Cathodic Protection Program Timeline
FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY25/26 FY26/27 FY 27/28 Total Total Member Agency Contribution $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000$8,000,000 OC-9 Design -$300,000 -$300,000
OC-9 Construction1 -$3,700,000 -$3,700,000
OC-35 Design -$300,000 -$300,000
OC-35 Construction1 -$3,700,000-$3,700,000
1 Design and Contruction cost estimates were made when the program was proposed in the FY 20/21 budget. Costs are anticipated to increase due to recent inflation. A more accurate estimate will be available after the OC-9 design is complete.