From: Isabella Ford
To: CITY COUNCIL (INCL. CMO STAFF); [email protected] Subject: Uphold the Planning Commission"s approval for the M&O building Date: Wednesday, April 29, 2026 5:59:05 PM
Dear City Council Members,
Just to put it on record since you don't seem to care...but I ask you please listen to your planning commissioners and do not appeal this project.
Thank you
Isabella Ford
714-308-0660
SUPPLEMENTAL COMMUNICATION - Meeting Date: 5/5/2026 Item No. 14 (26-279 ) 619.320.5894 Dan - 619.320.5895 Erika
[email protected] or [email protected] www.pacificrimeco.com
Dr. Daniel Barbara, DHSc, CPH, REP, CCPI, CPI
Principal Consultant
Pacific Rim EcoSystemic Strategy Advisors, LLC
2514 Jamacha Rd.
El Cajon, CA 92019
(619) 320-5894
April 28, 2026
VIA ELECTRONIC MAIL AND US Postal Mail
Huntington Beach City Council
2000 Main Street
Huntington Beach, CA 92648
RE: Expert Environmental Opinion Regarding the Validity of the CEQA Notice of Exemption (NOE) – HBCSD Maintenance & Operations Building Project (8750 Dorsett Drive) – CUP No. 23- 014; Planning Commission File No. 24-485; Design Review Board Application No. 24-005; and City Planning Record No. PA-2023-0067
Honorable Mayor and Members of the City Council,
Pacific Rim EcoSystemic Strategy Advisors, LLC (Pacific Rim Eco) has been retained by Robert Granger and the concerned residents of Breton Lane to perform an independent professional review of the Huntington Beach City School District’s (HBCSD) California Environmental Quality Act (CEQA) determination for the proposed 7,525-square-foot Maintenance & Operations (M&O) Building.
Accompanying this letter is our formal Expert Environmental Opinion & Analysis. Our investigation concludes that the District’s Notice of Exemption (NOE) is factually and procedurally invalid. We identified five compounding, disqualifying problems that necessitate a full environmental review:
• Procedural and Baseline Violations: The District relies on an unlawful baseline of unpermitted M&O operations and filed its NOE prematurely—prior to a project decision or permit submission— violating CEQA Guidelines Section 15062(a).
• Misapplication of Class 3 Exemption: This industrial facility, intended to house heavy machinery and hazardous substances, does not meet the "similar structure" criteria of Class 3 (small stores or offices).
• Extraordinary "Unusual Circumstances": The project’s 22.5-foot proximity to residences, adjacency to a public park, and location within a cluster of significant environmental sites—including
the Ascon Superfund Site, the Cannery Street Landfill, and the protected Huntington Beach Wetlands—create a "reasonable possibility" of significant effect. • Regulatory Vacuum: The District’s incorrect claim of zoning exemption under Government Code §53094 bypasses essential local vetting for noise, traffic, and hazardous materials. • Public Health Risks: Our analysis highlights scientifically evidenced risks to community physical and mental health, exacerbated by the site’s shallow seasonal water table and poorly drained soils, which facilitate contaminant migration.
Intent to Present
Please be advised that Pacific Rim Eco will be present at the City Council meeting on May 5, 2026, alongside our clients. We intend to provide expert testimony summarizing these findings for the administrative record with the bounds of whatever times is allocated for this purpose.
Upholding CEQA safeguards now is the responsible path to protecting the health of Huntington Beach residents.
Sincerely,
Dr. Daniel Barbara, DHSc, CPH, REP, CCPI, CPI
Principal Consultant
Pacific Rim EcoSystemic Strategy Advisors, LLC
An SBA-Certified Service-Disabled Veteran-Owned Small Business Enclosure: Expert Environmental Opinion & Analysis (with Appendices A-E) From: Robert Granger
To: [email protected]
Subject: File #: 26-279 Appeal of Planning Commission"s Action on Conditional Use Permit No. 23-014 (HBCSD Maintenance and Operations Building)
Date: Friday, May 1, 2026 4:19:59 PM
Attachments: Invalid Claim that M&O is for classroom educational use .pdf You don't often get email from [email protected]. Learn why this is important RE: The Invalid claim by district that this is to be used for educational purposes and is considered classroom use
The argument that the Maintenance and Operations (M&O) building will be used by students for classroom use is entirely invalid because it directly contradicts the District's own published project descriptions, architectural plans, hearing testimonies, and legal building strategies.
If the District attempts to make this argument, you can easily defeat it using their own record:
1. The District Explicitly Admitted It Will Not House Students. The District's own website, FAQs, and Development Guides explicitly state that "The M&O facility will not host students". Furthermore, during the Planning Commission hearing, the District’s architect, Brian Whitmore, testified on the record that "this particular project does not house students".
2. The Project is Evading the Field Act. The District has publicly admitted that the new M&O building will be built using "local building standards in lieu of Field Act compliance." The Field Act is the stringent California safety code that is legally required for any facility attended by students and teaching staff. Under California law, if a building is not subject to the Field Act, it is officially classified as a non-classroom facility. If the District were to suddenly argue the building is for classroom use, they would be legally forced to comply with the Field Act and submit to a full structural and fire/life safety review by the Division of the State Architect (DSA), a process they intentionally avoided.
3. The State Architect Confirmed It Is Not for School Purposes In an email dated August 22, 2024, the DSA Regional Manager, Ron LaPlante, confirmed in writing that the DSA will not oversee the project's structural safety specifically because "this site is not used for school purposes".
4. The Floor Plans Prove Industrial and Storage Use The official project narrative and architectural plans submitted to the City designate the 7,510 to 7,525-square-foot building strictly for industrial maintenance and storage. The space is explicitly partitioned for woodworking, metalworking, groundskeeping, light mechanic work, a centralized warehouse for maintenance materials, and office space for the 14 M&O staff members . There are no classrooms in the blueprints.
5. It Triggers Mandatory Local Zoning Compliance Because the building is legally and functionally a non-classroom facility, it is subject to the limitations of California Government Code §53094(b). This state code explicitly dictates that a school board cannot exempt itself from city zoning laws when the proposed use is for "nonclassroom facilities, including, but not limited to, warehouses, administrative buildings, and automotive storage and repair buildings".
In summary, the District cannot legally argue the building is for student use without invalidating their entire permitting strategy, triggering mandatory state safety oversight under the Field Act, and contradicting their own blueprints and public testimonies. photo Robert Granger
Insurance Agent & Broker,
Granger Independent Insurance Services
949-424-6423 - (949) 4-CHOICE
www.grangerindependent.com
[email protected]
20902 Brookhurst St. Ste 208, Huntington Beach, CA 92646 How the HBCSD Cheated the Public
Review Process
From: H Meyers
To: [email protected]
Subject: Agenda Item #14 - Appeal of Planning Commission Action Conditional Use Permit No. 23-014 (HBCSD Maintenance and Operations Building
Date: Sunday, May 3, 2026 3:39:04 PM
I am a long-time resident of Huntington Beach. I urge you not to support an appeal of the conditional use permit No. 23-014 allowing the Huntington Beach City School District to build a maintenance building on its property at Dorsett Drive. None of the objections to the project are based in fact. The HBCSD has complied with all requirements and already operates from this site but in an outdoor parking lot. Moving the activity indoors will reduce noise, and there will be no increase in traffic, since the activity is already occurring at that location.
Alternative locations have been explored, the project has completed its CEQA review and been approved at every level in the City, meeting all city requirements, including zoning. Sound insulation and a block wall will separate the structure from neighboring properties.
Again, I urge you to allow this project to go forward.
Hildy Meyers
Huntington Beach
From: Celeste Rybicki
To: [email protected]; Gruel, Andrew; McKeon, Casey; CITY COUNCIL (INCL. CMO STAFF) Subject: RE: Agenda Item#14 HBCSD Maintenance and Operation Building Date: Sunday, May 3, 2026 4:45:07 PM
Hello,
It feels very frustrating to have to write this email asking our city council to please move forward with the previously approved Maintenance and Operations Building that would so greatly benefit our community. It is especially frustrating that this is being fought and delayed by someone currently running a campaign on "putting Huntington Beach residents, small businesses, and community values ahead of outside interests." HB residents deserve wellmaintained schools and the safety and wellbeing of our children is certainly integral to our community values. I have children at HBCSD schools and who play soccer with AYSO on the fields that need this building desperately. I know that this project has already undergone multiple City review steps and has already been found to meet all the applicable zoning, building, and City requirements, so PLEASE, for our kids, let it proceed already!
Thanks,
Celeste Rybicki
17 year HB resident and concerned parent of 3
From: buzz mccord
To: [email protected]
Subject: Supplemental Communication re: Agenda Item 25: Fluoridation Date: Sunday, May 3, 2026 8:51:17 PM
To the Huntington Beach City Council:
I am trying to understand the Council’s new skepticism toward fluoridation. Not because skepticism is bad. Good science depends on skepticism. But science also depends on evidence, measurement, risk comparison and honesty about tradeoffs.
That is what seems to be missing from Council thought.
Science and technology are not abstractions. They are the basis of our prosperity, our health and our safety. They give us clean drinking water, antibiotics, vaccines, streaming sports, weather forecasts, earthquake engineering, cancer treatment, ED drugs, airplanes, smart phones. And dental care.
Take dental X-rays.
Every Council member has almost certainly had dental X-rays. So have your spouses, your parents and your children. Why? Because dentists use them to find cavities, infection, bone loss, impacted teeth and other problems that cannot always be seen with the naked eye.
But X-rays are not magic. They are electromagnetic radiation, the same broad family as visible light and ultraviolet radiation. In a beach city, we understand UV radiation very well. Around here, “SPF” is as common in our beach patois as “dude.” We teach our children to use sunscreen because UV light carries enough energy to damage skin.
And yet X-rays are far more energetic than UV. UV wavelengths are measured in hundreds of nanometers. Dental X-ray wavelengths are often fractions of a nanometer.
That means X-ray photons can carry thousands of times more energy than the UV photons we so passionately block with sunscreen. SPF.
So why do we accept dental X-rays?
Because the benefit-versus-risk question has been studied carefully. Because radiation dose is measured and governmentally regulated. Because dentists do not use X-rays randomly. Because standards exist. Because science has done the hard work of separating fear from evidence.
Guess what? That is also how fluoridation has been evaluated.
Community water fluoridation is supported by the American Dental Association, the nation’s largest dental association, representing about 152,000 dentist members. The ADA states that community water fluoridation at recommended levels is safe, effective and reduces tooth decay. The CDC says fluoridation reduces cavities by about 25% in children and adults. The recommended level is 0.7 milligrams per liter, a level chosen specifically to preserve benefit while limiting risk.
That does not mean there are no questions. High fluoride exposure deserves scrutiny.
Public-health policy should always be reviewed as new evidence develops.
But that is not what this Council appears to be doing.
This Council has already worked to ban masks against contagion. It has worked to ban or lock down library books. Now it wants to block fluoridation to recommended levels, a mainstream public-health measure grounded in decades of science.
So here is the obvious question:
Given the proven penetrating energy of X-rays, is the Council also preparing to ban dental X-rays in Huntington Beach?
If not, why not?
If your answer is that dental X-rays are useful, regulated, measured and supported by scientific evidence, then you have already accepted the principle. Public health does not ask whether something sounds scary in isolation. It asks whether the measured benefit outweighs the measured risk. A business principle and a life principle.
That is the standard for X-rays.
That is the standard for sunscreen.
That is the standard for electric power.
And that should be the standard for fluoridation.
Huntington Beach should not govern by suspicion of science. We are supposedly a modern city. Our health, safety and prosperity depend on scientific literacy, not political theater dressed up as concern.
The Council should follow the evidence, not fear of the word “fluoride.” Or a handful of vocalists.
Buzz McCord
Biophysicist, inventor and career specialist in the use of electromagnetic radiation for medical applications. HB resident but not qualified to be a dude.
From: Daniel Barbara
To: [email protected]
Cc: Robert Granger; Erika Vega
Subject: Information Submission RE 5/5/2026 City Council Meeting Agenda File # 26-279 Date: Sunday, May 3, 2026 5:53:53 PM
Attachments: Environmental Opinion - HBCSD - Maintenance Facility.pdf You don't often get email from [email protected]. Learn why this is important Good evening. Please find attached and below (in the form a link to large secure files), an information submission consisting of our (Pacific Rim Eco's) written Environmental Opinion regarding File # 26-279 before the City Council as an appeal on May 5, 2026. The Environmental Opinion is attached to this email, and the remaining appendices are included at the following link due to size. They have been mailed to your office via the USPS in paper form as well, and will provide nine written copies of the Opinion (minus appendices) in person on Tuesday as requested. This environmental investigation and opinion was commissioned by concerned residents of adjacent neighborhoods to the proposed HBCSD maintenance facility. We look forward to sharing briefly with the Council and answering any questions you might have prior to making this important decision.
Link to MS Office Opinion & Appendices
(Dr.) Daniel Bárbara, DHSc, CPH, REP
Partner & Principal Consultant
Pacific Rim EcoSystemic Strategy Advisors
619.320.5894
Environmental, Infrastructure & Public Health Consulting From: Laura Costelloe
To: CITY COUNCIL (INCL. CMO STAFF); [email protected] Subject: Support for HBCSD M&O Building
Date: Sunday, May 3, 2026 10:14:06 PM
You don't often get email from [email protected]. Learn why this is important Dear Honorable Mayor Casey McKeon and City Council
Members,
As a long-time advocate and volunteer for our
Huntington Beach City School District and a
taxpayer committed to fiscal accountability, I am
writing to urge the Council to deny the appeal and
uphold the approval of the proposed Maintenance
and Operations (M&O) building.
This project is a common-sense solution to a longstanding need. After years of operating behind the district office and paying nearly $1 million per year in lease costs—a staggering waste of taxpayer funds—the
District has presented a plan that is fiscally responsible and legally sound. There is no increase in traffic or
sound considering they’ve been there already for years.
The District has already committed $1.2 million to OVSD to house our busses and for future maintenance and
operations expenses. This was to alleviate the stress of the Sowers neighborhoods that didn’t want the busses
on the Sowers site. The district is always committed to working with the community and stakeholders. Thank
you OVSD!
In regards to the M&O building, moving it forward 10 feet as the appellant has requested not only negates the
CEQA but creates an unsafe environment behind the
building where undesirables can take refuge and do
drugs. Daily, the maintenance workers clean up needles
and trash behind the appellants house on the
pathway/easement to the softballs fields. The district
maintains the area as good stewards to the community.
As a local Realtor, I can say this will not drop property values or negate the appellants home owners insurance,
like he’s previously stated. He claims the heavy
equipment will negate his insurance. There is no heavy
equipment, large projects are conducted on school sites.
He also backs to the softballs fields where they run
heavy equipment twice a week.
The district site is quiet, unlike the many neighborhood school sites we have that have daily student drop offs
and pick ups, sports and events. This is what creates the culture and community of our HB neighborhoods. The
hustle and bustle; the sounds of our children playing on the playgrounds isn’t a negative thing, it was part of the original design of Huntington Beach. All our
neighborhood school sites actually increase homeowner
values.
The High Cost of Denial If the City denies this
project, it doesn't stop the building; it simply makes it more expensive for the public. The District would likely be forced to move the project through the Division of the State Architect (DSA). This shift would:
Inflate Costs: Force the District to abandon costsaving prefabricated plans for custom builds, costing taxpayers hundreds of thousands of dollars in extra
fees and additional time.
Bypass Local Input: Shift jurisdiction away from the
City to the State, removing local oversight.
Legal and Procedural Consistency: The City has no
valid legal cause to deny this project. It is not an
"industrial" use in a residential zone; it is a support facility for a school district that has operated on this site for years. Most school districts do not require a CUP for such sites because they are permitted uses.
To deny this project now, the Council would have to
declare that the Zoning Administrator and a 6-1
majority of the Planning Commission were "wrong"
in their interpretation of City Law. Such a reversal,
despite the project meeting every objective City standard and passing CEQA review, would be the definition of an
arbitrary and capricious decision, potentially exposing the City to unnecessary legal risk. Do all our school
districts in the city of Huntington Beach have CUPs for their M&O sites? I doubt that is a rabbit hole we want to go down?
A Commitment to Our Staff and Students: Our
HBCSD M&O staff has waited years for a safe, indoor
place to house their tools and equipment. They deserve
that! Moving their existing operations indoors reduces
noise and improves neighborhood aesthetics.
Every dollar saved on leases and construction
premiums is a dollar that stays in the classroom for
our 4,500+ students. I urge you to stand with our
students, our workers, and our taxpayers. Please
deny this appeal and do what’s right for our children!
I believe you will do the right thing.
Most Sincerely,
Laura Costelloe
(714)277-9330
Sent from my iPhone
From: Buffie Channel
To: CITY COUNCIL (INCL. CMO STAFF); [email protected] Subject: Agenda Item 14/26-279
Date: Monday, May 4, 2026 3:50:25 AM
To City Council:
Regarding Agenda item 14/ 26-279.
I am writing to encourage you to uphold the Planning Commission’s (6-1)approval of the HBCSD Maintenance and Operations building. I question the reasoning behind this agenda item that has provided a solution to a long-time problem and has the support of the VAST majority of citizens (except one citizen). How is that fiscally responsible? Why would we continue to pay nearly $1 million per year in lease costs? Why is one man stopping this for one citizen in a deal that has taken years to construct and approve?
There will be no impact in traffic or noise because they are already there operating.
The Zoning Administrator and a 6-1 majority of the Planning Commission supports this. Why is one council member giving one citizen this kind of attention and power? It doesn’t add up.
Deny the appeal - and support the approval of the Maintenance and Operations (M&O) building.
This would cause thousands of our school kids to lose because of this wasteful appeal. Support our students, our workers and let’s use our tax dollars wisely and use basic common sense.
Sincerely,
Buffie Channel
-36 year resident and tax payer
From: Robert Granger
To: Burns, Pat; CITY COUNCIL (INCL. CMO STAFF); [email protected] Cc: [email protected]; Mark Currie; Cheryl DeMarco, AIA; [email protected]; [email protected]; [email protected]; [email protected]; Phi Pham; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; Kip Thulin; [email protected]; Debbie Duda; Sharon Gonterman; Vince Brantley; [email protected]; Catherine Elles; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; Craig Wendt; [email protected]; [email protected]; Briian H; [email protected]; [email protected]; Becky Granger; Robert Granger; Lucy Granger; [email protected]; Evan B. Sorensen; Heather Sorensen; [email protected]; Susan Schaben Subject: Zoning Administrator Abuse: File #: 26-279 Appeal of Planning Commission"s Action on Conditional Use Permit No. 23-014 (HBCSD Maintenance and Operations Building)
Date: Monday, May 4, 2026 8:34:51 AM
We agree with you Pat,
“The Zoning Administrator, one person, has the Authority to approve CUP’s and Variances. This is not very common in other cities,” Burns wrote in a memo to his colleagues. “
The planning department should have invalidated the HBCSD CEQA Notice of Exemption from the get-go. By looking the other way at an obvious CEQA violation, it cleared the way for a review process of one. One person, the zoning administrator. Who knew the zoning administrator could look the other way when it comes to an industrial maintenance yard in a residential neighborhood? Let alone the district's CEQA consultants' professional credibility in her false and misleading testimony.
The city council needs to reject the CEQA NOE and start over with an open process that is subject to community involvement and complies with applicable CEQA guidelines.
Secondly, why is the city believing the districts' "experts" that it's too late to invalidate their CEQA Notice of Exemption?
Even though the Huntington Beach City School District (HBCSD) filed their Notice of Exemption (NOE) on November 1, 2023, attempting to run out the 35- day clock, their process was fundamentally flawed both procedurally and factually.
Here is why it is not too late to challenge their CEQA exemption:
1. Procedural Invalidity: The NOE Was Filed Prematurely Under CEQA Guidelines Section 15062(a), a public agency may only file an NOE after it has made a formal decision to carry out or approve a project. Furthermore, CEQA Guideline 15004(c) dictates that the CEQA process must be completed before the agency makes a decision.
• The Flaw: The District filed and recorded the NOE in November 2023, but did not formally resubmit its Conditional Use Permit (CUP) application to the City until April 10, 2024.
• The Legal Argument: By filing the NOE months before formalizing the project decision and submitting permit requests, the District triggered the 35-day window unlawfully. You can argue that an agency cannot "piecemeal" the environmental review by filing an exemption before a defined project action is actually submitted to the City for approval. Because the filing was procedurally invalid, the 35-day statute limit does not legally apply.
2. Inaccurate Project Description Restores the 180-Day Window The 35-day statute of limitations only provides immunity if the NOE honestly and accurately describes the project.
