written notice. Upon such termination for convenience, CONSULTANT shall be compensated only for those services and tasks which have been performed by finished or unfinished Documents and Data, as defined in Section 6.1 below, and other information of any kind prepared by CONSULTANT in connection with the performance of the Work. CONSULTANT shall be required to provide such Documents and Data within fifteen (15) calendar days of CITY's written request. No actual or asserted breach of this Agreement on the part of CITY pursuant to Section

5.2, below, shall operate to prohibit or otherwise restrict CITY's ability to terminate this Agreement for convenience as provided under this Section.

5.2 EVENTS OF DEFAULT; BREACH OF AGREEMENT:

A In the event either Party fails to perform any duty, obligation, service or task set forth under this Agreement (or fails to timely perform or properly perform any such duty, obligation, service or task set forth under this Agreement), an event of default (hereinafter, "Event of Default") shall occur. For all Events of Default, the Party alleging an Event of Default shall give written notice to the defaulting Party (hereinafter referred to as a "Default Notice") which shall specify: (i) the nature of the Event of Default; (i) the action required to cure the Event of Default; (iii) a date by which the Event of Default shall be cured, which shall not be less than the applicable cure period set forth under Sections 5.2.B and 5.2C below or if a cure is not reasonably possible within the applicable cure period, to begin such cure and diligently prosecute such cure to completion. The Event of Default shall constitute a breach of this Agreement if the defaulting Party fails to cure the Event of Default within the applicable cure period or any extended cure period allowed under this Agreement.

B. CONSULTANT shall cure the following Events of Defaults within the following time periods:
i Within three (3) business days of CITY's issuance of a Default Notice for any failure of CONSULTANT to timely provide CITY or CITY's employees or agents with any information and/or written reports, documentation or work product which CONSULTANT is obligated to provide to CITY or CITY's employees or agents under this Agreement. Prior to the expiration of the 3- day cure period, CONSULTANT may submit a written request for additional time to cure the Event of Default upon a showing that CONSULTANT has commenced efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured within the 3-day cure period. The foregoing notwithstanding, CITY shall be under no obligation to grant additional time for the cure of an Event of Default under this Section 5.2 B.i. that exceeds seven (7) calendar days from the end of the initial 3-day cure period; or i. Within thirty (30) calendar days of CITY's issuance of a Default Notice for any other Event of Default under this Agreement. Prior to the expiration of the 30- day cure period, CONSULTANT may submit a written request for additional time to cure the Event of Default upon a showing that CONSULTANT has commenced efforts to cure the Event of Default and that the Event of Default

Page 11 of 19 ends

cannot be reasonably cured within the 30-day cure period. The foregoing notwithstanding, CITY shall be under no obligation to grant additional time for the cure of an Event of Default under this Section 5.2B.ii that exceeds thirty (30) calendar days from the end of the initial 30-day cure period.

In addition to any other failure on the part of CONSULTANT to perform any duty, obligation, service or task set forth under this Agreement (or the failure to timely perform or properly perform any such duty, obligation, service or task), an Event of Default on the part of CONSULTANT shall include, but shall not be limited to the following: (i) CONSULTANT's refusal or failure to perform any of the services or tasks called for under the Scope of Services; (i) CONSULTANT's failure to fulfill or perform its obligations under this Agreement within the specified time or if no time is specified, within a reasonable time; (iii) CONSULTANT's and/or its employees' disregard or violate any federal, state, local law, rule, procedure or regulation; (iv) the initiation of proceedings under any bankruptcy, insolvency, receivership, reorganization, or similar legislation as relates to CONSULTANT, whether voluntary of involuntary; (v) CONSULTANT's refusal or failure to perform erroneous in any material respect.

C. CITY shall cure any Event of Default asserted by CONSULTANT within forty-five (45) calendar days of CONSULTANT's issuance of a Default Notice, unless the Event of Default cannot reasonably be cured within the 45-day cure period. Prior to the expiration of the 45-day cure period, CITY may submit a written request for additional time to cure the Event of Default upon a showing that CITY has commenced its efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured within the 45-day cure period. The foregoing notwithstanding, an Event of Default dealing with CITY's failure to timely pay any undisputed sums to CONSULTANT as provided under Section 1.4, above, shall be cured by CITY within five (5) calendar days from the date of CONSULTANT's Default Notice to CITY.

D. Either Party may also immediately suspend performance under this Agreement pending the Defaulting Party's cure of any Event of Default by giving said Party written notice of the Party's intent to suspend performance (hereinafter, a "Suspension Notice"). A Party may issue the Suspension Notice at any time upon the occurrence of an Event of Default. Upon such suspension, CONSULTANT shall be compensated only for those services and tasks which have been rendered by CONSULTANT in accordance with this Agreement up to the effective date of the suspension. No actual or asserted breach of this Agreement on the part of CITY shall operate to prohibit or otherwise restrict CITY's ability to suspend this Agreement as provided herein.

E. No waiver of any Event of Default or breach under this Agreement shall constitute a waiver of any other or subsequent Event of Default or breach. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.

Page 12 of 19 ends

F. The duties and obligations imposed under this Agreement and the rights and remedies available hereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. In addition to any other remedies available to CITY at law or under this Agreement in the event of any breach of this Agreement, CITY, in its sole and absolute discretion, may also pursue any one or more of the following remedies:
i Upon a thirty (30) day written notice to CONSULTANT, the CITY may terminate this Agreement in whole or in part;
i Upon written notice to CONSULTANT, the CITY may extend the time of performance;
i The CITY may proceed by appropriate court action to enforce the terms of the Agreement to recover damages for CONSULTANT's breach of the Agreement or to terminate the Agreement; or
N. The CITY may exercise any other available and lawful right or remedy.

G. In the event CITY is in breach of this Agreement, CONSULTANT's sole remedy shall be the suspension or termination of this Agreement and/or the recovery of any unpaid sums lawfully owed to CONSULTANT under this Agreement for completed services and tasks.

5.3 SCOPE OF WAIVER: No waiver of any default or breach under this Agreement shall constitute a waiver of any other default or breach, whether of the same or other covenant, warranty, agreement, term, condition, duty or requirement contained in this Agreement. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.

5.4 SURVIVING ARTICLES. SECTIONS AND PROVISIONS: The termination of this Agreement pursuant to any provision of this Article or by normal expiration of its term or any extension thereto shall not operate to terminate any Article, Section or provision contained herein which provides that it shall survive the termination or normal expiration of this Agreement.

VI.

