PROFESSIONAL SERVICES CONTRACT BETWEEN

THE CITY OF HUNTINGTON BEACH AND
TETRA TECH, INC.

FOR

ON-CALL CIVIL ENGINEERING
& PROFESSIONAL CONSULTING SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and TETRA TECH, INC., a California Corporation hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to provide On-Call Civil Engineering & Professional Consulting Services; and
Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and
CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:

1. SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT."
CONSULTANT hereby designates Molly Mell who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement.

CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement.
25-16466/378748 1of11

3. TERM; TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT are to commence on _ 20 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.

In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein.

COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed Two Million Dollars ($2,000,000.00).

EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained.

METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B." 25-16466/378748 2 of 11

7. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit.

8. HOLD HARMLESS
A. CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT.

B. To the extent that CONSULTANT performs "Design Professional Services" within the meaning of Civil Code Section 2782.8, then the following Hold Harmless provision applies in place of subsection A above:
25-16466/378748 3 of 11
"CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and against any and all claims, damages, losses, expenses, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) to the extent that the claims against CONSULTANT arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT's proportionate percentage of fault. However, notwithstanding the previous sentence, in the event one or more other defendants to the claims and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid defense costs. The duty to indemnify, including the duty and the cost to defend, is limited as provided in California Civil Code Section 2782.8.

C. Regardless of whether subparagraph A or B applies, CITY shall be reimbursed by CONSULTANT for all costs and attorney's fees incurred by CITY in enforcing this obligation.

This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONSULTANT.

9. PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars ($1,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not contain a self-insured retention without the express written consent of CITY; however an insurance 25-16466/378748 4 of 11
policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims-made policy shall be acceptable if the policy further provides that:

A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements).

B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims.

CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement.

If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY.

10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall:

A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and
25-16466/378748 5 of 11
shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium.

CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY.

The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required.

11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder.

12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner.

CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the 25-16466/378748 6 of 11
event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.

13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove.

14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement.

15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code.

16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail-return receipt requested:
25-16466/378748 7 of 11
TO CITY: TO CONSULTANT:

City of Huntington Beach Tetra Tech, Inc.

ATTN: Director of Public Works Attn: Molly Mell
2000 Main Street 3475 E. Foothill Blvd., Suite 300
Huntington Beach, CA 92648 Pasadena, CA 91107

17. CONSENT
When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event.

18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties.

19. SECTION HEADINGS
The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement.

20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or 25-16466/378748 8 of 11
neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law.

21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it.

22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification.

23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT.
25-16466/378748 9 of 11

24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party.

25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive.

26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.

28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this 25-16466/378748 10 of 11
Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.

29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.

This Agreement shall expire when terminated as provided herein.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.

CONSULTANT,
TETRA TECH, INC. CITY OF HUNTINGTON BEACH, a
municipal corporation of the State of
California
Mayor
FussEL
print name
ITS: (circle one) Chairman/President/Vice President City Clerk AND INITIATED AND APPROYED:

Mall
By:

Director of Public Works
print name
ITS: (circle one) Seeretary/Chief Financial Officer/Asst.

Secretary - Treasurer Vice President
REVIEWED AND APPROVED:

City Manager
APPROVED AS TO FORM:

PiDo
Lu City Attorney
25-16466/378748 11 of 11
EXHIBIT "A"
A. STATEMENT OF WORK: (Narrative of work to be performed) Provide On-Call Civil Engineering and Professional Consulting Services. If Consultant chooses to assign different personnel to the project, Consultant must submit names and qualifications of these staff to City for approval before commencing work.

B. CONSULTANT'S DUTIES AND RESPONSIBILITIES:

See Attached Exhibit A
C. CITY'S DUTIES AND RESPONSIBILITIES:

Furnish Scope of Work and provide a request for proposal for each project.

City shall issue a task order for each project based upon scope of services, work schedule, and fee proposal submitted.

D. WORK PROGRAM/PROJECT SCHEDULE:

A project schedule will be developed for each project assigned by the City.

EXHIBIT A

EXHIBIT A
A: COVER LETTER Tt TETRA TECH
March 13, 2025
City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
RE: REQUEST FOR PROPOSAL FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES Dear City of Huntington Beach Public Works Department Members and Selection Committee:

Tetra Tech is excited to submit our Statement of Qualifications for On-Call Civil Engineering Protessional Services to the City Huntington Beach (City). We are proud of our previous work as one of the City's on-call consultants. The opportunity to remain a part of the elite group of consultants serving the City is of great importance to everyone at Tetra Tech. The strength of our team is multifaceted but boils down to four main elements: leadership, service, technical ability, and depth of resources. We have assembled a team that will continue to provide you with the exemplary level of service that we have shown on the current on-call services contract and are eager to continue to work with you on your future projects. • Leadership: We have assigned Jason Fussel, PE as the Project Manager. He will manage the contract with the City and be directly involved in the projects as part of this contract. Mr. Fussel has over 21 years of experience in public works design and construction.
• Service: Over the years, our team has successfully completed and implemented a variety of projects for the City. Though we have the backing of a large company, we will respond to your requests with the speed and efficiency of a 20 person office. We consider it is a privilege to be part of an on-call contract, and we are committed to providing the City with responsive service to successfully complete your task orders. • Technical Ability: Jason Fussel, PE, the Project Manager, will be supported by a talented group of technical leads who have worked together for over a decade and will be able to provide you coordinated, seamless service. These technical leads include:
» Justin Smith, PE - General Civil Engineering
» Ken Berard, PE - Water/Sewer/Stormwater Engineering
» Rafael Holcombe, PE - Ocean Engineering
• Depth of Resources: Tetra Tech is a 30,000-associate strong, $5+ billion company. We have hundreds of staff located in Southern California, including 61 in Irvine, who can be deployed to support your projects.

Staff from our livine office will primarily lead your projects. The Irvine staff will be supported by other California Tetra Tech offices, whom have been focused on work in Orange County and Los Angeles County.

The depth of resources at Tetra Tech allows us to accommodate accelerated schedules and multiple projects, but the service you will receive from us will be from faces you recognize.

We are proud of our association with the City and look forward to working with you on your many upcoming project assignments. We have reviewed the City's contract agreement and accept the terms and will provide insurance requirements upon notice to proceed. Our price proposal will be valid for a period of at least 180 days. Please feel free to contact either of us if you have further questions or need any additional information.

Sincerely,
MIL. On Tund
Molly Mell, PE Jason Fussel, PE
Vice President/Principal-in-Charge Vice President/Project Manager 949-809-5205 805-305-0150
[email protected] [email protected]
17885 VON KARMAN AVENUE, SUITE 500| IRVINE, CA 92614-6213 TEL 949.809.5000| FAX 949.809.5010| TETRATECH.COM
A. VENDOR APPLICATION FORM

REQUEST FOR PROPOSAL

VENDOR APPLICATION FORM
TYPE OF APPLICANT: • ' NEW • CURRENT VENDOR
Legal Contractual Name of Corporation: Tetra Tech, Inc
Contact Person for Agreement: Molly Mell
Corporate Mailing Address: 3475 E. Foothill Blvd., Suite 300 City, State and Zip Code: Pasadena, CA 91107
E-Mail Address: [email protected]
949.809.5205 949.809.5010
Phone: Fax:

Contact Person for Proposals: Jason Fussel
Title: Vice President E-Mail Address: [email protected] Business Telephone: . 805.542.8630 Business Fax: 949.809.5010 Year Business was Established: 1966
Is your business: (check one)
L NON PROFIT CORPORATION • FOR PROFIT CORPORATION
Is your business: (check one)
CORPORATION • LIMITED LIABILITY PARTNERSHIP
INDIVIDUAL • SOLE PROPRIETORSHIP

PARTNERSHIP LI UNINCORPORATED ASSOCIATION
1 of2
Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Dan Batrack CEO/Chairman 626.351.4664
Lauren Springer President 770.738.6056
Molly Mell Vice President 949.809.5205
Jason Fussel Vice President 805.542.8630
95-4148514
Federal Tax Identification Number:

A133500
City of Huntington Beach Business License Number:
(If none, you must obtain a Huntington Beach Business License upon award of contract.) 12/31/2025
City of Huntington Beach Business License Expiration Date:
2 of 2

SERVICE APPLICATION FORM & SELECTION
Disciplines of Civil Engineering Services Application Form *Circle all that apply*
Civil Engineering Service Area Bidding?
Y/N
(circle)
• Water/Sewer/Storm Water Engineering (res No
• General Civil Engineering Yes No
• Ocean Engineering (ves| No
• Environmental/Water Quality Yes No
B: BACKGROUND AND PROJECT SUMMARY SECTION
The Scope of Work outlined in the RFQ aligns perfectly with Tetra Tech's decades of experience In this section we will illustrate our understanding of the City goals and objectives, our approach to innovation on similar projects, and our techniques for client satisfaction.

UNDERSTANDING OF THE CITY
A major key to understanding the City of Huntington Beach goals can be found by studying the City's General Plan and focusing on the Capital Improvements Program (CIP). The CIP addresses elements in the City's General Plan, as well as City Council adopted planning documents and master plans. Listed below are potential projects for fiscal years 2024/25 through 2028/29 from the Huntington Beach CIP that align with your specified categories: transportation, green streets, pathways, low-impact development, stormwater, bike path, park, Active Transportation Project (ATP), ADA, water treatment, PFAS, conveyance, pipeline, or pump station design services. • Drainage & Storm Water - Tide Check Valves to Harbour Storm Drains - $300k • Sewer Projects - McFadden Sewer Lift Station, Wet Well-$2M • Streets & Transportation - Citywide Mobility and Corridor Improvements - $155k • Streets & Transportation - ADA Improvement Program - $250k • Streets & Transportation - Arterial Rehabilitation Program - $6M • Streets & Transportation - Bridge Preventative Maintenance Program (BPMP) - $655k • Parks & Pathways -- Edison Park Reconfiguration - $2M • Parks & Pathways - Bluff Top Pathway Area Lighting - $64k • Water & Treatment Projects - Water Treatment for Well 3A - $2.2M • Water & Treatment Projects - Peck Reservoir Roof Replacement - $500k • Water & Treatment Projects - Well 14 Drilling and Casing Project - $250k • Water & Treatment Projects - WOCWB OC9 CP Retrofit - $3.7M • Water & Treatment Projects - OC35 Seal Beach Vault Relocation - $50k Tetra Tech will target these projects and any other projects that are on the City's priority list. We believe Huntington Beach will find that our past project experience aligns very well with the City's priority lists.

OBJECTIVES TO BE ACCOMPLISHED
Goals and objectives identified in the CIP include Improving Infrastructure, Long-term Financial Sustainability, and Economic Development. We understand that projects falling under these categories will range in scale from providing technical expertise by answering a question via email or phone, to providing the full range of engineering services on a single or multidisciplinary project. We are here to support you no matter the level of effort.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
C: METHODOLOGY the satisfaction of all clients. Tetra Tech is a full-service, multi-disciplinary A/E consulting firm, specializing in INNOVATIVE/ADVANCED site development, transportation infrastructure, water TECHNIQUES FOR DESIGN SERVICES resources and environmental engineering.

New technologies and state of the science practices
are constantly being developed and introduced TETRA TECH RELEVANT to the water, sewer, transportation, and storm Areas of Expertise drain fields. Relationships with academia, similar Civil/Transportation Engineering municipalities, and proprietary vendors provide Roadway and Highway Design continued learning and knowledge of the most Bridges, Streets, and Parking Lots recent practices being implemented throughout Improvements the state and nation. We pride ourselves in staying Street Lighting and Electrical Systems informed of the state of the science and share our • Surveying/Mapping/ROW Services experiences with others through publication and •Geotechnical Engineering conferences to further those relationships. Coastal Resilient Infrastructure Grading and Drainage
TECHNICAL ABILITY Storm Drain Hydrology and
AND METHODOLOGY Hydraulics Design
Water/Wastewater Systems
Tetra Tech provides a broad range of civil Potable Water Wells, Reservoirs, and engineering services in support of public works Booster Stations agencies, transportation departments, water • Watershed Management agencies, and private clients around the world. • Structural Design Tetra Tech has experience in all phases of planning, Mechanical Engineering design, construction, and operation for water, • Electrical, 1&C, & SCADA wastewater, ocean, and transportation infrastructure • Architectural Engineering projects. Tetra Tech is knowledgeable in public • Plans, Specifications, and Estimates outreach and stakeholder coordination for large, • Construction Engineering Support complex, and multi-phase infrastructure repair and
new construction projects. Our projects incorporate PROPOSED IMPLEMENTATION PLAN resilient measures and features to support efficient TO ACHIEVE SCOPE OF WORK asset management. We also design retrofits
Successful on-call engineering services task order
and additions in heavy industrial and
contracts require both a diverse and highly talented
manufacturing settings.
team of engineering professionals, incorporating
Tetra Tech has established a dedicated, qualified and specific engineering and design disciplines. The experienced team of professionals which will provide Project Manager, and support team will be responsible the City of Huntington Beach with the technical for the successful delivery of the project. This will be and managerial qualifications, specialized expertise achieved by:
and professional resources required to successfully
complete development and capital improvement • Delivering the project within budget projects under this On-Call contract. • Coordinating activities with the appropriate City representatives
Members of the Tetra Tech team have earned a • Providing a project schedule with regular updates reputation for providing quality projects for our • Implementing a QA/QC Plan clients. We have achieved our success by being • Participating in scheduled project meetings with selective with the projects we pursue and ensuring the necessary project stakeholders that our team capabilities meet and exceed the
Assignments of this type place a premium on the
project's requirements and client's expectations. depth of staff talent offered by the consultant and its The strength of Tetra Tech lies in its client-focused availability to tailor the project team to the diverse service, staff qualifications, firm commitment, and needs of the individual tasks. The Tetra Tech team offers desire to successfully complete each assignment to

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
a blend of experienced professionals who will apply the City's representative to measure the actual versus their specialized skills to the technical tasks detailed planned work in-progress. In addition, Tetra Tech in the Scope of Services. We have caretully examined utilizes a project collaboration "sharepoint" website the capabilities of each team member based on their that allows City Staff, subconsultants and other qualifications and experience, The Tetra Tech team will stakeholders to share information on a central web- provide all skills needed to conduct each assignment in based system that will include progress drawings, base accordance with the schedule for each project. files, AutoCAD files, and a calendar of deadlines and listing of critical tasks. The Tetra Tech Project Manager COST CONTROL will serve as the Team's and the City's single point of Tetra Tech is committed to delivering a project that contact. This will allow the City's representative to not only meets or exceeds the performance criteria obtain pertinent project information without extra effort established by the City of Huntington Beach and of locating the right person to contact within the firm. the public at large, but to accomplish this within the
allocated budgets. The effectiveness of our team's ROLE OF CITY STAFF cost control capability is best demonstrated through The City's engineering and support staff also play a our performance on previous relevant projects. crucial role in the implementation of any potential Negotiating collaboratively on scopes of work, task order. A single City point of contact for each task carefully preparing cost estimates, and strictly adhering order will be suggested in order to provide a simplified to schedules have been our most effective tools for and direct conduit of information between the City controlling cost on municipal contracts. and the Tetra Tech Project Manager. The City point of contact will be responsible for providing support in
COORDINATING ACTIVITIES WITH obtaining as-built information and record drawings CITY REPRESENTATIVE for the areas adjacent to potential projects. The single The Tetra Tech team is committed to ensuring that the City point of contact will also be counted on to set-up City's designated representative is fully informed of all necessary meetings with City staff and communicate as project activities and progress towards completion. needed with the various City departments. A detailed This will be achieved through project correspondence description of the Tetra Tech respective roles as well as as-needed progress reports that will allow is included in the staffing section of this proposal.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH

SCHEDULE
BUDGET

PROJECT

QUALITY MEET WITH CITY

UNDERSTANDING &

RECEIVE RFP AND REFINE

INNOVATION IDENTIFICATION OF KEY FINAL

PROJECT SCOPE

CHALLENGES

FLEXIBILITY PROJECT

SCOPE, FEE, SPECIFIC GOALS, STAFFING &

SUSTAINABILITY WORK PLAN

SCHEDULE OBJECTIVES & DEFINED

RELIABILITY DEVELOPMENT EXPECTATIONS DELIVERABLES

PUBLIC ACCEPTANCE

TETRA TECH

MINIMAL CONST, REVISIONS P

PROJECT TIMELINE SCHEDULE QUALITY MANAGEMENT
Tetra Tech will work closely with the City immediately Tetra Tech has a long history of providing quality design upon issuance of a notice to proceed for a specific services to all of our clients. This has been achieved by project in order to reach an agreement on general implementing an ettective Quality Assurance/ Quality project definitions, objectives and to finalize the scope Control (QA/QC) program. Tetra Tech's internal Project and budget as appropriate. Tetra Tech will develop a Management Manual requires that every project preliminary Critical Path Method (CPM) schedule that include a QA/QC plan in place prior to kick-off. For this is consistent with the phasing plan for the project. contract, each Task Order will include a specific QA/QC Microsoft Project software will be used to construct the program that not only meets the requirement of Tetra schedule. The degree of activity detail will cover the Tech's Project Management Manual, but that also meets the requirements set by the City. The program will be
major phases of the project. Task predecessors, float prepared specifically for each Task Order by the Project time, and task dependency will be indicated, as well as Manager, and it will be reviewed and approved by the a highlighted critical path for the project. The schedule QA/QC Manager. will serve as a planning tool and will be regularly
updated to measure actual progress. The successful implementation of our QA/QC program means that we do not use the client as "plan checkers"
Tetra Tech has a long-standing commitment with our for our work. Our philosophy is that quality control starts clients to deliver projects on schedule and within the at the beginning of the project, strongly emphasizing project budget. However, throughout the course planning and controls. Our approach employs a of any given project, there may be occasions where comprehensive quality management plan for controlling project schedules slip for a variety of reasons outside and ensuring the quality of our services. the control of Tetra Tech. We have successfully We recently updated our Quality Control Manual to mitigated project schedule delays in the past by incorporate new ideas, techniques, and procedures increasing the available staff assigned to a project further solidifying our commitment to quality control for and by assisting our clients with thorough and timely our project teams. It is important to our firm that our staff reviews of deliverables. We understand that most City have the state-of-the-practice guidelines available as and public projects are driven by funding measures quality management is a priority on every project. that may expire or be reallocated if projects are not
advertised or constructed by a given date. That is why PLAN CHECK ACT we work with our clients to identify a realistic timeline for projects and use our extensive experience to
identify potential delays at the beginning of projects QUALITY QUALITY QUALITY

ASSURANCE CONTROL, IMPROVEMENTS
and not during the course of them. Tetra Tech will
always strive to work with the City to bring delayed
projects back on schedule at no additional cost. Actions during planning and Independent reviews and checks Identifies and addresses root
implementation to build quality help verify that technical deci- causes of quality problems,
into project activities and work sions and work products meet improves work processes and
produch, reduces the need for client requirements and profes- overall performance. corrective actions. sional standards.

CONTINUOUS IMPROVEMENT

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH D: STAFFING
Our approach to supporting the City's infrastructure personnel in all of the key disciplines required for projects engages the expertise of our interdisciplinary this on-call contract, providing our team the ability in-house team of knowledgeable and seasoned to offer hundreds of A/E resources located locally or engineers and professional staff. Our goal is to provide nationwide. the City of Huntington Beach with a team that can Having this depth in all of your key disciplines allows us support the steady amount of design and construction to achieve consistent on-time delivery of every project activity the City anticipates over the next 3 years, or executed, regardless of size. Our local presence and more, if applicable. vast pool of resources will provide benefit and peace Tetra Tech has 12 offices in Southern California, and of mind to the City and other key stakeholders that we all of our key staff are local. In addition, we have can successfully complete all tasks efficiently, on-time over 1100 staff members within the footprint of and within budget. the Southwest Region of California that could be We have provided an organization chart below and key called upon for specialty expertise as needed. We staff bios on the following pages. Resumes for our staff employ experienced, trained, and knowledgeable are provided as an appendix.

ORGANIZATION CHART

PRINCIPAL-IN-CHARGE
Molly Mell, PE, ENV SP

PROJECT MANAGER
Jason Fussel, PE, PLS, QA/QC

ENV SP, LEED AP, QSD/P
Steve Tedesco, PE, BCEE

WATER SEWER/ GENERAL CIVIL OCEAN

STORMWATER ENGINEERING ENGINEERING ENGINEERING
Ken Berard, PE Justin Smith, PE Rafael Holcombe, PE
(Task Lead) (Task Lead) (Task Lead)
Molly Lovegren, PE Craig Ziel, PE, QSD/P Russell Boudreau, PE* Elias Sebhatu, PE Devin Newton, PE Gregory Hearon, PE*
Amanda Taylor, PE Elva Pangilinan, PE, CDT, ENV SP

SUPPORT SERVICES

ELECTRICAL/

STRUCTURAL MECHANICAL ARCHITECTURAL SURVEY GEOTECHNICAL SCADA
Eric Yuen, PE, SE Mazen Kassar, PE Ken Kulonis, PE Peter Skopek, Marcel Bodsky, RA Dan Helt, PE, PLS PhD, PE, GE
Mike Olsen, PE Johnson Le Luke Ramirez, PE, PMP Jesus Guzman, PLS Fernando Cuenca, PhD, PE, GE
*Subconsultant: Coastal Frontiers

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH

SUMMARY OF KEY PERSONNEL QUALIFICATIONS
We have assembled a team that is local, experienced, and has over a 15-year history of cohesively working together to meet project deadlines, enhancing quality, and providing design alternatives for the City of Huntington Beach. The management team will be led by Jason Fussel out of Tetra Tech's Irvine office, located approximately 11 miles from the City. To complement Mr. Fussel's leadership role in this contract and to successfully complete future task orders, a qualified and dedicated team of civil engineers and support staff will directly support the project.

The following lists the key personnel and their years of experience relevant to the scope of services under this contract.