The Precedent: In the 2023 case Committee to Relocate Marilyn v. City of Palm Springs, the Court of Appeal ruled that if an NOE inaccurately describes a project, it deprives the public of a fair chance to evaluate it. The court determined that in such instances, the 35- day limit is invalidated and the standard 180-day statute of limitations is reinstated. • The Legal Argument: The District's NOE claimed the project involved "negligible or no expansion of existing or former use". However, the District established this "existing" baseline on operations that have been unpermitted and illegal since 2018 or 2019. By failing to disclose that the "existing use" was an unpermitted industrial yard, the NOE's project description was factually inaccurate and misleading, legally opening the door to reinstate the 180-day timeline.
3. "Equitable Tolling" Due to a Misleading Baseline Statutes of limitations are designed to protect honest administrative mistakes, not deliberate misrepresentations. • The Legal Argument: Because the District deliberately withheld the fact that its baseline was an unpermitted operation lacking a City CUP, this could be considered a "fraud on the record". When a lead agency achieves a CEQA exemption by misrepresenting the legality of its baseline, the statute of limitations may be subject to "equitable tolling". This means the "clock" can be paused or reset because the public was fundamentally misled by the original notice.
4. Zoning Violations Are Independent of CEQA Deadlines Finally, even if a judge were to uphold the expired CEQA deadline, the statute of limitations on CEQA does not grant the District immunity from ongoing zoning violations. CEQA (environmental review) and zoning (land use permits) are separate regulatory mechanisms. Under California Government Code §53094, the District is in continuous violation of the law by operating a non-classroom industrial facility in a residential zone without a City CUP. This ongoing zoning violation is not subject to a 35-day CEQA window.
How the HBCSD Cheated the CEQA Process PowerPoint
YouTube - How the HBCSD Cheated the CEQA Process
City Recommends Approving Plan based upon CEQA 15303 NOE Slides plus notes
I'm here if you need help understanding a simple yet complex issue. Bottom line, the CEQA is invalid based upon a false baseline. Simply read the only environmental report ever conducted for this project by Dr. Daniel Barbara. The report speaks for itself.
Robert Granger
714-404-7140
From: Robert Granger
To: [email protected]; CITY COUNCIL (INCL. CMO STAFF) Subject: M&O building and operations conflict with Land Use Element Goals Date: Monday, May 4, 2026 2:46:31 PM
The proposed Maintenance & Operations (M&O) yard violates several key goals and policies outlined in the City of Huntington Beach General Plan (Adopted October 2, 2017), Land Use Element.
Here is how the project conflicts with the specific guidelines:
1. Incompatible Architecture and "Surf City" Identity (Goal LU-2 & Policy LU-2B) The Guideline: Goal LU-2 and Policy LU-2(B) require that new development preserves and enhances a "distinct Surf City identity" and that building architecture must be "contextsensitive, creative, complementary of the city’s beach culture, and compatible with surrounding development and public spaces."
The Conflict: During the Planning Commission hearing, now council member Don Kennedy pointed out the absurdity of the City claiming the project meets this standard, stating that "nothing speaks Surf City identity more than a prefab manufactured steel metal building in a coastal zone... it's ridiculous."
2. Disproportionate Scale and Elevation (Policy LU-1D & Goal LU-2B) The Guideline: Policy LU-1(D) dictates that new projects must be of "compatible proportion, scale, and character to complement adjoining uses."
The Conflict: Residents argue the building's scale is highly incompatible with the adjacent homes on Breton Lane. Because those residential properties sit at an elevation approximately 7 to 10 feet lower than the proposed building pad, the 17.5-foot-tall M&O building will actually tower 25 to 30 feet higher than the ground level of the neighboring homes
3. Encroachment of Incompatible Land Uses (Policy LU-2D) The Guideline: Policy LU-2(D) strictly directs the City to "maintain and protect residential neighborhoods by avoiding encroachment of incompatible land uses." The Conflict: Opponents argue that placing an industrial maintenance yard—which inherently involves early morning noise, heavy machinery, diesel trucks, and hazardous materials—just
22.5 feet from single-family residential property lines is a textbook example of an incompatible land use encroaching on a quiet neighborhood
4. Inconsistency with Community Park Integration (Goal LU-1) The Guideline: Goal LU-1 requires that new development be coordinated to ensure the land use pattern is "consistent with the overall goals and needs of the community." The Conflict: Neighbors note in their formal opposition letters that the project is inconsistent with the neighboring city park development plan. Rather than fostering community connectivity, the District's plan to build a continuous block wall along the western perimeter will wall off the city-owned corridor and walkway that connects the neighborhood to Edison Park, failing to integrate pedestrian and micro-mobility access Furthermore, residents argue that this very tight 10-foot-wide hidden corridor will create an attractive nuisance for criminal activity out of the view of police. And last of all, the higher fire risk associated with the building, chemicals, and fuels being stored so close to neighboring single-family homes. Are the insurance policy cancellations coming for these residents? Robert Granger
21232 Breton Lane
Huntington Beach 92646
From: Robert Granger
To: Vigliotta, Mike
Cc: [email protected]; CITY COUNCIL (INCL. CMO STAFF); Mark Currie; Cheryl DeMarco, AIA; [email protected]; [email protected]; [email protected]; [email protected]; Phi Pham; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; Kip Thulin; [email protected]; Debbie Duda; Sharon Gonterman; Vince Brantley; [email protected]; Catherine Elles; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; Craig Wendt; [email protected]; [email protected]; Briian H; [email protected]; [email protected]; Becky Granger; Robert Granger; Lucy Granger; [email protected]; Evan B. Sorensen; Heather Sorensen; [email protected]; Susan Schaben; [email protected]; Mike Chiavetta
Subject: RE: Municipal Liability and Homeowner Insurance Cancellation Risks Stemming from CUP No. 23-014 (HBCSD M&O Building)
Date: Monday, May 4, 2026 3:20:17 PM
Attachments: image001.png
Orbital_Risk.pdf
RE: Municipal Liability and Homeowner Insurance Cancellation Risks Stemming from CUP No. 23-014 (HBCSD M&O Building)
Dear Mr. Vigliotta,
Thank you for confirming that the items brought to your attention about CEQA will be vetted during the public hearing process during the appeal of this matter.
One more thing to advise the city council.
I am writing to formally alert your office to a severe and unmitigated financial risk facing the residents of the Kettler community should the City Council uphold the Planning Commission’s approval of Conditional Use Permit No. 23-014 for the Huntington Beach City School District (HBCSD) Maintenance & Operations (M&O) Building.
Beyond the existing California Environmental Quality Act (CEQA) and zoning violations previously brought to the City's attention, placing an industrial maintenance yard a mere 22.5 feet from single-family residential property lines exposes these homeowners to an immediate threat of severe property insurance rate hikes and policy cancellations due to modern, algorithm-driven insurance underwriting practices. The home insurance industry is currently undergoing a "Geospatial Revolution," shifting away from static annual contracts to a model of "Continuous Underwriting" driven by orbital data and scalable computer vision AI. Because of this, premium pricing and risk exposure adjust dynamically in real-time, responding instantly to environmental changes and property modifications detected from orbit. In this new landscape, "to be insurable is to be visible," and an AI algorithm is constantly scoring properties from the sky.
If the City allows the HBCSD to construct a 7,525-square-foot industrial facility—which will house diesel trucks, heavy machinery, wood and metal shops, and hazardous materials—just 22.5 feet from residential backyards, the City will be directly responsible for introducing a massive, algorithmic "Exposure" risk to the adjacent homes.
Modern insurance AI constantly evaluates a property's "Hazard Proximity" by quantifying external threats, such as encroaching fire risks or hazards near the parcel boundary. When the orbital telemetry scans Breton Lane and identifies a newly constructed industrial structure housing combustible materials and industrial operations abutting the residential fence line, the AI will automatically flag the residential properties as high-risk.
Consequently, the residents of Huntington Beach will be subjected to the "Consumer Shock" currently disrupting the insurance market: surprise non-renewal notices or massive premium hikes based on aerial imagery.
By illegally bypassing a formal CEQA Initial Study under a flawed "Small Structures" exemption and failing to evaluate the true environmental and hazard impacts of this project, the City is allowing a dangerous condition to be built that will directly trigger insurance cancellations for its citizens. We urge you to advise the City Council of the significant municipal liability the City assumes by forcing this unvetted industrial proximity onto residents. The City must overturn the approval of CUP No. 23-014 and mandate a full Environmental Impact Report (EIR) to properly evaluate the external hazards and resulting financial damages (diminution of value and loss of insurability) this project will inflict on the neighborhood.
I have a very short PowerPoint presentation on this new era of microinsurance underwriting. As an insurance professional for the last 33 years, I've seen a thing or two. Insurance companies are using AI to eliminate as many California risks as fast as they can. I receive frantic calls several times per week, "I've been canceled, and I don't know why".
Please advise the council that this increase in financial exposure/risk is being placed on our neighborhood. This is not an unpredictable natural disaster; it's just a disaster waiting to happen.
Orbital_Risk (1).pptx
Kind regards,
photo Robert Granger
Independent Insurance Broker
(949) 4-CHOICE or (949) 424-6423
[email protected]
WWW.GRANGERINDEPENDENT.COM
20902 Brookhurst St. Suite 208, Huntington Beach, CA 92646 Book a Meeting with Me
Meet me on Zoom
You don't often get email from [email protected]. Learn why this is important On Mon, May 4, 2026 at 10:05 AM Vigliotta, Mike <[email protected]> wrote:
Hi Mr. Granger,
Thank you for the email and I apologize for the delay in responding. The City Attorney’s Office can not provide legal advice to the public, however, the information you provided will be vetted during the public hearing process during the appeal of this matter.
Michael J. Vigliotta
CITY ATTORNEY
OFFICE OF THE CITY ATTORNEY
2000 Main Street, Fourth Floor
Huntington Beach, CA 92648
(714) 536-5538
Confidentiality Notice: This email may contain material that is confidential, privileged and/or attorney workproduct for the sole use of the addressee. Further, this email is protected under the Electronic Communications Privacy Act, 18 U.S.C. Sections 2510-2522. Any review by, reliance, or distribution by others or forwarding to others without express permission of the author is strictly prohibited. If you receive this transmission in error, you are advised that any disclosure, copying, distribution, or the taking of any action in reliance upon the communication is strictly prohibited. Moreover, any such inadvertent disclosure shall not compromise or waive the attorney-client privilege as to this communication. If you have received this communication in error, please immediately notify the sender and delete this e-mail. Thank you.
From: Robert Granger <[email protected]>
Sent: Sunday, May 3, 2026 11:33 AM
To: Vigliotta, Mike <[email protected]>; [email protected]; CITY COUNCIL (INCL. CMO STAFF) <[email protected]> Subject: Re: Request for Legal Clarification on CEQA Responsible Agency Duties – HBCSD Maintenance & Operations Building (CUP No. 23-014) Set for City Council Hearing on May 5, 2026 There are some very difficult legal hurdles to overcome should the city decide to agree with the HBCSD determination that this project is exempt from an environmental review.
The attached PowerPoint and this video, which you can watch on YouTube, explain the legal hurdles.
How the HBCSD Cheated the CEQA Process
Kind regards,
photo Robert Granger
Independent Insurance Broker
(949) 4-CHOICE or (949) 424-6423
[email protected]
WWW.GRANGERINDEPENDENT.COM
20902 Brookhurst St. Suite 208, Huntington Beach, CA 92646 Book a Meeting with Me
  Meet me on Zoom 
On Tue, Apr 28, 2026 at 6:43 PM Robert Granger <[email protected]> wrote:
RE: Request for Legal Clarification on CEQA Responsible Agency Duties – HBCSD Maintenance & Operations Building (CUP No. 23-014)
Set for City Council Hearing on May 5, 2026
Dear Mr. Vigliotta,
We need your help! On behalf of the neighbors surrounding the Kettler Education Center to request your formal legal advice and clarification regarding the position taken by the Huntington Beach Planning Department on Conditional Use Permit (CUP) No. 23-014. Specifically, we are seeking an explanation of the City’s legal obligations as a "Responsible Agency" under the California Environmental Quality Act (CEQA) and why the Planning Department accepted the Huntington Beach City School District’s (HBCSD) Notice of Exemption (NOE) as valid without conducting its own separate, independent CEQA determination.
Please read the environmental report prepared by Dr. Daneil Barbara that is attached to this email.
Background: The HBCSD is seeking a CUP to construct a 7,525-square-foot industrial Maintenance and Operations (M&O) Building 22.5 feet from residential property lines at the Kettler site. Acting as the Lead Agency, the District filed a CEQA NOE on November 1, 2023, claiming a Class 3 (Small Structures) Categorical Exemption.The District’s exemption rests on the premise that the project merely moves "existing" operations indoors. However, the District relocated its M&O operations to this site around 2018 or 2019 and has operated this maintenance yard ever since without the required City Conditional Use Permit.
Questionable Procedural Tactics and Evasion of Public Scrutiny The District appears to have employed a highly questionable procedural tactic to intentionally evade public scrutiny and legal challenges by manipulating the CEQA statute of limitations. Specifically, the District officially recorded its Notice of Exemption (NOE) with the County of Orange on November 1, 2023. By filing this NOE, the District triggered a very brief 35-day statute of limitations for anyone seeking to file a legal challenge to its environmental determination. The District then deliberately let this 35-day window quietly expire before advancing the project with the City. The Conditional Use Permit (CUP) application and plans were not resubmitted to the City of Huntington Beach Planning Department until April 10, 2024, and the application was not deemed complete by the City until May 7, 2024. Furthermore, the District did not hold a Community Input Meeting to actually notify the public and neighboring residents about the project's design and impacts until May 6, 2024—more than six months after the NOE was recorded.
This calculated timeline demonstrates that the District intentionally let the legal window to challenge the NOE expire long before they formally notified the affected neighbors that the project was moving forward.
The City’s Duty as a Responsible Agency:
Because the City of Huntington Beach holds discretionary authority over the approval of the Conditional Use Permit, the City acts as a "Responsible Agency" under CEQA. Under CEQA guidelines, a Responsible Agency is required to comply with CEQA and "must independently review and approve the CEQA document, and not rely automatically on the Lead Agency’s judgments". The guidelines further state that a Responsible Agency complies with CEQA "by considering the EIR or negative declaration prepared by the Lead Agency and by reaching its own conclusions on whether and how to approve the project involved".
Furthermore, during the July 23, 2024, Planning Commission hearing regarding the appeal of this project, a City official explicitly stated on the record that the Commission "has to make its own CEQA determination... before it acts on the project".
Here is the pertinent part from the planning commission video of that meeting.
Here is the link to the exact point of this testimony
"Madalyn Welch: That's correct. The school district served as the lead agency.
Madalyn Welch: The agency prepared the notice of exemption document.
Ian Adam: And with what's the city's role to review that? If it does, the city review it to confirm those findings or at least weigh in, or would if they had a disagreement with that process?
HB Employee: Yes. The Commission has to make its own CEQA determination before it approves, but before it acts on the project."
Questions for the City Attorney:
Given this clear legal framework, we respectfully request your legal opinion on the following questions:
1. Why did the Planning Department accept the District's NOE at face value? If a Responsible Agency must not "rely automatically on the Lead Agency's judgments", why did the City Planning Department fail to question the District’s use of an unpermitted, illegal operation as a valid CEQA "baseline" to claim there is no expansion of use?
2. Did the City fail to conduct an independent CEQA evaluation? CEQA guidelines stipulate that if a Responsible Agency believes the Lead Agency's document is inadequate, it has the option to bring a legal challenge against the document, assume the role of Lead Agency, or waive its objections .
3. Did the City explicitly waive its objections to the NOE, or did the Planning Department simply fail to conduct the independent review required by law before the Zoning Administrator approved the CUP on June 19, 2024?
4. How does the City justify ignoring "Unusual Circumstances"? Under CEQA Guidelines Section 15300.2(c), a categorical exemption cannot be used if there is a reasonable possibility of a significant environmental effect due to "unusual circumstances". Placing an industrial maintenance yard that houses heavy machinery and hazardous materials just 22.5 feet from single-family homes is clearly an unusual circumstance .
5. Why did the City not conduct its own initial study to evaluate these unmitigated noise and hazard impacts before approving the CUP? The community relies on the City of Huntington Beach to protect our neighborhoods through proper zoning and environmental oversight. By accepting a flawed NOE for an unpermitted industrial facility, we believe the City has sidestepped its legal duties as a Responsible Agency under CEQA.
The city council needs your guidance on this issue. It is our position that the HBCSD is not exempt from an environmental review, wherever they decide to build this non-classroom facility.
We look forward to your timely legal clarification on this matter as we prepare for the final appeal before the City Council.
Sincerely,
photo Robert Granger
Insurance Agent & Broker,
Granger Independent Insurance Services
949-424-6423 - (949) 4-CHOICE
www.grangerindependent.com
[email protected]
20902 Brookhurst St. Ste 208, Huntington Beach, CA 92646
Some people who received this message don't often get email from [email protected]. Learn why this is important
From: Lillian Altamirano
Sent: Monday, May 4, 2026 8:00 AM
To: CITY COUNCIL (INCL. CMO STAFF)
Subject: HBCSD M&O Building Project Vote
Dear City Council Members,
As a parent, a member of our community, and a voter who supported this Council, I am writing to you today regarding the upcoming City Council meeting on Tuesday, May 5, 2026, concerning the appeal of the Huntington Beach City School District’s Maintenance & Operations (M&O) Building project.
I am writing to respectfully urge the City Council to uphold the Planning Commission’s 6-1 approval of this project.
The District has spent over five years working with the City, OCTA, local realtors, and private landowners to find an alternative site, and this project has already completed CEQA review and has been approved at every level of City review. The district has proven itself to have done everything as it should to have this project approved.
This facility is essential for maintaining the schools that serve our 4,500+ students. Our M&O team is the backbone of our campus functionality, and they require a permanent, indoor home base to store tools and coordinate the work necessary to keep our schools safe and well-maintained. It is only fair that the council continues to uphold the vote to approve this building.
I understand there has been concern regarding this facility from a few (one) disgruntled community member(s), but the facts demonstrate that this project is a responsible and necessary solution for our district. The M&O team currently operates out of this site outdoors, and moving them into a 7,500 sq. ft. structure will actually reduce noise for the neighborhood. This building, which adheres to existing zoning, includes enhanced features like sound insulation, a block wall, and landscaping to ensure it fits the area appropriately.
Those that live near the area, willingly purchased a home that backed to a site that was owned by the district. Thousands of students and some of our most valuable district employees should not have to pay the price because they don’t like what their home has backed to since it was purchased.The facts demonstrate that this project is a responsible and necessary solution for our district.
Further delays in this approval process only serve to drain resources that should be going toward our students' education. I appreciate your time and your service to our community, and I ask that you please support this project by upholding the Planning Commission's vote.
Sincerely,
Lillian Altamirano
Huntington Beach Resident and Parent
Some people who received this message don't often get email from [email protected]. Learn why this is important From:
To:
[email protected]
Subject: FW: HBCSD proposed Maintenance and Operations Building Date: Monday, May 4, 2026 8:48:34 AM
From: Linda Minko
Sent: Sunday, May 3, 2026 2:08 PM
To: CITY COUNCIL (INCL. CMO STAFF)
Subject: HBCSD proposed Maintenance and Operations Building Dear Huntington Beach City Council Members,
Our names are Pete and Linda Minko and we are residents that live at 21361 Breton Lane. We also vote every election. I am writing to express my strong opposition to the Huntington Beach City School District's (HBCSD) proposed Maintenance & Operations (M&O) Building. Adding a 7,500-square-foot, 17.5-foot-tall industrial building in the heart of our residential neighborhood is completely unacceptable.
South Huntington Beach has already suffered the cumulative health impacts of remediation at the Ascon site, the power plant,( STILL waiting for the old plant to be taken down, but we can now see the new one at the end of my street where we used to see sky) and the Cannery Street Landfill (currently Edison Park). We cannot add industrial solvents, heavy trucks, and noise pollution to this list of health and environmental scars.
We live in the neighborhood right by the park and we can't understand why the HBCSD should get special treatment. They need to find an industrial site and put this facility there, not in our neighborhood. My husband works on his cars in our tract but that doesn't give him the ability to open a repair garage on our property. We have worked hard to afford a home in this neighborhood. This will affect our property values and be an eyesore. It also allows for a blind spot on the path we take to the park which could add a dangerous element for our neighborhood.
