Cities Index.
Att #1 Bid Results Report

City Council/Public Financing Authority
May 6, 2025

Document
Att #1 Bid Results Report
Meeting
May 6, 2025
Body
City Council/Public Financing Authority
Original file
69 KB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

City of Huntington Beach
Bid Results for Project Civic Center ‐ Generator & Switchgear Replacement Project (CC1720) Issued on 02/11/2025
Bid Due on April 07, 2025  2:00 PM (PDT)
Exported on 04/15/2025
Line Totals (Unit Price * Quantity)
Item Num Section Item Code Description Reference Unit of Measure Quantity MINAKO AMERICA CORPORATI OKindness General Contractors Mel Smith Electric, Inc. Arnaz Engin eering Contractors, Inc. US Builders and Consultants Inc. PC Inc 1 Section 1 1 Mobilization LS 1 $150,000.00 $149,420.00 $100,000.00 $100,000.00 $179,853.00 $189, 177.90 2 Section 1 2 Demolition LS 1 $175,000.00 $55,855.00 $80,000.00 $100,000.00 $571,805.00 $136,58 6.44 3 Section 1 3 Grading: Soil, Seeding, and Gravel LS 1 $75,000.00 $17,000.00 $60,000.00 $50,000.00 $7,745.00 $128,640.97 4 Section 1 4 New Exterior Concrete Footings, Pad & Pavement LS 1 $187,000.00 $55,000.00 $180,000.00 $100,000.00 $580,318.00 $124,8 57.41 5 Section 1 5 Interior Concrete Slab Repair LS 1 $25,000.00 $23,000.00 $40,000.00 $20,000.00 $5,971.00 $60,536.93 6 Section 1 6 New Interior Steel Bollards LS 1 $7,000.00 $7,500.00 $18,000.00 $10,000.00 $40,964.00 $37,835.58 7 Section 1 7 Exterior Plumbing ‐ Area Drains & Catch Basins LS 1 $37,000.00 $42,000.00 $43,000.00 $25,000.00 $59,651.00 $39,727.36 8 Section 1 8 Exterior Chain‐link Fencing LS 1 $15,000.00 $11,000.00 $26,000.00 $25,000.00 $97,488.00 $34,052.02 9 Section 1 9 Exterior Chain‐link Gates LS 1 $7,000.00 $2,500.00 $12,000.00 $10,000.00 $3,025.00 $32,160.24 10 Section 1 10 Plumbing ‐ Area Drains & Catch Basins LS 1 $17,000.00 $0.00 $54,000.00 $20,000.00 $1,270.00 $42,754.21 11 Section 1 11 Exterior CMU Retaining Wall LS 1 $67,000.00 $25,000.00 $60,000.00 $40,000.00 $61,952.00 $140,748.3 6 12 Section 1 12 Exterior Pipe Cleanout LS 1 $5,000.00 $6,000.00 $12,000.00 $1,000.00 $2,693.00 $30,268.46 13 Section 1 13 Painting LS 1 $6,700.00 $10,467.00 $23,000.00 $2,500.00 $9,631.00 $54,861.59 14 Section 1 14 Underground Exterior PVC Piping LS 1 $27,000.00 $121,150.00 $40,000.00 $5,000.00 $15,677.00 $52,969.81 15 Section 1 15 Underground Exterior Perforated Piping LS 1 $7,000.00 $8,000.00 $17,000.00 $5,000.00 $13,859.00 $49,186.25 16 Section 1 16 Electrical Equipment LS 1 $1,173,077.00 $1,234,075.00 $1,340,000.00 $1,600,000.00 $1,172,5 22.00 $1,191,820.77 17 Section 1 17 Electrical Equipment ‐ Pull Boxes, Conduit, Cable  Trays, Wiring, Grounding and Specialty Pull Boxes LS 1 $467,000.00 $1,040,713.00 $660,000.00 $850,000.00 $572,918.00 $444,568.07 18 Section 1 18 Exterior Seals and Fire Seals for Wall Penetration s LS 1 $1,000.00 $24,150.00 $19,000.00 $2,000.00 $3,616.00 $71,887.60 19 Section 1 19 Equipment Anchors LS 1 $3,000.00 $6,555.00 $20,000.00 $10,000.00 $2,094.00 $7,188.76 20 Section 1 20 Signage LS 1 $3,000.00 $3,163.00 $14,000.00 $2,000.00 $1,310.00 $5,675.34 21 Section 1 21 Existing Retrofitted Switchboard EA 1 $597,000.00 $286,078.00 $354,000.00 $400,000.00 $53,085.00 $586,4 51.49 22 Section 1 22 Removal of Existing Generator Underground Storage  Tank EA 1 $37,000.00 $69,150.00 $54,000.00 $30,000.00 $139,604.00 $321,602. 44 Subtotal $3,088,777.00 $3,197,776.00 $3,226,000.00 $3,407,500.00 $3, 597,051.00 $3,783,558.00 Total $3,088,777.00 $3,197,776.00 $3,226,000.00 $3,407,500.00 $3,597 ,051.00 $3,783,558.00

← All documents from this meeting