PROFESSIONAL SERVICES CONTRACT BETWEEN
THE CITY OF HUNTINGTON BEACH AND
MICHAEL K. NUNLEY & ASSOCIATES, INC.
FOR
ON-CALL CIVIL ENGINEERING
& PROFESSIONAL CONSULTING SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and MICHAEL K. NUNLEY & ASSOCIATES, INC., a California Corporation hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to provide On-Call Civil Engineering & Professional Consulting Services; and
Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and
CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:
1. SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT."
CONSULTANT hereby designates Ryan Gallagher who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement.
CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement.
25-16466/378917 1 of 11
TERM; TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT are to commence on - 20 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.
In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein.
COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed Two Million Dollars ($2,000,000.00).
EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained
6. METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B." 25-16466/378917 2 of11
DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit.
8. HOLD HARMLESS
A. CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT.
B. To the extent that CONSULTANT performs "Design Professional Services" within the meaning of Civil Code Section 2782.8, then the following Hold Harmless provision applies in place of subsection A above:
25-16466/378917 3 of 11
"CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and against any and all claims, damages, losses, expenses, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) to the extent that the claims against CONSULTANT arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT's proportionate percentage of fault. However, notwithstanding the previous sentence, in the event one or more other defendants to the claims and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid defense costs. The duty to indemnify, including the duty and the cost to defend, is limited as provided in California Civil Code Section 2782.8.
C. Regardless of whether subparagraph A or B applies, CITY shall be reimbursed by CONSULTANT for all costs and attorney's fees incurred by CITY in enforcing this obligation.
This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONSULTANT.
PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars ($1,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not contain a self-insured retention without the express written consent of CITY; however an insurance 25-16466/378917 4 of 11
policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims-made policy shall be acceptable if the policy further provides that:
A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements).
B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims.
CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement.
If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY.
10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall:
A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and
25-16466/378917 5 of 11
C. shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium.
CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY.
The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required
11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder.
12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner.
CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the 25-16466/378917 6 of 11
event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.
13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove.
14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement.
15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code.
16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail-return receipt requested:
25-16466/378917 7 of 11
TO CITY: TO CONSULTANT:
City of Huntington Beach Michael K. Nunley & Associates, Inc.
ATTN: Director of Public Works Attn: Ryan Gallagher
2000 Main Street 354 Pacific Street
Huntington Beach, CA 92648 San Luis Obispo, CA 93401
17. CONSENT
When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event.
18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties.
19. SECTION HEADINGS
The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement.
20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the 25-16466/378917 8 of 11
context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law.
21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it.
22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification.
23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT.
25-16466/378917 9 of 11
24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party.
25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive.
26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.
27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.
28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly • set forth in this 25-16466/378917 10 of 11
Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.
29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.
This Agreement shall expire when terminated as provided herein.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.
CONSULTANT,
MICHAEL K. NUNLEY & ASSOCIATES, CITY OF HUNTINGTON BEACH, a INC. municipal corporation of the State of
California
By:_ Mil Kry
MICHEL K. WUET Mayor
print name
ITS: (circle one) Chairman/President/Vice President
City Clerk
AND
INITIATED AND APPROVED:
By:_
Ryan Gallagher
print name Director of Public Works
ITS: (circle one) Secretary/Chief Financial Officer/Asst.
Secretary - Treasurer
REVIEWED AND APPROVED:
City Manager
APPROVED AS TO FORM:
PeDa
for City Attorney pe
11 of 11
25-16466/378917
EXHIBIT "A"
STATEMENT OF WORK: (Narrative of work to be performed)
Provide On-Call Civil Engineering and Professional Consulting Services. If Consultant chooses to assign different personnel to the project, Consultant must submit names and qualifications of these staff to City for approval before commencing work.
B. CONSULTANT'S DUTIES AND RESPONSIBILITIES:
See Attached Exhibit A
C. CITY'S DUTIES AND RESPONSIBILITIES:
Furnish Scope of Work and provide a request for proposal for each project.
City shall issue a task order for each project based upon scope of services, work schedule, and fee proposal submitted.
D. WORK PROGRAM/PROJECT SCHEDULE:
A project schedule will be developed for each project assigned by the City.
EXHIBIT A
EXHIBIT A
The following pages contain the completed copies of the forms requested in the RFP.
Disciplines of Civil Engineering Services Application Form *Circle all that apply*
Civil Engineering Service Area Bidding?
Y/N
(circle)
• Water/Sewer/Storm Water Engineering (Yes/ No
• General Civil Engineering Yes / No
• Ocean Engineering Yes / No
• Environmental/Water Quality Yes / (No
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
REQUEST FOR PROPOSAL
VENDOR APPLICATION FORM
TYPE OF APPLICANT: XI NEW • CURRENT VENDOR
Legal Contractual Name of Corporation: Michael K. Nunley & Associates. Inc.
Contact Person for Agreement: Ryan Gallagher, PE
Corporate Mailing Address: 354 Pacihc Street
City, State and Zip Code: San Luis Obispo, CA, 93401
E-Mail Address: [email protected]
Phone: 714-213-9758 Fax: 805-904-6532
Contact Person for Proposals: Safa Kamangar, PE, PMP, CCM, QSD/P Title: Contract Manager E-Mail Address: [email protected] Business Telephone: 949-637-3999 Business Fax: 805-904-6532 Year Business was Established: 2012
Is your business: (check one)
• NON PROFIT CORPORATION [X) FOR PROFIT CORPORATION
Is your business: (check one)
X CORPORATION E SOLTED ABLE PARTNERSHIP
INDIVIDUAL SOLE PROPRIETORSHIP
PARTNERSHIP UNINCORPORATED ASSOCIATION
1 0f2
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Michael K. Nunley, PE President/CFO 805-329-4773
Jon Hanlon, PE. AMPP Vice President 805-329-4773
Eileen Shields, PE Vice President 805-329-4773
Henry Liang, PE Board Member 559-500-4750 x1102
Ryan Gallagher, PE Board Member 949-491-1678
Federal Tax Identification Number: 45-5504041
City of Huntington Beach Business License Number: Will obtain upon award. (If none, you must obtain a Huntington Beach Business License upon award of contract.) City of Huntington Beach Business License Expiration Date: N/A 2 of2
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
BACKGROUND AND
B PROJECT SUMMARY
MKN's Client-Centric Origins
MKN is a water, wastewater, and recycled water
engineering firm located in Central and Southern
California. Since 2012, our firm has grown to over
80 professional engineers, planners, construction
managers/inspectors, and support staff. MKN is
focused on meeting the growing needs of public
agencies for responsive, technically capable
consultants who are committed to a long-term
relationship based on excellence. All City projects will be managed out of MKN's Irvine office, less than 20 miles from the City of Huntington Beach.
Our clients are looking for a trusted partner to
lean on, and MKN is an engineering firm that can participate and manage every aspect of a project from start to finish. This is what it means to be a client advocate. Whether we are overseeing a citywide water treatment program or managing a specific aspect of a project, our dedicated team works tirelessly to ensure we deliver the quality, responsiveness, availability, and accessibility our clients expect.
Water Is Our Focus
We are passionate about water in every form. Our firm is completely dedicated to delivering professional services for water-related projects. Beyond delivering for our clients, MKN's staff members are leaders in industry organizations; we actively research, present, and participate in the development of industry standards and best practices. We are innovating the way engineers deliver work and the products our clients use. Our principals have decades of experience in management and leadership roles for some of the highest-ranked engineering firms in the world, and we are excited to bring our expertise to the City.
MKN has delivered projects on over 35 On-Call contracts.
MKN has a robust track record of successfully executing projects under On-Call contracts for a diverse range of clients and has demonstrated its capability to deliver high-quality services efficiently and effectively. The firm's experience spans various project types, including water and wastewater treatment, hydraulic modeling, infrastructure design, and condition assessments. MKN's approach is characterized by responsiveness, technical expertise, and a commitment to client satisfaction, which has resulted in long- standing relationships with many agencies.
70+ Treatment Projects 80+ Pump/Lift: Stations 60+ Tanks/Reservoirs 400+ Miles of Pipeline mkn CITV OF HUNTINGTON BEACH LON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN Is Committed to Huntington Beach
MKN is proud to be engaged in locally focused projects that impact the Huntington Beach and Orange County communities. The firm understands the need to be responsive and flexible for the City, and its organizational structure and size allow it to serve without any external barriers. Unlike larger firms, MKN's engineers are fully committed to their clients and are not focused on "utilization" or "proft." The primary objective is to serve and support clients as a trusted partner.
MKN established its Irvine office to better serve the region, and its engineers have been working in Southern California for decades. The firm is actively engaged in several projects throughout Orange County for agencies such as the Cities of Anaheim, Irvine, Newport Beach, and other local municipalities such as Irvine Ranch Water District, East Orange County Water District, and South Coast Water District.
The proposed contract manager, Safa Kamangar, has extensive experience executing major water, wastewater and recycled water public works improvements in the region including working with the City of Huntington Beach for more than a decade. Safa understands the City's goals, requirements, and objectives, and has established a partnership with different City departments over the years.
MKN BY THE
• SAN JOSE NUMBERS
MKN Office
Locations 80+ staff across
MKN On-Call 8 CA offices
Client • FRESNO
$19.9M
2024 Revenue
35+
On-Call Contracts
City of Arroyo Grande 300+
Task Orders delivered
City of Atascadero
through On-Call
Atascadero Mutual Contracts
Water Company
City of Bakersheld
Calleguas Municipal • BAKERSFIELD
Water District
• SAN LUIS OBISPO
City of Camarillo
Camrosa Water District
Casitas Municipal Water District Creport Beach
Communiserves Districte Service Dict
Serves Draunity easant Vall • SANTA CLARITA
unty Water Distr • VENTURA
Water Disti County City of Port Hueneme
City of Fresno City of Riverside
City of Grover Beach Rural Community Assistanc
United Water © IRVINE
Inland Empire Utilities Agency Corporation Conservation District City of San Luis Obispo
Irvine Ranch Water District City of Ventura
anta Clarita Valley Water Replenishment District
Water Bistris Municipal later Agency
of Southern California
City of Santa Paula • OCEANSIDE
City of Watsonville
South Coast Water District
Western Municipal Water
City of Morro Bay City of Thousand Oaks District
*Southern California Client
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
C METHODOLOGY
Understanding of the City
MKN understands the critical importance of
infrastructure to the City of Huntington Beach,
a bustling community with a diverse array of
civil engineering needs. The City's infrastructure
encompasses water, sewer, and stormwater systems,
necessitating a robust and responsive engineering
approach. Past projects, such as the Saybrook Lift
Station Replacement with Safa at the helm as the
Project Manager, demonstrate Huntington Beach's Main Street and Ocean Avenue, 1930's.
Photo courtesy of the OC Archives.
commitment to upgrading and maintaining vital
infrastructure. MKN's extensive experience in water, sewer, and stormwater engineering positions us well to address the City's needs.
The City of Huntington Beach has made it clear that the selected on-call consultants must be able to deliver on a broad range of services, which aligns with our staffs' past experience with and understanding of the City. MKN has reviewed the City's five-year Capital Improvement Program and understands that the following project types are of high importance to the City:
• Annual Pipeline Replacement Program. This is one of core competencies of MKN. We have been providing the same service under On-Call contracts for East Orange County Water District and South Coast Water District over the past five years.
• Well Rehabilitation and Treatment. MKN has a long list of well equipping, rehabilitation, PFAS treatment, and other well treatment projects. Over the past three years MKN has completed four similar projects in So Cal and was recently selected for Santa Clarita Valley Water's Pin Court Well Equipping and Treatment Project.
• Sewer Lift Station Rehabilitation. Lift stations are another area of expertise for our proposed team.
Our Contract Manager, Safa Kamangar, has been involved with more than five Lift Station projects with the City of Huntington Beach, and the MKN team has completed the condition assessment for 12 sewer lift stations at South Coast Water District and the design of four lift stations in Southern California over the past five years. Three of these projects include the newest sewer pump station innovation - i.e., direct in-line pumps (overwatch) - for the City of Riverside.
Beyond these capabilities, the MKN team offers expert professionals in every aspect of Water and Wastewater engineering and can effectively and efficiently deliver the City's needs. mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Comprehensive Planning and Feasibility Studies
Many of the design projects will start with planning, feasibility or alternatives analysis to identify the most cost-effective approach while also refining and defining the project to be designed. MKN's experience includes numerous early planning studies, including various feasibility studies, alternatives analysis and conceptual designs. While the type of study is project specific, a general approach for all includes early development of the City goals and objectives from all stakeholders. Project alternatives or components can be developed from these initial discussions and subjected to preliminary screening.
Once short-listed alternatives are confirmed with the City, MKN will conduct an alternatives analysis using both quantitative and qualitative elements and varying weighting factors. These elements and factors will be established in collaboration with the City and based on projects' specific needs. These factors may include economic factors such as capital cost, life cycle or payback, or non-economic factors such as schedule, public impact, traffic, environmental, constructability, operability, and regulatory requirements.
By involving the City actively in this decision-making process, MKN seeks to deliver infrastructure designs that not only meet technical standards but also align with the City's broader goals and responsibilities.
MKN's Project Management and Schedule Approach
MKN employs a structured project management
approach that emphasizes close leadership
mka
involvement and meticulous schedule management PROJECT DELIVERY SISTEN IPDS) to ensure successful project delivery. Through our
Project Delivery Manual, we maintain consistency and
quality in project execution, allowing us to manage
multiple contracts efficiently. Our methodology
includes thorough task tracking, schedule adherence,
and proactive risk management, making us a reliable
partner for the City in implementing its on call
engineering services. MKN's Project Management
Plan is a requirement of every Task Order and will
set the stage for success by identifying key staff, MKN's Project Delivery Manual is the source of our continued success in delivering quality projects.
milestones, quality requirements and risk.
Key Goals of the Project Management Plan:
• Project Overview & Planning - A well-structured project begins with clear objectives and planning, ensuring a defined scope, schedule, and the necessary drawings to support execution. Establishing these foundational elements provides direction and alignment from the start. • Proiect Execution & Management - Successful execution relies on proactive management, including financial oversight, quality assurance, and risk mitigation. Maintaining clear communication, adhering to established CAD standards, and ensuring accurate timesheet charging contribute to efficiency and consistency throughout the project.
• Team & Client Coordination - Collaboration and accountability drive project success, with a strong team, client satisfaction, and key success factors playing a critical role. Keeping open lines of communication and ensuring accessibility through well-defined contact information fosters seamless coordination.
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES PLAN FOR SUCCESS 01
02 COLLABORATE &
INNOVATE
EXECUTE 03
30008
5 04 FEEDBACK
Step 1 - Plan for Success
Key Elements of Step 1
MKN's Contract Manager will coordinate with City staff • Clearly defined Client goals/concerns on a regular basis to understand upcoming task orders.
• Comprehensive scope of work
Through this early development process, or in some
cases once the task order is received, MKN focuses on • Explicit deliverables for each task identifying the key owner objectives which are integrated • Task-linked project schedule into our approach. Our scope, schedule and budget include • Assumptions and limitations
explicit line items for internal kickoff, quality control reviews, deliverable dates and client review. Specific team • Team-specife project fee members are identified on our fee sheets, which commits • Asana coordination on availability those resources to the client and ensures coordination is done ahead of the task order to confirm availability. This latter part is done through MKN's use of Asana, which is an innovative resource and project management tool available to the entire company.
Step 2 - Collaborate & Innovate
Following the Notice to Proceed, MKN's Project Manager will coordinate an internal kickoff meeting and prepare a Project Management Plan (PMP). Both serve as an opportunity to ensure appropriate staffing, understanding of client goals, and preparation for the subsequent Client Kickoff. This internal venue also serves as a platform to brainstorm with a designated QC reviewer and Technical Advisor regarding innovative approaches, allowing time for ideas to be vetted before bringing them forward at the Client Kickoff.
MKN has numerous examples of how this has resulted in savings for our customers, including a recent project with SCWD. In this instance, MKN suggested an alternative to a pipeline project scoped by the Client, in which MKN demonstrated equivalent performance via hydraulic modeling that resulted in a significantly reduced pipeline.
Throughout the course of the project, we will continue collaboration with all stakeholders through bi- weekly meetings with the City's Project Manager and additional participants as needed. During these meetings, key issues will be discussed and stakeholder responses and requirements will be documented for evaluation or implementation.
mkn CITY OF HUNTINGTON BEACH ON-CALL. CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Step 3 - Execute
With a well-formed plan in place, execution relies heavily on communication and coordination. MKN utilizes several tools to support our Contract and Task Order Managers in communicating expectations, project status, and project plan, including the following • Project Management Plan - This standard form is completed at the start of the project and serves as our team's roadmap.
• Microsoft Project Schedule - Our standard includes line items for QC, Client Review, and hard dates for Deliverables.
» Project Management Software - Our billing software (BillQuick V20) provides for up-to-date budget, billing, and payment details.
• Client Check-Ins - Ranging from weekly to bi-weekly these 15-30 minute calls follow a standard agenda that ensures accountability for delivering on action items for both parties. • Resource Coordination - MKN uses weekly office and company-wide coordination calls to ensure adequate resources are available to meet deliverables. All resources are managed through our online BillQuick software and Asana Project Management platform by the Contract Manager. The Asana platform is populated at the start of the project with all key deliverables and QC dates with direct links to those responsible. QC is successful when the reviewer has adequate time to review and the team has adequate time to respond; both are accomplished by MKN's utilization of Asana. Our technical teams also utilize tools such as the latest Microsoft, AutoCAD, GIS, and Modeling software to support execution of project work.
Expenditures and Earned Value
$4 560,000
• Earned Value Analysis - Our standard
$: 250,000
50%
spreadsheets, shared with the Client, track $3.300,000
20%
$3,500,000
budget and schedule in real time by integrating 05 $ 250.000 $3.000.000
2u.00
billing data and work status. This tool enables
• $2 250.000
effective project management while providing
$1,750,000
City staff with transparent updates. Additionally,
MKN can include an Earned Value Analysis (EVA) $1 000,000 20% $500.000 10%
graph with each invoice for a comprehensive 52-0.608
0%
view of budget health. Oct
MKN's Project Documentation
Our team will also utilize Microsoft Teams for project-related communication, video and screen share meetings, documentation, and management of action items. The City's Project Manager will be provided full access to the platform and can view these project materials and status at his or her convenience. This instant access to information ensures that the City will always be able to quickly get up to speed on the project status.
