PROFESSIONAL SERVICES CONTRACT BETWEEN
THE CITY OF HUNTINGTON BEACH AND
CANNON CORPORATION
FOR
ON-CALL CONSTRUCTION MANAGEMENT, MATERIALS TESTING, AND
INSPECTION SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and, CANNON CORPORATION, a hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to perform on-call construction management, materials testing and inspection services; and Pursuant to documentation on file in the office of the City Clerk, the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied with; and CONSULTANT has been selected to perform these services, NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:
SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT." CONSULTANT hereby designates Josh Knoefler who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement.
25-17168/393151 1 of 12
CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement.
TERM: TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT are to commence on , 2025 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than two (2) years from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.
In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein.
4. COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed Two Million Five Hundred Thousand Dollars ($2,500,000.00).
5. EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional 25-17168/393151 2 of 12
compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained.
6. METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B."
DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, data or programs, maps, memoranda, letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion, whichever shall occur first. These materials may be used by CITY as it sees fit.
8. HOLD HARMLESS
A. CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall 25-17168/393151 3 of 12
apply to all claims and liability regardless of whether any insurance policies are applicable.
The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT.
B. To the extent that CONSULTANT performs "Design Professional Services" within the meaning of Civil Code Section 2782.8, then the following Hold Harmless provision applies in place of subsection A above:
"CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and against any and all claims, damages, losses, expenses, demands and defense costs (including, without limitation, costs and fees of litigation of every nature or liability of any kind or nature) to the extent that the claims against CONSULTANT arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT's proportionate percentage of fault. However, notwithstanding the previous sentence, in the event one or more other defendants to the claims and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid defense costs. The duty to indemnify, including the duty and the cost to defend, is limited as provided in California Civil Code Section 2782.8.
C. Regardless of whether subparagraph A or B applies, CITY shall be reimbursed by CONSULTANT for all costs and attorney's fees incurred by CITY in enforcing this obligation. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONSULTANT. 25-17168/393151 4 of 12
PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT's professional liability in an amount not less than One Million Dollars ($1,000,000.00) per occurrence and in the aggregate. The above- mentioned insurance shall not contain a self-insured retention without the express written consent of CITY; however an insurance policy "deductible" of Ten Thousand Dollars ($10,000.00) or less is permitted. A claims-made policy shall be acceptable if the policy further provides that:
A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements).
B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims.
CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If insurance is terminated for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this Agreement.
If CONSULTANT fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification 25-17168/393151 5 of 12
of termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY.
10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall:
A. provide the name and policy number of each carrier and policy; B. state that the policy is currently in force; and
shall promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment of premium.
CONSULTANT shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by CITY.
The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required.
11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. 25-17168/393151 6 of 12
CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services to be perforned hereunder.
12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner. CITY may terminate CONSULTANT's services hereunder at any time with or without cause, and whether or not the PROJECT is fully complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the event of termination, all finished and unfinished documents, exhibits, report, and evidence shall, at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.
13. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove.
14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material produced as a result of this Agreement.
25-17168/393156 7 of 12
15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Goverment Code.
16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U. S. certified mail-return receipt requested:
TO CITY: TO CONSULTANT:
City of Huntington Beach Cannon Corporation
ATTN: Director of Public Works ATTN: Josh Knoefler
2000 Main Street 16842 Von Karman Avenue, Suite 150
Huntington Beach, CA 92648 Irvine, CA 92606
17. CONSENT
When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event. 25-17168/393151 8 of 12
18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties.
19. SECTION HEADINGS
The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement.
20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties.
If any provision of this Agreement is held by an arbitrator of court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here.
As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires.
Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement 25-17168/393151 9 of 12
which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law.
21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it.
22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification.
23. LEGAL SERVICES SUBCONTRACTING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONSULTANT.
24. ATTORNEY'S FEES
In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party. 25-17168/393151 10 of 12
25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive.
26. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.
27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.
28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof.
25-17168/393151 11 of 12
29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Attorney. This Agreement shall expire when terminated as provided herein.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers.
CONSULTANT, CITY OF HUNTINGTON BEACH,
CANNON CORPORATION a municipal corporation of the State of California
on Dawak
Michael F. Cannon City Manager
print name
ITS: (circle one) Chairman/President/Vide President
INITIATED AND APPROVED:
AND
By JA# Director of Public Works
APPROVED AS TO FORM:
Lawrence P. Kraemer
print name
ITS: (circle one) Secretary/Chief Financial Officer/Asst. Peja Secretary - Treasurer
City Attorney
Date 10/21/2025
RECEIVE AND FILE:
City Clerk
Date
25-17168/393151 12 of 12
EXHIBIT "A"
A. STATEMENT OF WORK: (Narrative of work to be performed) CONSULTANT shall provide consulting services on an "as-needed" basis for projects to be determined during the term of the agreement. During the tern of the agreement, CITY may elect to solicit proposals from CONSULTANT. CITY shall issue task order for each project based upon the scope of services, work schedule, and fee proposal submitted to CITY for its review and approval.
B. CONSULTANT'S DUTIES AND RESPONSIBILITIES:
CONSULTANT'S duties and responsibilities shall be per CONSULTANT'S State of Qualification (Exhibit A), consistent with the City of Huntington Beach's Request for Qualifications for On-Call Construction Management, Inspection and Material Testing. Upon award, and the contract period, the CONSULTANT can choose to assign different personnel to the project, CONSULTANT must submit the names and qualifications of these staff to CITY for approval before commencing work.
C. CITY'S DUTIES AND RESPONSIBILITIES:
1. Furnish scope of work request for each project.
Furnish construction plans and specifications to the CONSULTANT
3. City shall issue a task order for each project based upon scope of services, work schedule, and fee proposal submitted
D. WORK PROGRAM/PROJECT SCHEDULE:
A project schedule will be developed for each project assigned by CITY.
EXHIBIT A
EXHIBIT A
City of
Huntington Beach
Qualifications for
On-Call Construction
Management, Materials
Testing, and Inspectio
ilIServices
Cannon
Reliable Responsive Solutions
Table of Contents
A: Cover Letter. ... 1
B: Vendor Application Form#
C: Pre-Qualification Form#
D: Service Category 2
Firm Qualifications. .2
• Sub-consultants
• Organization Chart
• Licenses and Certifications
References and Project Experience.. ..7
Design-Build Experience 9
Understanding and Approach ... 11
E: Rate Sheets Submitted Separately via PlanetBids
Appendix
Resumes . T
Certification Copies.. ..ix
Rate Sheets. ..Xi
Cannon
Cover Letter
Jessica Castro June 13, 2025
City of Huntington Beach - Public Works
2000 Main Street
Huntington Beach, CA 92648
Subject: On-Call Construction Management, Materials Testing, and Inspection Services
Dear Ms. Castro:
The City of Huntington Beach (City) needs a dependable and qualified construction management team that can provide on-call construction management, construction inspection, and material testing services for a variety of public works infrastructure projects such as wells, pump stations, lift stations, curb and gutter, sidewalks, pipelines, traffic signals, structures, road rehabilitation, and bridge retrofits; and upgrades to City facilities, including fire stations, police department facilities and substations, community centers, beach and park restrooms, libraries, and city hall facilities. This construction management and inspection services agreement is a great opportunity for the City to strengthen its resources in anticipation of completing its future goals in a timely and efficient manner.
During the past 49 years, Cannon's staff has had many opportunities to work in an on-call capacity, providing construction management, construction inspection, engineering, and surveying services for municipalities throughout Southern California. An abbreviated list of clients who have selected Cannon to provide on-call construction management and inspection services in the last five years can be found of page 3.
Characteristics of a qualified construction management and inspection team include reliability, responsiveness, and availability. Our highly qualified team will operate as a seamless and scalable extension of the City, respond proactively to concerns, and comply with the City's standards, guidelines, and construction inspection methods. Proof of these characteristics can be seen through the quality of the finished product, Cannon's schedule and cost control abilities, and our diligence in documenting the project. The following proposal demonstrates our ability to provide the necessary characteristics.
If Cannon is selected, we will provide the items of work listed in Patrick Riddell, PE, CPII, QSD/P, who will this proposal within the time period requested. I am available serve as Principal-in-Charge and Project to answer any questions through the contact methods provided Manager, was born and raised in Huntington below, or to further discuss this proposal. We look forward to Beach, giving him a personal connection working with the City of Huntington Beach. to the City and a vested interest in its continued growth and success.
Sincerely,
Teasel
Patrick Riddell,* PE, CPII, QSD/P sh Knoefler, PE
Director, Construction Management Division Senior Construction Manager 16842 Von Karman Ave., Suite 150, Irvine, CA 92606 16842 Von Karman Ave., Suite 150 Д 805.503.4586 # 805.235.0576 E 805.503.4446 Irvine, CA 92606 M [email protected] # 949.668.1686 • 949.796.2654
*Authorized to bind firm. • [email protected]
Cannon 1
Vendor Application Form
REQUEST FOR PROPOSAL
VENDOR APPLICATION FORM
TYPE OF APPLICANT: ONEW /CURRENT VENDOR
Legal Contractual Name of Corporation: Cannon Corporation Contact Person for Agreement: Patrick Riddell, PE, CPII, QSD/P Corporate Mailing Address: 16842 Von Karman Ave., Ste 150 City, State and Zip Code: Irvine, CA 92606
E-Mail Address: [email protected]
Phone: 805.503.4586 Fax: 949.753.0775
Contact Person for Proposals: Josh, K nofeer,PE
Title: Regional Construction Manager E-Mail Address: [email protected] Business Telephone: 949.668.1686 Business Fax: 949.753.0775 Is your business: (check one)
ONON PROFIT CORPORATION FOR PROFIT CORPORATION
Is your business: (check one)
CORPORATION OLIMITED LIABILITY PARTNERSHIP
OINDIVIDUAL OSOLE PROPRIETORSHIP
DPARTNERSHIP DUNINCORPORATED ASSOCIATION
On-Call Construction Management, Materials Testing, and Inspection Services Cannon Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone
Michael Cannon President and CEO 805.544.7407
Secretary / Directo
Larry Kraemer Public Infrastructur 805.544.7407
Karen Morris COO 805.503.4524
Bob Stets Legal Council 805.459.2014
Director, Construction
Patrick Riddell Management 805.544.7407
Federal Tax Identification Number: 77-02462249
City of Huntington Beach Business License Number: A310856 (If none, you must obtain a Huntington Beach Business License upon award of contract.) City of Huntington Beach Business License Expiration Date: 7/31/2025 On-Call Construction Management, Materials Testing, and Inspection Services Cannon *(1/11"
CITY OF HUNTINGTON BEACH
BUSINESS LICENSE
P.O. Box 190
Huntington Beach, CA 92648-2702
(714) 536-5267
Sunny Han
Chief Financial Officer
HNY0729A
4000000411 408/1
CANNON CORPORATION
1050 SOUTHWOOD DRIVE
SAN LUIS OBISPO CA 93401-5813
Dear Business Owner:
Thank you for your payment. Attached is your City of Huntington Beach Business License certificate. Please note that approximately one month prior to the license expiration date, you will be mailed a renewal notice for the upcoming year. If for any reason your renewal notice does not arrive, you are still responsible for renewing and paying your business license prior to the expiration date.
Penalties will be incurred if the payment is not received by the expiration date.
Please post the business license in public view. If you do not transact business from a fixed location within the City, you must carry this license with you at all times. If a vehicle license plate number is displayed on the Business License certificate below, you must carry a copy of the certificate in that vehicle. Please contact the Business License office if there are any changes to: ownership, address, business name, business vehicle, or type of business conducted. Additionally, please notify our office if you discontinue your business.
The Gender Tax Repeal Act of 1995 (Act) prohibits a business from discriminating based on a person's gender for prices of similar or like-kind goods and services. However, the Act does not prohibit price differences based on the amount of time, difficulty, or cost of providing the services. In addition to prohibiting discrimination based on a person's gender, the Act requires certain businesses to clearly and conspicuously disclose to customers in writing the pricing for each standard service provided. The posting requirement applies to barbers and hair salons, tailors or businesses providing aftermarket clothing alterations, dry cleaners, and laundries providing services to individuals. To access the Department of Consumer Affairs publication, please use the following webpage:
https://www.barbercosmo.ca.gov/consumers/gender_policy.pdf. To access the publication in Korean, Spanish, Vietnamese, Traditional Chinese, Simplified Chinese, or Tagalog, please use the following webpage:
https://www.dca.ca.gov/publications/index.shtml
There are many resources available to our business owners. Listed below are a few that might be of interest and assistance to you.
Office of Business Development - (714) 536-5582 Service Corps of Retired Executives - (714) 550-7369 Huntington Beach Chamber of Commerce - (714) 536-8888 Fictitious Business Name Information - (714) 834-2889 CA Department of Tax and Fee Administration - (949) 440-3473 Community Development - (714) 536-5271 If you have any questions, please call a Business License representative at (714) 536-5267.
City of Huntington Beach
Business License
License Number
Business Name / Service Address POST IN PUBLIC VIEW A310856
CANNON CORPORATION
Effective Date
8/1/2024
Owner / Corporation Expiration Date
CANNON CORPORATION 7/31/2025
License Type Amount Paid
CONTRACTOR $110.80
THIS LICENSE IS ONLY FOR THE BUSINESS AND TYPE SHOWN. IT IS FOR THE PERSON TO WHOM ISSUED AND IS NON-TRANSFERABLE, RENEWAL IS DUE ON OR BEFORE THE EXPIRATION DATE.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon Pre-Qualification Form
PRE-QUALIFICATION FORM
ON-CALL CONSTRUCTION MANAGEMEERVIC MATERIALS INSPECTION CONSULTING SERVICE CATEGORY PROPOSING? Y/N
(circle)
A. Construction Management (Yes No
V (Initial) Consultant is willing to execute the Agreement as drafted (See Appendix B).
V (Initial) Consultant is able to provide the insurance as required (See Appendix C).
Firm Name: Cannon Corporation
Firm Address: 16842 Von Karman Avenue, Suite 150, Irvine, CA 92606 Signature: T82 1l01 Date: 6/13/2025
On-Call Construction Management, Materials Testing, and Inspection Services Cannon Service Category
D
Cannon Corporation- Providing Reliable Responsive Solutions since 1976 Firm Profile
Project Manager
As a full-service construction management and
inspection, engineering design, and surveying firm, Patrick Riddell, PE, CPII, QSD/P, has provided construction and design
Cannon takes pride in the ability to offer clients
services for public and private industry
a complete range of services. Our commitment
projects for more than 25 years. He
to providing clients Reliable Responsive Solutions,
offers in-depth knowledge of the
whether the project scope is expansive or more
Caltrans Construction Manual,
specialized, spans 49 years.
Local Assistance Procedures, and
Standard Plans and Specifications.
During that time, we have worked with many cities,
counties, and agencies to maintain secure and
dependable water systems; make streets safer and Construction more pedestrian and bicycle-friendly; and construct Manager buildings and facilities that are structurally sound. Josh Knoefler, PE, has These characteristics have been an integral part of provided construction and the infrastructure improvement projects we have design services for public and completed throughout California. private industry projects for more than 26 years. He will
Our multidisciplinary team of 150 professionals oversee the construction includes the following: management team assigned to
• APWA Certified Public Infrastructure Inspectors this agreement. • Caltrans Trained Resident Engineers and LAPM
Specialists
Local Office
• Registered Civil, Structural, Mechanical, and Services for the City will be provided primarily from our Electrical Engineers
Irvine office; less than 11 miles from the City's office. • Licensed Land Surveyors and Survey Technicians
• Instrumentation and Controls (SCADA) Specialists Irvine • County-, State-, and Federal-Level Funding 16842 Von Karman Ave.
Administration Managers Suite 150
Irvine, CA 92606
I 949.753.8111
Key Team Member Experience
The successful construction of a project is almost
always directly related to the experience of the
Cannon
Construction Management and Inspection team.
Our skilled Construction Management Inspection
team includes construction managers, construction
.!!
inspectors, resident engineers, office engineers and
funding administrators.
Cannon has over 100 cumulative years of on-call
contract experience.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 2
FIRM STATISTICS
49 100+ 200+ 40+
years in cumulative years combined years of professional business of on-call contract experience engineers
experience
Pat Riddell, PE, Project Manager and Principal-in-Charge is highly regarded for his effective project management, accurate record-keeping, and reliable schedule and cost control abilities. Assisting Mr. Riddel will be Josh Knoefler, PE, Construction Manager; Michael Petrovich, PE, Resident Engineer; Mossad Rizkalla and Jameson Farr, CPII, Construction Inspectors; Christine Kahn, PE, Scheduler; and Pete Maskal, PE, Principal Construction Engineer / Design-Build Lead.
At Cannon, we have been managing the construction of public infrastructure projects for decades. We offer extensive experience in each of the following areas of service:
• Federally-Funded Projects • Municipal Facilities (Building) Improvement Projects
• State-Funded Projects
• Park Improvement/Reconstruction Projects
• Water Infrastructure Projects
• Sewer Infrastructure Projects • Stormwater Improvement Projects (Low Impact Development, Green Streets, Regional, etc.)
