Att #1 Resolution No. 2022-63 SEIR (FOF_SOC)

City Council/Public Financing Authority
November 29, 2022

Document
Att #1 Resolution No. 2022-63 SEIR (FOF_SOC)
Meeting
November 29, 2022
Body
City Council/Public Financing Authority
Original file
2.2 MB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

Subsequent Final
Environmental Impact Report:

Findings of Fact/Statement of Overriding Considerations SCH #2021080104
2021-2029 Housing Element Update

LEAD AGENCY

CITY OF HUNTINGTON BEACH

DEPARTMENT OF COMMUNITY
2000 MAIN STREET 3RD FLOOR
HUNTINGTON BEACH, CA 92648
(714) 536-5721

CONSULTANT

KIMLEY-HORN AND ASSOCIATES, INC.

MS. RITA GARCIA
1100 TOWN AND COUNTRY ROAD, SUITE 700
ORANGE, CA 92868
(714) 786-6116

OCTOBER 2022

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Findings of Fact/Statement of Overriding Considerations

October 2022 Page 1
Table of Contents

1.0 INTRODUCTION .............................................................................................................................. 2

2.0 CEQA FINDINGS .............................................................................................................................. 4

3.0 FINDINGS REGARDING PROJECT ALTERNATIVES ................................................................... 17

3.1. Introduction ............................................................................................................................ 17

3.2. Project Objectives ................................................................................................................... 17

3.3. Selection of Alternatives ......................................................................................................... 18

3.4. Project Alternative Findings .................................................................................................... 18

4.0 STATEMENT OF OVERRID ING CONSIDERATIONS ................................................................... 25

4.1. Introduction ............................................................................................................................ 25

4.2. Significant Adverse Cumulative Impact .................................................................................. 25

4.3. Findings ................................................................................................................................... 26

4.4. Overriding Considerations ...................................................................................................... 26

List of Tables
Table 1: CEQA Findings for the HEU…………………………………………………………………………………………………………5

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Findings of Fact/Statement of Overriding Considerations

October 2022 Page 2

1.0 INTRODUCTION
This document presents the Findings of Fact and Statement of Overriding Considerations that must be adopted by the City of Huntington Beach (City) pursuant to the requirements of Sections 15091 and 15093, respectively, of the CEQA Guidelines prior to the approval of the City of of Huntington Beach 2021- 2029 Housing Element Update (otherwise referred to as “HEU” or the “Project”).

This document is organized as follows:

Chapter 1 Introduction to the Findings of Fact and Statement of Overriding Considerations.

Chapter 2 CEQA Findings of the Draft Subsequent Environmental Impact Repo rt (Draft S EIR), including the identified significant cumulative impacts.

Chapter 3 Summarizes the alternatives to the Project and evaluates them in relation to the findings contained in Section 15091(a)(3) of the CEQA Guideline s. The City must consider and make findings regarding alternatives when a project would involve environmental impacts that cannot be reduced to a less than significant level, or cannot be substantially reduced, by proposed mitigation measures.

Chapter 4 Statement of Overriding Considerations , as required by Section 15093 of the CEQA Guidelines, for significant impacts of a proposed project that cannot be mitigated to a less than significant level.

The Housing Element, which is a component of the Huntington Beach General Plan, provides direction for implementation of various programs to meet existing and projected future housing needs for all income levels within Huntington Beach. The City’s projected housing need for the 6th Cycle Regional Housing Needs Assessment (RHNA) planning period (2021 -2029) is 13,368 dwelling units (11,743 units when accounting for existing applications and projects that are currently under review).

State housing law requires the City to specify the number of housing units that can realistically be accommodated on candidate housing sites. The City is not required to build dwelling units in order to meet its RHNA allocation, only to identify potential sites and create the framework to allow the market the opportunity to develop these units. Therefore, the Project, as defined for CEQA purposes, consists of the Housing Program to accommodate the lower -income RHNA units, including amendments to existing land use designations and zoning districts, an affordable housing overlay, and identi fication of underutilized, residentially-zoned parcels in an inventory of 378 candidate housing sites.

The Housing Program specifically addresse d in the SEIR includes amendments to the Huntington Beach Zoning and Subdivision Ordinance (HBZSO) (Zoning Map Amendment Nos. 22-001 and 22-002 and Zoning Text Amendment Nos. 22-006, 22-007, 22-008, and 22-009) and the Huntington Beach General Plan Land Use Element (General Plan Amendment No. 22 -001) for changes to base/overlay districts and land use City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Findings of Fact/Statement of Overriding Considerations

October 2022 Page 3
designations, a s well amendments to other planning documents, as needed for clarification and consistency purposes and to accommodate future housing sites as part of the HEU’s Implementation Program. These amendments provide capacity for future development of approximate ly 19,738 housing units to meet the City’s remaining unmet RHNA of 11,743 housing units.

Other Federal, State, and local agencies are involved in the review and approval of the HEU, including those agencies designated as trustee and responsible agencies. A trustee agency is a State agency that has jurisdiction by law over natural resources affected by a project that are held in trust for the people of the State. A responsible agency is an agency, other than the lead agency, that has responsibility for carrying out or approving a project. Responsible and trustee agencies are consulted by the CEQA lead agency to ensure the opportunity for input and also review and comment on the Draft SEIR. Responsible agencies also use the CEQA document in their decision-making. Several agencies other than the City may require permits, approvals, and/or consultation to implement various HEU programs.

Responsible/Trustee Agencies for the HEU include, but are not limited to:
• South Coast Air Quality Management District (SCAQMD); • Santa Ana Regional Water Quality Control Board (RWQCB); and • State Department of Housing and Community Development (HCD).

Other agencies may use the Final S EIR in exercising their duties even if they do not have discretionary permit approval authority over all or parts of the HEU (or implementation of individual projects developed as a result of the HEU ). All projects that are proposed in the future under the HEU will be required to obtain all necessary discretionary actions and environmental clearance, separate from this HEU.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Findings of Fact/Statement of Overriding Considerations

October 2022 Page 4

2.0 CEQA FINDINGS
This chapter summarizes the potential impacts that were identified in the Draft Subsequent EIR (Draft SEIR) and the findings that are required in accordance with Section 15091 of the CEQA Guidelines. The possible findings for each significant and/or potentially significant adverse impact are as follows:
(a) Changes or alterations have been required in, or incorporated into the project which avoid, substantially lessen, or reduce the magnitude of the significant environmental effect as identified in the Draft SEIR (“Finding 1”).
(b) Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the findings. Such changes have been adopted by such other agency or can and should be adopted by such other agency. (“Finding 2”) (c) Specific economic, social, or other considerations make infeasible the mitigation measures or project alternatives in the Draft SEIR (“Finding 3”).

CEQA requires that the lead agency adopt mitigation measures or project alternatives, where feasible, to avoid or substantially reduce significant environmental impacts that would otherwise occur as a result of a project. Project modification s or alternatives are not required where they are infeasible or where the responsibility for modifying a project lies with an other agency (CEQA Guidelines §15091, subd. (a), [3]).

Public Resources Code Section 21061.1 defines “feasible” to mean “capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social and technological factors.” CEQA Guidelines Section 15364 adds: “legal” considerations. (See also Citizens of Goleta Valley v. Board of Supervisors [Goleta II] [1990] 52 Cal.3d 553, 565 [276 Cal. Rptr. 410].) Only after fully complying with the findings requirement can an agency adopt a Statement of Overriding Considerations. (Citizens for Quality Growth v. City of Mount Shasta [1988] 198 Cal.App.3d 433, 442, 445 [243 Cal. Rptr. 727].) CEQA requires the Lead Agency to state in writing the specific rationale to support its actions based on a Final EIR and/or information in the record. This written statement is known as the Statement o f Overriding Considerations. The Statement of Overriding Considerations provides the information that demonstrates the decision making body of the Lead Agency has weighed the benefits of a project against its unavoidable adverse effects in determining whet her to approve a project. If the benefits of a project outweigh the unavoidable adverse environmental effects, the adverse effects may be considered “acceptable.”
This document presents the findings of the City as required by CEQA, cites substantial evidence in the record in support of each of the findings, and presents an explanation to supply the logical step between the finding and the facts in the record. (CEQA Guidelines §15091.). Additional facts that support the findings are set forth in the Draft SE IR, the Final SEIR, staff reports to the Planning Commission and City Council, and the record of proceedings.

Table 1 summarizes the potentially significant impacts that were reduced to less than significant levels with mitigation as well as the significant impacts, as proposed for certification and adoption of the HEU.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 5
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
Air Quality
The project would result in a project -
specific significant and unavoidable air
quality impact s associated with a
cumulatively considerable net increase
of criteria pollutants for which the region
is in nonattainment.

Air pollutant emissions associated with
implementation of the HEU would result from
construction activities and operation of uses all owed
under the HEU. The amount of emissions generated by
future development projects would vary depending on
its size, the land area that would need to be disturbed during construction, the length of the construction
schedule, and the number of development s being
constructed concurrently. Due to the speculative
nature of estimating emissions from individual projects at the programmatic level of the HEU, emissions cannot
be quantified (as there is no project -level data) to
establish whether the South Coast A
ir Quality
Management District (SCAQMD) thresholds would be
exceeded. Despite compliance with applicable General
Plan goals and policies and incorporation of mitigation measures GPU PEIR MM 4.2-1 through MM 4.2-14, the
HEU would result in a significant and unavoidable air
quality impact due to the violation of an air quality
standard and exposure of sensitive receptors to
substantial pollutant concentrations.

Finding 3. The City of Huntington Beach finds that even with implementation of all feasible mitigat ion measures and compliance with applicable General Plan goals and
policies, emissions associated with the HEU could result in an exceedance of established thresholds for daily
emissions due to the speculative nature of future
projects. No mitigation measures in addition to GPU PEIR MM 4.2-1 through MM 4.2-14 are feasible to reduce
construction or operational air quality impacts to a less than significant level.

The project would result in less than
significant impacts related to the
exposure of sensitive receptors to
substantial pollutant concentrations
following incorporation of mitigation
measures MM AQ-1 and AQ-2.

As previously stated, air pollutant emissions associated with implementation of the HEU would result from
construction activities and operati on of uses allowed
under the HEU. The amount of emissions generated by
future development projects would vary depending on
its size, the land area that would need to be disturbed during construction,
the length of the construction
schedule, and the number of developments being
constructed concurrently. Future applicants for
development projects facilitated by the HEU would be
required to implement mitigation measures MM AQ -1
and AQ-2, which would require project -specific health
risk assessments to minimize impacts associated with
Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
mitigation measures MM AQ-1 and AQ-2.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 6
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
the exposure of sensitive receptors to toxic air
contaminants and to ensure that construction
emissions do not result in the exceedance of localized
significance thresholds. With implementation of these
measures, impacts would be reduced to a less than
significant level.

The project would result in a cumulative
contribution to an air quality impact,
resulting in a significant and unavoidable
cumulative impact to air quality.

Cumulative development could violate an air quality
standard or contribute to an existing or projected air
quality violation because the South Coast Air Basin
(SCAB) is currently in nonattainment for ozone, PM 10,
and PM 2.5. Concerning daily emissions and the
cumulative net increase of any criteria pollutant for
which the region is in nonattainment, the Project would result in a cumulatively considerable increase to
nonattainment of ozone, PM 2.5, and PM10 standards in
the SCAB. Because no information on individual
projects is currently available, cumulative construction and operational emissions cannot be accurately
quantified. Despite compliance with General Plan goals
and policies and implementation of mitigation
measures GPU PEIR MM 4.2 -1 through MM 4 .2-14,
daily construction and operational air quality emissions would be considered cumulatively significant and
unavoidable.

Finding 3. The City of Huntington Beach finds that even with implementation of all feasible mitigation measures and compliance with applicable General Plan goals and
policies, implementation
of the HEU could result
significant unavoidable impacts related to a cumulat ive increase in construction and operational emissions due to the speculative nature of future projects. No
mitigation measures in addition to GPU PEIR MM 4.2-1
through MM 4.2-14 are feasible to reduce cumulative air quality impacts to a less than significant level.

Cultural Resources
Construction activities associated with
implementation of the Project could
cause a substantial adverse change in the
significance of a historical and/or an ,
archaeological resource and may result
in the disturbance of unknown human
remains. With incorporation of
mitigation measures GPU PEIR MM 4.4-
1, MM 4.4 -2, and MM 4.4- 3, these
It is currently infeasible to determ ine whether future development under the Project would result in
demolition or rem oval of historical or archaeological
resources, or the disturbance of unknown human
remains, within the planning area . However, future
projects would be required to implement mitigation
measures GPU PEIR MM 4.4-1, MM 4.4-2, and MM 4.4-
3, which outline procedures to be followed during
future construction activities to ensure compliance
with local, State, and Federal regulations pertaining to Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
mitigation measures GPU PEIR MM 4.4-1, MM 4.4-2, and
MM 4.4-3.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 7
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
impacts would be reduced to a less than
significant level.
such requires. Implementation of the se measures
would ensure that Project impacts with respect to
archaeological and historical resources, as well as
unknown human remains, would be less than
significant.

Geology and Soils
Future development under the HEU
could expose people and/or structures
to potentially substantial adverse
effects, including the risk of loss, injury,
or death, involving fault rupture,
expansive soils,
strong seismic
groundshaking and/or seismic -related
ground failure, including liquefaction .

Future development under the HEU also
has the potential to disturb unknown
paleontological resources. With
implementation of mitigation measures
GPU PEIR 4.5 -1 through MM 4.5- 3 and
MM 4.4-4, a s well as compliance with
applicable State and City regulations,
these impacts would be reduced to a less
than significant level.