MISCELLANEOUS PROVISIONS

6.1 DOCUMENTS & DATA: LICENSING OF INTELLECTUAL PROPERTY: So long as CONSULTANT has been paid pursuant to this Agreement for the Work resulting in such Documents and Date, all Documents and Data shall be and remain the property of CITY without restriction or limitation upon their use or dissemination by CITY. For purposes of this Agreement, the term "Documents and Data" means and includes all materials, equipment, reports, analyses, correspondence, plans, drawings, designs, renderings, specifications, notes, summaries, strategies, charts, schedules, spreadsheets, calculations, lists, data compilations, documents or other materials developed and/or assembled by or on behalf of CONSULTANT in the

Page 13 of 19 ends

performance of this Agreement and fixed in any tangible medium of expression, including but not limited to Documents and Data stored digitally, magnetically and/or electronically. This Agreement creates, at no additional cost to CITY, a perpetual license for CITY to copy, use, reuse, disseminate and/or retain any and all copyrights, designs, and other intellectual property embodied in all Documents and Data. CONSULTANT shall require all subCONSULTANTs and subCONSULTANT in writing that CITY shall be granted the same right to copy, use, reuse, disseminate and retain Documents and Data prepared or assembled by any subCoNSULTANT or subCONSULTANT as applies to Documents and Data prepared CONSULTANT in the performance of this Agreement. CITY acknowledges that the Documents and Data are intended solely in connection with the Project for which they were prepared, and should the CITY reuse or modify them without CONSULTANT'S consent, it does so at its sole risk.

6.2 CONFIDENTIALITY: All data, documents, discussion, or other information developed or received by CONSULTANT or provided for performance of this Agreement are deemed confidential and shall not be disclosed by CONSULTANT without prior written consent by CITY. CITY shall grant such consent if disclosure is legally required. Upon request, all CITY data shall be returned to CITY upon the termination or expiration of this Agreement. CONSULTANT shall not use CITY's name or insignia, photographs, or any publicity pertaining to the Work in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of CITY.

6.3 FALSE CLAIMS ACT: CONSULTANT warrants and represents that neither CONSULTANT nor any person who is an officer of, in a managing position with, or has an ownership interest in CONSULTANT has been determined by a court or tribunal of competent jurisdiction to have violated the False Claims Act, 31 U.S.C., Section 3789 et seq. and the California False Claims Act, Government Code Section 12650 et seq.

6.4 NOTICES: All notices permitted or required under this Agreement shall be given to the respective Parties at the following addresses, or at such other address as the respective Parties may provide in writing for this purpose:

CONSULTANT:

West & Associates City of Huntington Park
Public Works
Engineering, Inc.
78 Anacapa Court 6550 Mile Avenue
Foothill Ranch, CA 92610 Huntington Park, CA 90255
Phone: 949.716.7670 Attn: Ricardo Reyes, City Manager
Attn: Phillip West, Phone: (323) 582-6161
Principal/President
mailto:[email protected]

Page 14 of 19 ends

Such notices shall be deemed effective when personally delivered or successfully transmitted by facsimile as evidenced by a fax confirmation slip or when mailed, forty-eight (48) hours after deposit with the United States Postal Service, first class postage prepaid and addressed to the Party at its applicable address.

6.5 COOPERATION: FURTHER ACTS: The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as is reasonably necessary, appropriate or convenient to achieve the purposes of this Agreement.

6.6 SUBCONTRACTING: CONSULTANT shall not subcontract any portion of the Work required by this Agreement, except as expressly stated herein, without the prior written approval of CITY. Subcontracts (including without limitation subcontracts with subCONSULTANTs), if any, shall contain a provision making them subject to all provisions stipulated in this Agreement with the exception of provisions relating to insurance requirements and indemnification.

6.7 CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS: CITY reserves the right to employ other CONSULTANTs in connection with the various projects worked upon by CONSULTANT.

6.8 PROHIBITED INTERESTS: CONSULTANT warrants, represents and maintains that it has not employed nor retained any company or person, other than a bona fide employee working solely for CONSULTANT, to solicit or secure this Agreement.

Further, CONSULTANT warrants and represents that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for CONSULTANT, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, CITY shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of CITY, during the term of his or her service with CITY, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

6.9 TIME IS OF THE ESSENCE: Time is of the essence for each and every provision of this Agreement.

6.10 GOVERNING LAW AND VENUE: This Agreement shall be interpreted and governed according to the laws of the State of California. In the event of litigation between the Parties, the venue, without exception, shall be in the Los Angeles County Superior Court of the State of California. If, and only if, applicable lav requires that all or part of any such litigation be tried exclusively in federal court, venue, without exception, shall be in the Central District of California located in the City of Los Angeles, California.

6.11 ATTORNEYS' FEES: If either Party commences an action against the other Party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing Party in such litigation shall be entitled to have and

Page 15 of 19 ends

recover from the losing Party reasonable attorneys' fees and all other costs of such action.

6.12 SUCCESSORS AND ASSIGNS: This Agreement shall be binding on the successors and assigns of the Parties.

6.13 NO THIRD-PARTY BENEFIT: There are no intended third-party beneficiaries of any right or obligation assumed by the Parties. All rights and benefits under this Agreement inure exclusively to the Parties.
this Agreement together through a process of negotiation and with the advice of their respective attorneys.

6.15 SEVERABILITY: If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

6.16 AMENDMENT; MODIFICATION: No amendment, modification or supplement of this Agreement shall be valid or binding unless executed in writing and signed by both Parties, subject to CITY approval. The requirement for written amendments, modifications or supplements cannot be waived and any attempted waiver shall be void and invalid.

6.17 CAPTIONS: The captions of the various articles, sections and paragraphs are for convenience and ease of reference only, and do not define, limits, augment, or describe the scope, content, or intent of this Agreement.

6.18 INCONSISTENCIES OR CONFLICTS: In the event of any conflict or inconsistency between the provisions of this Agreement and any of the exhibits attached hereto, the provisions of this Agreement shall control.

6.19 ENTIRE AGREEMENT: This Agreement including all attached exhibits is the entire, complete, final and exclusive expression of the Parties with respect to the matters addressed herein and supersedes all other agreements or understandings, whether oral or written, or entered into between CITY and CONSULTANT prior to the execution of this Agreement. No statements, representations or other agreements, whether oral or written, made by any Party which are not embodied herein shall be valid or binding. No amendment, modification or supplement to this Agreement shall be valid and binding unless in writing and duly executed by the Parties pursuant to Section 6.15, above.

6.20 COUNTERPARTS: This Agreement shall be executed in three (3) original typewritten amendment, modification or supplement to any one counterpart shall be valid or binding unless made to all three counterparts in conformity with Section

6.16, above. One fully executed original counterpart shall be delivered to CONSULTANT and the two remaining counterparts shall remain with the City for

Page 16 of 19 ends

archiving and day-to-day reference by the department responsible for administering the Agreement on the City's behalf.

6.21 Notwithstanding any provision to the contrary contained in this Agreement, in no event shall either party be liable for punitive damages.

6.22 FORCE MAJEURE: A party's performance of any obligation under this Agreement shall be excused if, and to the extent that, the party is unable to perform because of any event of Force Majeure. In any such event, the party unable to perform shall be required to resume performance of its obligations under this Agreement upon the termination of the event or cause that excused performance hereunder. "Force Majeure" herein means an event which is beyond the reasonable control of a party, including without limitation: (a) acts of God; (b) flood, fire, earthquake, hurricane or explosion; (c) war, invasion, hostilities (whether war is declared or not), terrorist threats or acts, riot or other civil unrest; (d) government order or law that prevents CONSULTANT from performing its obligations as set forth in this Agreement; (e) actions, embargoes or blockades in effect on or after the date of this Agreement; (f) action by any governmental authority that prevents CONSULTANT from performing its obligations as set forth in this Agreement; (g) national or regional emergency; (h) strikes, labor stoppages or slowdowns or other industrial disturbances, other than those involving the affected parties employees;] (i) shortage of adequate power or transportation facilities. [SIGNATURE PAGE TO FOLLOW]

Page 17 of 19 ends

IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed the day and year first appearing in this Agreement, above.