• Storm Drain Infrastructure Improvement Projects
• Project Labor Agreement
• Street Reconstruction Projects
• Pavement Rehabilitation Projects
Experience Working with Public Agencies / Authorities
Cannon has been committed to providing consulting services since 1976. Our reputation is a direct result of our consistent attention to our clients' needs. A majority of our firm's business is from repeat clients who trust in our integrity, as well as our professional competence. The following abbreviated list presents a summary of some of the municipal entities with whom we have worked:
• City of Huntington Beach • City of Lynwood • City of Glendora • City of Manhattan Beach • City of Whittier • City of Fullerton • Port of Long Beach • City of Pico Rivera • City of Chino • City of El Monte • City of Vernon • City of Pomona
• City of Santa Ana • City of Bell • County of Orange
• City of Huntington Park • City of Chino • Santa Clarita Valley Water Agency
• City of Los Angeles • City of Diamond Bar
• County of Los Angeles • Las Virgenes Municipal Water
• City of Lake Forest District
• City of Norwalk • City of Glendale • Crescenta Valley Water District • City of Santa Monica • City of Gardena
• Golden State Water Company
• City of Beverly Hills • City of South Pasadena • Monte Vista Water District • City of Monterey Park • City of Santa Fe Springs
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 3 California Coastal Experience
Cannon has provided professional construction management, engineering, and surveying services to more than 20 coastal communities throughout Central and Southern California. As a result, we understand the conditions and environment and what is necessary for long term improvements. A sample of our coastal experience is illustrated in the following figure:
•Paso , Wasco *Ridgecrest
. Cambria Robles
, Atascadero
Coastal communities served by
Cannon Team Members
San Luis
Obispo
California
City
Santa
Maria Edwards
Los Padres National Forest Lancaster (as8)
„Lompoc
Palmdale
Sespe
Victorvil
Condo
Santa Santa
Sanctuar
Golet Hespe
Barbara Clarita The San
Gabriel
Ventura Mountains
Moorpark. Thousand National
. Oxnard Monument
Oaks
Glendale' San Bernardi
Los. Angeles
Channel East Los Riverside,
Islands Angeles
N.P. Fullerton
Torrance. Wil.ong
Santa Ana
*Huntington
Some of our projects for California coastal cities include the following:
• Water Main Replacement, Manhattan Beach • Pavement Rehabilitation, Goleta • Manhattan Beach Boulevard Improvements, • Nipomo Community Services District Palms Lift Redondo Beach Station Rehabilitation
• Lift Station No. 136, Port of Long Beach • Nipomo Community Services District Woodgreen Lift Station Rehabilitation
• Pier A Pump Station 28, Port of Long Beach
• Pier B West Expansion Sewerlines and Lift Station, • CDGB Waterline Distribution, Grover Beach Port of Long Beach • Wastewater Treatment Plant, Avila Beach • 4th Street Phase II Construction Management, Santa • Phase I Wastewater Treatment Plant Upgrade, Monica County of Santa Barbara
• Olympic Water Transmission Main, Santa Monica • Lift Station No 1. Forcemain, Morro Bay • Seaside Transfer Station Force Main, Ventura • Morro Bay to Cayucos Connector, County of San Luis • Pavement Resurfacing, County of Ventura Obispo
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 4 Sub-consultants
The following table shows the Cannon team of sub-consultants and identifies their office location and services to be provided for this on-call contract. We have selected each of these sub-consultants based on our long history of completing projects on time and on budget.
Firm / Role Why Selected for Our Team Projects
Avant-Garde has successfully provided grant research, grant AVANT
TAR DE writing, tund administration, compliance management, and community outreach for over twenty years. Our understanding Avant-Garde
of federal and state requirements, funding administration, Labor
and the complex diversity of Southern California make AVANT- • 57/60 Confluence Compliance GARDE uniquely qualified to: perform extensive research to Project, Industry, CA
Support identify and secure grants as an "on-call" consultant; deliver a • Whittier Blvd.
variety of grants in the fields of park development, recreation, Revitalization, infrastructure, public safety, public health, planning and Montebello, CA community development, historic preservation, visual and • Kauffman and Dorothy performing arts, education, and outreach; deliver reports Avenue Street Widening, and documents to see projects through from inception to South Gate, CA conclusion or termination; and administer Federal, State and • County of Los Angeles regional required submittals and reporting. Flood Control District, CA Avant-Garde is a certified minority business enterprise, women business enterprise, disadvantaged business enterprise and small business enterprise (MBE, WBE, DBE, SBE).
Converse has provided Construction Management and
Inspection Services for nearly 80 years for a wide variety of capital improvement projects. Converse will work with Cannon Converse to lend its expertise and help to confirm that work complies Consultants with building codes and specifications while also maintaining Materials a high standard of accuracy and professionalism. Like Cannon, • On-Call Geotechnical Testing Converse prioritizes quality, safety, and compliance while and Environmental fostering a positive and collaborative relationship between Consulting Services, City all stakeholders on the project. Key aspects of the project will of Los Angeles, CA include on-site continuous inspection, proper certification, and • On-Call Geotechnical adherence to ethical principles. Consulting and Materials Testing, City of Pasadena,
The firm has over 50 professional and technical staff available CA to service your projects, including in-house geotechnical • As-Needed Materials engineers, engineering geologists, environmental scientists, Testing, Pavement Mix special inspectors, laboratory and field technicians, drafting/ Design and Inspection CAD specialists. Converse's full-service laboratories can perform Services, County of all geotechnical and materials tests that may be required for Los Angeles your projects. Their laboratories are approved by various certifying agencies, including Caltrans, DSA, CCRL and AASHTO, and supervised by a registered civil engineer to ensure quality control. All equipment is calibrated regularly and laboratory services are available 24 hours a day.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 5 Organizational Chart
Cannon is structured with an organizational framework that emphasizes both efficiency and consistency, while maintaining the flexibility required to undertake projects of varying magnitudes, large or small. In response to the unique demands of each assignment received from the City, Cannon stands prepared to promptly mobilize additional resources as necessary. Possessing extensive experience and a robust array of resources, Cannon is fully equipped to meet the City's project timelines, objectives, and funding commitments.
Key personnel resumes and copies of certifications are provided in the Appendix.
Cily of Huntington Beach
P Key Personnel
Project Manager /
.. . .
Principal-in-Charge
P Pat Riddell, PE, CPII, QSD/P
Construction Manager /
Main Point-of-Contact
P Josh Knoefler, PE
Resident Engineer:
(as needed)
• Michael Petrovich, PE
Harold Vance, PE, QSD
-
Scheduler Principal Public Works / SUBCONSULTANTS
P Christine Kahn, PE Construction Facility Inspectors Materials Testing ngineer • Jameson Farr, CPII
esign-Build Lea Converse Consultants
• Pete Maskal, PE • Mossad Rizkalla * Dean Stanphill, PE, GE Bud Nance Siva Sivathasan, PE, GE
Colin Campbell Hashmi Quazi, PE, GE
Robert Estrada, CPII
Ron Tegland, CPII Labor Compliance
Matt Natividad, CPII Support
Craig Fraki Avant-Garde
/ Lisette Montoya
/ Summer Mann
Local Team and Leadership
We have been located on the Southern and Central Coast for more than 49 years, providing a range of project support services from concept, to design, to construction management and inspection for tri county municipalities. We can offer the City immediate service and response time to address project needs as they arise and help meet schedule and budget requirements.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 6 Key Personnel Experience, Licensing, and Role
Name Years Job Role
Exp. Licensing / Certifications
Professional Civil Engineer, CA No. 68420 Project
Pat Riddell, PE, CPII, QSD/P P 25 Certified Public Infrastructure Inspector (CPII) Manager / PIC Qualified SWPPP Developer/Practitioner No. 23466
Construction
Josh Knoefler, PE P 26 Professional Civil Engineer, CA No. 66577 Manager Professional Civil Engineer, CA No. 93847 Resident
Michael Petrovich, PE P 11 Engineer
Qualified SWPPP Developer/Practitioner No. 93847
11 Certified Public Infrastructure Inspector (CPII) Construction Jameson Farr, CPII P Inspector
ICC - Master of Special Inspection; Reinforced / PT
35 Concrete; Structural Masonry; Structural Bolting; Construction Mossad Rizkalla P Structural Welding; Spray-applied Fire Proofing Inspector ACI - Field Test Technician
Pete Maskal, PE P 19 Professional Civil Engineer, CA No. 78139 Design-Build Professional Civil Engineer, CA No. 1877 Scheduler
Christine Kahn, PE P 34
OSHA-Confined Space Entry, No. 132326
Professional Civil Engineer, CA No. 43612 Materials
Dean Stanphill, PE, GE P 35 Professional Geotechnical Engineer, CA No. 2271 Testing
ICC-Certified
References and Project Experience
Construction Management and Inspection Projects
Well 29 and Site Rehabilitation Improvements Project
Santa Ana, California
Well 29 is a 2500 gpm well located at the southeast
corner of Flower Street and First Street in Santa Ana.
The well and well site needed complete rehabilitation.
Improvements included mechanical system upgrades,
new well house building construction, water service
and pipelines including upgraded connection to
the Metropolitan Water District, pump and motor
improvements, irrigation and landscaping, electrical
system upgrades, Motor Control Center cabinet
replacement, system controls and instrumentation,
public frontage and on-site improvements, paving,
concrete sidewalk, traffic signal loop replacements,
and bus shelter and site furnishing upgrades. Cannon
provided construction management, inspection, Construction Cost: $518,321 and construction administration for the new
Start/Finish: January 2022 - In Process
improvements and rehabilitation.
Key Project Team Members:
Reference: Sean Thomas, PE Principal Civil Engineer • Josh Knoefler, PE Project Manager City of Santa Ana, Public Works Agency • Patrick Riddell, PE, CPII, OSD/P Principal-In-Charge 20 Civic Center Plaza, Santa Ana, CA 92701 • Michael Petrovich Assistant Resident Engineer # 714.647.5655][email protected] • Jameson Farr, CPIl Construction Inspector On-Call Construction Management, Materials Testing, and Inspection Services Cannon 7 Parking Lot Rehabilitation
Garden Grove, California
The City of Garden Grove acquired a multilevel
building adjacent to City Hall with a parking lot in
severe disrepair. Overgrown trees and invasive roots
had damaged the pavement, and years of neglect left
the lot nearly unusable. The City identified the lot
restoration as a key Capital Improvement Plan project.
The high-profile location next to City Hall required
careful planning to minimize disruptions, particularly
during City meetings and site tours. Cannon provided
full-time construction inspection and coordination
between the City, contractor, and material testing
teams. We worked closely with City staff to confirm
timely decision-making and maintain project progress
on an expedited schedule.
The project involved tree and root system removal,
concrete curb and gutter replacement, and various
asphalt pavement repairs. Work included a 2.5-inch
grind and overlay across the entire parking area and
full-depth 8-inch dig-outs, replacing compromised
materials with Class 2 Aggregate Base and 4 inches of
Hot Mix Asphalt. The project was completed with low-
impact trees, irrigation, and fresh striping.
Additionally, Cannon provided construction inspection
services for other phases of the Garden Grove project.
The work included catch basin repairs, sewer manhole
adjustments, automatic retractable screens for storm
drains water meter box replacements upgrades, and Construction Cost: $171,668 new CCTV camera installations. Start/Finish: December 2024 - January 2025 Key Project Team Members
Reference: Mark Uphus, PE Project Manager • Josh Knoefler PE Project Manager City of Garden Grove • Patrick Riddell, PE, CPII, QSD/P Principal-in-Charge 11222 Acacia Parkway, Garden Grove, CA 92840 • Jameson Farr CPIl Construction Inspector # 714.741.5191 [email protected] • Mossad Rizkalla Construction Inspector On-Call Construction Management, Materials Testing, and Inspection Services Cannon Monterey Pass Road Transmission Main Replacement
Monterey Park, California
The project involved replacement of an existing 12-inch water transmission main and installation of two new,
parallel transmission water mains in a single trenchline.
Due to numerous breaks within the previous year,
this was an emergency project and was being fast-
tracked to mitigate the loss of water and manpower
needed to make recurring repairs to the existing water
transmission main. Cannon to provide construction
management and inspection services. The project
included approx. 4,800 LF of existing 12-inch pipelines with approx. 4,800 LF of two new 12-inch waterlines,
involved connecting the new pipelines to the existing
water system while maintaining water service,
installing new fire hydrants, and connecting them to
the new distribution water main. Cannon notified
utility companies for the as-built plans and contacted
suppliers to determine the availability of pipe material, fittings, and valves; coordinated with the City and Construction Cost: $392,076 contractor; and prepared base maps for the project. Start/Finish: March 2023 - January 2024 Reference: Ziad Mazboudi Project Manager Key Project Team Members:
City of Monterey Park • Patrick Riddell, PE, CPII, QSD/P Project Manager 320 West Newmark Avenue, Monterey Park, CA 91754 • Michael Petrovich Assistant Resident Engineer 2626.307.1320 [email protected] • Jameson Farr, CPIl Construction Inspector Design-Build Experience
Cannon has 49 years of experience acting as owner's representative with design-build teams on high-profile projects. Our team members are experienced in managing, leading, and advising on a variety of design-build projects. Josh Knoefler, construction manager, has held multiple roles on industrial, gas, electric, and other energy generation design-build projects. Additionally, Pete Maskal, PE, design-build lead, has over 19 years of experience in vertical construction and facility projects. Representative projects include:
• Cal Poly Engineering IV Building, Engineering/ • Hawthorne Woods Residential Subdivision Design- Architecture Renovation and Replacement Build Land Development • Cal Poly Center for Science and Mathematics
Services included construction management, inspection, conceptual design, grading and drainage plans, on- and off-site improvements, utility planning, environmental permitting and coordination, and surveying. We remain engaged from the start of the project through construction close-out, working closely with the design- build team to define goals, manage risks, and identify cost-saving opportunities. We establish communication procedures to support efficient coordination.
CONSTRUCTION MANAGER'S ROLE IN DESIGN-BUILD: In a design-build delivery, the construction manager represents the owner's interests across all phases of the project. Our role includes independent oversight of the design-build team, schedule and cost monitoring, constructability review, document coordination, and on-site observation. We help guide early decisions, identify risks, support quality control, and maintain clear communication between all parties to promote accountability and alignment with project goals.
LESSONS LEARNED: Early involvement and consistent collaboration help align project goals and streamline decision-making. Defined communication procedures and upfront identification of risks and savings opportunities contribute to efficient delivery and successful outcomes.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 9 Project Experience Summary
The following table summarizes some of our previous and on-going project experience providing relevant task categories.
Project Experience CM and Inspection Pavement Management Transportation Disaster Recovery / Emergency Repairs Utility
North Depot Street and Hwy 166 and Blosser Road Right Turn Lane Traffic Signals and Street Improvements, City of Santa Maria
Huasna Townsite Road Bridge, County of San Luis Obispo
Construction Management Services for Arterials 2023, City of San Luis Obispo Tank Farm and Orcutt Roundabout, City of San Luis Obispo Golden Hill and Union Road Intersection Improvements, City of Paso Robles V Salinas River Segment of the Paso Robles Recycled Water Distribution System, City of Paso Robles Airport Area Infrastructure Improvements, City of Paso Robles V V Main West Tank and Ductile Iron Pipeline Installation, City of Paso Robles V Sherwood Acres Backyard Sewer Replacements, City of Paso Robles V 2020-2021 Pavement Rehabilitation Project, Goleta, California, City of Goleta V V 2022-2023 Pavement Rehabilitation Project, Goleta, California, City of Goleta V Design and Construction Management for Measure K-14 Street Repair and Rehabilitation Program V Projects, City of Grover Beach
Train Station Expansion Project, City of Grover Beach V V 2022 Paving Project, City of Pismo Beach V V
Ocean Boulevard Seawall Improvements, City of Pismo Beach V Pismo Pier and Plaza Rehabilitation, City of Pismo Beach, California V Pismo Streetscape Shell Beach Road Improvements, City of Pismo Beach V V FEMA Emergency Repairs for Alisal Road at Various Locations, County of Santa Barbara V V Village Square Los Alamos Storm Drain, County of Santa Barbara Groves Booster Pump Station, Golden State Water Company, Orcutt, California V Construction Management and Inspection for Street Reconstruction, City of Huntington Park V V Calleguas-Las Virgenes Water District Interconnection Project, City of West Lake Village Highway 46 Water Pipeline Relocation and Horizontal Directional Drilling, City of Lost Hills Mission Village - KB Homes Improvements, Santa Clarita Valley Water Agency. City of Valencia Construction Management and Inspection Services for Street Improvements, City of Gardena Van Ness Avenue and 139th Street Improvements Project, City of Gardena V 178th Street Sewer Pump Station Renovation Project, City of Gardena Wastewater Treatment Plant 48-inch Interceptor Sewer Main, City of Delano V On-Call Construction Management, Materials Testing, and Inspection Services Cannon 10 Understanding and Approach
The City of Huntington Beach (City) is anticipating the Delivery of Services
commencement of a variety of construction projects
in the near future and is seeking a consultant that
has demonstrated familiarity and experience with 1 Tailored Project Approach construction management and inspection services. Since no two projects are exactly alike, we The City anticipates a steady amount of construction believe that a tailored approach is necessary to activity in the next three years for various public meet the City's needs and budget, as well as the works infrastructure projects, and consistent requirements of each project. The specific approach construction activity on City facilities. will depend on the nature of the project.
The City will evaluate consultants for their experience and ability to provide construction management for
2 Forward Thinking
variously funded projects. We are aware that the City
Being able to proactively work with the
intends to contract with multiple consultants with the
contractor and anticipate project challenges before
goal of obtaining services in a timely manner.
they impact the critical path schedule separates
Cannon is prepared to serve as an extension of the a "good" resident engineer from one that simply City's staff in providing construction management "observes and reacts." The right resident engineer services, including, but not limited to, the following: for the City will have a thorough understanding of project phasing and design to confirm that items
• Constructability Review (such as existing utilities) are properly marked and • Oversight of construction surveying and material discrepancies identified before construction begins; testing underground work is completed in advance; and
• Pre-job coordination and administration activities coordination with utility providers is established. • Understanding of standard details and
specifications from: Caltrans, Greenbook, APWA,
AWWA Information & Participation from City Staff
3 • Experience in documentation of activities through Since each project is distinct, the specific Daily Inspection Logs information required from City Staff will be • Construction Safety Orders determined at the onset of each project. In general, • Labor Compliance for each project Cannon is requested to provide • Public Outreach services, we will facilitate a kick-off meeting with City staff. At that time, specific information and/or
• Design-Build participation of City staff will be further developed. • Best Management Practices
• Inspection:
• Traffic Control Communication Strategy
4 • Storm Water Prevention Measures As is true with most projects, communication • General Street Construction is essential in successfully avoiding or resolving • Underground Utility Construction problems that may be encountered during the course • Traffic Signal Installation of a project. Understanding our role in relation to the • Landscaping and Irrigation Installation roles of the City's Director of Public Works, design engineer, and contractor is paramount. On-site staff
• Street Striping are responsible for keeping parties informed as to • Ability to work with utilities and public agencies in the progress of the project. We recommend clear and adjacent to the City of Huntington Beach
• Understanding of environmental regulations
relevant to construction activities
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 11 project work. Confirming that information is available 6 Interagency / Project Team Coordination to the construction team in the shortest possible time Working closely with project stakeholders is essential. from beginning to end on City projects is very important. Stakeholders include City Staff, the
In collaboration with the City, Senior Construction
design team, local and regional government agencies
Manager, Joshua Knoefler, PE, will establish involved with the project, residences and businesses, procedures for recording and distributing the local community, tourists, and patrons from correspondence, meeting minutes, reports, and surrounding communities. It is imperative that the other conversations to promote open channels of resident engineer stay attuned to the impacts of the communication on a construction project. Standards project on each of these stakeholders and be able to for recording, maintaining, and distributing this communicate effectively (verbally and in writing) in correspondence will be established at the onset of
the event adjustments are necessary.
the project. We recommend these standards be
maintained throughout the course of the project.
In line with communication is record keeping. The Public Convenience more complete the documentation, the more Construction activities are often scheduled effective Cannon will be in resolving problems. to occur through the high tourist season and have In addition, this information can be used to avoid potential to impact nearby businesses and residences. claims if the evidence is sufficient and clear. Written In an effort to reduce disruption on a project, our correspondence and notes are of the highest proposed resident engineer will be responsible for importance. Communications in meetings, with overseeing that the project contractor provides a the contractor, and/or over the telephone should clean and safe project site, and provides effective be summarized in writing. We will coordinate with communication with the nearby businesses, should the City and project contractor for things related to the need arise, to discuss potential inconvenience payment estimates, change orders, project meetings, during the duration of construction. submittals, RFl's, and as-built drawings.
The assigned construction manager is typically
responsible for project coordination and Funding Requirements State and Federally-funded projects form a
communication with project stakeholders. He
distinct subset of transportation projects that must
implements record keeping procedures, construction
comply with specific rules and laws in addition to
administration systems, and is responsible for project
those of the California Public Contracts Code, and
management. He keeps the City representative
other regulations. In California, Caltrans has been
updated on a project's status to maintain proper
given the authority to oversee the administration
quality control.
of projects that include State and Federal funding
sources.
Communication and Documentation
5 Traffic Control and Public Safety
Timely, detailed, and accurate documentation
of the implementation and progress of the work A key component to understanding most is paramount. Done well, written documentation construction projects is having a solid foundation of tells the "story" of the project and brings issues to knowledge in MUTCD and Caltrans requirements. the forefront for early and quick resolution. Weekly Disruption to the flow of traffic must be reduced to progress meetings, schedule reviews, processing of avoid public discontent and complaints. We have RFl's, submittals, and change orders help to facilitate recent experience with Caltrans highway projects open and complete communications throughout involving signal and curb ramp replacements and projects. understand the importance of these public safety requirements. In fact, we have recently completed
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 12 several signal projects, including the Five Cities Drive Lessons Learned and Highway 101 on/off ramp intersection in Pismo From countless interviews we have conducted with Beach, and the intersection of Highway 101 on/off agency staff, as well as our experience serving as an ramp and 17th Street in Paso Robles. In addition, we extension of municipalities' staff (during which we have have worked with the Caltrans Lane Closure System encountered successes and challenges alike), we have and Caltrans Right-of-Way (ROW) and permitting learned several lessons. We have compiled a few of staff, and we understand the methods and processes these challenges, along with our established solutions, required should there be a need for lane closures
in the following table:
within State highway ROW for City projects.
Challenges Lesson Learned
10 Construction Schedule and Budget Especially during on-call To prevent confusion, A properly managed schedule is projects, challenges can Cannon establishes instrumental in maintaining project progress and arise from a consultant's a culture of clear, establishing a common basis on which time and lack of knowledge of a mutual communication cost issues or disputes may be negotiated. To keep a municipality or agency's from the beginning project on schedule and budget, the City must select internal decision-making of each project. As a an experienced and proven management team. As hierarchy. result, Cannon and the implemented successfully on similar projects, we will municipality or agency use a systematic process for keeping construction will know what to records, procedures, and materials sampling and expect from each other. testing in service at times for the duration of a As a result of the Consultants, such as
project. engineers, surveyors, and clear and appropriate construction managers, procedural decision-
Likewise, the firm selected should be well established
in the community with a strong local presence and are often required to making protocols we readily available resources to support the efforts make decisions in the have instituted, our required for City projects. field. Too often, these engineers, surveyors, decisions are made and construction
based on misinformation, managers can make the
ADA Compliance
11 resulting in delays, necessary decisions in
Compliance with the Americans with the field with confidence unnecessary expenses,
Disability Act (ADA) is critical to the successful and even claims and based on a proven set of completion of most street improvement projects.
litigation. principles.
New concrete ramps, sidewalks, and islands will
Delays and additional Cannon institutes and,
require grades and slopes to be verified to confirm
costs can result from a just as importantly,
minimum ADA requirements are being met. In
project straying from the follows a strict critical
addition, the location of new signal poles and signal
features such as pedestrian push buttons (PPB) also required schedule. path for each of our fall under requirements of ADA for clearance, reach, projects, saving both time and money.
and height requirements. We have successfully
provided construction management and inspection
on transportation projects with these compliance Cost Savings Strategies requirements. Having worked with numerous local and regional public agencies, we clearly understand the need to
work within available budgets while providing value
on projects. We understand that the immediate and
long-term value may not be represented by the lowest
fee estimate. We have developed effective cost-saving
strategies that have been successful for our private
industry and public clients.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 13 These strategies may include the following: Approach to Management and • Invite experienced staff to review projects and Quality Assurance identify key factors that helped increase efficient
Project Management
project delivery for similar projects in the past.
We understand the importance of meeting project
• Provide research using Cannon's Project Database schedules and deliverable deadlines. To assist in this System to identify existing surveying and other area, we use Deltek Vision Management System as site data for the project.
our accounting and project management database.
• Provide Cost Benefit Analysis and Value With this system, we have detailed records of labor, Engineering Reviews. subconsultant, and other direct costs and breakdowns • Review projects for possible use of alternative by task and project milestones. The records are technologies or innovative approaches. organized by project.
Early, clear, and concise communication with This software allows Cannon's project managers to impacted private property owners, utility providers, employ an Earned Value Analysis (EVA) program for or Caltrans facilities on anticipated projects will pay many of our more complex projects (see sample in dividends in delivering projects on time. At the on-set Figure 1). Budgets and progress are reviewed monthly, of the project, we recommend making these types and EVAs are provided as required by the project of determinations to reduce project schedule risks. schedule: monthly, bi-weekly, or weekly. EVA is a Assigning team roles with the City, other consultants, method for managing projects based on the regular and in-house staff to overcome these obstacles will comparison of actual project costs to planned costs be critical for each project. Whether small or large, and to completed work. The phrase "earned value" implementation of third-party rights can take a comes from the concept that when a deliverable is simple, short scheduled project and make it into a completed, its value has been earned. complex and difficult project.
Figure 1. Earned Value Analysis (EVA) Chart
Technical Management Money
Record Keeping - VPM / Procore
Project documents, drawings, contract change Actual Coot Vaname (OV) 12 Cost (AC)
orders, contractor submittals, shop drawing and S¿herfule Varance (SV) correspondence will be maintained in electronic Earned
Value (EV)
form and hard copy. The City is migrating over to
VPM. Cannon will use the City's VPM platform for Planned Value (PV) Document Control Management. Cannon also has A
a subscription for Procore, a cloud-based project
management software, and can use Procore for
submittal, RFl and other document management → Time
if desired. Procore is especially useful when the 11
Engineer of Record needs to review and provide input
on a large percentage of submittals and RFl's. Many of We will conduct weekly or bi-weekly conference our clients also appreciate the ease with which they call meetings with the appropriate City personnel to can view and access project documents with Procore. facilitate clear communication on upcoming tasks, We will maintain an "as current" basis, a record copy and to make sure the project remains on schedule and of contracts, drawings, specifications, addenda, and within budget. We will prepare, update, and provide change orders in good order. City staff with an agenda prior to each meeting.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon The results of the systems and processes described Overview of Cannon's Quality Assurance / above are collected and incorporated into our Quality Control Programs:
performance appraisal (PA) system. Feedback to our
staff members is largely based on these metrics. Review WPR Design Checklist The results of the performance system are used to
determine profit sharing, performance modification,
and career advancement opportunities. This closes Prepare Draft Work Product the "accountability loop" and, along with an innate
desire to meet our clients' needs, motivates our
professionals to remain focused on adherence to Team Review of Draft Work quality, schedule, budget, and accurate assessment of Product Using WPR Checklist problems and successes.
Team Returns Work
Quality Assurance and Control
Product to PM
Procedures
We are prepared to provide our clients services
Prepare Final Work
for each phase of their project, from bid support Product through preconstruction preparations, construction,
and project close-out. As the first order of work
on a project, we develop a unique Construction Review Team Checks Final Management Plan which is customized to the type of Work Product Using WPR work, the plans and specifications, and contractual Checklist and Comments requirements of the project (see sample in Figure 2).
So that we can assign sufficient staff for your projects, this checklist will be used in collaboration with the
City during scoping meetings to determine which L If not complete... If complete.. specific tasks are needed for each project.
Figure 2. Sample Construction Management Plan
Provide to Client/Agency
Checklist for Approval
Construction Management Plan Checklist
Design Phase:
1. Provide design staff with constructability reviews of draft plans and specifications during design phase.
CM Responsibilities Prior to Construction:
1. Review project plans and contract documents
2. Review questions with City's project manager and project engineer/architect
3. Review pay quantities for awareness
For the past five months of construction progress, the
project has been going smooth with no major issues due
to [Cannon's] well coordinated efforts..
Ziad Mazboudi, PE,
Capital Improvement Project Manager
City of Monterey Park
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 15 Example of General Work Plan
The following example scope of services demonstrates Task 1.3 - Staff Reports Cannon's approach to completing tasks that may be After the lowest responsive bidder has been needed by the City for construction management and confirmed, we will prepare a staff report for the inspection. As an optional additional service, Cannon recommendation of contract award to the City. can provide the following services through various Additionally, if requested, we will coordinate with the qualified subconsultants: Converse Consultants will City to determine funding sources, publication dates, provide materials testing and Avant-Garde will provide environmental and fiscal impact, and schedule of labor compliance. We look forward to working with award to meet the City's deadlines. the City to identify and develop a specific scope to
Task 1.4 - Constructability Review
meet project and scheduling needs.
The Project Manager will assist the City and design
Phase 1 - Preconstruction Services engineer in a review to determine the constructability of the proposed project. We will give attention to
Task 1.1 - Project Management
potential construction schedules, activity sequences,
We will assign a Project Manager to the project and
and duration, while considering long lead time items.
will represent the City throughout the project's life
We will provide feedback to the City and design
cycle. The Project Manager will have over five years
engineer on likely construction timelines of proposed
of experience and possess relevant certifications and
credentials. All inspectors and administrators will projects. have relevant construction management experience, Task 1.5 - Preconstruction Conference certifications, and references that demonstrate their We will conduct a pre-construction conference and experience. site tour with the City, involved agencies, utilities, and the contractor's team as they prepare to mobilize
Task 1.2 - Bid Analysis
for the project. The Project Manager and support
We will attend the pre-bid conference and the bid
staff will review plans and specifications with the
opening as part of the bidding process if requested
contractor to facilitate the contractor's understanding or required. The Project Manager will assist the City of the project. In addition, we will do the following:
and design engineer in evaluating and reviewing bid
proposals, subcontractors, suppliers, and requests for • Review the contractor's construction schedule substitute materials and equipment. We will examine, for the project, including equipment, labor, and organize, and inventory bid documents (certificates supervision planning. of insurance, bonds, and "New Vendor Packet") • Review appropriate protocols and procedures submitted by bidders and determine the lowest detailed in the construction documentation. responsible bidder. • Apprise the contractor of contract requirements regarding security matters such as fences, lighting,
and posting of signs.
• Prepare the meeting minutes for the pre-
construction meeting.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 16 Task 1.6 - Preconstruction Documents • In conjunction with the City, negotiate schedule Upon award of the contract, we will review the adjustments with the contractor, which may be contractor's surety bonds, certificates of insurance, required due to weather, change orders, or other preliminary schedules, building permits, special impacts requiring schedule adjustments. permits, and other documents required prior to • We will prepare and issue Weekly Statement of construction for general compliance with the contract Work Day reports. documents and authorities with jurisdiction. We will
provide the City with recommendations based on the Task 2.2 - Progress Meetings We will conduct weekly progress meetings with
findings of the pre-construction documents review.
the contractor and the City representatives. These
Task 1.7 - Community Outreach Assistance meetings will include the following tasks:
We will co-lead community outreach efforts with the • Review progress and quality of work.
City, coordinate with the City's community liaison, and • Review submittal and RFI logs.
incorporate community messaging into our day-to-
day activities. We will wield our extensive experience • Notify the attendees of construction deficiencies. working on highly visible projects to keep messaging • Discuss labor, material, and equipment related to clear, current, concise, and correct. We will review upcoming work. temporary message boards, traffic signs, and public • Address team coordination matters. notifications with the City's input, and communicate
• Review maintenance of "as-built" drawings
with the contractor (in advance) so the community
throughout construction.
stays well informed
• Conduct each meeting according to a published
Our team is well-versed in interacting with the public agenda and prepare and promptly distribute during construction. We will be the first line of contact meeting summaries. Meeting summaries will in addressing community concerns and complaints. detail action items, the discussions that ensued, Our goal is that safety and public convenience be and announce the time and date of the next addressed at each location. We will meet that goal meeting. through our systematic construction management Task 2.3 - Special Meetings program and effective communication in partnership We will attend and conduct up to ten meetings with with the City. the project team and contractor to address special Phase 2 - Construction Services issues such as pre-submittals, mobilization of major subcontractors, change order negotiations, and
Task 2.1 - Scheduling
startup.
We will review the contractor's schedule to confirm
the project is in accordance with the contract Task 2.4 - Project File Database document requirements. We will complete the We will create and maintain project files per Local following tasks associated with the overall schedule: Assistance Procedures Manual and City filing structure (VPM). The development and implementation of the
• Review the contractor's schedule to determine
that it is properly prepared, that the milestones document system will include the following:
dates meet the overall schedule, and that there • Design of the document system to support project are no major conflicts. file database.
• Review progress against the approved schedule • Administration of the project database throughout to adequately record work-in-place, detect the project's lifespan. potential delays, and review the contractor's plan
for implementation of remedial measures, when
appropriate, to recover or maintain progress.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 17 Documents to be tracked in the system include the submittals the design engineer would typically not following: review, such as stormwater pollution prevention • Project drawings plans (SWPPP), traffic control plans, contractor safety programs, and other work plans.
• Project specifications
• Drawings and specification addenda Task 2.6 - Construction Observation We will implement observation guidelines for
• Correspondence
monitoring the quality of the contractor's work.
• Submittals/shop drawings We will conduct field observation and prepare • Requests for information (RFI) documentation, in the form of daily reports, of • Change orders and change order requests construction tasks including but not limited to construction staging, utility coordination, mechanical
• Meeting agendas and meeting summaries and electrical equipment, instrumentation, vehicular • Daily reports and pedestrian access, drainage, NDES requirements, • Daily photos concrete, grading, building construction, paving, • Inspection reports lighting, and landscaping and irrigation. • Testing reports Should materials, installation processes, or levels • Project schedules of quality not comply with construction contract • Weekly Statement of Working Day Reports documents, Cannon will first discuss with the City, then issue a non-conformance report notifying
• Progress payments the contractor of deviation and inquire about the • Permits contractor's proposed corrective action. We will • Warranties forward copies to the City.
Task 2.5 - Submittal Management The contractor has sole responsibility for compliance Cannon will provide timely coordination with the with safety requirements on the construction City's designated design engineer for submittals of contract. Cannon's staff will monitor the contractor's materials not supplied by the City, operations and general compliance with its safety program and advise maintenance manuals, and shop drawings. In addition, the City of observed deficiencies. We will take the we will conduct the following tasks associated with necessary steps to confirm the jobsite conditions are the management of project submittals: compliant with OSHA regulations. • Verify that the contractor's look-ahead schedules We will obtain and manage delivery slips for checking contain critical submittal dates.
payment requests, maintain a photographic log of
• Confirm that submittals are reviewed in construction activities, and provide the City copies accordance with the contract documents. of significant photographs. We have assumed 75% of • Update submittal logs on a regular basis. the time to be on-site observation during an assumed • Confirm that shop drawings have been reviewed 12-month construction phase. and returned before associated work has begun.
Task 2.7 - Safety Program and Traffic Control
• Maintain a copy of completed submittals in the Plan
project records. We will work closely with the contractor to confirm traffic control requirements are met and necessary
After submittal review is complete, we will return traffic control for work within the City right-of-way the submittal to the contractor and forward a copy is maintained in a safe and effective manner. We will to the City for record. While most submittals will review and approve, if sufficient, the contractor's be transmitted to the design engineer for an official traffic control plans. We will monitor the contractor's response, Cannon will also review submittals and on-site safety program and compliance with provide feedback to the City/design engineer, as the approved traffic control plan and Cal-OSHA applicable, prior to returning to the contractor. Construction Safety Orders.
We can review and provide an official response to
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 18 Task 2.8 - Construction Surveys and Staking • Confirm the contractor's price proposals are Coordination reasonable and accurate for construction
We will observe and review the contractor's surveys quantities, rates and unit prices, and time and and staking, and coordinate with the contractor schedule. and their licensed surveyor to quantify and confirm • Maintain a change order log to track change quantities of work provided by the contractor. order proposals through the review and approval process.
Task 2.9 - Stormwater Pollution Prevention
Plan (SWPPP) Task 2.12 - Claims Assistance
We will review the SWPPP submitted by the We will coordinate with City consultant on claim contractor and will monitor and document the matters. Claims submitted by the contractor must contractor's general conformance with the SWPPP. We adhere to the Public Contract Code Section 10240 assume that the City will file the SWPPP with the State and 20104. Documentation must be provided and re- Water Resources Control Board SMARTS System. viewed to support a claim. We will review claims and Task 2.10 - Request for Information (RF) provide an evaluation to the City and coordinate the We will maintain a log of contractor's Requests for resolution of each claim with the project team.
Information (RFI), and will review, coordinate, and Task 2.13 - Progress Pay Estimates respond to RFls. When appropriate, we will provide We will review the contractor's monthly progress recommendations, suggestions and alternatives to the payment requests, construction contract records, contractor and/or the City. and reports for general compliance with contract Task 2.11 - Change Orders documents. We will maintain an estimate of overall construction cost based on contractor's bid and
We will investigate proposed change orders submitted
by the contractor or requested by the City. Change earned value of completed work, and compile and order submittals will include supporting records. forward recommendations for contractor payment to Our investigation will include the impacts on the the City. project schedule and budget and will include a Phase 3 - Specialty Services recommendation for approval or disapproval. We will
Task 3.1 - Materials Testing and Special
complete the following tasks associated with change
Inspection
orders:
We have teamed with a geotechnical subconsultant,
• Assemble documentation to include, such as Converse Consultants, to provide materials testing and inspection reports, test reports, drawings, special inspections during construction. The materials sketches, photographs, and other materials, as testing and special inspections will be conducted required. in accordance with the City approved frequencies • Prepare change order cost estimates conforming and procedures, the construction contract plans to the City's procedures and forms; assess and specifications, and applicable materials testing the impacts of the proposed change on the manuals. We will review the results of materials contractor's schedule and operations; and testing and quality inspections, and will recommend prepare a written report summarizing the impact acceptance of work in general compliance with the of the proposed change on cost, schedule, and contract documents or remedial actions required to contractor's obligations.
correct unacceptable portions of the contractor's
work.
