PROFESSIONAL SERVICES CONTRACT BETWEEN

THE CITY OF HUNTINGTON BEACH AND
RJM DESIGN GROUP, INC.

FOR

ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE

ARCHITECTURAL ENGINEERING AND PROFESSIONAL

CONSULTING SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and RJM DESIGN GROUP, INC.., a California Corporation hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to provide on-call architectural engineering, landscape architectural engineering and professional consulting services; and
Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and
CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:

SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT."
CONSULTANT hereby designates Zachary Mueting who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement. 25-16636/3833892 1 of 11

2. CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement.

TERM; TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT are to commence on _ 20. (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than three (3) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.

In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein.

COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed One Million Dollars ($1,000,000.00).

EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained. 25-16636/3833892 2 of 11

METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B."

7. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit, provided that any such use not within the purposes intended, by the Agreement shall be at City's sole risk.

HOLD HARMLESS
A. CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT. 25-16636/3833894 3 of 11
B. To the extent that CONSULTANT performs "Design Professional Services" within the meaning of Civil Code Section 2782.8, then the following Hold Harmless provision applies in place of subsection A above:
"CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and against any and all claims, damages, losses, expenses, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind of nature) to the extent that the claims against CONSULTANT arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT's proportionate percentage of fault. However, notwithstanding the previous sentence, in the event one or more other defendants to the claims and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid defense costs. The duty to indemnify, including the duty and the cost to defend, is limited as provided in California Civil Code Section 2782.8.

Regardless of whether subparagraph A or B applies, CITY shall be reimbursed by CONSULTANT for all costs and attorney's fees incurred by CITY in enforcing this obligation.

This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONSULTANT.

9. PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars 25-16636/3833892 4 of 11
($1,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not contain a self-insured retention without the express written consent of CITY; however an insurance policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims-made policy shall be acceptable if the policy further provides that:

A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements).

B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims.

CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement.

If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY.

10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall:
25-16636/3833892 5 of 11
A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and
C. shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium.

CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY.

The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required.

11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder.

12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner.

CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall 25-16636/3833892 6 of 11
be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.

13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove.

14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement.

15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code.

16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or 25-16636/3833892 7of11
other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U.S. certified mail-return receipt requested:

ТО CITY: TO CONSULTANT:

City of Huntington Beach RRM DESIGN GROUP
ATTN: Dir. Comm. & Library Services ATTN: Mike Sherrod
2000 Main Street 32332 Camino Capistrano, Suite 205
Huntington Beach, CA 92648 San Juan Capistrano, CA 93401

17. CONSENT
When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event.

18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties.

19. SECTION HEADINGS
The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement.

20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining 25-16636/3833894 8 of 11
covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law.

21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it.

22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification.

23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for 25-16636/3833892 9 of 11
CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT.

24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party.

25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive.

26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.

28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this 25-16636/3833892 10 of 11
Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.

29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.

This Agreement shall expire when terminated as provided herein.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.

CONSULTANT, CITY OF HUNTINGTON BEACH, a
RJM DESIGN GROUP, municipal corporation of the State of California
vampion
Mayor
ITS: (circle one) Chairman/President/Vice President
AND City Clerk
By: Anita Weaver INITIATED AND APPROVED:

Anita Weaver
print name
ITS: (circle one) Secretary/Chief Financial Officer/Asst. Director of Community & Library Services Secretary - Treasurer
REVIEWED AND APPROVED:

City Manager
APPROVED AS TO FORM:

Will
City Attorne
25-16636/3833892 11 of 11
Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.

29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council. • This Agreement shall expire when terminated as provided herein.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.

CONSULTANT, CITY OF HUNTINGTON BEACH, a
RJM DESIGN GROUP, INC. municipal corporation of the State of California
By:_
print name Mayor
ITS: (circle one) Chairman/President/Vice President
AND City Clerk
By:_ INITIATED AND APPROVED:
print name tenetins
ITS: (circle one) Secretary/Chief Financial Officer/Asst.

Director of Community & Library Services
REVIEWED AND APPROVED:

City Manager
APPROVED AS TO FORM:

City Attorney
25-16636/3833892 11 of 11
EXHIBIT "A"
STATEMENT OF WORK: (Narrative of work to be performed)
Consultant to provide on-call architectural engineering, landscape architectural engineering and professional consulting services
B. CONSULTANT'S DUTIES AND RESPONSIBILITIES:

SEE ATTACHED EXHIBIT A
C. CITY'S DUTIES AND RESPONSIBILITIES:

D. WORK PROGRAM/PROJECT SCHEDULE:

EXHIBIT A
VCk
RJMDESI•01 MCCOWANA

ACORDI CERTIFICATE OF LIABILITY INSURANCE DATE (MADDYYYY) 9/11/2024

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIHCATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE GERTIFICATE HOLDER. this cortificate does not confer rights to the certificato holder in flot of such ondorsomont(s).

PRODUCER Liconso # 0E87768 _ARMcT All Smith
HOA Insuranco Servicos /C, No, ExI: (619) 788-5795 60206 3636 Nobel Drive FAX, Ho: 619) 574-6288
Suite 410 FullEss: [email protected]
San Diego, CA 92122
INSURERISI AFEORDING COVERAGE. ... MAIC II
SURER ARLI Insurance Company 13066
INSURED SURER B: Arch Insurance Company. 11150
RJM Design Group, Inc. INSURER C:
31591 Camino Caplstrano
INSURER D:

San Juan Caplstrano, GA 92075
INSURERE:

I INSURER F:

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD

CAUSONS AND CONTES OF I SEE LATE IN NE REDUCED BE PRIDE RULE TEREN SURE TO L REAS INSR!

AIRI TYPE OF INSURANCE POLICY NUMBER
A X COMMERCIAL GENERAL. LIABILITY 2,000,000
EACH OCCURRENCE.
] CANASAADE [X] OCCUR x PSB0007263 0/30/2024 9/30/2025 1,000,000 X Cont Lial/Soy of Int 10,000
PERSONAL & ADVRIURY 2,000,000
GENL AGGREGATE LIVIT APPLIES PER: GENERAL AGGREGATE 1,000,000 POLICY X PRO • LOC 4,000,000
OTHER: 0
A AUTOMOBILE LIABILITY les en 1,000,000
ANY AUTO PSA0002412 9/30/2024 0/3012026 Is.

X ABYSS ONLY X NONS ONES
X
$
A X UMBRELLA LIAB X OCCUR 1,000,000
EACH OCCURRENCE .s.

EXCESS LIAB CLAIMS-MADE PSE0003628 0/30/2021 / 9130/2025 /AGGREGATE 1,000,000

DED RETENTIONS
X/LL X PSW0004066 9/30/2024 0/30/2026 1,000,000
THIA EL. FACHACCIDENT $.

EL, DISEASE - EA EMPLOYEES. 7,000,000
os. dosenoo und
ESCRIPTION OF OPERATIONS bek 10712026 Por Cans POLY UNIT. S 1,000,000 B Prof Llab/Clins Made РАЛЕР0031107 10/172024 2,000,000 B Dost: $28K Por Clalm [PAAEP0031107 10/1/2024 10/1/2026 Aggregate 2,000,000 RO: A OOTIONS MATIONS LOCATIONS/ VEHICLES (ACORD 101, Alonal Romake Schedure, may be altache moro space to reguled) only or unite as eit ly wool or a a ver Biliato domes to eror Coponsor Will respot to General Liably or tho arlechned 'MICHAEL E GATES

CERTIFICATE HOLDER CANCELLATION
"CITY ATTORNEY
SHOULO ANY OF THE ABOVAANSARINDeENBONDANCELED BEFORE

EXPIRATION DATE NOTICE WILL BE DELIVERED
ACCORDANCE WITH THE POLICY PROVISIONS.

Clly of Huntington Boach AUTHORIZED REPRESENTATIVE
Atti: Risk Managoment
2000 Main Strool Cole.

Huntington Boach, CA 92040.

ACORD 26(2010/03) @ 1008-2016 ACORD CORPORATION. All rights reservod.

The ACORD name and logo are registered marks of ACORD
amed insured: Ri Design Group, le
licy Number: PSW000401
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 04 03 06 (Ed. 4-84)

WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT-CALIFORNIA We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce ur right against the person or organization named in the Schedule. (This agreement applies only to the exlent tha rou perform work under a willen contract that requres you to oblain this agreement from us.

You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule.

The additional premium for this endorsement shall be % of the Californla workers' compensation premium otherwise due on such remuneration.

Schedule
Person or Organization Job Description
All persons or organizations that are parly to a Jobs performed for any person or organization that you contract that requires you to obtaln this have agreed with in a written contraot to provide this before the provided you execuled the contrao agreement. ••
©1998 by the Workors' Componsation Insurance Rating Buroat of Calfornla. All rights rosorved. :

Policy Number: PSB0007263 RLI Insurance Company
Named Insured: RJM Design Group, Inc.

THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY.

RLIPack® FOR PROFESSIONALS

BLANKET ADDITIONAL INSURED ENDORSEMENT
This endorsement modifies insurance provided under the following:

BUSINESSOWNERS COVERAGE FORM - SECTION II - LIABILITY

1. C. dil sal i let a es on or or to intone a
ou agree in a contract or agreement requirin
surance to include as an additional insured on th
policy, but only with respect to liability for "bodily covers such additional insured as a named insured, "property damage" or "personal and and we will not share with that other insurance, advertising injury caused in whate or in part by you
provided that:
or those acting on your behalf:
a. The "bodily Injury" or "property damage" for
a. In the performance of your ongoing operations; which coverage is sought occurs after you have b. In connection with premises owned by or rented entered inlo that contract or agreement; or to you; or b. The "personal and advertising injury" for which c. In connection with "your work" and included coverage is sought arises out of an offense within the "product-compleled operations committed after you have entered into that hazard". contract or agreement.

2. The insurance provided to the additional insured by 4. The following is added to SECTION III K. 2. this endorsement is limited as follows: Transfer of Rights of Recovery Against Others to Us - COMMON POLICY CONDITIONS (BUT
a. This insurance does not apply on any basis to APPLICABLE TO ONLY TO SECTION I! - any person or organization for which coverage LIABILITY as an additional insured specifically is added by
We waive any rights of recovery we may have
another endorsement to this policy.
against any person or organization because of
b. This insurance does not apply to the rendering
of or failure to render any "professional damage" or "personal and advertising injury" arising services". out of "your work" performed by you, or on your under a contract or agreement with that

6. This endorsement does not increase any of the
imits of insurance slated in D. Liability An
Vedical Expenses Limits of Insurance

3. The following is added to SECTION III H.2. Other
- COMMON POLICY CONDITIONS
(BUT APPLICABLE ONLY TO SECTION I..

LIABILITY)
However, if you specifically agree in a contractor
agreement that the insurance provided lo an

ALL OTHER TERMS AND CONDITIONS OF THIS POLICY REMAIN UNCHANGED, PPB 304 02 12 Page 1 of 1

EXHIBIT A
On-Call Architectural Engineering,
Landscape Architectural Engineering,
and Professional Consulting Services
City of Huntington Beach
Proposal
Community Inspired Spaces

DESIGNI
April 29, 2025 RJM
Table of Contents
Murdy Park, Huntington Beach (RJM Project)
Cover Letter | 1
Vendor Application Form | 2
Background and Project Summary Section | 4
Methodology Section | 5
Staffing | 11
Qualifications | 16
References 23
Clarifications, Exceptions, or Deviations | 25
Fee Proposal | See Separate Document Submission
Cover Letter
31591 Camino Capistrano
San Juan Capistrano, CA 92675
www.RJMdesigngroup.com
(949) 493-2600 phone
Community Inspired Spaces
(949) 493-2690 fax
DESIGN
April 29,2025
City of Huntington Beach
Community & Library Services Department
2000 Main St. No. 5
Huntington Beach, CA 92648
Re: RFQ: On-Call Architectural Engineering, Landscape Architectural Engineering, and Professional Consulting Services
Dear Selection Committee and Department:

RJM Design Group, Inc. is pleased to submit our proposal for On-Call Landscape Architecture Engineering Services for the City of Huntington Beach. We are very excited about the opportunity to continue providing our services to the City and its residents.

RJM Design Group is a multi-disciplinary landscape architectural design and planning firm with extensive experience providing On-Call / As-Needed Professional Consulting and Design Services to numerous municipal clients. Specific to the City of Huntington Beach and this RFP, we present this proposal for the Landscape Architecture Engineering category. We will be responsible for providing various landscape planning, design and engineering services as outlined in the RFP. Our Scope of Work included herein defines our approach and methodology to delivering these on-call / as-needed landscape architectural engineering services.

RJM Design Group is proud to celebrate our 38th year in business. The key to our stability and success is our many clients with whom we have developed strong relationships with. We are committed to working closely with City staff to ensure the project development processes run smoothly and efficiently. Our goal is to work with the City to improve the quality of life for its residential and business communities.

Thank you for the opportunity to present our team and methodology for your consideration. If you have any questions or comments after reviewing this proposal, please feel free to contact me directly by phone at (949) 493-2600 or email at [email protected].

Sincerely,
RJM Design Group
Zachary Mueting, LLA
Principal
[email protected]
City of Huntington Beach • On-Call Landscape Architecture Services | 1

REQUEST FOR PROPOSAL

VENDOR APPLICATION FORM
TYPE OF APPLICANT: • NEW XI CURRENT VENDOR
Legal Contractual Name of Corporation: RJM Design Group, Inc.

Contact Person for Agreement: Zachary Mueting
Corporate Mailing Address: 31591 Camino Capistrano
City, State and Zip Code: _San Juan Capistrano, CA 92675 E-Mail Address:[email protected]
Phone: 949 493-2600 Fax:_ N/A
Contact Person for Proposals: _Amanda Gorman
Title: Marketing E-Mail Address: [email protected] Business Telephone: 949 493-2600 Business Fax: N/A
Year Business was Established: 1987
Is your business: (check one)
• NON PROFIT CORPORATION X FOR PROFIT CORPORATION
Is your business: (check one)
IX CORPORATION • LIMITED LIABILITY PARTNERSHIP
• INDIVIDUAL E SONCROPORATOASS

PARTNERSHIP UNINCORPORATED ASSOCIATION
1 of2
City of Huntington Beach • On-Call Landscape Architecture Services | 2 Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Larry Ryan President 949 493-2600
Zachary Mueting Secretary 949 493-2600
Anita Weaver CFO 949 493-2600
Federal Tax Identification Number: 33-0254945
City of Huntington Beach Business License Number:
(If none, you must obtain a Huntington Beach Business License upon award of contract.) City of Huntington Beach Business License Expiration Date: N/A 2012
City of Huntington Beach • On-Call Landscape Architecture Services | 3 Background and Project Summary Section
RJM Design Group offers landscape architectural and design services, specializing in parks and recreation and other public facilities. At RJM, we are nearing our 38th year of professional experience in working with counties, cities, and other public sectors. RJM's mission is to assist communities in the planning and design of environments that enhance the quality of life for all. Our goal is to implement the vision of the clients and the communities we serve by designing creative, functional, and fun Community Inspired Spaces.

The key to our stability and success are our many clients with whom we have developed long-term relationships. Throughout the years, we have had the good fortune to be selected as a pre-qualified On-Call Consultant to numerous counties, cities, and agencies. These include the cities of Mission Viejo (29 years), Long Beach (28 years), Chino (28 years), Chino Hills (23 years), Aliso Viejo (20 years), Santa Ana (16 years), Huntington Beach (15 years, San Dimas (15 years), County of Orange (15 years), San Juan Capistrano (14 years), County of Los Angeles (14 years), Whittier (11 years), Newport Beach (9 years) and various additional Clients.

Through this experience we strive to:
• Work closely with our client to develop a clear understanding of project goals. • Provide adequate staffing to provide service to clients on a short notice.

Develop a comprehensive scope and fee summary with the necessary specialty consultants.

Develop a project schedule that identifies all important project milestones (plan submittals, review periods, public presentations, other agency interactions/review, approvals, etc.). • Exceed your expectations in providing comprehensive and well-coordinated design services.

