PROFESSIONAL SERVICES CONTRACT BETWEEN

THE CITY OF HUNTINGTON BEACH AND
RAK DEVELOPMENT INC. DBA KREUZER CONSULTING GROUP
FOR

ON-CALL CIVIL ENGINEERING
& PROFESSIONAL CONSULTING SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and RAK DEVELOPMENT INC. DBA KREUZER CONSULTING GROUP, a California Corporation hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to provide On-Call Civil Engineering & Professional Consulting Services; and
Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and
CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:

1. SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT."
CONSULTANT hereby designates Rick Kreuzer who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement.

CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement.
25-16466/380233 1 of 11
TERM; TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT are to commence on → 20 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.

In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein.

COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed Two Million Dollars ($2,000,000.00).

EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained

METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B." 25-16466/380233 2 of 11

DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. • These materials may be used by CITY as it sees fit.

HOLD HARMLESS
CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT.

B. To the extent that CONSULTANT performs "Design Professional Services" within the meaning of Civil Code Section 2782.8, then the following Hold Harmless provision applies in place of subsection A above:
25-16466/380233 3 of 11
"CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and against any and all claims, damages, losses, expenses, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature to the extent that the claims against CONSULTANT arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT's proportionate percentage of fault. However, notwithstanding the previous sentence, in the event one or more other defendants to the claims and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid defense costs. The duty to indemnify, including the duty and the cost to defend, is limited as provided in California Civil Code Section 2782.8.

C. Regardless of whether subparagraph A or B applies, CITY shall be reimbursed by CONSULTANT for all costs and attorney's fees incurred by CITY in enforcing this obligation.

This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONSULTANT.

PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars ($1,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not contain a self-insured retention without the express written consent of CITY; however an insurance 25-16466/380233 4 of 11
policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims-made policy shall be acceptable if the policy further provides that:

A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements).

B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims.

CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement.

If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY.

10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall:

A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and
25-16466/380233 5 of 11
C. shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium.

CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY.

The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required.

11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder.

12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner.

CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the 25-16466/380233 6 of 11
event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.

13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove.

14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement.

15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code.

16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail-return receipt requested:
25-16466/380233 7 of 11
TO CITY: TO CONSULTANT:

City of Huntington Beach RAK Development Inc., dba Kreuzer ATTN: Director of Public Works Consulting Group
2000 Main Street Attn: Rick Kreuzer
Huntington Beach, CA 92648 18872 MacArthur Blvd., Suite 210 Irvine, CA 92612

17. CONSENT
When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event.

18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties.

19. SECTION HEADINGS
The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement.

20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or 25-16466/380233 8 of 11
neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law.

21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it.

22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification.

23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT.
25-16466/380233 9 of 11

24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party.

25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive.

26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.

28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this 25-16466/380233 10 of 11
Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.

29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.

This Agreement shall expire when terminated as provided herein.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.

CONSULTANT, CITY OF HUNTINGTON BEACH, a
RAK DEVELOPMENT INC. DBA municipal corporation of the State of KREUZER CONSULTING GROUP California
Mayor
By:

REUZER City Clerk
print name
ITS: (circle one) Chairman President/ ice President INITIATED AND APPROVED:

Director of Public Works
By:

JAAP
print name REVIEWED AND APPROVED:

ITS: (circle one) Secretary Chief Financial Officer/Asst.

Secretary - Treasurer
City Manager
APPROVED AS TO FORM:

Wilt
City Attorney Y pe
11 of 11
25-16466/380233
Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.

29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.

This Agreement shall expire when terminated as provided herein.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.

CONSULTANT, CITY OF HUNTINGTON BEACH, a
RAK DEVELOPMENT INC. DBA municipal corporation of the State of KREUZER CONSULTING GROUP California
Mayor
By:_
City Clerk
print name
ITS: (circle one) Chairman/President/Vice President INITIATED AND APPROVED:

AND
Director of Public Works
By:
print name
REVIEWED AND APPROVED:

ITS: (circle one) Secretary/Chief Financial Officer/Asst.

Secretary - Treasurer
City Manager
APPROVED AS TO FORM:

Meinos
City Attorney
25-16466/380233 11 of 11
EXHIBIT "A"
A. STATEMENT OF WORK: (Narrative of work to be performed) Provide On-Call Civil Engineering and Professional Consulting Services. If Consultant chooses to assign different personnel to the project, Consultant must submit names and qualifications of these staff to City for approval before commencing work.

B. CONSULTANT'S DUTIES AND RESPONSIBILITIES:

See Attached Exhibit A
C. CITY'S DUTIES AND RESPONSIBILITIES:

Furnish Scope of Work and provide a request for proposal for each project.

City shall issue a task order for each project based upon scope of services, work schedule, and fee proposal submitted.

D. WORK PROGRAM/PROJECT SCHEDULE:

A project schedule will be developed for each project assigned by the City.

EXHIBIT A

EXHIBIT A

KREUZER CONSULTING GROUP
March 13, 2025
City of Huntington Beach
Public Works Department
2000 Main Street
Huntington Beach, CA 92648
RE: Qualifications to Provide On-Call General Civil Engineering and Surveying Services To whom it may concern,
The Kreuzer Consulting Group (KCG) appreciates the opportunity to present our qualifications for the subject on-call contract. Our firm is uniquely qualified for this assignment for two reasons.

One, we are completely committed to the public works sector. We are a small company led by seasoned individuals that are completely devoted to providing quality planning and design services to Southern California municipalities; Two, we have significant experience serving as on- call consultants to Southern California municipalities. Currently, we have active on-call engineering with the following agencies: Huntington Beach, Irvine, Tustin, Gardena, Newport Beach, Stanton, San Juan Capistrano, Arcadia, San Clemente, Brea, Signal Hill and Culver City. We have formatted this proposal to address all of the items outlined in the RFQ and have limited our response to 20 pages, including the cover letter herein and excluding the enclosed forms, table of contents and appendix. We take no exceptions to the sample contract provided with the RFQ and can meet all insurance requirements outlined therein. All work will be completed in our Irvine office at the address denoted below.

These qualifications have been prepared in conformance with the RFQ dated February 4, 2025 and Questions and Answers dated February 20, 2025. Our proposed billing rates contained in the seperae fee schedule shall remain valid for the duration of the on-call contract.

As the President and CEO of the firm, I am authorized to sign on behalf of the company. Thank you for the opportunity to submit these qualifications. If you have questions or require additional information please do not hesitate to call.

Respectfully Submitted,
Rick Kreuzer, P.E.

President
18872 MacArthur Blvd Suite 210 Irvine, CA 92612 714-656-0160 Disciplines of Civil Engineering Services Application Form *Circle all that apply*
Civil Engineering Service Area Bidding?
Y/N
(circle)
• Water/Sewer/Storm Water Engineering Yes / No
• General Civil Engineering res / NO
Ocean Engineering Yes / No
Environmental/Water Quality Yes / No

REQUEST FOR PROPOSAL

VENDOR APPLICATION FORM
TYPE OF APPLICANT: • NEW CURRENT VENDOR
RAK Development inc dba Kreuzer Consulting Group
Legal Contractual Name of Corporation:

Contact Person for Agreement: Rick Kreuzer, PE
Corporate Mailing Address: 18872 MacArthur Blvd., Suite 210 Irvine, CA 92612
City, State and Zip Code:
[email protected]
E-Mail Address:
714-656-0160 Fax: 714-656-0165
Phone:

Contact Person for Proposals: Rick Kreuzer
Title: President E-Mail Address: [email protected] 714-656-0160 Business Fax: 714-656-0165
Business Telephone:

Year Business was Established:

Is your business: (check one)
• NON PROFIT CORPORATION • FOR PROFIT CORPORATION
Is your business: (check one)
• CORPORATION L LIMITED LIABILITY PARTNERSHIP
INDIVIDUAL | SOLE PROPRIETORSHI
PARTNERSHIP 7 UNINCORPORATED ASSOCIATIOI
1 of2
Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Rick Kreuzer President/CEO 714-656-0144
Kelsey Jaap Secretary 714-656-0160
68-0579985
Federal Tax Identification Number:

N/A
City of Huntington Beach Business License Number:
(If none, you must obtain a Huntington Beach Business License upon award of contract.) N/A
City of Huntington Beach Business License Expiration Date:
2 of 2
TABLE OF CONTENTS ....

