City of Huntington Beach
Proposed
Master Fee and
Charges Schedule
Proposed Effective Dates:
Fire and Public Works Fees: 60 Days After Adoption
All Other Fees: July 1, 2024
City Clerk 1
City Manager 2
Finance 6
Community Development 8
Information Services 22
Public Works 23
Police 30
Fire 32
Library 44
Community Services 48
City of Huntington Beach
Master Fee and Charges Schedule
Table of Contents
Copies:
CL-1 Per page (per case law) [1] $ 0.10 $ 0.10 CL-2 Miscellaneous (includes micro film) Cost of
Reproduction
Cost of
Reproduction
Electronic Data Request (CD/DVD Copy)
CL-3 Copy of Existing Data File Actual cost Actual cost CL-4 Copy of Non-Existing Data File Actual cost Actual cost CL-5 Certification of Document $ 18 $ 18 CL-6 Passport Program (Application fee, Federal Program Mandate) $35 (per Department of
State)
$35 (per
Department of
State)
CL-7 Passport Photograph (optional) $ 15 $ 15 CL-8 Hourly Rate:
City Clerk $ 127 $ 127 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Notes
[1] Per Public Records Act
City Clerk - User Fees
Adopted Fee No. Description Proposed Fee
Master Fee and Charges Schedule
Clerk
1 Civic Center Room Rentals (per hour)
Lower Level Conference Room B7
Non-Profit or Government Agency (HB Resident Rate) $70.00 Non-Profit or Government Agency (Non-HB Resident Rate) $75.00 Business or Private (HB Resident Rate) $100.00
Business or Private (Non-HB Resident Rate) $110.00
Lower Level Conference Room B8
Non-Profit or Government Agency (HB Resident Rate) $100.00 Non-Profit or Government Agency (Non-HB Resident Rate) $110.00 Business or Private (HB Resident Rate) $138.00
Business or Private (Non-HB Resident Rate) $155.00
Lower Level Conference Room B7/B8 Combined
Non-Profit or Government Agency (HB Resident Rate) $145.00 Non-Profit or Government Agency (Non-HB Resident Rate) $175.00 Business or Private (HB Resident Rate) $210.00
Business or Private (Non-HB Resident Rate) $240.00
Council Chambers Including Caucus Room
Non-Profit or Government Agency (HB Resident Rate) $120.00 Non-Profit or Government Agency (Non-HB Resident Rate) $150.00 Business or Private (HB Resident Rate) $220.00
Business or Private (Non-HB Resident Rate) $240.00
B7/B8/Council Chambers/Caucus Room
Non-Profit or Government Agency (HB Resident Rate) $200.00 Non-Profit or Government Agency (Non-HB Resident Rate) $235.00 Business or Private (HB Resident Rate) $320.00
Business or Private (Non-HB Resident Rate) $355.00
Security/Support Staffing $30.00/staff/hour
IS Technical Support $40.00/staff/hour
Chair/Table Set up (Depending on Rooms Reserved) $85 - $150 Cleaning Fee (Required if Food is Served) $50.00
Room Rental Security Deposit $500.00
Date Change Fee (up to 20 days before event) $30.00
Facility Reservation Cancellation Fee
a) Cancellation at Least 20 Days in Advance of Event $50 plus 10% of room rental rate
b) Cancellation Less than 20 Days in Advance of Event Entire Rental Charge City Manager - Civic Center Room Rental Rates
Description Adopted Fee Proposed Fee
Master Fee and Charges Schedule
City Mgr Room
2 Application Fee
Film $182.00 $300.00
Still Photography $182.00 $150.00
Student Application $50.00 $50.00
Permit Revisions $127.00 $150.00
Commercial Filming Permit Fee
Peak (April - October) - Per Day varies $500.00
Off-Peak (November - March) - Per Day varies $300.00
Still Photography Permit Fee
Per Day varies $150.00
City Coordination Fee (Percent of Total Fees Paid) n/a 15% Site Visit
First Visit n/a No Charge
Each Additional Visit n/a $150.00
City Staffing and Support Charges
Marine Safety Officer $101.00 See Fire Fee Schedule
Police Officer $101.00 See Police Fee Schedule
Fire Department Personnel See Fire Fee Schedule See Fire Fee Schedule Public Works Personnel Actual Costs Actual Costs
Marine Safety Equipment (per vehicle/per day) $50.00 $50.00 Police Department Equipment (per vehicle/per day) $50.00 $50.00 Beach Parking (per space/per day) $15.00 $15.00
Application of Parking Restrictions $140.00 $140.00
Location Use Fee Determined on case by
case basis by scope of
permit
Determined on case by
case basis by scope of
permit
City Manager - Film and Photography Permit Fees
Description Adopted Fee Proposed Fee
Master Fee and Charges Schedule
City Mgr Film
3 CM-1 Film Permit Application charge $ 182 Restructured CM-2 Student Film Permit Application charge $ 50 Restructured CM-3 Film Permit Revisions $ 145 Restructured CM-4 Hourly Rate $ 110 Restructured For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
City Manager - User Fees
No. Description Adopted Fee Proposed Fee
Master Fee and Charges Schedule
Film 1 OLD
4 Motion Daily Charges
Professional
Crew of under 5 243$ Restructured
Crew of 5-9 486$ Restructured
Crew of 10-20 607$ Restructured
Crew greater than 20 728$ Restructured Huntington Beach Film/Production Companies
Crew of under 5 182$ Restructured
Crew of 5-9 364$ Restructured
Crew of 10-20 486$ Restructured
Crew greater than 20 607$ Restructured Nonprofit
Crew of under 5 61$ Restructured Crew of 5-9 121$ Restructured
Crew of 10-20 243$ Restructured
Crew greater than 20 364$ Restructured Still Daily Charges
Professional
Crew of under 10 243$ Restructured Crew of 10-20 364$ Restructured
Crew greater than 20 486$ Restructured Huntington Beach Film/Production Companies
Crew of under 10 121$ Restructured Crew of 10-20 243$ Restructured
Crew greater than 20 364$ Restructured Nonprofit
Crew of under 10 61$ Restructured Crew of 10-20 121$ Restructured
Crew greater than 20 243$ Restructured Additional Charges
Location Use Fees To be determined
on case-by-case
basis by the City
Manager or his/her
Designee
Restructured
Student with instructor Verification Daily Fees not
required
Restructured
Government Agencies Daily Fees not
required
Restructured
Amateur photographers (including realtors and filming for personal use), Filming for private family use, and same-day breaking news
no charge; film
permit not required
Restructured
City Manager - Film Permit Services Charges
Proposed
ChargesDescription Adopted
Charges
Master Fee and Charges Schedule
Film 2 OLD
5 Delinquent Customer Fees
Returned Check Processing (Non-Sufficient Funds NSF)
FN-1 1st NSF Check [2] $ 25 $ 25 FN-2 Each Subsequent NSF Check [2] $ 35 $ 35 FN-3 Processing of Delinquent Administrative Citation $ 47 $ 47 FN-4 Transient Occupancy Tax (TOT) Administration processing fee (in addition to penalty) $ 40 $ 40 FN-5 Collections Processing Fee $ 40 $ 40 Other Fees and Charges
FN-7 Parking Citation Processing Fee $ 4.01 $ 4 FN-8 Cash Bond Acceptance and Processing $ 103 $ 103 FN-9 Tract/Other Bonds Processing $ 61 $ 61 FN-10 Lien Processing $ 103 $ 103 FN-11 Business Improvement District (BID) Processing Fee $ 12 $ 12 FN-12 Refund Processing - Check $ 30 $ 30 FN-13 Check Reissuance $ 35 $ 35 Water Billing
FN-14 Utility Customer Set-Up (residential, industrial, construction) $ 35 $ 35 FN-15 Utility Billing Late Fee greater of 5% or
$10 flat rate
greater of 5% or
$10 flat rate
Business License
FN-20 Change to Business License - Name $ 24 $ 24 FN-21 Change to Business License - Location $ 24 $ 24 FN-22 Duplicate Business License $ 13 $ 13 FN-23 Business License Tax Processing Renewal $ 30 $ 30 FN-24 Business License Tax Renewal Processing (Tax Exempt Business) $ - $ - FN-25 Business License Application $ 55 $ 55 FN-26 Business License Application (Tax Exempt Business) $ - $ - FN-27 Business License Home Occupation $ 13 $ 13 FN-28 Business License Field Re-inspection $ 24 $ 24 FN-29 Business License Revocation $ 399 $ 399 FN-30 Oil Penalty Administration Fee $ 46 $ 46 Special Regulatory Business Permits
Finance
Police
Sworn
Non sworn
FN-31 Bingo Permit [1] $ 50 $ 50 FN-32 Entertainment Permit - new $ 488 $ 488 FN-33 Entertainment Permit - renewal $ 488 $ 488 FN-34 Entertainment Permit- change of location/name $ 215 $ 215 FN-35 Entertainment Permit- conceptual $ 758 $ 758 FN-36 Fortune Teller Permit - initial $ 331 $ 331 FN-37 Fortune Teller Permit - renewal $ 331 $ 331 FN-38 Fortune Teller Permit - change of location/name $ 206 $ 206 FN-39 Sexually Oriented Business (SOB) Business Permit - initial $ 938 $ 938 FN-40 Sexually Oriented Business (SOB) Business Permit - renewal $ 938 $ 938 FN-41 Sexually Oriented Business (SOB) Business Permit - change name/location $ 308 $ 308 FN-42 Sexually Oriented Business (SOB) Performer Permit - initial $ 938 $ 938 FN-43 Sexually Oriented Business (SOB) Performer Permit - renewal $ 938 $ 938 FN-44 Massage Establishment Registration Certificate - initial / add partner $ 685 $ 685 Finance - User Fees and Charges
Proposed Fee No. Description Adopted Fee
Master Fee and Charges Schedule
Finance
6 Finance - User Fees and Charges
Proposed Fee No. Description Adopted Fee
FN-45 Massage Establishment Registration Certificate - renewal $ 685 $ 685 FN-46 Massage Establishment Registration Certificate - change of location/name/removal of partner $ 230 $ 230 FN-47 Massage Independent Registration Certificate- initial $ 345 $ 345 FN-48 Massage Independent Registration Certificate- renewal $ 243 $ 243 FN-49 Massage Independent Registration Certificate- change of location/name $ 73 $ 73 FN-50 Escort Service Permit - initial $ 748 $ 748 FN-51 Escort Service Permit - renewal $ 748 $ 748 FN-52 Escort Service Permit - change of location/name $ 308 $ 308 FN-53 Escort Employee Permit - initial $ 748 $ 748 FN-54 Escort Employee Permit - renewal $ 748 $ 748 Subpoena Fees
FN-55 Response to subpoena - Hourly [5] $ 24 $ 24 FN-56 Response to subpoena - Records [5] $ 15 $ 15 FN-57 Response to subpoena - Civil [6] $ 275 $ 275 FN-58 Copies - Standard Size (up to 8.5 x 14) per copy plus actual postage charges $0.10 + postage $0.10 + postage FN-59 Copies - Documents off of microfilm + actual postage charges $0.20 + postage $0.20 + postage FN-60 Copies - Reproduction of Documents requiring special processing + actual postage charges Actual Cost of production
Actual Cost of
production
Hourly Rate:
FN-61 Finance $ 159 $ 159 FN-62 Sidewalk Vending Permit Fee $ 299 $ 299 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Taxicab Program Permit Fees
FN-63 Company Permit [8], [10] $ 3,250 $ 3,250 FN-64 Vehicle Permit (per vehicle) [8], [10] $ 270 $ 270 FN-65 Driver Permit [8], [10] $ 438 $ 438 FN-66 Replacement Permit (Driver or Taxicab) [9], [10] $ 70 $ 70 Credit Card Transaction Convenience Fee
FN-67 Credit Card Transaction Convenience Fee 2.29% 3.00% Notes
[1] Bingo permit - Max $50 - CA Govt. Code 25845; Penal Code 326.3-326.5 [2]
[4] Current master fee schedule includes this fee but is not currently being charged due to CA State Law - SB731 section 4600 effective 9/1/09 and revised by AB1147 effective 1/1/15 [5] CA Evidence Code 1563
[6] CA Govt. Code 68097
[7] Not charged for parking meters
[8] Fixed fee; two-year permit
[9] The replacement permit shall be valid for the remaining term of the permit being replaced. [10] City Technology Automation Fee also applies and is in additional to the base permit fee.