Cannon's Construction Management team played an integral role in the delivery of the Avila Beach CSD WWTP Improvements Project... The Cannon CM team was instrumental in fostering collaboration between the MBR vendor, the design engineer and construction contractor, while ensuring that the CSD's interests were at the forefront...
Brad Hagemann, PE General Manager/District Engineer
Avila Beach Community Services District
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 19 Task 3.2 - Labor Compliance • Review the contractor's operational testing plan We have teamed with a subconsultant, Avant- and acceptance plan, and advise the City as to Garde, for labor compliance. We will provide a labor status of the scheduled tasks. compliance program to monitor the contractor's labor • Coordinate up to six contractor/client meetings to compliance, which includes the following: review start-up status. • Pre-Job Conference: Conduct a pre- job
Phase 4 - Post Construction Services
conference with the contractor and
subcontractors listed in the bid before Task 4.1 - Final Inspection and Punch List commencing work. We will discuss labor We will evaluate the substantially complete facilities compliance requirements and furnish copies to confirm general compliance and/or identify of the suggested reporting forms. We will keep discrepancies and deficiencies in the work completed records of the conferences on file. by the contractor. We will compile a punch list, transmit to the contractor, and monitor completion
• Monthly Audit of contractor Certified Payroll: of the punch list items. We will report to the City Review certified payrolls submitted by the
upon the completion of the project, and make
contractor and subcontractors to confirm
compliance with the requirements of prevailing recommendations regarding project acceptance, wage. Monitor that apprenticeship requirements retention of funds, and final payment to the are met. contractor.
• Monthly On-Site Interview: Conduct random Task 4.2 - Project Close-out on-site contractor employee interviews monthly, We will coordinate project close-out negotiations as required by the labor compliance program. with the City and contractor. We will provide recommendations to the City addressing payment,
• Violation Enforcement and Recommendations:
lien releases, and final change orders.
Communicate potential violations to the City and
provide recommended action. Task 4.3 - Final Report
• Annual Reporting to the Department of Industrial We will prepare and submit a final construction Relations (DIR): Compile and submit a summary report, including the following:
report to the DIR. We will submit the report • Operations manuals for equipment furnished by annually during construction and at the conclusion the contractor of the project.
• Testing records
Task 3.3 - Start-up and Commissioning
Coordination Task 4.4 - Processing of Record Drawings
We will serve as the start-up and commissioning We will maintain a hard copy file of the construction liaison coordinating with the contractor to develop drawings at the on-site office for the purpose of and implement a start-up and commissioning plan. documenting field changes, as-built conditions, and We will observe, monitor, and accept the operational approved changes. We will provide the City with testing of various components, and will conduct the monthly as-built updates as part of progress payment following tasks: packages. After receiving the contractor's mark-ups of • Coordinate contractors' start-up and changes and as-built conditions, we will transmit the commissioning activities, and compare to final as-builts to the design engineer for processing of contract document requirements, operations record drawings. plan, and acceptance plan, and advise the City of
nonconformance issues.
• Coordinate with the City staff, contractors),
systems integrator, and construction management
team start-up specialists.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon 20 Appendix
Resumes
Certification Copies
Rate Sheets
Resumes
Patrick Riddell, PE, CPII, QSP/D Project Manager / Principal-in-Charge As Project Manager, Mr. Riddell provides direct support to Cannon's construction management staff, including direct supervision of the overall project construction administration, pre-construction meetings, shop drawing review, inspections, processing of pay requests, assessing and resolving unforeseen conditions during construction, monitoring of schedules and budgets, overseeing equipment and materials testing, reviewing record drawings and certifications for accuracy, and confirming that work is in conformance with the contract documents and permit conditions before final acceptance. He also participates in conferences and meetings; coordinates activities with community and regulatory agencies; reviews and/ Professional Registration or recommends acceptance of pay requisitions submitted by contractors; • Civil Engineer, California, investigates and provides recommendations on contractor claims, change No. 72034 orders, etc.; and works with the Resident Engineer in the resolution of issues if • Certified Public encountered.
Infrastructure Inspector
(CPII), American Public City of Santa Ana Well No. 29, Santa Ana, California: Well 29 is a 2500 Works Association gpm well located at the southeast corner of Flower Street and First Street • Qualified SWPPP in Santa Ana. The well and well site needed a complete rehabilitation.
Developer/Practitioner Cannon provided construction management, inspection, and construction (QSD/QSP), No. 72034 administration for the new improvements and rehabilitation. • Excavation Safety Training
for Competent Persons Improvements included mechanical system upgrades, new well house building (CT), United Academy, ID: construction, water service and pipelines including upgraded connection to 1544359 the Metropolitan Water District, pump and motor improvements, irrigation Education and landscaping, electrical system upgrades, Motor Control Center (MCC) • Bachelor of Science, cabinet replacement, system controls and instrumentation, public frontage Environmental Engineering, and on-site improvements, paving, concrete sidewalk, traffic signal loop California Polytechnic State replacements, and bus shelter and site furnishing upgrades. Mr. Riddell served University, San Luis Obispo, as Project Manager.
California
• Caltrans Resident Engineer Select Project Experience Summary Academy Mr. Riddell has served as Principal-in-Charge or Project Manager on the Certification following projects:
• Lane Closure System, • On-Call Encroachment Permits, Various Locations, El Monte, California Caltrans • CDBG Street Reconstruction Project FY 21/22, Huntington Park, California Software • Suburban Water Systems Plant 209, Covina, California • ProCore • Yorba Linda Lakeview Ave Widening from Bastanchury Rd to Lemon Drive Professional Affiliations Street Improvement, Yorba Linda, California • American Society of Civil • Budlong/Halldale Street Improvements Project, Gardena, California Engineers • Van Ness Avenue and 139th Street Improvements Project, Gardena, • American Public Works California
Association • 178th Street Sewer Pump Station Renovation Project, Gardena, California Years Experience: 25
On-Call Construction Management, Materials Testing, and Inspection Services Cannon Josh Knoefler, PE Construction Manager
Mr. Knoefler brings over 26 years of experience in construction management including contract management services for lump sum turnkey projects.
Specializing in large public and private infrastructure as well as real estate development, he is proficient across a multitude of industrial sectors including public highways and bridge projects, energy generation design-build projects, underground wet and dry utilities, heavy manufacturing, electric and gas transmission/distribution, and master planned communities. He has worked with numerous agencies and municipalities throughout Southern California across Los Angeles, Orange, Riverside, San Diego, and Imperial Counties; and is familiar with how to navigate across a variety of public agency landscapes.
Professional Registration
• Civil Engineer, California, City of Santa Ana Well 29 Rehabilitation, Santa Ana, California: Performed a No. 66577 variety of construction management duties overseeing installation of a brand Education new pumping system on a compact site in between existing tennis courts at a • Master of Business public high school. Infrastructure consisted of managing compliance with Green Administration, Book, project specifications, and all construction documentation. Mr. Knoefler University of Southern served as Resident Engineer and Construction Inspector.
California, Los Angeles,
California Hawthorne Woods Residential Subdivision Design-Build Land Development, • Bachelor of Science, Terre Haute, Indiana: This Subdivision is a 40-acre design-build land Civil Engineering, Rose- development project situated within a master-planned community. Serving Hulman Institute of as the owner's representative and project manager, Mr. Knoefler provided Technology, Terre Haute, oversight of engineering and construction activities His responsibilities included Indiana coordinating engineering consultants, development and management of project Certifications specifications, facilitating the bidding process, and comprehensive construction management. He successfully led the execution of project closeout activities, • OSHA-10
met development goals on time and within budget, while maintaining the • Real Estate Development, quality and standards required for a community-scale residential project.
University of Southern
California
TE-TO Power Plant Combined Cycle Cogeneration Project, Zagreb, Croatia:
• Software Skills The TE-TO Project is a 320MW dual-fuel fired facility. The $120 million project • Procore involved the construction and commissioning of a high-efficiency power • Primavera generation plant designed to provide both electricity and thermal energy.
Mr. Knoefler provided project controls management oversight, confirming • Contract Management
alignment of project cost and schedule objectives. Responsibilities included Years Experience: 26 schedule analysis using Primavera, monthly cost reporting encompassing budgets, variances, and change tracking. Mr. Knoefler led the development and negotiation of project claims, focusing on critical milestones, delays related to shop drawing gaps for materials and equipment, and broader schedule impacts.
Select Project Experience Summary
Mr. Knoefler has served as Construction Manager Lead or Senior Resident Engineer on the following projects:
• City of Garden Grove Micro-Resurfacing Streets/Parking Lot Project, Garden Grove California
• Barakah Nuclear Power Plant Project, Barakah - Abu Dhabi - United Arab Emirates
• SCE Tehachapi Renewable Transmission Project, Los, Angeles, California On-Call Construction Management, Materials Testing, and Inspection Services Cannon ii Michael Petrovich, PE Resident Engineer
Mr. Petrovich brings 11 years of experience in the design and construction of infrastructure projects such as street and transportation projects, landfill expansions, and parks and recreation facilities. Specializing in capital improvements, field engineering, and construction; his experience includes mass grading, paving operations, concrete placement, utilities installation, landscaping, landfill infrastructure improvements, and landfill liner expansion.
Mr. Petrovich's responsibilities include project and construction management, inspection services, and constructability review. He has worked with numerous agencies and municipalities throughout Southern California, such as Orange County Waste and Recycling and the City of Ontario.
Professional Registration
• Civil Engineer, California,
CIP CDBG Street Reconstruction Project, Huntington Park, California: The No. 93847
City of Huntington Park (City) was awarded a grant from the Community • Qualified SWPPP
Development Block Grant Program (CDBG) to upgrade and replace various Developer/Practitioner
components of the City's infrastructure system. Improvements included (QSD/QSP), No. 93847 pedestrian safety and mobility enhancements, ADA-compliant pedestrian Education ramp upgrades, striping, and removal and replacement of existing water and • Bachelor of Science, Civil sewer service laterals.
Engineering, Texas Tech
University, Lubbock, TX Cannon provided construction management and inspection services and Certification monitored compliance with Greenbook standards, public contracting code, • Halliburton Cementing and procurement requirements. Mr. Peterovich served as Assistant Resident for Engineers 2014 Engineer.
Software Skills
• AutoCAD Select Project Experience Summary
• Civil 3D Mr. Petrovich has served as Assistant Resident Engineer on the following • Microsoft Office projects:
• Well 29 Rehabilitation Improvements Project, Santa Ana, California • ArcGIS
• Budlong and Halldale Street Improvements, Gardena, California • HEC RAS
• Monterey Pass Road Transmission Main Replacement, Monterey Park, • SWMM California
• EPA NET • South Bay X Right-of-Way Inspections for Southern California Edison • MATLAB Undergrounding, Gardena, California
• iCem (WWHM) • Port of Long Beach Pier A West Container Support Facility CEQA Support Years Experience: 11 Services, Long Beach, California
• Coyote Canyon Landfill Access Road and Repower, Newport Beach, California
• City of Ontario Park Place Development, Ontario, California • County of Ventura Pavement Resurfacing, California
• City of Goleta 2022-2023, Pavement Rehabilitation Project, Goleta, California
• City of San Luis Obispo 2023 Arterials, San Luis Obispo, California • 2023 Measure F-14 Pavement Rehabilitation, Atascadero, California On-Call Construction Management, Materials Testing, and Inspection Services Cannon iti Mossad Rizkalla Construction Inspector
Mr. Rizkalla is a bilingual senior public works and construction special inspector with 19 years of experience in construction management and inspection. His past projects have consisted of both residential and commercial structures with reinforced concrete, post- tensioned concrete, structural masonry, structural bolting, spray-applied fire proofing, and structural welding inspection.
Select Project Experience Summary
Mr. Rizkalla has served as Construction and/or Public Works Inspector on the following projects:
Education • On-call Inspection for SCE Permit Work, City of El Monte, California • Bachelor of Science,
Telecommunication • Downtown Public Parking Improvement Project, City of El Monte, California
Engineering, Helwan
University, Cairo, Egypt • CDBG Street Reconstruction Project FY 21/22, Huntington Park, California • Certified - Construction • 2-Mile Water Main Replacement for Hill Street and Cudahy Street, City of Project Management, Huntington Park, California
California State • Long Beach Blvd., Phase I and Phase II, Lynwood, California University, Dominguez
Hills, California • Frankel Avenue and 16th StreetS Improvements (FY 2015-2016), Montebello, California
Years Experience: 19
• South Bay X Right-of-Way Inspections for Southern California Edison Relocation Work from Overhead to Underground, Gardena, California Jameson Farr, CPII Construction Inspector
Mr. Farr brings 10 years of experience in materials testing and construction inspection. His experience includes testing and construction inspection for Federal Emergency Management Agency (FEMA) flood repair, roadway and shoulder improvements, guardrail installation, and pedestrian paths. He is well-versed in the Caltrans and Green Book for Public Works specifications.
Select Project Experience Summary
Mr. Farr has served as Construction Inspector on the following projects:
• On-call Inspection for SCE Permit Work, City of El Monte, California • On-Call Encroachment Permits, Various Locations, El Monte, California Certifications
• Certified Public • Well 29 Rehabilitation Improvements Project, Santa Ana, California Infrastructure Inspector, • CDBG Street Reconstruction Project FY 21/22, Huntington Park, California American Public Works
• Monterey Pass Road Transmission Main Replacement, Monterey Park, Association
California
• OSHA- Certified Confined
• Budlong/Halldale Street Improvements Project, Gardena, California Space Entry, No. 130815
• Van Ness Avenue and 139th Street Improvements Project, Gardena, • American Concrete
California
Institute No. 01383421
• Modjeska Park Underground Stormwater Detention and Infiltration • Nuclear Gauge Operator,
System, Anaheim, California
No. 17943
• Magic Mountain Pipeline Phase 4, 5 and 6A Project, Santa Clarita Valley Years Experience: 10 Water Agency, Santa Clarita, California • Vista Canyon Recycles Water Main Extension, Santa Clarita, California • 2022-2023, Pavement Rehabilitation Project, Goleta, California On-Call Construction Management, Materials Testing, and Inspection Services Cannon iv Pete Maskal, PE Principal Construction Engineer / Design-Build Lead Since 2006, Mr. Maskal has provided design, analysis, utility planning, project management, and construction support for improvements in public infrastructure, energy facilities, utility infrastructure, educational facilities, residential development projects, and civil engineering forensics. His responsibilities include project management, development of construction documents, agency and utility coordination, and construction administration.
He specializes in grading and drainage, site layout and multi-disciplinary coordination for complex sites in environmentally sensitive areas, site development for remediation and hazard mitigation, design-build delivery, Just In Time Engineering, and construction administration. Mr. Maskal served as Professional Registration Project Engineer or Project Manager on the following projects:
• Civil Engineer, California,
No. 78139 Cal Poly yak?it'utu Residential Community Design Build Project, San Luis Obispo, California: Cannon provided civil engineering and surveying for the Education design and construction of a 1,475-bed student housing facility. The civil design • Bachelor of Science, included the preparation of grading plans, a site demolition plan, Stormwater Civil Engineering, Pollution Prevention Plan, design data for the stormwater quantity and quality California Polytechnic
LEED points, and on-site utility plans for water, fire water, sewer, natural gas, State University, San Luis
and storm drains. Mr. Maskal served as Project Engineer.
Obispo, California
Profesional Affiliations Cal Poly Master Utility Plan, California Polytechnic University, San Luis Obispo, California: As part of updates for the 2035 master plan for the Cal • American Society of Civil
Engineers Poly campus, the University needed to analyze and plan for improvements to and expansion of aging utility infrastructure. The University needed a utility Years Experience: 19 master plan (UMP) to sustainably support an additional 7,200 beds of student and faculty housing and an additional 5,000 students/faculty. Cannon teamed with Affiliated Engineers, Inc. and was selected to provide civil engineering services in development of the UMP for sanitary sewer, domestic water, storm drain, and natural gas utilities. The master plan evaluated the current utility condition and capacity, identify risks and deficiencies, incorporate sustainability and efficiency components, and provided recommendations for future growth.
Mr. Maskal coordinated field assessments (survey, flow monitoring, and CCTV), developed modeling scenarios, compiled master plan, and coordinated civil project engineering assessment.
Cal Poly John Madden Football Project Early/Enabling Civil Works, San Luis Obispo, California: Cannon developed the southwest campus utility program, including the proposed WRF lift station LS-10. The project involved coordination and oversight of utility locating and approximately 70 potholes. We developed options for mitigation of storm drain capacity and flood issues at the east bleacher as well as options to vary the extents of utility improvements to meet project budgets. The scope included detail design of backbone storm drain, sewer, water, and natural gas mains.
Design-Build Experience Summary
• Cal Poly Engineering IV Building, • Allied Health/Math/Science Building, Engineering/Architecture Renovation Learning Resources Center, and Trades and Replacement & Technology Center at Cuesta College
• Cal Poly Center for Science and • Remediation and restoration of the Mathematics Former Guadalupe Oil Field
On-Call Construction Management, Materials Testing, and Inspection Services Cannon V Christine Kahn, PE Scheduler
Ms. Kahn is an experienced project manager, project engineer, and construction inspector with 34 years of experience in the public infrastructure field. She offers expertise in constructability reviews, preliminary site planning and permitting, and funding assistance. Throughout the course of her career, she has honed her abilities as an astute problem-solver capable of designing, managing, and inspecting transportation projects with proficiency.
As a Transportation Engineer for Caltrans, she was the lead engineer in the development of various complex transportation projects on the State Highway System. Ms. Kahn also managed a team of engineers to prepare technical Professional Registration documents that required extensive coordination with several functional units • Civil Engineer, California, within the district, region, headquarters and outside regulatory agencies. She No. 41877 followed many of her projects into construction to oversee field personnel to • OSHA-Confined Space confirm the cost effective and timely delivery of the project.
Entry, No. 132326
Train Station Expansion Project, Grover Beach, California: The City of Grover • Asphalt 101 for Civil and Beach successfully secured Federal funds from a Congestion Management Air Geotechnical Engineers
Quality Grant for the City of Grover Beach Train Station Expansion Project. - Asphalt Pavement
Additionally, the City received an allocation of grant funds for construction Alliance
from State Proposition 1B and from the Regional Surface Transportation Education Program. The City selected Cannon to provide Construction Management and • Bachelor of Science, Construction Inspection, and Materials Engineering, Sampling and Testing for Civil Engineering, this project. Materials installed on the project and specific documentation and California Polytechnic
required reporting adhered to Caltrans Local Assistance Procedures Manual State University, San Luis
Obispo, California (LAPM) standards. Ms. Kahn provided Construction Management services.
