City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 i Contents
1 Cross Connection Control Policy Overview ..................................................................... 1-1

1.1 Objective ............................................................................................................... 1-1

1.2 Applicability ........................................................................................................... 1-1

1.3 Policy Development Background and Legal Authorities .............................................. 1-1

1.4 California Safe Drinking Water Act ............................................................................ 1-1

1.5 Acronyms and Abbreviations ................................................................................... 1-3

1.6 Definitions and General Requirements ..................................................................... 1-4 2 Hazard Assessments and Required Protection ................................................................ 2-1

2.1 Hazard Assessments .............................................................................................. 2-1

2.2 Hazard Assessment Process ................................................................................... 2-2

2.2.1 Phase 1 - Connections with Backflow Protection ............................................... 2-2

2.2.2 Phase 2 - Commercial/Industrial Connections without Backflow Protection ........ 2-3

2.2.3 Phase 3 – Residential Connections without Backflow Protection ......................... 2-4 3 Operating Rules or Ordinances ....................................................................................... 3-1 4 Backflow Prevention ...................................................................................................... 4-1

4.1 Backflow Prevention Requirements ......................................................................... 4-1

4.2 Backflow Prevention Assemblies ............................................................................. 4-3

4.2.1 Standards for Types of Backflow Protection ....................................................... 4-3

4.2.2 Installation Criteria for Backflow Protection ....................................................... 4-4 5 Non-Testable Devices .................................................................................................... 5-1

5.1 Non-testable backflow preventer testing procedures ................................................ 5-1 6 Certified Backflow Prevention Assembly Testers and Certified Cross-Connection Control Specialists ........................................................................................................................... 6-1

6.1 Backflow Tester Certification ................................................................................... 6-1

6.1.1 Backflow Tester List ......................................................................................... 6-1

6.2 Cross-Connection Control Specialist Certification .................................................... 6-2 7 Backflow Incident Response, Reporting and Notification .................................................. 7-1

7.1 Backflow Incident Response Procedure ................................................................... 7-1

7.2 Backflow Incident Notification ................................................................................ 7-1 City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 ii 8 Cross-Connection Control Program Coordinator ............................................................. 8-1

8.1 Cross Connection Control Specialist Designee ......................................................... 8-2 9 Recordkeeping .............................................................................................................. 9-1

9.1 Records Retained ................................................................................................... 9-1

9.2 Recordkeeping Policy and Procedures ..................................................................... 9-2

9.2.1 Backflow Prevention Assembly Test Results ...................................................... 9-2

9.2.2 Phase 1 - Connections with Backflow Protection - Assessments ......................... 9-3

9.2.2 Phase 2– Commercial/Industrial Connections without Backflow Protection – Assessments ................................................................................................................ 9-3

9.2.3 Phase 3 – Residential Connections without Backflow Protection - Assessments .. 9-4 10 User Supervisors ......................................................................................................... 10-1 11 Backflow Prevention Assembly Testing and Reporting .................................................... 11-1

11.1 Backflow Testing Notification Process .................................................................... 11-1

11.2 Damaged, missing, or improperly installed backflow prevention assemblies ............ 11-2 12 Public Outreach and Education .................................................................................... 12-1 13 Local Entity Coordination ............................................................................................. 13-1 Tables
Table 5-1 Location of Non-Testable Backflow Prevention Devices ........................................ 5-1 Table 6-1 City Staff - Certified Backflow Testers ..................................................................... 6-2 Table 6-2 City Cross-Connection Control Specialists ............................................................. 6-3

Appendices
Appendix A What is a Cross Connection?
Appendix B Assembly Bill 1671 (2017, Chapter 533)
Assembly Bill 1180 (2019, Chapter 455)
Appendix C Municipal Code Resolution and Ordinance
Appendix D High Hazard Premises
Appendix E Assessment Database
Appendix F Self Report Letter (Commercial/Industrial Assessments) Appendix G Backflow Prevention Assembly Diagrams
Appendix H City Records Retention Policy
Appendix I Incident Response Form
Appendix J Water Quality Emergency Notification Plan
Appendix K City Standard Drawings and Specifications

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 1-1 1 Cross Connection Control Policy Overview

1.1 Objective
The primary objective of the Cross-Connection Control Management Plan (CCCMP) is to bring the City into compliance with the Cross Connection Control Policy Handbook ( CCCPH) developed by the State Water Resources Control Board (State Water Board) for the protection of public health through the establishment of standards intended to ensure a public water system’s (PWS) drinking water distribution system will not be subject to the backflow of liquids, gases, or other substances , see CCCMP Appendix A . In additi on, by providing basic educational information on backflow prevention, the City intends to build a foundation of awareness within the City regarding the importance of backflow protection and cross-connection control, leading to the implementation of a robust cross-connection control program.

Per Section 3.1.4 (b)(1) description the City will implement the requirements of the State CCCPH by implementing ordinances and procedures as detailed in this CCCMP.

1.2 Applicability
The State CCCPH and its standards apply to all California PWSs, as defined in California’s Health and Safety Code (CHSC, section 116275 (h)). Compliance with the State CCCPH is mandatory for all California PWSs. The City’s CCCMP has been developed in conformance to the State CCCPH and is applicable to all customers within the City’s service area.

1.3 Policy Development Background and Legal Authorities Through the adoption of the State CCCPH, the State Water Board exercised its authority, under California’s Safe Drinking Water Act (SDWA), to establish enforceable standards applicable to California’s PWSs. Failure to comply with the CCCMP which is in conformance with the State CCCPH may result in the issuance of compliance, enforcement, or other corrective actions against the City.

1.4 California Safe Drinking Water Act

On October 6, 2017, Assembly Bill 1671 (AB 1671) was approved and filed with the Secretary of State (see CCCMP Appendix B). AB 1671 amended California’s SDWA through the establishment of CHSC sections 116407 and 116555.5. AB 1671 also amended section 116810 of the CHSC, which is briefly discussed in CCCPH.

On October 2, 2019, Assembly Bill 1180 (AB 1180) was approved and filed with the Secretary City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 1-2 of State. AB 1180 amended Section 116407 of the CHSC and added section 13521.2 to the Water Code. AB 1180 requires that the CCCPH include provisions for the use of a swivel or changeover device (swivel-ell), see CCCMP Appendix B.

Pursuant to sections 116407 and 116555.5 of the CHSC, the State Water Board chose to adopt standards for backflow protection and cross-connection control through the adoption of this State CCCPH, which became effective July 1, 2024.

• The State Water Board is required to adopt regulations for the control of cross- connections that it determines to be necessary for ensuring PWSs “distribute a reliable and adequate supply of pure, wholesome, potable, and healthy water.” (CHSC section 116375, subd. (c).)
• Any person who owns a PWS is required to ensure that the distribution system will not be subject to backflow under normal operating conditions. (CHSC section 116555, subd. (a)(2).)

Prior to AB 1671 and the adoption of th e State CCCPH, California’s regulations pertaining to cross-connection control were set forth in regulations in CCR Title 17, which were adopted in 1987 with minor revisions in 2000. Although still protective to public health, the CCR Title 17 cross-connection regulations required updating as both the drinking water and cross-connection control industries had evolved. This State CCCPH updates those regulations, which as previously noted are no longer operative following the adoption of the State CCCPH.

The State Water Board may update its standards for backflow protection and cross- connection control through revisions of the State CCCPH. Prior to adopting substantive revisions to the State CCCPH, the State Water Board will consult with state and local agencies and persons identified as having expertise on the subject by the State Water Board, and the State Water Board will hold at least one public hearing to consider public comments.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 1-3

1.5 Acronyms and Abbreviations
As used in this policy, acronyms and abbreviations reference the following:

Acronym or Abbreviation Meaning
AB Assembly Bill
AG Air Gap separation
BAT Best Available Technology
BPA Backflow Prevention Assembly
Bus. & Prof. Code Business and Professional Code
CA California
CBSC California Building Standards Commission
CCCMP Cross Connection Control Management Plan
CCCPH Cross-Connection Control Policy Handbook
CCR California Code of Regulations
C.F.R. Code of Federal Regulations
CHSC California Health and Safety Code
City City of Huntington Beach
Civ. Code Civil Code
DC Double Check valve backflow prevention assembly
DCDA Double Check Detector backflow prevention Assembly DCDA-II Double Check Detector backflow prevention Assembly – type II
Division Division of Drinking Water
EPA Environmental Protection Agency
Gov. Code Government Code
MCL Maximum Contaminant Level
Muni Code Municipal Code
Pen. Code Penal Code
PVB Pressure Vacuum Breaker backsiphonage prevention
assembly
PWS Public Water System
RP Reduced Pressure principle backflow prevention assembly RPDA Reduced Pressure principle Detector backflow prevention Assembly
RPDA-II Reduced Pressure principle Detector backflow prevention Assembly – type II
RW Recycled Water
SB Senate Bill
SDWA Safe Drinking Water Act
State Water Board State Water Resources Control Board
SVB Spill-resistant Pressure Vacuum Breaker backsiphonage prevention assembly
U.S. United States City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 1-4

1.6 Definitions and General Requirements
The following definitions apply to the terms used in the CCCPH:

“Air-gap separation” or “AG” means a physical vertical separation of at least two (2) times the effective pipe diameter between the free-flowing discharge end of a potable water supply pipeline and the flood level of an open or non-pressurized receiving vessel, and in no case less than one (1) inch.

“Approved water supply” means a water source that has been approved by the State Water Board for domestic use in a public water system and designated as such in a domestic water supply permit issued pursuant to section 116525 of the CHSC.

“Auxiliary water supply” means a source of water, other than an approved water supply, which is either used or equipped, or can be equipped, to be used as a water supply and is located on the premises of, or available to, a water user.

“Backflow” means an undesired or unintended reversal of flow of water and/or other liquids, gases, or other substances into a public water system’s distribution system or approved water supply.

“Backflow prevention assembly” or “BPA” means a mechanical assembly designed and constructed to prevent backflow, such that while in-line it can be maintained and its ability to prevent backflow, as designed, can be field tested, inspected, and evaluated.

“Backflow prevention assembly tester” means a person who is certified as a backflow prevention assembly tester.

“Community water system” means a public water system that serves at least 15 service connections used by yearlong residents or regularly serves at least 25 yearlong residents of the area served by the system.

“Contact hour” means not less than 50 minutes of a continuing education course.

“Continuing education course” means a presentation or training that transmits information related to cross-connection control programs and backflow prevention and protection.

“Cross-connection” means any actual or potential connection or structural arrangement between a public water system, including a piping system connected to the public water system and located on the premises of a water user or available to the water user, and any source or distribution system containing liquid, gas, or other substances not from an approved water supply.

“Cross-connection control specialist” means a person who is certified as a cross- connection control specialist.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 1-5 “Distribution system” has the same meaning as defined in section 63750.50 of CCR, Title 22, Division 4, Chapter 2.

“Double check detector backflow prevention assembly” or “DCDA” means a double check valve backflow prevention assembly that includes a bypass with a water meter and double check backflow prevention assembly, with the bypass’s water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. This type of assembly may only be used to isolate low hazard cross-connections. See Diagram 1, CCCMP Appendix G.

“Double check detector backflow prevention assembly – type II” or “DCDA-II” means a double check valve backflow prevention assembly that includes a bypass around the second check, with the bypass having a single check valve and a water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. This type of assembly may only be used to isolate low hazard cross-connections. See Diagram 2, CCCMP Appendix G.

“Double check valve backflow prevention assembly” or “DC” means an assembly consisting of two independently-acting internally-loaded check valves, with tightly closing shut-off valves located at each end of the assembly (upstream and downstream of the two check valves) and fitted with test cocks that enable accurate field testing of the assembly. This type of assembly may only be used to isolate low hazard cross- connections. See Diagram 3, CCCMP Appendix G.

“Existing public water system” or “existing PWS” means a public water system initially permitted on or before July 1, 2024 as a public water system by the State Water Board.

“Hazard Assessment” means an evaluation of a user premises designed to evaluate the types and degrees of hazard at a user’s premises.

“High hazard cross-connection” means a cross-connection that poses a threat to the potability or safety of the public water supply. Materials entering the public water supply through a high hazard cross-connection are contaminants or health hazards.

