Cities Index.
Att #2 Resolution No. 2022-57 for Addendum No. 2 to Village at Bella Terra Specific Plan EIR No. 07-03

City Council/Public Financing Authority
November 1, 2022

Document
Att #2 Resolution No. 2022-57 for Addendum No. 2 to Village at Bella Terra Specific Plan EIR No. 07-03
Meeting
November 1, 2022
Body
City Council/Public Financing Authority
Original file
2.6 MB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

A-1City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Appendix A Revised Mitigation Monitoring and
Reporting Program
A. INTRODUCTION
As part of the previous project and EIR, mitigation measures were required to reduce potential impacts to the greatest extent feasible. These mitigation measures were set forth in the approved Mitigation Monitoring and Reporting Program (MMRP) for the previous project. Similarly, mitigation measures were identified to reduce potential impact of the revised project to the greatest extent feasible. Applicable mitigation measures are discussed in each chapter of this Addendum, with the impact for which the measures are necessary. As part of the preparation of the Addendum, primarily due to the format of the document, the numbering of mitigation measures has changed from the previous EIR, as shown in this Addendum. A comprehensive comparison of mitiga tion measures required for both the previous and revised projects, including changes to numbering, is provided below.

As with the previous MMRP, the following table identifies required mitigation measures by resource area.

Similar to what was prepared for the previous proj ect, this table provides the specific mitigation monitoring requirements, including implementation documentation, monitoring activity, timing and responsible monitoring party. Verification of comp liance with each measure is to be indicated by signature of the mitigation monitor, together with date of verification.

The MMRP shall be used by the City of Huntington Beach staff responsible for ensuring compliance with mitigation measures associated with revise d project. Monitoring shall consist of review of appropriate documentation, such as plans or reports prepared by the party responsible for implementation or by field observation of the mitigation measure during implementation.

The revised project Applicant and the Applicant’s Contractor shall be responsible for implementation of all mitigation measures, unless otherwise noted in the table.

A-2
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
Aesthetics
MM4.1-1 MM4.1-1 To the extent feasible, the Applicant shall use non- reflective façade treatments, such as matte paint or
glass coatings. Prior to issuance of building permits
for the proposed project, the Applicant shall indicate
provision of these materials on the building plans.

Project building
plans
Review and approve
building plans for
inclusion of features
Plan check prior
to issuance of
building permit
Planning

Air Quality
MM4.2-1 MM4.2-1 During construction, operators of any gas or diesel fueled equipment, including vehicles, shall be
encouraged to turn off equipment if not in use or left
idle for more than five minutes.

Contract language
and notes on
grading and
building plans
Review and approve
contract
specifications,
grading and building
plans for inclusion
Plan check prior
to issuance of a
grading permit

Perform periodic
field check during
construction to
ensure
compliance
Planning

MM4.2-2 MM4.2-2 The Applicant shall require by contract specifications that the architectural coating (paint and primer)
products used would have a low VOC rating.

Contract specifications shall be included in the
proposed project construction documents, which
shall be reviewed by the City prior to issuance of a
building permit.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-3 MM4.2-3 The Applicant shall require by contract specifications that electrical outlets are included in the building
design of the loading docks to allow use by
refrigerated delivery trucks. The proposed project
Applicant shall require that all delivery trucks do not idle for more than five minutes. If loading and/or
unloading of perishable goods would occur for more
than five minutes, and continual refrigeration is
required, all refrigerated delivery trucks shall use the electrical outlets to continue powering the truck
Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

A-3
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
refrigeration units when the delivery truck engine is
turned off.

MM4.2-4 MM4.2-4 The proposed project would provide plentiful short- and long-term bicycle parking facilities to meet peak
demand (generally one bike rack space per
20 vehicle/employee space).