All future housing development subject to rezoning and
within overlay zones would be required to comply with
applicable General Plan goals and policies related to
geology and soils and would also be required to
implement mitigation measures GPU PEIR 4.5- 1
through MM 4.5 -3, which require that relevant
geotechnical studies be undertaken prior to issuance of grading and construction permits. Future development
projects would also be required to implement
mitigation measures GPU MM 4.4- 2 through 4.2- 4,
which require site-specific studies and compliance with existing regulations to minimize impacts to unknown
paleontological resources. Implementation of these
measures and compliance with General Plan goals and
policies would reduce impacts associated with the
exposure of people to significant risk of geological
failures, as well as impacts to unknown paleontological resources, to a less than significant level.

Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project . No additional mitigation measures are necessary with implementation
mitigation measures GPU PEIR 4.5-1 through MM 4.5- 3
and MM 4.4-4.

Greenhouse Gas Emissions
The project would result in project-level
and cumulative significant and
unavoidable impacts due to the
generation of greenhouse gas ( GHG)
emissions and the potential conflict with
an applicable plan.

The Project would potentially generate GHG emissions
that could have a significant impact on the environment and could conflict with applicable plans for reducing
GHG emissions. Although the Project would aim to
comply with GHG reduction strategies outlined in the
GPU PEIR, these strategies require additional action by City staff and officials, and the feasibility of
implementing these strategies and specific
implementation details rely on numerous factors that
cannot be adequately forecasted at this time.

Finding 3. The City of Huntington Beach finds that even with implementation of all GHG reduction measures and
compliance with applicable General Plan goals and
policies, GHG emissions associated with the HEU could
would be significant and unavoidable. No feasible
mitigation meas ures are available to reduce GHG
impacts to a less than significant level.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 8
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
Furthermore, GHG emissions may differ from actual
Project future emissions due to various factors. As such, the Project’s potential to generate GHG emissions,
either directly or indirectly, and potential to conflict with an applicable plan, policy or regulation adopted
for the purpose of reducing t he GHG emissions would
be significant and unavoidable. Although both future
housing development facilitated by the Project and
cumulative projects are required to quantify project -
specific GHG emissions associated with construction
and operational activiti es and implement feasible
mitigation measures and/or GHG reduction strategies
to reduce GHG emissions, the contribution of daily
construction and operational GHG emissions has the
potential to create a significant impact. Thus, the
Project’s GHG impacts wo uld be cumulatively
significant and unavoidable.

Hazards
Implementation of future projects under
the HEU could create a potential
significant hazard to the public or the
environment through reasonably
foreseeable upset and accident
conditions involving the release of
hazardous materials into the
environment. However, with
implementation of mitigation measure
GPU PEIR MM 4.7- 1, this impact would
be reduced to
a less than significant
level.

Future housing development facilitated by the Project
would not involve ongoing or routine use of substantial quantities of hazardous materials during operations. All future housing development subject to rezoning and
within overlay zones would be subject to compliance
with General Plan policies aimed at reducing impacts
from hazardous materials. All future housing
development subject to rezoning and within overlay
zones would also be subject to compliance with GPU
PEIR MM 4. 7-1, which require s compliance with with
Huntington Beach Fire Department specifications
related to the potential to encounter methane gas.

Compliance with City regulations, General Plan policies, and implementation of mitigation measure GPU PEIR
MM 4.7-1 would ensure Project impacts would remain
less than significant.

Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporat ed into the Project. No additional mitigation measures are necessary with implementation
of mitigation measure GPU PEIR MM 4.7-1.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 9
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
Individual sites within the planning area
are included on a list of hazardous
materials sites that could result in the
accidental spread of contamination and
could create a significant hazard to the
public or environment. However, with
implementation of mitigation measures
GPU PEIR MM 4.7- 2 and 4.7- 3, this
impact would be reduced to a less than
significant level.

Development of any identified sites of contamination
would be required to undergo remediation and clean
up before construction activities can begin. If
contamination at any future project site were to exceed regulatory action levels, a future project would be
required to undertake remediation procedures prior to
grading and development under the supervision of
appropriate regulatory oversight agencies. Compliance
with City standards and implementation of mitigation
measures GPU PEIR MM 4.7 -2 and MM 4.7 -3, which
require preparation of a preliminary environmental site assessment to determine the potential for onsite
contamination, would ensure that the Project would
not create a significant hazard to the public or the
environment through reasonably foreseeable upset
and acci dent conditions involving the release of
hazardous materials into the e nvironment, resulting in a less than significant level.

Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measures GPU PEIR MM 4.7-2 and MM 4.7-

3. Implementation of the HEU could impair
implementation of or physically interfere
with an adopted emergency response
plan or emergency evacuation plan.

However, with implementation of
mitigation measure GPU PEIR MM 4.7-4,
this impact is considered less than
significant.

Future development facilitated by the Project would
increase housing density in certain areas of the City,
resulting in greater population concentrations within
certain areas. This increased density could interfere
with emergency evacuation in the event of a City -wide
emergency. However, the Project would not result in
changes to the City’s existing circulation network. No
land uses are proposed that would impair the
implementation of, or physically conflict with, the
Huntington Beach Emergency Operations Plan/Hazard
Mitigation Plan. As a result, the Project would not
conflict with any State or local plan aimed at preserving and maintaining adopted emergency response or
emergency evacuation plans. Notwithstanding, to
minimize all potential impacts, all future housing
development subject to rezoning and within overlay
zones would be required to adhere to GPU PEIR MM
Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measure GPU PEIR MM 4.7-4.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 10
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding

4.7-4, which requires future housing developments to
consult with the City of Huntington Beach Police or Fire Departments to disclose temporary lane or roadway
closures and alternative travel routes during
construction, to ensure that there are no conflicts with emergency response and evacuation plans, thereby
resulting in a less than significant impact.

Hydrology and Water Quality
Future development under the HEU
could result in violations of water quality
standard or waste discharge that could
degrade surface or groundwater quality
and could conflict with a water quality
control plan
. Implementation of
mitigation measure GPU PEIR MM 4.8 -1
would reduce this impact to a less than
significant level.

It is anticipated that construction activities for future housing development facilitated by the Project would
include excavation, grading, and trenching, which could displace soils and temporarily increase the potential for soils to be subject to wind and water erosion.

Therefore, construction activities from future housing
development could violate water quality standards or
otherwise degrad
e water quality. However,
construction activities that could affect water quality would be addressed through compliance with the
National Pollutant Discharge Elimination System
(NPDES) program’s Construction General Permit.

Future housing development would also be subject to
mitigation measure GPU PEIR MM 4.8-1, which requires
new development projects to prepare project-specific
Water Quality Management Plans. Compliance with
this measure would reduce potential impacts
associated with water quality violatio ns and conflicts with a water quality control plan to a less than
significant level.

Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measure GPU PEIR MM 4.8-1.

Future development under the HEU
could result in substantial groundwater
dewatering and could deplete
groundwater supplies , which
in turn
could result in conflicts with water
quality control plans and/or sustainable
groundwater management plans .

As discussed under Utilities and Service systems, there may not be sufficient water supplies available to serve the Project. Therefore, Project -related water demands
from future development would result in a significant
and unavoidable impact concerning water supplies. For
this reason, the Project could substantially decrease
groundwater supplies resulting in a significant and
Finding 3. The City of Huntington Beach finds that even with implementation of all feasible mitigation measures and compliance with applicable General Plan goals and
policies, implementation of the HEU could result in
significant and unavoidable impacts concerning
groundwater supplies and the sustainable management
of the groundwater Basin. No mitigation measures in
City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 11
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
Despite implementatio n of mitigation
measure GPU PEIR MM 4.8 -2 Project -
level and cumulative impacts wou ld be
significant and unavoidable.
unavoidable impact concerning sustainable
management of the Basin. Although future housing
projects would be required to comply with City, state
and federal goals and policies requiring water
conservation, mitigation measure GPU PEIR MM 4.8 -2
would also be required to ensure that applicants of
future developments prepare a groundwater hydrology
study to ensure that dewatering activities do not
interfere with groundwater supplies. Despite
compliance with this measure and until water supply
improves, both Project -level and cumulative water
demands would result in a significant unavoidable
impact concerning groundwater supplies.
addition to GPU PEIR MM 4.8-2 are feasible to reduce
Project-level or cumulative impacts to a less than
significant level.

Future development under the HEU
could increase stormwater runoff,
exceed the capacity of existing or
planned stormwater drainage systems,
and cause on - or off-site flooding. With
implementation of mitigation measure
GPU PEIR MM 4.8 -3, this impact is
considered less than significant.

Development under the HEU could result in an increase
in the amount of impervious surfaces compared to
existing conditions, thereby increasing stormwater
runoff. Incorporation of mitigation measure GPU PEIR
MM 4.8 -3, wh ich requires each future, project -level
development application to demonstrate adequate
capacity in the storm drain system and provide for
mitigation of constraints, would reduce this impact to a less than significant level.

Finding 1. The City of Huntingt on Beach finds that the identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measure GPU PEIR MM 4.8-3.

Noise
The Project would result in an increase in
ambient noise levels during construction
of future housing developments and
would also result in an increase in
ambient noise levels during operation
due to an increase in vehicle trips during
operation that would result in a Project -
specific significant and unavoidable
impact despite implementation of
mitigation measures GPU PEIR MM 4.10-
1 through 4.10-4.

Construction activities associated with future individual developments could occur near noise -sensitive
receptors and noise disturbances could occur for
prolonged periods of time, thereby resulting in
potential construction noise impacts. In addition,
future housing developments facilitated by the Project
have the potentia
l to introduce and increase new
roadway noise, thereby increasing ambient noise
levels. As such, future projects would be required to
comply with mitigation measures GPU PEIR 4.10- 1
through 4.10- 4, which include construction -level and
operational noise red uction measures to reduce
Finding 3. The City of Huntington Beach finds that even with implementation of all feasible mitigation measures and compliance with applicable General Plan goals and
policies, the Project could result in a significant and unavoidable impact due to an increase in the ambient
noise levels. No mitigation measures in addition to
mitigation measures GPU PEIR MM 4.10-1 through MM

4.10-4 are feasible to reduce impacts to a less than
significant level.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 12
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
ambient noise levels associated with the Project.

Despite compliance with General Plan goals and
policies aimed at reducing noise and implementation of
mitigation measures GPU PEIR 4.10 -1 through 4.10 -4,
the Project would result i n significant and unavoidable impacts concerning construction -related and
operational noise levels. The Project’s impact
concerning the substantial temporary and permanent
increase of ambient noise levels would be cumulatively
considerable.

The Project would result in a Project-
specific significant and unavoidable
impact due to the exposure of persons to
excessive groundborne vibration during
future construction activities despite
implementation of mitigation measure
GPU PEIR MM 4.10-5.

Future development under HEU has the potential to
generate construction vibration levels in exceedance of established thresholds at nearby sensitive receptors.

Although future development would comply with
General Plan policies to reduce groundborne vibration,
mitigation measure GPU PEIR MM 4.10- 5, which
requires new development projec ts that include pile
driving activities to incorporate vibration -reduction
techniques to help to reduce impacts, construction
vibration levels would not be reduced to a level that
would be less than significant. Compliance with General Plan policies and im
plementation of mitigation
measure GPU PEIR MM 4.10-5 would reduce potential
groundborne vibration impacts associated with future
construction activities, but not to a level that would be less than significant because certain construction
activities may st ill be required in proximity to nearby sensitive receptors. Therefore, this impact would
remain significant and unavoidable and would remain
cumulatively significant and unavoidable despite
implementation of mitigation.

Finding 3. The City of Huntington Be ach finds that even with implementation of all feasible mitigation measures and compliance with applicable General Plan goals and
policies, the Project could result in a significant and unavoidable impact due exposure of persons to the
generation of ground borne vibration during
construction. No mitigation measures in addition to
mitigation measure GPU PEIR MM 4.10-5 are feasible to
reduce impacts to a less than significant level.

Public Services
Future development under the HEU
would increase the demand on public
services including fire, police, schools,
Future development under the HEU would increase the
demand on public services including fire, police,
schools, parks/recreational facilities, and libraries.

Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 13
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
parks/recreational facilities, and
libraries. However, with incorporation of
mitigation measures GPU PEIR MM 4.12-
1 through MM 4.12-7, impacts to these
public services would be reduced to a
less than significant level
However, with incorporation of mitigation measures
GPU PEIR MM 4.12-1 through MM 4.12-7, which
require future projects to pay applicable development
impact fees related to each of these serves, impacts to these public services would be reduced to a less than
significant level.
are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measures GPU PEIR MM 4.12-1 through
MM 4.12-7.

Recreation
Future development under the HEU
would increase the demand for and on
parks and recreational services.

However, with incorporation of
mitigation measures GPU PEIR MM 4.13-
1 and MM 4.13-2, impacts related to
parks and recreational facilities would be
reduced to a less than significant level
Future development under the HEU would increase
the demand on recreational services. However, with
incorporation of mitigation measures GPU PEIR MM

4.13-1 and MM 4.13-2, which require compliance with
City parkland requirements and payment of park fees,
impacts to parks and recreational facilities would be
reduced to a less than significant level.

Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with
implementation of mitigation measures GPU PEIR MM

4.13-1 and MM 4.13-2.

Transportation
Future development under the HEU
would increase the number of vehicular
trips in the Project area, which could
conflict with City goals and policies
aimed at maintaining specific
performance thresholds addressing
circulation in the City . However, with
incorporation of mitigation measures
GPU PEIR MM 4.13-1 through MM 4.13-
3, impacts to the circulation system
would be reduced to a less than
significant level
Future development under the HEU could potentially
worsen levels of service (LOS) for various intersections in the City, which could conflict with the City’s policy to maintain specified performance standards for citywide
LOS at traffic -signal-
controlled intersections during
peak hours. Therefore, all future hous ing facilitated by the HEU would be required to comply with General Plan
goals and policies pertaining to LOS and would be
subject to compliance with mitigation measures GPU
PEIR MM 4.14.1 through 4.14- 3, which require future
projects near specified intersections to make fair share contributions toward specified improvements.