Per CA Civil Code; 1st NSF Check is limited to $25 fee; each subsequent NSF check is limited to $35 fee Master Fee and Charges Schedule
Finance
7 PLANNING COMMISSION ACTIONS [1]
PL-1 Annexation Request (deposit) Deposit of $44,000 Deposit of $44,000 PL-2 Coastal Development Permit [2] $ 10,228 $ 10,228 Conditional Use Permit:
PL-3 New Residential $ 14,480 $ 14,480 PL-4 Commercial/Industrial $ 15,399 $ 15,399 PL-5 Alcohol, Dancing or Live Entertainment $ 6,663 $ 6,663 PL-6 Mixed Use $ 33,682 $ 33,682 PL-7 Entitlement Continuance [3] $ 744 $ 744 Development Agreement
PL-8 Original Contract or Significant Amendment (Deposit) Deposit of $40,000
Deposit of
$40,000
PL-9 Minor Amendment / Affordable Housing Only $ 14,866 $ 14,866 PL-10 Annual Review (Planning Commission Hearing) $ 5,309 $ 5,309 PL-11 Annual Review (Administrative Review) $ 3,185 $ 3,185 Entitlement Plan Amendment
PL-12 New Hearing $ 7,277 $ 7,277 PL-13 No Change to Conditions - Director Review $ 3,975 $ 3,975 PL-14 General Plan Amendment – GPA Major $ 70,461 $ 70,461 PL-15 General Plan Amendment - GPA Minor $ 39,766 $ 39,766 PL-16 General Plan Conformance $ 8,875 $ 8,875 PL-17 Local Coastal Program Amendment $ 29,342 $ 29,342 PL-18 Reversion to Acreage $ 7,403 $ 7,403 PL-19 Special Permit $ 5,693 $ 5,693 Tentative Tract Map
PL-20 Base $ 36,863 $ 36,863 PL-21 Per Lot $ 107 $ 107 PL-22 Variance [5] $ 6,064 $ 6,064 PL-23 Zoning Map Amendment [6] $ 42,367 $ 42,367 PL-24 Precise Plan of Street Alignment $ 24,120 $ 24,120 PL-25 Mobile Home Park Conversion Review $ 62,048 $ 62,048 PL-26 Zoning Text Amendment-Major $ 54,825 $ 54,825 PL-27 Zoning Text Amendment-Minor $ 23,033 $ 23,033 Community Development, Planning Division - User Fees
No. Description Adopted Fee Proposed Fee
Master Fee and Charges Schedule
Planning
8 Community Development, Planning Division - User Fees
No. Description Adopted Fee Proposed Fee
ZONING ADMINISTRATOR ACTIONS [1]
Coastal Development Permit [2]
PL-28 Single Family Dwelling $ 5,588 $ 5,588 PL-29 All Others $ 7,248 $ 7,248 ZA-21 Sunset Beach - approval in concept - no public hearing $ 1,395 $ 1,395 PL-30 Conditional Use Permit $ 8,358 $ 8,358 PL-157 Conditional Use Permit (Alcohol, Dancing, or Live Entertainment) $ 8,358 $ 6,663 PL-31 Conditional Use Permit (Fences/Exceptions to Height Limits) $ 2,767 $ 2,767 PL-32 Entitlement Continuance [3] $ 531 $ 531 Entitlement Plan Amendment
PL-33 New Hearing $ 3,810 $ 3,810 PL-34 No Change to Conditions - Director Review $ 2,607 $ 2,607 PL-35 Temporary Use Permit $ 5,832 $ 5,832 PL-36 Bond (if applicable) [C] $ 530 $ 530 PL-37 Tentative Parcel Map $ 9,071 $ 9,071 PL-38 Tentative Parcel Map Waiver $ 3,987 $ 3,987 Tentative Tract Map
PL-39 Base $ 14,663 $ 14,663 PL-40 Per Lot $ 108 $ 108 PL-41 Variance [5] $ 5,533 $ 5,533 ENVIRONMENTAL REVIEW [1]
PL-42 Environmental Assessment (Deposit) [7] See Note See Note PL-43 Historic Structures (Deposit) [7] See Note See Note PL-44 Environmental Review Focused EA (Deposit) [7] See Note See Note Mitigation Monitoring:
PL-46 Mitigated Negative Declaration
PL-47 Environmental Impact Report See Note See Note
PL-48 Environmental Impact Report (EIR) Consultant Prepared (Deposit) [7] See Note See Note STAFF REVIEW AND SERVICES [1]
PL-49 Address Assignment Processing (per project) $ 2,089 $ 2,089 PL-50 Address Change $ 465 $ 465 PL-45 Address Assignment - Meter Only $ 137 $ 137 Administrative Permit
PL-51 List 1: Outdoor Dining, Eating and Drinking Establishments, Fence Extensions (<8'), Personal Enrichment Services over 5,000 sq. ft., and Home Occupations $ 1,736 $ 1,736
PL-52 List 2: Parking Reduction, Carts & Kiosks, Waiver of Development Standards, Non-conforming structure additions
$ 2,785 $ 2,785
PL-53 List 2A: Daycare No charge No charge
PL-54 List 3: Privacy Gates, Game Centers, Accessory Dwelling Units, Manufactured Home Parks $ 2,606 $ 2,606 Master Fee and Charges Schedule
Planning
9 Community Development, Planning Division - User Fees
No. Description Adopted Fee Proposed Fee
PL-55 List 4: Personal Enrichment Services under 5,000 sq ft No charge No charge PL-56 Animal Permits $ 438 $ 438 PL-57 Categorical Exclusion letter (coastal) $ 531 $ 531 PL-58 CC&R Review $ 1,727 $ 1,727 PL-59 Certificate of Compliance $ 1,630 $ 1,630 Design Review Board
PL-60 Minor- approved by DRB Secretary $ 1,987 $ 1,987 PL-61 Others $ 3,975 $ 3,975 PL-62 Extension of Time $ 637 $ 637 PL-148 Final Parcel Map $ 1,455 $ 1,455 PL-149 Final Tract Map $ 2,078 $ 2,078 Pl-63 Initial Plan, Zoning & Review (land use changes, zone changes, conceptual plans) $ 1,061 $ 1,061 Landscape Plan Check:
PL-64 Single Family Dwelling $ 781 $ 781 PL-65 Tract Map $ 1,562 $ 1,562 PL-66 Commercial/Industrial/Multi-Family Dwelling $ 1,562 $ 1,562 PL-67 Limited Sign Permit $ 1,896 $ 1,896 PL-68 Lot Line Adjustment / Lot Merger (Planning) $ 1,380 $ 1,380 Planned Sign Program
PL-70 Single User and Amendments to Existing Programs $ 1,994 $ 1,994 PL-71 Multiple Users $ 3,109 $ 3,109 Preliminary Plan Review: [4]
PL-72 Single Family Residential $ 1,477 $ 1,477 PL-73 Multi-Family Residential (up to 9 units) $ 2,597 $ 2,597 PL-74 Multi-Family Residential (≥10 units) $ 4,075 $ 4,075 PL-75 Non-Residential / Mixed Use $ 4,788 $ 4,788 PL-76 Sign Code Exception – Staff $ 1,699 $ 1,699 PL-77 Sign Code Exception – Design Review Board $ 2,336 $ 2,336 Site Plan Review
PL-78 Major -PC Review $ 14,627 $ 14,627 PL-79 Minor- Façade remodel, Car Dealerships $ 6,080 $ 6,080 PL-80 Temporary and Promotional Activity Sign Permit $ 107 $ 107 PL-81 Temporary Sales/Event Permit $ 309 $ 309 PL-82 Wireless Permit Applications $ 1,858 $ 1,858 Zoning Letter:
PL-83 Zoning/ Flood Verification $ 107 $ 107 PL-84 Zoning Letter Staff $ 319 $ 319 PL-85 Zoning Research/Information (Per Hour - 1 hr. min.) $ 212 $ 212 Master Fee and Charges Schedule
Planning
10 Community Development, Planning Division - User Fees No. Description Adopted Fee Proposed Fee
PL-86 Planning Consultation/Meeting Fee (Per Hour, Per Planner; 1 hr. min.) $ 212 $ 212 APPEALS [1]
To Planning Commission
PL-87 Single family owner appealing decision of own property $ 3,549 $ 3,549 PL-88 Others $ 4,899 $ 4,899 PL-89 Appeal of Director’s Decision (PC Public Hearing) $ 3,413 $ 3,413 PL-90 Appeal of Director’s Interpretation (PC Non-Public) $ 2,556 $ 2,556 To City Council (file w/ City Clerk’s Office)
PL-91 Single family owner appealing decision of own property $ 2,693 $ 2,693 PL-92 Others $ 4,323 $ 4,323 PL-93 Mills Act Annual Fee $ 212 $ 212 PL-94 Mills Act Application Fee $ 607 $ 607 PLANNING BUILDING PLAN REVIEW [1]
PL-95 Planning Plan review 46% of building
inspection fee
46% of building
inspection fee
PL-96 Standard production units after model unit has been reviewed 20% of building inspection fee
20% of building
inspection fee
[C]
Subject to Cost of Living Index Adjustments per Resolution 2008-43 PL-97
…
…
…
…
…
PL-131
PL-109 Inclusionary Housing In-Lieu Fee Manual Manual
OTHER FEES
PL-104 Downtown Specific Plan Fee [C] $831 per acre $831 per acre Outdoor Dining:
PL-105 License Agreement Application Fee $ 212 $ 212 PL-106 License Agreement Use Charge $0.01/SF $0.01/SF PL-107 License Agreement Code Enforcement Fee $4/SF $4/SF PL-108 Noise Deviation Permit $ 1,699 $ 1,699 General Plan Maintenance Fee per sq. ft new construction $ 0.27 $ 0.27 Pursuant to City Council Resolution No. 2012-66 adopted on October 1, 2012, the park land dedication in lieu fees (Quimby Fees) effective November 14, 2012 are as follows:
[C]
Refer to separately presented Affordable Housing in-lieu Fee Schedule for Planning Fees PL 97 - 131 (established per Resolution 2007-71 and subject to annual adjustment)
AFFORDABLE HOUSING IN-LIEU FEES
Master Fee and Charges Schedule
Planning
11 Community Development, Planning Division - User Fees No. Description Adopted Fee Proposed Fee
PROJECTS REQUIRING A SUBDIVISION MAP
Residential Land Use:
PL-144 Detached Dwelling Units (Persons per Dwelling: 2.913) PL-145 Attached Dwelling Units (Persons per Dwelling: 2.257) PL-146 Mobile Home Dwelling Units (Persons per Dwelling: 1.822) Beach Edinger Corridor Fees: [C]
Net new commercial or office project $0.30/sq.ft. $0.30/sq.ft.
Net new industrial project $0.30/sq.ft. $0.30/sq.ft.
Remodels or façade improvements (commercial) $0.08/sq.ft. $0.08/sq.ft.
Remodels or façade improvements (industrial) $0.08/sq.ft. $0.08/sq.ft.
New residential units (MFR) $300/unit $300/unit
New residential units (SFR) $300/unit $300/unit
New hotel room $300/room $300/room
ADDITIONAL FEES MAY BE REQUIRED
ENTITLEMENTS FOR DEVELOPMENT INCLUDE INITIAL REVIEW OF PLANS AND ONE SUBSEQUENT REVISION SUBMITTAL. REVIEW OF PLANS IN EXCESS OF ONE REVISION SHALL BE CHARGED THE FULLY BURDENED HOURLY RATE.
ALSO SEE DEPARTMENTS OF PUBLIC WORKS, FIRE, AND THE BUSINESS LICENSE DIVISION FOR ADDITIONAL FEES.
Hourly Rate
PL-147 Planning $ 212 $ 212 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
SHORT-TERM RENTAL PERMITS [1]
PL-150 Short-Term Rental Permit Processing - Initial Two Years [8] $ 620 $ 620 PL-151 Short-Term Rental Permit Processing - Renewal [8] $ 322 $ 322 GROUP HOME / SOBER LIVING HOME USE PERMIT [1]
PL-152 Six or Fewer Residents (Special Use Permit) $ 1,846 $ 1,846 Seven or More Residents
a) Conditional Use Permit $ 5,018 $ 5,018 PL-153 b) Operator Permit $ 2,310 $ 2,310 PL-154 Public Notice Fee $ 518 $ 518 PL-155 Conceptual Project Fee $ 1,000 $ 1,000 PL-156 Development Assistance Team (DAT) Fee (per hr) $ 212 $ 212 Master Fee and Charges Schedule
Planning
12 Community Development, Planning Division - User Fees No. Description Adopted Fee Proposed Fee
Notes:
[1]
[2]
[3]
[4]
[5]
[6]
[C]
[7]
[8]
ZMA fee reduced 50% when processed concurrently with a General Plan Amendment.
Included for the purpose of consolidation into the new Master Fee & Charges Schedule.
Deposit with actual costs based on a time and material (T&M) basis.
Short-Term Rental Permit fees include code enforcement review required to conduct permit application review. For Code Enforcement effort subsequent to issuance of initial permit, hourly billing rates apply.
Includes automation fee.
Coastal Development Permit reduced 50% when processed concurrently with a Conditional Use Permit, Tentative Map or Variance.
Plus costs for Notice of Publication, if applicable.
50 percent of fee credited towards future entitlements.
Variance fee reduced 50% when processed concurrently with a Conditional Use Permit.
Master Fee and Charges Schedule
Planning
13 B-1 Permit Processing Charge (All permits, plan reviews, including change of contractor, owner, special inspector program, etc.) $ 39 $ 39 B-2 Building Inspection Fees (Including Foundation or Partial Building Inspection as well as routine building permit activities) Based on Project Valuation Based on Project Valuation
Inspection Fees (based on valuation):
$1 to $500 $ 80 $ 80 $501 to $2,000 $80.00 for first $500 + $5.33 for
each additional $100 or fraction
thereof
$80.00 for first $500 + $5.33 for
each additional $100 or fraction
thereof
$2,001 to $25,000 $160.00 for first $2,000 + $21.30
for each additional $1,000 or
fraction thereof
$160.00 for first $2,000 + $21.30
for each additional $1,000 or
fraction thereof
$25,001 to $50,000 $650.00 for first $25,000 +
$12.00 for each additional $1,000
or fraction thereof
$650.00 for first $25,000 +
$12.00 for each additional $1,000
or fraction thereof
$50,001 to $100,000 $950.00 for first $50,000 + $7.00
for each additional $1,000 or
fraction thereof
$950.00 for first $50,000 + $7.00
for each additional $1,000 or
fraction thereof
$100,001 to $500,000 $1,300.00 for first $100,000 +
$6.50 for each additional $1,000
or fraction thereof
$1,300.00 for first $100,000 +
$6.50 for each additional $1,000
or fraction thereof
$500,001 to $1,000,000 $3,900.00 for first $500,000 +
$5.80 for each additional $1,000
or fraction thereof
$3,900.00 for first $500,000 +
$5.80 for each additional $1,000
or fraction thereof
$1,000,000 and up $6,800.00 for first $1,000,000 +
$4.64 for each additional $1,000
or fraction thereof
$6,800.00 for first $1,000,000 +
$4.64 for each additional $1,000
or fraction thereof
B-3 Building Plan Review Fees 61% of building inspection fee 61% of building inspection fee B-4 Standard production units after model unit has been reviewed [6] 26% of building inspection fee 26% of building inspection fee B-5 Plan Review Fee for projects requiring review in excess of 2-4 reviews - HOURLY
$100,000 or less - 2 or more reviews $ 157 $ 157 $100,001 - $1,000,000 - 3 or more reviews $ 157 $ 157 $1,000,001 or more - 4 or more reviews $ 157 $ 157 B-6 Refund Processing Fee $ 235 $ 235 B-7 Record Retention Fee - Each sheet of permitted drawings [5] $ 4 $ 4 B-8 Record Retention Fee - Each Issued permit [5] $ 1 $ 1 B-9 Counter Staff Research/Special Services (More than 10 min.) actual cost; $157 per hr. actual cost; $157 per hr.
B-10 Copies from Microfilm [5] $3.00 for 1st copy, $1.50 each additional copy
$3.00 for 1st copy, $1.50 each
additional copy
B-11 Copies not on Microfilm [5] $ 0.10 $ 0.10 B-12 Building Plan Review Extension $ 157 $ 157 B-13 Building Permit Extension $ 157 $ 157 B-14 Building Relocation Inspection Fee (first 2 hours, minimum charge) $ 313 $ 313 B-15 Building Relocation Inspection Fee (each additional hour) $ 157 $ 157 B-16 Investigation Fee-for work performed without a permit [7] Equal to Std. Insp. Fee OR Actual cost, whichever is greater.
Minimum $250
Equal to Std. Insp. Fee OR
Actual cost, whichever is greater.