Page No
Section A - Background and Project Summary... ...1
Section B - Methodology..... ..2
B.1 Firm Overview and Approach. 2
B.2 Project Controls and Project Delivery Process.. ... 4 Section C- Staffin........ .7
Section D - Qualification............ ....10
Appendix - References Form
KCG Team Resumes

SECTION A - BACKGROUND AND PROJECT SUMMARY
The Kreuzer Consulting Group (KCG) has been one of Huntington Beach's on-call civil engineering consultants since 2021. Over the last 4 years, we have completed the following projects for the City:
*, Blufftop Park Pedestrian, Bike Trail and ADA Improvements *; Humboldt Bridge Civil Improvements
• Pacific Coast Highway Relinquishment Study
* Pacific Coast Highway Opportunity Plan
* Zone 1 Survey Monumentation Restoration
** Zone 2 Survey Monumentation Restoration
Our firm, and team of subconsultants, have the skills and expertise to address all of the technical elements under the General Civil Engineering Category in the RFQ, summarized as follows:
• Street Widening Improvement Projects
• Street Rehabilitation Improvement Projects
• City Facility Projects including ADA Parking Lot and site grading Improvements • All aspects of NDES compliance, including WOMP's SWPPP's and field inspections • Construction and Bidding Support
• Provision of Record Drawings
• Geotechnical Reports (Subconsultant)
• Landscape Architecture (subconsultant)
• Bridge Structural Design (subconsultant)
• Field Survey services including, but not limited to, horizontal/vertical control, topographic surveys, cross sections, aerial mapping control, boundary surveys, centerline surveys and ties, corner records, records of survey and construction staking Right of Way services including, but not limited to, legal descriptions and plats, tentative and final subdivion maps, and procurement and review of Preliminary and Final Title Reports
KCG currently provides similar on-call engineering services to 12 agencies, including the City of Huntington Beach. We understand the nature of on-call contracts and the responsiveness and quality - focused approach required to deliver these projects in a timely, efficient manner. 1 SECTION B - METHODOLOGY
B1 - Firm Overview and Approach
The Kreuzer Consulting Group (KCG) is a firm comprised of individuals who have spent their entire professional careers serving the public sector in Southern California.

We are led by our President, Rick Kreuzer, who has 40+ years of experience in the Public Works engineering industry. Our firm is a small firm which can provide a broad range of services to our clients. We currently have active on-call engineering contracts with multiple departments in the City of Anaheim, as well as with the Cities of Long Beach, Tustin, Brea, San Juan Capistrano, San Clemente, Arcadia, Lake Forest, Newport Beach, Stanton, Gardena, Downey, Culver City and Huntington Beach.

We also maintain strong relationships with subconsulting support firms that share our philosophy of hands- on principal involvement on all projects. Depending on a particular project's needs, our team would include of some, or all, of the following subconsultants:
• Rende Consulting - Structural Engineering
Clark & Green - Landscape Architecture
Harrington Geotechnical - Geotechnical
KCG has worked extensively with these firms on past projects with great success.

Our in-house staff are second to none. Their credentials as well as a detailed description of the wide range of projects we have delivered over the years are summarized in Sections C and D of these qualifications.

Our experience will translate to value for the City of Huntington Beach. Based upon our firm's extensive public works design experience, we believe the key issues for successful completion of on-call design projects center around the following key areas.

Effective Project Management
There is no doubt that all proposing firms will tout their abilities to effectively "manage" a project.

Unfortunately, many firms believe if they stay somewhat on schedule and submit their invoices on time they have been "effective" managers. We at KCG do not subscribe to this. Our core business philosophy is centered around effective management of all of our projects with the goal of making our clients job easier. The cornerstone goal of this philosophy is to "get out and stay out in front of the issues" on each and every project. We feel very strongly that our clients hire us for an assignment it is our obligation to bring it to a successful completion without having our hands held or being reliant on City staff to do our job for us. We know that cities have this hand-holding experience with consultants too frequently... KCG will not allow this to take place on this or any project. The way we achieve this objective is by providing seasoned engineers that are also effective managers, not only because they understand the project process but because they 2 understand the technical background of the design itself. We can anticipate issues faster than those managers who are reliant on younger design engineers to keep them informed. This disconnect cannot and will not happen at KCG because our Project Managers have hands on day to day involvement in the project design. Our Project Manager for the subject project will be Rick Kreuzer. Mr. Kreuzer is the President of KCG and has 40 years of experience managing and designing public works projects. Over the last 15 years, he has personally managed and/or designed over 50 roadway and public works infrastructure improvement projects for Southern California cities.
** Proactive Utility Coordination
Utility coordination is an element that, if not properly addressed and managed, can significantly effect a project schedule and budget. This work task is much more than gathering record drawings and plotting then on the plans. The success of this task is proactively managing the relationship with all utility agencies involved. It certainly requires the establishment of the existing location of utilities as a first step but the real key is identifying the impacts to these facilities early on in the design process and coordinating proactively with the affected agency staff/service planners to mitigate those impacts and facilitate needed relocations. Overlooking or addressing utility impacts late in the design process usually results in schedule overruns and cost increases during construction.

NDES Expertise
Water quality requirements have become a critical component of projects over the last decade.

Successful delivery of a project requires a firm that understands this reality and can deliver the permits required. KCG's stormwater specialist, Chris Becker, has a thorough understanding of the City's plans for long-term pavement maintenance and rehabilitation, while maintaining strict compliance with today's stringent water quality regulatory environment. He is a seasoned stormwater compliance expert that specializes in the municipal sector. He is a California Certified/Qualified SWPPP Practitioner (QSP) and Qualified SWPPP Developer (QSD). KCG can turn- key all storm water compliance needs from site assessment, to report preparation, to site inspections and monitoring. We have a working knowledge of the complex California General Stormwater Permit for New Construction and are currently performing work for many cities, Caltrans and several developers and general contractors.

Focus and Experience
KCG's primary core business is civil design. Our staff has delivered successful street widening and rehabilitation and utility projects all around Southern California for the last two decades. We understand the design subtleties associated with public works design projects in urban settings.

Moreover, we provide in house experience in the complementary functions, namely water quality and community outreach, that have become so integral to the successful delivery of projects in today's world. This experience and focus will translate to value, via cost effective design, to the City of Huntington Beach.
3 On-Call Experience
The nature of on-call contracts requires a firm to be nimble and responsive. We are a small firm that prides ourselves on providing these qualities to our clients. This is evidenced by the number of active on-call contracts we maintain with other public agencies.

Project Quality and Delivery
Simply put, the ultimate success of a project is determined by the delivery of a quality design delivered on schedule. The following pages describe the tools and approaches KCG implements to insure that these objectives are achieved on all of our projects.

B2 - Project Controls and Project Delivery Process
Once a project is identified, the KCG Project Manager will meet with the City Project Manager or designated staff member responsible for the project to discuss the proposed scope of work, projected schedule, and estimated costs required to complete the detailed work. The KCG Team will not begin work on a project until a work order has been approved. Upon concurrence of all work order details, the City will issue the work order, and the KCG Team will begin the designated tasks.

The KCG Team, together with its supporting subconsultants, will provide the City with the resources necessary to successfully deliver the projects at hand. The following are the project controls we employ to deliver each project assignment.
* Schedule Control: KCG has extensive experience in managing projects through such automated scheduling tools such as Microsoft Project and Primavera. The KCG Project Manager will coordinate with the City Project Manager to determine the most appropriate scheduling software for this project. A monthly status of each project schedule will be provided and impacts to other project tasks will be noted if there are delays. Any delays or schedule modifications will be discussed with the City Project Manager and recommendations will be given for maintaining the overall schedule.
* Cost Control: KCG is committed to controlling costs through regular and timely discussions of work efforts and project accomplishments. KCG will utilize automated project accounting tools to ensure project completion within budget. Before the start of the project, a detailed scope of work will be established where tasks and subtasks are identified and a "per-task" budget will be estimated. Project team members will develop a scope of work that minimizes project cost, while ensuring a high-quality product. The KCG Team Project Manager will discuss with the City Project Manager key elements of the project budget and work scope before the project begins. In this way, unforeseen costs and potential delays will be minimized.
* Resource Allocation Tracking: Time spent on projects is recorded electronically on an integrated time sheet application for each work day and integrated into an automated tracking system. From the computerized system, the Project Manager can, at any time, obtain a detailed Project Progress Report that shows the amount of time spent per person, as well as the budget-per-task, year-to-date, and project-to-date. Expense sheets for professional services and expenses (from direct costs such as equipment, materials, and subcontractor services) are prepared weekly. These tools allow KCG to proactively manage the project delivery process and identify potential schedule and budget issues before they become a problem. We can also provide the City with a Work Breakdown Schedule (WBS) for both manhours and costs which assists us with managing the flow of work and provides the City with anticipated monthly project cash flows for the entire project duration * Quality Assurance/ Quality Control: At KCG, we believe our "uniqueness" comes from our belief that quality control is rooted in the philosophy by which you conduct your business. It is true that quality can be monitored and controlled to some degree via checklists and independent reviews, but a true "quality" product comes from a firm's commitment to excel for their clients. Do they care about their product? KCG does. Do they have experienced staff overseeing or doing the work every step of the way? KCG will. Do they want the next job? KCG does. Are they staying out in front of the issues and "leading" the project? KCG will. Quality is a culture within a company...you either have it or you don't. This philosophy manifests itself in how we systematically approach QA/QC. This is a cornerstone element of KCG's overall approach to the management and control of our work. The graphic on the following page depicts KCG's approach to QA/QC on all of our projects.

