AGENDA
Updates from Local Agencies
Ascon
Updates from City of Huntington Beach
Community & Library Services
Community Development
Public Works
Police Department

UPDATES FROM

LOCAL AGENCIES
ASCON

ASCON RESTART WORK SCHEDULE
4 DTSC and Ascon
finalize Restart
Work Plan, and
DTSC holds a
community
meeting
Ascon begins final
remedy work with
excavation and
grading
(~17 months)
Ascon installs
an engineered
cover (cap)
(~7 months)
Ascon installs
permanent
fencing along
Hamilton Ave.
and Magnolia St.
and performs
Site completion
work (~3
months)
We are here
*Communityoutreachcoordinatedwith DTSC inparallel with actionsabove, as needed.

Update for January 22, 2025, City of HuntingtonBeach Southeast Area meeting.

For Discussion Only.

JANUARY ASCON WORK UPDATES
Current work:
• Work to complete the 16-foot barrier wall in the northeast corner of the Site took place this month. Northeast corner excavation work and construction of the barrier wall began on 1/9 and is scheduled to be completed before the end of the month.
• This work includes lane closures and traffic control measures along Hamilton Ave, Magnolia St. and the intersection. The lane closures began on Monday, 1/13, and all lanes are reopened daily upon completion of work. • The Ascon community resource table in Edison Park and offsite air monitoring personnel are out in the community this month.

Upcoming work:
• Excavation and grading along the northern end of the Site, an area with a higher potential for odor, is planned upon completion of the 16-foot barrier wall. Excavation and grading in this area is expected to continue through most of 2025.
• Excavation and grading at the southeastern corner of the Site is expected to continue through late March 2025, where a future stormwater detention basin will be located. • During excavation and grading work in areas with a higher potential for odor in 2025, additional air monitoring personnel are observing for odors in the community, and the community resource table will be in Edison Park. DTSC will continue to be onsite observing work. Ascon will continue to note upcoming work in the weekly Site updates.

Update for January 22, 2025, City of HuntingtonBeach Southeast Area meeting.

For Discussion Only.

Northeast corner excavation work, January 2025
6 AIR MONITORING DURING

RESTART WORK
During Final Remedy excavation and grading work,
monitoring includes:
• 6 onsite perimeter near real-time telemetry air monitoring stations for dust and total VOCs
• 4 offsite trailers monitoring for VOCs, including locations adjacent to Eader Elementary and Edison High School
• Onsite workers monitoring downwind of excavations for odor, total VOCs and H2S (hydrogen sulfide)
• Dedicated personnel are in the community downwind of areas of excavation monitoring for potential odors
• During excavation in areas with higher potential for odor, additional monitoring personnel will be in the community, and an information table will be set up in Edison Park for community members to ask questions
• Data results will be posted on asconhb.com
Update for January 22, 2025, City of HuntingtonBeach Southeast Area meeting.

For Discussion Only.

Ascon Site Figure
7 2025 Ascon Stormwater Site Preparation
Ascon has completed Site maintenance
and preparation for the 2025 wet season.

Our team will complete stormwater
inspections with the City and conduct
maintenance as needed throughout
the wet season.

N
Update for January 22, 2025, City of HuntingtonBeach Southeast Area meeting.

For Discussion Only.

Map is for illustrative purposes, locations approximate

ASCON RESTART COMMUNITY

RESOURCES
Community Resources:
• Updated Ascon Air Monitoring
Webpage (https://asconhb.com/air-monitoring/)
• Ascon Restart webpage
(https://asconhb.com/restart) includes:
o Current schedule
o Near real-time air monitoring results
o Community resources (e.g., technical explainer,
community meeting materials, Restart Workplan)
8 • Weekly Project updates are sent to all Ascon email subscribers every Monday morning • Ascon Information Table and Information Line (714-388-1825) o The table is set up for the NE corner work occurring in January and will be set up during excavation work in areas with higher potential for odor in 2025
o DTSC and SCAQMD receive notifications of all calls that come through the line Ascon community resource table set up in Edison Park.

Update for January 22, 2025, City of HuntingtonBeach Southeast Area meeting.

For Discussion Only.

9 Ascon Phase 1 northeast corner work and excavation in the northern portion and other parts of the Site continues.

Final Remedy updates provided through Ascon website and project emails.

NEXT STEPS –

JANUARY/FEBRUARY
Update for January 22, 2025, City of HuntingtonBeach Southeast Area meeting.

For Discussion Only.

HOW TO STAYUP TO DATE

AND CONTACTUS
Visit asconhb.com to sign up to receive Ascon updates, including Weekly Site Updates covering onsite activities and field work, and sign up for AsconAlert.

Youcan reach the Ascon team at our information line, 714-388-1825, or via email at [email protected].

Update for January 22, 2025, City of HuntingtonBeach Southeast Area meeting.

For Discussion Only.

HB UPDATES
Community & Library Services

PARK IMPROVEMENTS
Edison Park
• bit.ly/hbedisonpark
Library Facilities Master Plan

BEACH EVENTS
City Beach
2/2: Surf City Marathon
3/8: Chili at the Beach on Main Street
State Beach
1/17-19: LeiOut Ultimate Frisbee Tournament
3,000 people, Towers 7 and North
3/1: One Hill Marathon
1,000 people, River Trail/Lot at Brookhurst
Community Development

COMMUNITY DEVELOPMENT
Magnolia Tank Farm LCP Amendment
- Coastal Commission
Final LUP Certification: December 13, 2024
- Next Steps
Applicant is working on their Tentative Tract Map &
Coastal Development Permit
• Subdivide land use areas
• Grading
• Infrastructure

Public Works

Police Department

PART I CRIMES
JANUARY – DECEMBER 2024
• Citywide - Part I Crimes are down 3.6%
• Southeast – Part I Crimes are up 1%

TRAFFIC COLLISIONS
JANUARY – DECEMBER 2024
Citywide Data:
• Citywide Collisions - 1484
• Bicycle Collisions
• Total Citywide: 267
• Involving E-bikes: 146
• Pedestrian Collisions
• Total Citywide: 87
• Southeast Area Collisions
• 321 collisions