Cities Index.
Att #1 2025 Housing Element Annual Report

City Council/Public Financing Authority
March 3, 2026

Document
Att #1 2025 Housing Element Annual Report
Meeting
March 3, 2026
Body
City Council/Public Financing Authority
Original file
3.0 MB
Text extracted from the city's file for reading and search. Open the original on huntingtonbeach.legistar1.com. That file is the official record.

Jurisidiction Name
Reporting Calendar Year
First Name
Last Name
Title Click here to download APR Instructions
Email
Phone
Street Address
City
Zipcode
v_01_30_26
Click here to add rows to a table. If you add too many
rows, you may select a cell in the row you wish to
remove and type ctrl + d.
2000 Main St
Huntington Beach
92648
Carolyn
Camarena
Associate Planner
[email protected]
7145365271
Mailing Address
Please Start Here
General Information
2025
Huntington Beach
Contact Information
Optional: Click here to import last year's data. This is best used when the workbook is new and empty. You
will be prompted to pick an old workbook to import
from. Project and program data will be copied exactly
how it was entered in last year's form and must be
updated. If a project is no longer has any reportable
activity, you may delete the project by selecting a cell in the row and typing ctrl + d.

Annual Progress Report January 2020
Optional: This runs a macro which checks to ensure all required fields are filled out. The macro will create two files saved in the same directory this APR file is saved in. One file will be a copy of the APR with highlighted cells which require information. The other file will be list of the problematic cells, along with a description of the nature of the error.

Optional: Save before running. This copies data on Table A2, and creates another workbook with the table split across 4 tabs, each of which can fit onto a single page for easier printing.

Running this macro will remove the comments on the column headers, which contain the instructions. Do not save the APR file after running in order to preserve comments once it is Optional: This macro identifies dates entered that occurred outside of the reporting year.

RHNA credit is only given for building permits issued during the reporting year.

Link to the online system:https://hcd.my.site.com/hcdconnect Toggles formatting that turns cells green/yellow/red based on data validation rules.

Submittal Instructions
Please save your file as Jurisdictionname2025 (no spaces). Example: the City of San Luis Obispo would save their file as SanLuisObispo2025 Housing Element Annual Progress Reports (APRs) forms and tables must be submitted to HCD and the Governor's Office of Planning and Research (OPR) on or before April 1 of each year for the prior calendar year; submit separate reports directly to both HCD and OPR pursuant to Government Code section 65400. There are two options for submitting APRs:

1. Online Annual Progress Reporting System - Please see the link to the online system to the left. This allows you to upload the completed APR form into directly into HCD’s database limiting the risk of errors. If you would like to use the online system, email [email protected] and HCD will send you the login information for your jurisdiction. Please note: Using the online system only provides the information to HCD. The APR must still be submitted to OPR. Their email address is [email protected].

2. Email - If you prefer to submit via email, you can complete the excel Annual Progress Report forms and submit to HCD at [email protected] and to OPR at [email protected]. Please send the Excel workbook, not a scanned or PDF copy of the tables.

Jurisdiction Huntington Beach
Reporting Year 2025
Housing Element Planning Period6th Cycle
Current Year
Deed
Restricted 0
Non-Deed
Restricted 0
Deed
Restricted 0
Non-Deed
Restricted 13
Deed
Restricted 0
Non-Deed
Restricted 9
Deed
Restricted 0
Non-Deed
Restricted 37
Deed
Restricted 0
Non-Deed
Restricted 26
59 144
Units by Structure Type Entitled Permitted Completed
Single-family Attached 0 0 0
Single-family Detached 0 16 0
2 to 4 units per structure 0 4 0
5+ units per structure 0 37 0
Accessory Dwelling Unit 0 87 0
Mobile/Manufactured Home 0 0 0
Total 0 144 0
Infill Housing Developments and Infill Units Permitted# of ProjectsUnits 108 144
0 0
6 19
3 0
0 0
Income Rental Ownership Total
Acutely Low 0 0 0
Extremely Low 0 0 0
Very Low 0 0 0
Low 0 0 0
Moderate 0 0 0
Above Moderate 0 0 0
Total 0 0 0
Streamlining Provisions Used - Permitted Units# of Projects Units SB 9 (2021) - Duplex in SF Zone 0 0
SB 9 (2021) - Residential Lot Split 0 0
AB 2011 (2022) 0 0
SB 6 (2022) 0 0
SB 423 (2023) 0 0
Ministerial and Discretionary Applications # of Units
Ministerial 0 0
Discretionary 6 19
Density Bonus Applications and Units Permitted
Number of Applications Submitted Requesting a Density Bonus 0 Number of Units in Applications Submitted Requesting a Density Bonus0 Number of Projects Permitted with a Density Bonus 4
Number of Units in Projects Permitted with a Density Bonus 37 Housing Element Programs Implemented and Sites RezonedCount 17 0
Programs Implemented
Sites Rezoned to Accommodate the RHNA
(Jan. 1 - Dec. 31)
10/15/2021 - 10/15/2029
Units Constructed - SB 423 Streamlining Permits
Number of SB 423 Streamlining Applications Approved
Very Low
Low
Moderate
Acutely Low
Extremely Low
Total Housing Applications Submitted:

Number of Proposed Units in All Applications Received:

Total Housing Units Approved:

Total Housing Units Disapproved:

Total Units
Housing Applications Summary
Use of SB 423 Streamlining Provisions - Applications
Number of SB 423 Streamlining Applications
Above Moderate
Indicated as Infill
Not Indicated as Infill
Building Permits Issued by Affordability Summary
Income Level
Jurisdiction
Huntington
Beach ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning
Period 6th Cycle 10/15/2021 - 10/15/2029
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Historic Sites Application
Status Project Type Notes
2 3 4 6 7 8 9 10 12 13 14
Prior APN+ Current APN Street AddressProject Name+
Local
Jurisdiction
Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
(see
instructions)
Acutely Low-
Income Deed
Restricted
Acutely Low-
Income Non
Deed
Restricted
Extremely
Low-Income
Deed
Restricted
Extremely
Low-Income
Non Deed
Restricted
Very Low-
Income
Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low-
Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income
Non Deed
Restricted
Above
Moderate-
Income
Total

PROPOSED
Units by
Project
Total

APPROVED
Units by
project
Total

DISAPPROVE
D Units by
Project
Please select
state
streamlining
provision/s the
application was
submitted
pursuant to.