Minimum $250
B-17 Reinspection Fee $ 196 $ 196 B-18 Permit Supplement [8]
B-19 Expired Permits [7, 9] $ 53 $ 53 Community Development, Building Division - User Fees
Adopted Fee No. Description Proposed Fee
Master Fee and Charges Schedule
Building
14 Community Development, Building Division - User Fees Adopted Fee No. Description Proposed Fee
B-20 Recording and Release of Non-Compliance due to Permit Expiration & Similar Services - City Processing Fee
$ 157 $ 157 B-21 Recording and Release of Non-Compliance due to Permit Expiration & Similar Services - County Recorder Fee
[10] $ 10 $ 10 B-22 Certificate of Occupancy w/Building Permit No Charge No Charge B-23 Certificate of Occupancy Review (no inspection required) [3] $ 53 $ 53 B-24 Modified Certificate without additional inspection/admin. [4] $ 39 $ 39 B-25 Certificate when Inspection/Administrative Services required - B/M Occ
$ 196 $ 196 B-26 Certificate when Inspection/Administrative Services required - All Other Occ
$ 626 $ 626 B-27 Certificate of Occupancy Review services requiring services in excess of 75 minutes for B/M Occupancy, or in excess of 250 minutes for Other Occupancies
$157/hour $157/hour
B-28 Temporary Certificate of Occupancy - B/M Occupancies Actual Cost; $121 minimum Actual Cost; $121 minimum B-29 Temporary Certificate of Occupancy - All Other Occupancies Actual Cost; $273 minimum Actual Cost; $273 minimum B-30 Building Division Counter Services, Inspection, Plan Review, Supervisory Services - during normal work hours - hourly rate $ 157 $ 157 B-31 Building Division Counter Services, Inspection, Plan Review, Supervisory Service - outside normal work hours - hourly rate $ 189 $ 189 B-32 Planning Division - Building Plan Review See Planning Fee Analysis See Planning Fee Analysis B-33 State of California - SMIP fees [5]
B-34 Huntington Beach Library and School District Fees [5] B-35 Electrical Permit Fees Minimum $47 Minimum $47
New single and multiple-family residential buildings including additions and attached garages
$0.22/sq foot, $47 minimum $0.22/sq foot, $47 minimum
Each service meter $1.15.00/AMP, $47 minimum $1.15.00/AMP, $47 minimum Each sub panel $ 54.95 $ 54.95 Each self-contained, factory-wired, approved unit (2-HP max over 2-HP see generators, motors and transformers)
$ 29.29 $ 29.29 Lighting Fixtures:
First 50 fixtures, each $ 4.55 $ 4.55 Each additional fixture $ 2.24 $ 2.24 Each pole with fixtures $ 29.29 $ 29.29 Generators, Motors and Transformers:
HP, kW, or KVA. Rating of Equipment up to and including two (2) $ 29.29 $ 29.29 Over two (2) and not over ten (10) $ 54.95 $ 54.95 Over ten (10) and not over fifty (50) $ 115.42 $ 115.42 Over fifty (50) $ 283.85 $ 283.85 Receptacle and Switch Outlets:
First fifty (50) outlets, each $ 4.55 $ 4.55 Each additional outlet $ 2.24 $ 2.24 Each section of track lighting or multiple outlet assembly $ 14.62 $ 14.62 Master Fee and Charges Schedule
Building
15 Community Development, Building Division - User Fees Adopted Fee No. Description Proposed Fee
Signs:
1st sign at one address $ 283.85 $ 283.85 Each additional sign at the same address $ 115.42 $ 115.42 Fuse up $ 73.27 $ 73.27 Temporary service:
Each temporary or construction pole (including lights and outlets for outdoor uses)
$ 115.42 $ 115.42 Each sub-pole with panel $ 54.95 $ 54.95 Each misc. item regulated by HB Electrical Code where no fee listed
$ 54.95 $ 54.95 B-36 Electrical Plan Review 62% of electrical Inspection fee; $79 minimum
62% of electrical Inspection fee;
$79 minimum
Reviews in excess of 3 submittals $157/hr; $79 minimum $157/hr; $79 minimum B-37 Mechanical Permit Fees Minimum $47.00 Minimum $47.00 Installation or relocation of each furnace, including ducts and/or vents attached to such appliance
$ 85 $ 85 Each Fire and/or Smoke Damper $ 37 $ 37 Relocation or replacement of each appliance vent not included in an appliance item also permitted
$ 37 $ 37 HVAC Duct Extension/Relocation for 1 to 10 ducts $ 54 $ 54 Each Additional Duct $ 7 $ 7 Installation or relocation of each boiler to 15hp or compressor to and including 5 tons, including attached cuts and/or vents $ 90 $ 90 Installation or relocation of each boiler over 15 hp or compressor over 5 tons, including attached ducts and/or vents
$ 218 $ 218 Each evaporative cooler (non-portable type) $ 44 $ 44 Exhaust fan connected to a single environmental air duct (includes residential cooking hoods)
$ 23 $ 23 Each Air Handling unit not part of a factory-assembled appliance $ 44 $ 44 Each ventilation system less than or equal to 100,000 cfm which is not a portion of any HVAC system authorized by permit $ 44 $ 44 Each ventilation system less more or equal to 100,000 cfm which is not a portion of any HVAC system authorized by permit $ 90 $ 90 Hood served by mechanical exhaust including duct/fan $ 90 $ 90 Miscellaneous items including all factory-built stoves, ovens, etc. $ 44 $ 44 Factory Built fireplaces $ 44 $ 44 Each low pressure gas-piping system up to .5 psi $ 35 $ 35 Each medium or high pressure gas piping system exceeding .5 psi
$ 119 $ 119 Each misc. item regulated by HB Mechanical Code where no fee listed
$ 44 $ 44 B-38 Mechanical Plan Review 121% of mechanical Inspection fee; $64 minimum
121% of mechanical Inspection
fee; $64 minimum
Reviews in excess of 3 submittals $157/hr; $79 minimum $157/hr; $79 minimum B-39 Plumbing Permit Fees Minimum $47.00 Minimum $47.00 Each plumbing fixture $ 47 $ 47 Each building sewer $ 95 $ 95 Rainwater systems-per drain $ 24 $ 24 Each water heater and or vent $ 47 $ 47 Master Fee and Charges Schedule
Building
16 Community Development, Building Division - User Fees Adopted Fee No. Description Proposed Fee
Each low pressure gas-piping system, up to .5 psi $ 35 $ 35 Each medium or high pressure gas piping system exceeding .5 psi $ 119 $ 119 Each waste interceptor or each kitchen grease trap $ 95 $ 95 Installation or alteration of water piping, including vacuum breakers or backflow devices
$ 95 $ 95 Water Treating Equipment $ 47 $ 47 Floor Drain or floor sink $ 47 $ 47 Each misc. item regulated by HB Plumbing Code where no fee is listed
$ 47 $ 47 Sump Pumps (sewage or rainwater) $ 47 $ 47 Medical Gas System of 1 to 5 outlets $ 318 $ 318 Each additional medical gas outlet $ 30 $ 30 Each misc. item regulated by HB Plumbing Code where no fee listed
$ 47 $ 47 B-40 Plumbing Plan Review 68% of plumbing Inspection fee; $79 minimum
68% of plumbing Inspection fee;
$79 minimum
Reviews in excess of 3 submittals $157/hr; $79 minimum $157/hr; $79 minimum B-41 Swimming Pool Permit Fees Minimum $47.00 Minimum $47.00 Building Inspection Fee 0.8x as established herein 0.8x as established herein Building Plan Review Fee 61% of building inspection fee 61% of building inspection fee Planning Plan Review Fee 20% of building inspection fee 20% of building inspection fee Electrical Items $ 151 $ 151 Exception: Above ground spas, see electrical items
Plumbing Items $ 134 $ 134 Exception: Above ground spas, see plumbing items
Pre-Site Inspection $ 157 $ 157 B-42 Solar Energy Permit Fees [11] Varies based on State GC Varies based on State GC Residential
15 kW or less $ 450.00 $ 450.00 More than 15 kW $450 + $15 per kW above 15
kW
$450 + $15 per kW above 15
kW
Commercial
15 kW or less $ 450.00 $ 450.00 More than 15 kW to 50 kW $ 1,000.00 $ 1,000.00 More than 50 kW to 250 kW $1,000 + $7 per kW above 50
kW
$1,000 + $7 per kW above 50
kW
More than 250 kW $2,000 + $5 per kW above 250
kW
$2,000 + $5 per kW above 250
kW
B-43 Landscape Inspection
Residential $ 79 $ 79 Commercial/Industrial/Multi-family $ 236 $ 236 B-44 NPDES Inspection (hourly, 1/2 hour minimum) $ 157 $ 157 B-45 Building without a permit-fine [5] 2 X Inspection Fee 2 X Inspection Fee B-46 Technology Automation fee 6% of all development, permit and prevention fees for Planning,
Building, Public Works and Fire
6% of all development, permit
and prevention fees for Planning,
Building, Public Works and Fire
B-47 Expedited Plan Review 2 X Plan Review Fee
Master Fee and Charges Schedule
Building
17 Community Development, Building Division - User Fees Adopted Fee No. Description Proposed Fee
For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Notes
[1] Building Flat Fees only; remainder of cost analysis conducted on program level in separate analysis
[2] Fees may be waived for Plumbing, Mechanical and Electrical permits issued by the Department of Building & Safety for electrical, mechanical or plumbing systems that either produce energy or save natural resources and exceed State and Federal minimum requirements. Examples include, but are not limited to, photovoltaic systems, solar water heating systems, high efficiency furnaces and high efficiency air conditioners.
[3] City collects $75 current fee (building counter svcs.) [4] Only $30 processing fee is collected if modified
[5] Not included in cost analysis; placeholder on Master Fee Schedule [6] Fee percentage set by City policy, not evaluated through NBS cost analysis [7] Penalty; set by City code/citation authority. Not included in NBS cost Analysis [8] Per City policy, fees to issue revised permits, adjust permits, admin permits or those not listed are subject to the processing fee, microfilm fee, and other fee schedule line items as applicable. Minimum Inspection Fee does not apply [9] Per City policy, fees to reactivate permits include the established processing fee plus a penalty of 50% of the new inspection fee for projects with less than 6 months expiry, or 100% of new inspection fee for more than 6 months expiry [10] Fee set by County; NBS did not evaluate
[11] Fees for this section are set by the State Government Code Section Master Fee and Charges Schedule
Building
18 CE-1 Re-inspection Fee without Citation $ 183 $ 183 CE-2 Re-inspection Fee with a Citation $ 457 $ 457 CE-3 Notice & Order Fee $ 3,203 $ 3,203 CE-4 Mobile Vending Permit Initial $ 321 $ 321 CE-5 Mobile Vending Permit Annual $ 90 $ 90 CE-6 Shopping Cart Retrieval Containment Application $ 687 $ 687 CE-7 Newsrack - New Permit $ 594 $ 594 CE-8 Newsrack - annual Permit per rack $ 90 $ 90 CE-9 Appeals Fee for Notice & Order $ 512 $ 512 CE-10 Hourly Rate - Code Enforcement Supervisor $ 221 $ 221 CE-11 Hourly Rate - Senior Code Enforcement Officer $ 176 $ 176 CE-12 Hourly Rate - Code Enforcement Officer II $ 167 $ 167 CE-13 Hourly Rate - Code Enforcement Officer I $ 128 $ 128 CE-14 Hourly Rate - Code Enforcement Technician $ 113 $ 113 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Community Development, Code Enforcement Division - User Fees No. Description Adopted Fee Proposed Fee
Master Fee and Charges Schedule
Code Enforcement
19 CE-15 Subordination Fee $ 303 $ 303 CE-16 Reconveyance Fee $ 97 $ 97 CE-17 Demand Fee $ 169 $ 169 CE-18 Rehab Loan / Grant Fee [1] $ 500 $ 500 CE-19 Affordable Housing Unit Inspection $ 53 $ 53 CE-20 Affordable Housing Unit - Annual Review $ 26 $ 26 Notes
[1] Pursuant to City Council adoption of the Housing and Rehab Rules and Regulations on April 5, 2010, Rehab Loan/Grant fee was set at $500
Community Development, Community Enhancement Division - User Fees Proposed Fee No. Description Adopted Fee
Master Fee and Charges Schedule
Community Enhancement
20 FEE DESCRIPTION
Strand Parking Structure Daily Fee:
September 15 - May 15: November 1 - March 31:
First 15 minutes(included as part of first hour) No Charge No Charge No Charge First 2 hours or less $2.00 $2.00 $2.50
Each 20 minutes thereafter $1.00 $2.00 $2.50
Daily Maximum $15.00 $18.00 $18.00
May 16 -September 14: April 1 - October 31:
First 15 minutes (included as part of first hour) No Charge No Charge No Charge First 2 hours or less $2.00 $2.00 $3.00
Each 20 minutes thereafter $2.00 $3.00 $3.00
Daily Maximum $17.00 $20.00 $22.00
Flat Rate (after 8:00 pm) $6.00 $8.00 $10.00
Holiday Event Flat Rate $27.00 $30.00 $30.00
Valet Rates:
September 15 - May 15: November 1 - March 31:
First 2 hours $6.00 $6.00 $8.00
Each 20 minutes thereafter $1.00 $2.00 $2.50
Maximum Rate $18.00 $20.00 $18.00
May 16 -September 14: April 1 - October 31:
First 2 hours $6.00 $6.00 $10.00
Each 20 minutes thereafter $1.00 $2.00 $3.00
Maximum Rate $18.00 $20.00 $22.00
Monthly Parking Pass: 24 hours, 7 days per week access $40.00 $50.00 $65.00 Business Hours Parking Pass (Program expires September 20, 2032):
4th Amendment to Owner Participation Agreement Annual CPI $18.86 $18.86 $19.99 Increase each May
COMMUNITY DEVELOPMENT - FACILITY RENTALS AND RECREATIONAL SERVICE FEES Adopted Fee
Floor
Adopted Fee
Maximum Proposed Fee
Master Fee and Charges Schedule
Strand Parking
21 IS - 1 Technology Fee [1] 6% 6%
Notes:
[1] To be charged on all user fee services using the ELM system Information Services - User Fee
Proposed Fee No. Description Adopted Fee
Master Fee and Charges Schedule
Information Services
22 DEVELOPMENT RELATED FEES
* All Plan Check fees include 2 plan checks; additional plan checks are additional
PW-1 Bond reduction (partially completed projects) [2,3] Deposit of $2,900 Deposit of $3,100 PW-2 Cash Bond Processing (plus $90 Treasury Fee) $ 721 $ 790 PW-3 Construction Water (per dwelling unit) [C] $ 100 2x commodity rate PW-4 Drainage Fees per acre-Ordinance #3741 dated 9/06, Resolution 2006-23 [C] $ 14,497 $ 14,497 PW-5 Dock Construction Plan Review/Inspection [12] $ 1,154 $ 1,260 PW-6 Final Parcel Map Check [2, 3, 12] Deposit of $4,600 Deposit of $5,000 PW-7 Final Tract Map Check [2, 3, 12] Deposit of $6,300 Deposit of $6,900 PW-8 Lot Line Adjustment (Public Works) [2, 3, 12] Deposit of $1,400 Deposit of $1,500 PW-9 Fire Hydrant Flow Analysis [3,7] Hourly Rate Hourly Rate Grading Plan Check & Inspection (includes erosion control) PW-10 (51--300 cubic yards) - deposit [2, 3, 12] Deposit of $5,500 Deposit of $6,000 PW-11 (301-5,000 cubic yards) - deposit [2, 3, 12] Deposit of $9,700 Deposit of $10,600 PW-12 (Greater than 5,001 cubic yards) Maximum Deposit* [2, 3, 12] Deposit of $14,600 Deposit of $16,000 Improvement Plan Check:
PW-13 Misc/Minor [7, 12] $ 924 $ 1,010 PW-14 Single Family Dwelling (deposit) [2, 3, 12] Deposit of $2,100 Deposit of $2,300 PW-15 All Others per 4 sheets (deposit) [2, 3, 12] Deposit of $4,800 Deposit of $5,200 PW-16 Landscape Plan Check and Inspection - (Right-of-way) - Deposit [3, 7, 12] Deposit of $1,800 Deposit of $1,900
ENCROACHMENT PERMITS
Improvement Inspection
PW-17 Minor (2 Hr. Min. Deposit) [2, 3, 12] Deposit of $289 Deposit of $310 PW-18 Residential Minor [12] Deposit of $2,163 Deposit of $2,370 PW-19 Residential Major [12] Deposit of $7,209 Deposit of $7,920 PW-20 Commercial/Retail/Industrial - Minor [12] Deposit of $2,883 Deposit of $3,170 PW-21 Commercial/Retail/Industrial - Major [12] Deposit of $7,209 Deposit of $7,920 PW-22 Utility Co Encroachment Permit [C, 12] $ 334 $ 360 Improvement Inspection (Utilities) - per hour (billed monthly) [12] $ 144 $ 158 PW-23 Encroachment Permit (None/working without): Violation Fine - Permit Cost is equal to the amount paid for the permit at the time of issuance. The fine for working without a permit shall equal the full permit fee as set forth in the Fee Schedule or as determined by the Director.
[4, 12] 2 X Permit Fee 2 X Permit Cost
Proposed Fee
Public Works - User Fees
Fee Activity
No. Description Adopted Fee
Master Fee and Charges Schedule
Public Works
23 Proposed Fee
Public Works - User Fees
Fee Activity
No. Description Adopted Fee
PW-24 Street Vacation:
Full vacation [2,3] Deposit of $4,700 Deposit of $5,100 Summary vacation [2,3] Deposit of $3,000 Deposit of $3,300 PW-25 Street Lighting Plan Check - Per Sheet [12] $ 865 $ 950 PW-26 Survey Fee (per point) [12] $ 72 $ 78 PW-27 Traffic Control Plan Check - Per sheet [12] $ 433 $ 470 PW-28 Traffic Signal Plan Check - Per sheet [12] $ 1,874 $ 2,060 PW-29 Traffic Signs & Striping Plan Check - Per Sheet [12] $ 1,009 $ 1,110 PW-30 Obstruction/Storage Bin Permit (good for 7 days) [7, 12] $ 72 $ 78 PW-31 Illegal Refuse Bin Impound $ 144 $ 158 PW-32 Illegal Storage Bin $ 216 $ 237 PW-33 Recycling Bin Permit (annual) [7] $ 181 $ 198 PW-34 Residential Parking Permit $ 29 $ 29 PW-35 Residential Parking Permit Replacement $ 12 $ 12 PW-36 Residential Parking Permit (each additional) $ 12 $ 12 PW-37 Temporary Restricted Parking Permits (Construction) * plus cost of signs ($ .75 per sign)
[12] $30 plus $ .75 per
sign
$36 plus $ 1 per sign
PW-38 Temporary Parking in Permit Districts (fee is per sign) [12] $ 1 $ 1 PW-39 Temporary Construction Parking Permit (use on street sweeping day) [12] $ 36 $ 36 PW-40 Residential Street Tree Request (24" box) (Review & Installation), plus cost of tree
[5, 12] $ 378 $ 410 PW-41 Street Tree Non-Permitted Removal (Evaluation & determination of tree cost; billing resident for tree replacement & installation), plus $50/caliper inch of trunk @ 48"
[12] $ 909 $ 990 PW-42 Transportation Permits:
Wide/Overweight/Loading: (set by state)
Three day permit
Temporary Permit
Annual Permit
Single Permit [10] $ 16 $ 16 Annual Permit [10] $ 90 $ 90
NPDES/STORMWATER
PW-43 Commercial High Priority sites (BMPs)- Annual Inspection [12] $ 144 $ 158 PW-44 Commercial Medium [12] $ 144 $ 158 PW-45 Commercial Low [12] $ 144 $ 158 PW-46 Industrial High Priority [12] $ 408 $ 448 PW-47 Industrial Medium [12] $ 144 $ 158 Master Fee and Charges Schedule
Public Works
24 Proposed Fee
Public Works - User Fees
Fee Activity
No. Description Adopted Fee
PW-48 Industrial Low [12] $ 144 $ 158 PW-49 Construction High Priority [12] $ 205 $ 225 PW-50 Construction Medium [12] $ 84 $ 92 PW-51 Construction Low [12] $ 61 $ 66 PW-52 Commercial - Industrial Reinspection [12] $ 144 $ 158 PW-53 Stormwater Permit Maintenance Inspection Fee [12] $ 192 $ 210 FATS, OILS & GREASES (FOG)*
PW-54 Food Service Establishment with Grease Control Devise (billed monthly); covers 1 insp/yr - see below
$ 156 $ 168 Monthly $13/month Monthly $14/month
PW-55 Food Service Establishment without Grease Control Devise (billed monthly; covers 2 insp/yr) - see below
$ 396 $ 432 Monthly $33/month Monthly $36/month
PW-56 Food Service Establishment - Re-Inspection $ 84 $ 92 WATER
PW-57 Delinquent Bill Water Tag $ 55 $ 55 PW-58 Delinquent Bill Water Shut-off $ 139 $ 139 PW-59 Same Day Turn-On Service (Regular Hours) $ 85 $ 85 PW-59.1 Same Day Reconnection Service (Regular Hours) $ 85 $ 85 PW-59.2 Same Day Reconnection Service (Regular Hours) - Low Income [9] $ 61 $ 61 PW-60 Same Day Turn-On Service (After Hours)- 2 Hour Minimum* $ 301 $ 301 PW-60.1 Same Day Reconnection Service (After Hours) - 2 Hour Minimum $ 301 $ 301 PW-60.2 Same Day Reconnection Service (After Hours) - 2 Hour Minimum - Low Income
[9] $ 182 $ 182 PW-61 Construction Water Meter Deposit [C] $ 849 $ 930 PW-62 Temp Meter Rental Setting & Removal (each occurrence) [7] $ 144 $ 158 PW-64 Turn Off/On/Stand-by (customer requested) per hour Actual Cost Actual Cost
MISCELLANEOUS FEES
PW-65 Banner Hanging- Main Street (Tree Dept) $ 266 $ 290 PW-66 Pennant Hanging (each) (Signals Dept) $ 75 $ 82 PW-67 Memorial Park Bench $ 303 $ 330 PW-68 Damage to City property [8] Actual Cost w/ 2 hour min.
