Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

Appropriate Funding for Hamilton and Slater Flood Station Repairs City Council Meeting
November 7, 2023

Background
City has 15 Flood Control Stations to mitigate flood risk in low elevation sections of the City.

Hamilton Station Pump #1 failed after the final rain event of the season. Pumps #3 and #4 heat exchangers were determined to be undersized during the Summer Tropical Storm.

Slater Station ingested a tire causing damage to Pump #1.

Hamilton Flood Station Damage

Slater Flood Station Damage

Requested Action
Estimated cost for repairing both stations = $210,000; Appropriation requested from Drainage Fund (211).

Repairs expected to take 60 days.

Failure to Repair These Stations Increases Flooding Risk to Area Streets, Residences and Business.