Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Planning Services Statement of Work
Customer Name City of Huntington Beach
Quote #: Q-274975
Project Name: 24 FCA+, Site, Strategy Startup
Preamble
This Statement of Work (“SOW” and “Statement of Work”), issued on August 7, 2024 (“Issue Date”), incorporates by reference and is governed by the terms and conditions of Agreement (“Agreement") dated _________________, between the City of Huntington Beach (“Customer”) and The Gordian Group, Inc. (“Gordian”). When in conflict, the terms of this SOW shall supersede those of the Agreement solely in relation to the Project listed below.
Term Information
Term of Offer
Gordian reserves the right to reject this Statement of Work if it is not signed and returned to Gordian, sent to David Tsung, [email protected], by September 5, 2024.
Term of Service
Gordian Assessment and Capital Planning Solutions (ACP) ordered hereunder will be available to Customer for 365 days from the Statement of Work Effective Date. After such date, any unused portion of the Services defined will be forfeited, unless otherwise agreed to by both parties (however the obligation for full payment shall remain). No forfeiture will occur if the parties are diligently working to completion.
Services shall not be scheduled or started pursuant to this SOW if Customer has an Accounts Receivable balance with Gordian that is more than thirty (30) days delinquent.
Customer Contact Information
Customer SOW Contact
Name: Patrick Bannon
Email: [email protected]
Phone: 714.505.2577
Customer Billing Information
All Invoices will be sent to the Billing Contact on file unless information is otherwise provided.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Service Fees
Service Description
Description One-time Fee
Gordian Cloud Platform—Year One SaaS Subscription $9,648 Facilities Condition Assessment+ Service $269,084
Site Linear Assessment $32,197
Strategic Assessment Insights $18,786
Total $329,715
Year Two Services Annual Fee
Assessment Data Update—requires SaaS subscription $25,759 Strategic Assessment Insights Update—requires SaaS subscription $11,082 Gordian Cloud Platform SaaS Subscription $9,937
Year Three Services Annual Fee
Assessment Data Update—requires SaaS subscription $26,499 Strategic Assessment Insights Update—requires SaaS subscription $11,353 Gordian Cloud Platform SaaS Subscription $10,236
Sourcewell Contract #020421-ACT—15% discount
Notes
• Refer to Appendix A—Facilities List and Service Type
• Service and software fees will be increased by 3% per year after year one.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Payment Summary
Milestone Billing
Gordian Cloud Software Subscription Fee
Product
Subscription
Fees
Quantity/Metric Year 1 Invoice
Period
Beginning
9/1/24
Year 2 Invoice
Period
Beginning
9/1/2025
Year 3 Invoice
Period
Beginning
9/1/2026
Total Fees
Initial Term
Gordian Cloud
Platform
1,466,427 GSF $9,648 $9,937 $10,236 $29,821
Assessment Services Fixed Fee
# Description Billing % Billing Amount
1 Project Initiation 10% $30,128
2 Assessment Complete 40% $120,512
3 Data Development Complete 35% $105,448
4 Preliminary Findings Delivered 10% $30,128
5 Presentation of Findings Delivered 5% $15,064
Total $301,281
Strategic Assessment Insights Fixed Fee
# Description Billing % Billing Amount
1 Development 50% $9,393
2 Delivery 50% $9,393
Total $18,786
Software and Service Fee Terms
GENERAL
1.1 Above fees include reasonable and customary expenses, unless otherwise noted in the Scope of Work details (see below).
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
1.2 All fees exclude applicable taxes.
1.3 Gordian reserves the right to request a change order should the number of assets or the square footage change.
PAYMENT TERMS
2.1 Payment will be due within 30 days of invoice date.
2.2 Milestone Billing: Gordian will invoice per the Milestone Billing table displayed above in the Payment Summary section.
Acknowledged and Agreed by the Duly Authorized Representatives of the Parties
Customer: Gordian Group
Signature: Signature:
Print Name: Print Name:
Title: Title:
Date: Effective Date:
PO Required? Yes [ ] No [ ] If Yes, PO must be
provided.
Tax-exempt? Yes [ ] No [ ]
If Yes, a Tax Exemption Certificate must be
provided.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Software Scope of Work
Gordian Cloud Platform
The Gordian Cloud Platform (GCP) integrates capital planning, estimating, and construction procurement capabilities in a single application powered by the industry-leading RSMeans Data. The GCP offers a unified user experience by connecting workflows throughout the building lifecycle. These workflows are enhanced with powerful automation and insights, ultimately ensuring optimal decision-making in project selection, budgeting, and execution and efficient and effective data management.
GCP includes the following capabilities for Assessments and Capital Planning.
Mobile Asset Capture–Streamline Asset Capture and Evaluation Gordian's Mobile Asset Capture (MAC) application equips users with a comprehensive solution for digitally recording facility assets on-site, combining a user-friendly interface with the ability to instantly capture photos and asset details, and integrate RSMeans Data in one seamless action. This results in a unified repository for all collected asset data, streamlining facility management, and decision-making.
Capital Planning–Understand Facility Conditions to Drive Project Prioritization and Selection
Creating a cohesive capital plan begins with thoroughly understanding your asset inventory and conditions.
Armed with comprehensive asset data and the industry-leading RSMeans cost information, your organization gains powerful analytical tools to prioritize asset replacement and chart the most strategic course of action.
Gordian’s Capital Planning software offers an intuitive interface that simplifies the user experience, ensuring customers can fully leverage its capabilities. Accompanied by a comprehensive help system, it provides quick, accessible answers and resources, facilitating a swift and effective learning curve for all users.
Implementation
Gordian is committed to offering comprehensive support and collaboration for the seamless implementation of the GCP and MAC applications, enhancing the management of your capital planning objectives.
The support and implementation of the GCP and MAC applications for your organization will include the following:
• Personalized configuration of your GCP account and settings to meet your requirements and preferences.
