Svendsbo, Bo
From: Goodspeed, Jerry
Sent: Tuesday, July 18, 2023 9:16 AM
To: Archer, Thoby; Svendsbo, Bo
Subject: FW: N523HB - Findings
From: [email protected] <[email protected]> Sent: Monday, July 17, 2023 6:40 PM
To: Goodspeed, Jerry <JGoodspeed @hbpd.org>
Cc: [email protected]
Subject: N523HB - Findings
Hi Jerry,
Thank you for accommodating Tim and I at your facility today. After reviewing the aircraft records for N523HB, the following items are what I have found are currently due or coming due.
- Fan bearing visual inspection and re-greasing (Due 7/1/23) - Fan bearing retainer inspection (Due 7/1/23)
- Transponder test (Due 4/30/23)
- Pitot/Static Test (Due 4/30/23)
- Annual inspection Ref 05-20-15 (Due 7/20/23)
- Fwd/aft fan cable coupler inspection (Due 7863.3 hrs) - M/R transmission oil change (Due 7863.3 hrs)
- M/R driveshaft inspection (Due 7863.3 hrs)
- PC Safety Valve inspection (Due 7863.3 hrs)
- MRB root and skin inspection (Due 7863.3 hrs)
- Full length skid shoes inspection and torque check (Due 7863.3 hrs) - ELT 100 hr inspection (Due 7863.3 hrs)
- Airframe 100 hrs and 300 hrs inspection (Due 7863.3 hrs) - Torque tube check (Due 7863.3 hrs)
- Fuel nozzle cleaning (Due 7863.3 hrs)
- Mist eliminator and access door check (Due 7863.3 hrs) - Cargo hook 5 yrs overhaul (Due 6/28/23)
- Cargo hook installation inspection (Due 7863.3 hrs)
Please let Tim or I know if you have any questions.
Best Regards,
Ryan Olsen