Exhibit “C”

PRESERVATION WORK PROGRAM AND PROPOSED TIMELINE
Please list the improvements to take place over the next ten years in order of priority. Listed work should be limited to stabilization and/or maintenance of the historic structure and/or repair of exterior, character-defining features of the historic pr operty. State the anticipated costs of the improvements, including but not limited to materials, labor, permits, and fees. Anticipated construction must be equal or greater than tax savings. Attach additional pages as needed to complete the information below.

Year Projects Completed Cost

1. 2022
Completed
Tree-Trimmed 100-year-old tree in front yard due to
rat intrusion and roof protection.
$950
TOTAL SPENT 2022–-
$950

2. 2023
Completed
Replaced all Plumbing,Vents/Drains & Gas Line
replacement
$38,977

3. 2023
Completed
Windows and Door Restoration $5,120

4. 2023
Completed
Tree & root removal due to root intrusion of plumbing
pipe, roof damage & close proximity to the house
$2,250

5. 2023
Completed
Demo & Repair due to age and water damage $15,373

6. 2023
Completed
Original Hardwood Floor Restoration $12,483

7. 2023
Completed
Roof Repair

TOTAL 2023—$74,953
$750
TOTAL SPENT 2023
$74,953

8. 2024
Complete
Bathroom ceiling demo, frame wall & add sunroom
door threshold
$700

9. 2024
Complete
Electrical Phase #1-Remove and replace knob and
tube in attic
$11,140

10. 2024
Complete
Electrical Phase #2-Upgrade panel, add sub panel in
garage and update electrical in garage
$11,825

Total SPENT 2022-2024 $99,568

Year Projects Completed Spent

11.2024
Complete
Electrical Phase #3

$9,000

12. 2024
Complete
Sealed doors, painted trim, sanded and primed
interior and exterior windows. Exterior painting. Trash removal.
$2,197

13. 2024
Complete
Installed exterior light fixtures, 3 door knobs, installed bathroom fan/heater/light. Exterior repairs.
$1,546

14. 2024
Complete
Attic screening $800

15. 2024
Complete
Removed insulation, cleaned & sprayed for rats.

Replaced heater and added ducts to bathrooms.
$4,111

16. 2024
Complete
3 doors and 2 windows $2,784

17. 2024
Complete
Rafter tail repair, prime/ paint and add facia board for rain gutters
$2,360

18. 2024
Complete
Rain gutter install $575

19. 2024
Complete

Replace and restore rafter tails and facia board on
house and garage. Prime and paint.

Termite treatment.
$6,996

20. There are many more projects that will be addressed in the fall of 2024

2024 SPENT as of 8/19/24
2022-8/19/24 SPENT
$54,034
$129,937

Please note the estimated cost of proposed restoration and maintenance activities must be equal or greater than the estimated reduction in property taxes.