, Nutrient Removal and the cathodic protection system and Wet Weather Flow Management a close-interval survey. Upgrade and Expansion Project, Irvine Ranch Water District, San Mateo, CA
Michelson Water Reclamation Project Engineer and DUCT Design Plant Phase 2 Expansion, Design Lead. Responsible for design of and Engineering Services During the dual use contact tank and flow Construction, Irvine, CA split structure and assist the design Responsible for developing the of the biological nutrient removal financial model to evaluate biosolids (BNR) system. HDR performed and sludge handling alternatives the conceptual design and is in analysis, design of the agitation the process of developing the aeration distribution system for preliminary design and final design the influent junction structure, of the San Mateo/Estero Municipal headworks, primary splitter box, Improvement District (EMID) and primary distribution channel, Wastewater Treatment Plant. managing and performing QA/QC
review of submittal reviews and
requests for information (RFls),
change orders, civil site grading
21 Item 15. - 175 HB -388-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix: HDR Service Category A. Water Engineering
Brien Clark, pe
Task Manager, Corrosion Control/Cathodic Protection Lead Brien Clark is the Manager of Technical Services for HDR Engineering, Inc. He has been with HDR Engineering since 2000. Brien has performed condition assessments, external direct assessments, failure analyses, soil corrosivity studies, water aggressivity studies, cathodic protection surveys, cathodic protection/corrosion control designs, and construction checkouts.
EDUCATION RELEVANT EXPERIENCE
Bachelor of Science
City of Huntington Beach, were energized and the pipeline had - Chemical Engineering,
Yorktown Transmission Main polarized to verify the effectiveness California Polytechnic
University, Pomona Rehabilitation - 30" of the impressed current cathodic Project Manager/Project Engineer. protection systems. Troubleshooting
REGISTRATIONS
The project entailed the installation with respect to unusual potential State of California,
Professional Chemical of corrosion test stations, three fluctuation was also investigated for Engineer - #6291 impressed current cathodic stray current activity. protection deep wells and rectifiers, City of Huntington Beach | Annual State of Arizona,
Professional Chemical pipeline internal and external joint Corrosion Survey, Huntington Engineer - #48417 bonding, and electrical isolation Beach, CA State of Idaho, joints for an existing 30-inch cement Cathodic Protection Design mortar lined and coated (CML&C) Reviewer. HDR provided condition Professional Chemical
Engineer - #15476 steel water transmission main. assessment and corrosion State of New Mexico, Technical construction management engineering services for the City of Professional Chemical services were provided including Huntington Beach's five (5) pipeline Engineer - #21879 interpreting design document systems. The five (5) systems, intent for the City, responding to include eleven (11) pipelines, 138 NACE International
Cathodic Protection contractor RFls and RFCs, and test stations, 34 insulating joint Technologist СP-3 performing construction witnessing (I) test stations, 35 cathodic #17978 and check-out testing. Field testing protection sacrificial anode beds, Cathodic Protection included performing electrical and 3 rectifiers. In addition to Specialist CP-4 #17978 continuity measurements along the facilities tested in 2012, HDR the pipeline; witnessing and testing included new facilities that were Cathodic Protection
the installation of the cathodic subsequently added including the Interference
protection systems including deep Huntington Beach Utility Yard, the NCCER Corrosion
well drilling, anode conformance 12-inch Harbor Crossing, and the Prevention Field
and inspection, cable inspection, 30-inch Yorktown Pipeline cathodic Technician 1
anode loading, well logging, and protection systems. Scope of NCCR Abnormal
rectifier installation and testing; services included records review; Operating Conditions -
confirming the installation and pipeline condition assessment Field Ops
effectiveness of electrical isolation survey of all corrosion monitoring devices; performing a pipe-to-soil test stations, CP rectifiers, potential survey of existing test performing instant Off survey of stations to establish a potential all impressed current systems, baseline; and performing a pipe-to- minor repairs at rectifiers and soil potential survey after rectifiers
HB -389- Item 15. - 176
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
BRIEN CLARK (CONTINUED)
corrosion monitoring test stations, wells, influent pump stations, grit monitoring Slip Lined 30-inch DIP chambers, diversion structures, within the 42-steel pipeline (special primary clarifiers, secondary CP probes), coordinating with clarifiers, digesters, aeration basins, City on locating missing CP test and various process piping across stations (16 each), and performing the five treatment facilities. Mr. minor maintenance and cleaning Clark is the contract manager and of all CP test stations; provide a has served as the project manager written report with findings and on the majority of the task orders to recommendations. date. He is also the quality reviewer
City of Huntington Beach | Feeders and engineer of record for the final OC-9 and OC-35, Huntington reports.