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-5 MM4.2-5 All retail and residential facilities shall ensure that current transit schedules are available in common
areas for the use of employees and residents.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-6 MM4.2-6 All retail facilities in excess of 150 employees shall provide preferential vanpool/carpool employee
parking.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-7 MM4.2-7 All retail facilities in excess of 150 employees shall be required to provide free parking passes to eligible
employees.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-8 MM4.2-8 All residential and nonresidential coatings applied during subsequent maintenance activities shall be
required to be low VOC paints with a reduction of at
least 20 percent.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-9 MM4.2-9 Residential and Retail development shall implement waste reduction and recycling measures such that
waste diversion from landfills equals 65 percent, the
current City Standard for waste diversion.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

A-4
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
MM4.2-10 MM4.2-10 Residential and Retail development shall use drought tolerant plants for landscaping. The following
are suggestions to enhance the benefits of this
measure. Evergreen trees on the north and west
sides afford the best protection from the setting
summer sun and cold winter winds. Additional
considerations include the use of deciduous trees on
the south side of the house that will admit summer
sun; evergreen plantings on the north side will slow
cold winter winds; constructing a natural planted
channel to funnel summer cooling breezes into the
house. Neighborhood CCR’s not requiring that front
and side yards of single-family homes be planted
with turf grass. Vegetable gardens, bunch grass, and
low –water landscaping shall also be permitted, or
even encouraged.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-11 MM4.2-11 Residential and Retail development shall implement water reduction features such that water usage is
reduced by 20 percent. Water reduction features
may include, but are not limited to:
■ Installation of water conserving irrigation
systems such that watering times can be varied
and that the system will shut off during rain
events
■ Installation of water saving appliances
■ Installation of low-flow showers and toilets
Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-12 MM4.2-12 Residential and Retail developments shall implement energy saving measures such that natural gas usage
is reduced to at least 15 percent below 2008 Title 24
standards. This could include, but is not limited to,
the following:
■ Use of light colored roofing material
■ Planting trees appropriately to provide shading
Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

A-5
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
during the heat of the day
■ Increase energy efficiency of insulation, doors,
and windows
MM4.2-13 MM4.2-13 Electrical outlets shall be located outside in the front and rear of both residential and retail development
such that 20 percent of landscaping equipment can
be electrically powered.

Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

MM4.2-14 MM4.2-14 Residential and Retail developments shall implement energy saving or incorporate renewable resources
such that a minimum of 30 percent of the projects
total electrical consumption is offset. Energy saving
features may include, but are not limited to the
following:
■ Use of Energy Star appliances
■ Use of energy saving lighting and light fixtures
including dimmer switches, motion sensors, and
timers
■ Addition of photovoltaic cells to offset onsite
electrical usage
■ Instillation of energy efficient HVAC units
Contract language
and notes on
building plans
Review and approve
contract
specifications and
building plans for
inclusion
Plan check prior
to issuance of a
building permit
Planning

Biological Resources
MM3.1-1 MM4.3-1 Nesting habitat for protected or sensitive avian species:

1. Vegetation removal and construction shall occur
between September 1 and January 31 whenever
feasible.

2. Prior to any construction or vegetation removal
between February 15 and August 31, a nesting
survey shall be conducted by a qualified biologist
of all habitats within 500 feet of the construction
area. Surveys shall be conducted no less than
Developer shall
submit construction
schedule (including
grading activities)
as evidence of
construction
overlap with
breeding season.

Review schedule
and field survey
report, and as
necessary, review
and approve plans
indicating
construction limits

Plan check prior
to issuance of a
grading permit

Planning

A-6
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
14 days and no more than 30 days prior to
commencement of construction activities and
surveys will be conducted in accordance with
CDFG protocol as applicable. If no active nests
are identified on or within 500 feet of the
construction site, no further mitigation is
necessary. A copy of the pre-construction survey
shall be submitted to the City of Huntington
Beach. If an active nest of a MBTA protected
species is identified onsite (per established
thresholds) a 250-foot no-work buffer shall be
maintained between the nest and construction
activity. This buffer can be reduced in
consultation with CDFG and/or USFWS.

3. Completion of the nesting cycle shall be
determined by qualified ornithologist or biologist.

If construction
occurs during
relevant breeding,
developer shall
present a survey
report (prepared by
a consultant
approved by the
City) to the City
prior to issuance of
a grading permit. If
nests are found,
developer shall
submit plans
identifying nest
locations and limits
of construction
activities.

Perform periodic
field check to
ensure compliance
During
construction
Planning

Cultural Resources
MM3.1-2 MM4.4-1 The Applicant shall arrange for a qualified professional archaeological and paleontological
monitor to be present during all project-related
ground-disturbing activities. In addition, all
construction personnel shall be informed of the need
to stop work on the project site in the event of a
potential find, until a qualified archaeologist or
paleontologist has been provided the opportunity to
assess the significance of the find and implement
appropriate measures to protect or scientifically
remove the find. Construction personnel will also be
informed that unauthorized collection of cultural
resources is prohibited.

