Central Library Lower Level Restrooms ADA Improvements
Project Overview
October 3, 2023

BACKGROUND
Huntington Beach Central Library - originally constructed in 1975 Project scope involves renovation of (1) Men’s and (1) Women’s restrooms located in lower level Upper level restrooms were renovated with ADA improvements in 2019. The lower level restroom finishes will match the upper level finishes

NEED/WHY/BENEFITS
Restroom facilities have not been updated since original construction in 1975 Improvements will comply with modern ADA accessibility standards New restrooms will be first set of “Family Restrooms” at Central Library. This style is more spacious and includes amenities such as baby changing stations

DETAILS

DETAILS
Shown below is the upper level restroom, which was renovated in 2019. These finishes are exemplary of the style that will be installed in the lower level restroom.

COMMUNITY OUTREACH
Central Library patron feedback has shown a desire for family restrooms in the library City maintenance groups have been consulted on design to ensure consistency in components and parts between new upper and lower restrooms

FUNDING/SCHEDULE
FUNDING:

Engineer’s Estimate:
$200,000.00
CDBG Fund account: 23980357.82800
SCHEDULE:

August 2023 – Bid project
August 2023 – Open bids
October 2023 – Award contract
November 2023 – Begin construction
January 2024 – Complete construction