Humboldt Lift Station Replacement
CC-1634
August 1, 2023

BACKGROUND AND PROJECT SCOPE
The Public Works Department’s Engineering and Utilities Divisions are proposing to replace the existing Humboldt Sewer Lift Station due to age and insufficient wet well capacity.

It is located on Humboldt Island at the southeast corner of Humboldt Drive and Wayfarer Lane. Constructed in 1967, the sewer lift station has reached its useful life and the existing concrete structure is failing.

The new lift station will predominately be underground
with only the electrical and control cabinets above ground.

VICINITY MAP - HUMBOLDT ISLAND

PROJECT LAYOUT

PROJECT BENEFITS
Provides facility with 50 years of useful life.

Prevents sewer lift station failure and resulting Sanitary Sewer Overflow into Huntington Harbor.

Enlarged wet well provides more response time to bring out generators during electrical black outs.

System will be airtight with no sewer odors.

PROJECT OVERVIEW
Construction Bids Received July 6, 2023
Current Budget (Sewer Funds) $4,045,118
Request Award to Lowest Bidder Mehta Mechanical Company, Inc. dba MMC Low Bid $4,134,200
Total Project Cost (With Inspection) $4,932,620
Recommended Action: Accept the lowest responsive bid and authorize execution of construction contract with MMC and appropriate $887,502.

Alternative Recommendation: Reject Bid
Construction Start: October 2023
Construction Duration: 12-13 months