Proof of retention of
archaeological and
paleontological
monitor
Verify retention of
qualified monitors

Periodic field check
to ensure monitors
are present
Plan check prior
to issuance of
grading permit

Throughout
ground-disturbing
activities
Planning

Planning

MM3.1-3 MM4.4-2 If archaeological or paleontological resources are discovered during ground-disturbing activities, all
construction activities within 50 feet of the find shall Notes on grading
plans

Review and approve
grading plans for
inclusion
Plan check prior
to issuance of
grading permit
Planning

A-7
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
cease until the archaeologist/paleontologist
evaluates the significance of the resource. In the
absence of a determination, all archaeological and
paleontological resources shall be considered
significant. If the resource is determined to be
significant, the archaeologist or paleontologist, as
appropriate, shall prepare a research design for
recovery of the resources in consultation with the
State Office of Historic Preservation that satisfies the requirements of Section 21083.2 of CEQA. The
archaeologist or paleontologist shall complete a
report of the excavations and findings, and shall
submit the report for peer review by three County-
certified archaeologists or paleontologists, as
appropriate. Upon approval of the report, the City
shall submit the report to the South Central Coastal
Information Center at California State University,
Fullerton, and keep the report on file at the City of
Huntington Beach.

Research design
and recovery plan,
if required

Review and approve
research design and
recovery plan

Throughout
ground-disturbing
activities

Peer review
by three
County-
certified
professionals

MM3.1-4 MM4.4-3 In the event of the discovery of a burial, human bone, or suspected human bone, all excavation or
grading in the vicinity of the find shall halt
immediately, the area of the find shall be protected,
and the Developer shall immediately notify the City
and the Orange County Coroner of the find and
comply with the provisions of P.R.C. Section 5097. If
the human remains are determined to be prehistoric,
the Coroner will notify the NAHC, which will
determine and notify a Most Likely Descendent
(MLD). The MLD shall complete the inspection of the
site within 24 hours of notification, and may
recommend scientific removal and non-destructive
analysis of human remains and items associated
with Native American burials.

Notes on grading
plans
Review and approve
grading plans for
inclusion
Plan check prior
to issuance of
grading permit

Throughout
ground-disturbing
activities

Orange
County
Coroner

Planning

A-8
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
Geology and Soils
MM3.1-5 MM4.5-1 The grading plan prepared for the proposed project shall contain the recommendations of the final soils
and geotechnical report. These recommendations
shall be implemented in the design of the project,
including but not limited to measures associated with
site preparation, fill placement, temporary shoring
and permanent dewatering, groundwater seismic
design features, excavation stability, foundations,
soil stabilization, establishment of deep foundations,
concrete slabs and pavements, surface drainage,
cement type and corrosion measures, erosion
control, shoring and internal bracing, and plan
review.

Notes on grading
plan and building
plans
Review and approve
grading and building
plans for inclusion of
final soils and
geotechnical
recommendations
Plan check prior
to issuance of a
grading permit
Public Works

Building and
Safety

Hazardous Materials
MM4.3-1 MM4.6-1 In the event that soil and/or groundwater contamination that could present a threat to human
health or the environment is encountered during
construction in the project area, construction
activities in the immediate vicinity of the
contamination shall cease immediately. For soil
and/or groundwater impacts, Risk Management
Plan(s) shall be submitted to the appropriate
agencies (e.g., Huntington Beach Fire Department
HBFD, Orange County Health Care Agency OCHCA,
Air Quality Management District AQMD, Regional
Water Quality Control Board RWQCB) for review and
approval. The Plan(s) shall (1) identify the
contaminants of concern and the potential risk each
contaminant would pose to human health and/or the
environment during construction and post-
development and (2) describe measures to be taken
to protect workers, and the public, and/or the
environment from exposure to potential site hazards.

Such measures could include a range of options,
Risk Management
Plan
& Site Health and
Safety Plan
Review and approve
any grading plans
for inclusion
Plan check prior
to issuance of
any grading
permit
Fire

A-9
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
including, but not limited to, physical site controls
during construction, remediation, long-term
monitoring, post-development maintenance or
access limitations, or some combination thereof. A
Site Health and Safety Plan that meets California
Occupational Safety and Health Administration
requirements shall be prepared and in place prior to
commencement of work in any contaminated area.