CODCOLLAGUNA NIGUR
RJM Staff | RJM Office
City of Huntington Beach • On-Call Landscape Architecture Services | 4 Methodology Section
Project Approach Summary Table
Phase Approach Deliverables
Kick-Off meeting with City Request for Information
Kick-Off On-site review Project Schedule
Obtain survey Schematic Design Plans
Overlay project base with existing utilities Statement of Probable Preliminary Design Prepare Schematic Design Plans Construction Costs Prepare for and facilitate a Community workshop City's Project Manager Meet with City Project Manager for review comments
Prepare refined Schematic Design Plans Refined consensus plan Prepare product cut sheets and color samples color graphics, refined Meet with City Project Manager for review preliminary construction Design Development cost estimate
Product cut sheets and
color samples
• Prepare drawings and specifications based on Construction Drawings approved Design Development Documents, Statement of Probable setting forth in detail the landscape Construction Costs Construction Technical Specifications
requirements for the project
Documents • Prepare final Statement of Probable Construction Costs
Develop and prepare technical specifications
Submit plans, specifications and cost estimate to Final approved plans, . the City for plan check, review and final approval specifications and cost Submit project documentation to the affected estimate
Agency Approval agencies, as well as City department (as required) • Revise plans and specifications in response to City
and other agency comments, resubmit for review
and approval
• Assist the City with questions, clarifications, or Addenda as a result of Bidding conflicts that arise during the Bidding Phase bid clarifications Conduct pre-construction conference Request for information, Review submittals and shop drawings change order requests Construction Conduct job site meetings and other related Administration • Prepare final punch list communications Final walk-through and
punch list
• Conduct final job site meeting and review of the As-built record drawings entire facility
• Conduct a second walk-through when all punch
Close-Out list items have been corrected, at which time a Final Notice of Completion shall be filed by the
City.
• Prepare As-built record drawings
City of Huntington Beach • On-Call Landscape Architecture Services | 5 Methodology Section (continued)

LANDSCAPE ARCHITECTURE SERVICES
The following Draft Scope of Services outlines the various tasks associated with the preparation of improvement plans for a variety of community projects. We have included an optional service that utlines a public workshop process that we have utilized successtully for numerous communit rojects. Tasks and methodology below are based upon our experience with similar projects.

Our proposed scope of work is general in nature to give you some idea of the design process we envision. This is a "Draft" approach that is subject to review and refinement per City comments and direction. In collaboration with City statt, our Design leam shall review, elaborate upon, and clarity the overall objectives for the development of your project.

PHASE 1.0 - PRELIMINARY DESIGN

1. Project Familiarization (research, site reconnaissance, opportunities and constraints)

2. Prepare a Draft Scope of Work and anticipated Schedule

3. Meet with City and Design Team to review scope of work and refine as necessary

4. "Taking Part" Community Workshop (Optional Service)-can be provided in a "virtual" format

5. Commence preparation of Preliminary Design (including plans and cost estimate)

6. Meet to review Preliminary Plans/Cost Estimate and revise as necessary per City comments

7. Prepare for and attend community/public presentation as desired by City Refine Preliminary plans based on public comments and City direction

9. Prepare for and attend public review meeting to obtain City approval PHASE 2.0 - DESIGN DEVELOPMENT

1. Based upon approved Preliminary Plan, prepare Design Development Plans indicating the proposed site components. Provide plan enlargements and catalog cut sheets to clearly define all site elements.

2. City to review and approve Design Development Plans, plan enlargements, and catalog cut sheets, to evaluate project goals, budget, and long term maintenance considerations.

3. Based on the nature and complexity of the project, we shall assist the City in securing the services of a Construction Management firm with the desired level of expertise in the specific type of project.

PHASE 3.0 - CONSTRUCTION DOCUMENTS
Design Plans. Construction drawings will be submitted at 90% complete for review, revised, and finally 100% complete construction drawings will be submitted for city review and approval.

1. Landscape Design/Documentation
Services during the Construction Documents Phase consist of preparation of drawings and specifications based on approved Design Development Documents, Setting forth in detail the landscape requirements for the project including:
a. Site construction/layout plans
b. Planting plans
c. Irrigation plans
d. Details
City of Huntington Beach • On-Call Landscape Architecture Services | 6 Methodology Section (continued)

2. Civil Design/Documentation (if needed)
Services during the Construction Documents Phase consist of preparation of final civil engineering calculations, drawings and specifications based on approved Design Development Documents, setting forth in detail the civil construction requirements for the project.
a. Prepare precise grading/site plan.
b. Prepare on-site area drain plans.
c. Prepare quantity and cost estimate for items shown on grading/site plan. d. Review and edit project specifications for site development and site utility construction items.

3. Electrical Design/Documentation (if needed)
Final drawings and specifications shall be completed at the Contract Documents Phase. All power, lighting and control schemes, complete with diagrams and details shall be finalized.

4. Statement of Probable Construction Cost

5. Submit plans to the City at 90% completeness for review

6. Meet with City to review plan check comments

7. Revise plans per plan check comments

8. Provide approved and digitally signed PDF plans and specifications to the City for pubic notice and formal bidding.

PHASE 4.0 - BIDDING AND NEGOTIATION
Following the City's approval of the Construction Documents and of the most recent Statement of Probable Construction Cost, we shall provide those services necessary to assist the City in obtaining bids or negotiated proposals and in awarding and preparing contracts for construction.

PHASE 5.0 - CONSTRUCTION SERVICES
The Construction Contract Administration Phase shall provide those services necessary for the administration of the construction contract.

1. Office construction administration
Services consist of:
a. Review and approval of submittals
b. Review and response to RF's with supplemental drawings, specifications and interpretations in response to requests tor intormation by Contractor.

2. Construction field observation: Services consist of visits to the project site at intervals appropriate to the stage of construction or as otherwise agreed in writing to become scope of construction and construction period).

City of Huntington Beach • On-Call Landscape Architecture Services | 7 Methodology Section (continued)

QUALITY ASSURANCE
produce the most fictive manner potle ying our en in pocal ming .

Our Quality Assurance Program is process-oriented and begins with experienced staff along with our firm's commitment to ongoing education. Our experience is based on hundreds of successtul projects and gratitied clients. Our staff is encouraged to continually pursue expanding their current knowledge base in order to allow us to be at the forefront of our industry. Continuing education is pursued in the following areas:

AIA - American Institute of Architects
ISA CA - International Society of Arborists, Certified Arborists ASLA - American Society of Landscape Architects
CPSI - Certified Playground Safety Inspector
LEED - Sustainable Practices
PSMJ - Project Management
QSP & QSD - Qualified SWPPP Practitioner and Developer
STMA - Sports Turf Managers Association
In addition to our well-educated and seasoned professionals is our thorough understanding of the project development process. This allows us to share information with our consultant team and clients so that our projects evolve in a proactive and well-orchestrated manner. Communication among staff, team members and client include the following project parameters:

Project Goals - clearly identified.

Program Needs - confirmed with the client.

Schedule - a project schedule is established at the onset which outlines the process evolution, major milestones, submittal dates, reviews, approvals, bid, construction, project opening, one- year follow up/review.

Budget - understanding the budget is critical to a project's success. The project budget is clarified (client staff, consultant fees, entitlement costs, construction costs, etc.) versus construction budget.

Construction Estimates - RJM maintains an extensive library of unit costs that are acquirec through our numerous public bids, as well as from specialty consultants and independent cost estimators. This allows our preliminary opinion of probable construction costs to accurately reflect the anticipated contractors' bids.

Our office environment is an open studio that allows for continual sharing of ideas and collaboration between our experienced principals, project managers, and staff members. We believe that this interaction promotes effective communication that is vitally important to the success of every project. Team meetings are scheduled at regular intervals to ensure that accurate communication on key project aspects is shared and understood.

Noteworthy to RJM and unique when compared to other firms, is that the same design team, individual staff members responsible for all preliminary design phases, will continue on and retair responsibility for the preparation of the final construction documents. We believe that this approach allows for a more consistent and accurate method of ensuring that all of those special details discussed in the design phase are carried throughout the final construction document process. This method is fundamental for maintaining quality assurance, limiting change orders, and effectively controlling construction costs.

The continual monitoring of project evolution provides the ability to confirm that appropriate goal, program ends, schedules oing bags This a ers a and eat unforeseen changes, carte ", do not occur inappropriately.

City of Huntington Beach • On-Call Landscape Architecture Services | 8 Methodology Section (continued)

QUALITY CONTROL PLAN
Our open office "bullpen" setting is especially conducive to regular milestone reviews and monitoring of a project. This review plays a central role in our quality control effort. The importance of plan review, checking, and cross-checking cannot be overemphasized, given the complexity and time constraints under which construction documents are often produced. Our review benchmarks include:
• Documents are comprehensively checked at key milestones and regular intervals. • One person checks all important dimensions, gradients and utility infrastructure. • The person responsible for the drawings reviews the specifications, and the specifier reviews the drawings.
• Regular consultant team meetings are held to review the documents produced by each for coordination (utility, civil, electrical, etc.)
• The Principal Landscape Architect will be ultimately responsible for all work produced under his or her direction. A constant review process is implemented in all phases of the work.

The Client is involved in reviewing plans at regular intervals and approving the construction documents before they are issued for bid.

Another integral component in our quality control process is the utilization of our "RJM lessons learned checklist." This checklist contains the learning experiences that we have encountered over 37 years of project development. It is a useful tool that allows us to systematically review our work and that of our consultant team to ensure that we are applying the collaborative experience learned to the benefit of our projects.

In addition to our in-house quality control efforts, we are also continually learning and applying the ongoing "lessons learned" from our outside plan check services provided to multiple agencies.

This methodical approach to outside projects gives us the unique advantage of reviewing our own plans and specifications with an impartiality that allows for a fresh and unbiased evaluation.

COMMUNICATIONS APPROACH
will be conducted through RJM Design Group.

1. Consultants can participate in online virtual meetings via Zoom, Microsoft Teams, or other video conterencing applications. Meetings to be held at regular intervals during the early phases of the project and continue on an as-needed basis thereafter to assess progress and provide direction throughout the performance of the services and preparation of the project deliverables.

2. RJM will prepare all meeting agendas for identified scheduled meetings with the City and provide a summary of key issues with action items (meeting notes) discussed at each meeting.

BALL FIELD

BALL FIELD
City of Huntington Beach • On-Call Landscape Architecture Services | 9 Methodology Section (continued)
Evidence of Insurability / Business License
a. RJM Design Group, Inc. certifies that we will provide the City's required insurance coverage per Exhibit-2 INS-A.
b. RJM Design Group, Inc. acknowledges that, if awarded the contract, the proposer has ten (10) calendar days to produce the required insurances, including a certified endorsement naming the City as additionally insured.
c. RJM Design Group, Inc. acknowledges that, if awarded the contract, the proposer must provide a copy of current business license or other applicable licenses.

Company Overview & Disclosure
a. No contributions were made by RJM Design Group, Inc. to any City of Huntington Beach elected officials by the owners of the company.
b. RJM Design Group, Inc. has been in business for 38 years. There are no prior business names.

Combined amongst all of RJM Design Group, Inc.'s team members, we have over 40 years of experience in providing the proposed, equivalent, or related services.

C. RJM Design Group, Inc. has not been subject to any litigation, current or within the last 5 years, involving the company or any principal officers thereof in connection with any contract. RJM Design Group, Inc. nor the principals associated with our company are under investigation, being sued, suing, or affiliated in any lawsuit or alternative dispute resolution with any governmental agency.

Beach Bluff Top Slope
Stabilization and Enhancement Project,
Huntington Beach (RJM Project)
City of Huntington Beach • On-Call Landscape Architecture Services | 10 Staffing
City of Huntington Beach
RJM Design Group, Inc.

Will Provide:

Professional Landscape Architectural Services,
Project Management, Project
Coordination & Administration
Principal In Charge:

Zachary Mueting
Project Landscape Architect /
Project Manager:

Eric Chastain
Andrew Steen
Sub-Consultants:

Civil Engineering
Tom Carcelli - CivTec
Electrical Engineering
Bill Zavrsnick - FBA Engineering
Irrigation
Chris Curry - Glasir Design
RJM Design Group is able to provide
additional subconsultant services including:

Architecture, Aquatic Design, Environmental
Analysis, Structural Engineering,
Geotechincal Services, Skatepark Design.

Staffing (continued)
Zachary Mueting, LLA Eric Chastain LLA, LEED AP
Principal-in-Charge (BD+C)
RJM Design Group, Inc. Principal Project Manager
Zachary Mueting is a visionary RJM Design Group, Inc.
landscape architect and urban designer Eric Chastain is a highly accomplished with over a decade of experience Principal Project Manager with a deep creating sustainable and engaging expertise in project management, outdoor spaces. His porttolio construction, and design. Recognized includes diverse projects, from public as the "go-to guy" for delivering parks and recreational tacilities to successful projects, Eric is known urban landscapes, all designed to for his ability to navigate complex foster community connection and challenges, streamline processes environmental stewardship. With a passion for blending and ensure seamless project execution from inception innovation and aesthetics, Zachary's work emphasizes to completion. His leadership and problem-solving collaboration and a deep understanding of community skills make him an invaluable asset to any design and needs, resulting in spaces that inspire and endure. construction team.

Zachary's exceptional technical design skills and ability to With extensive experience in aquatics and sports lead project teams have been integral to his success in facility design, Eric has played a key role in the planning advaned proficiency in design are staine and development of high-performance recreational proficiency in design software and sustainable and athletic spaces. His expertise spans all phases of practices with strategic project management, ensuring that the design process, including program development, each initiative is executed efficiently and to the highest site analysis, conceptual design, construction standards. His leadership style fosters collaboration and documentation, and construction observation. His innovation among team members, empowering them to hands-on approach ensures that each project is executed achieve shared goals and exceed client expectations. with precision, functionality, and long-term sustainability in mind.
• Landscape Architect / CA 5731
Licenses
Education • Landscape Architect / CA 3411
• Masters Degree, Landscape Architecture, California • LEED Accredited Professional Polytechnic State University, Pomona
Education
• Bachelor of Science, Information Technology, Colorado • Bachelor of Science, Landscape Architecture, Technical University California Polytechnic State University, Pomona, CA • Bachelor of Science, Information Systems Management,
Colorado Technical University • Minor in Irrigation Design, California Polytechnic State University, Pomona, CA
On-Call Services
• On-Call Design Services, City of Aliso Viejo, CA On-Call Design Services • On-Call Design Services, City of Chino Hills, CA • On-Call Design Services, City of Aliso Viejo, CA • On-Call Design Services, City of Fresno, CA • On-Call Design Services, City of Bell Gardens, CA • On-Call Design Services, City of Huntington Beach, CA • On-Call Design Services, City of Chino Hills, CA • On-Call Design Services, City of Laguna Niguel, CA • On-Call Design Services, City of Dana Point, CA • On-Call Design Services, City of Lake Elsinore, CA • On-Call Design Services, City of Eastvale, CA • On-Call Design Services, City of Lake Forest, CA • On-Call Design Services, City of Laguna Niguel, • On-Call Design Services, City of Long Beach, CA • On-Call Design Services, City of Lake Forest, CA • On-Call Design Services, City of Los Angeles, CA • On-Call Design Services, City of Long Beach, CA • On-Call Design Services, City of Mission Viejo, CA
• On-Call Design Services, City of Los Angeles, CA
• On-Call Design Services, City of Newport Beach, CA • On-Call Design Services, City of Mission Viejo, CA • On-Call Design Services, City of Ontario, CA
• On-Call Design Services, City of Sacramento, CA • On-Call Design Services, City of Newport Beach, • On-Call Design Services, City of San Juan Capistrano, CA • On-Call Design Services, City of Perris, CA • On-Call Design Services, City of Santa Ana, CA • On-Call Design Services, City of Riverside, CA • On-Call Design Services, City of South El Monte, CA
• On-Call Design Services, City of West Sacramento, CA Capistrano, • On-Call Design Services, County of Los Angeles, LA • On-Call Design Services, City of Santa Ana, CA County Development Authority, Los Angeles, CA
a Design Services, County of Orange, Orang
ounty Public Works, Orange County Los Angeles, CA
• On-Call Design Services, County of San Bernardino, • On-Call Design Services, Orange County Public Special Districts Department, CA Works, Orange County, CA City of Huntington Beach • On-Call Landscape Architecture Services | 12 Staffing (continued)
Andrew Steen, LLA Tom Carcelli
Associate Landscape Architect Civil Engineer
RJM Design Group, Inc.