Beyond the severe impact on our daily lives, I am deeply concerned that the District is attempting to push this project through using highly questionable and potentially illegal tactics. At the upcoming May 5th hearing, we urge the City Council to address these severe procedural overreaches:
● Illegal Baseline & Lack of Permits: The District is attempting to establish a "baseline" based on unpermitted, de facto industrial use that began around 2018/2019, despite lacking a City Conditional Use Permit (CUP). ● Misapplied Environmental Exemptions: The District is claiming a Class 3 "Small Structures" exemption. This is a massive overreach, as this exemption was never intended for an industrial yard containing heavy machinery and hazardous materials. ● Evasion of Oversight: The District claims an exemption from local zoning, but the Division of the State Architect (DSA) has confirmed that it lacks authority to issue conditional use permits or enforce local zoning. This leaves a non-classroom industrial facility completely unchecked in a regulatory gap. ● Safety & Park Conflicts: The proximity of this structure to residential property lines (only 22.5 feet) and its interference with the Edison Park walkway pose a significant public safety conflict and increase the likelihood of noise ordinance violations.
We cannot let the District bypass environmental and city oversight at the expense of our neighborhood's safety, peace, and property values. I urge the City Council to reject the District's Notice of Exemption (NOE) and demand that a formal Initial Study (IS) or Mitigated Negative Declaration (MND) be legally required before any further action is taken.
Pleas do not let this measure go through!
Pete and Linda Minko
From: Robert Granger
To: [email protected]; CITY COUNCIL (INCL. CMO STAFF); Vigliotta, Mike Subject: Cannery Street Landfill and Kettler Elementary School: File #: 26-279 Appeal of Planning Commission"s Action on Conditional Use Permit No. 23-014 (HBCSD Maintenance and Operations Building) Inbox Date: Monday, May 4, 2026 4:56:38 PM
Attachments: Edison-Geotechnical-Report.pdf
For the record.
The Cannery Street Landfill is also part of the Kettler Elementary School property. It has several wells to let off the methane gas, but there is no history of soil testing that was done similar to the testing done at the Edison Community Center Park for the city by Geosyntec Consultants. A copy of their report is attached but it does not include any boring tests on the Kettler Elementary side of the Cannery Street Landfill.
photo Robert Granger
Insurance Agent & Broker,
Granger Independent Insurance Services
949-424-6423 - (949) 4-CHOICE
www.grangerindependent.com
[email protected]
20902 Brookhurst St. Ste 208, Huntington Beach, CA 92646 2100 Main Street, Suite 150
Huntington Beach, California 92648
PH 714.969.0800
FAX 714.969.0820
www.geosyntec.com
HL1685B\Edison Park Waste Delineation Final Report
June 7, 2021
Farhad Bolourchi, MSCE
Project Coordinator - Development Division
Community Service Department - City of Huntington Beach 2000 Main Street
Huntington Beach, California 92648
Subject: Focused Area Waste Limit/Depth Evaluation
Edison Park, Huntington Beach, California
INTRODUCTION
At the request of City of Huntington Beach, Community Services Department (City), Geosyntec Consultants Inc. (Geosyntec) has prepared this letter report documenting the results of limited subsurface investigations to evaluate the approximate lateral limit(s) and depth(s) of existing waste along a selected portion of the eastern edge of the former Canary Street Refuse Disposal Station (Landfill) at Edison Park (hereafter Site). The requested area for waste delineation at the Site is shown on Figure 1 as it was provided to Geosyntec by the City in January 2019. The objective of the scope of work performed by Geosyntec was to collect field data to support the City in its evaluation of potential locations/types of proposed facilities/amenities at the Site.
BACKGROUND
Edison Park was constructed over the Cannery Street Former Refuse Disposal Station, also previously known as Cannery Street Landfill (CSL) in early 1970s. The CSL is approximately 27.5 acres, located in the City of Huntington Beach at the northwest corner of the intersection of Magnolia Street and Hamilton Avenue. The site’s formal address is 21379 Magnolia Street, Huntington Beach, California 92647.
Some of the existing facilities/amenities at the Site are constructed on top of waste material deposited at the former CSL. Settlement, differential settlement, and potential sinkholes are typically expected to occur at facilities constructed on top of waste. The effect of settlement, differential settlement and/or a combination of both are observed at the existing tennis courts, sidewalks, open park areas and other hardscape/amenities at the Site. However, the surface expression of settlement/differential settlement is more pronounced in the vicinity of the Tennis courts potentially limiting the functionality and aesthetics of the Tennis courts.
Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
In 2018, the City retained Geosyntec to prepare a feasibility study to evaluate several alternatives for repairing or reconstructing settlement related damage to the existing park and recreational areas at the Site [Geosyntec, 2018].
Geosyntec performed two site investigations for this project – the first investigation was performed between in November 2020 in the landscaped areas within the requested focus area and the second investigation was conducted on March 2021 in the areas of the park within the focus area currently under concrete slab.
PRE-FIELD INVESTIGATION ACTIVITIES
Geosyntec prepared a Site-specific Task Hazard Analysis (THA) that identified Site conditions, potential hazards, hazard control, monitoring procedures, personal protective equipment, and emergency procedures. Prior to field investigations, Geosyntec notified Underground Service Alert (USA) of southern California to mark and clear utilities in, and near to, the investigation focus area to reduce the potential for accidentally encountering buried utility lines. In addition, Geosyntec utilized the services of GEOVision, Inc. to perform a limited geophysical survey of the investigation focus area (and other potential boring/test pit locations) to evaluate potential buried underground utilities/features prior to performing field investigations. Geosyntec also obtained permits to advance soil borings from the Orange County Health Care Agency, Environmental Health Division, required under Orange County Well Ordinance (County Ordinance No. 2607) [Permit No. 20-08-22 and Permit No. 21-03-07]. The DigAlert ticket confirmations, field sketches provided by GEOVision and the soil boring permits are included here in Appendix A.
Geosyntec had, under a previous authorization from the City, prepared and submitted to the South Coast Air Quality Management District (SCAQMD) the required permit application package in general compliance with Rule 1150 which included an Excavation Management Plan. The permit application, was submitted on April 30, 2019 and deemed complete on May 03, 2019 [Application Number: 612262]. The SCAQMD issued the permit on September 11, 2020. An SCAQMD permit was not required for the second investigation. The permit issued by the SCAQMD for the first investigation and a copy of the Excavation Management Plan is included here in Appendix B.
Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
FIELD INVESTIGATION
Test Pits
Five (5) exploratory test pits were logged between November 24 and November 25, 2020 by a Geosyntec engineer under the direction of a Professional Engineer licensed in the State of California to evaluate the approximate lateral limit(s) of the existing waste in the approximate areas shown on Figure 2A. The logs were prepared based on visual field observations of the exploratory test pits’ exposed side-wall and retrieved soil cuttings.
The logs include a general description of the encountered soils in accordance with the Unified Soil Classification System (USCS) and Standard Practice for Description and Identification of Soils (ASTM D2488) as well as a field sketch of the exploratory test pit wall showing interfaces of encountered materials. Geosyntec subcontracted with American Integrated Services, Inc. (AIS) to excavate and backfill the exploratory test pits using a standard backhoe.
The proposed exploratory test pits commenced at the approximate waste limit estimated by TRC [2001] as shown on Figure 1. The exploratory test pits were advanced to an approximate depth of 5 feet vertically and horizontally until existing waste limits are visually observed. Once waste was encountered in the exploratory test pit, efforts were made to reduce the excavation of additional material. Waste materials were not, to the extent practical, removed from the excavation. The exploratory test pits were generally advanced until waste material was encountered or until an obstruction such as surface concrete or other infrastructure was reached. Plastic tarps were placed with plywood sheeting to temporarily stage the test pit spoils during the excavation. Additionally, approximately 10 ft by 20 ft fence panels with windscreen attached were used to serve as a work exclusion area and visual barrier on three sides. Existing grass and topsoil were segregated from the exploratory test pits and replaced after backfilling the test pits directly with the materials excavated from the test pits. Backfill material was compacted in place to help provide unyielding condition using a roller attached to the end of the backhoe, however, density or moisture testing was not performed and/or required. Test pit logs are provided here in Appendix C.
Test pits were first advanced vertically until the waste material was encountered, and then advanced horizontally in an eastward direction to determine the lateral limit of the waste.
The thickness of the soil overlying the waste were generally observed to range between 2 ft to 3.5 ft below the ground surface (bgs). Waste material was encountered at the five exploratory test pits (TP-1 through TP-5). Lateral limit of waste was delineated at test pits TP-1 and TP-2; however, the lateral limit of waste could not be identified at test pits Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
TP-3, TP-4, and TP-5. The approximate lateral limits of the waste as observed by the exploratory test pits are indicated in Figures 2A and 2B. A summary of test pit dimensions, thickness of the soil layer/depth to the top of waste is presented in Table 1.
Table 1: Summary of Test Pits
Test Pit ID Width (ft) Length (ft) Soil layer thickness/ Depth to Top of Waste (ft bgs)
Total Depth
(ft bgs)
TP-1 3.5 19.5 3.0 4.5
TP-2 3.5 8.0 2.0 2.5
TP-3 3.5 21.5 3.0 3.5
TP-4 3.5 - 7.5 15.0 3.0 4.0
TP-5 3.5 45.0 2.0 2.5 - 4
TP-5A 3.5 6.0 2.0 3.5
Hollow-Stem Auger Borings
ABC Livion Drilling, Inc, working as a drilling subcontractor to Geosyntec advanced five (5) hollow-stem auger (HSA) borings on October 28, 2020 in the landscape areas and seven (7) HSA borings on March 12, 2021 in the concrete covered areas. The purpose of the HSA borings was to estimate the thickness of the existing waste layer at the approximate locations shown on Figures 2A and 2B. The HSA borings advanced near the estimated lateral limits of waste (i.e., HSA-1 through HSA-3) started approximately 5 to 10 feet to the west of waste limit as observed by the exploratory test pits. The purpose of these HSA borings (i.e., HSA-1 through HSA-3) was to evaluate the depth of waste at or near the lateral limits of waste as observed by field measurements from the exploratory test pits. The objective of the HSA borings advanced near the Tennis Court (i.e., HSA-4 and HSA-5) was to estimate the depth of existing waste in the vicinity of the Tennis Court area. The objective of HSA-2A through HSA-8A was to confirm if waste is present under the existing concrete slab and determine its depth, if present. Borehole logs for the HSA borings are provided in Appendix D.
Each boring was logged by Geosyntec field engineer and includes a description of the encountered soils performed in general accordance with the USCS and Standard Practice for Description and Identification of Soils (ASTM D2488). Soil samples were collected from the HSA borings for logging and visual identification purposes, but no samples were retained for laboratory testing. Split-spoon samples were performed generally on the soil Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
material encountered at the bottom of the boreholes to estimate the depth of waste. Each boring was advanced to a minimum of 1 foot below the bottom of the waste material, or until refusal, to visually assess that bottom of waste was reached. The HSA borings were backfilled with hydrated bentonite chips and the upper six inches with topsoil. The cuttings were containerized in 55-gallon drums, stored on-Site pending waste profiling, and disposed off-Site by AIS under waste manifest. Groundwater levels encountered in the HSA borings were recorded using a water level indicator. The depths to encountered groundwater at each of the HSA are listed in Table 2.
The thickness of the soil overlying the waste material, as observed from the HSA borings were found to range between 2 ft to 3.5 ft bgs. Borings HSA-4 and HSA-5 were advanced to depths of 34 ft and 41.5 ft bgs, respectively. Borings HSA-1, HSA-2, and HSA-3 were advanced to depths of 11.5 ft, 16.5 ft, and 21.5 ft bgs, respectively. HSA-2A through HSA-8A were advanced to depths that ranged from about 16.5 to 18 feet. The depths of groundwater encountered in the landscape HSA borings (HSA-1 through HSA-5 performed) were observed to range between 8 and 12 ft bgs. The depths of groundwater encountered in borings (HSA-3A through HSA-5A, HSA-7A and HSA-8A) were observed to range between 12.5 and 16.5 ft bgs. Groundwater was not encountered at borings HSA-2A and HSA-6A. The depth of waste was identified in the HSA borings where waste was encountered except HSA-4, which hit refusal at a depth of 34 ft bgs before reaching the bottom of the waste. A summary of the HSA borings including the depth/thickness of the soil layer and waste, and the depth to groundwater is presented in Table 2.
Table 2: Summary of HSA Borings
Boring ID
Soil layer
thickness/ Depth
to Top of Waste
(ft bgs)
Depth to
bottom of
Waste (ft)
Waste
Thickness
(ft)
Total
Depth
(ft bgs)
Depth to
Groundwater (ft
bgs)
HSA-1 3.5 10.5 7.0 11.5 10.5
HSA-2 2.5 15.5 13.0 16.5 12.5
HSA-3 2.5 20.5 18.0 21.5 11.0
HSA-4 2.0 − >32.0 34.0 8.0
HSA-5 2.5 40.5 38.0 41.5 12.0
HSA-2A* 3.0* 10* 7.0* 16.5 Not observed
HSA-3A* 2.5* 10* 7.5* 16.5 15
Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
Boring ID
Soil layer
thickness/ Depth
to Top of Waste
(ft bgs)
Depth to
bottom of
Waste (ft)
Waste
Thickness
(ft)
Total
Depth
(ft bgs)
Depth to
Groundwater (ft
bgs)
HSA-4A* 2.5* 5* 2.5* 16.5 14.0
HSA-5A* 2.5* 15* 12.5* 17 16.5
HSA-6A* 2.5* 15* 12.5* 16.5 Not observed
HSA-7A* 3* 10* 7* 18 13.5
HSA-8A* 2.5* 11* 8.5* 16.5 12.5
*Soil materials encountered in this borehole contained slight traces of waste materials based on visual and odor field observations. No clearly defined waste layer was encountered in this borehole. Slight waste traces observed in this borehole may not be part of a continuous waste layer.
The approximate locations of the exploratory test pits and HSA borings were recorded using a hand-held global positioning system (GPS) unit.
Daily field reports with photo logs for the field investigation activities are included in Appendix E.
Air Monitoring
Geosyntec provided air monitoring services during the first field investigation phase of the project. The air monitoring was performed by Geosyntec in general accordance with the requirements of the SCAQMD Rule 1150. The general prevailing wind direction at the site was typically onshore from the west-southwest to east-northeast. The upwind and downwind monitoring locations are shown on Figure 1.
In accordance with the requirements of the SCAQMD Rule 1150, the following air quality parameters were monitored:
• Particulate matter (dust) as PM10 – PM10 monitoring will be performed using a DustTRAK DRX Handheld Aerosol monitor. Dust monitoring was conducted approximately every 60 minutes throughout the workday at the upwind and downwind monitoring locations. Action levels for dust at the monitoring locations was set in accordance with the SCAQMD Rule 1150 requirements at 0.05 mg/m3 above background. The recorded PM10 levels were below the action level of
0.05 mg/m3
above background.
• Total Organic Compounds (TOCs) as methane – Continuous monitoring of TOC was conducted using an QRAE III monitoring equipment at the working face of Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
the excavation and at the downwind property monitoring location. The maximum sustained readings (greater than 15 seconds) were recorded at approximately every 15 minutes. Action levels for TOC readings at the excavation face and downwind property monitoring location was set at 500 ppmv and 200 ppmv, respectively, in accordance with the SCAQMD Rule 1150 requirements. The recorded TOC level were below the action levels at the monitoring locations. • Odor – Unusual odor or increase in odor was not detected by Geosyntec personnel during the test pit excavation or HSA drilling.
• Local Weather – Local weather parameters were monitored at approximately every 15 minutes throughout the workday. Ambient Temperature (℉), and Wind Direction were monitored digitally from the KCAHUNT143 weather station located in close proximity to the Site. Wind Speed (miles/hour) was measured using a handheld Kestrel 4000 monitoring device.
Daily air monitoring logs are provided in Appendix E.
FINDINGS
Waste Delineated
Lateral limits of waste was delineated at two test pit locations (TP-1 and TP-2). Figure 2 shows an approximate limit of waste as identified from the test pits. The approximate depths to the encountered waste layer at TP-1 and TP-2 were 3.5 ft bgs and 3 ft bgs, respectively.
Waste Not-Delineated
Waste was identified at three test pit locations (TP-3, TP-4, and TP-5); however, the lateral limit of waste was not identified. It is likely that the lateral limits of waste at these locations may extend eastward past the obstruction such as the concrete slab at TP-3 and TP-4, and concrete sidewalk at TP-5. The approximate depths to waste from existing surface at TP-3, TP-4, and TP-5 ranged between 2 to 3 ft bgs.
Waste Depth
The depths of waste at HSA borings near the estimated lateral limits of waste (HSA-1 through HSA-3) were found to range between 10.5 ft and 20.5 ft bgs. The depth of waste at HSA-5 near the northern edge of tennis court was observed to be approximately
40.5 ft bgs. The depth of waste at HSA-4 near the southern edge of the tennis court could not be identified due to refusal, however waste was still observed up to 34 ft bgs. The Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
depths of waste at the borings under concrete slab (HSA-2A through HSA-8A) were found to range between 5 ft and 15 ft bgs.
Waste and Soil Layer Characteristics
The soil layer at the Site was visually classified as silty sand (SM) in general accordance with ASTM D2488. The thickness of the soil layer generally ranged between 2 to 3.5 ft bgs. The waste material encountered at the site generally composed of dark gray asphalt concrete debris and decayed wood pieces within the landscape areas and dark gray, medium to high plasticity clay soils, with trace debris and slight organic odor within the concrete slab areas. The waste materials did not have any unusual odor. The above characteristics of the waste material was consistent throughout the investigation locations.
Groundwater
Groundwater was encountered at all five HSA boring locations in the landscape areas and all but two HSA borings in the concrete slab areas. The depth to groundwater in the landscape borings generally ranged between 8 to 12 ft bgs. The depth to groundwater in the concrete slab borings generally ranged between 12.5 to 16.5 ft bgs except at HSA-2A and HSA-6A where groundwater was not encountered.
SUMMARY AND RECOMMENDATIONS
In general, existing waste limit was delineated along the Eastern limit of the CSL as identified by Test Pits (TP-1 and TP-2). However, the existing waste limit along the Southern Section of the Eastern limit of CSL was not delineated due the existing structures and/or concrete lined areas. Test Pits (TP-3, TP-4 and TP-5) were advanced until the test pit encountered a structure and/or lined areas. Based on borings HSA-2A through HSA-8A, traces of waste material impeded within soil layer is present under the concrete slab within the focus area as shown in Figure 2B. However, the exact waste amount that maybe impeded in the soil layer located in areas under the concrete slab of the site is not known. Geosyntec recommends that field observations and monitoring services are performed by an experienced landfill engineer during the construction and/or excavation phase of the project to help further identify the limit of potential waste materials. Geosyntec also recommends that excavation and/construction activities in the areas described in this letter report are performed by a licensed Contractor with extensive experience in working in landfill environments. Proposed design features, amenities and structures should take into consideration the potential presence of waste materials in the areas described in this letter report. Furthermore, Geosyntec recommends that the design team for proposed structures and park amenities work closely with an experience landfill Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
engineer that can provide design input recommendation including but not limited to potential settlement, methane, drainage, irrigation and other design considerations.
LIMITATIONS
The conclusions and professional opinions presented in this letter report were prepared for the City of Huntington Beach in accordance with generally accepted geotechnical and landfill engineering principles and practices.
The subsurface conditions presented in this letter report are based on information obtained from a limited number of exploratory test pits and HSA borings advanced to evaluate lateral limits and depths of the existing waste.
The data, conclusions, and recommendation contained herein should be considered only for this specific project and locations discussed in this letter report. Geosyntec is not responsible for any conclusions or recommendations that may be made by others, unless we have been given an opportunity to review such conclusions and/or recommendations and concur with them in writing. If any changes are made in the project as outlined in this letter report, the conclusions and/or recommendations contained in this letter report shall not be valid unless the changes are reviewed and the conclusions and/or recommendations of this letter report are modified or approved in writing by Geosyntec.
Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
CLOSURE
We appreciate the opportunity of assisting you on this important project. If you have any questions about this letter report, or require additional information, please do not hesitate to call the undersigned at (714) 969-0800.
Sincerely,
________________________________
Karthik Viswanathan, E.I.T.
Engineer
________________________________
Yonas B. Zemuy, P.E.
Principal Engineer
______________________________
Sneha Upadhyaya, Ph.D.
Senior Staff Engineer
Attachments:
Figure 1 – Site Plan
Figure 2a – Field Investigation Locations (North)
Figure 2b – Field Investigation Locations (South)
Appendix A – Soil Boring Permit, DigAlert Ticket Confirmations and Geophysical Utility Clearance Field Notes
Appendix B – SCAQMD Permit for Rule 1150
Appendix C – Test Pit Logs
Appendix D – Boring Logs with Key
Appendix E – Daily Field Reports
Appendix F – Air Monitoring Logs
Edison Park Waste Delineation
June 7, 2021
HL1685B\Edison Park Waste Delineation Final Report
REFERENCES
Geosyntec [2018], “Feasibility Study for Edison Park Settlement Related Damage Repair,” Geosyntec Consultants, Inc., October 3, 2018.