MM4.3-2 MM4.6-2 Prior to the issuance of grading permits, the project shall comply with HBFD City Specification No. 429,
Methane District Building Permit Requirements. A
plan for the testing of soils for the presence of
methane gas shall be prepared and submitted by the
Applicant to the HBFD for review and approval, prior
to the commencement of sampling. If significant
levels of methane gas are discovered in the soil on
the project site, the Applicant’s grading, building and methane plans shall reference that a sub-slab
methane barrier and vent system will be installed at
the project site per City Specification No. 429, prior
to plan approval. If required by the HBFD, additional
methane mitigation measures to reduce the level of
methane gas to acceptable levels shall be
implemented.

Methane Testing
Plan

Notes on building
and methane plans
Review and
approval of testing
plan

Review and approve
building and
methane gas plans
for appropriate
documentation
Prior to
commencement-
of sampling

Prior to issuance
of any grading
permit and during
construction
Fire

Fire

MM4.3-3 MM4.6-3 Prior to project implementation, the Applicant shall submit for approval a soil testing and management
work plan to the appropriate agencies (including the
HBFD, OCHCA, AQMD, RWQCB) for review and
approval. All native and imported soils associated
with the proposed project site shall meet the
standards outlined under the City’s Specification No.
431-92 prior to the approval of grading plans and
building plans by the HBFD, and any other
appropriate federal, state, local requirements.

Additionally, all work at the project site shall conform to the City’s Public Works Department requirements
Soil Testing Work
Plan

Contract language
Review and approve
soil testing work
plan

Review and approve
haul route plans
Prior to issuance
of any grading
permit

Prior to issuance
of haul permits
Fire

Public Works

A-10
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
(i.e., haul route permits).

Hydrology and Water Quality
MM3.1-6 MM4.7-1 The Applicant shall prepare a City of Huntington Beach-approved Water Quality Management Plan in
accordance with the DAMP requirements for a
Project WQMP and measures described below.

A final WQMP shall be prepared to satisfy the
requirements of the DAMP and City LIP. The final
WQMP shall incorporate water quality BMPs for all
improved phases of the proposed project. Prior to
receiving a precise grading permit, three signed
copies and an electronic copy on CD (.pdf or .doc
format) shall be submitted to the Public Works
Department. The final WQMP shall include the
following additional requirements:

Project and Site Characterization Requirements
■ Entitlement Application numbers and site
address shall be included on the title sheet of the
WQMP
■ In project description section, explain whether
proposed use includes onsite food preparation,
eating areas (if not please state), outdoor
activities to be expected, vehicle maintenance,
service, washing cleaning (if prohibited onsite,
please state).
■ All potential pollutants of concern for the
proposed project land use type as per Table 7.II-
1 of the Orange County Model Water Quality
Management Plan shall be identified
■ A narrative describing how all potential pollutants
of concern will be addressed through the
implementation of BMPs and describing how site
design BMP concepts will be considered and
Water Quality
Management Plan
Review and approve
WQMP
Prior to receiving
a precise grading
permit
Public Works

A-11
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
incorporated into the project design shall be
included.
■ Existing soil types and estimated percentages of
perviousness for existing and proposed
conditions shall be identified
■ In Section I of the WQMP, state verbatim the
Development Requirements from the Planning
Department’s letter to the Applicant.
■ A figure showing the selected treatment BMPs
and drainage areas shall be included in the
WQMP.

Structural Treatment BMPs
■ Infiltration-type BMPs shall not be used. These
would not be suitable or feasible for the project
site because, as mentioned above, the project
site soils have a shallow depth to seasonal high
groundwater.
■ Wet swales and grassed channels shall not be
used because of the slow infiltration rates of
project site soils and potentially shallow depth to
groundwater
■ Dry and wet detention basins and constructed
wetlands are not recommended for the project
site because of the amount of area required for
treatment and potential impacts to shallow
groundwater. Additionally, wet detention basins
would require approval by the vector control
agency.
■ If proprietary Structural Treatment Control
devices are used, they shall be sited and
designed also in compliance with the
manufacturers design criteria.
■ Treatment BMPs shall be selected such that
A-12
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
standing water drains within 24 hours or as
required by the City’s vector control.
■ Excess stormwater runoff shall bypass the
treatment BMPs unless they are designed to
handle the flow rate or volume from a 100-year
storm event without reducing effectiveness.