CITY OF HUNTINGTON PARK: WEST & ASSOCIATES ENGINEERING, INC.

By:_ By:_
Ricardo Reyes
City Manager Phillip West, Principal/President
APPROVED AS TO FORM:

By:

City Attorney

Page 18 of 19 ends

EXHIBIT "A"

SCOPE OF WORK
(SEE ATTACHED)

Page 19 of 19 ends

City of Huntington Park
Proposal for:

Professional Project Approval and
Environmental Design (PA&ED)
Services for CIP 2019-14 ATP Cycle V

CITY OF

HUNTINGTON PARK

CIVIC CEN
March 3, 2022
Submitted by:

West & Associates Engineering, Inc.

WEST&ASSOCIATES

WEST&ASSOCIATES

ENCINEERINGIN C
March 3, 2022
Cesar Roldan
Director of Public Works
City of Huntington Park
6550 Miles Avenue
Huntington Park, CA 90255
Subject: Professional Project Approval and Environmental Design (PA&ED) Services for CIP 2019-14 ATP Cycle V Dear Mr. Roldan:

West & Associates is pleased to submit our Proposal for Professional Project Approval and Environmental Design (PA&ED) Services for CIP 2019-14 ATP Cycle V for the City of Huntington Park.

We recently had the pleasure of working with the City on the PA&ED of Cycle IV of the City's Active Transportation Program (ATP). Therefore, we are very familiar with the needs of this Project. In particular, we understand that unlike previous cycles of the City's ATP, this 5th Cycle will include sidewalk, curb ramp, and bus pad improvements. Thus, it will be important to coordinate with LA Metro early during this PA&ED phase in order to confirm the locations of the bus pads. This will ensure that the bus pad locations do not change during the preparation of Plans (next phase of Cycle V).

From the previous Cycle IV PA&ED project, we understand that this cycle will include a Project Study Report Equivalent (PSRE), consisting of a Project Scope (Report), Preliminary Environmental Study (Caltrans LAPM Exhibit 6-A), Field Review Form (Caltrans LAPM Exhibit 7-B), and NOAA Species (Fisheries) Review (https://www.fisheries.noaa.gov/region/west-coast). We have prepared Exhibit A (included in Section 4 of this Proposal) to demonstrate our understanding of this Cycle V project.

According to a letter sent by Caltrans to the City in December 2021 (Page 39 of the RFP), we understand that the City has secured $50,000 in State Funding for this current PA&ED phase. This current PA&ED phase of the Project essentially seeks to "scope" and set the design and construction budgets.

I have read, understood, and agreed to all statements in this Request for Proposal and acknowledge receipt of all addendums/amendments as well as to the terms, conditions, and attachments referenced. This proposal is valid for a period of no less than one-hundred & eighty (180) calendar days from the date of this submittal. We also acknowledge that no addendums have been issued for this RFP.

Thank you for this project opportunity. Please contact me if you have any questions.

Sincerely,
Philly West
Phillip West, P.E., QSD/QSP
Principal/President
West & Associates Engineering, Inc.

Office: (949) 716-7670
Cell: (714) 728-8082
[email protected]
West & Associates Engineering, Inc. + 78 Anacapa Court, Foothill Ranch, CA 92610 • 949.716.7670 | 714.728.8082 + westaeng.com

TABLE OF CONTENTS

CONTENTS
SECTION 1: COVER LETTER (1 PAGE)
SECTION 2: CONSULTANT'S BACKGROUND (1.5 PAGES)
SECTION 3: QUALIFICATIONS AND EXPERIENCE OF CONSULTANT'S PERSONNEL (2 PAGES) SECTION 4: PROJECT APPROACH (2 PAGES)
SECTION 5: PROPOSED PERSONNEL (2 PAGES)*
SECTION 6: QUALITY ASSURANCE/QUALITY CONTROL (1 PAGE)
SECTION 7: REFERENCES (1 PAGE)
SECTION 8: SCHEDULE AND SCHEDULE CONTROL (1/4 PAGE)
SECTION 9: FEE SCHEDULE/COST PROPOSAL (1 PAGE)**
SECTION 10: COMPLIANCE WITH RFP AND CONTRACT AGREEMENT (1 PAGE) *This Section includes resumes. Resumes not included in page count. **Fee is provided in a separate envelope
WESTSASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services SECTION 2: CONSULTANT'S BACKGROUND
Company Background
West & Associates Engineering, Inc. was started in 2015 by Mr. Phillip West. We provide consulting services to clients throughout the state of California for a broad range of services, including planning, design, and construction management. In particular, we specialize in the following types of work:

GENERAL CIVIL / ROADWAYS
Streets & Streetscapes, Grading, Parks,
Parking Lots, etc.

FACILITIES
Services Listed Include ALL
Wells, Pumping Stations, Lift Stations, Valve Vaults, Major Phases of Work:

Tanks, Reservoirs, Structures
- Planning
- Design
- Construct. Management
Other Notable Services:

PIPELINES - Plan Check
Water Mains, Sewers, Storm Drains, Etc. - Staffing Augmentation - Specialty Studies

QSD/QSP SERVICES
Including preparation and inspection of
SWPPPs, WQMPS, etc.

Nearly all of the past experience by the West project team members has been with public agencies. As such, our focus is on public clients. Mr. West and the project team members have experience with over sixty (60) public agencies throughout Southern California. A good portion of these clients are repeat clients that the team members have worked with over the years. Clients that Mr. West and the project team members have worked with include Cities (49), Water Agencies (14), and County Agencies (2).

WEST ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 2 - Page 1 of 2
SECTION 2: CONSULTANT'S BACKGROUND
Our Project Team members have served clients all over Southern California, regardless of the distance. In fact, we have completed services for municipal agencies which are nearly four (4) hours away from our office. We are versatile and able to accommodate your needs! Office Location and Contact Information
We are a small California "S" Corporation. Our office is located in Foothill Ranch (Lake Forest) in Orange County, California. Mr. Phillip West acts as the Principal/President of the firm. - Started in 2015
- California "S" Corporation (Fed I.D. No. 81-5259524)
WEST&ASSOCIATES - Contact: Phillip West, P.E., QSD/QSP
www.westaeng.com - Office: (949) 716-7670
- Cell: (714) 728-8082
- [email protected]
Subconsultants
Brief descriptions of our sub-consultants are provided in Section 5 of this Proposal.

WEST&ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 2 - Page 2 of 2
SECTION 3: QUALIFICATIONS AND EXPERIENCE

OF CONSULTANT'S PERSONNEL
Related Project Examples
We have experience with over sixty (60) public agencies in Southern California, including experience with the City of Huntington Park. The following experience includes related project experience for our firm. A list of references with contact information is provided in Section 7 of this proposal.