Step 4 - Feedback
Constant improvement is a core value for MKN, and feedback is an essential component of that. For every project that we complete for the City, the agency Project Manager will receive a short survey that allows for candid feedback on performance of the MKN team. The survey even provides the City's personnel the opportunity to request a meeting with our CEO. This feedback will enable us to perform better in the next task order assignment and improve work quality, as well as the City's experience with MKN. mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN's Quality Assurance/Quality Control (QA/QC)
Our tried and true QA/QC process provides the City with peace of mind. Our team's philosophy and approach to project management and the QA/QC program is proactive. We work closely and effectively with clients to ensure a seamless operation. MKN's Quality Management System (QMS) includes three key elements: (1) Quality Planning, (2) Quality Assurance, and (3) Quality Control.
QUALITY PLANNING QUALITY ASSURANCE QUALITY CONTROL
• PM Plan • Internal Training • Approved QC Reviewers
* QC Scheduling • Robust Design Templates • Standard QC Forms * QC Line Item Budget • Proven Technical Tools • Subconsultant QC Reqs. • MKN QC Planning Calls • 10% Technical Review • Principal Review
PLAN PREVENT CONFIRM
Quality Planning - Plan for Success
Our QMS requires the Contract Manager to plan for quality even before a contract is signed. This means that our proposal must include the following:
• Line Item Scope - this helps to ensure that the budget is preserved through project execution. • Line Item Schedule - QC is included in our task-linked Microsoft Project Schedules to ensure that adequate time is allotted, which typically requires 2-5 days. • Identify a QC Manager - this person is identified and confirmed prior to submitting a proposal.
Once a contract is signed, a Project Management Plan is prepared which details key elements of the project, including risks and quality reviews.
Quality Assurance - Prevent Errors
A key element of Quality Assurance is our technical training which is conducted every two weeks. Our engineers are also supported by our design templates, calculation spreadsheets and access to our Technical Practice Groups which maintain and manage many of these documents.
The Technical Review completed at the 10% project phase is another key element of our Quality Assurance program.
Quality Control - Confirm MKN Quality Is Met
For the City, our Contract Manager will conduct monthly status meetings with Task Order Managers.
During this meeting, project status will be discussed along with adherence to QMS procedures and resource needs.
Every deliverable will be reviewed by either Dennis Phinney, PE or Karl Francis, PE, PLS, who will follow our defined process for QC review. Our standard review forms will be utilized which identify key elements of review. These documents have been prepared based on our team's extensive experience and "Lessons Learned."
mkn CITY OF HUNTINGTON PEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
D STAFFING
DA/OC OFFICERS CONTRACT MANACER PRINCIPAL IN CHARGE
Dennis Phinney PE • Sala Kamangar, PE PMP Ryan Callagher, PE Kark Frandis, PE PLS COM OSD B
TASK ORDER MANAGERS
Kevin Saleh, PE Parasto Azami, PE Kathleen Labrador, PE
PROJECT TEAM
PIPELINE DESIGN WATER QUALITY/TREATMENT SURVEY
Ivy Sanders, PE Chris Martin, PE Ramon Gonzalez, LSIT
Judy Beik, PE Stefanos Word, PE, Env Sp TRAFFIC CONTROL PLANNING/ PIPELINE REABILITATION/ David Kuan, PE, PTE?
HYDRAULIC MODELING CONDITION ASSESSMENT
Adam Bugielski, PE Joseph Reichmuth, PE GEOTECHNICAL
Kathleen Labrador, PE Kevin Norgaard, PE Adam Chamaa, PG, GE*
WASTEWATER PROCESS SURGE ARCHITECTURE
Scott Jones"
Michael Nunley, PE, Assoc. DBIA Jason Wilson, PE
Eileen Shields, PE ENVIRONMENTAL ASSESSMENT
CONSTRUCTABILITY
Peter Brennan, PE, CCM Jennifer Jacobus, PhD"
TANK REHABILITATION
Annaliese Torres'
Jon Hanlon, PE
WELL/RESERVOIR
POT HOLING
SITE CIVIL Henry Liang, PE
Becca Bugielski, PE Brian McCauley, PE Underground Solutions
STRUCTURAL
PUMP/LIFT STATION ELECTRICAL/INSTRUMENTATION
Josh Nord, PE Long Pham, EE! Joe Wendt, PE
Sarah Mathews, PE
1-SPEC; 2-Calvada Surveying; 3-Traffc Control Engineering: 4-AESCO; 5-Architects Orange (AO); 6-Rincon; 7-Peterson Structural Engineers Full resumes for the key project team members listed on the following pages can be found in Appendix 1. mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Since joining MKN in 2019, Ryan Gallagher has EDUCATION completed over 130 projects with 30+ public BS, Civil Engineering, California Polytechnic
agencies in Southern California, serving as the State University, San Luis Project Manager for the majority. The estimated Obispo, CA construction value of the projects that have been LICENSE planned, designed and/or constructed exceeds Professional Civil $300M. Projects include planning through Engineer, CA No. 74805 Ryan Gallagher, design for water, wastewater and recycled-water PE
conveyance, pumping, storage, and treatment.
Principal-in-Charge
Ryan specializes in complex multi-agency water
supply programs, alternative delivery, program
management, master planning, and contract
negotiations.
Safa Kamangar is a highly experienced EDUCATION
professional with 28 years of expertise in MS, Civil Engineering, University of Tehran, Iran
water, wastewater, and water reuse. As a
BS, Civil Engineering
design engineer, Safa has provided hydraulic Azad University, Tehran, calculations, mechanical design, detailed design Iran
drawings, and development of specifications. He LICENSE has a strong background in planning, design, Professional Civil Safa Kamangar, Engineer, CA No. 70118
and construction management, gained from
PE, PMP, CCM, Project Management
QSD/P working in both the private and public sectors. Professional (PMP), No.
His expertise encompasses design, construction, 1863656 Contract Manager
and commissioning of water/wastewater Certified Construction infrastructure including more than 65 pumping Manager, No. 6341 facilities, 15 welis, and more than 150 miles of Qualined SWPPP pipeline ranging from 4 inches to 72 inches in Developer/Practitioner (QSD/QSP), CA No. 23059
diameter.
Dennis Phinney's 46 years consulting experience EDUCATION in water and wastewater engineering includes MS, Civil Engineering, Rensselaer Polytechnic
design of over 100 pumping facilities, two of Institute, Troy, NY which were awarded Southern California APWA MBA, Pepperdine "Projects of the Year." He has also designed University, Malibu, CA pipelines, wells, chemical feed facilities, BS, Civil Engineering, reservoirs, and water and wastewater treatment Rensselaer Polytechnic Dennis Phinney, facilities in service throughout California and Institute, Troy, NY
PE LICENSE
QA/QC Officer Arizona. Professional Civil
Engineer, CA No. 30778
Professional Mechanical
Engineer, CA No. 21533
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Karl Francis has over four decades of experience EDUCATION in civil engineering, project management, and MS, Civil Engineering, California State
regulatory compliance. Throughout his career, University, Fullerton, CA Karl has demonstrated exceptional leadership MBA, The University of and technical expertise, managing and Kansas, Lawrence, KS overseeing numerous large-scale infrastructure BS, Civil Engineering, projects. His roles have included Deputy Director The University of Kansas, Karl Francis, PE, Lawrence, KS
PLS of Engineering at Western Municipal Water
LICENSE
District, Principal Civil Engineer at South Coast
QA/QC Officer Professional Civil
Water District, and various senior engineering Engineer, CA No. 45699 positions at the City of Anaheim and San Professional Land Bernardino County. Surveyor, CA No. 7239
Kevin Saleh has more than 30 years of EDUCATION
experience as a civil engineer. He has led and BS, Civil Engineering, University of Tabriz, Iran
participated in planning, design, construction Computer Programming/ management, and construction support for System Analysis, Seneca numerous public works projects, particularly Polytechnic, Toronto, in water and wastewater. His expertise Canada
spans the design and management of water Project Management Kevin Saleh, PE (PM) Certificate, Cornell
distribution and treatment facilities, pumping
Task Order Manager University, Ithaca, NY
stations, treatment plant processes, reservoirs, LICENSE pressure-reducing/surge facilities, wastewater Professional Civil conveyance systems, pumping stations, and Engineer,
treatment plant projects. CA No. 90535
Parasto Azami brings over 10 years of EDUCATION
experience in water and wastewater engineering MS, Civil Engineering, University of California,
design, with a strong focus on pipeline design. Irvine, CA Her expertise includes water conveyance
BS, Mechanical
systems, gravity sewers, force mains, pump Engineering, University stations, and the rehabilitation and condition of Tabriz, Iran assessment of infrastructure. LICENSE
Parasto Azami, PE Professional Civil
Task Order Manager Engineer, CA No. 91468
Project Management
Certification, UCI DCE
Kathleen Labrador has over 10 years of EDUCATION
experience in the water/wastewater civil BS, Civil Engineering, University of Caltornia,
engineering field. Her experience includes Irvine, CA
planning and design of potable water, sewer, LICENSE
and recycled water facilities within California- Professional Civil hydraulic analyses for water, recycled water, and Engineer, CA No. 90355 sewer projects and pipeline, pump station, and
Kathleen
reservoir design where she has prepared plans,
Labrador, PE
specifications, and cost-estimates and provided
Task Order Manager
construction support.
mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN's Additional Staff Resources
MKN prides itself on a robust team of licensed staff members who are integral to our project management structure. Beyond the skilled individuals directly listed in our proposal, MKN possesses a wealth of additional staff resources, providing us with a significant depth of expertise and flexibility. This allows us to effectively respond to varying project demands and timelines, enhancing our ability to meet client objectives efficiently. Service
Service Type
Агеа
Wastewater Recycled Water Planning/ Pumping Pipelines Storage Treatment Condition Assessment Environmental CM Support Water Studies
Staff Member Location CA Registration
Chris Haugen, EIT Irvine EIT 178979
Cindy Sevilla Esparza, PE Irvine Civil PE 96093
Dennis Phinney, PE Irvine Civil PE 30778; Mech. PE 21533 Ivy Sanders, PE Irvine Civil PE 93269
Judy Beik, PE Irvine Civil PE 96365
Kart Francis, PE, PLS Irvine Civil PE 45699; LS 7239
Kathleen Labrador, PE Irvine Civil PE 90355
Kevin Saleh, PE Irvine Civil PE 90535
Khanh Nguyen, EIT Irvine EIT 119293
Parasto Azami, PE Irvine Civil PE 91468
Ryan Gallagher, PE Irvine Civil PE 74805
Sabrina Ryan Irvine N/A
Safa Kamangar, PE, PMP, CCM, QSD/P Irvine Civil PE 70118; PMP 1863656; CCM 6341; QSD 23059
Saisanjith Kakkireni Irvine N/A
Chris Martin, PE Bakersfield Chem. PE 4597
Jason Wilson, PE Bakersfield Civil PE 89117
Josh Nord, PE Bakersfield Civil PE 61789
Ammar Hanna, EIT Fresno EIT 171630
Brian McCauley, PE Fresno Civit PE 92170
Carson Hatmaker, EIT Fresna EIT 177471
Henry Liang, PE Fresno Civil PE 68442
Kevin Norgaard, PE Fresno Mech. PE 27654
Miles Madrid, EIT Fresno EIT 179184
Xavier Vera, EIT Fresno EIT 172420
Vicki Quiram, PE, ENV SP Oceanside Texas - Civit PE 74346, Env SP 3577 Mihika Ram, PE San Jose Georgia - Civil PE 049695
Stefanos Word, PE, ENV SP San Jose Civil PE 93856; Env SP 18683 Eileen Shields, PE San Luis Obispo Civil PE 74757
Jon Hanton, PE, AMPP San Luis Obispo Mech. PE 33232; AMPP 10431924 Joseph J. Reichmuth, PE San Luis Obispo Civil PE 63124
Julia Cannon, EIT San Luis Obispo EIT 173059
Michael Nuntey, PE, Assoc. DBIA San Luis Obispo Civil PE 61801; Assoc. DBIA Tim McHale, EIT, AMPP San Luis Obispo EIT 175874; AMPP 114981 Peter Brennan, PE, CCM Santa Clarita Civil PE 53110; CCM A2428 Adam Bugielski, PE Ventura Civil PE 89065
Becca Bugielski, PE Ventura Civil PE 93278; PACP/LACP/MACP Gerardo Hernandez, EIT Ventura EIT 179738
Luis Garcia, EIT Ventura EIT Certification
Nick Liu, PE Ventura Civil PE 95502
Sarah Mathews, PE Ventura Civil PE 88471; PACP/LACP/MACP Shayne Curson, EIT Ventura EIT 179395
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Subconsultants
To strengthen our team, we made deliberate choices to provide you with highly skilled, reliable resources.
The professional capabilities of each firm are briefly highlighted below. We have successfully collaborated on previous projects with all of the subconsultants identified, and these established working relationships will translate to effective communication, trust and safety in the field, schedule efficiency, and the best value for Huntington Beach.
Subconsultant Firm Description
SPEC delivers a comprehensive range of planning,
engineering, design, and project services to a variety
SPEC Long Pham, EE of industries. Their offerings include feasibility studies, Electrical/Instrumentation project management, engineering design, and on-site
I SERVICE SPEC
support, ensuring complete solutions that drive success throughout every phase of the project lifecycle.
CAL VADA Ramon Gonzalez, LSIT Founded in 1989, Calvada Surveying, Inc. is a SUAVEYING, INC. Survey distinguished Disabled Veteran and Minority Owned land Calvada Surveying surveying firm headquartered in Corona, California.
TCE prepares traffc control plans and detour plans and
David Kuan, PE, PTE conducts traffic impact studies and alternative alignment Traffc Control evaluations to safely and expeditiously guide traffic Traffic Control Engineering through or around construction activities.
AESCO offers expertise in a wide array of geotechnical
Adam Chamaa, PG, GE and geologic services to determine the characteristics Geotechnical of soil conditions and recommend design parameters to AESCO AESCO support client projects.
Scott Jones Founded in 1974, AO is a full service Architectural, Architecture.
AO Desian. Architecture Master Planning and Design firm specializing in Retail, Relationships. Residential and Mixed-Use projects.
Architects Orange (AO)
Rincon was founded in 1994 and has grown to a leading
Jennifer Jacobus, PhD environmental consulting firm throughout California.
RINCON CONSULTANTS, INC.
Environmental Assessment
Rincon brings expertise in CEQA/NEPA compliance for
Rincon Consultants
public agencies.
Rincon was founded in 1994 and has grown to a leading
Annaliese Torres environmental consulting firm throughout California.
RINCON CONSULTANTS, INC. Environmental Assessment
Environmental Scientists | Planners | Englazers Rincon brings expertise in CEQA/NEPA compliance for Rincon Consultants public agencies.
USI provides potholing and subsurface utility engineering UNDERGROUND SOLUTIONS Underground Solutions, Inc. services to locate and understand underground utilities Potholing to help clients make informed decisions, avoid costly
POSITIVEID
conflicts or project delays, and minimize risk.
A single discipline structural engineering and consulting PSE Joe Wendt, PE | fırm specializing in municipal structural design and Structural evaluations. Extensive experience with reservoirs, pump
PETERS SURAL ENSINESS
Peterson Structural Engineers stations and condition assessment. mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
E QUALIFICATIONS
Project Experience
On-Call for South South Coast Water District selected MKN to serve KEY TEAM MEMBERS:
Coast Water as one of five firms on the District's multi-year Ryan Gallagher, PE District on-call contract. MKN has been executing projects Safa Kamangar, PE, both under this contract, as well as stand-alone PMP, CCM, QSD/P OWNER contracts. Projects include:
South Coast Water Parasto Azami, PE
District • Via California Pipeline Rehabilitation. An Dennis Phinney, PE emergency project that included replacement
CLIENT CONTACT Kevin Saleh, PE
Taryn Kjolsing, PE of an existing 10-inch AC pipeline and lining of the 16-inch casing for a failed pipe crossing the RELEVANCE TO Engineering Manager HUNTINGTON BEACH:
31592 West Street, 5 Freeway.
• On-Call Contract
Laguna Beach, CA • Development Review. Completed two task 92651 orders requiring review of plans submitted • Planning Studies [email protected] by vendors requesting to utilize District • Pipeline 949.541.1327 Replacement
infrastructure for telecommunications.
DURATION • Lift Station Condition Assessment. Condition • Lift Station Jan. 2020 - Present assessment of 12 lift stations, including a pump Improvements efficiency and wet well capacity assessment. • Reservoir MKN identified 175 improvement/rehabilitation Rehabilitation projects and prepared a 5-year implementation
plan in close collaboration with District
operations and engineering staff.
• Reservoirs No. 2B and 3B Replacement.
Feasibility study for replacement of Reservoirs
2B and 3B. The project was completed on
schedule and below budget and included
hydraulic modeling, alternatives evaluation,
cost estimating, constraints analysis,
environmental and geotechnical evaluation and
conceptual design.
• Marriott Pipeline. Design services for a 12-inch
water main approximately 1,500 feet in length
located in Dana Point in the vicinity of the
Laguna Cliffs Marriott.
• LS No. 13 and 14 Stairs. Design for
replacement of stairs and guardrails at the
District's Lift Stations No. 13 and 14.
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES As-Needed Since 2023, MKN has been delivering essential KEY TEAM MEMBERS:
Engineering on-call engineering services to Western Municipal Ryan Gallagher, PE Services for Water District (WMWD), encompassing project Safa Kamangar, PE, Western Municipal design and program management for their PMP, CCM, QSD/P Water District comprehensive Capital Improvement Program Karl Francis, PE, PLS (CIP). This partnership underscores MKN's Kevin Saleh, PE OWNER
commitment to ensuring efficient infrastructure
Western Municipal Kathleen Labrador, PE
Water District development and management within WMWD,
contributing to enhanced water service delivery Parasto Azami, PE
CLIENT CONTACT RELEVANCE TO
Luis Cardenas, PE and community sustainability. Following is a list of projects that have been completed or are ongoing: HUNTINGTON BEACH:
Principal Engineer
14205 Meridian Pkwy, • Magnolia Avenue Interconnect • On-Call Contract Riverside, CA 92518 • Mockingbird Canyon Pipeline • Pipeline Design Icardenas@wmwd. • Western RCWD Intertie
• Pump Station
com • Jefferson Avenue Interconnection
Planning and
951.571.7285
• Sterling Reservoir and Pumping Station Design
DURATION • Sterling Pump Station Second PRV
• Sewer Lift Station
2023 - Present • Well No. 7 Equipping and Discharge Pipe Design • PFAS Focused Sewer Rehab
• Murrietta Water Supply Study
• WWRF Flows Project Services
• Sewer Force Main Replacement Support
Various Since 2022, as a pre-qualifed approved vendor, KEY TEAM MEMBERS:
Engineering MKN has been selected for multiple design projects Ryan Gallagher, PE Services for Irvine for Irvine Ranch Water District. The following Safa Kamangar, PE.