TRC [2001], “Environmental Site Assessment Report, Former Cannery Street Refuse Disposal Station,” prepared for the County of Orange Integrated Waste Management Department. January.
HL1685B\Edison Park Waste Delineation Final Report
Figures
EXISTING BASKETBALL COURT
OUTDOOR RACQUETBALL COURT
EXISTING TENNIS COURTS G G G G G G G
TP-1
TP-2
TP-3
HSA-2A
HSA-2
HSA-5
LATERAL LIMITS OF
DELINEATED WASTE
HSA-1
PROJECT NO:
FIGURE N:\CACADD\E\EDISION PARK\EDISON PARK-HL1685\FIGURES\1685F014 - Last Saved by: KViswanathan on 5/6/21 FIELD INVESTIGATION LOCATIONS (NORTH)
EDISON PARK - WASTE DELINEATION
HUNTINGTON BEACH, CALIFORNIA
JUNE 2021
2A
HL1685B 0 50
SCALE IN FEET N
LEGEND
APPROXIMATE LIMITS OF EXISTING
CANNERY STREET FORMER
REFUSE DISPOSAL STATION
WASTE [TRC, 2001]
BORINGS PERFORMED TO
DETERMINE DEPTH OF WASTE
(GEOSYNTEC, 2020)
EXPLORATORY TEST PITS
PERFORMED (GEOSYNTEC, 2020)
REQUESTED INVESTIGATION AREA
(2020)
REQUESTED INVESTIGATION AREA
(2021)
EXISTING BURIED LFG HEADER
PIPE
APPROXIMATE LATERAL LIMITS OF
DELINEATED WASTE
AREAS WITH TRACES OF WASTE
MATERIAL (QUERIED WHERE
UNCERTAIN) G
EXISTING BASKETBALL COURT
OUTDOOR RACQUETBALL COURT
EXISTING TENNIS COURTS G G G G G G G
TP-1
TP-2
TP-3
HSA-2A
HSA-2
HSA-5
LATERAL LIMITS OF
DELINEATED WASTE
HSA-1
PROJECT NO:
FIGURE N:\CACADD\E\EDISION PARK\EDISON PARK-HL1685\FIGURES\1685F014 - Last Saved by: KViswanathan on 5/6/21 FIELD INVESTIGATION LOCATIONS (NORTH)
EDISON PARK - WASTE DELINEATION
HUNTINGTON BEACH, CALIFORNIA
JUNE 2021
2A
HL1685B 0 50
SCALE IN FEET N
LEGEND
APPROXIMATE LIMITS OF EXISTING
CANNERY STREET FORMER
REFUSE DISPOSAL STATION
WASTE [TRC, 2001]
BORINGS PERFORMED TO
DETERMINE DEPTH OF WASTE
(GEOSYNTEC, 2020)
EXPLORATORY TEST PITS
PERFORMED (GEOSYNTEC, 2020)
REQUESTED INVESTIGATION AREA
(2020)
REQUESTED INVESTIGATION AREA
(2021)
EXISTING BURIED LFG HEADER
PIPE
APPROXIMATE LATERAL LIMITS OF
DELINEATED WASTE
AREAS WITH TRACES OF WASTE
MATERIAL (QUERIED WHERE
UNCERTAIN) G
PICNIC
AREA
CHILDREN'S PLAY AREA
TP-4
TP-5
TP-5A
INVESTIGATION
AREA (2021)
HSA-2A
HSA-3A
HSA-6A
HSA-5A
HSA-4A
HSA-7A HSA-8A
HSA-3 HSA-4
PROJECT NO:
FIGURE N:\CACADD\E\EDISION PARK\EDISON PARK-HL1685\FIGURES\1685F014 - Last Saved by: KViswanathan on 5/6/21 FIELD INVESTIGATION LOCATIONS (SOUTH)
EDISON PARK - WASTE DELINEATION
HUNTINGTON BEACH, CALIFORNIA
JUNE 2021
2B
HL1685B 0 50
SCALE IN FEET N
LEGEND
APPROXIMATE LIMITS OF EXISTING
CANNERY STREET FORMER
REFUSE DISPOSAL STATION
WASTE [TRC, 2001]
BORINGS PERFORMED TO
DETERMINE DEPTH OF WASTE
(GEOSYNTEC, 2020)
EXPLORATORY TEST PITS
PERFORMED (GEOSYNTEC, 2020)
BORINGS PERFORMED TO
DETERMINE DEPTH OF WASTE
(GEOSYNTEC, 2021)
REQUESTED INVESTIGATION AREA
(2020)
REQUESTED INVESTIGATION AREA
(2021)
EXISTING BURIED LFG HEADER
PIPE
AREAS WITH TRACES OF WASTE
MATERIAL (QUERIED WHERE
UNCERTAIN) G
HL1685B\Edison Park Waste Delineation Final Report
Appendix A
Soil Boring Permit, DigAlert Ticket
Confirmations and Geophysical Utility
Clearance Field Notes
1 Karthik Viswanathan
From: [email protected]
Sent: Friday, September 18, 2020 6:25 PM
To: Karthik Viswanathan
Subject: DigAlert Confirmation for Ticket A202620900-00A CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic.
EMLCFM 03993A USAS 09/18/20 18:25:10 A202620900-00A NEW NORM POLY LREQ Thank you for contacting Underground Service Alert of Southern California.
This is an automatically generated confirmation of your DigAlert.
For your safety please excavate carefully around the marked utility lines.
For more information regarding DigAlert's web portals, mobile apps and text messaging, please visit www.digalert.org or text Services to DIGALT (344258).
This email comes from an automated program that is NOT MONITORED.
DO NOT REPLY TO THIS EMAIL.
This is not a certified copy of the ticket.
Ticket: A202620900 Rev: 00A Created: 09/18/20 18:24 User: BRJ Chan: 100 Work Start: 09/24/20 07:00 Legal Start: 09/24/20 07:00 Expires: 10/16/20 23:59 Response required: Y Priority: 2
Excavator Information
Company: AMERICAN INTERGRATED SERVICES
Co Addr: 1502 E OPP ST
City : WILMINGTON State: CA Zip: 90744
Created By: KARTHIK VISWANATHAN-GEOSYNTEC Language: ENGLISH Office Phone: 714-969-0800 SMS/Cell: 510-993-8823
Office Email: [email protected]
Site Contact: SNEHA UPADHYAYA
Site Phone: 714-461-9911 Site SMS/Cell: 714-461-9911
Site Email: [email protected]
Excavation Area
State: CA County: ORANGE Place: HUNTINGTON BEACH
Zip: 92646
Location: Address/Street: STILWELL DR
: X/ST1: POSTON LN
:
: APPROX 65FT W/OF POSTON LN AT APPROX 250FT, 400FT, 520FT, 760FT, : 1015FT S/OF STILWELL DR **ALL LOCATIONS WITHIN PARK** **PROPERTY OF : EDISON COMMUNITY PARK** **MARK 25FT RADIUS ALL LOCATIONS** Delineated Method: WHITEPAINT
Work Type: (5) TEST PITS (8FT DEPTH)
Work For : GEOSYNTEC CONSULTANTS
Permit: Job/Work order:
1 Year: N Boring: N Street/Sidewalk: N Vacuum: N Explosives: N 2 Lat/Long
Center Generated (NAD83): 33.653755/-117.973122 33.653752/-117.972114 : 33.650862/-117.973129 33.650859/-117.972121
Excavator Provided: 33.653346/-117.972630 33.652895/-117.972609 : 33.652569/-117.972623 33.651933/-117.972633 33.651273/-117.972623 Map link:
https://newtin.digalert.org/newtinweb/map_tkt.nap?TRG=E4TbQYTXQXOSNVW-C Members:
CSD91 ORANGE CO SANITATION CONTROL CENTER 714-593-7025
HUN01 C/OF HUNTINGTON BCH-WTR DAVID RICO 714-861-0134
MCISOCAL MCI (VERIZON BUSINESS) FIBE FIBER SECURITY DEPT 800-624-9675 SCG2XN SC GAS - GARDEN GROVE LEAD DISPATCHER - CHUCK 800-603-7060 UCHTRW_C5 UTIL/SPECTRUM GG - CATV SPECTRUM DAMAGE ONLY 844-780-6054 UOCW01 UTILIQUEST 4 OR CNTY WTR DIST SCOTT DAVIDSON / JUSTIN 714-766-9375xCELL USCEOR UTILIQUEST FOR SCE- ORANGE RE SC EDISON PERSONNEL 800-611-1911 UTFTRCA01 UTILIQUEST/FRONTIER - TEL/ UTILIQUEST DISPATCH 800-366-7801 (c) Copyright 2017 Underground Service Alert of Southern California.
All rights reserved.
1 Karthik Viswanathan
From: [email protected]
Sent: Friday, September 18, 2020 6:35 PM
To: Karthik Viswanathan
Subject: DigAlert Confirmation for Ticket A202620902-00A CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic.
EMLCFM 03997A USAS 09/18/20 18:34:34 A202620902-00A NEW NORM POLY LREQ Thank you for contacting Underground Service Alert of Southern California.
This is an automatically generated confirmation of your DigAlert.
For your safety please excavate carefully around the marked utility lines.
For more information regarding DigAlert's web portals, mobile apps and text messaging, please visit www.digalert.org or text Services to DIGALT (344258).
This email comes from an automated program that is NOT MONITORED.
DO NOT REPLY TO THIS EMAIL.
This is not a certified copy of the ticket.
Ticket: A202620902 Rev: 00A Created: 09/18/20 18:34 User: BRJ Chan: 100 Work Start: 09/24/20 07:00 Legal Start: 09/24/20 07:00 Expires: 10/16/20 23:59 Response required: Y Priority: 2
Excavator Information
Company: ABC LIOVIN DRILLING
Co Addr: 1180 E BURNETT ST
City : SIGNAL HILL State: CA Zip: 90755
Created By: KARTHIK VISWANATHAN-GEOSYNTEC Language: ENGLISH Office Phone: 714-969-0800 SMS/Cell: 510-993-8823
Office Email: [email protected]
Site Contact: SNEHA UPADHYAYA
Site Phone: 714-461-9911 Site SMS/Cell: 714-461-9911
Site Email: [email protected]
Excavation Area
State: CA County: ORANGE Place: HUNTINGTON BEACH
Zip: 92646
Location: Address/Street: STILWELL DR
: X/ST1: POSTON LN
:
: APPROX 50FT W/OF POSTON LN AT APPROX 320FT, 570FT, 745FT S/OF STILWELL : DR; APPROX 240FT W/OF POSTON LN AT APPROX 720FT & 450FT S/OF STILWELL : DR **ALL LOCATIONS WITHIN PARK** **PROPERTY OF EDISON COMMUNITY : PARK** **MARK 25FT RADIUS ALL LOCATIONS**
Delineated Method: WHITEPAINT
Work Type: (5) SOIL BORINGS
Work For : GEOSYNTEC CONSULTANTS
Permit: Job/Work order:
2 1 Year: N Boring: N Street/Sidewalk: N Vacuum: N Explosives: N Lat/Long
Center Generated (NAD83): 33.653556/-117.973708 33.653537/-117.972127 : 33.651572/-117.973731 33.651553/-117.972151
Excavator Provided: 33.653131/-117.972625 33.652477/-117.972639 : 33.651969/-117.972632 33.652032/-117.973225 33.652770/-117.973224 Map link:
https://newtin.digalert.org/newtinweb/map_tkt.nap?TRG=64Co9pCk9sztws3-k Members:
HUN01 C/OF HUNTINGTON BCH-WTR DAVID RICO 714-861-0134
SCG2XN SC GAS - GARDEN GROVE LEAD DISPATCHER - CHUCK 800-603-7060 UCHTRW_C5 UTIL/SPECTRUM GG - CATV SPECTRUM DAMAGE ONLY 844-780-6054 UOCW01 UTILIQUEST 4 OR CNTY WTR DIST SCOTT DAVIDSON / JUSTIN 714-766-9375xCELL USCEOR UTILIQUEST FOR SCE- ORANGE RE SC EDISON PERSONNEL 800-611-1911 UTFTRCA01 UTILIQUEST/FRONTIER - TEL/ UTILIQUEST DISPATCH 800-366-7801 (c) Copyright 2017 Underground Service Alert of Southern California.
All rights reserved.
1 Karthik Viswanathan
From: [email protected]
Sent: Monday, March 8, 2021 3:11 PM
To: Sneha Upadhyaya
Subject: DigAlert Confirmation for Ticket A210670984-00A CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic.
EMLCFM 04567A USAS 03/08/21 15:11:07 A210670984-00A NEW NORM POLY LREQ Thank you for contacting Underground Service Alert of Southern California.
This is an automatically generated confirmation of your DigAlert.
For your safety please excavate carefully around the marked utility lines.
For more information regarding DigAlert's web portals, mobile apps and text messaging, please visit www.digalert.org or text Services to DIGALT (344258).
This email comes from an automated program that is NOT MONITORED.
DO NOT REPLY TO THIS EMAIL.
This is not a certified copy of the ticket.
Ticket: A210670984 Rev: 00A Created: 03/08/21 15:10 User: NAN Chan: 100 Work Start: 03/12/21 07:00 Legal Start: 03/12/21 07:00 Expires: 04/05/21 23:59 Response required: Y Priority: 2
Excavator Information
Company: ABC LIOVIN DRILLING
Co Addr: 1180 E BURNETT ST
City : SIGNAL HILL State: CA Zip: 90755
Created By: KARTHIK VISWANATHAN (GEOSYNTEC Language: ENGLISH Office Phone: 714-969-0800 SMS/Cell: 510-993-8823
Office Email: [email protected]
Site Contact: SNEHA UPADHYAYA
Site Phone: 714-461-9911 Site SMS/Cell: 714-461-9911
Site Email: [email protected]
Excavation Area
State: CA County: ORANGE Place: HUNTINGTON BEACH
Zip: 92646
Location: Address/Street: MAGNOLIA ST
: X/ST1: HAMILTON AVE
:
: APPROX 685FT N/OF HAMILTON AVE AT APPROX 430FT W/OF S/BOUND MAGNOLIA : ST; APPROX 630FT N/OF HAMILTON AVE AT APPROX 370FT W/OF S/BOUND : MAGNOLIA ST; APPROX 585FT N/OF HAMILTON AVE AT APPROX 345FT W/OF : S/BOUND MAGNOLIA ST; APPROX 525FT N/OF HAMILTON AVE AT APPROX 335FT : W/OF S/BOUND MAGNOLIA ST; APPROX 530FT N/OF HAMILTON AVE AT APPROX : 375FT W/OF S/BOUND MAGNOLIA ST; APPROX 545FT N/OF HAMILTON AVE AT : APPROX 420FT W/OF S/BOUND MAGNOLIA ST; APPROX 608FT N/OF HAMILTON AVE : AT APPROX 375FT W/OF S/BOUND MAGNOLIA ST; **MARK 25FT RADIUS AROUND : EACH LOCATION** **DELINEATED EACH LOCATION #1-8 IN WHITE PAINT** 2 Delineated Method: WHITEPAINT
Work Type: 8 SOIL BORINGS
Work For : GEOSYNTEC
Permit: Job/Work order:
1 Year: N Boring: N Street/Sidewalk: N Vacuum: N Explosives: N Lat/Long
Center Generated (NAD83): 33.652888/-117.972945 33.652751/-117.971663 : 33.651623/-117.973080 33.651486/-117.971798
Excavator Provided: 33.652427/-117.972528 33.652276/-117.972352 : 33.652137/-117.972245 33.651984/-117.972236 33.651974/-117.972353 : 33.652017/-117.972514 33.652159/-117.972535 33.652187/-117.972344 Map link:
https://newtin.digalert.org/newtinweb/map_tkt.nap?TRG=F5RZPXUXMfKaEaN-Q Members:
HUN01 C/OF HUNTINGTON BCH-WTR DAVID RICO 714-861-0134
SCG2XN SOCALGAS DISTRIBUTION GARDEN LEAD DISPATCHER - CHUCK 800-603-7060 UOCW01 UTILIQUEST 4 OR CNTY WTR DIST SCOTT DAVIDSON / JUSTIN 714-766-9375xCELL USCEOR UTILIQUEST FOR SCE- ORANGE RE SC EDISON PERSONNEL 800-611-1911 UTFTRCA01 UTILIQUEST/FRONTIER - TEL/ UTILIQUEST DISPATCH 800-366-7801 (c) Copyright 2017 Underground Service Alert of Southern California.
All rights reserved.
APPLICATION FOR WELL CONSTRUCTION PErB^FHCA/ACC. UNTING ORANGE COUNTY HEALTH CARE AGENCY
ENVIRONMENTAL HEALTH DIVISION
CITY
Huntington Beach
1241 E. DYER ROAD, SUITE 120
SANTA ANA, CA 92706-5611
(714) 433«)00
(714) 433^1
DATE
03/02/2021
MAR 0 3
WELL LOCATION (ADDRESS IF AVAILABLE)
Edison Park - 21377 Magnolia St., Huntington Beach, CA 92646 ENVIRONMENTAL hEAL "I^ NAME OF WELL OWNER City of Huntington Beach - Community Services Dept.
ADDRESS
2000 Main Street
CITY ZIP
Huntington Beach 92648
NAME OF CONSULTING FIRM
Geosyntec Consultants, Inc.
BUSINESS ADDRESS
2100 Main Street. Suite 150
TELEPHONE
714-536-5486
CITY ZIP TELEPHONE
Huntington Beach 92648 714-969-0800
NAME OF DRILLING CO.
ABC Liovin Drilling Inc. v/ C-57 LICENSE NO.
422904 y
CITY
Signal Hill
ZIP
90755
TELEPHONE
562-981-8575
DIAGRAM OF WELL SITE (Use additional sheets and/or attachments) 1SITEPLAN ATTACHED
FOR ACCOUNTING USE ONLY:
HSO NO. MlOHn
DATE. 3/5 U
INTL.
CHECK NO.
AMOUNT
APPROVAL BY OTHER AGENCIES:
JURISDICTION
REMARKS
AUTHORIZED SIGNATURE
00^
DATE
TYPE OF W/ELL (CHECK) PROBE SURVEY •
PRIVATE DOMESTIC • MONITORING •
PUBLIC DOMESTIC • SOIL BORING
IRRIGATION • OTHER n
CATHODIC • TOTAL NUMBER ^
A. WELLS - SUBMIT A WELL CONSTRUCTION DIAGRAM
(INCLUDE DIMENSIONS)
B. SOIL BORINGS AND PROBESTOTAL DEPTH ^ feet
SEALING MATERIAL Hydrated Bentonite Chips
C. PROPOSED START DATE 3/12/2021
/ hereby agree lo comply in every respect with all
requirements of the Health Care Agency and with all
ordinances and laws of the County of Orange and ofthe
Slate ofCalifornia pertaining lo well construction,
reconstruction and destruction, including the require*
ments to maintain the integrity of all significant confining zones.
3/2/2021
APPLICANT'S SIGNATURE
Karthik Viswanathan
DATE
PRINT NAME
714-465-1250
PHONE NUMBER
714-333-4275
FAXNUMBER
DISPOSITION OF PERMIT (DO NOT FILL IN):
APPROVED SUBJECT TO THE FOLLOWING CONDITIONS;
A. NOTIFY THIS AGENCY AT LEAST 48 HOURS
PRIOR TO START. di\ar\<^eS • PRIOR TOSEALING THE ANNULAR SPACE ORFILLING OF THE CONDUCTOR CASING.
B, SUBMIT TO THE AGENCY WTTHIN 30 DAYS AFTER
COMPLETION OF WORK. A WELL COMPLETION REPORT
AND/OR DRILLING LOGS, PLEASE REFERENCE PERMIT NO.
