FINAL REPORT

UPDATED CITYWIDE
PAVEMENT MANAGEMENT PLAN
OC Go
2022‐2029

Submitted to:

City of Huntington Beach, CA
May 13, 2022

May 13, 2022

Mr. Chris Tanio
Department of Public Works
CITY OF HUNTINGTON BEACH
2000 Main Street
Huntington Beach, CA 92648

Subject:  City of Huntington Beac h –OCTA Pavement Management Compliance Report 2022

Dear Chris:

As  part  of  the  2022  Update  of  the  Pavement  Management  Plan  (PMP)  for  the  City  of  Huntington  Beach, Bucknam  Infrastructure  Group,  Inc.  is  pleased  to  submit  the  PMP  reporting  required  by  the  Orange County Transportation Authority (OCTA).  This data/report will be subm itted to OCTA as part of the City’s required biennial PMP prior to June 30, 2022.

The information contained in this report was used to develop th e recommended improvement program for the pavement network.  The report covers the following categories:

 Pavement Management Plan Certification

 Quality Assurance / Quality Control (QA/QC) Plan

 Pavement Management Data Files (electronic Huntington Beach.e70 file format)

 Pavement Management Plan that includes the following:

 Average Pavement Conditions For Each Segment in the Network (PCI Report) The Pavement Condition Index report shows the present conditio n of each street in t h e  p a v e m e n t  n e t w o r k  ( M a s t e r  P l a n  o f  A r t e r i a l  H i g h w a y  ( M P A H )  a nd  Locals).    In addition, the report shows the basic geometry of each street segment.

 Seven‐year Projected PCI Under Existing Funding Levels This report identifies the projected PCI’s based on the local  agencies current funding programs.  This report details the PCI projects for the entire network, MPAH roadways and Local streets.

 Seven‐year  Plan  for  Road  Mainten ance  and  Rehabilitation  (Foreca sted  Maintenance Report)
The  Forecasted  Maintenance  Report  projects  the  street  maintenan ce  activities required  for  the  next  seven  years,  broken  down  to  show  maintenance  levels  for  all streets.  This includes all scheduled projects provided by the  City for fiscal years 2022 through 2029.

 Alternative Funding Levels
O C T A  h a s  r e q u e s t e d  t w o  r e p o r t s  i n d i c a t i n g  t h e  n e c e s s a r y  f u n d i n g  to  maintain  the City’s current weighted average PCI as well as the necessary fu nding to improve the weighted average PCI by one PCI point over the next seven years.

 Backlog by Fiscal Year (re: unfunded restoration, rehabilitation and reconstruction)

 Percentage of total network in e ach of the five condition categ ories based on centerline mileage

 Local Match Reduction Reporting

 In order to be eligible for Local Match Reduction of 10%, the f ollowing must be submitted:
o Measurable improvement of paved road conditions during the prev ious reporting period defined as an overall weighted (by area) average system improvement of one PCI point.
o No reduction in the overall weighted (by area) average PCI in t he MPAH or local street categories
‐ or –
o  Have  road  pavement  conditions,  for  the  overall  network,  during  t h e previous reporting period within the highest twenty (20%) of the scale for road pavement conditions in confo rmance with OCTA Ordinance No.  3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.

These reports will be submitted to the City of Huntington Beach as part of the biennial Pavement Management Plan that is due prior to June 30, 2022.  These reports will be  packaged in a way that it will be easy for staff to review.

All comments received from the City have been incorporated in the reports that follow.  All of the City’s issues and needs that were brought to our attention are included in th e report.  It has been a pleasure working with you and the City on updating your Pavement Management Plan.  We look forward to the continued success of this project and future teamwork with City staff.

Sincerely,

Bucknam Infrastructure Group, Inc.