Ranch Water project descriptions are provided: PMP, CCM, QSD/P District • Serrano Creek Pipeline. MKN provided Parasto Azami, PE alternatives analysis, hydraulic modeling, and Kevin Saleh, PE OWNER
final design for approximately 1,200 feet of new
Irvine Ranch Water Dennis Phinney, PE
8-inch recycled water pipeline to replace an
District
existing pipe within a creek. RELEVANCE TO
CLIENT CONTACT HUNTINGTON BEACH:
Malcolm Cortez, PE • Park Plaza Pipeline. MKN provided an expedited design for a new pipeline to replace • Same Project Team Engineering Manager Members
15600 Sand Canyon approximately 1,100 feet of existing 6- and Avenue, 8-inch AC pipeline that had reached the end of • Pipeline Irvine, CA 92612 its useful life and was experiencing leaks. Replacement [email protected] • Technology and Ada Recycled Water Pipeline Program 949.453.5854 Replacement. (Ongoing project) MKN is • Multiple DURATION Stakeholder
providing design services for the replacement Engagement 2022 - Present of approximately 4,600 LF of existing 6" ACP recycled water pipe and replacement of 22
services that have reached the end of useful life
and are experiencing leaks.
mkn CITY OR HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES As-Needed Since 2021, as a pre-qualifed approved vendor, KEY TEAM MEMBERS:
Engineering MKN has been selected for multiple desıgn projects Ryan Gallagher, PE Services for for Yorba Linda Water District. The following Safa Kamangar, PE, Yorba Linda projects have been completed: PMP, CCM, QSD/P Water District " Water Master Plan Update Parasto Azami, PE " On-Call Hydraulic Modeling
OWNER Dennis Phinney, PE
• Placentia Waterline Replacement
Yorba Linda Water Kevin Saleh, PE
District • Staff Augmentation Services
RELEVANCE TO
CLIENT CONTACT HUNTINGTON BEACH:
Roseanne Weston,
• Same Key Team
PE, PMP
Members
Engineering Manager
1717 E. Miraloma Ave., • Pipeline
Placentia, CA 92870 Replacement
[email protected] Program
714.701.3102 • Hydraulic Modeling
DURATION Support Services
2021 - Present
On-Call for Santa MKN provides construction management, KEY TEAM MEMBERS:
Clarita Valley inspection, and engineering design services for Ryan Gallagher, PE Water Agency the Santa Clarita Valley Water Agency (SCVWA). Safa Kamangar, PE, As part of the Agency's on-call, MKN has PMP, CCM, QSD/P OWNER
been selected to conduct evaluations, studies, Kevin Saleh, PE Santa Clarita Valley
Water Agency preliminary and final designs, land acquisition, Kathleen Labrador, PE
permit acquisition and more for various projects for
CLIENT CONTACT RELEVANCE TO
the SCVWA's water treatment, water distribution,
Jason Yim, PE HUNTINGTON BEACH:
Principal Engineer storage and pumping facilities. Projects include:
• On-Call Contract
27234 Bouquet • Well 201 VOC Treatment improvements:
Canyon Road, Santa New GAC system for VOC treatment consisted • Pipeline Clarita, CA 91350 of construction of a new chemical building Replacement [email protected] including all associated chemical storage and Design 661.297.1277 • Wellhead
handling systems at the site.
DURATION • Well D/Clark Well PFAS Groundwater Treatment 2020 - Present Treatment: Prepared hydraulic calculations, treatment process equipment selection and
sizing, conceptual design, and preliminary
design report for PAS treatment at two
existing well locations.
• Smyth Waterline Improvements: Abandonment
and replacement of 1,300 linear feet of existing
14-inch PVC potable water line with a new
parallel 16-inch ductile iron pipe.
• Earl Schmidt Filtration Plant Two 5MG Tanks
Improvements: Prepared final construction
documents for the rehabilitation of two tanks.
mkn CITY OF HUNTINGTON PEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES On-Call for City of MKN was selected for the City of Newport Beach KEY TEAM MEMBERS:
Newport Beach On-Call in 2022 and has performed a series of task Ryan Gallagher, PE orders supporting various water supply planning Safa Kamangar, PE, OWNER
and rehabilitation projects. The task orders PMP, CCM, QSD/P City of Newport Beach
received to date included the following: Dennis Phinney, PE
CLIENT CONTACT
• Well-Siting Study. MKN performed a well-siting
Mike Sinacori, PE, MPA Parasto Azami, PE
Assistant City Engineer study for a new water production well. • Surge Analysis. MKN performed a surge Kathleen Labrador, PE 100 Civic Center Drive,
analysis to identify potential mitigation RELEVANCE TO
Newport Beach, CA
92660 HUNTINGTON BEACH:
measures to protect aging infrastructure.
msinacori@ • Cortland PRV. Hydraulic modeling and design • Same Project Team newportbeachca.gov of an expedited PRV abandonment project Members 949.644.3342 • Fast-paced
driven by a development project.
DURATION • 16th Street Constructability Review. MKN Pipeline 2022 - Present performed a peer review of a pump station Replacement rehabilitation project. • Small to Mid-Size
Task Orders
• Shore Cliffs Regulating Stations. MKN
designed two new PRV stations for the Shore
Cliffs area.
• Evening Canyon Pipeline. Design of
approximately 900 feet of potable pipeline
replacement.
• Balboa Ave/Irvine Terrace Pipeline. Design of
approximately 13,000 feet of potable pipeline
replacement.
On-Call for East MKN has been providing as-needed engineering KEY TEAM MEMBERS:
Orange County services to East Orange County Water District Ryan Gallagher, PE Water District through various contracts since 2021. The task Safa Kamangar, PE, orders received to date included the following: PMP, CCM, QSD/P OWNER
• Barrett Pump Station Replacement. MKN Dennis Phinney, PE East Orange County
Water District designed a new pump station to replace an Parasto Azami, PE existing station that had reached the end of its
CLIENT CONTACT RELEVANCE TO
useful life.
David Youngblood, PE HUNTINGTON BEACH:
General Manager • Water and Sewer Standards Update. MKN completed an update to the District's water and • Similar projects 185 N. McPherson Road, such as PRVs
Orange, CA 92869 sewer standards. and pipeline
dyoungblood@eocwd. • Zone 3 to 2 Conversion. MKN designed new replacement
com pipeline to replace existing piping that reached
714.538.5815 • Similar On-Call
the end of its useful life. Project also included Structure DURATION new distribution system and customer PRVS.
2021 - Present • Same Project Team
• Brae Glen Pipeline. Design of new pipeline and Members abandonment of existing pipeline in private
easement.
• Orange Knoll PRV. Design of new PRV and
abandonment of existing pipeline in private
easement.
mkn CITY OF HUNTINGTON REACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN On-Call Contracts Align with Huntington Beach's Needs MKN is uniquely built to operate as a single business unit, meaning that resources from around the company can and are brought in as needed to address specific technical solutions or to expedite production when our clients need a quick turnaround. The table below provides a sampling of our On-Call contract experience.
Service
Area Service Type
Year Started Total Years of Service Contract Services Total (Miltions) Water
On-Call Contracts
East Orange County Water District 2021 $0.9
Newport Beach 2021 $0.2
Water Replenishment District of SC 2021 $1.7 4 4 v
South Coast Water District 2017 $1.3
Los Angeles County Sanitation Districts 2020 $0.4
Inland Empire Utilities Agency 2021 $0.1
Western Municipal Water District 2023 $1.5
Las Virgenes Municipal Water District 2020 4 $0.3
Santa Clarita Valley Water Agency 2020 $0.2
4. 4..
Calleguas MWD 2015 $0.4
Thousand Oaks 2020 $1.1
Camrosa Water District 2020 4 $0.3
Camarillo 2019 5 $1.1
Pleasant Valley County Water District 2019 $0.7
< 4.
Port Hueneme 2020 $0.1
Channel Islands Beach CSD 2019 5 $0.6
United Water Conservation District 2023 $0.3
Ventura 2019 $1.6
Santa Paula 2015 9 $4.0
Casitas MWD 2018 6 $2.1
Nipomo Community Services District 2013 11 $2.9
Grover Beach 2021 $1.0
Arroyo Grande 2015 $0.5
San Luis Obispo 2013 11 $1.7
Morro Bay 2013 11 $2.4
Atascadero 2013 11 $1.2
Atascadero Mutual Water Company 2014 10 $1.9
Bakersheld 2016 8 $0.8
East Niles Community Services District 2015 $4.1
Fresno, City of 2021 $1.2
RCAC 2019 5 $0.6
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN Experience - Pipelines
MKN's team has delivered over 400+ miles of pipeline, covering every aspect of pipeline development including conceptual planning, hydraulic modeling, alternatives analysis, condition assessment, detailed design and construction management. Our design experience includes the full range of pipeline materials and trenchless construction methods, including pipe bursting, horizontal directional drilling and jack-and- bore.
Diameter
Client Project Name Material Length (LF)
(inches)
Water Replenishment District Brine Pipeline 16 HDPE 2,000 Water Replenishment District GRIP Conveyance Alternatives Analysis 42 Steel 25,000 Water Replenishment District 208th Street Pipelines 14, 24, 36 HDPE 2,400 West Basin MWD Palos Verdes Pipeline 10, 12 PVC 16,000
South Coast Water District Via California Replacement 10 PVC 500 United Water CD Alternatives Analysis 16 PVC 20,000
Ventura County Potable Pipeline Project 12 PVC 20,000
Las Virgenes MWD Westlake Reservoir 30, 36 Steel 2,200
Antelope Valley/East Kern WA 95th Street East PS/Turnout 20 Steel 500 Kern County Water Agency Northwest Feeder PS & Pipeline 42 Steel 21,120 Lakeside Union SO LUSD Connection to Bakersfield 16 PVC 15,500 Monterey County WRA Salinas River Diversion Facility 20,30 WSP. DIP 10,560 Nipomo CSD Joshua Road Booster Pump Station 24 PVC 27,000 Frontage Rd Trunk Sewer Replacement 24 PVC 4,200
Nipomo CSD
Nipomo CSD Branch St Water Improvements 8 PVC 2,100
Nipomo CSD Supplemental Water Project 12, 18,24 DIP, HDPE 27,000 North of the River MWD Highland Park Improvement 8, 12 PVC 27,000 Santa Maria WWTP Influent Piping Improvements 42,48 PE 600 Antelope Valley/East Kern WA South Feeder Parallel Pipeline 24,36,48 Steel 34,320 Arvin CSD Arvin RW Disposal Pipeline 18 PVC 18,480
California Rail Builders North Kern WSD Canal 9-26 42 Conc/HDPE 400 Casitas MWD Pipeline Loading Evaluation 33 Steel NA
Casitas MWD West Ojai Pipeline Project 8 PVC 5,600
Cayucos Sanitary District Sewer Pipeline Improvements PVC 3,500 Cayucos Sanitary District Toro Creek Bridge Pipeline Rehab PVC 100 City of Arroyo Grande Fair Oaks Waterline Replacement Project PVC 2,025 City of Grover Beach CDBG Waterline Replacement 8 PVC 2,400 City of Grover Beach COBG Waterline Replacement 6.8 PVC 5,500 City of Guadalupe Tognazzini Well Intertie 8 PVC 600
SLO County Food Control Nacimiento Water Pipeline 18-36 PVC, DIP 264,000 City of San Luis Obispo Highland Waterline Replacement DIP 165 East Niles CSD Morning and 178 Intertie 20 Steel 1,320
East Niles CSD Brentwood Sewer Extension VCP.PVC,HOPE 1,000 East Nites CSD Pioneer Pipeline Project PVC 1,400
East Niles CSD Redbank Rd Pipeline Project 8, 14 PVC 6,800 East Nites CSD Pesante Sewer Replacement 8 VCP 500
East Niles CSD Water Master Plan 12-36 NA 67,500
East Niles CSO Morning Dr Transmission Pipe 20 Steel 5,500 East Niles CSD Well 20 Flushing Pipeline Project 12 PVC 1,500 Fresno Met Flood CD Various Flood Control Projects 18-48 RCP/CIP 21,120 City of Fresno Friant-Kern Canal Pipeline 60 WSP 26,400 City of Fresno Regional Transmission Mains 16-48 WSP, DIP 68,640 Valley Children's Hospital VCH Rio Mesa Well & Pipeline 12 PVC 1,800 Gunner Ranch Wastewater Improvements 27,30 PVC 21,120
City of Modesto Ninth Street Storm Drain Replacement 24-96 RCP/CIP 52,800 ND State Water Commission Southwest Pipeline Project and PS 24,30 Steel 448,800 ND State Water Commission Devils Lake Emergency Outlet 30,54 Steel, HOPE 3,500 mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN Experience - Wells
MKN has executed over 70 wells and wellhead treatment projects throughout California, showcasing our commitment to delivering reliable and innovative water solutions. Our extensive portfolio demonstrates our expertise in addressing complex water quality challenges and our dedication to enhancing water reliability and safety for clients similar to the City.
Client Project Name Type Constituent
Crescenta Valley County WD Glenwood Treatment Plant lon Exchange Nitrate City of Beverly Hills Beverly Hills Desalter WTP BWRO Salinity/Hardness City of Compton Well 16 and 18 - Planning Various PCE/TCE City of Lynwood Well No. 11 GAC PCE/TCE
City of Lynwood Well No. 19 GAC and Greensand PCE/TCE and Fe & Mn Maywood Mutual #2 Maywood Well Greensand Fe & Mn
Monte Vista Water District Well 33 Treatment Ion Exchange Nitrate, Hardness Irvine Ranch Water District Deep Aquifer Treatment System (5 MGD) Nanofiltration (NF) Color/Organics/Hardness Jurupa CSD Jurupa IX Plant lon Exchange Nitrate
Jurupa CSD Jurupa IX Plant Expansion lon Exchange Nitrate Capistrano Beach WD 1.5 MGD/BWRO BWRO Salinity/Hardness Salinity/Hardness/Iron/
Capo. Valley CWD San Juan Capistrano Desalter BWRO
Manganese
Capistrano CSD Capistrano Desalter BWRO, Greensand Salinity/Iron City of Oxnard GREAT Program Brackish Desalter BWRO Salinity/Hardness City of Oxnard Water Operations Support Contract BWRO Salinity/Hardness City of Oxnard Brine Optimization BWRO Salinity/Hardness City of Oxnard BS No. 3 Brackish Desalter BWRO Salinity/Hardness Camrosa Water District Conejo Wellheld GAC Treatment Evaluation Adsorption (GAC) TCP Port Hueneme Water Agency Brine Optimization BWRO Salinity/Hardness Port Hueneme Water Agency BWRDF Facility Master Plan BWRO/NF Salinity/Hardness Port Hueneme Water Agency EDR Replacement 8WRO/NF Salinity/Hardness Well 8 Nitrate Treatment Study lon Exchange, Reverse Nitrate Meiners Oaks WD
Osmosis, Biological Treatment
Direct Filtration (Pressure Groundwater Under the
Meiners Oaks WD Wells No. 1 and No. 2 Water Treatment Plant Filtration) Influence of Surface Water
City of Fillmore Fillmore WTP Treatment Study BWRO Salinity/Hardness City of Solvang Well 22 Oxidation-Filtration Sulfide, Fe & Mn City of Goleta Anita Well GAC, Greensand, Airstripping Fe & Mn, TTHM Buena Vista Water Storage Dist. Ag. Drainage Study BWRO Selenium East Niles CSD Well 18 Arsenic Treatment Adsorption Arsenic East Niles CSD Well 19 Arsenic Treatment Adsorption Arsenic East Nites CSD Well 22 Arsenic Treatment Adsorption Arsenic East Niles CSD Well 21 and 23 GAC Treatment Adsorption (GAC) TCP City of Bakersheld 5 Wells Arsenic Treatment Adsorption Arsenic City of Delano Well 32 Nitrate Blending Analysis lon Exchange Nitrate City of McFarland McFarland Well 2 lon Exchange Nitrate City of McFarland McFarland Well 4 lon Exchange Nitrate Condential Client Well Cl, Greensand, RO Sulhde, TDS
University Enterprises Central Union School District Arsenic Removal Adsorption Arsenic University Enterprises Coarsegold Elementary School Arsenic Removal Adsorption Arsenic and Manganese University Enterprises Foothill Mobile Home Park Adsorption Uranium and Arsenic University Enterprises Lancaster Mobile Home Park Arsenic Removal Adsorption Arsenic Kern Housing Authority N. Shafter LLC lon Exchange Nitrate City of Guadalupe Well 5 lon Exchange Nitrate
City of Arroyo Grande Well No. 11 GAC and Greensand Iron and Arsenic City of Grover Beach Grover Beach Nitrate Removal Ion Exhcange Nitrate Nipomo CSD District-Wide Chloramine Conversion TTHM
Los Osos CSD Nitrate Removal Evaluation Various Nitrate City of Pismo Beach Meadow Creek Wells Oxidation-Filtration BWRO = Brackish Water Reverse Osmosis; GAC = Granular Activated Carbon mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN Experience - Wells Continued
Client Project Name Type Constituent
City of Paso Robles Sherwood Wells Adsorption, GAC Arsenic, Sultde, Taste & Odor Ion Exchange, GAC, Oxidation- PFOA and PFOS, Iron,
Atascadero Mutual Water Company PFOS/PFOA Treatment Manganese, Hydrogen Sulfide Adsorption
Atascadero Mutual Water Company PFAS Remediation Program Management Various PFAS and PFOS City of Fresno Pump Station 177 Wellhead Treatment Improvements | Adsorption (GAC), Airstripping TCP. Carbon Dioxide City of Fresno Pump Station 185 Wellhead Treatment Adsorption (GAC), Airstripping TCP, Carbon Dioxide Hydrogen Sulfde, Arsenic,
City of Fresno Pump Station 345-1 Wellhead Treatment Oxidation-Adsorption Iron, Manganese
Hydrogen Sulfide, Arsenic,
City of Fresno Pump Station 347 Wellhead Treatment Oxidation-Adsorption Iron, Manganese
Belmont Water Corporation Well 1 TCP Treatment Adsorption (GAC) TCP Salinity/Hardness/Iron/
Sweetwater Authority Richard A. Reynolds GW Desal Facility BWRO Manganese
Three Crowns Industrial Park Well 1-3 TCP Treatment Adsorption (GAC) TCP Sea Water Reverse Osmosis
Monterey Peninsula WMD Seawater Desal Feasibility Study (SWRO) Salinity/Hardness BWRO = Brackish Water Reverse Osmosis: GAC = Granular Activated Carbon mka CITY OF HUNTINGTON BEACH ON-CALL. CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES MKN Experience - Sewer Lift Stations
MKN is an industry leader in the planning, design, rehabilitation and inspection services for lift stations in Central and Southern California. The following table provides a sample of our team's lift station experience which includes over 80 lift stations.