CITY OF HUNTINGTON PARK
6550 Miles Avenue, Huntington Park CA 90255
Cesar Roldan, Director of Public Works (323) 584-6320
[email protected]
West & Associates was recently involved with the City of Huntington Park on the following projects):

CIP 2018-11 ATP CYCLE IV - PA&ED SERVICES
Engineering services for Phase IV of the City's ATP project. The services included Project Approval & Environmental Design (PA&ED) work in preparation for the solicitation of PS&E. The PA&ED phase will lay the groundwork for the completion of "complete streets" for six (6) streets, with a pedestrian focus, including bicycle routes, sharrows, curb bulbouts, zebra crosswalks, signal modifications, and signage.

CITY OF ALHAMBRA
900 New Avenue, Alhambra, CA 91801
Robert Bias, Engineer 626) 570-5062
[email protected]
West & Associates was recently involved with the City of Alhambra on the following projects):

FY 2020-21 STREET REHABILITATION PROJECT
Engineering services for the City's FY 2020-21 SB1 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five separate streets in the City. The total length of the project was about 30,000 feet.

WEST&ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 3 - Page 1 of 2
SECTION 3: QUALIFICATIONS AND EXPERIENCE

OF CONSULTANT'S PERSONNEL

CITY OF SIERRA MADRE
232 W. Sierra Madre Blvd. Sierra Madre CA 91024
Chris Cimino, Director of Public Works 626-355-7135
[email protected]
West & Associates was recently involved with the City of Sierra Madre on the following projects):

FY 2020-21 STREET REHABILITATION PROJECT
Engineering services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, and restoration of pavement striping. The total length of the project was 10,000 feet.

Total Related Experience
The following table provides a partial listing of relevant projects. Some of this experience is past experience for Mr. West prior to the formation of West & Associates:

AGENCY PROJECT NAME
City of Alhambra FY 20-21 Street Rehabilitation
City of Azusa Gladstone Elementary Safe Routes to School Survey City of Baldwin Park Street Condition Assessment
City of Bellflower Palo Verde Ave Rehabilitation
City of Culver City Wash. Bivd. & Wash. PI. Streetlight Improvements City of Hawaiian Gardens Fedde Middle School Safe Routes to School City of Huntington Park ATP Cycle IV Project - PA&ED Services City of Irvine Barranca Parkway Rehabilitation
City of Irvine Culver-Main/Culver-Alton Intersection Improvements City of Montebello Beach Street Pavement Rehabilitation Project City Ranchos Palos Verdes Infrastructure Report Card
City of Rancho Santa Margarita Melinda Road Median Extension City of San Dimas Foothill Blvd. Rehabilitation
City of San Dimas San Dimas Canyon Rehabilitation
City of Sierra Madre FY 20-21 Street Rehabilitation
City of Sierra Madre FY 19-20 Street Rehabilitation
City of Sierra Madre City Recreation Center Parking Lot Improvements City of Simi Valley Lost Canyons Drive Improvements
City of San Juan Capistrano Forster Street Improvements 15 DIFFERENT CLIENTS SERVED 19 RELATED PROJECTS
WEST ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 3 - Page 2 of 2
SECTION 4: PROJECT APPROACH
Project Understanding
In accordance with the RFP and as further clarified by the City, we understand that the City is seeking Project Approval and Environmental Design (PA&ED) Services in preparation for the solicitation of Plans, Specifications and Estimates (PS&E) from profesionally licensed design consultants. Through this Cycle V of the City's Active Transportation Program (ATP), the City intends to address safety concerns along school corridors, improve pedestrian safety, and encourage active transportation for over seventeen (17) schools within the City. This project will consist of the following streets:
• Gage Avenue (from Wilmington Ave to Salt Lake Ave)
• State Street (from Florence Ave to Randolph St)
• California Ave (from Florence Ave to Cudahy St)
The project locations are shown in Exhibit A.

The project will consist of sidewalk replacements, ADA curb ramp replacements, bus pad installations, pedestrian signal (HAWK beacon) installations, and potential striping (traditional crosswalks and/or "scrambles"). On Exhibit A, we have identified the potential locations of the HAWK beacons.

We understand that the City must prepare a "Project Study Report Equivalent" or PSRE. The PSRE essentially will "Scope" the design phase of the Project, and will result in approval of a construction budget by Caltrans. A PSRE consists of the following documents:
• Analysis of Project Site, Preparation of Preliminary Scope, and Preparation of Cost Estimates • Field Review Form (Exhibit 7-B)
• Preliminary Environmental Study (Exhibit 6-A)
• NOAA Species (Fisheries) Review: https://www.fisheries.noaa.gov/rerion/west-coast According to our previous environmental research, we understand that there is only one endangered species within the NOAA quadrangle (South Gate area), which is a steelhead fish as shown below. • Icals Add Help
South Gste
Dual Mamber 33918 H2
ESAAnado TaLA Ech
SONOC Cono ESu !T
COC Cebo ESU (El-
keson Sarm El -
C/SR Chinook Salmon EsU M-
SRWR Choloct. Ss/mGl ESU (El
NC Steethead DPS(-
CCC steelhtad OPS P-
SOCC Steelhead OPS (T) -
BERS (E) • x
SDPS Green Sturgeon (T)-
ESA ADRENALS FIA. Cotical Habe)
SONCE CMo Ciscal Hacsat
CCQ Coto Cracal Habeat-
Ca Camao Salmón Crocal Hastat-
CVSR Chinook Saimon Crocal Habest-
Comptos
Figure 1: NOAA Endangered Species Search Results (South Gate Quadrangle) WEST&ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 4 - Page 1 of 2
SECTION 4: PROJECT APPROACH
Special Coordination Requirements for Project
For the previous Cycle IV project, the PA&ED phase did not require coordination with Caltrans until the PSRE was complete and submitted to Caltrans. However, unlike Cycle IV, this Cycle V project will require coordination with LA Metro for the location of bus pads along Gage Ave. That is, it will be important to determine the locations of the bus pads so that the locations do not change during the preparation of Plans. We recommend that LA Metro be contacted early during the course of this PA&ED phase.

Project Approach
To accomplish the Scope of Work, we intend to begin preliminary work on this project upon notice of contract award (instead of upon Notice to Proceed). Typically, this is about three weeks prior to the Kickoff Meeting. The preliminary work will include requesting data from the City in advance of the Kickoff Meeting and initial coordination with LA Metro. This approach will result in a more productive Kickoff Meeting and help ensure that the PA&ED phase of work is complete with Caltrans approval by September 1, 2022, as stipulated in the RFP.

3. Review Data 4. Prepare
- 1. City Notifies of 2. Request Data from City. Review I from City and Summary of
Intent to Award BALA Metro a *Discussion Points
Contact LA Metro requirements.
for Kickoff Meeting
*5. Conduct a More!

6. Prepare Draft 7. City Review and 128. Finalize PSRE/ Effective Kickoff Comments on PSRE Submit to Caltrans
EPSRES
Meeting
Scope of Work
We acknowledge the tasks described in the RFP. Our proposed Scope of Work will include the entirety of the Scope described in the RFP. In order to provide the best possible services for your needs, we will consolidate the Scope into the following phases:
• Phase | - Due Diligence
• Phase |I — Preliminary Engineering (Draft PSRE)
• Phase II - Final Engineering (Final PSRE)
The Schedule provided in Section 8 of this Proposal shows the sequence and duration of the Phases above.