All projects require a collaborative approach between our PM and team and the client. That said, we pride ourselves on being "low maintenance" and delivering successful projects with minimal supervision and oversight. This is the result of providing a solid team that is lead by a very experienced Project Manager. Typically, we will require the following assistance from City Staff regarding our work effort:

Provision of record drawings and as-builts
• Coordination support with other City departments, as needed Payment of outside permit fees (i.e. Caltrans)
• Timely review of project submittals
At KCG, we pride ourselves on the quality of our work product. We encourage the City of Huntington Beach to contact our past and current clients regarding this claim. 5 KCG QA/QC APPROACH
Strong and Effective Management by the Project Progress Status Monitoring Manager - Conduct Progress Meetings with Client and other extemal agencies at • Serve as the primary contact with Client and other specified times as needed agencies. - Conduct team meetings:
• Manage the consultant team. Enforce effective • Prepare monthly progress reports communication. • Status summary exhibits on cost and schedule - Control the flow of communication. • Discussions on past/schedule activities • Exercise decision-making authority for the entire team. • Status of meetings and action ilems • Meet and thoroughly fulfill all contractual and : Prepare meeting minutes and promptly distribute to all parties. Include. technical/professional requirements. Be responsible for product quality and timely delivery.
• Purpose and objectives of the meeting
• Altend and/or chair all progress meetings.
• Be proactive. • Summary of the discussions
• Decisions reached
• Encourage thinking outside the box. * Action items and the respective responsible entity/individual Management
& Control of
the Work
Project Control Quality Assurance / Quality Control
* Initiate project control system. • Documents will be comprehensively checked at one or more milestones • Constantly monitor the overall project schedule as well before they are completed. as specific schedules of principal and critical activities. • A senior person not associated with the project will check all documents • Constantly monitor internal labor and direct costs. before they are submitted. • Monitor subconsultant costs. • One person will check all critical dimensions. • Alert Client of potential impacts to cost and/or schedule • The person responsible for the drawings will review the text, and the writer and propose solutions. will review the drawings, insuring adequate cross checking • Furnish invoices in a timely manner to Client. Monitor • The Project Manager will review all documents produced by other subconsultant invoices. contributors to insure overall project coordination. • Monitor project record keeping (project files, meeting • Apply TQM principles - DO IT RIGHT THE FIRST TIME. - Conduct Independent Reviews, as warranted.
6 SECTION C - STAFFING
Our team organization is depicted on Exhibit A below. KCG's president, Rick Kreuzer, PE, will be the Project Manager as well as the Principal in Charge. He will be the single point of contact with the City of Huntington Beach, and will have the authority to act on behalf of the firm regarding all contractual, project performance and quality matters.

Rick Kreuzer, PE
KCG
Project Manager
Eric Metz, LS
David Jarvi, PE Chris Becker, QSP/QSD
KCG

KCG KCG
Survey, R/W Docs & Water Quality
Civil Engineering
Mapping
Mike Green, ASLA Greg Rende, PE Joseph Welch, RCE, GE
Clark & Green Rende Consulting Harrington
Landscape Structural Geotechnical
Support Staff
Exhibit A - KCG Team
Mr. Kreuzer is a registered civil engineer in the State of California with 40+ years of professional experience. The unique aspect of Mr. Kreuzer's experience is that he has spent his entire professional career as an owner of (or working for) small firms which means he has been, and continues to be, a very involved and hands-on Project Manager. He is not a delegator or glorified principal but is "on the boards" and intimately involved with the day to day design aspects of his projects. We believe this attribute is a real value to our clients and is the cornerstone operating philosophy of our company.

Assisting Mr. Kreuzer with the day to day design of the project will be Mr. David Jarvi. Mr. Jarvi has been Mr. Kreuzer's right hand man for the last two decades including all of the on-call assignments referenced herin. He is a registered Civil Engineer with 24 years of experience. He is proficient with the use of AutoCAD software and has a thorough understanding of City standards, design criteria and plan formatting requirements. He is also well versed with Civil 3D design software.
7 Chris Becker, QSP is KCG's Storm Water Quality expert. Mr. Becker has 31 years of professional experience in the public works industry. He is a Qualified SWPP Developer and Practitioner (QSD/QSP), Certified Professional in Erosion and Sediment Control and Certified Sediment and Storm Water Quality Management Plans (WQMP), Storm Water Pollution Prevention Plans (SWPPP) and Caltrans Storm Water Data Reports (SDR).

The strength of our on-call team will be further enhanced by our subconsultants. These individuals/firms were handpicked based upon two key criteria. One, KCG staff had worked cooperatively and successfully with them in the past; and two, they employ KCG's philosophy of providing hands on principle involvement on their projects. The following provides a brief summary of the qualifications for our key subconsultant personnel.

Subconsultants
KCG utilizes the same subconsultant firms on all of our projects. These firms share our philosophy of hands-on principal involvement on all projects. Depending on the needs of a particular project or assignment, KCG would utilize the services of some or all of the following subconsultants:

Greg Rende, PE MCurrent Projects with KCG
Rende Consulting M Past Projects with KCG
Structural
Mr. Rende is KCG's structural engineer. He has 30 years of experience on all aspects of structural design including pedestrian highway and roadway bridge structures, building modifications, retaining walls and flood control structures.

Mike Green, ASLA MCurrent Projects with KCG
Clark & Green Associates M Past Projects with KCG
Landscape Architecture
Mr. Green has 43 years of experience. During his career, Mr. Green has worked with the City of Westminster Planning Department and the Port Authority for the City of Long Beach in Environmental Impact Research Preparation and Risk Management Assessment. In 1986, he and his partner, Bob Clark, formed Clark & Green Associates. Mr. Green has specialized in community residential projects and public streetscapes with an emphasis on water management, conservation and sustainable landscape design. He has received multiple ASLA awards for his design work over the years. Mr. Green has multiple roadway widening projects with KCG, including the Brookhurst Street and Orangewood Avenue Improvements in the City of Anaheim.

Joseph Welch, PE, GE • Current Projects with KCG
Harrington Geotechnical M Past Projects with KCG
Geotechnical
Joseph Welch, PE, GE, Geotechnical Engineer, is a registered civil and geotechnical engineer in California with 45 years of experience. Mr. Welch is a graduate of West Point and holds a master's degree in civil engineering from George Washington University. His responsibilities include geotechnical engineering, laboratory management, and expert witness. 8 Table 1 below provides a synopsis of the KCG team's key personnel registrations, experience and overall project availability.

TABLE 1 - TEAM MEMBER QUALIFICATIONS / AVAILABILITY SYNOPSIS Experience
California Working on %
Project Years of License Similar Available
Name Firm Responsibility Experience Education Type/No Projects KCG Project 41 BS PE/42407 40%
Rick Kreuzer
Manager
David Jarvi KCG Project 24 BS PE/66792 50%
Engineer
Chris Becker KCG Water Quality 31 BS QSP/24431 30%
Eric Metz KCG Survey&R/W 23 AA LS/9198 r 25%
Greg Rende RCG Structural 30 BS PE/54529 r 30%
Mike Green C&G Landscape 43 BS/MS RLA/2311 20%
Architecture
RGE/2239
Joseph Welch Harrington Geotechnical 45 BS/MS RCE/040236 r 20% Our approach to delivering projects will be the one we have used with a multitude of cities for the past 25 years which consists of providing an experienced Project Manager who is "hands-on" with the day to day design elements of the project and who proactively manages a team of subconsultants who share the same commitment of providing seasoned firm principals to direct and manage their work. All of the subconsultants on our team have worked extensively with KCG on past projects. We know what to expect of each other and are fully committed to delivering quality work.

Personal resumes for these KCG team members are included in the Appendix to these qualifications.
9 SECTION D - QUALIFICATIONS
BACKGROUND: The Kreuzer Consulting Group (KCG) is a California corporation. We were formed on July 1, 2004 by our president and founder, Rick Kreuzer. Mr. Kreuzer has spent his entire 40+ year professional career as a civil engineering design consultant serving the public sector. We are based in Irvine, California and maintain a staff size of 12.

SERVICES: Municipalities, counties, and public agencies as a whole, face diverse challenges when planning and implementing improvements to public infrastructure. Public planning issues, environmental constraints, and the concerns of local residents all have the potential to impact a project's bottom line. KCG has created a network of resources, both in-house and through long- standing relationships with quality subconsultants, to provide clients with "one-stop shopping" in all of the technical disciplines necessary to address these issues. Services provided by the KCG team include:

Rick Kreuzer, PE
KCG Team Leader

PROJECT MANAGEMENT &
MEDICTA TRANSPORTATION.

AGENCY SUPPORT

SERVICES SERVICES
•. Corridor & Alignment • Project Management
Studies • Grant Writing
• Caltrans PSRS & PRS • Plan Checking
• Highway Design • Value Engineering
• Traffic • Implementation Plans
Signing & Striping • Permitting Support
Traffic Control • Oversight / Extension of
0 Railway Design Staff
Roadway Grade • Cost Estimating
Separations • Critical Path Scheduling
Track Design D Community Revitalization
Quiet Zone Studies Studies/ Implementation
• Roundabout Design Plans
10 KCG staff have worked extremely hard over the years to establish the firm's reputation as engineers who will "go the extra mile" for our clients. We are proud of this reputation.

RELEVANT EXPERIENCE: A big part of our firms practice includes the provision of design services through on-call engineering contracts. The following summarizes our current on-call design services contracts:
* City of Huntington Beach • City of Tustin
• City of Gardena * City of Brea
City of Anaheim City of San Juan Capistrano
City of Culver City • City of Newport Beach
* City of San Clemente •City of Lake Forest
* City of Stanton •City of Signal Hill
• City of Arcadia • City of Irvine
We are familiar with the nature of on-call contracts. We are flexible, and through the team proposed herein, will provide a design team that is customized and has the resource capabilities to handle any project assignment put before us.

KCG is proposing to provide on call services for the range of service and technical elements summarized in the RFQ for the General Civil Engineering discipline. The following pages provide a broad range of recent and ongoing KCG projects that included all of these technical elements.

Each of the referenced projects includes a brief overview along with the additional project details.

Our summary of five references are included on the required References Form contained in the Appendix of these qualifications.

IMPERIAL AND PARAMOUNT INTERSECTION IMPROVEMENTS
Downey, CA
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Firm Role: Project Management & Civil Engineering
Support Staff: David Jarvi, PE
KC Contract Value: $300 K
Construction Value: $4 M
Design Completed: Ongoing (2025)
Construction Completed: Pending (2026)
Construction CO: N/A
Contracting Agency: City of Downey
References: Ed Norris-Deputy Director of Public Works
(562) 904-7110
This project includes the design of the following
improvements at the Imperial/Paramount intersection:
• Dual left turns southbound on Paramount
• Dual left turns westbound on Imperial
• Widening the southwest corner to allow
for northbound U-turns on Paramount
In addition to the roadway geometry required for these widening improvements, the project also includes the following other enhancements:

Reconstruction of all 4 legs of the intersection with concrete pavement. The limits of concrete will be approximately 300 feet for intersection approaches and 50 feet for departures.
• Reconstruction of the entire intersection with concrete pavement • Construction of decorative crosswalks
• Reconstruction of all access ramps, sidewalk and driveways to meet ADA standards • Implementation of custom City bus shelters
• Modifications to the existing traffic signal
• New signing and striping
• Utility adjustments and relocations
• Minor modifications to existing landscaping and irrigation The project also required partial right of way acquisition and TCE's for four (4) adjacent properties.

ORANGEWOOD AVENUE IMPROVEMENTS
Anaheim, CA
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: David Jarvi, PE & Daniel Perez
Firm Role: Project Management & Civil Engineering
KCG Contract Value: $700,000
Construction Value: $14M (Bid $13.8 M)
Final Construction Cost: N/A
Construction CO: None to Date
Design Completed: 2022
Construction Completed: Ongoing (2025)
Contracting Agency: City of Anaheim, CA
References: Edgar Garcia 714-765-4433
KCG completed the final design for the widening of Orangewood Avenue from State College Boulevard to the Santa Ana River, a distance of approximately 3,000 lineal feet. This project includes roadway widening, structural retaining walls, new landscaping and extensive utility design including new storm drains and domestic and recycled water lines, significant off-site improvements and partial right of way acquisition from ten (10) properties. This project also required extensive traffic control plans and the preparation of a comprehensive Water Quality Management Plan (WQMP).

CITY OF ANAHEIM

STREET IMPROVEMENT PLANS FOR THE CONSTRUCTION OF

ORANGEWOOD AVENUE

FROM STATE COLLEGE BOULEVARD TO SANTA ANA RIVER
Accounl No: 828-412-K939-7892
870-412-K939-7892
24127 на.

MiSTY HAN
no Colman us
FACE STATE CONCE VENUEA AVA FNER 145522
Fatimo
33215
13 TUSTIN ZONE 4 STREET IMPROVEMENTS
Tustin, CA
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: Leo Joson
Firm Role: Project Management & Design
KCG Contract Value: $120,000
Construction Value: $5.3M (Bid = $5.2 M)
Final Construction Cost: $5.3M
Construction CO: None
Design Completed: 2023
Construction Completed: 2024
Contracting Agency: City of Tustin
References: Eric Johnson
Principal Engineer
(714) 573-3320
[email protected]
Zone 4 is an area bounded by Nisson Road on the north,
Tustin Ranch Road on the East, Edinger Avenue on the
south and Newport Avenue on the west. Within this
zone there are 9 miles of residential and arterial streets.

KCG completed design for these streets which included
a variety of treatments including slurry seals, mill and overlays and full reconstruction. The project also included a complete field review of all streets to identify removal and replacement of damaged curb and gutter, sidewalk and driveways.

KCG also completed an assessment of all existing curb access ramps for ADA compliance and provided design details for all ramps that required reconstruction. "sil
anal
401021-
- 13
210"
14 CENTRAL AVENUE STREET AND WATER LINE IMPROVEMENTS
Brea, CA
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: David Jarvi, PE
Firm Role: Project Management & Civil Engineering
KCG Contract Value: $350 K
Construction Value: $7 M
Design Completed: 2024
Construction Completed: Pending/ 2026
Construction CO: N/A
Contracting Agency: City of Brea
References: Ryan Chapman
City Engineer
(714) 990-7763
[email protected]
The project includes the design of a new 12"
water line on Central Avenue between Roscoe
Street and Blossom Place, a distance of
approximately 8,600 lineal feet. The project will
also include coordination with and permitting
through the City of La Habra and the County of
Orange. These water line improvements plans
will be packaged and bid along with street
improvement plans KCG is designing for Central
Avenue between Palm Street and Lambert Road,
a total distance of approximately 14,000 lineal
feet. Together these project improvements will
consist of the following improvements:
8,600 feet of new 12" C900 PVC water line
New water line cross connections at 6 intersections
• Abandonment and/or removal of approximately 9,000 feet of existing cast iron water pipe • Suspension of new water line from Brea Canyon Channel bridge structure • Rehabilitation of approximately 2.6 miles of existing roadway consisting of a combination of mill/overlay and total reconstruction
• Reconstruction of damaged curb, gutter and sidewalk
• Reconstruction of eighteen (18) access ramps for ADA compliance • Pavement striping and markings
• Full traffic control to facilitate construction of the improvements above 15 DOWNTOWN TUSTIN STREETSCAPE ENHANCEMENTS
Tustin, CA
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: David Jarvi, PE & Robbie Kreuzer
Firm Role: Project Management & Civil Engineering
Contract Value: N/A Old towa
TUSTIN
Construction Value: $12 M (Estimate)
Design Completed: 2024
Construction Completed: Pending (2026)
Contracting Agency: City of Tustin
References: Eric Johnson
Principal Engineer
(714) 573-3320
[email protected]
KCG is completing preliminary and final design for improvements in the Old Town Historic District in the City of Tustin. These improvements including the narrowing of Main Street to implement a more "complete street" consisting of a more balanced vehicular/pedestrian/bicycle facility on main street and the construction of a series of "parklets" along El Camino Real to provide additional open space and facilitate the expansion of outdoor dining venues for local restaurants.