Andy Steen has been a dedicated
member of RJM Design Group since Tom Carcelli has over 25 years of experience in the civil 2014, bringing over 20 years of engineering field with particular emphasis on parks and experience as a licensed Landscape recreation, commercial/industrial, education and public Architect and certified arborist. With works projects. His extensive design and management a strong background in landscape experience in all phases of civil engineering for land materials, construction, and detailing, development projects throughout Southern California Andy has developed a unique approach
to blending traditional techniques includes grading, water quality, hydrology, hydraulics, with innovative, modern design ideas. His expertise storm drain, water/sewer, survey/mapping and street spans across a wide range of projects, with a particular design. Tom has been in charge as a project manager on focus on imaginative and exciting playground design, over 100 projects from master planning to construction where his design solutions emphasize both functionality and aesthetic appeal. Known for his exceptional project with RM Design Group over the past 20 years. management skills, Andy ensures projects are completed
on time and within budget while maintaining the highest Education quality standards. His extensive knowledge of plant species Civil Engineering, University of California, Irvine, 1988
and horticulture further enriches his designs, allowing him to create sustainable, thriving landscapes. Andy's depth of • Masters in Architecture, California State Polytechnic experience and commitment to excellence make him an University, Pomona, 1994 invaluable asset to any project. Licenses
• Registered Civil Engineer/CA #81640
Licenses
• Landscape Architect / CA 5858 • Qualified SWPPP Developer (QSD) - C-81640 • Certified Arborist WE-9969A
• Tree Risk Assessment Qualification Relevant Project Experience • FAA 107 Licensed Remote Drone Pilot • Anthony Munoz Community Center, Ontario, CA Education • Bommer Canyon Community Park, Irvine, CA
• Bachelor of Science, Environmental Planning and Design, • Cherry Park, Lake Forest, CA Landscape Architecture, Rutgers University, State
University of New Jersey • Cordova Park, Mission Viejo, CA • Dali Dog Park, Rowland Heights, CA
On-Call Experience • Esencia Sports Park, Rancho Mission Vijo, CA • On-Call Design Services, City of Signal Hill, CA
• On-Call Plan Check Services, City of Aliso Viejo, CA • Ford Park Aquatics Facility, Bell Gardens, CA • On-Call Plan Check Services, City of Chino, CA • Gardena Community Aquatics & Senior Center, Gardena, CA
• On-Call Plan Check Services, City of Culver City, CA
• On-Call Plan Check Services, City of Laguna Niguel, CA • Grant Howald Park, Newport Beach, CA • On-Call Plan Check Services, City of Laguna Woods, CA • JAPRD Community Recreation Center, Riverside, CA • On-Call Plan Check Services, City of Mission Viejo, CA • Joe Balderrama Park, Oceanside, CA • On-Call Plan Check Services, City of San Dimas, CA • Lake Mission Viejo Improvements, Mission Viejo, CA • On-Call Plan Check Services, City of Whittier, CA • Los Serranos Park, Chino Hills, CA • Marguerite Aquatics Complex, Mission Viejo, CA
Parks
• Boulder Pond Park, Rancho Mission Viejo, CA • Murdy Park, Huntington Beach, CA • Carriage Crest Park, Carson, CA • Orange Coast College Baseball Field Renovation, Costa • Cherry Park, Lake Forest, CA Mesa, CA
• Cordova Park, Mission Viejo, CA • Peace Park Playground, Long Beach, CA • Darrin Park, Lake Forest, CA • Portola Park, Lake Forest, CA • Los Serranos Park, Chino Hills, CA • Rancho Cucamonga Central Park Master Plan Update, • Mile Square Park Golf Course Conversion, Orange, CA Rancho Cucamonga, CA • Murdy Park, Huntington Beach, CA • Santa Ana Civic Center Plaza Improvements, Santa Ana, • Pinehurst Park, Chino Hills, CA CA
• Portola Park, Lake Forest, CA • Santa Monica Civic Multi-Purpose Sports Field, Santa • Premier Park, Stanton, CA Monica, CA
• Worthy Park, Huntington Beach, CA • Yorba Linda Adventure Play, Yorba Linda, CA • Yorba Linda Adventure Playground, Yorba Linda, CA
City of Huntington Beach • On-Call Landscape Architecture Services | 13 Staffing (continued)
William Zavrsnick FBA ENGINEERING Chris Curry GLASIR DESIGN Electrical Engineer Irrigation Designer
FBA Engineering Glasir Design
William Zavrsnick has 30 years of experience and has Chris Curry has over 15 years experience in irrigation design, been active in the electrical engineering field since landscape architecture, and landscape construction. His joining FBA in 1985. His experience includes the focus is on the efficient use of water in the landscape. He electrical design of Public Works, Parks and Recreation has been rewarded for his efforts by being chosen by the Facilities. He is particularly experienced in the design United States Environmental Protection Agency as the and development of electrical power distribution, WaterSense Irrigation Partner of the year for 2011. He is only general, specialized and event power systems, the second irrigation design consultant chosen for this award outdoor, security and sports field lighting systems, that shows his commitment to the environment through lighting photometric studies, phased construction sound water conservation practices. Chris is a leader in projects and familiar with public bid type projects and the irrigation industry. His expertise is called upon by construction. manufacturers, cities, and water districts.

Education Education
• BS Civil Engineering/Mount Hood College, Oregon • Bachelor of Science, Landscape Irrigation Science, California State Polytechnic University, Pomona, CA
Certifications Designation
• LEED Accredited Professional - LEED AP • US Environmental Protection Agency (EPA) WaterSense • Illuminating Engineering Society - IES Irrigation Partner - Selected the 2011 EPA WaterSense Irrigation Partner of the year
• Institute of Electrical and Electronic Engineers - Certifications IEEE American Institute of Architects - AIA
• Irrigation Association (IA) Certified Irrigation Designer (CID • Electrical Engineering - Los Angeles County in Commercial Irrigation Design, Golf Irrigation Design, and Landscape Irrigation Auditing
Relevant Project Experience Memberships
• Bommer Canyon Community Park, Irvine, CA • Professional Member of the American Society of Irrigation Consultants - 2011 Southern California
• Bonita Creek Field Renovation, Newport Beach, CA
• City Park Improvements, Lake Elsinore, CA Parks
• Grant Howald Park, Newport Beach, CA
• Civic Lot Multi-Purpose Sports Field,
Santa Monica, CA • Portola Park & Dog Park, Lake Forest, CA • El Dorado Park & Nature Center, Long Beach, CA • Central Park Master Plan Update, Rancho Cucamonga, CA • Worthy Park Renovation, Huntington Beach, CA
• Esencia Sports Park, Rancho Mission Viejo, CA
• Los Amigos Park, Rancho Cucamonga, CA
• Grant Howald Park, Newport Beach, CA • Admiral Kidd / Seaside Park Field Reno, Long Beach, CA • Hero's Park, Lake Forest, CA • Redhawk Dog Park Improvements, Temecula, CA • Joe Balderrama Park, Oceanside, CA
• Kraemer Memorial Park, Placentia, CA Sports / Aquatics Facilities • Drake Chavez Soccer Field, Long Beach, CA
• Laguna Hills City Parks, Laguna Hills, CA • Bonita Creek Field Renovation, Newport Beach, CA • Lake Forest Neighborhood Parks, Lake Forest, CA • Lake Forest Sports Park, Lake Forest, CA • La Placita Parkette, Placentia, CA • North Beach Improvements, Lake Mission Viejo Assoc, CA • Los Amigos Park, Santa Monica, CA • Central Park Tennis Complex, Santa Clarita, CA • Los Serranos Park, Chino Hills, CA • Fillmore Aquatics & Tennis Complex, Fillmore, CA • Marchant Park, San Dimas, CA • Santa Clarita Sports & Aquatic Center, Santa Clarita, CA • McFadden Park, Placentia, CA On-Call Plan Check Services • Murdy Park, Huntington Beach, CA • On-Call Plan Check Services, Aliso Viejo, CA • On-Call Plan Check Services, Chino, CA
• Portola Park, Lake Forest, CA
• On-Call Plan Check Services, Laguna Niguel, CA
• Portola Springs Park, Irvine, CA • On-Call Plan Check Services, Mission Viejo, CA • On-Call Plan Check Services, San Dimas, CA
• On-Call Plan Check Services, Whittier, CA
City of Huntington Beach • On-Call Landscape Architecture Services | 14 Staffing (continued)
Noteworthy to our proposal, and unique when compared to other firms, is that RJM holds long- term relationships with both our internal staff and our subconsultants. Over the past 38 years, we have cultivated a collaborative and dependable working dynamic with our subconsultant team, ensuring seamless integration and alignment with project goals. This longevity reflects not only our commitment to fostering trusted partnerships but also our ability to deliver consistent, high-quality results through a unified approach.

We bring extensive experience in collaborating with subconsultants across a wide range of projects, allowing us to effectively manage multidisciplinary teams, coordinate complex deliverables, and maintain clear communication across all parties. These long-standing relationships enable us to leverage the specialized expertise of our subconsultants while ensuring they align with RJM's standards of excellence, reliability, and innovation.

CIVIL ENGINEERING - ciVTEC, Tom Carcelli
999 Corporate Dr., Suite 100, Ladera Ranch, CA 92694 | (949) 463-8822 | [email protected] Our team has worked directly with Tom Carcelli on a multitude of projects since 1998. These projects include parks and park renovations, aquatic facilities, sports facilities, streetscapes, plazas and urban design, trails, cemeteries, and more.

Tom will be responsible for any civil engineering coordination including, but not limited to, site grading, drainage, and infrastructure.

ELECTRICAL ENGINEERING - FBA Engineering, Bill Zavrsnick 150 Paularino Avenue, Suite A120, Costa Mesa, CA 92626 | (949) 852-9995 | [email protected] Our team has worked directly with Bill Zavrsnick on a multitude of projects since 2007. These projects include parks and park renovations, aquatic facilities, sports facilities, streetscapes, plazas and urban design, trails, cemeteries, and more.

Bill will be responsible for any electrical engineering coordination including, but not limited to, site lighting, security lighting, decorative fixtures, and general site power/electrical systems.

IRRIGATION DESIGN - Glasir Design, Chris Curry
424 New Jersey Lane, Placentia, CA 92870 | (714) 514-9930 | [email protected] Our team has worked directly with Chris Curry on a multitude of projects since 2011. These projects include parks and park renovations, aquatic facilities, sports facilities, streetscapes, plazas and urban design, trails, cemeteries, and more.

Chris will be responsible for any irrigation coordination including, but not limited to, landscape irrigation design, assistance with construction documents, and construction administration.

City of Huntington Beach • On-Call Landscape Architecture Services | 15 Qualifications
Established in 1987, RJM Design Group has become a prominent, multi-disciplinary firm specializing in landscape architecture, planning, and design. We are committed to serving cities, public agencies, and organizations across California, by providing creative, sustainable solutions that address the unique needs of each community. Our team consists of skilled professionals with diverse backgrounds, including licensed landscape architects, designers, and planners. Known for our innovative designs, we have a strong ability to create community-inspired spaces that enhance the environment and bring people together. Each team member brings a wealth of knowledge and a passion for their craft, ensuring personalized, high-quality service at every stage of every project.

Firm Legal Name RJM Design Group, Inc.

Type of Business California Corporation, SBE
Number of Years in Business 38 Years (Since 1987)
Contact Information (949) 493-2600
List of Owners Larry P. Ryan - President, [email protected] Zachary Mueting - Secretary, [email protected]
Principal Contact Zachary Mueting / [email protected] Office Location 31591 Camino Capistrano, San Juan Capistrano, CA 92675 Firm Size 20 Personnel*
Personnel (12) Licensed Landscape Architects, Project Managers (4) Technical Support
(4) Administrative Support
(2) Certified Arborists
(2) FAA Part 107 Licensed Pilots
* Some individuals hold multiple licenses
Website www.rjmdesigngroup.com
DESIGN
RJM
RJM Office | San Juan Capistrano, CA
Qualifications (continued)
Ontario Sports Empire
Ontario, CA
Project Completion: 2026 Client Reference
Project Size: 110 acres Tito Haes
Design Cost: $7.5M Executive Public Director
Construction Cost: $350M City of Ontario
(909) 395-2665 | [email protected]
Project Summary
Set to open in Fall 2026, the Ontario Sports Empire is positioned to become the premier venue for major regional and national tournaments, elevating Ontario as a key sports destination a See 0 acres top-er let facilities, including 20 long fields, 14 youth diamond fields, 8 full-size diamonds, 4 football/rugby fields and 2 championship baseball fields, the Ontario Sports Empire will be the largest sports complex of its kind west of the Rocky Mountains.

The sports park also offers a family activity area with large video display boards, seating, shade, passive turf areas, spectator viewing and elevated walking concourses, restroom and concession buildings, upper level restaurant style deck seating and field viewing, 3 playgrounds, interior walking paths, surface level parking and parking structure, large and satellite maintenance yards, warehouse storage, batting cages, ticketed gateway entries, pedestrian and vehicular drop off and loading zones, ball containment netting, monument and wayfinding signage.

Located just 10 minutes from the Ontario International Airport, the Ontario Sports Empire will be destination facility for both Ontario residents and visitors.

Project Team
Principal: Larry P. Ryan
Project Manager: Craig Sensenbach Community Inspired Spaces Tamara McClory DESIGN
Erik Curran RJMr
City of Huntington Beach • On-Call Landscape Architecture Services | 17 Qualifications (continued)
Parks & Recreation Master Plan
Huntington Beach, CA
Year Delivered: 2016 Client Reference
Services: $ 190,000 Ashley Wysocki
Fees: $ 200,000 Director of Community & Library Services Duration of Services: November 2015 to January 2016 City of Huntington Beach Relationship/Role: Prime Consultant phone: (714) 374-5302 email: [email protected]
Project Summary
Nicknamed "Surf City" for its beautiful wide beaches and consistently breaking surf, The City of Huntington Beach has a large and well-established park system with over seventy five parks and numerous community recreation buildings. The City contracted RJM Design Group to update its existing Parks and Recreation Master Plan. The first phase of the project included a background review of the demographics and community trends and their impact on the park system. The second phase involved a detailed inventory of the facilities and programs currently provided in the City, as well as a gap analysis of the existing facilities to determine locations where recreational opportunities are needed. The third phase included a thorough public involvement process including executive interviews, sports organization questionnaire, telephone survey, and public workshops. The fourth phase looked at the demand and needs for facilities based on the inventory of existing facilities and the data derived from the prior phases. Recommendations will include an opportunities feasibility analysis, acquisition plan, cost estimates, capital improvement plan, and sustainable practices/maintenance and operations management plan.

Project Team
Community Inspired Spaces
Principal: Zachary Mueting DESIGN
Project Manager: Kristen Schnell RJME*
Senior Associate: Tim Gallagher
City of Huntington Beach • On-Call Landscape Architecture Services | 18 Qualifications (continued)
Worthy Park Renovation
Huntington Beach, CA
Completion Date: 2017 Client Reference
Project Size: 1.2 Acres David Dominguez
Design Cost: $ 1.49 Million Manager, Facilities & Development services Construction Cost: $ 1.75 Million City of Huntington Beach (951) 727-3516
[email protected]
Project Summary
In 2014, RJM Design Group completed a preliminary study of the existing conditions and the possible improvements to park amenities that could be made to update the existing Worthy Park site. Given the park's proximity to City Hall and the adjacent Huntington Beach High School, the site was very visible and showing signs of age. A racquetball court building, that had been shuttered nearly 10 years prior due to the waning interest in the sport, stood right in the center of the park in severe disrepair. The full-size basketball courts had been taken over by the surge in popularity of pickleball with the local community.

The racquetball building was razed giving way to a natural turf practice field, the basketball courts were converted to four pickleball courts, and new play equipment and a picnic shelter compliment the site.

Residents have overwhelmingly responded to the facelift, and are now requesting that the other portions of the park be updated to match.

Community inspired Spaces
Project Team
DESIGN
Principal: Larry Ryan
Project Manager: Larry Mouri
City of Huntington Beach • On-Call Landscape Architecture Services | 19 Qualifications (continued)
Edison Skate Spot
Huntington Beach, CA
Completion Date: 2021 Client Reference
Project Size: 16,000 SF Chris Slama
Design Cost: $9,800 Director of Community & Library Services Construction Cost: $50,000 City of Huntington Beach
(714) 536-5495
[email protected]
Project Summary
As part of the renovations at the Edison Park complex, which hosts a variety of recreational amenities for the community, the City of Huntington Beach elected to construct a new temporary skate spot in an unused portion of the park. By soliciting feedback from the local community, the design consultant team of RJM Design Group and Newline Skateparks were able to craft an all- ages street feature skate spot that challenges experienced riders and helps teach beginners. This skate spot contains various elements including double-sided curbs, a manual pad, a grind bench, a flat bar, and most importantly, tons of flat ground.

Since the grand opening on July 29th, 2021, the simply designed skate spot has gotten rave reviews from the local skateboarding community, as well as parents for giving their young children a place to learn and continue the rich history of skateboarding in Huntington Beach.

Project Team
Principal: Zachary Mueting
Community Inspired Spaces
Project Manager: Tamara McClory DESIGN
RJME
Project Manager: Kanten Russell, Newline Skate Parks
City of Huntington Beach • On-Call Landscape Architecture Services | 20 Qualifications (continued)
Premier Park
Stanton, CA
Project Completed: 2024 Client Reference
Project Size: 0.9 acre Han Sol Yoo
Design Cost: $96,980 Associate Engineer, Public Works Engineering Construction Cost: $1.2 M City of Stanton
(714) 890-4204 | [email protected]
Project Summary
Premier Park, located at 8340 Briarwood Street in the City of Stanton, is a 0.90-acre recreational park that was in need of renovations. The City of Stanton elected RJM Design Group to redesign and renovate Premier Park based on feedback from the community.