Peter J. Bucknam
Project Manager
Infrastructure Management – GIS Services

City of Huntington Beach, CA  Page i
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

AGENCY SUBMITTAL TABLE OF CONTENTS

I. Pavement Management Plan Certification  .............................................................................. 2

II. Executive Summary.................................................................................................................. 3

III. Background    ................................................... ................................................................... 4

IV. Current Pavement Conditions (PCI)  ......................................................................................... 7

V. Projected Pavement Conditions (PCI)  ...................................................................................... 8

VI. Alternative Funding Levels  ....................................................................................................... 9 a. Maintain Existing Average Network PCI ................................................................ 9 b. Improve Average Network PCI  ............................................................................... 9

VII. Current and Projected Backlog by Year of Pavement Maintenance Needs ............................ 9

VIII. Centerline Mileage  ................................................................................................................. 10

IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles  .... 10

X. Reduction in M2 Local Match ................................................................................................ 11

XI. Appendix A – Seven‐Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level .............................................................................. 12

XII. Appendix B – Complete Street Listing Current Conditions  .................................................... 13

XIII. Appendix C – GIS Digital Data ................................................................................................ 14

XIV. Appendix D – Quality Assurance / Quality Control Plan  ........................................................ 16  Introduction ......................................................................................................... 16  Objectives ............................................................................................................ 16  Structure of QA/QC Plan  ...................................................................................... 16  Condition Survey Procedures............................................................................... 17  Accuracy Required for Data Collection  ................................................................ 18  Random and Systematic Re‐Inspections  .............................................................. 18  PCI Comparison with Past Surveys  ....................................................................... 19  Inspector Qualifications and Experience ............................................................. 19  Safety Procedures ................................................................................................ 19

XV. Appendix E – Pavement Management Data Files  ............................................................. 20

XVI. Appendix F – GIS Maps – Current Conditions  ................................................................... 21

City of Huntington Beach, CA  Page 1
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

CITY OF HUNTINGTON BEACH PAVEMENT MANAGEMENT PLAN

‐ part of ‐

COUNTYWIDE PAVEMENT MANAGEMENT PLAN GUIDELINES
(OCTA Guideline – April 2020)

Prepared by: Bucknam Infrastructure Group, Inc.

Submitted to OCTA: June 30, 2022

City of Huntington Beach, CA  Page 3
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

II. EXECUTIVE SUMMARY

2022 UPDATE OF PAVEMENT MANAGEMENT PLAN (PMP)

As the City of Huntington Beach’s infrastructure continues to mature Public Works priorities such as Local street maintenance and Arterial r ehabilitation are key projects  to City staff.  With the City mostly built‐ out, wear and tear on the infrastructure will occur at an ever  increasing rate.  Pavement aging through annual  weathering,  dynamic  and  static  vehicle  loading,  and  increased  usage,  compounded  with  the increased cost of performing maintenance and rehabilitation, add to the yearly operational budget of the pavement  network.    System  sustainability  can  only  be  achieved  through  proactive  scheduling  and  the implementation of cost‐efficient pavement applications.

Over the past twenty years the City has made proactive and effi cient improvement regarding its overall condition status as well as greatly reduced its deferred maintenance burdens.  The City’s overall weighted PCI is 81.5 which is one of the above average in the County and close to the optimal industry standard PCI range of 82 to 85.  Funding the Huntington Beach PMP over the n ext ten years will be manageable and achievable based on city management proactivity, frequent inspections, and biennial budgetary review.

In  the  upcoming  years  as  the  City  continues  to  build  upon  this study  through  future  inspections  and maintenance work history, Huntington Beach pavement data will c ontinue to provide reliable data.  This will enhance the PMP through detailed Orange County Transportat ion Authority (OCTA) OC Go funding analysis, City specific budgetary reporting and level of service reporting.

The Huntington Beach PMP has been developed to assist City personnel by providing current data on the City’s street network and to devel op cost‐effective maintenance  strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources.

The project consisted of analyzing the City’s 2020 dataset for quality and usability.  In doing this, we were tasked to generate an  updated Capital Improvement Program repor t that  identified recommendations and deficiencies in the current operating and maintenance efforts put forth by the City.

We surveyed all designated arterial, collector (MPAH) routes th is past winter to assist the City in being compliant with OCTA – OC Go April 2020 guidelines.  Additionally, we updated the City’s unique Pavement Management – GIS layer that will continue to assist the City in  analyzing pavement conditions and other attribute information through the use of ESRI ArcMap.

