HUNTINGTON BEACH
MOBILITY IMPLEMENTATION PLAN (MIP) – HB IN MOTION SUMMARY SEPT 2024

PROJECT GOALS
Better planning means we’re not wasting funds or any missed opportunities: This plan helps us look at streets differently, holistically instead of standalone. Not going back and adding elements. We avoid throwaway costs.

Better position for GRANTS: Almost every grant agency requires a plan as supporting documentation for projects.

Plan for the Future: Where bike lanes were once occupied exclusively by people on bikes, they are now home to people riding electric scooters, motorized skateboards, and micromobility devices (with new devices being introduced regularly).

WHY DO THIS?
 Improve citywide bicycle and
pedestrian network options
and safety for all users
 Improve the comfort and
design of the Beach Path for
all users
 Build upon the City’s long
term mobility pedestrian,
bicycle, and transit planning
efforts

FLEXIBLE APPROACH

BASED ON BIKE FACILITIES THAT ALREADY EXIST IN HB

CREATES TOOLKIT OF OPTIONS

ALLOWS FOR CONTEXTUAL SOLUTIONS

FLEXIBLE TO MEET BUDGET PRIORITIES
CAN BE INSTALLED AS A SMALL % OF RESURFACING

PROJECTS

Toolkit Mobility Implementation Plan
Bicycle
Treatments
Pedestrian
Treatments
Beach Path
Treatments

MEASURED APPROACH

BUILDS ON EXISTING BICYCLE FACILITIES

INCREMENTAL IMPROVEMENTS WITH PHASING PLAN

CLARITY IN THE NETWORK BASED ON PUBLIC INPUT

ALLOWS FOR HB TO APPLY FOR GRANT FUNDING

PROJECT TIMELINE
Project Website: www.hbmobility.com
May 2022 - Present
Public Survey I
February 2022 – August 2022
Council Briefing / Study Session
August 2022
Public Meeting
October 2022
Public Survey II
May 2023 - Present
Council Briefing / Study Session to discuss draft recommendations September 2023
Public Meeting to discuss draft recommendations
October 2023
Plan Adoption
Fall 2024
Phase I Survey Results
February 2022 – August 2022
General Results
• 860+ survey responses
• 93% of respondents live in HB
• Other than driving, respondents
prefer to access destinations via
active transportation
• 81% prefer to bike
• 74% prefer towalk
• Close split between pedestrian and
biking on the Beach Path
Why it Matters
• Strong understanding of broad community
consensus for multiple categories

WHAT WE HEARD | PHASE II SURVEY
 Other than driving, respondents prefer to access
destinations via walking and bike / e-bike
 Beach Path Feedback
 Very strong positive sentiment toward: separated beach path (81%), beach path ped crosswalk (78%),slow
zones (70%)
 Strong/moderate support for speed feedback signs
(56%), 10 mph speed limit (54%)
 On-Street Bike Facilities
 Top three preferred on-street bike facility types:
separated bike lane (Delaware), Parking Protected Bike
Lane (Springdale), and Buffer Bike Lane (Algonquin)
 Top 3 separated bike lane separatory type: Planted
Buffer, Planter, Raised Median
On-Street Bike Facility Separatory Types
Technical Analysis
 Challenges at the arterials for bikes (see
graphic) and pedestrians once they reach
major intersections
 Need for a holistic network to bridge the gaps
that are inhibiting access for some travel
modes
 89% of major intersections operate at LOS C
or higher
 Opportunity to provide balance to allow for
more mobility choice for residents and
visitors

TOOLKIT
Near Term
"Low Hanging Fruit"
Phasing Needed
"Transformative"
Buffered Bike Lane
Leading Ped Interval
Mid-Block Flashers
Separated Bike Lane
Shared Use Path (Separated)
Median Refuge Island
Atlanta
Springdale
Beach PathEdwards
Heil (soon), and Edinger (soon)

BICYCLE NETWORK
Phase 1 Focus Areas; 1 to 5 yearsExisting Network 2023
Data Source: Toole Design
2023; City GIS 2023
Phase 2 Focus Areas; 5 to 10 years

PEDESTRIAN FOCUS CORRIDORS
Corridor Grouping Overlapping Factors
Atlanta / Magnolia /
Hamilton* Destinations, Vulnerable Populations, LTS
Algonquin / Warner /
Saybrook* LTS, Population Density, Crossing Distance
PCH / 17th LTS, Population Density, Destinations, Transit Edinger High Pedestrian Stress Corridor, Crashes,
Transit, LTS, Destination
Beach Transit, Pedestrian High Stress Corridor,
Crashes, Population Density, LTS
Goldenwest High Pedestrian Stress Corridor, Vulnerable
Populations, Destinations, Crossing Distance
Brookhurst / Indianapolis* High Pedestrian Stress Corridor, Transit, Destinations, Population Density
*Overlaps with bicycle corridor recommendations

WHAT WE ARE EXPERIENCING
Reality of Conditions
Older couple on e-bikes
travel to/from errands
Youth on e-bikes; youth
walking to/from school
Pedestrian + Bicyclist +
Scooter conflicts on the
beach path
Beach Path Bike Facilities

QUESTIONS
12