BROOKHURST STREET WIDENING PHASE 1
Anaheim, California
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: David Jarvi, PE
Firm Role: Project Management & Civil Engineering
Contract Value: S600 K
Construction Value: $18 M
Final Construction Cost: $17.8 M
Design Completed: 2018
Construction Completed: 2020
Contracting Agency: City of Anaheim
References: Edgar Garcia
Principal Engineer
714-765-4433
[email protected]
KCG completed preliminary engineering, environmental clearance, project report and final PS&E for this one mile long widening project in the City of Anaheim. This project involved the widening of Brookhurst Street from 4 to 6 lanes between Katella Avenue and Ball Road, a distance of 1 mile. This project included the acquisition of 21 residential properties and 3 part takes of commercial property.

This project included extensive sound wall improvements which were designed as CIDH pile foundation walls along the entire east side of the alignment. The project also included extensive storm drain design and utility coordination efforts and interfacing with Union Pacific Railroad (at-grade crossing improvements) and the County of Orange.
16 SOUTHERN AVENUE STREETSCAPE IMPROVEMENTS
Mesa, Arizona
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: Chris Scott, PE & Robbie Kreuzer
Firm Role: Project Management & Civil Engineering
Contract Value: $600,000
General Contractor: Haydon Corp.

Delivery Method: Construction Management @ Risk (MAR)
Construction Value: $20 M
Final Construction Cost: $20 M (on budget)
Design Completed: June 2016
Construction Completed: March 2019
KCG was the prime consultant for Contracting Agency: City of Mesa, AZ. the final design of corridor References: Marc Ahlstrom- Deputy City Engineer (480)644-4622
improvements to Southern Avenue marc. [email protected] from Alma School Road to
Sycamore Street, a distance of
approximately 1.2 miles. This project's construction was completed using the CMAR process. This project included narrowing Southern Avenue from 6 to 4 lanes and construction of wider pedestrian parkways along with drainage, traffic signal and utility undergrounding improvements.

KCG was assisted by J2 Engineering (landscape/ hardscape), Wright Engineering (lighting and traffic signals), MakPro (public outreach), and RAMM (geotechnical) on the project design. As depicted below, the KCG Team received an excellent rating in 13 of 14 categories and an overall rating of 98% for our performance of this project by the City of Mesa. In addition, the KCG Team received the ACEC "Project of the Year Award" for Arizona in 2020.

TA
17 BLUFFTOP PARK TRAIL IMPROVEMENTS
Huntington Beach, CA
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: Daniel Perez
Firm Role: Project Management & Civil Engineering
Contract Value: N/A
Construction Value: $5 M
Design Completed: 2022
Construction Completed: 2023
Contracting Agency: City of Huntington Beach
References: Tom Herbel
City Engineer
(714) 375-5077
[email protected]
KCG completed design for the reconstruction of the beach trail along the bluff top west of PCH between Seapoint Street to 11t Street. The project included setting the trail alignment and preparation of trail, grading and striping plans as well as details for ADA compliant ramp connections at various location. The project also included coordination and permitting with Caltrans District 12 for the implementation of curbside sidewalk on the west side of Pacific Coast Highway.

Humboldt Bridge Improvements
Huntington Beach, CA
Prime Consultant: Kreuzer Consulting Group
Project Manager: Rick Kreuzer, PE
Support Staff: David Jarvi, PE
Firm Role: Civil Engineering
Contract Value: $30 K
Construction Value: $5 M (Estimate)
Design Completed: 2023
onstruction Completed: Pendin
Contracting Agency: City of Huntington Beach
References: Eduardo Cerda
Senior Civil Engineer
(714) 374-1750
[email protected]
KCG completed the street design and utility coordination for the replacement of the Humboldt Street Bridge over the canal in Huntington Harbor. This project included the development of plan and profile drawings, phasing plans, construction details and close coordination with City staff and the bridge engineering design consultant.
18 In addition to the featured projects above, KCG has completed street and a variety of public works infrastructure projects totaling in excess of $50 M in construction value over the last 5 years, some of which are summarized as follows:

Project Agency Construction Cost
Balboa Peninsula Streets Newport Beach $2 M
Duarte Road Arcadia $1.1 M
State College Boulevard Brea $1.0 M
Pioneer Street Norwalk $900 K
Lambert Road Brea $1.2 M
Lincoln Avenue Anaheim • $1.3 M
Del Amo Boulevard Long Beach $1.5 M
Pacific Coast Highway Dana Point $1.7 M
Main Street Tustin $2.0 M
Huntington Drive Arcadia $1.7 M
Santa Anita Road Arcadia $500 K
Santa Clara Road Arcadia $300 K
Jeffrey Road Irvine $1.5 M
(Main Street improvements Tustin $3.0 M
Ball Road Anaheim $1.5 M
Williams Street Tustin : $600 K
Main Street Tustin $3 M
Sabina Area Anaheim $7 M
FY 19-20 Rehabs Downey $26 M
Newport Ave Tustin $1.6 M
Downtown Streets Arcadia $3.4 M
19 Appendix
• Reference Form
• KCG Team Resumes
References of Work Performed Form
(List 5 Local References)
Comany Name:_Kreuzer Consulting Group

1. Name of Reference: City of Tustin
Address: 300 Centennial Way, Tustin, CA 92780
Contact Name: Eric Johson Phone Number: 714-573-3320
Email: [email protected]
Dates of Business: 2012-Present

2. Name of Reference: City of Brea
Address: 1 Civic Center Circle, Brea, CA 92821
Contact Name: Ryan Chapman Phone Number: 714-990-7763
Email: [email protected]
Dates of Business: 2015-Present

3. Name of Reference: City of Arcadia
Address: 240 W. Huntington Dr., Arcadia, CA 91107
Contact Name: Kevin Merrill - Phone Number: 626-574-5481 Email: [email protected]
Dates of Business: 2015 - Present

4. Name of Reference: City of Anaheim
Address: 200 S. Anaheim Blvd., Anaheim, CA 92805
Contact Name: David Mori Phone Number: 714-765-5148
Email: [email protected]
Dates of Business: 2004- Present

5. Name of Reference: City of Downey
Address: 11111 Brookshire Ave., Downey, CA 90241
Contact Name: Fabian Aoun Phone Number: 951-743-5208
Email: [email protected]
Dates of Business: 2017-Present

KREUZER CONSULTING GROUP
RICK KREUZER, P.E.

Mr. Kreuzer, the founder and President of KCG, has 40 years of experience managing complex transportation and civil projects. His strength is managing multi-disciplined teams on projects which require innovative solutions and hands-on principal involvement. He is the President of the Kreuzer Consulting Group (KCG).

PROJECT EXPERIENCE:

Project Manager for on-call contracts with the following agencies:
** City of Anaheim
City of Irvine
City of Tustin
City of Lake Forest
University of California, Irvine, City of Brea
1983
City of Long Beach
City of Newport Beach
Certificate Program in
Construction Management, City of San Juan Capistrano
American Society of Civil City of Gardena
Engineers, 1987 City of Culver City
City of Downey
AFFILIATION:

City of San Clemente
American Society of Civil
City of Huntington Beach
Engineers
City of Stanton
Institute of Transportation City of Huntington Beach Projects: Mr. Kreuzer has served or is currently Engineers serving as the Project Manager for the following City Projects:

REGISTRATION: • On-Call Services
Humbolt Bridge Civil Design
Survey Monumentation Phase 1
Registered Civil Engineer
(California & Arizona) A A Survey Monumentation Phase 2 Blufftop Park Bike/Pedestrian Trail
Pacific Coast Highway Relinquishment Study
Registered Civil Engineer
(Arizona) Pacific Coast Highway Opportunity Plan
Disneyland Resort Area Improvements: Mr. Kreuzer has been involved with the transformation of the Disneyland Resort Area in the City of Anaheim for the last decade in various capacities. He was involved with the initial planning efforts which established the vision for the 800 acre Resort Area including significant outreach activities with local residents and business owners. From there, Mr. Kreuzer managed the Preliminary and Final Design efforts for the construction of the two main backbone arterial streets in the Resort District, namely Katella Avenue and Harbor Boulevard. These projects included significant streetscape and landscape enhancements to make the Resort Area a more attractive destination.