Client Project Name
*Algonquin Lift Station Construction
*Central Park Lift Station Design
*Edgewater Lift Station Construction Huntington Beach, City of *Lift Station No. 24 Construction Huntington Beach, City of *Saybrook Lane Lift Station Replacement
Seal Beach Lift Station Replacement Orange County Sanitation District Belgrave Lift Station Design Garden Grove Sanitation District Tiffany Lift Station Replacement Garden Grove Sanitation District Santa Ana Civic Center LS Rehab (2 total) Santa Ana, City of SD 03 Lift Station Design Long Beach, City of
LS Condition Assessment (7 stations) Emerald Bay Service District Lift Station No. 3 Rehabilitation Emerald Bay Service District Aliso Creek and Southwing LS Rehab
Paseo de Valencia LS Rehabilitation
Planning Area 3 Lift Station Study Rancho Mission Viejo, City of Landmark Lift Station Design LA County Sanitation Districts San Dimas Lift Station Improvements
Azusa Avenue LS Rehabititation
Yellowstone Lift Station Design Services Santa Clarita, City of Palomino Park Lift Station Design
Joy Lift Station Design Corona, City of
Arantine Hills Lift Station Construction
Smith/Rincon Lift Station Design
Fairgrounds & Dexter LS Replacement Riverside, City of
Pierce Street LS Condition Assessment
Wood Road Lift Station Assessment
Meridian Lift Station Replacement
Harbor, Roja, and Pilgrim Creek LS Rehab Oceanside, City of North Valley Lift Station Improvements Oceanside, City of Portola Hills Lift Station Improvements Ventura, City of Lift Station Capacity Evaluation Mission Hills CSD
Lift Station B Evaluation and Design Channel Islands Beach CSD Pump Station B Channel Islands Beach CSD
24th & Oak Lift Station Feasibility Study Bakersfield, City of District Lift Station Feasibility Study Bakersfield, City of Downtown Sewer Study LS Assessment Bakersheld, City of
McCutchen Lift Station Study Bakersheld, City of
Avila Ranch Lift Station Design-Build San Luis Obispo, City of Calle Joaquin Lift Station Replacement San Luis Obispo, City of Laguna Lift Station Replacement San Luis Obispo, City of Margarita and Foothill LS Replacement San Luis Obispo, City of WRRF Influent LS Pump Replacement San Luis Obispo, City of Lopez Recreation Area LS Eval (5 total) San Luis Obispo, County of Influent LS Assessment and Rehab Avila Beach CSD
LS No. 1 Force Main Replacement Arroyo Grande, City of
Lift Station No. 3 Rehabilitation Arroyo Grande. City of Lift Station No. 13 Replacement Atascadero, City of
Lift Station No. 2 Replacement Atascadero, City of
LS No. 4, 7 & 11 Rehabilitation Atascadero, City of
LS No. 4, 7, 11 & 15 Assessment Atascadero, City of
Lift Station No. 5 Rehabilitation Atascadero, City of
Lift Station No. 14 Improvements _Legacy Development (on behalf of City of Atascadero) Lift Station No. 3, 8, and 11 Rehab Paso Robles, City of Lift Station No. 4 Replacement Paso Robles, City of
* Staff Projects before MKN
mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES References of Work Performed Form
(List 5 Local References)
Comany Name: MKN & Associates, Inc
1. Name of Reference: South Coast Water District
Address: 131592 West Street, Laguna Beach, CA 92651
Contact Name: Taryn Kjolsing, PE...... Phone Number: 949.541.1327 Email: [email protected]
Dates of Business: 2020 - Current
2. Name of Reference: Western Municipal Water District
Address: 14205 Meridian Pkwy, Riverside, CA 92518
Contact Name: Luis Cardenas, PE.... Phone Number: 951.571.7285 Email: [email protected]
Dates of Business: 2023 - Current
3. Name of Reference: Yorba Linda Water District
Address: 1717 E. Miraloma Avenue, Placentia, CA 92870-6623 Contact Name: Roseanne Weston, PE, PMP Phone Number: 714.701.3102 Email: [email protected]
Dates of Business: 2021-Current
4. Name of Reference: Irvine Ranch Water District
Address: 131592 West Street, Laguna Beach, CA 92651
Contact Name: Malcolm Cortez, PE Phone Number: 949.453.5854 Email: [email protected]
Dates of Business: 2022-Current
5. Name of Refcrence: City of Newport Beach
Address: 131592 West Street, Laguna Beach, CA 92651
Contact Name: Mike Sinacori, PE, MPA _Phone Number: 949.644.3342 Email: [email protected]
Dates of Business: 2022-Current
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES APPENDIX 1 -
RESUMES
Project Experience
As requested in the RFP, the following pages contain full resumes of Key Personnel. mka CITYOF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
RYAN GALLAGHER, PE
PRINCIPAL-IN-CHARGE
EDUCATION Since 2019, Ryan Gallagher has completed over 130 projects with 30+ public agencies • BS, Civil Engineering, in Southern California, serving as the Project Manager for the majority. The estimated California Polytechnic
State University, San Luis construction value of the projects that have been planned, designed and/or constructed Obispo, CA exceeds $300M. Projects include planning through design for water, wastewater and recycled-water conveyance, pumping, storage, and treatment. Ryan specializes in complex
LICENSES &
REGISTRATIONS multi-agency water supply programs, alternative delivery, program management, master • Professional Civil planning, and contract negotiations.
Engineer, CA No. 74805
Why Ryan for City of Oceanside's On-Call?
PROFESSIONAL
• Local and Committed. Ryan is located in MKN's Irvine Office and is an active member
ASSOCIATIONS
• American Public Works of the local water industry. Mr. Gallagher offers a distinct perspective and valuable Association (APWA), industry insights, drawing from his experience as Board Chair at the Orange County Ventura County Chapter
(President 2014) Sanitation District.
• American Society of Civil • Company Principal. As a company Principal, Ryan can execute contracts, allocate Engineers (ASCE), Santa resources, and prioritize District projects.
Barbara-Ventura Branch
(Younger Member Forum • On-Call Experience. South Coast Water District, Water Replenishment District, President 2012)
Thousand Oaks, Las Virgenes MWD, Channel Islands Beach CSD, and City of Oxnard * Association of Water
Agencies of Ventura 16th Street Pump Station Constructability Review | City of Newport, Newport Beach, CA County (AWAVC) (Board Project Manager. Managed the constructability review of 90% design drawings for a pump of Directors 2010-2016,
station rehabilitation project. The evaluation included project drawings and specifcations.
President 2013)
The review identified over 100 comments with classifcations for low, medium and high. • Orange County Sanitation
District (OC San) (Board Comments included fatal flaws, schedule and cost risks, and opportunities for cost of Directors 2021- reduction.
Present, Vice Chair 2022-
2024, Board Chairman Via California Pipeline Replacement | South Coast Water District, Dana Point, CA 2024-2025
Project Manager. The project involved the replacement of 500 feet of pipe following failure • Orange County Water
Association (OCWA) of the pipeline. The 10-inch pipeline is located within a 16-inch casing in a freeway overpass. (President 2020 and The replacement design included evaluation of various materials, including fusible PVC and 2021) Certa-Lok PVC. The final design included a cured-in-place liner for the casing and new Certa- • Tustin City Council Lok PVC to replace the failed carrier pipe. The design was expedited to ensure the pipe 2020-2028, Mayor Pro
Tem 2024) could be returned to service quickly.
VEARS OF EXPERIENCE Reservoir 2B Final Design | South Coast Water District, Laguna Beach, CA • 5 with MKN Project Manager. The project involved the preliminary and final design for two new 100,000 • 19 Total gallon steel tanks located within a hillside in the City of Laguna Beach. The effort included environmental permitting, public outreach, access road improvements, site grading, retaining walls and demolition of one existing steel tank. The estimated project cost is approximately $3M.
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Reservoir 2B and 38 Reptacement | South Coast Water District, Laguna Beach, CA Project Manager. The project team provided a feasibility study to evaluate the replacement of two existing 100,000 gallon steel tanks (two sites). The scope of work included hydraulic modeling, siting evaluation, geotechnical and environmental review, constraints analysis, tank sizing, cost estimating and conceptual planning. Alternatives included consideration of new steel tanks, pre-stressed concrete tanks, new and/or expanded pump stations and pipeline improvements required to meet fire flow demands.
Anaheim Valve Vault | Orange County Water District, Anaheim, CA Project Manager. This project team designed the new valve vault for multiple buried valves (48-inch to 72-inch), which added gates to Atwood Channel discharge structure and made minor modification to the OC-28. Identified an opportunity to reduce costs by $300k during the PDR stage. Total project cost is estimated at $1M. 16th Street Pump Station Constructability Review | City of Newport, Newport Beach, CA Project Manager. Managed the constructability review of 90% design drawings for a pump station rehabilitation project. The evaluation included project drawings and specifications. The review identified over 100 comments with classifications for low, medium and high. Comments included fatal flaws, schedule and cost risks, and opportunities for cost reduction.
Barrett Pump Station Replacement | East Orange County Water District, Orange, CA Project Manager. The project designed a pump station replacement. Efforts included preliminary and final design for the replacement of an existing pump station. The new pump station was sized at 1,500 gpm and consisted of a package pumping system, associated piping, controls and valving. The construction included a temporary pumping system to allow for continued operation during construction and replacement of an elevated transformer (SCE). The total construction cost for the project was Eart Schmidt Filtration Plant (ESFP] Two 5MG Tanks Improvements | Santa Clarita Valley Water Agency, Castaic, CA Principal-in-Charge. The project involved planning and preliminary design services for two, 1970s era 5MG welded steel tanks at the Agency's Earl Schmidt Filtration Plant. The Scope of Services included development of a technical memorandum which included evaluation of rehabilitation alternatives, including retroftting the tanks with self-supporting aluminum dome roofs, opinions of probable construction costs, and 30% design drawings. The tank improvements will consist of roof and rafter structural retrofits and upgrades, recoating, safety enhancements, and seismic upgrades.
Granuiar Activated Carbon (GAC) Wellhead Treatment | Water Replenishment District of Southern California, Lynwood, CA Project Manager. The project provided preliminary and final design of two 20,000-pound skid-mounted GAC contact vessels, backwash system, piping modifications, new sewer lateral, and other on-site improvements. Treated tetrachlorothylene/ trichloroethylene (PCE/TCE) for an existing 700 gpm well in the City of Lynwood. The construction cost was approximately $900k.
Groundwater Treatment Evaluations - Lynwood Well and Maywood Well | Water Replenishment District of Southern California, Lakewood, CA
Project Manager. The project team provided feasibility evaluations for groundwater treatment at three separate well sites, covering two service areas - the cities of Lynwood and Maywood - and various contaminants, including iron, manganese, tetrachloroethylene (PCE), and trichloroethylene (TCE). The evaluations included reviewing well data, providing a comparative analysis of well treatment options, conducting a life-cycle cost analysis of options, and providing recommendations for well treatment. The final report included a detailed cost estimate, schedule, and conceptual site plan. Treatments evaluated included the following: Greensand Plus, Layne-Ox, DMI65 water filtration technology, reverse osmosis for iron and manganese, granular activated carbon, air-stripping, and ultraviolet oxidation for PCE. mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
SAFA KAMANGAR, PE, PMP, CCM, QSD/P
CONTRACT MANAGER
EDUCATION Safa Kamangar is a highly experienced professional with 28 years of expertise in • MS, Civil Engineering, water, wastewater, and water reuse. As a design engineer, Safa has provided hydraulic University of Tehran, Iran
calculations, mechanical design, detailed design drawings, and development of • BS, Civil Engineering,
Azad University, Tehran, specifications. He has a strong background in planning, design, and construction Iran management, gained from working in both the private and public sectors. His expertise encompasses design, construction, and commissioning of water/wastewater infrastructure
LICENSES
REGISTRATIONS including more than 50 pumping facilities, 15 wells, and more than 150 miles of pipeline • Professional Civil ranging from 4 inches to 72 inches in diameter.
Engineer, CA No. 70118
* Project Management Saybrook Lift Station Replacement | City of Huntington Beach, CA Professional (PMP), No. Project Manager. Provided design services for the Saybrook Lane Sewer Lift Station at 1863656 the intersection of Saybrook Lane and Heil Avenue. As part of the lift station replacement, • Certified Construction
included installing a new 30-ft deep wet-well structure, slide rail system submersible Manager, No. 6341
pumps, piping and force main, a valving facility and vault, electrical service and • Qualifed SWPPP
Developer/Practitioner instrumentation, and a new gas-powered generator. Additionally, project included the (QSD/QSP), CA No. 23059 design of relocating about 2,000 feet of existing utilities that conflicted with construction and • OSHA 30-Hour reconfiguring traffic lanes and a median in the intersection to allow for the new lift station.
Construction Outreach
Training Edgewater Sewer Lift Station | City of Huntington Beach, CA • OSHA 40-Hour Construction Manager. This $4M project constructed a new wet well type sewer lift station, HAZWOPER Certification force main, piping, electrical and controls. Construction included a 30-foot-deep wet well • OSHA Confined Space structure less than two miles from the coastline, which required an extensive dewatering Training
and monitoring program.
PROFESSIONAL
ASSOCIATIONS Algonquin Sewer Lint Station | City of Huntington Beach, CA • American Public Works Project Manager. The project team maintained the operation of the existing Algonquin Lift Association (APWA) Station white constructing a new station adjacent to it. The construction involved a 35-foot- • American Society of Civil deep concrete structure, valving and metering vaults, new sewer mains, force mains, and Engineers (ASCE)
manholes. Additionally, a new power and control system was installed, along with a startup » American Water Works
Association (AWWA) protocol and checklist.
• Iranian American
Sewer Lift Station No. 24 | City of Huntington Beach, CA Society of Engineers and
Architects (iaSEA) Project Manager. The project involved maintaining the operation of the existing sewer lift • Orange County Water station while constructing a new station adjacent to it. The work included building a 35-foot- Association (OCWA) deep concrete structure, constructing valving and metering vaults, and installing new sewer mains, force mains, manholes. Additionally, the project encompassed the installation of a
YEARS OF EXPERIENCE
* 1 with MKN new power and control system and the provision of a startup protocol and checklist. • 28 Total
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Downtown Watermain Replacement Project | City of Huntington Beach, CA Project Engineer. The scope of work included preparing final contract drawings, technical specifications and engineering cost estimate for replacing old water lines in alleys in downtown area in various locations and street rehabilitations.
Colinas Bridge Water Line Relocation | Moulton Niguel Water District, Laguna Niguel, CA Project Manager. The project consisted of preliminary and final design of water line relocations at the Pase de Colinas Bridge in the City of Laguna Niguel. Work consisted of investigating and preparing plans, specifications, and cost estimate (PS&E) for relocating the District's existing 20-inch gravity outfall and existing 12-inch water line including relocation of existing electrical conduits, control panel, and existing vault sump pump discharge lines into the existing sewer system. The two water lines were in conflict with the seismic retrofit of the Paseo de Colinas Bridge.
La Paz/Moulton PW System Confguration | Moulton Niguel Water District, La Crescenta, CA Project Manager. This project consisted of the preliminary and final design of the construction of approximately 1,500 feet of 12-inch potable water main along Moulton Parkway and La Paz Road and their connections to the existing system as well as abandonment of the existing pressure reducing station and water lines. The improvements will combine the water and fire systems and provide points of connection at the driveway right-of-way at the end of the commercial property for future connections to the District's 450-zone water system.
Santa Ana Civic Center Pump Stations Upgrades, Santa Ana | City of Santa Ana, CA Project Manager. Responsible for project oversight. Performed preliminary studies and final design services to identify options, recommend upgrades, and provide final construction plans for two stormwater lift stations at the Santa Ana Civic Center. After flooding during the 2016 El Nino season, the mechanical and electrical equipment in both lift stations were deemed to have reached the end of their lifespans. Project included designing upgrades for both stations that included the replacement of pumps, sump pumps, motors, piping and valves, structural and electrical improvements, site and drainage enhancements, and upgrades to SCADA and electrical instrumentation.
Bonita Canyon Zone D to B Pressure Reducing Station Supply Pipeline Replacement | Irvine Ranch Water District Project Manager. Responsible for project oversight. Project included the design of a 12" CML&C pipe replacement across Bonita Canyon Road, connecting the recycled water Zone D of IRWD's system to its Zone B system via an existing PRV Station.
On-Call Engineering and Construction Management | Santa Clarita Valley Water Agency, Santa Clarita, CA Project Manager/Technical Advisor. The project consisted of engineering services to SCV Water (including through Castaic Lake Water Agency). Safa has been involved in the following task orders: Magic Mountain Pump Station Preliminary Design; Magic Mountain Pipeline Design Phase 6 - Final Design; Rio Vista Valve #2 Vault Modifcations - 72-inch Valve Replacement; and Earl Schmidt Filtration Plant CT Credit Improvement Project. (Completed with a prior firm) Project Management Support Services | Western Municipal Water District (WMWD), Riverside, CA Project Manager. This project provided project management services to WMWD for their CIP program for three new projects under an on-call contract.
Lincoln Avenue 12-Inch Water LIne Replacement | City of Anahelm, CA Project Manager. The project installed approximately 3,000 linear feet of new 12-inch-diameter DIP water main in Lincoln Avenue between La Plaza and State College Boulevard to improve the fire flow in the portion of the City's 335 Pressure Zone.
Silverado Canyon Road Pipeline | İrvine Ranch Water District, Irvine, CA Project Manager. The project involved the design of pipeline based on data gathering and information collection performed.