WEST ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 4 - Page 2 of 2
Gage Ave
from Wilmington Ave to Salt Lake Ave
• 600+ LF of Sidewalk
Gage Ave @ Middleton St • 10 ADA Curb Ramps
• HAWK Beacon (Recommend) Huntington Park • Potential Striping (Crosswalks and/or Scramble) High School
Linda Esperanza
Marquez KIPP Comienza
High School Community
Prep San Antonto
Elementary School
GAGE AVE.

GAGE YMCA
AVE. Preschool
Victoria! Amadeus
Escuela" Music Gage Middle
Gage Ave @Albany St School School School
Renuevo
• HAWK Beacon (Recommend) Primary Come 0l Middleton St. Schools Elementary School Magnolla
Science / Martha Escutia
Miles Ave Primary Center
Elementary
St. Matthias
School _ Lucille Roybal Florence Ave @Bissell St
FLORENCE Allard Elementary
AVE. School • HAWK Beacon (3 of 3)
State Street
from Randolph St to Florence Ave. CA Music
School
• Sidewalk Bella Music
• 6 ADA Curb Ramps School
• Potential Striping
(Crosswalks and/or Scramble) Hope California Ave
TOTALS: Elementary from Florence Ave to Cudahy St
School
• S:+ AD Ramps (to per Calrans Funding Alocation) Reference:

CUDAHY Limits of Project
• Four (4) Transit Bus Pads
• HAWK Beacons at Three (3) Mid-Block Locations School Location : Sotential Striping (Traditional Crosswalks and or "Scrambles) Bus Stop Intersection for Hawk Beacon

EXHIBIT A
PROJECT SCOPE OF WORK 0z-
WEST&ASSOCIATES (CIP 2019-14 ATP CYCLE V)
SECTION 5: PROPOSED PERSONNEL
Organizational Chart
The project team will consist of the individuals below:

CITY OF HUNTINGTON PARK

PROJECT MANAGER
PHILLIP WEST, P.E., QSD/P
QA/QC

SUBCONSULTANTS
FRANK CAHILL, P.E.

EARTH SYSTEMS, INC.

Geotechnical Analysis
Pavement Sampling

ENGINEERING CORNERSTONE SURVEYING
Land Surveying
KEV TCHARKHOUTIAN, P.E.

TRAFFIC CONTROL ENGINEERING
JAKE COMER, E.I.T. Traffic Control Plans

STEPHEN WILLIAMS
FPL AND ASSOCIATES, INC.

Traffic Signal Design

SUPPLEMENTAL SURVEY
WILL ROLPH, P.E., P.L.S.

DANIEL ROLPH
Resumes of the above individuals are provided later in this section.

WESTSASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 5 - Page 1 of 2
SECTION 5: PROPOSED PERSONNEL
Subconsultants
Brief descriptions of our sub-consultants are provided below:

Geotechnical (Pavement Coring) Services:

Earth Systems, Inc., Company Overview: Geotechnical services for Southern California 2122 East Walnut Street clients. Earth Systems was started in 1969 and has been in business for Suite 200 over 50 years. They provide a complete range of Geotechnical Services Pasadena CA 91107 all over Southern California. Their client list includes architects, 626.356.0955 engineers, private homeowners, commercial businesses, and of course public agencies. In total, they have worked with cities, counties, water districts, school districts, and private companies.

Land Surveying:

Cornerstone Surveying Company Overview: Land Surveying services for California. Cornerstone 20730 Knob Place Surveying Inc. began in 1997 and includes a staff of three (3) Licensed Perris CA 92570 Surveyors as well as support staff. Cornerstone's team has over 75 years 951.736.0200 of in-depth experience with both development and capital improvement/public works projects.

Traffic Control:

Traffic Control Engineering Company Overview: Traffic Control Services throughout Southern 2687 Saturn St. California. The Company was founded in 1989, and provides traffic Brea, CA 92821 control engineering services to municipal clients in Southern California. 714.447.6077 Their services include local, state, and federally funded projects. Typical services include design of traffic control plans.

Traffic Signal Design:

FPL & Associates Inc. Company Overview: FPL and Associates, Inc. is a privately-held 30 Corporate Park #401, ( corporation located in the heart of Orange County, California. FPL Irvine, CA 92606 provides comprehensive civil and traffic engineering services to federal, state, municipal, and private clients across the western United States, particularly in the Southern California region.

WEST&ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 5 - Page 2 of 2
Resume

WEST&ASSOCIATES
REGISTRATION:

Registered Civil Engineer, California
EDUCATION: No. 77453
California State University, Qualified SWPPP Developer (QSD) Phillip West, P.E., QSD/QSP Long Beach Qualified SWPPP Practitioner (QSP) Principal/Project Manager B.S. Civil Engineering Certificate No. 25034 OVERVIEW:

As Principal/President at West & Associates, Mr. West also serves as a Project Manager for all projects.

The entirety of Mr. West's career has been solely focused on public clients, and he has served over sixty (60) public agency clients throughout his career. His experience has been very diverse and involves planning, design, construction management, field surveying, and even staffing augmentation. Most importantly for this particular project, a good portion of Mr. West's background involves street design and/or construction management, including widening, medians, ADA Ramps, rehabilitation etc. A handful of these projects have involved funding through Caltrans.

RELATED PROJECT EXPERIENCE
Mr. West has been involved with the related projects described below. These projects are only a portion of Mr. West's overall experience:

CITY OF HUNTINGTON PARK
Project management services for Phase IV of the City's ATP project. The services included Project Approval & Environmental Design (PA&ED) work in preparation for the solicitation of PS&E. The PA&ED phase will lay the groundwork for the completion of "complete streets" for six (6) streets, with a pedestrian focus, including bicycle routes, sharrows, curb bulbouts, zebra crosswalks, signal modifications, and signage.

CITY OF HAWAIIAN GARDENS
Engineering services for the City's Fedde Middle School Safe Routes to School project. The project involved new curb ramps, new crosswalk striping, new speed humps, and a new overhead pedestrian traffic signal along 214th St. and Elaine Ave. in the City of Hawaiian Gardens.

CITY OF ALHAMBRA
Project management services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

CITY OF SIERRA MADRE
Project management services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

Project management services for the City's FY 2019-20 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

Project management services for the City's Recreation Center Parking Lot Improvements project. The project involved grind & overlay, removal of curb and gutter, removal of grass parkway, removal of existing trees, construction of new parking spaces and curb islands, construction of new sidewalk and curb ramps, replacement of driveways, and installation of new striping.

Resume

WEST&ASSOCIATES

CITY OF BELLFLOWER
Construction Management services for the City's Rehabilitation of Palo Verde Avenue Project. The project involved grind and overlay, removal and replacement, curb and gutter work, ADA curb ramps, striping, and traffic signal modifications. This project also involved Caltrans coordination for funding purposes.