Compliance with these goals and policies and
implementation of mitigation measures GPU PEIR MM

4.14.1 through 4.14- 3 would ensure that impacts
related to the City’s circulation system would be
reduced to a less than significant level.

Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Pr oject. No additional mitigation measures are necessary with implementation
of mitigation measures MM 4.13-1 through MM 4.13-3.

Future development under the HEU
would increase the number of vehicular
A total of 325 candidate housing sites would not require preparation of a VMT analysis based on Small Project
Finding 1. The City of Huntingto n Beach finds that the identified changes or alterations in the Project, which City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 14
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
trips in the Project area, which would
generate additional vehicle miles
travelled (VMT) that could result in
conflicts with State guidelines pertaining
to VMT. However, with incorporation of
mitigation measure MM TRANS-1,
impacts would be reduced to a less than
significant level
screening (<110 daily trips), low VMT area screening; or proximity to transit screening. A total of 53 candidate housing sites would not be screened out, thereby
requiring additional VMT analysis at the time of
development application. Candidate housing sites that
identify significant VMT impacts would require feasible mitigation measures to reduce the project’s VMT
impacts. Consequently, future housing development on
these 53 sites would be required to reduce their
average home -based VMT through compliance with
applicable General Plan goals and policies and
implementation of mitigation measur e MM TRANS -1,
which identifies feasible mitigation strategies that
could help projects avoid or substantially reduce VMT - related impacts to a less than significant level.

Furthermore, future housing development would be
subject to all State and local requi rements for
minimizing VMT -related impacts. Therefore, future
housing developments on the 53 candidate housing
sites that were not screened out are presumed to result in a less than significant with mitigation incorporated. would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measure MM Trans-1.

Tribal Cultural Resources
Construction activities associated with
implementation of the HEU could cause
a substantial adverse change in the
significance of tribal remains on a
Project-level basis. With incorporation of
mitigation measures GPU PEIR MM 4.4-2
and MM 4.4 -3, these impacts would be
reduced to a less than significant level.

It is currently infeasible to determine whether future
development under the Project would result in the
disturbance of tribal cultural resourc es within the
planning area. However, future projects would be
required to implement mitigation measures GPU PEIR
MM 4.4 -2 and MM 4.4- 3, which require project
applicants to retain a qualified professional and/or
Native American monitors to determine if the project
could result in impacts to tribal cultural resources and also require the halting of all earth-disturbing activities within 100- feet of a known discovery while data
recovery and other methods are implemented.

Implementation of these measures would ensure that
Finding 1. The City of Huntington Beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measures GPU PEIR MM 4.4-2 and MM 4.4-

3. City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 15
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
Project impacts with respect to tribal cultural resources would be less than significant.

Utilities and Service Systems
Future development under HEU could
require new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunication facilities. However,
with implementation of mitigation
measure GP U PEIR MM 4.15- 1, this
impact would be considered less than
significant.

Future development under the HEU could introduce
the need for additional infrastructure or connections to existing infrastructure . With incorporation of
mitigation measure GPU PEIR MM 4.15- 1, which
requires futur e projects to demonstrate that there is
adequate capacity in the wastewater collection system
to accommodate discharges from future projects, and
adherence to General Plan policies and existing City of Huntington Beach processes, impacts to water,
wastewater treatment or storm water drainage,
electric power, natural gas, or telecommunication
facilities would be reduced to a less than significant
level.

Finding 1. The City of Huntington beach finds that the
identified changes or alterations in the Project, which would reduce this impact to a less than significant level, are hereby incorporated into the Project. No additional mitigation measures are necessary with implementation
of mitigation measure GPU PEIR MM 4.15-1.

The Project would result in a significa nt
and unavoidable project -specific impact
on existing water supplies despite
implementation of mitigation measure
GPU PEIR MM 4.15-2.

Given the uncertainty of water supplies across the
western United States and throughout the state of
California, a future supply deficit would result in a
significant and unavoidable impact associated with
water demands from future development facilitated by
the proposed Project. Until such time as greater
confidence in and commitment from water suppliers
can be made, even with implementation of mitigation
measure MM 4.15 -2, which requires project -specific
applicants to incorporate water conservation measures
as part of future projects, and adherence to General
Plan policies and existing regulations, the HEU would
result in a significant and unavoidable impact related to water supplies.

Finding 3. The City of Huntington Beach finds that even with implementation of all feasible mitigation measures and compliance with applicable General Plan goals and
policies, the Project could result in a significant and unavoidable impact to water supplies . No mitigation
measures in addition to GPU PEIR MM 4.15- 2 are
feasible to reduce water supply impacts to a less than
significant level.

The Project would result in a
cumulatively considera ble contribution
to water demand and a corresponding
significant and unavoidable cumulative
impact with respect to water supply.

As with the Project-specific impact, given the
uncertainty of water supply across the western United
States and throughout the state of California, a future supply deficit would result in a significant and
unavoidable impact. Until such time as greater
Finding 3. The City of Huntington Beach finds that even with implementation of all feasible mitigation measures and compliance with applicable General Plan goals and
policies, the Project could result in a sign ificant and unavoidable impact to water suppl ies. No mitigation
City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 16
Table 1: CEQA Findings for the HEU
Impact Statement Impact Summary Impact Finding
confidence in an d commitment from water suppliers
can be made, even with implementation of mitigation
measure GPU PEIR MM 4.15-2, the Project would result
in a cumulatively considerable contribution to water
supplies, result ing in a significant and unavoidable
cumulative impact.
measures in addition to MM 4.15 -2 are feasible to
reduce cumulative water supply impacts to a less than
significant level.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 17

3.0 FINDINGS REGARDING P ROJECT ALTERNATIVES

3.1. Introduction
The Draft SEIR prepared for the HEU considered two alternatives to the Project as proposed. Pursuant to Section 15126.6(a) of the CEQA Guidelines, the primary intent of an alternatives evaluation is to “describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives.” This chapter describes the project objectives and criteria used to develop and evaluate project alternatives presented in the Draft S EIR. A description of the alternatives compared to the Project and the findings regarding the feasibility of adopting the described alternatives is presented for use by the City in the decision-making process.