The park renovation that includes new tree house themed play equipment and surfacing with integrated shade and seating areas, dynamic exercise equipment, half-court basketball court, concrete walking pathways, split-rail fences, new irrigation system, sodded turf areas, security lighting, and California Friendly landscape plant material.

The park had its Grand Opening in October of 2024 and continues to be a well-visited park for Stanton residents and the local community.

Project Team
Community Inspired Spaces
Principal: Larry Ryan
ESIG
GROI
Project Manager: Andy Steen R M
City of Huntington Beach • On-Call Landscape Architecture Services | 21 Project Experience
Lower Castaways Aquatics
Newport Beach, CA
Project Completed: 2026 Client Reference
Project Size: 4 acres Tom Sandefur
Design Cost: $88,500 Assistant City Engineer
Construction Cost: $42M City of Newport Beach
(949) 644-3321 | [email protected]
Project Summary
Prominently positioned along Newport's picturesque Back Bay and visible from Pacific Coast Highway, the Lower Castaways Aquatic Center offers a dynamic recreational hub with rich historical significance. Situated at Lower Castaways Park-the historic site of the 1870 "Old Landing," where the first commercial vessel steamed into the bay to establish a "new port"-this project blends modern amenities with Newport's coastal heritage.

The 9,100 SF, two-story aquatics center is designed to serve a variety of community needs. The first level features a welcoming reception area, staff offices, men's and women's locker rooms and restrooms, family restrooms, a pool mechanical room, and convenient outdoor lockers. On the second level, visitors will find versatile multi-purpose rooms, an outdoor patio overlooking the stunning Back Bay, a kitchen, and additional restrooms for added convenience. The project site expands beyond the main building to include a separate, one-story lifeguard and concessions building, a competition-ready 25-yard by 50-meter pool, a therapeutic pool for rehabilitation and wellness programs, and a thematic splash pad for family-friendly play. Additionally, the site offers covered spectator seating and dedicated pool equipment storage, group and individual shade cabanas for relaxation, and hand launch and public beach access to support water recreation.

Covered outrigger and kayak dry storage racks are provided alongside a scenic stairway and trail connection to Upper Castaways Park. Coastal protection is enhanced with a reconstructed sea wall, while the site's rich history is preserved with a relocated historic 'Old Landing' plaque and monument entry sign. The site also includes a convenient parking lot with 189 stalls, a deceleration lane, and reconfigured sidewalks along Dover Drive for improved accessibility.

Project Team Community Inspired Spaces
DESIGN
Principal: Larry Ryan RIMi
Project Manager: Craig Sensenbach
Tyler Page City of Huntington Beach • On-Call Landscape Architecture Services | 22 References of Work Performed Form
(List 5 Local References)
Comany Name: RJM Design Group, Inc.

1. Name of Reference: City of Huntington Beach
Address: 2000 Main Street, Huntington Beach, CA 92648
Contact Name: Ashley Wysocki _ Phone Number: (714) 374-5304 Email: [email protected]
Dates of Business: 01/2022 - 01/2026

2. Name of Reference: City of Newport Beach
Address: 100 Civic Center Drive, Newport Beach, CA 92692 Contact Name: Tom Sandefur _ Phone Number: (949) 644-3321 Email: [email protected]
Dates of Business: 06/2022 - 06/2026

3. Name of Reference: City of Long Beach
Address: 411 West Ocean Blvd., Long Beach, CA 90802
Contact Name: Eric Lopez - Phone Number: (562) 570-6256 Email: [email protected]
Dates of Business: 04/2024 - 03/2027

4. Name of Reference: City of Chino
Address: 13220 Central Ave., Chino, CA 91710
Contact Name: Rosa Olguin Phone Number: (909) 334-3314
Email: [email protected]
Dates of Business: 07/2022 - 06/2025

5. Name of Reference: City of Aliso Viejo
Address: 12 Journey, Suite 100, Aliso Viejo, CA 92656
Contact Name: Shaun Pelletier Phone Number: (949) 425-2533 Email: [email protected]
Dates of Business: 07/2024 - 06/2027
City of Huntington Beach • On-Call Landscape Architecture Services | 23 Qualifications (continued) - References
2025 ON CALL DESIGN SERVICES
RJM Design Group has performed On Call Design Services for numerous cities within the past 38 years in business.

Here is a summary of On Call Design Services we have been performing within the past 5 years:

Client: CITY OF ALISO VIEJO Service Type: Principal in Charge:

Contact: Shaun Pelletier Current Contract: Landscape Larry P. Ryan City Engineer Architecture, Inspection Services, RJM Team:
12 Journey, Suite 100 Plan Check Services (On-Call Since 2005) Andrew Steen Aliso Viejo, CA 92656 Contract Duration: July 2024 - Eric Chastain phone: (949) 425-2533 June 2027 Contract Amount:
email: [email protected] Hourly
Client: CITY OF CHINO Service Type: Principal in Charge:

OF Contact: Rosa Olguin Current Contract: Landscape
Larry P. Ryan
Management Assistant Architecture, Inspection Services, RJM Team:
13220 Central Avenue Plan Check Services (On-Call Since Andrew Steen Chino, CA 91710 1997) Tamara McClory
phone: (909) 334-3314 Contract Duration: July 2022 - June Contract Amount:
email: [email protected] 2025 Hourly
Client: CITY OF HUNTINGTON BEACH Service Type: Principal in Charge:

Contact: Ashley Wysocki, Director of Current Contract: Landscape Larry P. Ryan Community & Library Services Architecture and Design Services (On- Zachary Mueting 2000 Main Street Call Since 2010) RJM Team:

Huntington Beach, CA 92648 Contract Duration: January 2022 - Andrew Steen phone: (714) 374-5302 January 2026 Contract Amount:
email: [email protected] Hourly
Client: CITY OF LAGUNA NIGUEL Service Type: Principal in Charge:

Contact: Katie Crockett Current Contract: Landscape Larry P. Ryan Planning Manager Architecture and Plan Check Services RJM Team:
30111 Crown Valley Parkway (On-Call Since 2016) Andrew Steen Laguna Niguel, CA 92677 Contract Duration: May 2021 - Tamara McClory phone: (949) 362-4363 June 2025 (Currently proposing on Eric Chastain email: [email protected] renewal) Contract Amount: Hourly Client: CITY OF LONG BEACH Service Type: Principal in Charge:

LONG Contact: Eric Lopez Current Contract: Landscape Larry P. Ryan Director of Public Works Architecture and Plan Check Services RJM Team:
411 W. Ocean Blvd. (On-Call Since 1997) Andrew Steen
Long Beach, CA 90802 Tamara McClory
COPPOR ЛУА phone: (562) 570-6256 Contract Duration: April 2024 - Contract Amount:
email: [email protected] March 2027 Hourly
Client: CITY OF MISSION VIEJO Service Type: Principal in Charge:

Contact: Jerry Hill Current Contract: Landscape Larry P. Ryan Assistant City Manager Architecture and Plan Check Services RJM Team:
200 Civic Center Drive (On-Call Since 1996) Andrew Steen Mission Viejo, CA 92692 Tamara McClory
CALIFORNY phone: (949) 470-3085 Contract Duration: July 2024 - June Eric Chastain email: [email protected] 2026 Contract Amount: Hourly Client: CITY OF NEWPORT BEACH Service Type: Principal in Charge:

Contact: Tom Sandefur Current Contract: Landscape Larry P. Ryan Assistant City Engineer Architecture and Design Services (On- RJM Team:
100 Civic Center Dr. Call Since 2016) Tamara McClory
Newport Beach, CA 92660 Tyler Page
CALIPORNIA phone: (949) 644-3321 Contract Duration: June 2022 - Contract Amount:
[email protected] June 2026 Hourly
Client: CITY OF WHITTIER Service Type: Principal in Charge:

FATTIER CAL Contact: Luis G. Escobedo, AICP Current Contract: Landscape Larry P. Ryan Senior Planner Architecture and Plan Check Services RJM Team:
13230 Penn Street (On-Call Since 2014) Andrew Steen
Whittier, CA 90602 Contract Amount:

INC. 1898 phone: (562) 567-9320 Contract Duration: July 2016 - June email: [email protected]
City of Huntington Beach • On-Call Landscape Architecture Services | 24 Clarifications, Exceptions, or Deviations
RJM DESIGN GROUP, INC. has established a reputation of integrity and professionalism within the landscape architecture industry. Our due diligence in performing client services begins with our proposal preparation, contract review and negotiation, and carries through to project completion.

We have reviewed the Professional Services Contract for On-Call Landscape Architectural Services with the City of Huntington Beach. As part of this review, we identify items which may not conform to the terms of our insurance coverage and/or to California Civil Code section 2782.8 which regulates contracts between public agencies and design professionals. Upon selection for this project, we would like to discuss the following requested changes pertaining to the agreement in order to arrive at mutually agreeable terms. All suggested additions and/or deletions to the contract language are in blue.

Page 3 ends

... whichever shall occur first. These materials may be used by CITY as it sees fit, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk.

Page 3 ends

Consultant hereby agrees to protect, defend, indemnify and hold...

Page 3 ends

... liability of any kind or nature to the extent arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this ...

Page 3 ends

... caused by the sele negligence or willful misconduct of CITY. CONSULTANT will cenduct all defense at its sele cost and expense and CITY shall approve selectien of CONSULTANT's ceunsel, This indemnity shall apply to all claims and liability regardless of whether any ...

Page 3 ends

... of indemnification to be provided by CONSULTANT. Notwithstanding the foregoing, if Consultant's obligation to defend, indemnify, and/or hold harmless arises out of Consultant's performance as a "design professional" (as that term is defined under Civil Code section 2782.8), then, to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant's indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant's liability for such claim, including the cost to defend, shall not exceed the Consultant's proportionate percentage of fault.

Page 4 ends

... however an insurance policy "deductible" of Ten Twenty Five Thousand Dollars ($10,000.00-$25,000.00) or less is …..

City of Huntington Beach • On-Call Landscape Architecture Services | 25 EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:

SEE ATTACHED EXHIBIT B
B. Travel Charges for time during travel are not reimbursable.

C. Billing
All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.

Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.

A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.

CONSULTANT shall submit to CITY an invoice for each monthly payment due.

Such invoice shall:

A) Reference this Agreement;
B) Describe the services performed;
C) Show the total amount of the payment due;
D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and
E) For all payments include an estimate of the percentage of work completed.

Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein.

Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.

Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.

Fee Proposal EXHIBIT B
RJM DESIGN GROUP, INC.

Principal Landscape Architect $240 per hour
Associate Landscape Architect $215 per hour
Landscape Architect $200 per hour
Job Captain / Landscape Designer $185 per hour
CADD Technician / Graphics $170 per hour
Word Processor $125 per hour

CIVTEC (CIVIL ENGINEER)
Principal $235 per hour
Project Manager $185 per hour
Project Engineer $165 per hour
Project Surveyor $185 per hour
Design Engineer $135 per hour
Draftsperson $105 per hour
Project Assistant $90 per hour
2-Man Survey Crew $375 per hour
3-Man Survey Crew $550 per hour

GLASIR (IRRIGATION)
On-Site Consulting / Public Agency Coordination $150 per hour Irrigation Designer $125 per hour
Plan Check $125 per hour

FBA ENGINEERING (ELECTRICAL ENGINEERING)
Principal / Project Director $250 per hour
Associate / Project Manager $175 per hour
Construction Support $150 per hour
Electrical Designer $120 per hour
CAD / BIM Designer $100 per hour
Technical Typist $60 per hour
Charges for sub-consultant services are billed at cost plus a 15% coordination fee.

REIMBURSABLE EXPENSES
When incurred, the following project expenses will be billed at cost plus 15% administrative fee in addition to the above professional services fee:

Printing, plotting, copying, scanning, photography, graphic expenses Delivery, shipping, and handling of documents
Permits, plan check, and inspection fees
• City business license
• Soils testing
Billings for all time and materials and contract extension work shall be in accordance with the level of work performed based on the categories listed above.

City of Huntington Beach • On-Call Landscape Architecture Services | 2

EXHIBIT A

TINGTON BEACH
СІТИ
OR

COUNTY CALIDS
APRIL 29, 2025

REQUEST FOR

QUALIFICATIONS (RFQ)

FOR ON-CALL

ARCHITECTURAL

ENGINEERING, LANDSCAPE

ARCHITECTURAL

ENGINEERING, AND

PROFESSIONAL

CONSULTING SERVICES
Verde Design
Uptown Family Park, City of Paso Robles

TABLE OF CONTENTS
TAB A
VENDOR APPLICATION FORM AND COVER LETTER ..P3
TAB B
BACKGROUND AND PROJECT SUMMARY SECTION P6
TAB C
METHODOLOGY SECTION .P9
TAB D
STAFFING P16
TAB E
QUALIFICATIONS .P24
TAB F

FEE PROPOSAL (SUBMITTED SEPARATELY PER THE RFQ)
REQ FOR ON-CALL ARCHITECTURAL ENGINEERNO, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 2/30 April 29, 2025
(0)
City of Huntington Beach
2000 Main Street, Huntington Beach, CA 92648 Verde Design Attn: Cody Hernandez, Buyer
SUBJECT: REQUEST FOR QUALIFICATIONS (RFQ) FOR ON-CALL ARCHITECTURAL ENGINEERING,

LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES Dear Mr. Hernandez and Members of the Evaluation Committee:

We thank you for considering our proposal for the City of Huntington Beach's (City) RFQ for On-Call Architectural Engineering, Landscape Architectural Engineering, and Professional Consulting Services.

Verde Design, Inc. stands as a leading provider of comprehensive and integrated landscape architecture and civil engineering services. Our specialization encompasses the planning, design, and construction administration of public recreational and athletic facilities. We collaborate closely with cities, counties, and parks and recreation districts to develop outstanding outdoor environments that improve the quality of life for our clients' communities. We are a committed team of 5l experienced professionals dedicated to improving recreational facilities, athletic programs, and the unique environments that enhance neighborhoods and community areas. We represent a team of talented professionals, including myself, Chris Giannini, as associate and senior project manager, and Mark Baginski as project principal, to help you achieve your goals. Our firm boasts a strong history, having successfully completed over 750 projects for more than 110 public agencies, including over 45 successful on-call partnerships. Many of these projects align closely with your anticipated initiatives. The office that will be providing services is located at 3685 Main Street, Suite 350, Riverside, CA 92501.

Experience with Similar Projects: We proudly uphold an extensive portfolio of successful public recreational facilities, demonstrating our proficiency in transforming master plans into tangible construction projects.

Our efforts prioritize health and wellness, fostering an environment conducive to both educational pursuits and recreational activities. This wealth of expertise has reinforced our distinguished reputation for crafting designs that are not only visually striking but also functional for public interaction, all while honoring the historical and cultural significance of the communities we serve. We possess a profound understanding of how to create community facilities that cater to the recreational needs and interests of the population, ensuring that these spaces are sustainable, operationally efficient, and visually appealing.

Sharing Our Knowledge: We will act as an integral part of your team, focusing on fostering robust relationships with your staff by attentively considering your evolving objectives and executing projects that fulfill them. Recognizing that proactive communication is essential for timely and budget-conscious project delivery, our team will be accessible and responsive during the entire process and even after project completion. By selecting Verde Design, you are securing a dedicated advocate and a partner invested in the enduring success of your projects.

We trust that this submission will enhance your comprehension of our dedication to excellence in design and exceptional service for our clients. We are eager to have the chance to create something remarkable within the Huntington Beach community, all while adhering to the established timeline and budget constraints. In my capacity as both associate and senior project manager, I, with the assistance of Mike Salazar, project manager, will be your main point of contact and will remain actively engaged throughout the entire process until your project is successfully completed. The proposal price will be valid for a period of at least 180 days. We acknowledge Addendum No. 1 and 2.

Sincerely,
VERDE DESIGN, INC. Chan.... Males Bo
Chris Giannini, RLA, Associate & Sr. PM (City contact) Mark Baginski, RLA, LEED AP, Principal (Authorized Signature) 951.221.3142 | [email protected] 408.850.3411 | [email protected] 3685 Main Street, Suite 350, Riverside, CA 92501 3685 Main Street, Suite 350, Riverside, CA 92501 REQ FOR ON-CALL ARCHITECTURAL ENGINEERNG, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 3/30 Verde Design

REQUEST FOR PROPOSAL

VENDOR APPLICATION FORM
TYPE OF APPLICANT: IX NEW • CURRENT VENDOR
Legal Contractual Name of Corporation: Verde Design Inc.