Is this project
located on a
site with an
associated
historical
designation as
outlined in
Government
Code Section
65400(a)(2)(N)
and reported on
Table L?
Did the
housing
development
application
seek
incentives or
concessions
pursuant to
Government
Code section
65915?
Were
incentives or
concessions
requested
pursuant to
Government
Code section
65915
approved?
Please
indicate the
status of the
application.

Is the project
considered a
ministerial
project or
discretionary
project?
Notes+
Summary Row: Start Data Entry Below 0 0 0 0 0 0 0 0 0 0 19 19 3 0 178-654-07 16961 Coral Cay Ln CDP-2025-006 SFD O 3/27/2025 1 1 1 NONE No No No ApprovedDiscretionary 024-165-13 220 Walnut Ave
CDP-2025-012, CUP-
2025-018, DRB-
2025-008, TTM-
2025-003
5+ O
5/30/2025 11
11 NONE No No No Pending Discretionary
024-165-12 212 3rd St
CDP-2025-013, DRB-
2025-009, AP-2025-
004
SFA O
5/30/2025 4
4 NONE No No No Pending Discretionary
178-653-26 16821 Coral Cay Ln CDP-2025-014 SFD O 6/4/2025 1 1 1 NONE No No No ApprovedDiscretionary 178-062-13 16482 Barnstable Cir
CDP-2025-015, CUP-
2025-020
SFD O
6/19/2025 1
1 1 NONE No No No ApprovedDiscretionary
178-654-14 16902 Coral Cay Ln
CDP-2025-018, CUP-
2025-030
SFD O
11/19/2025 1
1 NONE No No No Pending Discretionary
0 0
0 Table A
Cells in grey contain auto-calculation formulas
51 Project Identifier Unit Types Density Bonus Law
Applications
11 Housing Development Applications Submitted
Proposed Units - Affordability by Household Incomes
Jurisdiction
Huntington
Beach ANNUAL ELEMENT PROGRESS REPORT
Reporting
Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning
Period 6th Cycle 10/15/2021 - 10/15/2029
Table A2
Streamlining Historic Sites Infill
Housing without
Financial Assistance or
Deed Restrictions
Term of
Affordability or
Deed Restriction
Notes
2 3 5 6 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Prior APN+ Current APN Street
Address Project Name+
Local
Jurisdiction
Tracking ID
Unit
Category
(SFA,SFD,2
to
4,5+,ADU,MH
)
Tenure
R=Renter
O=Owner
Acutely Low-
Income
Deed
Restricted
Acutely Low-
Income Non
Deed
Restricted
Extremely
Low- Income
Deed
Restricted
Extremely
Low- Income
Non Deed
Restricted
Very Low-
Income
Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low-
Income
Deed
Restricted
Low-
Income
Non Deed
Restricted
Moderate-
Income
Deed
Restricted
Moderate-
Income Non
Deed
Restricted
Above
Moderate-
Income
Entitlement
Date
Approved
# of Units
issued
Entitlements
Acutely
Low-
Income
Deed
Restricted
Acutely
Low-
Income
Non Deed
Restricted
Extremely
Low-
Income
Deed
Restricted
Extremely
Low-
Income
Non Deed
Restricted
Very Low-
Income
Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low-
Income
Deed
Restricted
Low-
Income
Non Deed
Restricted
Moderate-
Income
Deed
Restricted
Moderate-
Income Non
Deed
Restricted
Above
Moderate-
Income
Building
Permits Date
Issued
# of Units Issued
Building Permits
Acutely
Low-
Income
Deed
Restricted
Acutely
Low-
Income Non
Deed
Restricted
Extremely
Low-
Income
Deed
Restricted
Extremely
Low-
Income Non
Deed
Restricted
Very Low-
Income
Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low-
Income
Deed
Restricted
Low-
Income
Non Deed
Restricted
Moderate-
Income
Deed
Restricted
Moderate-
Income Non
Deed
Restricted
Above
Moderate-
Income
Certificates of
Occupancy or
other forms of
readiness
(see instructions)
Date Issued
# of Units
issued
Certificates
of
Occupancy
or other
forms of
readiness
Please select
the state
streamlining
provision the
project was