Beach, CA Lower Busch Tank Cathodic
Project Manager, Project Protection Design, Los Angeles Engineer. The two pipelines were Department of Public Works approximately 53 and 43 years (LADPW), Malibu, CA.
old, respectively. Feeder OC-9 is Contracted through the tank a 14- to 30-inch diameter cement designer, Cannon Corporation, mortar lined and coated (CML&C) services provided included cathodic steel, PVC, and ductile iron pipeline, protection design to protect the running approximately 46,000 feet interior of a proposed welded (8.72 miles). Feeder OC-35 is a 27- steel 0.47 MG water reservoir. to 36-inch diameter CML&C Steel Deliverables included plan, pipeline, running approximately elevation, and detail drawings, and 31,300 feet (5.93 miles). HDR a technical specification. Design provided recommendations for Reviewer.
controlling corrosion on the two Southeast Water Reliability Project pipelines based on documentation (SWRP), Central Basin Municipal provided by the city. Water District (CBMWD), Pico
Inland Empire Utilities Agency Rivera, CA.
District | As-Needed Corrosion This project entailed the design Assessment Services, Chino, CA of approximately 70,000 linear Contract/Project Manager. The feet of 42-inch diameter recycled Inland Empire Utilities Agency water transmission pipeline and (IEUA) is a regional wastewater booster pump station. Corrosion- facility in southern California related deliverables included a that operates five regional plants 30% pre-design report, cathodic and processes 60 mgd. HDR protection calculations, plan and was selected as a consultant to detail sheet drawings, and technical provide corrosion assessment specifications. Report Reviewer and services as-needed on this 5-year Design Reviewer.
contract. Since inception, condition
assessments have been conducted
on numerous headworks, wet
23 Item 15. - 177 HB -390-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix: HDR Service Category A. Water Engineering
Dan Ellison, Pe
Task Order Manager
Dan has gained national and international recognition as an expert on pipe assessment, rehabilitation, and trenchless construction, having authored several books on the subject.
He is the former Chair of the Water Main Rehabilitation Committee of AWWA. Dan has managed groups with more than 40 employees and programs with annual budgets up to $40 million. Projects have ranged from record-setting trenchless river crossings, to published research, to power plant retrofits, even a fish ladder. This diversity of projects along with superior management skills of people and programs make Dan tremendously EDUCATION flexible and creative. With more than 35 years of civil and structural engineering Master of Business experience, Dan has design and construction experience in both the energy and water Admin, Finance, supply fields on projects ranging to the multi-billion dollar range.
University of Southern
California (USC), 1994 RELEVANT EXPERIENCE
Bachelor of Science, Civil Otay Water District, Annual to gather review and validate all Engineering, University of Corrosion Surveys San Diego, available data and update the Utah, 1981 California existing CCTV Tool Box. Other tasks Bachelor of Arts, English The OWD has an ongoing Cathodic performed included preparation Language & Literature, Protection (CP) Program. The of a condition assessment work University of Utah, 1978 program consists of monitoring plan field data collections and REGISTRATIONS and maintaining 60 separate preparation of a repair/rehabilitation Structural Engineer, pipelines and 29 reservoirs as and replacement (R&R) action plan California, US, #S3020 well as providing design services that included a comprehensive Professional Engineer for future projects. As part of the financial analysis projected timeline - Civil, California, US, Scope of Work HDR is responsible and cost estimate for each pipeline #C38094 for repairing cathodic protection implementation.
PROFESSIONAL systems having deficiencies on 29 City of Buena Park, Pipe Criticality MEMBERSHIPS steel reservoirs.
Assessment Buena Park, California
American Public Works
City of San Diego, California, As- The city was concerned about the Association (APWA),
Needed Engineering Wastewater system's remaining useful service Member
Facilities Condition Assessment life and was interested in developing American Society of
San Diego, California a plan for future replacement of
Civil Engineers (ASCE)
Provided as-needed corrosion their distribution piping. HDR Member
engineering and condition conducted a criticality assessment American Water
assessment services for city's sewer of the city313436s asbestos Works Association,
pipeline system which includes concrete (AC), ductile iron, and steel California Nevada,
Pipeline Rehabilitation pipelines ranging from eight-to pipes to prioritize assets requiring Committee, Former Chair 120-inches in diameter force mains immediate attention by means of and trunk sewers. Task orders have replacement or repair. Over 40 American Water Works
included a rigorous evaluation of percent of the existing pipelines Association, Member
the consequence of failure and a were over 50 years old, with the American Water
thorough analysis of the likelihood oldest in service for approximately Works Association,
of failure combining both field 65 years. HDR performed analysis National AWWA, Water
Main Rehabilitation condition data and statistical of available break data and Committee, Former Chair analysis. Work included the use of compared to industry norms, field closed circuit television (CCTV) corrosion survey, and acoustic velocity testing.