Work included performing field reconnaissance, held survey topographic maps, pothole information and geotechnical engineering recommendations. Design included plan and profile, pipeline connection details, road trench section replacement, traffic control plans, and all details necessary for construction of improvements for existing 8-inch domestic water line. mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
DENNIS PHINNEY, PE
QA/QC OFFICER
EDUCATION Dennis Phinney's 46 years consulting experience in water and wastewater engineering • MS, Civil Engineering, includes design of over 100 pumping facitities, two of which were awarded Southern Rensselaer Polytechnic
Institute, Troy, NY California APWA "Projects of the Year." He has also designed pipelines, wells, chemical feed • MBA, Business facilities, reservoirs, and water and wastewater treatment facilities in service throughout Administration, California and Arizona.
Pepperdine University,
Malibu, CA He has prepared water and wastewater master plans for service areas aggregating over * BS, Civil Engineering, 1 million residents, has authored standard specifications adopted by water agencies Rensselaer Polytechnic throughout California, and was responsible for preparing the sections added to the Institute, Troy, NY
"Greenbook" Standard Specifications for Public Works Construction in 2015 to address water LICENSES & and wastewater pipelines and appurtenances.
REGISTRATIONS
• Professional Civil Western Pump Station Upgrades | City of Glendale, CA Engineer, CA No. 30778 Project Engineer. This project involved upgrades of major City water pumping facility • Professional Mechanical
including power conversion from medium to low (460VAC) voltage, replacement of two Engineer, CA No. 21533
horizontal pumps, upgrading of ClaValves, site work and reconfiguration of piping in • Professional Civil
Engineer, AZ No. 15704 residential street to increase system flexibility.
PROFESSIONAL Bake Parkway Recycled Water Pipeline | İrvine Ranch Water District, Irvine, CA ASSOCIATIONS Project Engineer. Prepared preliminary design report and plans and specifications for • American Water Works
approximately 3,400 linear feet of 12-inch diameter PVC pipe, 730 linear feet of 10-inch Association (AWWA)
(Life Member) steel pipe in Caltrans bridge, 5,000 linear feet of 24-inch steel pipe, connections, pressure reducing station, and permitting with Caltrans and two cities.
YEARS OF EXPERIENCE
= 1 with MKN Planning Area 6, Zone 4 3 Zone C Reservoirs, Zone 4/6 BPS & Zone C/D BPS | Irvine * 46 Total Ranch Water District, Irvine, CA
Project Engineer. Prepared preliminary design report, plans, and specifications for 3.5 MG domestic water and 2.2 MG recycled water partially buried pre-stressed concrete tanks, domestic water and recycled water pump stations with (4) 125-hp and (1) 50-hp VFD pumps each, reservoir management system, grading and site improvements, access road, 1,000 LF of 20-inch domestic water pipeline, 1,000 LF of 24-inch recycled water pipeline, 1,000 LF of 24-inch storm drain, site piping, drains, and vaults.
Pier Point Landing Sewage Lift Station | Port of Los Angeles, Los Angeles, CA Project Engineer. Prepared plans and specifications for submersible sewage lift station next to Long Beach Aquarium serving a dockside commercial complex. Design included fixture unit counts of nearby building to estimate design wastewater flow using Hunter curves and plans for retroft of a duplex pump station with new 5-hp 150-gpm pumps, an overflow storage basin, a flagpole vent, and a solenoid to shut off water to neighboring bathrooms if needed to prevent a sewage overflow.
mkn CITY OF HUNTINGTON DEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Mangular Blending Facility | City of Corona, CA
Project Manager. Managed this combined water treatment and pumping facility allowing City to use existing 2.0 MG 905-Zone Mangular Park buried water tank as a second groundwater blending facility supplementing Corona's Garretson Blending Facility. The Mangular facility blends 1,000-3,800 gpm of inexpensive nitrate-containing water from the Temescal Groundwater Basin with surface water from other sources to provide citizens with a greater volume of EPA-compliant potable water. The blended water is then disinfected with chlorine and ammonia before the introduction to the water system. The project includes the 1 MW of standby power and two 150-hp pumps to deliver 2,500 gpm to the 1060-Zone plus three 150-hp 1250-gpm pumps to the 1220-Zone. APWA Southern California BEST Project of 2023 Drainage, Water Wastewater Category.
Walnut Pump Station | City of Santa Ana, CA
Project Engineer. Prepared a design report, plans, and specifications for new masonry buildings at Walnut Pump Station including a new 3,500-square-foot pump building to house existing pumps delivering well water from 7MG buried reservoir to Santa Ana distribution system using 5 existing vertical turbine pumps. New structure replaces obsolete building built in 1956.
Main building included new pump room, workshop, electrical building, offce space and bath and shower facilities. The design also included a separate 200 square-foot industrial storage building for sodium hypochlorite and POL fuel, plus a carport structure to shade a generator, a perimeter fence wall, and tennis practice courts and backwalls in the adjacent park to mask the perimeter fencing. Project earned Envision bronze rating from Institute for Sustainable Infrastructure. APWA Southern California BEST Project of 2020 Drainage, Water Wastewater Category.
Keith Tank | City of Corona, CA
Project Manager. The project consisted of a 2.5-million-gallon partially buried prestressed concrete water tank for gravity water redistribution back to City's 1220 Zone. Provided operational, emergency, and fire storage for Arantine Hills Development in southeastern Corona. Work incorporated interior Tideflex mixing system and included upsizing of local distribution pipelines to eliminate system bottlenecks to maximize emergency deliveries for fire protection.
Well No. 14A | City of Corona, CA
Project Manager. The project involved restoring Corona's abandoned Well No. 14A through chemical treatment and installation of new liner and screen to produce 550 gpm of groundwater. Work included equipping well with new 75-hp pump and motor and appurtenant piping to deliver groundwater to central groundwater treatment location at Mangular Park.
Ross Booster Station | City of Pasadena, CA
Project Manager. Oversaw the design of 1,400 gpm booster station including three 60-hp inline vertical pumps within a tight existing building. Work included site redesign and mechanical, HVAC, electrical and structural redesign of building to improve pumping capacity and facilitate operation.
La Palma Reservoir and Pump Station | Ciey of Anaheim, CA Project Engineer. This project involved the preparation of feasibility study, preliminary design report, plans and specifcations for reconstruction of a 4MG Hypalon-lined and aluminum roof La Palma Reservoir, new La Palma Pump Station including two 250-hp and two 125-hp pumps, standby power, remodeled restroom and chemical analyzer building, slip-lining of existing 12- inch cast iron pipe with new 10-inch HDPE pipe, inspection of and extensive pervious pavement and WQMP stormwater capture facilities onsite.
Linda Vista Reservoir and Pump Station | City of Anaheim, CA Project Engineer. Prepared preliminary design report, plans, and specifications for construction of 4.0 MG precast concrete reservoir, drainage facilities connecting to storm drains beneath Orange County Water District recharge basins (Anaheim Lake), improvements to on-site chlorination facilities, retrofit of structures to bring up to current seismic codes and relocation of an existing 11-pump pump station to pump from new reservoir to Zones 400 and 555. Plans included extensive grading and drainage plans including onsite retention to offset paving of unpaved area, trapezoidal vegetated swales to comply with SWPPP water quality management objectives and design of piping in groundwater recharge basin to withstand 275k scraper whee! loads.
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
KARL FRANCIS, PE, PLS
QA/QC OFFICER
EDUCATION Kart Francis has over four decades of experience in civil engineering, project management, • MS, Civil Engineering.
and regulatory compliance. Throughout his career, Karl has demonstrated exceptional California State
University, Fullerton, CA leadership and technical expertise, managing and overseeing numerous large-scale • MBA, The University of infrastructure projects. His roles have included Deputy Director of Engineering at Western Kansas, Lawrence, KS Municipal Water District, Principal Civil Engineer at South Coast Water District, and various • BS. Civil Engineering. senior engineering positions at the City of Anaheim and San Bernardino County. Karl has The University of Kansas,
successfully managed capital improvement programs, development services, and regulatory Lawrence, KS
compliance, ensuring projects meet high standards of quality and efficiency. Karl has a LICENSES 8. proven track record of securing competitive grant funds, collaborating with local, state, and
REGISTRATIONS
federal agencies, and continuously improving processes and procedures. • Professional Civil
Engineer, CA No. 45699 1269 Force Main Project Design | Western Municipal Water District, Riverside, CA. * Professional Land
Deputy Director of Engineering. Provided oversight and supervision for the design phase of Surveyor, CA No. 7239
the project, with funding secured for construction estimated at $7M.
PROFESSIONAL
ASSOCIATIONS Arlington Desalter Wells Rehabilitation Program | Western Municipal Water District, • American Water Works Riverside, CA.
Association (AWWA)
Deputy Director of Engineering. Supervised the annual wells rehabititation program ($420K YEARS OF EXPERIENCE over a 5-year period).
• < 1 with MKN
Sterling Reservolr and Pump Station Project | Western Municipal Water District, • 41 Total
Riverside, CA.
Deputy Director of Engineering. Acted as the principal in charge for this $18M project.
Cajalco Intake Switchgear and Motor Control Center Project | Western Municipal Water District, Riverside, CA.
Deputy Director of Engineering. Provided oversight and supervision for the design and construction phases for this $1OM project.
Cannon Street Interconnection with Riverside Public Utilities Design | Western Municipal Water District, Riverside, CA.
Deputy Director of Engineering. Supervised the design phase of the interconnection $2M project.
Magnolia Avenue Interconnection with Riverside Public Utilities | Western Municipal Water District, Riverside, CA.
Deputy Director of Engineering. Oversaw the planning, design, and construction of the interconnection $7M project.
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Pipeline Replacement Program | Western Municipal Water District, Riverside, CA.
Deputy Director of Engineering. Managed the programming, planning, funding, design, and construction of the pipeline replacement program, budgeted at $5M per year for the first five years, extended another two years.
Tunnel Rehabilitation and Sewer Pipeline Replacement Project | South Coast Water District, Laguna Beach, CA.
Project Manager. Performed detailed design reviews, provided comments, and implemented value engineering, risk analysis, and funding for the 2-mile long tunnel rehabilitation and sewer pipeline replacement project. mka CITYOF KUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
KEVIN SALEH, PE
TASK ORDER MANAGER
EDUCATION Kevin Saleh has more than 30 years of experience as a civil engineer. He has led and • BS, Civil Engineering, participated in planning, design, construction management, and construction support for University of Tabriz, Iran
numerous public works projects, particularly in water and wastewater. His expertise spans • Computer Programming/
System Analysis, Seneca the design and management of water distribution and treatment facilities, pumping stations, Polytechnic, Toronto, treatment plant processes, reservoirs, pressure-reducing/surge facilities, wastewater Canada
conveyance systems, pumping stations, and treatment plant projects. • Project Management
(PM) Certificate, Cornell B-inch and 6-inch Water Main Replacement in Wesiord Street, Ardmore Street, and Calle University, Ithaca, NY del Norte Street | Orange County, CA LICENSES & Project Manager. Responsible for design and preparation of construction bid documents for RECISTRATIONS abandonment and replacement of existing, aging 4-inch and 8-inch DIP with new 6-inch and • Professional Civil
8-inch PVC C-900, including water services and located in Westford, Ardmore, and Calle del Engineer, CA No. 90535
Norte streets.
• Professional Civil
Engineer, MD No. 36759 Culver Boulevard Area Main Replacement | Los Angeles County, CA PROFESSIONAL Senior Project Engineer. Responsible for the design of replacement of existing, aging 4-inch ASSOCIATIONS and 6-inch cast iron water main with 8-inch DIP or PVC in Culver Boulevard from Sepulveda * American Membrane
Boulevard to Overland Avenue and in Wagner Street from Sepulveda Boulevard to Coombs Technology Association
(AMTA) Avenue (approximately 7,000 feet). The project also includes the relocation of 1-inch and * Water Environment 2-inch services and meters and the abandonment of the existing water mains in the alley Federation (WEF) east of Culver Boulevard and Wagner Street.
YEARS OF EXPERIENCE Eastern Wells and Pipeline | Orange County, CA • 1 with MKN
Project Engineer. Mr. Saleh was responsible for the pipeline design, construction inspection. • 31 Total
and support of the project, which included two raw water wells and 9,000 feet of 16-inch AWWA C905 collection pipeline between the wells and the City's Groundwater Recovery Plant. This project also included the construction of the pipeline in the bike path under the 1-5 Bridge crossing over San Juan Creek. Caltrans permit engineer required that the 16- inch carrier pipe be constructed inside a 24-inch steel casing pipe. He was responsible for the engineering, design, and construction support of two replacement groundwater wells.
The wells were both drilled in a shallow aquifer (15 to 100-ft BGS) using an adapted auger method to reduce the need for drilling fluids and increase production. Both welts utilize 75-HP electric motors to produce up to 700gpm of raw groundwater. The well facilities each include 22ft x 18ft slump stone well houses, Variable Frequency Drives, 8-inch Ductile Iron discharge lines, 4-inch PVC pump-to-waste lines, and concrete pump-to-waste cisterns. mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Citywide Sanitary Sewer Improvement Program (CSSIP] Group 6, Model 6 | City of Anaheim, CA Technical Manager. Responsible for quality checks and technical reviews of plans. The City of Anaheim identified sewer capacity deficiencies in the Model 6 area of their collection system. The City retained the professional engineering services to confirm, analyze, and develop a recommended solution to mitigate the sewer system deficiencies. Project No. 2 within Group 6 of the Citywide Sanitary Sewer Improvement Program / Projects (CSSIPP) focused on improving the sewer collection system on Crescent Avenue, Loara Street, and North Street. The existing sewer collection system consisted of approximately 4,300 linear feet of 8-inch, 10-inch, and 12-inch gravity sewer pipelines.
Signal Will Pipeline and Pump Station | Signal Hill, CA Assistant Project Manager responsible for overseeing the design and preparation of project specifications. The project included preparing plans, specifications, and construction cost estimates for recycled water improvements to View Park.
Proposed by the City of Signal Hill, these improvements consist of approximately 6,300 feet of 6-inch pipeline and a new pump station to deliver 40 acre-feet annually to the park. Provided design services in two phases. The first phase of design, already completed, requires an irrigation supply of 17 gallons per minute and a pressure of 60 psi at the intersection of Cherry Avenue and Burnett Street. The project also required performing a feasibility study and a pipe alignment study to determine the best location for the proposed pump station.
Orange/Western Regional Trunk Sewer Rehabilitation | Orange County Sanitation District, Anaheim, Long Beach, Seat Beach, Cypress, Buena Park, and Los Alamitos, CA
QA/QC Engineer. Responsible for reviewing the plans and specs for quality assurance prior to submittal to the client. The design included providing engineering design services for the rehabilitation of four sewer reaches and one pump station in Anaheim, Long Beach, Seal Beach, Cypress, Buena Park, and Los Alamitos; a total of 84,000 linear feet of sewer line, a utility survey and research; surveying and mapping; a pipeline rehabilitation analysis; preparation of cost estimates and calculations; modeling in Civil 3D; and preparation of technical memoranda and reports, contract drawings and details, and contract specihcations.
Saybrook Lift Station Replacement | City of Huntington Beach, CA Senior Engineer. Responsible for overseeing the design and preparation of project specifications and construction cost estimate for the replacement of the Saybrook Lift Station. As part of the lift station replacement, project elements included installing a new wet-well structure, submersible pumps, a lift system, piping and force main, a valving facility and vault, electrical service and instrumentation, and a new gas-powered generator and relocating about 2,000 LF of utilities that conflicted with construction, in addition to reconfiguring traffic lanes and a median in the intersection to allow for the new lift station.
Paseo De Valencia Lift Station Rehabilitation Project | City of Laguna Hills, CA Project Manager. Responsible for preparation of plans, specifications, estimates, and construction support to rehabilitate and upgrade the existing lift station by replacing the existing pumps, mechanical, electrical, and control equipment and for a portable generator plug-in connection and associated equipment.
Lift Station No. 1 Improvements | Orange County, CA
Senior Project Engineer. Responsible for the design of a new lift station located at the Blue Lagoon Development, which has been the main source of resident noise complaints. The project includes the removal and replacement of all hatches, installation of a new "quiet" fan, installation of a new davit arm, and interlocking pavers. In addition, the new "quiet" fan must be in compliance with the City noise ordinance, the hatched must be spring-loaded and traffc-rated, and the interlocking paver must allow for a growing natural landscape around the station. mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
PARASTO AZAMI, PE
mkr TASK ORDER MANAGER
EDUCATION Parasto Azami brings over 10 years of experience in water and wastewater engineering * MS. Civil Engineering, design, with a strong focus on pipeline design. Her expertise includes water conveyance University of California,
Irvine, CA systems, gravity sewers, force mains, pump stations, and the rehabilitation and condition assessment of infrastructure. She has successfully led numerous complex, large- • BS. Mechanical
Engineering, University scale pipeline projects, delivering reliable and sustainable solutions. Parasto's deep of Tabriz, iran understanding of engineering challenges and commitment to excellence ensures optimal LICENSES 8 outcomes for her clients and stakeholders.
REGISTRATIONS
• Professional Civil Marriott Pipeline | South Coast Water District, Dana Point, CA Engineer, CA No. 91468 Project Manager and Design Lead. The project involved the design of new 12-inch water • Project Management main via open trench and trenchless installation in the vicinity of the Laguna Cliffs Marriott Certification, UCI DCE
in the City of Dana Point.
PROFESSIONAL
Park Plaza Recycled Waterline Replacement | Irvine Ranch Water Districk, Irvine, CA
ASSOCIATIONS
• American Society of Civil Design Lead and Project Manager. The project replaced an existing 6-inch and 8-inch Engineers (ASCE) diameter asbestos cement recycled water pipe in Park Plaza. Tasks included identifying • Association of Women optimum alignment, coordinating with Irvine Company for work hours and traffic control, in Water, Energy &
preparing plans, specifications, cost estimates and construction schedules.
Environment (AWWEE)
• University of California Circular Panorama Pipeline Replacement | East Orange County Water District, Orange, CA Irvine (UCI) Civil Project Manager. The project involved preliminary and final design of 4,000 feet of new and Environmental
Engineering (CEE) 12-inch waterlines and three pressure reducing facilities. Major tasks included alternative Affiliates (Program analysis, utilities research, coordination with County for Traffic and pavement replacement Committee Chair)
requirements.