APPROVED
pursuant to.
(may select
multiple)
Is this project
located on a site
with an
associated
historical
designation as
outlined in
Government
Code Section
65400(a)(2)(N)
and reported on
Table L?
Infill Units?
Y/N+
Assistance
Programs for Each
Development
(may select
multiple - see
instructions)
Deed Restriction
Type
(may select
multiple - see
instructions)
For units affordable
without financial
assistance or deed
restrictions, explain how
the locality determined the
units were affordable
(see instructions)
Term of Affordability
or Deed Restriction
(years) (if affordable
in perpetuity enter
1000)+
Number of
Demolished/Destro
yed Units
Demolished
or Destroyed
Units
Demolished/
Destroyed
Units
Owner or
Renter
Total Density Bonus
Applied to the Project
(Percentage Increase in
Total Allowable Units or
Total Maximum Allowable
Residential Gross Floor
Area)
Number of Other
Incentives,
Concessions,
Waivers, or Other
Modifications Given
to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the
incentives,
concessions,
waivers, and
modifications
(Excluding
Parking Waivers
or Parking
Modifications)
Did the project
receive a reduction
or waiver of parking
standards? (Y/N)
Notes+
Summary Row : Start Data Entry Below 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0 9 0 37 0 26 59 144 0 0 0 0 0 0 0 0 0 0 0 0 0 025-102-18 1119 Delaware St
Huntington
Beach CA 92648 C2024-007382
ADU R
0 1
2/13/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
165-051-02 6700 Warner Ave
Building 6 Unit I,
Huntington
Beach CA 92647 C2024-007853
ADU R
0 1
12/17/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
165-051-02 6700 Warner Blg
16 Unit I C2024-007857 ADU R 0 1 12/17/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
165-051-02 6700 Warner Blg 22 Unit I C2024-007858 ADU R 0 1 12/17/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
165-051-02 6700 Warner
Bldg 33 Unit I C2024-007860 ADU R 0 1 12/17/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
151-342-42 8016 Mermaid
Cir Huntington
Beach CA 92646 C2024-008658
ADU R
0 1
4/15/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
023-063-30 1726 Main St, Huntington Beach, CA 92648C2023-000958 ADU R 0 1 1/7/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-162-26 202 18th St
Huntington
Beach CA 92648 C2024-005975
ADU R
0 1
2/5/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
025-162-14 1102 England St, #201, Huntington Beach, CA 92648C2024-003257 ADU R 0 1 2/20/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
024-091-27 612 11th St Unit
201, Huntington
Beach CA 92648 C2024-006773
ADU R
0 1
1/14/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
151-582-23 20315 Allport Ln
Huntington
Beach CA 92646 C2024-008493
ADU R
0 1
3/20/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
023-167-03 125 16th St, #20, Huntington Beach, CA 92648C2024-007045 ADU R 0 1 2/3/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-162-27 204 18th St
Huntington
Beach CA 92648 C2024-005979
ADU R
0 1
2/5/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
938-400-08 7899 Palin Cir
Huntington
Beach CA 92648 C2024-008583
ADU R
0 1
4/21/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
146-131-12 16323 Nassau Ln
Huntington
Beach CA 92649 C2024-005786
ADU R
0 1
2/19/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
163-292-46 4811 Los Patos Ave, Huntington Beach, CA 92649C2022-004149 ADU R 0 1 12/8/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
114-491-04 9261 Christine Dr, Huntington Beach, CA 92646C2024-007307 ADU R 0 1 5/28/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
142-265-18
15285 Rushmoor
Ln Huntington
Beach CA 92647 C2024-005724
ADU R
0 1
4/4/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
110-022-16 17122 Sandra
Lee Ln
Huntington C2024-008010
ADU R
0 1
3/11/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
142-151-02 7601 Danube Dr
Huntington
Beach CA 92647 C2024-007218
ADU R
0 1
2/27/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
145-201-10 6276 Alexandria
Dr Huntington
Beach CA 92647 C2024-007220
ADU R
0 1
1/7/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
178-062-15 16466
Barnstable Cir C2024-008826 ADU R 0 1 4/25/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
153-133-06 19296 Hickory Ln, Huntington Beach, CA 92646C2024-002980 ADU R 0 1 5/15/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
178-533-11
16811 14th St,
Unit 3 C2024-003658 ADU R 0 1 1/31/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
178-533-11
16811 14th St,
Unit 4 C2024-003658 ADU R 0 1 1/31/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
149-303-19 9635 Gisler Dr
Huntington
Beach CA 92646 C2024-007502
ADU R
0 1
8/5/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
153-085-05 19327 Newhaven
Ln Huntington
Beach CA 92646 C2025-000193
ADU R
0 1
10/2/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
146-265-03 16176 Fairway Ln
Huntington
Beach CA 92649 C2024-006782
ADU R
0 1
1/14/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
155-092-08 19932 Ranger Ln
Huntington
Beach CA 92646 C2024-006175
ADU R
0 1
1/24/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
107-472-25 16615 Lucia Ln, Huntington Beach, CA 92647C2023-002021 ADU R 0 1 5/23/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
107-472-24 16595 Lucia Ln, Huntington Beach, CA 92647C2023-002053 ADU R 0 1 5/23/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
178-222-14 4981 Pearce Dr C
Huntington
Beach CA 92649 C2024-008083
ADU R
0 1
4/17/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
151-222-08 9271
Winterwood Cir
Huntington
Beach CA 92646 C2024-008791
ADU R
0 1
6/2/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
167-343-28 17076 Rotterdam
Ln Huntington
Beach CA 92647 C2025-000715
ADU R
0 1
6/20/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
153-293-15 19911
Gloucester Ln
Huntington C2024-008953
ADU R
0 1
7/23/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
157-325-01 8329 Rolf Cir, Huntington Beach, CA 92646C2024-002499 ADU R 0 1 5/23/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
145-121-45 15592 Dawson Ln
Huntington
Beach CA 92647 C2024-008411
ADU R
0 1
4/10/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
151-392-16 9593 Rocky
Mountain Dr
Huntington
Beach CA 92646 C2024-004602
ADU R
0 1
1/9/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
159-182-02 5920 Kenbrook Dr, Huntington Beach, CA 92648C2024-002857 ADU R 0 1 12/16/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