TETRA TECH TEAM EXPERIENCE SUMMARY

YEARS OF
NAME PROJECT ROLE RELEVANT Water/Sewer/Stormwater
EXPERIENCE Electrical/SCADA Hydraulic Modeling
General Civil Transportation Structural Geotechnical Mechanical Architectural Survey Ocean
Molly Mell, PE, ENV SP Principal-in-Charge 32
Jason Fussel, PE, PLS Project Manager
Steve Tedesco, PE, BCEE QA/QC
Justin Smith, PE General Civil Engineer
Craig Ziel, PE General Civil Engineer 19
Devin Newton, PE General Civil Engineer 24 <
Elva Pangilinan, PE General Civil Engineer
Ken Berard, PE Water/Sewer/Stormwater Engineer
Molly Lovegren, PE Water/Sewer/Stormwater Engineer
Elias Sebhatu, PE Water/Sewer/Stormwater Engineer
Amanda Taylor, PE Water/Sewer/Stormwater Engineer 16
Rafael Holcombe, PE Ocean Engineer 24
Russell Boudreau, PE Ocean Engineer 34
Gregory Hearon, PE Ocean Engineer 30
Dan Helt, PE, PLS Surveyor 21
Jesus Guzman, PLS Surveyor 26
Eric Yuen, PE, SE Structural Engineer 18
Mike Oisen, PE Structural Engineer 15
Mazen Kassar, PE Electrical/SCADA Engineer 32
Johnson Le Electrical/SCADA Engineer 10
KEN KULONIS, PE Mechanical Engineer 48
Luke Ramirez, PE, PMP Mechanical Engineer 19
Marcel Bodsky, RA Architectural Engineer 41
Peter Skopek, PHD, PE, GE Geotechnical Engineer 35
Femando Cuenca, PHD, PE, GE Geotechnical Engineer 16

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH

ASON FUSSEL, PENPLSHENVASF

MOLLY MELL, PE, ENV SP EED AP OSD
Principal-in Charge Project Manager
During Ms. Mell's 32 years in the civil engineering Mr. Fussel has over 21 years of experience and a field, she has provided management, coordination, broad knowledge of civil engineering stemming from and detailed design on a broad range of projects and his involvement in a variety of residential, educational has proven experience to pull together successtul and federal projects. His experience includes work teams to complete these projects on schedule on both public and private sector jobs of varying size and within budget. Ms. Mell has strong leadership and construction material types including the design capabilities and builds strong client relationships of sewer transmission systems, water distribution through communication. She has been a valuable systems, street and storm drain improvements asset in program management, coordinating and grading activities. Mr. Fussel's professional between her internal team and the client. Ms. Mell strengths and key areas of expertise include project will be responsible for ensuring Mr. Fussel has the management, QA/QC, peer review, cost estimating, resources needed to execute the projects stormwater analysis and studies, design, preparation to the City's satisfaction. of specifications, bid documents and cost estimates, and construction support services.

STEVE TEDESCO, PE, BCEE JUSTIN SMITH, PE
CA/QC Lead Civil Engineer
Mr. Tedesco has four decades of experience in QA/ Mr. Smith brings over a decade of relevant civil QC, planning, analysis, design, and construction engineering design experience including parking of civil engineering related projects. He brings a lot and roadway geometrics, pedestrian accessibility unique perspective to the overall project, as he is improvements (ADA compliant sidewalks, curb well accustomed to not only reviewing deliverables ramps), cross walks, and ramps), bike trails, for quality, but also for constructability. Mr. Tedesco construction and post-construction BMPs, storm drain has served as Design Manager on over 20 design- improvements including hydrologic and hydraulic build projects. He has extensive design experience design, overall utility plans, structural calculations, and in the advanced water and wastewater field. His grading activities varying from mass grading to final experience includes water master planning, water/ precise grading plans. Additional experience includes wastewater design, construction management, cost estimating, preparation of special provisions, design-build delivery methods, and construction utility research, and coordination with the project management. team and outside agencies.

KEN BERARD, PE RAFAEL HOLCOMBE, PE
Lead Water/ Sewer/ Stormwater Engineer Lead Ocean Engineer Mr. Berard has extensive experience in many facets Mr. Holcombe is experienced in design, engineering of water engineering over his 39-year career. He analysis, preparation of construction documents, has performed numerous studies ranging from and construction administration of multi-disciplinary complete water master plans to efficiency studies. waterfront developments, including dredging, marinas, His design experience includes preparing bid revetments, wave attenuators, piers, retaining walls, documents for reservoirs, pump stations, wells, parks and special projects. He is also responsible for pipelines, chlorination facilities, and pressure compliance with all environmental concerns including reducing facilities. Mr. Berard's experience includes endangered species monitoring, turbidity monitoring, inspection, construction administration, shop and contaminated materials remediation. He has drawing review, and plan checking. extensive experience in the marine industry as a Project Engineer, responsibilities including dredging plans and specifications, hydrographic and land surveys, quantity computations, scheduling, and production analysis
and reporting.

REQUEST FOR QUALIFICATIONS FOR ON-CALL. CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH E. FIRM QUALIFICATIONS
Tetra Tech is a full-service, multidisciplinary engineering consulting firm specializing in planning, engineering, design, and construction services.

Founded in 1966, Tetra Tech has 12 offices in Southern California, with performance in the engineering industry consistently ranked by Engineering News-Record (ENR) as among the leaders in a broad range of fields. Tetra • CIVIL ENGINEERING Tech's ENR rankings include #1 in Water Treatment and Desalination for EXPERTISE:
11 years in a row and #3 in Top Design Firms. We are a California-based company (headquartered in Pasadena from company inception) and Within the last 10 years, our consider ourselves to be a local firm that is deeply knowledgeable of California regulations and special requirements. We focus on providing project team has completed additional value to clients by collaborating and sharing best practices. hundreds of projects in Southern California.

TETRA TECH SNAPSHOT
WORKS IN ENFRANKINGS • EXISTING RELATIONSHIP
$5.2 billion WITH HUNTINGTON
Water Treatment/Desalination BEACH:
125
Environmental Management
ANNUAL REVENUE Tetra Tech has supported City
COUNTRIES Wind Power
staff on projects and through
WORKS ON Hydro Plants
7 110,000 our on-call contracts with the
CONTINENTS City since 2004.
25,000 CLIENTS

PROJECTS
Publicly traded = LOCAL EXPERIENCE:

ANNUALLY EMPLOYEES
on NASDAQ as
30,000 TNH1111 Our team has dedicated our
TTEK 550 WORLDWIDE фі$i**#******і** careers to Civil Engineering

WORLDWIDE
projects in the Southern
California counties including
Orange, Los Angeles, San
A. DEMONSTRATED CAPABILITIES
Bernardino and Riverside.

CIVIL ENGINEERING
Tetra Tech is excited for the opportunity to assist the City of Huntington • RELEVANT ON-CALL Beach in its future development and capital improvement projects. Tetra EXPERIENCE:

Tech has successfully worked with the City on multiple projects, both public and private, which are directly relevant to the types of projects outlined in Similar on-call engineering the Scope of Work section of the Request for Qualifications (RFQ). We are services for 20+ Southern familiar with the City staff and unique design challenges associated with highly visual projects within Huntington Beach. We will demonstrate below California clients. our vast experience supporting the five civil engineering disciplines outlined in the RFP scope of work.

MAIN OFFICE
17885 Von Karman Avenue
The tables and projects on the following pages provide an Suite 500 overview of Tetra Tech's relevant on-call projects. Irvine, CA 92614 (503) 684-9097

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH

GENERAL CIVIL
Tetra Tech has decades of experience working closely with Southern California cities in the design and construction of city facilities including street improvements, parking lots, sidewalk and curb ramps, pedestrian facilities, and bikeway improvements to name a few. Tetra Tech is well versed in all aspects of design, engineering, surveying, and administration including project controls, cost estimating, scheduling and planning, QA/QC, change control, and risk management as well as with the latest version of APWA's GreenBook. We have an established relationship with the City of Huntington Beach having completed over 16 projects for the City since 2004 providing a variety of services. This gives our team unique insight and understanding of standard City design, quality standards, locale, and personnel.

GENERAL CIVIL EXPERIENCE
PROJECT COST Project Controls APWA's Greenbook PS&E Packages - Street Improvements PS&E Packages - Parking Lots/ ADA Compliance NPDES SWPPP/WOMP Construction Support Survey
Huntington Beach Pavement
Resurfacing Design Plans for State $1.2M
Beach Parking Lot
Atlantic Avenue Streetscape & $275k
Lighting, 56th & 59th Avenue
5301 Long Beach Blvd. Parking Lot Design $275k
Bixby Park Bluff Improvements $2.2M
Adventure Park Multi-Benefit $29M (est.)
Stormwater Capture
East Garden Grove-Wintersburg $2.5M
Channel
FDA Parking Lot Mitigation $620k
Santa Fe Dr. Corridor Bike & $903k
Pedestrian Improvements
Lower Mission Creek Channel $1.1M
Improvements & Restoration
Long Beach Electric Vehicle Charging $50k (design)
Station Design
Orange County Public Works Flood $2.5M
Control (On-Call Contract)
Long Beach Public Works (On Call $3M
Contract
Los Angeles Dept. Beaches & Harbors $3M
(On-Call Contract) (aggregate/3 yrs.)
Los Angeles County Public Works $60M
(On-Call Contract)
Santa Monica Clean Beaches Initiative $6.7M
South El Monte Merced Ave Greenway $422k (design)
Santa Ana Lincoln Avenue
$1M
Pedestrian Pathway

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
SURVEY
Tetra Tech routinely performs site surveys for siting analysis and design, Surveys can consist of topographical surveying, geotechnical investigations (initial site characterization and detailed geotechnical investigations), utility surveys, and engineering surveys to determine utility (power, water, sewer, communications, gas, or fuel) availability and interface locations. A detailed site survey is performed to use as the basis for design. In addition to determining how a complex of facilities or a facility would be integrated into an existing location, information such as construction requirements/limitations; shipping logistics; local requirements, codes, and standards; power plant operations; other utility operations; fuel supply; haul routes; borrow pits; and existing housing is also captured in order to plan the complete integration of the mission to the location. One of Tetra Tech's more comprehensive aerial surveys was a $4M task order for LIDAR mapping of hundreds of miles of the Rio Grande along the Texas border, for the USIBWC

SURVEY EXPERIENCE
PROJECT Design & Topographic Aerial Surveys Boundary Surveys Records Of Survey • Centerline Surveys Preparing Records Reviewing of Maps/ Title Reports Construction Staking Culver City Culver Blvd. Realignment
Santa Ana First Street Pedestrian Improvements
Santa Monica Clean Beaches Initiative
LA. DTLA Arts District Pedestrian & Cyclist Safety Active Transportation Project (ATP 3)
L.A. Bureau of Engineering Skid Row Neighborhood Survey Pacific Gas & Electric (PG&E) San Francisco ADA Ramps
South Orange County J. B. Latham Treatment Plan Hydraulic Modeling Survey
Santa Barbara County Bonita School Road Bridge Replacement Survey
PG&E R-1200 Survey
LA. Dept. OfWater & Power As-Built Drawing Pump Stations / NAVFAC Records Research & Mapping Services for Defense
Fuel Supply Point
PG&E Survey & Mapping of Mission Road
Arroyo Grande Huasna Tract 3045, Coastal Community
Builders
PG&E Diablo Canyon Power Plant Boundary & Title Survey
County of Santa Barbara As Needed Survey Services
City of Los Angeles Albion Riverside Park
City of Buelton Engineering Services
City of Lakewood Mayfair Park Stormwater and Runoff Capture

REQUEST FOR QUALFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH OCEAN
Tetra Tech delivers innovative, nature-based solutions and structural design for coastal communities seeking climate-resilient flood risk reduction and marine habitat restoration. Our interdisciplinary team is Leading with Science® to create industry-leading design solutions for some of the most complex issues facing coastal communities and ecosystems around the world. With climate change driving sea level rise, stressing marine life, and creating more frequent and intense weather events, we support our clients with sustainable and scalable solutions to protect and restore coastal environments.

Since our founding in 1966, we have employed high-end technologies and approaches to condition and risk assessments, project feasibility studies, and data-driven decision tools that capture all social and environmental benefits generated by an array of possible solutions. Our Tetra Tech team partnering with Coastal Frontier will deliver sustainable, nature-based, and structurally sound solutions that are resilient and exceed client expectations-from designing a living shoreline or surge barrier protection system to assisting local communities with planning for a sustainable, blue economy.

We simulate the impact of climate change on our environment and use our suite of Tetra lech Delta technologies to design optimal, nature-based solutions and man-made adaptations. Tetra Tech designs living shorelines to reduce erosion, restore and sustain natural habitats, and increase coastal resiliency. We provide our clients with the social, economic, and environmental data they need to make informed decisions regarding shoreline protection. Our hazard mitigation and resilience planners incorporate the effects of climate change into advanced mitigation strategies that increase community flood protection and resiliency. We design sustainable solutions to address extreme weather events and sea level rise and support long-term resiliency in the built and natural environments, including levees, barriers, gates, seawalls, bulkheads, canals, diversions, and pumping systems.

OCEAN EXPERIENCE
PROJECT COST Design & Engineering Specifications Preserving Coastal Resources Ocean Studies Permitting Plans 8 Surveys
Orange Co. Flood Control East Garden Grove-
$2.3M (D); $60M (C)
Wintersburg Channel
Long Beach Davies Launch Ramp $330k (D); $3.9M (C)
Long Beach Belmont Pier Replacement 30% Design $1.6M(D) Long Beach Dock 10 Replacement $300K (D), $2.25M (C)
Long Beach Naples Seawall Repair. $2.9M (D); $29M (C) V Long Beach Bixby Park Bluff Improvement $360K (D); $2.2M (C) USACE LA. District Pismo Beach Bluff Protection $379K V.

Oxnard Mandalay Bay Seawall Investigations $200K
Long Beach Bayshore Swim Dock Replacement $155K (D); $400K (C) *Huntington Bluffs Shore Protection Study NA
*Malibu Broad Beach Living Shoreline Project NA
*Capistrano Beach Park Shore Protection Study NA
*City of Avalon Cabrillo Mole Ferry Terminal Pier NA
*Southern California Regional Shoreline NA
Monitoring Programs
* Subconsultant: Coastal Frontiers Project Experience

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

WATER/WASTEWATER/STORMWATER
Tetra Tech's industry-leading One Water practice delivers innovative and sustainable solutions to support resilient water futures for our communities. We bring together the expertise of talented engineers and scientists from around the world to partner with our clients to capture, treat, distribute, and recycle the essential resource of water.

WATER - Tetra Tech provides innovative, sustainable, and cost-effective water supply and treatment solutions to protect public health and improve quality of life. Our engineers and scientists have been Leading with Science® to help local governments and municipal utilities provide safe, secure drinking water to their clients for more than 50 years. Tetra Tech's drinking water experts provide comprehensive, cost-effective water solutions to address our clients' challenges, including maintaining or improving existing water supply infrastructure, planning new construction to expand capacity or enhance water quality, or minimizing life-cycle costs through the use of digital technology. Our integrated approach to water supply management and water facility design uses best practices and innovation to create a reliable, modern road map for clients' potable water systems.

WASTEWATER - Tetra Tech provides sustainable wastewater solutions for our clients relying on our abilities for innovation, optimization, and development of the best allocation and prioritization of economic resources.

Tetra Tech is a global leader in the technology and engineering of wastewater solutions. We listen and work with each client to develop innovative solutions to their unique challenges. Our full life-cycle services include master planning, asset management, rehabilitation, design, permitting, and construction administration with a focus on sustainability and resilience. Leveraging more than 30 years of proven experience and our Tetra Tech Delta technology solutions, we provide a full breadth of wastewater services. Tetra Tech's wastewater treatment specialists combine expertise in design and operation of biological, physical, and chemical processes to meet our clients' needs for effective and efficient treatment facilities. Our engineers regularly perform hands-on process energy audits, comprehensive performance evaluations, and plant optimization.

Tetra Tech works with our clients to evaluate, rehabilitate, and design improvements to their gravity sewer, force main, and pumping systems to get the most out of existing assets and optimize their systems. Our services include hydraulic modeling; sewer system evaluation surveys; condition assessments; and in addition to the planning, design, and permitting of improvements.

STORMWATER - Tetra Tech's diverse suite of stormwater management solutions supports clients facing regulatory, operations, and climate resiliency challenges. Tetra Tech has led the industry for more than 50 years in stormwater management and helped pioneer the use of green stormwater infrastructure (GSI) in the 1990s.

Creating, adapting, and maintaining a successful stormwater management program requires a breadth and depth of knowledge not commonly found in a single consulting firm. Tetra Tech is well-known for providing in-house, diverse services to solve our clients' stormwater needs. Our long history of supporting large, on-call stormwater contracts for major municipalities has enabled our staff to sustain effective programs.

Our multidisciplinary teams provide cutting-edge stormwater management approaches to support clients in meeting evolving regulatory, environmental, resilience, and community improvement goals. Tetra Tech prepares stormwater management plans that provide direction with flexibility, meeting the latest requirements with approaches that provide long-term benefits to communities. Using our Tetra Tech Delta technologies, we have developed innovative modeling and decision-support tools to manage stormwater quantity and quality strategically and effectively.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
Tetra Tech designs solutions focused on performance, ease of maintenance, cost-effectiveness, and aesthetics.

To achieve our clients' objectives, we employ a mix of traditional and innovative approaches, including water harvesting and reuse, stream stabilization, urban drainage control, real-time control technology, and integration with community enhancement projects, including parks and streetscapes.

WATER EXPERIENCE
- TOTAL
CONTRACT Reservoirs
PROJECT YEARS OF Pipeline Facilities
CAPACITY Local WTPS Wells

SERVICE
Huntington Beach On-Call Engineering (Water) 8 $1.5M
LA. Dept. of Water & Power As-Needed
15 $60M
Engineering
Santa Ana As-Needed Engineering Services 24 $8M
Yorba Linda Water District On-Call Engineering:
13 $810K
Water
Moulten Niguel Water District On-Call 23 $10M V.

Professional Engineering Services
LA. Co. As-Needed Engineering 11 $3.1M

WASTEWATER EXPERIENCE
•TOTAL

CONTRACT
PROJECT YEARS OF Facilities

CAPACITY

SERVICE
Oceanside On-Call Engineering 7 $1.5M
Santa Ana As-Needed Engineering Services 21 $8M
Moulten Niguel Water District On-Call Professional Engineering Svc. 20 $10M LA. Co. On-Call Engineering 11 $3.1M
L.A. Dept. of Water & Power As-Needed Engineering 15 $60M L.A. Co. As-Needed Engineering 11 $3.1M

STORMWATER EXPERIENCE

REGIONAL
PROJECT Hydrology / WQMP Sampling / Monitoring
VOLUME Pre-Design/ Feas.

On-Call Utility Research Geotech Studies Const. Support L.A. Albion Riverside Park 5.1
Belfflower Caruthers Park Stormwater Capture 9.7
Lakewood Bolivar Park Stormwater Capture 8.9
Orange County Public Works Multi-discipline N/A
Watershed & Regulatory Support
L.A. San Fernando Valley Stormwater Capture Parks
165.2 (Total)
Programs (4 Park Locations)

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
As-Needed Engineering Services - Water Main Replacements | Santa Ana, CA Since 1999, Tetra Tech has been involved in the design of various projects for the City of Santa Ana including the preparation of plans, specifications, and cost estimates for various water main replacement projects. Recent water main replacement projects include:
• Centennial Park Neighborhood Water Main Improvements. Design of approximately 20,000 linear feet (LF) of 8-inch PVC water main to replace existing water mains.
• Central City Water Main Improvement. Design of approximately 6,600 LF REFERENCE:
of 8-inch PVC water main to replace existing water mains. City of Santa Ana • Pico-Lowell Neighborhood Water Main Improvements. Design of Rudy Rosas, PE approximately 8,200 LF of 8- and 12-inch PVC water main to replace © 714.647,3379 existing water mains. 0 [email protected]
• Mid-City Neighborhood Water Main Replacement Project. Design of DATES/ VALUE:
10/1999-Ongoing
approximately 9,000 LF of 12- and 8-inch PVC water main replacements. $12M (Construction) KEY PERSONNEL:

Project Manager: Mark Bush
Others: Molly Mell, Molly
Lovegren, Ken Berard, Mazen
Kassar
On-Call Professional Engineering Services | Moulton Niguel Water District, CA Since 2000, Tetra Tech has completed more than 85 water, wastewater, and recycled water projects for MNWD. The vast majority of these projects occurred in an on-call capacity and covered improvements to MNWD's water, recycled water and sewer systems and facilities. This work has involved work on 30+ potable water facility and 15+ wastewater facility projects: with the goal of improving water quality/ quantity, and conveyance.

Projects include:
• Reservoir Management Systems Replacement REFERENCE:
• Diemer Pipeline Emergency Repair Moulton Niguel Water District (MNWD),
• ETWD Intertie Construction Support
Rodney Woods
• Recycled Water System Extension
0 949.831,2500
• Wastewater Flow Study - [email protected]
• Regional Treatment Plant Southerly Influent Sewer Improvements • Regional Lift Station Enhancements DATES/VALUE
05/2000-Ongoing
$1OM (Contract Capacity)
KEY PERSONNEL:

Project Manager: Tom
Epperson
Others: Mark Bush, Mazen
Kassar

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
Fleming Tank and Pump Station Improvements | Irvine Ranch Water District, CA Tetra Tech was selected to provide design, permitting, and construction services for the Irvine Ranch Water District's 1.3-million-gallon (MG) Fleming Zone 8 Reservoir and Zone 8 to 9 Pump Station. Construction phasing was critical for this project, since the new construction took place at an existing facility that was the sole source of water to numerous subareas. The work included demolishing existing facilities and designing a 1.3 MG prestressed concrete reservoir, grading into a rocky hillside for the pump station, three 670-gallon-per-minute pumps, a surge tank, a Reservoir Management REFERENCE:

System chemical feed system, inlet and outlet piping, overflow and drain Jivine Ranch Water District piping to an open channel, and a stormwater biofiltration system. In addition, Rich Mori our team coordinated with AT&T to remove and relocate the cellular tower @ 949.453.5571 to a temporary location during construction and provide a location for the -u [email protected] permanent facility. DATES/VALUE:

Scope Elements Included: 2019-2021
• Civil Engineering $927K
• Survey KEY PERSONNEL:
• Electrical/SCADA Project Manager: Tom
• Structural Engineering Epperson
• Geotechnical Others: Eric Yuen, Mazen
• Cost Estimating Kassar
Belmont Pier Replacement, 30% Design | Long Beach, CA
In partnership with the City of Long Beach, Tetra Tech is leading a multi- discipline team to replace the Long Beach Belmont Pier ahead of the 2028 Summer Olympics.

