Huntington Harbour Dock Demolition and ReplacementCC-1896 September 15, 2026
Project Location
Scope of Work
Replace existing dock with a modular concrete dock
Replace existing gangway with an aluminum gangway
Replace existing water line
Replace existing sewer line
Replace existing electrical panel
Install new lighthouse pedestals
Proposed Dock Design
Funding
Construction - Base Bid
$ 388,625.00
Contingency (10%)
$ 38,862.50
Total Project Cost
$ 427,487.50
Infrastructure Funds
Acct.
31490048.82800
$ 400,000.00
Infrastructure Funds
Acct.
31440003.82000
$ 27,487.50
Total Funds Available
$ 427,487.50