• Women in Water, Orange
County Chapter Coastal Recycled Water Expansion Program Phase 4 Project | South Coast Water District, YEARS OF EXPERIENCE Dana Point, CA
• 4 with MKN Project Manager. The project involved design of 5,500 LF of new 8-inch PVC recycled water * 11 Total pipe as well as a new pressure reducing station along Ritz Carlton Dr, Selva Road and Pacific Coast HWY in the City of Dana Point. Key responsibilities include coordinating with the City of Dana Point and Caltrans for traffic control and work hours and conducting an alternatives analysis to determine the pipeline alignment with minimal impact on community access. (Ongoing)
Capital Improvement Water, Sewer, and Reclaimed Water Lines - Portola Parkway | Irvine Ranch Water Districk, Irvine, CA
Project Engineer. The project involved the design over 2 miles 30-inch domestic transmission water line, 10-inch sewer line, 16-inch recycled water lines and over 200 feet of trenchless/ tunneling pipe for new developments along Portola Parkway. mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Recycled Water Conveyance Pipeline | Pleasant Valley County Water District, Ventura County, CA Design Lead. Project consisted of the preliminary and final design of 8,000 feet of 18-inch pipeline in Ventura County. The effort included HDD installation underneath of red-line channel, environmental permitting, and coordinating with jurisdiction agencies.
Orange Knoll PRV and Brae Glen Pipeline | East Orange County Water District (EOCWD), North Tustin, CA Project Manager and Design Lead. Project consisted of the design of new pressure reducing facility and new water line to abandon existing pipe in easement, and included site visits, preliminary and final design, specifications, stakeholder coordination and community outreach.
Serrano Creek Raw Waterline Replacement | Irvine Ranch Water District, Irvine, CA Design Lead. The project replaced an existing 8-inch diameter asbestos cement raw water pipe in the vicinity of Serrano Creek Trail in City of Lake Forest with over 100 feet of trenchless/ tunneling pipe under the community wall. Task included identifying optimum alignment, coordinating with utility and jurisdiction agencies, preparing plans, specifications, cost estimates and construction schedules.
Regional Desalter Conveyance Design | Water Replenishment District of Southern California, Torrance, CA Project Engineer. The project provided an expedited alternatives analysis and design of 2,500 LF pipelines for WRD's future Regional Brackish Water Reclamation Facility. The project included the evaluation of six alternative alignments, including both trenchless and open cut approaches, and final design. The project includes the preliminary and final design of a 14-inch HDPE brine line, two 24-inch HDPE product water lines, and a 34-inch HDPE source water line.
Barrett Pump Station Replacement | East Orange County Water District, Orange, CA Deputy Project Manager/Project Engineer. The project included the preliminary and final design for the replacement of an existing pump station. The new pump station consisted of a 1,500 gpm package pumping system, associated piping, controls and valves. The construction included a temporary pumping system to allow for continued operation during construction and replacement of an elevated electrical transformer (SCE).
Rehabilitation of Western Regional Sewer | Orange County Sanitation District, Fountain Valley, CA Design Engineer. The project involved the rehabilitation (CIPP) and replacement of 16 miles of sewer pipes and over 200 manholes to extend sewer system's reliable life by 50 years. Tasks included preliminary and final design, technical reports, bypass plans, construction schedule, cost estimate and specifications. Work also included coordination and attending progress review meetings with client, utility agencies and sub-contractors.
Life Stations Condition Assessment | South Coast Water District, Laguna Beach, CA Project Engineer. The project involved condition assessment of 12 sewer lift stations. Work included updating district's survey form, condition ratings of all aspects of the lift stations, wet well capacity, and review of pump efficiencies. A list of potential projects with estimated costs were developed for use in planning future capital improvement projects.
Reservoir 2B Final Design | South Coast Water District, Laguna Beach, CA Project Engineer. The project involved the design of two new 100K gallon steel reservoirs located within a hillside in Laguna Beach. The effort included environmental permitting, public outreach, access road improvements, site grading, retaining walls and demolition of one existing steel tank.
Morena Pump Station and Conveyance System (Pure Water) | City of San Diego, CA Design Engineer. The project involved the design of over 11 miles of 48-inch Force main and 30-inch Brine line to convey sewer from Morena pump station to North City Pure Water Facility and producing 15 MGD of purified drinking water. Major tasks included hydraulic analysis, steel pipe calculations (AWWA M-11), construction plans and Specifications, and pressure reducing facility.
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
KATHLEEN LABRADOR, PE
TASK ORDER MANAGER/PLANNING/
HYDRAULIC MODELING
EDUCATION
• BS, Civil Engineering, Kathleen Labrador has over 10 years of experience in the water/wastewater civil University of California,
irvine, CA engineering field. Her experience includes planning and design of potable water, sewer, and recycled water facilities within California. Her planning experience includes conducting LICENSES & hydraulic analyses for water, recycled water, and sewer projects where she uses hydraulic
REGISTRATIONS
= Professional Civil modeling software to build models, run simulations and summarize the results in a report.
Engineer, CA No. 90355 Her design experience includes various pipeline, pump station, and reservoir design where • Professional Civit she has prepared plans, specifcations, and cost-estimates, and provided construction Engineer, CO No. 61003
support.
PROFESSIONAL
On-Call Task Order No. 12 Recycled Water System Hydraulic Modeling | South Coast
ASSOCIATIONS
* Orange County Water Water District, Dana Point, CA
Association (OCWA) Project Engineer. Provided engineering services to complete a recycled water system YEARS OF EXPERIENCE hydraulic model evaluation. This study evaluated three alternatives and provided • 1 with MKN recommendations for the recycled water line improvements for the Coastal Recycled • 11 Total Water Expansion Project-Phase 4. MKN reviewed the existing hydraulic model, as- builts, Infrastructure Master Plan Update, and the 2023 Recycled Water Roadmap for the preparation for this study. The study used hydraulic modeling software, Innovyze's Infowater, to evaluate the three scenarios and determine which scenarios could provide adequate pressure to the proposed system. Results were reviewed against the District's infrastructure master plan and a technical memorandum was prepared to summarize the simulations, results, and recommendations.
Rose and Vine Sewer Improvements, Citywide Sanitary Sewer Program | City of Anaheim, CA
Project Engineer. The Citywide Sanitary Sewer Program Sewer Improvements is located in the City of Anaheim. The project consists of preliminary design and preparation of plans, specifcations, and estimates for the sewer replacement on Vine Street and Rose Street, north of Lincoln Avenue in Anaheim, CA. The purpose is to mitigate existing deficiencies identified in the City's Master Plan of Sanitary Sewer. The project consists of upsizing 1,300 If of existing sewer pipe from 6-inch to 8/10-inch sewer pipe. Responsible for authoring the preliminary design report that summarizes the design considerations of the project, existing and proposed sewer capacity calculations, alternative alignments and trenchless alternatives, pipe material selection, construction methods, and designed preliminary plans.
Responsibilities included preparing the construction plans, specifications, and cost-estimate and participated in the City's workshop to discuss design prior to finalization. mkn CITy Of HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Master Plan Studies and Hydraulic Modeling Services | Mesa Water District and Newport Beach, CA Project Engineer. Provided Master Plan updates by running hydraulic analyses and authoring reports and fire flow analysis and updating the hydraulic model per Mesa Water District's system updates. Worked with Mesa Water District to provide hydraulic modeling services, including Master Plan updates for proposed developments within the Mesa Water District distribution system. Analyses included land areas up to 9 acres, developments with 250 attached units, and developments with 177 detached units. Other hydraulic modeling services for Mesa Water District include on-call fire flow analysis to determine system reliability, system operational adjustments, and continuous hydraulic model updates, per Mesa Water's direction.
Hacienda Pump Station Project | City of La Habra, CA
Project Engineer. Provided preliminary analyses, final design, and construction support services for the City of La Habra's new Hacienda Park Booster Pump Station. The new pumping facility will replace two existing pump stations that currently serve the Foothill Zone of the City's water system. The proposed facility will be constructed within the Hacienda Park on a new asphalt pavement with access roads and seven vertical turbine pumps covering a flow range of 25 to 3,500 gallons per minute.
Construction of approximately one mile of 12-in transmission pipe, a stationary generator, and a surge tank are included as part of the project. Responsible for developing the site and grading plan, sizing and selecting pumps, and developing construction documents.
Sterling Pump Station Construction Support | Western Municipal Water District, Riverside, CA Project Engineer. Provided support services for the Sterling Reservoir and Pumping Station. The project elements are comprised of a new 1.5 MG prestressed post tensioned 80-foot-diameter and 35-foot-high concrete reservoir; a high pressure pumping station with six 700-HP pumps, each sized for 2,200 gpm at 1,000 feet of head (approximately 450 psi discharge pressure), two of which are gas engine driven pumps; a chemical injection building and metering pumps to generate and inject mono-chloramines; a flow control facility consisting of a 16 inch Cla-Val combination valve; pump house building: 15,000 gallon surge tank; and site improvements and fencing. Responsible for providing construction engineering support services.
Construction support duties include completing final bid construction plans and specifications prior to construction, designing modifications to alleviate issues during construction, assisting in hosting a workshop for Operations training, co-authored the Operations and Maintenance Manual, and providing oversight during the start-up and commissioning of the reservoir and pump station.
On-Call Sewer Study Support | City of Victorville, CA
Project Engineer. Provided on-call, as-needed sewer system studies for new proposed developments in the City of Victorville.
Prepared and maintained the sanitary sewer system hydraulic model for the City and provided area sewer studies on an as- needed basis to identify required improvements based on the proposed developments. Projects included proposed industrial campuses to be developed on open space, and recommendations included building a sewer extension and re-routing existing sewer pipeline to lead to the City's industrial wastewater treatment plant. Simulations were conducted within the hydraulic model, and the results were reviewed against the City's sewer master plan criteria. A technical memorandum was prepared to summarize the simulations, results, and recommendations.
State Water Interconnect Modeling | Calfeguas Municipal Water District and City of Ventura, CA Project Engineer. Conducted a hydraulic analysis to review various scenarios and summarizing the results in a technical memorandum for the new seven-mile State Water Project Interconnection 30-inch pipeline between the City of Ventura and Calleguas Municipal Water District. The pipeline allows for additional water supplies for the City as it will be able to deliver the City's allocated State Water of 10,000 acre-feet per year. The project includes updating the City's water hydraulic model to be consistent with the State Water Project. Results are summarized in a technical memorandum. mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:
SEE ATTACHED EXHIBIT B
B. Travel Charges for time during travel are not reimbursable.
C. Billing
1. All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.
Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.
A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.
4. CONSULTANT shall submit to CITY an invoice for each monthly payment due.
Such invoice shall:
A) Reference this Agreement;
B) Describe the services performed;
C) Show the total amount of the payment due;
D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and
E) For all payments include an estimate of the percentage of work completed.
Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein.
5. Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.
Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.
EXHIBIT "B"
F FEE PROPOSAL
mkn 2025 FEE SCHEDULE
CATEGORY POSITION: HOURLY RATES
Communications Administrative Assistant $113
and Strategic Communications Coordinator $121
Administrative Strategic Communications Specialist $147 CAD Technician I $137
Designers and CAD Design Technician I! $158
Technicians
Senior Designer $176
Assistant Planner!
Assistant Planner !!
GIS Specialist
Planning Planner 1
Planner I!
Senior Planner
Engineering Technician
Assistant Engineer!
Assistant Engineer I!
Project Engineer I
Engineers Project Engineer I!
Senior Engineer I
Senior Engineer I!
Senior Engineer lI $247
Principal Engineer $257
Project Manager $231
Project Senior Project Manager $267
Management Project Director $289
Senior Project Director $308
Scheduler $179
*** Construction Inspector $200
Construction Assistant Resident Engineer $200
Management
Resident Engineer $212
Services
Construction Manager $231
Principal Construction Manager $272
The foregoing Billing Rate Schedule is effective through December 31, 2025 and will be adjusted each year after at a rate of 2 to 5%.
DIRECT PROJECT EXPENSES
Outside Reproduction Cost + 10%
Subcontracted or Subconsultant Services
Travel & Subsistence (other than mileage)
Current IRS Rate
*** 40 hrs per week assumed; part-time rates can be provided upon request Rates also subject to prevailing wage mandatory increases during a calendar year mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES SPEC Services, Inc. Page 1 of 2
10540 Talbert Ave. Suite 100 East
SEC Fountain Valley, CA 92708
® 714.963.8077 Fax 714.963.0364
SERVICE www.specservices.com
RATE SCHEDULE
LABOR RATES:
Design & Document Production
Personnel Hourly Personnel Hourly
Classification Billing Rate Classification Billing Rate Design Drafter 1 $84.00 Designer 4 $171.00
Design Drafter 2 $98.00 Designer 5 $186.00
Designer $116.00 Designer 6 $198.00
Desiener $133.00 Project Administrative Assistant $98.00 Designer 3 $153.00 Project Accountant $108.00
Engineering & Project Management
Personnel Hourly Personnel Hourly
Classification Billing Rate Classification Billing Rate Engineer 1 $136.00 Procurement Agent 1 $108.00
Engineer 2 $167.00 Procurement Agent 2 $141.00
Engineer 3 $194.00 Procurement Agent 3 $175.00
ingineer, $222.00 Project Coordinator $168.00
ngineer $248.00 Project Controls Specialist 1 $136.00
Project Manager 1 $194.00 Project Controls Specialist 2 $167.00 Project Manager 2 $222.00 Project Controls Specialist 3 $194.00 Project Manager 3 $248.00 Project Controls Specialist 4 $218.00 Survey & Field Services
Personnel Hourly Personnel Hourly
Classification Billing Rate Classification Billing Rate Survey Technician $110.00 1-Person Survey Crew* $182.00 Party Chief $157.00 2-Person Survey Crew* $292.00
Survey Manager $218.00 3-Person Survey Crew* $402.00
*Includes survey equipment rate
A 30% premium on labor rates will be charged on labor for client authorized overtime, emergency or priority work. This premium will not be charged without prior approval of the client.
Rev. 23A System Planning, Engineering & Coordinating
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
EQUIPMENT RATES:
Survey Equipment $ 25.00 per hour
Laser Scanning Equipment $150.00 per hour
Drone Equipment $300.00 per day
In-House Aerial Imagery $500.00 Standard Access Fee
Computer Assisted Design/Drafting System $ 10.00 per hour Caesar Piping Stress Analysis System $ 10.00 per hour
PLC Programming Software $ 10.00 per hour
SYNERGI Stoner Pipeline Hydraulic Simulation $ 30.00 per hour Aspen Tech Suite $ 30.00 per hour
ETAP & SKM Electrical Analysis Software $ 10.00 per hour ArcGIS Mapping Software $ 20.00 per hour
Pipeflo Hydraulic Simulation Software $ 30.00 per hour
ArcFlash Label Software $ 10.00 per label
Procore Software as quoted per project
IN-HOUSE REPRODUCTION AND PLOTTING:
Photo Copies B&W Plots Color Plots
Size B&W Color Bond Bond High
Gloss
8.5"×11" $ 0.08 $ 0.70 $ 0.30 $ 4.00 $ 8.00
11"x17" $ 0.08 1.50 0.60 $ 5.00 10.00
24'x36" $ 3.50 10.00 $ 20.00
36"x48" 6.50 | S 20.00 $ 35.00
OTHER EXPENSES:
Automobile Expenses: Per Current IRS Rates
All other ice price sere and ding as of nice read an in expenses postage AGENCY PERSONNEL:
Staffing agency personnel will be billed the same as direct employees in accordance with the Labor Rates contained herein.
PAYMENT TERMS:
Monthly invoices, net 30 days
ANNUAL RATE ADJUSTMENTS:
Labor Rates shall be adjusted on January 1S each year based upon the percentage change in the Employment Cost Index (ECI): Series Title: Total compensation for Private industry workers in West, 12-month percent change |Series:CIU2010000000240A-non seasonally adjusted].
Rev. 23A
SPEC
SERVICE
mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
CAL VADA
SURVEYING INC DVBE. MBE • SBE • CERTIFIED
PROFESSIONAL LAND SURVEYING
Prevailing Wage Rate Schedule (2025)
Item Description Unit Unit Price
Field Support
Field Survey Crew & Equipment (Prevailing Wage) * Hour $385.00 Round Trip Travel Time & Costs Hour $165.00
Office Support
Principal Hour $275.00
Director Surveying/Professional Land Surveyor Hour $235.00 Senior Project Manager Hour $195.00
Project Surveyor Hour $180.00
GPS Post Processing Hour $170.00
Survey Technician Hour $165.00
Drafting/ AutoCAD Technician Hour $130.00
Accounting / Clerical Hour $90.00
Reimbursable Costs
In-House Reproductions Cost + 15%
Printing and Materials Cost + 15%
Parking and Tolls Cost + 15%
Express Mail, Courier, Next Day Service Cost + 15%
Special Sub-Consultant Services (GPR, etc.) Cost + 10%
Miscellaneous Services
Per Diem (when required) Day Per GSA Schedule
Consultation in Connection with Litigation Hour $465.00 Transportation (per 2025 IRS Mileage Rate) Mile $0.69
Overtime and Saturday Rates
Hour _ 1.5 times Hourly Rate
The hourly rate increases 3% per year to cover cost of living. Also, a 10% mark-up will be added to any sub-consultants utilized to cover project management and administration costs. Hourly rates good for 2025.