PHASE IA: TECHNICAL STUDIES + EARLY DESIGN: Tetra Tech is currently providing a review of existing information relevant to the project and developing a Risk Register to identify possible factors that might create risks to schedule, design, program, project performance, constructability, cost, and public safety/ security. This design validation is a collaborative process REFERENCE:
with City staff and will ensure full project team is aware of identified risks and City of Long Beach mitigation strategies. Concurrently with this design validation, Tetra Tech is Charlene Angsco preparing to conduct a technical analyses/study of the existing site area that O 562.547.1123 will be crucial to defining future design and permitting parameters as well as 0 charlene angsco@
meeting CEQA requirements. longbeach.gọv
PHASE 1B: CONCEPT DESIGN DEVELOPMENT TO PERMIT APPLICATION: DATES/VALUE:

At this phase, Tetra Tech will engage each of our technical engineering and 2024-Ongoing environmental disciplines to align them with the design direction, project 61 6M (30% Conceptual parameters, and design constraints. Each technical discipline will work in Design parallel and closely together throughout this phase to develop coordinated KEY PERSONNEL:
structure and system designs. Project Manager: Rafael
Holcombe

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
Merced Avenue Greenway | South El Monte, CA
This urban greening project entails planning and design for a retrofit of a 1.1 mile stretch of the Merced Avenue corridor in the City of South El Monte to implement surface and subsurface stormwater flow Best Management Practices, improve active transportation access, and increase urban greenery.

Improvements to the 1.1-mile section of Merced Avenue included the reconfiguration of traffic lanes to accommodate water quality improvements and LID/BMP infrastructure retrofits, native revegetation, and planned active transportation components to increase pedestrian safety and mobility throughout the corridor. REFERENCE:

The primary goal of the project was to manage stormwater runoff at its source City of South El Monte Eileen Alduenda
in order to meet regulatory compliance by improving water quality and 0 213.229.9959
enhancing watershed health. Water Quality LID/BMPs included curbside -t [email protected]
bioretention facilities to reduce pollutant loads, and permeable pavers and below-grade infiltration galleries to promote groundwater recharge. Active DATES/VALUE:
5/2018 6/2020
transportation components included elevated Class IV Cycle Tracks, ADA $422,000 (Fee)
compliant curb extensions and ramps, improved crosswalks, and improved $TIM (Construction)
pedestrian linkages.

KEY PERSONNEL:

Project Manager, Jason Fusse
Others: Elva Pangilinan, Dan
Helt
Western Our Way Walk and Wheel Improvements | Los Angeles, CA Tetra Tech provided Project Approval & Environmental Document (PA&ED) services for the Western Our Way: Walk and Wheel Improvements Project.

The project includes 4.5 miles of pedestrian and transit rider improvements in the heart of South Los Angeles. Extensive pedestrian improvements including traffic calming along Western Avenue will provide safer and more direct access for disadvantaged community members to transit lines and local destinations in contrast to the current conditions of the high-speed vehicular oriented corridor. Addition of street trees, pedestrian lighting, widened sidewalks, and bus bulbs will improve pedestrian safety and user comfort. Adjacent local streets will be improved to create neighborhood bike network streets along Gramercy Place and Denker Avenue which REFERENCE:
will create an exclusive path for bikes connecting to the greater South Los City of Long Angeles Angeles bike network and Rail to Rail Active Transportation Corridor. Mark Wissa Project Highlights: © 213.887.1065
• Traffic Calming Measure Design • Stakeholder Engagement 4 [email protected] • Multimodal Street Design • Environmental Planning DATES/ VALUE:
• Curb Extensions • Mobile Mapping 08/2023-02/2025
• Curb Ramps • Landscaping $2.5M (Fee)
• Bus Bulbs • Pedestrian Hybrid Flashing KEY PERSONNEL:
• Pedestrian Lighting Beacons Principal-in Charge: Jason Fusse
Others: Mike Olsen

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH
San Francisco ADA Ramps | San Francisco, CA
Pacific Gas and Electric Company (PG&E) contracted Tetra Tech through an existing Master Services Agreement to perform Survey and Civil Design Services on curb access ramps in San Francisco. The City of San Francisco has a master plan of all American with Disabilities Act (ADA) intersection ramp improvements, and has required that PG&E upgrade the intersections that are affected by the natural gas line construction work to insure they are ADA compliant.

In support of this effort, Tetra Tech has performed right-of-way research, monument research, topographic and construction survey for more than 700 REFERENCE:
ramps on 140 intersections in San Francisco. Tetra Tech prepared civil site Pacific Gas and Electric design improvement drawings for approval by the City of San Francisco. (PG&E) Project Highlights: Christopher Chu
• ADA Compliance © 415.973.7894
• Street and Sidewalk Rehabilitation [email protected]
• Survey and Mapping Services DATES/VALUE:
• Horizontal and Vertical Control 2015 Ongoing
• Monument Preservation $471k (Design)
• Record Survey Documents KEY PERSONNEL:
• Expedited Schedule Project Manager: Dan Felt
• Final Design Solutions
Sixth Street Park, Arts, River and Connectivity (PARC)| Los Angeles, CA The Sixth Street Viaduct, also known as the Sixth Street Bridge, spans nearly 3,500 feet connecting the historic Boyle Heights community to the east of the Los Angeles River with the Arts District and Downtown to the west. Just 20 years after construction of the bridge, the cement supports began to deteriorate due to a chemical reaction known as Alkali Silica Reaction (ASR), creating cracks in the concrete and significantly reducing the bridge's capacity to resist earthquake loads. In addition to its seismic vulnerability, the Sixth Street Viaduct also had geometric design and safety deficiencies.

The City of Los Angeles selected Tetra Tech, along with subconsultants Hargreaves Associates, and Michael Maltzan Architecture, to develop a REFERENCE:
unique landscape design and river improvements as part of the Sixth Street City of Los Angeles, Bureau of Viaduct Replacement Project. The Tetra Tech team is providing schematic Engineering and final design, environmental documentation and permitting, public John Saldin presentations, construction support services, and post-construction services © 213.485.5875 for nearly 12 acres of recreational and open spaces beneath and around the C john. [email protected] new bridge. The project includes approximately ¼ mile of improvements DATES/ VALUE:
within the Los Angeles River. These improvements will include bike trails, 2016-Ongoing pedestrian access, and softening of the existing concrete lined channel. $3.2M (Design) These improvements were originally envisioned in the Los Angeles River $18M (Construction Estimate) Revitalization Master Plan that Tetra Tech completed. The City's goal is to KEY PERSONNEL:
make the landscape component under the new bridge a world class public Technical Advisor: Jason Fussel
space that will include an Arts Plaza, several performance stages, synthetic Others Mike Olsen, Justin sports fields, river terracing, and bicycle and pedestrian pathways. Smith

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH

CITY OF HUNTINGTON BEACH

REFERENCES OF WORK PERFORMED
References of Work Performed Form
(List 5 Local References)
Comany Name: Tetra Tech

1. Name of Reference: - Irvine Ranch Water District
Address: 15600 Sand Canyon Ave., Irvine, CA 92618
Contact Name: Tiffany Foo, PE Phone Number: 949-453-5329 Email: [email protected]
Dates of Business: 2024

2. Name of Reference: City of Los Angeles, Bureau of Street Services Address: 1149 S. Broadway, 4th Floor, Los Angeles, CA 90015 Contact Name: _AlM Bazzi, PE Phone Number: 213-847-0962 Email: [email protected]
Dates of Business: 2022 - Present

3. Name of Reference: El Toro Water District
Address: 24251 Los Alisos Blvd., Lake Forest, CA 92630
Contact Name: Rory Harnisch, PE - Phone Number: 949-837-7050, ext. 251 Email: [email protected]
Dates of Business: 2024

1. Name of Reference: Moulton Niguel Water District
Address: 26161 Gordon Road, Laguna Hills, CA 92653
Contact Name: Bryan Hong, PE Phone Number: 949-425-3554 Email: [email protected]
Dates of Business: 2023

5. Name of Reference: City of Los Angeles, Bureau of Engineering Address: 1149 S. Broadway, Suite 700, Los Angeles, CA 90015 Contact Name: Bryan Powell, PE Phone Number: 213-485-5908 Email: [email protected]
Dates of Business: 2019 - Present
REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH 19.

CTY OFHUNTINGTON BEACH

UNIQUE QUALITIES/OVERALL BENEFITS
GENERAL CIVIL: Tetra SEWERS/PIPELINES: For 50+ STRUCTURAL: Tetra Tech Tech has completed over years, Tetra lech has provided has the capability to provide 16 projects for the City of design and construction all structural analysis and Huntington Beach since 2004 support services of more than design services in house 100,000 feet of relining and or
giving our team unique insight This includes numerous
rehabilitation of existing sewer
and understanding of City mains and over 325 miles seismic retrofits throughout design, quality standards, and of water and recycled water Southern California, Seismic personnel. We have decades pipelines. analysis includes a 3-D finite of experience working closely element analysis, member
with Southern California cities stress analysis, and foundation PUMP STATION/WELLS:
in the design and construction stability assessment
For 50+ years, Tetra Tech
of facilities including streets,
has provided design and
parking lots, sidewalk and curb
construction services on more ELECTRICAL/SCADA: Our
ramps, pedestrian lacilities,
than 40 water/recycled water in house electrical group
and bikepaths
pump stations and 25 water has extensive experience on
wells. We are among a select utility, industrial, residential, SURVEY. For more than few who can make that claim, commercial, governmental two decades, Tetra Tech has and military projects providing been an industry leader in the SCADA, transmission,
innovative use of GIS database RESERVOIRS: For 50+ years, distribution, programmable Tetra Tech has provided design
automation, applications logic controller, PID control, and construction support
programming, spatial and telecommunications.
services for 65+ water/
modeling, 3D modeling,
recycled water reservoirs (steel
advanced image analysis, and
and concrete). PLANNING/STUDIES:
interactive web mapping. We
Tetra Tech has provided over
have experts in aerial survey
15 master plans, hydraulic
such as LIDAR, land survey, and TRANSPORTATION: Tetra
modeling, and engineering
hydrographic survey. Tech provides the complete
studies in Southern California.
range of services to the
transportation sector including
OCEAN: For over 20 years,
residential streets, bridges WATER QUALITY: During
Tetra Tech has successfully
major interchanges, and the last 20 years, Tetra Tech
completed all aspects of
corridor studies. Our regional has provided design for 20+ waterfront and coastal
approach and consistent treatment (process membrane)
projects. Our work spans
delivery has resulted in the facilities in Southern California, marine, estuarine, riverine, and
majority of our projects being In addition, we have designed wetland environments. Our
repeat work with longstanding disinfection facilities at 10 t clients include national, state,
clients. well and reservoir facilities.
and local governments.

REQUESTFOR QUATUCATIONS FORON CA BENGINSARA 20
Te TETRA TECH
APPENDIX A:

TEAM RESUMES
City of Huntington Beach
32 Years of Experience
Molly Mell, PE, ENV SP BS Civil Engineering, University of Redlands PE California Professional Engineer, No. 59104
ENV SP Envision™ Sustainability Accredited Professional

PRINCIPAL-IN CHARGE
Ms. Mell has a diverse base of knowledge of the elements necessary to successfully execute large-scale, multi-disciplinary projects. She has had significant roles providing management, coordination, and detailed design on a broad range of project types. Her project management experience includes both public and private projects of varying size that include multiple sources of funding, including federal, state, and local transportation funding, Security Grant Funding, and private sources. Her management skills include project scheduling, cost estimating, building consensus, strong presentation skills, and innovative thinking. Ms. Mell has been a valuable asset in project execution for her clients.

RELEVANT PROJECTS
Pavement Resurfacing of Beach services included administrative support, proposed on-site and related off-site Parking Lot, City of Huntington photography, videography, and graphic systems, economic analysis of various Beach, Huntington Beach, CA. design. non-potable water and wastewater Project Manager. Project Managerfor Golden Valley Road Bike Trail collection alternatives, preliminary the rehabilitation of a beach parking lot design of water and sewer facilities, and Connection, City of Santa Clarita,
encompassing two different structural report preparation. The project was CA. Project Manager. Tetra Tech was
elevation sections. Tetra Tech prepared coordinated closely with Irvine Ranch contracted by The City of Santa Clarita
base maps, design survey and data Water District and The Irvine Company to complete a connection between the
collection, survey verification during planning staff to streamline the review existing bike path along Golden Valley
construction, and utility surveys. The Team process to meet fast-track schedule.

Road and the bike ramp at the Santa Clara
also provided final plan set improvement
River Bridge. This connection will give Public Works Infrastructure plans, signing and striping plans, and
PS&E. cyclists traveling to and from Soledad Improvement Program, City of Santa Canyon Road accessto the Golden Valley Clarita, CA Program Manager. Ms.

Community Involvement for Clean Road Bridge, allowing them to cross the Mell served as the Program Manager for Water Program (TOSSN 85), City of Santa Clara River and connecting them to Public Works Infrastructure Improvement Los Angeles Bureau of Sanitation, the existing bike trail network. As Project Program contract with Tetra Tech. Her City, CA. Senior Project Manager. Manager, Ms. Mell oversaw the Tetra program management duties included Provided public outreach materials and Tech team to conduct site inspection and working with the City to determine the services to neighbors and stakeholders survey reviews of the area of the proposed required improvements, ensured the for Hyperion Water Reclamation Plant work as well as an area 10'-25' beyond project was in compliance with federal (HWRP) projects. Outreach materials the area to understand how the proposed guidelines and safety requirements, included development, production, improvements tie into the existing overseeing the design/construction and maintenance of informational site. Survey data was also collected for phase, 100% Plans, Specifications, and collateral materials such as construction sidewalks, curb and gutter, cross slope, Estimates (PS&E), field reconnaissance, notices, fact sheets, brochures, videos, trees greater than 4-inches in diameter, utility research, topographic survey, and and information for use on websites surface features of underground utilities conceptual design report, site preparation and social media platforms including and location of above ground utilities. plan, 100% PS&E, and bid phase support.

Facebook, Twitter, and Instagram. Additional tasks included: site preparation On-Call Bridge/Civil Engineering Served as the liaison for residents, plan, 100% PS&E, and bid phase support. businesses, community organizations, Design and Support, Bureau of Planning Area 26 (Bonita Canyon Engineering, City of Los Angeles, elected officials and staff, and other
Village) Sub Area Master Plan, CA. Program Manager. Ms. Mell served stakeholders to provide information about
Irvine, CA. Design Engineer. This as the Program Manager for the Bridge wastewater infrastructure programs and Division's On-Call Contract with Tetra any potential implementation impacts. project involved planning of potable water, wastewater collection, and Tech. Her program management duties Provided community outreach services
non-potable facilities for several included overseeing the technical design, in support of the city's ongoing program
residential, institutional, commercial, coordinating with subconsultants, to rehabilitate the 6,500 miles of sewers stakeholders, and agencies, providing citywide. Proactively addressed program and recreational (parks and golf course) developments within the City of Irvine regular schedule updates, reviewing concerns by coordinating meetings
Planning Area 26 for 2,800 dwelling project quality, and holding progress and communication with stakeholders.
units, golf course, and commercial meetings to review contract objectives and Developed/Coordinated presentation milestones.
use on approximately 500 acres. The
skills training workshops. Additional
work included analysis of existing and

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
21 Years of Experience
Jason Fussel, PE, PLS, BS Civil Engineering, Cal Poly University, San Luis Obispo QSD/P, LEED AP, ENV SP PE California Professional Engineer, No. 70879 PLS California Professional Land Surveyor, No. 9006
PROJECT MANAGER and co Developer Os and Qualited S
actitioner (Osr. No. 2U
Mr. Fussel has more than 21 years of engineering experience that includes work on both public and private sectorjobs.

Jason's strengths include stormwater analysis, studies, design, preparation of specifications, bid documents, cost estimates, and construction support services. His experience also includes conducting topographic surveys, utility surveys, Record of Surveys, ALTA surveys, and coordination of aerial topography. Jason's professional strengths and key areas of expertise include project management, QA/QC, peer review, cost estimating, stormwater analysis and studies, design, preparation of specifications, bid documents and cost estimates, and construction support services.

RELEVANT PROJECTS
Santa Monica Clean Beaches ofa parking lane with innovative Survey and Civil Design Services on Initiative, City of Santa Monica, Santa buffer treatment to separate it from the curb access ramps in San Francisco.

Monica, CA. Engineering Design Lead eastbound high-speed travel lanes on This work order was to support the and Engineer ofRecord. Mr. Fussel Culver Boulevard. Tetra Tech also led ongoing work that PG&E is undertaking was responsible for the design of the a series of outreach meetings with the in the City of San Francisco where they site improvements, diversion structure, Community Advisory Committee and the intend to repair and replace all the pretreatment, underground storage residents to obtain input and consensus in existing medium pressure natural gas reservoirs, and piping systems. The project the design process. infrastructure. The City of San Francisco objective was to improve Santa Monica has a master plan of all American with Camp Roberts Perimeter Road,
Beach water quality by increasing the Disabilities Act (ADA) intersection California Army National Guard, San
diversion capacity at the Santa Monica ramp improvements, and has required Miguel, CA. QA/QCManager. Mr.

Pier and Pico-Kenter storm drain outfalls. that PG&E upgrade the intersections Fussel was responsible for coordinating
The 85th percentile storm event volume that are affected by the natural gas geotechnical investigations and the site line construction work to insure they will be treated and diverted from the Pier
survey, which included setting control are ADA compliant. In support of this watershed to the Santa Monica Urban
around the 17-mile perimeter loop, as well
Runoff Recycling Facility (SMURRF) or the effort, Tetra Tech has performed right- as the mobile mapping of the roadway.
sanitary sewer. The project included storm of-way research, monument research, Additionally, through the design process,
drain diversion and runoff storage systems topographic survey and construction Mr. Fussel provided quality assurance
at two separate storm drain outfalls, routed survey for more than 2,000 at 300 and quality control reviews throughout intersections in San Francisco. In to two subsurface storage areas. 1.6 million
to ensure that the project team met the
gallons will be stored at the historical goals and needs ofthe client. The goal of addition, Tetra Tech also prepared civil Deauville Beach Club site and an additional site design improvement drawings for the project is to bring the roadways up to
80,000 gallons will be stored at the Pico- modern asphalt standards, provide a safe, the purpose ofobtaining ADA ramp Kentor storm drain outfall. construction encroachment permits reliable and usable environment for soldier
Culver Boulevard Realignment training and improve operability and with the City of San Francisco.

Project, City of Culver City, CA. maintainability of roadways. Tetra Tech was Merced Avenue Greenway Project, Principal-In-Charge/Engineer of Record. responsible for conducting a pavement Council for Watershed Health for Mr. Fussel served as the Principal-in- condition assessment, topographic survey City of South El Monte, CA. Project Charge and Engineer of Record forthe services (traditional ground and mobile Manager. Mr. Fussel was responsible for development of PS&E documents for the LiDAR), and preparing conceptual and overseeing planning and design services realignment of Culver Boulevard between detailed design plans, specifications, and fora stormwater retrofit project along Sepulveda Boulevard and Elenda Street. calculations to allow the Government to the Merced Avenue corridor. The scope The new road included a 58-foot-wide assemble a bid package for repair ofthe of services included assessing existing raised landscape median, complete perimeter range roads. conditions, consulting with agencies with buffered bicycle and pedestrian San Francisco ADA Ramps, Pacific on regulations for planning and design, paths. Street improvements included the evaluating pre-design monitoring data reconfiguration of existing traffic lanes, new Gas and Electric (PG&E), San and analyzing urban heat island mitigation and reconstructed landscape medians, Francisco, CA. QA/QC Manager. strategies, providing a preliminary design traffic signal additions and modifications, Mr. Fussel is responsible for quality report, presenting at community design control of land surveying services in workshops and meetings in collaboration bus stops, signal interconnects, new
support of PG&E's Land Management
lighting, utility adjustments, relocation Department, on an as-needed basis. with various stakeholders to create designs of existing catch basins, and the design for the retrofit.

PG&E contracted Tetra Tech to perform

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
41 Years of Experience
Steve Tedesco, PE, BS Civil Engineering, Polytechnic Institute of New York BCEE PE California Professional Engineer, No. 39261.

BCEE Board Certified Environmental Engineer California, No. 11-20037 QA/QC
Mr. Tedesco is experienced in the planning, analysis, design, and construction of water supply, water treatment, water distribution, and collection systems. His background includes water master planning, watertreatment plant design, construction management, and design-build delivery methods. He has extensive design experience in the advanced water and wastewater field, including desalination, membrane filtration, reverse osmosis, nanofiltration, ultraviolet treatment, and waste disposal projects. He has led membrane system design teams and managed complete design and construction of membrane desalination and membrane filtration plants. Mr. Tedesco has authored several master plans and infrastructure planning studies for sewer, water, and reclaimed water programs.

RELEVANT PROJECTS
Design-Build of Well 21 and 22 and project includes two off-site pumping ultraviolet storm water treatment facility and Reverse Osmosis Treatment Plant, stations and a large diameter transmission preliminary design ofa new 24-inch HDPE Irvine Ranch Water District, Irvine, pipeline through busy Orange County force main to convey the raw wastewater CA. Design Manager: Served as Design streets. to the SLRWRF.