HB -391- Item 15. - 178
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix: HDR Service Category A. Water Engineering
DAN ELLISON (CONTINUED)
Long Beach Water Department, Water Denver Water Los Angeles Sewer Lift Station S-1 Claremont, Department of Water and Power Los Angeles, California Fairfax Water and Seattle Public HDR was selected by Long Beach Utilities.
Water Department to provide WRF 4034 Failure of Pre-stressed engineering design and bid/ Concrete Cylinder Pipe
construction phase services for the Dan characterized PCCP failure S-1 Sewer Lift Station Rehabilitation rates in the U.S. investigating the project. Work includes numerous past 65 years. The research used lift station improvements an actuarial approach to PCCP needed to address issues with pipe segments and identified and structural mechanical electrical predicted based on manufacturing and instrumentation components installation and design dates address the current condition portions of the population that have of SLS S-1 develop rehabilitation the highest likelihood of failure. alternatives and develop plans and In addition the project developed specifications to implement the a general evaluation matrix to rehabilitation and construction help utilities identify prestressed bidding assistance through contract concrete cylinder pipe (PCP) with award. the highest risk of failure in their
Western Municipal Water District, systems.
- Nondestructive Condition Tahoe Keys Property Owners
Assessment alternatives for the Association, Water Distribution Mills Gravity Pipeline Claremont, Piping Condition Assessment Los Angeles, California South Lake Tahoe, El Dorado,
Nondestructive Condition California
Assessment (NDA) for Western The purpose of this project is to Municipal Water District (Western) provide waterline assessment of AC on the Mills Gravity Pipeline and galvanized iron pipe at four of (MGL) to determine existing and the worse anticipated locations in probable future conditions develop the system to determine pipeline rehabilitation plans to reduce failure condition. HDR expects to conduct risks (if determined needed) to a series of laboratory and field tests maximize the life of the MGL. to determine the corrosivity of the Water Research Foundation, WRF soil and transported water and 4471 Leveraging Data from Non- the remaining strength of the pipe Destructive Examinations to Help material in the distribution system Select Ferrous Water Mains for by evaluating the mechanical Renewal Denver, Colorado, strength and the depth of
The objective of this project is to deterioration to the pipe wall. demonstrate that NDE can be used
cost effectively on some mains
and the results can be used to infer
the condition of similar mains.
Tailored Collaboration partners: DC
25 Item 15. - 179 HB -392-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
James Wang, PE
Pump/Booster Stations, Reservoirs/ Tanks
James has more than 21 years of experience with municipal and industrial wastewater treatment, water treatment, mechanical pumping systems including storm, potable, irrigation and wastewater; water distribution and sewage collection, contaminant fate during sewage treatment, water quality modeling and AutoCAD 2012. In addition, James is proficient in innovative and cost effective design with operations a top priority. He is adept at coordinating project plans with multiple disciplines and consultants.
EDUCATION Other responsibilities include field engineering, supervision and monitoring, Master of Science, particularly for pump stations, sewer lift stations and water quality testing.
Environmental
Engineering, University
of Windsor, Ontario, RELEVANT EXPERIENCE
Canada, 2004 City of Corona Department of (160hp, 2.0 MGD capacity; 60hp, Bachelor of Civil Water and Power, Mangular 1.4 MGD capacity; and 225 hp, 5.0 Engineering, Civil & Blending Facility, Corona, CA MGD capacity; a new three million Environmental Engineer, Project Engineer. Designed the gallon capacity AWWA D-110 Type 1997 new Mangular Blending Facility Ill pre-stressed concrete reservoir; REGISTRATIONS which includes a dual zone Booster and a new pressure reducing Professional Engineer - Pumping Station with a total firm station.
Civil, California, United capacity of 5,000 gpm using five Project P-1046, Waste Water
States, No. 81123
pumps. Additional components Conveyance Marine Corps Base, NASSCO Pipeline include provisions for emergency
Camp Pendleton, CA
Assessment and power; chemical facilities to inject
Design Manager. HDR served as
Certification Program, sodium hypochlorite and ammonia
United States National Designer-of-Record for Project
to produce monochloramines for P-1046, installation of new waste Registration, No. U-1114-
disinfection; and improvements to water conveyance, pumping, 06022800
the existing facility blend well water and emergency overflow storage NASSCO Manhole
with treated water. facilities at Marine Corps Base
Assessment Certification
Program (MACP), P-1045: New Potable Water Camp Pendleton (MCBCP). Project United States National Conveyance On-Board Marine P-1046 includes approximately Registration, No. U-1114- Corps Base, San Diego, CA 30,000 linear feet of high density 06022800 Design Manager. HDR served as polyethylene (HDPE) pipeline Designer-of-Record for Project ranging from 4-inch to 10-inch; P-1045, installation of new potable five lift station 120hp, 4.6MGD water conveyance, pumping, capacity; 120hp, 3.2 MGD capacity; and storage facilities at Marine 75hp, 1.5 MGD capacity; 30hp, Corps Base Camp Pendleton 1.0 MGD capacity and 20 hp, 0.3 (MCBCP). Project P-1045 includes MGD capacity; a new emergency approximately 99,400 linear feet overflow storage structure. of 24-inch nominal diameter high
density polyethylene (HDPE)
pipeline; 26,600 linear feet of
14-inch nominal diameter HDPE
pipeline; three pumping stations
HB -393- Item 15. - 180
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
JAMES WANG (CONTINUED)
Mountain House Development HDR modified the headworks,
Tank and Booster Pump Station, upgraded the treatment plant to Mountain House, CA full secondary standards using
Project Engineer. Designed two twin a trickling filter/activated sludge
3.7 MG concrete tanks and a multi- system, designed a new blower zone multi-pump water booster building, expanded secondary pump station. The facility was sedimentation capacity, designed required as part of the community's for new flow equalization, and master water plan and provides designed a new thickening and pressure stabilization potable and dewatering building. Design also emergency storage and inter-zone included site/civil work, paving and pressure regulation. The dual-zone grading. The improvements expand pump station allows water from the capacity of full treatment to either storage tank to be boosted approximately 9 mgd.