110-210-39 6885 Steeplechase Cir, Huntington Beach, CA 92648C2024-005137 ADU R 0 1 6/30/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
151-552-06 8816 Charford Dr
Huntington
Beach CA 92646 C2024-007335
ADU R
0 1
5/5/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
023-143-19 605 16th St
Huntington
Beach CA 92648 C2024-007102
ADU R
0 1
6/5/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
024-024-13 307 14th St, #201 C2024-006989 ADU R 0 1 3/6/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
025-182-15 732 Owen Dr Unit
103, Huntington
Beach CA 92648 C2024-007780
ADU R
0 1
2/3/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
155-142-05 10096 Cynthia Dr, Huntington Beach, CA 92646C2024-006693 ADU R 0 1 2/20/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
025-102-18 1121 Delaware St C2024-007382 ADU R 0 1 2/13/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
148-044-10 8450 Doncaster
Dr Huntington
Beach CA 92646 C2024-008874
ADU R
0 1
8/8/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
195-185-17 14441 Spa Dr
Huntington
Beach CA 92647 C2024-004919
ADU R
0 1
4/1/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
114-502-12 22006 Catalina C2024-008582 ADU R 0 1 10/9/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
153-302-01 19846
Chesapeake C2025-000442 ADU R 0 1 5/12/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-133-01 228 21st St C2024-005379 ADU R 0 1 8/21/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
145-342-01 15506 Mayflower Ln, Huntington Beach, CA 92647C2024-004918 ADU R 0 1 7/10/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-167-03 125 16th St, #19, Huntington Beach, CA 92648C2024-007164 ADU R 0 1 2/3/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-093-10 825 13th St, Huntington Beach, CA 92648C2024-002245 ADU R 0 1 12/29/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
024-105-09 406 11th St Unit
206 C2024-005925 ADU R 0 1 1/7/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
165-381-42 17952 Orkney Cir,
Huntington
Beach CA 92647 C2024-004917
ADU R
0 1
7/10/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
107-472-24 16587 Lucia Ln, Huntington Beach, CA 92647C2023-002053 ADU R 0 1 5/23/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
025-023-17 2221 Alabama
Unit 4 C2024-007844 ADU R 0 1 4/16/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
107-472-25 16607 Lucia Ln, Huntington Beach, CA 92647C2023-002021 ADU R 0 1 5/23/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
149-192-33 21655 Seaside C2024-008410 ADU R 0 1 4/24/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
167-442-07 17345 Newland St, Huntington Beach, CA 92647C2024-006254 ADU R 0 1 4/1/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
178-545-05 17094 5th St C2024-008392 ADU R 0 1 8/28/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
107-702-20 8296 Lancaster
Dr C2024-004092 ADU R 0 1 2/7/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
153-454-30 8575 Mossford Dr C2024-004253 ADU R 0 1 4/22/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
024-261-13 112 Huntington
Unit 101 C2025-000476 ADU R 0 1 12/15/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
145-202-38 15065 Rice Cir, Huntington Beach, CA 92647C2024-004410 ADU R 0 1 10/30/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-082-14 1203 Pine St, Huntington Beach, CA 92648C2024-002418 ADU R 0 1 9/25/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
024-061-09 936 11th St, Unit
101, Huntington
Beach, CA 92648 C2024-004388
ADU R
0 1
5/15/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
165-113-01 6356 Freeborn
Dr. C2024-008640 ADU R 0 1 4/17/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
151-342-01 8055 Driftwood
Dr C2024-007053 ADU R 0 1 4/25/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
157-325-01 8325 Rolf Cir, Huntington Beach, CA 92646C2024-002499 ADU R 0 1 5/23/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
025-182-15 732 Owens Dr C2024-007779 ADU R 0 1 2/3/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
145-121-45 15594 Dawson C2024-008411 ADU R 0 1 4/10/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
165-361-16 7759 Sycamore Dr, Huntington Beach, CA 92647C2024-005744 ADU R 0 1 5/2/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
142-212-06 7586 Washington
Dr C2024-005931 ADU R 0 1 12/4/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
025-052-01 1123 Huntington
St C2024-005210 ADU R 0 1 10/2/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
178-523-01
16635 Pacific
Coast Highway
Unit 203 C2024-006942
ADU R
0 1
12/9/2025
1 0 NONE No Y Based on SCAG HCD certified
ADU analysis for Orange County
024-122-06 117 9th St C2024-005926 ADU R 0 1 1/30/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
151-271-29 9975 Kings
Canyon Dr C2024-003369 ADU R 0 1 10/9/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
145-186-04 6536 Halifax Dr C2024-005351 ADU R 0 1 3/11/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
165-281-04 7792 Cypress C2024-008725 ADU R 0 1 4/7/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
107-482-10 16595 Ross Ln C2025-000619 ADU R 0 1 5/27/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
165-281-04 7796 Cypress C2024-008726 ADU R 0 1 4/7/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
151-483-05 9846 Vicksburg Dr, Huntington Beach, CA 92646C2022-008482 ADU R 0 1 1/6/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-093-17 803 13th St C2024-005504 ADU R 0 1 6/10/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
157-352-16
18315 Thomas
Cir C2024-006597 ADU R 0 1 4/25/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
142-212-04 7566 Washington
Dr C2025-000424 ADU R 0 1 5/14/2025 1 0 NONE No Y Based on SCAG HCD certified ADU analysis for Orange County
023-167-04
1620 Pacific
Coast Hwy,
Huntington C2021-002774
2 to 4 O
0 4
1/31/2025
4 0 NONE No Y
165-281-04
7784 Cypress Dr C2024-008229
SFD O
0 1
4/7/2025
1 0 NONE No Y
Duplex unit with 2
single family
dwellings approved
under two separate
permits: C2024-
008229 and C2024-
165-281-04
7788 Cypress Dr C2024-008724
SFD O
0 1
4/7/2025
1 0 NONE No Y
Duplex unit with 2
single family
dwellings approved
under two separate
permits: C2024-
008229 and C2024-
142-072-06
7224 Ellington Dr C2024-008864
5+ O
0 6
1/21/2025
6 0 NONE No Y DB 10.0%
1 Development
Standards
Modification
Yes
The following records
are associated to the
same project C2024-
008864,C2024-
008865, C2025-
000468, C2025-
000688. Each
building was issued its
own building permit.