Effectiveness of any treatment BMP for
removing the pollutants of concern shall be
documented.
■ The WQMP shall incorporate water efficient
landscaping using drought tolerant, native plants
in accordance with Landscape and Irrigation
Plans as set forth by the Association (see
below).
■ Pet waste stations shall be provided and
maintained.
■ Building materials shall minimize exposure of
bare metals to stormwater. Copper or Zinc
roofing materials, including downspouts, shall
not be used. Bare metal surfaces shall be
painted with non-lead containing paint.

For all structural treatment and source control BMPs,
the WQMP shall identify the responsible party, such
as a Master Residential Association and Master
Commercial Association or property owner, for
maintenance of the treatment system, and a funding
source or sources for its operation and maintenance.

The term Association refers to the responsible party.

Operations and maintenance BMPs shall include, but
not be limited to:
■ The Association shall dictate minimum
landscape maintenance standards and tree
trimming requirements for the total project site.

Landscape maintenance must be performed by
A-13
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
a qualified landscape maintenance company or
individual in accordance with a Chemical
Management Plan detailing chemical application
methods, chemical handling procedures, and
worker training. Pesticide application shall be
performed by a certified applicator. No chemicals
shall be stored on-site unless in a covered and
contained area and in accordance with an
approved Materials Management Plan.

Application rates shall not exceed labeled rates
for pesticides, and shall not exceed soil test
rates for nutrients. Slow release fertilizers shall
be used to prevent excessive nutrients in runoff
or irrigation waters.
■ The Association shall have the power and duty
to establish, oversee, guide, and require proper
maintenance and tree trimming procedures per
the ANSI A-300 Standards as established by the
International Society of Arborist. The Association
shall require that all trees be trimmed by or
under the direct observation/direction of a
licensed/certified Arborist, for the entire The
Village at Bella Terra improvement area. The
Association shall establish minimum standards
for maintenance for the total community, and
establish enforcement thereof for the total
community. The Association shall rectify
problems arising from incorrect tree trimming,
chemical applications, and other maintenance
within the total community.
■ Landscape irrigation shall be performed in
accordance with an Irrigation Management Plan
to minimize excess irrigation contributing to dry-
and wet-weather runoff. If automated sprinklers
are used, they shall be inspected at least
quarterly and adjusted yearly to minimize
A-14
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
potential excess irrigation flows. Landscape
irrigation maintenance shall be performed in
accordance with the approved irrigation plans,
the City Water Ordinance and per the City
Arboricultural and Landscape Standards and
Specifications.
■ Proprietary stormwater treatment systems
maintenance shall be in accordance with the
manufacturer’s recommendations. If a non-
proprietary treatment system is used,
maintenance shall be in accordance with
standard practices as identified in the CASQA
(2003) handbooks, City BMP guidelines, or other
City-accepted guidance.
■ Education programs. Signage, enforcement of
pet waste controls, and public education would
improve use and compliance, and therefore,
effectiveness of this BMP and reduce potential
for hazardous materials and other waste in
stormwater runoff. The Association shall prepare
and install appropriate signage, disseminate
information to residents and retail businesses,
and include pet waste controls in the Association
agreement/Conditions, Covenants, and
Restrictions.
■ Street sweeping shall be performed at an
adequate frequency to prevent build up of
pollutants (see
http://www.fhwa.dot.gov/environment/ultraurb/
for street sweeping effectiveness).
■ Maintenance Plan. The Association shall
develop a maintenance plan for BMPs and
facilities identifying responsible parties and
maintenance schedules and appropriate BMPs
to minimize discharges of contaminants to storm
A-15
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
drain systems during maintenance operations.

No discharge of building or courtyard/open
space wash water shall enter the storm drain
system unless treated and approved by the City
of Huntington Beach.
■ Reporting requirements: the Association shall
prepare an annual report and submit the annual
report to the City of Huntington Beach
documenting the BMPs operations and
maintenance conducted that year. The annual
report shall also address the potential system
deficiencies and corrective actions taken or
planned.