Bucknam Infrastructure Group reviewed the City’s previous maintenance efforts and the current 2021‐22 proposed street improvements for pertinent pavement information in order to generate a CIP report that identified  recommendations  and  opportunities  for  improvement  in   the  current  operating  and maintenance efforts put forth by the City.  The result of these work efforts is this report.

Additionally, with the current I‐405 expansion and its impact t o the Huntington Beach Arterial network conditions, future appropriated funds will be necessary to address the accelerated deterioration that will be caused by the OCTA / I‐405 detour traffic quantity/load.

City of Huntington Beach, CA  Page 4
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

III. BACKGROUND

In  late  1990,  voters  throughout  O range  County  approved  a  ½‐cent  s a l e s  t a x  f o r  t r a n s p o r t a t i o n i m p r o v e m e n t s  k n o w n  a s  O C  G o ,  f o r m e r l y  k n o w n  a s  M e a s u r e  M 2 .   F u nding  for  streets  and  roads  are included  within  the  sales  tax  and  are  distributed  to  locals  age ncies  through  both  formula  and  a competitive method.  In late 2006, the renewal of OC Go was approved by voters that would continue the ½‐cent sales tax for thirty additional years, starting in 2011.

The primary of goal of this report is to comply with established guidelines from OCTA to ensure that field data collection and reporting efforts performed by outside consultants or local agency staff are consistent.

This  is  required  in  order  that  funding  allocations  can  be  reviewed  and  based  on  agency  comparable pavement  conditions.  Specifically,  our  findings  and  recommendat ions  provide  Public  Works administrators, managers and field personnel with:

*   PMP report consistent with OCTA OC Go guidelines

* the  present  condition  status  of  the  pavement  network  (arterial,  collector,  residential  and industrial streets), as a whole and of any grouping or individual component within the City; * a ranked list of all streets, or segments of streets, by condition within the network; * rehabilitation/maintenance needs of each street segment by year; * an optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding;

* optimum annual pavement expenditure  levels for pavement mainte nance for the next seven (7) years;
* prediction of the life‐cycle performance of the City’s pavement  network and each individual street section; and
* pavement condition data and analysis presented in GIS through ESRI ArcMap

Pavement  is  a  dynamic  structure  where  deterioration  is  constant ly  occurring;  thus  the  pavement management  system  needs  to  be  updated  on  a  regular  basis  to  reflect  these  changes  in  pavement conditions,  pavement  maintenance  histories,  and  maintenance  str ategies  based  upon  budgetary constraints.  In our approach to develop the City’s forecasted maintenance recommendations we worked with  Huntington  Beach  Public  Works/Engineering  staff  in  identif ying  unit  costs  for  all  maintenance practices  used  on  an  annual  basis.    Currently,  based  upon  the  City’s  maintenance  practices  and  their a s s o c i a t e d  u n i t  c o s t s ,  t h e  t o t a l  r e p l a c e m e n t  v a l u e  o f  t h e  H u n t ington  Beach  pavement  network  is $979,764,500.   This value clearly indicates that the City’s pavement networ k is the most valuable and essential asset to Huntington Beach.  The City’s use of slurry seal, AC Overlay and remove & replace (R&R) practices  are  typically  applied  at  a  five  year,  ten  year  and  25   year  frequency  respectively.    These frequencies are typical but the City may see increases in deter ioration rates due to environmental, load and high average daily traffic (A DT) volumes.  For example, hig h ADT volumes along one of Huntington Beach’s arterial streets will increase deterioration rates for a previously applied AC Overlay compared to a small local street.  These deterioration rates are monitored through frequent inspections and functional class deterioration analysis within the City’s PMP database.

City of Huntington Beach, CA  Page 5
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

FINDINGS AND RECOMMENDATIONS

Through our assessment of historical maintenance performed within the City and through our discussions with  City  staff  the  conditional  data  found  across  the  network  cl e a r l y  s h o w s  t h a t  t h e  C i t y  h a s  a p p l i e d strong,  preventative  maintenance  strategies  over  the  past  decade.    Pavement  management  involves frequent preventative maintenance; as pavement deteriorates through heavy traffic impacts, weathering and  time,  preventative  maintenances  (such  as  slurry  seal,  stop g a p ,  e t c . )  h a ve  l i m i t e d  b e n e f i t s .   M o r e aggressive maintenance applications have to be used.