The project as a
whole was subject to
142-072-06
7224 Alchemy Cir C2024-008865
5+ O
0 12
1/22/2025
12 0 NONE No Y DB 10.0%
1 Development
Standards
Modification
Yes
The following records
are associated to the
same project C2024-
008864,C2024-
008865, C2025-
000468, C2025-
000688. Each
building was issued its
own building permit.

The project as a
whole was subject to
142-072-06
7248 Ellington Dr C2025-000468
5+ O
0 7
2/14/2025
7 0 NONE No Y DB 10.0%
1 Development
Standards
Modification
Yes
The following records
are associated to the
same project C2024-
008864,C2024-
008865, C2025-
000468, C2025-
000688. Each
building was issued its
own building permit.

The project as a
whole was subject to
142-072-06
7247 Aura Cir C2025-000688
5+ O
0 12
2/26/2025
12 0 NONE No Y DB 10.0%
1 Development
Standards
Modification
Yes
The following records
are associated to the
same project C2024-
008864,C2024-
008865, C2025-
000468, C2025-
000688. Each
building was issued its
own building permit.

The project as a
whole was subject to
024-024-13 307 14th St C2024-006989 SFD O 0 1 3/6/2025 1 0 NONE No Y 023-201-14 6852 Silver Beach
Cir C2024-008123 SFD O 0 1 4/16/2025 1 0 NONE No Y
178-533-11
16811 14th St,
Unit 2 C2024-003658 SFD O 0 1 1/31/2025 1 0 NONE No Y
024-093-16 602 9th St, Huntington Beach, CA 92648C2022-008965 SFD O 0 1 11/17/2025 1 0 NONE No Y 023-124-04 410 20th St C2024-007776 SFD O 0 1 8/7/2025 1 0 NONE No Y 024-017-09 513 12th St C2024-008669 SFD O 0 1 5/14/2025 1 0 NONE No Y 024-017-09 515 12th St C2024-008670 SFD O 0 1 5/14/2025 1 0 NONE No Y 024-094-16 601 7th St C2024-008856 SFD O 0 1 11/4/2025 1 0 NONE No Y Density Bonus
1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building Permits Affordability by Household Incomes - Certificates of Occupancy 4 7 10
Note: "+" indicates an optional field
Housing with Financial Assistance
and/or Deed Restrictions Demolished/Destroyed UnitsProject Identifier Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Jurisdiction
Huntington
Beach ANNUAL ELEMENT PROGRESS REPORT
Reporting
Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning
Period 6th Cycle 10/15/2021 - 10/15/2029
Note: "+" indicates an optional field
024-094-16 603 7th St C2024-008858 SFD O 0 1 10/7/2025 1 0 NONE No Y 023-082-14 1201 Pine St, Huntington Beach, CA 92648C2024-002418 SFD O 0 1 9/25/2025 1 0 NONE No Y 178-412-06 16542 Mariana Cir, Huntington Beach, CA 92649C2024-003232 SFD O 0 1 5/14/2025 1 0 NONE No Y 178-533-11
16811 14th St,
Unit 1 C2024-003658 SFD O 0 1 1/31/2025 1 0 NONE No Y
023-074-22 1842 Pine St C2024-008859 SFD O 0 1 6/26/2025 1 0 NONE No Y 024-024-13 305 14th St, Huntington Beach, CA 92648C2024-006971 SFD O 0 1 1/31/2025 1 0 NONE No Y 025-200-39 712 Utica C2020-002141 2 to 4 O 0 3 3 0 NONE No Y 0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Jurisdiction Huntington Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2025 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 10/15/2021 - 10/15/2029
1 Projection
Period 3 4
RHNA Allocation
by Income Level
Projection
Period -
06/30/2021-
10/14/2021
2021 2022 2023 2024 2025 2026 2027 2028 2029
Total Units to
Date (all
years)
Total Remaining
RHNA by
Income Level
Deed Restricted - - - - - - - - - - Non-Deed Restricted - - - - - - - - - - Deed Restricted - - 95 - - - - - - - Non-Deed Restricted - - 15 13 17 13 - - - - Deed Restricted - - 9 - - - - - - - Non-Deed Restricted 9 - 8 8 12 9 - - - - Deed Restricted - - - 71 - - - - - - Non-Deed Restricted 9 11 39 36 50 37 - - - - Deed Restricted - - 138 62 42 21 - - - - Non-Deed Restricted 4 1 30 25 34 26 - - - - Above Moderate 5,215 11 6 85 399 59 59 - - - - 619 4,596 13,368
33 18 419 614 214 165 - - - - 1,463 11,905 Income Level
Very Low
153 -
This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.

Please contact HCD if your data is different than the material supplied here 2 Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
3,453
383 Moderate
3,661
2,184
2,308
253
208
Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Acutely Low - - *For years prior to 2025, data on deed-restricted vs. non-deed restricted Extremely Low-Income units is approximated from whether the projects reported any deed-restricted Very Low-Income Units. If you wish to edit this historical data for accuracy or have any questions about the data, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Total Units
*For jurisdictions that received RHNA determinations for the current cycle prior to the passage of AB 3093 (September 19, 2024):
- You were not allocated Acutely Low-Income and Extremely Low-Income RHNA targets, therefore the allocations in Field 1 are listed as "0" - If you wish to set your own targets in these income categories for informational purposes, contact HCD staff at [email protected]. - All Acutely Low-Income and Extremely Low-Income units reported during the cycle are counted towards Very-Low Income RHNA progress 1,925
Total RHNA
-
1,931 Low
*For years prior to 2025, Acutely Low-Income units are reported within the Extremely Low-Income category Please Note: Table B does not currently contain data from Table F or Table F2 for prior years. You may login to the APR system to see Table B that contains this data.

Extremely Low -
Jurisdiction Huntington Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2025 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Date of
Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of
Rezone
Very Low-
Income Low-Income Moderate-
Income
Above
Moderate-
Income
Rezone Type Parcel Size
(Acres)
General Plan
Designation Zoning
Minimum
Density
Allowed
Maximum
Density
Allowed
Realistic
Capacity Vacant/NonvacantDescription of
Existing Uses
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
83 Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
Jurisdiction Huntington Beach
Reporting Year 2025 (Jan. 1 - Dec. 31)
1 2 3 4 5 6 7 8 9
Name of Program Objective
Projected Completion
Date in Housing
Element
Applicable CycleStatus of Program
Implementation
Program
Implementation
Details
Quantified Outcomes:

Category
Quantified Outcomes:

Count Supporting Documents
Housing Rehab Loan
Program
Assist 20 lower income households
annually, or 160 over planning period
2013-2021
6th Cycle
Between FY 2015-16 and
2022-23, the City has
assisted 82 lower income
households through the
housing rehab loan and
owner-occupied SF, Condo,
and Mobile Home Grant
Program. In FY 23-24, the
City assisted 14 lower
income households in these
programs.

Continuous Households 20
FY 2024/25 Consolidated Annual
Performance & Evaluation Report (CAPER)
Link to CAPER:
https://huntingtonbeachca.gov/Documents/D
epartments/Community%20Development/Aff
ordable%20Housing/CDBG/CAPER/HB%20-
%20FY%202024-
25%20CAPER%20(Final).pdf?t=2025092317
12460
MFR Acquisition/Rehab
through Non-Profit
Developers
Acquire, rehabilitate, and establish
affordability covenants on 20 to 40 rental
units
2013-2021
6th Cycle
The City has assisted in the
acquisition/rehab and
establishment of affordability
covenants of 13 units within
two projects.

Continuous Units 13 None

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.

Table D
Program Implementation Status pursuant to GC Section 65583 Neighborhood Preservation Conduct improvement activities in CDBG target areas. Conduct public forums for
residents to discuss specific neighborhood
issues and provide information on
resources including rehabilitation
assistance
Conduct neighborhood
forums on a monthly basis.