The Applicant is encouraged to consider the
following BMPs:
■ Use of porous concrete or asphalt (if acceptable
to the Geotechnical Engineer) or other pervious
pavement for driveways, paths, sidewalks, and
courtyards/open space areas to the maximum
extent practicable will reduce pollutants in
stormwater runoff as well as provide some
detention within the material void space. If
porous paver blocks are used, they must be
adequately maintained to provide continued
porosity (effectiveness).
■ Incorporation of rain gardens or cisterns to reuse
runoff for landscape irrigation
■ Site design and landscape planning to group
water use requirements for efficient irrigation
■ Sand filters or other filters(including media filters) for rooftop runoff
■ Dry swales a dry swale treatment system could
be used if sufficient area, slope gradient, and
length of swale could be incorporated into the
A-16
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
project design (PBS&J 2008). Dry swales could
remove substantial amounts of nutrients,
suspended solids, metals, and petroleum
hydrocarbons (PBS&J 2008).
■ Other proprietary treatment devices (if
supporting documentation is provided)
These BMPs shall not be used because they have
not been shown to be effective in many situations.

Therefore, unless sufficient objective studies and
review are available and supplied with the WQMP to
correctly size devices and to document expected
pollutant removal rates the WQMP shall not include:
■ Hydrodynamic separator type devices as a BMP
for removing any pollutant except trash and
gross particulates
■ Oil and Grit separators
CofA3.1-1 CofA4.7-1 Prior to receiving a precise grading or building permit, the Applicant shall prepare a site Grading
and Drainage Plan containing the recommendations
of the final Soils and Geotechnical Reports analysis
for temporary and permanent groundwater
dewatering as well as for surface drainage.

Grading and
Drainage Plan
Review and
approval of Grading
and Drainage Plan
Prior to issuance
of a precise
grading or
building permit
Public Works

MM3.1-7 MM4.7-2 The Applicant shall prepare a Groundwater Hydrology Study to determine the lateral
transmissivity of area soils and a safe pumping yield
such that dewatering activities do not interfere with
nearby water supplies. Based on the Groundwater
Hydrology Study, the Geotechnical, Hydrogeologic,
or other qualified Engineer shall determine whether
permanent groundwater dewatering is feasible within
the constraints of a safe pumping level. The project
Applicant shall incorporate the qualified Engineers
designs and recommendations into project plans. If
safe groundwater dewatering is determined to not be
Groundwater
Hydrology Study
Review and approve
Groundwater
Hydrology Study
Prior to issuance
of a precise
grading permit
Public Works

A-17
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
feasible, permanent groundwater dewatering shall
not be implemented. The City’s Director of Public
Works shall approve or disapprove of any permanent
groundwater dewatering based on the Groundwater
Hydrology Study and qualified Engineer
recommendations.

MM3.1-8 MM4.7-3 Prepare a Hydrology and Hydraulics Study and City- approved Site Development and Drainage Plan and
reduce peak runoff rates to the existing conditions
25-year storm event peak runoff rate; the design
capacity of the City storm drainage channels.

Prior to receiving a precise grading permit, the
project Applicant shall:
■ Prepare a Site Development and Drainage Plan
■ Prepare an existing and proposed project
Hydrology and Hydraulics Study based on the
Site Development and Drainage Plan. The
existing hydrology shall include an evaluation of
run-on to the project site because of spillage
from the Bella Terra Mall drainage system, north
of the Montgomery Ward Site.
■ Implement stormwater detention BMPs, based
on the Hydrology and Hydraulics Study, for all
storm events up to the 100-year storm event, to
ensure that peak flow rates from the project site
to the off-site storm drain system do not exceed
the existing 25-year storm event peak flow rate.
■ Analyze existing street flow capacity to
determine exceedance of any design criteria and
guidelines from the City’s MPD.
■ Additionally, stormwater detention BMPs shall be
implemented such that areas draining to the
existing piped storm drain systems do not
exceed existing peak flow rates for the 10- and
Site Development
and Drainage Plan

Hydrology and
Hydraulics Study

Precise final
grading and street
improvement plans
and studies
Review and approve
plan

Review and approve
study

Inspect project site;
verify that drainage
is in accordance
with the Final
Drainage Plan and
that required
detention/storm
drain system
improvements have
been implemented.