into either of two pressure zones. Edward C. Little Water Recycling Chemical injection facilities located Facility Expansion Design-Build within the facility automatically Services, West Basin Municipal maintain chlorine residuals within Water District, El Segundo, CA. the tanks as well as water entering Conducted a feasibility study and the distribution system. The facility provided engineering to support serves both planned residential design-build services to increase development and the Delta the capacity of barrier water to 12.5 Community College. mgd total capacity and increase
City of Lathrop Tank and Booster the capacity of Title 22 water to Pump Station, Lathrop, CA 40 mgd. Phase IV improvements Project Engineer. Designed a new included upgrades and expansion
3.6 MG welded steel water storage • of the Title 22 treatment system, tank and booster pump station solids handling system, chemical servicing the Central Lathrop systems, microfiltration treatment Specific Planning (CLSP) area. The system (includes a new 10.8 mgd pump station consisted of multiple microfiltration system), reverse VFD controlled pumps with a osmosis treatment process,
domestic capacity of up to 5,500 ultraviolet (UV) disinfection gpm. In addition the station features treatment system, and site. Title 22 a 2,500 gpm NFPA 20 certified treatment system improvements fire pumping system. The station included demolishing the has a PLC based remote telemetry flocculation basins, constructing a and SCADA control system with 20 mgd high-rate clarifier, extending automated chlorine residual control. the Title 22 treatment train No. 1 Project Engineer. conventional gravity filter gallery,
Goleta Wastewater Treatment adding two chlorine contact basins, Plant Upgrade, Goleta Sanitary and adding two medium voltage District, CA. variable frequency drives (VFDs) on
After preparing the preliminary the Title 22 product water pumps. design report and validation study,
27 Item 15. - 181 HB -394-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
Dave Spencer, PE
Condition Assessment and Rehab
David Spencer developed and implemented asset management programs encompassing over 60,000 miles of pipelines in the U.S. David specializes in developing and implementing practical results-oriented programs for aging water, recycled water, and wastewater infrastructure. He is adept in interacting with all levels of a utility organization from field staff to management. David is currently engaged in the evaluation of several emerging condition assessment technologies including acoustic testing, EDUCATION non-destructive examinations, an ASCE Manual of Practice, and other Water Bachelor of Science Civil Research Foundation projects. Proficient in ESRI and Microsoft analytical Engineering California tools, David has supported many high performing utilities in building and Polytechnic State refining asset management practices including the Cities of San Diego, University, San Luis Poway, Vista, Phoenix and Honolulu, Vista Irrigation District, Los Angeles Obispo Bureau of Sanitation, Johnson County Wastewater, and Seattle Public Utilities.
REGISTRATIONS
Professional Engineer
RELEVANT EXPERIENCE
C66885 California
Water Research Foundation, WRF 2016 Comprehensive Sewer 4471, Leveraging Data from Non- Management Plan, City of Vista, Destructive Examinations to Help CA.
Select Ferrous Water Mains for David is developing an asset Renewal, Denver, CO. management program and plan that
The objective of this project is to will close gaps in the asset registers demonstrate that NDE can be used for GIS/Cityworks/Pipelogix/ cost effectively on some mains, and hydraulic model. David will identify the results can be used to infer the likelihood and consequence of condition of similar mains. failure for asset risk, replacement Mesa Water District Pipeline costs, renewal prioritization, and evaluation of levels of service and
Integrity, Costa Mesa, CA.
Technical Lead. Scope of work for associated levels of investment.
