FY 2022/23 Sewer Lining Project
August 1, 2023
BACKGROUND AND PROJECT SCOPE
The Engineering and Utilities Divisions identified the need for rehabilitation of existing sewer pipes based on maintenance history and video inspections.
The scope of work for the project includes lining approximately 26,349 lineal feet of aged sewer main lines identified as a priority this year and 84 manholes.
The locations have either calcium deposits from groundwater seepage or have joints offset by tree roots. The calcium deposits and roots inhibit sewage flow and will be removed prior to lining. Lining of the pipes is a trenchless operation performed by inserting a liner inside the existing pipe to form a replacement pipe.
FY 2022-23 SEWER LINING PROJECT LOCATION MAP
FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 138
FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 139
FY 2022/23 SEWER LINING PROJECT LOCATION MAPRD 149
FY 2022/23 SEWER LINING PROJECT LOCATION MAPS RD 167
FY 2022/23 SEWER LINING PROJECT LOCATION MAPS RD 434
FY 2022/23 SEWER LINING PROJECT LOCATION MAPS RD 443
FY 2022/23 SEWER LINING PROJECT LOCATION MAPS RD 456
FY 2022/23 SEWER LINING PROJECT LOCATION MAPS RD 466
PROJECT BENEFITS
Extends life of sewers 20 years
Prevents Sanitary Sewer Overflows
Increases structural strength of sewers
PROJECT OVERVIEW
Construction Bids Received July 6, 2023
Current Budget (Sewer Enterprise Fund) $1,592,000
Council Awarded to Sancon Technologies, Inc. $1,434,710 Project not advertised in newspaper, as required by City Charter Recommended Action: Reject All Bids
Alternative Recommendation: Not Applicable