Our study has shown that key overlay projects will be needed ov er the next seven years to maintain the network’s high level of condition.  Currently, the City’s two m ajor streets networks combined (Local & Arterial) hold average weighted PCI value of 81.5 ; it is our r ecommendation that a proactive, common sense overlay program and a continued slurry seal program be sc heduled on the Local network over the next several fiscal years.  This will ensure that the Local and  citywide weighted PCI’s will increase thus allowing for more frequent preventative maintenance in the near future.  This can only happen if funding for the Local network is increased from $3.5 million per year to $6.5 million per year.

We have found and recommend the following detailed items which  should be reviewed and considered for a proactive approach to the future management of the PMP:

ARTERIAL / COLLECTOR (MPAH) FINDINGS AND RECOMMENDATIONS The actual workload requirements identified indicate that the Arterial (MPAH) street network is currently in  “good”  condition.    To  maintain  this  condition,  it  is  critical  that  preventive  maintenance  and  overlay activities are funded at the levels identified on page 9 to mai ntain a “good” network weighted average PCI value.   Our MPAH findings for conditional data and recomme ndations for revenue expenditures are shown below:

 The MPAH network has a weighted PCI of 81.6

 The MPAH network consists of 168.7 centerline miles and 34,423,330 SF of pavement;

 Currently,  38%  of  the  MPAH  network  (63.5  centerline  miles)  qualify  for  slurry  seal/stop  gap m a i n t e n a n c e ;  1 5 %  o f  t h e  A r t e r i a l  n e t w o r k  ( 2 5 . 5  c e n t e r l i n e  m i l e s)  qualify  for rehabilitation/reconstruction maintenance;

 A t  a  m i n i m u m ,  M P A H  m a i n t e n a n c e  p r o j e c t s  s h o u l d  f o c u s  o n  t h e  m a intaining  the  current  PCI above a weighted average of 81 over the next 7 years;

 Develop a proactive fiscal and planned approach to identify MPA H overlay projects based on the deterioration modeling within MicroPAVER;

o Maintain the MPAH revenues at an average annual level of $5,600,000/yr for the term of the CIP to generate the PCI identified on page 9;

o Demonstrated budget shown on page 8 is ample to increase the MP AH weighted PCI of

81.6 to 85.0 after seven years, additionally, the citywide deferred backlog decreases from City of Huntington Beach, CA  Page 6
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

a level of $49.8 million to $6.8 million after seven years; and

 Perform pavement inspections on the MPAH network every two years to continue the City’s solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for Measure M2.

LOCAL FINDINGS AND RECOMMENDATIONS

The actual workload requirements identified indicate that the Local street network is currently in “good” condition.  To maintain this condition, it is critical that pre ventive maintenance and overlay activities are funded at the levels identified on page 9 to maintain a “good” network weighted average PCI value.   Our Local network findings for conditional data and recommendations  for revenue expenditures are shown below:
 The Local network has a weighted PCI of 81.4;

 The Local network consists of 318.0 centerline miles and 62,397,119 SF of pavement;

 C u r r e n t l y ,  2 9 %  o f  t h e  L o c a l  n e t w o r k  ( 9 1 . 4  c e n t e r l i n e  m i l e s )  q u alifies  for  slurry  seal/stop  gap maintenance;    21%  of  the  Local  network  (68.1  centerline  miles)  qualify  for rehabilitation/reconstruction maintenance;

 At a minimum, Local maintenance projects should focus on the maintaining the current PCI above a weighted average of 81 over the next 7 years;