3.2. Project Objectives
In accordance with State CEQA Guidelines §15124, the following primary objectives support the HEU’s purpose, assist the City, as the lead agency, in developing a reasonable range of alternatives to be evaluated in this SEIR, and ultimately aid decision -makers in preparing findings and overriding considerations, if necessary. The HEU’s purpose is to address the housing needs and objectives of the City and to meet the State Housing law requirements. The HEU has the following goals:
• Adopt State-mandated and locally desired programs to implement the City’s Housing Element. • Maintain and enhance the quality and affordability of existing housing in Huntington Beach. • Provide adequate sites to accommodate projected housing unit needs at all income levels identified by the 2021-2029 RHNA.
• Provide for safe and decent housing for all economic segments of the community. • Reduce governmental constraints to housing production, with an emphasis on improving processes for projects that provide on-site affordable units. • Promote equal housing opportunities for all residents, including Huntington Beach’s special needs populations.
• Promote a healthy and sustainable Huntington Beach through support of housing at all income levels that minimizes reliance on natural resources and automobile use. • Maximize solutions for those experiencing or at risk of homelessness. • Improve quality of life and promote placemaking.
• Affirmatively further fair housing.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 18

3.3. Selection of Alternatives
The range of feasible alternatives was selected and discussed in a manner to foster meaningful public participation and informed decision -making. Among the factors that were taken into account when considering the feasibility of alternatives (as described in CEQA Guidelines Section 15126.6[f][1]) were environmental impacts, economic viability, availability of infrastructure, regulat ory limitations, jurisdictional boundaries, and attainment of project objectives. As stated in Section 15126.6(a) of the CEQA Guidelines, the Draft SEIR need not consider an alternative whose effects could not be reasonably identified, whose implementation is remote or speculative, or one that would not achieve the basic project objectives. The analysis includes sufficient information about each alternative to provide meaningful evaluation, analysis and comparison with the proposed project.

3.4. Project Alternat ive Findings
The following is a description of the alternatives evaluated in comparison to Project , as well as a description of the specific economic, social, or other considerations that make them infeasible for avoiding or lessening the impacts.

As shown below and in Chapter 7 .0 (Alternatives) of the Draft SEIR, two alternatives were evaluated in comparison to the P roject, including the No Project Alternative required by CEQA. The two alternatives analyzed represent a reasonable range of alternatives to the Project. The analysis in this section focuses on significant and unavoidable impacts attributable to each alternative and the ability of each alternative to meet basic project objectives.
“No Project” Alternative (Alternative 1)
According to State CEQA Guidelines §15126.6(e), the specific alternative of “No Project” shall also be evaluated along with its impact. The purpose of describing and analyzing a No Project Alternative is to allow decision-makers to compare the impacts of approving the proposed P roject with impacts of not approving the Project. The No Project Alternative analysis is required to discuss the existing conditions at the time the Notice of Preparation is published (August 4, 2021 ), as well as what would be reasonably expected to occur in the foreseeable future, if the Project were not approved, based on current plans and consistent with available infrastructure and community services.

Under Alternative 1, development within the City would proceed pursuant to the adopted City General Plan and zoning. The City’s projected regional housing need for the 6 th Cycle RHNA planning period (2021-
2029) is 13,368 dwelling units (11,743 units when accounting for existing applications and pipeline projects). Under Alternative 1, the City would not impl ement the Housing Program required to comply with State law, to accommodate the lower -income RHNA units, including amendments to existing land use designations and zoning districts, an affordable housing overlay, and identification of underutilized, residentially-zoned parcels in an inventory of candidate housing sites. In total, the HEU identifies 378 candidate housing sites (approximately 419 acres). The proposed amendments to the Huntington Beach City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 19

General Plan and the City of Huntington Beach Zoning and Subdivision Ordinance of the City of Huntington Beach Municipal Code (Zoning Text and Zoning Map amendments) for changes to land use designations and base/overlay districts, as well as ancillary amendments to other planning documents, would not be implemented. These amendments, which are needed to accommodate future housing sites as part of the HEU’s Implementation Program, would not be implemented at the 378 identified candidate housing sites.

The capacity to develop 11,743 additional housing units that wou ld be facilitated by Project implementation would not be provided under the No Project Alternative. Because the Project proposes only three candidate housing sites (S ites 3, 4, and 5 ) for rezoning, and all other sites would retain their existing underlying zoning, under Alternative 1, rezoning of Sites 3, 4, and 5 would not occur and existing zoning would remain in place.

Under this alternative, State Housing Law and legislative requirements for implementation of the Project’s proposed programs and strategies to increase housing capacity and the production of affordable dwelling units in the City would not occur . Overall, Alternative 1 would not consider the candidate housing sites and adoption of the land use amendments and rezones necessary to achieve the City’s RHNA. As a result, the capacity for 11,743 multi-family housing units would not be created. This alternative would not satisfy the Project objectives stated above because implementation of Alternative 1 would not facilitate the development of sufficient residential units to meet the City’s RHNA allocation and would not satisfy legislative mandates for the HEU.

Findings
The No Project Alternative would result in fewer impacts than the Project. Although this Alternative could reduce environmental impacts from future housing development facilitated by the HEU, the No Project Alternative would not achieve any of the project objectives. The No Project Alternative would not provide adequate housing sites to meet the City’s 6
th Cycle RHNA allocation or satisfy State housing law including AB 1397. Under the No Project Alternative, the City would not meet its RHNA obligations. Thus, this Alternative would directly conflict with California Government Code §65583, which stipulates that a jurisdiction must assess its housing element every eight years and identify adequate sites for housing and provide for the existing and projected needs of all economic segments of the community.

Beach and Edinger Corridors Alternative (Alternative 2) As with the proposed Project, the Beach and Edinger Corridors Alternative (Alternative 2) would meet the City’s RHNA. However, residential development under Alternative 2 would be concentrated around the Beach and Edinger Corridors area of the Beach and Edinger Corridors Specific Plan (Specific Plan 14). More specifically, new residential development would occur in portions of Specific Plan 14’s Transition Corridor Areas (TCAs), which would support transit-oriented communities, and on fewer total parcels. This would have the effect of further reducing vehicle miles traveled (VMT), transportation-related energy demands, and associated criteria air pollutant and greenhouse gas emissions associated with housing development.

However, this approach would require taller building height s and higher densities to achieve the target housing production in this area necessary to meet the RHNA , which could result in increased aesthetic City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 20

impacts as compared to the Project . This alternative would also create dense/confined residential development and not expand housing opportunities across the City and would not affirmatively further fair housing to the same degree as the Project.

Findings
Alternative 2 would meet the majority of the project objectives as it is assumed that development under this alternative would meet the 6 th Cycle RHNA housing needs. However, Alternative 2 would fail to affirmatively further fair housing since this alternative would not provide new housing within high est resources areas with access to highly rated schools, parks and community amenities. New housing would be concentrated within one area of the City. Furthermore, Alternative 2 could result in additional constraints to housing because the densities necessary to accommodate all of the RHNA within the Specific Plan m ay not be supported by the market (e.g., land and construction costs), which could potentially make it cost-prohibitive for developers to construct housing. As such, because Alternative 2 would fail to affirmatively further fair housing and could result in additional constraints to the construction of housing, this alternative would likely not be certified by the California Department of Housing and Community Development (HCD), as it would not substantially conform to Housing Element Law.

Alternatives Considered but Eliminated from Future Consideration Five additional alternatives were initially considered during the scoping and planning process , but were not selected for detailed analysis in the Draft S EIR. These included: Reduced Dwelling Units Alternativ e, Alternate Housing Sites Alternative , Palm/Goldenwest Specific Plan (SP 12) Alternative , Huntington Harbour Area Sites Alternative, and McDonnell Centre Business Park Specific Plan (SP 11) Alternative.