See CCCMP Appendix D for some examples.

“Low hazard cross-connection” means a cross-connection that has been found to not pose a threat to the potability or safety of the public water supply but may adversely affect the aesthetic quality of the potable water supply. Materials entering the public water supply through a low hazard cross-connection are pollutants or non-health hazards.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 1-6 “New public water system” or “new PWS” means a public water system permitted after July 1, 2024 as a public water system by the State Water Board. A new public water system includes a public water system receiving a new permit because of a change in ownership.

“Premises containment” means protection of a public water system’s distribution system from backflow from a user’s premises through the installation of one or more air gaps or BPAs, installed as close as practical to the user’s service connection, in a manner that isolates the water user’s water supply from the public water system’s distribution system.

“Pressure vacuum breaker backsiphonage prevention assembly” or “PVB” means an assembly with an independently-acting internally-loaded check valve and an independently-acting loaded air inlet valve located on the discharge side of the check valve; with test cocks and tightly closing shutoff valves located at each end of the assembly that enable accurate field testing of the assembly. This type of assembly may only be used for protection from backsiphonage and is not to be used to protect from backpressure. See Diagram 4, CCCMP Appendix G.

“Public water system” or “PWS” has the same meaning as defined in section 116275(h) of the CHSC.

“Recycled Water" is a wastewater which as a result of treatment is suitable for uses other than potable use.

“Reduced pressure principle backflow prevention assembly” or “RP” means an assembly with two independently acting internally-loaded check valves, with a hydraulically operating mechanically independent differential-pressure relief valve located between the check valves and below the upstream check valve. The assembly shall have shut-off valves located upstream and downstream of the two check-valves, and test cocks to enable accurate field testing of the assembly. See Diagram 5, CCCMP Appendix G.

“Reduced pressure principle detector backflow prevention assembly” or “RPDA” means a reduced pressure principle backflow prevention assembly that includes a bypass with a water meter and reduced pressure principle backflow prevention assembly, with the bypass’s water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. See Diagram 6, CCCMP Appendix G.

“Reduced pressure principle detector backflow prevention assembly – type II” or “RPDA-II” means a reduced pressure principle backflow prevention assembly that includes a bypass around the second check, with the bypass having a single check valve and a water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. See Diagram 7, CCCMP Appendix G.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 1-7

“Spill-resistant pressure vacuum breaker backsiphonage prevention assembly” or “SVB” means an assembly with an independently-acting internally-loaded check valve and an independently-acting loaded air inlet valve located on the discharge side of the check valve; with shutoff valves at each end and a test cock and bleed/vent port, to enable accurate field testing of the assembly. This type of assembly may only be used for protection from backsiphonage and is not to be used to protect from backpressure.

See Diagram 8, CCCMP Appendix G.

“State Water Board,” unless otherwise specified, means the State Water Resources Control Board or the local primacy agency having been delegated the authority to enforce the requirements of the CCCPH by the State Water Resources Control Board.

“Swivel-Ell” means a reduced pressure principle backflow prevention assembly combined with a changeover piping configuration (swivel-ell connection) designed and constructed pursuant to this Chapter. See design and construction criteria, as well as Diagrams 9a and 9b, CCCMP Appendix G.

“User premises” means the property under the ownership or control of a water user and is served, or is readily capable of being served, with water via a service connection with a public water system.

“User’s service connection” means either the point where a water user’s piping is connected to a water system or the point in a water system where the approved water supply can be protected from backflow using an air gap or backflow prevention assembly.

“User Supervisor” means a person designated by a water user to oversee a water use site and responsible for the avoidance of cross-connections.

“Water supplier” means a person who owns or operates a public water system.

“Water user” means a person or entity who is authorized by the PWS to receive water.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 2-1 2 Hazard Assessments and Required Protection

In accordance with the State CCCPH, Section 3.1.3 (a)(3) – Hazard Assessments, Section 3.1.4 (b)(2), and Section 3.2.1 – The City must survey its service area and conduct hazard assessments per Article 2 of the State CCCPH that identifies actual or potential cross-connection hazards, degree of hazard, and any backflow protection needed.

2.1 Hazard Assessments

a. To evaluate the potential for backflow into the City’s water distribution system the City must conduct an initial hazard assessment of the user premises within its service area.

The hazard assessment must consider:

1. The existence of cross-connections;

2. the type and use of materials handled and present, or likely to be, on the user premises;

3. the degree of piping system complexity and accessibility;

4. access to auxiliary water supplies, pumping systems, or pressure systems;

5. distribution system conditions that increase the likelihood of a backflow event (e.g., hydraulic gradient differences impacted by main breaks and high water - demand situations, multiple service connections that may result in flow-through conditions, etc.);

6. user premises accessibility;

7. any previous backflow incidents on the user premises; and

8. the requirements and information provided in the State CCCPH, and the City’s CCCMP.

b. Each hazard assessment must identify the degree of hazard to the City’s distribution system as either a high hazard cross -connection, a low hazard cross - connection, or having no hazard. Examples of some high hazard cross-connection activities may be found in CCCMP Appendix D.

c. The hazard assessment must determine whether an existing BPA, if any, provides adequate protection based on the degree of hazard.

d. Hazard assessments completed prior to the adoption of the State CCCPH may be considered as an initial hazard assessment provided that such hazard assessments and associated backflow protection provide protection consistent with the State CCCPH and the City describes their review of these assessments in the City’s CCCMP.

e. Subsequent to the initial hazard assessment described in subsection (a), the City must perform a hazard assessment under the following criteria:

1. if a user premises changes account holder, excluding single-family residences;

2. if a user premises is connected to the City’s water distribution system; City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 2-2

3. if evidence exists of changes in the activities or materials on a user’s premises;

4. if backflow from a user’s premises occurs;

5. periodically, as identified in the City’s CCCMP required pursuant to State CCCPH section 3.1.4.;

6. if the State Water Board requests a hazard assessment of a user’s premises; or

7. if the City concludes an existing hazard assessment may no longer accurately represent the degree of hazard.

f. A cross-connection control specialist must review or conduct each initial and follow-up hazard assessment pursuant to this section and make a written finding that, in the specialist’s judgment based on cross -connection control principles, the City’s hazard assessment properly identified all hazards at the time of the assessment, the appropriate degree of hazards, and the corresponding backflow protection.

2.2 Hazard Assessment Process
In order to assess each connection in the City’s water distribution system for potential cross connection the City will undertake assessments in the following phases. As part of the hazard assessment process the City has created a tracking system for the assessments made under the CCCMP. See CCCMP Appendix E. Data will be gathered and logged into the assessment database in three phases.

The assessment database will be included in the City’s Records Retention Policy, see CCCMP Appendix H.

• Phase 1 - All connections with existing backflow prevention assemblies at the meter connection
• Phase 2 - All commercial/industrial connections without backflow prevention assemblies at the meter connection
• Phase 3 – All residential connections without backflow prevention assemblies at the meter connection

2.2.1 Phase 1 - Connections with Backflow Protection
The City currently has 6,996 connections with backflow protection installed at the meter as of April 23, 2025. For connections with backflow protection the City will enter each address into the assessment tracking system indicating what type of BPA has been installed. The City’s Cross Connection Control Specialist will review the data when entered into the assessment database to verify that an appropriate BPA has been installed on the meter connection. The Cross Connection Control Specialist’s review date will be noted in the assessment database.

It is assumed that a Cross Connection Control Specialist can process (5) existing connections with backflow protection installed at the meter per available hour, and the total number of annual Cross Connection Control Specialist available hours is 93 hrs./yr (5% of total annual 1,867 hrs., based 2,080 hrs./yr less 80 hrs./yr for vacation, 45 hrs./yr for sick leave, and 88 hrs./yr for holidays) for a total of 465 existing connections per year per Cross Connection Control Specialist assigned by the City to cross connection control.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 2-3

Based on the availability of the Cross Connection Control Project S pecialist t he City has determined that this phase of the assessments can be completed within 15.0 years from the adoption of the City’s CCCMP.

2.2.2 Phase 2 - Commercial/Industrial Connections without Backflow Protection The City currently has 1,441 commercial/industrial sites without backflow protection installed at the meter as of April 23, 2025. For those commercial/industrial connections without an approved BPA the City will provide a self-reporting letter to provide information regarding onsite conditions which would necessitate the installation of an approved BPA at the meter connection. The self- reporting letters will be distributed via direct mail, see Appendix F.

The self-reporting letters would be reviewed based on the available Cross Connection Control Specialist hours to review and process commercial/industrial self -reporting letters and the expected percent of self-reporting letters returned per distribution.

It is assumed that a Cross Connection Control Specialist can process (5) self -reporting letters for existing connections without backflow protection installed at the meter per available hour, and the total number of annual Cross Connection Control Specialist available hours is 93 hrs./yr (5% of total annual 1,867 hrs., based 2,080 hrs./yr less 80 hrs./yr for vacation, 45 hrs./yr for sick leave, and 88 hrs./yr for holidays) for a total of 465 existing commercial/industrial connections without per year per Cr oss Connection Control Specialist assigned by the City to cross connection control.

Based on the availability of the Cross Connection Control Project Specialists the City has determined that this phase of the assessments can be completed within 3.1 years from the completion of Phase 2.

• If the Cross Connection Control Specialist determines that based on the self -reporting letter that an approved BPA is not required, they will note that in the assessment database and the reason for not requiring an approved BPA.

• If the Cross Connection Control Specialist determines that based on the self -reporting letter that an approved BPA is required, they will note that in the assessment database and notify the commercial/industrial customer that an approved BPA must be installed at the meter connection and note that determination in the assessment database.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 2-4

2.2.3 Phase 3 – Residential Connections without Backflow Protection Residential connections equipped with AMI meters can monitor flow on a continuous basis and can inform th e City of a backflow condition when it occurs. For those residential connections with AMI meters the addresses for those connections will be entered into the assessment database and noted as equipped with AMI. The Cross Connection Control Specialist will review the data for accuracy and note their review in the assessment database indicating no BPA is required.

The City currently has 47,210 residential sites without backflow protection installed at the meter as of April 23, 2025. For those residential connections the City will assess each site by means of office-based tools such as:

• Reviewing sites via Google Maps or other aerial photography software • Reviewing tract maps to review blocks of residential customer in a common building area or zone.
• Using meter route maps or other billing information databases.

The office-based assessment will review sites for:

• Private water wells
• Other auxiliary water supplies
• Sewer lift stations
• Graywater systems

The office-based assessments would be conducted based on the available Cross Connection Control Specialist hours to review the office-based databases and/or files.

• If the Cross Connection Control Specialist determines that based on the office- based assessment that an approved BPA is not required, they will note that in the assessment database.

• If the Cross Connection Control Specialist determines that based on the office- based assessment that an approved BPA is required, they will note that in the assessment database and notify the residential customer that an approved BPA must be installed at the meter connection and note that the customer has been contacted in the assessment database.

It is assumed that a Cross Connection Control Specialist can process (25) existing residential connections without backflow protection installed at the meter per available hour, and the total number of annual Cross Connection Control Specialist available hours is 93 hrs./yr (5% of total annual 1,867 hrs., based 2,080 hrs./yr less 80 hrs./yr for vacation, 45 hrs./yr for sick leave, and 88 hrs./yr for holidays) for a total of 2,325 existing residential connections per year per Cross Connection Control Specialist assigned by the City to cross connection control.

Based on the availability of the Cross Connection Control Project Specialist the City has determined that this phase of the assessments can be completed within 20 years from the completion of Phase 3..

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 3-1 3 Operating Rules or Ordinances

In accordance with the State CCCPH, Section 3.1.3 (a)(1), and Section 3.1.4(b)(1) and Section

3.1.4 (b)(3),the City must have operating rules, ordinances, by-laws, or a resolution to implement the cross-connection program. The City must have legal authority to implement corrective actions in the event a water user fails to comply in a timely manner with the City’s provisions regarding the installation, inspection, field testing, or maintenance of BPAs required pursuant to this Section. Such corrective actions must include the City’s ability to perform at least one of the following:

• Deny or discontinue water service to a water user,
• Install, inspect, field test, and/or maintain a BPA at a water user’s premises, or • Otherwise address in a timely manner a failure to comply with the City’s cross-connection control program.