Mark Baginski
Contact Person for Agreement:

Corporate Mailing Address: 3685 Main Street, Suite 350
City, State and Zip Code: Riverside, CA 92501
E-Mail Address: [email protected]
Phone: 408.850.3411 Fax: 408.985.7260
Contact Person for Proposals: Chris Giannini
Title: Associate, Senior Project Manager E-Mail Address: [email protected] Business Telephone:_ 951.221.3142 Business Fax: 408.985.7260 Year Business was Established: 2007
Is your business: (check one)
• NON PROFIT CORPORATION X FOR PROFIT CORPORATION
Is your business: (check one)
[X] CORPORATION O LIMITED LIABILITY PARTNERSHIP

INDIVIDUAL SOLE PROPRIETORSHIP

PARTNERSHIP UNINCORPORATED ASSOCIATION
REQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL. ENGINEERING, AND PROFESSORIAL CONSULTINO SERVICES VERDE DESIGN, INC. 4/30
Verde Design
Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Mark Baginski Principal/Secretary 408.850.3411
Devin Conway Principal/Vice President 408.850.3420
Derek McKee Principal/President 408.850.3410
Nance Cronin Principal/Treasurer 408.850.3405
Antonia Conway Board Member 408.884.9585
Federal Tax Identification Number: 20-897-4203
N/A
City of Huntington Beach Business License Number:
(If none, you must obtain a Huntington Beach Business License upon award of contract.) City of Huntington Beach Business License Expiration Date:

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERNG, LANDSCAPE ARCHITECTURAL ENGINEERING, AND FROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 5/30

BACKGROUND AND
TAB B

PROJECT SUMMARY SECTION

FIRM PROFILE YEARS IN

VERDE DESIGN FIRM INFORMATION BUSINESS
18 AS A CERTIFIED SMALL
Type of Legal Entity: S Type Corporation and BUSINESS ENTERPRISE Certified Small Business Enterprise
Years in Business: 18 years PARK &
Number of Employees: 51 PLAYGROUND
Main-Contact: Chris Giannini, RLA, Associate, Sr. 150 PROJECTS FOR PM, 951.221.3142 | [email protected] PUBLIC AGENCIES Office Providing Services: 3685 Main Street,
Suite 350, Riverside, CA 92501 PUBLIC AGENCIES
Website: www.verdedesigninc.com PARTNERED WITH
110
OVER THE LAST 18

ABOUT VERDE DESIGN YEARS IN BUSINESS
Verde Design is an integrated landscape
architecture and civil engineering firm FIRM PRINCIPALS specializing in award-winning recreational
and athletic-focused spaces. We provide our
clients with comprehensive planning, design,
and construction administration services, and
focus on serving cities, counties, and parks
and recreations districts. DEREK MCKEE, RLA DEVIN CONWAY, PE We have partnered with over 110 public RDE DE
agencies to date, and have completed
more than 750 public facility projects for
clients. Projects have ranged from small
neighborhood pocket parks to destination MARK BAGINSKI, RLA NANCE CRONIN sites, including expansive community parks
and sports complexes. We staff our projects OUR PROJECTS & SERVICE TYPES with a team of creative problem solvers,
and draw upon our in-house site planning, •Landscape •New & Replacement grading and drainage, planting, and irrigation Architecture Athletic & Rec Fields design expertise, to provide solutions that •Civil Engineering •New & Replacement meet or beat project schedules and remain •Master Planning Playgrounds within the established project budgets. •Facility Assessments •All-Inclusive •Management Plans/ Playgrounds
BRIEF HISTORY Studies •Bike/skate Parks
•Feasibility Studies •Sports Field/Park
In 2007, Derek McKee and Devin Conway, both •Schematic Design Lighting veterans of the A/E/C industry, purchased key •3D Modeling •Tennis/Hard Courts assets of a former firm and founded Verde •Community •Pre-Fab Buildings Design, a certified SBE. Our leaders have Facilitation for Restrooms, crafted a culture rooted in sound practice, & Outreach Concessions, focused on sustainability, and staffed with •Construction Maintenance, and people who care about enhancing their Documentation Storage communities. Since our founding in Santa • Irrigation Design •Plazas/Entry Elements Clara, we expanded operations with additional & Audits • Stormwater Facilities offices in Folsom, Santa Rosa, and Riverside. •Cost Estimating • SWPPP & SWMOCP

REQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 6/30

BACKGROUND AND
TAB B

PROJECT SUMMARY SECTION

VERDE DESIGN BY THE NUMBERS

WE ARE PROUD
THAT OVER 96%
OF OUR BUSINESS 750
COMES FROM 51 PROFESSD

PROFESSIONALS

REPEAT CLIENTS

ATHLETIC FACILITY PROJECTS
96% COMPLETED IN THE LAST 18

YEARS IN BUSINESS
SANTA CLARA 110 PUBLIC

FOLSOM AGENCIES
4 SANTA ROSA

PARTNERED

RIVERSIDE

BRANCH OFFICES WITH IN
THE LAST 18
*OFFICE PROVIDING SERVICES: YEARS
RIVERSIDE OFFICE: 3685 MAIN ST,
SUITE 350, RIVERSIDE, CA 92501 IN BUSINESS

YEARS IN

BUSINESS
18 AS A CERTIFIED 42
SMALL
$750 MILLION IN PUBLIC BUSINESS

PROJECT DESIGN

PROJECTS COMPLETED ENTERPRISE AWARDS RECEIVED
Verde Design possesses a wealth of experience in the design of athletic and recreational facilities, having successfully completed more than 400 400 projects involving synthetic turf, which includes over 100 synthetic turf field replacements. Our comprehensive understanding of these turf systems, combined with our technical proficiency, has established us as SYNTHETIC TURF FIELDS a premier specialist in synthetic turf across California.

DESIGNED FOR The expertise of our project team encompasses a thorough knowledge OUR PROJECTS/CLIENTS of the necessary products, drainage solutions, maintenance protocols, and the management of program usage that synthetic turf fields demand. We are committed to equipping you with the essential information required to make well-informed choices regarding the selection of products for your fields.

RFO FOR CN-CALL ARCHITECTURAL EN SCAPE ARCHTECTURAL ENGINEERING, AND PROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 7/30

BACKGROUND AND
TAB B

PROJECT SUMMARY SECTION

UNDERSTANDING OF THE CITY
Verde Design understands that the City of
Huntington Beach (City) is built out and
new development is limited. As existing
facilities age, renovation, re-imagining and
redevelopment of public spaces is critical
to meeting the community's needs. The
City is seeking qualified design consultants
to submit qualifications to be selected to
provide consulting services on an "on-call"
basis for projects to be determined during the cors
three-year term of the contract which has an
optional one-year term. The City will issue task
orders for each project based upon the scope UN Plaza, City of San Francisco of services, qualifications, work schedule and
reasonableness of the fee. For task orders • Landscape architecture services throughout greater than $50,000, the City will solicit City medians and public spaces qualifications from two or more consultants. • Prepare sketches, renderings, and materials In the case of projects where the consultant boards providing alternative architectural cannot provide all services internally, we may concepts, designs, and options that can be sub-contract with appropriate firms. The applied to project requirements. scope of work in general terms will include the • Prepare in AutoCAD or Revit, 24x36 following. inch construction drawings for bidding
• Kick-off & progress meetings and archival purposes, providing code requirements, floor plans, ceiling plans, roof
• Preliminary plans and design plans, elevations, walls, material schedules, • Entitlements/permits door and window schedules, and details. A • Construction documents (plans, full-size set at design stage will be provided specifications, cost estimates and bidding with electronic file in PDF format, and in documents) AutoCAD or Revit format.
• Technical reports and analysis of varying types • Provide technical specifications in MS Word format, for materials and methods
• Bid assistance
to be incorporated into the City's Standard
• Construction support Supplemental Master Specifications.

Verde Design is submitting under the • Prepare Architect's/ Engineer's cost Landscape Architectural Engineering Services estimates. category. We understand that the objective • Provide support during construction of is to provide the City with experienced, projects.
professional personnel to provide high quality, • Prepare as-builts and provide electronica timely services and documents for bidding file in PDF format, and in AutoCAD or Revit and construction. The types of services format.
include the following.
• Additional services such as assistance
• Provide landscape, architectural, planning with environmental assessments, material and design services primarily for existing testing, civil and soils engineering and City parks, facilities, community centers, building architecture may also be provided clubhouses, tenant improvements, ADA through the use of subconsultants or in- modifications and park developments. house personnel.

REQ FOR ON-CALL ARCHITECTURAL ENGNEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 8/30

METHODOLOGY
TAB C

SECTION

APPROACH AND

METHODOLOGY

IMPLEMENTATION PLAN

PROJECT MANAGEMENT
Our approach to project management
starts with the allocation of a highly
skilled and experienced team tailored
to each project. Chris Giannini will act
as the senior project manager and
your main point of contact, while Mark
Baginski will take on the role of principal-
in-charge. Both professionals bring over
thirty years of experience in designing,
managing, and supervising a diverse
range of projects that align closely with
the City of Huntington Beach's (City)
upcoming projects. John D Morgan Park, City of Campbell, 2022 American Public Works Association (APWA) Honor Awards Recipient (Env/Porks <$2M)
Mark and Chris have collaborated on
numerous projects focused on the
our insights. This relationship-driven
development of neighborhood, community,
service promotes transparent and candid
and regional park facilities, encompassing
communication throughout the duration of
both new constructions and renovations. Their
the project and beyond. We will ask you about
work spans a wide array of enhancements,
including inclusive playgrounds, fitness your preferences regarding communication method and frequency during the project
stations, splash pads, and various sports and will tailor our communication style to suit courts, as well as amenities like picnic areas, your preferences. Documents like the Basis of amphitheaters, and dog parks. They have
also designed aquatics centers, running Design Document, Design Log, and Submittal Book will help us communicate ideas, track
tracks, and fields for baseball, soccer, and
cricket, while ensuring the integration of inquiries and document design progression, essential infrastructure such as sports lighting, which will help you manage the project from irrigation systems, and efficient grading and the City side and will help you communicate project progress to your team.
drainage solutions tailored to client needs.

Additionally, their partnership extends to the The Basis of Design document will provide creation of educational plazas and collegiate a detailed summary of our understanding athletic facilities, showcasing their dedication of the conceptual design. The Design Log to improving community spaces through documents the questions and decisions that thoughtful design and landscaping. arise during the design phase so that when the project is complete, a summary of specific
The effectiveness of our collaborative
approach lies in the commitment of our key decisions that shaped the final design can be easily referenced. These documents will
personnel, who will be engaged with the
be included in the Submittal Book along with
project from its inception to its completion.
an updated estimate of cost, plan and spec
We prioritize fostering strong partnerships, submittals and proposed site furnishing ensuring that our clients feel comfortable images that extends from conceptual reaching out with inquiries or seeking design through the final CD submittal. These

RFO FOR ON-CAIL ARCHITECTURAL ENGNEERNG, LANDSCAPE ARCHITECTURAL ENGINEERING, AND ONAL CONSULTINO SERVICES VERDE DESIGN, INC. 9/30

METHODOLOGY
TAB C

SECTION
South Sunset Fields, San Francisco
resources, among others, are integral to files with the City to document the plan review our team's internal and external processes, process for all parties. Furthermore, we are facilitating the communication of critical equipped to participate in design charrettes information throughout the project lifecycle. through online platforms or in-person with the City and other Stake Holders.

In the process of preparing progress
submittals, we find it advantageous to SOLICITING AND DOCUMENTING VIEWS OF convene with the design team to collectively INTERNAL AND EXTERNAL STAKEHOLDERS examine the plans and specifications. This
collaborative approach fosters effective There are various definitions of "stakeholder." communication among team members, We begin by verifying who our stakeholders enabling us to identify and rectify any gaps are and understanding their relationship with in the plans while minimizing ambiguities. To the project and the typical approach the facilitate this teamwork, we have invested in City has used before. We have approached a variety of user-friendly and interactive tools stakeholder input in various ways. Sometimes, that enhance collaboration with our staff, with smaller groups, it can be as simple partners, and clients. One of the primary tools as one in depth meeting. Larger groups, we employ for our internal Quality Assurance / especially when they include community Quality Control measures is Bluebeam Revue, groups or special interest groups, may require which we utilize consistently for plan review, several progressive, outreach meetings that document plan revisions and managing start with general project information and agency approval processes. We are also end with finalized conceptual planning based able to share Bluebeam studio sessions with upon stakeholder input. We sometimes also the client, if desired, so that real-time plan prepare project documents, questionnaires, review can be done by the City as well. These support images and graphics that are used redlined documents can be shared as pdf in an online platform that allows stakeholders

REQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 10/30

METHODOLOGY
TAB C

SECTION
& the local community to conveniently
provide their input virtually and conveniently.

Just as with live meetings, we then take
that input and summarize it and put it into
easy to read and understand formats and
graphics to document the outreach process.

These summaries also demonstrate to the
stakeholders that they have been heard
and that their input was integrated into the
development of the project. This information
then serves as our design directives that
we use to inform our design process and
ultimately to develop the final project design.

SCOPE OF WORK

DELIVERING SERVICES/PROJECT
Kaiser Permanente Sports Village, City of Bakersfield

APPROACH TO WORKING WITH THE CITY
Verde Design believes that the key to Listen - A key element to project success, or developing successful projects begins with any relational success for that matter. We a simple, but clear, philosophy, Investigate, emphasize the importance of listening to all Listen, Understand, and Recommend. project stakeholders' concerns and desires.

These are the core elements of our project Our team will provide options and incorporate approach. Beginning with our initial kick-off guidance provided by our client and other meeting with City staff, we will learn more stakeholders, including maintenance and about the proposed projects) and better operations staff, user groups, advisory bodies, understand your goals. This framework and members of the community. The result is critical to ensure consistent and clear of our focus on listening is a cohesive team communication is established between our that works together on a shared path of team and City staff. Our desire is to build understanding with client goals in mind, rapport with our clients. We want to become resulting in smooth-running projects. trusted partners as we work with you and for
you on your projects. Understand - As we mentioned, we use all information available to develop design
Investigate - The first step to the success of solutions that respond to our clients' project a project begins with a solid investigation. needs, including site constraints, client We will review existing documents and plans. staff direction, community feedback, and We will conduct a site visit with client staff the allocated budget. We document our to understand and analyze the existing understanding of the input and design conditions of the facilities. This will ensure that process by providing you with a Basis of we fully understand the projects' parameters Design Document. This document serves as and constraints, as well as the existing site a summary of the input we have received conditions and existing challenges. This site and states what we have heard and what our analysis effort will be utilized throughout the understanding of the design directive is. We projects, enabling educated and effective list all aspects of the project design in detail decisions to be made at the beginning of the so that you can review and comment on it to design phase and throughout the ensure that we have the same understanding project design. and expectations.

REQ FOR ON-CALL ARCHITECTURAL ENGINEERNO, LANDSCAPE ARCHITECTURAL ENGINEERING, AND FROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 11/30

TAB C METHODOLOGY

SECTION
Kay Sakamoto Park, City of Roseville
Recommend - Using our clients' clear of the schematic design graphics and and approved concept, we will render the support elements. The review at this stage project's vision into a complete, biddable is not technical, but quality control reviews set of construction documents. The Verde the design to verify community and staff Design team will draw upon past successes comments are included or rectified, spelling, with our extensive recreational projects, as well as graphic clarity. and knowledge of recreational and athletic
facility design and construction to seamlessly As we develop construction documents, we facilitate the construction document phase. have a licensed professional who is not part With most of our projects being constructed, of the project team provide a 'fresh eyes' our staff are also well experienced in review of the documents, in addition to the supporting our clients through bidding and reviews by the principal-in-charge and the construction phases. project manager. We perform internal redline reviews, incorporate revisions, and review
QUALITY ASSURANCE/QUALITY all client comments prior to submitting the documents to you.

CONTROL (QA/QC)
We review the submittal packages one week
Our dedication to quality control throughout
the life of a project is one of the ways we prior to our submittal date and again during establish trust that leads to long-term the City review period. During submittal relationships with our clients: We are proud of review meetings with City staff, we will share our comments and jointly decide how to
the fact that over 96% of our business comes
address each of them. As part of our internal
from repeat clients. Our internal Quality
Assurance (QA)/ Quality Control (QC) reviews review process, we request draft submittals address design, biddability, constructability, from all team consultants one week prior to compliance with local/state codes, and the submittal date. We review their plans, comment on their materials, coordinate
project requirements.
improvements between all team members,
Our QC begins with the design phase and and return them for updates as needed continues throughout a project's life. During before we incorporate their materials into our the design phase, we will review the content submittal package to you.

RFQ FOR ON-CAIL ARCHITECTURAL ENGINEERNG, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 12/30

METHODOLOGY
TAB C

SECTION
Another aspect of our quality
assurance process is our multi-
disciplinary firm. We have licensed
landscape architects, civil
engineers, and irrigation designers
working together on the design
and integration of the drainage,
utilities, grading, materials, paving,
layout, planting, and irrigation.

Our staff will develop the project
with systems designed together,
creating a more efficient and
effective product.