C. • SECURE ALL MONITORING WELLS TO PREVENT TAMPERING.
I
D. M OTHER
• DENIED
PERMjTBSUED ETA— , , PAT^ _
iNT NAME PHONE NUMBER
WHEN SIGNED BY ORANGE COUNTY HEALTH CARE AGENCY REPRESENTATIVE, THIS APPLICATION IS A PERMIT. fi.F272-09.0803 (R11/01)
HL1685B\Edison Park Waste Delineation Final Report
Appendix B
SCAQMD Permit for Rule 1150
HL1685B\Edison Park Waste Delineation Final Report
Appendix C
Test Pit Logs
HL1685B\Edison Park Waste Delineation Final Report
Appendix D
Borings Logs with Key
KEY/SYMBOLS 01/04
HIGHLY ORGANIC SOILS PT
NOTE: DUAL SYMBOLS USED FOR BORDERLINE CLASSIFICATIONS
UNIFIED SOIL CLASSIFICATION AND SYMBOL CHART
COARSE
GRAINED
SOILS
MORE THAN
50% OF MATERIAL COARSER
THAN NO. 200
SIEVE SIZE
MAJOR DIVISIONS SYMBOLS DESCRIPTIONS
GRAVEL
AND
GRAVELLY
SOILS
MORE THAN
50% OF
COARSE
FRACTION
RETAINED ON
NO.4 SIEVE
SAND
AND
AND
CLAYS
LIQUID LIMIT
LESS THAN 50
LIQUID LIMIT
GREATER
THAN 50
ML
CL
OL
MH
CH
OH
SANDY
SOILS
MORE THAN
50% OF
COARSE
FRACTION
PASSING NO.4
SIEVE
CLEAN
GRAVELS
LITTLE OR NO
FINES
GRAVELS
WITH FINES
APPRECIABLE
AMOUNT OF
FINES
SANDS
CLEAN
LITTLE OR NO
FINES
SANDS
GW
GP
GM
GC
SW
SM
SP
WELL-GRADED GRAVELS,
GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES
POORLY GRADED GRAVELS,
GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES
SILTY GRAVELS, GRAVELSAND-SILT MIXTURES
CLAYEY GRAVELS, GRAVEL
-SAND-CLAY MIXTURES
WELL GRADED SANDS,
GRAVELLY SANDS, LITTLE OR
NO FINES
POORLY GRADED SANDS,
GRAVELLY SANDS, LITTLE OR
NO FINES
SILTY SANDS, SAND-SILT
MIXTURES WITH FINES
APPRECIABLE
AMOUNT OF
FINES
SC CLAYEY SANDS, SAND-CLAY
MIXTURES
FINE
GRAINED
SOILS
MORE THAN
50% OF MATERIAL FINER THAN
NO. 200
SIEVE SIZE
SILTS
AND
CLAYS
SILTS
PEAT, HUMUS, SWAMP SOILS WITH HIGH ORGANIC CONTENT
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC
SILTS
INORGANIC CLAYS OF HIGH
PLASTICITY, FAT CLAYS
INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE
SANDY OR SILTY SOILS, ELASTIC SILT
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS
INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH
SLIGHT PLASTICITY
CONSISTENCY UNCONFINED COMPRESSIVE
STRENGTH (TONS/SQ FT)
FINE
GRAINED
SOILS
0 - 2
3 - 4
5 - 8
9 - 15
16 - 30
31 - 50
>50
VERY SOFT
SOFT
FIRM
STIFF
VERY STIFF
HARD
VERY HARD
<0.25
0.25 - 0.50
0.50 - 1.00
1.00 - 2.00
2.00 - 4.00
>4.00
COARSE
GRAINED
SOILS
RELATIVE
DENSITY
0 - 4
5 - 10
11 - 30
31 - 50
>50
VERY LOOSE
LOOSE
MEDIUM DENSE
DENSE
VERY DENSE
EMPIRICAL CORRELATIONS WITH STANDARD PENETRATION RESISTANCE N60 VALUES * N60 VALUE *
(BLOWS/FT)
N60 VALUE *
(BLOWS/FT)
* ASTM D 1586; NUMBER OF BLOWS OF 140 POUND HAMMER FALLING 30 INCHES TO DRIVE A 2 IN. O.D., 1.4 IN. I.D. SAMPLER ONE FOOT, CORRECTED FOR HAMMER EFFICIENCY.
PLASTICITY CHART
P
L
A
S
T
I
C
I
T
Y
I
N
D
E
X
LIQUID LIMIT (LL) (%)
"U" LINE
CH or OH
CL or OL
"A" LINE
MH or OH
PI=0.73(LL-20)
ML or OL CL-ML
0 10
20 30
40 50
60 0 10 20 30 40 50 60 70 80 90 16 100
01-KEY/SYMBOLS HL1685A.GPJ GEOSNTEC.GDT 10/25/20
PARTICLE SIZE IDENTIFICATION
USCS (SOILS ONLY) * SEDIMENTARY (ROCK ONLY)
BOULDER
COBBLE
GRAVEL: COARSE
GRAVEL: FINE
SAND: COARSE
SAND: MEDIUM
SAND: FINE
SILT/CLAY
>300 mm
75 - 300 mm
20 - 75 mm
4.75 - 20 mm
2 - 4.75 mm
0.42 - 2 mm
0.074 - 0.42 mm
<0.074 mm
BOULDER
COBBLE
PEBBLE
GRANULE
SAND: V. COARSE
SAND: COARSE
SAND: MEDIUM
SAND: FINE
SAND: V. FINE
SILT
CLAY
>256 mm
64 - 256 mm
4 - 64 mm
2 - 4 mm
1 - 2 mm
0.5 - 1 mm
0.25 - 0.5 mm
0.125 - 0.25 mm
0.063 - 0.125 mm
0.004 - 0.063 mm
<0.004 mm
* POORLY GRADED - PREDOMINANTLY ONE GRAIN SIZE, OR HAVING A RANGE OF SIZES WITH SOME INTERMEDIATE SIZES MISSING * WELL GRADED - HAVING WIDE RANGE OF GRAIN SIZES AND APPRECIABLE AMOUNTS OF ALL INTERMEDIATE PARTICLE SIZES
PERCENTAGE OF PARTICLE TYPE IN DECREASING ORDER OF PARTICLE SIZE (GRAVEL,SAND,FINES), BASED ON VISUAL OBSERVATION
WELL SYMBOLS
BENTONITE SEAL
CONCRETE
GROUT
TRANSITION
SAND
SAND PACK
CENTRALIZER
NATIVE/SLUFF
GRAVEL PACK
MSL: Mean Sea Level
Pump Inlet
SAMPLE TYPE AND OTHER SYMBOLS
Static Water Level
Water Level at Time
Drilling, or as Shown
HSA: Hollow Stem Auger
BTOC: Below Top of
Casing
BGS: Below Ground
Surface
AGS: Above Ground
Surface
MODIFIED CALIFORNIA
SAMPLE
CORE SAMPLE
BULK SAMPLE
DRIVE SAMPLE
STANDARD
PENETRATION TEST
SHELBY TUBE
Loss of Drilling Fluid
PROJECT NUMBER
PROJECT LOCATION
PROJECT
GS FORM:
Huntington Beach, CA
KEY SHEET - CLASSIFICATIONS AND SYMBOLS
Edison Park Waste Delineation
HL1685A
OTHER MATERIAL SYMBOLS
Conglomerate
Clayey Sandstone
Sandy Siltstone
Siltstone
Clayey Siltstone/
Silty Claystone
Sandstone
Silty Sandstone
Claystone
Sandy Claystone
Metamorphic
Limestone
Dolomite
Glacial Till
Granitic/Intrusive
Volcanic/Extrusive
Landslide Debris
Artificial Fill
Concrete/Asphalt
Marker Bed
Refuse
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
Silty SAND (SM): brown; dry; fine sand; [0,80,20];
non-plastic.
LANDFILL MAERIAL: dark grey; moist; no odor; wood
pieces, asphalt concrete debris.
Silty SAND (SM): grey; wet; fine sand; [0,80,20]; low
plastic.
Terminate boring at 11.5-ft below ground surface
(bgs).
16:20
16:30
16:45
16:55
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
10 5
0 -5
-10
-15
02-GEOTECH1 HL1685A.GPJ GEOSNTEC.GDT 10/25/20
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin 33.65306
-117.97278
Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
GS FORM:
SHEET
Sep 28, 20
HSA-1 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Sep 28, 20 ELEVATION DATA:
GROUND SURF. 11
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685A
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
Silty SAND (SM): brown; dry; fine sand; [5,75,20];
non-plastic; 1/4-in. to 1/2-in. gravel.
LANDFILL MAERIAL: dark grey; moist; no odor; wood
pieces, asphalt concrete debris.
Silty SAND (SM): grey; wet; fine sand; [0,80,20];
non-plastic.
Terminate boring at 16.5-ft below ground surface
(bgs).
15:30
15:35
15:45
15:50
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
5 0
-5
-10
-15
-20
02-GEOTECH1 HL1685A.GPJ GEOSNTEC.GDT 10/25/20
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin 33.65250
-117.97250
Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
GS FORM:
SHEET
Sep 28, 20
HSA-2 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Sep 28, 20 ELEVATION DATA:
GROUND SURF. 7
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685A
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
Silty SAND (SM): brown; dry; fine sand; [5,75,20];
non-plastic; 1/4-in. to 1/2-in. gravel.
LANDFILL MAERIAL: dark grey; moist; no odor; wood
pieces, asphalt concrete debris.
Poorly-graded SAND with Silt (SP-SM): grey; wet;
predominantly fine sand; [0,90,10]; non-plastic.
Terminate boring at 21.5-ft below ground
surface (bgs).
13:55
14:05
14:20
14:30
14:40
14:45
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
5 0
-5
-10
-15
-20
02-GEOTECH1 HL1685A.GPJ GEOSNTEC.GDT 10/25/20
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin 33.65194
-117.97250
Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
GS FORM:
SHEET
Sep 28, 20
HSA-3 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Sep 28, 20 ELEVATION DATA:
GROUND SURF. 7
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685A
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
Hard drilling observed.
Hard drilling observed.
Silty SAND (SM): brown; dry; fine sand; [5,75,20];
non-plastic; 1/4-in. to 1/2-in. gravel.
LANDFILL MAERIAL: dark grey; moist; no odor; wood
pieces, asphalt concrete debris.
10:50
10:55
11:10
11:15
11:20
11:30
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
0 -5
-10
-15
-20
-25
02-GEOTECH1 HL1685A.GPJ GEOSNTEC.GDT 10/25/20
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin 33.65194
-117.97306
Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
GS FORM:
SHEET
Sep 28, 20
HSA-4 1 OF
GS FORM:
BORING 2
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Sep 28, 20 ELEVATION DATA:
GROUND SURF. 5
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685A
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Very hard drilling, little to no spoils.
Refusal; auger plugged with wood.
Wood chunks observed in the spoils
as the auger was retracted.
Terminate boring at 34-ft below ground surface (bgs)
due to refusal.
12:00
12:40
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
35 40
45 50
55 60
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
-30
-35
-40
-45
-50
-55
02-GEOTECH1 HL1685A.GPJ GEOSNTEC.GDT 10/25/20
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin 33.65194
-117.97306
Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
GS FORM:
SHEET
Sep 28, 20
HSA-4 2 OF
GS FORM:
BORING 2
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Sep 28, 20 ELEVATION DATA:
GROUND SURF. 5
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685A
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
Silty SAND (SM): brown; dry; fine sand; [5,75,20];
non-plastic; 1/4-in. to 1/2-in. gravel.
LANDFILL MAERIAL: dark grey; moist; no odor; wood
pieces, asphalt concrete debris.
organic odor.
becomes wet.
07:45
08:00
08:20
08:25
08:30
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
5 0
-5
-10
-15
-20
02-GEOTECH1 HL1685A.GPJ GEOSNTEC.GDT 10/25/20
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin 33.65278
-117.97333
Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
GS FORM:
SHEET
Sep 28, 20
HSA-5 1 OF
GS FORM:
BORING 2
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Sep 28, 20 ELEVATION DATA:
GROUND SURF. 9
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685A
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hard drilling (rattling of auger)
observed.
No recovery.
Hard drilling observed.
No recovery.
Silty SAND (SM): grey; wet; fine sand; [0,80,20];
non-plastic.
Terminate boring at 41.5-ft below ground surface
(bgs).
09:00
09:30
09:32
09:35
09:45
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
35 40
45 50
55 60
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
-25
-30
-35
-40
-45
-50
02-GEOTECH1 HL1685A.GPJ GEOSNTEC.GDT 10/25/20
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin 33.65278
-117.97333
Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
GS FORM:
SHEET
Sep 28, 20
HSA-5 2 OF
GS FORM:
BORING 2
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Sep 28, 20 ELEVATION DATA:
GROUND SURF. 9
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685A
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
KEY/SYMBOLS 01/04
HIGHLY ORGANIC SOILS PT
NOTE: DUAL SYMBOLS USED FOR BORDERLINE CLASSIFICATIONS
UNIFIED SOIL CLASSIFICATION AND SYMBOL CHART
COARSE
GRAINED
SOILS
MORE THAN
50% OF MATERIAL COARSER
THAN NO. 200
SIEVE SIZE
MAJOR DIVISIONS SYMBOLS DESCRIPTIONS
GRAVEL
AND
GRAVELLY
SOILS
MORE THAN
50% OF
COARSE
FRACTION
RETAINED ON
NO.4 SIEVE
SAND
AND
AND
CLAYS
LIQUID LIMIT
LESS THAN 50
LIQUID LIMIT
GREATER
THAN 50
ML
CL
OL
MH
CH
OH
SANDY
SOILS
MORE THAN
50% OF
COARSE
FRACTION
PASSING NO.4
SIEVE
CLEAN
GRAVELS
LITTLE OR NO
FINES
GRAVELS
WITH FINES
APPRECIABLE
AMOUNT OF
FINES
SANDS
CLEAN
LITTLE OR NO
FINES
SANDS
GW
GP
GM
GC
SW
SM
SP
WELL-GRADED GRAVELS,
GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES
POORLY GRADED GRAVELS,
GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES
SILTY GRAVELS, GRAVELSAND-SILT MIXTURES
CLAYEY GRAVELS, GRAVEL
-SAND-CLAY MIXTURES
WELL GRADED SANDS,
GRAVELLY SANDS, LITTLE OR
NO FINES
POORLY GRADED SANDS,
GRAVELLY SANDS, LITTLE OR
NO FINES
SILTY SANDS, SAND-SILT
MIXTURES WITH FINES
APPRECIABLE
AMOUNT OF
FINES
SC CLAYEY SANDS, SAND-CLAY
MIXTURES
FINE
GRAINED
SOILS
MORE THAN
50% OF MATERIAL FINER THAN
NO. 200
SIEVE SIZE
SILTS
AND
CLAYS
SILTS
PEAT, HUMUS, SWAMP SOILS WITH HIGH ORGANIC CONTENT
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC
SILTS
INORGANIC CLAYS OF HIGH
PLASTICITY, FAT CLAYS
INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE
SANDY OR SILTY SOILS, ELASTIC SILT
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS
INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH
SLIGHT PLASTICITY
CONSISTENCY UNCONFINED COMPRESSIVE
STRENGTH (TONS/SQ FT)
FINE
GRAINED
SOILS
0 - 2
3 - 4
5 - 8
9 - 15
16 - 30
31 - 50
>50
VERY SOFT
SOFT
FIRM
STIFF
VERY STIFF
HARD
VERY HARD
<0.25
0.25 - 0.50
0.50 - 1.00
1.00 - 2.00
2.00 - 4.00
>4.00
COARSE
GRAINED
SOILS
RELATIVE
DENSITY
0 - 4
5 - 10
11 - 30
31 - 50
>50
VERY LOOSE
LOOSE
MEDIUM DENSE
DENSE
VERY DENSE
EMPIRICAL CORRELATIONS WITH STANDARD PENETRATION RESISTANCE N60 VALUES * N60 VALUE *
(BLOWS/FT)
N60 VALUE *
(BLOWS/FT)
* ASTM D 1586; NUMBER OF BLOWS OF 140 POUND HAMMER FALLING 30 INCHES TO DRIVE A 2 IN. O.D., 1.4 IN. I.D. SAMPLER ONE FOOT, CORRECTED FOR HAMMER EFFICIENCY.
PLASTICITY CHART
P
L
A
S
T
I
C
I
T
Y
I
N
D
E
X
LIQUID LIMIT (LL) (%)
"U" LINE
CH or OH
CL or OL
"A" LINE
MH or OH
PI=0.73(LL-20)
ML or OL CL-ML
0 10
20 30
40 50
60 0 10 20 30 40 50 60 70 80 90 16 100
01-KEY/SYMBOLS HL1685B.GPJ GEOSNTEC.GDT 3/26/21
PARTICLE SIZE IDENTIFICATION
USCS (SOILS ONLY) * SEDIMENTARY (ROCK ONLY)
BOULDER
COBBLE
GRAVEL: COARSE
GRAVEL: FINE
SAND: COARSE
SAND: MEDIUM
SAND: FINE
SILT/CLAY
>300 mm
75 - 300 mm
20 - 75 mm
4.75 - 20 mm
2 - 4.75 mm
0.42 - 2 mm
0.074 - 0.42 mm
<0.074 mm
BOULDER
COBBLE
PEBBLE
GRANULE
SAND: V. COARSE
SAND: COARSE
SAND: MEDIUM
SAND: FINE
SAND: V. FINE
SILT
CLAY
>256 mm
64 - 256 mm
4 - 64 mm
2 - 4 mm
1 - 2 mm
0.5 - 1 mm
0.25 - 0.5 mm
0.125 - 0.25 mm
0.063 - 0.125 mm
0.004 - 0.063 mm
<0.004 mm
* POORLY GRADED - PREDOMINANTLY ONE GRAIN SIZE, OR HAVING A RANGE OF SIZES WITH SOME INTERMEDIATE SIZES MISSING * WELL GRADED - HAVING WIDE RANGE OF GRAIN SIZES AND APPRECIABLE AMOUNTS OF ALL INTERMEDIATE PARTICLE SIZES
PERCENTAGE OF PARTICLE TYPE IN DECREASING ORDER OF PARTICLE SIZE (GRAVEL,SAND,FINES), BASED ON VISUAL OBSERVATION
WELL SYMBOLS
BENTONITE SEAL
CONCRETE
GROUT
TRANSITION
SAND
SAND PACK
CENTRALIZER
NATIVE/SLUFF
GRAVEL PACK
MSL: Mean Sea Level
Pump Inlet
SAMPLE TYPE AND OTHER SYMBOLS
Static Water Level
Water Level at Time
Drilling, or as Shown
HSA: Hollow Stem Auger
BTOC: Below Top of
Casing
BGS: Below Ground
Surface
AGS: Above Ground
Surface
MODIFIED CALIFORNIA
SAMPLE
CORE SAMPLE
BULK SAMPLE
DRIVE SAMPLE
STANDARD
PENETRATION TEST
SHELBY TUBE
Loss of Drilling Fluid
PROJECT NUMBER
PROJECT LOCATION
PROJECT
GS FORM:
Huntington Beach, CA
KEY SHEET - CLASSIFICATIONS AND SYMBOLS
Edison Park Waste Delineation
HL1685B
OTHER MATERIAL SYMBOLS
Conglomerate
Clayey Sandstone
Sandy Siltstone
Siltstone
Clayey Siltstone/
Silty Claystone
Sandstone
Silty Sandstone
Claystone
Sandy Claystone
Metamorphic
Limestone
Dolomite
Glacial Till
Granitic/Intrusive
Volcanic/Extrusive
Landslide Debris
Artificial Fill
Concrete/Asphalt
Marker Bed
Refuse
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
CONCRETE
Silty SAND (SM): brown; moist; fine sand; [5,80,15];
non-plastic; trace 1/4-in. to 1/2-in. gravel.
Fat CLAY (CH): dark grey; moist; trace fine sand;
[5,5,90]; medium to high plasticity; slight organic odor; trace brick debris pieces.
Fat CLAY with Sand (CH): dark grey; moist; fine
sand; [0;20;80]; medium to high plasticity.
Sandy SILT (ML): dark grey; wet; fine sand; [0,40,60];
none to low plasticity.
Terminate boring at 16.5-ft below ground surface
(bgs).
13:05
13:15
13:25
13:40
13:45
13:50
100
100
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
8 7
6 5
4 3
2 1
0 -1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
-21
02-GEOTECH1 HL1685B.GPJ GEOSNTEC.GDT 4/9/21
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin Groundwater was not encountered. Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
-117.972310
33.652273
GS FORM:
SHEET
Mar 12, 21
HSA-2A 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Mar 12, 21 ELEVATION DATA:
GROUND SURF. 9
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685B
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
CONCRETE
Silty SAND (SM): brown; moist; fine sand; [5,80,15];
non-plastic; trace 1/4-in. to 1/2-in. gravel.
Fat CLAY (CH): dark grey; moist; trace fine sand;
[0,5,95]; medium to high plasticity; slight organic odor; trace asphalt debris pieces.
Fat CLAY with Sand (CH): dark grey; moist; fine
sand; [0;25;75]; medium to high plasticity.