 Develop a proactive fiscal and planned approach to identify loc al overlay projects based on the deterioration modeling within MicroPAVER;

o Continue to utilize the City’s twelve (12) Zone Maintenance Schedule;  Apply  the  proper  Local  budget  to  allow  for  two  (2)  zones  to  be addressed  per year;
 This  policy  and  application  will  generate  even  greater  ROI  in  the  next  several years;

o Increase the Local revenues to an average annual level of $6,50 0,000/yr for the term of the CIP to generate a higher weighted PCI by FY 2028‐29; and

o Demonstrated budget shown on page 8 is ample to increase the Lo cal weighted PCI of

81.4 to 83.4 after seven years, additionally, the citywide deferred backlog decreases from a level of $49.9 million to $6.8 million after seven years; and

 Perform pavement inspections on the Local network every six yea rs to continue the City’s solid planning model within MicroPAVER to track PCI deterioration; al so follows new OCTA guidelines for Measure M2

 The City consideration and future action to  condense their twelve (12) Local Maintenance zones to six (6) zones by] 2022‐23 is showing through our PMP modeling to extremely advantageous.

City of Huntington Beach, CA  Page 7
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

IV. CURRENT PAVEMENT CONDITIONS (PCI)

City of Huntington Beach, CA  Page 8
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

V. PROJECTED PAVEMENT CONDITIONS (PCI) – Current Funding

City of Huntington Beach, CA  Page 9
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

VI. ALTERNATIVE FUNDING LEVELS

Maintain Existing Average Network PCI

Improve Average Network PCI

VII. CURRENT  AND  PROJECTED  BACKLOG  BY  YEAR  OF  PAVEMENT MAINTENANCE NEEDS

City of Huntington Beach, CA  Page 10
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

DEFERRED MAINTENANCE
Delaying  repairs  on  streets  where  pavement  conditions  indicate  a  need  generates  deferred maintenance or “backlog”.  Deferred maintenance is work that is  postponed to a future budget cycle,  or  until  funds  are  available.  As  maintenance  is  deferred ,  the  opportunity  to  apply preventive, life extending pavement treatments is forfeited and the ultimate cost of rehabilitation multiplies  (i.e.  slurry  seal  costs  to  overlay  costs).    By  using  the  City’s  pavement  maintenance applications and their associated unit costs, when a budgetary model is exercised within the PMP software the amount of deferred maintenance is calculated.  Bas ed upon the available budget applied to the model, deferred maintenance will increase or decrease.

As  maintenance  is  deferred,  the  opportunity  to  apply  life  extending  preventive  pavement applications is lost and the ultimate cost of rehabilitation multiples.

VIII. CENTERLINE MILEAGE

IX. PERCENTAGE  OF  NETWORK  IN  EACH  OF  FIVE  CONDITION  CATEGORIES BASED ON CENTERLINE MILES

City of Huntington Beach, CA  Page 11
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

X. REDUCTION IN M2 LOCAL MATCH

A  local  agency  match  reduction  of  10%  of  the  eligible  cost  for projects  submitted  for  consideration  of funding  through  the  M2  Comprehensive  Transportation  Funding  Programs  (CTFP)  call  for  projects  is available if the local agency either:

a. Shows  measurable  improvement  of  paved  road  conditions  during  the  previous  reporting p e r i o d  d e f i n e d  a s  a n  o v e r a l l  w e i g h t e d  ( b y  a r e a )  a v e r a g e  s y s t e m  improvement  of  one P a v e m e n t  C o n d i t i o n  I n d e x  ( P C I )  p o i n t  w i t h  n o  r e d u c t i o n  i n  t h e  overall  weighted  (by  area) average PCI in the Master Plan of Arterial Highways (MPAH) or local categories:

or

b. Have road pavement conditions during the previous reporting period, within the highest 20% of  the  scale  for  road  pavement  conditions  in  conformance  with  OCTA  Ordinance  No.  3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.

Road conditions found through our 2022 PMP management study shows that the City is eligible for Local Match Reduction based on the current network weighted PCI of 81.5.  Additionally, the City of Huntington Beach has demonstrated with the enclosed budget projection (pag e 8) that the City’s weighted average PCI (by area) remains above a PCI of 75 after the seven year program.