David will conduct workshops with
the project included estimating
the remaining life of the pipelines operations staff on best practices based on measured pipeline and SOPs. The results of asset properties, identify specific pipes management analysis and asset that require replacement, and refine information will be coordinated with GIS staff for inclusion in appropriate
the testing program to provide the
most value to the ratepayers. Thru systems and the identification of this program, HDR was able to asset management software. A save Mesa Water approximately continuous improvement plan will $100,000 per year in pipeline be developed that includes analysis of existing business processes
testing
and systems and identification
of prioritized opportunities for
improvement for policies, processes
and systems.
HB -395- Item 15. - 182
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix: HDR Service Category A. Water Engineering
DAVE SPENCER (CONTINUED)
Asset Management Plan, Otay Vista Irrigation District, City of Water District, Otay, CA. Vista, CA
Prepared a district-wide asset HDR was selected by Vista management plan as the framework Irrigation District (VID) to prepare for district staff to implement the an update to their 2000 Potable ongoing condition assessment and Water Master Plan. As part of that associated service life estimates Master Plan, condition assessment for all of the fixed assets. The of the District's reservoirs and project included the development pipelines is being conducted and of asset criticality criteria, condition prioritization of rehabilitation and assessment rating and ranking replacement projects. David is criteria, and asset valuation leading the condition assessment methodology that serve as the basis and renewal prioritization for future rates and bond financing. components of the project which includes assessing and
City of Westminster, Westminster
Distribution System Renewal cleansing existing data, quantifying Program Prioritization and deterioration, identifying investment Modeling, Denver, CO. scenarios compared with level of
Evaluated the water distribution service, and incorporating results system and prioritized water main into the master plan. repair and replacement projects City of Poway, Utilities Operational based on a number of criteria. Effectiveness Study (UOES), A risk analysis and prioritization Poway, CA.
factors matrix was established and Project Manager who reviewed was used to develop an optimized operational activities for the potable pipe and valve replacement capital water, wastewater operations, improvement program (CIP). and recycled water, then assessed their organizational efficiency
and effectiveness to prepare
an operational effectiveness
report with competitive levels
for (O&M) of the system with
recommended cost savings and
improvement strategies. Worked
closely with the city's public works
department's utilities manager and
key representatives from labor,
management and employees.
29 Item 15. - 183 HB -396-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
Andrew Cherene, PG, CHG
Wells
Andrew Cherene has 12 years of experience in the environmental field with expertise in groundwater monitoring, drilling, well installation, soil sampling, Phase I and Phase Il environmental site assessments, soil vapor sampling, and groundwater resources. He manages drilling programs and designs, installs, develops, and tests water supply wells. He also conducts sampling and analysis field programs to support regulatory compliance, pre- construction site characterization, and aquifer modelling.
EDUCATION
Bachelor of Science -
Earth Sciences, University
of California, San Diego, RELEVANT EXPERIENCE
June 2004. City of Oxnard, Highway 101 at
City of Santa Monica, Olympic Well
Master of Science - Earth Field, Santa Monica, CA Rice Ave Reconstruction Project, Sciences, University of Andrew Cherene was project Oxnard, CA.
California, San Diego,
manager and primary author of the Andrew Cherene was lead geologist December 2005.
quarterly groundwater monitoring for investigation and remediation REGISTRATIONS activities associated with the Former
report and manager of field tasks.
Registered Professional Jim's Texaco service station and Groundwater contamination
Geologist, California,
surrounding the City Corporation environmental support activities for United States, No. 8580
Yard and the Bergamot Arts Center the construction surrounding the Certified Hydrogeologist, has been linked to a release of interchange. Project tasks included California, United States, site characterization of commingled gasoline from underground storage
No. 974
tanks on the Corporation Yard fuel releases, well abandonment, Drinking Water property. Chlorinated solvents from development and implementation Treatment Operator,
former PaperMate and Douglas of a risk assessment sampling Level T2, California,
Aircraft Facilities have also migrated and analysis plan, and plume United States, No. 30382
to the groundwater beneath this characterization for the protection Drinking Water of drinking water wells. This project
site, compromising water quality
Distribution Operator,
in the City's Olympic Well Field. required close coordination with Level D2, California,
United States, No. 39368 Olympic is one of three major well regulatory agencies to obtain fields that serve as the drinking timely closure of the site under water source for the City. The other the schedule constraints of a two, Arcadia and Charnock, also major interchange and bridge have a recent history of impacts reconstruction project. from leaking underground storage
tanks.