Silty SAND (SM): grey; wet; fine sand; [0,60,40]; none
to low plasticity.
Terminate boring at 16.5-ft below ground surface
(bgs).
11:20
11:35
11:45
12:00
12:10
12:20
100
100
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
7 6
5 4
3 2
1 0
-1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
-21
-22
02-GEOTECH1 HL1685B.GPJ GEOSNTEC.GDT 4/9/21
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
-117.972250
33.652136
GS FORM:
SHEET
Mar 12, 21
HSA-3A 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Mar 12, 21 ELEVATION DATA:
GROUND SURF. 8
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685B
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
CONCRETE
Silty SAND (SM): brown; moist; fine sand; [5,75,20];
non-plastic; trace 1/4-in. to 1/2-in. gravel.
Fat CLAY (CH): dark grey; moist; trace fine sand;
[5,5,90]; medium to high plasticity; slight organic odor; wood debris; trace brick debris pieces.
few brick debris pieces.
Fat CLAY (CH): dark grey; moist; few fine sand;
[0;10;90]; medium to high plasticity; trace sea shells. becomes wet; [0;5;95].
Sandy SILT (ML): grey; wet; fine sand; (0;40;60); low
to medium plasticity.
Fat CLAY (CH): grey; wet; few fine sand; [0,10,90];
medium to high plasticity.
Terminate boring at 16.5-ft below ground surface
(bgs).
14:30
14:40
14:50
15:15
15:25
15:30
100
100
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
8 7
6 5
4 3
2 1
0 -1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
-21
02-GEOTECH1 HL1685B.GPJ GEOSNTEC.GDT 4/9/21
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
-117.972290
33.651973
GS FORM:
SHEET
Mar 12, 21
HSA-4A 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Mar 12, 21 ELEVATION DATA:
GROUND SURF. 9
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685B
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
CONCRETE
Silty SAND (SM): brown; moist; fine sand; [5,75,20];
none to low plasticity; trace 1/4-in. to 1/2-in. gravel.
Fat CLAY (CH): dark grey; moist; trace fine sand;
[0,5,95]; medium to high plasticity; slight organic odor.
Sandy SILT (ML): dark grey; wet; fine sand; (0;30;70);
low to medium plasticity.
Terminate boring at 17.0-ft below ground surface
(bgs).
16:00
16:15
16:25
16:45
16:50
17:00
100
100
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
8 7
6 5
4 3
2 1
0 -1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
-21
02-GEOTECH1 HL1685B.GPJ GEOSNTEC.GDT 4/9/21
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
-117.972360
33.651951
GS FORM:
SHEET
Mar 12, 21
HSA-5A 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Mar 12, 21 ELEVATION DATA:
GROUND SURF. 9
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685B
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
CONCRETE
Silty SAND (SM): brown; moist; fine sand; [5,80,15];
non-plastic; trace 1/4-in. to 1/2-in. gravel.
Fat CLAY (CH): dark grey; moist; trace fine sand;
[0,5,95]; medium to high plasticity; slight organic odor. [0;10;90]; no odor.
Sandy SILT (ML): dark grey; wet; fine sand; [0,30,70];
none to low plasticity.
Terminate boring at 16.5-ft below ground surface
(bgs).
17:10
17:15
17:30
17:35
17:45
17:50
100
100
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
6 5
4 3
2 1
0 -1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
-21
-22
-23
02-GEOTECH1 HL1685B.GPJ GEOSNTEC.GDT 4/9/21
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
K. Viswanathan
CME 85
ABC Liovin Groundwater was not encountered. Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
-117.972510
33.652033
GS FORM:
SHEET
Mar 12, 21
HSA-6A 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Mar 12, 21 ELEVATION DATA:
GROUND SURF. 7
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685B
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
Hand augered to 5 ft bgs.
First depth to groundwater.
CONCRETE
Silty SAND (SM): brown; moist; fine sand; [5,80,15];
none to low plasticity; trace 1/4-in. to 1/2-in. gravel.
Fat CLAY (CH): dark grey; moist; trace fine sand;
[0,5,95]; medium to high plasticity; slight organic odor.
Sandy SILT (ML): dark brown; wet; fine sand;
(0;40;60); low to medium plasticity.
Fat CLAY (CH): grey; wet; few fine sand; [0,10,90];
medium to high plasticity.
Terminate boring at 18.0-ft below ground surface
(bgs).
07:50
08:00
08:10
08:25
08:35
100
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
9 8
7 6
5 4
3 2
1 0
-1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
02-GEOTECH1 HL1685B.GPJ GEOSNTEC.GDT 4/9/21
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
-117.972520
33.652178
GS FORM:
SHEET
Mar 12, 21
HSA-7A 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Mar 12, 21 ELEVATION DATA:
GROUND SURF. 10
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685B
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
CONCRETE
Silty SAND (SM): brown; moist; fine sand; [0,85,15];
non-plastic.
Fat CLAY (CH): dark grey; moist; trace fine sand;
[0,5,95]; medium to high plasticity; slight organic odor.
Sandy SILT (ML): dark gray; wet; fine sand; (0;40;60);
low to medium plasticity.
Silty SAND (SM): grey; wet; fine to medium sand;
[0;80;20]; none to low plasticity.
Terminate boring at 16.5-ft below ground surface
(bgs).
09:50
10:10
10:15
10:20
10:30
10:35
100
100
1) Soil Name (USCS Sym.)
2) Color
3) Moisture
4) Grain Size
5) Percentage
6) Plasticity
7) Density/Consistency
8) Other (Mineral Content,
Discoloration, Odor, etc.)
BOREHOLE LOG
ELEV.
(ft)
BLOWS PER 6"
PID READING (ppm)
DEPTH
(ft-bgs)
COMMENTS
TYPE
GRAPHIC LOG
5 10
15 20
25 30
SAMPLE
GEOTECH1 01/04
SAMPLE NO.
N VALUE
RECOVERY (%)
TIME (00:00)
DESCRIPTION
1) Rig Behavior
2) Air Monitoring
3) Pocket Pen
4) Tor Vane
9 8
7 6
5 4
3 2
1 0
-1
-2
-3
-4
-5
-6
-7
-8
-9
-10
-11
-12
-13
-14
-15
-16
-17
-18
-19
-20
02-GEOTECH1 HL1685B.GPJ GEOSNTEC.GDT 4/9/21
EASTING
NORTHING
LOGGER
DIAMETER
DRILL MTHD
EQUIPMENT
CONTRACTOR
REVIEWER
Hollow Stem Auger
Y. Zemuy, P. E.
8-inch
SEE KEY SHEET FOR SYMBOLS AND ABBREVIATIONS
COORDINATE SYSTEM:
S. Upadhyaya
CME 85
ABC Liovin Borehole backfilled with hydrated bentonite chips. Logging of soils completed in general accordance with ASTM D2488 and ASTM D1586.
NOTES:
-117.972360
33.652181
GS FORM:
SHEET
Mar 12, 21
HSA-8A 1 OF
GS FORM:
BORING 1
PROJECT
LOCATION
START DRILL DATE
FINISH DRILL DATE
NUMBER
Mar 12, 21 ELEVATION DATA:
GROUND SURF. 10
TOP OF CASING
Edison Park Waste Delineation DATUM ft +MSL
Huntington Beach, CA
HL1685B
2100 Main St
Suite 150
Huntington Beach, CA 92648
Tel: (714) 969-0800
Fax: (714) 333-4275
HL1685B\Edison Park Waste Delineation Final Report
Appendix E
Daily Field Reports
DAILY FIELD REPORT Report Sequence No.:001
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 01 DESCRIPTION: Geophysical Survey for Locating Utilities CONTRACTOR: GEOVision, Inc., DAY OF WEEK: Wednesday DATE: September 23, 2020
WEATHER: Sunny, High 72° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-001 - GEOPHYSICAL UTILITY CLEARANCE - 9.23.2020 1 of 4 Time Field Work Activities
0700 Arrived on site and met with GEOVision field crew Martin Garcia and Christopher Collins. 0705 Held a brief tailgate safety meeting. GEOVision crew acknowledged the THA. 0710 Performed a site walk with GEOVision crew to observe the proposed investigation locations (HSA-1 through HSA-5; TP-1 through TP-5).
0730 GEOVision started utility clearance survey at location of TP-1 test pit. Some utilities (likely irrigation and main water line) were encountered within 5 ft of TP-1. GEOVision marked a new location 14 ft north of the existing TP-1 location. 0800 GEOVision performed utility clearance survey at location of HSA-1 boring. No conflicts were found at HSA-1 location. 0810 GEOVision performed utility clearance survey at location of TP-2. Electrical and irrigation utility lines were located within 3 ft of TP-2 location. GEOVision marked a new TP-2 location 10 ft south of the existing location. 0820 GEOVision performed utility clearance survey at location of HSA-5 boring. No conflicts were found at HSA-5 location. 0835 GEOVision performed utility clearance survey at locations of TP-3 and HSA-2. Some utilities (likely irrigation lines) were encountered within 5 ft of HSA-2 and TP-3 location. GEOVision marked a new HAS-2 location 3 ft east of the existing location.
0850 GEOVision performed utility clearance survey at location of HSA-4. Some utilities were encountered within 2 ft of the HSA-4 location. GEOVision marked a new location 3 ft east of the existing location. 0900 GEOVision performed utility clearance survey at locations of TP-4 and HSA-3. Electrical and irrigation utility lines were encountered within 5-10 ft of TP-4 and HSA-3 locations. No conflict at HSA-3. GEOVision marked a new location 15 ft southwest of the existing TP-4 location.
0920 GEOVision performed utility clearance survey at TP-5 location. No conflicts were found at TP-5. 0945 Geosyntec and GEOVision departed the site for the day.
DAILY FIELD REPORT Report Sequence No.:001
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 01 DESCRIPTION: Geophysical Survey for Locating Utilities CONTRACTOR: GEOVision, Inc., DAY OF WEEK: Wednesday DATE: September 23, 2020
WEATHER: Sunny, High 72° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-001 - GEOPHYSICAL UTILITY CLEARANCE - 9.23.2020 2 of 4 GEOVision crew performing utility clearance survey at
location TP-1 (looking west)
Utility markings at TP-1 and the new TP-1 location
(looking west)
Location HSA-1 cleared of utilities (looking north) GEOVision crew performing utility clearance survey at location TP-2 (looking north)
New TP-1 location
Existing TP-1
DAILY FIELD REPORT Report Sequence No.:001
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 01 DESCRIPTION: Geophysical Survey for Locating Utilities CONTRACTOR: GEOVision, Inc., DAY OF WEEK: Wednesday DATE: September 23, 2020
WEATHER: Sunny, High 72° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-001 - GEOPHYSICAL UTILITY CLEARANCE - 9.23.2020 3 of 4 Electrical utility markings at existing TP-2 and the new TP2 location (looking north) Location HSA-5 cleared of utilities (looking south) Utility markings at existing TP-3 and HSA-2 locations and the new HSA-2 location (looking northwest)
Utility markings at existing HSA-4 location and the new HSA-4 location (looking northwest)
New TP-2 location
New HSA-2 location
TP-3
New HSA-4 location
DAILY FIELD REPORT Report Sequence No.:001
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 01 DESCRIPTION: Geophysical Survey for Locating Utilities CONTRACTOR: GEOVision, Inc., DAY OF WEEK: Wednesday DATE: September 23, 2020
WEATHER: Sunny, High 72° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-001 - GEOPHYSICAL UTILITY CLEARANCE - 9.23.2020 4 of 4 Utility markings (electrical and irrigation lines) at TP-4 and HSA-3 locations and the new TP-4 location (looking north) Location TP-5 cleared of utilities (looking northwest). The anomalies located are likely roots.
HSA-3
New TP-4 location
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Thursday DATE: September 24, 2020
WEATHER: Sunny, High 76° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-002 - TRENCHING AND BACKFILLING - 9.24.2020 1 of 5
Time Field Work Activities
0645 Geosyntec air monitoring staff Eric Garcia arrived on site. 0650 Geosyntec field staff Sneha Upadhyaya arrived on site. 0700 Met with American Integrated Services (AIS) field crew (Geoff Harris, Antonio Sanchez, Jose Avila, and Brandon Duncan) and Geosyntec Air Monitoring field staff (Eric Garcia). Discussed the plan for the day with AIS field crew. 0710 AIS unloaded the drums at the parking lot.
0720 AIS mobilized the field equipment to proposed TP-1 exploratory test pit location. Plywood panels were placed on the ground to prevent potential rutting of the vegetation from the backhoe tires. 0730 Conducted a brief tailgate safety meeting.
0740 Fence panels with wind screens were placed around the excavation area. Plastic tarps were placed for temporarily staging the excavated soil.
0745 Started excavation activities at TP-1 location using a backhoe (CASE 580 Super N) with 36 inches wide bucket. About 4 inches of sod and topsoil was removed carefully.
0750 Continued excavating through the cover soil [visual classification in general accordance with ASTM D2488: Silty SAND (SM)]
0810 Encountered a 1 ft long metallic object at 2 ft below the ground surface (bgs). 0820 Encountered waste at approximately 3.5 ft bgs. Continued excavation to delineate the lateral limit of the waste. 0825 Geosyntec engineer Karthik Viswanathan arrived on-site. 0830 Encountered an underground irrigation pipe at approximately 3.0 ft bgs(1.5-inch PVC pipe). Minor damage caused during excavation was observed on the pipe.
0900 A section of the irrigation pipe was cut for repair. Excavation was continued towards the east to delineate the lateral limit of waste.
0930 Observed the lateral limit of the waste. Geosyntec took field measurements, prepared a log of the test-pit to include the field sketch of the exploratory test-pit wall.
0950 AIS repaired the damaged section of the irrigation pipe. 1010 AIS went to fill up the water trailer.
1050 Started backfilling the test pit (TP-1) with the excavated materials. The excavated material was backfilled into the test-pit and compacted to a firm condition.
1130 City of Huntington Beach personnel (Farhad Bolourchi) arrived on-site. Geosyntec provided an update to Mr. Bolourchi on TP-1 excavation activities.
1140 Geosyntec Senior Engineer (Yonas Zemuy) arrived on-site. Mr. Zemuy and Mr. Bolourchi performed a site walk. 1200 Backfilling activities were completed at TP-1.
1210 AIS field crew stopped for lunch break.
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Thursday DATE: September 24, 2020
WEATHER: Sunny, High 76° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-002 - TRENCHING AND BACKFILLING - 9.24.2020 2 of 5
1250 Mobilized to TP-2 location.
1300 Excavation activities started at TP-2 location. The sod and topsoil were carefully removed. Excavation continued through the cover soil [visual classification in general accordance with ASTM D2488: Silty SAND (SM)]. 1315 Encountered waste at approximately 2 ft bgs at TP-2. Continued excavation towards the east to delineate the lateral limit of the waste.
1320 Observed the lateral limit of the waste at TP-2. Geosyntec took field measurements, prepared a log of the test-pit to include the field sketch of the exploratory test-pit wall.
1330 Started backfilling the test pit (TP-2) with the excavated materials. The excavated material was backfilled into the test-pit and compacted to a firm condition.
1350 Backfilling activities were completed at TP-2.
1355 Mobilized to TP-3 location.
1410 Excavation activities started at TP-3 location. The sod and topsoil were carefully removed. Excavation continued through the cover soil [visual classification in general accordance with ASTM D2488: Silty SAND (SM)]. 1420 Encountered waste at approximately 3 ft bgs at TP-3. Continued excavation towards the east to delineate the lateral limit of the waste.
1430 Could not reach the lateral limit of the waste due to proximity to electric utility lines toward the east. Geosyntec field staff contacted Karthik Viswanathan (Geosyntec) and discussed about backfilling the excavated test-pit at TP-3 and starting a new test-pit the following day at 2 ft away from the marked electric lines (towards the east). 1440 Started backfilling the test pit (TP-3) with the excavated materials. The excavated material was returned into the test-pit and compacted to a firm condition.
1510 Backfilling activities were completed at TP-3. AIS to excavate a new test-pit at TP-3 tomorrow. 1515 AIS started moving the field equipment to the parking lot. Drums, plywood panels, and other equipment were secured within the fence panels at the parking lot.
1520 Geosyntec air monitoring staff Eric Garcia departed the site. 1545 Geosyntec field staff Sneha U. departed the site.
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Thursday DATE: September 24, 2020
WEATHER: Sunny, High 76° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-002 - TRENCHING AND BACKFILLING - 9.24.2020 3 of 5
Start of excavation at TP-1 location (looking south). Waste encountered at TP-1. Also indicated is the exposed underground irrigation pipeline (looking southeast).
Lateral limit of waste at TP-1 (looking south) Backfilling at TP-1(looking northeast) DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Thursday DATE: September 24, 2020
WEATHER: Sunny, High 76° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-002 - TRENCHING AND BACKFILLING - 9.24.2020 4 of 5
Start of excavation at TP-2 location (looking north). Waste encountered at TP-2 and the lateral limit of waste (looking northeast).
Backfilling at TP-2; placing the vegetation back (looking northeast). Start of excavation at TP-3 location (looking southeast).
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Thursday DATE: September 24, 2020
WEATHER: Sunny, High 76° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-002 - TRENCHING AND BACKFILLING - 9.24.2020 5 of 5
Waste encountered at TP-3 (looking east). Backfilling at TP-3 (looking southeast).
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 1 of 9
Time Field Work Activities
0650 Geosyntec field staff Sneha Upadhyaya and Eric Garcia arrived on site. 0700 Met with American Integrated Services (AIS) field crew and mobilized the equipment to TP-3 location to resume trenching activities at TP-3. Note that the trenching activities were discontinued at TP-3 on September 24 due to proximity to marked electric utility line.
0710 Plywood panels were placed on the ground to prevent potential rutting of the vegetation from the backhoe tires. Fence panels with wind screens were placed around the excavation area. Plastic tarps were placed for temporarily staging the excavated soil.
0715 Started excavation activities at TP-3 location 2 ft east of the marked electric utility line. Approximately 4 inches of sod and topsoil was removed carefully.
0720 Encountered the electric line at approximately 3.5 ft east of the marked utility line (1.5 ft from the western edge of the trench). Continued trenching from 1.5 ft away from the actual electric line (towards east). 0730 Encountered waste at about 3 ft bgs (dark grey Asphalt concrete debris, no odor). Continued excavation to delineate the lateral limit of the waste.
0810 Trench extended up to the edge of the concrete slab. Waste was observed to extent underneath the concrete slab. Unable to delineate the lateral extent of the waste. Geosyntec took field measurements, prepared a log of the test-pit to include the field sketch of the exploratory test-pit wall.
0815 Started backfilling the test pit (TP-3) with the excavated materials. The excavated material was backfilled into the test-pit and compacted to a firm condition.
0830 Backfilling activities completed at TP-3.
0840 Mobilized to proposed TP-4 location.
0850 Excavation activities started at TP-4 location. The sod and topsoil were carefully removed. Excavation continued through the cover soil [visual classification in general accordance with ASTM D2488: Silty SAND (SM)]. 0855 Traces of Asphalt concrete observed at approximately 1.5 ft bgs. Some poorly graded fine sand (SP) was also observed at about 2 ft bgs (likely pipe bedding material).
0900 Encountered irrigation line (2-in. PVC pipe) at approximately 1 ft 8 in bgs. The irrigation pipe was damaged during excavation activities.
0915 Started another test pit 1 ft south of the existing test-pit at TP-4. 0930 Encountered waste at about 3 ft 3 inches bgs at TP-4 (dark grey Asphalt concrete debris, no odor). Continued excavation towards the east to delineate the lateral limit of the waste. 1025 Excavation was discontinued at approximately 3.5 ft away from the concrete slab due to close proximity to the marked utilities lines along the edge of the concrete slab. Unable to delineate the lateral extent of the waste. Geosyntec took field measurements, prepared a log of the test-pit to include the field sketch of the exploratory test-pit wall. 1030 AIS fixed the damaged irrigation pipe.
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 2 of 9
1055 Started backfilling at TP-4 with the excavated materials. The excavated material was backfilled into the test-pit and compacted to a firm condition.
1140 Backfilling activities were completed at TP-2. AIS stopped for lunch. 1215 AIS returned from lunch.
1220 City of Huntington Beach Park Development Division officials arrived at the site (Chris Slama et al.). 1230 Mobilized to proposed TP-5 location.
1250 Excavation activities started at TP-5 location. The sod and topsoil were carefully removed. Excavation continued through the cover soil [visual classification in general accordance with ASTM D2488: Silty SAND (SM)]. 1300 Encountered waste (Asphalt concrete debris) at 1 ft 8 in bgs. 1310 Decayed wood pieces encountered at 4 ft 2 in bgs (mild organic odor). 1330 Excavation activities were continued towards the east. Waste was observed consistently at about 2 ft below the ground surface along the length of the trench.