City of Huntington Beach, CA  Page 12
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

XI. APPENDIX  A  –  SEVEN  YEAR  ROAD  MAINTENANCE  AND  REHABILITATION PLAN BASED ON CURRENT OR EXPECTED FUNDING LEVEL

City of Huntington Beach, CA  Page 13
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

XII. APPENDIX B – COMPLETE STREET LISTING CURRENT CONDITIONS

City of Huntington Beach, CA  Page 14
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

XIII. APPENDIX C – GIS DIGITAL DATA

Introduction
The OCTA GIS Section maintains a spatial inventory of transport ation infrastructure which mostly consists of major arterial streets, roads, and highways. A key component of road  information is pavement condition. Maintaining an inventory  of  pavement  condition  will  enhance  OCTA’s  GIS  visualization  and  analysis  capabilities  and  assist  in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset in digital format should be included in this report.

Structure of GIS Data
The GIS dataset must consist of linear geographic features that  represent road/street segments. All segments that are  part  of  the  report  should  be  included in  the  GIS  dataset.   The  attribute  information  of  each  segment  should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B above.

The GIS data requirements are discussed below. Most commercial and open‐source GIS software provide industry‐ standard tools to manage GIS data to meet these requirements.

GIS Digital Data Format
The GIS data must be submitted in either one of the following formats:
 Esri Shapefile, or
 Esri File Geodatabase
Metadata
The GIS data are required to have associated metadata. The minimum metadata items required are:
 Title of Dataset
 T a g s  ( A  s e t  o f  w o r d s  t h a t  c a n  b e  u s e d  b y  G I S  t o  s e a r c h  f o r  t h e  resource.  For  example:  “pavement”, “transportation”, “roads”)
 Summary (A brief purpose statement of the dataset)
 Description (A brief narrative of the dataset’s content)  Credits (A recognition of those who created or contributed to the resource) Spatial Geometry Type
The spatial geometry of the segment features must be lines that  represent the roadway centerline as accurately as possible.

Projection
The GIS data must have spatial reference information and have its coordinate system identified and embedded in or associated  with  the  data  file(s).  All  GIS  data  submitted  to  OCTA  s h o u l d  b e  i n  t h e  f o l l o w i n g  p r o j e c t e d  c o o r d i n a t e system:

City of Huntington Beach, CA  Page 15
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

 NAD 1983 State Plane California VI FIPS 0406 (US Feet) ‐ More information about this system can be found at: https://spatialreference.org/ref/epsg/nad83‐california‐zone‐6‐ftus/ GIS Feature Attributes
The required segment attributes are:
 Street name
 Unique segment identifier (Segment ID from original source if available)  Name of intersecting road at the beginning of a segment  Name of intersecting road at the end of the segment
 Current pavement condition index (PCI)
 Current PCI inspection date
 Length of road segment in feet
 Width of road segment in feet
 Paved area of road segment in square feet or square yards  Projected PCI at end of Seven‐Year Road Maintenance and Rehabilitation Plan Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may be provided. An example of a GIS attribute table for road segments  is shown below (Note that there are additional attributes such as surface, functional class, and number of travel lanes).

City of Huntington Beach, CA  Page 16
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

XIV. APPENDIX D – QUALITY ASSURANCE / QUALITY CONTROL PLAN

Introduction
When performing data collection in any field, the need for qual ity control is paramount as it is essential for accurate planning, analysis and design.  This is particular ly true for collecting pavement distress data for a pavement management program.

The  Quality  Assurance  /  Quality  Control  (QA/QC)  Plan  establishe s  minimum  quality  standards  for performance and procedures for update of the pavement management program.

Objectives
This document constitutes a formal QA/QC Plan for the City of H untington Beach.  It was prepared on March, 2018 and last revised in March, 2018.

Specifically, it is intended for the 2022 Pavement Management Plan Update.  The focus is on the collection of  network‐level  pavement  distress  data  (defined  by  National  Cooperative  Highway  Research  Program (NCHRP)  Synthesis  401  Quality  Management  of  Pavement  Data  Colle ction,  as  “Network‐level  data collection involves collection of large quantities of pavement  condition data, which is often converted to individual condition indices or aggregated into composite condition indices”.

