FY 2022/23 Sewer Lining Project
November 7, 2023

BACKGROUND AND PROJECT SCOPE
The Engineering and Utilities Division coordinate the need for rehabilitation of existing sewer pipes based on maintenance history and video inspections. The sewers and manholes selected for lining are either encrusted with calcium deposits from groundwater infiltration at joints and cracks, or have joints offset by tree roots from mature trees located in the parkways.

This project will rehabilitate 26,349 LF (5 miles) of 50 to 60 year old sewer pipe and 84 sewer manholes, greatly reducing groundwater infiltration and extending the useful life of the sewers.

FY 2022-23 SEWER LINING PROJECT LOCATION MAP

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 138

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 139

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 149

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 167

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 434

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 443

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 456

FY 2022/23 SEWER LINING PROJECT LOCATION MAP RD 466

PROJECT BENEFITS
Extends life of sewers 20 years
Prevents Sanitary Sewer Overflows
Increases structural strength of sewers

FUNDING/SCHEDULE
Construction Bids Received
October 5, 2023
Current Budget
$1,658,000 (Sewer Enterprise Fund)
Request Award to Lowest Bidder – Sancon Technologies, Inc.

Total Low Bid = $1,432,642
Total Project Cost including Inspection = $1,648,000
Recommended Action
Accept the lowest responsive bid and authorize execution of construction contract with Sancon Technologies Inc.

Alternative Recommendation
Reject Bid
Construction Start
January 2024
Construction Duration
16 weeks