1400 Excavation activities were continued until the edge of concrete sidewalk was reached (45 ft from the western edge of the trench). Excavation activities were discontinued. Unable to determine the lateral extent of the waste. 1410 Started backfilling the test pit (TP-5) with the excavated materials. The excavated material was backfilled into the test-pit and compacted to a firm condition.
1500 Backfilling activities were completed at the excavated trench at TP-5. 1530 A pothole was excavated at about 35 ft away from the eastern edge of the TP-5 trench (past the sidewalks). Waste was observed at 2 ft bgs.
1540 Backfilled the pothole.
1545 AIS started demobilization activities.
1600 AIS and Geosyntec departed the site.
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 3 of 9
Resumption of excavation at TP-3 location (looking south). Electric utility pipe encountered at TP-3 (looking south).
Waste encountered at TP-3, waste continues underneath the concrete slab (looking east) Backfilling at TP-3 (looking east) DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 4 of 9
Start of excavation at TP-4 location (looking northeast). Damaged irrigation pipe at TP-4 (looking northeast).
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 5 of 9
Excavation of second trench adjacent to the first trench at TP-4 (looking southeast). Waste encountered at TP-4 (looking east).
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 6 of 9
Waste observed to continue underneath the concrete slab at TP-4 (looking south).
AIS repairing the damaged irrigation pipe at TP-4 (looking northwest).
Start of excavation at TP-5 (looking southeast). Waste encountered at TP-5 (looking south).
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 7 of 9
Waste materials at TP-5 (looking south). Trench wall face at TP-5 (looking south).
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 8 of 9
Waste material encountered at TP-5 (looking south). Pothole 35 ft east of excavated trench at TP-5 and observation of waste (looking west).
DAILY FIELD REPORT Report Sequence No.:003
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Trenching and Backfilling CONTRACTOR: American Integrated Services, Inc.
DAY OF WEEK: Friday DATE: September 25, 2020
WEATHER: Sunny, High 78° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-003 - TRENCHING AND BACKFILLING - 9.25.2020 9 of 9
Backfilling the pothole at TP-5 (looking northwest).
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 1 of 9
Time Field Work Activities
0650 Geosyntec field staff Sneha Upadhyaya arrived on site. 0655 Geosyntec air monitoring staff Eric Garcia arrived on site. 0705 ABC Liovin Drilling (ABC) arrived on site. Met with ABC crew Julio Gutierrez and Jimmy Candelaria. 0710 Discussed the plan for the day and walked to the first hollow stem auger location (HSA-5) to check the equipment access route.
0715 Conducted a brief safety meeting with ABC. ABC acknowledged the THA. 0730 Mobilized to proposed HSA-5 location.
0750 ABC carefully removed the top soil and vegetation. Hand augered the top 5 ft of soil. 0800 Encountered waste at approximately 2.5 ft bgs (dark gray Asphalt concrete debris, no odor). Continued hand augering. The soil cuttings were placed in 55-gallon drums.
0820 Started HSA drilling with CME85 drill rig. Mild organic odor at 8 ft bgs. 0825 Hard drilling observed at approximately 12 ft bgs. Some brick debris observed in the spoil. 0830 Observed wet spoil at approximately 18 ft indicative of reaching the ground water table (GWT). Measured the depth to the GWT to approximately 12 ft bgs.
0845 ABC project manager Bill Borgo on site.
0900 First split spoon sample collected at 30 – 31.5 ft bgs. Sample indicative of the presence of waste (dark gray, wet, with pieces of decayed wood, mild organic odor).
0905 Observed hard drilling (rattling of auger) at approximately 32 ft bgs. Advanced through the hard material at approximately 34 ft bgs.
0920 City of Huntington Beach Park Development Division official Farhad Bolourchi arrived at the site. 0930 Unsuccessful attempt to collect a split spoon sample at 35 to 36.5 ft bgs (no recovery, sample too soft). Second attempt was made to collect sample at 38-39.5 ft bgs, still unsuccessful. 0935 Third attempt was made to collect the sample at 40 to 41.5 ft bgs. The sample indicated the end of waste and beginning of native soil at approximately 40.5 ft bgs. Native soil was visually classified as Silty SAND (SM) in general accordance with ASTM D2488.
0940 HSA drilling terminated at 41.5 ft bgs.
0945 Geosyntec Senior Engineer Yonas Zemuy arrived at the site. 0950 Started backfilling the borehole at HSA-5 with hydrated bentonite chips. 1015 Mr. Bolourchi departed the site.
1025 Mr. Zemuy departed the site.
1030 Completed backfilling the borehole at HSA-5. The upper 6 inches were covered with top soil and vegetation. Mr. Borgo departed the site.
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 2 of 9
1035 Mobilized to proposed HSA-4 location.
1050 ABC carefully removed the top soil and vegetation. Hand augered the top 5 ft of soil at HSA-4. 1055 Encountered waste at approximately 2 ft bgs (dark gray asphalt concrete debris, no odor). Continued hand augering. The soil cuttings were placed in 55-gallon drums.
1105 Started HSA drilling with CME85 drill rig.
1110 Encountered GWT; the depth to GWT was measured to be approximately 8 ft bgs. 1115 Hard drilling (rattling and rumbling of auger) observed starting at approximately 16 ft bgs. 1130 Hard drilling continues at approximately 25 ft bgs. Auger tilting observed. Little to no spoil observed starting at this depth. 1140 Damage to the wire connecting the sampling barrel assembly to the lead auger. 1150 ABC repaired the wire damage and continued drilling. 1200 Hard drilling continues at 30 ft bgs, little to no spoil observed at the ground surface. 1215 Continued attempt to drill past 30 ft bgs. Very slow advancement of the auger. 1235 At 34 ft bgs, auger tilting observed. Unable to drill past 34 ft. 1240 Terminated boring at 34 ft bgs.
1245 Retrieved the auger. The lead auger was plugged with wood. The wood had mild organic odor. 1300 Started backfilling the borehole at HSA-4 with hydrated bentonite chips. 1335 Completed backfilling the borehole at HSA-4. The upper 6 inches were covered with top soil and vegetation. 1345 Mobilized to HSA-3.
1355 ABC carefully removed the top soil and vegetation. Hand augered the top 5 ft of soil at HSA-3. 1405 Encountered waste at approximately 2.5 ft bgs (dark gray Asphalt concrete debris, no odor). Continued hand augering. The soil cuttings were placed in 55-gallon drums.
1415 Started HSA drilling with CME85 drill rig.
1420 Encountered GWT; the depth to GWT was measured to be approximately 11 ft bgs. 1430 First split spoon sample collected at 15 – 16.5 ft bgs. Observed material with a different texture than the overlying waste material (Visual classification: Sandy CLAY, dark gray, wet, medium to high plasticity, no odor), likely an interim soil cover layer.
1440 Second split spoon sample collected at 20 to 21.5 ft bgs. The sample indicated the end of waste and beginning of native soil at approximately 20.5 ft bgs. Native soil was visually classified as Poorly graded SAND with silt (SP-SM) in general accordance with ASTM D2488.
1445 Terminated boring HSA-3 at 21.5 ft bgs.
1450 Started backfilling the borehole at HSA-3 with hydrated bentonite chips. 1510 Completed backfilling the borehole at HSA-3. The upper 6 inches were covered with top soil and vegetation.
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 3 of 9
1515 Mobilized to proposed HSA-2 location.
1530 ABC carefully removed the top soil and vegetation. Hand augered the top 5 ft of soil at HSA-2. 1535 Encountered waste at approximately 2.7 ft bgs (dark gray Asphalt concrete debris, no odor). Continued hand augering. The soil cuttings were placed in 55-gallon drums.
1540 Started HSA drilling at HSA-2 with CME85 drill rig. 1545 Split spoon sample collected at 15 – 16.5 ft bgs. The sample indicated the end of waste and beginning of native soil at approximately 15.5 ft bgs. Native soil was visually classified as Silty SAND (SM) in general accordance with ASTM D2488. 1550 Terminated boring HSA-2 at 16.5 ft bgs. Started backfilling at HSA-2. 1600 Completed backfilling HSA-2.
1615 Mobilized to HSA-1.
1620 ABC carefully removed the top soil and vegetation. Hand augered the top 5 ft of soil at HSA-1. 1630 Encountered waste at approximately 3.5 ft bgs (dark gray Asphalt concrete debris, no odor). Continued hand augering. The soil cuttings were placed in 55-gallon drums.
1640 Started HSA drilling at HSA-1 with CME85 drill rig. 1645 Split spoon sample collected at 10 – 11.5 ft bgs. The sample indicated the end of waste and beginning of native soil at approximately 10.3 ft bgs. Native soil was visually classified as Silty SAND (SM) in general accordance with ASTM D2488. 1650 Depth to GWT measured to be at approximately 10.5 ft bgs. 1655 Terminated boring HSA-1 at 11.5 ft bgs.
1700 Started backfilling at HSA-1.
1710 Completed backfilling at HSA-1.
1715 Geosyntec air monitoring staff Eric G. departed the site. 1720 ABC crew Julio G. departed the site.
1730 ABC crew Jimmy C. helped store the drums at the backyard of Edison Park Community Center, pending analysis and disposal.
1740 ABC crew Jimmy departed the site.
1745 Geosyntec field staff Sneha Upadhyaya departed the site DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 4 of 9
Removal of top soil and vegetation at HSA-5 (looking northeast). Waste encountered at HSA-5 (looking northwest).
First split spoon sample collected at 30 – 31.5 ft bgs at HSA-5.
Sample indicates of the presence of waste.
Split spoon sample collected at 40 – 41.5 ft bgs at HSA-5. The interface between the waste and native soil is indicated.
Piece of wood
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 5 of 9
Backfilling the borehole at HSA-5 (looking northeast). Waste encountered at HSA-4 (looking northwest).
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 6 of 9
Damage to the wire connecting the sampling barrel assembly to the lead auger at HSA-4; ABC fixing the wire (looking west). Tilting of auger at HSA-4 (looking west).
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 7 of 9
Spoil (wood debris) retrieved from the auger at HSA-4. Wood plugged in the lead auger at HSA-4.
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 8 of 9
Waste observed in the soil cuttings at HSA-3 (looking northeast). Split spoon sample collected at 20 to 21.5 ft bgs at HSA-3. The interface between the waste and native soil is indicated.
DAILY FIELD REPORT Report Sequence No.:004
PROJECT: Edison Park Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685A TASK NO.: 02 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Monday DATE: September 28, 2020
WEATHER: Sunny, High 82° Low 64°
Printed Name: Sneha Upadhyaya Signature
DFR-004 - HSA DRILLING - 9.28.2020 9 of 9
Waste material observed in the spoil at HSA-2 (looking
northeast).
Split spoon sample collected at 15 – 16.5 ft bgs at HSA-2. The interface between the waste and native soil is indicated.
Waste material observed at HSA-1 (looking northwest). Split spoon sample collected at 10 – 11.5 ft bgs at HSA-1. The interface between the waste and native soil is indicated.
DAILY FIELD REPORT Report Sequence No.:001
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Geophysical Survey for Locating Utilities CONTRACTOR: GEOVision, Inc., DAY OF WEEK: Thursday DATE: March 11, 2021
WEATHER: Sunny, High 64° Low 55°
Printed Name: Sneha Upadhyaya Signature
DFR-001 - GEOPHYSICAL UTILITY CLEARANCE - 3.11.2021 1 of 3 Time Field Work Activities
0700 Arrived on site and met with GEOVision field crew J. Weiss and J. Foster. 0705 Held a brief tailgate safety meeting. GEOVision crew acknowledged the THA. 0710 Performed a site walk with GEOVision crew to observe the proposed investigation locations (HSA-1A through HSA-8A). 0720 GEOVision started utility clearance survey at proposed location of HSA-1A using the RD 8000 electromagnetic utility locater, Fisher TW-6 deep search pipe locator/metal detector, 60 HDZ, SIR3000 Ground Penetrating Radar, and walk in tandem. No conflicts were found at HSA-1A.
0730 GEOVision performed utility clearance survey at proposed location of HSA-2A boring. No conflicts were found at HSA2A location. 0745 GEOVision performed utility clearance survey at location of HSA-3A. Unknown anomalies were detected at the location of HSA-3A. GEOVision marked a new HSA-3A location 3 ft west of the existing location. 0800 GEOVision performed utility clearance survey at proposed location of HSA-4A boring. High voltage electrical lines and other unknown anomalies were detected within 5 ft of HSA-4A location. GEOVision marked a new HSA-4A location 3 ft north of the existing location.
0815 GEOVision performed utility clearance survey at proposed location of HSA-5A. Electrical lines were detected conflicting with the proposed HSA-5A location. GEOVision marked a new HSA-5A location 5.5 ft west of the existing location. 0825 GEOVision performed utility clearance survey at proposed location of HSA-6A. Some anomalies were detected within 5 ft of the HSA-6A location. GEOVision marked a new location 1.5 ft north of the existing location. 0840 GEOVision performed utility clearance survey at proposed location of HSA-7A. No conflicts were found at HSA-7A location.
0850 GEOVision performed utility clearance survey at HSA-8A location. Unknown utilities were detected conflicting with the HSA-8A location. GEOVision marked a new location 2.5 ft south of the existing location 0915 Geosyntec and GEOVision departed the site for the day.
DAILY FIELD REPORT Report Sequence No.:001
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Geophysical Survey for Locating Utilities CONTRACTOR: GEOVision, Inc., DAY OF WEEK: Thursday DATE: March 11, 2021
WEATHER: Sunny, High 64° Low 55°
Printed Name: Sneha Upadhyaya Signature
DFR-001 - GEOPHYSICAL UTILITY CLEARANCE - 3.11.2021 2 of 3 Location HSA-1A cleared of utilities (looking north) Location HSA-2A cleared of utilities (looking north) Marked anomalies at HSA-3A and the new HSA-3A
location (looking north)
Marked utilities at HSA-4A and the new HSA-4A location
(looking north)
DAILY FIELD REPORT Report Sequence No.:001
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Geophysical Survey for Locating Utilities CONTRACTOR: GEOVision, Inc., DAY OF WEEK: Thursday DATE: March 11, 2021
WEATHER: Sunny, High 64° Low 55°
Printed Name: Sneha Upadhyaya Signature
DFR-001 - GEOPHYSICAL UTILITY CLEARANCE - 3.11.2021 3 of 3 Electrical utility markings at existing HSA-5A and the
new HSA-5A location (looking north)
Marked anomalies at HSA-6A and the new HSA-6A
location (looking north)
Location HSA-7A cleared of utilities (looking north) Marked anomalies at HSA-8 and the new HSA-8A location (looking north)
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 1 of 8
Time Field Work Activities
0650 Geosyntec field staff Sneha Upadhyaya arrived on site. 0705 ABC Liovin Drilling (ABC) arrived on site. Met with ABC crew N. De La Torres and C. Villicana. 0715 Conducted a brief safety meeting with ABC. ABC acknowledged the THA. Discussed the scope of work and plan for the day.
0720 Mobilized to proposed HSA-7A location.
0750 ABC started drilling through the concrete at HSA-7A. Hand augered the top 5 ft of soil. The soil cuttings were placed in 55- gallon drums.
0810 Started HSA drilling with CME85 drill rig.
0825 Split spoon sample collected at 10 – 11.5 ft bgs.
0830 Encountered GWT; the depth to GWT was measured to be approximately 13.5 ft bgs. 0835 Terminated boring HSA-7A at approximately 18 ft bgs. 0850 Backfilled the borehole at HSA-7A with hydrated bentonite chips and patched the surface with rapid setting concrete. 0900 Bill Borgo from ABC arrived at the site.
0915 Mobilized to proposed HSA-8A location.
0920 Bill Borgo departed the site.
0925 ABC started drilling through the concrete and noticed 2 distinct layers of concrete. ABC informed that this could be indicative of potential utilities underneath the concrete slab and this decided to move the drilling location approximately 5 ft south of the originally proposed HSA-8A location.
0950 ABC started drilling through the concrete at the new HSA-8A location. Hand augered the top 5 ft of soil. The soil cuttings were placed in 55-gallon drums.
1015 Started HSA drilling at HSA-8A with CME85 drill rig. 1020 First split spoon sample collected at 10 – 11.5 ft bgs. 1025 Encountered GWT; the depth to GWT was measured to be approximately 12.5 ft bgs. 1030 A second split spoon sample was collected at 15 – 16.5 ft bgs. 1035 Terminated boring HSA-8A at 16.5 ft bgs.
1100 Backfilled the borehole at HSA-8A with hydrated bentonite chips and patched the surface with rapid setting concrete. 1115 Mobilized to HSA-3A.
1120 ABC started drilling through the concrete at the HSA-3A location. Hand augered the top 5 ft of soil. The soil cuttings were placed in 55-gallon drums.
1145 Started HSA drilling at HSA-3A with CME85 drill rig. 1200 First split spoon sample collected at 10 – 11.5 ft bgs.
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 2 of 8
1210 A second split spoon sample was collected at 15 – 16.5 ft bgs. 1215 Encountered GWT; the depth to GWT was measured to be approximately 15 ft bgs. 1220 Terminated boring HSA-3A at 16.5 ft bgs.
1240 Backfilled the borehole at HSA-3A with hydrated bentonite chips and patched the surface with rapid setting concrete. 1250 Mobilized to HSA-2A.
1305 ABC started drilling through the concrete at the HSA-2A location. Hand augered the top 5 ft of soil. The soil cuttings were placed in 55-gallon drums.
1325 Started HSA drilling at HSA-2A with CME85 drill rig. 1340 First split spoon sample collected at 10 – 11.5 ft bgs. 1345 A second split spoon sample was collected at 15 – 16.5 ft bgs. 1350 Terminated boring HSA-2A at 16.5 ft bgs. No groundwater was encountered at this location. 1410 Backfilled the borehole at HSA-2A with hydrated bentonite chips and patched the surface with rapid setting concrete. 1420 Mobilized to HSA-4A.
1430 ABC started drilling through the concrete at the HSA-4A location. Hand augered the top 5 ft of soil. The soil cuttings were placed in 55-gallon drums.
1450 Started HSA drilling at HSA-4A with CME85 drill rig. 15:15 First split spoon sample collected at 10 – 11.5 ft bgs. 15:20 Encountered GWT; the depth to GWT was measured to be approximately 14.1 ft bgs. 15:25 A second split spoon sample was collected at 15 – 16.5 ft bgs. 1530 Terminated boring HSA-4A at 16.5 ft bgs.
1545 Backfilled the borehole at HSA-4A with hydrated bentonite chips and patched the surface with rapid setting concrete. 1555 Mobilized to HSA-5A.
1600 ABC started drilling through the concrete at the HSA-5A location. Hand augered the top 5 ft of soil. The soil cuttings were placed in 55-gallon drums.
1625 Started HSA drilling at HSA-4A with CME85 drill rig. 1630 K. Viswanathan (Geosyntec) arrived on-site.
1645 First split spoon sample collected at 10 – 11.5 ft bgs. 1650 A second split spoon sample was collected at 15 – 16.5 ft bgs. 1655 Encountered GWT; the depth to GWT was measured to be approximately 16.6 ft bgs. 1700 Terminated boring HSA-5A at 17 ft bgs.
1710 Mobilized to HSA-6A.
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 3 of 8
1715 Backfilled the borehole at HSA-5A with hydrated bentonite chips and patched the surface with rapid setting concrete.
ABC started drilling through the concrete at the HSA-6A location. Hand augered the top 5 ft of soil. The soil cuttings were placed in 55-gallon drums.
1720 S. Upadhyaya (Geosyntec) departed the site.
1730 Started HSA drilling at HSA-3A with CME85 drill rig. 1735 First split spoon sample collected at 10 – 11.5 ft bgs. 1745 A second split spoon sample was collected at 15 – 16.5 ft bgs. 1800 Terminated boring HSA-6A at 16.5 ft bgs. No groundwater was encountered at this location. 1805 Backfilled the borehole at HSA-5A with hydrated bentonite chips and patched the surface with rapid setting concrete. 1830 ABC moved the 55-gallon drums (7 drums) within the fenced construction area south of the investigation area. 1845 Geosyntec and ABC personnel departed the site.
Drilling through concrete slab at HSA-7A (looking southeast) Hand augering at HSA-7A (looking east) DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 4 of 8
Change in material observed in the drill cuttings at HSA-7A (looking east) Split spoon sample collected at 10 – 11.5 ft bgs at HSA-7A.