This  document  also  addresses  the  QA/QC  plan  requirements  of  the   Orange  County  Transportation Authority (OCTA)’s “Countywide P avement Management Plan Guideli nes” (Section 2.4), adopted in May 2010.

Structure of QA/QC Plan
The following components are addressed in this QA/QC Plan:

 Condition survey procedures used;
 Accuracy required for data collection;
 Inspector qualifications and experience; and
 Safety.

City of Huntington Beach, CA  Page 17
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

Condition Survey Procedures
The governing document in performing condition surveys for the City of Huntington Beach is ASTM D6433‐ 18 “Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys.”  Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol.  The following distresses are collected for each pavement type:

As required by the Orange County Transportation Authority (OCTA ), the City of Huntington Beach must prepare  and  implement  a  quality  assurance  /  quality  control  (QA /QC)  plan  regarding  pavement management inspection as they pe rtain to MicroPAVER.  For the p urposes of this report, Bucknam has demonstrated below how our project team implemented QA/QC procedures during the project.

Our QA/QC plan focuses on the how each pavement inspection is performed, what distresses are collected and  ensures  that  it  complies  with  the  OCTA  guidelines  defined  w ithin  the  “Countywide  Pavement Management Plan Guidelines (CPMPG)”.

As shown within the OCTA (CPMPG), our staff followed and delive red on the requirements stated within C h a p t e r  2 ,  p a g e  2 ‐ 5  w h i c h  r e q u i r e  s p e c i f i c  Q A / Q C  d a t a  ( I t e m s  A  through  G).    Additionally,  Chapter  3 requires numerous data/deliverables from local agencies for OC  Go eligibility.  All general PCI budgetary report submittals will follow the Chapter 3 guidelines.

In  conjunction  with  the  outlined  items  within  the  CPMPG  Section 2  w e  h a v e  s u m m a r i z e d  o u r  Q A / Q C procedures below:

City of Huntington Beach, CA  Page 18
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

a. Descriptions  of  condition  survey  ‐  Our  staff  follows  the  required  Condition  Survey  Protocols (CPMPG,  Chapter  2);  our  staff  assesses  each  p a v e m e n t  s e c t i o n  f or  the  minimum  distresses outlined within Chapter 2, page 2‐1.  Additionally, based on th e pavement conditions found, we collect all MicroPAVER/StreetSaver Army Corps of Engineers (ACOE) distresses, if found within the sample sections; for example, if slippage cracking, potholes, etc. are found our survey technicians record the proper information.
b. H o w  d a t a  w a s  c o l l e c t e d  ‐  Our  surveys  follow  the  OCTA  accepted  walking  requirements.   All sections that our staff surveys are performed through the walking method, approximately 10% of all sections surveyed were complemented with windshield surveys  based on unique conditions found.  Our staff physically measures the width of every section as well as measure for any square footage adjustment that need to be added or taken away from a sections “true area” (i.e. cul‐de‐ sac, bus pads, street width variances, etc.).  Samples taken always include a minimum of 2,500 SF coverage unless specific section  limits  prohibit this.  Arteria l section samples  utilize a 3,500 SF s a m p l e  s i z e  d u e  t o  t h e  l a r g e r  s e c t i o n  a r e a  ( t h i s  i s  w i t h i n  t h e  ASTM  D6433‐18  sample  size calculation.  Field crews typically include one individual for  residential pavement sections while Arterial (MPAH) routes utilize a two‐person crew for safety, tr affic control and increases quality control.
c. Accuracy required for data collection ‐ We use a statistical sampling approach for measuring the quality of our field technician’s work.  In this manner, 10 per cent of the original surveys are re‐ surveyed by a different survey crew than the original, supervis ed by a field supervisor, and the results are compared to the orig inal surveys.  Our QC process i nvolves checking the field crews’ work in a “blind study” fashion.  Quality control checks are pe rformed at the end of each survey week.  This ensures that all field personnel are properly collecting section samples, distress types and distress severities for all street segments.
 When QA/QC issues are found, our staff documents the issues within MicroPAVER’s user interface.  If distress types found are not within the 97% accuracy our QA/QC is expanded beyond our minimum 10% resurvey to 20% of the original survey d. Random and Systematic Re‐Inspections – As described above our staff re‐inspects, as a minimum, 1 0 %  o f  t h e  o r i g i n a l  s u r v e y  ( O C T A  o n l y  r e q u i r e s  5 % ) .   P e r  t h e  a gencies  requests,  our  staff  will submit PCI reports to the agency as project status reports for their review.  Agencies will typically review  specific  pavement  sections  for  PCI  accuracy  based  on  rec ent  overlay  or  slurry  seal maintenance; this serves as an initial accuracy check on our surveys (outside Bucknam QC efforts).