HB -397- Item 15. - 184
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix:
Service Category A. Water Engineering
ANDREW CHERENE (CONTINUED)
Antelope Valley Water Bank, NextEra Energy, Blythe Solar Willow Springs Aquifer Storage Generating Station.
and Recharge, Antelope Valley, CA. The design phase of the project Prior to initiating an aquifer storage required exploration for a source and recovery (ASR) project, a of cooling and cleaning water groundwater basin and its aquifers in California's Sonoran Desert. must be adequately characterized The program drilled a test well with respect to potential yields, to a depth of over 1800 feet to storage capacity, and water quality. sample discrete aquifer zones for Andrew Cherene managed a field water quality and test them for sampling program that collected production potential. Separate samples from idle irrigation supply zones were packed off to be tested wells and active domestic water for yield potential and water quality. supply wells to analyze for naturally Overdraft of near-surface drinking occurring compounds that may water source aquifers would present a challenge for the proposed have been met with regulatory ASR program. opposition, while brackish deep
Pier B On-Dock Rail Support zones would have provided very poor quality water. Andrew Cherene
Facility, Long Beach, CA.
HDR is providing engineering oversaw drilling and well installation services for the project. Some key activities for the test well. components of the project include
realignment of Pier B Street to
accommodate new yard tracks
construction of approximately
80000 feet of new trackage at
the Pier B Rail Yard design of
classification yard facilities and/or
a potential Near Dock Intermodal
Cargo Transfer Facility (ICTF) in the
North Harbor Area and feasibility
studies and alternative analysis
for potential grade separations at
9th Street and the North Harbor
Area. Since 1996 HDR has provided
engineering services to the Port
of Long Beach under two separate
on-call contracts. In total seven
final design packages have been
completed on budget and on
schedule under this contract.
31 Item 15. - 185 HB -398-
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Appendix: HDR Service Category A. Water Engineering
Erika Perez, EIT
Corrosion Control/Cathodic Protection
Erika Perez is the Field Services Supervisor with HDR Engineering, Inc. She has been with HDR since 2007. Erika has experience in soil analysis, soil corrosivity studies, corrosion condition assessments of wastewater facilities and potable water tanks, external corrosion direct assessments, cathodic protection (CP) system design for tanks, construction support services, field surveys for existing cathodic protection systems on pipelines and reservoirs.
RELEVANT EXPERIENCE
EDUCATION
City of Huntington Beach, Annual Metropolitan Water District (MWD), Bachelor of Science -
Chemical Engineering Corrosion Survey, Huntington Lake Mathews Forebay Condition Beach, CA Assessment, Riverside, CA
California State
Corrosion EIT. The project was Erika Perez was the lead field Polytechnic University,
Pomona, CA an annual corrosion survey of the engineer on the condition assessment City's 11 pipelines, consisting of of the concrete structure and rebar
REGISTRATIONS
170 test stations, and providing reinforcement at MWD's Lake Engineer-In-Training
recommendations for future Mathews Forebay. The structural (EIT), State of California
#153360 corrosion control. Ms. Perez served assessment included exterior and as corrosion EIT. The survey was interior visual inspections, concrete NACE Cathodic
performed by the interruption of sounding, and pH testing. The Protection Technician
existing rectifiers and galvanic rebar reinforcement assessment (CP-2), #63436
anodes and measuring the on/off included potential mapping Confined Space Certified
potentials. A report was prepared to determine areas of internal OSHA 30-Hours
documenting all the testing data corroding rebar and electrical PROFESSIONAL with recommendations for general continuity testing. Concrete cores MEMBERSHIP corrosion control. were also collected and analyzed NACE International Irvine Ranch Water District | by HDR's laboratory to determine #673147 the degree of concrete degradation.
Three Year Cathodic Protection
Monitoring Program, Irvine, CA The condition assessment report included: tabulated test results, photo
Lead Field Engineer. HDR was
. documentation of notable features
recently awarded this cathodic
protection project consisting observed during the assessment, of 35 impressed current and 4 and recommendations based on conditions found to be in need of
galvanic systems, 40 rectifiers,
approximately 500 corrosion test repair, remediation, or corrosion stations, and 17 reservoirs. Pipe monitoring.
sizes vary between 16-inches and
54-inches. Pipe materials include
CCP, SCC, DIP, and CML&C. Ms.
Perez performed the pipeline CP
corrosion survey, including on and
instant off pipe-to-soil potentials,
rectifier readings, anode current
output, and insulating flange and
casing isolation testing.
HB -399- Item 15. - 186
I-DR
3230 El Camino Real, Suite 200
Irvine, CA 92602-1377
714 730.2300
hdrinc.com
We practice increased use of sustainable
materials and reduction of material use
© 2018 HDR, Inc., all rights reserved.
Item 15. - 187 HB -400-
EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:
B. Travel Charges for time during travel are not reimbursable.
C. Billing
All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.
2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.
3. A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.
4. CONSULTANT shall submit to CITY an invoice for each monthly payment due.
Such invoice shall:
A) Reference this Agreement;
B) Describe the services performed;
C) Show the total amount of the payment due;
D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and
E) For all payments include an estimate of the percentage of work completed.
Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein.
Exhibit B
5. Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.
Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.