Prior to issuance
of a precise
grading permit

Prior to issuance
of a precise
grading permit

Following
grading,
excavation, and
installation of
utilities
Public Works

Public Works

Public Works

A-18
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
25-year storm events and that peak flows to
local streets do not exceed MPD and City design
guidelines:
 In accordance with the MPD, streets must
be designed to leave at least one-lane free
of ponded water in each direction for
conveyance of the 10-year storm event,
must be contained within the curbs for the
25-year storm event, cannot exceed 0.2 foot
above the street curbs for the 50-year storm
event, and cannot exceed 0.5 foot above the
street curbs for the 100-year storm event.
 The internal storm drain system must be
adequate to detain sufficient stormwater
runoff such that the street flow requirements
are not exceeded.
 Surface ponding or sump areas on the site
will be limited to a maximum depth of 8-
inches, and shall be distributed to areas
away from building pads, and remote areas
of parking lots.
 Surface ponding or sump areas shall not
exceed 1/3 of the proposed parking area in
surface area. If there are proposed
underground parking structures, they shall
not be used for retention or storage, unless
approved by the Director of Public Works.
■ Stormwater retention areas shall be analyzed for
back-to-back 24-hour 100-year storm events per
the requirements of the Orange County Flood
Control Manual.
■ The final Hydrology and Hydraulics Study shall
identify and evaluate the routing through the
project site in relation to the new buildings,
A-19
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
landscaping, utilities, and others. Sufficient
detention, provided to mitigate constrained
capacities in the Bella Terra Mall drainage
system, shall be implemented for run-on from
north of the Montgomery Ward site onto the
project site.
■ The final Hydrology and Hydraulics Study shall
incorporate all NPDES requirements in effect at
the time that the precise grading permit is
anticipated to be issued or when the study is
accepted as complete.
■ Precise final grading and street improvement
plans and studies shall be submitted to the
Public Works Department for review and
approval. The project developer shall incorporate
into a final Drainage Plan all recommendations
and requirements identified the review of the
final Hydrology and Hydraulics Study and
identified stormwater detention
requirements/features.

Following grading, excavation, and installation of
utilities, the Public Works Department shall inspect
the project site and verify that project site drainage is in accordance with the Final Drainage Plan and that
required detention/storm drain system improvements
have been implemented.

MM3.1-9 MM4.7-4 The Applicant shall design and implement project site drainage features to minimize stormwater runoff
and flood waters from entering into any proposed
underground parking structures or otherwise
contribute to flood hazards and shall incorporate
flood-proofing and hydrostatic pressure measures for
all below-ground structures.

Prior to receiving a precise grading or building
permit, the Applicant shall prepare a Precise Grading
Precise Grading
and Site
Development and
Drainage Plan
Review and
approval of Grading
and Site
Development and
Drainage Plan
Prior to issuance
of a precise
grading or
building permit
Public Works

A-20
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
and Site Development and Drainage Plan identifying
BMPs to minimize underground structure flooding.

The Precise Grading and Site Development and
Drainage Plan shall implement design features to
minimize flooding of underground structures such as,
but not limited to:
■ Grade areas to drain away from the structure
entryways
■ Implement runon prevention (e.g., berms or
dikes) to direct project site runoff and flood flows
away from underground structure entryways
■ Elevate underground structure entryways to two-
feet above the existing grade (approximate
depth of potential flooding from the East Garden
Grove-Wintersburg Channel)
■ Implement sumps and pumps within the
underground structures to remove any runoff
entering the underground structures (this
measure shall also be subject to the WQMP and
DAMP BMP requirements for discharge
treatment and disposal)
Additionally, the Applicant shall incorporate flood-
proofing measures to prevent seepage flooding.

Underground structures materials and design shall
be in accordance with FEMA floodplain development
requirements and the 2007 California Building Code
for structures subject to flooding and hydrostatic
pressures.
■ The geotechnical engineer and/or waterproofing
specialist shall prepare design requirements for
flood-proofing the underground structures and
ensuring that structures are build to withstand
hydrostatic pressures.
■ Any utilities located in below grade structures
A-21
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
shall be protected from ponding water and
seepage in accordance with the geotechnical
engineer recommendations and 2007 California
Building Code.