Additionally, our staff performs “ride‐a‐long” surveys with loc al agency staff to build consensus on how our MicroPAVER/StreetSaver ACOE surveys are performed, recorded and reported on.

Random re‐inspections will include a representative selection across the following categories:
 Functional classed (i.e. MPAH, locals);
 Surface types (e.g. AC or PCC);
 Pavement conditions (e.g. good, fair, poor);
 Inspectors;
 Geographical areas, if applicable.

City of Huntington Beach, CA  Page 19
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

For systematic re‐inspections, this could be due to noticed trends such as specific treatment types (e.g.  open‐graded  mixed),  a  specific  inspector  or  geographical area.    In  these  cases  Bucknam continues to utilize a 10% re‐inspection policy.
e. PCI Comparison with Past Surveys  ‐ if previous inspection data is available, new PCI’s calculat ed through the most recent inspections will be compared to previou s PCI’s.  If the variance in PCI is greater than +/‐ 10 PCI points, these sections will be flagged  for further investigation and/or re‐ i n sp e ct i on  (In  t h e c ase s th at  a PCI  i ncr e ase s or  d e cr e ase s b y  10  points  follows  the  established CPMPG guidelines; Appendix A, page A‐18).
f. Schedule of data submittal – Pending on the City’s last major PMP submittal, Bucknam will assist the agency in submitting the following:
 Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least once every two years
 Local streets will be surveyed and reported on every six years  Corresponding MPAH and local PCI reporting and budgetary report ing will be submitted every two years
g. Experience of Inspectors  – Bucknam staff have been trained on the use of MicroPAVER and  the ACOE  MicroPAVER  segment  calibration  and  inspection  practices.   Mr.  Peter  Bucknam  (Project Manager) and Mr. Shaun Russo (Lead Field Tech) have completed t he MicroPAVER Certification of Professional Development courses.  All Bucknam field technic ians are trained using the ACOE survey methodologies and have passed OCTA’s prequalification testing.

Bucknam Infrastructure Group inspectors have attended formal tr aining on pavement condition distress surveys.  This training was conducted prior to performing any work using the ASTM D6433‐18 protocols, consistent with OCTA’s requirements.

h. Field data collection safety procedures  – Bucknam field survey techniques utilize the following procedures:
a. All vehicles are properly marked or flagged with appropriate sign markings indicating that a “PAVEMENT SURVEY IS IN PROGRESS”
b. All vehicles have the proper flashing amber light beacons placed on the top of the vehicle to allow for proper visibility and line‐of‐site warning c. Large  MPAH  routes  are  surveyed  using  two  field  technicians  to  increase  traffic  control warning and safety
d. While parking or stopping along the survey route, vehicles lega lly park within the right‐ of‐way or use a parking lot
e. All field technicians wear ANSI – 105 Class II safety vests

City of Huntington Beach, CA  Page 20
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

XV. APPENDIX E – PAVEMENT MANAGEMENT DATA FILES

The City of Huntington Beach MicroPAVER database (.e70 file) ha s been enclosed for City and OCTA use.

This data and the associated reporting data includes:

 Street names and limits for the City’s public streets  Street identifiers (Branch ID, Section ID)
 Direction
 Begin and end of section
 Length, width and true areas
 Functional Classification (MPAH, Local)
 Number of travel lanes
 Pavement Condition Index (PCI) and date of inspection  Type of recommended treatment
 Cost of recommended treatment

City of Huntington Beach, CA  Page 21
2022 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2022

XVI. APPENDIX F – GIS MAPS / CURRENT