Profesional Affiliations
• American Society of Civil Select Project Experience Summary Engineers; Past President, Ms. kahn has served as Construction Inspector or Scheduler on the following SLO Branch
projects:
• American Public Works • Blosser Road Right Turn Lane at W. Main Street, Santa Maria, California Association, Member, • Morro Bay to Cayucos Connector, County of San Luis Obispo California Central Coast Chapter
• Avila Beach Roundabout, County of San Luis Obispo, California Years Experience: 34 • Countywide Surface Treatment, County of San Luis Obispo, California • 2021 Pavement Inspection Services, Guadalupe, California • Measure K-14 CIP Pavement Rehabilitation, Grover Beach, California • County of San Luis Obispo, Huasna Townsite Road Bridge Rehabilitation, Oak Shores, California
• Huasna Townsite Road Rehabilitation, San Luis Obispo, California • County of SLO 2023 Storm Damage Repair Work, San Luis Obispo, California
• Pismo Pier and Plaza Rehabilitation, City of Pismo Beach, California • 4th Street Phase 2, Santa Monica, California
• CDBG-Funded Community Center and Leroy Park Guadalupe, California • Vintage Ranch Development Project Inspection Services, Orcutt, California On-Call Construction Management, Materials Testing, and Inspection Services Cannon vi Dean Stanphill, PE, GE, ICC-Certified Materials Testing Mr. Stanphill has over 35 years of experience providing geotechnical engineering services for a wide variety of projects, including transportation, education, commercial, landfill, and public agency projects. He also has over 10 years of experience with regards to methane monitoring and biogas collection system design. His experience includes expert witness work regarding methane migration issues on several projects in both the United States and in Australia.
Industrial Warehouse, City of Industry, California. Principal-in-charge of an approximate 900,000 square foot concrete tilt-up warehouse in the City Professional Registration of Industry. Mr. Stanphill worked closely with the contractor as well as the • Civil Engineer, California, owner's construction team to verify that all components of the project were No. 43612 constructed in accordance with project plans and specifications. The scope • Geotechnical Engineer, of work included grading observation and testing as well as in inspection of California No. 2271 concrete and structural steel.
Education
• MBA, California Mammoth Lakes Middle School, High School, and Elementary School State University, San Additions, Mammoth Lakes, California. Principal-in-charge of services Bernardino provided for the expansion of schools. Work was performed included grading observation and testing, concrete, structural steel, and masonry. Work • Bachelor of Science, Civil was performed in strict accordance with the California Division of the State Engineering, San Diego
Architect Requirements.
State University, San
Diego, California
Vans Corporate Headquarters Expansion, Laguna Beach, California.
Certification Principal-in-charge for the construction of a major addition at the Vans • Nuclear Density Corporate Headquarters. Work included grading observations as well as Gauge Structural Steel inspection of concrete and structural steel. Other services included inspection and Welding - ICC; of firestopping and other building envelope components.
Fireproofing - ICC;
Masonry - ICC
Mariners Church Expansion, Newport Beach, California. Principal-in-charge • California, Environmental for a major expansion project at Mariners Church in Newport Beach. Work Assessor, No. 07476 primarily consisted of structural steel and fireproofing inspection. The project • California, Qualified included not only interior remodeling and re-purposing of spaces but the Stormwater Practitioner / construction of an outdoor worship center.
Developer, No. 22010
• California, Qualified San Jose State University Spartan Shops at MacQuarrie Hall, San Jose, Industrial Stormwater California. Engineer of Record during the material testing and inspection Practitioner services provided to the new Spartan Shops. This project was the relocation of the Spartan Shops.
Profesional Affiliations
• American Council of
Engineering Companies
• American Public Works
Association
• American Society of Civil
Engineers
Years Experience: 35
On-Call Construction Management, Materials Testing, and Inspection Services Cannon vii Lissette Montoya Labor Compliance Support
Ms. Montoya has more than 20 years of experience in project management, analysis, funding management, grant administration, and community outreach programs. Her expertise includes identifying federal and state fund allocation balances, programming funds, and administering long-and-short range programs consistent with the economic capabilities of the City. Ms. Montoya directs the Program Management team to ensure that projects are developed in accordance with policy and procedural requirements, and she assists in determining eligible projects for various funding sources. She also manages development and capital improvement programs/projects from conception Education
to completion, conducts a variety of analyses and studies to identify State • Master of Business
Administration, California and Federal funding options. Additionally, she has experience in grant writing, State Polytechnic project monitoring, labor compliance, and funding administration services.
University Pomona Her team has successfully monitored federal and state funding for municipal California agencies throughout Southern California and has secured over $555.4 million in funding for government agencies.
• Bachelor of Science,
Business Management,
California State Project Experience
Polytechnic University Ms. Montoya is experienced in strategic budget planning specifically with Pomona, California Capital Improvement Programs. Her team has effectively managed labor Years Experience: 20 compliance for over 291 construction projects, totaling $1.1 billion in value.
Summer Mann Labor Compliance / Sr. Program Coordinator
Ms. Mann has more than six years of experience in providing labor compliance services. She collaborates with project managers to act as a liaison and offer support on various labor compliance projects. She enforces labor compliance regulations by conducting on-site interviews of employees, calculating prevailing wages for job classifications and duties in line with State or Federal labor laws. Ms. Mann also works closely with project contractors to ensure timely delivery of all required documents. Moreover, she monitors contracts to ensure adherence to all applicable DBE and labor compliance requirements, prepares correspondence, conducts desk audits of compliance documents and Certifications
• CA LAP Certificate of contractor submittals, prepares management reports, issues non-compliance Completion - Labor notices to ensure contractor compliance, and prepares close-out reports.
Compliance Course Additionally, she assists in bid evaluations and participates in pre-bid and • CA Prevailing Wage/ pre-construction conferences and meetings as needed to review contractor Public Works Compliance compliance obligations.
Training - Center for
Contract Compliance Project Experience
• 2021 Section 3 Final Rule Relevant City Experience includes: San Luis Obispo, Lynwood, Pico Rivera, El Training Monte, La Cañada Flintridge, Norwalk, Rialto, Hawaiian Gardens, Industry, La • Davis-Bacon Labor Mirada, Commerce, Cudahy, Monterey Park, South El Monte, Temple City, Standards West Covina, Ojai, and many more.
• Rail Safety and Wayside
Worker Program Certified A full list of labor compliance projects can be provided upon request. - METRO
Years Experience: 6
On-Call Construction Management, Materials Testing, and Inspection Services Cannon vili Certification Copies
Name Licensing
RIDDELL, PATRICK RYAN
LICENSE NUMBER: 72034 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR EXPIRATION DATE: JUNE 30, 2026
SECONDARY STATUS: N/A
CITY: CAYUCOS STATE: CALIFORNIA COUNTY: SAN LUIS OBISPO ZIP: 93430 Mr. Patrick R. Riddell, PE,CPII
CERTIFIED PUBLIC INFRASTRUCTURE INSPECTOR (CPII)
Pat Riddell, PE, CPII, QSD/P P
as so Cornestion. ortober 1.o)
Octeber 14, 2025
АРНД
CBPELSO • ASD
len below to tsarch
Last Hame Riddes
Thirsare
Search for Existing Records Create New Record
4O4 E 51 Cayuces CA 93405
KNOEFLER, JOSHUA WAYNE
LICENSE NUMBER: 66577 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR O EXPIRATION DATE: JUNE 30, 2026
Josh Knoefler, PE P
SECONDARY STATUS: NIA
CITY: INGLEWOOD STATE: CALIFORNIA COUNTY: LOS ANGELES ZIP: 90301
PETROVICH, MICHAEL ROBERT
LICENSE NUMBER: 93847 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR O EXPIRATION DATE: SEPTEMBER 30, 2026 SECONDARY STATUS: N/A
CITY: PASADENA STATE: CALIFORNIA COUNTY: LOS ANGELES ZIP: 91107 Michael Petrovich, PE P
COMPETION OF THE STATE WATEA BOARD
CAPELS LICENTEE OSDIO SELF-CERTIFICO ON TRAINING FORTH
7009 AND 2022 CONSTRUCTION STORMWATER GENERAL PERMITS
C93847 Michael Petrovich
06/06/2025
BOAS, NIKOLAS
LICENSE NUMBER: 80636 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR O EXPIRATION DATE: MARCH 31, 2027 Nik Boas, PEP
SECONDARY STATUS: N/A
CITY: VENTURA STATE: CALIFORNIA COUNTY: VENTURA ZIP: 93004 Jameson D. Farr, CPII
Jameson Farr, CPII P CERTIFIED PUBLIC INFRASTRUCTURE INSPECTOR (CPII) I.P DETACOSTOATA A HE LEVEL OF COMPETENCE FOR IF DASTRUC TURE INSEC DON DY SCESSEUTE Date of Certilication: December 10, 2024
Certified Until: December9, 2029
Mark Atinson Il. Week Imit
On-Call Construction Management, Materials Testing, and Inspection Services Cannon ix Name Licensing
MASKAL, KRISTOPHER
LICENSE NUMBER: 78139 LICENSE TYPE: CIVIL ENGINEER
Pete Maskal, PE P LICENSE STATUS: CLEAR O EXPIRATION DATE: SEPTEMBER 30, 2025 SECONDARY STATUS: NIA
CITY: ATASCADERO STATE: CALIFORNIA COUNTY: SAN LUIS OBISPO ZIP: 93122
KAHN, CHRISTINE CARRUTH
LICENSE NUMBER: 41877 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR O EXPIRATION DATE: MARCH 31, 2026 SECONDARY STATUS: N/A
CITY: SAN LUIS OBISPO STATE: CALIFORNIA COUNTY: SAN LUIS OBISPO ZIP: 93-101 Christine Kahn, PE P Christine Kahn
has reccived training for successfully completing
OSHA Permit-Required Confined Space Entry
OSHA 29 CEIL 1910.146 - 2 Hours
Novcinber 06, 2019 Certificate Number: 132326
STANPHILL, DEAN RAY
LICENSE NUMBER: 43612 LICENSE TYPE: CIVIL ENGINEER
LICENSE STATUS: CLEAR O EXPIRATION DATE: DECEMBER 31, 2026 SECONDARY STATUS: NIA
CITY: FOOTHILL RANCH STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92610 Dean Stanphill, PE, GE P
STANPHILL, DEAN RAY
LICENSE NUMBER: 2271 LICENSE TYPE: GEOTECHNICAL ENGINEER LICENSE STATUS: CLEAR O EXPIRATION DATE: DECEMBER 31, 2026 SECONDARY STATUS: N/A
CITY: FOOTHILL RANCH STATE: CALIFORNIA COUNTY: ORANGE ZIP: 92610 Cannon
On-Call Construction Management, Materials Testing, and Inspection Services Cannon Rate Sheets
2025-2029 Fee Schedule
Cannon
Role 2025-2026 2026-2027 2027-2028 2028-2029
Construction Manager $ 207 $ 215 224 $ 233
Director, Construction Management $ 247$ 257 $ 267 $ 278 Principal Construction Manager $ 247 $ 257 $ 267 $ 278
Principal Construction Engineer $ 235 245$ 255|$ 265
Sr. Construction Manager $ 233 $ 243T5 252 $ 262
Senior Resident Engineer $ 239 248 268
Resident Engineer $ 223 232$ 250
Assistant Resident Engineer 186 1$ 193$ 201|$ 209
Office Engineer/Doc Control 156$ 169 $ 175
Construction Coordinator $ 137$ 148 $ 154
Engineering Assistant 133$ 143$ 149
Construction inspector (Non PW) $ 161$ 174$ 181
Prevailing Wage (PW) Construction Inspection $ 176$ 191 $ 198 f the client requests, or the client's schedule requires work to be done on an overtime basis, a multiplie of 1.5 will be applied to the stated rates for weekdays for daily hours in excess of 8 as well as weekend:
and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to Rates shown are subject to 4% increase July 1st of each year.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon
CONVERSE CONSULTANTS
Schedule of Fees - Materials Laboratory Testing
Compensation for laboratory testing services will be based on rates in accordance with this fee schedule which includes test reports) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee
MOISTURE EMISSION TEST
. 30.00 Moisture Emission Test Kit..
Particle Size Analysis
130.00 ASPHALTIC CONCRETE
Coarse and Fine, ASTM C136 & C137), each Stability, Flow, and Unit Weight, AST D6927 190.00
Specific Gravity & Absorption Marshall ASTM D1559, ASTM D2726... 115.00 Measured Maximum Specific Gravity of Mix, ASTM D2041, 175.00
Unit Weight per Cubic Foot, ASTM C29 75.00 Void Analysis of Cores or Marshall Specimens, Calculations Only, ASTM D3203, set of 2 or 3.....
Soundness, Sodium or Magnesium, ASTM C88, each..... 550.00 Laboratory Mixing of Asphalt & Concrete, per sample Potential Alkali Reactivity, ASTM D289.. 700.00
Freeze Thaw Soundness..... 175.00 Complete Asphalt Concrete Mix Design 375.00 Hveem or Marshall .......
Los Angeles Abrasion, per class, ASTM C131, C535 Extraction of Asphalt and Gradation, ASTM D2172, Method B, 180.00
Lightweight Particles, ASTM C123, each. ...300.00 or California 310, including ash correction, each Extraction of Rubberized Asphalt & Gradation, each.
Clay Lumps & Friable Particles, ASTM C142, each. ... 290.00 Stripping Test, ASTM D1664, each 85.00 Specific Gravity, ASTM D2726 or ASTM D1188 .. 140.00
By Quote
Immersion-Compression........
Laboratory Trial Batch, ASTM C192 By Quote Stripping, ASTM D1664 Laboratory Mix Design, Historical Data... By Quote Moisture or Volatile Distillates in Paving Mixtures, or Compression Test, 6"x12" Cylinder, ASTM C39, each.. 55.00 Materials Containing Petroleum Products or Lightweight Concrete
Compression. 55.00 Retained Strength, ASTM D1074/D1075, 6 specimens Unit Weight... 55.00 Retained Stability, Mil, Std, 520A, Method 104, Specimen Preparation, Trimming or Coring, each 75.00
Bond Strength, ASTM C321 CBR, ASTM D1883, including M/D Curve, 1 point Prepared by Converse. 250.00 Asphalt Temperature.
Prepared by Others.. 150.00
Core Compression Test, ASTM C12, each. 120.00 STRUCTURAL STEEL Flexure Test, 6"x6" Beams, ASTM C78, each... 130.00 Tensile Test #9 Bar or Smaller, each 65.00 Modulus of Elasticity, Static, ASTM C469, each 275.00 Bend Test #9 Bar or Smaller, each.. .65.00 Length Change, ASTM C157, 3 bars, 5 readings each, Tensile Test #10 Bar or Greater, each 300.00 up to 26 days.......…....……. .. 550.00 Tensile Test #14 Bar, each 330.00 Splitting Tensile, 6"x12" Cylinders, each. 110.00 Rebar Coupler Tensile Test 160.00 Field Concrete Control (sampling, slump, temperature, Tensile Test, Welded #9 Bar or Smaller, each 160.00 cast 4 cylinders, molds, cylinder pick-up, within 10 miles Tensile Test, Welded #10 Bar or Greater, each 300.00 of office, stand-by extra), ASTM/UBC, hourly rate Tensile Test, Welded #14 Bar, each 330.00 schedule, or each cylinder.. 95.00 Tensile Test, Mechanically Spliced, #9 Bar or Smaller, Field Concrete Control (same as above plus air content test), each... ...210.00 ASTM/UBC, each cylinder... 95.00 Tensile Test, Mechanically Spliced, #10 Bar or Greater, Hold Cylinder.. 10.00 each 350.00
Cylinder Mold, sent to job site but not cast by Converse or returned to Converse.. HIGH STRENGTH BOLT, NUT, AND WASHER TESTING ... 5.00
MASONRY (ASTM C140, E447, UBC STANDARD 24-22) ..140.00
Moisture Content, as received, each.. 105.00 Over 100,000 Ibs., each ... ...150.00 Absorption, each... 85.00
85,00 ..160.00
250,00 Tensile Test, Anchor Bolts, tested with displacement Net Area and Volume, each.... ..... 30.00 ...300.00
1,500.00 Nut Hardness, Proof & Cone Proof Load Test, each .65.00 Masonry Core Compression, each 125.00 55,00
Masonry Core Shear, each.... ... 245.00 A325 or A490, Bolt Hardness Only, each... .55.00 Masonry Core Trimming, each....... 150.00 Bolt A325 or A490 Wedge Tensile Compression Test, grouted prisms, 8"x8"x16", each.... 300.00 Under 100,000 Ibs. & Hardness, each. .240.00 Compression Test, grouted prisms, 12"x16"x16", each. 425.00 Over 100,000 Ibs. & Hardness, each.... 280.00 Compression Test Bolt, Nut & Washer, all tests per set with bolts 55,00 400.00
55.00 Over 100,000 Ibs. ...500.00
2" Cubes, ASTM C109, each. 55.00
See Schedule of Fees - Geotechnical Laboratory Testing for soil
55.00 .. By Quote testing. Hourly rates are available upon request. Field Laboratory rates are available upon request. Listed unit rates are based upon FIREPROOFING TESTS the assumption that samples will be delivered to our laboratory at no Oven Dry Density, per sample 90.00 cost to Converse.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon xii
CONVERSE CONSULTANTS
Schedule of Fees - Geotechnical Laboratory Testing
Compensation for laboratory testing services will be made in accordance with this fee schedule which includes test reports) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. The rates are based on non-contaminated soil. A surcharge will be charged for handling contaminated material, which will be determined based on the project.
IDENTIFICATION AND INDEX PROPERTIES TESTS Single Load Swell, ASTM D4546 Visual Classification, ASTM D2488..... ....20.00 Ring Sample, Field Moisture.... 95.00 Engineering Classification, ASTM D2487 .25.00 Ring Sample, Air Dried 95.00 Moisture Content and Dry (bulk) Density. Remolded Sample. 70.00
25.00 Expansion Index Test, UBC 29-2/ASTM D482: 135.00
Moisture Content, ASTM D2216 20.00
Shrinkage Limit, ASTM D4943 ... .85.00 HYDRAULIC CONDUCTIVITY TESTS Atterberg Limits, ASTM D4318 Constant Head, ASTM D2434...... -.250.00 .. 150.00 Falling Head Flexible Wall, ASTM D5084 .300.00 ...50.00 Triaxial Permeability, EPA 9100 .350.00
Particle Size Analysis, ASTM D6913 Remolded Specimen 65.00 Fine Sieve, from +#200 to #4... ..100.00
Coarse and Fine Sieve, from #200 to 3 in. ... 190.00 CHEMICAL TESTS .. 130.00 Corrosivity (pH, resistivity, sulfates, chlorides) ...230.00 Percent Passing #200 Sieve, ASTM D1140 ...80.00 Organic Content, ASTM D2974.. ..110.00 Specific Gravity
Fine, passing #4 sieve, ASTM D854..... .100.00 Conditions: Unit rates presented on this fee schedule are for routinely Coarse, retained on #4 sieve, ASTM C127 .... 100.00 performed geotechnical laboratory tests. Numerous other earth material Sand Equivalent Test, ASTM D2419 .. 130.00 physical tests can be performed in our geotechnical laboratories, including rock core, soil cement and soil lime mixture lests. Tests not listed can be Double Hydrometer Dispersion, ASTM D4221 ...150.00 quoted upon request. This fee schedule is valid through December 31, 2028.
COMPACTION AND BEARING STRENGTH Prices are based on the assumption that samples are uncontaminated and do Standard Proctor Compaction, ASTM D698 or ASTM D1557 not contain heavy metals, acids, carcinogens and/or volatile organics which Method A or B.... ..... 210.00 can be measured by an organic vapor analyzer or photoionization detector with a concentration greater than 50 parts-per-million (ppm). Quoted testing Method C, 6" mold. 220.00 fees are based on the assumption that no protective clothing will be required California Impact Method, Caltrans 216 220.00 to handle samples. If Level D protective clothing will be required during R-value, ASTM D2844 and CTM301. ..280.00 handling of samples (as defined in Federal CFR Part 1910.120), then a 40% California Bearing Ratio (CBR), ASTM D1883 increase in fees presented in this schedule will be applied. Level C protective clothing will be a 60% increase in fees. Converse will not handle samples that 1 Point..... ...530.00 require either Level B or Level A protection in our geotechnical laboratories. 3 Points ..750.00 Contaminated samples will be returned to the client. Uncontaminated samples Relative Density will be disposed of 30 days after presentation of test results. The client must
0.1 Cubic Foot Mold ..200.00 disclose the source of samples. Samples imported from out of state will be
0.5 Cubic Foot Mold .300.00 incinerated after testing in accordance with requirements of the United States Department of Agriculture. Soil samples obtained within the State of California currently designated quarantine areas will also be incinerated in accordance SHEAR STRENGTH with the requirement of the State of Califomia, Department of Food and Torvane/Pocket Penetrometer 25.00 Agriculture, Division of Plant Industry, Pest Exclusion. A $5.00 incineration Direct Shear fee will be added to each sample that is required to be incinerated in Quick Test.. .75.00 accordance with State and Federal law.
Consolidated, Drained, granular soil, Test results requiring plots will be presented in a publishable formal generated ASTM D3080 ... ..230.00 from computer programs. Otherwise, raw test numbers will be presented. A Consolidated, Drained, fine grained soil, minimum laboratory fee of $50.00 will be charged to present and mail test ASTM D3080. 270.00 results. Beyond the standard U.S. Mail delivery, specialized transmittal will be Consolidated, Undrained, fine grained soil. .230.00 charged at additional cost (e.g., Federal Express, UPS, etc.). Geotechnical Residual Strength, per cycle.. .75.00 testing does not include engineering and/or geologic review and analysis.
Typical turnaround for geotechnical laboratory testing is two weeks (or roughly Remolded Specimens... .....75.00 ten working days). To expedite test turnaround to five working days, a 50% increase in the fees in this schedule will be applied. Many geotechnical tests STATIC UNIAXIAL AND TRIAXIAL STRENGTH TESTS require at least one week to perform in accordance with AST or other (PER POINT) standard specifications. Fees presented in this schedule for relatively undisturbed direct shear, consolidation or expansion pressure tests are based Unconfined Compression, ASTM D2166 150.00 on the assumption that 2.416-inch inside diameter brass ring samples will be Unconsolidated, Undrained, ASTM D2850 160.00 Remolded specimens will provided to the geotechnical laboratory for testing.
Consolidated, Undrained, per point...... ...700.00 be compacted in standard 2.5-inch outside diameter brass rings for direct Consolidated, Drained, per point. ..700.00 shear, consolidation and expansion pressure tests. All fees presented in this With Pore Pressure Measurement, per load ...150.00 schedule are based on the assumption that the client will deliver samples to our laboratory at no additional cost to Converse.
Remolded Specimen. ....90.00
Invoices will be issued monthly and are payable on receipt unless otherwise CONSOLIDATION (ASTM2435) AND SWELL COLLAPSE agreed upon. Interest of 1.5% per month (but not exceeding the maximum (ASTM D4546) TESTS allowed by law) will be payable on any amount not paid within thirty days; 8 Load Increments ..250.00 payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. The Client shall pay any altorneys' fees or other Additional Load Increment... ....50.00
costs incurred in collecting any delinquent amounts.
Time-Ratio, per load increment. 90.00
Single Point, collapse test. ..90.00
On-Call Construction Management, Materials Testing, and Inspection Services Cannon xili
CONVERSE CONSULTANTS
Prevailing Wage Schedule of Fees
Introduction
is the objective of Converse Consultants to provide its clients with quality professional and technical services and a continuin source of professional advice and opinions. ervices will be performed in a manner consistent with that level of care and skill ordinaril exercised by members of the profession currently practicing in the same locality under similar conditions.
Hourly Charges for Personnel
Staff assignments will depend on personnel availability, job complexity, project site location, and experience level required to satisfy the technical requirements of the proiect and to meet the prevailing standard of professional care.
Field Technical Services (hourly rate including vehicle and equipment) Construction Inspector - ACI/ICC and/or AWS/CWI certified (concrete, post-tension, masonry, structural steel, fireproofing; includes concrete batch plant and local steel fabrication inspections) ...$160 DSA Masonry Inspector. .. 160
Non-Destructive Testing Inspector (ultrasonic, magnetic particle, dye penetrant, skidmore, pull testing, torque testing, Schmidt hammer, and pachometer)... 165
Coating Inspector/Coring Technician......... . 165
Soils Technician (soil, base, asphalt concrete, and moisture emission testing) 160 Sample Pick-Up ...75
Professional Services (consultation for field and office, if requested) Staff Professional $160
Senior Staff Professional 170
Project Professional .. 180
Project Manager... 190
Senior Professional... 190
Principal Professional 230
Principal Consultant ..240
Laboratory Testing
Laboratory Technician... Per Test
(see Geotechnical Laboratory Testing and Materials Testing Services fee schedules.) Laboratory Supervisor.. ...$100
Office Support
Clerical/Word Processing ...$100
Drafting. . 100
CAD Operator/Drafting Manager .. 110
Overtime and special shift rates for Field Services personnel are determined in accordance with Prevailing Wage law. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel Expenses
1. Exploration expenses (drilling, trenching, etc.) are charged at cost plus fifteen percent.
2. Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects requiring travel and/or living 50 miles away from the project site are charged at cost plus fifteen percent.
3. Automobile and truck expenses are charged at cost plus fifteen percent (rentals) or at the current IRS milage rate per mile for company-owned vehicles traveling between principal office and project.
4. Other out-of-pocket direct project expenses (aerial photos, long-distance telephone calls, permits, bonds, outside printing services, tests, etc.) are charged at cost plus fifteen percent.
Invoices will be submitted to the Client on a monthly basis, and a final bill will be submitted upon completion of services.
2. Payment is due upon presentation of invoice and is past-due thirty days from invoice date. In the event Client fails to make any payment to Converse when due, Converse may immediately cease work hereunder until said payment, together with a service charge at the rate of eighteen percent per annum (but not exceeding the maximum allowed by law) from the due date, has been received Further, Converse may at its sole option and discretion refuse to perform any further work irrespective of payment from Client in the event Client fails to pay Converse for services when said payments are due.
3. Client shall pay attorneys' fees or other costs incurred in collecting any delinquent amount.
General Conditions
The terms and provisions of the Converse General Conditions are incorporated into this fee schedule as though set forth in full. If a copy of the General Conditions does not accompany this fee schedule, Client should request a copy from this office.
Converse Consultants
On-Call Construction Management, Materials Testing, and Inspection Services Cannon XiV AVANI
GARDI
ON-CALL CONSTRUCTION MANAGMENT, MATERIALS TESTING, and INSPECTIONSERVICES Agency: Advanced Avant-Garde Corporation
Task: Labor Compliance Services
Year 1 Year 2 Year 3 Year 4
Program Director $150 $150 $158 $158
Program Manager $135 $135 $142 $142
Sr. Program Coordinator $125 $125 $131 $131
Program Coordinator $110 $110 $115 $115
Program Assistant $100 $100 $105 $105
On-Call Construction Management, Materials Testing, and Inspection Services Cannon EXHIBIT "B"
Payment Schedule (Hourly Payment)
A. Hourly Rate
CONSULTANT'S fees for such services shall be based upon the following hourly rate and cost schedule:
SEE ATTACHED EXHIBIT B
B. Travel. Charges for time during travel are not reimbursable C. Billing
1. All billing shall be done monthly in fifteen (15) minute increments and matched to an appropriate breakdown of the time that was taken to perform that work and who performed it.
2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project.
A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion.
4. CONSULTANT shall submit to CITY an invoice for each monthly payment due.
Such invoice shall:
A) Reference this Agreement;
B) Describe the services performed;
C) Show the total amount of the payment due;
D) Include a certification by a principal member of CONSULTANT's firm that the work has been performed in accordance with the provisions of this Agreement; and
E) For all payments include an estimate of the percentage of work completed.
Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice, in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice, CITY shall notify CONSULTANT in writing of the reasons for non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in, or has been brought into compliance, or until this Agreement has expired or is terminated as provided herein.
5. Any billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and if CITY is satisfied that the statement of hours worked and costs incurred is accurate.
Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance of the remainder of this Agreement.
EXHIBIT B
Rate Sheets
2025-2029 Fee Schedule
Cannon
Rote 2025-2026 2026-2027 2027-2028 2028-2029
Construction Manager $ 207 $ 215 $ 224 $ 233
Director, Construction Management $ 247 $ 257 $ 267 $ 278 Principal Construction Manager $ 247 $ 257 $ 267 $ 278
Principal Construction Engineer 235 245 .$ 255 265
Sr. Construction Manager $ 233 1$ 243$ 252 $ 262
Senior Resident Engineer $ 239| 248 $ 258 268
$ 223|$ 232 241|$ 250
Assistant Resident Engineer 186 S 201$ 209
Office Engineer/Doc Control 156$ 175
Construction Coordinator $ 137$ 148$ 154
Engineering Assistant $ 133$ 143 $ 149
Construction Inspector (Non PW) $ 161| $ 174$ 181
Prevailing Wage (PW) Construction Inspection $ 176$ 183 $ 191 $ 198 If the client requests, or the client's schedule requires work to be done on an overtime basis, a multiplies of 1.5 will be applied to the staled rates for weekdays for daily hours in excess of 8 as well as weekends and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to be provided oufside of normal working hours, a multiplier of 1.5 will be applied to the stated rates. Fo prevailing wage projects, if the client requests field services to be provided on any given Sunday, multiplier of 2.0 will be applied to the stated rates; on or around an observed holiday, other rates may be Rates shown are subject to 4% increase July 1st of each year.
On-Call Construction Management, Materials Testing, and Inspection Services Cannon xi
CONVERSE CONSULTANTS
Schedule of Fees - Materials Laboratory Testing
ompensation for laboratory testing services will be based on rates in accordance with this fee schedule which includes tes eports) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fer schedule.
MOISTURE EMISSION TEST
30,00 Moisture Emission Test Kit. 95.00
ASPHALTIC CONCRETE
Coarse, ASTM C136, each. ....130.00
Coarse and Fine, ASTM C136 & C137), each 190.00 Stability, Flow, and Unit Weight, ASTM D6927 ..... ....500.00 Marshall ASTM D1559, ASTM D2726.... 450.00
Coarse Aggregate, ASTM C127 115.00 Measured Maximum Specific Gravity of Mix, ASTM D2041, 175.00 Rice Method, each ...... .350.00
Unit Weight per Cubic Foot, ASTM C29 75.00 Void Analysis of Cores or Marshall Specimens, Calculations Only, ASTM D3203, set of 2 or 3.... .60.00 Soundness, Sodium or Magnesium, ASTM C88, each..... 550.00 aboratory Mixing of Asphalt & Concrete, per sampl .75.00 Potential Alkali Reactivity, ASTM D289.... 700.00
omplete Asphalt Concrete Mix Desig
175.00
..By Quote
Los Angeles Abrasion, per class, ASTM C131, C535. 375.00 Extraction of Asphalt and Gradation, ASTM D2172, Method B 180.00
Lightweight Particles, ASTM C123, each... 300.00 or California 310, including ash correction, each.
Extraction of Rubberized Asphalt & Gradation, each. 350.00 Clay Lumps & Friable Particles, ASTM C142, each 290.00
Stripping Test, ASTM D1664, each... . 85.00 Specific Gravity, ASTM D2726 or ASTM D1188 Uncoated.. ..95.00
140.00
By Quote
Immersion-Compression
CONCRETE TESTS Particle Coating, ASTM D2489
Laboratory Trial Batch, ASTM C192
Laboratory Mix Design, Historical Data Moisture or Volatile Distillates in Paving Mixtures, or Compression Test, 6"x12" Cylinder, ASTM C39, each. Materials Containing Petroleum Products or Retained Strength, ASTM D1074/D1075, 6 specimens.
Retained Stability, Mil, Std, 520A, Method 104,
Specimen Preparation, Trimming or Coring, each
CBR, ASTM D1883, including M/D Curve, 1 point 400.00
Prepared by Converse. Asphalt Temperature. 25.00
Core Compression Test, ASTM C12, each STRUCTURAL STEEL
Flexure Test, 6"x6" Beams, ASTM C78, each. Tensile Test #9 Bar or Smaller, each 65.00 Modulus of Elasticity, Static, ASTM C469, each Bend Test #9 Bar or Smaller, each.. ..65.00 Length Change, ASTM C157, 3 bars, 5 readings each, Tensile Test #10 Bar or Greater, each 300.00 Tensile Test #14 Bar, each 330.00
Splitting Tensile, 6°x12" Cylinders, each.... Rebar Coupler Tensile Test 160.00 Field Concrete Control (sampling, slump, temperature, Tensile Test, Welded #9 Bar or Smaller, each 160.00 cast 4 cylinders, molds, cylinder pick-up, within 10 miles Tensile Test, Welded #10 Bar or Greater, each 300.00 of office, stand-by extra), ASTM/UBC, hourly rate Tensile Test, Welded #14 Bar, each... .330.00 Tensile Test, Mechanically Spliced, #9 Bar or Smaller,
Field Concrete Control (same as above plus air content test). each ...210.00 ASTM/UBC, each cylinder. Tensile Test, Mecha #10 Bar or Greater.
Cylinder Mold, sent to job site but not cast by Converse or
HIGH STRENGTH BOLT, NUT, AND WASHER TESTING
Wedge Tensile Test, A490 Bolts
MASONRY (ASTM C140, E447, UBC STANDARD 24-22)
Moisture Content, as received, each.. .. 105.00
Absorption, each. 85.00 Wedge Tensile Test, A325 Bolts
Compression, each. . 85.00
250.00 Tensile Test, Anchor Bolts, tested with displacement Net Area and Volume, each.... 30.00
1,500.00 Nut Hardness, Proof & Cone Proof Load Test, each Masonry Core Compression, each 125.00
Masonry Core Shear, each... ..245.00 A325 or A490, Bolt Hardness Only, each Masonry Core Trimming, each........ ... 150.00 Boll A325 or A490 Wedge Tensile Compression Test, grouted prisms, 8"x8"x16", each.... 300.00 Under 100,000 Ibs. & Hardness, each Compression Test, grouted prisms, 12°x16"x16", each ...425.00 Over 100,000 Ibs. & Hardness, each.
Compression Test Bolt, Nut & Washer, all tests per set with bolts
55.00 55.00
2" Cubes, ASTM C109, each 55.00
See Schedule of Fees -Geotechnical Laboratory Tesling for soil Cast by Others.... 55.00
....By Quote testing. Hourly rates are available upon request. Field Laboratory rates are available upon request. Listed unit rates are based upon FIREPROOFING TESTS the assumption that samples will be delivered to our laboratory at no Oven Dry Density, per sample ........ 90.00
On-Call Construction Management, Materials Testing, and Inspection Services Cannon xii
CONVERSE CONSULTANTS
Schedule of Fees - Geotechnical Laboratory Testing
based on the project.
IDENTIFICATION AND INDEX PROPERTIES TESTS Single Load Swell, ASTM D4546 Visual Classification, ASTM D2488. .20.00 Ring Sample, Field Moisture 95.00 Engineering Classification, ASTM D2487 .25.00 Ring Sample, Air Dried 95.00 Moisture Content and Dry (bulk) Density, emolded Sample... 70.00 ASTM D2216 and D2937 ...25.00 ‹pansion Index Test, UBC 29-2/ASTM D482 135.00 Moisture Content, ASTM D2216 ...20.00
Shrinkage Limit, ASTM D4943 ...85.00 HYDRAULIC CONDUCTIVITY TESTS Alterberg Limits, ASTM D4318 Constant Head, ASTM D2434........... .250.00 Several points .... ... 150.00 Falling Head Flexible Wall, ASTM D508 ..300.00 One Point... .50.00 remoled Specimen EPA 9100 ...350.00 Particle Size Analysis, ASTM D6913 65.00
Fine Sieve, from +#200 to #4.. ... 100.00
Coarse and Fine Sieve, from #200 to 3 in. 190.00 CHEMICAL TESTS Hydrometer ................... 130.00 Corrosivity (pH, resistivity, sulfates, chlorides). ..230.00 Percent Passing #200 Sieve, ASTM D1140. ...80.00 Organic Content, ASTM D2974.... ..110.00 Specific Gravity
Fine, passing #4 sieve, ASTM D854. .100.00 Conditions: Unit rates presented on this fee schedule are for routinely Coarse, retained on #4 sieve, ASTM C127 ..100.00 performed geotechnical laboratory tests. Numerous other earth material Sand Equivalent Test, ASTM D2419........ 130.00 physical tests can be performed in our geotechnical laboratories, including rock core, soil cement and soil lime mixture tests. Tests not listed can be Double Hydrometer Dispersion, ASTM D4221 ..... 150.00 quoted upon request. This fee schedule is valid through December 31, 2028.