The Applicant shall also design on-site runoff to drain away from building foundations and shall not allow
for more than 8 inches of ponding at any location on-
site.

Noise
MM4.5-1 MM4.9-1 The Applicant shall require by contract specifications that the following construction best management
practices (BMPs) be implemented by contractors to
reduce construction noise levels:
■ Notification shall be mailed to owners and
occupants of all developed land uses
immediately bordering or directly across the
street from the project site area providing a
schedule for major construction activities that will
occur through the duration of the construction
period. In addition, the notification will include
the identification and contact number for a
community liaison and designated construction
manager that would be available on site to
monitor construction activities. The construction
manager will be located at the on-site
construction office during construction hours for
the duration of all construction activities.

Contract information for the community liaison
and construction manager will be located at the
construction office, City Hall, and the police
department.
■ Ensure that construction equipment is properly
muffled according to industry standards
■ Utilize the best available technology to reduce
Contract language
and notes on
grading and
building plans
Review and approve
contract
specifications,
grading and building
plans for inclusion
Plan check prior
to issuance of a
grading permit
Planning

A-22
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
noise levels from pile driving activities, including
but not limited to the use of noise blankets or
temporary sound barriers
■ Place noise-generating construction equipment
and locate construction staging areas away from
sensitive uses, where feasible
■ Schedule pile-driving activities between the
hours of 8:00 A.M. and 4:00 P.M. on Mondays
through Fridays only.

MM4.5-2 MM4.9-2 The Applicant shall require by contract specifications that construction staging areas, along with the
operation of earthmoving equipment within the
project site, are located as far away from vibration-
and noise-sensitive sites as possible. Contract
specifications shall be included in the proposed
project construction documents, which shall be
reviewed and approved by the City.

Contract language
and notes on
grading plans
Review and approve
grading plans for
inclusion
Prior to issuance
of a grading
permit
Planning

MM4.5-3 MM4.9-3 Prior to issuance of building permits, the Applicant shall submit an acoustical study, prepared by a
certified acoustical engineer, to ensure that exterior
(e.g., patios and balconies) and interior noise levels
would not exceed the standards set forth in the City
of Huntington Beach Municipal Code Sections

8.40.050 through 8.40.070. Final project design shall
incorporate special design measures in the
construction of the residential units, if necessary.

Acoustical Study Review and
approval of study
and building plans
for inclusion any
special design
measures
Prior to issuance
of building
permits
Planning

Public Services
MM3.1-10 MM4.11-1 Radio antenna receivers (BDA’s) shall be installed in all underground parking structures in order to allow
emergency responders to use their radio systems.

Final building plans Review and
approval of building
plans for inclusion
Prior to issuance
of a building
permit
Planning

A-23
Appendix A Revised Mitigation Monitoring and Reporting Program City of Huntington Beach, The Revised Village at Bella Terra Addendum to The Village at Bella Terra Environmental Impact Report Revised Project Mitigation Monitoring and Reporting Program Revised
Project
Mitigation
Measure No.

Previous
Project
Mitigation
Measure No. Mitigation Measure
Implementation
Documentation Monitoring Activity Timing
Responsible
Monitor
Compliance
Verification Signature Date
Transportation/Traffic
MM4.6-1 MM4.13-1 The Applicant shall provide funds on a fair share basis to the City of Huntington Beach to construct
either an additional northbound through lane or an
additional westbound through lane at the intersection
of Beach Boulevard and Edinger Avenue.

Proof of fair share
payment
Confirm payment Prior to issuance
of certificate of
occupancy
Public Works

Utilities and Service Systems
MM3.1-11 MM4.14-1 Prior to issuance of a building permit for the proposed project, the existing 10-inch stubout
connection shall be replaced with a stubout, whose
size will be determined with a sewer study, to the 69-
inch OCSD trunk sewer line so that a replacement
sewer lateral can be installed to service the
development. The sewer study shall also evaluate
the condition of the existing OCSD manhole in
Edinger Avenue to determine if the manhole requires
rehabilitation. In addition, a second 12-inch point of
connection shall be constructed for additional
capacity, if necessary.

Sewer Study

Infrastructure
Improvement Plans
Review and
approval of study

Review and
approval of
infrastructure plans
Prior to issuance
of a grading
permit

Prior to issuance
of a building
permit
Public Works

Public Works