Katella Avenue Smart Street Phases 1 & 2: Project Manager of an alignment study and final design for the widening of three miles of Katella Avenue along the Disneyland and Anaheim Convention Center frontages. This included widening of four major intersections. Total construction value of Phases 1 and 2 was approximately $35 million. The project included the design of street, storm drain, sewer, water, landscape, streetscape and traffic signal improvements. In addition right of way acquisition documents in the formal of legal descriptions and plans were prepared by KCG staff for approximately 120 partial takes of existing parcels. This project also included coordination with Caltrans with regard to I-5 improvements at the east end of the project.

Brookhurst Street Widening: KCG recently completed preliminary and final design services for the widening of Brookhurst Street between Katella Avenue and Ball Road in the City of Anaheim. This project will includes roadway, drainage, utility, landscaping, and traffic signal improvements.

Platinum Triangle Backbone Infrastructure Implementation Plan: The Platinum Triangle is located in the City of Anaheim at the confluence of the I-5 and SR-57 freeways. The Platinum Triangle is approximately 820 acres in size.

It is traversed by a major intercity/commuter railroad line and encompasses Angel Stadium of Anaheim, as well as the Arrowhead Pond of Anaheim.

The Platinum Triangle project will be a mixed-use development with a dynamic mix of uses including upscale, high density urban housing integrated by a carefully planned network of pedestrian walkways, streetscape improvements and recreation spaces.

For this project, Mr. Kreuzer managed the completion of the Platinum Triangle Implementation Plan for Backbone Public Works Facilities. This plan served to define the:
• required arterial roadway, streetscape and landscape improvements • required sewer system improvements
• required storm drain system improvements
• required water system improvements
• required electrical system improvements
* right of way acquisition required to construct all backbone infrastructure improvements • breakdown of project segments for implementation
• cost estimates for all project segments
• schedule for implementation of the program
• cash flow estimate for the implementation of the program This plan is currently being used as the basis for establishment of a $200 million Community Facilities District (CFD) to finance all required backbone infrastructure improvements needed to support development in the Platinum Triangle project area.

Katella Avenue Widening: Final PS&E for the first arterial improvement project in the Platinum Triangle project area. This project consists of widening of Katella Avenue between Lewis Street and State College Boulevard to accommodate 4 lanes of traffic in each direction. New parkway and median landscaping will be constructed along with upgraded streetscape furnishings consisting of light poles, bus shelters, and traffic signs.

Brookhurst Street Widening: Final PS&E for the widening of Brookhurst Street from 1-5 to SR-91 in the City of Anaheim. This project includes widening the existing 4 lane roadway to 6 lanes as well as the construction of a new 54 inch mainline storm drain and extensive landscaping in the medians and parkways.

Imperial Highway Smart Street: Completed Project Report, Alignment Study and Implementation Plan for the widening of Imperial Highway from the Los Angeles County line to Rose Drive, a distance of 8.5 miles.

Arizona Avenue Streetscape Improvements: Planning and design for the downtown revitalization of Arizona Avenue in Chandler, Arizona.

Southern Avenue Phase 2 Streetscape Improvements, Mesa, Arizona: Mr. Kreuzer is the Project Manager for the final design of the 2nd phase of the Southern Avenue Improvements in the Fiesta District from Sycamore to the west City limit at the Tempe Canal. This project is a natural extension of the Phase 1 improvements that were recently constructed. This project includes street narrowing, landscape and streetscape improvements, drainage, lighting and traffic signal improvements. The project will also require the preparation of right of way acquisition documents and coordination with the City's real estate staff as well as the public and other stakeholders.

KREUZER CONSULTING GROUP
David Jarvi, PE
Mr. Jarvi has over 23 years of experience in General Civil and Transportation Engineering. He specializes in local roadway planning and design projects with experience in design engineering with a focus on civil and transportation projects. His extensive knowledge of roadway layout, reconstruction, and rehabilitation are evident by a growing list of local agencies that seek his street improvement involvement (Los Alamitos, Cypress, Anaheim, Stanton, Long Beach, Downey, Costa Mesa, Industry, Yorba Linda, Newport Beach, Orange, Dana Point, Irvine, Mission Viejo, San Clemente, Lake Forest, San Juan Capistrano, and Laguna Niguel). Mr. Jarvi has been responsible for the preparation of street plans, cross sections and details for a wide range of roadways from single intersections to miles of large arterial highways.

EDUCATION:

PROJECT EXPERIENCE:

B.S., Civil Engineering,
California State University, City of Huntington Beach Projects: Mr. Jarvi has served or is currently serving Chico as the Project Engineer for the following Downey Projects:
• On-Call Services
SOFTWARE SKILLS:

Humbolt Bridge Civil Design
AutoTURN, Microsoft Excel, Survey Monumentation Phase 1 Bentley Inroads, Microstation, Survey Monumentation Phase 2 Autodesk Civil 3D Blufftop Park Bike/Pedestrian Trail
Pacific Coast Highway Relinquishment Study
REGISTRATION: • Pacific Coast Highway Opportunity Plan
Professional Engineer,
California, No. 66792 Atlantic Avenue / Pacific Coast Highway Intersection Improvements, City of Long Beach, Long Beach, CA - Project Engineer for the rehabilitation of over two miles of Atlantic Avenue in the City of Long Beach. Tetra Tech prepared the preliminary and final PS&E for roadway rehabilitation, right turn pocket widening, storm drain inlet upgrades and pipe reconstruction, utility relocations, traffic signal, traffic control, and parking lot improvements at the Atlantic Avenue and Pacific Coast Highway intersection in the City of Long Beach. Since the widening portion of the project impacted the adjacent high school parking lot, our Team effectively coordinated with the school district to complete the required work within the schedule. In addition, our work included obtaining an encroachment permit from Caltrans for construction within the state highway system.

Lakewood Boulevard Improvements Phase 3A, City of Downey, Downey, CA - Project Engineer for the design of streetscape and roadway improvements on Lakewood Boulevard in the City of Downey. Tetra Tech prepared preliminary and final plans for streetscape and engineering improvements for the 4,000 foot segment of Lakewood Boulevard from 5th Street to Florence Avenue in the City of Downey. The project included additional through lanes, extensive median and parkway improvements, decorative lighting, street furniture and both potable and recycled water improvements. Great care was taken to minimize impacts to private development and to provide a seamless transition between old and new areas. The project created an aesthetically pleasing corridor, while decreasing construction cost savings of over $500,000 through the use of recycled pavement.

La Palma Avenue / Kraemer Boulevard Intersection, City of Anaheim, Anaheim, CA - Project Engineer for the $2.4 million widening of La Palma and Kraemer Intersection for the City of Anaheim Orange County, including right-of- way engineering and utility coordination. Tetra Tech prepared plans, specifications and cost estimates for the widening of this key arterial intersection in the City of Anaheim. The project involved the development of a Precise Alignment Plan, Landscape Concept Plan, and legal descriptions for 8 parcels. The project included the design of a raised, landscaped median, parkway landscaping in both the City area as well as a large slope in Caltrans right-of- way, and significant redesign of private property improvements impacted by the roadway widening. The approval process included obtaining an easement and encroachment permit from the County of Orange as well as an encroachment permit from Caltrans. Other elements of the project included the design of a traffic signal, traffic control, a MSE retaining wall, and utility improvements.

Firestone Boulevard Rehabilitation Old River School Road to Lakewood Boulevard, City of Downey, Downey, CA - Project Engineer for the construction of sidewalk and pavement rehabilitation of an over one mile reach of Old River School Road in the City of Downey. The project includes pavement reconstruction and rehabilitation, reconstruction of curb ramps per current ADA criteria, and signing and striping.

Chapman Avenue Widening, City of Orange, Orange CA - Project Engineer for the alignment study for a one mile segment of Chapman Avenue. Responsibilities include the development of base plans and cross sections for the purpose of alignment analysis and the completion of a summary report outlining roadway widening costs and right- of-way impacts for various alignment alternatives. Tetra Tech completed alignment plans and is designing final PS&E for a 1 mile widening of Main Street from Palmyra Avenue to Chapman Avenue. This project included design of roadway, water line, drainage, utility, landscape, and lighting improvements. Project also included traffic control plans, signing and striping plans and traffic signal modification plans. Parking lot modifications were also involved on the project.