Managerforthe Wells 21 and 22 Reverse Shady Canyon Pipelines, Irvine Ranch Well #1 PFAS WTP, City of Bell Osmosis Treatment Plant providing Water District, Irvine, CA. Project Gardens, CA. Principal-in-Charge.
overall design management and client
Director. Project Director for the design and This project involved the final design coordination for a brackish groundwater
construction support services for about for providing PFAS treatment at the City treatment facility. The water treatment
25,000 linear feet of 12-to 24-inch potable of Bell Gardens Well #1. The plant was plant consisted of: cartridge filters, and recycled water transmission mains as designed to treat flow from one well
pretreatment chemical systems, high
part of the Shady Canyon Development. with a total capacity of 2.9 MGD. The pressure feed pumps, reverse osmosis treatment processes included 5-micron treatment trains, membrane clean-in-place Springdale Reservoir, City of cartridge filters, ion exchange pressure
system, decarbonators, post treatment Huntington Beach, Huntington vessel contactors, and new chemical
chemical systems, concentrate disposable Beach, CA. Project Director. Project feed facilities for sodium hypochlorite.
system, supervisory control and data Director for this project which included acquisition, clearwell, product water pump a new 9.0 MG concrete partially On-Call Engineering Services for station, plant discharge system to storm buried, conventionally reinforced PFAS Treatment Systems Design, drain, treatment plant building, auxiliary hopper bottom reservoir with a wood Orange County Water District, building structures, and electrical and roof, site improvements, pump station Orange County, CA. Project instrumentation. The Reverse Osmosis modification, and minor modifications Manager. Tetra Tech was selected by Treatment Plant is sized to produce 6.27 to the existing adjacent Peck Reservoir. OCWD to design the first three PFAS MGD of product water. Water will be projects (six affected wells) as part of The La Salina Wastewater Treatment their program to construct treatment treated to remove salts (total dissolved
Plant, City of Oceanside, CA. Project
solids [TDS]) and nitrates. The project Director. Project Director for preliminary facilities for 66 affected wells in Orange included design of plans, specifications, County. Projects included:
and final design. The La Salina Wastewater
and engineer's cost estimate. Treatment Plant (LSWWTP), originally » Serrano Water District Well #5 and The Huntington Beach Seawater constructed in 1948, has been expanded #9 (Completed Design) Desalination Project, Poseidon and rehabilitated over the years. LSWWTP » Kimberly Well 1A (Completed Water, Huntington Beach, CA. Project serves as the connection point for multiple Design) Manager. Project Manager for preliminary regional discharge pipelines including design (30 percent) for the largest treated effluent from Fallbrook, Camp » Yorba Linda Water District seawater desalination facility planned for Pendleton, and the San Luis Rey Water Headquarters Plant (Completed the United States. This facility will produce Reclamation Facility (SLRWRF). This project Design) 50 MGD of potable drinking water to serve consists of demolishing the LSWWTP » Fulierton Main Water Treatment communities in Orange County, California. and replacing it with a new 5.0MGD Co-located within the existing Huntington raw wastewater lift station to convey Plant (Completed Design) Beach Generating Station, the Desalination wastewater from the LSWWTP collection Plant takes water from the existing power areato San Luis Rey Water Reclamation plantand discharges brine to the power Facility. The scope of work also includes plant's existing ocean outfall pipe. The the relocation of an existing 1.0 MGD

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH FE City of Huntington Beach
39 Years of Experience
Ken Berard, PE BS Civil Engineering, California State Polytechnic University, Pomona
PE California Professional Engineer, No. 45499

WATER/SEWER/STORMWATER

ENGINEERING LEAD
Mr. Berard has extensive experience in many facets of water/wastewater engineering. He has performed numerous ranging from complete water master plans to efficiency studies. His design experience includes preparing bid documents for sewers, reservoirs, pump stations, wells, pipelines, chlorination facilities, and pressure reducing facilities. Ken also has extensive experience in hydraulic modeling and is familiar with numerous software packages in addition to open channel flow software.

RELEVANT PROJECTS
RWQCP Levee Rehabilitation, City bidding, and construction services for Trenchless Sewer System Repairs, of Riverside, Riverside, CA. Project three municipal drinking water wells, City of Norwalk, Norwalk, CA. Project Engineer. The Regional Water Quality ranging from 300 to 800 gpm. This project Manager for the design ofthe repair for Control Plant is adjacent to the Santa Ana consists of two potable water extraction 12 sewer segments totaling 5,800 linear River and is subject to potential flooding wells and one water injection/extraction feet of 8-inch pipe. Preliminary Design from the river. The project strengthened well. All three wells are located within the Report evaluated traditional cut and cover the levee along the Plant boundary for over large, grassy median of Olympic Boulevard replacement, pipe bursting, slip lining, 1000'. A bike lane was included on the top at separate sites in the city of Santa Monica. cured-in-place pipe, cut and cover spot of the levee. The levee improvements also The wells are located thousands offeet repairs, mechanical spot repairs, and required relocation of an 8-inch recycied apart, and each well site is configured to cured-in-place spot repairs. Design was water line and miscellaneous other contribute to the aesthetics and function of completed for cured-in-place pipe, cut infrastructure such as lighting. the area. Tetra Tech's design left adequate and cover spot repairs, and mechanical room within the median for public access spot repairs. Projects were located in areas 20 MG Memorial Park Underground varying from a highly congested State Reservoir and Booster Pump Station, past the well sites without getting too close to traffic. We addressed project security Highway to residential easements with City of Santa Monica. Santa Monica.
and aesthetics by including a wall around sheds, walls, and other superstructure CA. Project Manager. Project managerfor
the site, which was designed with the encroaching the easements. a feasibility study, predesign report, and
assistance ofa local artist to emulate the
final design for their recycled water system. Central Water Integration Project water aquifer, sedimentary materials, and (CWIP), San Antonio Water System, The study focused on the development
water wells and provide security, improved
and selection of viable alternatives that TX. Project Engineer. Project consists of aesthetics, and public awareness for the treatment facilities, conveyance pipelines, would provide the required storage
and pumping while causing the least City'swater supply. and improvementsto existing pump impact to Memorial Park. The feasibility I-5 Water Main Relocation stations and distribution facilities to study recommended that the reservoir Carmenita Road Segment, Santa integrate a new 48.0 MGD potable water be constructed entirely below grade, Fe Springs, CA. Project Manager for supply source into the utility's potable underneath the existing tennis courts. The design, construction management, water distribution system. The supply pump station would be located underthe and construction inspection services source for this project consisted of a $900 existing parking lot with the only impact for relocation of approximately 13,500 million P3 water supply project that will being a loss of a couple of parking lot trees. linear feet of 12-inch and 16-inch water import groundwater from a wellfeld that During the development of the Preliminary main. This project was required due to is 140 miles from the City of San Antonio.

Design Report, a location forthe pump the widening of the I-5 Freeway and The designed treatment facilities include station adjacent to the park became the impacts on frontage streets and pressurized solution injection of carbon available and allowed for above ground ramps. The project included three bore dioxide for pHadjustment, lime storage construction in order to reduce project and jacks for construction under the 1-5 and batch slaking, lime saturators (solids costs. The PDR addressed items such as Freeway, under Carmenita Road, and contactors) for calcium remineralization, environmental documentation, facility under the railroad. Many issues made dual media pressure filters, a sodium configuration and layouts, construction this project very complex including hypochlorite on-site generation system, grading/shoring, and construction staging hydrocarbon contaminated soils, other fluoride storage and feed, backwash areas as well as construction costs and simultaneous construction, congested recovery, filtered solids and lime sludge schedule. utilities, moving existing streets in gravity thickener, sludge handling and various phases of construction, and dewatering using centrifuges, and City of Santa Monica Equipping associated polymer storage and feed of Three Wells, Santa Monica, CA. heavy truck traffic on Carmenita Road.

Project Manager. Tetra Tech is providing systems.
preliminary and final design, permitting,

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
12 Years of Experience
Justin Smith, PE, QSD
BS Civil Engineering, University of California, Irvine
PE California Professional Engineer, No. 85736

GENERAL CIVIL ENGINEERING LEAD
Mr. Smith brings extensive knowledge in civil engineering from his involvement in a variety of municipal projects of varying size and funding. His design experience includes parking lot and roadway geometrics, pedestrian accessibility improvements, bike trails, parks, construction and post-construction stormwater BMPs, storm drain improvements including hydrologic and hydraulic design, overall utility plans, structural design, and grading activities varying from mass grading to final precise grading plans. His additional experience includes cost estimating, preparing specifications, providing construction/post-construction support, performing utility research, and coordinating with the project team and outside agencies.

RELEVANT PROJECTS
Bristol-Tolliver Street Urban developed a conceptual plan showing the replacement of the Second Street Greening Project, City of Santa Ana, the reconfiguration and reconstruction Bridge, built in 1952 and widened in 1965, CA. Project Managerand Civil Design Lead. of Parking Lot 7 to increase the total over Warm Creek between Arrowhead The Bristol Tolliver Street Urban Greening number of spots, improve circulation, Avenue and Mt View Avenue in the City Project involved the construction of a new and create an enhanced entrance to the of San Bemardino. The Second Street public park on a vacant lot at the corner southeast portion of the campus. Tetra Bridge is founded on timber piles that have of Bristol and Tolliver Streets in Santa Ana. Tech was contracted by Lehrer Architects been driven into the earth, and extend The project included landscaping, a skate LA to provide final construction plans approximately 10 feet below the natural park, basketball court, fitness equipment, including demolition, precise grading, invert of the Creek. The Creek is a well- children's play areas, shade structures, storm drain improvement plans, water defined, unimproved, natural channel pathways, signage, lighting, benches, line improvement plans, retaining between the outlet of Town Creek Tunnel picnictables, and stormwater management walls plans, preparation of hydrology, and the Second Street Bridge. In August features. A storm drain system was designed hydraulic, and LID calculations for the 2006, a Bridge Inspection Report (BIP) to capture, store, and reuse stormwater for site drainage, curb, gutter, ramp, and was prepared by Caltrans for the Second irrigation, supplemented by potable water sidewalk designs. Street Bridge. The BIP assigned the bridge when needed. a sufficiency rating of 48 and it was flagged Naples Sea Wall Phase 1 Replacement,
structurally deficient with a health index of
Golden Valley Road Bike Trail City of Long Beach, Long Beach, CA.

51.3. The City of San Bemardino initiated
Connection, City of Santa Clarita, Design Engineer. Responsible for assisting CA. Project Designer. Responsible forthe in the preparation ofthe civil pathway and a field review of the bridge, which was performed in June 2010 to identify and
preparation of plans, specifications, and drainage system improvement plans, document deterioration and/or damage to
estimates (PS&E), and survey services. The along with the supporting hydrology and City of Santa Clarita's goal is to complete a hydraulics studies for the installation of the existing bridge structure. Through the connection between the existing bike path the new proposed storm drain system. design, Tetra Tech improved the longevity of the bridge, reduce maintenance, improve
along Golden Valley Road and the bike path The existing sea walls were constructed seismic performance, and bring the design
ramp at the Santa Clara River Bridge. This in the 1930s and modified throughout into compliance with AASHTO standards.
project will give cyclists traveling to and from the decades to strengthen and raise the Soledad Canyon Road access to the Golden height of the walls. The sea walls were at The purposed bridge replacement was Valley Road Bridge, allowing them to cross the end of their design life and in need of designed to conform to the alignment, profile, and cross section ofthe existing
the Santa Clara River and connecting them replacement. Projecttasks included the complete design ofthe canal pathway, bridge, except that the sidewalks would to the existing bike trail network. be six feet wide and bridge barer railings associated landscaping, and other pathway
CSULB Lot 7 Parking Area improvements. Tetra Tech was responsible conforming to AASHTO standards would Renovations, Lehrer Architects LA, for the structural design of the sea walls in be included. The project tasks include:

California State University Long addition to the civil design of the pathway PS&E, bridge type selection report, utility Beach, Long Beach, CA. Project research and coordination, surveying and Designer. Responsible for assisting in the reconstruction. mapping, geotechnical/foundation reports,
preparation of demolition plans, precise Second Street Bridge at Warm Creek, pavement design reports, hydrology and grading plans, existing utility plans, water City of San Bernardino, CA. Project hydraulics study reports, scour analysis, line plan and profile plans, storm drain Engineer. Responsible for assisting in cultural resources, and noise assessment. In plan and profile plans, retaining wall performing the field survey, preparing addition, the project requires environmental plans, and Best Management Practices the civil roadway plans, and preparing documents, including: biologic services, (BMPs) designs to meet Low Impact the Hydrology and Hydraulics Report for plant/wildlife surveys, environmental Development (LID) requirements for the the project. The City of San Bernardino studies/assessment, jurisdictional parking lot reconstruction. The University contracted Tetra Tech for the design of delineation, and permit processing.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
24 Years of Experience
Rafael Holcombe, PE, OSD BS Civil Engineering, Ohio State University PE California Professional Engineer, No.C67956

OCEAN ENGINEERING LEAD
Mr. Holcombe is a project manager with experience in design, engineering analysis, preparation of construction documents, and construction administration of multi-disciplinary waterfront developments, including dredging, marinas, revetments, wave attenuators, piers, retaining walls, parks, and special projects. He is also responsible for compliance with all environmental concerns including endangered species monitoring, turbidity monitoring, and contaminated materials remediation. Rafael has extensive experience dredging plans and specifications, hydrographic and land surveys, equipment positioning, quantity computations, scheduling, production analysis, production reporting, subcontract management, and quality control.

RELEVANT PROJECTS
Queen's Gate Deepening Project, Catalina Cruises Terminal and South probable wave run up height at the project Port of Long Beach, CA. Project Shore Launch Ramp Dredging Project, Engineer. Provided construction Long Beach, CA. Project Manager. Lido Peninsula Bulkhead Replacement management and engineering support for Project Manager responsible for preparing Project, Newport Beach, CA. Project dredging operations of a hopper dredge plans, specifications and permits in a Engineer. Mr. Holcombe Provided
deening project to -53 mllw. Responsible condensed time frame for emergency construction management and
for hydrographic surveying, endangered dredging of the Catalina Cruise Terminal engineering support for the replacement species monitoring and water quality Basin. This included a bathymetric survey, volume computations, sediment sampling of 300 feet of steel sheet pile retaining sampling at the dig and disposal sites.
wall. He developed design change
Partnered in a joint venture with a major and analysis. The topographic survey recommendations during construction
scientific firm to implement the Palos served as the baseline for the plans and to account for differing field conditions.

Verde Contaminated Sediments Capping volume computations. The project is He prepared out of scope work plans
Project. located in an urban setting and required
and obtained permitting. Mr. Holcombe
the use of an electric dredge and sediment
Cerritos Bahia Marina Dredging provided project engineering services separation equipment. The sediment to be
Project, Long Beach, CA. Project during construction that included design dredged in this project is to be separated changes, response to RFI's and contractor Engineer. Developed plans, specifications
into fine grained sediment for upland
and cost estimate for dredging the submittals and structural inspection. disposal and course grained sediment for
existing marina. Performed topographic 5th Place, 7th Place and 12th Place beach disposal.
and bathymetric surveys to develop Bluff Erosion Control Projects, Long the site plan. Completed permits for Port of Los Angeles Berths 171 - 173 Beach, CA. Project Engineer. Developed the Army Corps of Engineers, Califomia Environmental Site Remediation plans, technical specifications, cost
Coastal Commission, and the State Water Project, Los Angeles, CA. Project estimates and engineering for bluff erosion Resources Control Board. The project Engineer. Prepared plans and control projects at 5th Place, 7th Place and
utilized a proprietary technology to de- specifications for the cleanup ofa former 12th Place that included retaining walls,
water the dredge material priorto disposal. petroleum storage and handling facility grading, street/curb/gutter, railing and Disposal of material was beneficial reuse as with petroleum hydrocarbon impacted landscaping. Performed a topographic daily cover at a local landfill. soils. Project includes thermal treatment of survey and geotechnical investigation to hydrocarbon impacted soils at an off-site support plan development. Conducted Castaic Lake Dredging and Debris facility and disposal oflead impacted Removal, Los Angeles, CA. Project soils. Excavation trenches will be left open community meetings with surrounding Engineer. Project engineer for an and skimming equipment will be used to community to gain public support and emergency dredging operation at input. Supported the client during the remove hydrocarbon sheen on the water public bid process. Acted as Engineer the Castic Lake Power Generation
prior to backfilling. of Record throughout the project.

Plant for the Los Angeles Department
of Water and Power (LWDWP). The Poche Beach Wave Run-up Study, Responded to requests for information and project involved specialized dredging San Clemente, CA. Project Engineer. reviewed construction submittals. techniques to dredge the face of the Mr. Holcombe assisted in the preparation power plant. 100 foot water depth and ofa Wave Run-up Study to be used in a limited access were key obstacles in Storm Water Treatment Project design. removing sediment and debris from the Mr. Holcombe conducted hydrographic penstocks. survey to supplement the land survey data
and a numerical model to estimate the

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH ( City of Huntington Beach
19 Years of Experience
BS BioResource & Agricultural Engineering, Cal Poly, San Luis Craig Ziel, PE, QSD/P Obispo
PE California Professional Engineer, No.74743
GENERAL CIVIL ENGINEER Qualified SWPPP Developer (QSD/Practitioner) Mr. Ziel's experience involves the planning, analysis, and design for residential, commercial, and municipal development projects, including the design and preparation of construction documents for sewer, water, and storm drains, and improvement plans for the geometric design of roads, highways, bike paths, and parking areas. He also has experience preparing grading and drainage plans forroads, mass grading, finish grading, and grading for LID projects. Craig has implemented State Water Board requirements for preventing and mitigating stormwater pollutants, including preparing traditional and linear SWPPPs to eliminate pollutant discharges during construction. He prepares WQMPs for development and redevelopment projects and incorporates his knowledge of hydraulic/ hydrologic analysis and Low Impact Design Best Management Practices to mitigate post-development impacts to the environment.

RELEVANT PROJECTS
Sand Canyon Trail Phases IV - VI, widened sidewalks with curb extensions, and estimates. Tetra Tech is providing Alta Planning + Design for the City new traffic-controlled intersections, a new pre-design and detailed design services of Santa Clarita, Santa Clarita, CA. shared street connecting to the new Sixth for this street improvement project. The Project Engineer. Mr. Ziel was responsible Street Viaduct Arts Plaza, as well as green project entails street improvements for for preparing planning and construction street elements. The goal of this Caltrans approximately six city blocks, along documents for project which consisted Local Assistance Program funded projectis 67th Street from 1Tth Avenueto West of the installation of a multi-use trail along to increase the mobility and safety for non- Boulevard, and along West Boulevard Sand Canyon Road in the City of Santa motorized users to achieve the regional from 67th Street to 71st Street. Project Clarita. The proposed trail is approximately agency's greenhouse gas reduction goals, elements include sidewalk improvements,

1.6 miles in length, and is separated from and aid in the enhancement of the public's curb ramp upgrades, driveway approach motor vehicular traffic by fencing, providing reconstructions, roadway resurfacing, a safe route for pedestrian and equestrian tree pruning, and curb and gutter use. Tetra Tech worked with Alta Planning + Shell Beach Road Streetscape reconstruction. Tetra Tech is providing Design to provide the City of Santa Clarita Phase I Project, City of Pismo Beach, pre-design and design services, including design, plans and engineer's estimates Pismo Beach, CA. Project Engineer. 100% PS&Es, survey services, public for Phases IV through Vi of the project, Responsible for preparing utility and site outreach/stakeholder engagement, and layout exhibits for the design of a "total environmental documentation (CEQA). which was a continuation ofthe completed
street" reconstruction of 18 blocks of
Phase Ill trail, The project scope included
Shell Beach Road in the City of Pismo San Luis Obispo Stormwater preliminary conceptual trail design, Plan Check, County of San Luis preliminary environmental analysis, right- Beach. The project entails incorporating a new Class 1 bikeway along an existing Obispo, CA. Project Manager. Project of-way mapping, civil engineering, bridge Manager responsible for overseeing design, specifications, and construction Caltrans right-of-way (Highway 101).

In addition, the project aims to replace on-call plan check services for projects cost estimates. required to meet post construction
aging utilities, including: a new 12-
DTLA Arts District Pedestrian and inch water line, new 12-inch reclaimed requirements as set forth in the Central Cyclist Safety Active Transportation water line, undergrounding power Coast Regional Water Quality Control Project (ATP 3), City of Los Angeles, and communication lines, and new Board (RWQCB) order R3-2013-0032.

Bureau of Engineering, Los Angeles, storm drain improvements. The project Mr. Ziel managed the review services CA. Project Engineer. Mr. Ziel is providing will incorporate new way-finding and contract and provided final QA/QC pre-design and preparation of plans, streetscape enhancements including to reviews performed by Tetra Tech. specifications and estimates for this pavement enhancements at crosswalks Additionally, Mr. Ziel met with County active transportation project, funded by and intersections, full ADA compliance, staff and third-party engineers to discuss a CalTrans ATP grant. The project area is street furniture and landscape review findings and recommendations characterized by a complex street system improvements (incorporating Low for achieving PCR compliance. On-call ofvery long blocks with few safe crossing Impact Development techniques). services provided under this contract locations, complicated intersections, included the review of Storm Water TOS 33 67th Street and West Management Plans (SWMP), audit of and very limited bike facilities that create
Boulevard Civil Improvements, City of existing County SWMP documents, and mobility challenges for residents, workers
Los Angeles, Bureau of Engineering, in-field inspections of installed storm and visitors to the district. The project
Los Angeles, CA. Project Engineer. water Best Management Practices improvements will provide pedestrian and
Responsible for the design and production (BMPs).
cyclist improvements including new cycle ofimprovement plans, calculations, tracks, bike lanes, bike routes, new and

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
Devin Newton, PE 24 Years of Experience
BS Engineering, Cal Poly University, San Luis Obispo
GENERAL CIVIL ENGINEER PE California Professional Civil Engineer, No. 72952 Mr. Newton is highly skilled in infrastructure design and is able to provide timely, cost-effective design solutions for his clients. His civil engineering experience totals more than two decades focused on public works projects throughout California, with a focus on roadway, sidewalk, and curb ramp improvements. He serves in increasingly significant roles providing project management, coordination, and detailed design on small and large scale multidisciplinary projects. Devin has a proven track record of managing capital improvement projects on time and within budget, with a high degree of client satisfaction.

RELEVANT PROJECTS
StreetsLA Sidewalk Repair Program, overseeing survey and engineering improve pedestrian safety. The project City of Los Angeles, Bureau of design services in support of StreetslA's focuses on pedestrian transportation Engineering, Los Angeles, CA. Project Pavement Preservation Program which improvements which includes sidewalk Manager overseeing surveying and maintains a street network of 23,000 enhancements, ADA ramps, new and engineering services in support of the City lane miles and keeps all improved streets enhanced crosswalks, and safety features of Los Angeles's Sidewalk Repair Program and related throughways in good to that include curb pedestrian signals and (SP). Services include survey and design excellent condition. Tetra Tech's scope new pedestrian lighting along all new/ for the reconstruction of inaccessible and of services includes topographic survey, improved walkways. The project will damaged pedestrian facilities throughout engineering design, design support provide nearly 4,000 linear feet ofnew, the City's public right-of-way to ensure during construction, and construction replaced, and reconstructed sidewalk.

ADA compliance pursuant to the City's management services for various access The sidewalk improvements will include obligations under the Willits Settlement amps throughout the City, in compliance new and reconstructed ADA ramps Agreement. Along with addressing with the Americans with Disabilities Act and crosswalks, providing connectivity accessibility of sidewalks, the SRP also to various key community features and addresses related elements such as curb adjacent neighboring locations. Vehicle Templeton to Atascadero Connector, traffic calming improvements will consist ramps, street trees, utilities, driveways,
County of San Luis Obispo, Templeton,
curb and gutter, roadway transitions, and of installing a new traffic signal at the CA. Project Manager. Mr. Newton is intersection of 4th Street and Clarence crosswalks.
responsible for overseeing design services
67th Street and West Boulevard Civil during construction for a multi-use pathway Improvements, City of Los Angeles, including completing the California Camp Roberts Perimeter Road, Bureau of Engineering, Los Angeles, Environmental Quality Act (CEQA) and California Army National Guard, CA. Project Manager overseeing pre- National Environmental Policy Act (NEPA) San Miguel, CA. Project Manager. Mr. design and detailed design services for processes, right-of-way acquisition, Newton is responsible for overseeing this street improvement project. The permits, construction documents and engineering services for upgradesto project entails street improvements for grantadministration. The ultimate goal approximately 17.1 miles of roadway along approximately six city blocks, along of the pathway network is to provide the Eastand West Perimeter Range Roads 67th Street from 11th Avenue to West connectivity between Templeton and at Camp Roberts. The goal of the project Boulevard, and along West Boulevard Atascadero, facilitating safe and attractive wasto bring the roadways up to modem from 67th Street to 71st Street. Project transportation between these two towns asphalt standards, provide a safe, reliable, elements include sidewalk improvements, and encouraging alternative transportation and usable environment for soldier training curb ramp upgrades, driveway approach modes. and improve operability and maintainability reconstructions, roadway resurfacing, of roadways. Tetra Tech was responsible Boyle Heights Pedestrian Linkages for conducting a pavement condition tree pruning, and curb and gutter Active Transportation Project (ATP reconstruction. Tetra Tech is providing assessment, topographic survey services 2), City of Los Angeles, Bureau of
pre-design and design services, including (traditional ground and mobile LiDAR), and Engineering, Los Angeles, CA. Project
100% PS&Es, survey services, public Manager and Engineer of Record. Mr. preparing conceptual and detailed design outreach/stakeholder engagement, and plans, specifications, and calculations Newton is responsible for overseeing
environmental documentation (CEQA). to allow the Government to assemble a the project design and preparation of
final plans, specifications and estimates bid package for repair of the perimeter StreetsLA Ramp Design, City of Los range roads. Tetra Tech also provided Angeles, Bureau of Engineering, for this active transportation project, construction support services.

Los Angeles, CA. Project Manager funded by a CalTrans ATP grant, aims to

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
17 Years of Experience
Elva Pangilinan, PE,
BS Engineering, Cal Poly University, San Luis Obispo:

CDT, ENV SP PE California Professional Engineer, No. 81113 Construction Documents Technology (CDT) Certified
GENERAL CIVIL ENGINEERING Envision™ Sustainability Professional Ms. Pangilinan has experience in designing and preparing improvement plans, specifications, and estimates for both municipal and federal projects. She has extensive knowledge in BMP and LID implementation through her involvement in various stormwater capture projects throughout Southern California. Additionally, Elva's experience includes design and construction support of various street improvement projects, including design of bikeway and pedestrian improvements, right-of-way improvements, ADA compliant facilities, underground utilities, grading design, erosion control, and green street infrastructure projects. Elva is a Construction Documents Technology (CDT) Certified Professional, as well as a certified EnvisionTM Sustainability Professional.

RELEVANT PROJECTS
Santa Monica Clean Beaches StreetsLA Ramp Design Program, Culver Boulevard Realignment, Project for Pier and Pico-Kenter City of Los Angeles, Bureau of Street City of Culver City, Culver City, Watersheds, City of Santa Monica, Services, Los Angeles, CA. Civil CA. Design Engineer. Prepared Santa Monica, CA. Civil Engineer Engineer responsible for performing specifications and bid documents responsible for the design of the site internal review of designs as well as for realignment of Culver Boulevard improvements, diversion structure, completing the specifications for the which included a 58-foot-wide raised pretreatment, underground storage bridging documents. Tetra Tech is landscape median with buffered reservoirs, and piping systems. The providing survey and engineering bicycle and pedestrian paths. objective of the project is to improve design services in support of Street improvements included the Santa Monica beach water quality StreetsLA's Pavement Preservation reconfiguration of existing traffic lanes, by increasing the diversion capacity Program which maintains a street new and reconstructed landscape at the Santa Monica Pier and Pico- network of 23,000 lane miles and medians, traffic signal additions Kenter storm drain outfalls. The 85th keeps all improved streets and related and modifications, bus stops, signal percentile storm event volume would throughwavs in good to excellent interconnects, new lighting, utility be treated and diverted from the Pier condition. Tetra Tech's scope of adjustments, relocation of existing watershed to the Santa Monica Urban services includes topographic survey, catch basins, and design of a parking Runoff Recycling Facility or the sanitary engineering design, design support lane with innovative buffer treatment sewer. The project proposes storm during construction, and construction to separate it from the eastbound drain diversion and runoff storage management services for various high-speed travel lanes. Tetra Tech also systems at two separate storm drain access ramps throughout the City, in led a series of outreach meetings with outlalis. compliance with the Americans with the Community Advisory Committee Disabilities Act. and the residents to obtain input and Stormwater Capture Parks
consensus in the design process.

Program, City of Los Angeles, 67th Street and West Boulevard Bureau of Engineering, Los Civil Improvements, City of Los Shell Beach Road Streetscape, Angeles, CA. Project Engineer/ Angeles, Bureau of Engineering, City of Pismo Beach, Pismo Beach, Assistant Project Manager. Currently Los Angeles, CA. Civil Engineer CA. Project Engineer responsible leading the preparation of PS&Es for responsible for drainage study and for the preparation offinal PS&Es for four stormwater capture projects as desian of street improvements. reconstruction of 18 blocks of Shell part of the second largest stormwater Tetra lech is providina pre-design Beach Road. Specific tasks included program undertaken in the state's and detailed design services for this performing a study to determine history. The Program will capture street improvement project. The optimal areas for LID improvements, up to 2,912 acre-feet of stormwater project entails street improvements grading study at crosswalks and and urban runoff per year from a for approximately six city blocks. intersections to achieve ADA 5,686-acre drainage area and divert Project elements include sidewalk compliance, vehicle turning study, and runoff into subterranean infiltration improvements, curb ramp upgrades, a study to maintain clear sight lines. The galleries, or other stormwater capture driveway approach reconstructions, project incorporated new wayfinding and infiltration infrastructures located roadway resurfacing, tree pruning, and and streetscape enhancements under the City's parks, for infiltration curb and gutter reconstruction. Tetra including pavement enhancements into the underlying San Fernando Tech is providing pre-design and design at crosswalks and intersections, full Groundwater Basin. The goal of the services, including 100% PS&Es, survey ADA compliance, street furniture and Program is to alleviate local flooding, services, public outreach/stakeholder landscape improvements. The project increase water supplies through engagement, and environmental also replaced aging utilities, including stormwater capture, improve water documentation (CEQA). a new 12-inch water line, new 12-inch quality, and provide recreational, reclaimed water line, undergrounding social, and economic benefits. power and communication lines, and new storm drain improvements.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
19 Years of Experience
Molly Lovegren, PE
BS Civil & Environmental Engineering, University of California, Los Angeles
WATER/SEWER/ STORMWATER PE California Professional Engineer, No. 73957

ENGINEERING
For 19 years, Ms. Lovegren has provided design engineering in various water and wastewater projects, including domestic and reclaimed water pipelines, water main replacements, gravity sewer mains, pump stations, lift stations, reinforced concrete reservoirs, flow control facilities, and pressure reducing valve vaults. She is responsible for preparing construction plans and specifications, performing design calculations, and creating project memorandums.

RELEVANT PROJECTS
Newport Boulevard Water Main providing all design-build services North Hollywood Operable Rehabilitation, City of Newport required to design and construct Unit Permanent Intertie Pipeline Beach, CA. Design Engineer. a fully operational reverse osmosis Design Services, Lockheed Martin, Provided engineering support for water treatment plant including, Los Angeles County, CA. Project the replacement and rehabilitation of but not limited to cartridge filters, Engineer. Part of a larger plan that the existing 20- to 16-inch cast iron pretreatment chemical systems, expands the amount of groundwater pipeline constructed in the mid-1920s. high pressure feed pumps, reverse extracted and treated from the San The pipeline is vital as it provides osmosis treatment trains, membrane Fernando Valley Basin, which is an water and fire flow protection to clean-in-place system, decarbonators, important source of drinking water for the businesses and residents in the post treatment chemical systems, the Los Angeles metropolitan area.

Newport Bay and Peninsula area. concentrate disposable system and Upon completion, the proposed 18- pipeline, supervisory control and data inch intertie pipeline will meet potable The La Salina Wastewater
acquisition, 120,000 gallon clearwell, water delivery requirements of 4,670 Treatment Plant, City of Oceanside,
product water pump station, plant acre-feet per year while operating at a CA. Project Engineer. This project flow velocity of less than seven feet per consisted of demolishing the plant and discharge system to storm drain, treatment plant building, auxiliary second (FPS) and will have an average replacing it with a new 5 MGD sewer
building structures, and electrical and working flow rate of 3,500 GPM and lift station to convey wastewater from
instrumentation. The Reverse Osmosis maximum rate of 5,500 GPM. The the collection area to the San Luis Rey
Treatment Plant is sized to produce pipeline will connect an existing 20-inch Reclamation Facility, benefiting future BWP water main to a 16-inch buried reclaimed water treatment expansion 6.27 mgd of product water. Water will be treated to remove salts (TDS) and vertical riser (intertie) connected to a 78- and indirect or direct potable reuse.

Tetra Tech prepared a preliminary nitrates. The project included design inch LADWP water main RSC currently of plans, specifications, and engineer's being constructed approximately 25 design report that included evaluation feet below grade. of several site plan layouts, evaluation
of several alternative force main Warner Industrial Park Sewer Carlsbad Seawater Desalination discharge alignments, geotechnical Replacement, City of Santa Ana, CA. Conveyance Pipeline, Conveyance investigation, EIR preparation, 30 Design Engineer. Responsible for the Pipeline Design-Build Project, bercent discharge force main desian design and construction support of a KSD Joint Venture, Carisbad, CA. plans, and final design plans for the sewer and water pipeline replacement Design Engineer. Mr. Lovegren oversaw new lift station. The new lift station will and upgrade project. The project pipeline and manhole rehabilitation for be equipped with a load equalization entailed construction of approximately the project to design approximately 10 tank to accommodate peak flows, a 8,200 feet of 8-inch water main, miles of 54-inch welded steel pipe. The two-hour emergency standby tank, a approximately 7,200 feet of 8-to 15- pipeline is being installed in existing standby generator, and odor control inch sewer pipe, a double barrel HDPE city streets and right-of-way through facilities. In addition, the project will siphon, 28 manholes, and 6i lateral the cities of Carlsbad, Vista, and San demolish, redesign, and reconstruct connections. The scope also included Marcos. Large diameter tunnels are an existing 1 MGD dry weather flow performing flow monitoring analysis being used to cross a major commuter stormwater treatment facility that and condition assessment to determine rail line, an Interstate Highway, and conveys dry weather flows from Loma the best pipe sizing and developing protected wetlands at the entrance Alta Creek. specs for sewer bypass pumping to a seawater lagoon. The 54-inch during construction. Key to successful transmission main was sized for 54 Design-Build of Well No. 21 and
Well No. 22 and Reverse Osmosis completion of this project was adhering million gallons per day of desalinated to the schedule throughout the project seawater. Pressures range from 250 psi Treatment Plant, Irvine Ranch
duration in order for the City's street at the point of connection to 500 psi at Water District, Irvine, CA. Design the seawater desalination plant. baving project to remain on schedule
Engineer. Wells No. 21 and No. 22
Reverse Osmosis Treatment Plant was
constructed to provide a new potable
water source. The work consisted of

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
10 Years of Experience
Elias Sebhatu, PE
BS Civil Engineering, California State Polytechnic University, Pomona

WATER/SEWER/ STORMWATER
PE California Professional Engineer, No. 91276

ENGINEERING
Mr. Sebhatu has provided design engineering in various water and wastewater projects including domestic water pipelines, water main replacements, gravity sewer mains, gravity force mains, pump stations, lift stations, reinforced concrete reservoirs, steel tank reservoirs, flow control facilities, and pressure reducing valve vaults. Responsibilities have included preparation of construction plans, specifications, and design calculations; assisted supervisors in preparing project memorandums and project schedules; and organized office technical library.

RELEVANT PROJECTS
Newport Boulevard Water Main for Orange County Water District. In Techite sewer force main with Laguna Rehabilitation, City of Newport addition to the engineering services Niguel Regional Park. Regional Lift Beach, CA. Design Engineer. for the four injection wells, the project Station and Force Mains are critical Provided engineering support for includes the design of the supply wastewater facilities that pump flow the replacement/rehabilitation of the pipeline, backflush pipeline, bridge from MNWD sewer collection system existing 20/16-inch cast iron pipeline crossing, two shared facility sites, a to South Orange County Wastewater constructed in the mid-1920s within monitoring well site, site improvements, Authority Regional Treatment Plant. The Newport/Balboa Boulevard from and paving of park access roads and replacement force main consists of dual the intersection of Via Oporto and parking lots. 24-inch pipeline approximately 8,000 Central Avenue to the intersection of Recycled Water Distribution System feet length and will be constructed with Balboa Boulevard and 19th Street. This Laguna Niguel Regional Park. Scope of Expansion, El Toro Water District, services include preliminary design, final pipeline is vital as it provides water and Laguna Woods, CA. Design Engineer. fire flow protection to the businesses design and construction phase services.

Design Engineer for the design of over
and residents in the Newport Bay and 20 miles of recycled water pipelines for City of Santa Monica Equipping the El Toro Water District's - Recycled of Three Wells, Santa Monica, Beacon Hill Pump Station Water Distribution System Expansion CA. Civil Engineer. Tetra Tech is Rehabilitation, Moulton Niguel Project. The pipelines range in size providing preliminary and final design, Water District, City of Laguna from 4-inch to 20-inch in diameter, and permitting, bidding, and construction Niguel, CA. Project Engineer. Total convey up to 775 acre-feet oftertiary services for three municipal drinking station rehabilitation including treated recycled water per year. The water wells, ranging from 300 to replacement of all mechanical/ major customer being served recycled 800 gpm. This project consists of electrical components; a diesel engine- water is the Laguna Woods Village two potable water extraction wells driven high-flow pump/standby Home Owners Association (formerly and one water injection/extraction generator; on-site potable water Leisure World). well. All three wells are located within piping, and site restoration. Evaluated the large, grassy median of Olympic Peters Canyon Channel Water
two design options from a conceptual Boulevard at separate sites in the city Capture and Reuse Pipeline, Irvine
level prior preliminary design. of Santa Monica. The wells are located Ranch Water District, Irvine, CA. thousands of feet apart, and each well Alternative 1: Replace Beacon Hill Design Engineer. Design Engineer for with a temporary bypass at either Bear over 17,000 linear feet of 10-inch to site is configured to contribute to the Brand or Golden Lantern RW Pump 16-inch steel and PVC pipeline. This was aesthetics and function of the area. Tetra Station. Recommended Alternative 2: Tech's design left adequate room within a joint project with the City of Irvine,
construct a new station at Bear Brand. City of Tustin, County of Orange, and the median for public access past the Scope included project administration, Caltrans, Proiect included three storm well sites without getting too close to QA/QC, potholing, geotechnical drain diversion structures and intake traffic. We addressed project security exploration, design survey, preliminary design, hanging the pipeline from and aesthetics by including a wall and final design, asset register, permit two bridges, bore and jack under the around the site, which was designed support, bidding phase services, and railroad and backpressure vault. with the assistance of a local artist to construction phase services. emulate the water aquifer, sedimentary Regional Lift Station Force Main materials, and water wells and provide Mid-Basin Injection: Centennial Replacement, Moulton Niguel Park Design Services, Orange security, improved aesthetics, and Water District, Moulton Niguel, public awareness for the City's water County Water District, Santa Ana, CA. Design Engineer. Design Engineer supply..

CA. Design Engineer. Design Engineer providing engineering services for the responsible for the design of four replacement of approximatelv 15,000 injection wells to be located within linear feet of 20-inch and 24-inch Centennial Park in the City of Santa Ana

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
16 Years of Experience
Amanda Taylor, pe MS Environmental Engineering and Science, Johns Hopkins University
WATER/SEWER/ STORMWATER BS Biological Systems Engineering, Virginia Polytechnic Institute and State University
ENGINEERING PE California Professional Chemical Engineer, No. 6700 Ms. Taylor is a skilled professional with extensive experience in the analysis and process design of municipal and industrial water and wastewater projects. Her expertise spans both traditional and advanced treatment systems, including Title 22 compliance, microfiltration, ultrafiltration, reverse osmosis, and UV treatment. She also has specialized experience in designing adsorptive media processes for trace organic and PFAS removal. Additionally, she is proficient in designing control systems for municipal plants.

RELEVANT PROJECTS
SGU PFAS Treatment Plant, Irvine also includes chemical storage and feed Well No 1 PFAS WTP, City of Bell Ranch Water District, Irvine, equipment for conditioning, stabilizing, Gardens, CA. Process Engineer. Final CA. Process Engineer. Design and and membrane cleaning. Influent flow design to provide PFAS treatment at Well construction support for 12 shallow storage, flow diversion, and associated #1. Plant designed to treat flow from one wells affected by very high VOC pumping included in tacilities design well with a total capacity of 2.9 MGD levels and PFAS on site of former El Provided detailed process design P&IDs Treatment processes included 5-micron Toro Marine Base. Design included and developed detailed process control cartridge filters, ion exchange pressure GAC treatment and replacement of plant narrative, including direct-coupled vessel contactors, and new chemical an air stripper system. City required UF-RO system which operated without a feed facilities for sodium hypochlorite. permitting on pipeline. break tank, chemical systems, feed, and Hyperion WWTP, Los Angeles product water pump stations. Provided Wastewater Integrated Network PFAS Study for Wells ET-1, ET-2, and
construction support. Systems, Playa Del Rey, CA. Lead
78, Irvine Ranch Water District,
Irvine, CA. Lead Process Engineer. John Garthe Reservoir PFAS Process Engineer. Upgraded DCS Study to determine options to add Treatment, City of Santa Ana, controls for LA Bureau of Sanitation PFAS treatment to an operating VOC CA. Process Engineer. Final design wastewater infrastructure. Process air stripper. Well ET-l operates at 2.0 for providing PFAS treatment at site included documenting over 60,000 MGD through a tray air stripper that supplied by five wells producing up to wire terminations and design control discharges into a small wet well with a 13.8 MGD. New centralized treatment strategies of new applications. Directed single booster pump station. Plant is on plant designed to remove PFAS from a team in design of Hyperion WWTP a small lot with limited space. Provided well supply line before storage at new Honeywell DCS control strategy water quality analysis, options for IX or reservoir. Treatment equipment included and field verification of equipment and GAC treatment, and analysis of adding 5-micron cartridge filters, ion exchange instrumentation processes and controls Wells ET-2 and 78 to project if affected pressure vessel contactors, and new at Terminal Island Water Reclamation by PFAS. Prepared capital and O&M on-site generation, storage, and feed Plant. costs. facilities for sodium hypochlorite. Domestic Water Temporary Pure Water Oceanside Advanced Evaluated well pumps individually and Treatment System, Metropolitan Water Purification Facility, City of replaced or modified to meet new plant Water District of Southern California, and system demands. Los Angeles, CA. Project Engineer. As Oceanside, CA. Process Engineer.

To counteract growing reliance on SJVWB-ERRP Phase 1 Well Equipping part of a design-build team, contributed imported water supply while increasing and Treatment Facilities, Eastern to development of two temporary water local water supplies and to meet Municipal Water District, San Jacinto, treatment systems for district. These city's long-term goal of 50% water CA. Project Engineer. Design of a new systems, essential during demolition of independence by 2030, designed 8.64-MGD centralized treatment plant existing infrastructure and construction a new Advanced Water Purification based on recommendations offered of a new permanent facility, included Facility (AWPF). Proposed AWPF during preliminary design report components such as a membrane provides highly treated water supply prepared under a separate task order. filtration unit, granular activated carbon to recharge MGB in the upper San Central groundwater treatment plant vessels, booster pump station, sodium Luis Rey recycled water service area includes greensand plus pressure filters hypochlorite feed system, compressed through indirect potable reuse as a for iron and manganese removal and air system, water quality monitoring component of an overall project titled disinfection and option to expand to equipment, and controls. Mobile skid- Pure Water Oceanside. AWPF built on four double-the-flow capacity to iron mounted systems designed to be easily a former recycled water storage pond and manganese removal equipment and installed and removed with external at the San Luis Rey WRE. AWPF process triple-the-flow to disinfection system. connections for influent and effluent designed as a multi-barrier treatment Design included a backwash reclaim ensuring required flow rates maintained process including microfiltration, reverse system and bulk sodium hypochlorite throughout project. osmosis (RO), and ultraviolet advanced storage and dosing facilities. oxidation processes (UVAOP). AWPF

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
Russell Boudreau, PE 34 Years of Experience
BA Applied Mechanics University of California, San Diego OCEAN ENGINEERING MS Coastal and Ocean Engineering University of California, Berkeley
PE California Professional Engineer, No. 041810
Mr. Boudreau is a principal coastal engineer with over 34 years of relevant experience, serving as both project engineer and project manager on a wide range of projects involving coastal processes, environmental restoration, and shore protection. Mr. Boudreau's experience in these areas ranges from planning and design through permit acquisition, preparation of final design documents and construction management. He brings tested coastal engineering solutions to accelerating coastal erosion and sea level rise. He has served as a project manager and principal for studies and projects that support coastal and waterfront clients seeking planning strategies to manage the threat of sea level rise, including living shoreline projects to protect critical infrastructure including a major coastal highway and wastewater treatment facility. Prior to joining Coastal Frontiers in October 2020, Mr. Boudreau supervised the coastal engineering department at Moffatt & Nichol in Long Beach, California.