Reduced Dwelling Units Alternative
A Reduced Dwellin g Units Alternative was considered , but rejected from further consideration. This alternative was considered to assess if it would help mitigate the significant and unavoidable impact to potable water resources associated with the proposed Project, as future housing development facilitated by the Project would incrementally increase the demand for potable water. The projected water demand associated with Project implementation at buildout would increase water demand in the City by approximately 2,905 acre-feet per year (A FY), or approximately 11 percent over existing 2022 and projected 2030 City demands. While the Urban Water Management Plan (UWMP) did not specifically account for the population growth associated with the Project, it did project that the City would serve a population of 206,499 persons by 2030
1, which is an additional 9,625 persons over the City’s existing population of 196,874 persons. 2 Therefore, it can be inferred that at least a portion (approximately 54 percent3, or 949 AFY) of the water demand associated with the Project population growth was accounted

1 UWMP Table 3-2: Retail: Population - Current and Projected. 2 State of California Department of Finance. 2021. E-5 Population and Housing Estimates for Cities, Counties, and the State, 2011-2021 with 2010 Census Benchmark. https://www.dof.ca.gov/Forecasting/Demographics/Estimates/e-5/ (accessed June 2021). 3 Based on 25,020 persons/9,625 persons.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 21

for in the UWMP’s anticipated 2030 future water demand. Thus, after considering the existing water demand associated with the displaced land uses that would be removed, the approximatel y 54 percent assumed to be already accounted for in the UWMP’s anticipated population growth, and unaccounted for net Project water demand of approximately 46 percent or 823 AFY which would remain unmet. In order to not exceed the projected water resources for the City, the Reduced Dwelling Units Alternative would have to reduce the number of housing units to a number that would fail to meet the basic RHNA requirements.

Alternate Housing Sites Alternative
The Alternate Housing Sites Alternative was considered, but rejected from further consideration. This alternative was determined to be infeasible during the scoping process because alternative housing sites not included in the scope of the Project were found to be infeasible due to regulations, site constraints, property owner interest in developing housing, community input, and existing uses. Additionally, some candidate housing sites were considered , but rejected because potentially significant effects of future housing development would be avoided or subs tantially lessened by rejecting those sites. Examples of alternative sites initially considered are discussed below.

Palm/Goldenwest Specific Plan (SP 12) Alternative
This is a 96-acre area bordered by Pacific Coast Highway, Goldenwest Street, and Seapoin t Street and is located entirely within the Coastal Zone. The property is designated for visitor serving commercial uses within the Palm/Goldenwest Specific Plan. At the time the specific plan was adopted in 2000, the property was an active oil field. Aera Energy owned the property and indicated that the property would remain in oil production for the next 15 to 20 years. As such, the specific plan was adopted to plan for reuse of the site after oil production activities ceased.

Palm/Goldenwest Specific Plan 12
This site was originally identified as a candidate housing site in the 6 th Cycle Housing Element because of its large size and its potential availability for residential development within the planning period (based on the information in SP 12). H ousing capacity on the site, when applying the proposed Affordable

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 22

Housing Overlay, would accommodate 40 to 50 percent of the City’s total RHNA (96 acres x 55 du/acre up to 96 acres x 70 du/acre). Although this site could accommodate residential uses, the site is located within higher resource areas that could result in greater environmental impacts than other sites included in the scope of the Project. The following are reasons why this alternative was rejected:
- The location of the site within the Coastal Zone would require the California Coastal Commission to approve the Affordable Housing Overlay designation; timing of the “rezoning” effort could be lengthy with no guarantee of approval from the Coastal Commission. - The potential for costly remediation of the site due to its historic use as oil field. - The property owner no longer anticipates oil production activities to cease as described in SP 12.

Therefore, the property is not expected to be available for development prior to 2030. - The concentration of al most 50 percent of RHNA allocation on one site may lead to overconcentration of affordable housing in one area.

Huntington Harbour Area Sites Alternative
There are two commercial areas in the Huntington Harbour area with a combined acreage of 21.5 acres.

One area is the Huntington Harbour mall, which is an older mall developed in the 1960s. This 10.8 -acre site was identified as a potential candidate housing site because it is underutilized with one and two-story buildings developed at a relatively low floor-area-ratio (FAR) considering that the maximum allowed FAR is 1.5. The site has potential to be redeveloped as a mixed -use project with the inclusion of residential units at 30 du/acre. The site has close access to Warner Avenue, a major arterial. The seco nd area is Peter’s Landing. This site includes the Peter’s Landing commercial center and adjacent properties along Pacific Coast Highway, and has been studied for mixed use (residential/commercial) in prior General Plan planning efforts. In addition, the property owners previously showed interest in adding residential uses in existing or new development projects on the sites. Previous site analyses on this site indicate that residential could be accommodated at higher densities.

Peter’s Landing Area Huntington Harbour Mall

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 23

The following are reasons why this alternative was rejected:
- The location of these sites within the Coastal Zone would require the California Coastal Commission to approve any changes to the zoning/land use designation including an Affordable Housing Overlay designation. As such, the timing of the “rezoning” effort could be length with no guarantee that the Coastal Commission would approve the amendments, particularly because residential is a lower priority use in the Coastal Zone. - These sites, in conjunction with the general Huntington Harbour area, are shown in the City’s Sea Level Rise Vulnerability Assessment as one of the most vulnerable areas in the City with development in this area having the highest exposure to sea level ris e hazards (e.g., storm and non-storm flood projections becoming widespread with 1.6 -foot and 3.3 -foot sea level rise, respectively).

McDonnell Centre Business Park Specific Plan (SP 11) Alternative The McDonnell Centre Business Park Specific Plan encompasses 307 acres in the northwestern portion of the City. It has access from Bolsa Chica Street and Bolsa Avenue, both major arterials, with close access to the 405 freeway. The area was first developed for the aerospace industry in the 1960s and a specific plan was adopted in 1997 with amendments in 2002 and 2006 that allowed for approximately eight million square feet of industrial, office, and ancillary uses (including the existing development). Boeing has been the primary landowner in the area, although oth er major business tenants have moved into the specific plan area. In 2018, Boeing began marketing some of its properties in the specific plan area. As such, the City evaluated housing potential within portions of the specific plan area for the 6 th Cycle, particularly
workforce housing and lower income worker housing. The specific plan could accommodate a large capacity of housing units at higher densities due to its size and existing and planned infrastructure.

McDonnell Centre Business Park Specific Plan (SP 11)

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 24

The following are reasons why this alternative was rejected:
- There is a strong market for industrial land in this area of the City. The site was even more attractive to potential developers due to its proximity to the freeway and because zoning and environmental approvals were already in place.
- Potential conflicts between industrial uses and residential uses. - Potential costs to remediate site to residential standards. - Properties have already started redeveloping with new industrial buildings recently completed and future phases approved.