The City’s backflow and cross -connection prevention requirements are contained in the following:

1. Via a City Resolution No. 2025- XX – the City will be updating the Cross Connection Program by approving the Cross Connection Control Management Plan which will be an Exhibit “A”.

2. City’s Ordinance No. 2-25-XX will be amending Section 14.16.190 of the City’s Municipal Code by referencing Resolution No. 2025-XX.

Draft copies of the Resolution and Ordinance are contained in CCCMP Appendix C.

It will require two Council meetings to complete the approval process. The first meeting will open the public hearing to consider the Municipal Code amendment. After a required public review period, the second meeting will close the public hearing and allow the Council to approve the changes to the municipal code and ordinance.

The City anticipates to take the above documents to City Council in 2025 for review and adoption.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 4-1 4 Backflow Prevention

In accordance wit h the State CCCPH, Section 3.1.3 (a)(4) and Section 3.2.2 – the City must ensure that actual and potential cross -connections are eliminated when possible or controlled by the installation of approved BPAs or AG’s consistent with the requirements of the Article 3 of the State CCCPH and the sections to follow. The City has 6,996 BPA’s in the City’s distribution system as of April 23,2025, and 2,326 onsite backflow assembles which are in the City’s tracking database and included in their annual backflow testing reports.

4.1 Backflow Prevention Requirements
(a) The City must ensure its distribution system is protected from backflow from identified hazards through the proper installation, continued operation, and field testing of an approved BPA (see Section 4.2.1 for installation and approved BPA criteria). When a DC is required or referenced in the State CCCPH, a DCDA or DCDA-II type of assembly may be substituted if appropriate. When an RP is required or referenced in the State CCCPH, an RPDA or RPDA-II type of assembly may be substituted if appropriate.

(b) The BPA installed must be no less protective than that which is commensurate with the degree of hazard at a user premises, as specified in this section and as determined based on the results of the hazard assessment conducted pursuant to CCCMP Section 3.

(c) Unless specified otherwise in this section, a City must, at all times, protect its distribution system from high hazard cross-connections (see CCCMP Appendix E for examples), through premises containment, through the use of AG(s) or RP(s).

(1) Following State Water Board review and approval, the City may implement an alternate method of premises containment in lieu of a required AG provided that the proposed alternative would provide at least the same level of protection to public health.
(2) Following State Water Board review and approval, the City may accept internal protection in lieu of containment when premises containment is not feasible.

(d) Except as otherwise allowed or prohibited in statute or in CCR Title 22, Division 4, Chapter 3, a swivel-ell may be used instead of an AG for premises containment protection when temporarily substituting tertiary recycled water use areas with potable water from a PWS if all the following criteria are met:

(1) the swivel-ell is approved by the State Water Board; (2) the City has a cross -connection control program, required pursuant to the State CCCPH Section 3.1.3, and the use and operation of the swivel-ell is described in the CCCMP required pursuant to the State CCCPH Section 3.1.4; (3) the design and construction-related requirements of the swivel-ell adheres to the criteria in CCCMP Appendix H;
City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 4-2 (4) at least every 12 months, inspections are performed and documented to confirm ongoing compliance with the design and construction- related requirements in CCCMP Appendix H;
(5) the RP used in conjunction with the swivel-ell is field tested and found to be functioning properly:

(A) immediately upon each switchover to potable water use, a visual inspection of the RP must be completed
(B) within 72 hours of each switchover to potable water use, a field test must be completed, and
(C) at least every 12 weeks the use site is supplied with potable water; and

(6) there is a legally binding agreement between the City and the entity supplying the recycled water, signed by those with relevant legal authority, which includes the following requirements:

(A) The State Water Board will be notified within 24 hours of all switchovers to or from potable water, will be given an estimate of the timeframe until the next switchover, and will be provided the results of the field testing required in paragraph (5);
(B) a trained representative of the City be present to supervise each switchover; and
(C) within seven days of each switchover, if requested by the State Water Board, the City will submit a written report describing compliance with this subsection, as well as potable and recycled water usage information.

(e) Except as noted below, the City must ensure its distribution system is protected with no less than DC protection for a user premises with a fire protection system within ten years of adoption of the State CCCPH.

(1) A high hazard cross-connection fire protection system, including but not limited to fire protection systems that may utilize chemical addition (e.g., wetting agents, foam, anti-freeze, corrosion inhibitor, etc.) or an auxiliary water supply, must have no less than RP protection.

(2) For existing fire protection systems that do not meet the State CCCPH, Section

3.2.2 (e)(3) or cannot install DC protection within ten years of adoption of the State CCCPH, the City may propose in the CCCMP submitted for compliance with the State CCCPH Section 3.1.4:

(A) an alternative date; or
(B) an alternative method of backflow protection that provides at least the same level of protection to public health.

(3) A BPA is not necessary for a low hazard fire protection system on a residential user premises if the following criteria are satisfied:

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 4-3 (A) the user premises has only one service connection to the City; (B) a single service line onto the user premises exists that subsequently splits on the property for domestic flow and fire protection system flow, such that the fire protection system may be isolated from the rest of the user premises;
(C) a single, water industry standard, water meter is provided to measure combined domestic flow and fire protection system flow; (D) the fire protection system is constructed of piping materials certified as meeting NSF/ANSI Standard 61; or
(E) the fire protection system’s piping is looped within the structure and is connected to one or more routinely used fixtures (such as a water closet) to prevent stagnant water.

(f) The State Water Board and the City may, at their discretion, require a water user to designate a user supervisor when the user premises has a multi -piping system that conveys various types of fluids and where changes in the piping system are frequently made. If a user supervisor is designated the following is required:

(1) The user supervisor is responsible for the avoidance of cross -connections during the installation, operation and maintenance of the water user’s pipelines and equipment. The user supervisor must be trained on the fluids used and backflow protection for the premise, and must inform the City of changes in piping, and maintain current contact information on file with the City; and; (2) The City must include in the CCCMP required in the State CCCPH Section 3.1.4 the training and qualification requirements for user supervisors, identify the entity that will provide the user supervisor training, and frequency of any necessary recurring training. The training must adequately address the types of hazards and concerns typically found.

(g) Facilities producing, treating, storing, or distributing drinking water that are an approved water supply or water recycling plants as defined by CCR Title 22, Section 60301.710 must have proper internal protection from cross -connections to ensure that all drinking water produced and delivered to customers and workers at those facilities is free from unprotected cross-connections.

4.2 Backflow Prevention Assemblies

4.2.1 Standards for Types of Backflow Protection
(a) Each AG used for the CCCMP must meet the requirements in Table 1, Minimum Air Gaps for Generally used Plumbing Fixtures, page 4 of the American Society of Mechanical Engineers (ASME) A112.1.2- 2012(R2017).

(b) Each replaced or newly installed PVB, SVB, DC, and RP for protection of the PWS must be approved through both laboratory and field evaluation tests performed in accordance with at least one of the following:

(1) Standards found in Chapter 10 of the Manual of Cross-Connection Control, Tenth City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 4-4 Edition, published by the University of Southern California Foundation for Cross- Connection Control and Hydraulic Research;
(2) certification requirements for BPAs in the Standards of ASSE International current as of 2022 that include ASSE 1015 -2021 for the DC, ASSE 1048-2021 for the DCDA & DCDA-11, ASSE 1013-2021 for the RP, and ASSE 1047-2021 (3) for the RPDA & RPDA-II and must have the 1YT mark.

(c) BPAs must not be modified following approval granted under Section 4.2.1(b). The City requires that BPA testers notify the City if a water user or City -owned BPA has been modified from the CCCMP Section 4.2.1(b) approval.

4.2.2 Installation Criteria for Backflow Protection

(a) For AGs, the following is required:

(1) The receiving water container must be located on the water user’s premises at the water user’s service connection unless an alternate location has been approved by the City;
(2) all piping between the water user’s service connection and the discharge location of the receiving water container must be above finished grade and be accessible for visual inspection unless an alternative piping configuration is approved by the City;
(3) the City must ensure that the AG specified in the State CCCPH Section 3.3.1 (a) has been installed; and
(4) any new air gap installation at a user’s service connection must be reviewed and approved by the State Water Board prior to installation.

(b) RPs must be installed such that the lowest point of an assembly is a minimum of twelve inches above grade, and a maximum of thirty-six inches above the finished grade, unless an alternative is approved by the PWS.

(c) DCs installed or replaced after the adoption of the State CCCPH must be installed according to the State CCCPH Section 3.3.2 (b). Below ground installation can be considered if approved by the City where it determines no alternative options are available.

(d) A PVB or SVB must be installed at a minimum of twelve inches above all downstream piping and outlets.

(e) SVBs may not be used for premises containment. PVBs may only be used for roadway right of way irrigation systems as premises containment where there is no potential for backpressure.

(f) A RP or DC installed after the adoption of the State CCCPH must have a minimum side clearance of twelve inches, except that a minimum side clearance of twenty-four inches must be provided on the side of the assembly that contains the test cocks. The City may City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 4-5 approve alternate clearances providing that there is adequate clearance for field testing and maintenance.

(g) Backflow protection must be located as close as practical to the water user’s service connection unless one or more alternative locations have been approved by the City . If internal protection is provided in lieu of premises containment, the City must obtain access to the user premises and must ensure that the on- site protection meets the requirements of this Chapter for installation, field testing, and inspections.

(h) Each BPA and air gap separation must be accessible for field testing, inspection, and maintenance.

City Standard Drawings and Specifications for each type of BPA is contained in Appendix K City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 5-1 5 Non-Testable Devices

5.1 Non-testable backflow preventer testing procedures
There are non- testable backflow preventer devices under City ownership or administration.

Hose-bibb vacuum breakers is an example of the most common types of non-testable backflow prevention devices for the City.

Table 5-1 Location of Non-Testable Backflow Prevention Devices Location of Non-Testable Backflow Preventer
Location Air Gap
Atmospheric
Vacuum
Breaker
Hose-bibb
Vacuum
Breaker
Dual Check
Valve
Identification Potential Onsite Hazard
Utilities Yard Yes Yes Yes No Chlorine
Peck Reservoir Yes No Yes No Chlorine
Edwards Hill
Reservoir Yes No Yes No Chlorine
Springdale
Reservoir Yes No Yes No Chlorine
Overmyer
Reservoir Yes No Yes No Chlorine
Well 1A
Yes No Yes No Chlorine and Fluoride
Well 3A Yes No Yes No Chlorine and Fluoride
Well 4 Yes No Yes No Chlorine and Fluoride
Well 5 Yes No Yes No Chlorine and Fluoride
Well 6 Yes No Yes No Chlorine and Fluoride
Well 7 Yes No Yes No Chlorine and Fluoride
Well 9 Yes No Yes No Chlorine and Fluoride
Well 10 Yes No Yes No Chlorine and Fluoride
Well 13 Yes No Yes No Chlorine and Fluoride

The City owned sites are inspected daily by City personnel.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 6-1 6 Certified Backflow Prevention Assembly Testers and
Certified Cross-Connection Control Specialists

In accordance with the State CCCPH, Section 3.1.3 (a)(5), Section 3.1.4 (b)(6), and Section

3.4.1 – the City must ensure that each BPA required by the CCCMP to protect the City’s domestic water system is field tested by a person with valid certification from a certifying organization recognized by the State Water Board pursuant to the State’s CCCPH.

6.1 Backflow Tester Certification

All backflow testers testing within the service area of the City must provide evidence of current certification from a State Water Board- recognized organization certifying backflow prevention assembly testers. Certifying organizations must be recognized by the State Water Board in accordance with requirements of the State CCCPH and ISO/IEC 17024. Beginning on July 1, 2025, only those testers with a valid certification from a State Water Board recognized certifying organization shall be allowed to test BPA’s in the City’s service area, certifications from any other entity will be considered invalid.