Katella Avenue Smart Street Improvements, Orange County, CA - Project Engineer for sections of the Katella Avenue Smart Street running through the cities of Los Alamitos, Cypress, Anaheim and Stanton. Responsibilities included the preparation of street plans, cross sections, utility coordination, water vault design and the preparation of legal plats and descriptions.

Bus Stop Improvement Projects, City of Santa Clarita, Santa Clarita, CA- Project Engineer for the improvement of 23 selected bus stop locations throughout the City of Santa Clarita. The design of each bus stop addressed the safety and accessibility needs of the rider, passenger with disabilities, driver, pedestrians, cyclists, motoring public, and people living and working near the stops. Each site specific bus stop safety improvements included the sidewalk access, concrete pads, shelter and amenities, adequate right-of-way, grading/separating walls, signage, bus approach zones, future needs, and existing site constraints including utility features and covers. Mr. Jarvi also provided utility research, data collection, conceptual design report, and final plan, specifications and estimate. The project met all federal guidelines and requirements, City procedures and guidelines, and Transit Agency regulations.

Orangethorpe Avenue Widening, City of Buena Park, Buena Park, CA- Project Engineer for the widening of the south side of Orangethorpe Avenue from Stanton Avenue to Thomas Street. Topographic survey of 50-foot cross sections were completed and site investigation and research of the crown elevation and gutter lip elevations were provided. Additional detail collected at each location where new ADA curb ramps, and cross gutters were

CHRISTOPHER BECKER, QSD/QSP KREULER CONSOLING GROUP
Mr. Becker has 31 years of outstanding success in delivering complicated public and private construction, infrastructure, real estate and transportation projects from inception to completion. His background includes all phases of project coordination including feasibility, technical writing, conceptual planning, environmental clearance, final design, entitlement processing, obtaining agency approvals and construction management.

Over the last 15 years, he has specialized in comprehensive storm water compliance services for design and construction clients. As a State Certified QSD/QSP; Certified Professional in Erosion and Sediment Control; Certified Erosion, Sediment and Stormwater Inspector, he has provided the following services:

EDUCATION:

B.S. in Urban Planning California
Prepare bid estimates and develop proposals and marketing State Polytechnic University, Pomona
materials.
• Prepare Water Pollution Control Programs/SWPPPs AFFILIATION:
• Water Quality Management Plans Construction Management Association of America
• Storm Water Data Reports Project Management Institute Provide Qualified SWPPP Practitioner inspection services REGISTRATION:
• Design Water Pollution Control Drawings Qualified SWPPP Developer and • Establish cost effective Best Management Practices Practitioner (QSD/QSP) #24331 • Perform QSP services for approximately 20 projects per quarter Certified Professional in Erosion including being the Water Pollution Control Manager of record for and Sediment Control #7408 several Caltrans projects
Certified Erosion, Sediment and
Recent project experience includes: Stormwater Inspector #3080 OSHA 10 and 30 Safety Certified
• WQMP for Williams Street Roadway and Storm Drain Improvements in Tustin.
• WQMP for Valencia Avenue Street Improvements in the City of Brea. • WQMP for Imperial Highway Greenbelt Improvements in the City of Brea.
• WOMP for the Anaheim Convention Center Grand Plaza in the City of Anaheim.
• WQMP and SWDR for SR-1/Old Newport Boulevard Intersection Improvements in the City of Newport Beach.
• WOMP and SWDR for SR-1/Broadway Road Intersection
Improvements in the City of Laguna Beach.
• Numerous SWPPP's for various construction contractors in Southern California.

KREUZER CONSULTING GROUP

ERIC W METZ, PLS
Mr. Metz has over 23 years of professional experience in land surveying and engineering work for government organizations, public agencies, and the private sector. His experience includes preparation of Records of Surveys, Tract Maps, topographic surveying, boundary surveys, aerial control, GPS control surveys, right-of-way mapping, ALTA surveying, and construction staking. Mr. Metz also has extensive knowledge in AutoCAD Civil 3D, Revit and Navisworks BIM software.

Project Experience:
• Orangethorpe Ave Widening Phase 1 & 2, City of Buena Park, Buena Park, CA Project Surveyor responsible for topographic survey, right-of-way survey, property research, legal descriptions and plats for right of way acquisitions and temporary construction easements required by the city. In addition, provided construction staking support for the project.

Bus Stop Improvement Projects, City of Santa Clarita, Santa Clarita, CA Project Surveyor responsible for topographic survey, survey control plans, utility research, legal descriptions and plats for right-of-way acquisitions and temporary construction easements to meet city requirements. Education:
• Lakewood Stormwater and Runoff Capture Project, City of Lakewood, Santiago Canyon College,
Lakewood, CA Survey/Mapping Sciences
Project Surveyor responsible for topographic survey and cross sections of the flood control channels. Legal descriptions and plats were prepared for proposed Registrations/Certifications:
city storm drain easements across county land.

Waste Management (Southern California Sites) Casino and Surveyor, Project Surveyor responsible for topographic survey, right-of-way survey, property research and construction staking support for eight sites across irimble Business Center roject Specialis
Southern California.

USPS Redevelopment, Pacific Industrial, Long Beach, CA OPUS.

Project Surveyor responsible for topographic survey, right-of-way survey, Projects Manager's Training property research and ALTA survey of the United States Postal Service 10 acre Professional Affiliations:
sorting facility.

Limekiln Creek Restoration Project, City of Los Angeles Bureau of Engineering, California Land Surveyors Los Angeles, CA Association
Project Surveyor responsible for topographic survey, cross-sections of the flood Orange County Land Surveyors channels and site utility research. Association
Houghton Park Community Center, City of Long Beach, Long Beach, CA Project Surveyor responsible for topographic survey, cross-sections and profile Society of American Military Engineers
survey, preparation of horizontal control plans, and preparation of existing conditions base map.
• Los Angeles Bureau of Sanitation Monitoring Station, Gardena, CA Project Surveyor responsible for utility research and topographic survey of the Dominguez Channel from right-of-way to right-of-way for approximately 1,000 feet at the West 135th Street bridge.
• Riverside Drive near Zoo Drive Bridge over Los Angeles River, Bridge No. 53C-1298, City of Los Angeles, Los Angeles, CA
Project Surveyor responsible for topographic survey to support the bridge widening and retrofit. Ongoing construction staking support.

EL Paseo Drive Pedestrian Overcrossing Replacement, City of Santa Clarita, Santa Clarita, CA, Project Surveyor responsible for topographic survey, survey control plans and construction staking support. • Surveying and Mapping at Marine Corps Recruit Depot (MCRD) NAVFAC SW, San Diego, CA Project Surveyor responsible for topographic cross section survey of all roadways within the MCRD base boundary as well as project aerial control.

Gregory L. Rende, P.E. RESUME
Structures Design
Registration: Qualifications and Experience:
1995, Civil Engineer, CA, 54529 Mr. Rende has 33 years of experience in all phases of project 2001, Civil Engineer, AZ, 36034 development for major highway and public works structures Years of Experience: 33 projects. As a consultant to both public and private-sector clients, Mr. Rende has provided project management, preliminary and Associate Bridge Engineer, Caltrans final engineering design, plan-preparation, specification writing, 1992-1996 permit processing, plan-checking, and construction agency
Senior Associate, RBF Consulting engineering in a wide variety of projects. (now Michael Baker, Int'l) In 2006, Mr. Rende founded Rende Consulting Group (RCG) and 1996-2006 serves as RCG's President and Principal Engineer.

Founder, President and Principal The following is a list of some of the types of structures for which Engineer of Rende Consulting Group, Mr. Rende has been directly involved in the preliminary and/or final Inc. since 2006 structures design:

Education: Highway & Railway Bridges (more than 100)
B.S., 1991, Civil Engineering, Cast-in-Place Prestressed Concrete Box Girder University of California, Berkeley Pre-Cast Concrete I-Girder / Box Girder / Slab • Widenings, Seismic Retrofits, Staged Replacements
1994 Graduate of the Caltrans
>20 Structure Type Selection Approvals by Caltrans
Bridge Design Academy,
Sacramento, CA • >80 Bridges over Major Regional Drainage Facilities and Environmentally-Sensitive Habitat Areas
1995 Graduate of the Caltrans
Resident Engineer's Academy, Non-Standard Retaining Walls Cast-in-Place Concrete Cantilever Retaining Walls
Santa Ana, CA
Tieback Retaining Walls
• Soldier Pile Retaining Walls
Sheet Pile Retaining Walls
• Mechanically-Stabilized Embankment (MSE) Walls
Pedestrian Bridges
Cast-in-Place Prestressed Concrete Box Girder
Pre-Fabricated Steel Through-Truss
• Rolled Wide-Flange Beam Deck-Girder
Flood Control / Water Quality Structures
• Open-Channels / Transitions / Drop Structures
• Single and Multi-Cell RCB Culverts
Detention Basin Intake Towers / Outlet Structures
• Non-Standard Junction Structures
Stormwater Pump Stations
Wildlife Undercrossings / Tunnels
Mr. Rende was among the first in the consultant community to implement Caltrans' Seismic Design Criteria (S.D.C.) and has obtained Caltrans Type Selection and PS&E approvals of
numerous major highway bridge projects on California's Highway System. Mr. Rende also has extensive experience in bridge construction engineering and inspection gained while working at Caltrans Division of Structures from 1992 to 1996. Additional construction experience includes work for the County of Orange Department of Public Works (Construction Division) as an Engineering Assistant from 1987 to 1991 while attending college.