RELEVANT PROJECTS
Capistrano Beach Park Shore establishment of a Sea Level Rise fleet which utilized that same ocean Protection Study, Capistrano Beach, Task Force comprising a broad range entrance location at Anaheim Bay.

CA. Project manager and engineer for a of public and private stakeholders. Coastal engineering studies included project to evaluate shoreline protection Deliverables included preparation of the vulnerability assessment and adaptation alternatives using sand-filled geotextile Vulnerability Assessment and the Coastal for sea level rise, circulation and water containers in lieu of stone, as required Resiliency Plan. The reports prepared quality modeling, dredging design, by the California Coastal Commission under Mr. Boudreau's guidance acted as environmental mitigation design, and Coastal Development Permit. Coastal "bridge documents" for that effort, and boat traffic studies for the new public Frontiers Corporation has developed were prepared using the latest guidance navigation channel. reliable sand-filled geotextile shore from the California Coastal Commission Dana Point Harbor Dredging and protection based on decades of on SLR studies for LCP updates. Beach Nourishment, Dana Point, successful application in Alaska and Huntington Bluffs Shore Protection CA. Project manager who provided a California. Assessment, City of Huntington full range of services for maintenance Sea Level Rise Vulnerability Beach, CA. Project manager and dredging of Dana Point Harbor for the Assessments and Coastal engineer the investigation of shore County of Orange. Project elements Development Permit Support, protection alternatives for the eroding included initial planning, coordination Long Beach, CA. Mr. Boudreau has bluffs on the City shoreline which is ofall permits, preparing construction been working closely with the City of resulting in upland land loss including documents, bid assistance and Long Beach Tidelands staff to evaluate threat to public access and utilities. Mr. construction support. Identified beach the vulnerability to and adaptation Boudreau developed an innovative quality dredged material to be placed strategies for accelerating sea level rise approach to salvage remnant revetment on the adjacent down-coast beach and for various coastal capital improvement stone along the shoreline which has no the interior harbor swimming beach. and/or restoration projects including current shore protection value and is Finer-grained material was specified to a new public pool/aquatic facility considered a negative impact on the be disposed offshore at a designated and the rebuild of an existing junior public beach. By removing the remnant offshore disposal site. lifeguard building. Planning efforts stone and relocating it landward to Cardiff Beach Living Shoreline, included including close coordination the bluff toe and constructing a more City of Encinitas. Project engineer with the California Coastal Commission engineered revetment would result in for a living shoreline project to protect
staff at the staff level through senior arresting future bluff failures and reduce transportation infrastructure (Coast management. the "footprint" of rock shore protection Highway 101), environmental resources General Plan Update - Sea Level Rise on the existing beach. (San Elijo Lagoon), public access Assessment, Huntington Beach, CA. P-224/226 Causeway, Boat and utilities. The project comprises a Mr. Boudreau was lead coastal engineer Channel, Turning Basin and buried rock revetment, constructed as part of a planning team tasked Ammunition Pier, Naval Weapons of both salvaged from the beach and with updating the City's General Plan. Station Seal Beach, Seal Beach, CA. imported stone, covered by a planted High priority items included the SLR Lead coastal engineer for planning dune constructed beach/dune quality vulnerability assessment and adaptive through design of a major naval port sediment from the adjacent San management strategies. Threatened infrastructure improvement project. Elijo Lagoon restoration project. The infrastructure includes world class Key project elements included a new project will beneficially re-use dredged beaches and pier, pedestrian and bike relocated and expanded ammunition sediment from ongoing lagoon access ways, parking lots, Pacific Coast wharf, construction of a new wharf maintenance dredging to adaptively Highway, power plant and others. A access causeway, and construction manage the dune and fronting beach key element of the General Plan Update of a new public navigation channel to volumes, which will be critical element of was focused public outreach including accommodate the large public vessel the project under future sea level rise.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
Gregory Hearon, PE 30 Years of Experience
OCEAN ENGINEERING BS Ocean Engineering, Florida Institute of Technology MS Civil Engineering, Oregon State University
PE California Professional Engineer, No. 60328
Mr. Hearon has extensive experience in the fields of coastal engineering, coastal oceanography, and oceanographic data acquisition. His project involvement includes field data acquisition and analysis, project design, construction advisory, and performance monitoring. He routinely undertakes both office and field studies for projects in temperate and Arctic environments. While serving as the project engineer for the Corps' Coast of California Storm and Tidal Waves Study - Orange County, Mr. Hearon analyzed beach and nearshore survey data encompassing a 32-year period to quantify historical shoreline and volume changes in the Huntington Beach and Seal Beach Littoral Cells. The study included a comprehensive evaluation of beach nourishment operations at Surfside-Sunset and West Newport and the development of a budget of sediment. Mr. Hearon is a member of the American Shore and Beach Preservation Association. He was a co- author for the California Beach Restoration Study. As a certified SCUBA diver, he has performed underwater inspections and deployed oceanographic instrumentation both in California and the Alaskan Arctic. He is a licensed professional engineer in the states of California and Alaska.

RELEVANT PROJECTS
CA Department of Boating and SANDAG Regional Beach addition, the functional effectiveness Waterways - California Beach Monitoring Program San Diego and structural integrity of the Restoration Study, CA. Primary County, CA. Conducting ongoing breakwater were assessed in terms of Investigator reporting on the California shoreline monitoring program for the wave overtopping, wave transmission, Public Beach Restoration Program on region. Semi-annual beach profiling on and armor stability. Recommendations behalf of the Dept. of Boating and up to 47 transects between Oceanside for repairs were developed and a plan Waterways; Objectives were to detail and Mexican Border; coastal lagoon set and specifications were prepared. the program activities, assess the entrance assessment; Oblique aerial Los Angeles County Offshore Sand need for continued beach restoration, photography at RBSP sites and lagoons; Characterization Study, Los Angeles and evaluate the effectiveness of the Detailed analysis of coastal changes County, CA. Conducted sediment program. and evaluation of natural events (El
sampling program to characterize
Niño) and human intervention (beach potential offshore sand sources for US Army Corps of Engineers-
nourishment); Program conducted a proposed beach nourishment Oceanside Feasibility Study, San
Diego County, CA. Project manager annually since 1996. program, Sites in Los Angeles County for a two-phase numerical modeling Baby Beach Water Circulation included Zuma Beach, Corral Canyon, effort conducted for the US Army Study, Dana Point Harbor, CA. Dockweiler and Manhattan Beach.

Corps of Engineers to quantify the Performed a fluorescent dye tracer Twenty foot cores were obtained at influence of Oceanside Harbor on study to assess the effectiveness of multiple locations at each investigation historical shoreline change, forecast Oloid water circulation devices at area, and the physical and chemical future shoreline evolution and Baby Beach located in Dana Point properties ofthe material were coastal storm impacts, and assess Harbor. The objective was to provide documented. the effectiveness of a variety of shore suitable calibration data for a numerical protection alternatives. Coastal model and to determine if mechanical storm effects, consisting of wave circulation could improve the water overtopping, bore propagation, wave quality. Dye was released at the project forces associated with the bore, and site and tracked throughout the harbor revetment damage, were calculated with a flourometer operated from a concurrently with shoreline evolution. small boat equipped with a precision Coastal Trail Access Ways, City of GPS positions.

San Clemente, CA. Conducted a Port San Luis Breakwater
detailed coastal engineering analysis Comprehensive Condition to support design of the San Clemente Survey and Repairs, San Luis Coastal Trail Access Ways. The Obispo County, CA. Lead engineer evaluation included developing design for a US Army Corps of Engineers oceanographic conditions (25-yr and comprehensive condition survey of 100-yr waves and water levels); Beach the Port San Luis Breakwater in Avila response to storms, Wave runup and Beach, CA. Evaluated the condition of overtopping; Wave induced scour, the rubble mound breakwater based on Wave forces; and revetment armor bathymetric and topographic surveys, stability. site inspections, and assessment
of construction/repair records. In
REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH nE City of Huntington Beach
18 Years of Experience
Eric Yuen, PE, SE MS Structural Engineering, California State Polytechnic University, Pomona
PE California Professional Engineer, No. 75983

STRUCTURAL ENGINEERING
SE California Professional Structural Engineer, No. 6177 Mr. Yuen has 17 years of experience in the design, analysis, and detailing of structures with special emphasis on the design of water storage/ water containment and water conveyance-related structures, including reservoirs, design water/wastewater treatment plants, booster pump stations, flow control facilities, pressure reducing stations and pipelines.

He is knowledgeable in all types of construction including reinforced concrete, masonry, structural steel, and wood frame design. He also has extensive experience with seismic evaluation, assessment, strengthening, retrofit, and replacement of existing structures.

RELEVANT PROJECTS
Well Site Improvements, Irvine John Garthe Reservoir PFAS As-Needed Structural Engineering Ranch Water District, Irvine, CA. Treatment, City of Santa Ana, CA. Services, San Diego County Water Structural Engineer. Designed site Structural Engineer. Final design for Authority, San Diego, CA. Project improvements and construction for PFAS treatment at John Garthe site, Engineer for the following task orders:
groundwater Wells 6, 12, 14, and 15 supplied by five wells to produce up to San Diego 12 Flow Control Facility including assessments of mechanical, 13.8 MGD. New centralized treatment (Q0333); Carlsbad 5 Flow Control structural, civil, and instrumentation plant removes PFAS from well supply Facility and Pressure Reducing and control systems. Conducted a field line prior to storage at reservoir. Facility (KO307); San Vicente Dam visit to sites and prepared a conditional Treatment equipment includes Low Level Outlet Structure (NO406); assessment memorandum of all 5-micron cartridge filters, ion exchange Fallbrook 4/Rainbow 7 Flow Control equipment and site features required to pressure vessel contactors, new on- Facility (Q0303); Hubbard Hill properly operate them. site generation, and storage and feed North (Q0204); Hubbard Hill North facilities for sodium hypochlorite. - Geotechnical; and MTFRS CL2 Pure Water Oceanside, Advanced Evaluated well pumps on an individual System-Facility Improvement Design.

Water Purification Facility, City of basis and will replace or modify as Oceanside, CA. Structural Engineer. San Lorenzo Sewer Lift Station, needed to meet new plant and system City of Santa Ana, CA. Structural To counteract the growing reliance
demands.
on imported water supply while Engineer. Design engineering for increasing local water supplies, and SGU PFAS Treatment Plant, Irvine preparation of plans, specifications, to meet the City's long-term goal of Ranch Water District, Irvine, CA. and cost estimates to construct a 50% water independence by 2030, Structural Engineer. Design and new sewer lift station on San Lorenzo the City has selected a team led by construction support for 12 shallow Avenue. New lift station replaces a Tetra Tech to design a new Advanced wells affected by very high VOC levels smaller submersible lift station located Water Purification Facility (AWPF). The and PFAS located on site of former El within Bristol Street, a heavily traveled newly proposed AWPF will provide Toro Marine Base. Design included arterial. Project included preliminary highly-treated water supply with the GAC treatment and replacement of design including pump selection, specific purpose to recharge the MGB an air stripper system. City required hydraulic analysis, pipeline alignment, in the upper San Luis Rey recycled water pipeline permitting. and site and building layout studies. service area through indirect potable Prepared an environmental impact reuse as a component of the overall Kimberly 1A PFAS, Orange County report and incorporated mitigation Water District, Fullerton, CA. measures into final design.

Pure Water Oceanside project. The Structural Engineer. Prepared plans AWPF will be built on an existing former and specifications for construction Challenges included deep excavation recycled water storage pond at the San (approximately 35 feet), a tight site of a PFAS system. Fullerton Main requiring vertical shoring, heavily Luis Rey Water Reclamation Facility. Plant treats six on-site wells with a The AWPF process will be designed total capacity of 10,100 GPM. PFOS, traveled streets, adjacent residences as a multi-barrier treatment process and businesses, and maintaining flow including microfiltration, reverse within sewer system. vast dang nore, 40
osmosis, and ultraviolet advanced
oxidation process. In addition to these
pumped into distribution system.
three main unit treatment processes,
Remaining wells treated with an
the AWPF will include chemical storage Ion Exchange system consisting and feed equipment for conditioning,
stabilizing and membrane cleaning. The of eight vessels and bag filters for pre-treatment. New wellhead
facilities design also includes influent construction requires demolition of flow storage, flow diversion, and light frame metal pump building and associated pumping. concrete pump pedestal.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
15 Years of Experience
Mike Olsen, PE IS Civil Engineering (Structural Emphasis), Calitornia Stai olytechnic University, Pomon
BS Civil Engineering, California State Polytechnic University, STRUCTURAL ENGINEERING Pomona
PE California Professional Engineer, No. 81944
With over 15 years of structural engineering experience, Mr. Olsen is a structural project manager with expertise spanning design, analysis, and detailing for reinforced concrete, masonry, steel, and wood frame structures. Mike's diverse portfolio includes stormwater infrastructure, water and wastewater treatment facilities, pedestrian bridges, reservoirs, and seismic retrofits. His leadership in managing multidisciplinary teams and delivering complex projects-from the development of stormwater capture systems to regional transportation infrastructure-demonstrates his technical acumen and project management capabilities.

RELEVANT PROJECTS
Huntington Beach Bridge reduces pollutants being discharged Canyon Trail Corridor provides access Preventative Maintenance, City into the watershed. The project captures for cyclists, hikers, and equestrians and of Huntington Beach, CA. Project runoff from the 23-acre drainage area connects the Santa Clarita Valley to the Manager responsible for overseeing into the infiltration system located northeast San Fernando Valley. In order preparation of plans, specifications, underneath the parking lot, eventually to preserve the natural environment, the and estimates (PS&E) to rehabilitate recharging the groundwater table. 0.8-mile extension of the multi-use trail the Golden West Street bridge (No. will require two (2) prefabricated steel Santa Monica Clean Beaches
55C0124). The project involved bridges. The project started and was Initiative for Pier and Pico-Kenter successfully completed by June of 2024. various work items including joint sea!
assembly replacement, methacrylate Basins, City of Santa Monica, Public Works Department, Santa Monica, Arroyo Park Pedestrian Bridge application to bridge decks, epoxy Replacement, City of Santa Clarita, CA. Structural Design Lead. Mr. Olsen
injection of concrete cracks, and was responsible for the structural design Santa Clarita, CA. Engineer of spalled concrete repair with polyester
of the site improvements, diversion Record and Project Manager. The City polymer patching systems. The repair structure, pretreatment, underground of Santa Clarita in conjunction with plan for each structure was field verified the Landscape Maintenance District, storage reservoirs, and piping systems.
with City representatives to confirm maintains 25 pedestrian bridges and County recommended repairs and The project objective was to improve Santa Monica Beach water quality by 5 under crossings that link the paseo identify any additional repair items to increasing the diversion capacity at system in the Valencia North and South be included in the work plan. Tetra Tech
the Santa Monica Pier and Pico-Kenter neighborhoods in the City of Santa staff worked closely with City staff to storm drain outfalls. The 85th percentile Clarita. The City proposes to replace accelerate the design process and meet storm event volume will be treated and the last timber bridge located on the City's budgetary needs. The City diverted from the Pier watershed to the Arroyo Park Drive, 0.6 miles west of has awarded construction contracts to
Santa Monica Urban Runoff Recycling McBean Parkway, with a pre fabricated rehabilitate several sets of bridges in the steel truss structure. Tetra Tech was Facility (SMURRF) or the sanitary sewer.
last few years. Repairs were completed The project proposes storm drain hired to finalize the design and successfully. Tetra Tech is currently diversion and runoff storage systems complete detailed construction Plans, providing construction support through
at two separate storm drain outfalls, Specifications, and Estimate (PS&E) of field meetings, clarification to the routed to two subsurface storage areas. the proposed bridge replacement and contractor, and submittal review. additional support services as needed

1.6 million gallons will be stored at the
Santa Ana Downtown Flood historical Deauville Beach Club site and by the City. The biggest challenge Reduction and Stormwater an additional 80,000 gallons will be that faces the Arroyo Park Pedestrian Infiltration, City of Santa Ana, CA. stored at the Pico-Kentor storm drain Bridge Replacement project is Arroyo Structural Design Lead and Engineer of Park Drive itself. Arroyo Park Drive is Record. Developed design documents, a residential roadway and has traffic Sand Canyon Trail Pedestrian throughout the day. Coordination hydrology calculations, and coordinated Bridges for the City of Santa Clarita, various project disciplines. Located during the demolition of the existing in downtown, the City of Santa Ana is Santa Clarita, CA. Project Manager bridge and during final assembly and and Engineer of Record. Mr. Olsen erection of the new pre-fabricated reconstructing the 3rd Street parking served as Engineer of Record (EOR) lot to incorporate Best Management bridge will be key to the project and Project Manager for the design success. These major construction Practices (BMPs). Surrounding catch and construction phase portions of this basins and storm drains are being activities will most likely require full project. Tetra Tech provided detailed closure of Arroyo Park Drive. Tetra Tech reconstructed to divert stormwater
bridge design engineering services is experienced in the preparation of into the parking lot for treatment and
infiltration. The improvement in drainage including crossing plans, foundation traffic control plans within the City and details, performance specifications for
and treatment alleviates flooding that will work once again to minimize the pre-fabricated bridge elements, cost
occurs in the surrounding area and estimates and specifications. The Sand impact to the public.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
32 Years of Experience
Mazen Kassar, PE BS Electrical Engineering, California State University, Long Beach PE California Professional Electrical Engineer, No. 15809 General Construction, Class B, California, No. 777845
ELECTRICAL/SCADA Class C-Specialty, No. 777845
Mr. Kassar is experienced in electrical engineering and industry standards that include electrical engineering staff management, project management, construction management and supervision, water and wastewater treatment, petro-chemical design, and environmental soil and groundwater treatment. His background includes designing medium and low voltage power distribution, designing instrumentation, control systems and SCADA systems for a wide-variety of projects, and the installation of electrical systems for remediation projects, including soil vapor extraction systems and groundwater pump-and-treat systems. Other experience includes, working with utility companies to provide new electrical service to new projects, working with local Building and Safety Departments to obtain Plan Check and construction permits, field trouble shooting of electrical and mechanical systems, system commissioning and startup, problem solving, and managing an operation and maintenance department.

RELEVANT PROJECTS
Well Site Improvements, Irvine City of Santa Monica Equipping and stormwater runoff from the Del Ranch Water District, Irvine, CA. of Three Wells, Santa Monica, Amo channel through a pretreatment Electrical/SCADA. Designed site CA. Electrical Engineering Manager. system to remove trash, debris, improvements and construction for Tetra Tech is providing preliminary and sediment. A pump station and groundwater Wells 6, 12, 14, and 15 and final design, permitting, bidding, drainage pipeline will convey the including assessments of mechanical, and construction services for three water into a large, buried multi- structural, civil, and instrumentation municipal drinking water wells, chambered storage/infiltration and control systems. Conducted ranging from 300 to 800 gpm. This facility. The stormwater collected in a field visit to sites and prepared a project consists of two potable the underground reservoir will be conditional assessment memorandum water extraction wells and one water treated and used to irrigate the park's of all equipment and site features injection/extraction well. All three landscaped areas. The system will required to properly operate them. wells are located within the large, monitor the weather conditions and grassy median of Olympic Boulevard the facility through a secured cloud- Santa Monica Clean Beaches
at separate sites in the city of Santa based system. The underground Initiative, City of Santa Monica, Monica. The wells are located storage system is 2.8 million gallons Santa Monica, CA. Electrical thousands of feet apart, and each well (8.7 ac-ft). The goal of the project Engineer. Mr. Kassar was responsible is to not only help the City comply site is configured to contribute to the
for providing electrical engineering aesthetics and function of the area. with the metals Total Maximum Daily design services in support of site Tetra Tech's design left adequate room Loads (TMDLs), as presented in the improvements, a diversion structure, within the median for public access Los Cerritos Channel Watershed pretreatment, underground storage Management Program, but also past the well sites without getting too
reservoirs, and piping systems for this close to traffic. We addressed project provide additional benefits, such as stormwater management project. security and aesthetics by including revitalized park infrastructure and The project objective is to improve augmentation of local water supplies. a wall around the site, which was
Santa Monica Beach water quality
designed with the assistance of a local Loma Linda University Anderson by increasing the diversion capacity artist to emulate the water aquifer, at the Santa Monica Pier and Pico- No 4 Well, Loma Linda, CA. sedimentary materials, and water Electrical Engineer. Created electrical Kenter storm drain outfalls. The 85th
wells and provide security, improved plans, specifications, electrical load percentile storm event volume would aesthetics, and public awareness for be treated and diverted from the Pier schedules, panel schedules, conduit the City's water supply.
watershed to the Santa Monica Urban and wire sizing, electrical details, Runoff Recycling Facility (SMURRF) Bolivar Park Stormwater and emergency standby generator sizing, or the sanitary sewer. The project Runoff Capture Project, City creation of pump control schematics, proposes storm drain diversion and of Lakewood, Lakewood, CA. drafting technical specifications, and runoff storage systems at two separate Electrical Engineer. Mr. Kassar was preforming electrical power system storm drain outfalls, routed to two responsible for providing electrical studies including load flow, short subsurface storage areas. 1.6 million engineering design services in circuit, and arc flash calculations. gallons will be stored at the historical support of preparation of final plans, Design included a new pump, new Deauville Beach Club site and an specifications, and estimates. Tetra PLC system to control well pump, and additional 80,000 gallons will be Tech was contracted to evaluate the a lighting system. stored at the Pico-Kentor storm drain potential site location and develop outfall. this stormwater runoff and capture
project. The project consists of an
air-inflated rubber dam diversion
system to re-direct all urban runoff

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
Johnson Le 10 Years of Experience
BS Electrical Engineering, California State Polytechnic University, Pomona

ELECTRICAL/SCADA
Mr. Le has experience in electrical engineering and industry standard that include water and wastewater treatment, system studies, power distribution, emergency power supply, and motor and instrumentation control.