6.1.1 Backflow Tester List

The City maintains a list of approved Backflow Testers. To be included on this list, testers must submit an application to the City at [email protected], provide proof of certification from a State Water Board-recognized certifying organization, and hold a valid City business license. The City accepts test reports from any certified tester—whether or not they are on the City's approved list—provided the tester meets the certification criteria from a State Water Board- recognized certifying organization.

A copy of the list of approved testers can be downloaded from the City’s website at:

https://www.huntingtonbeachca.gov/cross_connection

The City has five (5) staff members who are certified as Backflow Testers by a State Water Board recognized certifying organization.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 6-2 Table 6-1 City Staff - Certified Backflow Testers

Name

Agency

Address

Phone No.

Email Address

Certification
No.

Expiration
Date
Kristen
Schroeder
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
(714) 960-8802 Kristen.Schroeder@surfcity-
hb.org 19123 5/31/2026
Jennifer Reyes
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
714-375-5061 jennifer.reyes@surfcity-
hb.org 19517 3/31/2027
James Montero
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
714-536-5610 james.montero@surfcity-
hb.org 19630 5/31/2027
Richard Legere
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
714-374-5322 [email protected] 18480 12/31/2027
Kevin Scally
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
714) 375-5173 [email protected] 19600 4/30/2027

6.2 Cross-Connection Control Specialist Certification

All Cross-Connection Control Specialists, used by the City pursuant to the requirements of the State CCCPH, shall have valid certification from a State Water Board recognized certifying organization, which complies with the State CCCPH, will be considered to be a State Water Board recognized certifying organization.

Beginning three years after the effective date of the State CCCPH, only those Cross-Connection Control S pecialists with a valid certification from a State Water Board recognized certifying organization shall satisfy the requirements of the State CCCPH. C ertifications obtained by organizations that do not meet the requirements of the State CCCPH will be invalid.

The City h as four (4) staff members who are certified by a State Water Board recognized certifying organization as Cross Connection Control Specialists.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 6-3 Table 6-2 City Cross-Connection Control Specialists

Name

Agency

Address

Phone No.

Email Address

Certification
No.

Expiration
Date
Kristen
Schroeder
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
(714) 960-8802 Kristen.Schroeder@surfcity-
hb.org 2576 11/30/2027
Jennifer Reyes
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
(714) 375-5061 jennifer.reyes@surfcity-
hb.org 2741 5/1/2026
James Montero
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
(714) 536-5610 james.montero@surfcity-
hb.org 3644 8/31/2026
Richard Legere
City of
Huntington
Beach
19001
Huntington St.

Huntington
Beach
CA 92648
(714) 374-5322 [email protected] 3417 9/30/2026

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 7-1 7 Backflow Incident Response, Reporting and Notification

In accordance with the State CCCPH, Section 3.1.3(a)(8), Section 3.1.4 (b)(7), and Section 3.5.2 the City has developed and implemented procedures for investigating and responding to suspected or actual backflow incidents. The procedure for responding to backflow incidents, reporting any incidents, and reporting those incidents, will be:

7.1 Backflow Incident Response Procedure

In the event that a suspected backflow incident occurs in the City , the City’s response will include, but not limited to, the following:

(a) Consideration of complaints or reports of changes in water quality as possible incidents of backflow;
(b) Water quality sampling and pressure recording; and
(c) Documentation of the investigation, and any response and follow-up activities.

7.2 Backflow Incident Notification

In the event that a backflow incident occurs the Cross -Connection Control Coordinator will provide the following notification:

(a) The Cross-Connection Control Coordinator will notify the State Water Board and Orange County Health Care Agency of any known or suspected incident of backflow within 24 hours of the determination. If required by the State Water Board, the City will issue a Tier 1 public notification pursuant to CCR, Title 22, Section 64463.1.

(b) If required by the State Water Board, the City will submit, by a date specified by the State Water Board, a written incident report describing the details and affected area of the backflow incident, the actions taken by the City in response to the backflow incident, and the follow up actions to prevent future backflow incidents.

The written report form is in CCCMP Appendix I.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) City of Huntington Beach CCCMP – June 2025 8-1
8 Cross -Connection Control Program Coordinator
In accordance with the State CCCPH, Section 3.1.3 (a)(2) and Section 3.1.4 (b)(8), the City must designate at least one individual involved in the development of and be responsible for the r
eporting, tracking, and other administration duties of its cross -connection control program.

F
urther for public water systems with more than 3,000 service connections the Cross- C
onnection Control Program Coordinator must be a Cross-Connection Control Specialist.

The
City’s water system includes 53,337 domestic water connections as of April 23, 2025. Therefore, the City must have a Cross-Connection Control Program Coordinator. The Coordinator must be a certified Cross-Connection Control Specialist.

Information regarding the City’s Cross Control Connection Program Coordinator, and other Cross Connection Control Specialists is detailed in the City’s Emergency Notification Plan which is included in the CCCMP Appendix J.

Th
e City’s Cross-Connection Control Program Coordinator is:

Kristen Schroeder
City
of Huntington Beach
19001 Huntington Street
Huntington Beach, CA 92648
(
714) 960-8802
[email protected]
The City’s Cross-Connection Control Program Specialist is:

Kristen Schroeder
City of Huntington Beach
19001 Huntington Street
Huntington Beach, CA 92648
(
714) 960-8802
[email protected]
Cross Connection Control Specialist
AWWA Cert. No. 2578
Expires: 11/30/2027
City of Huntington Beach Cross Connection Control Management Plan (CCCMP) City of Huntington Beach CCCMP – June 2025 8-2
The City’s designated Cr oss-Connection Control Specialist can be contacted within one hour, per the requirement of the State CCCPH for a PWS with 3,000 or more service connections.

8.1 Cross Connection Control Specialist Designee
In the event the City’s Cross Connection Control Specialist is not available due to vacation, sickness, or other reason, the duties of the Cross Connection Control Specialist will be carried out
by:

1. Ba
ck-up Cross Connection Control Specialist
Jenni
fer Reyes
City of Huntington Beach
19001 Huntington Street
Huntington Beach, CA 92648
(714) 375-5061
[email protected]
AWWA Cert. No. 2741
Expires: 5/1/2026

2. Ba
ck-up Cross Connection Control Specialist
Ji
mmy Montero
City of Huntington Beach
19001 Huntington Street
Huntington Beach, CA 92648
(714) 536-5610
[email protected]
AWWA Cert. No. 3644
Expires: 8/31/2026
City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 9-1 9 Recordkeeping
In accordance with the State CCCPH, Section 3.1.3(a)(7) and Section 3.1.4 (b) (9) the City has developed and implemented a recordkeeping system for:

1. Backflow prevention assemblies (BPA)

2. Cross-connection information.

3. Commercial/Industrial and Residential site assessments.

This recordkeeping system complies with the State CCCPH section 3.5.1, and the City’s Written Records Retention Policy included in CCCMP Appendix H.

9.1 Records Retained
The City maintains the following records via a Microsoft Database:

(a) The hazard assessments for each user premise, conducted pursuant to CCCPH section

3.2.1 (Hazard Assessment).

(b) For each BPA, the associated hazard or application, location, owner, type, manufacturer and model, size, installation date, and serial number. The City does not have the associated hazard or applications for those locations with a BPA and that will be developed during Phase 1 outlined below in Section 9.2.2.

(c) For each AG installation, the associated hazard or application and the location, owner, and as -built plans of the AG. The City does not have as -builts for the current AG installation but all conform to the requirements of the CCCPH

(d) Results of all BPA field testing, AG inspections, swivel-ell inspections, and field tests for the previous three calendar years, including the name, test date, repair date, and certification number of the backflow prevention assembly tester for each BPA field test and AG and swivel-ell.

(e) Repairs made to, or replacement or relocation of, BPAs for the previous three calendar years.

(f) If a User Supervisor is designated for a user premise, the current contact information for the User Supervisor and Water User, and any applicable training and qualifications as described by State CCCPH section 3.2.2(f).

(g) Descriptions and follow-up actions related to all backflow incidents.

(h) If any portion of the cross-connection control program is carried out under contract or agreement, a copy of the current contract or agreement.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) City of Huntington Beach CCCMP – June 2025 9-2
(i
) The current Cross-Connection Control Management Plan as required in the State CCCPH Section 3.1.4.
(j
) Any public outreach or education materials issued as required in the State CCCPH section

3.1.3.(a)(7) for the previous three calendar years.
(k
) All records retained by the City will be made available to the State Water Board upon request.
(l
) Records of Commercial/Industrial site assessments.
(m
) Records of Residential site assessments.

9.2 Recordkeeping Policy and Procedures
The City has a written Records Retention Policy which is contained in CCCMP Appendix H.

The procedures are generally described below:

9.2.1 Backflow Prevention Assembly Test Results
• Staff person generates the BPA test notices on the City ’s computer data management system, currently Syncta.
• BPA test notices are distributed to customers by direct mail. o Customers can return the BPA test results to the City by emailing a pdf of the test report.
• BPA test results are stored in three ways:
o Physical copies are kept for three years
o Pdfs filed electronically
o Internal tracking system database (i.e. Syncta)
• Where are they stored?
o Hard copies are stored for 3 years in the Water Quality storage area. o Electronic copies are stored in an email archive server in Microsoft Outlook under [email protected].
• Who is responsible for the storage?
o Kristen Schroeder, Water Quality Supervisor, 19001 Huntington St., Huntington Beach, CA 92648. [email protected], (714) 960-8802.
• Records are retained as hard copies for three years, electronic copies are k ept for five years.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 9-3

9.2.2 Phase 1 - Connections with Backflow Protection - Assessments Electronic assessment document reviewed and approved by the Cross Connection Control Specialist.

• If no action is required -
o Assessments are stored on the server share drive S:\Water Quality\Cross Connection Assessments
o All files are stored digitally
o Water Quality staff are assigned the responsibility for filing the assessments o Assessments are retained digitally indefinitely.
o Records are not disposed of because they are retained digitally. o No one is responsible for the disposal of the expired document because they are retained digitally indefinitely.

• If action is required
o Notification generated by Cross Connection Control Specialist that a backflow is required.
o Notification mailed to customer.
o Specialist follows up in 30 days to verify the progress of the backflow installation and depending on the customer an extension may be allowed by the City at the discretion of the Cross Connection Control Specialist.
o Action noted in assessment database.
o Action noted by assigned Water Quality staff.

9.2.2 Phase 2– Commercial/Industrial Connections without Backflow Protection – Assessments
Electronic assessment document reviewed and approved by the Cross Connection Control Specialist.

• If no action is required -
o Assessments are stored on the server share drive S:\Water Quality\Cross Connection Assessments
o All files are stored digitally
o Water Quality staff are assigned the responsibility for filing the assessments o Assessments are retained digitally indefinitely.
o Records are not disposed of because they are retained digitally. o No one is responsible for the disposal of the expired document because they are retained digitally indefinitely.

• If action is required
o Notification generated by Cross Connection Control Specialist that a backflow is required.
o Notification mailed to commercial/industrial customer. o Specialist follows up in 30 days to verify the progress of the backflow installation City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 9-4 and depending on the customer an extension may be allowed by the City at the discretion of the Cross Connection Control Specialist.
o Action noted in assessment database.
o Action noted by assigned Water Quality staff.

9.2.3 Phase 3 – Residential Connections without Backflow Protection - Assessments
Electronic assessment document reviewed and approved by the Cross Connection Control Specialist.

• If no action is required -
o Assessments are stored on the server share drive S:\Water Quality\Cross Connection Assessments
o All files are stored digitally
o Water Quality staff are assigned the responsibility for filing the assessments o Assessments are retained digitally indefinitely.
o Records are not disposed of because they are retained digitally. o No one is responsible for the disposal of the expired document because they are retained digitally indefinitely.

• If action is required
o Notification generated by Cross Connection Control Specialist that a backflow is required.
o Notification mailed to residential customer.
o Specialist follows up in 30 days to verify the progress of the backflow installation and depending on the customer an extension may be allowed by the City at the discretion of the Cross Connection Control Specialist.
o Action noted in assessment database.
o Action noted by assigned Water Quality staff.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 10-1 10 User Supervisors

In accordance with the State CCCPH, Section 3.2.2 (3)(f),The State Water Board and City may, at their discretion, require a water user to designate a user supervisor when the user premises has a multi-piping system that conveys various types of fluids and where changes in the piping system are frequently made. If a user supervisor is designated the following is required:

(1) The user supervisor is responsible for the avoidance of cross -connections during the installation, operation and maintenance of the water user’s pipelines and equipment. The user supervisor must be trained on the fluids used and backflow protection for the premise, and must inform the City of changes in piping, and maintain current contact information on file with the City; and,

(2) The City must include in the CCCMP required in CCCPH Section 3.1.4 the training and qualification requirements for user supervisors if required by the State Water Board or City, identify the entity that will provide the user supervisor training, and frequency of any necessary recurring training. The training must adequately address the types of hazards and concerns typically found.

The City has not required any user supervisors for use sites within the City.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) City of Huntington Beach CCCMP – June 2025 11-1
11 Backflow Prevention Assembly Testing and Reporting
In accordance with the State CCCPH, Section 3.1.3 (a)(6) – the City must ensure that each BPA required by the CCCMP to protect the City’s domestic water system is field tested. The City must develop and implement a procedure for ensuring all BPAs are field tested, inspected, and maintained and AG’s are inspected and maintained in accordance with the State CCCPH , Section 3.3.3.

1. All BPAs installed in the City in compliance with it CCCMP must be field tested following installation, repair, depressurization for winterizing, or permanent relocation.

All required field testing must be performed by certified backflow prevention assembly tester.

2. BPAs must be field tested at least annually. The State CCCPH does not preclude the City, the State Water Board, or a local health agency from requiring more frequent field testing for premises with high hazard cross -connection or BPA at increased risk of testing failure.

3. A
ir-gap separations must be visually inspected at least annually by a certified as backflow prevention assembly tester or certified as a cross- connection control specialist.

4. T
he City must receive passing field tests before providing continuous service to a water user with a newly installed BPA.

5. BPAs t
hat fail in the field test must be repaired or replaced within 30 days of notification of the failure by the City. Extensions may be allowed by the City at the discretion of the Cross Connection Control Specialist.

Bac
kflow prevention assembly testers must notify the City within one day if a backflow incident or an unprotected cross-connection is observed at the BPA or prior to the user premises during field testing. The City will immediately investigate and discontinue service to the user premises if a backflow incident is confirmed, and water service will not be restored to that user premises until the City receives a confirmation of a passing BPA field test from a backflow prevention assembly tester and the assembly is protecting the City’s distribution system.

11.1 Backflow Testing Notification Process
F
or each BPA in the City’s water distribution system, an annual notice that the BPA must be tested in accordance with the CCCMP will be mailed to the billing address on file.

U
pon receipt, the owner will have a minimum of 30 days, to the end of the month indicated on the first notice to have the BPA tested by a certified backflow assembly tester, and the test results submitted by email to [email protected] City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 11-2 Each water user with a BPA on the service connection must comply with the following schedule in order to be in compliance with the CCCMP and continue to receive water service from the City.

• Annual Test 1
st Notice
o Mailed to allow a minimum of 30 days for compliance.
o Due date is the last day of the month due. Example, mailed January 25 th, due February 28th.

• Annual Test 2nd Notice:
o Mailed after 1st Notice due date.
o Compliance is due in 14 days. Example, Mailed March 6th, due March 20th.

• Door Tag Notice – Hand Delivered
o Delivered after due date of 2nd Notice.
o Compliance is due in 14 days. Example, April 1st door tag, due April 15th.

• Water Service Shut-off Notice- Hand Delivered
o After Noncompliance with door tag due date.
o Water Service will be shut off.

Dates are approximate time frames as they may be adjusted to account for holidays and weekends.

Meter shuts off will occur if no response has been received from the customer. If the customer has scheduled, or is in the process of repairing a device, the meter may not be shut off and the customer will be grant ed more time to complete the testing at the discretion of the Cross Connection Control Specialist.

11.2 Damaged, missing, or improperly installed backflow prevention assemblies

In the event that a backflow prevention assembly is missing (or stolen), installed incorrectly, illegally modified, or tampered with, the City will notify the customer that BPA must be repaired or replaced within 30 days of notification that the BPA is missing (or stolen), installed incorrectly, illegally modified, or tampered with. Extensions may be allowed by the City at the discretion of the Cross Connection Control Specialist.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 12-1 12 Public Outreach and Education

In accordance with State CCCPH, Section 3.1. 3 (a)(9) and Section 3.1.4 (b)(12) – the City has developed a cross-connection control public outreach and education program that is intended to educate staff, customers, and the community about backflow protection and cross -connection control.

The City has a designated Public Information Officer (PIO) that provides a point of contact for the City regarding the City’s cross-connection control and backflow protection program and other water related issues. The City’s PIO is:

Public Affairs Manager
(714) 352-1690
[email protected]

Public Outreach to educate t he City’s customers on backflow and cross -connection control include information on backflow and cross-connections on the City’s website which is:

https://www.huntingtonbeachca.gov/cross_connection

In addition, backflow and cross -connection prevention may be distributed by other means, including but not limited to, periodic water bill inserts, information pamphlet distribution, new customer documentation, emails, and additions to t he City’s Consumer Confidence R eports (CCR). The CCR is on the City’s website which is:

https://huntingtonbeachca.gov/waterquality

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025 13-1 13 Local Entity Coordination

In accordance with the State CCCPH, Section 3.1.3 (a)(10) and Section 3.1.4 (b)(13) The City must coordinate with applicable local entities that are involved in either cross-connection control or public health protection to ensure hazard assessments can be performed, appropriate backflow protection is provided and provide assistance in the investigation of backflow incidents.

Local entities may include but are not limited to plumbing, permitting, or health officials, law enforcement, fire departments, maintenance, and public and private entities.

For the City, the local entities which are involved in cross-connection control include, but are not limited to:

City of Huntington Beach – Public Works
Tom Herbel, Deputy Public Works Director/City Engineer
2000 Main Street, Huntington Beach, CA 92648
(714) 375-5077
[email protected]
Coordination includes: meetings, phone calls and emails as needed on a project-by-project basis

City of Huntington Beach
Jasmine Daley, Building Official
2000 Main Street, Huntington Beach, CA 92648
(714) 375-5147
[email protected]
Coordination includes: meetings, phone calls and emails as needed on a project-by-project basis

City of Huntington Beach Fire
Janice Van Mullem, Fire Marshal
2000 Main Street, Huntington Beach, CA 92648
(714) 536-5565
[email protected]
Coordination includes: meetings, phone calls and emails as needed on a project-by-project basis

Orange County Health Care Agency
Hisham Elmishad, Water Quality Supervisor
1241 E Dyer Road Suite 120. Santa Ana, CA 92705
(714) 433-6280
[email protected]
Coordination includes: meetings, phone calls and emails as needed on a project-by-project basis

The City intends to include coordination with other local PWS through events which may include, but not be limited to, semi -annual gatherings with other PWS’ Cross Connection Control Coordinators, public outreach events, and vendor workshops.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix A

What is a Cross Connection?

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025
Appendix A
Background on Backflow Protection and Cross-Connection Control

A.1 What is a Cross-Connection?
A cross-connection is an interconnection between a potable water supply and a non- potable source via any actual or potential connection or structural arrangement between a PWS and any source or distribution system containing liquid, gas, or other substances not from an approved water supply. Bypass arrangements, jumper connections, removable sections, swivel or change-over devices and other temporary or permanent devices through which, or because of which backflow can occur are considered to be cross-connections.1 The State CCCPH includes acceptable installation criteria for swivel -ell and other types of backflow prevention assemblies (BPAs) to prevent backflow.

Backflow is the undesired or unintended reversal of flow of water and/or other liquids, gases, or other substances into a PWS’s distribution system or approved water supply.

The presence of a cross-connection represents a location in a distribution system through which backflow of contaminants or pollutants can occur. Backflow occurs when a non-potable source is at a greater pressure than the potable water distribution system. Backflow can occur from either backsiphonage or backpressure. Backsiphonage occurs when a non- potable source enters the drinking water supply due to negative (i.e., sub -atmospheric) distribution system pressure. Backpressure occurs when the pressure from a non- potable source exceeds the pressure in the potable water distribution system.

Backsiphonage may be caused by a variety of circumstances, such as main breaks, flushing, pump failure, or emergency firefighting water demand. Backpressure may occur when heating, cooling, waste disposal, or industrial manufacturing systems are connected to potable supplies and the pressure in the external system exceeds the pressure in the distribution system. Both situations act to change the direction of water, which normally flows from the distribution system to the customer, so that non- potable substances from industrial, commercial, or residential premises flows back into the distribution system through a cross-connection.

Cross-connections are not limited to industrial or commercial facilities. Submerged inlets are found on many common plumbing fixtures and are sometimes necessary features of the fixtures if they are to function properly. Examples of this type of design are siphon-jet urinals or water closets, flushing rim slop sinks, and dental cuspidors.

Older bathtubs and lavatories may have supply inlets below the flood level rims, but modern sanitary design has minimized or eliminated this cross-connection in new fixtures. Chemical and industrial process vats sometimes have submerged inlets where the water pressure is used as an aid in diffusion, dispersion, and agitation of the vat contents. Even though a supply pipe may be installed above a vat, backsiphonage can still occur. Siphon action has been shown to raise a liquid in a pipe such as water almost 34 feet. Some submerged inlets are difficult to control, including those which are not apparent until a significant change in water level occurs or where a supply may be conveniently extended below the liquid surface by means of a hose or auxiliary piping. A submerged inlet may be created in numerous ways, and its detection may be difficult.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Chemical and biological contaminants have caused illness and deaths during known incidents of backflow, with contamination affecting several service connections, and the number of incidents reported is believed to be a small percentage of the total number of backflow incidents that actually occur. The public health risk from cross-connections and backflow is a function of a variety of factors including cross-connection and backflow occurrence and type and amount of contaminants.

A.2 Purpose of a Cross-Connection Control Program
The purpose of a cross-connection control program is to prevent the occurrence of backflow into a PWS’s distribution system in order to protect customers from contamination or pollution from any on-site hazards. Properly installed and maintained BPAs, devices or methods provide protection against the threat posed by many conditions typically found on a user’s premise.

The use of approved BPAs ensures that the appropriate performance evaluation of the assembly was conducted. It is important and required by the State CCCPH to select and properly install an approved BPA that is capable of protecting the distribution system from the hazard identified.

The success of a program depends on individuals that are knowledgeable about cross - connection control to identify actual and potential hazards, apply principles of backflow protection and prevention, and implement cross -connection control policies and procedures. A successful program will have ongoing surveillance of a PWS to ensure BPAs, devices or methods are working and identify new hazards or changes in the distribution system. Certified specialists are needed to properly evaluate the degree of hazard that exists in the distribution system. Hazards typically identified in distribution systems along with the required level of protection are specified in Chapter 3 of the State CCCPH.

A.3 Notes on Applicability of the Cross-Connection Control Policy Handbook The State CCCPH provides the basis for regulating the use and management of cross - connection control programs and BPAs in PWSs, and related requirements for supporting programs and policies. Activities or uses outside of the scope of the authority of the State Water Board to regulate PWSs are not regulated by the State CCCPH, including California Plumbing Code requirements and definitions not related to PWSs.

Recycled water cross-connection control installations and programs for the purposes of protecting the recycled water supply are not regulated by the State CCCPH, although a PWS that uses recycled water is regulated by the State CCCPH to ensure that a PWS’s drinking water system has adequate backflow protection from a recycled water system.

Water systems that do not meet the definition of a PWS ( e.g., “State Small Water Systems” under CCR Title 22, Article 3) are not regulated by the CCCPH, although they may need to comply with the California Plumbing Code, local health agencies, and other laws or entities.

__________________________________________
1 California Department of Health Services (DHS), Public Water Supply Branch. (1988). Guidance Manual for cross connection Control Program (Green Manual). California Department of Health Services City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix B

Assembly Bill 1671 (2017, Chapter 533)
Assembly Bill 1180 (2019, Chapter 455)
City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Assembly Bill No. 1671
CHAPTER 533

An act to amend Section 116810 of, and to add Sections 116407 and 116555.5 to, the Health and Safety Code, relating to drinking water.

[Approved by Governor October 6, 2017. Filed with Secretary of State October 6, 2017.]
legislative counsel’s digest
AB 1671, Caballero. Backflow protection and cross-connection controls:
standards.
(1) Existing law, the California Safe Drinking Water Act, requires the State Water Resources Control Board to administer provisions relating to the regulation of drinking water to protect public health, including, but not limited to, conducting research, studies, and demonstration projects relating to the provision of a dependable, safe supply of drinking water, enforcing the federal Safe Drinking Water Act, adopting regulations, and conducting studies and investigations to assess the quality of private domestic water wells. Existing law makes certain violations of the act a misdemeanor.

Existing law requires any person who owns a public water system to ensure that the system does certain things, including, but not limited to, that it will not be subject to backflow under normal operating conditions. Existing law, to ensure that testing and maintenance of backflow prevention devices are performed by persons qualified to do testing and maintenance, authorizes local health officers to maintain programs for certification of backflow prevention device testers and requires the certification program to be consistent with backflow protection regulations adopted by the state board. A violation of these provisions, or an order by a local health officer pursuant to these provisions, is a misdemeanor.

This bill would require a public water system to implement a cross- connection control program that complies with, and would require the certification program to be consistent with, applicable regulations and the standards described in (2).
(2) Existing regulations establish standards for a backflow prevention device and cross-connection control.

This bill, on or before January 1, 2020, would require the state board to adopt standards for backflow protection and cross -connection control and would authorize the state board to do so through the adoption of a policy handbook, as specified. By authorizing the state board to adopt standards, the violation of which would be a crime, the bill would create a new crime and impose a state-mandated local program.

94 City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025
Ch. 533 — 2 —

(3) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

This bill would provide that no reimbursement is required by this act for a specified reason.

The people of the State of California do enact as follows:

SECTION 1. Section 116407 is added to the Health and Safety Code, to read:
116407. (a) On or before January 1, 2020, the state board shall adopt standards for backflow protection and cross-connection control.
(b) The state board may implement subdivision (a) through the adoption of a policy handbook that is not subject to the requirements of Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code. The policy handbook shall include standards for backflow protection and cross -connection control. In developing the standards and any amendments to those standards, the state board shall consult with state and local agencies and other persons whom the state board has identified as having expertise in the subject of backflow protection and cross-connection control.

The state board shall hold at least two public hearings before adopting the policy handbook. The policy handbook shall be posted on the board’s Internet Web site. (c) (1) Upon the effective date of a policy handbook adopted by the state board pursuant to subdivision (b), the regulations set forth in Article 1 (commencing with Section 7583) and Article 2 (commencing with Section 7601) of Group 4 of Subchapter 1 of Chapter 5 of Division 1 of Title 17 of the California Code of Regulations shall become inoperative, and, 90 days thereafter, are repealed, unless the state board makes a determination not to repeal a specific regulation. (2) If the state board determines not to repeal a specific regulation pursuant to paragraph (1), the state board shall provide to the Office of Administrative Law and the Secretary of State written notice of its determination, including identification of the specific regulation that is not repealed. That regulation, upon the provision of that written notice to the Office of Administrative Law and the Secretary of State, shall become operative.

SEC. 2. Section 116555.5 is added to the Health and Safety Code, to read:
116555.5. A public water system shall implement a cross -connection control program that complies with applicable regulations and with standards adopted by the board pursuant to Section 116407.

SEC. 3. Section 116810 of the Health and Safety Code is amended to read:
116810. To ensure that testing and maintenance of backflow prevention devices are performed by persons qualified to do testing and maintenance,

94 City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025
— 3 — Ch. 533

local health officers may maintain programs for certification of backflow prevention device testers. The local health officer may suspend, revoke, or refuse to renew the certificate of a tester, if, after a hearing before the local health officer or his or her designee, the local health officer or his or her designee finds that the tester has practiced fraud or deception or has displayed gross negligence or misconduct in the performance of his or her duties as a certified backflow prevention device tester. The local health officer may collect fees from certified testers to offset the cost of the certification program provided pursuant to this section. The certification standards shall be consistent with standards adopted by the state board pursuant to Section 116407 and any other applicable backflow protection regulations.

SEC. 4. No reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII B of the California Constitution.

94 City of Huntington Beach Cross Connection Control Management Plan (CCCMP) City of Huntington Beach CCCMP – June 2025
A
ssembly Bill No. 1180
CHAPTER 455
A
n act to amend Section 116407 of the Health and Safety Code, and to add Section 13521.2 to the Water Code, relating to water.
[Approved by Governor October 2, 2019. Filed with Secretary of State October 2, 2019.]
legislative counsel’s digest
AB 1180, Friedman. Water: recycled water.
(1) Existing law, the California Safe Drinking Water Act, requires the Stat e W
ater Resources Control Board to administer provisions relating to the regulation of drinking water to protect public health. Existing law requires, on or before January 1, 2020, the state board to adopt standards for backflow protection and cross-connection control through the adoption of a policy handbook, as specified.

This bill would require that handbook to include provisions for the use of a swivel or changeover device to supply potable water to a dual-plumbed system during an interruption in recycled water service.
(2) Existing law requires the state board to establish uniform statewide recycling criteria for each varying type of use of recycled water where the use involves the protection of public health.

This bill would require the state board, on or before January 1, 2023, as specified, to update the uniform statewide criteria for nonpotable recycled water uses.

T
he people of the State of California do enact as follows:

SECTION 1. The Legislature finds and declares all of the following:
(a) On December 11, 2018, the State Water Resources Control Boar d una
nimously adopted an amendment to the policy for water quality control for recycled water, which included a goal to increase the use of recycled water in the state from 714,000 acre -feet per year in 2015 to 1,500,000 acre -feet per year by 2020 and 2,500,000 acre-feet per year by 2030.
(b) Section 13521 of the Water Code requires the state board to establish uniform statewide recycling criteria for each varying type of use of recycled water where the use involves the protection of public health.
(c) The regulations establishing the uniform statewide criteria for recycled water uses are set forth in Chapter 3 (commencing with Section 60301.050) of Division 4 of Title 22 of the California Code of Regulations. The regulations that pertain to nonpotable recycled water uses have not been updated since 2000. 95 City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025
Ch. 455 — 2 —

(d) The regulations relating to backflow protection and cross-connection control for recycled water are set forth in Article 1 (commencing with Section 7583) and Article 2 (commencing with Section 7601) of Group 4 of Subchapter 1 of Chapter 5 of Division 1 of Title 17 of the California Code of Regulations. These regulations have not been updated since 1987.
(e) Section 1 of Chapter 533 of the Statutes of 2017 (Assembly Bill 1671 of the 2017–18 Regular Session) requires, on or before January 1, 2020, the state board to adopt backflow protection and cross -connection control standards and authorizes their implementation through a policy handbook.
(f) In order to maximize the amount of recycled water California can safely use for beneficial purposes, it is necessary to update the uniform statewide criteria for nonpotable recycled water uses and specify certain associated backflow protection and cross-connection control provisions.

SEC. 2. Section 116407 of the Health and Safety Code is amended to read:
116407. (a) On or before January 1, 2020, the state board shall adopt standards for backflow protection and cross-connection control.
(b) (1) The state board may implement subdivision (a) through the adoption of a policy handbook that is not subject to the requirements of Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code. The policy handbook shall include standards for backflow protection and cross -connection control. In developing the standards and any amendments to those standards, the state board shall consult with state and local agencies and other persons whom the state board has identified as having expertise in the subject of backflow protection and cross-connection control. The state board shall hold at least two public hearings before adopting the policy handbook. The policy handbook shall be posted on the board’s internet website. (2) (A) The policy handbook described in this subdivision shall include provisions for the use of a swivel or changeover device to supply potable water to a dual-plumbed system during an interruption in recycled water service. (B) The use of a swivel or changeover device shall be consistent with any notification and backflow protection provisions contained in the policy handbook. (c) (1) Upon the effective date of a policy handbook adopted by the state board pursuant to subdivision (b), the regulations set forth in Article 1 (commencing with Section 7583) and Article 2 (commencing with Section 7601) of Group 4 of Subchapter 1 of Chapter 5 of Division 1 of Title 17 of the California Code of Regulations shall become inoperative, and, 90 days thereafter, are repealed, unless the state board makes a determination not to repeal a specific regulation. (2) If the state board determines not to repeal a specific regulation pursuant to paragraph (1), the state board shall provide to the Office of Administrative Law and the Secretary of State written notice of its determination, including identification of the specific regulation that is not repealed. That regulation, upon the provision of that written notice to the

95 City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025
— 3 — Ch. 455

Office of Administrative Law and the Secretary of State, shall become operative.

SEC. 3. Section 13521.2 is added to the Water Code, to read:
13521.2. (a) On or before January 1, 2023, the state board shall update the uniform statewide criteria for nonpotable recycled water uses established in Chapter 3 (commencing with Section 60301.050) of Division 4 of Title 22 of the California Code of Regulations. The deadline imposed by this section is mandatory only if the Legislature has appropriated sufficient funds, as determined by the executive director of the state board, in the annual Budget Act or otherwise to cover the state board’s costs associated with the performance of the duties imposed by this section. (b) For purposes of the update to the uniform statewide criteria for nonpotable recycled water uses described in subdivision (a), the state board shall adopt a regulation that incorporates by reference the criteria and applicable backflow protection provisions, including the provisions for the use of a swivel or changeover device for dual-plumbed systems, that are contained in the most recently adopted version of the policy handbook adopted pursuant to Section 116407 of the Health and Safety Code and any future versions of the policy handbook.

O

95 City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix C

Municipal Code and Ordinance

25-16158/380507
RESOLUTION NO. 2025-____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH

ADOPTING THE CROSS CONNECTION CONTROL MANAGEMENT PLAN

WHEREAS, by Resolution No. 2022-12, the City Council of the City of Huntington Beach updated the Cross Connection Control Program for the Huntington Beach Water System; and

The City desires to further update and improve the Cross Connection Control Program by approval and adoption of the “Cross Connection Control Management Plan” as set forth in Exhibit A hereto,

NOW, THEREFORE, the City Council of the City of Huntington Beach does hereby resolve as follows:

1. The “Cross Connection Control Management Plan” attached hereto as Exhibit “A” and incorporated by this reference as thought fully set forth herein, is hereby approved and adopted.

2. Resolution No. 2002-12 and all other previous Resolutions in conflict herewith are hereby repealed.

3. This Resolution shall become operative upon the effective date of Ordinance No. _________.

PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on ____________, 2025.

___________________________
Mayor

ATTEST: APPROVED AS TO FORM:

___________________________ ___________________________ City Clerk City Attorney

REVIEWED AND APPROVED: INITIATED AND APPROVED:

___________________________ ___________________________ City Manager Director of Public Works

25-16158/380506
ORDINANCE NO. 2025-____

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF HUNTINGTON BEACH AMENDING SECTION 14.16.190 OF THE HUNTINGTON BEACH

MUNICIPAL CODE RELATING TO PROTECTING CROSS CONNECTIONS

The City Council of the City of Huntington Beach does hereby ordain as follows:

SECTION 1. Section 14.16.190 of the Huntington Beach Municipal Code is hereby amended to read as follows:

14.16.190 Protecting Cross Connections. The City shall maintain a Cross Connection Control Program throughout the Huntington Beach Water System service area. Such program shall be established by the City Council pursuant to Resolution No. 2025-____, titled “A Resolution of the City Council of the City of Huntington Beach Adopting the Cross Connection Control Management Plan.”

SECTION 2. This ordinance shall be effective 30 days after its adoption.

PASSED AND ADOPTED by the City Council of the City of Huntington Beach at a regular meeting thereof held on _______________________, 2025.

ATTEST:

_______________________________
City Clerk

REVIEWED AND APPROVED:

________________________________
City Manager

___________________________________
Mayor

APPROVED AS TO FORM:

____________________________________
City Attorney

INITIATED AND APPROVED:

____________________________________
Director of Public Works

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix D

High Hazard Premises

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

APPENDIX D

HIGH HAZARD CROSS-CONNECTION CONTROL PREMISES
The list below identifies premises that require backflow protection provided by an air gap or a reduced pressure principle backflow prevention assembly, unless noted otherwise. The list below is not intended to be all-inclusive. A PWS, State Water Board, or local health agency may require an AG, RP, or both to protect a PWS from other hazards not listed below and identified in premises through the hazard assessment completed in CCCPH Chapter 3, section 3.2.1. A PWS may reduce or increase the minimum protection required for a previously hazard-assessed user premise following a hazard reassessment as described in CCCPH Chapter 3, section 3.2.1.

1. Sewage handling facilities

2. Wastewater lift stations and pumping stations

3. Wastewater treatment processes, handling, or pumping equipment that is interconnected to a piping system connected to a PWS (+)

4. Petroleum processing or storage plants

5. Radioactive material storage, processing plants or nuclear reactors

6. Mortuaries

7. Cemeteries

8. Sites with an auxiliary water supply interconnected with PWS (+)

9. Sites with an auxiliary water supply not interconnected with PWS

10. Premises with more than one connection to the PWS (++++)

11. Recycled water (++)(+++)

12. Recycled water interconnected to piping system that contains water received from a PWS (+)

13. Graywater systems, as defined in California Water Code Section 14876, that are interconnected to a piping system that is connected to a PWS

14. Medical facilities

15. Kidney dialysis facilities

16. Dental office with water-connected equipment

17. Veterinarian facilities

18. Chemical plants

19. Laboratories

20. Biotech facilities

21. Electronics manufacture

22. Dry cleaner facilities

23. Industrial or commercial laundry facilities

24. Metal-plating facilities

25. Business park with a single meter serving multiple businesses

26. Marine-port facilities

27. Car wash facilities

28. Mobile home park, RV park, or campgrounds with RV hookups

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

29. Hotels/motels

30. Gas stations

31. Fire stations

32. Solid waste disposal facilities

33. Pet groomers

34. Agricultural premises

35. Hazard assessment access denied or restricted

36. Railroad maintenance facilities

37. Incarceration facilities (e.g., prisons)

38. Temporary connections to fire hydrants for miscellaneous uses, including construction

39. Private water distribution mains

40. Drinking water storage tank overflow connected to a sump or storm drain (+)

41. Airports
(+) Premise isolated by air gap only except as allowed through CCCPH Section 3.2.2(c) (++) Dual-plumbed use areas established per CCR Title 22, Section 60313 through 60316 where recycled water is used for individually owned residential unit. (+++) Residences using recycled water for landscape irrigation as part of an approved dual plumbed use area established pursuant to CCR Title 22, sections 60313 through 60316 shall use, at a minimum, a DC. If the water supplier is also the supplier of the recycled water, then the recycled water supplier may obtain approval of the local public water supplier or the State Water Board, to utilize an alternative backflow protection plan that includes an annual inspection of both the recycled water and potable w ater systems and an annual cross - connection test of the recycled water and potable water systems pursuant to subsection 60316(a) in lieu of any BPA.
(++++) All connections must receive at least the same level of protection excluding fire protection when connected to the PWS distribution system ( e.g., if one connection requires an RP then all connections must have RPs installed).

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix E

Assessment Database

Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended BPA
Assessment
Date CCCPS Name, No.
100 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 K. Schroeder, No. 12345 100 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 K. Schroeder, No. 12346 100 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 K. Schroeder, No. 12347 100 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 K. Schroeder, No. 12349 100 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 K. Schroeder, No. 12350 100 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234571 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 100 1234575 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 Cross-Connection Assessment Tracking Sheet
Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended BPA
Assessment
Date CCCPS Name, No.
200 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 K. Schroeder, No. 12345 200 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 K. Schroeder, No. 12346 200 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 K. Schroeder, No. 12347 200 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 K. Schroeder, No. 12349 200 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 K. Schroeder, No. 12350 200 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 Cross-Connection Assessment Tracking Sheet
Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended BPA
Assessment
Date CCCPS Name, No.
300 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 K. Schroeder, No. 12345 300 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 K. Schroeder, No. 12346 300 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 K. Schroeder, No. 12347 300 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 K. Schroeder, No. 12349 300 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 K. Schroeder, No. 12350 300 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234571 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234575 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 300 1234575 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 Cross-Connection Assessment Tracking Sheet
Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended BPA
Assessment
Date CCCPS Name, No.
400 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 K. Schroeder, No. 12345 400 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 K. Schroeder, No. 12346 400 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 K. Schroeder, No. 12347 400 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 K. Schroeder, No. 12349 400 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 K. Schroeder, No. 12350 400 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 400 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 400 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 400 1234571 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 400 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 400 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 K. Schroeder, No. 12348 Cross-Connection Assessment Tracking Sheet

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix F

Self-Report Letter
(Commercial/Industrial Assessments)

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) C
ity of Huntington Beach CCCMP – June 2025

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix G

Backflow Prevention Assembly Diagrams

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) C
ity of Huntington Beach CCCMP – June 2025
Di
agram 1
Do
uble check detector backflow prevention assembly

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Diagram 2

Double check detector backflow prevention assembly – type II

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Diagram 3

Double check valve backflow prevention assembly

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) C
ity of Huntington Beach CCCMP – June 2025
Di
agram 4
P
ressure vacuum breaker backsiphonage prevention assembly

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Diagram 5

Reduced pressure principle backflow prevention assembly

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Diagram 6

Reduced pressure principle detector backflow prevention assembly

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) C
ity of Huntington Beach CCCMP – June 2025
Di
agram 7
R
educed pressure principle detector backflow prevention assembly – Type II

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Diagram 8

Spill-resistant pressure vacuum breaker backsiphonage prevention assembly

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) C
ity of Huntington Beach CCCMP – June 2025
Swivel-Ell Design and Construction Criteria
The criteria below, in conjunction with the swivel-ell diagrams that follow (Diagrams A and B), are minimum acceptable design and construction-related requirements for utilizing a swivel- ell. For restrictions and allowances for utilizing a swivel-ell, see CCCPH section 3.2.2.

A. Prior to operation of a swivel -ell, the PWS will receive approval for the design and construction plans of that swivel-ell from the State Water Board.

B. The drinking water supply must not, under any circumstances, be directly connected to the recycled water supply, nor be designed such that the recycled water use site could be supplied concurrently by a recycled water supply and a drinking water supply.

C. The drinking water supply line and the recycled water supply line must be offset (see Diagram 9b) in a manner that ensures a tee-connection, spool, or other prefabricated mechanical appurtenance(s) could not be readily utilized in lieu of the swivel -ell connection, nor result in the recycled water use site being supplied concurrently by recycled water and drinking water.

D. The recycled water supply line used in conjunction with the swivel-ell must be the only recycled water supply to the recycled water use area.

E. The swivel-ell must be located as close as practical to the public water system service connection, with the swivel-ell connection being located as close as practical to the RP upstream of the swivel-ell.

F. The swivel-ell must:

1. be located above ground;

2. be color-coded pursuant to section 116815 of the CHSC and its implementing regulations;

3. include appropriate signage, as required by regulation and the State Water Board;

4. be provided the security necessary to prevent interconnections, vandalism, unauthorized entry, etc.; and

5. be provided with meters on both the recycled water service and drinking water service connections.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025
Legend for Diagram 9a and 9b (also see next page)
RP = Reduced pressure principle backflow prevention assembly RW = Tertiary-treated recycled water originating from wastewater treatment facility DW = Drinking water originating from a public water system W = Water (tertiary recycled water or drinking water) to use site. As pictured, configured for supplemental drinking water to the use site.

M = Meter (next page)
PE = Plain End (next page)
GRV = Groove (next page)
PWS = Public Water System (next page)

Diagram A: Example Swivel-Ell Pictorial (also see Plan View Schematics)

Note: The R P, a required component of an acceptable swivel-ell, is not shown in the picture.

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) C
ity of Huntington Beach CCCMP – June 2025
Diagram B
Swivel-Ell Typical Plan View Schematics
(not intended to be an exact portrayal of the pictorial)

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix H

City Records Retention Policy

ADMINISTRATIVE REGULATION

OFFICE OF THE CITY MANAGER
Number
Responsible Department
Established/Effective Date
Latest Revision Date
Next Review & Reauthorization Date
222
City Clerk's Office
August 2016
January 3, 2023
January 3, 2025
SUBJECT: Centralized Records Management

1. Purpose: To state the policy of the City of Huntington Beach (City) to develop and implement a centralized Records Management Program (RMP) that (a) provides for the systematic identification and management of records, in all formats or media, and (b) specifies responsibilities to implement the program.

The RMP manages the creation, receipt, maintenance, and disposition of City records; maintenance of the approved Records Retention Schedule; utilization of appropriate technology to facilitate records retrieval and storage; and establishment of guidelines and procedures to carry out
these functions. The RMP provides systematic control of all records, regardless of format or location, from creation or receipt through processing, distribution, maintenance retrieval and disposition.

The objectives of the RMP are to:
■ Identify
the City's records to facilitate access to information required to conduct the City's business
and to comply with applicable statutes and regulations; ■ Establish
procedures for the maintenance and preservation of City records in accordance with this policy and Records Retention Schedule;
■ Promote
awareness among City employees of the importance of the RMP and provide consistency
in the storage, retention, and destruction of City records; ■ Ensure
preservation of records subject to Legal Hold as a result of ongoing, threatened or anticipated l
itigation, claim, audit, proceeding or governmental or City investigation, until the matter or the need for such records has been completed; ■ Protect the integrity of the City's records;
■ Provide protocols to ensure compliance with the California Public Records Act (CPRA) (Government Code sections 7920 et seq); and
■ Identify, protect, and process in accordance with established procedures Historical and Vital records of the City.

2. Authority:

California Public Records Act (CPRA) (Government Code sections 7920 et seq).

City of Huntington Beach Charter Sec
tion 401 (g) ; Charter Section 31 O; Resolution No . 2002-9;

3. Applicability:

This policy applies to all City elected officials, employees, and representatives.

AR 222 Records Management Program 1 of 9

I ADMINISTRATIVE REGULATION
OFFICE OF THE CITY MANAGERh

4. Definitions:
■ HistoricalRecords - Records thathave continuingvalue to the Cityafterbusiness or legal recordkeeping requirements have been met. Historicalrecords relateto the formation, major events, or growth and development of the City.

Legal Hold - A situation in which the destruction or deletionof a record istemporarily postponed, and the record isretainedpast the assigned retentionperiod due to an investigation,litigation,or auditinwhich the record may be useful.The record isheld untilthe matter is resolved.

Non-Records - Any document or informationthatdoes not pertainto City business transactions or any document or informationthat isnot included inthe definitionof a record.

Examples of “Non-Records” are listedin ExhibitB.

Obsolete Records - Records that have met the required retention periods, are not subject to Legal Hold, and should be processed for destruction.

Records - Any recorded information,regardlessof medium or characteristics,created or received by the Citythat provides evidence of itsoperations,or itscompliance with statutes and regulations.A Record can be invarious formats, includinghardcopy, electronic, audio/video, etc.,can be recorded in various media, includingpaper, computer disk,optical image, etc.Examples of “Records” are listedin ExhibitA.

Records Liaison - A Citystaffmember{s) designated by Department Head at each department to act as a primary pointof contactand liaisonwith the CityClerk’sOfficeinthe implementation of a centralizedRMP. department..

Records Management Procedures - A set of steps, instructions,and/or other methodologies to follow in order to complete records management tasks ina systematic way.

Common business practicedesigned to identify,classify,and protectan organization’s records and destroy them at the end of the approved retentionperiod.

Records Management Program - The policy,procedures and resources designed to protectthe City’srecords, and to destroy them at the end of the approved retentionperiod.

Records Retention Schedule - A listof categoriesof records thatshows the approved retention period and other attributesof such records.

Representatives - Any contractor,agent, or other service provider (includingany temporary worker whose servicesare provided by a third-partycontractorthathas expressed or implied responsibilityto maintain records inthe course of itsservicesto the City.

Vital Records - Records identified as essential for the continuationof the City’soperations if a disasterstrikes.Such records are necessary to re-createthe City’slegaland financial status and determine the rightsand obligationsof employees, City residents,vendors, etc.

Examples of “VitalRecords” are listedin ExhibitC.
2 of 9AR 222 Records Management Program
I ADMINISTRATIVE REGULATIONI OFFICE OF THE CITYMANAGERs-

5. Policy:

A. Records Maintenance
Allemployees shall:

1. Collaboratewiththe CityClerk’sOffice- Records Management Divisionin maintaining City Records in accordance with the Records Retention Schedule or,when applicable, Legal Holds;

2. Take reasonable steps to ensure thatrepresentativesworking at theirdirectionwho maintain Cityrecords do so inaccordance with the Records Retention Schedule or,when applicable,Legal Holds.

B. Legal Hold
Employees and representativesaware of any pending,threatened or anticipatedlitigation, auditor investigationare requiredto retainallRecords and Non-Records related to such litigationor investigation.No records shallbe altered,destroyed, mutilated,concealed, or deleted ifitrelatesto any ongoing,threatened,or anticipatedlitigation,audit,or investigation.

6. Responsibilities:

A. The City Clerk’s Office - Records Management Division shall:

1. Oversee the implementation of a centralizedRecords Management Program;

2. Maintain,review and with approvals of the CityClerk,CityAttorney,CityManager and Department Heads, revisethe Records Retention Schedule ifnecessary;

3. Act as an advisor on allrecords management issues and relatedprojects;

4. Coordinate the timelyprocessing of allPublic Records Act (PRA) requests;

5. Manage retention,transfer,appropriatestorage,retrievalof records as wellas the destruction or deletion of allobsolete records;

6. Coordinate withthe CityAttorneyand concerned Departments the suspension of destructionor deletionof recordssubjectto Legal Holds, as wellas the releases of Legal Holds, which willallow the resumption of destructionor deletionof records;

7. Coordinate at leastone annual citywiderecords review and destructionof ail Departments obsoletehardcopy and electronicrecords;and

8. Develop and providenecessary trainingto allRecords Liaisons to ensure compliance with the RMP and the Records Retention Schedule.

B. City Attorney’s Office shall:

1. Identifyand advise the CityClerk’sOffice- Records Management Divisionregarding applicablestatutoryand regulatoryrecordkeeping requirements and any records pertainingto any pending legalaction;

2. Provide legalsupporton matters regardingCPRA requests to ensure proper compliance and prevent the release of informationexempt from disclosure under the CPRA;

3. Promptly process requests fordestructionof obsolete records;

4. Promptly request Legal Holds and when appropriate,releases of Legal Holds; and AR 222 Records Management Program 3 of 9

ADMINISTRATIVE REGULATION

OFFICE OF THE CITY MANAGER

5. Advise the City Clerk's Office, City Manager and Chief Information Officer of any changes in legal requirements concerning the Records Management Program.

C. City Manager

1. Ensure compliance of Records Management Program activities by all City Department Heads in conjunction with existing policies adopted by the City Council.

D. Chief Information Officer (CIO)

1. Ensure prompt technical support to the City Clerk's Office - Records Management Division, City Attorney, City Manager and Records Liaisons concerning the implementation of the RMP, including Legal Holds and CPRA related requests.

2. Coordinate with the Records Management Division the retention, transfer, storage, retrieval, and destruction of electronic records in accordance with the Records Retention Schedule or, when applicable, Legal Holds.

3. Review features of new information technologies that affect the management of electronic records with the Records Management Division.

E. Department Heads

1. Appoint and oversee Department Records Liaisons to ensure Department records are managed in accordance with the Records Retention Schedule.

2. Promptly review and approve records destruction certificates.

F. Records Liaisons

1. Coordinate with the Municipal Records Manager to ensure department records are maintained and protected in accordance with the Records Retention Schedule.

2. Forward to the Municipal Records Manager all requested changes to the Records Retention Schedule.

3. Coordinate destruction of obsolete Department records with the Municipal Records Manager.

4. Provide assistance to Department's employees and representatives concerning all RMP related issues and activities.

Attachments:

1. Exhibit A - Examples of Records

2. Exhibit B - Examples of Non-Records

3. Exhibit C - Current List of Vital Records

4. All Inclusive Records Retention Schedule
Distribution:

All employees may access the Administrative Regulations via the SurfNet or City website:
www.huntingtonbeachca.gov/AR
AR 222 Records Management Program 4 of9

I ADMINISTRATIVE REGULATIONI OFFICE OF THE CITYMANAGER
Ro)6inEstanislau,CityClerk
InitiatingDepartment
Aporoved as to Form
Michael Gates, CityAttorney
Eric G. Parra
InterimCityManager
Review Schedule
REVIEW DATE DEPT. HEAD

INITIAL

CITY MANAGER

SIGNATURE
AR 222 Records Management Program 5 of 9

ADMINISTRATIVE REGULATION

OFFICE OF THE CITY MANAGER

EXHIBIT A

EXAMPLES OF RECORDS
Records can existinallformats or media, and may include,but are not limitedto writings drawings,graphs, charts,photographs,audio or video recordings,and electronicdocuments.

The list below is categorized into two and not a comprehensive list of Records.

Employees who have questions about whether any document would be considered a Record should consult their Records Liaison and Records Retention Schedule applicable to their Department.

Generally Disclosed Records
Audit reports
Contracts / Agreements
Vendor invoices
Purchase orders and authorizations
Permits and licenses
Projectrecords
City Council resolutions
Meeting Minutes
Election records
Equipment /Vehicle repairfiles
Finalversion of presentations
Generally Non-Dtsclosed Records
■ Employee personnel files
■ LitigationFiles
■ Employee medical files
■ Ongoing investigationfiles
6 of 9AR 222 Records Management Program
k\
i. ADMINISTRATIVE REGULATION

OFFICE OF THE CITY MANAGER
j

EXHIBIT B

EXAMPLES OF NON-RECORDS
Following isa listof documents, electronicforms, supplies or ephemera that do not meet the definitionof a recordforthe purposes of providingevidence of the City’stransactions. ● Extracopies of publications,pamphlets, and allblank forms. These are considered “supplies”ratherthan records.
■ Incorrectversionof documents, forms,or reportsthat must be regenerated to correct errorsintyping,data entry,spelling,grammar, or format.
■ Preliminarydraftsof documents such as letters,memoranda, emails, reports,and worksheets which do not represent significantsteps in the preparation of records, and which do not record decisions. Once such document is rendered, the working copies (drafts)are considered non-records.
■ Working copies of documents used solelyuntilthe finishedrecord is“rendered”,such as sending itto or receivingitfrom another employee or outside person. ■ Phone messages used only to inform an employee thatthere was a missed telephone call.

Note: voicemail recordingsmay fallunder the definitionof a record ifthe content meets the definition of a record.
■ Reference materialsnot produced by the Citysuch as dictionaries,library-typereference books, periodicalsor other serialpublications.
■ Catalogs, tradejournals,and other published materialsreceived from outside organizations,industryorganizations,commercial firms,vendors, or privateinstitutions, which requireno actionand are not needed fordocumentary purposes. These materials are usuallyconsidered “librarymaterials”and should be controlledas such but are not records.

AR 222 Records Management Program 7 of 9

ADMINISTRATIVE REGULATION
OFFICE OF THE CITY MANAGER1

EXHIBIT C

CURRENT LIST OF VITAL RECORDS
(subjectto change)
● Council Policies and Procedures
● Minutes
● Resolutions
● VitalRecord Storage
● MicrofilmProgram
● AdministrativeRegulations / Policies
● Dispositionof Records
● General ObligationBonds
● Revenue Bond - Cityand/or Agency
● Revenue Bond - Public FacilitiesCorp.
● Revenue Bond - CivicImprovement Corp.
● Revenue Bond - H.B. Public Finance Authority
● Tax AnticipationRevenue bonds/Notes
● Underground Utilities
● Special Assessment / Improvement Districts
● Redevelopment ProjectAreas:
● Main-Pier ProjectArea
● Oakvie\A/ProjectArea
● Warner-Goldenwest ProjectArea
● Talbert-Beach ProjectArea
● Yorktown-Lake ProjectArea
● Civic Center
● Florida Utica Enhancement Area
● Commodore CircleFunding Area
● Articlesof Incorporation
● Annexations
● Easements / Deeds / Quitclaims
● Tract Maps
AR 222 Records Management Program 8 of 9
*

ADMINISTRATIVE REGULATION

OFFICE OF THE CITY MANAGER
n
t!
S' y
● City FacilitiesBlueprints
● InfrastructureMaps (CIS)
AR 222 Records Management Program 9 of 9

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix I

Cross-Connection Incident Response Form

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix J

Emergency Response Plan

City of Huntington Beach Cross Connection Control Management Plan (CCCMP) C
ity of Huntington Beach CCCMP – June 2025
Appendix J
Emergency Response Plan
1 2
3 N� JARED 8LUMEtffH()

4..--......___� SECRHARY FOR
Water Boards ,_.,. rnV!RONME/ITAL PROTECTION
State Water Resources Control Board
Division of Drinking Water

WATER QUALITY EMERGENCY NOTIFICATION PLAN

NOT FOR PUBLIC DISTRIBUTION
Name of Utility: City of Huntington Beach System Number: 3010053 Physical Location/Address: 1900 I Huntington Street, Huntine,>ton Beach, CA 92648 The following persons have been designated to implement the plan upon notification by the Division of DrinkinQ Water, SWRCB, that an imminent danqer to the health of the water users exists· Water Utility Email Address Telephone
Contact Name & Title Dav Evenini:1
Kristen Schroeder, WQ Supervisor Kristen.schroeder@su,•fcity- (714) 960-8802 (657) 237-4049 hb.Ol'I!
Vince Madrid, Acting Utility Vince.madl'[email protected] (714) 536-5269 (714)907-7412 Superintendent
John Poehler, Denutv Director PW Joh 11, ooehl er@s u rf ci tv-h b. o I'!! !714) 536-5503 (562) 522-8573 Implementation of the plan will be carried out with the assistance of the following DDW-SWRCB personnel, along with County Health Department representatives:

Cell
(657) 237-4049
(714) 907-7412
(562) 522-8573
DDW-SWRCB: Contact Name & Title Email Address Telephone 1 2
3 4
5 Day EveninQ
Oliver Pacifico, District Engr. Oliver.�[email protected] (714) 558-4997 Yen Tran, Assoc. Sanitary Engr. [email protected] (714) 558-4707 Anthony Nhan, Assoc. Sanitary Engr. AnthonY:,[email protected] (714) 567-7261 Minliang Shih, Assoc. Sanitary Engr. Minliang.shih(@waterboards.ca.gov (714) 547-0430 James Jablonski, Assoc. Sanitary Engr. [email protected] (714) 558-1540 Orange County Environmental Health: Phone Number (714) 433-6000 and Fax Number (714) 433-6481 Office of Emergency Services Warning Center (24 hrs) (800) 852-7550 or (916) 845-8911 When reporting a water quality emergency to the Warning Center, please ask for the State Water Resources Control Board - Division of Drinking Water Dutv Officer.

NOTIFICATION PLAN
Attach a written description of the method or combination of methods to be used (radio, television, doorMto-door, sound truck, etc.) to notify customers in an emergency. For each section of your p!an give an estimate of the time required, necessary personnel, estimated coverage, etc. Consideration must be given to special organizations (such as schools), non-English speaking groups, and outlylng water users. Ensure that the notification procedures you describe are practical and that you will be able to actually implement them in the event of an emergency. Examples of notification plans are enclosed for large, medium and small communities. 3/19/25
Date
E. JOAQUIN ESQUIVEL, CHAIR f EILEEN SOBECK, EXECUTIVE DIRECTOR 2 MacArthur Place Suite 150, Santa Ana, CA 92707 ! www.waterboards.ca.gov

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Appendix K

Standard Specifications
and/or Standard Drawings

City of Huntington Beach Cross Connection Control Management Plan (CCCMP)

City of Huntington Beach CCCMP – June 2025

Standard Specifications and/or Standard
Drawings can be reviewed at:

https://www.huntingtonbeachca.gov/depart
ments/public_works/standard_plans/index.
php