3/2 SC #21 - Edison Park Proposed Improvements PPT

City Council/Public Financing Authority
March 3, 2026

Document
3/2 SC #21 - Edison Park Proposed Improvements PPT
Meeting
March 3, 2026
Body
City Council/Public Financing Authority
Original file
6.0 MB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

Edison Community
Park Reconfiguration:

Conceptual Plan
March 3, 2026

Table of Contents
• Project Background
• Existing Site
• Major Existing Park Elements & Conditions
• Landfill Limits
• Oil Well Locations
• Tree Study
• Noise Impact Study (Pickleball)
• Proposed Improvement Plan
• Proposed Park Elements
• Potential Phasing of Proposed Plan
• Potential Phasing Costs of Proposed Plan
• Next Steps

Project
Background
• May – June 2021
• Background research and data collection begin. RJM collects from the City previous planning materials, performs a site inventory and analysis studies. A project website was developed to allow feedback and project reporting to the community.
• July 12-16, 2021
• Online Survey #1 conducted. (160 participants)
• August 9-23, 2021
• Online Survey #2 conducted. (295 participants)
• August 18, 2021
• In-person Community Workshop #1 held at Edison Community Center. (10 participants)
• September 15, 2021
• Community Design Charette Workshop #2 held at Edison Community Center. (45 participants)
• September 2 – October 11, 2021
• Online Feedback Survey conducted. (90 participants)
Condensed Timeline

• November 16, 2021
• City Council Approved Conceptual Plan – Option C and authorized staff to start further design studies.
• March 1, 2022
• City Council withdrew previous approval and directed staff to conduct further community outreach.
• August 4, 2022
• In-person Community Workshop #3 held at Edison Community Center. (145 participants)
• August 5 – September 29, 2022
• Online Survey #3 conducted. (450 participants)
• August 30, 2022
• FAQs from the Community Workshop released online.
• November 9, 2022
• Staff presented a project update to the Community & Library Services Commission, summarizing all outreach efforts.

Condensed Timeline
• February 2023
• City and Design Team work with Edison Park Community Group (EPCG) to review park planning elements.
• April 2023
• Staff directs Design Team to further assess the viability of the proposed recreational amenities in regards to the landfill and the related cost implications.

Additional studies include noise impact study and oil well location verification. • March 12, 2025
• Community & Library Services Commission approves the conceptual design • December 2025
• EPCG requests consideration of pickleball courts behind the fire station • Michael Baker International (MBI) conducts second pickleball noise study • February 2026
• MBI finalizes the California Environmental Quality Act (CEQA) 15183 Environmental Compliance Checklist
Condensed Timeline
Existing
Conditions
Section Title

Effects of Settlement

Oil Wells – Geophysical Survey

Tree Study
Tree Study
• 2022 Arborist Report Surveyed 234 Existing Trees
• Report recommends 67 Trees be Removed due to
Hazardous Health plus 15 Trees based on declining health • Report indicated 152 Healthy Trees

MELALEUCA TREES AT SOFTBALL OUTFIELD FENCING MELALEUCA TREES AT FIRE STATION

MELALEUCA TREES AT FIRE STATION

SYCAMORE TREES AT COMMUNITY CENTER PLAZA TREES AT PARKING LOT DROP OFF

EUCALYPTUS TREES AT BASKETBALL
COURTS
Tree Study
Future planning will
include consideration of
larger more mature
trees.

Noise Impact
Studies
(Pickleball)
Two Noise Studies Conducted
• Evaluated noise levels for sixteen (16)
pickleball courts
• Results did NOT exceed the City’s Noise
Standards
• April 2023: Commission Approved Plan:
• RK Engineering Group (Certified Acoustical
Engineers)
• Receptors at Breton Lane, Stillwell Dr.,
Edison High School and Regatta Drive,
• December 2025: Option 2
• Michael Baker International
• Receptors at Breton Lane,
Stillwell Dr., Edison High
School and
Magnolia/Hamilton
CEQA 15183
Environmental
Compliance
Checklist
• Completed by Michael Baker International
• Review determined the project is statutorily exempt from the provision of the CEQA pursuant to Section 15183 of the CEQA Guidelines and would not result in a peculiar or significant impact not identified as significant under the General Plan Update EIR.
• The project is consistent with the General Plan and Council adopted a Final Program Environmental Impact Report (FEIR) for the General Plan on October 2, 2017.
• All feasible and applicable mitigation measures adopted for the General Plan Update EIR would be implemented.

CEQA 15183 Checklist
Proposed
Improvement
Plan
Commission Approved Plan

Option 2 Proposed Plan

Potential
Phasing of
Proposed Plan
Commission Approved Phased Plan

Option 2 Proposed Phased Plan

Potential
Phasing Costs
of Proposed
Plan
Commission Approved Plan
Potential Phasing Costs
• Phase A Cost: ~$ 5,820,170
• Demo of Condemned Tennis Court, Play Area, Skate Spot, Pickleball Courts
• Conversion of 2 Existing Tennis Court to 8 Pickleball Courts • New All-Inclusive Playground, Enlarged All-Wheel Plaza, Shade Shelter, Refurbished Exterior Park Restrooms, & Additional Parking • Phase B Cost: ~$ 7,003,131
• Demo of Handball Courts/Walls, Basketball Courts, & Existing Parking • Installation of 2 New Tennis Courts, Overlayed Courts (8 Pickleball Courts/2 Tennis Courts), 6 Full Basketball Courts, & Additional Parking • Phase C Cost: ~$ 917,860
• Demo of Existing Walkways
• Installation of 3 New Soccer Fields & Park Walkways
• Proposed Park with No Phasing Cost: ~$13,741,161
* Preliminary Cost Estimate based on Preliminary Plans

Option 2 Plan
Potential Phasing Costs
• Phase A Cost: ~$ 6,019,341
• Demo of Condemned Tennis Court, Play Area, Skate Spot, and Pickleball Courts
• Conversion of 2 Existing Tennis Courts into Overlayed Courts (8 Pickleball Courts/2 Tennis Courts)
• New All-Inclusive Playground, Enlarged All-Wheel Plaza, Refurbished Exterior Park Restrooms, 8 Pickleball Courts
• Phase B Cost: ~$ 7,113,548
• Demo of Handball Courts/Walls, Basketball Courts, & Existing Parking • Installation of 2 New Tennis Courts, 4 Bocce Courts, Hitting Wall, 6 Full Basketball Courts, Shade Structure (Bocce Courts) & Additional Parking • Phase C Cost: ~$ 917,860
• Demo of Existing Walkways
• Installation of 3 New Soccer Fields & Park Walkways
• Proposed Park with No Phasing Cost: ~$14,050,569
* Preliminary Cost Estimate based on Preliminary Plans

Project
Development
Timeline
• $4,352,000 currently available in FY 2024/25 Capital Improvement Budget through combination of Park Development, Quimby and AES sources
• Phasing the project will allow rotating portions of the park to remain open during construction.
• Ensures “like-for-like” amenities are reintroduced to the community upon phase completion.
• Proposed phasing does increase the project cost and extends the timeline Project Development/Timeline
Recommended Action
Approve on of the two conceptual design option for the Edison Park reconfiguration plan and authorize staff to move forward with initiating either a phased or complete development of the design and bid package for construction of the updated facility.

Questions?