CITY OF CULVER CITY
Design services for the City's Washington Blvd. and Washington Pl. streetlight improvements project. The project involved new streetlights in the City's two main thoroughfares as well as some sidewalk, curb, gutter, street, and ramp work. Project involved nearly 6,000 feet of street.

CITY OF IRVINE
Assisted with engineering services for the City's Barranca Parkway Pavement Restoration Project. The project involved rehabilitation of 10,000 ft. of Barranca Parkway, including grind & overlay, new driveway ramps near the Broadcom building, re-grading of certain portions of street, striping, landscaping adjustments, and adjustment of pedestrian curb ramps.

Engineering services for the City's Culver-Alton & Culver-Main Intersection Improvements project. The project involved re-configuring of a landscaped median, re-grading of a street intersection, re-configuring of turn pocket islands, striping, landscaping adjustments, and adjustment of pedestrian curb ramps.

CITY OF MONTEBELLO
Recently provided engineering services for the City's Beach Street Pavement Rehabilitation Project. The project involves removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five separate streets in the City. The total length of the project was 5,000 feet.

CITY OF RANCHOS PALOS VERDES
Engineering services for the preparation of an Infrastructure Report Card. The Infrastructure Report Card evaluated the City's infrastructure, including the City's streets. The Report Card provided an assessment of existing street infrastructure conditions, recommendations on rehabilitation or replacement needs, a cost estimate for infrastructure improvements of one letter grade, and the costs to improve infrastructure from the current assigned grade all the way to an "A" grade. The project also involved field site visits, presentations to City staff, and a final presentation to the City Council. The City's street's received an "A" grade.

CITY OF RANCHO SANTA MARGARITA
Engineering services for the City's Melinda Road Median Extension Project. The project involves extension of an existing median in Melinda Road at Paseo Alegria near the 241 toll road. The project involves removal of concrete curbs, stamped concrete, landscaping, striping, existing asphalt pavement, and traffic signs, construction of new concrete curbs, construction of new stamped concrete, installation of new asphalt pavement, grind and overlay of asphalt for smooth "feathered" transition for drainage, installation of new project signs and posts, curb painting, and restoration of pavement striping

CITY OF SAN DIMAS
Design services for the City's Foothill Blvd Rehabilitation Project. The project involved grind & overlay, removal and replacement, curb and gutter replacement, sidewalk restoration, landscaped median adjustment, re-grading of some portions of street, striping, and traffic loop adjustment.

Resume

WEST& ASSOCIATES
EDUCATION:

California State University, REGISTRATION:

Kev Tcharkhoutian, P.E. Long Beach Registered Civil Engineer, California Engineer B.S. Civil Engineering, 1980 No. 44598
OVERVIEW:

Mr. Tcharkhoutian has over 40 years-experience in municipal civil engineering design and construction.

He has served as City Engineer or Public Works Director for several agencies throughout Southern California. Mr. Tcharkhoutian has overseen a wide variety of projects including water, sewer, storm drain, streets, parks, and grading. Mr. Tcharkhoutian previously provided QA/QC services for the City of Alhambra's FY 20-21 Street Rehabilitation Project.

RELATED PROJECT EXPERIENCE (CITY ENGINEER OR PuBLIc WOrKs DireCToR) Mr. Tcharkhoutian has served as City Engineer or Public Works Director for the following agencies:
• City of Sierra Madre
City of El Monte
City of South El Monte
• City of Baldwin Park

RELATED PROJECT EXPERIENCE (OTHER AGENCY EXPERIENCE)
Mr. Tcharkhoutian has served as Principal, Senior, or Associate Engineer for the following agencies:

City of Montebello
City of Duarte
• City of Vernon
• City of Wildomar
• City of Colton
• City of South Gate
• City of Maywood
• City of Monrovia

RECENT PROJECT EXPERIENCE
Mr. Tcharkhoutian has recently provided Inspection Services for the following projects:

CITY OF ALHAMBRA
Project management services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

CITY OF HUNTINGTON PARK
Engineering services for Phase IV of the City's ATP project. The services included Project Approval & Environmental Design (PA&ED) work in preparation for the solicitation of PS&E. The PA&ED phase will lay the groundwork for the completion of "complete streets" for six (6) streets, with a pedestrian focus, including bicycle routes, sharrows, curb bulbouts, zebra crosswalks, signal modifications, and signage.

Engineering services of the City and County catch basins within the limits of the City of Huntington Park.

The project involved an inventory of the catch basins to assess the rehabilitation needs of the catch basins related to clean stormwater discharges. The goal of the inspections was to determine the need for inlet Resume

WEST&ASSOCIATES
EDUCATION:

Frank Cahill, P.E. University College Dublin, REGISTRATION:

Ireland Registered Civil Engineer, California
Quality Assurance/Control B.Eng. Civil Engineering No. 55373 OVERVIEW:

Mr. Cahill has about twenty-five years of experience in California with civil engineering management, design and construction for site development, and municipal projects in the water/wastewater industry. te will be providing quality review of plans prior to submittal to the City

RELATED PROJECT EXPERIENCE
Mr. Cahill has been involved with the related projects described below and on the following page. These projects are only a small portion of Mr. Cahill's overall experience:

EAST ORANGE COUNTY WATER DISTRICT
Mr. Cahill acted as the District Engineer for East Orange County Water District from 2017 to 2018, for a period of nearly two years. District Engineer duties included oversight of current projects, planning and budgeting of proposed projects, direction of staff and resources. During his tenure, Mr. Cahill oversaw the implementation of the District's Master Plan Update.

IRVINE RANCH WATER DISTRICT
Project Manager & QA/QC services for the Culver Drive Recycled Water Main Replacement project. The project involved replacement of approximately 1,200 feet of existing recycled water main with a new 12- inch PVC recycled water main, along with new recycled service laterals, air-vacs and a blow-off, and abandonment of existing facilities. The project also involved a complex connection in a busy intersection that required traffic control and the installation of a large 8-inch meter vault to an existing golf course.

MOULTON NIGUEL WATER DISTRICT
Project Manager for the Wood Canyon Domestic Water Booster Pump Station which included four 150 HP pumps, suction and discharge piping and valves, LPG standby generator, electrical system and controls, masonry building, grading and miscellaneous site work. Also provided construction management and inspection services.

CITY OF SIMI VALLEY
Prepared a Water Master Plan for a proposed development in the City. The proposed development included roughly 200 homes, new golf courses, a clubhouse, and club member suites. The master plan included nearly 5 miles of new mains, a booster station, a new reservoir, and revitalization of an existing reservoir.

Quality Assurance/Control services for the design of about 30,000 feet of new streets for a proposed housing development in the City. The street improvements included new street design, curb and gutter, parking pop-outs, and parking lots for a clubhouse at a private golf course. The project also included street rehabilitation work. Mr. Cahill overlooked the design of over 22,000 feet of water mains and over 3,000 feet of sewer improvements within the project vicinity.

UNIVERSAL STUDIOS
Prepared Domestic and Fire Water Master Plans as a Universal Studios Project Engineer. Recommended modifications to enhance the performance of the existing systems.

Resume

WEST&ASSOCIATES
EDUCATION:

California State University, REGISTRATION:

Jake Comer, E.I.T. Long Beach Engineer-In-Training, CA (No. 18-460-16) Engineer B.S. Civil Engineering Licensed Engineer, CA (In Progress) OVERVIEW:

Mr. Comer serves as an engineer for various projects, including water, sewer, and storm drain projects.

Mr. Comer has experience in hydrologic and hydraulic analyses, engineering design work with both AutoCAD and MicroStation, field data collection, and GIS analyses. The majority of Mr. Comer's experience has been with public agencies. Mr. Comer previously provided engineering services for the City of Alhambra's FY 20-21 Street Rehabilitation Project.

RELATED PROJECT EXPERIENCE
Mr. Comer has been involved with the related projects described below and on the following page. These projects are only a portion of Mr. Comer's overall experience:

CITY OF HUNTINGTON PARK
Engineering services for Phase IV of the City's ATP project. The services included Project Approval & Environmental Design (PA&ED) work in preparation for the solicitation of PS&E. The PA&ED phase will lay the groundwork for the completion of "complete streets" for six (6) streets, with a pedestrian focus, including bicycle routes, sharrows, curb bulbouts, zebra crosswalks, signal modifications, and signage.

Inspection services of the City and County catch basins within the limits of the City of Huntington Park.

The project involved an inventory of the catch basins to assess the rehabilitation needs of the catch basins related to clean stormwater discharges. The goal of the inspections was to determine the need for inlet screens and baskets, and to determine the cleaning needs of the catch basins.

CITY OF ALHAMBRA
Project management services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

CITY OF CHINO
Engineering services for the Yorba Avenue and Eucalyptus Avenue Sewer Main Replacement project. The project involved replacing approximately 5,000 feet of 10-inch and 15-inch sewer main with 15-inch and 21-inch VCP. The project also included a sewer study which evaluated design alternatives and calculated sewer flows and capacity of the existing and new main. Finally, the project also involved coordination with Union Pacific Rail Road for a railroad crossing.

CITY OF MONTEBELLO
Recently provided engineering services for the City's Beach Street Pavement Rehabilitation Project. The project involves removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five separate streets in the City. The total length of the project was 5,000 feet.

CITY OF SIERRA MADRE
Project management services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

Resume

WEST&ASSOCIATES
EDUCATION:

Stephen Williams Penn State University,
Engineer B.S. Business (Org. Leadership)
OVERVIEW:

Mr. Williams provides engineering, surveying, construction inspection and drafting services for West & Associates. Prior to his experience in the water/wastewater industry, Mr. Williams had worked in the manufacturing industry for about 10 years, wherein he supervised a team. His skills with the finer details add to the precision of work for the project team. Mr. Williams previously provided engineering services for the City of Alhambra's FY 20-21 Street Rehabilitation Project.

PROJECT EXPERIENCE
Mr. Williams has been involved with the related projects described below:

CITY OF ALHAMBRA
Mapping and drafting services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

CITY OF MONTEBELLO
Recently provided engineering services for the City's Beach Street Pavement Rehabilitation Project. The project involves removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five separate streets in the City. The total length of the project was 5,000 feet.

CITY OF RANCHO SANTA MARGARITA
Engineering services for the City's Melinda Road Median Extension Project. The project involves extension of an existing median in Melinda Road at Paseo Alegria near the 241-toll road. The project involves removal of concrete curbs, stamped concrete, landscaping, striping, existing asphalt pavement, and traffic signs, construction of new concrete curbs, construction of new stamped concrete, installation of new asphalt pavement, grind and overlay of asphalt for smooth "feathered" transition for drainage, installation of new project signs and posts, curb painting, and restoration of pavement striping.

Recently provided engineering services for the City's FY 2020-21 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City.

Engineering services for the City's FY 2019-20 Street Rehabilitation Project. The project involved pavement removal and replacement, grind and overlay, slurry seal, removal of trees, curb and gutter replacement, sidewalk replacement, sidewalk repair, driveway replacement, curb ramp replacement, restoration of pavement striping, and manhole adjustment on five streets in the City. construction of new parking spaces and curb islands, construction of new sidewalk and curb ramps, replacement of driveways, and installation of new striping.

Resume

WESTRASSOCIATES
REGISTRATION:

Licensed Civil Engineer, CA. No. 76698
EDUCATION: Licensed Surveyor, CA 9381
California State University, Qualified SWPPP Developer (QSD) Will Rolph, P.E., P.L.S., QSD/P Long Beach Qualified SWPPP Practitioner (QSP) Surveyor B.S. Civil Engineering Certificate No. 00812
OVERVIEW:

Mr. Rolph has over fifteen (15) years of engineering and land surveying experience. Mr. Rolph assists Mr.

West with a portion of West & Associates' projects. As a surveyor, Mr. Rolph's primary focus is large residential and commercial developments, but he also has experience working with local municipalities.

Mr. Rolph's engineering background involves a strong component of water and sewer utility design.

PROJECT EXPERIENCE
Mr. Rolph has worked with Mr. West on the following projects described below. These projects represent just a small portion of Mr. Rolph's experience:

CITY OF ALHAMBRA
Land surveying & mapping services for the Winchester Avenue and Winthrop Drive Water Main Replacement project. The project involved replacing distribution mains and a transmission main along with new service laterals, hydrants, air-vacs and blow-offs, connections to existing mains, and abandonment of existing facilities. The total length of the project was approximately 10,000 feet. Finally, the project also involved street rehabilitation.

Land surveying & mapping services for the Chapel Avenue Sewer Main Replacement project. The project involved replacing an existing 8-inch sewer main with a 12-inch sewer main, including manhole rehabilitation, connections to existing sewer service laterals, and street rehabilitation. The work also included a Preliminary Design Report (PDR) which evaluated design alternatives and calculated sewer flows and capacity of the existing and new main. Finally, the project also involved street rehabilitation.

CITY OF CHINO
Oversight of surveying & mapping services for the Baker Avenue Water Main Replacement project. The project involved replacing a distribution main along with new service laterals, hydrants, air-vacs and blow- offs, connections to existing mains, and abandonment of existing facilities. The total length of the project was approximately 700 feet.

CITY OF CHINO HILLS
Oversight of surveying & mapping services for the Maroon Bell - Winchester Water Main Replacement project. The project involved replacing distribution mains along with new service laterals, hydrants, air- vacs and blow-offs, connections to existing mains, and abandonment of existing facilities. The project also involved street rehabilitation. The total length of the project was approximately 3,500 feet.

CITY OF RANCHO SANTA MARGARITA
Oversight of surveying & mapping services for the City's Melinda Road Median Extension Project. The project involved the extension of an existing curbed median in Melinda Road north of the 241-toll road.

CITY OF SIERRA MADRE
Oversight of surveying & mapping services for the City's FY 2019-20 Street Improvements Project. The project involved the rehabilitation of over 10,000 feet of City streets, including full-depth replacement, grind and overlay, slurry seal, replacement of curb, gutter, sidewalk, and curb ramps.