His background includes designing medium and low-voltage power distribution, microgrids, instrumentation, control systems and SCADA systems, and the installation of electrical systems for remediation projects. Other experience includes, working with utility companies to provide new electrical service to new projects and problem solving

RELEVANT PROJECTS
Well 9 Roof Replacement, City of for the electrical design of the iron and transformers. Power was Huntington Beach, Long Beach, and manganese treatment systems distributed via underground and CA. Electrical Engineer. Mr. Le at well 3 and well 4. Mr. Le created overhead conduits to HVAC, lighting, provided the electrical engineering the single line diagram and panel receptacles, fans, pumps, VFDs, design for the project's power system schedule for the existing wells and controls, security and antenna power and lighting which includes the added the backwash return pump, air system main switchboard. Voltage- preparation of electrical site plans, compressor, and chemical metering drop calculations were performed to single line diagrams, and electrical pump to the load. determine power wiring sizing. Wire details. The wood roof was replaced and conduit sizes were determined Signal Hill Well 8 and 10, City
with metal to provide fire protection to distribute power, controis and and sound attenuation. The existing of Signal Hill, Signal Hill, CA. communications across the site.

Electrical Engineer. Mr. Le created Lighting photometric calculations HVAC system builds up excessive
the record drawings and visited the
heat if the door of the engine room is were performed to determine the site to confirm the equipment layout.
left open, so in response the HVAC Well 8 was demolished and replaced best lighting distribution for exterior was improved with a roof mounted site lighting.
with well 10. The site had a new main
exhaust fan. switchboard, panelboard, automatic Mitsubishi Microgrids for San Beacon Hill Pump Station transfer switch, transformer, control Diego Gas and Electric (SDG&E) Rehabilitation, Moulton Niguel panel, variable frequency drive, substations, Design-Build, Water District, City of Laguna thermostat, and lighting installed. Morrow Meadows Corporation, Niguel, CA. Project Engineer. Total San Diego County, CA. Electrical Oceano Airport Campground Engineer. Tetra Tech is providing station rehabilitation including
Project, Mead & Hunt, Oceano, 30-percent, 90-percent, and issued- replacement of all mechanical/
CA. Electrical Engineer. Provided for-construction civil, structural, electrical components; a diesel
electrical engineering design services
engine-driven high-flow pump/ electrical, and communication design in support of preparation of final for four new SDG&E microgrids, standby generator; on-site potable plans, specifications and estimates. water piping, and site restoration. The work involved coordinating located adjacent to the Boulevard, Evaluated two design options from Clairemont, Elliot, and Paradise a conceptual level prior preliminary with Pacific Gas & Electric to provide SDG&E substations. The electrical and utility power to the new panelboard.
design. Alternative 1: Replace Beacon communication design focus is on the Conduits were installed to provide
Hill with a temporary bypass at equipment selection coordination, power to the new pilot's lounge and
either Bear Brand or Golden Lantern restroom as well as the future wash power supply and communication RW Pump Station. Recommended design, conduit routing, conduit rack, campsite, and modular units.

Alternative 2: construct a new station and wire sizing, site lighting, and at Bear Brand. Scope included Apollo DSS-23 Antenna Facilities site security. The project involved project administration, QA/QC, Design, Goldstone Deep Space working with medium voltage, AC/ potholing, geotechnical exploration, Communications Complex, DC inverters, and DC power. Voltage- design survey, preliminary and Jet Propulsion Laboratories drop calculations were performed to final design, asset register, permit (JPL), Goldstone, CA. Electrical determine power wiring sizing. Wire support, bidding phase services, and Engineer. Mr. Le provided support and conduit sizes were determined construction phase services. in preparation for the electrical to distribute power, controls and engineering design for the project's communications across the site.

Tract 349 Well 3 and 4 Water power system which includes Lighting photometric calculations
Treatment Plant, Water preparation of electrical site plans, were performed to determine the Replenishment District of single-line diagrams, and electrical best lighting distribution for exterior Southern California, Cudahy, details. The electrical system included site lighting.

Huntington Park, CA. Electrical design and product selection for Engineer. Mr. Le provided support medium and low-voltage switchgear

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
Ken Kulonis, PE 48 Years of Experience
BS Environmental Engineering, California Polytechnic State University, San Luis Obispo
MECHANICAL PE California Professional Engineer, No. M27379 Mr. Kulonis has more than 45 years of experience designing mechanical and plumbing portions of construction projects in the commercial, residential, federal, institutional and industrial market segments. His expertise ranges from the design of various types of HVAC and plumbing systems for facilities from pharmaceutical cleanrooms to aircraft hangars, shopping malls, and multi-family residential buildings. Mr. Kulonis' expertise includes energy analysis, LEED analysis, forensic engineering, construction administration, and project management. Mr. Kulonis has worked on projects for the Department of Defense, the General Services Administration, The State of California, large retail companies, large food service companies, and several school districts in California.

RELEVANT PROJECTS
Military Ocean Terminal fire protection, and fire alarm design Building housed influent raw sewage (MOTCO) General Purpose services for the rehabilitation and pump station, sludge storage tanks Maintenance Shop, US Army enlargement of Building 510. and pumping, incinerators, sludge Corps of Engineers, CA. Mechanical dewatering equipment, laboratory, South Gate and Commercial
Engineer. Mr. Kulonis was responsible maintenance shop, locker room, and for preparing design-build plans and Vehicle Inspection Facilities, staff offices. Evaluated feasibility of Travis Air Force Base, US Navy reprogramming building interior after specifications for the installation of
c/o NAVFAC SW, Desert IPT, CA. four recent major WRRF construction new HVAC and plumbing systems. Mechanical Engineer. Mr. Kulonis Tetra Tech was contracted to provide projects were completed. was responsible for comprehensive
final construction documents and
design services for a new 13-acre Anchorage Solid Waste Services specifications for the renovation of an
South Gate facility for commercial (SWS) Central Transfer Station existing building and construction of
vehicle inspection and private vehicle (CTS), Anchorage AK. Mechanical a new military operations building. processing at Travis AFB. The project Engineer. Conceptual design, final The new building will replace an consisted of a truck inspection design, and construction support existing paved driveway and include facility that contained administrative services for the new CTS campus. the construction of a parking lot, space for security forces along Tetra Tech scope includes site layout, driveway, and an 11,765 square.
foot maintenance facility to perform with a kennel for military working structural, mechanical, electrical, dogs. The site layout contained new and plumbing engineering for eight general maintenance. Project roads to incorporate passive AT/ included the design of thick pavement facility buildings, including the new FP design, including berms, swales 75,000 sf transfer station building, slabs using Pavement-Transportation and other traffic obstacles, as well as maintenance building, overhead Computer Assisted Structural
comprehensive upgrade of existing bridge crane, warm storage facility for Engineering (PCASE) software to utilities (water, sewer, storm drain, collection vehicles, and underground accommodate heavy vehicle loading. tunnel with warm storage for vehicles Project achieved LEÉD certification gas, electrical and communication).

City of Kotzebue, Construction overnight.
through implementation of Low
Impact Development (LID) design Administration Services, Construct CE Pavement and strategies for site layout and storm Kotzebue, AK. Mechanical Engineer. Grounds Facility B3223, Eielson water management. This project was Tetra Tech provided construction AFB, National Guard Bureau, AKB. awarded LEED Gold administration assistance services for Mechanical Engineer. Mr. Kulonis the City of Kotzebue Water Treatment is responsible for preparing design Facilities Rehab and Enlargement Plant. Tetra Tech, in association with documents for the construction of Building 510, Air Force Plant DOWL, designed the new plant of the mechanical and plumbing 42, NAVFAC SW, CA. Mechanical and improvements to the water systems for a new vehicle storage Engineer. Mr. Kulonis was responsible distribution system and provided facility. The mechanical systems for preparing Design-Bid-Build plans construction administration services. include radiant in-floor heating. and specifications for an upgraded The new WTP will have a production Heating hot water is generated by a communications hub. Project scope
capacity of 300 gpm with the space vertical heat exchanger which uses included topographic survey of to expand its capacity to 450 gpm. district steam as the primary source
existing site, civil upgrades for a new of heat. Code required ventilation parking lot and upgraded security WRRF Administration Building is provided through a heat recovery fencing. Structural upgrades included Feasibility Study, City of East unit, which recovers heat from the a new concrete shell for blast Lansing, MI. Mechanical Engineer. air being exhausted from the facility
protection and seismic upgrades, WRRF Administration Building and preheats the makeup air from this upgraded mechanical systems, constructed as part of the original exhaust air.
electrical, communications, dry type facility in 1965 and expanded in 1973.

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
19 Years of Experience
Luke Ramirez, PE, LEED AP, PMP BS Mechanical Engineering, University of Washington PE California Professional Engineer, No. 36190
PMP Project Management Professional, No. 2210468

MECHANICAL
Mr. Ramirez provides clients with a variety of HVAC and plumbing designs as well as life-cycle assessment of systems and products. His projects have included designs for municipal, industrial, and commercial facilities, construction administration services for water and wastewater treatment plants, energy audit reports, quality assurance measurement for a utility provider in Colorado, pump replacement analyses and design for the U.S. Fish and Wildlife Service, and mechanical renovation of dorms at Misawa Air Force Base in Japan. In addition, he has designed petroleum systems for hatcheries and mines in Alaska, Colorado, and Nevada.

RELEVANT PROJECTS
Well Site Improvements, Irvine plumbing designs included energy siphons, one to be installed by Ranch Water District, Irvine, CA. modeling, well house, sodium trenchless methods. HVAC, plumbing, Mechanical Engineer. Designed site hypochlorite room, and electrical and fuel oil designs for the pump improvements and construction for room design. The District wishes to station and new generator building. groundwater Wells 6, 12, 14, and 15 operate these well houses at 1 MGD Fruita WWTP Headworks
including assessments of mechanical, initially, but will treat up to 5 MGD Improvements, City of Fruita, CO. structural, civil, and instrumentation within 15 years. Secondary project Mechanical Engineer. Completed
and control systems. Conducted goal is to provide a standard well designs and assisted during
a field visit to sites and prepared a house design for the District to use construction of the headworks conditional assessment memorandum in streamlining future well house improvements. Designs included
of all equipment and site features development and to recognize installation of an odor control system, required to properly operate them. efficiencies in the future. Supported permitting and construction activities new screens, and improvements to Water Treatment Plant Design, concrete structures. Design of ionizing with Cities of Lone Tree and Castle
Lockheed Martin, Beaumont, odor control system to mitigate Pines, South Metro Fire District,
CA. Mechanical Engineer. Design concrete degradation caused by Douglas County, Xcel, and IREA. the unusually high hydrogen sulfide of a water treatment plant to treat
chlorinated solvents, perchlorate, South Boulder Dam Trunnion concentration in the influent stream. and other contaminants. HVAC and Bearing Improvements, Denver Wastewater Treatment Plant plumbing designs. Water, CO. Project Engineer. Major Capital Improvements, Conceptual design and design criteria
WISE Denver International Delta Charter Township, MI. Project memorandum, opinion of probable Engineer. Conducted an extensive Airport (DIA) Connection, Denver
Water, CO. Mechanical Engineer. cost, 30-, 60-, 90-percent and final evaluation of WWTP and developed a design documents for construction.

Project includes engineering comprehensive master plan to address Dam includes a 17 by 20-foot Tainter identified issues with condition design, permitting, and construction
gate to divert water for downstream
management services for the new and process capacities. Township storage and treatment. Design
six-mile pipeline and flow control completed a Project Plan to prioritize included a review of the loads, system improvements to allow the facility. As part of a partnership acceptance criteria, alternatives community to apply for SRF financial
Water, and South Metro WISE analysis of proposed pin and bushing assistance to design and construct materials, a review of nondestructive
Authority (SMWSA), this new pipeline projects. Project Plan provides the demolition options, and construction basis for recommended projects will deliver up to 5.9 MGD of water phasing options to complete during a supply through 32,370 feet of 18-inch for WWTP improvements. Selected short four-week duration.
diameter PVC pipeline, enhancing improvements will provide the water resource efficiency for several North Mercer Pump Station, King WWTP with the firm design capacity communities south of Denver. County, WA. Mechanical Engineer. of 8.0 MGD average day, 20.0 MGD Alternatives evaluation, predesign, max day, and 28.0 MGD peak hour.

Canyons and Ridgegate Well
and future phases of final design Provided design services for phased House Designs and Construction, WWTP improvements. Project and construction support services
Parker Water and Sanitation
for the improvement of this major goal is to design and construct the District, Parker, CO. HVAC and conveyance system between Mercer improvements to rehabilitate critical Plumbing Engineering Lead. Design of Island and Bellevue. Projected peak unit processes and infrastructure, two new well houses that utilized the increase treatment capacity, and gain flows are 16 MGD. Facilities consist
CMAR contract process. Mechanical of a pump station and 17,000 feet of additional operational efficiency. design of well houses and supported force main, gravity sewers both on construction observation, submittal
land and in water, and two inverted
review, and RFI response. HVAC and

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
21 Years of Experience
Dan Helt, PE, PLs BS Civil Engineering, Cal Poly University, San Luis Obispo PE California Professional Civil Engineer, No. C69347
SURVEY PLS California Professional Land Surveyor, No. 8925 Mr. Helt has a diverse base of knowledge of the elements necessary to successfully execute both small and large scale multidisciplinary projects. During his 21 years in the civil engineering field, he has had significant roles providing management, coordination and detailed design on a broad range of capital improvement projects. Dan has strong leadership capabilities in team development, communication within the team, and builds strong client relationships through communication. Mr. Helt has performed field boundary and topographic surveys, as well as construction staking, certification and monitoring, and ALTA/ACSM surveys. He has considerable experience researching boundary and chain of title information, and preparing legal descriptions.

RELEVANT PROJECTS
County of Santa Barbara As-Needed construction condition and location of prepared and presented in a spreadsheet, Survey, County of Santa Barbara, survey monuments and the right-of-way and a base plan was prepared to identity Santa Barbara, CA. Program Manager. establishment. When overlay project is each project location and site utilities.

Mr. Helt is overseeing field and office complete, an additional record of survey Merced Avenue Greenway, Council survey services for the County of Santa for post construction monument condition for Watershed Health for City of South Barbara under an Indefinite Delivery- and position will be prepared.

El Monte, CA. Survey Manager. Mr. Helt
Indefinite Quantity (IDIQ) Survey contract. oversaw survey services for this stormwater The services provided are important to Ramp Design, City of Los Angeles, Bureau of Engineering, Los Angeles, retrofit project along the Merced Avenue assist the County with its transportation CA. Survey Manager. Responsible for corridor in South El Monte. The scope project delivery goals, which are vital for overseeing survey services in support of of services included assessing existing meeting the Transportation Division's engineering design for the StreetsLA's conditions on Merced Avenue, consulting ongoing mission to provide a clear path,
Pavement Preservation Program which with agencies on regulations for planning smooth ride, and a safe trip to the traveling maintains a street network of 23,000 and design, evaluating pre-design
public. To date, Tetra Tech has performed
lane miles and keeps all improved monitoring data and analyzing urban heat topographic surveys, right-of-way streets and related throughways in good island mitigation strategies, providing research and stakeout for storm damage to excellent condition. Tetra Tech's a preliminary design report, presenting
repairs, and monument perpetuation and scope of services includes topographic at community design workshops and
preservation services. meetings in collaboration with various survey, engineering design, design
Survey Services for South County support during construction, and stakeholdersto create designs for the Overlay, County of San Luis Obispo, construction management services for retrofit. Tetra Tech also provided final CA. Program Manager. Responsible for various access ramps throughout the permitting, construction drawings, cost overseeing survey services as part of an City, in compliance with the Americans estimates, and a bid package. The goal On-Call Professional Survey Services with Disabilities Act (ADA). ofthe project was to manage stormwater Contract. Tetra Tech provided topographic Redondo Beach Upper Walkway runoff at its source to meet regulatory and right-of-way surveys for ADA curb Boundary Survey, County of Los compliance by improving water quality and ramp and other survey locations, and enhancing watershed health. Additional Angeles, CA. Survey Manager. benefits include reducing the urban heat monument preservation for asphalt
Responsible for overseeing survey services.
overlay of various south county roads. island effect and its carbon footprint, Tetra Tech performed a topographic
Topographic surveys were performed at boundary survey ofthe project site. Aerial creating new safe bike and pedestrian 14 intersections and six areas of drainage connections, enhancing public health and acquired photogrammetric data from an
concem. Field work included a control beautifying the neighborhood. In addition, Unmanned Aerial Systems (UAS) was used
survey for the topographic survey and in combination with GPS acquired ground the project included active transportation the monument preservation. Boundary programming and incorporated a data for base mapping. The survey services
monuments, sufficient to establish right- were in support of the development of community-based approach that provides of-way were located and observed. an Engineering Study performed by Tetra opportunities for watershed education and Base map files including topographic Tech which included a prioritized list of neighborhood involvement in designing survey information and right-of-way were short and long-term projects intended to the project. prepared. 63 separate monuments
improve the upper pedestrian walkway
within the intersection construction
paving surface, drainage, ADA compliance
areas and the remainder of the overlay
and bluff stabilization. Ascope ofwork
project were observed. Two separate
and cost estimate for each project was
Records of Survey were prepared: a pre-

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
Jesus Guzman, PLS 26 Years of Experience
Math studies, California State at Fullerton
PLS California Professional Land Surveyor, No. 8648
SURVEY
Mr. Guzman is a licensed surveyor with 26 years of experience providing office and field survey support for projects involving engineering, construction, and mapping for highways, utility infrastructure, airport runways, schools, water pipeline tunnels, dams, rivers, and lake improvements. He is experienced with preparation, agency submittal, and recordation of tract maps, parcel maps, final maps, Records of Surveys, tentative maps, corner records, lot mergers, lot line adjustments, ALTA documents, and public roadway abandonments. Mr. Guzman has managed and participated in various land survey activities including field surveying for municipalities, county, state, and federal agencies, and the armed services.

RELEVANT PROJECTS
Lankershim Boulevard and Oro high-speed vehicular oriented corridor. right-of-way to ensure ADA compliance Vista Avenue Local Area Urban Flow Addition of street trees, pedestrian pursuant to the City's obligations under Management, City of Los Angeles, lighting, widened sidewalks, and bus the Willits Settlement Agreement.

CA. Project Surveyor. Responsible bulbs will improve pedestrian safety and Along with addressing accessibility for overseeing field crews and office user comfort. Adjacent local streets will of sidewalks, the SRP also addresses staff related to topography data be improved to create neighborhood related elements such as curb ramps, collection, processing, and base sheet bike network streets along Gramercy street trees, utilities, driveways, curb development. The project aims to Avenue and Denker Avenue which and gutter, roadway transitions, infiltrate stormwater runoff to improve will create an exclusive path for bikes crosswalks. water quality and increase underground connecting to the greater South Los Angeles bike network and Rail to Rail Merced Avenue Greenway Project, water supplies, provide community Council for Watershed Health for enhancements with the addition of Active Transportation Corridor. greening elements, reduce flooding South El Monte, South El Monte, along the corridor with the installation StreetsLA Ramp Design, City of Los CA. Project Surveyor. Responsible Angeles, Bureau of Engineering, for overseeing field crews and office of new piping and catch basin inlets,
Los Angeles, CA. Senior Land staff related to topography data install new concrete curb and gutter, Surveyor. Responsible for preparing collection, processing, and base sheet and construct new sidewalks to improve
centerline alignments and Right-of- development. Tetra Tech provided pedestrian accessibility throughout the Ways in support of ADA compliant ramp pre-design and design services and corridor.
designs. Tetra Tech was contracted is currently providing construction Western Our Way Walk and Wheel by the City of Los Angeles to provide support services for a stormwater retrofit Improvements Project (ATP 6), survey and engineering design services project along the Merced Avenue City of Los Angeles, Bureau of in support of StreetsLA's Pavement corridor. The goal of the project is to Engineering, Los Angeles, CA. Preservation Program which maintains manage stormwater runoff at its source Project Surveyor. Responsible for a street network of 23,000 lane to meet regulatory compliance by coordinating and performing survey miles and keeps all improved streets improving water quality and enhancing activities related to the development and related throughways in good to watershed health. Additional benefits of site topography, including survey excellent condition. Tetra Tech's scope include reducing the urban heat research, site survey control network of services includes topographic survey, island effect and its carbon footprint, for aerial mapping, ground LiDAR engineering design, design support creating new safe bike and pedestrian mapping, conventional and RTK during construction, and construction connections, enhancing public health, surveys, and data collection by field management services for various and beautifying the neighborhood crews. Also managing the development access ramps throughout the City, in In addition, the project will include of centerline and ROW from existing compliance with the Americans with active transportation programming survey monumentation, and efforts Disabilities Act (ADA). and incorporate a community- relating to dratting base maps using StreetsLA Sidewalk Repair Program, based approach that provides AutoCAD Civil 3D. The project includes City of Los Angeles, Bureau of opportunities for watershed education

4.5 miles of pedestrian and transit rider Engineering, Los Angeles, CA. and neighborhood involvement in improvements in the heart of South designing the project.

Los Angeles. Extensive pedestrian Project Surveyor. Tetra Tech is providing improvements including traffic calming surveying and engineering services along Western Avenue will provide in support of the City of Los Angeles, Bureau of Engineering, Sidewalk Repair
safer and more direct access for
disadvantaged community members rogram (SP). Services include surve nd desian for the reconstruction of
to transit lines and local destinations in
inaccessible and damaged pedestrian
contrast to the current conditions ofthe
facilities throughout the City's public

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
35 Years of Experience
Peter Skopek, PhD, PE, GE PhD Geotechnical Engineering, University of Alberta, Edmonton Canada
PE California Professional Engineer, No. 59242
GEOTECHNICAL GE California Geotechnical Engineer, No. 2635 Dr. Skopek has executed a variety of geotechnical engineering projects for a broad range of clients. These projects include transportation infrastructure, commercial, industrial, and redevelopment, design of tailings and earthen dams and reservoirs, deep and shallow foundation design, slope assessment and stabilization design, ground stabilization, design of retaining walls and excavations, liquefaction assessment and geotechnical seismic design, forensic geotechnical engineering, geotechnical review, performance reviews, geotechnical site investigation, design and implementation of laboratory programs, field inspections, and provision of quality assurance and engineering services during construction.

RELEVANT PROJECTS
On-Call Geotechnical and Geotechnical Consulting, City of slope also needed to be considered to Environmental Engineering, City of Anaheim, Geologic Hazard Abate- mitigate the potential for unbalanced Los Angeles, Bureau of Engineering, ment District, CA. Project Director seepage forces during sudden draw- CA. Project Manager responsible for responsible for geotechnical consulting down and scour conditions. geotechnical and geological services services to assess potential water restric- Bolivar Park Stormwater and Runoff on an task order solicitation (TOS) basis. tion measures that could be implement- Capture, City of Los Angeles, CA.