Backfilling the borehole at HSA-7A with hydrated bentonite chips (looking southeast)
Surface patching with rapid set concrete at HSA-7A (looking southwest)
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 5 of 8
Change in material observed in the drill cuttings at HSA-8A at approximately 2.5 ft bgs Split spoon sample collected at 10 – 11.5 ft bgs at HSA-8A.
Split spoon sample collected at 10 – 11.5 ft bgs at HSA-3A. Split spoon sample collected at 15 – 16.5 ft bgs at HSA-3A.
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 6 of 8
Split spoon sample collected at 10 – 11.5 ft bgs at HSA-2A. Split spoon sample collected at 15 – 16.5 ft bgs at HSA-2A.
Wood debris observed in the drill cuttings at HSA-4A Brick pieces observed in the drill cuttings at HSA-4A DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 7 of 8
Split spoon sample collected at 10 – 11.5 ft bgs at HSA-4A. Split spoon sample collected at 15 – 16.5 ft bgs at HSA-4A.
Split spoon sample collected at 10 – 11.5 ft bgs at HSA-5A. Split spoon sample collected at 15 – 16.5 ft bgs at HSA-5A.
DAILY FIELD REPORT Report Sequence No.:002
PROJECT: Edison Park Additional Waste Delineation
LOCATION: Huntington Beach, California PROJECT NO.: HL1685B TASK NO.: 01 DESCRIPTION: Hollow-Stem Auger (HSA) drilling CONTRACTOR: ABC Liovin Drilling DAY OF WEEK: Friday DATE: March 12, 2021
WEATHER: Sunny, High 68° Low 52°
Printed Name: Sneha Upadhyaya and Karthik Viswanathan Signature DFR-002 - HSA DRILLING - 3.12.2021 8 of 8
Split spoon sample collected at 10 – 11.5 ft bgs at HSA-6A. Split spoon sample collected at 15 – 16.5 ft bgs at HSA-6A.
HL1685B\Edison Park Waste Delineation Final Report
Appendix F
Air Monitoring Logs
Time1,4 Ambient
Temp2,4 Wind Speed2,4 Wind Direction3,4 Time1,4 Ambient Temp2,4 Wind Speed2,4 Wind Direction3,4 8:00 65 3.5 W 14:00 77 2.4 NW
8:20 65 5.1 W 14:15 77 2.7 NW
8:35 66 3.6 W 14:30 77 5.8 NW
8:50 66 1.8 W 14:45 77 5.4 NW
9:00 66 1.7 NW 15:00 77 4 NW
9:15 66 1.9 NW
9:30 67 0.8 E
9:45 67 1.3 E
10:00 69 1.6 E
10:15 70 2.4 NW
10:30 70 2.4 W
10:45 71 3.1 W
11:00 72 3.9 NW
11:15 72 4.1 NW
11:30 74 3.5 NW
11:45 74 5.3 NW
12:00 74 3.1 NW
12:15 74 3.4 W
12:30 73 3 W
12:45 73 2.8 W
13:00 74 4.4 NW
13:15 76 2.8 NW
13:30 77 1.9 NW
13:45 78 1.5 NW
3 - Wind Direction from KCAHUNT143 weather station
4 - Collect Readings Every 15 Minutes
Daily Local Weather Monitoring Log - 09/24/2020
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
1 - Pacific Daylight Time (PDT)
2 - Ambient Temperature (℉), and Wind Speed (miles/hour) - measured using Kestrel 4000 and from KCAHUNT143 weather statio Time1,4 Ambient
Temp2,4 Wind Speed2,4 Wind Direction3,4 Time1,4 Ambient Temp2,4 Wind Speed2,4 Wind Direction3,4 7:15 65 2 NW 13:15 77 6.4 N
7:30 65 0.9 NW 13:30 76 5.4 N
7:45 66 2.1 W 13:45 76 5.1 NW
8:00 67 2.7 SW 14:00 75 4.8 NW
8:15 67 0.9 NW 14:15 75 6.7 NE
8:30 67 1.4 NW 14:30 74 6.1 NE
8:45 67 2.3 NW 14:45 74 5.4 NE
9:00 68 3.1 NW 15:00 74 4.5 NE
9:15 68 1.5 SW 15:15 74 4.8 NE
9:30 69 2.6 NW 15:30 74 5.1 N
9:45 69 2.1 NW
10:00 70 3.5 NW
10:15 72 3.6 NW
10:30 72 2.6 NW
10:45 72 3.4 NW
11:00 72 2.7 SW
11:15 72 2.1 W
11:30 74 2.5 NW
11:45 75 3.9 NW
12:00 75 3 NW
12:15 75 3.8 NW
12:30 76 3.5 NW
12:45 76 6 NW
13:00 76 5.2 N
4 - Collect Readings Every 15 Minutes
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Local Weather Monitoring Log - 09/25/2020
1 - Pacific Daylight Time (PDT)
2 - Ambient Temperature (℉), and Wind Speed (miles/hour) - measured using Kestrel 4000 and from KCAHUNT143 weather statio 3 - Wind Direction from KCAHUNT143 weather station
Time1,4 Ambient
Temp2,4 Wind Speed2,4 Wind Direction3,4 Time1,4 Ambient Temp2,4 Wind Speed2,4 Wind Direction3,4 7:45 66 1 E 13:45 81 5.7 NE
8:00 66 1.2 E 14:00 81 5.1 NE
8:15 66 1.3 E 14:15 81 9 NE
8:30 68 1.7 NE 14:30 80 7.7 NE
8:45 70 1.9 NW 14:45 79 7.5 NE
9:00 70 2.2 NW 15:00 79 8.9 NE
9:15 70 2.5 W 15:15 78 3.3 NE
9:30 72 1.4 W 15:30 77 4.4 NE
9:45 72 2.5 SW 15:45 77 9.2 NE
10:00 72 1.2 SW 16:00 76 5.4 NE
10:15 73 1.8 SW 16:15 76 8 NE
10:30 73 2.1 SW 16:30 76 7.9 NE
10:45 73 2.5 NE 16:45 76 7.4 NE
11:00 74 4.2 NE 17:00 75 5.4 NE
11:15 75 3.8 NE
11:30 75 3.4 NE
11:45 75 3 NE
12:00 78 5.5 NE
12:15 78 4.8 NE
12:30 81 6.5 NE
12:45 81 5.4 NE
13:00 81 5.2 NE
13:15 81 4.4 NE
13:30 81 5.2 NE
4 - Collect Readings Every 15 Minutes
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Local Weather Monitoring Log - 09/28/2020
1 - Pacific Daylight Time (PDT)
2 - Ambient Temperature (℉), and Wind Speed (miles/hour) - measured using Kestrel 4000 and from KCAHUNT143 weather statio 3 - Wind Direction from KCAHUNT143 weather station
Date Time1 Location2 Equipment
ID3
Equipment
Operator
Reading
(mg/m3
)
4 Comments
24-Sep-20 8:00 TP-1 FA02926 EG 0.113 Background
24-Sep-20 8:05 UW FA02926 EG 0.089
24-Sep-20 8:12 DW FA02926 EG 0.093
24-Sep-20 9:00 UW FA02926 EG 0.055
24-Sep-20 9:10 DW FA02926 EG 0.075
24-Sep-20 10:00 UW FA02926 EG 0.061
24-Sep-20 10:10 DW FA02926 EG 0.059
24-Sep-20 11:00 UW FA02926 EG 0.023
24-Sep-20 11:05 DW FA02926 EG 0.062
24-Sep-20 11:15 Stop excavating
24-Sep-20 13:10 DW FA02926 EG 0.036
24-Sep-20 13:20 UW FA02926 EG 0.037 Stop excavating mob to TP-3 24-Sep-20 14:20 DW FA02926 EG 0.027
24-Sep-20 14:25 UW FA02926 EG 0.022 Stop excavating
25-Sep-20 7:15 TP-3 FA02926 EG 0.059 Background
25-Sep-20 7:21 UW FA02926 EG 0.039
25-Sep-20 7:26 DW FA02926 EG 0.041
25-Sep-20 8:15 Stop excavation at TP-2
25-Sep-20 8:53 Start excavation at TP-4
25-Sep-20 8:58 DW FA02926 EG 0.043
25-Sep-20 9:03 UW FA02926 EG 0.041
25-Sep-20 9:58 DW FA02926 EG 0.053
25-Sep-20 10:05 UW FA02926 EG 0.047
25-Sep-20 11:08 DW FA02926 EG 0.048
25-Sep-20 11:18 UW FA02926 EG 0.035 Start backfilling at TP-4 25-Sep-20 12:50 Start excavating TP-5
25-Sep-20 12:55 DW FA02926 EG 0.039
25-Sep-20 13:00 UW FA02926 EG 0.045
25-Sep-20 14:05 DW FA02926 EG 0.037
25-Sep-20 14:15 UW FA02926 EG 0.058
25-Sep-20 15:10 DW FA02926 EG 0.041
25-Sep-20 15:20 UW FA02926 EG 0.049
28-Sep-20 7:45 DW FA02926 EG 0.081 Background
28-Sep-20 7:50 UW FA02926 EG 0.088
28-Sep-20 8:00 DW FA02926 EG 0.095
28-Sep-20 8:08 UW FA02926 EG 0.097
28-Sep-20 9:05 DW FA02926 EG 0.076
28-Sep-20 9:10 UW FA02926 EG 0.09
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Particulate Matter (PM) Monitoring Log
1 of 2
Date Time1 Location2 Equipment
ID3
Equipment
Operator
Reading
(mg/m3
)
4 Comments
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Particulate Matter (PM) Monitoring Log
28-Sep-20 9:35 Stop boring at HSA5
28-Sep-20 10:55 Start boring at HSA4
28-Sep-20 11:00 DW FA02926 EG 0.099
28-Sep-20 11:05 UW FA02926 EG 0.097
28-Sep-20 12:00 DW FA02926 EG 0.088
28-Sep-20 12:08 UW FA02926 EG 0.092
28-Sep-20 13:05 Stop boring at HSA4
28-Sep-20 14:15 DW FA02926 EG 0.059
28-Sep-20 14:25 UW FA02926 EG 0.078
28-Sep-20 15:20 UW FA02926 EG 0.058
28-Sep-20 15:30 DW FA02926 EG 0.065
28-Sep-20 15:45 Stop boring at HSA2
28-Sep-20 16:45 DW FA02926 EG 0.078
28-Sep-20 16:50 UW FA02926 EG 0.052
Notes:
4 - Recorded every 60 minutes, when soil handling or excavation is in progress 3 - DustTRAK DRX Handheld Aerosol
1 - Pacific Daylight Time (PDT)
2 - Upwind or Downwind (perimeter)
2 of 2
Date Time1 Location2 Equipment
ID3
Equipment
Operator
Reading
(ppm)4 Comments
24-Sep-20 8:00 TP-1 FA02533 EG 0
24-Sep-20 8:12 DW FA02533 EG 0
24-Sep-20 8:20 TP-1 FA02533 EG 0
24-Sep-20 8:28 DW FA02533 EG 0
24-Sep-20 8:35 TP-1 FA02533 EG 0
24-Sep-20 8:40 DW FA02533 EG 0
24-Sep-20 8:47 TP-1 FA02533 EG 0
24-Sep-20 8:55 DW FA02533 EG 0
24-Sep-20 9:00 TP-1 FA02533 EG 0
24-Sep-20 9:10 DW 0
24-Sep-20 9:15 TP-1 FA02533 EG 0
24-Sep-20 9:20 DW FA02533 EG 0
24-Sep-20 9:30 TP-1 FA02533 EG 0
24-Sep-20 9:35 DW FA02533 EG 0
24-Sep-20 9:45 TP-1 FA02533 EG 0
24-Sep-20 9:55 DW FA02533 EG 0.2
24-Sep-20 10:00 TP-1 FA02533 EG 0.1
24-Sep-20 10:10 DW FA02533 EG 0
24-Sep-20 10:15 TP-1 FA02533 EG 0.1
24-Sep-20 10:30 DW FA02533 EG 0.1
24-Sep-20 10:35 TP-1 FA02533 EG 0.1
24-Sep-20 10:45 DW FA02533 EG 0.1
24-Sep-20 10:50 TP-1 FA02533 EG 0.1
24-Sep-20 11:05 DW FA02533 EG 0.1
24-Sep-20 11:15 TP-1 FA02533 EG 0.1
24-Sep-20 11:25 DW FA02533 EG 0.1
24-Sep-20 11:30 TP-1 FA02533 EG 0.1
24-Sep-20 11:40 DW FA02533 EG 0.1
24-Sep-20 11:45 TP-1 FA02533 EG 0.1
24-Sep-20 11:50 Stop excavation
24-Sep-20 13:05 TP-2 FA02533 EG 0
24-Sep-20 13:10 DW FA02533 EG 0
24-Sep-20 13:20 TP-2 FA02533 EG 0
24-Sep-20 13:30 DW FA02533 EG 0
24-Sep-20 13:35 TP-2 FA02533 EG 0
24-Sep-20 13:45 DW FA02533 EG 0.1
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Total Organic Compounds (TOC) Monitoring Log
1 of 4
Date Time1 Location2 Equipment
ID3
Equipment
Operator
Reading
(ppm)4 Comments
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Total Organic Compounds (TOC) Monitoring Log
24-Sep-20 13:50 TP-2 FA02533 EG 0.1 Stop excavation mob to TP-3 24-Sep-20 14:15 TP-3 FA02533 EG 0.1
24-Sep-20 14:20 DW FA02533 EG 0.1
24-Sep-20 14:30 TP-3 FA02533 EG 0.1
24-Sep-20 14:40 DW FA02533 EG 0.1
24-Sep-20 14:45 TP-3 FA02533 EG 0.1
24-Sep-20 14:55 DW FA02533 EG 0
24-Sep-20 15:00 TP-3 FA02533 EG 0.1 Stop excavation at TP-3 25-Sep-20 7:15 TP-3 FA02533 EG 0.1 Start excavation at TP-3 25-Sep-20 7:26 DW FA02533 EG 0.1
25-Sep-20 7:30 TP-3 FA02533 EG 0.2
25-Sep-20 7:35 DW FA02533 EG 0.3
25-Sep-20 7:45 TP-3 FA02533 EG 0.1
25-Sep-20 7:50 DW FA02533 EG 0.2
25-Sep-20 8:00 TP-3 FA02533 EG 0.1
25-Sep-20 8:10 DW FA02533 EG 0.1
25-Sep-20 8:15 TP-3 FA02533 EG 0.1 Stop excavation at TP-3. Mob to TP-4 25-Sep-20 8:53 TP-4 FA02533 EG 0.2
25-Sep-20 8:58 DW FA02533 EG 0.2
25-Sep-20 9:10 TP-4 FA02533 EG 0.2
25-Sep-20 9:15 DW FA02533 EG 0.1
25-Sep-20 9:25 TP-4 FA02533 EG 0.2
25-Sep-20 9:30 DW FA02533 EG 0.1
25-Sep-20 9:40 TP-4 FA02533 EG 0.2
25-Sep-20 9:45 DW FA02533 EG 0.2
25-Sep-20 9:55 TP-4 FA02533 EG 0.2
25-Sep-20 10:00 DW FA02533 EG 0.1
25-Sep-20 10:15 TP-4 FA02533 EG 0.1
25-Sep-20 10:20 DW FA02533 EG 0.1
25-Sep-20 10:30 TP-4 FA02533 EG 0.1 Stop excavation at TP-4 and begin backfilling 25-Sep-20 10:55 TP-4 FA02533 EG 0.1
25-Sep-20 11:00 DW FA02533 EG 0.1
25-Sep-20 11:05 TP-4 FA02533 EG 0.1
25-Sep-20 11:15 DW FA02533 EG 0.1
25-Sep-20 12:50 TP-4 FA02533 EG 0.1
25-Sep-20 12:55 DW FA02533 EG 0.1 Finished backfilling TP-4 2 of 4
Date Time1 Location2 Equipment
ID3
Equipment
Operator
Reading
(ppm)4 Comments
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Total Organic Compounds (TOC) Monitoring Log
25-Sep-20 13:05 TP-5 FA02533 EG 0.1 Start excavation at TP-5 25-Sep-20 13:10 DW FA02533 EG 0.1
25-Sep-20 13:20 TP-5 FA02533 EG 0.2
25-Sep-20 13:30 DW FA02533 EG 0.1
25-Sep-20 13:35 TP-5 FA02533 EG 0.2
25-Sep-20 13:50 DW FA02533 EG 0.1
25-Sep-20 13:55 TP-5 FA02533 EG 0.2
25-Sep-20 14:05 DW FA02533 EG 0.1
25-Sep-20 14:10 TP-5 FA02533 EG 0.2 Begin backfilling at TP-5 25-Sep-20 14:25 DW FA02533 EG 0.1
25-Sep-20 14:40 TP-5 FA02533 EG 0.1
25-Sep-20 15:15 TP-5 FA02533 EG 0.1 Excavate small trench 25-Sep-20 15:25 DW FA02533 EG 0.1
25-Sep-20 15:30 TP-5 FA02533 EG 0.1 Backfill done
28-Sep-20 7:45 DW FA02533 EG 0.1
28-Sep-20 7:55 HSA5 FA02533 EG 0.1
28-Sep-20 8:00 DW FA02533 EG 0.2
28-Sep-20 8:10 HSA5 FA02533 EG 0.2
28-Sep-20 8:15 DW FA02533 EG 0.2
28-Sep-20 8:25 HSA5 FA02533 EG 0.4
28-Sep-20 8:30 DW FA02533 EG 0.2
28-Sep-20 8:40 HSA5 FA02533 EG 0.4
28-Sep-20 8:50 DW FA02533 EG 0.2
28-Sep-20 8:55 HSA5 FA02533 EG 0.3
28-Sep-20 9:05 DW FA02533 EG 0.2
28-Sep-20 9:15 HSA5 FA02533 EG 0.3
28-Sep-20 9:20 DW FA02533 EG 0.1 Stop boring HSA5
28-Sep-20 9:30 HSA5 FA02533 EG 0.3 Start boring HSA4
28-Sep-20 9:35 DW FA02533 EG 0.1
28-Sep-20 10:55 HSA4 FA02533 EG 0.1
28-Sep-20 11:00 DW FA02533 EG 0.2
28-Sep-20 11:10 HSA4 FA02533 EG 0.2
28-Sep-20 11:15 DW FA02533 EG 0.2
28-Sep-20 11:20 HSA4 FA02533 EG 0.3
28-Sep-20 11:35 DW FA02533 EG 0.2
28-Sep-20 11:45 HSA4 FA02533 EG 0.3
3 of 4
Date Time1 Location2 Equipment
ID3
Equipment
Operator
Reading
(ppm)4 Comments
Edison Park Waste Delineation Project
Edison Park
21379 Magnolia Street, Huntington Beach, CA 92647
Daily Total Organic Compounds (TOC) Monitoring Log
28-Sep-20 11:50 DW FA02533 EG 0.5
28-Sep-20 12:00 HSA4 FA02533 EG 0.3
28-Sep-20 12:05 DW FA02533 EG 0.2
28-Sep-20 12:15 HSA4 FA02533 EG 0.3
28-Sep-20 12:20 DW FA02533 EG 0.2
28-Sep-20 12:30 HSA4 FA02533 EG 0.3
28-Sep-20 12:35 DW FA02533 EG 0.2
28-Sep-20 12:45 HSA4 FA02533 EG 0.3
28-Sep-20 12:50 DW FA02533 EG 0.2
28-Sep-20 13:00 HSA4 FA02533 EG 0.3
28-Sep-20 14:20 HSA3 FA02533 EG 0.1
28-Sep-20 14:25 DW FA02533 EG 0.1
28-Sep-20 14:35 HSA3 FA02533 EG 0.3
28-Sep-20 14:40 DW FA02533 EG 0.1
28-Sep-20 14:50 HSA3 FA02533 EG 0.3
28-Sep-20 14:55 DW FA02533 EG 0.1
28-Sep-20 14:58 Begin backfilling at HSA3
28-Sep-20 15:20 Begin boring at HSA2
28-Sep-20 15:25 HSA2 FA02533 EG 0.3
28-Sep-20 15:35 DW FA02533 EG 0.1
28-Sep-20 15:40 HSA2 FA02533 EG 0.3
28-Sep-20 15:45 Stop boring at HSA2 and backfill
28-Sep-20 16:30 Begin boring at HSA1
28-Sep-20 16:35 HSA1 FA02533 EG 0.4
28-Sep-20 16:45 DW FA02533 EG 0.1 Stop boring at HSA1
Notes:
1 - Pacific Daylight Time (PDT)
2 - Excavation Face or Perimeter (downwind)
3 - PID Monitor QRae III
4 - 15 seconds sustained readings, recorded every 15 minutes 4 of 4