Analyze CE complaint data
on a monthly basis
6th Cycle
The City has maintained two
full time code enforcement
officers in the CDBG target
areas throughout the
planning period. During the
2024 calendar year, 3,442
inspections were conducted
for 1,395 complaints
received. The City supports
the establishment of
residential community
groups within these
neighborhood areas, such
as the Oak View Task
Force, and facilitates
resident forums to discuss
specific neighborhood
issues and provide
information on various
resources for rehabilitation
assistance. Code
Enforcement also
endeavors to expand its
Neighborhood Preservation
activities within CDBG
areas. Code Enforcement
Officers attend a monthly
neighborhood cleanup event
in the Oak View community
to provide information and
establish connections with
community members. Code
Continuous Units 1,008
FY 2024/25 Consolidated Annual
Performance & Evaluation Report (CAPER)
Link to CAPER:
https://huntingtonbeachca.gov/Documents/D
epartments/Community%20Development/Aff
ordable%20Housing/CDBG/CAPER/HB%20-
%20FY%202024-
25%20CAPER%20(Final).pdf?t=2025092317
12460
Preservation of Assisted
Housing
Continue to monitor Section 8 contract
renewals in Huntington Villa Yorba and
Huntington Gardens. As necessary,
explore outside funding and preservation
options; offer preservation incentives to
owners; provide technical assistance and
education to affected
tenants.

Contact property owners at
least six months prior to
Section 8 contract renewals
6th Cycle
In December 2013, the
Huntington Beach City
Council conducted a public
hearing under the Tax and
Equity Fiscal Responsibility
Act (TEFRA) in support of a
tax exempt bond issuance
by the California Statewide
Communities Development
Authority (CSCDA) for the
acquisition of Huntington
Villa Yorba by Preservation
Partners Management
Group. A second TEFRA
hearing was held by the City
in August 2015 to approve
the issuance of $13 million in
bonds to allow the new
property owner to refinance
the property at a lower
interest rate and maintain its
affordability. Preservation
Partners has agreed to the
preservation of all 192 units -
10% at 50% area median
income (AMI), and 90% at
60% AMI.

Continuous Units 375 None
Rental Assistance - Section
8 Continue current levels of Section 8;
coordinate with OCHA; encourage
landlords to register units
2013-2021
6th Cycle
In 2024, approximately 640
Huntington Beach
households received tenant-
based Housing Choice
Vouchers administered
through OCHA.

Approximately 84 of these
were for Veterans Affairs
Supportive Housing
Vouchers, 25 were Family
Unification Vouchers, 116
were for the disabled, 379
were for seniors, and 60
were for formerly homeless
households. Based on HUD
regulations, 75 percent of
households admitted to the
program must have incomes
less than 30 percent of the
area median, making
Section 8 a key way in which
the City addresses the
needs of extremely low
income households.

Continuous Households 650
2025 Orange County Housing Authority,
"Programs Assisted by Cities Chart", June 2,
2025
Rental Assistance - TBRA Initiate local TBRA program, with goal to assist 168 households, with preference
given to veterans, seniors, and victims of
domestic violence.

Initiate local TBRA program
in FY 2015-16
6th Cycle
Since the inception of the
TBRA program, the City has
partnered with three TBRA
contractors including Interval
House, Mercy House and
Families Forward. The
program will continue to
target homeless, persons at
risk of homelessness,
veterans, seniors, and
victims of domestic violence
in Huntington Beach. The
program assisted 336
households between FY
15/16 and FY 21/22. In
November 2022, the City
Council approved to expand
the TBRA Program to
include seniors earning
below 50% of area median
income that own a mobile
home to pay for a portion of
their space rent. The mobile
home TBRA program was
implemented in April 2023
and provided space rent
assistance to 31 senior
households in FY 23/24. In
FY 23/24, the TBRA
program assisted a total of
54 households, including the
aforementioned 31 mobile
Continuous Households 62
FY 2024/25 Consolidated Annual
Performance & Evaluation Report (CAPER)
Link to CAPER:
https://huntingtonbeachca.gov/Documents/D
epartments/Community%20Development/Aff
ordable%20Housing/CDBG/CAPER/HB%20-
%20FY%202024-
25%20CAPER%20(Final).pdf?t=2025092317
12460
Mobile Home Park
Preservation
Implement MHP Conversion Ordinance.

Utilize Advisory Board to assist in resolving
issues. Provide tenants info on MPROP
funding. Assist tenants with subdivision
map waiver process
2013-2021
6th Cycle
The Mobile Home Advisory
Board continued to meet
quarterly through 2022 and
is made up of MHP owners,
residents and at-large
citizens. As of 2023, the
MHAB no longer exists. In
2014, the City adopted a
Senior Residential Mobile
Home Park Overlay and
designated 8 mobile home
parks in the City with the
objective to retain existing
affordable housing options
for seniors.

Completed Other None
Residential and Mixed Use
Inventory
Maintain current inventory of vacant and
underutilized development sites, and
provide to developers along with
information on incentives. Monitor sites to
ensure an adequate inventory is
maintained to accommodate
the RHNA, including rezoning as
necessary.
2013-2021; Review sites
annually throughout the
planning period
6th Cycle
In 2020, the City adopted an
amendment to the Housing
Element, which included a
review of the residential sites
inventory. Sites were
updated as necessary. The
Housing Element including
the sites inventory continues
to be made available on the
City's website and at the
zoning counter. The City
also tracks vacant sites
citywide through GIS. The
vacant sites inventory is
updated periodically.

Continuous Other None
Adequate Sites Program 1) Draft zoning text amendment to define Affordable Housing Overlay in BECSP; 2)
Conduct public hearings on BECSP
Amendment 3) Commence
comprehensive review and revision of the
BECSP.

Amend BECSP concurrently
with the Housing Element
Amendment by March 20206th Cycle
In Feb. 2020, the City
adopted an amendment to
the BECSP to implement
this program. Continuous Units 43 None
Development Fee
Assistance
Continue to offer fee reductions to
incentivize affordable housing. Specify the
waiver of 100% of application processing
fees in the Code for projects with 10% ELI
units.
2013-2021. Modify the Code
in 2020 for ELI units
6th Cycle
The City's inclusionary
ordinance has provisions
that allow for projects that
exceed inclusionary
requirements on-site to be
eligible for reduced City
fees. In 2013, the City
provided over one million
dollars in Development
Impact Fee exemptions for a
78- unit affordable rental
project (8 ELI, 32 VL, 37
Low).

Continuous Units 78 None
Residential Processing
Procedures
Provide non-discretionary development
review for sites in the Affordable Housing
Overlay within the Beach
and Edinger Corridors Specific Plan. Adopt
streamlined review procedures for multi-
family development on a Citywide basis
Initiate study of streamlined
procedures in 2015 and
adopt by 2021
6th Cycle
The City adopted an
Affordable Housing Overlay
in the BECSP which
provides for non-
discretionary project
approval for residential
projects with a minimum of
20% lower income units on-
site. In 2018, the City
commenced a multi-phased
comprehensive zoning code
update. The City has
completed three phases to
date and will evaluate
streamlined review
procedures for multi-family
development for inclusion in
future phases.

Continuous Other None
Zoning for Transitional and
Supportive Housing
Provide for transitional and supportive
housing within the CV zone. Prepare a
Policy Memo to clarify such uses are to be
accommodated within zone districts
similar to other residential uses within the
Beach and Edinger Corridors, Downtown
and Bella Terra specific
plans
Prepare Policy Memo in
2014 and modify the Code
by 2020. Incorporate
language into specific plans
in conjunction with future
plan amendments
6th Cycle
Residential is not a
permitted use within the CV
General Plan land use
designation. As such, the
code has not been
amended. While the City
has not amended the
specific plans to expressly
add supportive and
transitional housing uses,
the City treats these uses as
residential uses for zoning
purposes and would permit
them in the same way
residential uses are
permitted. As an example,
the City funded and acquired
a property in the BECSP to
be developed with affordable
housing with supportive
services. The property is
currently utilized as a
Navigation Center. The City
is in the preliminary stages
of planning for permanent
affordable housing and
supportive services on the
site. An RFQ was issued in
March 2022 and an
exclusive negotiating
agreement with Jamboree
Housing was approved by
Continuous Other None
Fair Housing Contract with Fair Housing provider; invite to speak at public events; assist in
distributing brochures in community
locations. Provide walk-in fair housing
counseling at City Hall on a monthly basis.

At least annually, invite fair
housing contractor to City
events and distribute
brochures in community
locations. Offer monthly walk-
in clinic.
6th Cycle
The Fair Housing
Foundation (FHF) assisted
approximately 320
unduplicated Huntington
Beach residents in FY 23/24
with issues regarding
tenant/landlord matters, and
handles over a dozen fair
housing cases each year on
behalf of residents. In
addition to the availability of
counselors by toll-free
telephone number and walk-
in assistance at one of their
two offices Monday-Friday,
FHF also provides on-site
walk-in counseling at
Huntington Beach City Hall
one time per month. FHF
also regularly schedules
certification and training
programs locally for
apartment owners and
managers.

Continuous Persons 333
FY 2024/25 Consolidated Annual
Performance & Evaluation Report (CAPER)
Link to CAPER:
https://huntingtonbeachca.gov/Documents/D
epartments/Community%20Development/Aff
ordable%20Housing/CDBG/CAPER/HB%20-
%20FY%202024-
25%20CAPER%20(Final).pdf?t=2025092317
12460
Housing Opportunities for
Persons
Living with Developmental
Disabilities
Work with OCRC to publicize information
on resources. Pursue State and Federal
funding; meet with current affordable
housing providers regarding
options to serve disabled population in
existing housing; contact supportive
housing providers re:expanding the supply
of housing for the developmentally disabled
Pursue funds for supportive
housing and services at
least twice during planning
period. Continue to meet
with current housing
providers and contact
supportive
housing providers as part of
Huntington Beach
Homeless Collaborative
monthly meetings
6th Cycle
The City regularly meets with
a variety of housing
providers and supports
various programs that
address shelter and
transitional housing needs of
homeless individuals and
families. The City has not
obtained funding specific to
this program, but will
continue to monitor funding
opportunities and pursue
funding if feasible/available.

Continuous Units None
Homeless Assistance Continue participation in Regional
Committee for the Continuum of Care.

Annually allocate funds to agencies serving
the homeless and at-risk
population.Maintain a City Homeless
Coordinator to serve as the
City's point person on homelessness
Attend periodic meetings of
County Regional
Committee. Annually
allocate CDBG funds.
6th Cycle
The City’s strategy is to
continue to support a
continuum of programs,
including
homeless support services,
emergency shelter,
transitional housing,
permanent
affordable housing, and
homeless prevention
services. Specific City
support into the
County’s annual COC
funding application to HUD
includes: 1) data compilation
on
homeless services and
facilities; 2) providing official
letters of support for the
funding
application; and 3)
participation in meetings of
the Orange County Cities
Advisory
Committee, responsible for
the regional COC Homeless
Strategy, and meetings of
the COC Board as
necessary. The City has
established a continuum of
services and
housing options that people
Continuous Persons 579
FY 2024/25 Consolidated Annual
Performance & Evaluation Report (CAPER)
Link to CAPER:
https://huntingtonbeachca.gov/Documents/D
epartments/Community%20Development/Aff
ordable%20Housing/CDBG/CAPER/HB%20-
%20FY%202024-
25%20CAPER%20(Final).pdf?t=2025092317
12460
Project Self Sufficiency Assist 90 households annually 2013-2021 6th Cycle
Effective March 1, 2018, the
Project Self Sufficiency
program began operating
independently as a nonprofit
program, separate from the
City of Huntington Beach.

Although the City still
provides some funding to
the program, it now assist
families in communities
throughout the County
including Huntington Beach.

Completed Persons None
Green Building and
Sustainability
Provide education/outreach to residents
and development community on new
Green Building Program. Implement
comprehensive “HB Goes Green Program”
to promote sustainable energy and water
conservation, recycling, open space and
transportation practices
2013-2021
6th Cycle
Many green/sustainable
programs have been
implemented and marketed
to the public citywide
including: a Sustainable
Business Certification
Program, Recycling Market
Development Zone,
streamlined permitting for
EV chargers, and expedited
solar plan review. The City
also provides information on
programs and incentives of
other agencies and
companies on its website. In
addition, in 2017, the City
adopted a qualified
Greenhouse Gas Reduction
Program that would allow for
streamlined CEQA review
for development projects.

Continuous Other None
Jurisdiction
Huntington
Beach ANNUAL ELEMENT PROGRESS REPORT
Reporting
Period 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning 6th Cycle 10/15/2021 - 10/15/2029
Description of
Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of
Commercial
Development Bonus
Commercial Development Bonus Date
Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020
Jurisdiction
Huntington
Beach ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 10/15/2021 - 10/15/2029
The description should adequately document
how each unit complies with subsection (c) of
Government Code Section 65583.1+.

For detailed reporting requirements, see the
chcklist here:

Extremely Low-
Income+
Very Low-
Income+ Low-Income+ TOTAL UNITS+
Extremely Low-
Income+
Very Low-
Income+ Low-Income+
TOTAL
UNITS+
https://www.hcd.ca.gov/community-
development/docs/adequate-sites-checklist.pdf
Rehabilitation Activity
Preservation of Units At-Risk
Acquisition of Units
Mobilehome Park Preservation
Total Units by Income
Table F
Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehabilitated, converted from non-affordable to affordable by acquisition, and preserved, including mobilehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or other structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new housing units and must be reported in Table A2 and not reported in Table F.

Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be counted, please contact HCD at [email protected] and we will unlock the form which enable you to populate these fields.

Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 2020
Jurisdiction
Huntington
Beach ANNUAL ELEMENT PROGRESS REPORT
Note: "+" indicates an
optional field
Reporting
Period 2025 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning
Period 6th Cycle 10/15/2021 - 10/15/2029
Notes
2 3 6
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit
Category
(2 to 4,5+)
Tenure
R=Renter
Very Low-
Income
Deed
Restricted
Very Low-
Income
Non Deed
Restricted
Low- Income Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed
Restricted
Above
Moderate-
Income
Total Moderate Income
Units Converted from
Above Moderate
Date
Converted Notes
Summary Row: Start Data Entry Below 0 0 0 0 21 0 0 21
157-471-33 18504 Beach Boulevard Middle Income Housingnone 5+ R 21 21 12/31/2025 Table F2 Above Moderate Income Units Converted to Moderate Income Pursuant to Government Code section 65400.2 For up to 25 percent of a jurisdiction’s moderate-income regional housing need allocation, the planning agency may include the number of units in an existing multifamily building that were converted to deed-restricted rental housing for moderate-income households by the imposition of affordability covenants and restrictions for the unit. Before adding information to this table, please ensure housing developments meet the requirements described in Government Code 65400.2(b). 5 Project Identifier Unit Types
1 4
Affordability by Household Incomes After Conversion Units credited toward Moderate Income RHNA
Jurisdiction
Huntington
Beach
Reporting
Period 2025
(Jan. 1 - Dec.
31)
Period 6th Cycle 10/15/2021 - 10/15/2029ANNUAL ELEMENT PROGRESS REPORTHousing Element Implementation 2 3 4
APN Street AddressProject Name+
Local
Jurisdiction
Tracking ID+
Realistic
Capacity
Identified in the
Housing
Element
Entity to whom the site
transferred Intended Use for Site
1 Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier
NOTE: This table must only be filled out if the housing element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting
Jurisdiction Huntington Beach Note: "+" indicates an optional field Reporting
Period 2025
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Designation Size Notes
1 2 3 4 5 6 7
APN Street Address/Intersection Existing Use Number of
Units
Surplus
Designation
Parcel Size (in
acres) Notes
NOTE: This table must contain an inventory of
ALL surplus/excess lands the reporting
jurisdiction owns
Summary Row: Start Data Entry Below
Parcel Identifier

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table H
Locally Owned Surplus Sites
Jurisdiction
Huntington
Beach ANNUAL ELEMENT PROGRESS REPORT
Reporting
Period 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning
Period 6th Cycle 10/15/2021 - 10/15/2029
Project Type Date
Units
(Beds/Student
Capacity) Granted
Notes
2 3 5 6
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Unit Category
(SH - Student
Housing)
Date
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed
Restricted
Above
Moderate-
Income
Total Additional
Beds Created Due
to Density Bonus
Notes
Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Table J
Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915 Project Identifier Units (Beds/Student Capacity) Approved 1 4
NOTE: STUDENT HOUSING WITH DENSITY BONUS
ONLY. This table only needs to be completed if there
were student housing projects WITH a density bonus
approved pursuant to Government Code65915(b)(1)(F)
Annual Progress Report January 2020
Jurisdiction Huntington Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2025 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
No
Table K
Tenant Preference Policy
Local governments are required to inform HCD about any local tenant preference ordinance the local government maintains when the jurisdiction submits their annual progress report on housing approvals and production, per Government Code 7061 (SB 649, 2022, Cortese). Effective January 1, 2023, local governments adopting a tenant preference are required to create a webpage on their internet website containing authorizing local ordinance and supporting materials, no more than 90 days after the ordinance becomes operational.

Does the Jurisdiction have a local tenant preference policy? If the jurisdiction has a local tenant preference policy, provide a link to the jurisdiction's webpage containing authorizing local ordinance and supporting materials.

Notes
Jurisdiction Huntington Beach Note: "+" indicates an optional field Reporting
Period 2025
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Size Notes
3 4
APN Street Address/Intersection Date of
Designation
Designation
Level
Historic Site
Period
Areas of
Significance
Parcel Size (in
acres) Notes
Summary Row:

NOTE: This table needs to be completed with any sites within your jurisdiction that were newly added to a National, State, or Local register of historic places within the reporting year. If none, leave blank.

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table L
Historical Resources
Parcel Identifier
1 Designation
2 Jurisdiction Huntington Beach
Reporting Year 2025 (Jan. 1 - Dec. 31)
Total Award Amount Total award amount is auto-populated based on amounts entered in rows 15-26.

Task $ Amount Awarded $ Cumulative Reimbursement Requested Other Funding Notes
Summary of entitlements, building permits, and certificates of occupancy (auto-populated from Table A2) Current Year
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
0 0
Current Year
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 13
Deed Restricted 0
Non-Deed Restricted 9
Deed Restricted 0
Non-Deed Restricted 37
Deed Restricted 0
Non-Deed Restricted 26
59 144
Current Year
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
0 0
Acutely Low
Extremely Low
Acutely Low
Extremely Low

ANNUAL ELEMENT PROGRESS REPORT
Local Early Action Planning (LEAP) Reporting
(CCR Title 25 §6202)
Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02 or 50515.03, as applicable. -$
Task Status
Total Units
Certificate of Occupancy Issued by Affordability Summary Income Level
Very Low
Low
Moderate
Above Moderate
Moderate
Above Moderate
Total Units
Completed Entitlement Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
Total Units
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low
Acutely Low
Extremely Low

← All documents from this meeting