17th Street
Arterial
Rehabilitation
Project
June 3, 2025

BACKGROUND
• 17th Street ( Main Street to Palm Avenue)
• 0.5 street miles of construction
• Project opened bids publicly on May 8, 2025

• This arterial segment has a minimum Pavement Condition Index (PCI) rating of 42 reflecting a very poor condition, warranting rehabilitation. • New asphalt overlay required to existing pavement for extending life of street • Replace damaged and uneven concrete
• Construct ADA ramps
• Landscape enhancement with tree replacement
• Drainage improvements
• Striping and signage improvements
• Utility adjustments and cover replacements

NEEDS/WHY/BENEFITS

FUNDING
• Arterial CIP Funding $1,952,522.10
• This project will be fully funded by the Road
Maintenance and Rehabilitation Account (RMRA)

SCHEDULE
• Construction to commence in Summer 2025
• Construction to finalize in Fall 2025

RECOMMENDATION
• Accept the lowest responsive and responsible bid
submitted by All American Asphalt in the amount of
$1,684,111.00
• Authorize the Mayor and City Clerk to execute a
construction contract in a form approved by the City
Attorney.

Questions?