Actual Cost w/ 2 hour
min.
PW-69 Emergency cleanup (hazmat, street cleaning) [8] Actual Cost w/ 2 hour min.
Actual Cost w/ 2 hour
min.
PW-70 Tree/Shrub Overhang Abatement [8] Actual Cost w/ 2 hour min.
Actual Cost w/ 2 hour
min.
PW-71 Weed Abatement (per parcel), plus additional contract costs if applicable (now handled by Code Enforcement)
[6] $ 227 $ 250 Master Fee and Charges Schedule
Public Works
25 Proposed Fee
Public Works - User Fees
Fee Activity
No. Description Adopted Fee
PW-72 Archive Fee (as-builts per sheet) [12] $ 144 $ 158 PW-73 Special Studies (Hydrology/Sewer/Other) Actual Cost Actual Cost PW-74 Excessive Plan Checks > 2; per Re-Check [3, 12] Actual Cost; Minimum Deposit
$636
Actual Cost;
Minimum Deposit
$700
PW-75 Re-Inspection (hourly) [8, 12] Actual Cost Actual Cost PW-76 Public Improvement Inspection - After Hours * 4 hour minimum (hourly) [8, 12] Actual Cost; Minimum Deposit
$513
Actual Cost;
Minimum Deposit
$565
Copies of plans and specifications (Most items available on-line) [C] $ .10 per copy per PRA or Actual Cost
for plans
$ .10 per copy per
PRA or Actual Cost
for plans Orange County Sanitation District [C]
Sewer Connection Fee (City) [C]
Traffic Impact Fee [C]
Water Capital Facilities Charge [C]
Electric Vehicle Charging Rate $0.29/kWh $0.35/kWh
HOURLY RATE
For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Hourly Rate - (w/ automation fee) $ 152 $ 166 PW-77 Hourly Rate - Engineering (w/out automation fee) [12] $ 144 $ 158 WATER SERVICE DEPOSIT*
PW-78 Deposit - Residential - Meter Size 3/4" [11] $ 75 $ 75 PW-79 Deposit - Residential - Meter Size 1" [11] $ 100 $ 100 PW-80 Deposit - Residential - Meter Size 1 1/2" [11] $ 125 $ 125 PW-81 Deposit - Residential - Meter Size 2" [11] $ 175 $ 175 PW-82 Deposit - Residential - Meter Size 3" [11] $ 225 $ 225 PW-83 Deposit - Residential - Meter Size 4" [11] $ 400 $ 400 PW-84 Deposit - Residential - Meter Size 6" [11] $ 800 $ 800 PW-85 Deposit - Residential - Meter Size 8" [11] $ 1,150 $ 1,150 PW-86 Deposit - Residential - Meter Size 10" [11] $ 1,600 $ 1,600 PW-87 Deposit - Fire Service - Meter Size 4" $ 80 $ 80 PW-88 Deposit - Fire Service - Meter Size 6" $ 120 $ 120 PW-89 Deposit - Fire Service - Meter Size 8" $ 160 $ 160 PW-90 Deposit - Fire Service - Meter Size 10" $ 200 $ 200 Master Fee and Charges Schedule
Public Works
26 Proposed Fee
Public Works - User Fees
Fee Activity
No. Description Adopted Fee
Notes
[C] Included for the purpose of consolidation into the new Master Fee & Charges Schedule [2] Fee is currently a deposit, with actual costs using FBHR [3] Fee recommended is deposit with actual costs using FBHR [4] Penalty; not included in cost analysis
[5] Time estimates represents upgrade from standard 15 gallon to 24 inch box [6] Fee plus additional costs if applicable
[7] Revised fee structure
[8] Actual Costs; using Fully Burdened Hourly Rates (FBHR) [9]
[10] Fee set by California Vehicle Code section 35795
[11] Multi units: Add $10.00 for each unit over 1
[12] Includes automation fee
* Current deposits historically assessed to new customers. There are no recommended changes to the deposit amount. This resolution will formalize the deposit amounts assessed. The City may waive or refund deposits for creditworthy customers as outlined in Administrative Regulation 311.
To qualify for the low income rate, household income must be below 200% of the federal poverty level or meet requirements as specified in CA Health and Safety Code section 116914. The Chief Financial Officer shall annually increase the Low Income Reconnection Fees by the CPI beginning June 1, 2021, and every June 1 thereafter. The base index of the CPI adjustment shall be defined as the All Urban Consumers (CPI-U) for the Los Angeles- Long Beach-Anaheim area (1982-84=100) as published by the United States Bureau of Labor Statistics ("Bureau") as such index stands on January 1, 2020, and the “current index” shall be the index for the month of January immediately preceding the June 1, 2021 adjustment date, and every June 1 adjustment date thereafter, provided that in no event shall the Low Income Reconnection Fees exceed the non-Low Income Reconnection Fees.The City shall post the new CPI-U adjusted Fees on the City website and in the City Policy on discontinuation of residential water service.
Master Fee and Charges Schedule
Public Works
27 Use Category Rate Basis Base Charge
Commercial – Industrial Per 1,000 square feet1
Low Demand2 Per 1,000 square feet $336
Average Demand4 Per 1,000 square feet $2,088
High Demand3 Per 1,000 square feet $4,962
Single Family Residential (SFR)5 Per Each
5+ bedrooms $7,430
4 Bedrooms $6,362
3 Bedrooms $5,346
2 Bedrooms $4,331
1 Bedrooms $3,314
Multi – Family residential (MFR)6 Per Unit
4 + Bedrooms Per Unit $5,774
3 Bedrooms Per Unit $4,758
2 Bedrooms Per Unit $3,743
1 Bedrooms Per Unit $2,672
Studio Per Unit $1,710
Bedroom Additions
2nd bedroom addition Per each $1,017
3rd bedroom addition Per each $1,015
4th bedroom addition Per each $1,016
5th bedroom addition Per each $1,068
6th bedroom addition No additional charge No additional charge Orange County Sanitation District (OCSD)
CITY OF HUNTINGTON BEACH
Public Works Fee Schedule
July 1, 2022 Update
User Fees Effective 6/16/09; resolution # 2009-31
Development Fees effective 1/6/17
*Refunds are only available for permits canceled within 12 months of payment date.
Capital Facilities Capacity Charge (CFCC)
FY 2024 - 2025
1Provided that the minimum Capital Facilities Capacity Charge for such new construction shall be $5,346 2 Low Demand connections are the following categories of users: Nurseries; Warehouses; Churches; Truck Terminals; RV Parks, RV Storage Yards, Lumber/Construction Yards, Public Storage Buildings; and other facilities with restrooms, offices, lobbies and/or areas whose flows are similar in volume to these listed categories. 3 High Demand connections are the following categories of users: Food/Beverage Service Establishments; Supermarkets (with bakery, meat counter, and/or food service); Car Washes; Coin Laundries; Amusement Parks; Shopping Centers with one or more Food/Beverage Service Establishments; Food Courts; Food Processing Facilities; Textile Manufacturers; Breweries; and other facilities whose wastewater discharge is similar to these listed categories. 4All other connections are Average demand users including: Church Offices and Schools; Hotels, Shopping Centers/Strip Malls without food/beverage service establishments, Music Halls without food facilities, Office buildings, Senior Housing with individual living units without kitchens but with a common kitchen. 5 Residential Accessory Structures such as workshops and hobby shops that connect to the sewer, will be charged at the average demand rate and the minimum charge does not apply. 6 Bedroom additions are considered a change of use and a CFCC must be paid. Enclosed loft additions, bonus rooms, offices, workout rooms, media rooms, libraries and any other enclosed addition which could potentially be used as a bedroom are included in this category. The classification of these additions will be reviewed and determined by staff.
7 MFR units consist of multiple attached units that are not sold individually and receive one secured property tax bill such as apartments. Multiple attached units that are not sold individually and are senior housing with individual living units that include a kitchen are considered MFR units.
8 Studio – one single room with no separating doors or openings leading to another part of the room (except for a bathroom).
Live/Work units will be charged at the residential rate for the living quarters and at the nonresidential rate for the work portion square footage.
Master Fee and Charges Schedule
PW-OCSD
28 $2,317
$1,895
Meter Size & Type EDU’s Charge
3/4” 1 $2,633
1” 2 $5,267
1 ½” 3 $7,901
2” 5 $13,170
3” 11 $28,974
4” Compound 17 $44,776
4” Domestic & Turbine 33 $86,919
6” Compound 33 $86,919
6” Domestic & Turbine 67 $176,469
8” Domestic 117 $308,163
10” Domestic 183 $479,241
Residential Development
Meter size & type EDUs Charge
3/4" 1 $2,700
1" 2 $5,398
1 1/2" 3 $8,099
2" 5 $13,497
3" 11 $29,693
4" Compound 17 $45,888
4" Domestic & Fire Service 33 $89,077
6" Compound 33 $89,077
6" FM 67 $180,853
8" FM 117 $315,818
10" FM 183 $493,972
Non-residential Development
Parcels less than 10,000 sq ft $60 per usable unit
Parcels 10,000 sq ft or greater $300 per acre or fraction thereof or
$60 per usable unit
whichever is greater
Multiple Family Dwelling Unit
Non-Residential (based on water meter size relationship to Equivalent Dwelling Unit, EDU ) WATER CAPITAL FACILIITES CHARGE Effective October 1, 2011
CITY OF HUNTINGTON BEACH
Public Works Fee Schedule
CITY SEWER CONNECTION FEES Effective October 1, 2017 Resolution 2003-52, 2012-23, Ordinance#3613-9/03
Single Family Dwelling Unit
Master Fee and Charges Schedule
PW-Water & Sewer
29 PD-1 Noise disturbance response/processing $ 401 $ 401 ( in addition to a fine/penalty)
PD-2 Clearance letter $ 36 $ 36 Subpoena Fee [3] $ 15 $ 15 PD-3 Response to subpoena - Hourly [3] $ 24 $ 24 PD-4 Response to subpoena - Records [4] $ 15 $ 15 PD-5 Response to subpoena - Civil - (Deposit per day; actual costs) [4] $ 275 $ 275 PD-6 Vehicle equipment correction inspection/ Cite Sign Off (sworn) $ 20 $ 20 Digital reproduction (CD-ROM)
PD-7 Copy of Existing Data File $ 12 $ 12 PD-8 Copy of Non-Existing Data File $ 26 $ 26 Records
PD-60 Copy of Photographs $ 25
PD-61 911 Tape Duplication $ 25 PD-62 Body-Worn Camera Duplication $ 25 PD-63 Police Report Copies $ 5 PD-9 Vehicle release $ 183 $ 183 PD-10 Alarm permit application review/renewal (non sworn) $ 41 $ 41 PD-10.1 Alarm permit application review/renewal (non sworn) - Senior Rate [9] $ 21 $ 21 False Alarm Fee (with Permit)
PD-11 1st and 2nd false alarm (12 month period) [4] $ - $ - PD-11.1 1st false alarm in 12-month period (waived w/online alarm school) [4] $ 25 $ 25 PD-11.2 2nd false alarm in 12-month period [4] $ 50 $ 50 PD-12 3rd false alarm [4] $ 75 $ 75 PD-13 4th false alarm [4] $ 100 $ 100 PD-14 5th false alarm [4] $ 150 $ 150 PD-15 6th false alarm [4] $ 300 $ 300 PD-16 7th false alarm [4] $ 400 $ 400 PD-17 8th false alarm in 12-month period (plus non-response status) [4] $ 500 $ 500 False Alarm Fee (without Permit)
PD-17.1 1st false alarm (waived w/permit application within 10 days) $ 250 $ 250 PD-17.2 2nd false alarm $ 250 $ 250 PD-17.3 3rd false alarm $ 500 $ 500 PD-17.4 4th false alarm (plus non-response status) $ 1,000 $ 1,000 PD-18 Response [2]
$ - $ - PD-19 Records Check (non sworn) $ 26 $ 26 PD-20 Boot Removal (non sworn) $ 121 $ 121 PD-21 Vehicle Repossession Receipt (non sworn) [6] $ 15 $ 15 PD-47 Massage Establishment Registration Certificate (ERC) - Revocation Appeal $ 2,203 $ 2,203 PD-48 Tow truck establishment - initial (sworn) [7] $ 441 $ 441 PD-49 Tow truck establishment - renewal (sworn) $ 110 $ 110 PD-50 Tow truck establishment - change of location (sworn) $ 220 $ 220 PD-51 Tow truck driver - initial (sworn) $ 220 $ 220 PD-52 Tow truck driver - renewal (sworn) $ 220 $ 220 PD-53 Jail Processing/Booking Fee [1] $ 275 $ 275 PD-54 City Jail Fee per Inmate per day (Pay to Stay) [4] $ 100 $ 100 PD-55 One Time Admin fee for cost of account set up of an applicant $ 50 $ 50 PD-56 Renting a GPS Inmate Tracking Device per 24-hour period [4] $ 10 $ 10 PD-57 Bicycle Impound [8], $ 20 $ 20 Drug/DUI/Hazmat/Other Incident Response
PD-58 * DUI - $12,000 Maximum per State law Actual Cost Actual Cost Police - User Fees
No. Adopted Fee Fee Description Proposed Fee
Master Fee and Charges Schedule
Police
30 Police - User Fees
No. Adopted Fee Fee Description Proposed Fee
Hourly Rates
PD-59 Sworn $ 220 $ 220 Non-Sworn $ 109 $ 109 Jail $ 142 $ 142 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Notes
[1] City does not collect on all booking fees.