The following is a listing of some of Mr. Rende's project experience:

RENDE CONSULTING GROUP
Resume Page 1 of 2
Gregory L. Rende, P.E. RESUME
Structures Design
Recent Projects:

Ethanac Road Bridge over the San Jacinto River (Riverside County, CA) 2024 - Principal Engineer preparing the final structural design calculations and PS&E for a new 450-foot long 3-span cast-in-place pre-stressed concrete box girder structure.

All structural calculations were performed in accordance with the AASHTO LRFD Bridge Design Specifications with Caltrans
Amendments.

Limonite Avenue Bridge over Cucamonga Creek Channel
(Eastvale, CA) 2023 - Principal Engineer preparing the final structural design calculations and PS&E for a new 320-foot long 3-span precast prestressed concrete "Wide-Flange" girder bridge.

All structural calculations were performed in accordance with the AASHTO LRFD Bridge Design Specifications with Caltrans
Pierson Boulevard Bridge over Mission Creek (Riverside
County, CA) 2023 - Principal Engineer developing the structural concept and preparing the final structural design and PS&E for the repair of this existing 220-foot long 3-span reinforced concrete T- girder structure which was damaged during a major debris flow and boulder impact resulting from a severe tropical storm in August 2023.

Bridge Maintenance & Rehabilitation Design of City of Irvine Bridges (Irvine, CA) 2023 - Principal Engineer providing the structural design and preparation of the PS&E for bridge maintenance and rehabilitation of 6 City-owned large arterial highway vehicular bridges carrying heavy traffic volumes. Five of these bridges span environmentally-sensitive creeks operated by the Orange County Flood Control District, and one of them spans the Metrolink Railroad.

Sterling Avenue Bridge over City Creek (San Bernardino, CA) 2023 - Principal Engineer preparing the structure type selection, final structural design calculations and PS&E for a new 68'-long single-span pre-cast prestressed concrete box girder bridge. All structural calculations were performed in accordance with the AASHTO LRFD Bridge Design Specifications with Caltrans
Amendments.

Inspection of City of Irvine Bridges (Irvine, CA) 2022 - Principal Engineer providing the inspection of 46 City-owned The bridges inspected included a wide variety of structure types:
cast-in-place prestressed concrete box girders, single and multi- cell reinforced concrete box culverts and pedestrian underpasses, multi-span reinforced concrete slab bridges, metal multi-plate arch culverts and pedestrian underpasses, and various steel truss pedestrian bridges

RENDE CONSULTING GROUP
Resume Page 2 of 2
MICHAEL A. GREEN ASLA
Senior Principal

BIOGRAPHY
EDUCATION As Principal of Clark & Green Associates
Master of Landscape Architecture, with over 30 years of experience, Michael California State Polytechnic University, Green oversees project management and Pomona, 1981 design for the firm.

REGISTRATIONS Mr. Green graduated from California State Landscape Architect, CA #2311 Polytechnic University, Pomona in 1982 with Landscape Architect, AZ #19864 a master's degree in landscape architecture Landscape Architect, CO #508 and formed Clark & Green Associates in Landscape Architect, FL #6666965 1987.

Landscape Architect, GA #1535
Landscape Architect, HI #15118 During his career, Mr. Green has worked with Landscape Architect, ID #16574 the City of Westminster Planning Department Landscape Architect, NV #857 and the Port Authority for the City of Long Landscape Architect, OK #0336 Beach in Environmental Impact Research Landscape Architect, OR #456 Preparation and Risk Management Landscape Architect, TX #02138 Assessment. He also is an ASLA award Landscape Architect, UT #99-368388-5301 winner.

Landscape Architect, WA #1801
Mr. Green has specialized in community
AFFILIATIONS residential projects and streetscapes with an American Society of Landscape Architects emphasis on water management, conservation and sustainable landscape design.

ANALOGOUS PROJECTS
Disney Resort/Platinum Triangle
Streetscapes, Anaheim
Brookhurst Avenue, Greenbelt/Streetscape
Improvements, Anaheim
Jeffrey/Alton and University/Ridgeline
Streetscape Improvements, Irvine, CA
Old Town Revitalization, Tustin
Alfresco dining and seating, Glendora Avenue,
West Covina
Tarrin (ton
Jeotrichnical
Ingineering, Inc.

CURRICULUM VITAE
Joseph L. Welch, R.C.E., G.E.
1590 North Brian Street Phone: 714-637-3093
Orange, CA 92867-3406 [email protected]

PROFESSIONAL LICENCES
Registered Geotechnical Engineer (CA #2239)
Registered Civil Engineer (CA #040236)

EDUCATION

MASTERS OF SCIENCE, CIVIL ENGINEERING
George Washington University, Washington DC, 1977

BACHELOR OF SCIENCE, CIVIL ENGINEERING
U.S. Military Academy, West Point, NY, 1966

CAREER OVERVIEW
Mr. Welch is an expert in the field of geotechnical engineering. His 38-year career in civil and geotechnical engineering together with his advanced education has led him to senior responsibilities for large scale construction projects. His duties include acting as the City of Yorba Linda's geotechnical expert responsible for review of geotechnical engineering reports submitted to the City. Mr. Welch is the acting Laboratory Manager for HEI's AMRL Accredited Geotechnical Engineering Laboratory.

He has overseen large civil engineering projects acting as the geotechnical engineer of record; responsible for project management and geotechnical engineering from the preliminary investigation through review of the civil engineering plan to earthwork design and construction; coordinating with clients, municipalities, review agencies, and contractors; responsible charge of field investigations and laboratory testing programs; in addition to preparation of analysis and technical reports.

His technical skills include Seismic Hazard Evaluation, Hydrology, Settlement Analysis, Pavement Design, Foundation Design, Slope-Stability Analysis, Liquefaction Analysis, and Grading Review.

EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:

SEE ATTACHED EXHIBIT B
B. Travel Charges for time during travel are not reimbursable.

C. Billing
All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.

Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.

A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.

CONSULTANT shall submit to CITY an invoice for each monthly payment due.

Such invoice shall:

A) Reference this Agreement;
B) Describe the services performed;
C) Show the total amount of the payment due;
D) Include a certification by a principal member of CONSULTANI's firm that the work has been performed in accordance with the provisions of this Agreement; and
E) For all payments include an estimate of the percentage of work completed.

Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein.

Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.

Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.

EXHIBIT "B"

FEE PROPOSAL

KREUZER CONSULTING GROUP
Office Personnel:

Typists, Word Processors $50
..$75
Design Engineer / CADI . $125
.. $150
incipal / Project Manag .. $220
apport & Miscellaneous Cost
Copies - Black & White. • $0.10/pg.

Copies- Color. $0.50/pg.

Plotting - Black & White. $2.00/ft*
lotting - Color... $4.00/ft2
Two-Man Survey Party, including Truck ano
Equipment…...... ..$215

RENDE CONSULTING GROUP
Principal Engineer. $200
Senior Engineer. $180
Project Engineer. $160
CADD Technician $150
Vehicle Mileage. $$0.60/mile
Maria pict chical
Ingineering, Inc.

Associates
Principal
Principal.. ...$207
Project Director/Senior Associate.. $161
Senior Project Manager... $103
Project Manager.... ...$97
Design Draftsperson. Senior Technician (Soil, Concrete, Asphalt Concrete) Draftsperson 580 Technician (Soil, Concrete, Asphalt Concrete Senior Clerical. 70 Special Inspector (Grading)... $121 SO Special Inspector (Building Construction $97
Clerical.

Draftsperson.... ..$79
Administrative Assistant ..$92