*4 or 8 Hour Minimum
Armando D. DuPont, Professional Land Surveyor 7780
CAL VADA
412 Jenks Circle, Suite 205, Corona, CA 92878 DVBE • MBE • SBE • CERTIFIED SURVEYING, INC. www.calvada.com|[email protected]
951.280.9960 (P)| 951.280.9746 (F) PROFESSIONAL LAND SURVEYING mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
Cost Table
Professional Staffing
Code Item $/Unit Unit
P100 Principal Professional Engineer $ 220.00 Your
P101 Senior Geotechnical Engineer 205.00 Hour
P102 Project Engineer / Manager 175.00 Hour
P103 Geologist 185.00 Hour
P104 Quality Control Manager 175.00 Hour
P105 Senior Staff Engineer 170.00 Hour
P116 Health and Safety Officer 205.00 Hour
P115 LA City Deputy Methane Specialist 150.00 Hour
P107 Laboratory Manager serenes es as es es es es es es es es es 140.00 Hour P108 Laboratory Technician 115.00 Hour
P109 CADD Operator/Draftsperson 95.00 Hour
P110 Data Processing, Technical Editing or Reproduction 95.00 Hour P111 Expert Witness Testimony 465.00 Hour
P112 Certified Payroll, per hr. 170.00 Hour
P113 Senior Staff Environmental Engineer 170.00 Hour
P114 Senior Environmental Engineer 205.00 Hour
Field Technician
Code Item S/Unit Unit
T150 Special Inspector (Reinforced Concrete, and Masonry) 125.00 Hour T151 Special Inspector (Structural Steel, Drilled-In-Anchors 125.00 Hour T152 Special Inspector for Welding 125.00 Hour
T153 DSA Class Inspector 145.00 Hour
T154 DSA Class I! Inspector 135.00 Hour
T155 Special Inspector for Fireproofing 125.00 Hour
T156 Special Inspector Load Tests or Torque/Bolt) 125.00 Hour T157 Special Inspector Rebar Sample 125.00 Hour
T158 Special Inspector Pachometer 125.00 Hour
T159 Senior Asphalt Placement Technician 125.00 Hour
T160 Asphalt Placement Technician 125.00 Hour
T161 Asphalt/Concrete Plant Technician 125.00 Hour
T162 ACI/Caltrans Technician 125.00 Hour
T163 Senior Soils Technician 125.00 Hour
T164 Senior Grading Inspector 130.00 Hour
T165 Staff Grading Inspector 125.00 Hour
T166 Soils Technician 125.00 Hour
T167 Pile Driving Inspector 140.00 Hour
T168 AWS Certified Welding Inspector $ 125.00 Hour
T169 NACE Coating Inspector 150.00 Hour
T170 Field Coring Technician $ 125.00 Hour
T171 Nondestructive Examination Technician, UT, MT, LP 130.00 Hour T172 Structural Steel Fabrication Inspector (AWS) 130.00 Hour T177 Senior Environmental Technician 140.00 Hour
T178 Environmental Technician 140.00 Hour
T179 Building Inspector 145.00 Hour
Fabrication Shop Inspections
Code Item $/Unit Unit
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
T173 Structural Steel Inspector (ICC/CBO) 125 Hour
T174 Structural Steel Inspector (AWS) 125 Hour
T175 Batch Plant Quality Control Technician/Inspector 125 Hour T176 Reinforced Concrete, Prestressed Inspector 125 Hour Field Inspector/Technician Hours
No Work Performed (Work Cancelled) will be charged at 2 hour minimum All field services charge at 4 hour minimum and 8 hour thereafter Regular Work Hours
First 8 hours, Monday through Friday, between 5:00 a.m. to 5:00 p.m.
Direct Project expenses outside services will be charged at Cost + 15%.
Time and One-Half
Any increment past first 8 hours through 12 hours, Monday through Friday First 12 hours on Saturday
Shift between 3:00 a.m. and 5:00 a.m.
Double Time
Any hours past 12 hours Monday through Saturday, all day Sunday and Federal Holidays Field Analysis
Code $/Unit Unit
G200 Soil Boring with Hollow Stem Auger Drilling Portal to Portal $ 415.00 Hour G200A Mobilization and Demobilization for Hollow Stem Auger 350.00 Hour G201 Backfill Boreholes with Bentonite 26.00 Foot
G202 Backfill Boreholes with Grout 37.00 Foot
G203 Drumming and Disposal of Clean Cuttings 410.00 Drum G204 Fire Water Buffalo 578.00 Day
G205 Support Truck 158.00 Day
G206 Water Truck 473.00 Day
G207 Mobilization and Demobilization for Rock coring 1,208.00 Each G208 Rock Coring 478.00 Hour
G209 Decontamination of Vehicle and Equipment (Up to 100 miles) 315.00 Each G210 Field Resistivity, up to 3 arrays, maximum distance of 40 ft. 1,890.00 Each G211 Environmental Soil Boring with Hollow Stem Auger Portal to Portal 446.00 Hour G212 Environmental Soil Boring with Direct Push Portal to Portal 399.00 Hour G213 Environmental Groundwater Sampling with Grundfos, Portal to Portal 289.00 Hour G214 Environmental Analysis of soil for waste classification Quote/Sample G215 Environmental Analysis of liquid for waste classification Quote/Sample G216 Ground Resistance Tester (Four Point Method), plus travel $ 1,700.00 Each G217 Potholing, two-man crew 600.00 Hour
G218 Ground Penetrating Radar (GPR) for Locating Utilities $ 1,500.00 Day Mix Design Review
Code Item $/Unit Unit
D250 Review of Concrete Mix Design 168.00 Each
D251 Review of Concrete Mix Design, per Trial Batch, 6 cylinder, ACI 250.00 Each D252 Review of Grout Mix Design 168.00 Each
D253 Review of Mortar Mix Design 168.00 Each
D254 Review of Asphalt Mix Design 210.00 Each
D255 Review of Asphalt Mix Design, Caltrans 150.00 Each Sample Pick-Up/Hold
Code Item $/Unit Unit
All hold samples are charged at the same rate as the testing rate U303 Technician for Specimen pick up, minimum 2 hours 120.00 Hour U304 Vehicle (Up to 100 miles) 75.00 Trip
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
Field Equipment Charges
Code item $/Unit
E350 Brass Mold $ 21.00
E351 Concrete Air Meter $ 53.00
E352 Concrete Unit Weight (Scale, Bucket, Rod and Mallet) $ 32.00 E353 Field Vehicle Usage (Up to 100 miles) $ 74.00
E354 Concrete/Asphalt Coring Equipment rental (min 4 hrs and 8 hrs after) $ 200.00 E355 Fireproofing Adhesion/Cohesion $ 21.00
E356 Hand Auger Equipment 131.00
E357 Level D Personal Protective Equipment (PPE), per person 42.00 E358 Liquid Penetrating Consumables 32.00
E359 Magnetic Particle Equipment and Consumables 42.00
E360 Ultrasonic Equipment and Consumables 68.00
E361 Nuclear Density Gauge Usage 19.00
E362 Compaction Test, per location 21.00
E363 Portable Concrete Laboratory-not including Technicians E364 Pachometer (Rebar Locator) usures 58.00
E365 Environmental PID Usage 200.00
E366 Pull Test Equipment $ 74.00
E367 Sand Cone Test Kit (Scale, Burner, Sand Cone Apparatus) $ 179.00 E368 Schmidt Hammer $ 53.00
E369 Torque Wrench, Small 21.00
E370 Torque Wrench, Large $ 37.00
E371 Torque Multiplier (Skidmore) $ 95.00
E372 Miscellaneous Equipment Charge $
E373 Vapor Emission Kit $ 58.00
E374 Field Resistivity Meter $ 240.00
E375 Water Level Meter 80.00
unus 110.00
E376 Environmental ph/Turbidity/Conductivity/Temp Meter E377 Environmental FID Usage $ 110.00
E378 Environmental groundwater sampling pump $ 215.00
E379 XRF Lead Analyzer $ 131.00
E380 Relative Humidity $ 74.00
F381 GPR (Groud Penetrating Radar), for buried rebar in concrete 90.00 E382 Load Cell for tension - Maximum 2,000 Ib 55.00
E383 Barologger Solinst A/E 61160 180.00 Day
E384 Drone Site Monitoring & Mapping 225.00 Day
E385 Equipment for Double Ring Infiltrometer Testing per ASTM D3385 750.00 Equipment for Standard Test Method for Permeability of Synthetic Turf Sports Field Based E386
Stone and Surface System by Non-confined Area Flood Test Method. ASTM F2898 $ 250.00 Day Minor Traffic Control Equipment for residential/minor or secondary collector (signs and E387
cones) $ 129000 Day
E388 Zefon High Volume Air Sampling Pump 150.00 Day
E389 Zefon Rotameter 40.00 Day
E390 PCM Air Cassettes 15.00 Each
E391 TEM Air Cassettes 15.00 Each
E392 Ghost Wipes for surface sampling, including lead and beryllium testing 5.00 Each E393 TEM Cassette, 25mm, Microvac for collection of fibers and particulate 15.00 Each E394 Automatic Pull-off Adhesion Tester (ASTM C1583) 350.00 Day E395 50mm Dolly's for ASTM C1583 65.00 Each
Schedule of Fees for Laboratory Services
Concrete Tests
Code Item Unit
C400 6"x 12" Cylinder: Compression Strength (ASTM C39) Test C401 6" × 6" x 18" Flexural Beams Not Exceeding Referenced Size (ASTM C78, C293, or CTM 523) 84.00 Test C402 Cylinders: Splitting Tensile Strength (ASTM C496) es es is 84.00 Test C403 Core Compression including Trimming (ASTM C39) 53.00 Test mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
C404 Concrete Core Compression excludes sampling (C42) $ 58.00 Test C404 Coring of Test Panels in Lab $ 26.00 Each
C405 Diamond Sawing of Cores or Cylinders (ASTM C642) 26.00 Test C406 Density, Absorption, and Voids in Hardened Concrete (ASTM C642) 315.00 Test C407 Modulus of Elasticity Static Test (ASTM C469) 131.00 Test (408 Unit Weight Including Lightweight Concrete 68.00 Test C409 Lightweight Concrete Fill, Compression (C495) 27.00 Test Drying Shrinkage Up to 28 Days: Three 3"x 3" or 4"x 4" Bars, Five Readings up to 28 Dry Days C410 $ 394.00 Test
C411 Additional Reading $ 47.00 Set of 3 Bars
C412 Storage Over Ninety (90) Days 37.00 set of
C413 Splitting Tensile Strength (C496) 55.00
(435 Coefficient of Thermal Expansion of Concrete (CRD 39, AASHTO T336) 840.00 Test C436 Compression Test (ASTM C495 and C472) 47.00 Test
C437 Air Dry Density (ASTM C472) 37.00
C438 Oven Dry Density (ASTM C495) 63.00 Test
C439 Sample Trimming in the lab, up 6" diameter 21.00 Test Concrete Block, ASTM C140
Code Item S/Unit Unit
C412 Compression (3 Required Per ASTM C90) $ 63.00 Each C413 Absorption/Moisture Content/Oven Dry Density (3 Required per ASTM) $ 95.00 Each C414 Linear/Volumetric Shrinkage (ASTM C426) 105.00 Test C415 Web and Face Shell Measurements 47.00 Test
(416 Tension Test 179.00 Test
C417 Core Compression 58.00 Test
C418 Conformance Package (CTM 90) 63.00 Test
C419 Shear Test of Masonry Cores: 2 Faces 95.00 Test
C420 Efflorescence Test (3 Required), each 58.00 Test
Laboratory Trial Batch: Cement, Concrete, Grout and Mortar Code Item $/Unit Unit
L450 All trial batch for cement, concrete, grout, mortar, etc Quote Each Brick Masonry Tests
Code item $/Unit Unit
M500 Modulus of Rupture: Flexural (5 Required Per ASTM), each 58.00 Test M501 Compression Strength (3 Required Per ASTM), each 53.00 Test M502 Absorption: 5 Hour or 24 Hour (5 Required), each 53.00 Test M503 Absorption: 7 Day (CTM 67) 50.00 Test
M504 Absorption (Boil): 1, 2, or 5 Hours (5 Required), each 84.00 Test M505 Initial Rate of Absorption (5 Required), each 42.00 Test M506 Moisture as Received (CTM 67) 25.00 Test
M507 Saturation Coefficitent (CTM 67) 60.00 Test
M508 Efflorescence (5 Required), each 89.00 Test
M509 Core: Compression, each 74.00 Test
M510 Shear Test on Brick Core: 2 Faces, each 95.00 Test Masonry Prisms
Code Item $/Unit Unit
M508 Compression Test: Composite Masonry Prisms Up To 8" × 16" 210.00 Test M509 Compression Test: Composite Masonry Prisms Larger Than 8" × 16" 305.00 Test M510 Masonry: Cutting of Cubes or Prisms 74.00 Test
Mortar and Grout
Code $/Unit Unit
M511 Compression: 2" x 4" Mortar Cylinders 47.00 Test
M512 Compression: 3" × 3" x 6" Grout Prisms, Includes Trimming $ 63.00 Test M513 Compression: 2" Cubes (ASTM C109) 63.00 Test
M514 Compression: Cores (ASTM C42) 63.00 Test
mka CITY OF HUNTINGTON BEAGH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
M515 Mortar Expansion (ASTM C806) $ 315.00 Test
Fireproofing Tests
Code Item S/Unit Unit
F550 Oven Dry Density $ 12600 79.00 Test
F551 Adhesion/Cohesions Testing, per hour, 4 hour minimum Test Gunite and Shotcrete Tests
Code Item S/Unit Unit
C420 Core Compression Including Trimming (ASTM C42) 63.00 Test C421 Compression 6" × 12" Cylinders 37.00 Test
C422 Compression: Cubes 42.00 Test
Soils and Aggregate Tests
Code Item $/Unit Unit
$599 Atterberg Limits/Plasticity Index (ASTM D4318) $ 147.00 Test $600 California Bearing Ratio (ASTM D1883) $ 375.00 Test 5601 Chloride and Sulfate Content (CTM 417, CTM 422) $ 152.00 Test S602 Consolidation, Full Cycle (ASTM 2435, CTM 219) $ 289.00 Test S603 Cleanness Value: 1" x #4 (CTM 227) $ 194.00 Test
S604 Cleanness Value: 2.5" × 1.5" or 1.5"x .75" (CTM 227) $ 310.00 Test S605 Corrosivity Series: Sulfate, Cl, pH (CTM 643 and 417) 210.00 Test S606 Lab Resistivity 131.00 Test
S607 Direct Shear Test (ASTM D3080) 268.00 Test
S608 Direct Shear Test, per point 116.00 Test
S609 Direct Shear Test Sample Remolding (ASTM D3080) $ 47.00 Test S610 Durability index Fine Aggregate $ 168.00 Test
S611 Expansion Index (ASTM D4829, UBC 18-2) 163.00 Test S612 Durability Index: Coarse Aggregate 168.00 Test
→ er er us 194.00
S613 Maximum Density: Methods A/B/C (ASTM D1557 or D698, CT 216) Test S614 Maximum Density: Check Point abrasion (ASTM D1557) 79.00 Test 5615 Maximum Density: AASHTO C (Modified) (AASHTO T-180) $ 210.00 Test S616 Moisture Density Rock Correction $ 168.00 Test
S617 Moisture Content (ASTM D2216, CTM 226) $ 26.00 Test S617A Moisture, Ash and Organic Matter of Peat/Organic Soils $ 100.00 Test S618 Density: Ring Sample (ASTM D2937) 32.00 Test
$619 Density: Shelby Tube Sample (ASTM D2937) 58.00 Test S620 Organic Impurities (ASTM C40) 100.00 Test
S621 Failing Head Permeability (ASTM D2434) 263.00 Test S622 R-Value: Soil (ASTM 2844) 373.00 Test
S623 R-Value: Aggregate Base (ASTM D2844) 373.00 Test
S624 Sand Equivalent (ASTM D2419, CTM 217) 137.00 Test
5625 Soil Classification (ASTM D2487) 37.00 Test
S626 Sieve #200 Wash Only (AST D1140) 100.00 Test
S627 Sieve with Hydrometer: Sand to Clay (ASTM D422) 305.00 Test S628 Sieve Analysis including Wash (ASTM C136) 179.00 Test S629 Sieve Analysis Without Wash 126.00 Test
S630 Specific Gravity and Absorption: Coarse (ASTM C127, CTM 202) 100.00 Test S631 Specific Gravity and Absorption: Fine(ASTM C128, CTM 207) 168.00 Test S632 Swell/Settlement Potential: One Dimensional (ASTM D4546) 173.00 Test S633 Unit Weight Coarse Aggregate 84.00 Test
S634 Unit Weight Fine Aggregate 84.00 Test
S635 Voids in Aggregate (ASTM C29) 95.00 Test
S636 Unconfined Compression (ASTM D2166, CTM 221) $ 105.00 Test $637 LA Rattier 205.00 Test
S638 pH of soil $ 26.00 Test
S639 Pocket Penetration Test $ 220000 11.00 Test
S640 Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer (ASTM D3385) Test Permeability of Synthetic Turf Sports Field Base Stone and Surface System by Non-Confined S641
Area Flood Test Method ASTM F2898 $ 1,100.00 Test
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
S637 Shrinkage of Soil Mixture 290.00 Test
S638 Hydraulic Conductivity of Saturated Porous Materials by Flexible Wall (ASTM D5084) 240.00 Test S639 Consolidated Drained Triaxial Compression Test for Soils (ASTM D7181) 280.00 Test 5640 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (ASTM D4767) 315.00 Test S641 Unconsolidated-Undrained Triaxial Compression Test on Cohesive Soils (ASTM D2850) 295.00 Test S642 Triaxial Shear, C.D., three points, (CTM 230) $ 280.00 Test S643 Triaxial Shear, C.U., three points (ASTM D4767, CTM 230) $ 315.00 Test S644 Triaxial Shear, U.U., one point (ASTM D2850, CTM 230) $ 295.00 Test S645 Wax Density (ASTM D1188) 63.00 Test
S646 Clay Lumps and Friable Particles (CTM 142) es uses es 55.00 Test S647 75.00 Test
S648 Mortar Making Properties of Fine Aggregate (CTM 87) 140.00 Test Asphalt Concrete Tests
Code Item $/Unit Unit
A650 Asphalt Core Density 63.00 Test
A651 Extraction % AC by Ignition Oven (CTM 382)/ Binder $ 184.00 Test A652 Gradation on Extracted Asph (ASTM D6507 andD5444, CTM 202, and CTM 382) $ 105.00 Test A653 Moisture Content (CTM 370) $ 79.00 Test
A654 Maximum Theoretical Specific Gravity (RICE) (ASTM D2041, CTM 309) 168.00 Test A655 Specific Gravity and Absorption: Coarse (AST C127, CTM 206) $ 95.00 Test A656 Specific Gravity and Absorption: Fine (ASTM C128, CTM 207) $ 168.00 Test A657 Sieve Analysis (ASTM D5444 and C136) 100.00 Test
A658 Sieve Analysis with Wash (ASTM D5444) 147.00 Test
A659 Sand Equivalent (ASTM D2419) $ 142.00 Test
A660 5 pt LTMD Bulk Specific Gravity (CTM 308, CTM 375) 299.00 Test A661 Flat and Elongated Particles (ASTM D4791) $ 221.00 Test A662 Fine Aggregate Angularity (AASHTO T304 A) $ 205.00 Test A663 Maximum Density VEEM (ASTM D1560) $ 221.00 Test
A664 Maximum Density Marshall (ASTM D1559 and D561) 221.00 Test A665 Mix Stability (CTM 304) 221.00 Test
A668 Wet track Abrasion Loss (ASTM D3910), each 184.00 Test uses es es es es
A669 Extraction % of Emulsion (ASTM D6307) 163.00 Test