COMPACTION AND BEARING STRENGTH Prices are based on the assumption that samples are uncontaminated and do Standard Proctor Compaction, AST D698 or ASTM D1557 not contain heavy metals, acids, carcinogens and/or volatile organics which Method A or B can be measured by an organic vapor analyzer or photoionization detector ..210.00 with a concentration greater than 50 parts-per-million (ppm). Quoted testing Method C, 6" mold. .220.00
fees are based on the assumption that no protective clothing will be required California Impact Method, Caltrans 216 ...220.00 to handle samples. If Level D protective clothing will be required during R-value, ASTM D2844 and CTM301. 280.00 handling of samples (as defined in Federal CFR Part 1910.120), then a 40% California Bearing Ratio (CBR), ASTM D1883 increase in fees presented in this schedule will be applied. Level C protective 1 Point... .530.00 clothing will be a 60% increase in fees. Converse will not handle samples that require either Level B or Level A protection in our geotechnical laboratories. 3 Points 750.00 Contaminated samples will be returned to the client. Uncontaminated samples Relative Density will be disposed of 30 days after presentation of test results. The client must
0.1 Cubic Foot Mold 200.00 disclose the source of samples. Samples imported from out of state will be
0.5 Cubic Foot Mold ..300.00 Incinerated after testing in accordance with requirements of the United States Department of Agriculture. Soil samples obtained within the State of California currently designated quarantine areas will also be incinerated in accordance SHEAR STRENGTH with the requirement of the State of Califomia, Department of Food and Torvane/Pocket Penetrometer .......25.00 Agriculture, Division of Plant Industry, Pest Exclusion. A $5.00 incineration fee will be added to each sample that is required to be incinerated in ...75.00 accordance with State and Federal law.
Consolidated, Drained, granular soil, Test results requiring plots will be presented in a publishable format generated ASTM D3080 ..230.00 from computer programs. Otherwise, raw test numbers will be presented.
Consolidated, Drained, fine grained soil, minimum laboratory fee of $50.00 will be charged to present and mail test ASTM D3080 ....... .270.00 results. Beyond the standard U.S. Mail delivery, specialized transmittal will be Consolidated, Undrained, fine grained soil. ..230,00 charged at additional cost (e.g., Federal Express, UPS, etc.). Geotechnical Residual Strength, per cycle .... ......75.00 testing does not include engineering and/or geologic review and analysis.
Typical turnaround for geotechnical laboratory testing is two weeks (or roughly Remolded Specimens....... ........75.00 ten working days). To expedite test turnaround to five working days, a 50% increase in the fees in this schedule will be applied. Many geolechnical tests STATIC UNIAXIAL AND TRIAXIAL STRENGTH TESTS require at least one week to perform in accordance with ASTor other (PER POINT) standard specifications. Fees presented in this schedule for relatively undisturbed direct shear, consolidation or expansion pressure tests are based Unconfined Compression, ASTM D2166 ....150.00 on the assumption that 2.416-inch inside diameter brass ring samples will be Unconsolidated, Undrained, ASTM D2850 ....160.00 provided to the geotechnical laboratory for testing. Remolded specimens will Consolidated, Undrained, per point.. ...700.00 be compacted in standard 2.5-inch outside diameter brass rings for direct Consolidated, Drained, per point .... .700.00 shear, consolidation and expansion pressure tests. All fees presented in this With Pore Pressure Measurement, per load ....150.00 schedule are based on the assumption that the client will deliver samples to Remolded Specimen.... ....90.00 our laboratory at no additional cost to Converse.
Invoices will be issued monthly and are payable on receipt unless otherwise CONSOLIDATION (ASTM2435) AND SWELL COLLAPSE agreed upon. Interest of 1.5% per month (but not exceeding the maximum (ASTM D4546) TESTS allowed by law) will be payable on any amount not paid within thirty days; 8 Load Increments. .....250.00 payment thereafter to be applied first to accrued interest and then to the Additional Load Increment ....... principle unpaid amount. The Client shall pay any attomeys' fees or other ......50.00 costs incurred in collecting any delinquent amounts.
Time-Ratio, per load increment. 90.00
Single Point, collapse test. ..90.00
On-Call Construction Management, Materials Testing, and Inspection Services Cannon xiii
CONVERSE CONSULTANTS
Prevailing Wage Schedule of Fees
Introduction
It is the objective of Converse Consultants to provide its clients with quality professional and technical services and a continuing source of professional advice and opinions. Services will be performed in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions.
Hourly Charges for Personnel
Staff assignments will depend on personnel availability, job complexity, project site location, and experience level required to satisfy the technical requirements of the project and to meet the prevailing standard of professional care Field Technical Services (hourly rate including vehicle and equipment) Constructural stel, repring includes uncrete batch plant and local ste abration inspections). . $160
DSA Masonry Inspector ...... 160
Non-Destructive Testing Inspector (ultrasonic, magnetic particle, dye penetrant, skidmore, pull testing torque testing, Schmidt hammer, and pachometer) 165
Coating Inspector/Coring Technician............................ 165 Soils Technician (soil, base, asphalt concrete, and moisture emission testing).. . 160 Sample Pick-Up ... 75
Professional Services (consultation for field and office, if requested) Staff Professional.. $160
Senior Staff Professional . 170
Project Professional . 180
Project Manager.... . 190
Senior Professional... • 190
Principal Professional . 230
Principal Consultant . 240
Laboratory Testing
Laboratory Technician.. Per Test
(see Geotechnical Laboratory Testing and Materials Testing Services fee schedules.) Laboratory Supervisor.... ... $100
Office Support
Clerical/Word Processing .. .. $100
Drafting... .100
CAD Operator/Drafting Manager 110
Overtime and special shift rates for Field Services personnel are determined in accordance with Prevailing Wage law. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel. ploration expenses (drilling, trenching, etc.) are charged at cost plus fifteen perce Travel and subsistence expenses (transportation, room and board, etc. for individuals on projects requiring travel and/or living miles away from the project site are charged at cost plus fifteen percent.
Automobile and truck expenses are charged at cost plus fifteen percent (rentals) or at the current IRS milage rate per mile for company-owned vehicles traveling between principal office and project.
4. Other out-of-pocket direct project expenses (aerial photos, long-distance telephone calls, permits, bonds, outside printing services, tests, etc.) are charged at cost plus fifteen percent.
Invoices will be submitted to the Client on a monthly basis, and a final bill will be submitted upon completion of services.
2. Payment is due upon presentation of invoice and is past-due thirty days from invoice date. In the event Client fails to make any payment to Converse when due, Converse may immediately cease work hereunder until said payment, together with a service charge at the rate of eighteen percent per annum (but not exceeding the maximum allowed by law) from the due date, has been received.
Further, Converse may at its sole option and discretion refuse to perform any further work irrespective of payment from Client in the event Client fails to pay Converse for services when said payments are due.
3. Client shall pay attorneys' fees or other costs incurred in collecting any delinquent amount.
General Conditions
The terms and provisions of the Converse General Conditions are incorporated into this fee schedule as though set forth in full. If a copy of the General Conditions does not accompany this fee schedule, Client should request a copy from this office.
Converse Consultants
On-Call Construction Management, Materials Testing, and Inspection Services Cannon xiv VAN
G ARDC
ON-CALL CONSTRUCTION MANAGMENT, MATERIALS TESTING, and INSPECTIONSERVICES Agency: Advanced Avant-Garde Corporation
Labor Compliance Services
Year 1 Year 2 Year 3 Year 4
Program Director $150 $150 $158 $158
Program Manager $135 $135 $142 $142
Sr. Program Coordinator $125 $125 $131 $131
Program Coordinator $110 $110 $115 $115
Program Assistant $100 $100 $105 $105
On-Call Construction Management, Materials Testing, and Inspection Services Cannon XV ACORD® DATE (MM/DDYYYY)
CERTIFICATE OF LIABILITY INSURANCE
CERTIFATE DOES NOT AFFRMATIVELY OR MEGATVELY AMEND, EXTEND OR ALTER NE COVERAGE AFFORDED BE HOLDER THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERS), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
MPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed F SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement or this certificate does not confer rights to the certificate holder in lieu of such endorsements).
NAME: Venbrook Insurance Services
Venbrook Insurance Services PHONE 818-598-8900 [FAC. No): 818-598-8910 6320 Canoga Avenue, 12th Floor (A/C. No. Ext):
Woodland Hills, CA 91367 ADDRESS:
INSURERS) AFFORDING COVERAGE NAIC *
www.venbrook.com CA Lic No. 0D80832 INSURER A: Continental Insurance Company A XV 35289 INSURED INSURER B: Hartford Casualty Insurance Company A+ XV 29424 Cannon Corporation INSURER C: Beazley Insurance Company, Inc. A XV 37540 1050 Southwood Drive
San Luis Obispo CA 93401 INSURER D:
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: 87778587
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TADDL SUBR
TYPE OF INSURANCE POLICY NUMBER LIMITS
LLTR
COMMERCIAL GENERAL LIABILITY 7039996776 9/1/2025 9/1/2026 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED™
CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ 100,000
Contractual Liability MED EXP (Any one person) $ 15,000 PERSONAL & ADV IN.URY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY V PROT LOC PRODUCTS - COMPIOP AGG 32,00,000
OTHER:
7040001609 9/1/2025 9/1/2026 COMBINED SINGLE LIMIT $1,000,000 A AUTOMOBILE LIABILITY (Ea accident)
ANY AUTO BODILY INJURY (Per person) $
OWNED SCHEDULED BODILY INJURY (Per accident) s
AUTOS ONLY AUTOS
NON-OWNED
AUTOS ONLY AUTOS ONLY
UMBRELLA LIAB 7040002176 9/1/2025 9/1/2026 LEACH OCCURRENCE $9,000,000 OCCUR
EXCESS LIAB CLAIMS-MADE AGGREGATE $9,000,000
DED / RETENTION $10,000 $
WORKERS COMPENSATION 72 WE OL6H1H 9/1/2025 9/1/2026
AND EMPLOYERS' LIABILITY Y/N
ANYPROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? IN/A
E.L. DISEASE -EA EMPLOYEE $ $1.000.000
scribe ur
SCRIPTION OF OPERATIONS be 5.00,0 or a s 00 gregate
Professional/Pollution Liability C27737250701 9/1/2025 9/1/2026 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) E: City of Huntington Beach - On-Call - CM & | Services - Cannon #2412
SEE ATTATCHED ADDENDUN
CERTIFICATE HOLDER CANCELLATION
HOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFOF City of Huntington Beach THE PIRATION DATE THEREC NOTICE WILL BE DELIVERED IN 2000 Main Street ACCORDANCE WITH THE POLICY PROVISIONS.
Huntington Beach CA 92648
AUTHORIZED REPRESENTATIVE
then moth
Karen Smith
© 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD 87778587 | 25-26 GL/AL/WC/UM/PL | Exc1: OT2 OT3 OTA | Isabella Saldivax | 10/27/2025 4:29:26 PM (PDT) | Page 1 of 13 AGENCY CUSTOMER ID:
LOC #:
ACORDI ADDITIONAL REMARKS SCHEDULE Page of
AGENCY NAMED INSURED
Venbrook Insurance Services Cannon Corporation
1050 Southwood Drive
POLICY NUMBER San Luis Obispo CA 93401
CARRIER NAIC CODE
EFFECTIVE DATE:
ADDITIONAL REMARKS
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM.
FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance (03/16) HOLDER: City of Huntington Beach
ADDRESS: 2000 Main Street Huntington Beach CA 9264
RE: City of Huntington Beach - On-Call - CM & I Services - Cannon # 241240 The cited as aditional need un an one de of albilly and fugee nablunteers and the additional
follows form. *10 Days Notice of Cancellation for Non-Payment of Premium, 30 Days All ACORD 101(2008/01) © 2008 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD ADDENDUM 87778587 | 25-26 GL/AL/WC/UM/PL | Exc1:012 0T3 OT4 | Isabella Saldivar | 10/27/2025 4:29:26 PM (PDT) | Page 2 of 13
CNA CNA PARAMOUNT
Architects, Engineers and Surveyors General Liability
Extension Endorsement
1. ADDITIONAL INSUREDS
. WHO IS AN INSURED is amended to include as an Insured any person or organization described in paragraph (1) is currently in effect or becomes effective during the term of this Coverage Part; and (2) was executed prior to:
(a) the bodily injury or property damage; or
(b) the offense that caused the personal and advertising injury, for which such additional insured seeks coverage.
b. However, subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with:
(1) a higher limit of insurance than required by such contract or agreement; or (2) coverage broader than required by such contract or agreement, and in no event broader than that described by the applicable paragraph A. through I. below.
Any coverage granted by this endorsement shall apply only to the extent permissible by law.
A. Controlling Interest
Any person or organization with a controlling interest in a Named Insured, but only with respect to such person o organization's liability for bodily injury, property damage or personal and advertising injury arising out of
1. such person or organization's financial control of a Named Insured; or
2. premises such person or organization owns, maintains or controls while a Named Insured leases or occupies such premises;
provided that the coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured.
B. Co-owner of Insured Premises
A co-owner of a premises co-owned by a Named Insured and covered under this insurance but only with respect to such co-owner's liability for bodily injury, property damage or personal and advertising injury as co-owner of such premises.
C. Engineers, Architects or Surveyors Engaged By You
An architect, engineer or surveyor engaged by the Named Insured, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused in whole or in part by the Named Insured's acts or omissions, or the acts or omissions of those acting on the Named Insured's behalf:
a. in connection with the Named Insured's premises; or
b. in the performance of the Named Insured's ongoing operations.
But the coverage hereby granted to such additional insureds does not apply to bodily injury, property damage or personal and advertising injury arising out of the rendering of or failure to render any professional services by, on behalf of, or for the Named Insured, including but not limited to:
CNA74858XX (1-15) Policy No: 7039996776
CONTINENTAL CASUALTY COMPANY Effective Date: 09/01/2024 Insured Name: CANNON CORPORATION
Copyright CNA All Rights Reserved. Includes copyrighted materlal of Insurance Services Office, Inc., with Its permisslon. 87778587 | 25-26 GL/AL/WC/UM/PL | Excl: OT2 OT3 OT4 | Isabella Saldivar | 10/27/2025 4:29:26 PM (PDT) | Page 3 of 13
CNA CNA PARAMOUNT
Architects, Engineers and Surveyors General Liability
Extension Endorsement
the preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or
2. supervisory, inspection, architectural or engineering activities.
D. Lessor of Equipment
E. Lessor of Land
Any person or organization from whom a Named Insured leases land but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of the ownership, maintenance or use of such land, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured.
F. Lessor of Premises
An owner or lessor of premises leased to the Named Insured, or such owner or lessor's real estate manager, but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of the ownership, maintenance or use of such part of the premises leased to the Named Insured, and provided that the occurrence giving rise to such bodily injury or property damage, or the offense giving rise to such personal and advertising injury, takes place prior to the termination of such lease. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured.
G. Mortgagee, Assignee or Receiver
A mortgagee, assignee or receiver of premises but only with respect to such mortgagee, assignee or receiver's liability for bodily injury, property damage or personal and advertising injury arising out of the Named Insured's ownership, maintenance, or use of a premises by a Named Insured. 30020007670390967762948 The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured.
H. State or Governmental Agency or Subdivision or Political Subdivisions - Permits A state or governmental agency or subdivision or political subdivision that has issued a permit or authorization but only with respect to such state or governmental agency or subdivision or political subdivision's liability for bodily injury, property damage or personal and advertising injury arising out of:
1. the following hazards in connection with premises a Named Insured owns, rents, or controls and to which this insurance applies:
a. the existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoistaway openings, sidewalk vaults, street banners, or decorations and similar exposures; or b. the construction, erection, or removal of elevators; or c. the ownership, maintenance or use of any elevators covered by this insurance; or CNA74858XX (1-15) Policy No: 7039996776
CONTINENTAL CASUALTY COMPANY Effective Date: 09/01/2024 Insured Name: CANNON CORPORATION
Copyright CNA All Flights Reserved. Includes copyrighted materlal of Insurance Services Oilice, Inc., with its permission. 87778587 | 25-26 GL/AL/WC/UM/PL | Excl: OT2 OT3 OT4 | Isabella Saldivar | 10/27/2025 1:29:26 PM (PDT) | Page 4 of 13
CNA PARAMOUNT
CNA
Architects, Engineers and Surveyors General Liability
Extension Endorsement
2. the permitted or authorized operations performed by a Named Insured or on a Named Insured's behalf.
The coverage granted by this paragraph does not apply to:
a. Bodily injury, property damage or personal and advertising injury arising out of operations performed for the state or governmental agency or subdivision or political subdivision; or b. Bodily injury or property damage included within the products-completed operations hazard.
With respect to this provision's requirement that additional insured status must be requested under a written contract or agreement, the Insurer will treat as a written contract any governmental permit that requires the Named Insured to add the governmental entity as an additional insured.
I. Trade Show Event Lessor
1. With respect to a Named Insured's participation in a trade show event as an exhibitor, presenter or displayer, any person or organization whom the Named Insured is required to include as an additional insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury caused by:
a. the Named Insured's acts or omissions; or
b. the acts or omissions of those acting on the Named Insured's behalf, in the performance of the Named Insured's ongoing operations at the trade show event premises during the trade show event.
2. The coverage granted by this paragraph does not apply to bodily injury or property damage included within the products-completed operations hazard
2. ADDITIONAL INSURED - PRIMARY AND NON-CONTRIBUTORY TO ADDITIONAL INSURED'S INSURANCE The Other Insurance Condition in the COMMERCIAL GENERAL LIABILITY CONDITIONS Section is amended to add the following paragraph:
If the Named Insured has agreed in writing in a contract or agreement that this insurance is primary and non- contributory relative to an additional insured's own insurance, then this insurance is primary, and the Insurer will not seek contribution from that other insurance. For the purpose of this Provision 2., the additional insured's owr insurance means insurance on which the additional insured is a named insured. Otherwise, and notwithstanding anything to the contrary elsewhere in this Condition, the insurance provided to such person or organization is excess of any other insurance available to such person or organization.
3. ADDITIONAL INSURED - EXTENDED COVERAGE
When an additional insured is added by this or any other endorsement attached to this Coverage Part, WHO IS AN INSURED is amended to make the following natural persons Insureds.
If the additional insured is:
a. An individual, then his or her spouse is an insured; b. A partnership or joint venture, then its partners, members and their spouses are Insureds; c. A limited liability company, then its members and managers are Insureds; or d. An organization other than a partnership, joint venture or limited liability company, then its executive officers, directors and shareholders are Insureds;
CNA74858XX (1-15) Policy No: 7039996776
CONTINENTAL CASUALTY COMPANY Effective Date: 09/01/2024 Insured Name: CANNON CORPORATION
Copyright CNA All Rights Reserved. Includes copyrighted materlal of Insurance Servicas Office, Inc., with Its permission. 87778587 | 25-26 GL/AL/WC/UM/PL | Exc]:072 OT3 0T4 | Isabella Saldivar | 10/27/2025 4:29:26 PM (PDT) | Page 5 of 13
CNA CNA PARAMOUNT
Architects, Engineers and Surveyors General Liability
Extension Endorsement
but only with respect to locations and operations covered by the additional insured endorsement's provisions, and only with respect to their respective roles within their organizations.