Exhibit B
Exhibit B
HOR
January 11, 2018
City Clerk's Office, 2nd Floor
City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
RE: On-Call Water Engineering & Professional Consulting Services, Service Category A. Water Engineering - Cost Proposal/Rate Sheet Dear Selection Committee,
HDR appreciates the opportunity to submit our fee schedule for the On-Call Water Engineering & Professional Consulting Services. We look foward to working with the City. Should you have any questions, please feel free to contact Steve Friedman at (714) 368-5634 or via email at [email protected] Sincerely.,
HDR
Cabile Seve trioman
Aaron Meilleur, PE steve Friedman, PE, PMP, BCE
Vice President Project Manager
3230 El Camino Real, Suite 200, Irvine, CA 92602-1377
hdrinc.com
T 714.730.2300 F 714.730.2301
City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Cost Proposal/Rate Sheet Service Category A. Water Engineering
E. Cost Proposal/Rate Sheet
Billing offices will be closed on the previous Friday.
• Business hours on December 24th will be
HDR acknowledges that all billing for work 8:00 AM to 4:00 PM. done by the end of billing period be submitted
to the City on a monthly basis. Each billing will Travel Time be submitted with a status report describing
The City's office is only 17 miles from HDR's office
progress made during the billing period on
each task along with percent complete for each in Irvine, wherethis project will be managed. task. Final billing will be approved for payment Depending on the time of day, we can be at your office on Main Street office within 35 minutes. Our
only after a completed status report has been
vehicle mileage will be billed as a Reimbursable
approved by the City.
Expense per Federal travel regulations, which
HDR's accounting cycle typically coincides with currently allots $0.545 per mile driven. the first of every month and we submit invoices
no later than the 10 of every month. Changes to the Rate Schedule if Contract is Extended
Minimum Time Rate
If the contract is extended beyond the three-year
Compensation terms are defined by Direct Labor base period, the rates may be increased based on Hours times an hourly billing rate for the services salary adjustments and changes in CP. of HDR's personnel engaged, plus reimbursable
expenses. HDR will not apply a minimum time Equipment, Miscellaneous Charges, rate for this project. and Subconsultants
Procedures for Overtime Pay Personnel charges include the indicating instruments commonly used in corrosion testing
HDR follows fair employment practices. Hours Specialized instrumentation/test equipment worked in excess of eight (8) per day or forty and facilities may require and additional charge. (40) hours per week will be billed in accordance Other direct costs (ODC), such as outside with the rate schedule presented on the following consultants or laboratories, rental equipment page at straight time for professional personnel and, miscellaneous expenses (including vehicle and at 1.5 times for inspector, technician, and usuage, photography, reproduction, binding, clerical personnel. If applicable, prevailing wage overnight mail or courier services, etc.) will be requirements will need to be negotiated at the charged at cost plus ten percent (10%), Permits issuance of each task order. and fees required for projects will be charged at cost. Costs for subconsultants, if any, will be
Holidays charged at cost plus ten percent (10%).
HDR recognizes the following seven (7) holidays
per year where HDR staff does not conduct
normal business hours:
• New Year's Day • Thanksgiving Day
• Memorial Day • Day after Thanksgiving
• Independence Day • Christmas Day
• Labor Day
• When a holiday falls on Sunday, the offices
will be closed on the following Monday.
• When a holiday falls on a Saturday, the
01 City of Huntington Beach, Public Works Department | On-Call Water Engineering & Professional Consulting Services | Cost Proposal/Rate Sheet ... 1- Service Category A. Water Engineering
Rate Schedule
Our proposed hourly rate schedule by job classification is provided below which covers payroll costs, employee benefits, and HDR overhead and profit. The hourly rate schedule will be in effect during the course of the contract or three years from the notice-to proceed date, which-ever occurs first. Personnel time is billed in half-hour increments.
FRONE
HOR RATE SCHEDULE CHR
S/HR
Sr. Company Officer/Principal in Charge $345.00 $420.00 Sr. Construction Manager $212.00 $270.00
Sr. Engineer Mgr/Sr. Project Manager. $283.00 $353.00
Water Resources Sr. Engineer $277.00 $335.00
Project Manager/Task Manager $202:00 $271.00
Sr. Project Engineer $190.00 $254.00
Construction Inspection $185,00 $249.00
Database Programmer $173.00 $230.00
Water Resources PE $161.00 $219.00
CADD/BIM/Designer $138.00 $197.00
Project Engineer $114.00 $185.00
Project Administrator $99.00 $161.00
Document Production Specialist $93.00 :$151.00
EIT $86.00 $144.00
Technician: A 04902000N02 $70.00 $127.00
Intern $58.00 $99.00
*Billing rates subject to 3.5% escalation (maximum) effective January Ist of each year. 02 Bidder's List for Water & Engineering - 2018
Company Name Phone
CivilSource, Inc. 949-585-0477
Civiltec Engineering, Inc. 626-357-0588
Dahl, Taylor & Associates 949-756-8654
DMc Engineering 949-753-9393
ERSC Inc. 951-765-6622
GEl Consultants, Inc. 916-912-4930
Geosyntec Consultants 310-957-6100
GHD Inc 949-585-5218
HDR Engineering, Inc. 213-239-5800 ext. 5817
LEE & RO, Inc. 626-667-5385
Lockwood Andrews and Newnam 714-620-6520
Michael Baker Intl 281-908-5335
Pacific Advanced Civil Engineering, Inc. 714-481-7203
Psomas 714-481-8026
Quantum Quality Consulting, Inc. 310-891-3994
SA Associates 626-821-3456
Tetra Tech 949-809-5208
West & Associates Engineering, Inc. 949-716-7670
ACORD® DATE (MM/DD/YYYY)
CERTIFICATE OF LIABILITY INSURANCE
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERS), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsements).
PRODUCER Lockton Companies
444 W. 47th Street, Suite 900
Kansas City MO 64112-1906
INSURERA: Lexington Insurance Company 19437
INSURED INSURER B:
HDR ENGINEERING, INC.
1429583
8404 INDIAN HILLS DRIVE INSURER C:
OMAHA NE 68114-4049 INSURER D:
INSURER E :
INSURER F:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
COMMERCIAL GENERAL LIABILITY NOT APPLICABLE EACH OCCURRENCE 5 XXXXXXX
DAMAGE TO RENTED
CLAIMS-MADE OCCUR PREMISES (Ea occurrence). $ XXXXXXX
MED EXP (Any one person) $ XXXXXXX
PERSONAL & ADV INJURY 5 XXXXXXX
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ XXXXXXX POLICY LOC PRODUCTS - COMP/OP AGG 3 XXXXXXX
OTHER:
AUTOMOBILE LIABILITY NOT APPLICABLE COMBINED SINGLE LIMIT (Ea accident) S XXXXXXX
ANY AUTO BODILY INJURY (Per person) 5 XXXXXXX
AUTOS ONLY BODILY INJURY (Per accidentS XXXXXXX
AUTOS
PROPERTY DAMAGE
AUTOS ONLY AUTOS ONLY Per accident) S XXXXXXX
S XXXXXXX
UMBRELLA LIAB OCCUR NOT APPLICABLE EACH OCCURRENCE $ XXXXXXX EXCESS LIAB CLAIMS-MADE AGGREGATE $ XXXXXXX
DED RETENTIONS 3 XXXXXXX
WORKERS COMPENSATION NOT APPLICABLE STATUTE
AND EMPLOYERS' LIABILITY
YIN
ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $ XXXXXXX OFFICER/MEMBER EXCLUDED? N/ A
(Mandatory in NH) E.L. DISEASE - EA EMPLOYEES XXXXXXX
ÉSCRIPTION OF OPERATIONS belo E.L. DISEASE - POLICY LIMIT|S XXXXXXX A ARCH & ENG N N 061853691 6/1/2017 6/1/2018 PER CLAIM: S1,000,000 AGGREGATE: $1,000,00
OF-CALL WATER ENGINEERING & KON BONAL CONSULTING SIRVICulo, may be stached l more pace is require)
APPROVED AS TO FORM
MICHAEL E. GATES
CITY ATTORNEY
CITY OF HUNTINGTON BEACH
CERTIFICATE HOLDER CANCELLATION
15288761
City of Huntington Beach SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Attention: Duncan Lee ACCORDANCE WITH THE POLICY PROVISIONS. 2000 Main Street
Huntington Beach CA 92648
AUTHORIZED REPRESENTATIVE
Amell
© 1988 2015 ACORD CORPORATION. All rights reserved.
ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD
PROFESSIONAL SERVICES CONTRACT BETWEEN
THE CITY OF HUNTINGTON BEACH AND
HDR ENGINEERING, INC.
FOR
ON CALL WATER AND ENGINEERING SERVICES
Table of Contents
1 Scope of Services... ...1
2 City Staff Assistance... .2
3 Term; Time of Performance..... 2
4 Compensation... .2
5 Extra Work..
6 Method of Payment.
7 Disposition of Plans, Estimates and Other Documents
8 Hold Harmless
9 Professional Liability Insurance.
10 Certificate of Insurance...
11 Independent Contractor...
12 Termination of Agreement.
13 Assignment and Delegation..
14 Copyrights/Patents
15 City Employees and Officials.
16 Notices...
17 Consent
18 Modification
19 Section Headings
20 Interpretation of this Agreement...
21 Duplicate Original
22 Immigration..
23 Legal Services Subcontracting Prohibited
24 Attorney's Fees
25 Survival.
26 Governing Law .......
27 Signatories..
28 Entirety.
29 Effective Date........