[2] For Information Purposes only; not included in cost analysis [3] CA Govt. Code 68097; CA Evidence Code 1563
[4] Placeholder for Master Fee Schedule (MFS); Not included in cost analysis [6] Set by state
[7] No volume - 5 yr cycle
[8] CA Govt. Code 53150-35159
[9] Senior discounted rate - applicant must be 62 years or older and have a combined annual adjusted gross income of all members of the household that does not exceed the HUD Income Guidelines for "Very Low Income Category"
Master Fee and Charges Schedule
Police
31 Fire Department - Development Fees
Underground/Aboveground Storage Tanks [7,15,18]
F-1 Underground Tank & piping Installation Plan Check (One Tank) $ 391 $ 395 F-2 Underground Tank & piping Installation Inspection (One Tank) $ 488 $ 493 F-3 Underground Tank Install Plan Check each additional tank $ 97 $ 98 F-4 Underground Tank Install Inspection each additional tank $ 391 $ 395 F-5 Underground Tank Removal Plan Check (One Tank) $ 195 $ 197 F-6 Underground Tank Removal Inspection (One Tank) $ 975 $ 985 F-7 Underground Tank Removal Plan Check each additional tank $ 49 $ 50 F-8 Underground Tank Removal Inspection each additional tank $ 195 $ 197 F-9 Flammable / Combustible Liquid new piping or re-pipe Plan Check $ 292 $ 295 F-10 Flammable / Combustible Liquid new piping or re-pipe Inspection $ 391 $ 395 F-11 Aboveground - Storage Tank Installation Plan Check (Per Tank) $ 585 $ 591 F-12 Aboveground - Storage Tank Installation Inspection (Per Tank) $ 391 $ 395 F-13 Aboveground - Storage Tank Removal Plan Check $ 97 $ 98 F-14 Aboveground - Storage Tank Removal Inspection $ 292 $ 295 F-15 Aboveground - Storage Tank Removal Plan Check - Each additional tank $ 49 $ 50 F-16 Aboveground - Storage Tank Removal Inspection - Each additional tank $ 195 $ 197 Methane Barrier and Venting System
Methane Protection System Plan Check:
F-17 1-2,500 sq feet $ 292 $ 295 F-18 Each additional sq ft > 2,500 sq ft $ 0.05 $ 0.05 F-19 Plan Recheck (hourly) $ 195 $ 197 Methane Protection System Inspection (includes two risers):
F-20 0 - 2,500 sq feet $ 975 $ 985 F-21 Each additional sq ft > 2,500 sq ft $ 0.15 $ 0.15 F-22 Additional risers $ 49 $ 50 F-23 Each additional floor over three stories $ 49 $ 50 Methane Protection System
F-24 Methane Protection System Repair Inspection - 1 - 100 sq. ft. $ 292 $ 295 F-25 Methane Protection System Repair Insp - each additional sq. ft. over 100 sq. ft. $ 1 $ 1 F-26 Methane Plan Check repair $ 195 $ 197 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
Master Fee and Charges Schedule
Fire
32 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
Project Review and Oversight for Compliance with City Specification 429 (Methane Mitigation) or 431-92 (Soil remediation)
F-27 Single Family Residence / Multifamily Residential up to 5 units [13] $390 Deposit; Actual Cost
Actual Cost Plus
Other Fees (F-
F-28 All Other Residential, Commercial and Industrial [13] $977 Deposit; Actual Cost
Actual Cost Plus
Other Fees (F-
Water Based Fire Protection Systems
F-29 Fire Sprinkler Single family base (up to 30 heads) Plan Check $ 488 $ 493 F-30 Fire Sprinkler Single family base (up to 30 heads) Inspection $ 585 $ 591 F-31 Fire Sprinkler Multi Family Residences (up to 120 heads) Plan Check $ 780 $ 790 F-32 Fire Sprinkler Multi Family Residences (up to 120 heads) Inspection $ 1,171 $ 1,183 F-33 Fire Sprinkler Commercial/Industrial base (up to 50 heads) Plan Check $ 780 $ 789 F-34 Fire Sprinkler Commercial/Industrial base (up to 50 heads) Inspection $ 975 $ 985 F-35 Fire Sprinkler Tenant Improvement (up to 10 heads) Plan Check $ 195 $ 197 F-36 Fire Sprinkler Tenant Improvement (up to 10 heads) Inspection $ 292 $ 295 F-37 Fire Sprinkler, Per Additional Head - All Types of Buildings (plan check) $ 2.00 $ 2.02 F-38 Fire Sprinkler, Per Additional Head - All Types of Buildings (Inspection) $ 4.00 $ 4.04 F-39 Standpipe System Plan Check (Per Vertical Standpipe) $ 391 $ 395 F-40 Standpipe System Inspection (Per Vertical Standpipe) $ 780 $ 788 F-41 Fire Sprinkler, Per Additional Head Plan Check (head replacement only, no modification to piping)
$ 1.21 $ 1.22
F-42 Fire Sprinkler, Per Additional Head Inspection (head replacement only, no modification to piping)
$ 1.88 $ 1.90
F-43 Fire Protection Underground System Plan Check (includes 1 riser or hydrant) $ 585 $ 591 F-44 Fire Protection Underground System Inspection (includes 1 riser or hydrant) $ 780 $ 788 F-45 Fire Protection Underground, Per Additional Sprinkler Riser or Hydrant Plan Check $ 391 $ 395 F-46 Fire Protection Underground, Per Additional Sprinkler Riser or Hydrant Inspection $ 391 $ 395 F-47 Fire Pump Plan Check $ 780 $ 788 F-48 Fire Pump Inspection $ 1,171 $ 1,183 Fire Alarm or Methane Detection:
F-49 Up to 25 devices - Plan Check $ 488 $ 493 F-50 Up to 25 devices - Inspection $ 488 $ 493 F-51 Tenant Improvement (up to 5 devices) Plan Check $ 189 $ 191 F-52 Tenant Improvement (up to 5 devices) Inspection $ 283 $ 286 F-53 Per additional Device (new or TI) plan check $ 4.00 $ 4.05 F-54 Per additional Device (new or TI) inspection $ 7.00 $ 7.10 Master Fee and Charges Schedule
Fire
33 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
Alternative Automatic Extinguishing Systems:
F-55 Dry or Wet Chemical, CO2, Halon, Clean Agent, and Other Plan Check $ 391 $ 395 F-56 Dry or Wet Chemical, CO2, Halon, Clean Agent, and Other Inspection $ 391 $ 395 Other Fire Construction Permits:
F-57 Industrial Oven Plan Check $ 195 $ 197 F-58 Industrial Oven Inspection $ 391 $ 395 F-59 LPG, Cryogenics, Compressed Gas, Medical Gas, Battery Storage Systems, & other Fire Construction Permit Plan Check
$ 391 $ 395
F-60 LPG, Cryogenics, Compressed Gas, Medical Gas, Battery Storage Systems, & other Fire Construction Permit Inspection
$ 488 $ 493
F-61 Emergency Responder Radio Coverage Plan Review & Coordination $ 585 $ 591 F-62 Emergency Responder Radio Coverage Inspection & Coordination $ 780 $ 788 F-63 Public School Access & Water Supply Plan Check $ 391 $ 395 New Street Name or Name Change Review:
F-64 Per street name $ 195 $ 197 New Construction / Remodel:
Valuation Based Fire Inspection Fees (Applicable to Building Permit):
F-65 $1 to $500 $ 109.17 $ 110.26 F-66 $501 to $2,000; 1st $500 $ 109.17 $ 110.26 F-67 $501 to $2,000; each additional $100 or fraction thereof $ 2.43 $ 2.45 F-68 $2,001 to $25,000; 1st $2,000 $ 194.08 $ 196.02 F-69 $2,001 to $25,000; each additional $1,000 or fraction thereof $ 4.85 $ 4.90 F-70 $25,001 to $50,000; 1st $25,000 $ 206.22 $ 208.28 F-71 $25,001 to $50,000; each additional $1,000 or fraction thereof $ 2.43 $ 2.45 F-72 $50,001 to $100,000; 1st $50,000 $ 266.87 $ 269.54 F-73 $50,001 to $100,000; each additional $1,000 or fraction thereof $ 1.18 $ 1.19 F-74 $100,001 to $500,000; 1st $100,000 $ 326.30 $ 329.56 F-75 $100,001 to $500,000; each additional $1,000 or fraction thereof $ 0.78 $ 0.79 F-76 $500,001 to $1,000,000; 1st $500,000 $ 638.05 $ 644.43 F-77 $500,001 to $1,000,000; each additional $1,000 or fraction thereof $ 0.78 $ 0.79 F-78 $1,000,000 and up; 1st $1,000,000 $ 1,027.44 $ 1,037.71 F-79 $1,000,000 and up; each additional $1,000 or fraction thereof $ 0.73 $ 0.74 Master Fee and Charges Schedule
Fire
34 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
New Valuation Based Fire Plan Review Fees (Applicable to Building Permit):
F-80 $1 to $500 $ 72.78 $ 73.51 F-81 $501 to $2,000; 1st $500 $ 72.78 $ 73.51 F-82 $501 to $2,000; each additional $100 of fraction thereof $ 2.43 $ 2.45 F-83 $2,001 to $25,000; 1st $2,000 $ 145.56 $ 147.02 F-84 $2,001 to $25,000; each additional $1,000 or fraction thereof $ 3.86 $ 3.90 F-85 $25,001 to $50,000; 1st $25,000 $ 183.17 $ 185.00 F-86 $25,001 to $50,000; each additional $1,000 or fraction thereof $ 2.50 $ 2.53 F-87 $50,001 to $100,000; 1st $50,000 $ 246.25 $ 248.71 F-88 $50,001 to $100,000; each additional $1,000 or fraction thereof $ 1.25 $ 1.26 F-89 $100,001 to $500,000; 1st $100,000 $ 308.11 $ 311.19 F-90 $100,001 to $500,000; each additional $1,000 or fraction thereof $ 0.63 $ 0.64 F-91 $500,001 to $1,000,000; 1st $500,000 $ 559.21 $ 564.80 F-92 $500,001 to $1,000,000; each additional $1,000 or fraction thereof $ 0.62 $ 0.63 F-93 $1,000,000 and up; 1st $1,000,000 $ 872.17 $ 881.89 F-94 $1,000,000 and up; each additional $1,000 or fraction thereof $ 0.36 $ 0.36 F-95 Plan Review Fee Exception (Standard Production Units after model unit has been reviewed are charged at % of Fire Plan Review fee for first model unit. Changes are to 26% of Plan
Review Fee
27% of Plan
Review Fee
F-96 Alternative Materials and Methods of Construction - Application Fee - Minimum 2-hour review deposit required
Actual Cost
(FBHR)
F-252 at 2-hour
Minimum
F-96.1 Alternative Materials and Methods of Construction - Plan Review Fee (remaining fee) Actual Cost Less Application
Fee
The Following Notes Apply to All Fire Construction Permits:
For plan and permit scanning costs, see "Document Production, Processing & Retrieval" (F-128 and F-129)
Technology automation fees applies to all development permit/plan check/inspection (F-135)
For plan review and inspection hourly charges, see "Emergency Response Charges" (F- 252)
NEW OPERATIONAL PERMIT (per permit)
F-97 Plan Check/Application Code Review $ 195 $ 197 F-98 Inspection $ 97 $ 98 Master Fee and Charges Schedule
Fire
35 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
FIRE/LIFE SAFETY INSPECTION [26]
F-99 Self-Inspection Report - Third Party Processing Fee $ 16 $24.95 or Actual Cost
F-100 Up to 2,000 sq. ft. $ 116 $ 117 F-101 2,001 - 10,000 sq. ft. $ 301 $ 304 F-102 Over 10,000 sq. ft. $ 430 $ 433 F-105 Repeat Inspection Attempts Violation - Minimum half an hour required Actual Cost, but subject to 50% of
F-252 Minimum
F-106 Additional for New Occupancy/Tenant Inspection [17,26] $ 147 $ 147 PETROCHEM INSPECTIONS [26]
F-107 Oil/Gas/Injection Well Abandonment Plan Check $ 585 $ 591 F-108 Oil/Gas/Injection Well Abandonment Inspection $ 585 $ 591 F-109 Oil/Gas/Injection Well Vent Inspection - per well $ 585 $ 591 F-110 Oil/Gas/Injection Well Activation Plan Check/Permit $ 292 $ 295 F-111 Oil/Gas/Injection Well Activation Plan Check/Permit - per additional well $ 97 $ 98 F-112 Oil/Gas/Injection Well Activation Inspection $ 195 $ 197 F-113 Oil/Gas/Injection Well Activation Inspection - per additional well $ 97 $ 98 F-114 Oil Well Gas Monitoring Inspection $ 195 $ 197 F-115 Existing Oil/Gas/Injection Well - Minimum half an hour required $ 292 Actual Cost, but subject to 50% of
F-252 Minimum
F-116 Existing Oil/Gas/Injection Well Inspection - per additional well $ 49 $ 49 F-117 Oil Well Re-inspection - per well $ 147 $ 147
STATE MANDATED INSPECTIONS
F-118 Convalescent / Care Facility Inspections Actual Cost Actual Cost F-119 Hospitals / Medical Facility Inspections Actual Cost Actual Cost F-120 Private School Inspections Actual Cost Actual Cost High Rise Inspections
F-121 7 stories (base fees) Actual Cost Actual Cost F-122 Per floor above 7 stories Actual Cost Actual Cost Hotel, Motel & Multifamily Inspections [26]
F-123 Up to 3 Units (base fee) $ 38 $ 39 F-124 per additional unit over 3 units $ 1.61 $ 1.63 F-125 Large Family Day Care Inspections $ 351 $ 355 Master Fee and Charges Schedule
Fire
36 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
F-126 Fire Clearance Pre-Inspection for State License - Minimum .5 hour $50 or Current State Fee
Actual Cost or
50% of F-252
Minimum
Fire Clearance Pre-Inspection for State License
F-126 1 to 25 persons (Fee Set by State) $50 or current State Fee
$50 or current
State Fee
F-127 26 or more persons (Fee Set by State) $100 or current State Fee
$100 or current
State Fee
Master Fee and Charges Schedule
Fire
37 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
DOCUMENT PRODUCTION, PROCESSING & RETRIEVAL
F-128 Record Retention Fee - Each sheet of permitted drawings $ 4.04 $ 4.10 F-129 Record Retention fee - Each Issued permit $ 1.04 $ 1.05 F-130 Refund Processing Fee $ 80 $ 81 F-131 Reactivate permit for projects expired LESS than 6 months (plus penalty) $ 53 $ 54 F-132 Penalty 50% of new
inspection fee
51% of new
inspection fee
F-133 Reactivate permit for projects expired GREATER than 6 months (plus penalty) $ 53 $ 54 F-134 Penalty 100% of new
inspection fee
101% of new
inspection fee
F-135 Technology Automation Fee 6% 7%
SPECIAL SERVICES FEES & CONDITIONS (See Conditions 1-4 below) F-136 Inspection Outside of Normal Work Hours - Hourly Rate [1,3,4] $195/Hr, 2 Hour Minimum
1.5 times F-252
at 2-Hour
F-137 Inspection During Normal Work Hours - Hourly Rate [1,2] $ 195 $ 197 F-138 Plan Review Outside Normal Work Hours - Hourly Rate [1,3,4] $195/Hr, 2 Hour Minimum
1.5 times F-252
at 2-Hour
F-139 Plan Review During Normal Work Hours - Hourly Rate [1,2] $ 195 $ 197 F-140 Investigation Charge (work without a permit) [6] 2X Permit Fee 2X Permit Fee F-141 Administrative Processing for Consultant Work $ 97 $ 98 Fire - Marine Safety - User Fees
JUNIOR LIFEGUARD PROGRAM FEES
F-142 Resident Fees Charged $ 654 $ 654 F-143 Non-Resident Fees Charged $ 681 $ 681 F-143.3 Sand Crab (resident and non-resident) $ 240 $ 240 Central Net Training Center-User Fees [11]
ASSEMBLY-CLASSROOM #1/ 50-100
F-144 Safety Rate ($0-$11,999)- per hour 50$ 80$ F-145 10% Reduced Rate ($12,000-$24,000)- per hour 45$ 45$ F-146 20% Reduced Rate ($25,000-$39,999)- per hour 40$ 40$ F-147 30% Reduced Rate ($40,000- Plus)- per hour 35$ 35$ F-148 Commercial - per hour 55$ 88$
CLASSROOM #2 / 18-35
F-149 Safety Rate ($0-$11,999)- per hour 35$ 45$ F-150 10% Reduced Rate ($12,000-$24,000)- per hour 30$ 30$ F-151 20% Reduced Rate ($25,000-$39,999)- per hour 25$ 25$ F-152 30% Reduced Rate ($40,000- Plus)- per hour 20$ 20$ F-153 Commercial - per hour 35$ 50$
CLASSROOM #4 / 42
F-154 Safety Rate ($0-$11,999)- per hour 40$ 60$ F-155 10% Reduced Rate ($12,000-$24,000)- per hour 35$ 35$ F-156 20% Reduced Rate ($25,000-$39,999)- per hour 30$ 30$ F-157 30% Reduced Rate ($40,000- Plus)- per hour 25$ 25$ F-158 Commercial - per hour 45$ 67$
Master Fee and Charges Schedule
Fire
38 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
CLASSROOM #5 / 22
F-159 Safety Rate ($0-$11,999)- per hour 25$ 35$ F-160 10% Reduced Rate ($12,000-$24,000)- per hour 20$ 20$ F-161 20% Reduced Rate ($25,000-$39,999)- per hour 17$ 17$ F-162 30% Reduced Rate ($40,000- Plus)- per hour 15$ 15$ F-163 Commercial - per hour 25$ 39$
EXECUTIVE BOARDROOM / 12
F-164 Safety Rate ($0-$11,999)- per hour 75$ 75$ F-165 10% Reduced Rate ($12,000-$24,000)- per hour 70$ 70$ F-166 20% Reduced Rate ($25,000-$39,999)- per hour 60$ 60$ F-167 30% Reduced Rate ($40,000- Plus)- per hour 50$ 50$ F-168 Commercial - per hour 90$ 90$
DRILL GROUNDS & TOWER
F-169 Safety Rate ($0-$11,999)- per hour 75$ 150$ F-170 10% Reduced Rate ($12,000-$24,000)- per hour 70$ 70$ F-171 20% Reduced Rate ($25,000-$39,999)- per hour 60$ 60$ F-172 30% Reduced Rate ($40,000- Plus)- per hour 50$ 50$ F-173 Commercial - per hour 90$ 167$
TOWER & BURN ROOMS
F-174 Safety Rate ($0-$11,999)- per hour 475$ 150$ F-175 Safety Rate ($0-$11,999)- per full day 700$ 700$ F-176 10% Reduced Rate ($12,000-$24,000)- per 1/2 day 425$ 425$ F-177 10% Reduced Rate ($12,000-$24,000)- per full day 630$ 630$ F-178 20% Reduced Rate ($25,000-$39,999)- per 1/2 day 370$ 370$ F-179 20% Reduced Rate ($25,000-$39,999)- per full day 575$ 575$ F-180 30% Reduced Rate ($40,000- Plus)- per 1/2 day 325$ 325$ F-181 30% Reduced Rate ($40,000- Plus)- per full day 500$ 500$ F-182 Commercial- per 1/2 day 550$ 550$ F-183 Commercial- per full day hour 835$ 167$
DRILL GROUNDS
F-184 Safety Rate ($0-$11,999)- per hour 55$ 75$ F-185 10% Reduced Rate ($12,000-$24,000)- per hour 50$ 50$ F-186 20% Reduced Rate ($25,000-$39,999)- per hour 45$ 45$ F-187 30% Reduced Rate ($40,000- Plus)- per hour 30$ 30$ F-188 Commercial - per hour 65$ 83$
TOWER (NO BURNING)
F-189 Safety Rate ($0-$11,999)- per hour 55$ 75$ F-190 10% Reduced Rate ($12,000-$24,000)- per hour 50$ 50$ F-191 20% Reduced Rate ($25,000-$39,999)- per hour 45$ 45$ F-192 30% Reduced Rate ($40,000- Plus)- per hour 30$ 30$ F-193 Commercial - per hour 65$ 83$
DRAFTING / TEST PIT
F-194 Safety Rate ($0-$11,999)- per hour 20$ 30$ F-195 10% Reduced Rate ($12,000-$24,000)- per hour 18$ 18$ F-196 20% Reduced Rate ($25,000-$39,999)- per hour 16$ 16$ F-197 30% Reduced Rate ($40,000- Plus)- per hour 14$ 14$ F-198 Commercial - per hour 25$ 33$
FLASHOVER TRAINING
F-199 Safety Rate ($0-$11,999)- per burn session 475$ 500$ F-200 10% Reduced Rate ($12,000-$24,000)- per burn session 450$ 450$ F-201 20% Reduced Rate ($25,000-$39,999)- per burn session 425$ 425$ F-202 30% Reduced Rate ($40,000- Plus)- per burn session 400$ 400$ F-203 Commercial - per burn session 500$ 556$ ENTIRE FACILITY (Private, may include one burn day)
F-204 Safety Rate ($0-$11,999)- full day 1,000$ 1,000$ F-205 10% Reduced Rate ($12,000-$24,000)- full day 900$ 900$ F-206 20% Reduced Rate ($25,000-$39,999)- full day 800$ 800$ F-207 30% Reduced Rate ($40,000- Plus)- full day 700$ 700$ F-208 Commercial - full day 1,000$ 1,111$ Master Fee and Charges Schedule
Fire
39 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
ALL OUTSIDE AREA
F-209 Safety Rate ($0-$11,999)- per hour 90$ 75$ F-210 10% Reduced Rate ($12,000-$24,000)- per hour 85$ 85$ F-211 20% Reduced Rate ($25,000-$39,999)- per hour 75$ 75$ F-212 30% Reduced Rate ($40,000- Plus)- per hour 65$ 65$ F-213 Commercial- per hour 115$ 83$
VENTILATION WOOD PROP
F-219 Safety Rate ($0-$11,999)- plus Material cost and clean up 65$ 75$ F-220 10% Reduced Rate ($12,000-$24,000)- plus Material cost and clean up 65$ 65$ F-221 20% Reduced Rate ($25,000-$39,999)- plus Material cost and clean up 65$ 65$ F-222 30% Reduced Rate ($40,000- Plus)- plus Material cost and clean up 65$ 65$ F-223 Commercial - plus Material cost and clean up 65$ 83$
BURN CADRE & IAP CREATION
F-263 Safety Rate ($0-$11,999)- per hour 200$ 200$ F-264 10% Reduced Rate ($12,000-$24,000)- per hour 180$ 180$ F-265 20% Reduced Rate ($25,000-$39,999)- per hour 160$ 160$ F-266 30% Reduced Rate ($40,000- Plus)- per hour 140$ 140$ F-267 Commercial- per hour 250$ 250$
BURN PACKAGE
F-270 Safety Rate - per day $200 per Hour $2,775 per Day F-271 Commercial - per day $200 per Hour $2,775 per Day OTHER
F-270 Burn Packing & Cleaning- 1/2 day 150$ 150$ F-271 Burn Packing & Cleaning- Full day 200$ 200$ F-272 Coffee - per 25 attendees per day 20$ 20$ F-273 Copies - B&W 0.20$
F-274 Copies - Color 0.60$
F-275 Lead Instructor Wage - per hour $76.27 or Refer
to Current
RSCCD Beyond
Contract/Overhe
ad Part-Time
Salary Schedule
F-276 Assistant Instructor Wage - per hour $68.64 or Refer to Current
RSCCD Beyond
Contract/Overhe
ad Part-Time
Salary Schedule
CUPA Program- Hazardous Materials Review and Inspection [17] Annual Fee by Quantity Ranges:
F-224 1 chemical 341$ 341$
F-225 2-5 chemicals 488$ 488$
F-226 6-10 chemicals 780$ 780$
Master Fee and Charges Schedule
Fire
40 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
F-227 11-15 25 chemicals 975$ 975$
F-228 16-20 26 and above chemicals chemicals 1,268$ 1,658$ F-229 21-25 chemicals 1,366$ 1,366$
F-230 26-30 chemicals 1,463$ 1,463$
F-231 31-35 chemicals 1,560$ 1,560$
F-232 36 and above chemicals 1,658$ 1,658$ F-229 Late fee [6] 150$ 150$
Fire - EMS Fees
Placeholder for Master Fee Schedule [10]
Master Fee and Charges Schedule
Fire
41 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
FALSE ALARM RESPONSE/NON-EMERGENCY SERVICE CALLS (RESIDENTIAL &
COMMERCIAL)
F-233 1 or 2 in 12-month period (No charge 1st 2 in 12 months) [28] $ - $ - F-234 3 in 12-month period [28] $ 146 $ 146 F-235 4 in 12-month period [28] $ 297 $ 297 F-236 5 in 12-month period [28] $ 594 $ 594 F-237 Each additional False Alarm Response over 5 in 12-month period [28] $ 740 $ 740 F-238 Response
SPECIAL/ SPECIFIC EVENTS Plan Review/ Inspection [20]
F-239 Up to 750 sq. ft. event area [17, 14] $ 274 $ 274 F-240 750 - 5,000 sq. ft. event area [17, 14] $ 367 $ 367 F-241 5,001 - 25,000 sq. ft. event area [18, 15] $ 549 $ 549 F-242 25,001 - 50,000 sq. ft. event area [18, 15] $ 1,650 $ 1,650 F-243 > 50,000 sq. ft. event area (base fee) [18, 15] $ 2,732 $ 2,732 F-244 Per 2,000 sq. ft. > 50,000 sq. ft. [18, 15] $ 91 $ 91
EMERGENCY RESPONSE CHARGES
F-245 Accident/Incident Response Actual Cost Actual Cost F-246 DUI Accident Response Actual Cost Actual Cost
F-247 Hazardous Materials Clean-up Actual Cost Actual Cost F-248 Water / Flood Pumping & Clean-up Actual Cost Actual Cost F-249 Urban Search and Rescue (USAR) Actual Cost Actual Cost Hourly Rates (any other services not identified elsewhere in this fee schedule will be billed at the hourly rate):
F-250 Paramedic Engine Company (4 person) $ 569 $ 603 F-251 Truck Company (4 person) $ 569 $ 603 F-252 Fire Prevention $ 195 $ 197 F-253 Marine Safety $ 109 $ 109 F-254 Marine Safety - Seasonal/Part-Time $ 23 $ 23 F-255 Emergency Transport Unit (2 EMT/ Vehicle Operators) $ 296 $ 314 F-256 Hazmat (4 person) $ 569 $ 603 F-257 Fire Personnel Actual Cost Actual Cost
F-258 Consultant Fee (Final consultant fee charges based on actual per hour charges) Actual Cost Actual Cost Master Fee and Charges Schedule
Fire
42 Fire - User Fees & Charges
No. Description Adopted Fee Proposed Fee
F-259 Subpoena Appearance (fee set by Court) $ 275 $ 275 F-260 Subpoena Request for Records (fee set by Court) $ 15 $ 15 F-261 California Fire Code (CFC) Maintenance Testing and Inspection Report Submittal $12 per CFC regulated
features for each
submission or
actual cost
$25.95 per CFC
regulated
features for each
submission or
actual cost
F-262 Report Submission for Inspection, Test, and Maintenance (ITM) of Installed Fire Protection Systems - Late Fee (per month, starting at 90 days overdue) $ 15 $ 15
Lifeguard Tower Advertising Fees
F-263 Top $23,301 per
year
$23,301 per
year
F-264 Premium $15,534 per
year
$15,534 per
year
F-265 Base $7,767 per year $7,767 per year
F-266 Smaller Towers $3,700 per year $3,700 per year
For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Notes
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
[11]
[13]
[14]
[15]
[16]
[18]
[19]
[20]
[21]
[22]
[23]
[24]
[25]
[26]
[27]
[28]
Condition 3 -- When the special service is provided as overtime as per the employee's MOU Condition 4 -- When the special service is provided as overtime on a normal day off or a typical City holiday, as defined in the City's current Memorandum of Understanding (MOUS)
**Note: Most of these cannot be broken down individually because they involve multiple unites/recourses, such as DUI Accident Response or Hazmat Unit Response.
Penalty; not included in cost analysis
Previous fee covered both plan check and inspection
Condition 1 -- The payment of such fees shall be in addition to other required fees Condition 2 -- When the special services is provided during normal work hours, the fee shall be based on the actual time expended, but not less than one-half (1/2) hour Deposit for staff time, plus Consultant deposit based on consultant estimate; actual costs using FBHR and consultant costs Fee is listed on HBFD fee schedule; however was not collected, therefore current revenue reflects $0 Emergency Medical Service fees are approved separately using transportation fees adopted by the Orange County Emergency Medical Services Agency and through research by staff for other cost-associated fees.
Fees not included in cost analysis; per Prop 26 - market sensitive, included in fee comparison survey; Per City - no recommended fee changes at this time.
Actual Costs - using the Fully Burdened Hourly Rates (FBHR), plus any outside consultant costs if applicable Includes 2 plan reviews; additional plan checks will be billed at the adopted hourly rate Includes 3 plan reviews; additional plan checks will be billed at the adopted hourly rate Includes 4 plan reviews; additional plan checks will be billed at the adopted hourly rate Includes up to 3 inspections; additional inspections may be billed at the adopted hourly rate One temporary operational permit included. Each additional operational permit is billed at the adopted rates.
Includes fire and life safety inspection for common and commercial areas. If the structure meets the definition of "high rise," the "high rise" fee applies in lieu of this fee.
Multi-tenant commercial/industrial inspection is conducted for common fire features that are the responsibility of the building complex, mall owner or management company including egress, sprinklers, alarms, private fire hydrants, and emergency access.
False alarms include (1) system or detector malfunction, including improper performance of fire alarm system that is not a result of a proper system response to environmental stimuli such as smoke or high heat conditions; and (2) unintentional system or detector operation (no fire), includes tripping an interior device unintentionally. Non-emergency service calls include (1) lock-ins (non-emergency), (2) smoke or odor removal (no fire), (3) removal of a victim from a stalled elevator that has known mechanical issues; (4) other abuses of Fire Department services for repeat non-emergency conditions (excludes medical).
Current Fee Amount assumed at 50% Plan Check and 50% Inspection. Current practice does not delineate between PC and Insp fee amounts.
Review time exceeding initial hours assumed for establishing deposit is billed at hourly rate Fire/Life Safety Inspection Fees based on square footage also apply Staff recommend fee consistent with Building department Technology Automation fee added to all development, permit and prevention related fees.
Master Fee and Charges Schedule
Fire
43 Library Card Fees
L-1 Replacement Card $ 5 $ 5 L-2 Replacement Card - Children's $ 5 $ 5 Material processing fees and Media Rental Charges
The Director of Library Services has the authority to waive fines and penalties, up to $25.
Processing Fees:
L-6 Processing Fee (for lost materials) $ 5 $ 5 L-7 Processing Fee (for damaged materials) $ 5 $ 5 L-8 Processing Fee (for replacement materials) $ 5 $ 5 Damaged Materials Fees:
L-9 Damaged Audiobook CD $ 15 $ 15 L-10 Damaged Audiobook case $ 10 $ 10 L-11 Damaged music CD case $ 1 $ 1 L-12 Damaged DVD/Video case $ 2 $ 2 L-13 Damaged Radio Frequency ID tag $ 2 $ 2 L-14 Damaged Chromebook $ - $ - L-15 Actual Replacement Cost actual cost actual cost
Reserve Request Fees:
L-16 Interlibrary loan request - book $ 6 $ 6 L-17 Interlibrary loan request - microfilm $ 6 $ 6 Facility Rental Charges (per hour unless otherwise noted) [1] L-21 Includes: Central Library, room rentals, Theater rentals [3] N/A N/A Small Study Room Rentals $ 5 $ 5 Cleaning/Security Deposit
L-22 Theaters, Rooms C&D combined, Talbert Room $ 500 $ 500 L-23 Maddy, B, C, D, E Rooms $ 300 $ 300 L-24 Technician Fee for Theater per hour $ 40 $ 40 Alcohol Use/Liability insurance
L-25 Under 100 persons in attendance
L-26 Over 100 persons in attendance
L-27 Setup/Takedown Charge (charged in addition to room rental rate) $ 85 $ 85 L-28 Setup/Takedown Charge Rooms C&D (mandatory; charged in addition to room rental rates)) $ 150 $ 150 L-29 Cleaning Services (hourly) $ 65 $ 65 Reservations and Cancellations Policy
L-30 Standard Cancellation Fee (plus 10% of total room rental x number of months reservation held) $ 50 $ 50 L-31 Less than 20 days (Penalty) Entire Rental
Charge
Entire Rental
Charge
L-32 Date Change $ 30 $ 30 L-33 Security staff - minimum of 1 for up to 100 people (City requirement) - per hour $ 30 $ 30 Library - User Fees
Proposed Fee No. Description Adopted Fee
Master Fee and Charges Schedule
Library
44 Library - User Fees
Proposed Fee No. Description Adopted Fee
HOURLY RATEs
L-34 Full-time $ 143 $ 143 L-35 Part-time $ 36 $ 36 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Notes
[1] Charges for use of City Facilities may be waived for City sponsored and Co-sponsored programs & events
[3] Facility Rentals - not included in cost analysis; market based; no change in rates recommended; Revenues sourced from FY 14 Trial Balance
Master Fee and Charges Schedule
Library
45 Adopted
Charges
Proposed
Charges
Cleaning/Security Deposit
L-22 Theaters, Rooms C&D combined, Talbert Room
Without Alchohol $ 500 $ 500 With Alcohol Additional $200
L-23 Maddy, B, C, D, E, Balboa Rooms
Without Alchohol $ 300 $ 300 With Alcohol Additional $200
L-24 Technician Fee for Theater per hour per technician $ 40 $ 40 Room Rental with Alcohol Additional $20 per
hour
Additional $20 per
hour
Setup/Takedown
L-27 Setup/Takedown Charge (charged in addition to room rental rate) $ 85 $ 85 L-28 Setup/Takedown Charge - Rooms C&D (mandatory; charged in addition to room rental rates)
$ 150 $ 150
L-29 Cleaning Services (hourly) $ 65 $ 65 Reservations and Cancellations Policy
L-30 Standard Cancellation Fee (plus 10% of total room rental x number of months reservation held)
$ 50 $ 50
L-31 Less than 20 days (Penalty) in advance of event date Entire Rental Charge
Entire Rental
Charge
L-32 Date Change $ 30 $ 30 L-33 Security staff - minimum of 1 for up to 100 people (City requirement) - per hour per staff.
