PROFESSIONAL SERVICES CONTRACT BETWEEN

THE CITY OF HUNTINGTON BEACH AND
H.W. LOCHNER
FOR

ON-CALL CIVIL ENGINEERING
& PROFESSIONAL CONSULTING SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and H.W. LOCHNER, a California Corporation hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to provide On-Call Civil Engineering & Professional Consulting Services; and
Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and
CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:

1. SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT."
CONSULTANT hereby designates Giusseppe Canzonieri who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement.
25-16466/380237 1 of 11

CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement.

TERM; TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT are to commence on → 20 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.

In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein.

COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed Two Million Dollars ($2,000,000.00).

EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained. 25-16466/380237 2 of 11

METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B."

DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit.

HOLD HARMLESS
A. CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT. 25-16466/380237 3 of 11
B. To the extent that CONSULTANT performs "Design Professional Services" within the meaning of Civil Code Section 2782.8, then the following Hold Harmless provision applies in place of subsection A above:
"CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and against any and all claims, damages, losses, expenses, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) to the extent that the claims against CONSULTANT arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT's proportionate percentage of fault. However, notwithstanding the previous sentence, in the event one or more other defendants to the claims and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid defense costs. The duty to indemnify, including the duty and the cost to defend, is limited as provided in California Civil Code Section 2782.8.

C. Regardless of whether subparagraph A or B applies, CITY shall be reimbursed by CONSULTANT for all costs and attorney's fees incurred by CITY in enforcing this obligation.

This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONSULTANT.

9. PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars 25-16466/380237 4 of 11
($1,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not contain a self-insured retention without the express written consent of CITY; however an insurance policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims-made policy shall be acceptable if the policy further provides that:

A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements).

B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims.

CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement.

If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY.

10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall:
25-16466/380237 5 of 1l
provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and
shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium.

CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY.

The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required.

11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder.

12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner.

CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall 25-16466/380237 6 of 11
be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.

13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove.

14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement.

15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code.

16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or 25-16466/380237 7 of 11
other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail-return receipt requested:

TO CITY: TO CONSULTANT:

City of Huntington Beach H.W. LOCHNER
ATTN: Director of Public Works Attn: Giusseppe Canzonieri 2000 Main Street 1100 Corporate Center Drive, Suite 201 Huntington Beach, CA 92648 Monterey Park, CA 91754

17. CONSENT
When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event.

18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties.

19. SECTION HEADINGS
The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement.

20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining 25-16466/380237 8 of 11
covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law.

21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it.

22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification.

23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for 25-16466/380237 9 of 11
CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT.

24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party.

25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive.

26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.

28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this 25-16466/380237 10 of 11
Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.

29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.

This Agreement shall expire when terminated as provided herein.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.

CONSULTANT, CITY OF HUNTINGTON BEACH, a
H.W. LOCHNER municipal corporation of the State of
California
By:

Giuseppo Canzonieri Mayor
print name
ITS: Principal, Southern California Design Lead
City Clerk
AND
INITIATED AND APPROVED:

By:
print name
Director of Public Works
ITS: Principal, Southern California CEI Lead
REVIEWED AND APPROVED:

City Manager
APPROVED AS TO FORM:

City Attorney pur
25-16466/380237 11 of 11
Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, factor circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.

29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.

This Agreement shall expire when terminated as provided herein.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.

CONSULTANT, CITY OF HUNTINGTON BEACH, a
H.W. LOCHNER municipal corporation of the State of
California
By:_
Mayor
print name
ITS: (circle one) Chairman/President/Vice President
City Clerk
AND
INITIATED AND APPROVED:

By:
print name Director of Public Works
ITS: (circle one) Secretary/Chief Financial Officer/Asst.

Secretary - Treasurer
REVIEWED AND APPROVED:

City Manager
APPROVED AS TO FORM:

City Attorney
25-16466/380237 11 of 11
EXHIBIT "A"
A. STATEMENT OF WORK: (Narrative of work to be performed) Provide On-Call Civil Engineering and Professional Consulting Services. If Consultant chooses to assign different personnel to the project, Consultant must submit names and qualifications of these staff to City for approval before commencing work.

B. CONSULTANT'S DUTIES AND RESPONSIBILITIES:

See Attached Exhibit A
C. CITY'S DUTIES AND RESPONSIBILITIES:

Furnish Scope of Work and provide a request for proposal for each project.

2. City shall issue a task order for each project based upon scope of services, work schedule, and fee proposal submitted.

D. WORK PROGRAM/PROJECT SCHEDULE:

A project schedule will be developed for each project assigned by the City.

EXHIBIT A

EXHIBIT A
1 1100 Corporate Center Drive, Suite 201 • Monterey Park, CA 91754 & Lochner OFFICE 323.260.4703 • hwlochner.com
SECTION 1 | VENDOR APPLICATION FORM AND COVER
LETTER
March 13, 2025
City of Huntington Beach
Public Works Department
2000 Main Street
Huntington Beach, CA 92648
Re: Request for Proposals for On-Call Civil Engineering Professional Consulting Services Dear Public Works Department,
Lochner is pleased to submit this proposal to describe our experience and capability in providing the City of Huntington Beach with on-call engineering civil engineering services. We believe our firm's 80-year history in transportation planning, civil and traffic engineering, and construction management and inspection, as well as the skills and experiences that we can bring from having worked on a wide variety of projects over the years, will bring the City the depth and breadth of experience and expertise needed to deliver on-call project assignments.

Lochner stands out as a comprehensive consulting firm, offering expertise in transportation planning, civil and traffic engineering, and construction management. We have provided cities services from the beginning stages of project planning and conceptual design, assisted cities with obtaining project funding, provided a high-quality plans, specifications, and estimate (PS&E) package, provided construction support, and construction management/inspection services. We have satisfied many of our clients with the quality of our work products, responsive service, and sound advice. Consequently, many of our current clients are repeat customers and we are proud of that fact. We have assembled a team that is ready to demonstrate our exceptional qualities to City staff and establish a long-term working relationship with the City of Huntington Beach.

Previously known as KOA Corporation, Lochner has had a strong presence in Southern California since 1987. In December 2022, KOA joined the Lochner family of companies, as a wholly owned subsidiary. Lochner's investment in KOA means that the company now has seamless access to a national team of more than 1,000 transportation planners and environmental professionals, engineers and designers, project managers, construction engineers and inspectors, right-of- way, and drainage specialists serving clients across the United States. KOA's long standing commitment to communities in Southern California, its reputation for responsive client service, and the company's demonstrated delivery of innovative, safe, and sustainable transportation solutions, now coupled with Lochner's 80-year legacy of successfully delivering transportation infrastructure improvements, will allow us to bring a new level of depth and breadth of experience to the City of Huntington Beach.
2 & Lochner
Martin Arshid, PE will serve as the On-Call Project Administrator and Principal-In-Charge for this contract. With over 25 years of extensive civil engineering experience, Martin is a highly accomplished professional specializing in transportation infrastructure projects, including road widening, intersection reconfiguration, and multi-modal improvements. He has played a key role in delivering complex, multi-discipline civil design projects that enhance connectivity, improve traffic flow, and support sustainable urban development.