Please see the ESTATES, LEGAL REPRESENTATIVES, AND SPOUSES provision of this endorsement for additional coverage and restrictions applicable to spouses of natural person insureds.
4. BOATS
Under COVERAGES, Coverage A - Bodily Injury And Property Damage Liability, the paragraph entitled Exclusions is amended to add the following additional exception to the exclusion entitled Aircraft, Auto or This exclusion does not apply to:
Any watercraft owned by the Named Insured that is less than 30 feet long while being used in the course of the Named Insured's inspection or surveying work.
5. BODILY INJURY - EXPANDED DEFINITION
Under DEFINITIONS, the definition of bodily injury is deleted and replaced by the following:
Bodily injury means physical injury, sickness or disease sustained by a person, including death, humiliation, shock. mental anguish or mental injury sustained by that person at any time which results as a consequence of the physical injury, sickness or disease.
6. BROAD KNOWLEDGE OF OCCURRENCE/ NOTICE OF OCCURRENCE
Under CONDITIONS, the condition entitled Duties in The Event of Occurrence, Offense, Claim or Suit is amended to add the following provisions:
A. BROAD KNOWLEDGE OF OCCURRENCE
The Named Insured must give the Insurer or the Insurer's authorized representative notice of an occurrence offense or claim only when the occurrence, offense or claim is known to a natural person Named Insured, to a partner, executive officer, manager or member of a Named Insured, or to an employee designated by any of the above to give such notice.
B. NOTICE OF OCCURRENCE
30020007670399967762948 The Named Insured's rights under this Coverage Part will not be prejudiced if the Named Insured fails to give the Insurer notice of an occurrence, offense or claim and that failure is solely due to the Named Insured's reasonable belief that the bodily injury or property damage is not covered under this Coverage Part. However, the Named Insured shall give written notice of such occurrence, offense or claim to the Insurer as soon as the Named Insured is aware that this insurance may apply to such occurrence, offense or claim.
7. BROAD NAMED INSURED
WHO IS AN INSURED is amended to delete its Paragraph 3. in its entirety and replace it with the following:
3. Pursuant to the limitations described in Paragraph 4. below, any organization in which a Named Insured has management control:
a. on the effective date of this Coverage Part; or
b. by reason of a Named Insured creating or acquiring the organization during the policy period, qualifies as a Named Insured, provided that there is no other similar liability insurance, whether primary, contributory, excess, contingent or otherwise, which provides coverage to such organization, or which would have CNA74858XX (1-15) Policy No: 7039996776
CONTINENTAL CASUALTY COMPANY Effective Date: 09/01/2024 Insured Name: CANNON CORPORATION
Copyright CNA All Rights Reserved. Includes copyrighted material of insurance Services Office, inc., with its permission. 87778587 | 25-26 GL/AL/WC/UM/PL | Excl: 0T2 OT3 OT4 | Isabella Saldivar | 10/27/2025 4:29:26 PM (PDT) | Page 6 of 13 Cannon Corporation
Business Auto Policy
CNA Endorsement
EXTENDED COVERAGE ENDORSEMENT - BA PLUS
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
I. LIABILTY COVERAGE
A. Who Is An Insured
The following is added to SECTION II, Paragraph A. 1., Who Is An Insured:
1. a. Any incorporated entity of which the Named Insured owns a majority of the voting stock on the date of inception of this Coverage Form; provided that, b. The insurance afforded by this provision A. 1. does not apply to any such entity that is an insured under any other liability "policy" providing auto coverage.
2. Any organization you newly acquire or form, other than a limited liability company, partnership or joint venture, and over which you maintain majority ownership interest.
The insurance afforded by this provision A.2.:
a. Is effective on the acquisition or formation date, and is afforded only until the end of the policy period of this Coverage Form, or the next anniversary of its inception date, whichever is earlier. b. Does not apply to:
(1) Bodily injury or property damage caused by an accident that occurred before you acquired or formed the organization; or
(2) Any such organization that is an insured under any other liability "policy" providing auto coverage.
3. Any person or organization that you are obligated to provide Insurance where required by a written contract or agreement is an insured, but only with respect to legal responsibility for acts or omissions of a person for whom Liability Coverage is afforded under this policy.
4. An employee of yours is an insured while operating an auto hired or rented under a contract or agreement in that employee's name, with your permission, while performing duties related to the conduct of your business.
"Policy", as used in this provision A. Who Is An Insured, includes those policies that were in force on the inception date of this Coverage Form but:
1. Which are no longer in force; or
2. Whose limits have been exhausted.
B. Bail Bonds and Loss of Earnings
SECTION II, Paragraphs A.2.a.(2) and A.2.a.(4) are revised as follows:
1. In a.(2), the limit for the cost of bail bonds is increased from $2,000 to $5,000, and
2. In a. (4), the limit for the loss of earnings is increased from $250 to $500 a day.
C. Fellow Employee
Form No: SCA 23 500 D 10 11 Policy No: 704000160
Endorsement Effective Date: 09/01/2025 olicy Effective Date: 09/01/202 Endorsement No: Policy Page: 1 of 5
Underwriting Company: Continental Insurance Company A XV ® Copyright CNA All Rights Reserved. Includes copyrighted material of the 87778587 | GL/AL/WC/UM/PL GL/AL/W/UM/PL | Exel: 0T2 0T3 OT4 | Isoland@ Séreices-OA6894hd.:28sed Wit bettission. 13 Cannon Corporation
Business Auto Policy
CNA Endorsement
SECTION II, Paragraph B.5 does not apply.
Such coverage as is afforded by this provision C. is excess over any other collectible insurance.
II. PHYSICAL DAMAGE COVERAGE
A. Towing
SECTION III. Paragraph A.2., is revised to include Light Trucks up to 10,000 pounds G.V.W.
B. Glass Breakage - Hitting A Bird Or Animal - Falling Objects Or Missiles The following is added to SECTION III, Paragraph A.3.:
With respect to any covered auto, any deductible shown in the Declarations will not apply to glass breakage if such glass is repaired, in a manner acceptable to us, rather than replaced.
C. Transportation Expenses
SECTION III, Paragraph A.4.a. is revised, with respect to transportation expense incurred by you, to provide:
a. $60 per day, in lieu of $20; subject to
b. $1,800 maximum, in lieu of $600.
D. Loss of Use Expenses
SECTION III, Paragraph A.4.b. is revised, with respect to loss of use expenses incurred by you, to provide:
a. $1,000 maximum, in lieu of $600.
E. Personal Property
The following is added to SECTION III, Paragraph A.4.
c. We will pay up to $500 for loss to Personal Property which is:
(1) Owned by an insured; and
(2) In or on the covered auto.
This coverage applies only in the event of a total theft of your covered auto.
This insurance is excess over any other collectible insurance and no deductible applies.
F. Rental Reimbursement
The following is added to SECTION III, Paragraph A.4.:
d. We will pay for rental reimbursement expenses incurred by you for the rental of an auto because of loss to a covered auto. Payment applies in addition to the otherwise applicable amount of each coverage you have on a covered auto. No deductibles apply to this coverage.
1. We will pay only for those expenses incurred during the policy period beginning 24 hours after the loss and ending, regardless of the policy's expiration, with the lesser of the following number of days:
(a) The number of days reasonably required to repair or replace the covered auto; or, (b) 15 days.
2. Our payment is limited to the lesser of the following amounts:
(a) Necessary and actual expenses incurred; or,
(b) $25 per day subject to a maximum of $375.
Form No: SCA 23 500 D 10 11 Policy No: 704000160
Endorsement Effective Date: 09/01/2025
Endorsement No:
Underwriting Company: Continental Insurance Company A XV * Copyright CNA All Rights Reserved. Includes copyrighted material of the Cannon Corporation
Business Auto Policy
CNA Endorsement
3. This coverage does not apply while there are spare or reserve autos available to you for your operations.
4. If loss results from the total theft of a covered auto of the private passenger type, we will pay under this coverage only that amount of your rental reimbursement expenses which is not already provided for under the Physical Damage Coverage Extension.
G. Hired "Autos"
The following is added to SECTION III. Paragraph A.:
5. Hired Autos
If Physical Damage coverage is provided under this policy, and such coverage does not extend to Hired Autos, then Physical Damage coverage is extended to:
a. Any covered auto you lease, hire, rent or borrow without a driver; and b. Any covered auto hired or rented by your employee without a driver, under a contract in that individual employee's name, with your permission, while performing duties related to the conduct of your business.
c. The most we will pay for any one accident or loss is the actual cash value, cost of repair, cost of replacement or $75,000 whichever is less minus a $500 deductible for each covered auto. No deductible applies to loss caused by fire or lightning. d. The physical damage coverage as is provided by this provision will be limited to the types of physical damage coverage(s) provided on your owned autos. e. Such physical damage coverage for hired autos will:
(1) Include loss of use, provided it is the consequence of an accident for which the Named Insured is legally liable, and as a result of which a monetary loss is sustained by the leasing or rental concern.
(2) Such coverage as is provided by this provision G.e.(1) will be subject to a limit of $750 per accident.
H. Airbag Coverage
The following is added to SECTION III, Paragraph B.3.
The accidental discharge of an airbag shall not be considered mechanical breakdown.
1. Electronic Equipment
SECTION III, Paragraphs B.4.c and B.4.d. are deleted and replaced by the following:
c. Physical Damage Coverage on a covered auto also applies to loss to any permanently installed electronic equipment including its antennas and other accessories d. A $100 per occurrence deductible applies to the coverage provided by this provision.
J. Diminution In Value
The following is added to SECTION III, Paragraph B.6.
Subject to the following, the diminution in value exclusion does not apply to:
a. Any covered auto of the private passenger type you lease, hire, rent or borrow, without a driver for a period of 30 days or less, while performing duties related to the conduct of your business; and Form No: SCA 23 500 D 10 11 Policy No: 7040001609
Endorsement Effective Date: 09/01/2025
Policy Eage: ve Date: 09/01/2025
Endorsement No:
Underwriting Company: Continental Insurance Company A XV © Copyright CNA All Rights Reserved. Includes copyrighted material of the 87778587 | 25-26 GL/AL/WC/UM/PL | Exc1:012 013 014 Ifserangerices/#16204nd:285ed its beitfission. 13 Cannon Corporation
Business Auto Policy
CNA Endorsement
b. Any covered auto of the private passenger type hired or rented by your employee without a driver for a period of 30 days or less, under a contract in that individual employee's name, with your permission, while performing duties related to the conduct of your business. c. Such coverage as is provided by this provision is limited to a diminution in value loss arising directly out of accidental damage and not as a result of the failure to make repairs; faulty or incomplete maintenance or repairs; or the installation of substandard parts. d. The most we will pay for loss to a covered auto in any one accident is the lesser of:
(1) $5,000; or
(2) 20% of the auto's actual cash value (ACV)
III. Drive Other Car Coverage - Executive Officers
The following is added to SECTIONS II and Ill:
1. Any auto you don't own, hire or borrow is a covered auto for Liability Coverage while being used by, and for Physical Damage Coverage while in the care, custody or control of, any of your "executive officers", except:
a. An auto owned by that "executive officer" or a member of that person's household; or b. An auto used by that "executive officer" while working in a business of selling, servicing, repairing or parking autos.
Such Liability and/or Physical Damage Coverage as is afforded by this provision will be:
(1) Equal to the greatest of those coverages afforded any covered auto; and (2) Excess over any other collectible insurance.
2. For purposes of this provision, "executive officer" means a person holding any of the officer positions created by your charter, constitution, by-laws or any other similar governing document, and, while a resident of the same household, includes that person's spouse.
Such "executive officers" are insureds while using a covered auto described in this provision.
IV. BUSINESS AUTO CONDITIONS
A. Duties In The Event Of Accident, Claim, Suit Or Loss The following is added to SECTION IV, Paragraph A.2.a.
(4) Your employees may know of an accident or loss. This will not mean that you have such knowledge, unless such accident or loss is known to you or if you are not an individual, to any of your executive officers or partners or your insurance manager.
The following is added to SECTION IV, Paragraph A.2.b.
(6) Your employees may know of documents received concerning a claim or suit. This will not mean that you have such knowledge, unless receipt of such documents is known to you or if you are not an individual, to any of your executive officers or partners or your insurance manager.
B. Concealment, Misrepresentation or Fraud
The following is added to SECTION IV, Paragraph B.2.
Your failure to disclose all hazards existing on the date of inception of this Coverage Form shall not prejudice you with respect to the coverage afforded provided such failure or omission is not intentional.
C. Policy Period, Coverage Territory
SECTION IV, Paragraphs 7.(5).(a). is revised to provide:
Form No: SCA 23 500 D 10 11 Policy No: 7040001605
Endorsement Effective Date:09/01/2025
Endorsement No:
Underwriting Company: Continental Insurance Company A XV ® Copyright CNA All Rights Reserved. Includes copyrighted material of the Cannon Corporation
Business Auto Policy
CNA Endorsement
a. 45 days of coverage in lieu of 30 days
V. DEFINITIONS
SECTION V. Paragraph C. is deleted and replaced by the following:
Bodily injury means bodily injury, sickness or disease sustained by a person, including mental anguish, mental injury or death resulting from any of these
Form No: SCA 23 500 D 10 11 Policy No: 7040001609
Endorsement Effective Date: 09/01/2025 Policy Effective Date: 09/01/2025 Endorsement No: Policy Page: 5 of 5
Underwriting Company: Continental Insurance Company A XV ® Copyright CNA All Rights Reserved. Includes copyrighted material of the Beazley | A&E Professional Liability/Media Tech | Policy | Page 10 The insurance company will not agree to any settlement without the consent of the insured. If the insured refuses to consent to any settlement recommended by the insurance company and acceptable to the claimant, the insurance company's liability for loss will not exceed:
i. the amount for which the claim could have been settled, less the remaining Deductible, plus the defense costs incurred up to the time of such refusal, and ii. fifty percent (50%) of any defense costs incurred after the date such settlement or compromise was recommended to the insured with the remaining fifty percent (50%) of such defense costs to be borne by the insured at their own risk and uninsured; or the applicable Limit of Liability, whichever is less. The portion of any proposed settlement or compromise that requires the insured to cease, limit or refrain from actual or alleged infringing or otherwise injurious activity or is attributable to future royalties or other amounts that are not loss shall not be considered in determining the amount for which a claim could have been settled.
Assistance and Cooperation
If any claim or circumstance is reported by the insured under this Policy, the insured will give all information and assistance to the insurance company as it may need to investigate such matters.
The insured will cooperate with the insurance company in responding to such claim or circumstance. The insured agrees not to take any action which in any way increases the insurance company's exposure under this Policy.
Upon the insurance company's request, the insured shall assist in making settlements, in the conduct of suits and in enforcing any right of contribution or indemnity against any person or organization, and the insured shall attend hearings and trials and assist in securing and giving evidence and obtaining the attendance of witnesses.
The insured shall not admit liability, make any payment, assume any obligations, incur any expense, enter into any settlement, stipulate to any judgment or award or dispose of any claim without the written consent of the insurance company.
Except where expressly provided for in this Policy, any costs to provide such information or assistance to the insurance company will be at the insured's own cost.
Other Insurance
This Insurance shall apply in excess of:
(a) any other valid and collectible insurance available to any insured, including, but not limited to, any project specific professional liability insurance, contractors pollution liability insurance or media, technology or cyber liability insurance; and
(b) any self-insured retention or deductible portion thereof, unless such other insurance is written only as specific excess insurance over the Limit of Liability of this Policy.
Subrogation and Recoveries
If any payment is made under this Policy, the insured will transfer its rights of recovery against any third party to the insurance company. The insured will do whatever is reasonably necessary to secure and preserve such rights after a claim is first made against them or the date they become aware of a circumstance giving rise to a claim. The insurance company agrees to waive its right of recovery against any client of the named insured for a claim which is covered under the Architects and Engineers Professional Liability and Pollution Liability Coverages to the extent the named insured had, prior to such claim, a written agreement to waive such rights.
A-F00009
092022 ed
87778587 | 25-26 GL/AL/WC/UM/PL | Excl: OT2 OT3 OT4 | Isabella Saldivar | 10/27/2025 4:29:26 PM (PDT) | Page 12 of 13 Beazley | A&E Professional Liability/Media Tech | Policy | Page 11 Any amounts recovered will be applied in the following order:
(a) to reimburse costs incurred by or on behalf of the insurance company in bringing proceedings against such other party;
(b) then to the insured for the amount of any loss which exceeds the Limit of Liability; (c) then to the insurance company up to the amount of the loss paid by the insurance company and the Limit of Liability will be reinstated for such amounts; and (d) then to the insured to reimburse the Deductible.
Reimbursement of Uncovered Amounts
To the extent that the insurance company pays any loss or other sums that are not covered under this Policy, the insurance company is entitled to reimbursement from the named insured and any insured (or other party) on whose behalf such loss or sums are paid.
Action against the Insurance Company
No action will lie against the insurance company unless and until the insured has fully complied with all the terms of this Policy.
No person or organization will have the right under this Policy to join the insurance company as a party to an action against the insured to determine the insured's liability or implead the insurance company in any such action.
General Conditions
Innocent Insured
Whenever coverage under this Insurance would be excluded, suspended or lost because of the Criminal, Dishonest, Intentional, Fraudulent and Malicious Acts and Omissions Exclusion relating to any act, error or omission by any insured, and with respect to which any other insured did not personally participate or personally acquiesce or remain passive after having personal knowledge thereof, then the insurance company agrees that such insurance as would otherwise be afforded under this Policy shall cover and be paid with respect to those insureds who did not personally commit or personally participate in committing or personally acquiesce in or remain passive after having personal knowledge of one or more of the acts, errors or omissions described in the Criminal, Dishonest, Intentional, Fraudulent and Malicious Acts and Omissions Exclusion.
This provision is inapplicable to any claim or circumstance against the named insured arising from acts, errors or omissions known to any present or former principal, partner, director or officer of the named insured.
With respect to this provision, the insurance company obligation to pay in such event shall only be in excess of the full extent of any recoverable assets of any insured to whom the Criminal, Dishonest, Intentional, Fraudulent and Malicious Acts and Omissions Exclusion applies and shall be subject to the terms, conditions and limitations of this Policy.
Mergers and Acquisitions
(a) If during the policy period, the named insured acquires another entity for whom more than fifty percent (50%) of the outstanding securities representing the present right to vote for the election of such entity's directors are owned by the named insured, then no insured shall have coverage under this Policy for any claim that arises out of any act, error or omission, A-F00009
092022 ed
87778587 | 25-26 GL/AL/WC/UM/PL | Exc1:0T2 OT3 OT4 | Isabella Saldivar | 10/27/2025 4:29:26 PM (PDT) | Page 13 of 13