Upon your request we can provide
our internal redline pdf drawings
with each submittal that will outline
comments and items we have
seen and have addressed prior to
our submittal. We can also provide Fair Oaks Park, City of Sunnyvale 2022 APWA Honor Awards Recipient (Env/Parks $5M-$25M)
City staff comments and documents that
were provided as part of the city's review
process with what their status is and how by our firm allows us to intelligently respond they were resolved. Each submittal includes to the needs and design services that may priority items such as cost estimate progress, be required for your anticipated projects. We plan updates, specifications, basis of design strive to provide problem-specific solutions document and the design log which tracks by matching the personal and professional questions, answers or outstanding items qualities of the individuals on our team to that came up since the last submittal. All best serve the project's needs. team members help update this report for
each submittal. At each submittal, we also Project schedules are a critical aspect of have a meeting with City staff to present the all projects outlining tasks, milestones, and submittal package in which the progress deliverables. When the schedule is being report is essentially the meeting agenda. developed, we develop our internal staffing plan and workload schedule. Communicating
The goals of the Verde Design QC/QA process and coordinating large staffing needs for are to ensure that the project is bid within a project is done internally in our weekly the stated budget, that the documentation production meetings. If a project is going to package is clear and free of ambiguity so require more staff than one project team can that it can be properly priced by a group of complete, we look at additional staff support qualified bidders, and that the improvements or overtime to meet delivery schedules. can be constructed in accordance with the
design intent. At the start, we will meet with you and your project team. We will review your overall
HOW WE CONTROL SCHEDULING schedule constraints, identify critical path items, set initial milestones, and then prepare
Verde Design employs 51 professionals with a draft master project schedule for further a variety of experience and expertise that discussion. This schedule will include such can be utilized to complete or assist with items as submittal deadlines, dates for any project. The variety of work completed review/presentation meetings, community/

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 13/30

METHODOLOGY
TAB C

SECTION
Noe Valley Town Square, City of San Francisco
governing body milestones, agency review, accurate estimate possible. While we are etc. As the schedule is refined and dates are seeing some easing of inflationary influences, set, we will make staffing assignments within there is uncertainty in future markets relative Verde and arrange internal workloads to meet to potential tariffs on foreign goods which will your deadlines. As the lead consultant, we cause some escalation in selective products. will also be carefully coordinating the work of
team consultants to ensure that their work is Our strategy to overcome these challenges is a multi-faceted approach to cost estimating,
completed on schedule.
including utilizing relationships in the contractor
community to understand current pricing and

PREPARING BUDGETS AND ESTIMATES
preparing additive alternates to our project
METHODOLOGY plans to cushion against market dynamics.

Good budgeting and estimating begin
with developing a clear project program, CONTINGENCIES UTILIZED prioritizing the program elements, and Verde Design utilizes the following aligning them with your expressed budget. contingencies as a starting point for We begin each project by developing cost most projects:
estimates based on the known information
and program. We work with the client to • Survey, Permits, Traffic and SWPPP 3% determine the revisions to the program • Bonding 2%
throughout each submittal to maintain the • Mobilization/Project Management 12-15% accuracy of project costs within budget. Our
estimates are developed by our staff and We have also carried other contingencies team, and we start them early during the as determined by the project and bidding design phase. environment:

Verde Design is actively working throughout • Escalation +/- 5% California and understands that market • Bidding Contingency +/- 5-10% conditions vary. Our team adjusts to local
(Based on the number of bidders received)
market conditions to provide the most

REQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 14/30

METHODOLOGY
TAB C

SECTION

RETO ALL
Edgewater Park, City of Foster City
Our pricing approach includes materials, about communication preferences, labor, and markups based on a proven format information regarding expectations from the we have honed over years of successful design consultant, information regarding project bidding. The trickiest part of cost the City's design guidelines and design estimating is the dynamics of the market at preferences and processes and lastly, the time of bid versus when the plans are information about the project site. This would completed, which is usually months before include assistance in locating existing record in some cases. Adding a bid contingency drawings. We would also like to hear from is good if there is a lag between the final maintenance staff regarding challenges estimate and bidding. on existing sites or long-term maintenance preferences.

STANDARD ESTIMATING MANUALS
Once we are in the design phase, we will look
USED AS REFERENCE to the City to collect and provide input from Verde Design does not rely on manuals or City staff relative to design options as well as guidebooks for estimating. We have found provide meaningful input on both conceptual these to be unreliable. We focus on getting designs and construction drawing, milestone real costs from contractors, suppliers, and submittals as well as calendar availability manufacturers. We communicate with relative to project meetings or site visits. If specialty trades to understand asphalt, there are community meetings, we see the concrete, electrical, fencing costs, etc. We can City staff as partners and co-facilitators demonstrate the accuracy of this approach in some respects depending upon the through our historical bid results summary. complexity of the project.

As the design consultant, it is our role to

SPECIFIC TASKS IN THE SCOPE OF WORK
provide you with status reports on the
As previously noted, it is our intent to build project related to budget, schedule, and rapport with City staff with the goal of design decisions. We will provide you with developing efficient and effective lines of appropriate plans, specs and estimates for communication. The initial expectation from your review based upon input we have City staff is to provide information. Information been provided.

REQ FOR ON-CAIL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTRNG SERVICES VERDE DESIGN, INC. 15/30

TAB D STAFFING

FIRM STAFFING AND KEY PERSONNEL
To help the City of Huntington Beach (City) accomplish their future goals and projects, we have hand-selected a team with specialized public recreational facility knowledge, problem-solving experience, and a history of successfully working together on an extensive list of projects for numerous public agencies with similar scope to the City's anticipated projects. We recognize the importance of continuing to build and develop new and ongoing relationships throughout your project, and are committed to maintaining a consistent project team. Please see below for a team organizational chart. The subsequent pages will provide insights into our proposed as-needed subconsultant team, including overviews of their firms. Furthermore, we have included the resumes of key members from Verde Design at the conclusion of this section, detailing the their project experience, qualifications, credentials, and specific roles they will provide for your projects.

PROJECT TEAM ORGANIZATIONAL CHART

GION BEN
Mark Baginski, RLA, LEED AP Chris Giannini, RLA
Principal-in-Charge Associate, Sr. PM/ Contact
408.850.3411 951.221.3142
[email protected] [email protected]
Years with Firm: 16 Years with Firm: 6
Office Location: Santa Clara/ Office Location: Riverside Riverside
Michael Salazar, RLA
Project Manager
951.266.5221
[email protected]
Years with Firm: 3
Office Location: Riverside
Giovani Aguirre, RLA Jamie Wallis, PE, QSD/QSP
Project Designer Sr. Associate, Civil Engineer
951.266.5423 408.850.3425
[email protected] [email protected]
Years with Firm: 3 Years with Firm: 10
Office Location: Riverside Office Location: Santa Clara/ Riverside
Verde Design Production Staff

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND FROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 16/30

TAB D STAFFING
SUBCONSULTANT TEAM professional land surveyors, have over 45 years of combined experience in the survey
SUBCONSULTANT COORDINATION industry, and are involved in every project.

At the beginning of a project, we review

CONVERSE CONSULTANTS
the project scope for consultant needs,
As-Need Service: Geotechnical Engineering
including verifying with the City if there are
any particular consultants that may have Converse is a consulting engineering firm recent experience and knowledge of their that provides geotechnical engineering, particular project site we should consider. We engineering geology, soils and materials establish a scope of work with the team, and testing and inspection, environmental coordinate it with the City. services, water resources management, and occupational and environmental health/
Part of that scope is the timeline and safety services. The firm's experience and attaining buy-in from our proposed list dedicated team of professionals partners of subconsultant team members on the with clients to provide innovative solutions schedule and deliverable dates. As the on projects since 1946. Its past, present, design process evolves and documentation and future are founded on the principles of progresses, the Verde Design staff works with providing high-quality service in a timely and subconsultants to ensure that our team is cost-effective manner. using the proper AutoCAD (CAD) background
files and specification templates. We will work DAHLIN GROUP to get submittals from subconsultants five As-Need Service: Architecture (5) days before they are due so that we can Dahlin is a diverse architecture and planning review and redline for content and clarity practice of 150+ multicultural professionals prior to the official submittal to the City. working with developers, municipalities, and private clients. Since 1976, Dahlin has been
This process also continues during the City
committed to excellence in design - best
review of the submittal. After receiving any
City (or public agency) comments from the demonstrated through their long-term client relationships and by their award-winning,
submittal, the Verde Design project team will financially successful, and sustainable have a design team meeting to coordinate
design solutions. For your Park, Facilities,
the project design, including client comments, and Recreation Master Plan, Dahlin will with the subconsultants, and coordinate the
be providing assessments of the existing
work required toward the next submittal. We
regularly have project and team meetings recreation buildings and will develop conceptual diagrams and budgets for future
to coordinate and adjust items to avoid
and/or renovated recreation buildings.
any conflicts later during construction.

Additionally, we review each subconsultants' FBA ENGINEERING deliverables to ensure the programmatic As-Need Service: Electrical Engineering needs of the project are captured. Since 1968, FBA Engineering (FBA) has sought CL SURVEY consistency and excellence in providing
As-Need Service: Survey innovative, state-of-the-art electrical, technology and lighting design solutions that
CL Surveying & Mapping (CL Survey) is a
match the unique requirements of each of its
local, SBE/DBE/MBE professional land survey client each project. FBA provides professional, firm that focuses exclusively on public works
independent, and innovative electrical
projects for design engineering firms, general engineering via consulting, planning, design contractors and municipalities. CL Survey's
and construction documents for projects
owners, Lam Le and Dan Calvillo, are licensed

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 17/30

TAB D STAFFING
from basic to complex whether local, who rely on Kier & Wright to provide them with national or international. Verde Design base mapping and design-level topographic has partnered with FBA on more than 15 surveying for their projects. projects from recreational to athletic facility

WATEARTH
programming. As-Need Service: CEQA
KIER + WRIGHT Watearth is your best resource for planning, As-Need Service: Civil Engineering master plans, modeling, design, and Kier + Wright provides civil engineering and construction support services in disciplines land surveying services for the planning and such as Water Resources, Environmental, construction. Our land surveying department Green Infrastructure, Hydrology & produces topographic surveys for use in our Hydraulics, Site Design, Stormwater, and own civil engineering plans. Through this Communications in the Federal Government, coordination with our in-house civil design Industrial, Litigation/Expert Witness, Local professionals, our surveying personnel have and State Government, Private Development, an in-depth understanding of the user Transportation, Utilities, and Water Districts experience, and know how to produce the sectors. Watearth's niche focus allows them optimal product showing the desired level of to create solutions that elude less specialized detail for utilization in the design process. In firms. With highly accredited senior staff, addition to providing these services for our Watearth is widely considered a leading firm own design work, Kier & Wright's client base in our disciplines, filling both key sub and includes numerous architects and engineers prime roles.

Rotary Playgarden, City of San Jose

RFO FOR CN-CALL ARCHITECTURAL ENGINEERNG, LANDSCAPE ARCHITECTURAL ENGN AL CONSULTING SERVICES VERDE DESIGN, INC. 18/30

TAB D STAFFING

MARK BAGINSKI RLA, LEED AP
PRINCIPAL-IN-CHARGE | VERDE DESIGN, INC.

Mark joined Verde Design as a principal in 2008, one year after it was founded. He brings over 30 years of professional experience, and is responsible for project design and management, client relationships, and production of project documents. His projects have included recreational and athletic facilities, including neighborhood and pocket parks with playgrounds, athletic fields and sports complexes, plazas and streetscapes, aquatic facilities, commercial property development, and corporate campus master planning. Marks projects have earned several notable awards and distinctions. A key characteristic of Mark's designs is the belief in an overall "big idea." This ensures that our clients' projects benefit from a strong, overall design concept that incorporates their goals and project objectives. Mark's background leading multidisciplinary development teams from the early programming phase through construction management, provides a broad base of experience for his projects.

Education RELEVANT EXPERIENCE
B.S, Mississippi State University, 1991 Town of Apple Valley B.L.A., Landscape Architecture, •(curren McConnel Jr. Park, Community Park & Athletic Facility Mississippi State University, 1991
A.A.S, Land Development, State City of Cathedral City
University of New York at • Dream Homes Park, Community Park & Playground (current) Cobleskill, 1987 City of Roseville
Licenses & Affiliations • F-51 (Riego Creek Park), Community Park (current) CA 4089, Landscape Architect, 1994 • Roseville Regional Soccer Complex, Sports Complex (current) • Gibson Park, Sports Complex (2023)
LEED Accredited Professional • F-94 (Kay Sakamoto) Pocket Park & Playground (2021) American Society of Landscape •F-101 (North Hayden) Pocket Park (2021) Architects • F-97 (Jim Gray) Pocket Park & Playground (2019) • Pistachio Park, Community Park 2019)
Urban Land Institute • F-95 (Bev Bos) Pocket Park & Playground (2018) Coalition for Adequate School
Housing City of San Francisco
• Golden Gate Park Fitness, Community Park (current)
American Sports Builders • Kimbell Playfields, Sports Complex (current) Association • Crocker Amazon Baseball Fields, Sports Complex (current) California Parks and Recreation • Noe Valley Town Square, Urban Design (2023) Society • UN Plaza, Urban Design (2023)
• Crocker Amazon Soccer Fields, Sports Complex (2023)
• South Sunset Fields, Sports Complex 2022)

PROJECT ROLE
Mark will be your advocate to City of Sunnyvale
• Community Center Grounds, Community Park (current)
keep your project on target • Lakewood Park, Community Park (current) to meet your goals. He will • Fair Oaks Park, Community Park (2022) be responsible for contract City of West Sacramento
administration and oversee • Bryte Park, Community Park/Sports Complex (current) design development. As the • Recreational Center, Community Park (2024) design development proceeds, Fair Oaks Recreation and Park District, Fair Oaks he will review all aspects of the • Phoenix Park, Community Park (current) project to confirm that all goals • Jim Streng Park, Community Park & Playground (2022) are met.

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 19/30

TAB D STAFFING

CHRIS GIANNINI RLA
ASSOCIATE, SENIOR PROJECT MANAGER | VERDE DESIGN, INC.

Chris joined Verde Design in 2019 as our Southern California office leader who leads all production efforts. This includes graphics, conceptual and construction drawing efforts as well as meeting preparation and project updates. Chris will provide management for the project, working with the team to attain input from your staff and various agencies involved, develop project programs, as well as direct supervision of drafting personnel, to ensure that you are satisfied and that the project's goals are met. Chris brings expertise in recreational facility and public park design, public works, high-density housing development, private residential design, commercial development, retail development, streetscape and highway design, and construction management to the Verde Design team. Chris has more than 25 years of experience in the design industry. Over his career, Chris has received multiple project awards from California Parks & Recreation Society (CPRS), American Society of Civil Engineers (ASCE) and American Public Works Association (APWA), which are all organizations he is actively involved in.

Education RELEVANT EXPERIENCE
B.S, Landscape Architecture, Town of Apple Valley
California Polytechnic State • curentcConnel Jr. Park, Community Park & Athletic Facility University, Pomona, 1993
Licenses & Affiliations City of Cathedral City
• Dream Homes Park, Community Park & Playground (current) CA 4287, Landscape Architect, 1998 • Downtown Dog Park, Conceptual Plan (2023) American Society of Landscape • Panorama Park, Dog Park (2022) Architects City of Santa Ana
California Parks and Recreation • Ist & Mountainview Park, Community Park (current) Society • Chavez Campesino Park, Sports Complex (2022)
Coalition for Adequate School City of Burbank
Housing • Brace Canyon Park, Sports Complex (2023)
City of Bakersfield
• Kaiser Permanente Sports Village, Sports Complex (2023) PROJECT ROLE City of Orange
Chris will oversee the • Hart Park, Sports Complex (current) preparation of schematic City of Palm Springs
design, and construction • Whitewater Park, Master Plan 2019) documents/packages. City of Poway
His responsibilities include • Lake Poway Softball Field, Sports Complex (current) consistent QA/QC and design Alvord School District, Riverside direction of the project. During • Norte Vista High School, Athletic Facility (2025) the startup phase, he will work Coachella Valley Unified School District, Coachella Valley with Mike and the team to • Sea View Elementary School, Athletic Facility (2021) attain input from your staff, Colton Joint Unified School District, Colton develop project programs, and • Grand Terrace High School, Athletic Facility (2025) respond to development issues.

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND FROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 20/30

TAB D STAFFING

MICHAEL SALAZAR RLA
PROJECT MANAGER | VERDE DESIGN, INC.

Mike joined Verde Design in 2022, contributing over 20 years of expertise in the field of landscape architecture. Prior to joining Verde Design, he dedicated his skills to several comprehensive landscape architectural firms. Mike's extensive portfolio includes a wide variety of public and private projects, including master planned communities, mixed-use commercial retail spaces, residential sub-divisions, parks, schools, churches, and streetscapes. Notably, he has overseen projects from the initial proposal stage and conceptual development to the creation of detailed working drawings, ultimately resulting in the thorough management of construction administration.

Education RELEVANT EXPERIENCE
B.S, Landscape Architecture, Town of Apple Valley
California Polytechnic State • Joseph McConnel Jr. Park, Community Park & Athletic Facility University, Pomona, 2001 (current)
Licenses & Affiliations City of Cathedral City
CA 5166, Landscape Architect, 2006 • Dream Homes Park, Community Park & Playground (current) City of Santa Ana
• Ist & Mountainview Park, Community Park (current)
• Chavez Campesino Park, Sports Complex (2022)

PROJECT ROLE
Mike will coordinate with Chris City of Burbank
• Brace Canyon Park, Sports Complex (2023)
and lead in the preparation of
graphics, meeting preparation, City of Santa Fe Springs • Ríver Park, Conceptual Plan (current)
client needs, and landscape
construction documents/ City of Poway
• Lake Poway Softball Field, Sports Complex (current)
packages. Mike's responsibilities
include management of Oro Grande School District, Oro Grande • Oro Grande Elementary School, Exterior Educational Facility projects as well as direct (2022)
supervision of drafting
Coachella Valley Unified School District, Coachella Valley personnel. He will also be
responsible for drafting and
other assistance as required to
Los Angeles Unified School District, Los Angeles
complete all assigned projects. • Gardena High School, Athletic Facility (current Palo Verde Unified School District, Palo Verde
• Palo Verde High School, Athletic Facility (2020)

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERNO, LANDSCAPE ARCHITECTURAL ENGEERNO, AND FROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 21/30

TAB D STAFFING

GIOVANI AGUIRRE RLA
PROJECT DESIGNER | VERDE DESIGN, INC.

Giovani became a member of Verde Design in 2022, taking on the role of project designer. In this capacity, Giovani plays a pivotal role in various projects, engaging in tasks that range from the initial stages of conceptual design to the preparation of construction documentation, and further extending support during the construction administration phase. With over a decade of professional experience, Giovani has been involved in a diverse array of project types, including parks, trails, streetscapes, single-family and multi-family residential developments, commercial retail spaces, industrial projects, and environmental planning initiatives, which encompass design guidelines, specific plans, and Greening Studies.

Education RELEVANT EXPERIENCE
B.S, Landscape Architecture, Town of Apple Valley
California Polytechnic State • Joseph McConnel Jr. Park, Community Park & Athletic Facility University, Pomona, 2013
A.S, Riverside City College, 2008 City of Cathedral City Licenses & Affiliations • Dream Homes Park, Community Park & Playground (current) • Downtown Dog Park, Conceptual Plan 2023)
CA 6899, Landscape Architect,
• Town Square Water Play, Community Park 2023)
2023
City of Santa Ana
American Society of Landscape • Ist & Mountainview Park, Community Park (current) Architects
City of Burbank
• Brace Canyon Park, Sports Complex (2023)
PROJECT ROLE City of Santa Fe Springs
Gio will be responsible for • Ríver Park, Conceptual Plan (current) design, drafting, and team City of Glendale
coordination to help create • Pacific Park, Sports Complex (current) the best possible product for City of Poway
the client. In this role, he will • Lake Poway Softball Field, Sports Complex (current) collaborate with Chris and Mike, City of Bakersfield
beginning with the program • Kaiser Permanente Sports Village, Sports Complex (2023) development through the Oro Grande School District, Oro Grande construction services. He will • Oro Grande Elementary School, Exterior Educational Facility manage the construction (2022)
documentation packaging and Coachella Valley Unified School District, Coachella Valley files. Gio will also be responsible • Mecca Elementary School, Athletic Facility (2022) for all construction cost
Palo Verde Unified School District, Palo Verde
estimating • Palo Verde High School, Athletic Facility (2020) Alvord School District, Riverside
• Norte Vista High School, Athletic Facility (2025)
Colton Joint Unified School District, Colton
• Grand Terrace High School, Athletic Facility (2025)

RFO FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 22/30

TAB D STAFFING

JAMIE WALLIS PE, QSD/QSP
SENIOR ASSOCIATE, CIVIL ENGINEER | VERDE DESIGN, INC.

Jamie joined Verde Design in 2014 and has developed into recent associate. She joined Derek's team to assist in managing current design projects, maintaining and building client relationships, and overseeing the rest of the production team in many aspects of each project she is involved in. During Jamie's time with Verde Design, she has assisted or managed a variety of projects, including public parks, athletic fields, and school facilities. Jamie also provides stormwater calculations, stormwater pollution prevention plans, and QSD service to ensure that the new facilities are designed in compliance with stormwater and C.3 requirements, if needed. Jamie utilizes her experience as a former NCAA DI athlete, and her technical design skills, to produce innovative solutions to unique project issues.

Education RELEVANT EXPERIENCE
B.S., Civil Engineering, Santa Clara City of Foster City University, Santa Clara, 2013 • Edgewater Park, Sports Complex (2024).

Licenses & Affiliations • Catamaran Park, Sports Complex (2016) CA C86612, Professional Engineer, City of Redwood City
2016 • Hawes Park, Sports Complex (2024)
• Red Morton Community Park, Sports Complex (2016)
CA QSD/QSP Certification #26164,
2016 City of San Jose
• Tamien Park Phase I, Community Park & Playground (2021) PROJECT ROLE City of Burbank
Jamie will support the • Brace Canyon Park (2023))
civil engineering and City of South San Francisco
documentation aspects of • Orange Memorial Park, Sports Complex (2023) the project. She will work with City of Alameda
Derek, Daniel, and Jerry to • Estuary Park Phase II, Community Park (current) coordinate the engineering • Estuary Park Phase I, Community Park (2017) and production of construction City of Burlingame
documents and provide • Murray Soccer Field, Sports Complex (2016) stormwater calculations for the City of Milpitas
project to ensure compliance • Militas Sports Center, Sports Complex 2016) with stormwater regulations Los Gatos Union School District, Los Gatos and C.3 requirements. • Blossom Hill Elementary School, Exterior Outdoor Classroom Area (2023)
• Daves Avenue Elementary School, Exterior Outdoor
Classroom Area (2023
• Louise Van Meter Elementary School, Exterior Outdoor
Classroom Area (2023
Mount Diablo Unified School District, Concord
• Oak Grove Middle School, Athletic Facility & Quad Area 2020) • Mount Diablo Elementary School, Athletic Facility (2019 • College Park High School, Athletic Facility 2018
Pacifica School District, Pacifica
• Cabrillo Elementary School, Athletic Facility (current) • Ortega Elementary School, Athletic Facility (2024,

REQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 23/30

TAB E QUALIFICATIONS

FIRM QUALIFICATIONS
Our mission is to provide excellence in
design and outstanding service to our
clients. In our 18 years in business, we
have accumulated an extensive portfolio
of successful recreational and athletic
facilities, partnering with more than 110 public
agencies and developing over 45 on-call
partnerships, and have completed over 750
recreational and athletic facility projects.

Sea Cloud Park, City of Foster City
Projects for public agencies have included
master plans for community and pocket them to make informed decisions. We have parks to regional and destination sites, which proven experience taking projects from include a variety of components, but not just an idea through community meetings limited to, natural grass and synthetic turf to conceptual design to constructed and fields, playgrounds, as well as all-inclusive completed projects. playground with custom play features and
surfaces, bike and skate parks, hard courts, Our in-house team of landscape architects fitness and exercise areas, recreational and civil engineers will seamlessly integrate and passive areas, picnic and BBQ areas, plans and specifications into a complete and sports field/park/security lighting, park easily built set of construction documents. beautification and perimeter fencing/ The extensive experience we have garnered security, irrigation design, and ADA and through successful collaborations with public circulation improvements. agencies has led to the development of numerous thoughtfully designed recreational
The City of Huntington Beach's (City) RFQ facilities. In many instances, we faced for On-Call Architectural Engineering, the critical decision of selecting between Landscape Architectural, and Professional natural grass and turf fields, ensuring that Consulting Services is a submittal that each choice aligned with the specific needs directly aligns with our 18 years of built and preferences of the communities we and proven project experience. Our serve. Many of these facilities have been experienced team will guide the City through community and destination sites that receive a comprehensive programming process, a high-level of attention, traffic, and use. The ensuring that all aspects of your projects are sophisticated design concept serves as a thoroughly understood. This will empower catalyst for our team's innovative thinking, the City to make well-informed decisions guaranteeing meticulous development of at each step of the way, ultimately leading your projects with thorough exploration of all to successful outcomes. At Verde Design, available options. we recognize the significance of both the
operational and maintenance requirements Should our team be selected to collaborate in any project. We are committed to with the City, we will dedicate ourselves to collaborating with our clients to ensure that understanding your objectives, preferences, these needs are effectively met. current priorities, and principles in order to ensure a successful partnership. This begins
We have demonstrated our ability to with a shared vision built upon your project consistently play a role with educating goals, and is supported by Verde Design's communities through community workshops portfolio of similar work, which can be seen in and stakeholder meetings, which allows following pages.

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 24/30

TAB E QUALFICATIONS

CAPTAIN JOSEPH
MCCONNEL JR. USAF

PARK, APPLE VALLEY
Verde Design was engaged to
deliver design services for a
12-acre community park in the
Town of Apple Valley. This site,
which had formerly served as
sports fields and featured a
decomposed granite track, was
leased from the local school
district and had deteriorated
over time. Recognizing its
potential, the Town chose this
property to apply for Proposition
68 State Grant Funding aimed
at establishing a new park. The
state subsequently awarded funding to the Town to create a recreational facility that would benefit the underserved community. In response, Verde Design's multi-disciplinary team has developed various conceptual master plan options that align with the allocated budget, and they are currently in the process of preparing the construction drawing Project Team: Mark Baginski (PIC), Chris Giannini (Sr. PM), Mike Salazar (PM), and Gio Aguire (Designer)

PACIFIC PARK,

GLENDALE
Pacific Park is a joint use
park shared by the City of
Glendale and Glendale USD
Verde Design was hired to
provide design services
from concept through
construction support for the
replacement of an existing
synthetic turf field. The field
suffers from poor drainage
and has ADA compliance
challenges. Construction
drawings are now complete
and include drainage improvements that did not require the complete replacement of field base material and drainage. Access compliance has also been addressed and a new netting system has been designed to keep soccer balls out of the adjacent street. The project is currently bidding
Project Team: Mark Baginski (PIC), Chris Giannini (Sr. PM), and Gio Aguire (Designer)

RFO FOR ON-CALL ARCHITECTURAL ENGINEERNG, LANDSCAPE ATCHITECTURAL ENGINEERING, AND PROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 25/30

TAB E QUALIFICATIONS

KAISER PERMANENTE SPORTS

VILLAGE, BAKERSFIELD
Verde Design was selected by
the City of Bakersfield to deliver
conceptual design services for the
remaining 95 acres of undeveloped
parkland designated for the Kaiser
Permanente Sports Village. Our team
has developed a comprehensive
updated conceptual master plan
that encompasses a variety of
recreational facilities, including six
natural grass football fields equipped
with sports field lighting, eight baseball
and softball fields, a skate park, and
a dog park. Additionally, the plan
features fitness stations, a splash pad, an aquatics center, a community center, a designated play area, restroom and concessions buildings, shade structures, picnic areas, walking trails, parking facilities, and internal roadways. Furthermore, we have developed detailed construction drawings for 35 acres of improvements at the park under Phase IV of this project. This phase includes the development of five football fields with sports field lighting, a restroom and concessions building, enhancements to roadway extensions, and the establishment of two parking areas to accommodate visitors.

Project Team: Mark Baginski (PIC), Chris Giannini (Sr. PM) and Gio Aguirre (Designer)

CHED MUL ALL COURTS

DREAM HOMES PARK,

CATHEDRAL CITY
In 2020, Verde Design undertook
the conceptual planning for a

7.5-acre community park situated

SOCCER HELD

CELINE CONMECTION
along the seasonal Whitewater OFSHIPLAY

MOON PICNIC SHETENS FLO
River in Cathedral City. This park
is designed to integrate trail K SIGNAC
connections with the region's
master-planned CV Link trail,
which serves as an alternative
transportation route for the Coachella Valley. The proposed design encompasses a variety of features, including a multi-use natural grass open space, a futsal court, a central plaza, restroom facilities, two covered play areas, fitness stations, two basketball courts, a dog park, picnic shelters, picnic tables, walkways, benches, and two designated parking areas.

The City has recently engaged our firm to leverage our expertise in order to successfully finalize this project, specifically tasking us with the development of the construction drawings. With these drawings now finalized, the park is actively undergoing construction, and it is anticipated that the park will open in mid 2025.

Program: Mark Baginski (PIC), Chris Giannini (Sr. PM), Mike Salazar (PM), and Gio Aguirre (Designer)

RFO FOR ON-CALL ARCHITECTURAL ENGNEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 26/30
TAB E

QUALIFICATIONS

BRACE CANYON PARK,

BURBANK
Brace Canyon Park includes
existing natural grass sports
fields over an existing concrete
reservoir, as well as an unpaved 80
walking path. The City has
eliminated the use of pesticides
in their park programs and
seeks to reduce the use of
water so they chose to replace
the natural grass fields with
synthetic turf. The concrete
reservoir is roughly 30" below
existing grades and was built in
the 1940's. Load requirements
and access points are critical
design criteria that must be
followed. Verde Design is currently designing construction drawings for this project.

Project Team: Mark Baginski (PIC), Chris Giannini (Sr. PM), Mike Salazar (PM), Gio Aguirre (Designer), and Jamie Wallis (Civil Engineer)
LASSERATLISA • WALL CA TENCE

WHITE WATER PARK,

PALM SPRINGS
Verde Design provided
conceptual planning efforts
for a 5.7 acre community
park for the City of Palm
Springs along the seasonal
Whitewater River. The park
will be developed with trail
connections to the region's
master planned CV link SUNESE PARKWAY
trail, Coachella Valley's
SAPITY PENO SPLATAP:
alternative transportation
route.

The park design includes
natural grass open space, two covered play areas, splash pad, fitness stations, dog park, skate plaza, drinking fountains, picnic shelters, picnic tables, a monument sign, walkways, fencing and benches.

Project Team: Mark Baginski (PIC) and Chris Giannini (Sr. PM)

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 27/30

TAB E QUALIFICATIONS

FAIR OAKS PARK, SUNNYVALE
Verde Design was selected by
the City of Sunnyvale for the
renovation of Fair Oaks Park, a
15-acre community park located
in Northern Sunnyvale, originally
built in 1969. The design includes
the replacement of the existing
natural grass athletic field with
synthetic turf for its baseball,
soccer, and multi-use fields. This is
the Citys first park with synthetic
turf, which will greatly extend the
duration of playtime, particularly
during periods of heavy rainfall.

Alongside the remarkable fields,
we collaborated closely with
both the Magical Bridge Foundation and City staff to seamlessly integrate an all-inclusive playground into the park's overall design. This inclusive approach ensures that individuals of all abilities can enjoy the park's amenities and foster a sense of community. The project also included hardcourt improvements, expanded picnic areas, and circulation and infrastructure improvements.

Project Team: Mark Baginski (PIC), Pat Healy (PM), Qian Huang (Job Captain), Bill Drulias (Director of Design), and Daniel Correia (Job Captain)

GIBSON PARK, ROSEVILLE
Gibson Park is a recreational
facility situated in the City of
Roseville (City), featuring a
variety of sports courts that
cater to tennis, pickleball,
and basketball enthusiasts.

Currently, the park has
completed its first phase,
which encompasses the
construction of nine pickleball
courts, a restroom facility,
2024
shaded seating areas, and
lighting for the sports courts.

Additionally, this phase has
introduced enhancements such as accessible parking spaces and electric vehicle charging stations. Looking ahead, the City plans to expand further with the addition of three more pickleball courts, ten tennis courts, and three basketball courts, alongside improvements in parking, landscaping, and signage. Future developments will also incorporate a walking trail and a fitness loop equipped with fitness stations, promoting a more diverse range of recreational activities for the community.

Project Team: Mark Baginski (PIC), Chris Sullivan (Sr. PM), and Amy LaTomme (PM)

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESS ONAL CONSULTING SERVICES VERDE DESIGN, INC. 28/30

TAB E QUALIFICATIONS

JOHN D MORGAN PARK, CAMPBELL
The City's grand vision has been to provide
recreation and learning opportunities to
a large part of the population previously
underserved and set out to create an all-
inclusive play area within the mature John
D Morgan Park. The City engaged the PRC
and established an Ad Hoc subcommittee
to lead the design process. Community
engagement was integral in developing the
park site through several workshops and
lead to the 'Play in the Trees' theme and
play features.

The existing site was well established but
working within the existing forested site and underground root systems required an adept team to keep the project moving in a timely efficient process. The site also included underground utilities within easements that were protected in place during construction but required a team effort from manufacturer to installer to avoid field conflicts. The playground amenities allow users of all levels to play side by side without barriers and the introduction of a picture exchange communication board (PECS) for non verbal park users. This may be the first installation of a PECS board in a public park in northern California.

Project Team: Derek McKee (PIC) and Bill Drulias (Director of Design)

TAMIEN PARK, SAN JOSE
Verde Design was selected by the City of
San Jose (City) to provide two concept
plans, a preferred concept, construction
documents, bidding, and construction
assistance for the City's Tamien Park.

Included in Phase 1 of the 3.67-acre
park design, is a new parking lot, a pre-
fabricated restroom/storage building,
security lighting with power outlets, shade
structures, picnic and play opportunities.

Additional features of the park include
a post-tension slab basketball court,
synthetic turf volleyball court, youth play area, game tables, ornamental fencing, stone pilasters, signage, pervious and impervious paving, site-specific improvements, drought- tolerant planting, and an MWELO-compliant pump and irrigation system that is designed to be switched over to recycled water when it becomes available. In Spring 2021, Verde Design completed Phase Il additions to the park, which included a natural grass multi-use field with accompanying shade structures, perimeter all-weather walking/running path, and field netting.

An outdoor fitness/exercise area is provided with additional seating and shade. The park is designed to have direct linkage to the train station upon build out. A perimeter pathway encompasses the new field with raised planting beds. A solar lighting was also installed for safety and emergency lighting.

Project Team: Derek Mckee (PIC) and Bill Drulias (Director of Design)

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSONAL CONSULTING SERVICES VERDE DESIGN, INC. 29/30

TAB E QUALIFICATIONS
References of Work Performed Form
(List 5 Local References)
Comany Name:_ Verde Design Inc.

1. Name of Reference: - Town of Apple Valley
Address: 14955 Dale Evans Parkway, Apple Valley, CA, 92307 Rich Berger Phone Number: 760.240.7000
Contact Name:

Email: [email protected]
Dates of Business: June 2023 - Estimated mid 2025

2. Name of Reference: City of Glendale
Address: 201 E. Colorado Street, Glendale, CA 91201
Joseph Gonzalez _ Phone Number: 818.550.4415
Contact Name: —
Email: [email protected]
Dates of Business: March 2024 - In design

3. Name of Reference: City of Burbank
Address: 275 East Olive Avenue Burbank, CA 91502
Contact Name: _ Mike Del Campo - Phone Number: _ 818.238.5343 Email: [email protected]
Dates of Business: January 2020 - October 2023

4. Name of Reference:_ City of Cathedral City
Address: 68700 Avenida Lalo Guerrero, Cathedral City, CA 92234 Contact Name: John Corella Phone Number: 760.770.0340
Email: [email protected]
Dates of Business: November 2019 - Estimated mid 2025

5. Name of Reference: City of Bakersfield
Address: 1600 Truxtun Avenue, Bakersfield, CA 93306
Contact Name: Navdip Grewal Phone Number: 415.999.6548
Email: [email protected]
Dates of Business:_December 2019 - August 2023

AFQ FOR ON-CAIL ARCHITECTURAL ENGINEERNG, LANDSCAPE ARCHITECTURAL ENGNEERING, AND PROFESSONAL CONSULTINO SERVICES VERDE DESIGN, INC. 30/30
EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:

SEE ATTACHED EXHIBIT B
B. Travel Charges for time during travel are not reimbursable.

C. Billing
All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.

Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.

A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.

CONSULTANT shall submit to CITY an invoice for each monthly payment due.

Such invoice shall:

A)
B) escribe the services pertorme
C) how the total amount of the payment du
D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and
E) For all payments include an estimate of the percentage of work completed.

Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.

Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.

EXHIBIT B

TAB F PR

PROPOSAL

DETERMINING COSTS FOR PROFESSIONAL FEES
Verde Design strongly believes that the success of any project begins with clear communication including identifying a specific scope of services and associated fees for every respective project. It is important to us that our client not only feels that they received the services that they paid for but that it was also excellent value without sacrifice.

If we are selected to perform professional services for the City of Huntington Beach (City, we will review the project scope with you to develop project specific tasks, consultant needs and overall process to establish professional compensation which can be provided in a fee breakdown matrix.

It is our intent to be all-inclusive with our proposal and prefer not to provide additional services or contract amendments as the project progresses.

Typically, our fees are provided on a lump sum fixed fee basis that is derived from the task/fee worksheet. Additional services, if required, can use fixed fee or time and materials approach as determined through discussions with the City. We have provided services utilizing a percentage of construction costs. While the percentage can vary based on scope, we are typically in the 7.5% to 12% range. Fee percentage is determined by the complexity and overall size of the project scope and anticipated construction budget.

Barkley Park, City of Woodside

RO FOR ON-CALL ARCHITECTURAL ENGNEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 1/8

TAB FREE PROPOSAL
Verde Design
For every project, we determine a cost utilizing a task and fee methodology tailored to the specific requirements of the project, with a preference for a fixed fee lump sum structure. The accompanying chart details the current rates for professional services and office- related expenses. Additionally, the reimbursable rates and associated costs are presented at the bottom of the chart. 2025 2026 2027 2028
$275.00 per hour $285.00 per hour $295.00 per hour $305.00 per hour $260.00 per hour $270.00 per hour $280.00 per hour $290.00 per hour $240.00 per hour $250.00 per hour $260.00 per hour $270.00 per hour $195.00 per hour $200.00 per hour $210.00 per hour $220.00 per hour $180.00 per hour $190.00 per hour $200.00 per hour $210.00 per hour $200.00 per hour $210.00 per hour $220.00 per hour $230.00 per hour Level l $185.00 per hour $195.00 per hour $210.00 per hour $215.00 per hour IT Manager $195.00 per hour $205.00 per hour $215.00 per hour $225.00 per hour CAD Manager $190.00 per hour $200.00 per hour $210.00 per hour $220.00 per hour Project Designer $175.00 per hour $180.00 per hour $190.00 per hour $200.00 per hour Job Captain/staff Engineer/Construction Admin $165.00 per hour $170.00 per hour $180.00 per hour $190.00 per hour Draftsperson Level lI $160.00 per hour $165.00 per hour $170.00 per hour $180.00 per hour Draftsperson Level l $155.00 per hour $160.00 per hour $165.00 per hour $170.00 per hour Project Administrator $100.00 per hour $105.00 per hour $110.00 per hour $115.00 per hour Intern $85.00 per hour $90.00 per hour $95.00 per hour $100.00 per hour Reimbursable Rates
Blueprints, Printing and Reproductions Cost plus 10% Cost plus 10% Cost plus 10% Cost plus 10% Sub Consultant Services Cost plus 10% Cost plus 10% Cost plus 10% Cost plus 10% Reimbursable Expenses
Blueprints and Reproductions Travel Expenses Travel Expenses Travel Expenses Travel Expenses Photography Parking and Toll Expenses Parking and Toll Expenses Parking and Toll Expenses Parking and Toll Expenses Models and Renderings Permit Fees Permit Fees Permit Fees Permit Fees Postage/Overnight Mail Service Courier Delivery Service Courier Delivery Service Courier Delivery Service Courier Delivery Service Charge Rate Schedule is subject to revisions.

REQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 2/37 rEb

TAB F PROPOSAL
CL
* SURVEYING & MAPPING

SURVEYING AND MAPPING SERVICES

FEE SCHEDULE
(This rate schedule is subject to a revision on October 1, 2025) Office Staff:

Contract/ Survey Manager $260
Project Surveyor $220
Survey Analyst / Technician $185
Admin / Clerical $100
Note: Authorized overtime will be charged at 1.5 times the above rate.

Field Staff:
1 Person Field Crew * $265
2 Person Field Crew * $365
• 3 Person Field Crew * $485
* CL Surveying and Mapping, Inc. is signatory to the International Union of Operating Engineers Local 12. Field surveyors are therefore paid prevailing wage rates for all work performed.

Reimbursable Expenses:

1. 3D Laser Scanner equipment is not included in our overhead rate and will be invoiced at an additional separate daily rate.

2. All field staff are subject to prevailing wages.

3. Aerial Mapping costs by subconsultant will be invoiced as an ODC. A copy of invoices from the subconsultant will be submitted for reimbursement.

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 3/8
FEE

TAB F PROPOSAL

CONVERSE CONSULTANTS
Non-Prevailing Wage Schedule of Fees
Geotechnical Personnel
Introduction
It is the objective of Converse Consultants to provide its clients with quality professional and technical services and a continuing source by merbers of the prosion cur Sty prating in the same focally under similar contions. This fee soner is vale through, December 31, 2025.

Hourly Charges for Personnel
Staff assignments will depend on personnel availability, job complexity, project site location, and experience level required to satisfy the technical requirements of the project and to meet the prevailing standard of professional care.

Field Technical Services (all including vehicle and equipment) construction Inspector - ACI/ICC and/or AWS/CW certified (concrete, post-tension, masonry tructural steel, fireproofing; includes concrete batch plant and local steel fabrication inspections) ... $90 on-Destructive resuing inspector (ultrasonic. magnetic panic. .90 onstruction Inspector/Technician (skidmore, pull testing, torque testing, Schmidt hammer, and pachomete 90 Coring Technician....... .90
Soils Technician (soil, base, asphalt concrete, and moisture emission testing) . 90 Senior Soils Technician. .95
Sample Pick-Up ..... ..60
Professional Services (field and office)
Staff Professional... . $150
Senior Staff Professional 155
Project Professional 165
Project Manager..... 175
Senior Professional.. 180
Principal Professional .225
Principal/Consultant. . 235
Laboratory Testing
Laboratory Technician.... ... Per Test
(See Geotechnical Laboratory Testing and Materials Testing Services fee schedules.) Laboratory Supervisor. . $100
Office Support
Clerical/Word Processing . $90
Drafting......... ...90
CAD Operator/Drafting Manager 100
An overtime charge of 50 percent of the above hourly rates (excluding Professional Services) will be added for time in excess of eight hours per day and for all time on Saturdays, Sundays and holidays. An overtime charge of 100 percent of the above hourly rates (excluding Professional Services) will be charged on Sunday if hours worked were seven continuous eight hours per day in one work week, not counting paid time off within the week. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel.

Expenses

1. Exploration expenses (drilling, trenching, etc.) are charged at cost plus fifteen percent.

2. Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects requiring travel and/or living 50 miles away from the project site are charged at cost plus fifteen percent.

3. Automobile and truck expenses are charged at cost plus fifteen percent (rentals) or at the current IRS mileage rate for company- owned vehicles traveling between principal office and project.

4. Other out-of-pocket direct project expenses (aerial photos, long-distance telephone calls, permits, outside printing services, tests, etc.) are charged at cost plus fifteen percent.

Invoices

1. Invoices will be submitted to the Client on a monthly basis, and a final bill will be submitted upon completion of services.

2. Payment is due upon presentation of invoice and is past-due thirty days from invoice date. In the event Client fails to make any

3. General Conditions
The terms and provisions of the Converse General Conditions are incorporated into this fee schedule as though set forth in full. If a copy of the General Conditions does not accompany this fee schedule, Client should request a copy from this office.

Converse Consultants P2025 Geotech

RFQ FOR ON-CALL ARCHITECTURAL ENGINEERNG, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 4/8

PROPOSA
DAHLIN
RATES
2025 PRESIDENT/CEO, SENIOR VICE PRESIDENT, FOUNDER, CFO, CMO, CPO $ $275 - $300

BASIC HOURLY
RATE SCHEDULE SENOR DIETOR, MANAGING PRINCIPA, MANAGING DIRECTOR, SENOR PRINCIPAL, $210 - $270 SENIOR - ARCHITECT, PROJECT MANAGER, PROJECT SPECIALIST, DESIGNER, PLANNER $190 - $200 ARCHITECT, PROJECT MANAGER, PROJECT SPECIALIST, PROJECT DESIGNER, DESIGN $170 - $180

MANAGER
JOB CAPTAIN, INTERIOR DESIGNER, BIM SPECIALIST, DESIGNER, PLANNER $130 - $160 DESIGNER/DRAFTER $100 - $120
ADMINISTRATION $85 - $125
RATES EFFECTIVE THROUGH DECEMBER 31, 2025 AND MAY BE ADJUSTED ANNUALLY

RFQ FOR ON-CALL ARCHITECTURAL ENGNEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 5/8

TAB F PR

PROPOSAI

FBA ENGINEERING
FBA HOURLY RATE SCHEDULE - 2024
Principal / Project Director... $ 210.00/hour
V.P. / Senior Associate.... $ 160.00/hour
Associate / Project Manager.... $ 160.00/hour
Construction Support.. $ 135.00/hour
Electrical Designer.. $ 110.00/hour
CAD / BIM Designer..... ...$ 90.00/hour
Technical Typist........... $ 50.00/hour
Consulting Engineers 150 Paularino Avenue, Suite A120 • Costa Mesa, California 92626 • 949.852.9995 • FBAengr.com Electrical • Lighting • LEED*/Energy • Technology • Fire Life Safety

REQ FOR ON-CALL ARCHITECTURAL ENGNEERING, LANDSCAPE ARCHITECTURAL ENGNEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 6/8

TAB F PRE

PROPOSAL
W KIER+WRIGHT

HOURLY RATE SCHEDULE
Effective February 24, 2025 through February 28, 2026
Principal. ...$ 325.00 / Hour
Development Services Manager.... ..$ 305.00 / Hour
Associate...... $275.00/ Hour
Structural Engineering Manage......... $ 260.00 / Hour
Technical Manager (SME) / Senior Engineering Manager.... .$ 260.00 / Hour Senior Enginee...... ...$ 249.00/ Hour
Engineer III..... $228.00/Hour
Engineer Il. $ 198.00/ Hour
Engineer I. $160.00/Hour
Engineering Tech III ...$ 208.00 / Hour
Engineering Tech II.. . $ 189.00 / Hour
Engineering Tech I... .$ 175.00 / Hour
Project Coordinator III.. .. $150.00/Hour
Project Coordinator II. ..$137.00 / Hour
Project Coordinator I... ...$ 129.00 / Hour
Senior Land Surveyor.. ...$ 255.00/Hour
Senior Survey Construction Manager... .. $ 255.00 / Hour Survey Operations Coordinator... ..$ 218.00 / Hour
Project Surveyor III $ 228.00/ Hour
Project Surveyor Il ..$ 185.00 / Hour
Project Surveyor I..... $158.00 / Hour
Draftsman / Survey Tech III... $178.00/Hour
Draftsman / Survey Tech II.... $ 152.00 / Hour
Draftsman / Survey Tech I $ 132.00 / Hour
3D Laser Scanning Crew ... ...$444.00 / Hour
3-Man Survey Crew.... ...$360.00 / Hour
2-Man Survey Crew.. $ 286.00 / Hour
1-Man Survey Crew.. $180.00 / Hour
1-Man Hrly Rate (Travel) ...$125.00 / Hour
2-Man Hrly Rate (Travel)... $ 205.00 / Hour
Engineering / Survey Intern.... $90.00 / Hour
Testimony (Trial or Deposition)... $ 589.00 / Hour
All blueprinting and reproduction will be billed at cost plus 10%.

Time spent for preparation for testimony will be billed in accordance with the above hourly rates.

Kier + Wright Hourly Rates | Southern - CONFIDENTIAL - www.kierwright.com

RFQ FOR ON-CALL ARCHITECTURAL ENGNEERING, LANDSCAPE ARCHITECTURAL ENG NEERANG, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 7/8
TAB F • FEE

PROPOSAL
Watearth™ Rates
Rates
Rates
Classification (S/hr)
Principal $ 360.00
Managing Engineer $265.00
Sr. Project Manager $240.00
Project Manager $ 180.00
Project Coordinator $ 135.00
Sr. Engineer $ 225.00
Engineer $ 180.00
Assistant Engineer $ 135.00
Sr. Environmental Planner $ 200.00
Environmental Planner $ 140.00
Sr. Environmental Scientist $ 200.00
Environmental Scientist $ 165.00
Assistant Environmentalist $ 115.00
Geologist $ 165.00
Sr. Hydrologist $ 180.00
Hydrologist $ 165.00
Sr. Landscape Architect or Designer $ 200.00
Landscape Architect or Designer $ 145.00
Sr. Designer $ 170.00
Designer $ 125.00
Sr. GIS Specialist $ 170.00
GIS Specialist $ 140.00
Sr. Surveyor $ 170.00
Surveyor $ 140.00
Sr. Inspector $ 170.00
Inspector $ 135.00
Outreach or Communications Specialist $ 155.00
Technical Editor $ 125.00
Graphic Designer $ 125.00
Project Controls $ 155.00
Administrative Assistant $ 95.00

RFQ FOR ON-CALL ARCHITECTURAL ENGNEERING, LANDSCAPE ARCHITECTURAL ENGINEERING, AND PROFESSIONAL CONSULTING SERVICES VERDE DESIGN, INC. 8/8