His expertise encompasses roadway upgrades, stormwater and sewer network enhancements, slope stability studies, and traffic impact assessments. Martin has successfully led projects involving grade-separated interchanges, multi-use pathways, and critical utility upgrades, ensuring seamless coordination with stakeholders. His commitment to delivering high-quality engineering solutions has been instrumental in completing infrastructure projects that align with public needs and city planning objectives.

The work for this on-call contract will be managed from our Orange office, located at 333 S. Anita Drive, Suite 800, Orange, CA 92868. Our office is located only 14 miles from City Hall, so we can often meet with City staff at a moment's notice whenever necessary.

Lochner's billing rates will be valid for a minimum of 180 days from the proposal due date.

If you have any questions, or if you require additional information regarding this proposal or our qualifications, please contact Martin Arshid at [email protected]. He will be the designated contact person for this proposal and for the proposed on-call contract. We look forward to the opportunity to continue working with the City of Huntington Beach and becoming your most trusted and capable engineering consultant firm.

Sincerely,
Lochner
Giuseppe Canzonieri, PE (CA Civil 79006) Martin Arshid, PE, MS (CA Civil 70000) Principal | Southern California Design Lead Principal

REQUEST FOR PROPOSAL

VENDOR APPLICATION FORM
TYPE OF APPLICANT: - NEW • CURRENT VENDOR
Legal Contractual Name of Corporation: H. W. Lochner
Contact Person for Agreement: Giusseppe Canzonieri, PE
Corporate Mailing Address: 1100 Corporate Center Drive, Suite 201 City, State and Zip Code: Monterey Park, CA 91754
E-Mail Address: [email protected]
(323) 859-3155 Fax: N/A
Phone:

Contact Person for Proposals: Martin Arshid
Title: Principal E-Mail Address: martin arshid@hw/ohner.com Business Telephone: Business Fax:
44 Year Business was Established:

Is your business: (check one)
• NON PROFIT CORPORATION • FOR PROFIT CORPORATION
Is your business: (check one)
• CORPORATION • LIMITED LIABILITY PARTNERSHIP
INDIVIDUAL • SOLE PROPRIETORSHIP
PARTNERSHIP • UNINCORPORATED ASSOCIATION
1 of2
Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Terry A. Ruhl Board Chairman 312-372-7346
Michael Shen Director Not Available
Gregory Ruben Director Not Available
Karen Friese Director Not Available
Jonnie Thomas Director Not Available
36-2338811
Federal Tax Identification Number:

TBD
City of Huntington Beach Business License Number:
(If none, you must obtain a Huntington Beach Business License upon award of contract.) TBD
City of Huntington Beach Business License Expiration Date:

Additional Authorized Signers
Giuseppe Canzonieri (S1M Max)
Michael Nilsson ($1M Max)
Zachary Wheeler ($1M Max)
Tom Bacus ($5M Max)
Marvin Thomas ($10M Max)
2 of 2
& Lochner Background and Project Summary Section
SECTION 2 | BACKGROUND AND PROJECT SUMMARY

SECTION
Huntington Beach, known as "Surf City," is engineering, surveying, and project a dynamic coastal community in Orange administration. This includes, but is County, California, celebrated for its extensive not limited to, project controls such as

9.5-mile shoreline and vibrant surf culture. estimating, cost and schedule management, Beyond its picturesque beaches, the City is planning, QA/QC, change control, and risk dedicated to the continuous enhancement of management. A thorough knowledge and its infrastructure through a well-structured application of the most recent version of Capital Improvement Program (CIP). For APWA's GreenBook, along with the standard the fiscal year 2024/25, Huntington Beach plans and specifications of the City, is has allocated approximately $35.3 million essential. The consultant must provide highly to initiate 43 new CIP projects. The CIP is qualified staff with substantial experience in financed through a combination of special their respective fields to ensure successful revenue funds, enterprise funds, and grants. project execution. The scope of services Special revenue funds, such as Gas Tax includes:
and Measure M, are allocated for specific - Preparation of PS&E Packages - purposes like street and transportation system Developing comprehensive PS&E for various street improvements, including
enhancements. Enterprise funds, derived rehabilitation, widening, and realignment. from user charges, support water and sewer These improvements may involve system projects. Additionally, the City actively enhancements to traffic flow, roadway pursues grants to supplement funding for safety, utilities improvements, and infrastructure resilience.
various infrastructure improvements. Through - City Facilities Site Work and ADA its comprehensive CIP, Huntington Beach Compliance - Preparing PS&E packages demonstrates a steadfast commitment to for the rehabilitation and improvement of maintaining and enhancing its infrastructure, City facilities, including parking lots and ensuring the city remains a desirable place to compliance with the ADA. - Environmental and Stormwater
live, work, and visit. Compliance - Preparing and reviewing Lochner understands that the City of reports related to environmental Huntington Beach is seeking highly qualified regulations, including National Pollutant consultant firms to provide on-call civil Discharge Elimination System (NPDES) reports, WQMP, and SWPPP to ensure
engineering and surveying services for various compliance with state and federal capital improvement projects within the City. requirements.

Through project task orders issued by the City, - Construction Support - Providing technical the Lochner team will be providing various support during construction, including engineering support services for the Public responding to RFls, reviewing submittals, conducting field inspections, and ensuring
Works Department including, but is not limited adherence to design specifications. to rehabilitation of roads, alleys, bridges, curb, - Record Drawings - Delivering final as- gutter, sidewalks, and parking lots. The general built drawings in both mylar and digital scope of work consists of the following: (dwg) formats to maintain accurate project records and facilitate future modifications
• Bridges, Street Improvements, and or expansions.

Parking Lots - Geotechnical Engineering - While the City The consultant is expected to possess in- has existing contracts with geotechnical depth expertise in all facets of design, engineering consultants, there may be City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services SECTION 2 4
& Lochner Background and Project Summary Section
instances where geotechnical services works projects, ensuring accurate are required under the civil consultant's implementation of design specifications in direction. In such cases, Lochner will engage the field. a reputable geotechnical subconsultant This scope ensures a comprehensive approach based on project needs.
to infrastructure development, from initial
• Survey Services planning and design through construction and The consultant must provide experienced final documentation, aligning with the City's personnel, advanced surveying equipment, requirements and regulatory standards. and necessary facilities to perform a range
of surveying tasks to support project
development and execution. These tasks
- Horizontal and Vertical Control Surveys
- Establish precise control networks to
support project layouts, ensuring accuracy
in all subsequent surveying activities.
- Design and Topographic Surveys -
Conduct detailed surveys to capture
existing site conditions and provide critical
data for engineering design.
- Aerial Surveying and Photo Control
- Set aerial targets and perform
photogrammetric control to enhance
mapping accuracy.
- AERIAL AND TOPOGRAPHIC MAPPING
- Utilize aerial and ground-based survey
techniques to generate topographic maps
and intorm project design
- Boundary Surveys and Analysis -
Determine property boundaries and
conduct legal boundary analysis to ensure
iccurate land ownership delineatior
• Centerline Survevs and Ties - Establish
and verify roadway centerlines for
transportation projects.
- Corner Records Preparation - Document
and submit corner records to maintain
accurate land survey records.
- Records of Survey Preparation - Develop
and submit survey records in compliance
with regulatory requirements.
- Legal Descriptions and Plat Maps
- Prepare and review legal property
- Subdivision Map Review Conduce
thorough reviews of tentative and final
subdivision maps to ensure compliance
with planning and zoning requirements.
- Title Report Review - Analyze title reports
to identify encumbrances or restrictions
affecting project development.
- Construction Staking - Provide precise
construction staking for various public
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services & Lochner Methodology Section
SECTION 3 | METHODOLOGY SECTION
GENERAL WORK APPROACH & • We will have an experienced lead project engineer assigned to the project, who is
METHODOLOGY ramiliar with design projects and agency
The staffing and resource level needed for requirements. Our lead project engineer will closely oversee the daily design production
the project's scope of services will depend efforts and will serve as an assistant project on the type of project, the size of the project, manager to provide an additional point-ot- and the schedule. In order to determine the contact and to ensure continuity of staff appropriate staffing and resource levels, the assigned to the project. Our design tean are familiar with latest revision of APWA':