City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 25

4.0 STATEMENT OF OVERRID ING CONSIDERATIONS

4.1. Introduction
Section 15093 of the CEQA guidelines states:
(a) CEQA requires the decision-making agency to balance, as applicable, the economic, legal, social, technological, or other benefits of a proposed project against its unavoidable environmental risks when determining whether to approve the project. If the specific economic, legal, social, technological, or other benefits of a proposed project outweigh the unavoidable adverse environmental effects, the adverse environmental effects may be considered “acceptable.” (b) When the lead agency approves a project which will result in the occurrence of significant effects which are identified in the Final EIR but are not avoided or substantially lessened, the agency shall state in writing the spe cific reason to support its actions based on the Final EIR and/or other information in the record. The statement of overriding considerations shall be supported by substantial evidence in the record.
(c) If an agency makes a statement of overriding considerations, the statement should be included in the record of the project approval and should be mentioned in the notice of determination.

The City of Huntington Beach proposes to adopt a Statement of Overriding Considerations regarding the significant cumulative air quality, greenhouse gas, hydrology and water quality, noise, and utilities/water supply impacts of the Project. This section describes the anticipated benefits and other considerations of the Project to support the decision to proceed, even though significant and unavoidable impacts are anticipated.

4.2. Significant Adverse Project and Cumulative Impact s The City of Huntington Beach is proposing to approve the proposed Project, with revisions to reduce environmental impacts, and has prepared a SEIR as required by CEQA. Even with revisions to the Project, the following impacts have been identified as being unavoidable as there are no feasible mitigation measures available to further reduce the impacts. Refer to Chapter 2 (CEQA Findings) for further clarification regarding the impact listed below.

Air Quality
Despite compliance with General Plan policies, GPU PEIR mitigation, and MM AQ-1 and AQ-2, the Project would result in significant and unavoidable impacts concerning construction -related and operational emissions. In addition, sites over two acres could expose sensitive receptors to significant impacts by exceeding construction LST thresholds . The Project -related contribution of daily construction and operational emissions associated with the HEU are considered cumulatively significant and unavoidable.

Greenhouse Gas Emissions
Despite the recommendation of Greenhouse Gas Reduction program G HG reduction strategies, the Project would generate GHG emissions that may have a significant impact on the environment and could City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 26

conflict with applicable plans for reducing GHG emissions. Therefore, impacts on GHG are considered significant and unavoidable, both for the Project and cumulative conditions.

Hydrology and Water Quality
The Project could substantially decrease groundwater supplies resulting in a significant and unavoidable impact concerning sustainable management of the Basin. The Project’s impact concerning groundwater supplies would be cumulatively considerable and a significant unavoidable impact would occur.

Noise
Despite compliance with GPU PEIR mitigation, the Project would result in significant and unavoidable impacts concerning construction-related noise and vibration levels and operational noise levels associated with traffic. The Project’s impact concerning the substantial temporary and permanent increase of ambient noise levels would be cumulatively considerable. The Project’s impact concerning construction- related noise and groundborne vibration would also be cumulatively considerable.

Utilities and Service Systems
Despite compliance with GPU PEIR mitigation , until the water supply situation improves, the w ater demands from future development pursuant to the HEU would result in a significant and unavoidable impact concerning water supplies. Additionally, until such time as greater confidence in and commitment from water suppliers can be made, or the water su pply situation improves, the Project’s impacts concerning water supplies to serve future development would be cumulatively considerable.

4.3. Findings
The City of Huntington Beach has evaluated all feasible mitigation measures and potential changes to the Project with respect to reducing the impacts that have been identified as significant and unavoidable (see Chapter 2, CEQA Findings). The City of Huntington Beach has also examined a reasonable range of alternatives to the project as proposed (see Chapter 3, Findings Regarding Project Alternatives). Based on this examination, the City of Huntington Beach has determined that the No Project Alternative is considered to be the environmentally superior alternative.

4.4. Overriding Considerations
Specific economic, social, or other considerations outweigh the significant and unavoidable impacts stated above. The reasons for proceeding with the proposed project, notwithstanding the identified significant and unavoidable impacts are described below.

Proposed Project Benefits
1) The HEU would facilitate the development of a wide range of housing types in sufficient supply to meet the needs of current and future residents, particularly for persons with specific needs, including but not limited to extremely low, very low, and lower income households; seniors; persons City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 27

with disabilities; large households, single-parent households, people experiencing homelessness or at risk of homelessness, and farmworkers.

2) The HEU would increase the supply of affordable housing in high opport unity/resource areas, including areas with access to employment opportunities, community facilities and services, and amenities.

3) The HEU would provide a comprehensive system of support and would expand housing options aimed to prevent and end homelessness.

4) The HEU would reduce constraints to the development of housing, including affordable housing, through programs that allow ministerial approval processes, permit ready plans for A ccessory Dwelling Units, a review and update of the City’s small lot ordinance, and housing overlays in non - residential areas.

5) The HEU would address planning and monitoring goals for long -term affordability of adequate housing.

6) The HEU would facilitate the development of an accessible housing supply for all persons without discrimination in accordance with State and federal fair housing laws . The HEU would enhance existing lower resource neighb orhoods by promoting livable, healthy, and safe housing for all residents.

7) The HEU provides a plan for meeting the City’s RHNA goals and to affirmatively further fair housing, which substantially complies with State law, thereby enabling the City to achieve certification of the HEU through the California Department of Housing and Community Development. Certification of the HEU would also enable the City to maintain eligibility for funding programs tied to a compliant HEU.

8) The HEU would allow the City of to revitalize commercial corridors and older industrial areas by allowing for additional housing opportunities in the City while maintaining the character of existing, long-established single-family residential neighborhoods in the City. Consistent with General Plan Implementation Program LU- P.14, the Affordable Housing Overlay allows for housing within the Research and Technology zoned areas, which establishes housing opportunities for employees of business in these areas. The provisions of the Affordab le Housing Overlay ensure that potential conflicts between residential and non-residential uses in these areas would be minimized. The City would continue to ensure that all standards for building design, streetscape design, and landscaping would be adher ed to and would review development proposals to ensure consistency with the character and visual appearance of the surrounding neighborhood.

9) The HEU would encourage future housing developments to better integrate with alternative modes of traditional transport because over half o f the candidate housing sites identified in the HEU are located along High Quality Transit Areas. New development would also be encouraged to promote and support public transit and alternative modes of transportation by incorpo rating bus turnouts and shaded bus stops (where appropriate) and providing enhanced pedestrian and bicycle facilities.

10) With more organized development and guided use of existing resources, such potential impacts to water supply can be monitored and improved for the health and benefit of residents. Further, park City of Huntington Beach Final Subsequent Environmental Impact Report 2021-2029 HEU Implementation Program Findings of Fact/Statement of Overriding Considerations

October 2022 Page 28

lands and open spaces can be protected and retained in place throughout the planning horizon to provide recreational benefits to residents, visitors and school aged students. A shift toward sustainable resources and self-sufficiency, as outlined in the HEU, will allow for the continuation of the valued way of life within the City of Huntington Beach throughout the planning horizon. For example, future projects would be required to comply with General Plan Goal ERC -15 and Policies ERC-15.A and ERC -15.B, which aim to maintain an adequate supply of water and distribution facilities capable of meeting existing and future water supply needs and require monitoring to reduce impacts to the water system in an effort to maintain and expand water supply and distribution facilities.