• Authorized user access to the GCP and MAC applications. • A Resource Center for your users to search or browse to get the most from the GCP and MAC applications’ features and functions easily and quickly. • Ongoing technical support and troubleshooting for the GCP and MAC applications’ issues or queries.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
• Ongoing customer success management to ensure your organization’s satisfaction and adoption of the GCP and MAC applications.
Deliverables
Gordian will deliver the following to City of Huntington Beach:
• A configured and functional GCP account and MAC application for your organization. • A user guide and training materials for the GCP and MAC applications. • A support and customer success plan and schedule for the GCP and MAC applications.
Timeline
Gordian estimates that the implementation and support of the GCP and MAC applications for your organization will be completed within 30 business days following the signing of this SOW. The timeline may vary depending on the availability of your organization’s resources, the complexity of the data migration, and the feedback and approval process. The project phases are provided on the following pages.
Services Scope of Work
FCA+ Assessment Approach
The FCA+ process is delivered using a disciplined and proven set of processes and tools to ensure that accurate data is collected and populated in the software to provide deep insights into your capital planning needs and to enable you to develop impactful capital plans.
Phases of the Condition Assessment Process
The assessment process is implemented through four phases:
• Project Initiation
• Assessment
• Data Development
• Deliverables
Each of these phases is described in the following sections.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Project Initiation Phase
The Project Initiation Phase of the assessment is the foundational stage where the groundwork for the entire assessment process is established.
Introduction to the Project Team and Customer Project Kick-off Meeting Once you have been introduced to your project team, the first step is to discuss the details of the project during the kick-off meeting.
Set Goals
To kick off the project, your designated Gordian Project Manager will set up a meeting with your organization’s key stakeholders for introductions and to confirm the goals and objectives for the project.
Confirm Scope and Deliverables
During the initiation phase, the Gordian Project Manager will collaborate with key stakeholders to establish and document the parameters for the assessment. A scoping meeting will be held to discuss and confirm schedules, assessment criteria, data classifications, system configuration, prioritizations, and categorizations.
Management Plan
The Gordian Project Manager will conduct regular progress meetings throughout the phases of the project to maintain open communication. The frequency of progress meetings will be determined during the initial engagement phase of the project. A schedule will be provided to illustrate the usual phases and milestones of the condition assessment project, including tasks and durations of your required involvement. The project schedule will be maintained by Gordian’s Project Manager who oversees each task, communicates at both the project management and assessment team levels, and tracks changes closely.
Assessment Project Schedule
A detailed project schedule will be created when the assessment project is confirmed in cooperation with your organization. The prompt achievement of milestones and deliverables is fully dependent upon the accessibility of facilities—for FCA+—and the availability of staff and data.
City of Huntington Beach Responsibilities
To ensure the best possible quality of the final assessment information, some aspects of the work require support from our customers in addition to your involvement in the standard project delivery. The expected City of Huntington Beach responsibilities will be as follows:
• Provide a Project Representative. This person is responsible for coordinating your organization’s resources as necessary for the project. This project representative will possess the authority to allocate and dedicate both human and material resources on behalf of your organization, ensuring the successful execution of the project.
• Prepare and Organize. Dedicate time to prepare and organize key reports, plans, and documents the team can utilize to support the field assessment work—data collection process. Careful preparation of facility plans and other documentation is important to our work. While we appreciate having access to large amounts of information, simply providing a link to an online library of large volumes of historical facility construction documents, reports, and other data, can introduce risk in the project timeline.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
• Before the On-Site Assessment Work. Before Gordian arrives on-site, assist with developing a rational sequential work plan, obtain and prepare note-taking floor plans, facilitate any required security clearances, and arrange escorts for our assessment teams. • During the Assessment. Once Gordian is on-site, provide a full-time—one per team—escort with access to all facility spaces and ensure that key operations and maintenance personnel are available to respond to questions. This ensures the ability to complete the assessment data-gathering process. • After the On-Site Work is Complete. Once Gordian’s on-site work is finished, assist with data qualification as a further check on our internal Quality Control process. A timely review keeps the project on schedule and builds confidence that the information is complete and accurate.
Gordian’s Responsibilities
The Gordian Project Manager's responsibilities will be as follows:
• Develop the project instructions and resource scheduling. • Provide the assessment team members with all collected information for their review before the on- site assessment phase.
• Coordinate and facilitate an internal kick-off meeting to bring together all members of the assessment team. Team composition is carefully selected by matching individual expertise and availability to the project's needs.
> The Gordian Project Manager determines the optimal number and structure of assessment teams, which may vary from solo professionals to groups of two or three, based on the size and complexity of the assets being evaluated.
• Supply the following project documents to your organization’s point of contact that will inform, track, and guide the project:
> Project team roster
> Project schedule
> Project kick-off meeting agenda and virtual meeting platform and details Data Collection
The Gordian Project Manager will communicate with your facility and maintenance managers and staff members using email and teleconferencing to facilitate the collection of essential information required by our assessment teams. This data typically includes additional asset information (e.g., floor plans, drawings, previous studies, recent capital improvements made and planned for, etc.).
System Configuration
System configuration is necessary to prepare for the Assessment phase. In the Gordian Cloud Platform, we will create a virtual facilities inventory by leveraging technology to model the facilities accurately. This baseline is created for facilities based on the level of detail required.
For the FCA+ service, data is configured up to Uniformat Level 5.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Assessment Phase
The Assessment Phase is the fundamental step in building your assessment dataset in which Gordian professionals will account for your unique facility characteristics.
Onsite Assessment Using Mobile Asset Capture
During an FCA+, Gordian will send one or more teams to your facilities to perform the assessments. On the first day of the field visit, Gordian will organize a meeting with your team members who will be involved with the field assessment phases of the project to kick off the on-site survey work. > The City of Huntington Beach agrees to grant Gordian’s field assessment team(s) prompt and full access to the subject properties, including supervised entry to all relevant areas and safe access to subject properties—including roof unless sloped—to facilitate a thorough and efficient assessment process.
Assets Included in an On-Site Assessment
Information gathered during the assessment process and stored in the Gordian Cloud Platform is organized by Uniformat code. The ASTM International Uniformat II Classification for Building Elements defines a standard classification for building elements and related site work. Each Uniformat II Category performs a given function, regardless of the design specification, construction method, or materials used. Using Uniformat II to classify systems and assets provides a consistent reference for the description, economic analysis, and management of building components during all phases of their life cycles.
The Uniformat II Classification for Buildings Elements is made up of four levels:
• Level 1 is a general grouping of major elements.
• Level 2 is group elements (e.g., roofing, conveying, plumbing). • Level 3 contains individual elements (e.g., basement walls, partitions, floor finishes). • Level 4 contains sub-elements of individual elements (e.g., specific equipment, door frames, roof canopies).
Following are examples of the assets evaluated as part of an on-site assessment:
• Cooling: Building Distribution, Generation
• Electrical: Building Distribution, Fixtures/Lighting, Generation, Secondary Services, Specialties • Exterior Shell: Exterior Painting, Gutters & Leaders, Opening, Roof, Structural • Heating: Building Distribution, Fuel Supply & Management, Generation • HVAC: Air Handling, Building Distribution, End-use HVAC, Generation, Ventilation, Ceilings • Interior Shell: Floors, Walls, Ceilings, Finishes
• Mechanical: Pumps/Motors, Specialty Equipment, Vertical Systems • Plumbing: Bathroom Renovations, DHW Generation, Fixtures & Fittings, Primary Service, Pumps/Motors, Supply Piping, Waste Piping
• Fire Safety: Fire Alarm/Detection, Fire Protection/Egress
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
All evaluated assets will be assigned to specific Uniformat categories using the levels described previously.
The specific assets to be assessed—by Uniformat category—will be established during the Project Initiation phase.
Visual Inspection
Gordian’s team will visually inspect all the facilities included in the project’s scope to identify deficient conditions and assess the remaining lifecycle of designated assets documented by digital photographs. > The inspection of the facilities' interior space will include all mechanical and electrical rooms, all public spaces, and a representative sampling of similar room types (e.g., offices). > The inspections of the facility's exterior space will include an approximate ten-foot perimeter around the facility and the areas adjacent to and/or attached to the facility that are inherent to the facility’s use, such as ramps, stairs, entryways, and exterior wall-mounted lighting.
Digital Photos
Gordian will capture photos during the assessment process and associate them with facilities, assets, and/or requirements to visually illustrate existing conditions.
Requirements
If the scope of your service includes our most detailed assessment (FCA+), the Gordian team will provide experienced professionals to document observed deficiencies as they relate to accessibility, life safety, building codes and standards and local regulations during the evaluation of asset condition. In addition, the team will identify projects where an alternative action to full asset replacement is feasible to help extend or preserve Remaining Useful Life. FCA+ will also consider factors such as environmental exposure, quality of installation, material suitability, and the rigor of the preventive maintenance program. > Findings Limitations. Non-compliance findings are limited due to sampling of space and limited measurements and therefore should not be considered an exhaustive list of all non-compliance for a given property.
> New Construction. Non-compliance may be noted concerning codes for new construction, without implying non-conformance with older regulations in force at the time of original construction. > Accessibility. Apparent accessibility compliance issues are noted as observed during the visual inspection of an asset. A detailed study of the requirements of accessibility—such as would be provided by a specialized ADA compliance consultant—is beyond this scope.
Site Linear Assessment
The assessment of site and utilities assets will include the systems listed below. • Roadways • Fixed Benches and Other Appurtenances
• Parking Lots • Exterior Steps
• Lighting • Storm Water System
• Major Pedestrian Walkways • Fuel Supply
• Architectural and Sports Field Fencing • Water Supply and Distribution
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
• Primary Electric Supply & Distribution • Chilled Water Distribution • Sanitary Sewer • Steam & Condensate Distribution
• Playground Equipment • Heating Hot Water Distribution • Retaining Walls over 5’ in Height • Irrigation Systems Please note the following:
• Visible systems will be evaluated by physically touring the site, reviewing institution maintenance records, and conducting in-depth interviews with facility personnel with historical knowledge of each asset.
• Where site assets and their system components are buried or otherwise inaccessible, Gordian will interview institution personnel and review the City of Huntington Beach maintenance records and drawings to gain insight and gather information related to system type, age, quantities, and condition to construct assets and system data models, including cost estimates and relative condition estimates.
• Details on Uniformat level data capture of site assets can be found below.
Legend
• In scope for this project as a system, if observable or if information is provided. May be created as separate systems for an additional level of detail at the Assessors Option or maybe line items within a system or an RSMeans assembly or may be included in a higher-level system and not be specifically itemized in the data.