Lochner Principal-in-Charge (Principal or PIC) GreenBook, Caltrans standards, and the City will typically go through the following process: standards and bylaws. • Generally, when we conduct field reviews,
• The Lochner PIC will review the work order our field crew will consist of two staff provided by the City and assign a Lochner members. If the project involves multiple Project Manager and statting resources, to locations and a tight deadline, we may send the project. more than one field crew out, in order to
expedite the work effort (but we won't take
• Lochner will develop a comprehensive shortcuts on the thoroughness and quality of proposal outlining our understanding of the our field reviews). project scope, key work tasks, associated
fees, and the proposed project schedule. • If the project is relatively small and the This proposal will be reviewed in detail with schedule is manageable, we may have 1 or the City to ensure alignment with project 2 design staff members involved. We will objectives and expectations. Any necessary assign more design staff to the project, when refinements will be discussed collaboratively the project tends to be larger. We have the to establish a clear and mutually agreed- flexibility to assign several staff members to a upon approach before proceeding with project, if necessary. Regardless of how many execution. design staff we assign to the project, the
Lochner Project Manager and a lead project
• After approval by the City (and an agreement engineer are always involved. is executed), the Lochner Project Manager
will schedule a kickoff meeting with the City
to contirm the scope, schedule, and overall species ve it inter then neute expectations.
proposal. As the prime consultant, it is our
• After the kickoff meeting, the Lochner Projec responsibility to ensure that any firms we Manager will lead the effort in establishins
hire comply with the necessary work scope
a dedicated Lochner design team for the and expected timelines to meet the City's project that can meet the schedule and requirements for the project. work expectations of the City. The Project
Manager will continuously monitor project
expenditures, manage team resources
effectively, and prepare monthly invoices SAMPLE WORK PLAN FOR PS&E and progress reports for the duration of the PROJECTS
assignment.

The Lochner team will provide and manage the
• Our Project Manager will be responsible for
overseeing the overall project delivery and resources necessary to accomplish the scope delegating work tasks to our firm's design staff, of services as described in the RFP. Lochner's so that there are adequate resources working work plan for preparing plans, specifications, on the project to meet the necessary time- and estimates (PS&E) for various improvement frames for submittal. We believe our team projects will generally involve the following has the staff depth and resources available to
complete any foreseeable assignment. procedures:

City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services SECTION 3
P Lochner
Methodology Section
• Understanding the scope of work scope, check constructability, and look out - Street improvement examples: road for potential utility or substructure conflicts. widening, road realignment, curb bulb- If necessary, we will conduct additional field outs, pavement reconstruction, mealan reviews to verity the existing improvements island improvements, sidewalks and curb and suitability/constructability of the ramps, curb and gutter improvements, proposed improvements. catch basins and other roadway drainage • Upon receiving plan check comments from improvements, etc. the City, we will diligently review and address • Conducting research each and every comment made. We will try - Obtain as-built plans, acquire a topographic to understand the meaning and intent o and right-of-way survey, controller cabinet each comment. If we have any questions inventory, County Assessor maps for right- or concerns, we will contact the City to of-way information, utility and substructure discuss and resolve them, to ensure the plan information, geotechnical/pavement revisions we make are done appropriately engineering report, etc. and correctly. If necessary, we will conduct additional field reviews to verify the
• Conducting a thorough field review proposed design. We will subject our plans - Verify existing roadway features and to another round of internal quality control configuration, roadway and pavement plan reviews before submitting the revised conditions, visible utilities, catch basins and
drainage improvements, sidewalks, curb olans to the City. We will verity that we nave addressed each and every plan check
ramps, driveways, street trees, right-of- comment, either by making the appropriate way constraints, potential design conflicts, plan revisions and/or making a note on the existing signal equipment, pull boxes, curb
ramps, vehicle detection systems, roadway check prints. striping, pavement markings, signage, etc. • If required, we can assist the City in preparing • Preparing accurate base plans special provisions and construction cost - Base plans will depict all relevant existing estimates. We can prepare the necessary technical specifications for those items
or proposed street improvements, not covered by the SPPWC or Caltrans topography, traffic signal equipment and Specifications. We can prepare quantity conduit, striping and pavement markings. estimates for each bid item and also signage, centerline, north arrow, scale,
determine appropriate unit prices based on
street names, jurisdictional boundary lines
plan border, title block, signature block, etc. recent bid price histories. When preparing our estimates of probable construction costs,
• Designing the appropriate improvements we will adjust our estimated unit prices - Street improvements: Show proposed based on the relative quantities (higher unit roadway features to be constructed, prices for lower quantity items; lower unit removed, or reconstructed. Show station prices for higher quantity items) and also the call-outs for all proposed improvements project location (higher unit prices for more and all appropriate dimensions. Show remote locations and farther distances). construction notes, general notes, and
details. Show proposed centerline profile • If needed, we will provide construction phase and curb line (or flow line) profiles, as support services tor the City. Our work plar will generally involve providing clarificatior
appropriate. Follow appropriate design
standards (SPPWC, Caltrans, etc.). Prepare to the design plans that we prepared and roadway cross-sections, as appropriate. preparing change order documents when necessary. We can also attend pre-bid
• Performing a thorough quality control meetings, pre-construction meetings, field review process. This very important step meetings, etc. We will prepare bid addenda will generally involve a design peer review, when needed, review contractor submittals, followed by a design supervisor review, and and will respond to requests for information then followed by yet another review by a (RFls) upon request. senior, experienced engineer. During our
quality control process, we will verify the
accuracy and correctness of plans, make sure
the design conforms to the intended design
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services & Lochner Methodology Section
QUALITY CONTROL This QA/QC approach has led to a high level Lochner is also committed to generating of quality in our engineering plans, and we quality work products and strives to producing believe our firm has established a strong error-free plans. We have staff experienced reputation with a number of agencies for in civil and traffic engineering, and we are producing high quality work products. A QAI particularly strong in producing high quality QC Manager will be assigned to the project, improvement plans. will take the lead to ensure Lochner's QA/QC process is followed, and the City is receiving
A key factor to project success is accountability.
high quality submittals.

