1 2021-2029 HEU Implementation Program Draft SEIR

Final Subsequent Environmental Impact Report
SCH 2021080104

September 2022
City of Huntington Beach
2021-2029 Housing Element Update
Implementation Program

Subsequent Final
Environmental Impact Report
SCH #2021080104
2021-2029 Housing Element Update
Implementation Program Project

LEAD AGENCY

CITY OF HUNTINGTON BEACH

DEPARTMENT OF COMMUNITY
2000 MAIN STREET 3RD FLOOR
HUNTINGTON BEACH, CA 92648
(714) 536-5721

CONSULTANT

KIMLEY-HORN AND ASSOCIATES, INC.

MS. RITA GARCIA
1100 TOWN AND COUNTRY ROAD, SUITE 700
ORANGE, CA 92868
(714) 786-6116

SEPTEMBER 2022

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 Table of Contents
i
Table of Contents
Section 1: Introduction

1.1 Overview of the Final SEIR ................................ ................................ ................................ ....1.0-1

1.2 Organization of the Final SEIR ................................ ................................ .............................. 1.0-1

1.3 Summary of the CEQA Process ................................ ................................ ............................. 1.0-1

1.4 Changes to the Draft SEIR................................ ................................ ................................ .....1.0-2 Section 2: Comments and Responses

2.1 Introduction to Comments and Responses ................................ ................................ ...........2.0-1

2.2 Comments and Responses ................................ ................................ ................................ ...2.0-3 Section 3.0: Errata to the Draft SEIR

3.1 Introduction to the Errata ................................ ................................ ................................ ....3.0-1

3.2 Changes to the Draft SEIR................................ ................................ ................................ .....3.0-1 List of Tables
Table 2-1: Comments from Public Agencies and Organizations ................................ ...................... 2.0-1 List of Appendices
Appendix A - Draft SEIR Distribution Package

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 Table of Contents
ii
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022
Section 1
Introduction

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 1.0 | Introduction

1.0-1
Section 1.0 Introduction

1.1 Overview of the Final SEIR
The City of Huntington Beach (City) has prepared this Final Subsequent Environmental Impact Report (Final SEIR) for the 2021-2029 HEU Implementation Program (Project) in accordance with the California Environmental Quality Act (CEQA) and State CEQA Guidelines. Before approving a project, CEQA requires that the Lead Agency (i.e., City of Huntington Beach [City]) prepare and certify a Final EIR. Section 15132 of the State CEQA Guidelines, Contents of Final Environmental Impact Report, indicates that the contents of a Final EIR shall consist of the following:
(a) The draft EIR or a revision of the draft;
(b) Comments and recommendations received on the draft EIR either verbatim or in summary; (c) A list of persons, organizations, and public agencies commenting on the draft EIR; (d) The responses of the Lead Agency to significant environmental points raised in the review and consultation process; and
(e) Any other information added by the Lead Agency.

The Final SEIR will be considered by the City of Huntington Beach City Council in determining whether to certify the EIR and approve the proposed Project.

1.2 Organization of the Final SEIR
This Final SEIR contains the requisite components required under State CEQA Guidelines §15132 and is organized as follows:

Final SEIR Section 1.0: Introduction. This section introduces the Final SEIR, including the CEQA requirements and document organization, and summarizes the CEQA process activities to date. • Final SEIR Section 2.0: Comments and Responses . This section provides a list of persons, organizations, and public agencies commenting on the Draft SEIR. It also provides a copy of each written comment received on the Draft SEIR, and the City’s responses to significant environmental points raised in the comment.
• Final SEIR Section 3.0: Errata to the Draft SEIR. This section details changes to the Draft SEIR text intended to clarify or correct information.

1.3 Summary of the CEQA Process
On August 4, 2021, the City circulated a Notice of Preparation (NOP) to various federal, State, regional and local government agencies, and other interested parties. The NOP informed them that an SEIR was being prepared and invited comments on the SEIR’s scope and content, and their participation at a public scoping meeting held August 19, 2021; see Draft SEIR Appendix A: Notice of Preparation and Scoping City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 1.0 | Introduction

1.0-2
Meeting Materials. The NOP was circulated through September 7, 2021, in compliance with the CEQA- required 30-day circulation period.

In accordance with State CEQA Guidelines §§15087 and 15105, the Draft SEIR was released to the public on June 29, 2022, for a 45-day review period ending on August 15, 2022. During the review period, the Draft SEIR was made available for review and comment to the public, responsible and trustee agencies, and interested groups and organizations. The Draft SEIR was also made available directly to State agencies through the State of California Governor’s Office of Planning and Research, State Clearinghouse and Planning Unit. Copies of the Draft SEIR were made available for review at the following locations:
http://www.huntingtonbeachca.gov/government/departments/planning/major/; https://www.huntingtonbeachca.gov/government/departments/planning/environmental- reports/;
https://www.huntingtonbeachca.gov/housing-element-update/; Central Library, 7111 Talbert Avenue, Huntington Beach, CA 92648; and City of Huntington Beach, Planning Division, 2000 Main Street, Huntington Beach, CA 92648 In Fall of 2022, the City of Huntington Beach City Council will consider the F inal SEIR, inclusive of the Draft SEIR, comments and recommendations received on the Draft SEIR , and responses to those comments, when determining whether to certify the SEIR and approve the 2021-2029 HEU Implementation Program Project.

1.4 Changes to the Draft SEIR
As previously stated, Final SEIR Section 3.0 details the changes to the Draft SEIR. In response to public comments, text changes have been made to the Draft SEIR to clarify and amplify the analysis or mitigation measures, and to make insignificant modifications to the Draft SEIR.

State CEQA Guidelines §15088.5 discusses the conditions that warrant recirculation prior to certification, stating in part:
“(a) A lead agency is required to recirculate an EIR when significant new information is added to the EIR after public notice is given of the availability of the draft EIR for public review under Section 15087 but before certification. As used in this section, the term "information" can include changes in the project or environmental setting as well as additional data or other information. New information added to an EIR is not "significant" unless the EIR is changed in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of the project or a feasible way to mitigate or avoid such an effect (including a feasible project alternative) that the project's proponents have declined to implement. “Significant new information” requiring recirculation include, for example, a disclosure showing that:

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 1.0 | Introduction

1.0-3
(1) A new significant environmental impact would result from the project or from a new mitigation measure proposed to be implemented.
(2) A substantial increase in the severity of an environmental impact would result unless mitigation measures are adopted that reduce the impact to a level of insignificance.
(3) A feasible project alternative or mitigation measure considerably different from others previously analyzed would clearly lessen the environmental impacts of the project, but the project’s proponents decline to apply it. (4) The draft EIR was so fundamentally and basically inadequate and conclusory in nature that meaningful public review and comment were preclud ed (Mountain Lion Coalition v. Fish and Game Com. (1989) 214 Cal.App.3d 1043). (b) Recirculation is not required where the new information added to the EIR merely clarifies or amplifies or makes insignificant modifications in an adequate EIR.” The information presented in Final S EIR Section 3.0 does not rise to the level of significant new information as the resulting impact analysis and alternatives considered remain essentially unchanged, and no new or more severe impacts have been identified. These changes do not warrant Draft SEIR recirculation pursuant to California Public Resources Code §21092.1 and State CEQA Guidelines §15088.5.

As discussed herein and as elaborated upon in the respective Response to Comments, none of the clarifications or changes made in the Errata reflect a new significant environmental impact, a “substantial increase” in the severity of an environmental impact for which mitigation is not proposed, or a new feasible alternative or mitigation measure that would clearly lessen significant environmental impacts but is not adopted, nor do the Errata reflect a “fundamentally flawed” or “conclusory” Draft SEIR. In all cases, as discussed in individual responses to comments and in the Errata to the Draft S EIR, these minor clarifications and modifications do not identify new or substantially more severe environmental impacts that the City has not committed to mitigate. As such, the public has not been deprived of a meaningful opportunity to comment upon a substantial adverse environmental effect of the Project or an unadopted feasible Project alternative or mitigation measure. Instead, the information added supports the existing analysis and conclusions, and responds to inquiries made from commenters. Therefore, this Final SEIR is not subject to recirculation prior to certification.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 1.0 | Introduction

1.0-4
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022
Section 2
Comments and Responses

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-1
Section 2.0 Comments and Responses to Comments

2.1 Introduction to Comments and Responses
In accordance with State CEQA Guidelines §15132, Final SEIR Table 2-1: List of Parties Commenting on the Draft SEIR lists public agencies, persons, and organizations commenting on the Draft SEIR during the 45-day public review period (June 29, 2022 through August 15, 2022).

Copies of the written comments are provided in this section. For ease of reference and to communicate authorship, each comment letter has been annotated with a letter label. Additionally, individual comments have been annotated with a letter and number label, indicating the comment letter and comment number, respectively.

Table 2-1: List of Parties Commenting on the Draft SEIR Reference Commenter Date
A Gabrielino Tongva Indians of California
Christina Conley July 13, 2022
B California Department of Transportation (Caltrans)
Scott Shelley, Branch Chief - Regional-IGR-Transit Planning July 28, 2022 C
OC Health Care Agency, Public Health Services Environmental Health Division
Geniece Higgins, Supervising Hazardous Materials Specialist August 12, 2022
D
OC Health Care Agency, Public Health Services
Environmental Health Division
Dan Weerasekera, Hazardous Materials Specialist
August 15, 2022
E
Ocean View School District
Michael Conroy, Ed.D., Superintendent
Gina Clayton-Tarvin, Board President
August 15, 2022
State CEQA Guidelines §15132 indicates that the F inal EIR shall include the Lead Agency 's responses to significant environmental points raised in the review and consultation process. Additionally, State CEQA Guidelines §15088(a) states that the Lead Agency shall respond to comments received during the noticed comment period and any extensions and may respond to late comments. In compliance with these requirements, this section includes the comments and recommendations received on the D raft S EIR during the noticed comment period, along with the City’s responses to significant environmental points raised by those comments.

Responses may include text changes to clarify/amplify or correct information in the D raft S EIR, as requested by the Lead Agency or due to environmental points raised in the comments. A response to a comment requiring revisions to the Draft SEIR presents the relevant Draft SEIR text in a box, with new text indicated by underlining and deleted text indicated by strike through, as shown in the following example.

Deleted text Added text
The Draft SEIR text revisions are also compiled and presented in Final S EIR Section 3.0: Errata to the Draft SEIR.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-2
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-3

2.2 Comments and Responses
Comment Letter A – Gabrielino Tongva Indians of California Christina Conley

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-4
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-5
Responses to Comment Letter A – Gabrielino Tongva Indians of California Christina Conley
A-1 This comment requests that the City continue to notify the Gabrielino Tongva Indians of California of future projects as many areas in the City are on culturally sensitive land. This comment does not address the adequacy or completeness of the Draft Subsequent Environmental Impact Report (SEIR); does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response pursuant to State CEQA Guidelines §15088(a), the City will continue to follow notification requirements outlined in Senate Bill 18 and Assembly Bill 52 and will notify the Gabrielino Tongva Indians of California of future projects in accordance with these guidelines. No further response is necessary.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-6
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-7
Comment Letter B – California Department of Transportation, Caltrans Scott Shelley, Branch Chief - Regional-IGR-Transit Planning

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-8

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-9

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-10

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-11
Responses to Comment Letter B – California Department of Transportation, Caltrans Scott Shelley, Branch Chief - Regional-IGR-Transit Planning B-1 This comment is introductory and summarizes the main Project components. This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorpora tion of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a).

No further response is necessary.

B-2 This comment summarizes Caltrans’ mission and correctly notes that C altrans is a responsible agency on the project. This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). No further response is necessary.

B-3 This comment requests that the City consider accounting for off-street parking and alley space or similar areas to reduce the n eed for on-street parking as the Housing Element Update (HEU) is implemented.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Su ch comments do not require a response pursuant to State CEQA Guidelines §15088(a). This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

B-4 This comment requests that as the HEU is implemented, the City ensure the width of parking lanes are wide enough for freight trucks without encroaching into bicycle lanes or street lanes if truck parking for home deliveries is provided on the street.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response, pursuant to State CEQA Guidelines §15088(a). This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

B-5 This comments requests that the City consider designating on -street freight-only parking and delivery time windows to reduce the need for double parking and prevent traffic congestion.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-12
B-6 This comments requests that the City consider implementing shared drop -off locations for deliveries and automated parcel systems in future projects implemented under the HEU to reduce the amount of driving done by delivery trucks and to increase efficiency of deliveries.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

B-7 This comments requests that the City provide posted speed signs for truckers to follow in areas proposed for increased housing opportunities.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response, pursuant to State CEQA Guidelines §15088(a), the City will post speed limitations, including speed limitations for trucks (as necessary and where necessary) in areas where future projects are implemented under the HEU. This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

B-8 This comments requests that the City consider accommodating cargo bikes (such as those needed for food delivery services) as part of bicycle parking designs for future projects implemented under the HEU to reduce delivery trucks and associated greenhouse gas (GHG) emissions.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

B-9 This comment notes that Caltrans recognizes their responsibility to assist communities of color and under-served communities by removing barriers to provide an equitable transportation.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

B-10 This comment notes that Caltrans embraces racial equity, inclusion, and diversity and requests that the City consider including a discussion on equity in the document.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response pursuant to State City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-13
CEQA Guidelines § 15088(a), it is noted that a robust discussion of equity in relation to the distribution of housing (in particular affordable housing) is included in HEU Section 2, which is the land use document (i.e., the “project”) that serves as the basis for the environmental analysis in the Draft SEIR. No further response is necessary.

B-11 This comment notes there is a bicycle gap east of Ellis Avenue and Beach Boulevard and requests that the City consider closing this gap as future housing development occurs along this corridor.

The comment notes that closing this gap woul d reduce dependency on single-occupant vehicle trips and would improve accessibility.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response pursuant to State CEQA Guidelines §15088(a), the City will continue to implement bicycle lane improvements in this area in accordance with the Circulation Element of General Plan (which identifies bicycle lanes in areas east of Ellis Avenue and Beach Boulevard) and with the shared goal of Caltrans to reduced dependency on single-occupant vehicle trips and improved accessibility. No further respo nse is necessary.

B-12 This comment notes that including CalEnvi roScreen percentiles for certain population characteristics would provide more context in the existing environmental setting in Draft SEIR Section 5.10.3.

Information outlined in this comment, including a discussion of CalEnviroScreen percentiles and mapped results, is provided in HEU Section 2, which is the land use document (i.e., the “project”) that serves as the basis for the environmental analysis in the Draft SEIR. As outlined in this section of the HEU, the City will continue to implement inclusionary housing policies to facilitate the production of affordable housing to successfully create mixed -income communities in areas throughout the City. No changes to Draft SEIR Section 5.10.3 are necessary given the inclusion of this information in the HEU and given that the inclusion of such data would not result in changes to the environmental analysis with respect to Population and Housing.

B-13 This comment notes that Census tracts southwest of the Warner Avenue and Beach Boulevard intersection are designated as SB 535 Disadvantaged Communities and would be eligible for investment from the State’s Cap-and-Trade Program for programs that improve health, quality of life, and economic opportunities. The comment notes that including this information in the SEIR would demonstrate efforts of addressing equity in implementing affordable housing.

The inclusion of this information would not result in changes to the analysis or conclusion in the Draft SEIR with respect to Population and Housing and would not be appropriate in the context of Population and Housing impacts, as SB 535 aims to provide funding for projects that would improve public health, quality of life, and provide economic opportunities. For these reasons, the SEIR has not been amended to include a discussion on SB 535. In addition, the draft HEU identifies these census tracts for programs to reduce health risk/burden factors and improve quality of life through neighborhood enhancements and infrastructure improvements funded through State City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-14
initiatives such as Safe Routes to School. This comment will be forwarded to City decision-makers for their review and consideration.

B-14 This comment notes that any project work in the vicinity of the State right-of-way would require an encroachment permit and all environmental concerns must be adequately addresse d. The comment provides additional resources regarding encroachment permits and requests that the City meet with Caltrans for any work within or near the State right-of-way.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response pursuant to State CEQA Guidelines §15088(a), the City will coordinate with Caltrans on any future plans affecting State rights-of-way. The City will continue to inform project applicants of Caltrans requirements to obtain encroachment permits for work proposed within or adjacent to the State right-of-way.

This comment will be forwarded to City decision-makers for their review and consideration. No further response is necessary.

B-15 This comment provides contact information for the project coordinator at Caltrans should the City have any questions regarding this comment letter and for future reference regarding additional agency-to-agency coordination.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response, pursuant to State CEQA Guidelines §15088(a). No further response is necessary.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-15
Comment Letter C – OC Health Care Agency, Public Health Services Environmental Health Division
Geniece Higgins, Supervising Hazardous Materials Speciali st

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-16
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-17
Responses to Comment Letter C – OC Health Care Agency, Public Health Services Environmental Health Division
Geniece Higgins, Supervising Hazardous Materials
Specialist
C-1 This comment notes that while none of the candidate housing sites are on a list of hazardous materials sites, the OC Health Care Agency representatives listed in this letter should be contacted if previously unknown contamination or underground storage tanks are encountered during site development.

This comment does not address the adequacy or completeness of the Draft Subsequent SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). No further response is necessary.

C-2 This comment notes that rezoning is planned for some of the candidate housing sites. The comment also notes that No Further Action letters were issued for previous cleanup cases based on the site uses at the time of the No Further Action determination. The commenter notes that a change in the use may nullify the letters for these sites and additional evaluation may be required.

The comment goes on to provide resources where a complete listing of current and historic cleanup cases can be found.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response pursuant to State CEQA Guidelines §15088(a), it is noted that implementation of GPU PEIR MM 4.7 -2 and 4.7 -3 would ensure that impacts related to soil contamination and hazards are addressed by the applicant and the appropriate oversight agency is consulted at the time residential p rojects are proposed. No further response is necessary.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-18
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-19
Comment Letter D – OC Health Care Agency, Public Health Services Environmental Health Division
Dan Weerasekera, Hazardous Materials Specialist

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-20

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-21

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-22

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-23

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-24
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-25
Responses to Comment Letter D – OC Health Care Agency, Public Health Services Environmental Health Division
Dan Weerasekera, Hazardous Materials Specialist
D-1 This comment is introductory and does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). No further response is necessary.

D-2 This comment summarizes the role of the Orange County Health Care Agency (OC Health Care Agency) and does not address the adequacy or completeness of the Draft Subsequent SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). No further response is necessary.

D-3 This comment notes that some of the proposed candidate housing sites identified in the Draft SEIR are outside the landfill boundary, but are within approximately 1,000 feet of the former Gothard Street Landfill and the City of Hunt ington Beach Landfill, both of which the OC Health Care Agency oversees. This comment also provides information on the landfills, including the total landfill area, the types of waste disposed of at the landfill, and the date of the landfill closure.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues pursuant to State CEQA Guidelines §15088(a). This comment will be forwarded to City decision -makers for their review and consideration. No further response is necessary.

D-4 This comments notes that Draft SEIR Appendix E notes the presence of these two landfills, but incorrectly and inconsistently lists the status of the landfill sites. The comment also correctly notes that Draft SEIR Appendix E states that the presence of these landfills do not affect the candidate housing sites because they are not proposed on the landfill parcels and does not raise an environmental issue with this statement . The comment concludes by noting that Draft SEIR Section 5.6.2: Existing Regulatory Setting and Draft SEIR Section 5.6.9: References fail to identify CalRecycle Solid Waste Information System (SWIS) SWIS database review with SWIS numbers listed for the two land disposal sites.

See Final SEIR Section 3.0: Errata for updates to Draft SEIR Sections 5.6.3 and 5.6.9, and Draft SEIR Appendix E. It is assumed that where the commenter referred to Draft SEIR Section 5.6.2, they intended to refer to Draft SEIR Section 5.6.3: Existing Environmental Setting.

Regarding the Gothard Street Landfill, the SWIS finds that there are no areas of concern or violations based on quarterly inspections completed.1 The State Geotracker website indicates that the site is an open – closed with monitoring case, as the landfill is closed but ongoing monitoring

1 CalRecycle. 2022. SWIS Facility/Sites Summary, Gothard Street Landfill (30 -AB-0014), Recent Inspections. https://www2.calrecycle.ca.gov/SolidWaste/Site/Summary/2080 (accessed September 2022).

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-26
events occur. Currently the site is undergoing a post-closure land use change (PCLUCP) with recent OC Waste and Recycling (OCWR) correspondence.2 In 2013, OCWR applied for the landfill to be covered under the general wast e discharge requirements (WDRs) for closed, abandoned , and inactive landfills, Order No. R8-2013-0010. The PCLUCP is intended to provide a description of the project related to changes that are relevant to regulatory agencies, including CalRecycle, OC Health Care Agency (OCHCA), which is the Local Enforcement Agency (LEA), the Santa Ana Regional Water Quality Control Board (SARWQCB), and South Coast Air Quality Management District (SCAQMD), for understanding the scope of the PCLUCP and site specific modific ations taken to protect the environment and public health. The PCLUP also serves as an amended Report of Waste Discharge for a land use change, in compliance with SARWQCB Order No. R8-2013-0010.

D-5 This comment opines that future residential housing projects within 1,000 feet of the landfill boundary should consider installing landfill gas monitoring protection systems and/or structural monitoring to ensure landfill gas buildup, if any, will not cause adverse impacts t o the public health or safety and the environment.

As outlined in Draft SEIR Section 5.6 : Hazards and Hazardous Materials , all future housing development subject to rezoning and within overlay zones would be subject to compliance with GPU PEIR MM 4.7 -1, wh ich would require future housing developments to comply with Huntington Beach Fire Department City Specification No. 429, Methane Mitigation Requirements.

Among other requirements, City Specification and GPU PEIR MM 4.7-1 require that project-level applicants develop a plan to test soils for the presence of methane and submit the plan to the Huntington Beach Fire Department for review and approval. If significant levels of methane gas are discovered in the soil on a future development site, the project -level applicant’s grading, building, and methane plans shall reference that a sub-slab methane barrier and vent system will be installed at the site per City Specification No. 429, prior to plan approval. If required by the Huntington Beach Fire Department, additional methane mitigation measures to reduce the level of methane gas to acceptable levels shall be implemented. Following compliance with this mitigation measure, impacts associated with methane gas emissions from these landfills and/or other potential contaminants on future candidate housing sites, would be reduced to a less than significant level.

D-6 This comment notes that local jurisdictions with disadvantaged communities are required to develop an Environmental Justice Element or consider Environmental Justice goals, policies, and objectives when updating two or more General Plan elements.

Refer to Responses B-12 and B-13, above. This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and d oes not request the incorporation of additional information relevant to environmental issues pursuant to State CEQA Guidelines §15088(a). Additionally, it is noted that the City added environmental justice policies in 2017 when the General Plan was compreh ensively updated. Also, the draft HEU includes a program (i.e., Program 2G) to update the General Plan to further incorporate environmental

2 SWRCB. 2021. Gothard Street Landfill Post -Closure Land Use Change Proposal Revised October 2021. https://documents.geotracker.waterboards.ca.gov/esi/uploads/geo_report/3608050763/L10002414494.PDF (accessed September 2022).

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-27
justice policies within a year of Housing Element adoption if necessary. This comment will be forwarded to City deci sion-makers for their review and consideration. No further response is necessary.

D-7 This comment provides contact information for representatives at the OC Health Care Agency should the City have any questions regarding this comment letter. This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response, pursuant to State CEQA Guidelines §15088(a). No further response is necessary.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-28
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-29
Comment Letter E – Ocean View School District
Michael Conroy Ed.D., Superintendent

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-30

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-31

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-32

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-33
Responses to Comment Letter E – Ocean View School District Michael Conroy, Ed.D., Superintendent
E-1 This comment thanks the City for the opportunity to review the Draft SEIR and communicates that questions and comments on the Draft SEIR follow. This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). No further response is needed.

E-2 This comment asks if “CEQA Project” is a defined term in the Draft SEIR and does not address the adequacy of the environmental analysis or raise an environmental issue.

The CEQA Project is described in detail and defined throughout Draft SEIR Section 3.0: Project Description. Specifically refer to Draft SEIR Section 3.6: Housing Element Update - CEQA Project, for a definition of the CEQA Project and a description of the Project analyzed throughout the Draft SEIR.

For clarity, State CEQA Guidelines §15378: Project, states the following concerning a project under CEQA:
a) “Project” means the whole of an action, which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and that is any of the following:
1) An activity directly undertaken by any public agency including but not limited to public works construction and related activities clearing or grading of land, improvements to existing public structures, enactment and a mendment of zoning ordinances, and the adoption and amendment of local General Plans or elements thereof pursuant to Government Code Sections 65100–65700.
2) An activity undertaken by a person which is supported in whole or in part through public agency contacts, grants, subsidies, loans, or other forms of assistance from one or more public agencies.
3) An activity involving the issuance to a person of a lease, permit, license, certificate, or other entitlement for use by one or more public agencies.

Therefore, “CEQA Project ,” as used in the Draft SEIR and pursuant to State CEQA Guidelines §15378, is interchangeable with “Project under CEQA” and includes all proposed Project activities that by their nature are c apable of causing a direct or reasonably foreseeable indirect physical impact on the environment.

E-3 This comment requests that the SEIR include appeal procedures if residents need to appeal ministerial approvals of the housing development.

This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environ mental issues. Although s uch comments do not require a response pursuant to City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-34
State CEQA Guidelines §15088(a), it is noted that future projects requiring discretionary action would be subject to appeal procedures in effect at the time action is taken on the project. The appeal period and procedures for filing an appeal would be disclosed at the time a decision is made on the project and in the Notice of Action for the project. M inisterial permits are not discretionary and, as such, action is not taken during a public meeting and no written notice of action is required. However, Huntington Beach Zoning and Subdivision Ordinance (HBZSO) Chapter 248 provides for appeals of a decision, requirement, or determination made by the Director in the administration of the zoning and subdivision ordinances not otherwise provided.

Additionally, Huntington Beach Municipal Code (HBMC) Chapter 17 provides for appeals of decisions made by the Building Official. The HBZSO and HBMC are availab le to the public at all times on the City’s website or by contacting the City Clerk’s office or Community Development Department. No further response is needed.

E-4 This comment requests that, along with the Floor Area Ratio (FAR), Draft SEIR Table 3-3:

Candidate Housing Sites Involving Rezoning include the projected number of units that would result if the rezoned candidate housing sites were developed with residential units.

Please refer to Draft SEIR Table 3-3 in Draft SEIR Section 3.2: Existing Environmental Setting.

Rezoning is a Project activity that is more appropriately discussed as a potential Project impact; see Draft SEIR page 5.8 -21. It is also noted that z one changes are proposed on o nly three candidate housing sites: Sites 3, 4, and 5. Draft SEIR Table 5.8-6: Proposed Zone Changes – Candidate Housing Sites , provides the existing and proposed zoning for these three sites. As indicated in Draft SEIR Table 5.8-6, the zoning on Sites 3, 4, and 5 would change from IL, IG, and CG (with an existing development capacity of 765,458 square feet of non-residential land uses) to RMH, with a resultant development capacity of 428 housing units.

The maximum allowable development on an individual parcel is regulated by the maximum density or intensity fo r the parcel’s land use designation. Density applies to residential designations and is expressed as the maximum number of dwelling units per acre of land. Intensity applies to nonresidential development and is expressed as floor -to-area (FAR) ratio. Candidate housing sites proposed to be rezoned to RMH (Residential Medium High Density) would be subject to the maximum density allowable for that land use designation, which is 25 dwelling units per acre. No FAR standard is established for the RMH land use designation.

E-5 This comment requests that Draft SEIR Appendix B: Candidate Housing Sites Inventory also include the anticipated FAR for each candidate housing site.

The Project’s proposed rezoning and overlay strategies are all intended to accommodate additional residential development . Therefore, Draft SEIR Appendix B appropriately includes residential development density, which is expressed in terms of dwelling units per acre. There is no FAR proposed for the candidate housing sites. Further, FAR as suggested in this comment, is a quantitative measure that typically applies to non-residential development, including as part of a mixed-use development. The Project’s proposed rezoning and overlay are intended for residential development and not non-residential or mixed-use developments.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-35
E-6 This comment requests clarification, asking if the statement “except for development permitted by right” found on Draft SEIR page 3-10 refers to any residential development within an overlay.

This statement does not refer to “any” project, instead it refers to projects that meet State housing law requirements (i.e., by providing a minimum of 20 percent lower income units on site).

To further clarify, Draft SEIR page 3-10 paragraph 3 is revised in the Final SEIR, as follows:
….. Similarly, discretionary permits and future CEQA evaluation will be required prior to approval of future housing development facilitated by the HEU, except for development permitted by right, which includes housing projects within overlay zones that meet State housing law requirements (e.g., by providing a minimum of 20% lower income units on site) , emergency shelters, low barrier navigation centers, and small licensed residential care facilities for six or fewer persons; and ADUs and Junior ADUs, which ar e exempt from CEQA, pursuant to State CEQA Guidelines §15268 (Ministerial Projects) and PRC §21080(b)(1) and discretionary permits per CGC §§65852.2 and 65852.22. In addition, ADUs can be categorically exempt from CEQA pursuant to State CEQA Guidelines §§1 5301 and 15303, authority cited under PRC §§21083 and 21087.

Although not related to the SEIR’s environmental analysis, to further clarify, within the proposed Overlay areas, if a project does not provide a minimum of 20 percent lower income units on site, an applicant would be subject to development pursuant to the base/underlying zoning designation. For some candidate housing sites, this would preclude residential development on the site and any nonresidential development proposed would be subject to th e City’s discretionary processes and be subject to CEQA. In instances where the base zoning designation allows residential (such as the Beach and Edinger Corridors Specific Plan) a project that does not provide a minimum of 20 percent lower income units o n site would be subject to the City’s discretionary processes and be subject to CEQA.

E-7 This comment requests clarification on when in the process City Council will decide concerning the statement made on Draft SEIR page 3-11 “the Huntington Beach City Council will decide which housing sites from the candidate housing sites inventory will be identified in the 6th Cycle Housing Element, as action programs to accommodate the assigned affordable housing obligations.” This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Although such comments do not require a response pursuant to State CEQA Guidelines §15088(a), it is noted that the Huntington Beach City Council will make these decisions at the time the HEU an d its associated SEIR are brought forth for their consideration.

This is tentatively scheduled to occur during a City Council meeting to be held in Fall of 2022.

Public notices of this meeting will be made available in accordance with all applicable regulations No further response is needed.

E-8 This comment requests clarification regarding the 60 percent buffer.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-36
As stated on Draft SEIR page 3-13, a buffer of 60 percent is included to accommodate the RHNA during the entire planning period given the State’s requirements of the “no net loss” statute. The purpose of No Net Loss Law ( CGC §65863) is to ensure development opportunities remain available throughout the planning period to accommodate a jurisdiction’s RHNA, especially for lower- and moderate-income households.3
The Project does not propose new residential or other development on the 378 candidate housing sites; rather, it provides capacity for future development of approximately 19,738 housing units to meet the City’s remaining unmet RHNA of 11,743 housing units, consistent with State law.

Because private property development is largely the result of market forces, it is possible that a candidate site would be developed with nonresidential uses pursuant to the base zoning designation or be developed with fewer units than the assumed capacity. The City is required to accommodate a buffer to ensure that residential capacity will continue to accommodate the City’s RHNA targets for each income level in the event this happens. While the 11,743 units of remaining unmet R HNA is not a development cap, the City only has to allow residential development pursuant to the proposed Affordable Housing Overlays (i.e., by-right development) until the RHNA is met. The 19,738 units, which do account for the buffer, reflect the development capacities for all 378 candidate housing sites. There is no additional buffer or other sites aside from the 378 sites identified. The assumed development densities are detailed in Draft SEIR Appendix B. Lastly, during the planning period, residential development projects could be proposed in other areas of the City designated for residential uses on sites not identified in the Housing Element . These residential projects are not part of the Project analyzed in the SEIR and would be subject to the City’s established discretionary process and CEQA. These projects would also contribute to meeting the City’s RHNA targets.

E-9 This comment requests clarification concerning developments that have previously received CEQA clearance (Draft SEIR page 3-18). This statement refers to the 1,625 units that are already entitled and current in the pipeline projects- it does not refer to the buffer units. To further clarify, Draft SEIR page 3-18 last paragraph is revised in the Final SEIR, as follows:

It is noted, while the candidate housing sites’ development capacity totals 19,738 housing units, this includes a 60 percent buffer, which is intended to serve as a sites contingency. Therefore, the CEQA Project analyzed in this SEIR assumes 11,743 additio nal housing units over existing conditions, which excludes the 60 percent 7,995 buffer units and 1,625 pipeline units (i.e., existing applications and current projects)4 since these have previously received CEQA clearance….

3 California Department of Housing and Community Development. 2021. Accountability and Enforcement. https://www.hcd.ca.gov/community -development/accountability -enforcement.shtml (accessed January 2022). 4 Please refer to the City’s website for a list of environmental reports that have been prepared for the pipeline units that have previously received CEQA clearance: https://www.huntingtonbeach ca.gov/government/departments/planning/environmental -reports/. As indicated on pages B-8 and B-9, some of the pipeline projects are currently under review and their associated environmental documents are underway.

The completed environmental documents for each of these projects will be posted at the same location on the City’s website, a s noted above.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-37
The candidate housing sites included in the inventory have already undergone a site suitability analysis as part of the HEU and have been deemed suitable to accommodate residential capacity pursuant to Housing Element law.

As discussed in Response E -8, the 19,738 units conside r the development capacities of all 378 candidate housing sites and includes the buffer (7,995 units). The locations of the 378 candidate housing sites are depicted on Draft SEIR Exhibit 1-1: Candidate Housing Sites. All of the parcels would be located wit hin Overlay areas, except for the three sites proposed to be rezoned. There are no additional parcels being considered beyond the 378 sites depicted on Draft SEIR Exhibit 1-1.

E-10 This comment requests a discussion on how the Affordable Housing Overlay is implemented.

The Housing Element’s Affordable Housing Overlay is a subsequent implementing action to be adopted by the City Council at a duly noticed public hearing. Upon adoption, the Overlay will become the official standards regulating land uses subject to the Overlay. It is noted that the Draft SEIR analyzes the whole of the Project in that it evaluates and identifies potential environmental impacts associated with the total development capacity on all of the candidate housing sites, including sites within the Affordable Housing Overlay. By doing so, the Draft SEIR outlines a worst- case scenario of potential Project impacts on the environment. Residential projects proposed pursuant to the Overlay would be required to provide 20 percent lower income units on site and would not be allowed to pay in-lieu fees to satisfy the affordable requirement.

E-11 This comment requests additional information concerning flooding from Prado Dam failure. The comment states that the Draft SEIR should provide support for concluding that risk of flooding from Prado Dam failure is unlikely due to the short duration that the reservoir is full.

In acc ordance with the State CEQA Guidelines, t he Draft SEIR addresses the following impact statement: Would the Project in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? Draft SEIR Section 5.7: Hydrology and Water Quality states that future development facilitated by the Project could place housing and structures within a 100-year flood hazard area and/or dam inundation area. The section further discloses that General Plan Figure HAZ-8, Dam Flooding Area, identifies portions of the City, including 154 candidate housing sites, in the Prado Reservoir Dam inundation area. The Association of State Dam Safety Officials reports the most likely cause of dam failure is flooding from overtopping.5 The General Plan Natural and Environmental Hazards Element reports that Prado Dam releases water in a controlled manner down the Santa Ana River to recharge the groundwater aquifer underlying Orange County. 6 Although upstream dam failure could occur, it is likely only a threat to Huntington Beach during a relatively small part of the year when the reservoir behind Prado Dam is at its fullest. Therefore, the Draft SEIR appropriately concludes that flood risk from dam failure is unlikely. Although unlikely, potential for flooding from dam failure due to overtopping or other cause of failure, in

5 The Association of State Dam Safety Officials. 2022. Dam Failures and Incidents. https://damsafety .org/dam- failures#:~:text=Overtopping%20caused%20by%20water%20spilling,of%20all%20U.S.%20dam%20failures. (accessed September 2022). 6 City of Huntington Beach. 2017. General Plan, Natural and Environmental Hazards Element. https://www.huntingtonbeachca.gov/files/users/planning/Natural -and-Environmental-Hazards.pdf (accessed September 2022).

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-38
addition to flooding and inundation from storm events, would be addressed through Building Code and other applicable requirements. The analysis addresses federal and local requirements as follows: FEMA requires municipalities that participate in the NFIP to adopt certain flood hazard reduction standards for construction and development in 100-year flood plains. Accordingly, the City requires all new development within a 100 -year flood hazard area to obtain all necessary permits from applicable governmental agencies, comply with Floodplain Overlay District requirements (HBZSO Chapter 222), and ensure that proposed housing sites would be reasonably safe from flooding. A discussion of the measures the County of Orange, Federal government, and other regional governments implement to reduce flood risks from Prado Dam failure would not inform the analysis because the impact threshold is adequately addressed, and the Project is not the analysis of potential Prado Dam failure, but rather of potential Project impacts. It is also noted that all of the 154 candidate housing sites within or partially within the dam flooding area are currently designated for residential, commercial, or industrial land uses that could place housing and structures within flood hazard areas.

E-12 This comment is concerning GPU PEIR MM 4.15-2, which is intended to mitigate impacts to water supplies and the commenter alleges is for commercial businesses with employees. See revisions to Final SEIR Section 3.0: Errata for revisions to GPU PEIR MM 4.15-2 to account for the residential component.

E-13 This comment opines that the Vehicle Miles Traveled (VMT) analysis included in the Draft SEIR is inadequate because it screens out several of the candidate housing sites identified in the HEU, and therefore does not describe the total VMT generated by the Project.

As discussed in Responses E-8 and E-9 above, the inventory of candidate housing sites results in a development capacity of 19,738 units, including the 7,995 unit buffer (60 percent), although the City’s unmet RHNA is only 11,743 units. As the housing development projects’ built environment characteristics (e.g., d ensity, bicycle facilities, transportation demand measures, sequence and combination of candidate housing sites , and displaced land uses, among others) , that could influence trip generation and VMT cannot be known at this time, calculating VMT for all sites for 19,738 units would generate VMT for an unrealistic development scenario that is not anticipated to occur. The Housing Element is a policy-level document that presents the City’s proposed policies and programs to achieve the City’s housing objectives within the 2021 -2029 planning period. Growth assumptions included in the HEU represent a theoretical development capacity (based on the City’s RHNA allocation as determined by SCAG), which, consistent with the Housing Element planning period, is estimated to occur by 2029. The Project does not propose development, but rather is intended to accommodate and encourage housing development to accommodate projected housing needs at all income levels within the City. The 19,738 dwelling unit development capacity, inclusive of the buffer needed to meet the remaining unmet RHNA of 11,743 dwelling units, and planning period are based on theoretical conditions used to conduct a thorough and conservative analysis of potential environmental impacts that would result from future development accommodated by the HEU and corresponding updates to the LUE. The actual rate and location of housing development would be outside of the City’s control and would be dictated by factors that influence development, such as eco nomics and market forces, among City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-39
others. Individual projects would occur incrementally over time, largely based on economic conditions, market demand, and other planning considerations.

As stated on Draft SEIR page 5.13-10, to quickly identify when a project should be expected to cause a less than significant impact without conducting a detailed study, the Governor’s Office of Planning and Research 2018 December Technical Advisory (OPR TA) suggests that a lead agency may screen out VMT impacts using pr oject size, maps, transit availability, and provision of affordable housing. The OPR TA specifies that land development projects that have one or more of the following attributes may be presumed to have a less than significant impact on transportation and circulation: Small Projects; Low VMT Area Projects; Proximity to Transit (Projects in Transit Priority Areas (TPAs)/High-Quality Transit Area (HQTA); Affordable Residential Development Projects. A land use project needs to meet only one of these screening criteria to be presumed to have a less than significant impact on transportation and circulation, under CEQA and pursuant to SB 743. Accordingly, the Draft SEIR provides the VMT Assessment for screened projects beginning on page 5.13-16. All 378 candidate housing sites were analyzed based on their maximum allowable density, maximum development capacity, maximum trip generation, location and each screening criteria (i.e., Small Projects; projects in low VMT areas; projects in TPAs/ HQTA; and affordable hous ing projects ). Moreover, t o provide forecast ADT for representative residential developments, the ADT for the maximum, mean, and 90 th percentile development capacities were estimated. The daily trip generation per candidate housing site and the exhibits that depict the sites in the context of projects in low VMT areas and projects in TPAs/ HQTA are provided in Draft SEIR Appendix F: Vehicle Miles Traveled Assessment; see the following:
▪ Attachment A: Forecast Trip Generation by Candidate Housing Site ▪ Attachment C: Small Project Screening Map
▪ Attachment E: Low VMT Area Screening Map
▪ Attachment F: Transit Proximity Screening Map
Therefore, the Draft SEIR analysis screens out the candidate housing sites based on their ability to qualify for the four screening criteria.

Future housing development in the City will be processed in accordance with the applicable zoning regulations and development standards in effect at the time a project is submitted. Future developments would be examined in light of the assumptions for that site included in the SEIR to determine whether they would be subject to a “by right” site plan review process or further discretionary review, including environmental clearance requirements pursuant to CEQA. As discussed above, the assumed developments on each candidate housing site are theoretical- lot consolidation, etc. is speculative and cannot be determined at this policy-level analysis. See Response E-4 concerning FAR , which is a quantitative measure th at typically applies to non - residential development, thus, the densities specified in Draft SEIR Appendix B were used for screening purposes.

E-14 This comment requests information on proximity to transit and bicycle facilities and opines that the SEIR needs to discuss transit within the Project area in relation to VMT impacts.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-40
See Response E-13 concerning adequacy of the VMT analysis, transit screening, and Attachment F: Transit Proximity Screening Map . The City’s Bicycle Master Plan (2013) and General Pla n Circulation Element Figure CIRC-5, Bikeway Plan, which detail the existing bicycle network and also offer future improvements intended to enhance the City’s bicycle network are discussed on Draft SEIR page 5.13-6. Additionally, the Existing Transportation Network (Draft SEIR page 5.13-6) discusses for each roadway the locations of bicycle facilities and which candidate housing sites are present/would be served by that facility.

The use of bicycling as an alternative mode of transportation is not solely relied upon to mitigate VMT impacts. Other examples of potential measures to reduce VMT, as outlined in MM TRANS-1, include:
▪ Increase access to common goods and services, such as groceries, schools, and daycare. ▪ Incorporate affordable housing into the project.
▪ Provide traffic calming.
▪ Limit or eliminate parking supply.
▪ Unbundle parking costs.
▪ Implement or provide access to a commute reduction program. ▪ Provide transit passes.

E-15 This comment questions whether the Draft SEIR defers VMT mitigation as part of the VMT analysis by noting that individual projects will need to undergo and prepare a separate VMT evaluation.

As discussed in Response E -13, the housing development projects’ built environment characteristics (e.g., density, bicycl e facilities, transportation demand measures, sequence and combination of candidate housing sites , and displaced land uses, among others), that could influence trip generation and VMT cannot be known at this time. These are practical considerations that preclude conducting site-specific VMT analyses and devising site-specific mitigation measures, and are moreover not appropriate for this policy level analysis. Additionally, MM TRANS-1 includes the elements necessary to devise site-specific mitigation measures: the Lead Agency’s commitment to devise such measures in the future; inclusion of performance standards (i.e., low VMT threshold); and identification of potential actions that could feasibly achieve the performance standard.

E-16 This comment notes the two alternatives provided in the SEIR. The State CEQA Guidelines do not require an EIR to consider every plausible alternative to a project, but rather must examine in detail only the ones which the lead agency determines could feasibly attain most of the basic project objectives. Given the Project’s objectives, and most notably the ability to meet R HNA requirements, the SEIR has both identified those alternatives considered but rejected, and analyzed in detail two alternatives that could at least in part attain Project objectives.

E-17 See Responses E-13, E-14, and E-15 concerning the adequacy of the VMT analysis.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-41
State CEQA Guidelines §15126.6(d): Evaluation of Alternatives states: The EIR shall include sufficient information about each alternative to allow meaningful evaluation, analysis, and comparison with the proposed project. A matrix displaying the major characteristics and significant environmental effects of each alternative may be used to summarize the comparison.

If an alternative would cause one or more significant effects in addition to those that would be caused by the project as proposed, the significant effects of the alternative shall be discussed, but in less detail than the significant effects of the project as proposed. Therefore, the level of detail provided is suitable for an alternative s analysis. Further, under Alternative 2, new residential development would occur in portions of Specific Plan 14’s (Beach Edinger Corridors Specific Plan) Transition Corridor Areas (TCA s), which would support transit -oriented communities, and on fewer total parcels throughout the City. This would further reduce vehicle miles traveled (VMT), transportation-related energy demands, and associated criteria air pollutant and greenhouse gas emissions associated with housing development. Thus, the analysis found that compared to the proposed Project, Alternative 2 would better support goals to reduce Citywide and regional VMT.

This alternative would not restrict the City’s ability to implement a ny planned transportation improvements and new development would continue to be subject to HBMC Chapter 17.65: Fair Share Traffic Impact Fees. Following compliance with General Plan Policies CIRC-1.B, 1.F, 2.C, 3.C,

3.D, 5.A, 6.C, 9.B, payment of traffic i mpact fees, and implementation of GPU PEIR MMs 4.14-1 through MM 4.14 -3 and MM TRANS -1 (which would remain applicable to Alternative 2), Alternative 2’s potential to conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadways, bicycle and pedestrian facilities would also be less than significant. Thus, Alternative 2 would be considered environmentally superior to the Project concerning transportation.

E-18 This comment notes that there has been public controversy over high-rise development fronting Beach Boulevard. See Response E-17, regarding the adequacy of the Alternative 2 analysis.

There is no high -rise development anticipated by the Project. As detailed for each candidate housing site in VMT Assessment Attachment A: Forecast Trip Generation by Candidate Housing Site, either low-rise or mid-rise developments were assumed for the sites. Therefore, no visual analysis of high-rise development is warranted.

See Final SEIR Section 3.0: Errata for revisions to the Aesthetic analysis under Alternative 2.

E-19 This comment opines that there will be additional impacts to recreational facilities within areas around Beach Boulevard under Alternative 2, as this alternative would result in an increase i n population concentrated within this area, which could result in an increased demand for parks and recreational facilities. See Draft SEIR Section 5.12: Recreation, for an analysis of the Project’s potential impacts on recreational facilities. As with the Project, the increased use of existing recreational facilities associated with Alternative 2 is not anticipated to result in the substantial physical deterioration of these facilities because Alternative 2 buildout would occur incrementally through 2029, based on market conditions and other factors, such that recreational facilities are not overburdened by substantially increased demands at any single point in time. Also, as stated in Draft SEIR Section 7.0: Alternatives, Alternative 2 does not include recreational facilities but may require the construction or expansion of facilities to meet the demand for recreational City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-42
facilities to meet General Plan Policy ERC -1.A’s park per capita target ratio of 5.0 acres per 1,000 persons.

E-20 This comment notes that high-rise development is costly and may not be affordable to renters if developers choose to pay in -lieu fees rather than provide affordable housing . As such , the comment opines that housing locations and development envisioned under Alternative 2 should be rejected.

See Response E-18 concerning high-rise development. Residential projects proposed within the Overlay areas would be required to provide 20 percent lower income units on site and would not be able to satisfy the affordable requirements through the payment of in-lieu fees. The rejection of Alternative 2 based on a hypothetical scenario in which rental units could be too costly to maintain and rent would be speculative, and would conflict with the State CEQA Guidelines, which require an evaluation of a reasonable range of alternatives that could lessen or eliminate Project- related environmental impacts.

E-21 This comment requests that additional alter natives (i.e., the Huntington Harbour Area) be analyzed. See Response E-16 concerning th e Alternatives analyses. In addition, as discussed in Draft SEIR Section 7.0: Alternatives, sites in the Huntington Harbour area would be subject to approval of a Local Coastal Program Amendment by the California Coastal Commission. The comment asserts that development can occur in areas vulnerable to hazards from sea level rise if the design mitigates sea level rise. However, when considering land use plan amendments, the Coastal Commission’s adopted guidance policies provide that jurisdictions should identify sea level rise hazard areas and limit new development in current and future sea level rise hazard zones. The Huntington Harbour area is mapped as a potential Sea Level Rise Hazard Area in General Plan Figure HAZ -6. The City has no assurances that the Coastal Commission would approve land use amendments to designate this area for residential uses. Therefore, this area would not be available to accommodate residential development (i.e. , the City’s RHNA targets) during the planning period and would not meet this Project objective. Further, the number of residential units that would need to be accommodated in the HEU would remain the same regardless of site location. As such, environmental impacts would not necessarily be reduced.

Since impacts would not be reduced and Project objectives would not be met, alternatives to consider different sites were not selected for further analysis.

E-22 This comment requests that the McDonnell Centre Business Park Specific Plan (SP11) Alternative not be rejected. See Response E-16 concerning the Alternatives analyses. In addition, as discussed in Draft SEIR Section 7.0: Alternatives, properties within the SP11 area that were considered for housing in the HEU are proposed to be developed with industrial uses. The first phase of buildings was recently completed, and additional phases were approved for over one million square feet of industrial, office , and warehouse space . Therefore, these sites would not be available to accommodate residential development (i.e., the City’s RHNA targets) during the planning period and would not meet this Project objective. Further, the number of residential units that would need to be accommodated in the HEU would remain the same regardless of site location. As such, environmental impacts would not necessarily be reduced. Since impacts would not be reduced City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-43
and Project objectives would not be met, alternatives to consider different sites were not selected for further analysis.

E-23 This comment is a closing statement that communicates contact information. No further response is needed. This comment does not address the adequacy or completeness of the Draft SEIR; does not raise environmental issues; and does not request the incorporation of additional information relevant to environmental issues. Such comments do not require a response pursuant to State CEQA Guidelines §15088(a). No further response is necessary.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 2.0 | Comments and Responses

2.0-44
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022
Section 3
Errata to the Draft SEIR

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-1
Section 3.0 Errata to the Draft SEIR

3.1 Introduction to the Errata
In accordance with State CEQA Guidelines §15132: Contents of Final Environmental Impact Report, the Final SEIR for the 2021-2029 HEU Implementation Program Project includes the Draft S EIR (SCH #2021080104, June 2022), as well as any proposed revisions or changes to the Draft SEIR. Changes to the Draft SEIR are listed below in this section by Draft SEIR Section, page, paragraph, etc. to best guide the reader to the revision. Changes are identified as follows:

Deletions are indicated by strikeout text.

Additions are indicated by underlined text.

It is noted, the changes to the Draft SEIR provided below do not affect the Draft SEIR’s overall conclusions, and instead represent changes to provide clarification, amplification, and/or insignificant modifications, as needed as a result of public comments on the Draft SEIR, or due to additional information received during the public review period. These clarifications and corrections do not warrant Draft SEIR recirculation pursuant to State CEQA Guidelines §15088.5; see also Final SEIR Section 1.4: Changes to the Draft SEIR.

None of the changes or information provided in the comments identify a new significant environmental impact, a substantial increase in the severity of an environmental impact for which mitigation is not proposed, or a new feasible alternative or m itigation measure that would clearly lessen significant environmental impacts but is not adopted. In addition, the changes do not reflect a fundamentally flawed or conclusory Draft SEIR.

3.2 Changes to the Draft SEIR
Section 3.0: Project Description

Page 3 ends

….. Similarly, discretionary permits and future CEQA evaluation will be required prior to approval of future housing development facilitated by the HEU, except for development permitted by right, which includes housing projects within overlay zones that meet State housing law requirements (e.g., by providing a minimum of 20% lower income units on site) , emergency shelters, low barrier navigation centers, and small licensed residential care facilities for six or fewer persons; and ADUs and Junior ADUs, which ar e exempt from CEQA, pursuant to State CEQA Guidelines §15268 (Ministerial Projects) and PRC §21080(b)(1) and discretionary permits per CGC §§65852.2 and 65852.22. In addition, ADUs can be categorically exempt from CEQA pursuant to State CEQA Guidelines §§15301 and 15303, authority cited under PRC §§21083 and 21087.

Page 3 ends

It is noted, while the candidate housing sites’ development capacity totals 19,738 housing units, this includes a 60 percent buffer, which is intended to serve as a sites contingency. Therefore, the CEQA City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-2
Project analyzed in this SEIR assumes 11,743 additional housing units over existing conditions, which excludes the 60 percent 7,995 buffer units and 1,625 pipeline units (i.e., existing applications and current projects)1 since these have previously received CEQA clearance….

Section 5.6: Hazards and Hazardous Materials

Page 5 ends

Kimley-Horn performed regulatory database searches of the SWRCB GeoTracker website2, and the DTSC Envirostor website3, and the CalRecycle Solid Waste Information System (SWIS), 4 to identify hazardous materials regulated facilities within the City. Appendix E: Hazardous Materials Listed Sites , lists all the SWRCB GeoTracker, DTSC Envirostor, and SWIS databases listed sites that occur within the City.

Page 5 ends

Review.

There is one hazardous waste site (Ascon Landfill, located at 21641 Magnolia Street) in the City that is on the Hazardous Waste and Substances Site List (Cortese List) compiled pursuant to California Government Code §65962.5.5 This property is not included in the inventory of candidate housing sites.

In addition, CalRecycle’s SWIS identified two other landfills in the City : the City of Huntington Beach Landfill (No. 30 -AB-0026, previously located between Gothard Street and Goldenwest Street ); and the Gothard Street Landfill (No. 30-AB-0014, previously located at 18131 Gothard Street). These landfills have a “closed” operational status and are not included in the inventory of candidate housing sites. The State Geotracker website indicates that the Gothard Street Landfill is an open – closed with monitoring case, as the landfill is closed but ongoing monitoring events occur.

Page 5 ends

Review of regulatory databases (i.e., SWRCB GeoTracker, and DTSC Envirostor, and SWIS ) indicates candidate housing Sites 32, 38, 289, 300, and 325 are located on three DTSC Envirostor open cases and, candidate housing Sites 133, 204, 214, 217 and 222 are located on five of the Geotracker open cases, and candidate housing Sites 52, 283, 147, 92, 298, 93, 33, 197, 96, 169, 168, 26, 329, 314, 35, 295, 207, 282, 34, 3, 27, 28, 21, 20, 29, 308, 309, 30, 24, 32, 208, 203, 25, 23, 312, 290, and 22 are within 1,000 feet of an open – closed with monitoring case. Additionally, these databases report multiple listings are present within the City that have or previously had cases associated with hazardous material spills, violations, or

1 Please refer to the City’s website for a list of environmental reports that have been prepared for the pipeline units that ha ve previously received CEQA clearance: https://www.huntingtonbeachca.gov/government/departments/planning/environmental -reports/. As indicated on pages B-8 and B-9, some of the pipeline projects are currently under review and their associated environmental reports are underway. The completed environmental documents for each of these projects will be posted at the same location on the City’s website, as no ted above. 2 State Water Resources Control Board's (SWRCB) GeoTracker website http://geotracker.waterboards.ca.gov/ . (accessed January 26, 2022).http://www.envirostor.dtsc.ca.gov/public/
3 Department of Toxic Substances Control Envirostor website http://www.envirostor.dtsc.ca.gov/public/ . (accessed January 26, 2022). 4 CalRecycle. SWIS Facility/Site Search. https://www2.calrecycle.ca.gov/SolidWaste/Site/Search (accessed September 2022). 5 California, State of, Department of Toxic Substances Control, DTSC's Hazardous Waste and Substances Site List - Site Cleanup (Cortese List).

Available at: https://dtsc.ca.gov/dtscs-cortese-list/. Accessed: January 30, 2022.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-3
incidents. As previously noted, the SWRCB GeoTracker database reports 35 open cases and the DTSC Envirostor database reports 34 open cases throughout the City. Additionally,…

Page 5 ends

CalReycle. 2022. SWIS Facility/Site Summary – City of Huntington Beach Landfill (30-AB-0026). Available at: https://www2.calrecycle.ca.gov/SolidWaste/Site/Summary/2086. Accessed September 7, 2022.

CalReycle. 2022. SWIS Facility/Site Summary – Gothard Street Landfill (30 -AB-0014). Available at:
https://www2.calrecycle.ca.gov/SolidWaste/Site/Summary/2080. Accessed September 7, 2022.

Section 5.12: Recreation
Pages 5.12-3 and -4, Section 5.12.3: Existing Environmental Setting Parks2
The City is served by a wide variety of recreational programs run by the City of Huntington Beach Department of Community Services. There are 7 89 parks and public facilities, public golf courses, city facilities, and public beaches in the City totaling 1,073 767 acres, 190 playground apparatus, and irrigation systems. In addition to the 767 acres of parkland, the City also has 208 acres of public beach and a 98-acre public golf course. City recreational facilities also include community centers, senior centers, clubhouses, a gym and pool, bikeways and equestrian trail systems, and campgrounds. City -run marine -based amenities, such as beaches, a pier, and harbor channels, as well as two State beaches and one regional park (operated by Orange County), are also available for recreational usage.

Parks/Parkland
Based on the City’s existing population of 196,874 persons (see Table 5.10-2: Existing and Forecast Population -City) and City target to maintain or exceed the current park per capita ratio of 5.0 acres per 1,000 persons, including the beach in the calculations (see General Plan Policy ERC-1.A), the City’s current parkland demand is 985 acres. As discussed above, there are 1,073 975 acres of parkland in the City , including 767 acres of parks and 208 acres of public beach. Therefore, the City is currently over under its parkland demand by approximately 88 10 acres.

Pages 5.12-5 and -6, Section 5.12.6: Project Impacts and Mitigation, Impacts REC-1 and -2

IMPACT ANALYSIS
Implementation of the HEU w ould not, in and of itself, construct new housing in the City but would facilitate the development of residential units by providing programs and policies that would promote housing for all persons.

Future housing development facilitated by the Project would incrementally increase the City’s population by approximately 29,475 persons; see Table 5.10-8: Existing Plus Project Growth Projections. Additionally, this forecast population growth would require the construction or expansion of recreational facilities to meet General Plan Policy ERC -1.A’s park per capita target ratio of 5.0 acres per 1,000 persons.

Table 5.12-1: Projected Parkland Demand – Project and Representative Development Capacities, provides the projected parkland demand for Project buildout and indicates the Project would generate a demand City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-4
for approximately 147 acres of parkland. Although the Project-related increase in population is anticipated to increase the use of existing recreational facilities, the increased use of existing recreational facilities is not anticipated to result in the such that substantial physical deterioration of these facilityies could occur or be accelerated because much of the project-related growth has. It is noted that Project buildout would occur incrementally through 2029, based on market conditions and other factors, such that recreational facilities are not overburdened by substantially increased demands at any single point in time.

Additionally, the Project -related increase in population (and resulting increase in parkland demand) represents a conservative, worst-case scenario because there is an overlap in growth anticipated as part of the Project and growth anticipated as part of the GPU (2017). Namely, growth ant icipated as part of the Project could occur on many of the same sites that were forecasted for development as part of the GPU. Furthermore, it is not anticipated that each candidate housing site would be developed with a maximum development scenario, and thereby would not result in the maximum potential for an increased demand for parkland and recreational facilities in the City. For context, Table 5.12 -1, also provides the projected parkland demand for the average size development (Site 53 with 51 dwelling units) and maximum size development (Site 217 with approximately 601 dwelling units), respectively. As also indicated in Table 5.12-1, at most, the parkland demand associated with a single housing development site would be 8.4 acres.

All future housing development subject to rezoning and within overlay zones would also be subject to compliance with General Plan Policy ERC -1.A, which ensure existing parks and their current and future development meet the changing recreational and leisure needs of existing and future residents through processes such as: current park per capita would be maintained or exceeded; Policy ERC-1.B, which seeks opportunities to develop and acquire additional parks and open space in underserved areas where needed; and Policy ERC-1.C, which ensures distribution of future developed park and recreational sites to equitably serve neighborhood and community needs while balancing budget constraints; as well as General Plan Policies ERC-1.E, ERC-1.F, ERC-1.G, and ERC-1.H. All future housing development subject to rezoning and within overlay zones would also be subject to compliance with GPU PEIR MM 4.13 -1 and MM 4.13 -2, which would ensure project applicants demonstrate compliance with City parkland requirements identified in HBZSO §254.08 (or Ordinance No. 3596), either through the dedication of Table 5.12-1: Projected Parkland Demand –
Project and Representative Development Capacities
Scenario Units Population1 Demand Factor2 Projected Parkland Demand (AC)
Mean (Site No. 53)
Proposed 51 128 5.55 ac/1000 residents 0.7
Maximum (Site No. 217)
Proposed 601 1,509 5.55 ac/1000 residents 8.4
90th Percentile (Site No. 16)
Proposed 143 359 5.55 ac/1000 residents 2.0
Notes:

1. Based on 2.51 persons per household (California Department of Finance, E -5 Population and Housing Estimates for Cities, Counties, and the State, 2011-2021 with 2010 Census Benchmark, available at https://www.dof.ca.gov/Forecasting/Demographics/Estimates/e -5/.

2. Demand Factor of 5.55 acres per 1,000 residents per City of Huntington Beach GPU PEIR Section 4.13.3.3, page 4.13 -2.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-5
onsite parkland or through payment of applicable fees and that project applicants pay the Park Land/Open Space and Facilities Development Impact Fees in effect at the time of permit. Payment of fees would help offset the co sts associated with the physical deterioration of existing facilities and construction or construction or expansion of facilities.

The Project does not include recreational facilities, but may require the construction or expansion of recreational facilities to meet the Project’s demand for parkland, as concluded above. Construction or expansion of recreational facilities could have an adverse physical effect on the environment. Any future expansion of existing facilities or construction of new facilities, if required, would be subject to environmental review under CEQA.

Following compliance with General Plan Policies, and GPU PEIR MM 4.13-1 (HBZSO §254.08) and 4.13-2, the Project’s potential impacts associated with recreational facilities would be reduced t o less than significant.

Pages 5.12-7 and -8, Section 5.12.7: Cumulative Impacts The Project would result in a parkland demand of approximately 147 acres. As concluded above, this would be a less than significant impact following compliance with the City’s General Plan, HBZSO, and GPU PEIR MM 4.13-1 and 4.13-2. Cumulative development combined with the Project would generate a demand for 1,132 1,202 acres of parkland.6 There are 975 1,073 acres of parkland in the City, including 767 acres of parks and 208 a cres of public beach. When accounting for existing facilities, the remaining unmet parkland demand associated with cumulative development would be 59 227 acres. Additionally, the cumulative population forecast combined with the Project’s forecast population growth would total 240,523 persons, which cwould increase the use of existing recreational facilities such that substantial physical deterioration of a facility could occur or be accelerated. However, cumulative development would occur incrementally, based on market conditions and other factors, such that recreational facilities are not overburdened by substantially increased demands at any single point in time. All cumulative development would also undergo environmental review on a project-by-project basis pursuant to CEQA to evaluate potential impacts concerning recreational facilities. All cumulative projects would be subject to compliance with General Plan Policies ERC-1.A through ERC-1.H. Future cumulative development would also be subject to compliance with GPU PEIR MM 4.13 -1 and 4.13 -2, which would ensure project applicants demonstrate compliance with City parkland requirements identified in HBZSO §254.08, either through dedication of on-site parkland or payment of applicable fees and that project applicants pay the Park Land/Open Space and Facilities Development Impact Fees in effect at the time of permit. Where significant or potentially significan t impacts are identified, implementation of all feasible site -specific mitigation would be required to avoid or reduce impacts. For future residential development subject to a ministerial “by right” site plan review process, projects would be required to submit a GPU PEIR Mitigation Checklist identifying how they would comply with the GPU PEIR mitigation measures. Consequently, the Project combined with cumulative development would not result in significant cumulative environmental impacts concerning recreational facilities and no mitigation is required.

Page 5 ends

6 Existing demand (985 acres) + Project Demand (147 acres) City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-6
City of Huntington Beach. City Parks. 2022.
https://www.huntingtonbeachca.gov/residents/parks_facilities/parks/.

Pages 5.12-1 through -8, Footer
June 20212

Section 5.15: Utilities and Service Systems
Pages 4.15-25 and -26, Section 5.15.6: Project Impacts and Mitigation, GPU PEIR MM 4.15-2 GPU PEIR MM 4.15-2 Future projects under the General Plan Update shall incorporate the following measures to ensure that conservation and efficient water use practices are implemented. Project proponents, as applicable, shall:
1) Require employees and residents to report leaks and water losses immediately and shall provide information and training as required to allow for efficient reporting and follow up.
2) Educate employees and residents about the importance and benefits of water conservation.
3) Create water conservation suggestion boxes, and place them in prominent areas.
4) Install signs in restrooms and cafeterias that encourage water conservation. 5) Assign an employee or resident to evaluate water conservation opportunities and effectiveness.
6) Develop and implement a water management plan for its facilities that includes methods for reducing overall water use.
7) Conduct a water use survey to update current water use needs. (Processes and equipment are constantly upgrading, thus changing the need for wa ter in some areas.)
8) Repair leaks. Check the water supply system for leaks and turn off unnecessary flows.
9) Utilize water-efficient irrigation systems and drought tolerant plant palette and ensure that sprinklers are directing water to landscape areas, and not to parking lots, sidewalks or other paved areas.
10) Adjust the irrigation schedule for seasonal changes.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-7
11) Install low-flow or waterless fixtures in public and employee restrooms. 12) Instruct cleaning crews to use water efficiently for mopping. 13) Use brooms, squeegees, and wet/dry vacuums to clean surfaces before washing with water; do not use hoses as brooms. Sweep or blow paved areas to clean, rather than hosing off (applies outside, not inside). 14) Avoid washing building exteriors or other outside structures. 15) Sweep and vacuum parking lots/sidewalks/window surfaces rather than washing with water.
16) Switch from “wet” carpet cleaning methods, such as steam, to “dry,” powder methods. Change window -cleaning schedule from “periodic” to “as required.”
17) Set automatic optic sensors on icemakers to minimum fill levels to provide lowest possible daily requirement. Ensure units are air-cooled and not water- cooled.
18) Control the flow of water to the garbage disposal
19) Install and maintain spray rinsers for pot washing and reduce flow of spray rinsers for prewash
20) Turn off dishwashers when not in use – wash only full loads 21) Scrape rather than rinse dishes before washing
22) Operate steam tables to minimize excess water use
23) Discontinue use of water softening systems where possible 24) Ensure water pressure and flows to dishwashers are set a minimum required setting.
25) Install electric eye sensors for conveyor dishwashers 256) Retrofit existing flushometer (tankless) toilets with water-saving diaphragms and coordinate automatic systems with work hours so that they don’t run continuously
267) Use a shut-off nozzle on all hoses that can be adjusted down to a fine spray so that water flows only when needed.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-8
278) Install automatic rain shutoff device on sprinkler systems 289) Launder hotel linens per room by request or after vacancy

Section 7.0: Alternatives

Page 7 ends

Aesthetics. New housing development under Alternative 2 would concentrate developments in the TCAs of the Beach and Edinger Corridors Specific Plan 14; however, development on the proposed Project candidate housing sites would still be able to occur. Alternative 2 is different than the proposed Project in that Alternative 2 assumes higher density development in the TCAs but continues to allow development in the candidate housing sites. With higher densities in the TCAs under Alternative 2, it is anticipated that housing development would be predominately multi-family.

Similar to Unlike the Project, Alternative 2 would not impact City identified scenic vistas such as the Pacific Ocean, the Bolsa Chica Ecological Reserve, the Huntington Beach Mesa, and the low, steep bluffs on the south side of the Pacific Coast Highway due to the taller building heights and higher densities. The increase in development associated with both the proposed Project and Alternative 2 could affect the Huntington Beach Municipal Pier with the increase in light and glare in the area. Following Despite compliance with General Plan Policies LU-7.A through LU-7.C, LU-8.B through LU-8.D, CIRC-7.E, and the California Building Standards Code (Part 11 of Title 24), and HBZSO design guidelines that address light and spillage and glare on adjacent properties), both the proposed Project and Alternative 2 would have a less than significant impact on aesthetic resources. Thus, the Alternative 2 would be considered environmentally equivalent inferior to the Project concerning aesthetics.

Page 7 ends

Alternatives
Table 7-2: Comparison of Project Alternatives
Resource Areas Alternative 1
No Project
Alternative 2
Beach and Edinger
Corridor Alternative
Aesthetics  =
Agriculture and Forestry Resources = =
Air Quality  =
Biological Resources = =
Cultural Resources = 
Energy  =
Geology and Soils = =
Greenhouse Gas Emissions = =
Hazards and Hazardous Materials = =
Hydrology and Water Quality  
Land Use and Planning  
City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-9
Resource Areas Alternative 1
No Project
Alternative 2
Beach and Edinger
Corridor Alternative
Mineral Resources = =
Noise and Vibration = =
Population and Housing  =
Public Services  =
Recreation = =
Transportation  
Tribal Cultural Resources = =
Utilities and Service Systems  =
Wildfire = =
 Indicates an impact that is greater than the proposed Project (environmentally inferior).  Indicates an impact that is less than the proposed Project (environmentally superior). = Indicates an impact that is equal to the proposed Project (neither environmentally superior nor inferior).

Appendix E: Hazardous Materials Data
SWIS Number Site Name
Site Operational
Status
Site Regulatory
Status County
Enforcement
Agency (LEA/EA)
30-AB-0014 Gothard Street Landfill Closed Pre-regulation Orange Orange County 30-AB-0026
City Of Huntington
Beach Landfill Closed Pre-regulation Orange Orange County 30-AB-0027 Ascon Landfill Closed Unpermitted Orange Orange County

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022 3.0 | Errata to the Draft SEIR

3.0-10
This page intentionally left blank.

City of Huntington Beach
2021-2029 HEU Implementation Program Final Subsequent Environmental Impact Report

September 2022
Appendix A
Draft SEIR Distribution Package

From:

Meng Heu <[email protected]>
Sent: Wednesday, June 29, 2022 2:39 PM
To: Salas, Ruben <[email protected]>
Subject: SCH Number 2021080104
Thank you for using CEQASubmit. Your notice has been posted.

Meng Heu
Office of Planning and Research (OPR)
State Clearing House
**Note: No reply, response, or information provided constitutes legal advice.

To view your submission, use the following link.
https://ceqasubmit.opr.ca.gov/Document/Index/271977/2

NEW AUTHORS
WANTED! Page
Publishing will help
you self-publish
your own
book. FREE author
submission kit!
Limited offer! Why
wait? Call now: 1-
855-
667-0380 (Cal-
SCAN)
Sports and non
sports card Collec-
tions WANTED!!
Excellent cash pri-
ces paid!
Serving all of Cali-
fornia.

Purchasing large
and small accumu-
lations alike!
Collections pur-
chased daily.
1-209-204-1404
Sportscar dliquidat
[email protected]
(Cal-SCAN)

RETIRED COUPLE
$$$$ for business
purpose Real Estate
loans. Credit unim-
portant. V.I.P. Trust
Deed Company ww
w.viploan.com Call
1- 81 8- 248 -00 00.

Br oker -pr i nc ipal
DRE 01041073. No
consumer loans.
(Cal-SCAN)

SEAL BEACH
1BD, 1BA, Upper,
Ocean View, Off strt
prkng, lndry on site,
only $1,950/mo.
303 Seal Beach Blvd.
#6 Call 562-712-6394
or msg 562-596-8214

NOTICE TO OUR

READERS
The Orange Coun-
ty Register recom-
mends investigat-
ing before you
hire or advance
any monies on
srvcs rendered.

You may do so by
contacting one of
the following
agencies:

Better Business
Bureau
www.bbb.org
California Contrac-
tors Lic.B oard
1-800-321-2752
www.cslb.ca.gov
Construction or
improvement
advertisers with-
out California lic.
numbers in their
ads arep resumed
unlicensed. The
cost of unlicensed
work (labor &
materials) must
be under $500.
(CSBL General In-
fo on Unlicensed
Operators)
AT&T Internet.

Starting at
$40/month w/12-mo
agmt. Includes 1T B
of data per
month. Get More
For Your High-
Speed Internet
Thing. Ask us how
to bundle and
SAVE! Geo &s vc re-
strictions apply.

Call us today 1-855-
397-7909. (SCAN)
DIRECTV for
$79.99/mo for 12
months with
CHOICE Package.

Watch your favorite
live sports, news &
entertainment any-
where. First 3
months of HBO
Max, Cinemax,
Showtime, Starz
and Epix included!
Directv is #1 in Cus-
tomer Satisfaction
(JD Power &A ssoc.)
Some restrictions
apply. Call 1-888-
641-5762. (Cal-
SCAN)
DIRECTV Stream -
The Best of Live &
On-Demand On All
Your Favorite
Screens.

CHOICE Package,
$84.99/mo for 12
months. Stream on
20 devices in your
home
at once. HBO Max
included for 3m os
(w/CHOICE Pack-
age or higher.) No
annual
contract, no hidden
fees! Some restric-
tions apply. Call
IVS 1-855-404-2509
(Cal-
SCAN)
Available Right
Now. No Fee if
you need
babysitter,
housekeeping,
elderly live in /
live out, part
time or full time.

Please Call
Maria America
(714) 564-1747
Aloe Care Health,
medical alert sys-
tem. The most ad-
vanced medical
alert
product on the
market. Voice-
activated! No wi-fi
needed! Special of-
fer? call and
mention offer code
CARE20 to get $20
off Mobile Com-
panion. Call today
?1-844-
790-1673. (SCAN)
Become aP ublished
Author. We want to
Read Your Book!
Dorra nce
Pub lishing-Trust ed
by Authors Since
1920 Book manu-
script submissions
currently being re-
viewed. Compre-
hensive Services:

Consultation, Pro-
duction, Promotion
and Distribution.

Call for Your Free
Author‘s Guide1 -
877-538-9554 or visit
http://dorranceinfo.
com/Cali (Cal-
SCAN)
Looking for assisted
living, memory
care, or independ-
ent living? AP lace
for Mom simplifies
the process of find-
ing senior living at
no cost to your fam-
ily. Call 1-844-741-
0130 today. (Cal-
SCAN)
Over $10K in Debt?
Be debt free in 24 to
48 months. No up-
front fees to enroll.

A+ BBB rated. Call
National Debt Relief
1-888-231-4274. (Cal-
SCAN)
SAVE BIG on HOME
INSURANCE! Com-
pare 20 A-rated
insurances compa-
nies. Get aq uote
within
minutes. Average
savings of
$444/year! Call 1-
844-410-9609! (M-F
8am-8pm Central)
(Cal-SCAN)
The difference in
winning and losing
an election is how
campaign dollars
are spent. Get the
best ROI
by using our deep
relationships in ev-
ery community in
California. Our on-
the-ground knowl-
edge is
indispensable to
campaigns that
want results. For
more info on multi-
market ethnic and
non-ethnic
solutions call Cece-
lia @( 916) 288-6011
or [email protected]
m
The difference in
winning and losing
market share is
how businesses use
their advertising
dollars.

CNPA’s Advertising
Services’ power to
connect to nearly 13
million of the
state’s readers who
are an
engaged audience,
makes our services
an indispensable
marketing solution.

For more info call
Cecelia
@( 916) 288-6011 or
[email protected]
The difference in
winning and losing
market share is
how businesses use
their advertising
dollars.

Mark Twain said,
“Many as mall thing
has been made
large by the right
kind of advertising”.

So why
spend your hard-
earned dollars on
social media where
you already have an
audience? For more
info call
Cecelia @( 916) 288-
6011 or cecelia@cnp
a.com
The difference in
winning and losing
market share is
how businesses use
their advertising
dollars.

We deliver the larg-
est consortium of
trusted news
pub-
lishers in California
and beyond. For
more info on
multi-market solu-
tions call Cecelia @
(916) 288-6011 or ce
[email protected]

LONG DISTANCE
MOVING: Call today
for aF REE QUOTE
from America’s
Most
Trusted Interstate
Movers. Let us take
the stress out of
moving! Speak to a
Relocation Special-
ist, call 844-857-
1737 (Cal-SCAN)

PAINTING BY JOSE
Int/Ext, Repair Dry
Wall, Stucco, Wood
Flrs, Mold L#967673
714-760-5417

DONATE YOUR CAR

OR TRUCK TO HER-

ITAGE FOR THE
BLIND. Free 3D ay
Vacation, Tax De-
ductible, Free Tow-
ing, All Paperwork
Taken Care Of. CALL
1-844-491-2884 (Cal-
SCAN)

DONATE YOUR CAR
TO KIDS Fast Free
Pickup –R unning or
Not -2 4H our Re-
sponse -M aximum
Tax Donation –H elp
Find Missing Kids!
Call 1-888-491-1453.
(Cal-SCAN)
WANTED! Old
Po rs ch e
356/911/912 for re-
storation by hob-
byist 1948-1973 On-
ly.

Any condition, top
$p aid! PLEASE
LEAVE MESSAGE 1-
707-339-5994. Email:
porscherestoration
@yahoo.com (Cal-
SCAN)

NOTICEOFPUBLICHEARINGBEFORE

THECIAB/PUBLICWORKSCOMMISSIONOFTHECITYOFHUNTINGTONBEACH Notice of Public Hearing on consideration to accept and hear public comment on DepartmentofPublicWorksUtilitiesDivisionPublicHealthGoalsReport.

Notice is hereby given that ap ublic hearing will be held by the CIAB/Public Works Commission of the City of HuntingtonB each, at the Utilities Yard, 19021 Huntington Street, at the hour of 5:00 PM, or as soon as possible thereafter on Wednesday,t he 20th of July 2022 for the purpose of considering acceptance of and hearing public comment on the DepartmentofPublicWorksUtilitiesDivisionPublicHealthGoalsReport.

Pursuant to SB 1307 (Calderone-Sher; effective 01-01-97) ar eport on Public Health Goals must be prepared by water utilities on July 1, 1998 and every three years thereafter. Copies of the report are available for review in the Office of the City Clerk at the address noted below.

All interested persons are invited to attend the hearing on the Public Health Goals Report, to express their opinions for, or against, with written or oral comments. Written communications to the CIAB/ Public Works Commission also may be mailed to the City Clerk. Further information may be obtained from the Office of the City Clerk, 2000 Main Street, Huntington Beach, CA 92648- Phone (714) 536-5227. The City of Huntington Beach endeavors to accommodate persons of handicapped status in the admissiono ra ccess to, or treatmento re mployment in, City programso ra ctivities.T he City of Huntington Beach is anequalopportunitiesemployer.

RobinEstanislau,CityClerk
CityofHuntingtonBeach
2000MainStreet,2ndFloor
HuntingtonBeach,California92648
714-536-5227
http://huntingtonbeachca.gov/HBPublicComments/

ZOOMLOG-ININSTRUCTIONS
MeetingURL:
ht tps ://h un ti ngto nbe ach.z oom. us /j /92 03 555 7461 ? pwd=SGNRWUxqNTVrR0tOZWhJQXJPYllwZz09Passcode:238081
Phoneone-tap:
+16699006833,,92035557461#,,,,*238081#US(SanJose)
+13462487799,,92035557461#,,,,*238081#US(Houston)
Joinbytelephone:

Dial(forhigherquality,dialanumberbasedonyourcurrentlocation):

US:+16699006833or+13462487799or+12532158782or+13126266799or+1 9294362866or+13017158592
MeetingID:92035557461
Passcode:238081
PublishedHuntingtonBeachWaveJune30,2022

LEGALA DVERTISEMENT

DEPARTMENT OF COMMUNITY DEVELOPMENT

CITY OF HUNTINGTON BEACH
Notice is herebyg iven by the Department of Community Development of the City of Huntington Beach that the following Notice of Availability has been prepared to notify interested parties that the Draft Subsequent Environmental Impact Report( SEIR) has been prepared for the Huntington Beach 6th Cycle Housing Element Update (HEU) (2021- 2029) Implementation Program (Project). The City of Huntington Beach is the lead agency for the preparation of this SEIR. The Draft SEIR will be available for public review and comment for 45 days commencing Wednesday, June 29, 2022 and ending Monday, August 15, 2022.

The Draft SEIR identifies the potentiale nvironmental impacts associated with the proposed HEU Implementation Program,i ncluding the Project’sp otential to result in significant and unavoidable impacts concerning Air Quality, Greenhouse Gas Emissions, Hydrology and Water Quality, Noise, and Utilities and ServiceS ystems. Impacts concerning the following resource areas were determined to be less than significant or less than significant with mitigation incorporated: Cultural Resources, Energy, Geology and Soils, Hazards and Hazardous Materials, Land Use and Planning, Population and Housing, Public Services, Recreation,Transportation,andTribalCulturalResources.

PROJECT LOCATION: Citywide
PROJECT DESCRIPTION: The Housing Element, which is ac omponent of the Huntington Beach General Plan, provides direction for implementation of various programst om eet existing and projected future housing needs for all income levels within HuntingtonB each. The City’s projected housing need for the 6th Cycle Regional Housing Needs Assessment (RHNA) planning period (2021-2029) is 13,368 dwelling units (11,743 units whenaccountingforexistingapplicationsandprojectsthatarecurrentlyunderreview).

State housing law requirest he City to specify the number of housing units that can accommodated on candidate housing sites. The City is not required to build dwelling units in order to meet its RHNA allocation, only to identify potential sites and create the framework to allow the market the opportunity to develop these units. Therefore, the City has developed aH ousing Program to accommodate the RHNA units, including amendments to existing land use designations and zoning districts,a na ffordable housing overlay,a nd identification of underutilized, residentially-zoned parcels in an inventory of 378 candidate housing sites (approximately 419 acres). None of these sites are on al ist of hazardous materialssitescompiledpursuanttoGovernmentCodeSection65962.5.

The Housing Program specifically addressedi nt he SEIR includes amendments to the HuntingtonB each Zoning and Subdivision Ordinance (HBZSO) and the Huntington Beach General Plan Update (GPU) for changes to base/overlay districts and land use designations, as well as amendments to other planning documents, as needed for clarification and consistencyp urposes and to accommodate future housing sites as part of the HEU’s Implementation Program. These amendments provide capacity for future development of approximately 19,738h ousing units to meet the City’s remaining unmet RHNA of 11,743 housing units. Of the 378 candidate housing sites, 372 sites would be assigned an overlay to permit housing by right. These 372 overlay sites, as well as the three hotel conversion sites, would retain their existingu nderlyingz oning/land use designations -o nly three sites would be rezoned/redesignated. The CEQA Project analyzed in the SEIR assumes 11,743 additional housing units will result from the proposed planning document amendments.

The HEU Implementation Program requires adoptionb yC ityC ouncilR esolution at ad uly noticed public hearing. Additionally, California Department of Housing and Community Development will review the HEU Implementation Program for compliance with applicable statutory provisions. The SEIR, which has been prepared in compliancew itht he California Environmental Quality Act, requiresc ertification by City Council. The following discretionaryactionsarealsorequiredfortheProject:
∂ GeneralPlanAmendment:toamendtheLandUseElementtoreflectupdatedlanduse designations for specific properties to ensure compliance with the HEU rezoning/overlayprogram.
∂ ZoningTextAmendment:toreviseapplicablesectionsoftheHBZSOand SpecificPla- nsaffectedbytheHEUrezoning/overlayprogram.
∂ ZoningMapAmendment:toresolvepotentialzoninginconsistenciesresultingfro- madoptionoftheHEUrezoning/overlayprogram.

Housing Element update documents, videos of community meetings, and presentations developed to date are available at the following website:
https://www.huntingtonbeachca.gov/housingelement
PUBLIC REVIEW AND COMMENT PERIOD: A4 5-day public review periodf or submitting comments on the scope of the DraftS EIR starts on Wednesday, June 29, 2022 and ends on Monday, August1 5, 2022 at 5:00 p.m. All comments shall be submitted via e- mail, U.S. Postal Service, or courier service no later than 5:00 p.m. on August 15, 2021. All comments shall be submitted in writing, including your name, address, and concerns, to:

Alyssa Helper,A ssociate Planner, City of Huntington Beach,D epartment of Community Development, 2000 Main Street, Huntington Beach, CA 92648 or via e-mail to:

[email protected] .

Ac opy of the Draft SEIR describing the Projectl ocation and potential environmental effectsisavailableatthefollowinglocations:
∂ CityofHuntingtonBeachCommunityDevelopmentDepartment,3rdFloor, 2000MainStreet,HuntingtonBeach,California,92648
Hours:Monday–Friday,8:00AM–3:00PM
∂ CentralLibrary,7111TalbertAvenue,HuntingtonBeach,CA92647 Hoursvary,seewebsite:
https://www.huntingtonbeachca.gov/government/departments/library/ ∂ TheHousingElementupdatewebsite:
https://www.huntingtonbeachca.gov/housingelement
∂ TheCity’swebsites:
http://www.huntingtonbeachca.gov/government/departments/planning/major/ https://www.huntingtonbeachca.gov/government/departments/planning/environmental- reports/
PublishedHuntingotnBeachWaveJune30,2022
NOTICE IS HEREBY GIVEN theu ndersigned
intends to sell the personalp roperty described below
to enforce al ien imposed on said property pursuant to
Sections 21700-21716 of the Business &P rofessions
Code, Section 2328 of the UCC, Section 535 of the Penal Code and provisions of the Civil Code. Any vehicles
soldwillbeunderSection3071ofmotorvehiclecode.

The Online bidding startso n6 /28/22 and ends at
10 :0 0A M, 7/07/22.F ull access to this auction can be viewed at www.bid13.com.T he undersigned will be
sold by competitive bidding at BID13 on or after
07/ 07/ 22 at 10: 00AM or later, on the premisesw here
said propertyh as been stored and which are located
at:

Allspace Huntington Beach
8564 Hamilton Avenue
Huntington Beach,C A9 2646
County of Orange
State of California
Unit sold appears to contain bins, skateboards,m isc.
householditems
Belongingto:

UNIT# F028, Christopher Kearney
Purchases must be paid for at the time of purchase in
CASH ONLY .All purchased items sold as is and must
be removed at the time of sale. Sale subject to
cancellation in the event of settlement betweeno wner
andobligatedparty.

Bid 13 HST License #864431754
PublishedH untington Beach Wave June 23, 30, 2022
11542764
Legal Notice Legal Notice Legal NoticeLegal Notice Legal Notice Legal Notice Legal Notice Legal Notice Legal Notice Legal Notice Merchandise
Clothing Furs
Coins &S tamps
Misc for Sale
Wanted to Buy
Real Estate
Real Estate Services
Rentals
Unfurnished Apts
Services
Advertising Services
Cable Satellite
Services
Domestic Services
Misc Services
Services
Misc Services
Moving Storage
Painting
Transportation
Autos Wanted/Swaps
BESTD ELIVERYI NT HE GAME!
Turn to theS ports section for
outstanding coverage of theD odgers,
Angels and ALL local baseballa ction.

NobodyB eats Our Coverage.

NobodyB eats Our Coverage.
ocregister.com/subscribe
Blow out Clothing Sale
60% OFF Blow Out Sale.

Tanks, Shorts, Dresses,
Shoes, Sweaters, Jeans,
and more starting at 60%
off! Men’s &W omen’s
Bins of clothing $5 or less,
while supplies last. Dress-
ing rooms are open.

Starts June 18th 10AM
Uptown Cheapskate
24366 Rockfield Blvd
Lake Forest, CA 92630
Uptown Cheapskate
120 E. Yorba Linda Blvd
Placentia, CA. 92870

NORTH COUNTY MONTHLY
COIN SHOW SUN JULY 3rd
9am-4pm Embassy Suites
Hotel 3100 Frontera St.

Anaheim CA -F REE COIN
DRAWINGS! Kids 13 &u n-
der free. $3 admission- $1
discount with this ad! Next
Show SUN AUG 7. Kerry
Pieropan 714-271-8946
PacificExposLLC.com

SUMMONS
(CITACION JUDICIAL)
NOTICE TO DEFENDANT:
(AVISO AL DEMANDO):

Cassidy Fiala Pesak
YOU ARE BEING SUED BY:

Maria Bautista
Youh ave 30 CALENDAR DAYS after this summons and legal papers ares erved on you to file aw ritten response at this court and have ac opy served on the plaintiff.

Al etter or phone call will not protect you. Your written response must be in proper legal form if you want the court to hear your case. Therem ay be ac ourt form that you can use for your response. Youc an find these court forms and morei nformation at the California Courts Online Self-Help Center (www.courtinfo.ca.gov/selfhelp), your county law library, or the courthouse nearest you. If you cannot pay the filing fee, ask the court clerk for af ee waiver form. If you do not file your response on time, you may lose the case by default, and your wages, money,a nd property may be taken without further warning from the court.

Therea re other legal requirements. Youm ay want to call an attorney right away.I f you do not know an attorney,y ou may want to call an attorney referral service. If you cannot afforda na ttorney,y ou may be eligible for free legal services from an onprofit legal services program. Youc an locate these nonprofit groups at the California Legal Services Webs ite (www.lawhelpcalifornia.org), the California Courts Online Self-Help Center (www.courtinfo.ca.gov/selfhelp), or by contacting your local court or county bar association. NOTE: The Court has as tatutory lien for waived fees and costs on any settlement or arbitration awardo f$ 10,000 or morei na civil case. The court's lien must be paid beforet he court will dismiss the case. AVISO! Lo han demandado. Si no responde dentro de 30 dias, la corte puede decidir en su contra sin escuchar su version.

Leal ai nformacion ac ontinuacion.

Tiene 30 DIAS DE CALENDARIO despues de que le entreguen esta citacion yp apeles legales para presentar una respuesta por escrito en esta corte yh acer que se entregue una copia al demandante. Una carta ou na llamada telefonica no lo protegen. Su respuesta por escrito tiene que estar en formato legal correcto si desea que procesen su caso en la corte. Es posible que haya un formulario que usted pueda usar para su respuesta. Puede encontrar estos formularios de la corte ym as informacion en el Centro de Ayuda de las Cortes de California (www.sucorte.ca.gov),e nl ab iblioteca de leyes de su condado oe nl ac orte que le quede mas cerca. Si no pueda pagar la cuota de presentacion, pida al secretario de la corte que le de un formulario de exencion de pago de cuotas. Si no presenta su respuesta at iempo, puede perder el caso por incumplimiento yl ac orte le podra quitar su sueldo, dinero yb ienes sinm as advertencia.

Hay otros requisitos legales. Es recomendable que llame au na bogado inmediatamente.

Si no conoce au na bogado, puede llamar au ns ervicio de remision aa bogados. Si no puede pagar au na bogado, es posible que cumpla con los requisitos para obtener servicios legales gratuitos de un programa de serviciosl egales sin fines de lucro. Puede encontrar estos grupos sin fines de lucro en el sitio web de California Legal Services, (www.lawhelpcalifornia.org),e ne lC entro de Ayuda de las Cortes del California, (www. sucorte.cagov) op oniendose en contacto con la corte oe lc olegio de abogados locales.

AVISO: Porl ey,l ac orte tiene derecho ar eclamar las cuotas yl os costos exentos por imponer un gravamen sobrec ualquier recuperacion de $10,000 om as de valor recibida mediante un acuerdo ou na concesion de arbitrajee nu nc asod ed erecho civil. Tiene que pagar el gravamen de la corte antes de que la corte pueda desechar el caso.

The name and address of the court is:
(El nombreyd ireccion de la cortee s):
700 West Civic Center Drive
Santa Ana, CA 90721
SHORTN AME OF CASE (from Complaint)
(Nobred eC aso):

MARIA BAUTISTAv s. UBER TECHNOLOGIES, INC.; RASIER-CA, LLC; CASSIDY FIALAP ESAK; AND DOES 1T O1 00, INCLUSIVE
CASE NUMBER: (Numero del Caso):
30-2021-01188915-CU-PA-CJC
The name, address, and telephone number of plaintiff's attorney,o r plaintiff without an attorney,i s: (El nombre, la direccion ye ln umero de telefono del abogado del demandante, od el demandante que no tiene abogado, es):
3777 Long Beach Boulevard, ThirdF loor,L ong Beach, California 90807 (562) 283-5415
David H. Yamasaki, Deputy (Adjunto)
DATE: (Fecha) May 20 2022
Clerk, by BP OOL
Fountain Valley View
Published: 6/16, 6/23, 6/30, 7/7/22

STATEMENT OF

ABANDONMENT OF USEO F

FICTITIOUS

BUSINESS NAME
20226635110
The following person(s) has
(have) abandoned the use of the
Fictitious Business Name:

JOSHUAG OLD EXCHANGE
10956 EL COCO CIRCLE
FOUNTAIN VALLEY,C A9 2780
The Fictitious Business Name
referredt oa bove was filed in
Orange County on 11/09/2021
FILE NO.2 0216620137
Full name of Registrant:

JOSHUAD OAN
10956 EL COCO CIRCLE
FOUNTAIN VALLEY,C A9 2708
This business is conducted by an
Individual.
/s/ JOSHUAD OAN, OWNER
This statement was filed with the
County Clerk of Orange County on
05/18/2022.

Fountain Valley View
Published: 6/9, 6/16, 6/23, 6/30/22
| CLASSIFIEDS | HUNTINGTON BEACH WAVE >> OCREGISTER.COM/HB THURSDAY, JUNE 30, 20228 A Mitigation Monitoring and Reporting Program
City of Huntington Beach 1 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
Aesthetics
None - - - - - -
Air Quality
GPU PEIR MM 4.2-1
Project applicants shall require by contract specifications that all diesel-powered equipment used will be retrofitted with after -treatment products (e.g., engine catalysts).

Contract specifications shall be included in project
construction documents, which shall be reviewed by the
City of H untington Beach prior to issuance of a grading permit.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-2
Project applicants shall require by contract specifications that all heavy -duty diesel-powered equipment operating and refueling at the project site use low nitrogen oxides diesel fuel to the extent that it is readily available and cost effective in the Basin (this does not apply to diesel - powered trucks traveling to and from the project site).

Contract specifications shall be included in project
construction documents, which shall be reviewed by the
City of Huntington Beach prior to iss uance of a grading permit.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-3
Project applicants shall require by contract specifications that construction equipment engines be maintained in
good condition and in proper tune per manufacturer’s
specification for the duration of construction. Contract specifications shall be included in project construction documents, which shall be reviewed by the City of
Huntington Beach prior to issuance of a grading permit.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-4
Project applicants shall require by contract specifications that construction operations rely on the electricity
infrastructure surrounding the construction site rather than electrical generators powered by internal combustion Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 2 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
engines. Contract specifications shall be included in project construction documents, which shall be reviewed by the
City of Huntington Beach prior to issuan ce of a grading permit.

GPU PEIR MM 4.2-5
As required by South Coast Air Quality Management
District Rule 403—Fugitive Dust, all construction activities that are capable of generating fugitive dust are required to implement dust control measures during each phase of
project development to reduce the amount of particulate matter entrained in the ambient air. These measures
include the following:
1) Application of soil stabilizers to inactive construction areas
2) Quick replacement of ground cover in disturbed areas 3) Watering of exposed surfaces three times daily
4) Watering of all unpaved haul roads three times daily 5) Covering all stockpiles with tarp
6) Reduction of vehicle speed on unpaved roads
7) Post signs on-site limiting traffic to 15 miles per hour or less
8) Sweep streets adjacent to the project site at the end of the day if visible soil material is carried over to
adjacent roads
9) Cover or have water applied to the exposed surface of all trucks hauling dirt, sand, soil, or other loose
materials prior to leaving the site to prevent dust from impacting the surrounding areas
10) Install wheel washers where vehicles enter and exit unpaved roads onto paved roads to wash off trucks
and any equipment leaving the site each trip
Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 3 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
GPU PEIR MM 4.2-6
Project applicants shall require by contract specifications that construction-related equipment, including heavy-duty equipment, motor vehicles, and portable equipment, shall be turned off when not in use for more than 30 minutes.

Diesel-fueled commercial motor vehicles with gross
vehicular weight ratings of greater tha n 10,000 pounds shall be turned off when not in use for more than 5
minutes. Contract specifications shall be included in future project construction documents, which shall be approved by the City of Huntington Beach.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-7
Project applicants shall require by contract specifications that construction parking be configured to minimize traffic interference during the construction period and,
therefore, reduce idling of traffic. Contract specifications shall be included in future project construction
documents, which shall be approved by the City of
Huntington Beach.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-8
Project applicants shall require by contract specifications that temporary traffic controls are provided, such as a flag person, during all phases of construction to facilitate smooth traffic flow. Contract specifications shall be
included in future project construction documents, which shall be approved by the City of Huntington Beach.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-9
Project applicants shall require by contract specifications that construction activities that affect traffic flow on the arterial system be scheduled to off-peak hours (10:00 a.m. to 4:00 p.m.). Contract specifications shall be included in future project construction documents, which shall be
approved by the City of Huntington Beach.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-10
Project applicants shall require by contract specifications that dedicated on-site and off-site left-turn lanes on truck Contract
language and
Review and
approve contract
specifications and
Plan check
prior to
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 4 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
hauling routes be utilized for movement of construc tion trucks and equipment on -site and off -site to the extent feasible during construction activities. Contract
specifications shall be included in future project
construction documents, which shall be approved by the
City of Huntington Beach.
notes on grading
plans
grading plans for
inclusion
issuance of a
grading permit
GPU PEIR MM 4.2-11
Upon issuance of building or grading permits, whichever is issued earlier, notification shall be mailed to owners and occupants of all developed land uses within 300 feet of a project site providing a schedule for major construction activities that will occur through the duration of the
construction p eriod. In addition, the notification will include the identification and contact number for a
community liaison and designated construction manager
that would be available on -site to monitor construction activities. The construction manager shall be respon sible for complying with all project requirements related to
PM10 generation. The construction manager will be located at the on-site construction office during construction hours for the duration of all construction activities. Contact information for the community liaison and construction manager will be located at the construction office, City Hall, the police department, and a sign on site.

Mail to owners
and occupants
within 300 feet
of project site a
notice regarding
major
construction
activities
Obtain
confirmation that
mailing to owners
and occupants
took place
Plan check
prior to
issuance of a
grading or
building
permits, which
occur earlier
Community
Development

GPU PEIR MM 4.2-12
Project applicants shall require by contract specifications that the architectural coating (paint and primer) products used would have a volatile organic compound rating of 125 50 grams per liter or less. Contract specifications shall be included in future project construction documents, which shall be reviewed and approved by the City of Huntington Beach.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.2-13
Project applicants shall require by contract specifications that materials that do not require painting be used during construction to the extent feasible. Contract specifications Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
Plan check
prior to
issuance of a
grading permit
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 5 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
shall be included in future project construction
documents, which shall be reviewed and approved by the
City of Huntington Beach.
grading plans for
inclusion
GPU PEIR MM 4.2-14
Project applicants shall require by contract specifications that pre -painted construction materials be used to the extent feasible. Contract specifications shall be included in future project construction documents, which shall be
reviewed and approved by the City of Huntington Beach.

Contract
language and
notes on grading
plans
Review and
approve contract
specifications and
grading plans for
inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

MM AQ-1
During the site -specific entitlement and/or the design review process, the City of Huntington Beach Community
Development Department shall require a project-specific Health Risk Assessment for future residential development proposed within 500 feet of the I-405 freeway right -of- way, pursuant to the recommendations set forth in the
CARB Air Quality and Land Use Handbook. The Health Risk Assessment shall evaluate a project per the following
SCAQMD thresholds:
• Cancer Risk: Emit carcinogenic or toxic contaminants that exceed the maximum individual cancer risk of 10 in one million.
• Non‐Cancer Risk: Emit toxic contaminants that exceed the maximum hazard quotient of one in one million.

The SCAQMD has also establi shed non -carcinogenic risk parameters for use in HRAs. Noncarcinogenic risks are
quantified by calculating a “hazard index,” expressed as the ratio between the ambient pollutant concentration
and its toxicity or Reference Exposure Level (REL). An REL is a concentration at or below which health effects are not likely to occur. A hazard index less of than one (1.0) means that adverse health effects are not expected.

If projects are found to exceed the SCAQMD’s Health Risk Assessment thresholds, mitigation measures, such as
requiring MERV 13 air filters in all dwelling units, shall be Project-specific
Health Risk
Assessment
Proof of
completion
During the site-
specific
entitlement
and/or the
design review
process
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 6 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
incorporated to reduce impacts to below SCAQMD
thresholds.

MM AQ-2
During the site -specific entitlement and/or the design review process, the City of Huntington Beach Community
Development Department shall ensure that residential
development shall not be located cl oser than 1,000 feet from any existing or proposed distribution
center/warehouse facility which generates a minimum of
100 heavy truck trips per day, or 40 truck trips with
transport refrigeration units (TRUs) per day, or TRU
operations exceeding 300 hours per week, pursuant to the recommendations set forth in the CARB Air Quality and
Land Use Handbook. If future residential development
cannot meet this setback, a project -specific Health Risk Assessment shall be prepared to evaluate a project for the SCAQMD thresholds (i.e., carcinogenic risk equals or
exceeds 10 in one million; acute non -carcinogenic hazard index equals or exceeds one; and/or if chronic non -
carcinogenic hazard index equals or exceeds one, as
outlined above). If projects are found to exceed the
SCAQMD’s Health Risk Assessment thresholds, mitigation
measures, such as requiring MERV 13 air filters in all
dwelling units, shall be incorporated to reduce impacts to below SCAQMD thresholds.

Ensure residential
development is
not located closer
than 1,000 feet
from any existing
or proposed
distribution
center/
warehouse
facility which
generates a
minimum of 100
heavy truck trips
per day, or 40
truck trips with
transport
refrigeration
units (TRUs) per
day, or TRU
operations
exceeding 300
hours per week,
pursuant to the
recommendation
s set forth in the
CARB Air Quality
and Land Use
Handbook
Review of Site
Plan
During the site-
specific
entitlement
and/or the
design review
process
Community
Development

Cultural Resources
GPU PEIR MM 4.4-1
Prior to development activities that would demolish or
otherwise physically affect buildings or structures 4 5 50 years old or older or affect their historic setting, the project–level applicant shall retain a cultural resource Proof of
retention of an
historical
resource
professional to
Verify retention
of qualified
historical
resource
professional.

Plan check
prior to
issuance of
demolition or
grading permit,
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 7 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
professional who meets the Secretary of the Interior’s
Professional Qualifications Standards for Architectural History to determine if the GPU would cause a substantial adverse change in the significance of a historical resource as defined in Section 15064.5 of the CEQA Guidelines. The investigation shall include, as determined appropriate by the cultural resource professional and the City of
Huntington Beach, the appropriate archival research,
including, if necessary, an updated records search of the South-Central Coastal Information Center of the California Historical Resources Information System and a pedestrian survey of the proposed development area to determine if any significant historic -period resources would be
adversely affected by the proposed development. The
results of the investigation shall be documented in a
technical report or memorandum that identifies and
evaluates any historical resources within the development area and includes recommendations and methods for
eliminating or reducing impacts on historical resources.

The technical report or memorandum shall be submitted
to the City of Huntington Beach for approval. As
determined necessary by the city, environmental
documentation (e.g., CEQA documentation) prepared for
future development under the General Plan Amendment
shall reference or incorporate the findings and
recommendations of the technical report or
memorandum. The proje ct-level applicant shall be
responsible for implementing methods for eliminating or reducing impacts on historical resources identified in the technical report or memorandum.
determine
potential
significance of
structure 50
years old or
older.

Preparation of a
technical report
or memorandum
documenting the
result of
historical
resources
investigation.

Review and
approve technical
report or
memorandum. If
determined
necessary, verify
that project
applicant has
implemented
methods
identified in the
technical report
or memorandum
for reducing
impacts on
historical
resources.
whichever
occurs earlier
GPU PEIR MM 4.4-2
Prior to any earth -disturbing activities (e.g., excavation, trenching, grading) that could encounter undisturbed soils, the project -level applicant for future development shall retain an archaeologist who meets the Secretary of the
Interior’s Professional Qualifications Standards for
Proof of retention
of archaeological
professional to
determine if a
substantial
adverse change
Verify retention of
qualified
Archaeological
professional, if
necessary, and
Prior to
issuance of
grading permit;
Continued
throughout
ground
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 8 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
Archaeology to determine if site -specific development
allowed under the General Plan Update could result in a substantial adverse change in the significance of an
archaeological resource pursuant to Section 15064.5 of the CEQA Guidelines or disturb human remains. The
investigation shall include, as determined appropriate by the archaeologist and the City of Huntington Beach, an
updated records search of the South Central Coastal
Information Center of the California Historical Re sources Information System, updated Native American
consultation, and a pedestrian survey of the area proposed for development. The results of the investigation shall be documented in a technical report or memorandum that
identifies and evaluates any archa eological resources
within the development area and includes
recommendations and methods for eliminating or avoiding impacts on archaeological resources or human remains.

The measures shall include, as appropriate, subsurface
testing of archaeological reso urces and/or construction monitoring by a qualified professional and, if necessary, appropriate Native American monitors identified by the
applicable tribe (e.g., the Gabrielino Tongva Nation)
and/or the Native American Heritage Commission. The
methods sha ll also include procedures for the
unanticipated discovery of human remains, which shall be in accordance with Section 5097.98 of the State Public
Resources Code and Section 7050.5 of California’s Health and Safety Code. The technical report or memorandum
shall be submitted to the City of Huntington Beach for
approval. As determined necessary by the city,
environmental documentation (e.g., CEQA
documentation) prepared for future development allowed
under the General Plan Update shall reference or
incorporate the findings and recommendations of the
technical report or memorandum. The project -level
applicant shall be responsible for implementing methods would occur to an
archaeological
resource.

Preparation of a
technical report
or memorandum
documenting the
result of
archaeological
resources
investigation
Developer shall
implement all
recommendation
s of the technical
report or
memorandum.
complete
documentation

Review and
approve technical
report or
memorandum.

If determined
necessary, verify
that project
applicant has
implemented
methods identified
in the technical
report or
memorandum for
reducing impacts
on archaeological
resources.
disturbing
activities, as
required
Mitigation Monitoring and Reporting Program
City of Huntington Beach 9 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
for eliminating or avoiding impacts on archaeological
resources identified in the technical report or
memorandum. Projects that would not encounter
undisturbed soils and would therefore not be required to retain an archaeologist shall demonstrate non-disturbance to the city through the appropriate construction plans or geotechnical studies prior to any earth -disturbing
activities. Projects that would include any earth
disturbance (disturbed or undisturbed soils) shall comply with MM 4.4-3.

GPU PEIR MM 4.4-3
If evidence of an archaeological site or other suspected historical resource as defined by CEQA Guidelines Section 15064.5, including darkened soil representing past human activity (“midden”), that could conceal material remains (e.g., worked stone, fired clay vessels, faunal bone,
hearths, storage pits, or burials) are discovered during any project-related earth -disturbing activities (including projects that would not encounter undisturbed soils), all earth-disturbing activity within 100 feet of the find shall be halted and the City of Huntington Beach shall be notified.

The project -level applicant shall retain an archaeologist who meets the Secretary of the Interior’s Professional
Qualifications Standards for Archaeology to assess the
significance of the find. Impacts to any significant
resources shall be mitigated to a less than significant level through data recovery or other methods determined
adequate by the archaeologist and that are consistent with the Secretary of the Interior's Standards for Archaeological Documentation. Any identified cultural resources shall be recorded on the appropriate DPR 523 form and filed with the appropriate Information Center.

Proof of
retention of
archaeological
professional to
determine if a
substantial
adverse change
would occur to
an
archaeological
resource
Verify retention
of qualified
archaeological
professional, if
necessary, and
complete
documentation
Prior to
issuance of
grading permit;
Continued
throughout
ground
disturbing
activities, as
required
Community
Development

Energy
None. - - - - - -
Mitigation Monitoring and Reporting Program
City of Huntington Beach 10 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
Geology and Soils
GPU PEIR MM 4.5-1
Prior to issuance of a grading permit, a California-licensed Certified Engineering Geologist and/or Geotechnical
Engineer shall prepare and submit to the City of
Huntington Beach Department of Public Works a detailed
soils and geotechnical analysis. The report shall include soil sampling and laboratory testing of materials to provide detailed recommendations for grading, chemical and fill properties, liquefaction, expansive soils, soil erosion, earthquake faulting and landscaping.

Detailed soils and
geotechnical
report (prepared
by a Certified
Engineering
Geologist or
Geotechnical
Engineer) to the
City prior to
issuance of a
grading permit
As necessary,
review and
approve
Recommendations
and any other
relevant document
per this mitigation
Plan check
prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.5-2
Any future project within the planning area shall comply with the recommendations of a final soils and geotechnical report (a preliminary report would be required per MM

4.5-1). These recommendations shall be implemented in
the design of a project, including but not limited to
measures associated with site preparation, fill placement, temporary shoring and permanent dewatering,
groundwater seismic design features, excavation stability, foundations, soil stabilization, establishment of deep
foundations, concrete slabs and pavements, surface
drainage, cement type and corrosion measures, erosion
control, shoring and internal bracing, and plan review.

Soils and
geotechnical
analysis and
notes on grading
plan and building
plans
Review and
approve grading
and building plans
for inclusion of
final soils and
geotechnical
recommendations
Plan check
prior to
issuance of a
grading permit
Public Works
GPU PEIR MM 4.5-3
Pre-Construction Soil Condition Evaluation . A site -specific evaluation of soil conditions would be required with the submittal of grading plans for all future projects and must contain recommendations for ground preparation and
earthwork specific to the site.

Site-specific
pre-construction
soil condition
evaluation
Review and
approve grading
and building plans
for inclusion of
pre-construction
soil condition
evaluation
recommendations
Plan check
prior to
issuance of a
grading permit
Public Works
GPU PEIR MM 4.4-4
Should paleontological resources (i.e., fossil remains) be identified at a particular site during project construction, Proof of retention
of a
paleontological
Verify retention
of qualified
paleontological
Prior to
issuance of
grading permit;
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 11 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
the construction foreman shall cease construction within 100 feet of the find until a qualified professional can provide an evaluation. Mitigation of resource impacts shall be implemented and funded by the project-level applicant and shall be conducted as follows:
1) Identify and evaluate paleontological resources by
intense field surv ey where impacts are considered
high
2) Assess effects on identified sites
3) Consult with the institutional/academic
paleontologists conducting research investigations
within the geological formations that are slated to be
impacted
4) Obtain comments from the researchers
5) Comply with researchers’ recommendations to
address any significant adverse effects were
determined by the city to be feasible
In considering any suggested mitigation proposed by the consulting paleontologist, the City of Huntington Beach staff shall determine whether avoidance is necessary and feasible in light of factors such as the nature of the find, project design, costs, applicable policies and land use assumptions, and other considerations. If avoidance is
unnecessary or infeasible, other app ropriate measures
(e.g., data recovery) shall be instituted. Work may proceed on other parts of the project site while mitigation for paleontological resources is carried out.
professional to
determine if a
substantial
adverse change
would occur to a
paleontological
resource
professional, if
necessary
Continued
throughout
ground
disturbing
activities, as
required
Greenhouse Gas Emissions
None. - - - - - -
Hazards and Hazardous Materials
GPU PEIR MM 4.7-1
Prior to the issuance of grading permits, future
development in the planning area shall comply with
Huntington Beach Fire Department City Specification No. 429, Methane Mitigation Requirements. A plan for the
Methane Testing
Plan

Review and
approval of
testing plan

Prior to start of
Sampling

Prior to
issuance of any
Fire
Mitigation Monitoring and Reporting Program
City of Huntington Beach 12 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
testing of soils for the presence of methane gas shall be prepared and submitted by the project -level applicant to the Huntington Beach Fire Department for review and
approval, prior to the commencement of sampling. If
significant levels of methane gas are discovered in the soil on a future development site, the project-level applicant’s grading, building, and methane plans shall reference that a sub -slab methane barrier and vent system will be
installed at the site per City Specification No. 429, prior to plan approval. If required by the Huntington Beach Fire Department, additional methane mitigation measures to
reduce the level of methane gas to acceptable levels shall be implemented.

Notes on
building and
methane plans
Review and
approve building
and methane gas
plans for
appropriate
documents.
grading permit
and during
construction
GPU PEIR MM 4.7-2
Prior to the issuance of grading permits on any project site, the project applicant shall:
1) Investigate the project site to determine whether it or immediately adjacent areas have a record of
hazardous material contamination via the preparation
of a preliminary environmental site assessment, which
shall be submitted to the city for review. If
contamination is found the report shall characterize
the site according to the nature and extent of
contamination that is present before development
activities precede at that site.
2) If contamination is determined to be on-site, the city, in accordance with ap propriate regulatory agencies,
shall determine the need for further investigation
and/or remediation of the soils conditions on the
contaminated site. If further investigation or
remediation is required, it shall be the responsibility of the site developer (s) to complete such investigation
and/or remediation prior to construction of the
project.

Preparation of
technical
documentation
to address site-
specific hazards;
Risk
Management
Plan and Site
Health and
Safety Plan.

Review technical
documentation
and, as necessary,
review and
approve closure
reports.

Plan check
prior to
issuance of
demolition or
grading
permits,
whichever
occurs earlier
Fire
Mitigation Monitoring and Reporting Program
City of Huntington Beach 13 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
3) If remediation is required as identified by the local oversight agency, it shall be accomplished in a manner
that reduces risk to below applicable standards and
shall be completed prior to issuance of any occupancy
permits.
4) Closure reports or other reports acceptable to the
Huntington Beach Fire Department that document the
successful completion of required remediation
activities, if any, for contaminated soils, in accordance with City Specification 429 and 431-92, shall be
submitted and approved by the Huntington Beach Fire
Department prior to the issuance of grading permits
for any site development. No construction shall occur
in the affected area until reports have been accepted
by the city.
5) Any on -site oil wells will need to comply with the
requirements found in City Specification No. 429. If
abandonment is required, then the well will need to
be abandoned to the current California Geologic
Energy Management Divisi on (CalGEM) standard for
abandonment.

GPU PEIR MM 4.7-3
In the event that previously unknown or unidentified soil and/or groundwater contamination that could present a
threat to human health or the environment is encountered during construction, construction activities in the
immediate vicinity of the contamination shall cease
immediately. If contamination is encountered, a Risk
Management Plan shall be prepared and implemented
that (1) identifies the contaminants of concern and the potential risk each contaminant would pose to human
health and the environment during construction and post- development and (2) describes measures to be taken to
protect workers, and the public from exposure to potential site hazards. Such measures could include a range of
Risk
Management
Plan and Site
Health and
Safety Plan
Review and
approve any
grading plans for
inclusion
Plan check
prior to
issuance of any
grading permit
and during
construction
Fire
Mitigation Monitoring and Reporting Program
City of Huntington Beach 14 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
options, including, but not limited to, physical site controls during construction, remediation, long -term monitoring, post-development maintenance or access limitations, or
some combination thereof. Depending on the nature of
contamination, if any, appropriate agencies shall be
notified (e.g., City of Huntington Beach Fire Department).

If needed, a Site Health and Safety Plan that meets
Occupational Safety and Health Administration
requirements shall be prepared and in place prior to
commencement of work in any contaminated area.

GPU PEIR MM 4.7-4
To ensure adequate access for emergency vehicles when
construction activities would result in temporary lane or roadway closures, a future project applicant shall consult with the City of Huntington Beach Pol ice or Fire
Departments to disclose temporary lane or roadway
closures and alternative travel routes. The project -level applicant shall be required to keep a minimum of one lane in each direction free from encumbrances at all times on perimeter streets accessing a project site. At any time only a single lane is available, the project -level applicant shall provide a temporary traffic signal, signal carriers (i.e., flagpersons), or other appropriate traffic controls to allow travel in both directions. If cons truction activities require the complete closure of a roadway segment, the applicant shall coordinate with the City of Huntington Beach Police and Fire Departments to designate proper detour routes
and signage indicating alternative routes.

Prepare
construction
roadway plans
Plan check prior
to grading or
building permits,
whichever occurs
earlier
Prior to
approval of
grading or
building
permits,
whichever
occurs earlier
Fire, Police
Hydrology and Water Quality
GPU PEIR MM 4.8-1
The City of Huntington Beach shall require applicants for new development and significant redevelopment projects
within the planning area to prepare a project -specific preliminary Water Quality Management Plan (WQMP) in
accordance with the Model WQMP and Techn ical
Guidance Document requirements and all current adopted
Water Quality
Management
Plan
Review and
approve WQMP
Prior to
receiving a
precise grading
permit
Public Works
Mitigation Monitoring and Reporting Program
City of Huntington Beach 15 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
permits. The WQMP shall be prepared by a Licensed Civil Engineer and submitted for review and acceptance by the City of Huntington Beach Public Works Department prior
to issuance of a Precise Grading or Building permit.

Best management practices in the WQMP shall be
designed in accordance with the Municipal NPDES Permit, Model WQMP, Technical Guidance Document, Drainage
Area Management Plan, and City of Huntington Beach
Local Implementation Plan. A ll projects shall include site design and source control best management practices in
the project WQMP. Additionally, new development or
significant redevelopment projects and priority projects shall include low impact development principles to reduce runoff to a level consistent with the maximum extent
practicable and treatment control best management
practices in the WQMP.

If permanent dewatering is required and allowed by the
city, OCWD, and other regulatory agencies, the applicant shall include a descr iption of the dewatering technique, discharge location, discharge quantities, chemical
characteristics of discharged water, operations and
maintenance plan, and Waste Discharger Identification
number for proof of coverage under the De Minimus
Permit or cop y of the individual waste discharge
requirements in the WQMP. Additionally, the WQMP shall
incorporate any additional best management practices as required by the City of Huntington Beach Public Works
Department.

The WQMP shall include the following additi onal
requirements:
1) Project and Site Characterization Requirements
a) Entitlement Application numbers and site address
shall be included on the title sheet of the WQMP
Mitigation Monitoring and Reporting Program
City of Huntington Beach 16 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
b) In the project description section, explain whether
proposed use includes on -site food preparation,
eating areas (if not please state), outdoor activities
to be expected, vehicle maintenance, service,
washing cleaning (if prohibited on -site, please
state)
c) All potential pollutants of concern for a proposed
project land use type as per Table 2 .I.1 of the
Technical Guidance Document shall be identified
d) A narrative describing how all potential pollutants
of concern will be addressed through the
implementation of BMPs and describing how site
design BMPs concepts will be considered and
incorporated into the project design shall be
included
e) Existing soil types and estimated percentages of
perviousness for existing and proposed conditions
shall be identified
f) In Section I of the WQMP, state verbatim the
Development Requirements from the Planning
Department’s letter to the applicant
g) A site plan showing the location of the selected
treatment control BMPs and drainage areas shall
be included in the WQMP
h) A Geotechnical Report shall be submitted to
address site conditions for determination of
infiltration li mitations and other pertinent
characteristics.
2) Pursuant to the County’s Technician Guidance
Document, the feasibility of Low Impact Development
(LID) BMPs, such as infiltration, harvest and reuse,
evapotranspiration, and biotreatment, shall be first in the stormwater treatment design for a new
development or redevelopment priority project.
3) Project-Based Treatment Control BMPs
Mitigation Monitoring and Reporting Program
City of Huntington Beach 17 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
a) Infiltration-type BMPs shall not be used unless the
Geotechnical Report states otherwise.
b) Wet swales and grassed channels shall not be used
because of the slow infiltration rates of project site
soils, the potentially shallow depth to
groundwater, and water conservation needs
c) If proprietary Structural Treatment Control devices
are used, they shall be sited and designed in
compliance with the manufacturers design criteria
d) Surface exposed treatment control BMPs shall be
selected such that standing water drains or
evaporates within 24 hours or as required by the
County’s vector control
e) Excess stormwater runoff shall bypass the
treatment control BMPs unless they are designed
to handle the flow rate or volume from a 100-year
storm event without reducing effectiveness.

Effectiveness of any treatment control BMPs for
removing the pollutants of concern shall be
documented via analytical models or existing
studies on effectiveness.
f) A project WQMP shall incorporate water efficient
landscaping using drought tolerant, native plants in
accordance with Landscape and Irrigation Plans
g) Pet waste stations (stations that provide waste
pick-up bags and a conv enient disposal container
protected from precipitation) shall be provided and
maintained
h) Building materials shall minimize exposure of bare
metals to stormwater. Copper or Zinc roofing
materials, including downspouts, shall be
prohibited. Bare metal surfac es shall be painted
with non-lead-containing paint
i) Any applicant proposing development in the
planning area is encouraged to consider LID BMPs
Mitigation Monitoring and Reporting Program
City of Huntington Beach 18 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
for infiltration, harvest and reuse,
evapotranspiration, and bio-treatment
4) Structural and Non-Structural BMPs. The WQMP shall
include the following operations and maintenance
BMPs, where applicable. Additionally, a commitment
and mechanism to fund and implement an operational
and maintenance program that includes the following
must be included:
a) Minimum landscape maintenance standards and
tree trimming requirements for the total project
site. Landscape maintenance shall be performed by
a qualified landscape maintenance company or
individual in accordance with a Chemical
Management Plan detailing chemical application
methods, chemical handling procedures, and
worker training. Pesticide application shall be
performed by a certified applicator. No chemicals
shall be stored on -site unless in a covered and
contained area and in accordance with an
approved Materials Management Plan. Application
rates shall not exceed labeled rates for pesticides,
and shall not exceed soil test rates for nutrients.

Slow release fertilizers shall be used to prevent
excessive nutrients in stormwater or irrigation
runoff.
b) Maintenance and tree trimming procedures per
the ANSI A -300 Standards as established by the
International Society of Arborist must be followed.

All trees shall be trimmed by or under the direct
observation/direction of a licensed/ certified
Arborist.
c) Landscape irrigation shall be performed in
accordance with an Irrigation Management Plan to
minimize excess irrigation contributing to dry- and
wet-weather runoff. Automated sprinklers shall be
used and be inspected at least quarterly and
Mitigation Monitoring and Reporting Program
City of Huntington Beach 19 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
adjusted yearly to mini mize potential excess
irrigation flows. Landscape irrigation maintenance
shall be performed in accordance with the
approved irrigation plans, the city Water
Ordinance and per the city Arboricultural and
Landscape Standards and Specifications.
d) Proprietary s tormwater treatment systems
maintenance shall be in accordance with the
manufacturer’s recommendations. If a
nonproprietary treatment system is used,
maintenance shall be in accordance with standard
practices as identified in the current CASQA
handbooks, o perations and maintenance
procedures outlined in the approved WQMP, or
other city-accepted guidance.
e) Signage, enforcement of pet waste controls, and
public education would improve use and
compliance, and therefore, effectiveness of the
program, and reduce the potential for hazardous
materials and other pollution in stormwater runoff.

The responsible entity (e.g., HOA, property
manager) shall prepare and install and include pet
waste controls (e.g., requirements for pet waste
cleanup, pet activity area restr ictions, pet waste
disposal restrictions) in the Association
agreement/Conditions, Covenants, and
Restrictions.
f) Street and parking lot/area sweeping shall be
performed at an adequate frequency to prevent
buildup of pollutants (for street sweeping
effectiveness see
http://www.fhwa.dot.gov/environment/ultraurb/
).
g) A maintenance plan for BMPs and facilities
identifying responsible parties and maintenance
schedules and appropriate BMPs to minimize
Mitigation Monitoring and Reporting Program
City of Huntington Beach 20 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
discharges of contaminants to storm drain systems
during maintenance operations.
h) The responsible entity (e.g., HOA, property
manager) must retain records of all maintenance of
BMPs including outside vendor invoices.
5) Site Design BMPs. Any applicant proposing
development in the planning area is required to
incorporate low impact development principles as
defined in the NPDES Permit and, if allowed in
accordance with the geotechnical report and
limitations on infiltration BMPs, encouraged the
following LID BMPs: infiltration, harvest and reuse,
evapotranspiration, and bio-treatment.

GPU PEIR MM 4.8-2
The City of Huntington Beach shall require that any
applicant prepare a groundwater hydrology study to
determine the lateral transmissivity of area soils and a safe pumping yield such that dewatering activities do not
interfere with nearby water supplies. The groundwater
hydrology study shall make recommendations on whether
permanent groundwater dewatering is feasible within the constraints of a safe pumping level. The applicant’s
engineer of record shall incorporate the hydrology study designs and recommendations into project plans. If safe groundwater dewatering is determined to not be feasible, permanent groundwater dewatering shall not be
implemented. The City of Huntington Beach Director of
Public Works, Orange County Water District, and other
regulatory agencies shall approve or disapprove any
permanent groundwater dewatering based on the
groundwater hy drology study and qualified engineers’
recommendations.

Groundwater
Hydrology Study
Review and
approve
Groundwater
Hydrology Study
Prior to
issuance of a
precise grading
permit
Public Works
Mitigation Monitoring and Reporting Program
City of Huntington Beach 21 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
GPU PEIR MM 4.8-3
The City of Huntington Beach shall require that adequate capacity in the storm drain system is demonstrated from a specific development site discharge location to the nearest main channel to accommodate discharges from the
specific development. If capacity is demonstrated as
adequate, upgrades may not be required. If capacity is not adequate, the City of Huntington Beach shall identify
corrective action(s) required by the specific development applicant to ensure adequate capacity. Corrective action could include, but is not limited to:
1) Construction of new storm drain infrastructure, as
identified in the Master Plan of Drainage or based on
the Hydrology and Hydraulic Study, if the Hydrology and Hydraulic Study identifies greater impacts than the
Master Plan of Drainage
2) Improvement of existing storm drain infrastructure, as identified in the Master Plan of Drainage or based on
the Hydrology and Hydraulic Study, if the Hydrology and Hydraulic Study identifies greater impacts than the
Master Plan of Drainage
3) In-lieu fees to implement system -wide storm drain
infrastructure improvements
4) Other mechanisms as determined by the City of
Huntington Beach Public Works Department.
5) For nonresidential areas, if redevelopment would result in an impervious fraction of less than 0.9 and does not increase the directly connected impervious area
compared to existing conditions, runoff is expected to
remain the same or less than as assessed in the Master
Plan of Drainage and only Master Plan of Drainage
improvements would be required.

Hydrology and
Hydraulics Study
Review and
approve study
Prior to
issuance of a
precise grading
permit
Public Works
Mitigation Monitoring and Reporting Program
City of Huntington Beach 22 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
Because some storm drai n system constraints may be
located far downgradient from the actual development
site, several properties may serve to contribute to system capacity constraints. Therefore, the City of Huntington Beach Public Works Department shall assess each site
development and system characteristics to identify the
best method for achieving adequate capacity in the storm drain system. Drainage assessment fees/districts to
improve/implement storm drains at downstream locations
or where contributing areas are large are enforced through Municipal Code (§14.20).

The City of Huntington Beach Public Works Department
shall review the Hydrology and Hydraulic Study and
determine required corrective action(s) or if a waiver of corrective action is applicable. The site -specific
development applicant shall incorporate required
corrective actions into their project design and/or plan.

Prior to receiving a Certificate of Occupancy or final
inspection, the Public Works Department shall ensure that required corrective action has been implemented.

Land Use and Planning
None. - - - - -
Noise
GPU PEIR MM 4.10-1
Project applicants will require by contract specifications that the following construction best management
practices be implemented by contractors to reduce
construction noise levels:
1) Ensure that construction equipment is properly
muffled according to industry standards and be in
good working condition
2) Place noise -generating construction equipment and
locate construction staging areas away from sensitive
uses, where feasible
Contract
language and
notes on grading
and building
plans
Review and
approve contract
specifications,
grading and
building plans for
inclusion

Periodic field
check
Plan check
prior to
issuance of a
grading permit

During
construction
Community
Development
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 23 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
3) Schedule high noise-producing activities between the hours of 8:00 a.m. and 5:00 p.m. to minimize
disruption on sensitive uses, Monday through
Saturday. Schedule pile-driving activities between the
hours of 8:00 a.m. and 4:00 p.m. on Monday through
Friday only.
4) Implement noise attenuation measures, which may
include, but are not limited to, temporary noise
barriers or noise blanke ts around stationary
construction noise sources.
5) Use electric air compressors and similar power tools rather than diesel equipment, where feasible.
6) Construction-related equipment, including heavy-duty equipment, motor vehicles, and portable equipment,
will b e turned off when not in use for more than
10 minutes.
7) Construction hours, allowable workdays, and the
phone number of the job superintendent will be
clearly posted at all construction entrances to allow
for surrounding owners and residents to contact the
job superintendent. If the City of Huntington Beach or
the job superintendent receives a complaint, the
superintendent will investigate, take appropriate
corrective action, and report the action taken to the
reporting party.

Contract specifications will be included in construction documents, which will be reviewed by the City of
Huntington Beach prior to issuance of a grading permit.

GPU PEIR MM 4.10-2
Project applicants will require by contract specifications that construction staging areas along with the operation of earthmoving equipment within the project area would be
located as far away from vibration and noise sensitive sites as possible. Contract specifications will be included in construction documents, which will be reviewed by the
Contract
language and
notes on grading
plans and
building plans
Review and
approve grading
plans and building
plans for inclusion
Prior to
issuance of a
grading permit
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 24 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
City of Huntington Beach prior to issuance of a grading permit.

GPU PEIR MM 4.10-3
Project applicants will require by contract specifications that heavily loaded trucks used during construction would be routed away from residential streets. Contract
specifications will be included in construction documents, which will be reviewed by the City of Huntington Beach
prior to issuance of a grading permit.

Contract
language and
notes on grading
plans and
building plans
Review and
approve grading
plans and building
plans for inclusion
Prior to
issuance of a
grading permit
Community
Development

GPU PEIR MM 4.10-4
Prior to issuance of building permits, project applicants will submit an acoustical study for each development,
prepared by a certified acoustical engineer. Should the results of the acoustical study indicate that exterior and interior noise levels would exceed the standards set forth in the City of Huntington Beach Municipal Code §8.40.050 through §8.40.070, the project app licant will include
design measures that may include acoustical paneling or walls to ensure that noise levels do not exceed City
standards. Final project design will incorporate special design measures in the construction of the residential
units, if necessary.

Acoustical Study Review and
approval of study
and building plans
for inclusion of
any special design
measures from
acoustical study
Prior to
issuance of
building
permits
Community
Development

GPU PEIR MM 4.10-5
Prior to issuance of construction permits, applicants for new development projects that require pile driving must incorporate the following vibration-reducing techniques as determined feasible by a project -related geotechnical
study:
1) Install intake and exhaust mufflers on p ile-driving equipment.
2) Vibrate piles into place when feasible, and install
shrouds around the pile -driving hammer where
feasible.
3) Implement “quiet” pile -driving technology (such as
pre-drilling of piles and the use of more than one pile Contract
language and
notes on grading
and building
plans
Review and
approve contract
specifications,
grading and
building plans for
inclusion Periodic
field check
Plan check
prior to
issuance of a
grading permit
During
construction
Community
Development
Building
Division

Mitigation Monitoring and Reporting Program
City of Huntington Beach 25 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
driver to sho rten the total pile driving duration),
where feasible, in consideration of geotechnical and
structural requirements and conditions.
4) Use cushion blocks to dampen impact noise, if
feasible, based on soil conditions. Cushion blocks are
blocks of material that are used with impact hammer
pile drivers. They consist of blocks of material placed atop a pile during installation to minimize noise
generated when driving the pile. Materials typically
used for cushion blocks include wood, nylon, and
micarta (a composite material).
5) At least 48 hours prior to pile -driving activities, notify building owners and occupants within 600 feet of the
project area of the dates, hours, and expected
duration of such activities.

Population and Housing
None. - - - - -
Public Services
GPU PEIR MM 4.12-1
Subject to the city’s annual budgetary process, which
considers available funding and the staffing levels needed to provide acceptable response time for fire and police services, the city shall provide sufficient funding to
maintain the city’s standard, average level of service
through the use of General Fund monies.

Budget
sufficiently to
maintain
standard level of
fire and police
protection
Review at annual
budgetary
discussions;
Review currently
standard levels
Prior to
issuance of
building
permits
Community
Development

GPU PEIR MM 4.12-2
The applicant of future individual development projects shall pay required development impact fees for fire
suppression facilities, as required by HBMC §17.74. These fees are currently $349.85 for any new attached dwelling unit, $844.11 for any new detached dwelling unit,
$1,449.23 for each mobile home dwelling unit, $0.00 per hotel/motel unit, $0.301 per square foot of
commercial/office uses, and $0.0275 per square foot of
industrial uses.

Payment of
applicable
impact fee
Confirm payment Prior to final
inspection
Building
Division

Mitigation Monitoring and Reporting Program
City of Huntington Beach 26 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
GPU PEIR MM 4.12-3
The applicant of future individual development projects shall pay required development impact fees for police
facilities as required by HBMC §17.75. These fees are
currently $746.48 for any new attached dwelling unit,
$362.05 for any new detached dwelling unit, $337.64 for each mobile home dwelling uni t, $0.00 per hotel/motel
unit, $0.953 per square foot of commercial/office uses, and $0.406 per of industrial uses.

Payment of
applicable
impact fee
Confirm payment Prior to final
inspection
Building
Division

GPU PEIR MM 4.12-4
Project applicants for future development located within the Huntington Beach City School District shall pay all applicable development impact fees in effect at the time of building permit issuance to the Huntington Beach City School District to cover additional school services required by the new development. These fees are currently $1.52
per square foot for any new multi -family attached
residential unit, $0.29 per of commercial/ industrial
development, and $0.25 per square foot of hotel/motel
development.

Payment of
applicable
impact fee
Confirm payment Prior to
issuance of
building
permits
Building
Division

GPU PEIR MM 4.12-5
Project applicants for future development located within the Ocean View School District shall pay all applicable development impact fees in effect at the time of building permit issuance to the Ocean View School District to cover additional school services required by the new
development. These fees are currently $1.37 per square
foot of accessible interior space for any new residential unit and $0.22 per square foot of covered floor space for new commercial/retail development.

Payment of
applicable
impact fee
Confirm payment Prior to
issuance of
building
permits
Building
Division

GPU PEIR MM 4.12-6
Future project applicants shall pay all applicable
development impact fees in effect at the time of building permit issuance to the Huntington Beach Union High
School District to cover additional school services required by the new development. These fees are cur rently $1.15 Payment of
applicable
impact fee
Confirm payment Prior to
issuance of
building
permits
Building
Division

Mitigation Monitoring and Reporting Program
City of Huntington Beach 27 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
per square foot of accessible interior space for any new residential unit and $0.16 per square foot of covered floor space for new commercial/retail development.

GPU PEIR MM 4.12-7
The applicant of future individual development projects shall pay required library development impact fees per
§17.67 of the city’s Municipal Code (Library Development Fee), prior to issuance of bu ilding permits. These fees are currently $866.48 for any new attached dwelling unit,
$1,179.72 for any new detached dwelling unit, $708.85 for each mobile home dwelling unit, $0.041 per square foot of hotel/motel unit, with no fee for commercial/office and industrial uses.

Payment of
applicable
impact fee
Confirm payment Prior to
issuance of
building
permits
Building
Division

Recreation
GPU PEIR MM 4.13-1
For future projects that require a subdivision map, prior to the issuance of building permits within the city, project applicants shall demonstrate compliance with city
parkland requirements identified in City of Huntington
Beach Zoning and Subdivision Ord inance, §254.08
(or Ordinance No. 3596), either through the dedication of on-site parkland or through payment of applicable fees.

Any on-site park provided in compliance with this section shall be improved prior to final inspection (occupancy) of the first residential unit (other than model homes). Current fees per unit for projects with a subdivision map are
$13,385 for any new attached dwelling unit, $17,857 for any new detached dwelling unit, and $11,169 for any new mobile home unit.

Payment of
applicable
impact fee
Confirm payment Prior to
issuance of
building
permits
Community
Development

GPU PEIR MM 4.13-2
Prior to the issuance of building permits within the city, project applicants shall pay the Park Land/Open Space and Facilities Development Impact Fees in effect at the time of permit. These fees are currently $12,732.84 for any new attached dwelling unit, $16,554.73 for any new detached dwelling unit, $10,222.88 for each mobile home dwelling Payment of
applicable
impact fee
Prior to
issuance of
building
permits
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 28 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
unit, $0.234 per square foot of hotel/motel unit, $0.897 per square foot of commercial/office uses, and $0.730 per square foot of industrial uses.

Transportation and Traffic
GPU PEIR MM 4.14-1
For future projects that occur within proximity of the
Gothard Street/Center Avenue intersection, the project
applicant(s), as required by the Transportation
Administrative Report at the time of applicati on, shall make a fair share contribution for the addition of
1) a second westbound left turn lane (Buildout of the
County Master Plan of Arterial Highways (MPAH)
scenario, MPAH Amendment scenario)
2) a second southbound left turn lane (Buildout of the
MPAH scenario, MPAH Amendment scenario)
3) an additional westbound left turn lane (MPAH
Amendment scenario only)
Proof of fair
share payment
Confirm payment Prior to
issuance of
certificate of
occupancy
Public Works
GPU PEIR MM 4.14-2
For future projects that occur within proximity of the
Brookhurst Street/Adams Avenue intersection, the project applicant(s), as required by the Transportation
Administrative Report at the time of application, shall make a fair share contribution for the addition of
1) conversion of the eastbound right turn lane to a fourth eastbound through lane (Buildout of the County Master
Plan of Arterial Highways (MPAH) scenario, MPAH
Amendment scenario)
2) an additional (fourth) westbound through lane
(Buildout of the MPAH scenario, MPAH Amendment
scenario)
Proof of fair
share payment
Confirm payment Prior to
issuance of
certificate of
occupancy
Public Works
Mitigation Monitoring and Reporting Program
City of Huntington Beach 29 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
GPU PEIR MM 4.14-3
For future projects that occur within proximity of the
Beach Boulevard/Heil Avenue intersection, a project
applicant(s), as required by the Transportation
Administrative Report at the time of application, shall make a fair share contribution for the addition of
1) conversion of one eastbound through lane to a second eastbound left turn lane (County Master Plan of Arterial Highways Amendment scenario)
Proof of fair
share payment
Confirm payment Prior to
issuance of
certificate of
occupancy
Public Works
MM TRANS-1
Vehicle Miles Traveled (VMT). Prior to issuance of a
building permit, one or more of the following measures
shall be implemented to reduce VMT -related impacts
associated with future projects that are not able to be screened out of the VMT analysis process such that the
development’s VMT is below the low VMT threshold s
recommended by the Office of Planning and Research or
adopted by the City of Huntington Beach at the time of the development application:
• Modify the project’s -built environment characteristics to reduce VMT generated by a project.
• Implement Transportatio n Demand Management
strategies pursuant to General Plan Policy CIRC -5.A to reduce VMT generated by a project.
• Participate in a Fair Share Traffic Impact Fee program or VMT mitigation banking program, if available.

Examples of potential measures to reduce V MT include,
but are not limited to, the following:
• Improve or increase access to transit.
• Increase access to common goods and services, such as groceries, schools, and daycare.
• Incorporate affordable housing into the project.
• Orient the project toward transit, bicycle, and
pedestrian facilities.

Provide proof
that:
• Project screens
out of VMT
analysis; or
• Project has
participated in
a Fair Share
Traffic Impact
Fee program or
VMT mitigation
banking
program
Confirmation of
compliance with
City-adopted VMT
Guidelines
Prior to
issuance of a
building permit
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 30 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
• Improve pedestrian or bicycle networks, or transit
service.
• Provide traffic calming.
• Provide bicycle parking.
• Limit or eliminate parking supply.
• Unbundle parking costs.
• Implement or provide access to a co mmute reduction
program.
• Provide car -sharing, bike sharing, and ride -sharing programs.
• Provide transit passes.

Tribal Cultural Resources
GPU PEIR MM 4.4-2
Prior to any earth -disturbing activities (e.g., excavation, trenching, grading) that could encounter undisturbed soils, the project -level applicant for future development shall retain an archaeologist who meets the Secretary of the
Interior’s Professional Qualifications Standards for
Archaeology to determine if site -specific development
allowed under the GPU PEIR could result in a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5 of the CEQA Guidelines or disturb human remains. The investigation shall include, as determined appropriate by the archaeologist and the City of Huntington Beach, an updated records search of the
South Central Coastal Information Center of the California Historical Resources Information System, updated Native American consultation, and a pedestrian survey of the area proposed for development. The results of the investigation shall be documented in a technical report or memorandum that identifies and evaluates any archaeological resources within the development area and includes
recommendations and methods for eliminating or avoiding impacts on archaeological resources or human remains.

The measures shall include as appropriate, subsurface
testing of archaeological resources and/or constr uction Proof of
retention of
archaeological
professional to
determine if a
substantial
adverse change
would occur to
an
archaeological
resource.

Preparation of a
technical report
or memorandum
documenting the
result of
archaeological
resources
investigation

Developer shall
implement all
recommendations
Verify retention
of qualified
Archaeological
professional, if
necessary, and
complete
documentation

Review and
approve technical
report or
memorandum.

If determined
necessary, verify
that project
applicant has
implemented
methods
identified in the
technical report
or memorandum
for reducing
impacts on
Prior to
issuance of
grading permit;
Continued
throughout
ground
disturbing
activities, as
required
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 31 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
monitoring by a qualified professional and, if necessary, appropriate Native American monitors identified by the
applicable tribe (e.g., the Gabrielino Tongva Nation)
and/or the Native American Heritage Commission. The
methods shall also include pro cedures for the
unanticipated discovery of human remains, which shall be in accordance with §5097.98 of the State Public Resources Code and §7050.5 of California’s Health and Safety Code.

The technical report or memorandum shall be submitted
to the City of Huntington Beach for approval. As
determined necessary by the city, environmental
documentation (e.g., CEQA documentation) prepared for
future development allowed under the GPU PEIR shall
reference or incorporate the findings and
recommendations of the te chnical report or
memorandum. The project -level applicant shall be
responsible for implementing methods for eliminating or avoiding impacts on archaeological resources identified in the technical report or memorandum. Projects that would not encounter undisturbed soils and would therefore not be required to retain an archaeologist shall demonstrate non-disturbance to the city through the appropriate
construction plans or geotechnical studies prior to any earth-disturbing activities. Projects that would include any earth disturbance (disturbed or undisturbed soils) shall comply with MM 4.4-3.
of the technical
report or
memorandum.
archaeological
resources.

GPU PEIR MM 4.4-3
If evidence of an archaeological site or other suspected historical resource as defined by CEQA Guidelines
§15064.5, including darkened soil representing past
human activity (“midden”), that could conceal material
remains (e.g., worked stone, fired clay vessels, faunal bone, hearths, storage pits, or burials) are discovered during any project -related earth-disturbing activities (including projects that would not encounter undisturbed soils), all earth -disturbing activity within 100 feet of the Proof of
retention of
archaeological
professional to
determine if a
substantial
adverse change
would occur to
an
Verify retention
of qualified
archaeological
professional, if
necessary, and
complete
documentation
Prior to
issuance of
grading permit;
Continued
throughout
ground
disturbing
activities, as
required
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 32 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
find shall be halted and the City of Huntington Beach shall be notified. The project -level applicant shall re tain an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standards for Archaeology to assess the significance of the find. Impacts to any
significant resources shall be mitigated to a less than significant level through d ata recovery or other methods determined adequate by the archaeologist and that are
consistent with the Secretary of the Interior's Standards for Archaeological Documentation. Any identified cultural resources shall be recorded on the appropriate DPR 523
form and filed with the appropriate Information Center. archaeological
resource
Utilities and Service Systems
GPU PEIR MM 4.15-1
The City of Huntington Beach shall require that adequate capacity in the wastewater collection system is
demonstrated from the specific development site
discharge location to the nearest Orange County Sanitary District main or trunk line to accommodate dis charges
from the specific development project. If capacity and/or conditions are demonstrated to be adequate, upgrades
may not be required. If capacity and/or condition is not adequate, the City of Huntington Beach shall identify
corrective action(s) required by the specific development applicant to ensure adequate capacity. Corrective action could include, but is not limited to:
1) Upsize/replace new sewer pipes, as identified in sewer analysis
2) Discharge assessment fees/districts to upsize/replace sewer lines at downstream locations or where
contributing areas are large
3) In-lieu fees to implement system -wide wastewater
collection infrastructure improvements
4) Other mechanisms as determined by the City
Department of Public Works.

Contract
language and
notes on grading
plans and
construction
plans
Review and
approve contract
specifications and
grading plans and
construction
plans for inclusion
Plan check
prior to
issuance of a
grading permit
Community
Development

Mitigation Monitoring and Reporting Program
City of Huntington Beach 33 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
Because some wastewater collectio n system constraints
may be located far down gradient from the actual
development site, several properties may serve to
contribute to system capacity constraints. Therefore, the City Department of Public Works shall assess each
development and system chara cteristics to identify the best method for achieving adequate capacity in the
wastewater collection system.

The City of Huntington Beach Department of Public Works shall review the sewer analysis and determine required
corrective action(s) or if a waiver of corrective action is applicable. The site -specific development applicant shall incorporate required corrective actions into their project design and/or plan. Prior to Final Inspection, the City Department of Public Works shall ensure that require d
corrective action has been implemented.

GPU PEIR MM 4.15-2
Future projects under the General Plan Update shall
incorporate the following measures to ensure that
conservation and efficient water use practices are
implemented. Project proponents, as applicable, shall:
1) Require employees and residents to report leaks and
water losses immediately and shall provide
information and training as required to allow for
efficient reporting and follow up.
2) Educate employees and residents about the
importance and benefits of water conservation.
3) Create water conservation suggestion boxes, and
place them in prominent areas.
4) Install signs in restrooms and cafeterias that
encourage water conservation.
5) Assign an employee or resident to evaluate water
conservation opportunities and effectiveness.

Notes on
construction
plans and
conditions,
covenants and
restrictions
(CC&Rs), as
applicable
Review
construction plans
prior to issuance
of building
permits; Review
CC&Rs prior to
final inspection
Prior to
issuance of
building
permits; Prior
to final
inspection
Public Works
Mitigation Monitoring and Reporting Program
City of Huntington Beach 34 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
6) Develop and implement a water management plan for
its facilities that includes methods for reducing overall water use.
7) Conduct a water use survey to update current water
use needs. (Processes and equipment are constantly
upgrading, thus changing the need for water in some
areas.)
8) Repair leaks. Check the water supply system for leaks and turn off unnecessary flows.
9) Utilize water-efficient irrigation systems and drought tolerant plant palette and ensure that sprin klers are
directing water to landscape areas, and not to parking
lots, sidewalks or other paved areas.
10) Adjust the irrigation schedule for seasonal changes. 11) Install low -flow or waterless fixtures in public and employee restrooms.
12) Instruct cleaning crews to use water efficiently for mopping.
13) Use brooms, squeegees, and wet/dry vacuums to
clean surfaces before washing with water; do not use
hoses as brooms. Sweep or blow paved areas to clean,
rather than hosing off (applies outside, not inside).
14) Avoid washing b uilding exteriors or other outside
structures.
15) Sweep and vacuum parking lots/sidewalks/window
surfaces rather than washing with water.
16) Switch from “wet” carpet cleaning methods, such as
steam, to “dry,” powder methods. Change window -
cleaning schedule from “periodic” to “as required.”
17) Set automatic optic sensors on icemakers to minimum fill levels to provide lowest possible daily requirement.

Ensure units are air-cooled and not water-cooled.
18) Control the flow of water to the garbage disposal
19) Install and maintain spray rinsers for pot washing and reduce flow of spray rinsers for prewash
Mitigation Monitoring and Reporting Program
City of Huntington Beach 35 September 2022
Mitigation Measure Implementation
Documentation
Monitoring
Activity Timing Responsible
Monitor
Compliance
Verification
Signature
Date
20) Turn off dishwashers when not in use – wash only full loads
21) Scrape rather than rinse dishes before washing
22) Operate steam tables to minimize excess water use
23) Discontinue use of water softening systems where
possible
24) Ensure water pressure and flows to dishwashers are
set a minimum required setting.
25) Install electric eye sensors for conveyor dishwashers 26) Retrofit existing flushometer (tankless) toilets with water-saving diaphragms and coordinate automatic
systems with work hours so that they don’t run
continuously
27) Use a shut-off nozzle on all hoses that can be adjusted down to a fine spray so that water flows only when