Drew Park and Robinwood Park Playground ImprovementsCC-1859 & CC-1823 July 21, 2026 City Council Meeting
Project Overview
In the CIP FY 2025/26 List of Projects, the playgrounds for both Drew Park, CC1859 and Robinwood Park, CC1823, were approved for replacement. These parks are also both included in the Park Playground & Equipment Replacement List.
The proposed project for Drew Park will include, the removal and replacement of the play structure, removal of the swings and the installation of a new swing in a new location, and poured-in-place surfacing in both the play area and swing area.
The proposed project for Robinwood Park will include, the removal and replacement of both play structures, partial poured-in-place surfacing, and sand replenishment for the adventure portion of the play structure.
Analysis
The playgrounds offer varying warranty packages ranging from 5-year to lifetime specific part warranties, and a 1-year Maintenance Bond.
Staff reached out to local, qualified, and licensed contractors, advertised the project in the Huntington Beach Wave, and advertised and managed proposals on PlanetBids. A job walkthrough was publicly advertised for June 2, 2026, with twenty (20) firms in attendance.
Funding
$ 397,298.35
$ 39,729.84
$ 5,000.00$ 442,028.19
$ 291,470.11
$ 265,214.38$ 556,684.49
Construction Costs
R.E. Schultz Construction, Inc. Bid:
Construction Contingency (10%)
Supplemental Costs:
Current Funding
Park Improvements (226) Fund:
Park Development (228) Fund: