EDISON PARK CONCEPTUAL PLAN LEGEND
KROLL IN POSTON IN SHAW IN
1. Reconfigured parking lot with new entry at Edison H.S. intersection. (Total parking spaces + 275)
2. New parking lot entry at Poston Lane. LANDFILL STILWELL DR
3. New sport court plaza with seating and shade.
4. New full court basketball court (4).
5. New tennis courts (2). OWNDED AND OPERATED
BY SCHOOL DISTRICT
6. New practice hitting wall at tennis court. OPEN TO THE PUBLIC
7. New dual use courts (2 tennis with 8 pickleball overlays). (5 ACRES)
8. Existing tennis courts (#3 and #4) converted to pickleball EDISON PARK PROPERTY - (28 ACRES) courts (8).
9. Existing trees.
10. New trees.
11. New shade shelter. 19
12. Existing softball fields.
13. New U14 (55 yds x 100 yds) soccer field with ball 20 EDISON H.S.
containment netting and street adjacent fencing.
14. New U10 (50 yrds x 70 yrds) soccer field overlay in SCE Corridor (pending SCE review and approval).
15. Enlarged all-wheel plaza. 4
16. New tot lot with rubber surfacing, equipment and shade.
17. Expanded exterior restrooms at Community Center.
18. Existing SCE Towers and overhead utility lines.
19. Existing walkways.
17)
20. Landfill monitoring station. 23 EDISON
21. Oil Well #1. 12 COMMUNITY
CENTER EDISON
22. Oil Well #2. MAGNOLIA ST HIGH
SCHOOL
23. New mounded lawn for spectator seating.
sting Healiny Trees to Rema ~ 95
er 2022 Arborist Repo 12
xisting Healtny Trees to be Remove 23
ased on Plan improvement ~ 50
New Trees - 200+
New Parking Stalls ~ 74
15 HB FIRE
STATION
LANDFILL
U14
OWNED BY SCE AND OPERATED
FIELD
AND MAINTAINED BY CITY
OPEN TO PUBLIC (5+ ACRES)
HAMILTON AVE
ASCON
LANDFILL