$ 30 $ 30
Facility Rental Charges (per hour unless otherwise noted) Small Study Rooms 5.00$ 5.00$
B Room Non Profit (501c3) - Residential 50.00$ 50.00$ Non Profit (501c3) - Non Residential 60.00$ 60.00$ Business/private - Residential 80.00$ 80.00$ Business/private - Non Residential 90.00$ 90.00$ Balboa Room Non Profit (501c3) - Residential 50.00$ 50.00$ Non Profit (501c3) - Non Residential 60.00$ 60.00$ Business/private - Residential 80.00$ 80.00$ Business/private - Non Residential 90.00$ 90.00$ C Room (piano) Non Profit (501c3) - Residential 85.00$ 100.00$ Non Profit (501c3) - Non Residential 95.00$ 110.00$ Business/private - Residential 120.00$ 135.00$ Business/private - Non Residential 135.00$ 150.00$ D Room Non Profit (501c3) - Residential 85.00$ 100.00$ Non Profit (501c3) - Non Residential 95.00$ 110.00$ Business/private - Residential 120.00$ 135.00$ Business/private - Non Residential 135.00$ 150.00$ C/D Room Non Profit (501c3) - Residential 145.00$ 160.00$ Non Profit (501c3) - Non Residential 175.00$ 190.00$ Business/private - Residential 210.00$ 225.00$ Business/private - Non Residential 240.00$ 255.00$ Central Library Theater and Meeting Room Rental Charges [1] Library - Charges
Master Fee and Charges Schedule
Library-Charges
46 Adopted
Charges
Proposed
ChargesCentral Library Theater and Meeting Room Rental Charges [1] Library - Charges
C/D Room
flat rate package Non Profit (501c3) - Residential 800.00$ 960.00$ 8 hour maximum Non Profit (501c3) - Non Residential 945.00$ 1,140.00$ Business/private - Residential 1,155.00$ 1,350.00$ Business/private - Non Residential 1,315.00$ 1,530.00$ E Room Non Profit (501c3) - Residential 50.00$ 50.00$ Non Profit (501c3) - Non Residential 60.00$ 60.00$ Business/private - Residential 70.00$ 70.00$ Business/private - Non Residential 80.00$ 80.00$ Maddy Room Non Profit (501c3) - Residential 60.00$ 60.00$ Non Profit (501c3) - Non Residential 80.00$ 80.00$ Business/private - Residential 95.00$ 95.00$ Business/private - Non Residential 110.00$ 110.00$ Talbert Room Non Profit (501c3) - Residential 95.00$ 95.00$ Non Profit (501c3) - Non Residential 105.00$ 105.00$ Business/private - Residential 145.00$ 145.00$ Business/private - Non Residential 155.00$ 155.00$ Library Theater Non Profit (501c3) - Residential 120.00$ 135.00$ Monday-Thursday Non Profit (501c3) - Non Residential 150.00$ 165.00$ Business/private - Residential 220.00$ 235.00$ Business/private - Non Residential 240.00$ 255.00$ Library Theater Non Profit (501c3) - Residential 150.00$ 165.00$ Friday,Saturday,Sunday Non Profit (501c3) - Non Residential 185.00$ 200.00$ Business/private - Residential 335.00$ 350.00$ Business/private - Non Residential 365.00$ 380.00$ Tabby Theater Non Profit (501c3) - Residential 80.00$ 80.00$ Non Profit (501c3) - Non Residential 100.00$ 100.00$ Business/private - Residential 170.00$ 170.00$ Business/private - Non Residential 200.00$ 200.00$ [1] Charges for use of City Facilities may be waived for City or Library sponsored or co-sponsored events, per Resolution 2014-15.
Master Fee and Charges Schedule
Library-Charges
47 CS-28 Specific Events [1]
Application Fee
Under 2,000 Estimated Overall Attendance $ 225.00 $ 225.00 Over 2,000 Estimated Overall Attendance $ 450.00 $ 450.00 Other Department Staff Charges As Applicable As Applicable CS-29 Special Events [1]
Application Fee $ 110.00 $ 110.00 Other Department Staff Charges As Applicable As Applicable CS-30 Ticketed Event Fee (based on ticket price charged by event operator) $0 - $50.00 $2 per ticket
$51.00 - $200.00 $4 per ticket
$201.00 + $6 per ticket
Hourly Rate:
Community Services $ 136 $ 136 For services requested of City staff which have no fee listed in this fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this department/division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application.
Notes
[1] Fees for City Sponsored or Co-Sponsored programs & events may be waived per Resolution 2014-16 Community Services - User Fees
Proposed Fee No. Description Adopted Fee
Master Fee and Charges Schedule
Community Services
48 FACILITIES
Group I = City Department Activity
Group II = City Department Co-Sponsored Activity
Group III = Civic and Nonprofit Organizations
Group IV = Residents or misc. HB Groups (2-hr min)
Group V = Non-Residents (2-hr. min)
Group VI = Commercial, Business, For Profit (2-hr min)
Facility Reservation Change Fee $10.00 $10.00
Facility Reservation Cancellation Fee $25.00 $25.00
Room Rental Security Deposit varies (up to $1,000
maximum)
varies (up to $1,000
maximum)
Room Set up & Cleaning Charge N/A Varies (up to $350
maximum)
Additional Staffing $20.00/staff/hour $20.00/staff/hour Alcohol Filing Fee $5.00 $5.00
Edison/Murdy Community Centers (hourly)
Hall A
Group I & II N/A N/A
Group III $55.00 $70.00
Group IV $65.00 $80.00
Group V $95.00 $110.00
Group VI $125.00 $140.00
Hall B
Group I & II N/A N/A
Group III $40.00 $55.00
Group IV $45.00 $60.00
Group V $65.00 $80.00
Group VI $80.00 $95.00
Hall C & D
Group I & II N/A N/A
Group III $40.00 $55.00
Group IV $45.00 $60.00
Group V $65.00 $80.00
Group VI $80.00 $95.00
Studio
Group I & II N/A N/A
Group III $40.00 $55.00
Group IV $45.00 $60.00
Group V $65.00 $80.00
Group VI $80.00 $95.00
Hall A & B
Group I & II N/A N/A
Group III $75.00 $75.00
Group IV $90.00 $90.00
Group V $140.00 $140.00
Group VI $175.00 $175.00
Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Master Fee and Charges Schedule
Community Services-Charges
49 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Hall A, B, C & D
Group I & II N/A N/A
Group III $95.00 $95.00
Group IV $120.00 $120.00
Group V $175.00 $175.00
Group VI $235.00 $235.00
Edison/Murdy Community Centers with Alcohol (additional hourly amount) N/A Hourly Rate + $10.00/hour
Kitchen $10/hour $10/hour
City Gym & Pool (hourly):
Gym & Lockers (1-40)
Group I & II N/A N/A
Group III $50.00 $65.00
Group IV $60.00 $75.00
Group V $85.00 $100.00
Group VI $115.00 $130.00
Gym & Lockers 41+
Group I & II N/A N/A
Group III $65.00 $65.00
Group IV $75.00 $75.00
Group V $110.00 $110.00
Group VI $145.00 $145.00
Pool & Lockers (1-25)
Group I & II N/A N/A
Group III $60.00 $75.00
Group IV $70.00 $85.00
Group V $100.00 $115.00
Group VI $135.00 $150.00
Room A
Group I & II N/A N/A
Group III $35.00 $50.00
Group IV $40.00 $55.00
Group V $55.00 $70.00
Group VI $70.00 $85.00
Room B
Group I & II N/A N/A
Group III $40.00 $55.00
Group IV $45.00 $60.00
Group V $65.00 $80.00
Group VI $80.00 $95.00
Conference Room
Group I & II N/A N/A
Group III $20.00 $35.00
Group IV $25.00 $40.00
Group V $35.00 $50.00
Group VI $40.00 $55.00
Master Fee and Charges Schedule
Community Services-Charges
50 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Gym, Lockers (1-40), & 1 Room
Group I & II N/A N/A
Group III $60.00 $60.00
Group IV $75.00 $75.00
Group V $110.00 $110.00
Group VI $145.00 $145.00
Gym, Lockers (41+), & 1 Room
Group I & II N/A N/A
Group III $75.00 $75.00
Group IV $90.00 $90.00
Group V $135.00 $135.00
Group; VI $175.00 $175.00
Pool, Lockers (1-25),& 1 Room
Group I & II N/A N/A
Group III $70.00 $70.00
Group IV $85.00 $85.00
Group V $130.00 $130.00
Group VI $165.00 $165.00
Gym, Pool, Rooms A & B, & Lockers (1-25)
Group I & II N/A N/A
Group III $90.00 $90.00
Group IV $135.00 $135.00
Group V $195.00 $195.00
Group VI $270.00 $270.00
Gym, Pool, Rooms A & B, & Lockers (26+)
Group I & II N/A N/A
Group III $105.00 $105.00
Group IV $150.00 $150.00
Group V $230.00 $230.00
Group VI $305.00 $305.00
City Gym Half Court Rentals
Group I & II N/A N/A
Group III N/A $38.00
Group IV N/A $43.00
Group V N/A $55.00
Group VI N/A $70.00
Kitchen $10/hour $10/hour
Pool Lifeguard (hourly) $25.00/staff/hour $25.00/staff/hour Master Fee and Charges Schedule
Community Services-Charges
51 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Memorial Hall (hourly):
Group I & II N/A N/A
Group III $25.00 $40.00
Group IV $30.00 $45.00
Group V $55.00 $70.00
Group VI $75.00 $90.00
Senior Center in Central Park (hourly except as noted below) Parkview Room, Stage & Patio included*
*6 hour minimum rental: Fri. after 3 pm, Sat. & Sun. all day Group I & II N/A N/A
Group III $130.00 $145.00
Group IV $180.00 $195.00
Group V $210.00 $225.00
Group VI $280.00 $295.00
Parkview Room South, stage included
Group I & II N/A N/A
Group III $80.00 $95.00
Group IV $100.00 $115.00
Group V $120.00 $135.00
Group VI $160.00 $175.00
Parkview Room North, patio included
Group I & II N/A N/A
Group III $80.00 $95.00
Group IV $100.00 $115.00
Group V $120.00 $135.00
Group VI $160.00 $175.00
Note: Parkview Rooms available separately Mon-Thurs, Friday until 3:00 pm Edinger Medical Group -- Room 1
Group I & II N/A N/A
Group III $50.00 $65.00
Group IV $70.00 $85.00
Group V $80.00 $95.00
Group VI $100.00 $115.00
Edinger Medical Group -Room 2
Group I & II N/A N/A
Group III $40.00 $55.00
Group IV $60.00 $75.00
Group V $70.00 $85.00
Group VI $90.00 $105.00
Game Room
Group I & II N/A N/A
Group III $50.00 $65.00
Group IV $70.00 $85.00
Group V $80.00 $95.00
Group VI $100.00 $115.00
Master Fee and Charges Schedule
Community Services-Charges
52 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Dance Room
Group I & II N/A N/A
Group III $50.00 $65.00
Group IV $70.00 $85.00
Group V $80.00 $95.00
Group VI $100.00 $115.00
Group Exercise Room
Group I & II N/A N/A
Group III $50.00 $65.00
Group IV $70.00 $85.00
Group V $80.00 $95.00
Group VI $100.00 $115.00
Computer Lab Room
Group I & II N/A N/A
Group III N/A $65.00
Group IV N/A $85.00
Group V N/A $95.00
Group VI N/A $115.00
Kitchen (vendor use with room rental only)
Group I & II N/A N/A
Group III $20.00 < 4 hours
$100 flat fee > 4 hours
$20.00 < 4 hours
$100 flat fee > 4 hours
Group IV $20.00 < 4 hours
$100 flat fee > 4 hours
$20.00 < 4 hours
$100 flat fee > 4 hours
Group V $20.00 < 4 hours
$150 flat fee > 4 hours
$20.00 < 4 hours
$150 flat fee > 4 hours
Group VI $20.00 < 4 hours
$150 flat fee > 4 hours
$20.00 < 4 hours
$150 flat fee > 4 hours
Additional Charges
Room Rental with alcohol Additional $20.00
per hour
Additional $20.00
per hour
(not available for Dance Room or Group Exercise Room)
Reduction for Group III Reduce 50% Mon - Thurs,
8:00 am to 10:00 pm;
based on availability
Reduce 50% Mon - Thurs,
8:00 am to 10:00 pm;
based on availability
Set-up & Cleaning Charge $25.00 - $350 flat fee $25.00 - $350 flat fee Event Accessories $10.00 - $300.00 per use $10.00 - $300.00 per use Wedding Package #1 (ceremony + reception) $3,000.00 flat fee $3,000.00 flat fee Wedding Package #2 (reception only) $1,900.00 flat fee $2,000.00 flat fee Art Center (hourly):
Multi-Purpose Room (hourly)
Group I & II N/A N/A
All Others $70/hour $70/hour
Multi-Purpose Room with Alcohol (additional hourly amount) Hourly Rate + $10.00/hour
Hourly Rate +
$10.00/hour
Master Fee and Charges Schedule
Community Services-Charges
53 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Technical assistance/Security during closed hours $15.00/hour $15.00/hour Galleries - Dinner Event $150.00/hour (5 hour min) $150.00/hour (5 hour min) Galleries - Wedding Reception $3,000.00 (8 hour max) $3,000.00 (8 hour max) Kitchen - Per Month $500.00 $500.00
Kitchen - Per Day $100.00 $100.00
Newland Barn (hourly):
Group I & II N/A N/A
Group III $45.00 $60.00
Group IV $75.00 $90.00
Group V $95.00 $110.00
Group VI $120.00 $135.00
Newland Barn with Alcohol (additional hourly amount) Hourly Rate + $10.00/hour
Hourly Rate +
$10.00/hour
Lake View Clubhouse (hourly):
Group I & II N/A N/A
Group III $20.00 $35.00
Group IV $25.00 $40.00
Group V $45.00 $60.00
Group VI $55.00 $70.00
Lake View Clubhouse with Alcohol (additional hourly amount) Hourly Rate + $10.00/hour
Hourly Rate +
$10.00/hour
Lake Park/Harbour View Clubhouse (hourly):
Group I & II No Charge No Charge
Group III $35.00 $50.00
Group IV $40.00 $55.00
Group V $65.00 $80.00
Group VI $85.00 $100.00
Lake Park/Harbour View Clubhouse with Alcohol (additional hourly amount) Hourly Rate + $10.00/hour
Hourly Rate +
$10.00/hour
Lake Park BBQ Facility $175.00
(nonprofit/resident)
$175.00
(nonprofit/resident)$275.00 (nonresident) $275.00 (nonresident) $375.00 (commercial) $375.00 (commercial)
Huntington Central Park
Amphitheater (daily rate)
Nonprofit/City Sponsored $150.00 $150.00
Park Site Reservation
Nonprofit/Resident $75.00 per day $75.00 per day
Nonresident $150.00 per day $150.00 per day
Commercial $250.00/day OR
$100.00/day + 10% gross
revenue -- whichever is
greater
$250.00/day OR
$100.00/day + 10% gross
revenue -- whichever is
greater
Band Stand
Nonprofit/City Sponsored $175.00 (daily rate) $175.00 (daily rate) Nonresident $250.00/day $250.00/day
Commercial $350.00/day $350.00/day
Youth Group Camping - Per Person/Per Night $4.00 $4.00
Master Fee and Charges Schedule
Community Services-Charges
54 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Jumper/ Bounce House/ Trailer with mounted Merry-Go-Round Permit $25.00 $25.00 Master Fee and Charges Schedule
Community Services-Charges
55 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Courts and Fields Rentals (hourly)
Edison/Murdy Tennis/Racquetball/Bocci Ball Courts Reservations Group I - City Department Activity N/A N/A
Group II - City Department Co-Sponsored Activity [1] N/A N/A Hourly Court Reservations Group III - HB Civic and HB Nonprofit Organizations/HB Organized 55+ Senior Groups
$4.00/hour + tournament
fees
$9.00 per hour or $81.00
per day
Group IV - Residents or Misc. HB Groups $4.00/hour + tournament fees
$9.00 per hour or $81.00
per day
Group V - Non-resident Groups/Nonprofit Organizations $4.00/hour + tournament fees
$18.00 per hour or
$108.00 per day
Group VI - Commercial, Business, For Profit (Tournaments, Camps, Clinics) $4.00/hour + tournament fees
$25.00 per hour or
$125.00 per day
Field/Practice Lights: Hope View $15.00 $15.00
Fields
Fields - Soccer/Softball/Artificial Turf Fields (Edison, Murdy, Worthy, Greer, Lamb - hourly)Field without Lights (hourly):
Adult/Youth $25.00 $25.00
Nonprofit Youth or Organized 55+ Seniors $15.00 $15.00
Field with Lights/Arena Field:
Adult/Youth $35.00 $35.00
Nonprofit Youth or Organized 55+ Seniors $25.00 $25.00