A670 Slurry seal field consistency test (ASTM D3910) 89.00 Test A671 Maximum Theoretical Unit Weight (ASTM D2041) 160.00 Test Reinforcing Steel
Code Item $/Unit Unit
R700 Bend Test: #11 or Smaller 68.00 Test
R701 Bend Test: Larger Than #11 $ 100.00 Test
R702 Tensile Test: # 11 or Smaller 89.00 Test
R703 Tensile Test: # 14 121.00 Test
R704 Tensile Test: # 18 300.00 Test
R705 Slippage Test In Addition to Tensile Test (Per Caltrans 52-1.08C) 350.00 Test R706 Tensile Test: Mechanical Splice # 11 and Smaller $ 130.00 Test R707 Tensile Test: Mechanical Splice # 14 $ 180.00 Test R708 Tensile Test: Mechanical Splice # 18 $ 350.00 Test R709 Tensile Test: Welded # 11 and Smaller $ 90.00 Test R710 Tensile Test: Welded # 14 $ 130.00 Test
R711 Tensile Test: Welded # 18 $ 300.00 Test
R712 Sample Straightening for Bend or Tensile Test (if required) $ 65.00 Test R713 Testing Multi-Wire Steel Prestressing Strand $ 350.00 Test R714 Tensile Test: T-Head #11 and Smaller $ 160.00 Test R715 Tensile Test: T-Head #14 210.00 Test
R716 Tensile Test: T-Head #18 300.00 Test
R717 Tensile Test: Welded Hoops # 11 and Smaller 130.00 Test R718 Tensile Test: Welded Hoops # 14 180.00 Test
R719 High Strength Bolt, Nut and Washer Conformance, set, A-32 135.00 Test R720 Structural Steel Tensile Test up to 200,000 Ibs. (machining extra), A370 45.00 Test Metal Testing
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
Code $/Unit Unit
R714 Hardness Test (Rockwell) and Brinnel (ASTM E18) 79.00 Test R715 Hardness Test of Nuts 89.00 Test
R716 Hardness Test of Bolts 105.00 Test
R717 Hardness Test of Washers 89.00 Test
R718 ASTM F606 Bolt Axial, Wedge Tensile and Proof load 125.00 Test Concrete Coring Services
Code Item $/Unit Unit
C423 Equipment Concrete (4 and 8 hour minimum) $ 210.00 Hour dividual Core Prices (all prices are for a four core minimum job $ ab on Grade Coring for 2",3" and 4" Diameter (first 6" depth) eac 74.00 Test C424
C425 79.00 Test
C426 11.00 Test
(427 89.00 Test
Wall Concrete Core (price per inch after 6" in depth), per inch C428 $ Inch
(Wall core pries based on Contractor supplying access to area to be cored) 11.00 Miscellaneous Concrete Coring Prices:
C429 Patching Slab on Grade Cored Holes with 2500 psi Concrete Patch, each 21.00 Test (430 Thickness Determination per AST C42, each 21.00 Test C431 Compression Strength Determination 68.00 Test
Asphalt Concrete Coring Services
Code Item $/Unit Unit
Alternate Individual Core Prices (all prices are for a four core minimum job):
A661 Asphaltic Concrete Cores 2",3" and 4" Diameter (First 6" in depth), each es es 74.00 Test A662 Asphaltic Concrete Cores 6" and 8" Diameter (First 6" in depth), each 74.00 Test A663 Asphaltic Concrete Cores price per inch after 6" in depth, each $ 11.00 Test Miscellaneous Asphaltic Coring Prices:
A664 Patching of Core Drilled Holes Using Cold Patch Material, each 32.00 Test A665 Thickness Determination per ASTM C42, each us es es es 37.00 Test A666 Specific Gravity for Determination of Percent Compaction per ASTM D 2726, each 47.00 Test A667 Specific Gravity for Determination of Percent Compaction by Paraffin, each 68.00 Test Environmental Tests
Code Item $/Unit Unit
N800 Asbestos Polarized Light Microscopy (PLM) 6-hour/rush Turnaround, each 35.00 Test N801 Asbestos Polarized Light Microscopy (PLM) 8-hour Turnaround, each 23.00 Test N802 Asbestos Polarized Light Microscopy (PLM) 24-hour Turnaround, each 21.00 Test N803 Asbestos Polarized Light Microscopy (PLM) 48-hour Turnaround, each 18.00 Test N804 Asbestos Polarized Light Microscopy (PLM) 72-hour Turnaround, each 17.00 Test N805 Asbestos Polarized Light Microscopy (PLM) 5-day Turnaround, each $ 14.00 Test N806 Asbestos Polarized Light Microscopy (PLM) 10-day Turnaround, each 12.00 Test N807 Phase Contrast Microscopy (PCM) 6-hour Turnaround, each 28.00 Test N808 Phase Contrast Microscopy (PCM) 24-hour Turnaround, each 21.00 Test N809 Phase Contrast Microscopy (PCM) 48-hour Turnaround, each $ 18.00 Test N810 Phase Contrast Microscopy (PCM) 3-day Turnaround, each $ 14.00 Test N811 Phase Contrast Microscopy (PCM) 5-day Turnaround, each 12.00 Test N812 Asbestos Transmission Electron Microscopy (TEM) AHERA, 6-8 hour Turnaround, each $ 202.00 Test N813 Asbestos Transmission Electron Microscopy (TEM) AHERA, 24 hour Turnaround, each $ 144.00 Test N814 Asbestos Transmission Electron Microscopy (TEM) AHERA, 48 hour Turnaround, each $ 127.00 Test N815 Asbestos Transmission Electron Microscopy (TEM) AHERA, 3-day Turnaround, each $ 115.00 Test N816 Asbestos Transmission Electron Microscopy (TEM) AHERA, 5-day Turnaround, each $ 110.00 Test N817 Asbestos Polarized Light Microscopy (PLM) 1000 Point Count, 4-hour Turnaround, each 120.00 Test N818 Asbestos Polarized Light Microscopy (PLM) 1000 Point Count, 8-hour Turnaround, each $ 115.00 Test N819 Asbestos Polarized Light Microscopy (PLM) 1000 Point Count, 24-hour Turnaround, each $ 110.00 Test N820 Asbestos Polarized Light Microscopy (PLM) 1000 Point Count, 48-hour Turnaround, each $ 98.00 Test N821 Asbestos Polarized Light Microscopy (PLM) 1000 Point Count, 72-hour Turnaround, eact $ 92.00 Test N822 Asbestos Polarized Light Microscopy (PLM) 1000 Point Count, 5-day Turnaround, eact $ 81.00 Test N823 Asbestos TEM NIOSH 7402, same day Turnaround, each $ 133.00 Test mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES A
AESCO
N824 Asbestos TEM NIOSH 7402, 24-hour Turnaround, each $ 111.00 Test N825 Asbestos TEM NIOSH 7402, 72-hour Turnaround, eact $ 87.00 Test N826 Asbestos TEM NIOSH 7402, 5-day Turnaround, each 81.00 Test N827 Asbestos TEM Microvac Dust Quantitative, 6-hour Turnaround, each 345.00 Test N828 Asbestos TEM Microvac Dust Quantitative, 24-hour Turnaround, each 250.00 Test N829 Asbestos TEM Microvac Dust Quantitative, 48-hour Turnaround, each 230.00 Test N830 Asbestos TEM Microvac Dust Qualitative, 24-hour Turnaround, each $ 180.00 Test N831 Asbestos TEM Microvac Dust Qualitative, 48-hour Turnaround, each $ 173.00 Test N832 Asbestos TEM Microvac Dust Qualitative, 3-day Turnaround, each S 144.00 Test N833 Asbestos TEM Microvac Dust Qualitative, 5-day Turnaround, each $ 127.00 Test N834 Lead Wipe Dust (Flame Atomic Absorption), 4-hour Turnaround, each 41.00 Test N835 Lead Wipe Dust (Flame Atomic Absorption), 6-hour/same day Turnaround, each $ 23.00 Test N836 Lead Wipe Dust (Flame Atomic Absorption), 24-hour Turnaround, each 18.00 Test N837 Lead Wipe Dust (Flame Atomic Absorption), 48-hour Turnaround, each $ 15.00 Test N838 Lead Wipe Dust (Flame Atomic Absorption), 3-day Turnaround, each $ 12.00 Test N839 Lead Air Sample (Flame Atomic Absorption), 4-hour Turnaround, each $ 41.00 Test N840 Lead Air Sample (Flame Atomic Absorption), 6-hour/same day Turnaround, each 23.00 Test N841 Lead Air Sample (Flame Atomic Absorption), 24-hour Turnaround, each 18.00 Test N842 Lead Air Sample (Flame Atomic Absorption), 48-hour Turnaround, each 15.00 Test N843 Lead Paint Chip (Flame Atomic Absorption), 3-day Turnaround, each 12.00 Test N844 Lead Paint Chip (Flame Atomic Absorption), 4-hour Turnaround, each S 41.00 Test N845 Lead Paint Chip (Flame Atomic Absorption), 6-hour/same day Turnaround, each 23.00 Test N846 Lead Paint Chip (Flame Atomic Absorption), 24-hour Turnaround, each $ 18.00 Test N847 Lead Paint Chip (Flame Atomic Absorption), 48-hour Turnaround, each $ 15.00 Test N848 Lead Paint Chip (Flame Atomic Absorption), 3-day Turnaround, each 12.00 Test N849 Lead Soil (Flame Atomic Absorption), 3-hour Turnaround, each 46.00 Test N850 Lead Soil (Flame Atomic Absorption), 6-hour Turnaround, each 35.00 Test N851 Lead Soil (Flame Atomic Absorption), 24-hour Turnaround, each $ 27.00 Test N852 Lead Soil (Flame Atomic Absorption), 32-hour Turnaround, each 22.00 Test N853 Lead Soil (Flame Atomic Absorption), 48-hour Turnaround, each $ 20.00 Test N854 Lead Soil (Flame Atomic Absorption), 3-day Turnaround, each 19.00 Test N855 Lead Soil (Flame Atomic Absorption), 4-day Turnaround, each 18.00 Test N856 Lead Soil (Flame Atomic Absorption), 5-day Turnaround, each 17.50 Test mkn
CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES rincon Rincon Consultants, Inc.
Standard Fee Schedule for Environmental Sciences and Planning Services Hourly Rate
Professional Technical January 1.- January 1- January 1- and Support Personnel* December 31, 2025 December 31, 2026 December 31 2027 Senior Principal $330 $342 $354
Principal $318 $329 $341
Director $318 $329 $341
Senior Supervisor 1l $302 $313 $324
Supervisor I $282 $292 $302
Senior Professional I| $264 $273 $283
Senior Professional I $246 $255 $264
Professional IV $218 $226 $234
Professional Ill $203 $210 $217
Professional lI $180 $186 $193
Professional i $160 $166 $172
Associate I'l $135 $140 $145
Associate lI $121 $125 $129
Associate l $113 $117 $121
Field Technician $97 $100 $104
Technical Editor $152 $157 $162
$129 $134 $139
Project Accountant
$111 $115 $119
Billing Specialist
Publishing Specialist $124 $128 $132
$111 $115 $119
Clerical
* Professional classifications include environmental scientists, urban planners, biologists, geologists, marine scientists, GHG verifiers, sustainability experts, cultural resources experts, data technology experts, and other professionals. Expert witness services consisting of depositions or in-court testimony are charged at the hourly rate of $400.
Reimbursable Expenses
Direct Cost Rates
Photocopies - B/W $0.25 (single-sided), $0.45 (double-sided) Photocopies - Color $1.55 (single sided), $3.10 (double sided) Photocopies - 11" by 17" $0.55 (B/W), $3.40 (color)
Oversized Maps $8.50/square foot
_Digital Production $15/CD. $20/Hlash drive
Light-Duty and Passenger Vehicles* $90/day
4WD and Off-Road Vehicles * $150/day
*Current IRS mileage rate for mileage over 50 and for all miles incurred in employee-owned vehicies.
Other Direct Costs. Other direct costs associated with the execution of a project, that are not included in the hourly rates above, are billed at cost plus 16%. These may include, but are not limited to, laboratory and drilling services, subcontractor services, authorized travel expenses, permit charges and filing fees, mailings and postage, performance bonds, sample handling and shipment, rental equipment, and vehicles other than covered by the above charges.
Annual Escalation. Standard rates subject to 3.5% annual escalation, on January 1.
Payment Terms. All fees will be billed to Client monthly and shall be due and payable upon receipt or as indicated in the contract provisions for the assignment. Invoices are delinquent if not paid within 10 days from receipt or per the contractually required payment terms.
Effective January 1, 2025
mkn CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES rincon Rincon Consultants, Inc.
Equipment Rate
Environmental Site Assessment
Soil Vapor Extraction Monitoring Equipment $160
Four Gas Monitor $137
$110
Flame lonization Detector
Photo lonization Detector $82
$62
Mand Auger Sampler
Water Level Indicator, DC Purge Pump $46
CAPDash $7,500
Natural Resources Field Equipment
UAS Drone $300
Spotting or Fiberoptic Scope $170
Petterson Bat Ultrasound Detector/Recording Equipment $170 Sound Level Metering Field Package (Anemometer, Tripod and Digital Camera) $113 $67
GPS (Sub-meter Accuracy)
Infrared Sensor Digital Camera or Computer Field Equipment $57 $23
Scent Station
Laser Rangefinder/Altitude $11
Pit-fall Traps, Spotlights, Anemometer, GPS Units, Sterilized Sample Jar $9 Mammal Trap, Large/Small $1.55/$0.55
Water and Marine Resources Equipment
Boat (20 ft. Boston Whaler or Similar) $800
Multi Parameter Sonde (Temp, Cond, Turbidity, DO, pH) with GPS $170 Water Quality Equipment (DO, pH, Turbidity, Refractometer, Temperature) $62 $38
Refractometer (Salinity) or Turbidity Meter
Large Block Nets $114
Minnow Trap $98
$57
Net, Hand/Large Seine
Field Equipment Packages
Standard Field Package (Digital Camera, GPS, Thermometer, Binoculars, Tablet, Safety Equipment, $114 and Botanic Collecting Equipment)
Remote Field Package (Digital Camera, GPS, Thermometer, Binoculars, Tablet and Mifi, Delorme $144 Satellite Beacon, 24-Hour Safety Phone)
Amphibian/Vernal Pool Field Package (Digital Camera, GPS, Thermometer, Decon Chlorine, $170 Waders, Float Tube, Hand Net, Field Microscope)
Fisheries Equipment Package (Waders, Wetsuits, Dip Nets, Seine Nets, Bubblers, Buckets) $57 Underwater and Marine Sampling Gear (U/W Photo/Video Camera, Scuba Equipment (Tanks, BCD, $57/diver Regulators, Wetsuits, etc.)
Marine Field Package (PFDs - Personal Flotation Devices, 100-foot Reel Tapes with Stainless $100 Carabiners, Pelican Floats, Underwater Slates, Thermometer, Refractometer, Anemometer, Various Field Guides)
Insurance, Hazard and Fees
Historic Research Fees $55
L&H Dive insurance $57/diver
Levei C Health and Safety $70/person
Effective January 1, 2025
mka CITY OF HUNTINGION BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES
ESTIMATE
UNDERGROUND SOLUTIONS
Your First Chaice for Potholing Services Date: March 11, 2025 To: Quote # TC31125-09H
Safa Kamangar, PE Expiration Date: December 31, 2025
MKN
16310 Bake Parkway
Irvine, CA 92618
Project Name: HB Water/Wastewater On Call Sales Person: i TC Item # Qty Description Unit Price Line Total
1 (Pothole Service (Prevailing Wage) Per Day $ 2,925.00
ASPHALT REPAIR
Cold Patch Asphalt Repair (Ea) $ 85.00
/10" Core (Ea) $ 200.00
[Synthetic Overlay (Ea) up to 4x4' area $ 575.00
:TRAFFIC CONTROL
Traffic Control Plans - Non Eng Stamped (Each) $ 135.00 Traffic Control Plans - Eng Stamped (Each) $ 550.00
Standard Traffic Control (Per Day) 650.00
Major Traffic Control (Per Day) 1,350.00
9 ¡Encroachment / Traffic Permit Processing Fee 680.00
: TRAVEL
10 Mobilization / Demobilization - (Per Day) 425.00
REPORTING
11 PDF/Digital Flash Card Utility Report (1 - 10 potholes) 350.00 12 PDF/Digital Flash Card Utility Report (10 - 20 potholes) $ 450.00
OTHER COSTS
13 ¡Fuel Surcharge - (Per Day) 185.00
14 USA Dig Alert Delination and Mark Out $ 325.00
15 ]USA Markout Paint Removal (Per Hour) min (4) Hrs 175.00 16 Sand / Class il Base (each) 35.00
Excluded: Permit and Deposit Fees to be paid by client prior to start of work Encroachment & Traffic Permits N/A Parking Meter Buyouts N/A Deposit Amt
USt to: Subtotal $
Delineate for USA markout
Vacuum excavate each site, determine diameter and depth of utilities Total: $ Hacktill, compact and patch
Mark each location with PK nail, paint or stake for future survey Prepare a "Subsurface Utility Report w/data, photos and PH location map Paytor no w/Tratic Permit i required
Supply pothole locations
Final restoration of pothole locations
This proposal is based on digable conditions using the air excavation process Standard Notes: Excludes Grind/Overlay, Striping, Sidewalk Panel Replacements Terms: Existing Accounts Net 30
The above is an "estimate", final costs wil be determined by the actuat number of work hours and travel time logged.
A cancellation fee may apply if job iscancelled at site. To accept that qur ton, signate and et lo the condions, nelusions and/or exclusions noted above.
Credit Application Required To Open Account
Date
120 N. Andreasen Dr. Escondido, CA 92029 PH# 760/2949449 Fax# 780/294-9490 mka CITY OF IUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES PSE
PETERSON STRUCTURAL ENGINEERS
PETERSON STRUCTURAL ENGINEERS
2025 Hourly Rates
Principal-in-Charge $305
Principal $290
Senior Associate $275
Associate $266
Senior Project Manager $260
Senior Structural Engineer $260
Project Manager $242
Structural Engineer $242
Associate Project Manager $228
Senior Project Engineer $216
Project Engineer $208
Staff Engineer $202
Staff Designer $196
CADD Drafting $161
Administrative $150
• Vehicle mileage will be billed at current U.S. General Services Administration allowable rates and periodically adjusted according to federal updates
• Direct expenses will be billed at cost plus 10%
www.psengineers.com
OREGON I WASHINGTON 1 CALIFORNIA
mka CITY OF HUNTINGTON BEACH ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES