Cities Index.
Att 4 Quote from AllStar Fire Equipment for SCBAs

City Council/Public Financing Authority
May 2, 2023

Document
Att 4 Quote from AllStar Fire Equipment for SCBAs
Meeting
May 2, 2023
Body
City Council/Public Financing Authority
Pages
2
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

To:

Attn:

E-Mail:

Qty Unit Description Price Extension
112 Ea Scott - p/n X8815025305304 / Air-Pak X3-PRO (2018) SCBA with CGA, Parachute Buckle Harness, 5500 psig, Standard Harness, E-Z Flo Regulator with Quick Connect Hose and Rectus Fitting, Universal UEBSS with Rectus Fitting, RIC/UAC
Connections (Less Spare Harness, Escape Rope, Cylinder, Mask, Amplifier & Case)
$6,517.85 $729,999.20
10 Ea Scott - p/n X8815025305H04 / Air-Pak X3-PRO-HAZMAT (2018) - Air-Pak X3 Pro SCBA with CGA, Parachute Buckle Harness, 5500 psig, Standard Harness, E-Z Flo Regulator with Quick Connect Hose and Rectus Fitting, Universal UEBSS, SEMS II Pro Hazmat, RIC/UAC Connections (Less Spare Harness, Escape Rope, Cylinder, Mask, Amplifier & Case)
$6,585.96 $65,859.60
224 Ea Scott - p/n 200969-01 / Cylinder, 5500 psig, 45 Minute with CGA Valve Assembly
$664.20 $148,780.80
30 Ea Scott - p/n 200972-01 / Cylinder, 5500 psig, 60 Minute with CGA Valve Assembly
$737.38 $22,121.40
112 Ea Scott - p/n 31003989 / QD, MALE, CHECKED, UEBSS $173.69 $19,453.28 112 Ea Scott - p/n 10012129 / QD, FEMALE, CHECK *KB* $167.21 $18,727.52 Per your request, we are pleased to quote on the following. [email protected]
Phone 626-652-0900 Fax 626-652-0920
Huntington Beach FD
Captain Sean Haynes
Quote Valid for 60 Days
Quote Valid for 90 Days
Sales Quote
12328 Lower Azusa Road
Arcadia, California 91006
April 14, 2023

Page 1 of 2 ends

112 Ea Scott - p/n 31004304 / PACK PREFORMED-.078W X .468ID $7.47 $836.64 112 Ea Scott - p/n 10008912 / PACKING, PREFORMED $2.06 $230.72 112 Lot Parker - 6-5-G5HG5-S / Adapter, #5 SAE female x #6 SAE female, steel, 1.26" over all length.
$35.00 $3,920.00
Terms: Net 30
FOB: Destination (Free Shipping)
Delivery: 14-16 Weeks ARO or Sooner
Subtotal $1,009,929.16

7.750% $78,269.51
Rene Reyes S & H $0.00
[email protected] Total $1,088,198.67

Page 2 of 2 ends
← All documents from this meeting