Task orders include various services ed to help reduce surface water infiltra- Geotechnical Engineering Lead for this
such as observation and certification, tion within the much larger watershed regional stormwater capture project.
geophysical surveys, construction, boundaries that encompass an existing The project components included a
development, sampling of groundwater Geologic Hazard Abatement District diversion structure to divert water from wells, geotechnical laboratory testing (GHAD) within the Anaheim Hills area of one of the major flood control channels,
of soil and/or bedrock samples, East Anaheim. The dewatering facilities a pretreatment structure to remove
geotechnical analyses, project plan include multiple vertical dewatering debris from the runoff, an underground preparation and/or review, infiltration wells, horizontal dewatering wells, structure to infiltrate or capture the testing, seismic ground motion studies, groundwater observation wells, water that will be treated for landscape geotechnical and/or geologic report piezometers, and inclinometers that irrigation use, and a rehabilitated park
preparation, specification preparation were installed by previous consultants surface with new picnic areas. The goal
or review, constructability review of and subcontractors at various locations of the project is to not only help the City
plans and specifications, as well as within Santiago Landslide and vari- comply with the metals Total Maximum geotechnical/geologic support in ous locations beyond the limits ofthe landslide (within the Abatement District Daily Loads (TMDLs), as presented in response to emergencies, project or the Los Cerritos Channel Watershed technical presentations for City staff, boundaries).

Management Program, but also provide
regulators, or the public, participation in Santa Ana River Channel Improve- additional benefits, such as revitalized meetings with regulatory agencies and ments, Reach 9 Phase 3, Orange park infrastructure and augmentation of the public in support of or on behalf of local water supplies.

County, CA. Senior Technical Review-
the City. er during development of plans and
Santa Monica Clean Beaches
Geotechnical Engineer and specifications for improvements to the Geologist Services, City of West Santa Ana River Channel in eastern Initiative, Santa Monica, CA.

Geotechnical Design and Construction
Hollywood, CA. Project Manager Quality Assurance (CQA) for this project responsible for performing reviews
to improve beach water quality and
of seismic hazards reports, fault
tween Gypsum Canyon Road and Coal increase the City's drought resilience. studies, and geotechnical reports Services provided thus far have for development projects in the City Canyon Road. Proposed improvements included site characterization, seismic of West Hollywood. Specific tasks include over-excavation of the existing have included review of fault hazard riverbank and riverbed, placement of a hazard evaluation, foundation design soil cement slope buttress, re-construc- for the proposed tanks and conveyance evaluation studies, geotechnical
tion of storm drain outlets through the pipelines, and shoring design including reports, and methane studies for dewatering considerations for the projects within the City. Used in depth slope and restoration of the bike trail construction of the proposed facilities.
knowledge of the varied geologic and above the re-configured slope. Geo- CQA services will include observation geotechnical conditions within the technical issues that required evaluation City and the surrounding Los Angeles for this project included the stability of ofthe installation of the shoring system, excavation, subgrade preparation,
basin to update the Geologic and the soil-cement slope during periods of design flood conditions, sudden placement of pipelines, asphalt Seismic Technical Background Report
replacement, and as-built reporting.
for inclusion in the City's General Plan drawdown, and earthquake loading.

Update. Subdrainage behind the soil-cement

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
16 Years of Experience
Fernando Cuenca, PhD, PhD Geotechnical Engineering, University of Texas, Austin PE GE PE California Professional Engineer, No. 50097
GE California Geotechnical Engineer, No. 3128

GEOTECHNICAL
Dr. Cuenca's experience includes research on the stability of reinforced embankments incorporating coupled analysis including pore water pressures in unsaturated soils and water flow movement with slope deformations, using finite element formulations. Femando also has extensive experience in cyclic behavior of soils, liquefaction evaluation, lateral spreading assessments, linear and non-linear site response analysis, ground motions and time history selection and development, estimation of lateral seismic earth pressures, and foundation design for seismic conditions. He has worked on several projects including design of rigid and flexible pavements, as well as design of permeable pavements for green street projects requiring stormwater infiltration, as well as projects requiring pavement rehabilitation including the use of glass-grid interlayer to mitigate against reflective cracking and increase durability.

RELEVANT PROJECTS
Wintersburg Channel, Huntington design of deadman and tieback rods, slug testing in selected wells installed Beach, CA. Project Engineer in charge and submittal to Caltrans for review. in some of the exploratory borings. of the design of a replacement levee Recommendations were provided Lake Gregory Dam Rehabilitation, for dewatering, including estimated at the Wintersburg Channel consisting Crestline, CA. Assisting with the of sheet pile walls and a Soil Cement extraction rates, shoring and temporary development of seismic response
Mix to mitigate against effects of slopes. In addition, recommendations spectrum and selection of ground
liquefaction. The project includes were provided for slurry trench motion time histories, numerical
widening the channel from upstream excavation in the area of one of the modeling with the GeoStudio Suite
of Edwards Street to Warner Street bridge crossings. In this area spatial (including SEEP/W, SLOPE/W,
for a length of approximately 5,050 constraints did not allow enough room QUAKE/W, and SIGMA/W) for
feet. The design for the improvements for a shored excavation and the slope evaluation of rehabilitation alternatives.
includes the installation of 2 rows of protection had to be provided with a hydraulically pressed (Giken method) Ventura River and Santa Clara vertical mass concrete wall installed in sheet pile walls on both the right and River Levees, County of Ventura, the slurry trench. the left banks of the channel. This CA. Project Engineer in charge of certification and rehabilitation of USFS and USACE San Francisquito will allow for removal of significant Fire Station and Barracks (USACE), portions of the existing levees and existing levees along the Ventura River and Santa Clara River. Evaluation of Santa Clarita, CA. Project Engineer result in widening of the existing in charge of evaluating the subsurface channel to convey the flows for the seepage using finite element models conditions, to assess key geotechnical
100-year design storm event. The soil considering transient and unsaturated constraints and geologic hazards at 2
in between the sheet pile walls will be flow.
alternative sites within the Los Angeles
improved throughout the entire depth Riverside Levees 1 and 2, Santa National Forest considered for the
of 46 feet by constructing Soil Cement Ana River- Riverside, CA. Dr. design and construction of a fire station, Mixing (SCM) columns that will mitigate Cuenca served as design engineer barracks and associated improvements. the liquefaction potential under the for the levee rehabilitation project of Several geotechnical/geologic design seismic events considered. Dr. Levees 1 and 2 on the Santa Ana River factors impacted differently both sites, Cuenca performed numerical analyses in Riverside, California. The project including recommended building
including one-dimensional on-linear site involved the construction of grouted setbacks from slopes and faults, and
response evaluations using DEEPSOIL stone protection along the landside the suitability for Onsite Wastewater and soil-structure interaction evaluations
slope of the existing levees. The Treatment System (OWTS). using dynamic Finite Element program protection extends to the design scour PLAXIS. Adventure Park, City of Whittier,
depth which is up to approximately CA. Project Engineer in charge of the Manix, Dola, and Lanzit Bridge 20 feet below the channel invert. The infiltration testing and geotechnical Replacements, San Bernardino, construction will involve extensive dewatering to install the grouted exploration for the design of large CA. Project Engineer assigned with the stormwater infiltration and storage task of designing the pile foundations stone. The geotechnical investigation underground vaults, including shoring for these three timber bridges in the included drilling of 10 rotary wash design for soil nails and soldier piles County of San Bernardino, historical borings along the levee and within the with tiebacks, foundation design for landmarks. Analyses included channel and performance of 10 Cone Penetration Tests. Field permeability of diversion structures, pump stations, and evaluation of scour conditions, lateral
pretreatment units.
and axial load capacity evaluations, the subsurface soils was evaluated by

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH City of Huntington Beach
41 Years of Experience
Marcel Bodsky, RA MA Architecture, California Polytechnic University San Luis Obispo BA Architectüre, University of Washington
ARCHITECTURAL RA California Registered Architect, No. C35520 Mr. Bodsky has 41 years of design experience with a variety of building types and clients. Hisexperience designing multi- building facilities is extensive; his designs for public works infrastructure include rail and bus transit facilities, parking garages and maintenance facilities. His experience covers all phases of project development, including planning, programming, design, and construction. Marcel's expertise in managing contracts, dealing with contract issues and delivering on projects ranges from multiple on- call work order contracts

RELEVANT PROJECTS
Everett Transit Parking Garage, mechanical vehicle maintenance Ryerson and Bellevue Base City of Everett, Everett, WA. upgrades to various Metro bases. Improvements, King County Dept.

Project Architect. Tetra Tech teamed Marcel negotiated and managed of Transportation, Metro Transit with KPFF on the design of the Everett the contracts for all 22 work orders Division, Seattle, WA. Project Transit Parking Garage project, totaling approximately $750,000 in Manager for significant mechanical which is currently at 30% design design work. Many of the work orders and architectural upgrades for two stage. Tetra Tech provided Transit were performed simultaneously Metro bases. Ryerson Base capacity design coordination and integration, and fast-track. Projects included will be increased by providing architectural site design, electrical, a predesign study for a table lift more driver and administrative lighting and mechanical design for replacement for Metro's existing functions within the existing the project. Marcel directed the paint facility, installation of four building footprint. All lighting and transit integration and site design parallelogram lifts, design of a mechanical systems were also aspects of the project. The City of steam clean facility and predesign replaced, with special emphasis on Everett is currently pursuing federal for the Ryerson Base Operations energy savings and sustainability. construction funding. Improvements. Indoor air quality monitoring in the maintenance bays allows
Juneau Parking Garage and Architectural Services for Transit reduction of heated air, providing
Transit Center, City and Borough Projects on a Work Order Basis, tremendous energy savings. The of Juneau, Juneau, AK. Project King County Department of work includes complete phasing of Architect. Tetra Tech Provided project Transportation, Metro Transit the project to maintain operation of management, civil, mechanical and Division, Seattle, WA. Project all aspects of the bases on site during electrical design services for this Manager for design of multiple construction, either through trailers
award winning parking garage and architectural, civil, electrical and or phased construction of necessary transit center in Juneau, AK. Marcel security work orders for Metro Transit. components, as well as integration provided initial concept planning Marcel negotiated and managed all 9 of security and communication
and concept level architectural projects totaling $484,000. To date, the work orders have ranged from: upgrades.
design and transit station integration,
and provided architectural QC for construction management services, the project. Because of its size and emergency road repair design, key location it was one of the most security improvements at Ryerson significant architectural additions Transit Base, security improvements to the downtown area in the last at Atlantic Central Metro Base, 10 years. The project included the lighting improvements at Green Lake redesign of the intersection of Main Park, structural improvements at the Street and Egan drive, as well as downtown bus tunnel, and support pedestrian upgrades to both streets. services for roof and green roof Architectural Services for Transit redevelopment. Projects have been Projects on a Work-Order Basis, both fast track and ongoing.

King County Department of
Transportation, Metro Transit
Division, Seattle, WA. Project
Manager and Project Architect for
design on multiple architectural and

REQUEST FOR QUALIFICATIONS FOR ON-CALL CIVIL ENGINEERING PROFESSIONAL CONSULTING SERVICES TETRA TECH EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:

SEE ATTACHED EXHIBIT B
B. Iravel Charges for time during travel are not reimbursable.

C. Billing
All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.

Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.

A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.

CONSULTANT shall submit to CITY an invoice for each monthly payment due.

Such invoice shall:

A) Reference this Agreement;
B) Describe the services performed;
C) Show the total amount of the payment due;
D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and
E) For all payments include an estimate of the percentage of work completed.

Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, ClY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein.

5. Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.

Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.

EXHIBIT "B"
TETRA TECH - 2025

STANDARD HOURLY BILLING RATES AND EXPENSE REIMBURSEMENT SCHEDULE NOTE: Rates subject to change annually

MANAGEMENT CONSTRUCTION
Project Manager 1 $220.00 Construction Technician $100.00 Project Manager 2 $270.00 Assistant Construction Manager $140.00 Project Manager 3 $290.00 Senior Construction Manager $190.00 Senior Project Manager $315.00 Construction Inspector $130.00 QA/QC Manager $320.00 Senior Construction Inspector $155.00 Program Manager $375.00 GEOTECHNICAL
Principal-In-Charge $375.00 Soils Field Technician (Standard) $116.00 ENGINEERS Soils Field Technician (Prevailing Wage) $145.00 Engineering Technician $100.00 Sr. Soils Field Technician (Standard) $122.00 Engineer 1 $115.00 Geotechnical Drafter $140.00
Engineer 2 $135.00 Engineer/Geologist 1 $130.00
Engineer 3 $155.00 Engineer/Geologist 2 $140.00
Project Engineer 1 $175.00 Engineer/Geologist 3 $150.00 Project Engineer 2 $195.00 Project Engineer/Geologist 1 $160.00 Project Engineer 3 $205.00 Project Engineer/Geologist 2 $175.00 Senior Engineer 1 $240.00 Project Engineer/Geologist 3 $240.00 Senior Engineer 2 $250.00 Senior Engineer/Geologist 1 $210.00 Senior Engineer 3 $275.00 Senior Engineer/Geologist 2 $225.00 Principal Engineer $365.00 Senior Engineer/Geologist 3 $240.00 SURVEYING Supervising Engineer/Geologist $250.00
Survey Tech 1 $105.00 Principal Engineer/Geologist $250.00 Survey Tech 2 $115.00 Principal/Geotechnical $300.00
Survey Tech 3 $135.00 OCEAN ENGINEERING
Survey Crew Chief $155.00 Senior Ocean Engineer $300.00 Surveying Specialist $175.00 Ocean Engineer 3 $150.00
Land Surveyor $190.00 Ocean Engineer 2 $135.00
Senior Land Surveyor $240.00 PLANNERS/SCIENTISTS
Survey Crew (Non-Prevailing) Planner/Scientist 1 $125.00 1-person Survey Crew $175.00 Planner/Scientist 2 $135.00 2-person Survey Crew $295.00 Planner/Scientist 3 $145.00 3-person Survey Crew $395.00 Sr. Planner/Scientist 1 $155.00 Survey Crew (Prevailing) Sr. Planner/Scientist 2 $170.00 1-person Survey Crew $210.00 Sr. Planner/Scientist 3 $185.00 2-person Survey Crew $365.00
3-person Survey Crew $515.00 Reimbursable in House Costs DESIGNERS/TECHNICIANS Photo Copies (B&W 8.5"x11") $ 0.20/Each CAD Designer 1 $125.00 Photo Copies (B&W 11"x17") $ 0.50/Each CAD Designer 2 $135.00 Color Copies (up to 8.5"x11") $2.00/Each Senior CAD Designer $150.00 Color Copies (to 11"x17") $ 3.00/Each GIS Analyst 1 $100.00 Compact Discs $10/each
GIS Analyst 2 $120.00 Large format copies $0.50 S.F.

OUTREACH Mileage-Company Vehicle $0.80/mile
Outreach Specialist 1 $135.00 Mileage-POV $0.67/mile*
Outreach Specialist 2 $150.00
Graphic Designer $160.00 *Current GSA POV mileage is subject to change.

PROJECT ADMINISTRATION
Project Assistant 1 $75.00 All ODCs and any other services performed by Project Assistant 2 $85.00 subcontractors will be billed at cost plus 10% Project Administrator $115.00
Senior Project Administrator $135.00

EQUIPMENT GEOTECHNICAL
Field vehicle usage (geotechnical $0.85/mile
engineers/geologists only)
Field vehicle usage (geotechnical field $20/hr.
services)
Sand Cone or Nuclear Density Gauge $16/hr
Hand auger and soil sampling $70/day
equipment
BAT Permeameter $275/day
Double Ring infiltrometer $250/day
Inclinometer data collection system $400/day
Floor level manomenter $80/day
$130/per
Infiltration test flowmeter
day-test
Per diem $300/day
Field vehicle usage (geotechnical
$0.85/mile
engineers/geologists only)
Field vehicle usage (geotechnical field
$20/hr.
services)
Sand Cone or Nuciear Density Gauge $16/hr
Hand auger and soil sampling
$70/day
equipment
BAT Permeameter $275/day
Double Ring Infiltrometer $250/day
Geotechnical Notes, Conditions, and Limitations
REGULAR HOURS: Fees for field technician's services are based on a standard 8-hour workday that is between 6:00 AM and 5:00PM Monday through Friday. Premium rates will be charged for work outside of these hours.

OVERTIME RATES: Overtime rates of 1.35 times of the standard rates will be charged for the first 4 overtime hours on weekdays, and for the first 8 hours on Saturdays. Premium rates of 1.7 times of the standard rates will be charged for hours worked in excess of 12 hours on weekdays, 8 hours on Saturdays, and alf hours worked on Sundays and holidays.

SPECIAL SHIFTS: A surcharge of 50% will be added to personnel charges for personnel working during non-regular hours, e.g., night shift.

MINIMUM HOURS: For field inspection duration between 0 and 4 hours, 4 and 6 hours, and 6 and 8 hours, a minimum charge of 4 hours, 6, hours, and 8 hours, respectively, will be applied.

CANCELLATIONS: A minimum of 24 hours' notice is required to schedule or cancel field personnel. If less than 24 hours cancellation notice is provided, a show-up charge equivalent to 4 hours of work will be assessed.

HAZARDOUS ENVIRONMENT: A minimum surcharge of 20% will be added to personnel charges for personnel working with hazardous materials or in hazardous environments requiring Level C or better personal protection equipment.

MARKUP: Cost plus 15% will be charged for requested materials and services not listed on the above schedule associated with geotechnical support.

RATE ADJUSTMENTS: Unless otherwise agreed upon, the rates will be adjusted to the then current prevailing rates on the anniversary date of the project contract.

COASTAL FRONTIERS CORPORATION
2025 RATE SCHEDULE
Direct Labor Costs
Direct labor charges are made for project-related consulting services performed on behalf of the Client. These services may include engineering, technical typing, as in the prepair of repare and pret daemen, con, dung, eneral secretarial serious, and maintenance, as these are included in our overhead.

Effective January Ist, 2025, hourly rates for Coastal Frontiers personnel engaged in the performance of consulting services are as follows:

Job Classification Hourly Rate (U.S. $)
Principal Engineer . $285.00
Associate Principal Engineer $253.00
Senior Engineer/Senior Scientist $223.00
Engineer Il/Scientist II $203.00
Engineer I/Scientist I. $190.00
Technician. ..$132.00
Word Processor/Drafter . $100.00
Support Services .. $90.00
Overtime will be charged at the standard hourly rates. Time spent travelling on behalf of the Client also will be charged at the standard hourly rates, with the exception that no more than eight hours of travel will be charged in any one calendar day. When expert witness testimony is provided, time spent under oath, as in the case of depositions and court appearances, will be charged at 1.5 times the standard hourly rates.

These rates are not subject to escalation or adjustment until January IS, 2026. If Coastal Frontiers desires to utilize additional personnel whose classifications are not listed above in the performance of a project, their qualifications and hourly rates shall be submitted to the Client for prior approval of participation.

COASTAL FRONTIERS CORPORATION
2025 RATE SCHEDULE

Page 2 ends

Other Direct Costs
Costs relating directly to the performance of a project, other than Direct Labor Costs, will be charged at the billing or cost rate times 1.10. Such costs may include outside services, subconsultants, third-party equipment rentals, duplication, printing and photographic work, third-party computer time, special insurance, travel and transportation, subsistence or room and board, long distance communications, and exceptional postage.

In-House Equipment Rental
In-house equipment rental charges are made for the use of company-owned equipment dedicated to the performance of the Client's project. Rates are as shown on the following page.

Invoices
Invoices are submitted monthly and all fees are payable in U.S. Dollars within 30 days of date of invoice. Direct Labor charges will be invoiced by employee, charge rate, and hours worked. Other Direct Costs will be itemized and copies of receipts will be furnished. In-House Equipment Rental charges will be invoiced by item, charge rate, and period of use. Late payments are subject to an interest charge of 10% per annum, compounded monthly, on the unpaid balance.

COASTAL FRONTIERS CORPORATION
2025 RATE SCHEDULE

Page 3 ends

IN-HOUSE EQUIPMENT RENTAL RATES

ITEM DAILY RATE
DIVING
Arctic Diving Equipment, per Diver. • $150
: ...55
Von-Arctic Diving Equipment, per Dive
• ry Suit (Without Other Diving Geat .. 50

HYDROGRAPHIC SURVEY
Odom Hydrotrac Echosounder...... ..95
CeeEcho Shallow Water Echosounder. ... 100
• Inflatable Boat and Motor.. ..225
• Aluminum Boat and Motor..... 500
TSS DMS2-05 Motion Sensor .. 160
• SBG Ellipse Inertial Navigation System.... 160
Hemisphere VS-110 GNSS/Heading System ..125
Hemisphere R-110 GNSS 90
Garmin GPSMap 196/78SC GPS.. 40
Castaway CID 100
Ruggedized Data Acquisition Computer. 60
• Hypack Navigation Sofiware....... 100
Hysweep Multi-Beam Sonar Software.. 100
Hypack-Hysweep Combination Software 150
Tilt Adapter Multi-Beam Sonar Mount... 50
• Chesapeake SonarWiz Side Scan Sonar Software 150
SURVEY
GNSS RTK Base/Rover Set.. .. 400
GNSS RTK Rover.. ... 200
• GNSS GSM Network Rover... ..300
GNSS Differential-Only Rover. . 100
• GNSS 35W Radio.. . 150
Survey Data Collector. , 50
Electronic Total Station. 150
UAV Mapping System 750
Mavic Mini UAV. 200
Survey Equipment (Automatic Level, Rod, and Tripod)
Hand-Held VHF Radio
Satellite Telephone.

All-Terrain Vehicle...

Survival Pack
• Switlik Aviation Survival Suit with ACR PLB Beacon 50

COASTAL FRONTIERS CORPORATION
2025 RATE SCHEDULE

Page 4 ends

IN-HOUSE EQUIPMENT RENTAL RATES (cont.)

ITEM DAILY RATE

MEASUREMENT
50 :
25 • 60
• Hatch TSS Portable Meter ..... 80
• RM Young Marine Wind Monitor and Data Collector.. . 25

COMPUTING
..45
: Laptop (Field Use)... Color Printing (per 8½" × 11" page equivalent) ........... 0.60