Zone 2 Residential Overlay Project
Zone 2
Residential Zone Maintenance Program
Phases Within the Program:
Tree Maintenance
Fall
Concrete Rehabilitation/ADA Ramps
Fall/Winter
Street Paving
Spring/Early Summer
Slurry Seal
Early Summer
Zone 2 Residential Overlay Project
The Public Works Department has identified 110 residential street segments most in need of repair within Zone 2.
Scope of work includes:
Limited localized pavement repairs
Crack sealing
Cold milling
Asphalt overlay
Striping