Lochner will be accountable to the City to
deliver on what is outlined in this proposal. PROJECT SCHEDULES We fully understand this principle and utilize With each task order proposal, the Lochner our internal Quality Assurance and Quality Project Manager will submit a preliminary Control (QA/QC) procedure to support our schedule detailing the tasks and sub- efforts throughout the life of each task order. tasks included in the scope of work, major Our QA/QC involves having plans go through milestones, deliverable dates, approximate a minimum of two stages of internal review City review times, etc. As part of our project before allowing plans to be submitted to an management duties, the Lochner Project agency for plan review and approval. The Manager will update and maintain the project first stage of internal review involves a peer schedule throughout the life of the project. review by an experienced design engineer. Project schedules will be prepared in either The second stage of internal review involves Microsoft Excel or Microsoft Project, depending another round of reviews by one or more on the City's preference. On the following two senior-level registered engineers. Each pages are sample schedules. reviewer confirms that plans reflect the
appropriate improvements and conform to
the approving agency's design standards and
plan format. The reviewers also verify that
all plan check comments have been properly
addressed on any plan revisions we prepare.

Prior to completion of the 100% PS&E, we will
pertorm a constructability review, which entails
going out to the project site with the plans and
having a detailed walk-through of anticipated
construction activities. The goal of this exercise
is to view the project from the contractor's
perspective and identify potential construction
change orders. We will then make necessary
adjustments to the plans to limit any issues
during construction.

For design plans, we utilize Bluebeam Revu
Software for all QA/QC activities. This software
allows for paperless review, simultaneous
commenting, cloud-based record keeping, and
clean response to comments. We have found
this tool to be very helpful and streamline
review, response, and submittals.

City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services SECTION 3
e Lochner Methodology Section
Not part of the page count
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services sasab minis
613251500
#.si.ms hamke ",ee"
35-% 180
ET5 mä panig wind, ?ni..
r'"ei s inn.
4197/904
11% Nanes

30.59 timin
•.VS 1/0450 0A0NT. 493
.i mir :
*93 °
MA.* 20% 12008:2:150-0
Ds : w90
pratisye a.iinis
113:70
:."8..5 220%
y.314mo
L:9: : 0000
WA2 bang
is 909a5
P7.-39:31:20
10 001
42472
AX: %,/S:10 2% Nari:s. 729 •
/1*** H/MIS*; 176
127025: 13y
n:=30y0e1 ***.9
1221.9 w7, =.55
ri: l02:re:
1-54 90 Hr0.2: 102 h tw: Broonmi masr
$5 3297 ag
82:403 3 W:603 Tinis sa inilase2
nfs, sn arg ee tirin! "
72-02m n99=; "1/9 %
Ag/23 g aas0 Ri/z/ne mg vạn ta
ILTE*; i-, --2 Tane Sanr3sa La Base st
str türps inü kein ic ekon, dint (marc.ki w90ls vit)) e 300 E NOS
SECTION 3
& Lochner Methodology Section

ROLES AND RESPONSIBILITIES
To successfully execute the tasks outlined in the Scope of Work, collaboration between Lochner and City staff will be essential. Below is a breakdown of the specific tasks that will require City staff involvement, along with the respective roles of both City and consultant staff. This collaborative approach will ensure efficient project delivery while leveraging the strengths of both City and consultant staff.

Project Phase City Staff Responsibilities Lochner Responsibilities Project Initiation Provide access to existing plans, Review and analyze background & Scoping reports, and relevant City standards. information provided by the City.

Identify key stakeholders and Develop a project work plan, provide project expectations. schedule, and fee estimate.

Assign a project manager to serve as Conduct a kick-off meeting to the primary point of contact. confirm project scope and approach.

Data Collection & Facilitate access to City-owned Conduct site visits and field Site Investigations properties and infrastructure for investigations. field investigations.

Perform condition assessments and
Provide GIS data, utility maps, and collect necessary data. as-built drawings.

Coordinate with utility agencies and
Share records of previous stakeholders.
maintenance activities or known
infrastructure issues.

Design Provide feedback on design Prepare construction drawings, Development & concepts and alternatives. specifications, and cost estimates Review for City review at the draft and final
Ensure project designs align with stages.

City standards and regulatory
requirements®
Review consultant deliverables at
key milestones.

Permitting & Assist in identifying necessary Prepare and submit permit Regulatory permits and regulatory applications.

Compliance requirements.

Conduct environmental and
Provide support in coordinating with regulatory analyses. regulatory agencies.

Address agency comments and
Facilitate internal approvals for update designs as needed. permits.

City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services SECTION 3
f Lochner Methodology Section
Project Phase City Staff Responsibilities Lochner Responsibilities Construction Provide oversight during Provide construction administration Support & Project construction and ensure compliance support, including RFls and Closeout with City requirements. submittal reviews.

Review and approve contractor Conduct periodic site visits and submittals and change orders. respond to field issues.

Conduct final project acceptance Prepare project closeout inspections. documentation and as-built
drawings.

CLIENT SATISFACTION the City to be completely informed of our Lochner's Project Managers strive to be highly capabilities and project understanding from responsive to our clients' project needs. You day one.
will find us pleasant and easy to work with.

We listen carefully to our client's needs and We do not believe in taking shortcuts that tailor our work scope, staffing resources, would compromise quality. For infrastructure and priorities in order to satisfy the client's design projects, we strongly believe it is expectations as best as we can. We keep our essential to do proper research and thorough clients informed. We know that it is important field reviews to accurately depict the existing to provide the clients with timely information conditions on our base plans, which ultimately when needed because we understand lead to good designs. We also recognize the that they, in turn, usually need to respond importance of identifying any potential utility to managers/supervisors, administration, impacts early in the design phase. Our staff Commissioners, City Council, the public, and/or can effectively map existing utilities, identify other stakeholders. potential impacts, and coordinate relocations/ modifications as necessary.

The technical approach will vary from project
to project; however, the general approach All key management personnel identified on to every project is to provide high quality the organizational chart will be fully committed deliverables on time and within budget. We to the projects) under this contract, and no will keep an open line of communication with key staff will be changed without prior consent City staff and the project team/stakeholders. from the City. When and if required by an We will be proactive about issues that arise assignment, all Lochner staff will be committed and maintain comprehensive correspondence. for the duration of their assignment, or as Our technical approach will be based on the needed, for specific short duration tasks. The assignment disciple and assigned to Lochner task leaders will be responsible for assigning staff with the knowledge and expertise to work to the key staff identified on our meet or exceed project expectations. Any organization chart or within the depths of our supplemental studies and reports we believe firm. All project staff will be given an explicit necessary to complete the assigned task will scope of what is required for each discrete be included as optional services and presented assignment, and the requisite time in which to the City along with our task proposal. We the assignment is to be completed. believe in upfront transparency and want
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services & Lochner Staffing
SECTION 4 STAFFING
Below are a list of individuals and an organizational chart showing who will be working on this project and the functions of each of them. Note that in accordance with the Q&A released on February 26, 2025 via PlanetBids, the resumes for the proposed key staff are included in the Appendices section.

ON-CALL

PRINCIPAL IN CHARGE
Martin Arshid, PE, MS*

PROJECT TEAM MEMBERS
Civil Engineering (HWL) Structural Engineering (HWL) Surveying (KDM) Task Leaders Task Leaders Task Leaders
(Key Proposed Staff) (Key Proposed Staff) (Key Proposed Staff) Martin Arshid, PE, MS* Chris Stearns, PE Richard Maher, PLS Kevin Manilla, PE, MS* Robert Hong, PE Patrick Earl, PLS Giuseppe Canzonieri, PE
Anastasia Canzonieri, PE
Support Staff
Manual Barrios, PE | Jose
Hernandez | Raisa Garcia |
Anthony Wong | Nicolette
Seargeant | Lydia Rivera
Proposed Individual Proposed Function Key Staff/ Resume Provided Principal-in-Charge Yes
Martin Arshid, PE Civil Engineering Task Leader
Kevin Manilla, PE Civil Engineering Task Leader Yes
Giuseppe Canzonieri, PE Civil Engineering Task Leader Yes Anastasia Canzonieri, PE Civil Engineering Task Leader Yes Chris Stearns, PE Structural Engineering Task Leader
Robert Hong, PE Structural Engineering Task Leader
Richard Maher (KDM) Survey Task Leader
Patrick Earl (KDM) Survey Task Leader
Manual Barrios, PE Engineering Support 799*222222
Jose Hernandez Engineering Support
Raisa Garcia Engineering Support
Anthony Wong Engineering Support
Nicolette Seargeant Engineering Support
Lydia Rivera Engineering Support
City of Huntington Beach | On-Cal! Civil Engineering Professional Consulting Services & Lochner Qualifications
SECTION 5 | QUALIFICATIONS

TYPES OF SERVICES
LOCHNER FIRM INFORMATION • Engineering & Design
Lochner's mission is to improve the lives of people and • Environmental their communities. As a people-centric organization, our • Construction professionals are dedicated to transforming challenges Engineering & Inspection into opportunities. Lochner leads in delivering planning. • Alternative Delivery environmental, design, construction engineering and • Planning inspection, right-of-way, and drainage services for highway, • Program & Construction bridge, rall, transit, municipal, and aviation clients across the Management United States. • Public Works
Founded in 1944 and headquartered in Chicago, Lochner • Technology provides planning, environmental, design, construction SIZE & LOCATION OF engineering and inspection, and right-of-way services for surface transportation, aviation, rail and transit clients across OFFICES • 51 Offices in 21 states
the United States. With offices in 21 states, Lochner's 1000+ • The size of Lochner's
employees are problem-solvers, driven by transforming individual offices vary and transportation infrastructure challenges into opportunities. In range from 5 to 30 staff, as December 2022, Lochner expanded its services and geographic well as additional hybrid/ footprint through the acquisition of California-based KOA remote employees that are Corporation and Colorado-based Armstrong Consultants. affiliated with an office.

In May of 2023, Lochner acquired Texas-based K. Friese CONTACT INFORMATION + Associates, establishing and growing water/wastewater and drainage services as a core component of our civil Martin Arshid, PE, P.Eng., MSC.
infrastructure offering.

Principal
Lochner has extensive experience in civil engineering design. (714) 923-6273 Our staff of registered professional engineers and designers martin.arshid@ has provided civil engineering services on many award-winning hwlochner.com projects throughout Southern California since 1987. Lochner

LOCHNER QUICK FACTS
o0C0c
1000+ Ranked 50+
employees at Lochner #103 Offices in
on ENR's Top 500 21 states
Design Firms
1944
year founded Organization Type 6
Corporation Local offices
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services SECTION 5 12
&- Lochner Qualifications
provides multiple civil engineering services allows them to scale their workforce and including, but not limited to, plan and profile resources to meet the specific demands of design of new roadways; roadway widenings/ each project, ensuring efficiency and accuracy. narrowings; pavement rehabilitation; curb Under the leadership of founder and principal ramp design; curb extension design; utility Richard C. Maher, PLS, KDM has been a trusted coordination and relocation; low-impact partner in public works design improvement development (LID) design and implementation; projects for over two decades. KDM has streetscape enhancements; and storm drain worked closely with city agencies, acting as and sewer modification design. We utilize an extension of their survey departments to AutoCAD and Civil 3D software to simulate provide topographic and mapping services for proposed improvements, to verify our design infrastructure enhancements. Public works intent. All designs are meticulously reviewed improvements account for the majority of their by our senior staff to check compliance with current projects, reflecting their deep expertise current standards and guidelines such as the in the field. KDM takes pride in delivering Standard Plans and Specifications for Public responsive, cost-effective, and professional Works Construction, Caltrans Standard Plans surveying solutions that align with project and Specifications, and Highway Design Manual. schedules and objectives.

We also check compliance with ADA standards KDM has been providing professional from the ADA Standards for Accessible Design, land surveying services for over 24 years, California Building Code, and Proposed specializing in GPS, LiDAR scanning Accessibility Guidelines for Pedestrian Facilities conventional land surveying, and map in the Public Right-of-Way (PROWAG). checking. Their extensive experience in KDM MERIDIAN (KDM) FIRM boundary, right-of-way, and topographic surveying and mapping, as well as construction
INFORMATION | SURVEY staking and legal descriptions, makes them SUBCONSULTANT a trusted partner for both public and private Established in 2000, KDM Meridian (KDM) sector clients. With a staff of five California is a professional land survey consulting Licensed Land Surveyors and two certified firm specializing in GPS, LiDAR scanning, Land-Surveyors-in-Training, KDM has the conventional land surveying, and map expertise and resources to handle complex checking. As a registered California survey projects with accuracy and efficiency. corporation based in Irvine, KDM has built a KDM has a proven track record of delivering strong reputation by providing high-quality high-quality surveying support for public professional and technical services to both works infrastructure projects, serving as an public and private sector clients. Their extension of municipal survey departments expertise extends to boundary, right-of-way, and working closely with city agencies on and topographic surveying and mapping, topographic surveys, mapping services, and construction staking, legal descriptions, and design improvements. They field multiple land development functions. They are a Small survey crews equipped for conventional, GPS, Business Enterprise based in Irvine. and LiDAR land surveying, ensuring timely With a dedicated team of approximately 20 and precise results. Their ability to scale professionals, including five California Licensed operations as needed allows them to meet the Land Surveyors and two certified Land demands of any project, making us a reliable Surveyors-in-Training, KDM operates multiple and responsive partner in civil engineering and survey crews equipped for conventional, GPS, public works project. and LiDAR land surveying. Their flexibility
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services SECTION 5
& Lochner Qualifications
Not part of the page count |
References of Work Performed Form
(List 5 Local References)
Comany Name: Lochner
Sonoma County Transportation Authority

1. Name of Reference:
411 King Street, Santa Rosa, CA 95404
Address:

Margot Ocañas . (707) 565.5374
Contact Name: Phone Number:

[email protected]
Email:
11/2019-06/2022
Dates of Business:

City of South Gate

2. Name of Reference:
8650 California Avenue, South Gate, CA 90280
Address:

Jose Loera Phone Number: (323) 563-9578
Contact Name:

Email: [email protected]
Dates of Business: 03/2022-Ongoing

3. Name of Reference: Los Angeles County Public Works (LACPW Address: 900 S. Fremont Ave., Alhambra, CA 91803
Contact Name: Lisa M. Woung, PE - Phone Number: (626) 238-4016 Email: [email protected]
Dates of Business: 11/2021-Ongoing

4. Name of Reference: City of Claremont
Address: 207 Harvard Avenue, Claremont, CA 91711
Contact Name: Vincent Ramos Phone Number: (909) 399-5395 Email: [email protected]
Dates of Business: 06/2016-02/2021

5. Name of Reference: LACPW
Address: 900 S. Fremont Ave., Alhambra, CA 91803
Contact Name: Maria Sim Phone Number: (626) 458-5956
Email: [email protected]
Dates of Business: 08/2023-Ongoing
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services SECTION 5 13
& Lochner Qualifications
Sonoma County Transportation Authority
Margot Ocañas | Senior Transportation Planner | Former City of LA DOT Director, Safe Routes to School, Supervising Transportation Planner | (707) 565.5374 | [email protected] LADOT Safe Routes to School (SRTS) PS&E
Lochner prepared PS&E to improve roadways for three elementary schools, with curb extensions, modified storm drains, raised crosswalk, one-way design, medians, new signal, and rectangular rapid flashing beacons.
11/2019-06/2022
Giuseppe Canzonieri: Project Manager; Nicolette Seargeant/Anthony Wong: Project Engineering City of South Gate
Jose Loera | City Traffic Engineer
(323) 563-9578 | [email protected]
Tweedy Mile Complete Streets Project
Lochner is providing civil and traffic engineering, outreach support, ATP funding administration, and construction support services. The overall project includes several pedestrian improvements. 03/2022-Ongoing/In Construction
Giuseppe Canzonieri: Principal-in-Charge; Ana Canzonieri: Senior Engineering Support; Nicolette Seargeant/Lydia Rivera/Anthony Wong: Project Engineering Los Angeles County Public Works (LACPW)
Lisa M. Woung, PE | Senior Project Manager
(626) 238-4016 | [email protected]
Mines Boulevard Et Al Pavement Rehabilitation Traffic Design, West Whittier-Los Nietos Lochner is providing civil and traffic engineering services for a roadway rehabilitation project.

The engineering services include PS&E for striping, traffic signal design, roundabout, curb extension, striping, street lighting, and landscape design, and traffic control design. 11/2021-Ongoing/In Construction
Giuseppe Canzonieri: Principal-in-Charge; Anthony Wong: Project Engineering City of Claremont
Vincent Ramos | Associate Engineer | (909) 399-5395 | [email protected] Claremont Foothill Boulevard Master Plan Implementation Analysis included traffic impacts, geotechnical investigation/percolation, and hydrology-. Design included roadway/intersection/pedestrian improvements, bio-retention, drywells, new storm drains, new bicycle lanes, and landscaping/irrigation. Lochner also provided construction management and inspection.
06/2016-02/2021
Giuseppe Canzonieri: Senior Engineering Support; Ana Canzonieri: Project Engineering City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services P Lochner
Qualifications
LACPW
Maria Sim | Civil Engineer | (626) 458-5956 | [email protected] On-Call Engineering Design-Transportation
LACPW has retained Lochner for the last 20 years for as-needed transportation-related engineering design and support. Our improvements have included roadway, roundabout, pavement rehabilitation, signing and striping, traffic signal, street lighting, traffic control design, traffic studies, feasibility studies, grant assistance, and project design concept report services. 08/2023-Ongoing | Giuseppe Canzonieri: Project Manager; Nicolette Sergeant/Lydia Rivera/ Anthony Wong: Project Engineering
KDM
Harris & Associates for City of Huntington Beach
Randy Berry | Principal Engineer | (949) 536-2503 | [email protected] Oak View Streetscape Improvement Project
Comprehensive surveying and mapping services, including aerial photogrammetry, topographic surveys, and right-of-way mapping, to support infrastructure and streetscape improvements. 08/2022-12/2024
Richard Maher: Senior Project Manager; Patrick Earl: Survey Manager KDM - Subconsultant to Lochner
City of South Gate
Giuseppe Canzonieri, Lochner (see Lochner's entry for this project) Tweedy Mile Complete Streets
KDM Meridian provided topographic surveying and mapping, using aerial and ground methods to support street improvements, curb ramp upgrades, and rehabilitation efforts, with deliverables including CAD base mapping and an aerial digital terrain model. 04/2022-10/2024
Richard Maher: Senior Project Manager; Patrick Earl: Survey Manager KDM - Subconsultant to Lochner
City of Los Angeles
Giuseppe Canzonieri, Lochner
Topographic Survey for Street Design, Ramirez St.

KDM Meridian conducted a topographic survey along Ramirez Street in Los Angeles to support the design of an ADA-compliant curb bulb-out, providing base mapping, centerline placement, and a digital terrain model in AutoCAD format.
12/2023-02/2024
Richard Maher: Senior Project Manager; Patrick Earl: Survey Manager City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services & Lochner SECTION 5|15
Qualifications
KDM
City of Fullerton
Melissa Rendon | Public Works Engineer | (714) 738-6845 | [email protected] Topographic Survey for Storm Drain Repair
KDM Meridian performed a topographic survey to assess drainage conditions and document site features for the rehabilitation of a storm drain system in Fullerton. 10/2024-01/2025
Richard Maher: Senior Project Manager; Patrick Earl: Survey Manager KDM
City of Laguna Beach
Alpha Santos-Guinto | Project Manager | (949) 497-0729 | [email protected] Tree Top Lane Drainage Survey
KDM Meridian conducted a topographic design survey using LiDAR and conventional methods to map flooding-prone intersections in Laguna Beach, providing detailed elevation data for drainage improvements.
03/2018-05/2018
Richard Maher: Senior Project Manager; Patrick Earl: Survey Manager City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services APPENDICES | 16
& Lochner Sample Professional Services Contract
This section not part of the page count |

APPENDICES
This section contains the information and materials listed below.

SAMPLE PROFESSIONAL SERVICES CONTRACT
Lochner accepts the terms of the sample contract, but wishes to add the following language.

Add to the end of 7. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS:

CITY agrees that use of CONSULTANT's completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY's own risk.

Insert at the beginning of 8. HOLD HARMLESS:

For non-professional services,
For this same section, add to the end:

If Consultant's obligation to defend, indemnify, and/or hold harmless arises out of Consultant's performance as a "design professional" (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant's indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant's liability for such claim, including the cost to defend, shall not exceed the Consultant's proportionate percentage of fault.

At the end of 9. PROFESSIONAL LIABILITY INSURANCE, subsection B, please add:
...specifically related to the Services provided under this Agreement Lochner requests the following clauses to be added to the contract, to address the design and construction support elements.

Consultant's Personnel at Construction Site. The presence or duties of Consultant's personnel at a construction site, whether as onsite representatives or otherwise, do not make Consultant or Consultant's personnel in any way responsible for those duties that belong to CITY and/or the construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the construction Contract Documents and any health or safety precautions required by such construction work.

Consultant and Consultant's personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty for inspecting, noting, observing, correcting, or reporting on health or safety deficiencies of the construction contractor(s) or City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services APPENDICES 17
& Lochner Sample Professional Services Contract
other entity or any other persons at the site except Consultant's own personnel.

The presence of Consultant's personnel at a construction site is for the purpose of providing to CITY a greater degree of confidence that the completed construction work will conform generally to the construction documents and that the integrity of the design concept as reflected in the construction documents has been implemented and preserved by the construction contractor(s). Consultant neither guarantees the performance of the construction contractors) nor assumes responsibility for construction contractor's failure to perform work in accordance with the construction documents.

Opinions of Cost, Financial Considerations, and Schedules. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the Project, Consultant has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate Project cost or schedule. Therefore, Consultant makes no warranty that CITY's actual Project costs, financial aspects, economic feasibility, or schedules will not vary from Consultant's opinions, analyses, projections, or estimates.

If CITY wishes greater assurance as to any element of Project cost, feasibility, or schedule, Client will employ an independent cost estimator, contractor, or other appropriate advisor.

RESUMES
Resumes for the proposed key staff (including subconsultants) begin on the following page.

FORMS
Required forms not already provided in the main body of this proposal are included at the end of this section.

City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services APPENDICES 18
& Lochner Resumes
Martin Arshid, PE, MS
FIRM On-call Principal-in-Charge | 24 Years of Experience Lochner Boasting over 24 years of extensive experience, Martin Arshid, PE, MS excels in steering, planning, and overseeing engineering EDUCATION projects on domestic and international fronts, encompassing MS, Civil & Environmental a broad spectrum from $1 million to well beyond $2 billion. He Engineering, UC Davis manages teams of 10 to 80 engineers, consistently delivering BS, Civil Engineering, profitable, high-quality results within specified timelines, University of Damascus, budgetary constraints, and meticulous compliance with customer Syria requirements. He handles marketing budget constraints, achieving Cost Effective Pavement a commendable 100% adherence despite limited resources. He Evaluation, 2021 is an ambitious engineering professional who actively cultivates Effective Management strategic alliances with organizational leaders, seamlessly aligning Skills, 2020 with and supporting key business initiatives. His unwavering Project Management Cert., commitment to excellence extends to ensuring quality assurance. 2015
Relevant Experience
CREDENTIALS Arrow Hwy & Cambridge Ave FMLM Improvement | SGVCOG Professional Engineer (PE) | Claremont, CA | Ongoing | Principal-in-Charge Civil, CA #70000 I-10 Highway Project* | Caltrans | Southern California | Structure Representative
SR-23 Highway Project| Caltrans | Ventura County | Structure Representative
FIRM Kevin Manilla, PE, PMP, ENV SP
Lochner Civil Engineering Task Lead | 23 Years of Experience Kevin is a Principal who is well-versed in Caltrans standards, EDUCATION PMBOK guidelines, and the Caltrans Risk Management Handbook MS, University of Central He has significant experience with local cities and counties. His Florida expertise includes corridor improvement studies, interchange BE, Civil Engineering, BITS designs, roadway design-build, and street and local roadway Pilani, India improvements. His services include ADA requirements, PSRS, PA/ ED, and PS&E. He has extensive experience preparing drainage CREDENTIALS reports, storm water data reports, life cycle cost analysis reports, Professional Engineer (PE), and DSDDs for Caltrans-related projects. Kevin has extensive Civil, CA #76179 knowledge of risk management and earned value management.

PMP #1804420 He is familiar with the resource-loaded critical path method (CPM).

ENV SP
Relevant Experience
SR-23 Drainage & Utilities PS&E | City of Moorpark and
Thousand Oaks | Ventura County | 2024 | QA/QC Manager
I-5 Segment 2 Widening, Yale Avenue to SR-55 PS&E | OCTA | Irvine, CA | 2024 | QA/QC Manager
Cathedral City ATP Safety Projects | CVAG | Cathedral City, CA |2024 | QA/QC Managerl-105 Express Lanes - Roadway
Package 1 & 2, Structures Group 1 through 4 - PS&E | Metro | LA County, CA | 2024 | QA/QC Manager
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services APPENDICES 19
& Lochner Resumes
Giuseppe Canzonieri, PE
FIRM Civil Engineering Task Lead | 21 Years of Experience Lochner Giuseppe Canzonieri has performed numerous projects for both public and private developments throughout Southern EDUCATION California. He has considerable experience working with BS, Civil Engineering, roadway design, traffic signal design, signing & striping design, California State Polytechnic traffic control design, construction specifications and cost University, Pomona estimates. He has served as project manager and project engineer on several civil and traffic engineering design projects CREDENTIALS for several Cities throughout Southern California. Giuseppe is Professional Engineer (PE), also known for his quality control capabilities and providing Civil, CA #79006 clients with high quality construction documents.

Relevant Experience
On-Call General Traffic Engineering and Civil Engineering | City of El Monte | El Monte, CA | Ongoing | Project Manager On-Call Engineering Design-Transportation | LACPW | Los Angeles County, CA | Ongoing | Project Manager
TOS CC-002 Safe Routes to School (SRTS) Shatto Place
Redesign Quick Build Project-ReRelease | City of Los Angeles | Los Angeles, CA | 2024 | Senior Civil Engineer
FIRM Ana Canzonieri, PE
Lochner Civil Engineering Task Lead | 12 Years of Experience Ana Canzonieri's expertise includes the preparation, design EDUCATION and management of engineering plans, specifications and cost BS, Civil Engineering, estimate (PS&E) for public works projects. She has successfully University of California, completed multiple project from concept to construction for Irvine agencies throughout Southern California. She has experience in street improvement design, traffic signal design, street CREDENTIALS lighting, signing & striping and traffic control design. Recent Professional Engineer (PE), projects include the Long Beach Market Street Pedestrian Civil, CA #86541 and Streetscape Enhancement Project and the Santa Monica Olympic Boulevard Improvement Project. Ana also has
experience working for a public agency (City of Anaheim, Traffic Department), and is familiar with preparing presentations, presenting to Stakeholders, and the politics, policies, and procedures of public agencies.

Relevant Experience
On-Call Ball Rd & Walnut St Signal Modifications | City of Anaheim | Anaheim, CA | 2022 | Project Manager
Metrolink ATP Phase II | SBCTA | San Bernardino Count | Ongoing | Project Manager
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services APPENDICES 1200
& Lochner Resumes
Chris Stearns, PE, SE
FIRM Structural Engineering Task Lead | 22 Years of Experience Lochner Charles Stearns is a Structural Engineer for Lochner with more than two decades of experience in the field. He has expertise EDUCATION in bridge rehabilitation, movable bridge design, pile bridge MS, Structural Engineering, design, PS&E, prestressed concrete bridge design, seismic University of California, analysis, structural analysis, structural design, structural San Diego inspection, and structural load rating analysis. He also has BS, Structural Engineering, experience in bridge replacements, constructability reviews, cost University of California, estimate development, light rail transit planning and design, San Diego posttensioned concrete bridge design, quality control and assurance, retaining wall design, and steel beam bridge design.

CREDENTIALS
Relevant Experience
Professional Engineer, CA
#69161 SR 523 (N/NE 145th) and I-5 Interchange Improvements | Structural Engineer, WA City of Shoreline | Shoreline, WA | Ongoing #46202 Project Structural Engineer
FIRM Robert Hong, PE
Lochner Structural Engineering Task Lead | 30+ Years of Experience Robert Hong, PE, SE is a Lead Structural Engineer and Senior EDUCATION Project Manager, with more than 30 years of structural design Master of Science in experience within the transportation industry. Specialty areas Structural Engineering, of structural analysis and materials include pre-stressed, post- Oklahoma State University tensioned, accelerated bridge construction, seismic analysis, and Bachelor of Science in slurry wall and secant pile wall design. Robert also has extensive Structural Engineering, design experience with various long-span and unique bridge Tongli University types including railroad, cable-stayed, truss, swing/vertical lift moveable, tied arch, and thrust arch bridges. Robert has designed CREDENTIALS bridges, retaining walls, and related structures for numerous Professional Engineer: CA highways, heavy light rail facilities, and pedestrian crossings. #85263
Relevant Experience
Phase | Engineering for Lake-Woodbine Bridge Replacement | City of Lake Forest | City of Lake Forest, IL | 2024 | Supervisor (Task Mgr.)
Hidden Lake Forest Preserve Bridges Phase I| Engineering Services | Forest Preserve District of DuPage County | DuPage County, IL | 2022 | Supervisor (Task Mgr.)
405 Construction Support Services | OHL USA | Orange
County, CA | 2024 | Senior Structural Engineer
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services APPENDICES 121
& Lochner Resumes
Richard Maher, PLS
FIRM Professional Land Surveyor | 36 Years of Experience KDM Richard C. Maher, a Professional Land Surveyor (PLS) registered in California, is the President and founding member of KDM EDUCATION Meridian, a leading Land Survey & Mapping firm established Coursework, Civil in 2000. With 35 years of experience in land surveying and civil Engineering, California engineering, he has worked with over a hundred local, county, State Fullerton and state agencies, as well as utility districts. His expertise includes GPS, LiDAR scanning, conventional land surveying, map CREDENTIALS checking, right-of-way engineering, annexations, construction Professional Land staking, design topographic surveys, aerial control networks, Surveyor, CA No. 7564 legal descriptions, boundary surveys, and records of surveys.

Committed to innovation, Richard stays at the forefront of industry advancements in technology, hardware, and software, ensuring KDM Meridian continues to lead in land surveying and mapping services..

Relevant Experience
Oak View Streetscape Improvement Project | Harris &
Associates | Huntington Beach, CA | Surveying and Mapping Services
On-Call Map Checking & Surveying Services | City of Ontario | Ontario, CA | Surveying and Mapping Services
FIRM Patrick Earl, PLS
KDM Professional Land Surveyor | 23 Years of Experience Patrick Earl, a Professional Land Surveyor (PLS) registered in EDUCATION California since 2010, has been in the land surveying industry BS, Mechanical for over 23 years. Beginning as a chainman in 2001, he quickly Engineering, University of advanced to Party Chief, gaining expertise in real property California, Santa Barbara boundaries under the mentorship of an experienced surveyor.

In 2008, he joined KDM Meridian, where he progressed to CREDENTIALS Survey Manager, overseeing daily survey operations, including Professional Land data reduction, mapping, boundary analysis, and survey Surveyor, CA No. 8773 calculations. With extensive field and office experience, he excels in topographic, boundary, and construction surveying, as well as legal descriptions and mapping. As Survey Manager, Patrick leads a skilled team, maintaining a hands-on approach in project management and fieldwork while mentoring the next generation of survey professionals..

Relevant Experience
Oak View Streetscape Improvement Project | Harris &
Associates | Huntington Beach, CA | Surveying and Mapping Services
On-Call Map Checking & Surveying Services | City of Ontario | Ontario, CA | Surveying and Mapping Services
City of Huntington Beach | On-Call Civil Engineering Professional Consulting Services Disciplines of Civil Engineering Services Application Form *Circle all that apply*
Civil Engineering Service Area Bidding?
Y/N
(circle)
• Water/Sewer/Storm Water Engineering Yes /
• General Civil Engineering Tes / No
• Ocean Engineering Yes / No
• Environmental/Water Quality Yes No
EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:

SEE ATTACHED EXHIBIT B
B. Travel Charges for time during travel are not reimbursable.

C. Billing
All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.

2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.

A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.

4. CONSULTANT shall submit to CITY an invoice for each monthly payment due.

Such invoice shall:

A) Reference this Agreement;
B) Describe the services performed;
C) Show the total amount of the payment due;
D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and
For all payments include an estimate of the percentage of work completed.

Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein.

5. Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.

Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.

EXHIBIT "B"
Lochner Company
2025-2027 Hourly Billing Rates
Job Framework Title 2025 2026 2027
Regional Manager $378 $397 $417
Office Manager I $347 $364 5382
Program Director I $331
Project Manager III
Project Manager II
Project Manager I
Engineer IV
Engineer I!!
Engineer Il
Engineer 1 $189
Engineer Associate I/ $168
$147
$210
$189
$168
$147
Construction Engineer Ill
Construction Engineer I
Construction Engineer I $168
Inspector Ill $168
Inspector lI $158
Project Services Coordinator I!! $147
Project Services Coordinator I| $126 $132
Project Services Coordinator l $105 $110
Intern $100 $105
KDM

MERIDIAN
Surveying, Mapping, and Land Services
KDM Meridian Fee Schedule
Version Code: V.250307_PWR
Professional Services
Schedule Category Hourly Rate
Principal $240
Project Manager $225
Project Surveyor $210
Senior Survey Technician $175
Survey Technician $145
Clerical / Administration / Technical Aide $ 95
Expert Witness $500
Survey Crew (1-person) $280
Survey Crew (2 persons) $380
Survey Crew (3 persons) $480
Reimbursables
Schedule Category Rate
Rental of Special Equipment or Special Supplies Cost + 5% Subconsultants Cost + 5%
Agency Fees Actual Cost
Airfare Cost +5%
Per Diem (Meals & Lodging) GSA Published Rates
Miscellaneous Fee Schedule Terms
Fee Schedule Terms and Conditions
A minimum of 4 hours per day will be charged for survey crews and expert witness services.

Over-time will be charged at 1.35 times the regular rate.

Double-time will be charged at 1.75 times the regular rate.:

The above rates shall be charged portal to portal (time spent on project site plus travel time) excluding meal breaks. 1340 Reynolds Ave | Suite 110