Field without Lights:
Group I - City Department Activity N/A N/A
Group II - City Department Co-Sponsored Activity [1] N/A N/A Group III - HB Civic and HB Nonprofit Organizations/HB Organized 55+ Senior Groups
$15.00 per hour $22.00 per hour or
$198.00 per day
Group IV - Residents or Misc. HB Groups $25.00 per hour $32.00 per hour or $238.00 per day
Group V - Non-resident Groups/Nonprofit Organizations $25.00 per hour $37.00 per hour or $285.00 per day
Group VI - Commercial, Business, For Profit (Tournaments, Camps, Clinics) $25.00 per hour $42.00 per hour or $342.00 per day
Field With Lights/Arena Field: Additional $10 per hour
Field with Lights/Arena Field:
Adult/Youth $35.00 $35.00
Nonprofit Youth or Organized 55+ Seniors $25.00 $25.00
Softball/Baseball Field Preparation Charge $25.00/field/per preparation
$25.00/field/per
preparation
Adventure Playground
Residents $4.00/person $4.00/person
Non-Residents/Groups $4.00/person $4.00/person
Adults/Chaperones No Charge No Charge
COMMUNITY SERVICES PROGRAMS
Tournaments 10% of gross receipts +
rental fees
10% of gross receipts +
rental fees
Youth Sports Programs/per participant:
Basketball $60.00 $60.00
Summer Basketball $60.00 $60.00
Shooting Stars Basketball $60.00 $60.00
Master Fee and Charges Schedule
Community Services-Charges
56 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Flag Football $60.00 $60.00
Baseball $60.00 $60.00
Volleyball $60.00 $60.00
Jr. Baseball/Softball, Basketball, Football $60.00 $60.00 Pee Wee Soccer, Basketball, T-Ball $60.00 $60.00
Youth Sports Clinics (per person): $60.00 $80.00 - $100.00 Youth Sports Leagues (per person): $60.00 $96.00 - $116.00 Recreation/Human Services Events (per person):
Pier Swim/with Shirt (pre-registration) $25.00 $30.00
Pier Swim/no Shirt (day of event) $25.00 $30.00
Surf Contest $40.00 $50.00
Family Camp Out $18.00/Space +
$12.00/participant
$25.00/Space +
$15.00/participant
Camp HB $180 - $200/week $205 - $225/week
Camp HB Extended Hours $35 - $50/week $35 - $50/week
Community Center Recreation Events & Material Fees $5.00 - $100.00 $5.00 - $100.00 Senior Center Dances & Events $5.00 - $50.00 $5.00 - $50.00 Master Fee and Charges Schedule
Community Services-Charges
57 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Instructional Recreation Classes/Workshops/Camps/Programs* Instructional Classes Processing Fee $6.00 maximum $6.00 maximum * Recreation events excepted
Sands Community Services Guide Advertising
Back Cover $3,500.00 $3,625.00
Inside Front Cover - Full page $3,200.00 $3,200.00
Inside Back Cover - Full Page $3,200.00 $3,200.00
Full Interior $3,000.00 $3,000.00
1/2 page $1,500.00 $1,500.00
1/4 page $1,000.00 $1,000.00
Inside Front Cover - 1/2 page $1,600.00 $1,600.00
Inside Back Cover - 1/2 page $1,600.00 $1,600.00
Aquatics Classes $85.00/session $85.00/session
(maximum) (maximum)
Aquatics Classes - Group (per lesson) N/A $10.00 - $15.00 Aquatics Classes - Private (per lesson) N/A $25.00 - $30.00 Senior Citizen Swim $2.00 $3.00
Recreation Swim $3.00 $4.00
Fitness Center Annual Membership (Senior Center in Central Park) Ages 50-79 $120.00 $120.00
Ages 80 + $80.00 $80.00
Art Center (per person):
Memberships
Friends/Family $60.00 $60.00
Student/Senior $40.00 $40.00
Supporter $150.00 $150.00
Sustaining $300.00 $300.00
Director's Circle $1,000.00 $1,000.00
Admission to Events
General $15.00 - $150.00 $15.00 - $150.00
Members Discount varies by event Discount varies by event Art Camp for Kids $160.00 - $300.00 $160.00 - $300.00
Fourth of July Independence Day Celebration
Parade Entry Application $300.00 - $3,000 $300.00 - $3,000 Non-Judged Exempt (marching bands, drum & bugle corps, mounted equestrian groups)
Exempt Exempt
Parade/Fireworks Bleacher Seats $10.00 - $50.00 $10.00 - $50.00 Pier Plaza Festival Vendor Booths $500 to $2,500 $500 to $2,500 Official 4th of July Merchandise $5.00 - $100.00 $5.00 - $100.00 Surf City Run
Children (12 years and under) $15.00 - $50.00 $15.00 - $50.00 Adults (13 years and over) $32.00 - $55.00 $32.00 - $55.00 VIP Package $25.00 - $50.00 $25.00 - $50.00
Master Fee and Charges Schedule
Community Services-Charges
58 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Specific Events
Day Use Charges (Daily)
Resident Nonprofit (501c3) $650.00 $650.00
Non Resident - Non Profit (501c3) $1,000.00 $1,000.00
Commercial $1,350.00 $1,350.00
Set-up/Take Down Charges (Daily)
Resident Non Profit (501c3) $ 325.00 $ 325.00 Non Resident - Non Profit (501c3) $ 500.00 $ 500.00 Commercial $ 675.00 $ 675.00 Mobile Stage Rental (transferred from Resolution 2014-16 schedule) $700.00 $700.00 Special Events
Day Use Charges (Daily)
Resident Non Profit (501c3) $375.00 $375.00
Non Resident - Non Profit (501c3) $425.00 $425.00
Resident $400.00 $400.00
Non Resident $500.00 $500.00
Commercial $550.00 $550.00
Set-up/Take Down Charges (Daily)
Resident Non Profit (501c3) $187.00 $187.00
Non Resident - Non Profit (501c3) $212.00 $212.00
Resident $200.00 $200.00
Non Resident $250.00 $250.00
Commercial $275.00 $275.00
Modified Day Use Charges
Minimum Hours/Use $325.00 $325.00
less than 3 hours with 20-50 participants that do not require any set-up and do not require additional staff time or city services. These events should not impact the beach public in any way.
Minimum Participants No Charge No Charge
less than 20 participants with no professional contracted services associated with event. These events do not require any set-up and do not require additional staff time or city services. These events should not impact the beach public in any way.
PARKING RATES
South Beach Attended Lots - Off-Peak Season
Auto, pickup truck, motorcycle $15.00/day $15.00/day
Autos with disabled person (DP ) placard $10.00 $10.00
Bus - 24 passengers or less $50.00/day $50.00/day
Bus - 25 passengers or more $100.00/day $100.00/day
Vehicles over 20 ft in length, including overhangs $15.00 per occupied space*
$15.00 per occupied
space*
Vehicles over 20 ft in length, inc overhangs, with disabled person (DP) placard $10.00 per occupied space*
$10.00 per occupied
space*
Master Fee and Charges Schedule
Community Services-Charges
59 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
South Beach Attended Lots - Peak Season [3]
Auto, pickup truck, motorcycle
Monday - Friday $15.00/day $15.00/day
Saturday & Sunday, Memorial and Labor Days $20.00/day $20.00/day Autos with disabled person (DP ) placard $10.00 $10.00
Bus - 24 passengers or less $50.00/day $50.00/day
Bus - 25 passengers or more $100.00/day $100.00/day
Vehicles over 20 ft in length, including overhangs
Monday - Friday $15.00 per
occupied space*
$15.00 per
occupied space*
Saturday & Sunday, Memorial and Labor Days $20.00 per
occupied space*
$20.00 per
occupied space*
Vehicles over 20 ft in length, inc overhangs, with disabled person (DP) placard $10.00 per occupied space*
$10.00 per
occupied space*
Fourth of July (flat rate) $30 for July 4th, plus
$25.00 flat rate for each of
two additional days
immediately preceding
and/or following July 4th
as selected by the
Director of Community &
Library Services
$30 for July 4th, plus
$25.00 flat rate for each of
two additional days
immediately preceding
and/or following July 4th
as selected by the
Director of Community &
Library Services
Air Show (daily flat rate) $30.00 until 5:00 pm $30.00 until 5:00 pm * Example: Three (3) occupied spaces x $20 per space = $60.00 Event Parking - Beach Lots (permitted events)**
Peak Season - Memorial Day weekend through Labor Day Weekend $15/day $15/day Non-Peak Season - After Labor Day through October 31 $10/day $10/day Non-Peak Season - March 1 until Memorial Day Weekend $10/day $10/day Off Season - November through the end of February $7/day $7/day ** Available only to Specific Event organizers for permitted events that take place annually and when participants will park in beach lots at full day rate.
Notes:
Beach Service Road Permit, Vendor Permit
Beach Service Road Permit, Vendor Permit $10.00/year $10.00/year Beach Service Road Replacement Pass $5.00 $5.00
Resident Meter Pass
Resident Meter Pass $10.00/year $20.00/year
Resident Meter Replacement Pass - Up to 4 max per dwelling unit $5.00 $5.00 Annual Beach Parking Permit [4]
Vehicles under 20 ft, including overhangs
General $195.00 $195.00
Senior (62+) (one pass per person) $100.00 $100.00
Disabled Person (DP) Placard $100.00 $100.00
Veterans (with proper identification) $125.00 $125.00
Oversize Vehicles, up to 40 feet total length $400.00 $400.00 [3] Peak season: Memorial Day weekend - Labor Day weekend.
Master Fee and Charges Schedule
Community Services-Charges
60 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Annual Beach Parking Replacement Pass $10.00 $10.00
Surf Class Parking Pass $5.00/Semester $5.00/Semester
(Students must furnish proof of school enrollment for the current semester) - pass is valid only during class/practice times and location as indicated on the permit submitted by the authorized school representative.
Huntington Beach RV Campground
Winter Camping (Day after Labor Day - May 31)
Recreational Vehicle (RV) plus auto $75.00/day Sun-Thurs $100.00/day Fri-Sat
and Holidays*
$75.00/day Sun-Thurs
$100.00/day Fri-Sat
and Holidays*
Senior (62+) $65.00/day Sun-Thurs
$90.00/day Fri-Sat and
Holidays*
$65.00/day Sun-Thurs
$90.00/day Fri-Sat and
Holidays*
With Disabled Person (DP) Placard $65.00/day Sun-Thurs
$90.00/day Fri-Sat and
Holidays*
$65.00/day Sun-Thurs
$90.00/day Fri-Sat and
Holidays*
Reservation Cancellation Fee (Greater than 2 days prior to arrival date) $25.00 $25.00 Reservation Cancellation Fee (2 or less days prior to arrival date) First Night's Daily Rate First Night's Daily Rate Change Fee $10.00 $10.00
Site Lock Fee $10/day $10/day
*Holiday Rates
Thanksgiving Week (Sunday preceding Thanksgiving through Saturday night following Thanksgiving) Christmas Week (day preceding Christmas through New Year's Eve) Day preceding Veterans Day (observed), Martin Luther King Jr. Day, Presidents' Day, Memorial Day Recreational Vehicle (RV) Event Camping Three-Day Air Show Pass (BY RESERVATION ONLY) Up to $1,600 (3 or 4 day
pass)
Up to $1,600 (3 or 4 day
pass)
(Valid Thursday of the Air
Show after 10 am through
Monday,10 am following
completion of the Air
Show)
(Valid Thursday of the Air
Show after 10 am through
Monday,10 am following
completion of the Air
Show)
Parking Lots
Bluff Top [5]
Hourly Rate (Off-Peak) [2] $3.00 $3.00
Hourly Rate (Peak Season) [3] $3.50 $3.50
Dog Beach [5]
Hourly Rate (Off-Peak) [2] $3.00 $3.00
Hourly Rate (Peak Season) [3] $3.50 $3.50
First and Atlanta [5]
Hourly Rate (Off-Peak) [2] $3.00 $3.00
Hourly Rate (Peak Season) [3] $3.50 $3.50
First and Walnut [5]
Hourly Rate (Off-Peak) [2] $3.00 $3.00
Hourly Rate (Peak Season) [3] $4.00 $4.00
Pier Plaza Parking (between 1st and 7th streets) [5]
Hourly Rate (Off-Peak) [2] $3.00 $3.00
Hourly Rate (Peak Season) [3] $4.00 $4.00
Daily Flat Rate $25.00 per
occupied space
$30.00 per
occupied space
Master Fee and Charges Schedule
Community Services-Charges
61 Community Services - Facility Rentals and Recreational Services Charges [1] Proposed ChargesDescription Adopted Charges
Sports Complex
Day Use $2.00 $2.00
Season Parking Pass $20.00 $20.00
Annual Parking Pass (3 seasons) $60.00 $60.00
Vehicles over 20 feet, including overhangs, Day Use $20.00 $20.00 Tournaments & Special Events $10.00 per day
(Director Discretion)
Warner
Hourly Rate (Off-Peak) [2] $3.00 $3.00
Hourly Rate (Peak Season) [3] $3.50 $3.50
Main Promenade Parking Structure
Daily Rates:
First 90 minutes No Charge No Charge
After 90 minutes $1.00 / Each 20 Minutes $1.00 / Each 20 Minutes (Off-Peak)
[3] $1.00 / Each 15 Minutes
(Peak Season)
Evening Rate: (After 9:00 pm) Prevailing Hrly Rate or
$5.00
Prevailing Hrly Rate or
$5.00
(Director Discretion) (Director Discretion)
Maximum Daily Rate - Off-Peak $15.00 $15.00
Maximum Daily Rate - Peak Season [3] $20.00 $20.00
Downtown Business Employee Pass $25.00/month $25.00/month Downtown Business Employee Daily Stamped Validation $2.00/day $4.00/day Main Promenade Parking Structure (4th of July Only) $30.00 $30.00 Main Promenade Parking Structure (two additional days immediately preceding and/or following July 4th as selected by the Director of Community & Library Services)
First 90 minutes No Charge No Charge
After 90 minutes $2.00 / Each 20 Minutes $2.00 / Each 20 Minutes Maximum Daily Rate $27.00 $30.00
Evening Rate: (After 9:00 pm) Prevailing Hrly Rate or
$10.00
Prevailing Hrly Rate or
$10.00
(Director Discretion) (Director Discretion)
Main Promenade Parking Structure (Three-Day Air Show Event) First 90 minutes No Charge No Charge
After 90 minutes $2.00 / Each 20 Minutes $2.00 / Each 20 Minutes Maximum Daily Special Event Rate $30.00 $30.00
Evening Rate: (After 9:00 pm) (Prevailing Hourly Rate or $10.00)
(Prevailing Hourly Rate or
$10.00)
(Director Discretion) (Director Discretion)
Main Promenade Parking Structure - Permitted Event Days (as selected by the Director of Community & Library Services)
First 90 minutes N/A No Charge
After 90 minutes N/A $2.00 / Each 20 Minutes
Maximum Daily Special Event Rate N/A $30.00
Evening Rate: (After 9:00 pm) N/A (Prevailing Hourly Rate or $10.00)
(Director Discretion)
Notes:
[2] No charge for autos with disabled placards (DP) in marked DP parking spaces. [3] Peak season: Memorial Day weekend - Labor Day weekend. [4] Valid at City beach parking lots, the Main Promenade Parking Structure, and metered spaces on Pacific Coast Highway & Beach Blvd . Exceptions include July 4th, two days immediately preceding and/or following July 4th as selected by the Director of Community & Library Services and three days of the Air Show.
[5] Additional $2.00 per hour on special event days including July 4th, two days immediately preceding and/or following July 4th as selected by the Director of Community & Library Services and three days of the Air Show. [1] Charges for City sponsored or co-sponsored programs & events may be waived per Resolution 2014-15 Master Fee and Charges Schedule
Community Services-Charges
62