• Normally not in scope
Level 2:
Group Elements
Level 3:
Individual
Elements
Level 4:
Sub-Elements
Unit of Measure
G10 Site
Preparation
G1010 Site Clearing G1011 Clearing & Grubbing
G1012 Tree Removal & Thinning
G1020 Site
Demolition &
Relocation
G1021 Building Demolition
G1022 Demolition of Site
Components
G1023 Relocation of Building &
Utilities
G1024 Utilities Relocation
G1030 Site Earthwork G1031 Site Grading Excavation
G1032 Borrow Fill
G1033 Soil Stabilization &
Treatment
G1034 Site Dewatering
G1035 Site Shoring
G1036 Embankments
G1037 Erosion Control
G1040 Hazardous
Waste Remediation
G1041 Removal of Contaminated
Soil
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Level 2:
Group Elements
Level 3:
Individual
Elements
Level 4:
Sub-Elements
Unit of Measure
G1042 Soil Restoration &
Treatment
G20 Site
Improvement
G2010 Roadways G2011 Bases & Sub-Bases
G2012 Paving & Surfacing
G2013 Curbs Gutters & Drains
G2014 Guardrails & Barriers
G2015 Painted Lines
G2016 Marking & Signage
G2017 Vehicular Bridges
SF
SF
LF
LF
SF
Each
G2020 Parking Lots G2021 Bases & Sub-Bases
G2022 Paving & Surfacing
G2023 Curbs, Rails & Barriers
G2024 Parking Booths &
Equipment
G2025 Markings & Signage
SF
SF
LF
Each
Each
G2030 Pedestrian
Paving
G2031 Paving & Surfacing
G2032 Edging
G2033 Exterior Steps
G2034 Pedestrian Bridges
SF
Flight
Each
G2040 Site
Development
G2041 Fences & Gates
G2042 Retaining Walls
G2043 Terrace & Perimeter Walls
G2044 Signage
G2045 Site Furnishings
G2046 Fountains, Pools &
Watercourses
G2047 Playing Fields
G2048 Flagpoles
G2049 Miscellaneous Structures
LF
LF
Each
Each
Each
Varies
G2053 Topsoil &
Planting
G2051 Fine Grading & Soil
Preparation
G2053 Topsoil & Planting
G2053 Topsoil & Planting Beds
G2053 Topsoil & Planting
G2057 Irrigation Systems
G2059 Other Landscape Features
G30 Site
Mechanical
Utilities
G3010 Water Supply G3011 Potable Water Distribution
& Storage
G3012 Non-Potable Water
Distrib. & Storage
G3013 Well Systems
G3014 Fire Protection
Distribution & Storage
G3015 Pumping Stations
G3016 Package Water Treatment
Plants
LF
LF
Each
Each
Each
Each
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Level 2:
Group Elements
Level 3:
Individual
Elements
Level 4:
Sub-Elements
Unit of Measure
G3020 Sanitary Sewer G3021 Piping
G3022 Manholes & Cleanouts
G3023 Septic Disposal Systems
G3024 Lift Stations
G3025 Packaged Water Waste
Treatment Plants
G3026 Septic Tanks
G3027 Drain Fields
LF
SF
Each
Each
SF
G3030 Storm Sewer G3027 Drain Fields
G3032 Manholes
G3033 Headwalls & Catch Basins
G3034 Lift Stations
G3035 Retention Ponds
G3036 Ditches & Culverts
SF
Each
LF
G3040 Heating
Distribution
G3041 Steam Supply
G3042 Condensate Return
G3043 Hot Water Supply System
G3044 Pumping Stations
LF
LF
LF
Each
G3050 Cooling
Distribution
G3051 Chilled Water Piping
G3052 Wells for Cooling/Heating
G3053 Pumping Stations
G3054 Cooling Towers on Site
LF
Each
Each
Each
G3060 Fuel
Distribution
G3061 Fuel Piping
G3062 Fuel Equipment
G3063 Fuel Storage Tanks
G3064 Fuel Dispensing Stations
LF
Each
G3090 Other Site
Mechanical Utilities
G3091 Industrial Waste Systems
G3092 POL (Petroleum Oil &
Lubricants) Distribution Systems
Each
G40 Site Electrical
Utilities
G4010 Electrical
Distribution
G4011 Substations
G4012 Overhead Power
Distribution
G4013 Underground Power
Distribution
Each
LF
LF
G4020 Site Lighting G4021 Fixtures & Transformers
G4022 Poles
G4023 Wiring Conduits & Duct
banks
G4024 Site Lighting Controls
Each
Each
LF
SF or Each
G4030 Site
Communication &
Security
G4031 Site Communication
Systems (duct banks)
G4032 Site Security & Alarm
Systems
LF
LF or Each
G4090 Other Site
Electrical Utilities
G4091 Cathodic Protection
G4092 Site Emergency Power
Generation
Each
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Level 2:
Group Elements
Level 3:
Individual
Elements
Level 4:
Sub-Elements
Unit of Measure
G90 Other Site
Construction
G9010 Service &
Pedestrian Tunnels
G9011 Service Tunnels
G9012 Trench Boxes
G9013 Pedestrian Tunnels
LF
G9090 Other Site
Systems
G9091 Snow Melting Systems SF
Data Development Phase
As we transition into the Data Development Phase, Gordian will process and refine the data collected on-site, ensuring that each facility's profile is accurately documented, costed, and analyzed for effective lifecycle management on the GCP.
Data Processing
After the on-site work is complete and the data has been synced to the GCP, the Gordian assessment team(s) will review their notes and findings and complete the tasks of documenting each facility, including asset and/or requirement data updates, costing, estimated life, and reporting. All data will be housed on the GCP.
Testing, measuring, or preparing calculations for any asset or component to determine adequacy, capacity, or compliance with any standard is outside the scope of assessment.
Requirements will be identified for the entire facility—not by individual room or component unless specified otherwise.
Facilities and Asset Descriptions
A narrative summary of each assessed facility and its assets will be documented to support field findings and adjustments. This information is useful for having key information about a facility including finishes and infrastructure. For all assets—where the condition is rated poor—and all requirements, a narrative will describe the needs in detail.
Data Quality Control and Assurance
Our Center of Excellence team will process the assessment data, utilizing our AI-powered quality control software to guarantee the highest standards of data quality and integrity. Once the data passes our quality check, it will be presented to your organization for review and approval, ensuring accuracy and satisfaction.
Data Qualification and Acceptance
Following our internal review, Gordian will conduct a data qualification meeting with your team to review a summary of identified needs to help guide the feedback process and make changes as requested. If desired, detailed data can be provided for independent customer review. While City of Huntington Beach input is not required, it is valued to ensure the assessment's precision and depth. Any feedback provided will be incorporated into the final deliverables.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Deliverables Phase
Once the Data Development Phase is complete, we move to the Deliverables Phase which includes the presentation of findings and seek project completion acceptance from you.
Preliminary Findings Delivered and Client Review
An initial draft of our presentation of findings will be created and provided for your review and feedback.
Presentation of Findings Delivered
Following the review, the Gordian Project Manager will host a formal meeting dedicated to presenting the comprehensive results of the assessment.
Final Report Package Delivery
This final report details Gordian’s findings including requirement and renewal costs and timelines. These elements are essential for creating various funding scenarios, allowing for a side-by-side evaluation of potential investment strategies. We deliver final reports electronically in PDF.
The Final Report Package will include the following elements:
• Executive Summary. This report provides high-level information to offer an overview of the facilities together as a portfolio.
• Assessment Methodology. This report covers the assessment process itself • Appendix Report Data. This element includes major findings from the assessment process in various data summaries and reports.
Introduction and Orientation to the Gordian Cloud Platform If you are new to GCP, the Gordian Project Manager will provide an introduction and orientation to this platform for your project team; this will continue throughout your partnership with Gordian with our Customer Success team. You will also be introduced to your personal Customer Success Manager, who will be available to assist you beyond the initial project completion.
Scope of Work Completion
The Notification Period before the closure of the scope of work is 10 Business Days from the date Gordian provides written notice to City of Huntington Beach that states the delivery of Services is complete.
In the event:
• City of Huntington Beach does not provide notice of material non-conformance or request for change during the Notification Period, the project will be closed, and no additional work will be performed by Gordian pursuant to the Services contained herein.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
• City of Huntington Beach does provide notice of material non-conformance or request for change after the expiration of the Notification Period, such work shall only be performed under a new contractual arrangement.
• Material non-conformance is identified within the Notification Period, Gordian shall promptly correct such non-conformance, which was due to fault or negligence of Gordian, at no additional cost to City of Huntington Beach.
Strategic Assessment Insights
Once your assessment is complete, Gordian will engage you through the following steps:
Strategic Assessment Insights Development
• Customize Strategic Tools. Gordian uses an array of strategic concepts as tools to tie facilities projects to the mission and vision of leadership and define a framework for reinvestment funding.
The primary strategic and functional prioritization tools are outlined below though others may be added as necessary to ensure a robust toolkit.
> Building Portfolios. Organizing facilities into a portfolio of assets provides the means to reflect existing priorities and future aspirations.
> Project Category. The classification of a project helps to differentiate between a “want” versus a “need.”
> Project Package. Typical packages are Building Envelope, Building System, Infrastructure, Space Renewal, and Safety/Code.
> Timeframe. Multi-year investment timeframes—immediate investment needs, 1-3 years, 4-7 years, 8-10 years, etc.—establish useful investment horizons based on age and condition. > Investment Criteria. Gordian uses Investment Criteria to help decision-makers understand the importance or impact of a project.
• Develop a Multi-year Capital Plan. Gordian engages leadership in an exercise that guides future investment decisions and ensures the effective use of capital investment funds. • Project Selection. Gordian will work with your organization to assign a custom scoring methodology to rank projects within facilities where a condition assessment was conducted or those facilities that otherwise have modeled component-level detail.
Strategic Assessment Insights Delivery
Along with sessions throughout the process to gather necessary information and insights, Gordian will deliver a completed strategic capital plan and recommendations for the next steps. This presentation will recommend a strategic course of action as well as:
• Provide context of historical funding levels and detail backlog origin. • Give a summary-level overview of facilities needs highlighting key strategic issues. • Summarize Gordian’s recommendation for a portfolio investment plan that ties to priorities and available funding.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
As directed, an additional presentation can be given to senior leadership (e.g. CFO, President, Cabinet, Board of Trustees) or the appropriate audience at your organization.
Year Two Services
Gordian is committed to offering flexible post-project support tailored to your specific needs, whether it is refreshing your data and facility asset inventories or providing sustained access to the Gordian Cloud Platform. For an additional fee, our partnership ensures that your team is equipped with the latest tools and information for efficient and effective facility management.
Assessment Data Update
The true mark of success for any capital investment program is securing ongoing funding—approval for the second, third, and subsequent rounds of investment is key. The cornerstone of building this trust is the ability to track and showcase the program's achievements.
Gordian suggests an annual update process that independently confirms performance and demonstrates progress toward the attainment of goals.
Ongoing annual support will include:
• Annual documentation of projects completed, their cost, and impact on the phase-out plan. • Documenting and updating the project inventory for any “new” customer-provided projects. • Qualification of data updates to ensure accuracy.
Strategic Assessment Insights Update
In conjunction with annual data updates, strategic assessment insights can be updated to reflect the status of your database. As key investments, divestments, or other facility or asset decisions are made, stakeholders must remain informed, and progress toward your strategic plan is tracked. Your Gordian Project Manager will facilitate the update of key deliverables and host a formal presentation of findings to stakeholders of City of Huntington Beach’s choosing. Gordian deliverables can be designed appropriately for a wide variety of audiences, including executive leadership summary presentations.
Gordian Cloud Platform Software
To keep the program performing and the power of facilities investment decision-making at your fingertips, Gordian will continue to provide immersive user access and support by our leading customer success team for the Gordian Cloud platform for as long as your subscription is active. This platform will allow you to house the most up-to-date facility inventory information, keeping you seamlessly integrated into your capital planning data via reports, dashboards, and interactive tools.
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Appendix A—Facility List and Service Type
The Facilities included in this scope of work are:
Facility Name SQ FT Complexity Service Type
Civic Center
Council/Chambers
4,000.00 Standard Facility Condition Assessment+
Civic Center Police
Department
78,966.00 Standard Facility Condition Assessment+
Civic Center Public
Works
106,635.00 Standard Facility Condition Assessment+
Beach Jr. Lifeguard
HQ
7,064.00 Standard Facility Condition Assessment+
Beach Lifeguard
HQ
12,892.00 Standard Facility Condition Assessment+
Beach Lifeguard
HQ Gate
42.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #1
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #2
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #3
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #4
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #5
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #6
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #7
144.00 Parking Garage Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Beach Lifeguard
Tower #8
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #9
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #10
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #11
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #12
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #13
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #14
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #15
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #16
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #17
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #18
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #19
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #20
144.00 Parking Garage Facility Condition Assessment+
Beach Lifeguard
Tower #21
144.00 Parking Garage Facility Condition Assessment+
Beach Parking
Booth #1 North
40.00 Parking Garage Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Beach Parking
Booth #2 Lake
125.00 Parking Garage Facility Condition Assessment+
Beach Parking
Booth #3 Hunt.
40.00 Parking Garage Facility Condition Assessment+
Beach Parking
Booth #4 Beach
Blvd.
40.00 Parking Garage Facility Condition Assessment+
Beach Parking
Structure w/2 Elev.
317,261.00 Parking Garage Facility Condition Assessment+ Beach Pier
Electrical Room
225.00 Standard Facility Condition Assessment+
Beach Pier
Restroom Trailer
850.00 Standard Facility Condition Assessment+
Beach Pier Zero
Tower
300.00 Standard Facility Condition Assessment+
Beach Restroom #1
North
800.00 Standard Facility Condition Assessment+
Beach Restroom #2 800.00 Standard Facility Condition Assessment+ Beach Restroom #3 860.00 Standard Facility Condition Assessment+ Beach Restroom #4 798.00 Standard Facility Condition Assessment+ Beach Restroom #5
South
779.00 Standard Facility Condition Assessment+
Beach Restroom #6
North of Pier
629.00 Standard Facility Condition Assessment+
Beach Restroom
Trailer
800.00 Standard Facility Condition Assessment+
Beach Yard Bldg.
#1 Offices
4,000.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Beach Yard Bldg.
#2 Garage
4,000.00 Parking Garage Facility Condition Assessment+ Meadowlark
Caretakers
Residence
3,000.00 Standard Facility Condition Assessment+
Beach Conc. Beach
Hut
1,817.00 Standard Facility Condition Assessment+
Beach Conc.
Dwight's
3,332.00 Standard Facility Condition Assessment+
Beach Conc. Jack's 2,064.00 Standard Facility Condition Assessment+ Beach Conc.
Sunny's
1,152.00 Standard Facility Condition Assessment+
Beach Conc. Vic's 3,069.00 Standard Facility Condition Assessment+ Beach Conc.
Waterfront Cab.
2,470.00 Standard Facility Condition Assessment+
Beach Conc. Zack's
too
2,232.00 Standard Facility Condition Assessment+
Boys and Girls Club 6,000.00 Standard Facility Condition Assessment+ Brooks House 5,600.00 Standard Facility Condition Assessment+ Central Aldertree
Conc.
1,200.00 Standard Facility Condition Assessment+
Central Breakfast
Park Conc.
4,820.00 Standard Facility Condition Assessment+
Cultural Arts
Center
11,092.00 Standard Facility Condition Assessment+
HB Art Center 10,225.00 Standard Facility Condition Assessment+ Golden West
College Shed
102.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Legal Aid Office 450.00 Standard Facility Condition Assessment+ Meadowlark Golf
Club House
7,906.00 Standard Facility Condition Assessment+
Newland House
Museum
2,750.00 Standard Facility Condition Assessment+
Oak View Day Care
#1
1,500.00 Standard Facility Condition Assessment+
Oak View Day Care
#2
2,400.00 Standard Facility Condition Assessment+
Ocean View Ests.
Trailer Park Club
2,219.00 Standard Facility Condition Assessment+
Surf Museum 2,250.00 Standard Facility Condition Assessment+ Boy Scout Cabin at
Lake Park
1,574.00 Standard Facility Condition Assessment+
Central Nature
Center
1,863.00 Standard Facility Condition Assessment+
Chris Carr Pump
House
150.00 Standard Facility Condition Assessment+
City Gym 23,600.00 Standard Facility Condition Assessment+ Edison Comm.
Center
11,065.00 Standard Facility Condition Assessment+
Edison Comm.
Center Cabana #1
850.00 Standard Facility Condition Assessment+
Edison Comm.
Center Cabana #2
850.00 Standard Facility Condition Assessment+
Edison Comm.
Center Cabana #3
850.00 Standard Facility Condition Assessment+
Edison Comm.
Center Cabana #4
850.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Greer Annex Pump
House
99.00 Standard Facility Condition Assessment+
Greer Ball Field
Shack
100.00 Standard Facility Condition Assessment+
Harbor View
Comm. Center
2,203.00 Standard Facility Condition Assessment+
Lake Park Comm.
Center
3,000.00 Standard Facility Condition Assessment+
Lake View Comm.
Center
2,000.00 Standard Facility Condition Assessment+
Lebard Comm.
Center
800.00 Standard Facility Condition Assessment+
Marina Park
Cabanas
2,960.00 Standard Facility Condition Assessment+
Marina Rest Bldg. 1,050.00 Standard Facility Condition Assessment+ Murdy Comm.
Center
11,000.00 Standard Facility Condition Assessment+
Murdy Picnic
Cabana
3,480.00 Standard Facility Condition Assessment+
Newland Barn 6,000.00 Standard Facility Condition Assessment+ Oakview Comm.
Center & Gym
10,000.00 Standard Facility Condition Assessment+
Percy Park Dock 276.00 Standard Facility Condition Assessment+ Seabridge Park
Restrooms
475.00 Standard Facility Condition Assessment+
SeniorCtr in the
Park
37,537 Standard Facility Condition Assessment+
Memorial Hall 2,700.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Terry Park Comm.
Center
1,664.00 Standard Facility Condition Assessment+
Trinidad Park
Restroom
456.00 Standard Facility Condition Assessment+
Worthy Park
Storage Cont.
120.00 Standard Facility Condition Assessment+
Worthy Park Utility
Bldg.
120.00 Standard Facility Condition Assessment+
Bushard Fire
Station
5,700.00 Standard Facility Condition Assessment+
Gothard Fire
Station
10,200.00 Standard Facility Condition Assessment+
Heil Fire Station 5,712 Standard Facility Condition Assessment+ JPTC Bruno Bldg. 4,000 Standard Facility Condition Assessment+ JPTC Butler Bldg. 2,475.00 Standard Facility Condition Assessment+ JPTC Control Tower 450.00 Standard Facility Condition Assessment+ JPTC Operations
Center
13,600.00 Standard Facility Condition Assessment+
JPTC Training
Tower
720.00 Standard Facility Condition Assessment+
Lake Fire Station 11,508.00 Standard Facility Condition Assessment+ Magnolia Fire
Station
5,702.00 Standard Facility Condition Assessment+
Murdy Fire Station 11,500.00 Standard Facility Condition Assessment+ Warner Fire Station 8,750.00 Standard Facility Condition Assessment+ Heliport 9,081.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Heliport Search &
Rescue
2,000.00 Standard Facility Condition Assessment+
Heliport Trailer 1,272.00 Standard Facility Condition Assessment+ Huntington Center
PD Substation
250.00 Standard Facility Condition Assessment+
Huntington Harbor
PD Substation
600.00 Standard Facility Condition Assessment+
Shank House
Substation
2,860.00 Standard Facility Condition Assessment+
Vista Center Police
Substation
1,500.00 Standard Facility Condition Assessment+
Banning Library 2,400.00 Standard Facility Condition Assessment+ Central Library 107,400.00 Standard Facility Condition Assessment+ Central Library
Elect. Service
200.00 Standard Facility Condition Assessment+
Graham Library 2,500.00 Standard Facility Condition Assessment+ Main Street Library 9,306.00 Standard Facility Condition Assessment+ Main Street Library
M.U.N.
1,025.00 Standard Facility Condition Assessment+
Oakview Library 1,900.00 Standard Facility Condition Assessment+ Yard Crews Lounge 900.00 Standard Facility Condition Assessment+ Yard Haz-Mat
Storage
300.00 Standard Facility Condition Assessment+
Yard Mechanics
Bldg. #1
625.00 Standard Facility Condition Assessment+
Yard Mechanics
Bldg. #2
1,000.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Yard Main Offices 4,010.00 Standard Facility Condition Assessment+ Yard Old Offices 1,956.00 Standard Facility Condition Assessment+ Yard Shed #1 300 Parking Garage Facility Condition Assessment+ Yard Shed #2 300.00 Parking Garage Facility Condition Assessment+ Yard Shed #3 150.00 Parking Garage Facility Condition Assessment+ Yard Shed #4 225.00 Parking Garage Facility Condition Assessment+ Yard Shed #5 225.00 Parking Garage Facility Condition Assessment+ Yard Shed #6 225.00 Parking Garage Facility Condition Assessment+ Yard Shed #7 225.00 Parking Garage Facility Condition Assessment+ Yard Shed #8 225.00 Parking Garage Facility Condition Assessment+ Yard Shed #9 1,000.00 Parking Garage Facility Condition Assessment+ Yard Shed #10 575.00 Parking Garage Facility Condition Assessment+ Yard Storage
Container #11
300.00 Standard Facility Condition Assessment+
Yard Storage
Container #12
300.00 Standard Facility Condition Assessment+
Yard Storage
Container #13
300.00 Standard Facility Condition Assessment+
Yard Storage
Container #14
300.00 Standard Facility Condition Assessment+
Yard Storage
Container #15
300.00 Standard Facility Condition Assessment+
Yard Storage
Container #16
300.00 Standard Facility Condition Assessment+
Central Park
Amphitheater
945.00 Parking Garage Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Central Park Elect.
Service
500.00 Standard Facility Condition Assessment+
Central Park Picnic
Shelter
3,393.00 Standard Facility Condition Assessment+
Central Park
Restroom #1A
600.00 Standard Facility Condition Assessment+
Central Park
Restroom #1B
600.00 Standard Facility Condition Assessment+
Central Park
Restroom #2A
600.00 Standard Facility Condition Assessment+
Central Park
Restroom #2B
600.00 Standard Facility Condition Assessment+
Central Park
Restroom #3B
600.00 Standard Facility Condition Assessment+
Central Park
Restroom #4B
600.00 Standard Facility Condition Assessment+
City Yard Bldg. A -
Admin.
7,200.00 Standard Facility Condition Assessment+
City Yard Bldg. B -
Veh. Maint.
30,201.00 Standard Facility Condition Assessment+
City Yard Bldg. C -
Combined Maint.
19,300.00 Standard Facility Condition Assessment+
City Yard Bldg. D -
PD Mech.
7,680.00 Standard Facility Condition Assessment+
City Yard Bldg. E -
Warehouse
14,448.00 Standard Facility Condition Assessment+
City Yard Bldg. F -
Communications
1,200.00 Standard Facility Condition Assessment+
City Yard Bldg. G -
Compressor/Elect
1,290.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
City Yard Bldg. H -
Sheet Metal Shop
960.00 Standard Facility Condition Assessment+
City Yard Bldg. I -
Haz. Mat. Storage
150.00 Standard Facility Condition Assessment+
City Yard Bldg. J -
Signs & Mkg. Equip
720.00 Standard Facility Condition Assessment+
City Yard Bldg. K -
Signs & Mkg. Equip
720.00 Standard Facility Condition Assessment+
City Yard Bldg. L -
Streets
800.00 Standard Facility Condition Assessment+
City Yard Bldg. M -
Streets
800.00 Standard Facility Condition Assessment+
City Yard Bldg. N -
Streets
1,000.00 Standard Facility Condition Assessment+
City Yard Bldg. O -
Streets
1,000.00 Standard Facility Condition Assessment+
City Yard Bldg. P -
Building Maint.
Storage
960.00 Standard Facility Condition Assessment+
City Yard Bldg. Q -
Generator Storage
2,400.00 Parking Garage Facility Condition Assessment+ City Yard Bldg. R -
Wastewater
2,400.00 Standard Facility Condition Assessment+
Water Flood
Adams
1,000.00 Standard Facility Condition Assessment+
Water Flood
Atlanta #1
960.00 Standard Facility Condition Assessment+
Water Flood
Atlanta #2
736.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Water Flood
Banning
1,326.00 Standard Facility Condition Assessment+
Water Flood
Flounder
320.00 Standard Facility Condition Assessment+
Water Flood
Hamilton
1,219.00 Standard Facility Condition Assessment+
Water Flood Heil 320.00 Standard Facility Condition Assessment+ Water Flood
Indianapolis
1,272.00 Standard Facility Condition Assessment+
Water Flood
Marilyn
960.00 Standard Facility Condition Assessment+
Water Flood
Meredith
560.00 Standard Facility Condition Assessment+
Water Flood
Newland
1,078.00 Standard Facility Condition Assessment+
Water Flood
Scenario
684.00 Standard Facility Condition Assessment+
Water Flood
Shields
432.00 Standard Facility Condition Assessment+
Water Flood Slater 18,848.00 Standard Facility Condition Assessment+ Water Flood Slater
Sump Pump Bldg.
225.00 Standard Facility Condition Assessment+
Water Flood
Springdale
1,325.00 Standard Facility Condition Assessment+
Water Flood
Yorktown
620.00 Standard Facility Condition Assessment+
Water Operations 10,000.00 Standard Facility Condition Assessment+ Water Productions 8,300.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Water Reservoir
Goldenwest (Clay)
78,000.00 Standard Facility Condition Assessment+
Water Reservoir
Overmyer
114,500.00 Standard Facility Condition Assessment+
Water Resvr.
Overmyer
Booster(New)
2,730.00 Standard Facility Condition Assessment+
Water Reservoir
Peck
94,923.00 Standard Facility Condition Assessment+
Water Resvr. Peck
Booster Pump
702.00 Standard Facility Condition Assessment+
Water Residence 961.00 Standard Facility Condition Assessment+ Water Resvr.
Overmyer Booster
Bldg.
4,000.00 Standard Facility Condition Assessment+
Water Warehouse 10,550.00 Standard Facility Condition Assessment+ Water Well #1 425.00 Standard Facility Condition Assessment+ Water Well #1
Chlorine Bldg.
80.00 Standard Facility Condition Assessment+
Water Well #1
Equipment Bldg.
200.00 Standard Facility Condition Assessment+
Water Well #1
Flouride Bldg.
80.00 Standard Facility Condition Assessment+
Water Well #2 481.00 Standard Facility Condition Assessment+ Water Well #4 600.00 Standard Facility Condition Assessment+ Water Well #4
Chlorine Bldg.
64.00 Standard Facility Condition Assessment+
Water Well #5 330.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Water Well #5
Chlorine Bldg.
125.00 Standard Facility Condition Assessment+
Water Well #5
Flouride Bldg.
64.00 Standard Facility Condition Assessment+
Water Well #6 3,570.00 Standard Facility Condition Assessment+ Water Well #6 Chlr.
& Flour. Bldg.
64.00 Standard Facility Condition Assessment+
Water Well #7 600.00 Standard Facility Condition Assessment+ Water Well #7 Chlr.
& Flour. Bldg.
250.00 Standard Facility Condition Assessment+
Water Well #8 75.00 Standard Facility Condition Assessment+ Water Well #8
Chlorine Bldg.
64.00 Standard Facility Condition Assessment+
Water Well #9 600.00 Standard Facility Condition Assessment+ Water Well #9
Flouride Bldg.
125.00 Standard Facility Condition Assessment+
Water Well #9 Well
Head Bldg.
80.00 Standard Facility Condition Assessment+
Water Well #10 600.00 Standard Facility Condition Assessment+ Water Well Clay
Booster Stat. Back-
up
100.00 Standard Facility Condition Assessment+
Water Well Clay
Booster Stat. Bldg.
528.00 Standard Facility Condition Assessment+
Water Well Dyke 80.00 Standard Facility Condition Assessment+ Water Well Dyke
Chlorine Bldg.
36.00 Standard Facility Condition Assessment+
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Facility Name SQ FT Complexity Service Type
Water Well Dyke
Flouride Bldg.
36.00 Standard Facility Condition Assessment+
310 5th 2,688.00 Standard Facility Condition Assessment+ 408 1/2 PCH
Commercial Bldg.
1,600.00 Standard Facility Condition Assessment+
411 Olive 1,200.00 Standard Facility Condition Assessment+ 438 Main 4,500.00 Standard Facility Condition Assessment+ 705 Yorktown
Rental Residence
2,000.00 Standard Facility Condition Assessment+
Beach Conc.
Sunny's
4,000.00 Standard Facility Condition Assessment+
Total GSF 1,446,427
Site Linear Assessments
Facility Name SQ FT Asset Use/Type
Block Walls 359,040 (assumes 8' high, 44,880 l.f. or 8.5 miles) Beach Parking 5th Street Lot 15,410
Beach Parking Lot. Grd. Lighting 1,000
Beach Pier 55,000
Dump Graham Sweeper 105
Adventure Playground 450
Central Transformer Sys Enclosure 1,000
Percy Park Dock 276
Sewer Station A 100 Vault
Sewer Station Algonquin 100 Submersible Pump
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Sewer Station Atlanta 100 Submersible Pump
Sewer Station B 100 Vault
Sewer Station Brighton 100 Vault
Sewer Station Brookhurst 100 Vault
Sewer Station Bushard 100 Vault
Sewer Station C 100 Vault
Sewer Station Coral Clay 100 Vault
Sewer Station D 100 Vault
Sewer Station Davenport 100 Vault
Sewer Station Dilks Ditch 100 Vault
Sewer Station E 100 Vault
Sewer Station Edgewater 100 Vault
Sewer Station Edwards 100 Vault
Sewer Station Ellis 100 Vault
Sewer Station Gothard 100 Vault
Sewer Station Graham 100 Vault
Sewer Station Heil 100 Vault
Sewer Station Humbolt 100 Vault
Sewer Station Lark 100 Vault
Sewer Station Lifeguard 120 Vault
Sewer Station McFadden 100 Vault
Sewer Station New Britan 100 Vault
Sewer Station Oceanhill 100 Vault
Gordian Copyright 2024
24 FCA+, Site, Strategy Startup
Sewer Station Ranger 100 Vault
Sewer Station Santa Barbara 100 Vault
Sewer Station Saybrook 100 Vault
Sewer Station Speer 100 Vault
Sewer Station Springdale 100 Vault
Sewer Station Trinidad 100 Vault
30 Patewood Drive
Building 2, Suite 350
Greenville, SC
29615
p: 1.800.874.2291
e: [email protected]
w: gordian.com