Resume

WEST&ASSOCIATES
EDUCATION:

Daniel Rolph, B.S., Architecture,
San Diego School of REGISTRATION:

Surveyor/CAD Designer Architecture Licensed Surveyor, CA (In Progress) OVERVIEW:

Mr. Rolph practices as a surveyor and CAD designer in the State of California. He has experience in land urveying in over a dozen cities throughout California, many of which have involved coordination with Pus, agencies is laudiar wyand meds of puts age and california state agencies, such as calrans

PROJECT EXPERIENCE
Mr. Rolph has over five (5) years of land surveying and CAD experience. Mr. Rolph has worked with Mr.

West on the following projects described below. Most of Mr. Rolph's experience has been with other firms. As such, these projects represent just a small portion of Mr. Rolph's experience:

CITY OF ALHAMBRA
Land surveying & CAD Design services for the Winchester Avenue and Winthrop Drive Water Main Replacement project. The project involved replacing distribution mains and a transmission main along with new service laterals, hydrants, air-vacs and blow-offs, connections to existing mains, and abandonment of existing facilities. The total length of the project was approximately 10,000 feet. Finally, the project also involved street rehabilitation. (
Land surveying & CAD Design services for the Chapel Avenue Sewer Main Replacement project. The project involved replacing an existing 8-inch sewer main with a 12-inch sewer main, including manhole rehabilitation, connections to existing sewer service laterals, and street rehabilitation. The work also included a Preliminary Design Report (PDR) which evaluated design alternatives and calculated sewer flows and capacity of the existing and new main. Finally, the project also involved street rehabilitation.

CITY OF CHINO
Land surveying services for the Baker Avenue Water Main Replacement project. The project involved replacing a distribution main along with new service laterals, hydrants, air-vacs and blow-offs, connections to existing mains, and abandonment of existing facilities. The total length of the project was approximately 700 feet.

CITY OF CHINO HILLS
Land surveying services for the Maroon Bell - Winchester Water Main Replacement project. The project involved replacing distribution mains along with new service laterals, hydrants, air-vacs and blow-offs, connections to existing mains, and abandonment of existing facilities. The project also involved street rehabilitation. The total length of the project was approximately 3,500 feet.

CITY OF RANCHO SANTA MARGARITA
Land surveying services for the City's Melinda Road Median Extension Project. The project involved the extension of an existing curbed median in Melinda Road just north of the 241 toll road.

CITY OF SIERRA MADRE
Land surveying & CAD Design services for the City's FY 2019-20 Street Improvements Project. The project involved the rehabilitation of over 10,000 feet of City streets, including full-depth replacement, grind and overlay, slurry seal, replacement of curb, gutter, sidewalk, and curb ramps.

SECTION 6: QUALITY ASSURANCE/QUALITY CONTROL
Quality Assurance/Control of Procedures
The following are quality control methods that we plan on implementing for this project:

Direct Project Management
The Project Manager, Mr. Phillip West, will be directly involved on this project. Instead of periodic reviews and dictations to engineering staff, he will work alongside engineering staff to ensure the work is done properly. All staff members have access to the same files and can edit as the needs arise without things being "lost-in-translation". This drastically reduces errors during the work process.

Communication Plan
We will strive to address all issues the first time, so that the issues do not have to be re-addressed down the road, thus saving time and money. To accomplish this, we will apply the following procedures:
• Coordinate with the City to schedule meetings at such a day/time which allows the maximum number of City staff to attend the meeting (in order to provide better input for the City). • Maintain regular communication via telephone and email. Important information will be made in writing via email in order to be accessible by all parties throughout the duration of the project. • Strive for a high level of responsiveness and timeliness with all email and telephone communication. Typically, we respond to all phone calls or emails within a few hours or less. This reduces re-work if communication corrects a design issue that would have otherwise been resolved improperly.

Quality Assurance/Control of Products
All work will go through a QA/QC process before submittal to the client. We strive to have all projects reviewed by an experienced individual not directly involved in the project, although general familiarity with the project and the client is desirable. During the QA/QC process, Adobe PDF software is utilized to review documents as opposed to printing hard copies. This is not done to be "green", but rather to save time and to keep records of our quality control. This is also important if any quarantines persist during this project. The review of the construction documents shall focus on three key areas including: 1) quality of drafting, 2) quality of design, and 3) constructability.

WEST&ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 6 - Page 1 of 1
SECTION 7: REFERENCES
References
The following are key references for this proposal:

CITY OF HUNTINGTON PARK
6550 Miles Avenue, Huntington Park CA 90255
Cesar Roldan, Director of Public Works (323) 584-6320
[email protected]

CITY OF ALHAMBRA
900 New Avenue, Alhambra, CA 91801
Thomas Amare, Engineer (626) 300-1562
[email protected]
900 New Avenue, Alhambra, CA 91801
Robert Bias, Engineer (626) 570-5062
[email protected]

CITY OF SIERRA MADRE
232 W. Sierra Madre Blvd. Sierra Madre CA 91024
Chris Cimino, Director of Public Works (626) 355-7135
[email protected]
| CITY OF RANCHO SANTA MARGARITA
22112 El Paseo, Rancho Santa Margarita CA 92688
Tri Nguyen, Principal Engineer 949-635-1813
[email protected]

CITY OF MONTEBELLO
1600 W Beverly Blvd. Montebello, CA 90640
Albert Mendoza, Deputy Director of Public Works (323) 887-1200 [email protected]
WESTBASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 7 - Page 1 of 1
SECTION 8: SCHEDULE
Project Schedule
We have included our project schedule on the following page in MS Project format. The schedule is based on a start date (Kickoff Meeting) of March 21, 2022 in accordance with the Notice to Proceed date as shown on Page 10 of the RFP ("Important Dates"). The schedule shows Caltrans (CTC) approval of the PA&ED by September 1, 2022 as stated in the RFP.

WEST&ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 8 - Page 1 of 1
City of Huntington Park
Professional Project Approval and Environmental Design (PA&ED) Services for CIP 2019-14 ATP Cycle V
Duration Start Finish
Kickoff Maeting Mon 3/21/22 Mon 3/21/22
Due Diligence 18 days Thu 3/10/22 MaN 1A27A Due Diligence • 18 days Preliminary Coordination with LA Metro Thu 3/10/22 Fil 3/1822 Preliminary Coordination with LA Metro

1.4 wks.

Obtain and Review Data 2 wks Tue 3/22/22 Man 414/22 Obtain and Review Data ≥ 2 wks Site Walk/Review Meeting with City 1 day Thu 3/31/22" Thu 3/31/22" Sito Walk/Review Meeting with City* Proliminary Engineeting 32 days Tue 4/5/22 Wed 5/18/22 Preliminary Engineering • * 32 days Prepare Draft Project Analysis for City (Letter Memo) 2 wks Tue 4/5/22 Mon 4/18/22 Prepare Draft Project Analysis for City (Letter Memo) * 2 wks City Review 2 wks Tue 4/19/22 Mon 5/2/22 City Review - 2 wks LA Metro Review & Coordination 4 wks Tue 4/19/22 Mon 5/16/22 LA Metro Review & Coordination - 4 wks Meeting with City (Reviev/ & Scoping) 1 day Tue 5/3/22 Tue 5/3/22 Meoting with City (Review & Scoping) * 11 Prepare Final Project Analysis for City (Letter Memo) 2 wks Wed 5/4122 • "Tuö 5/17/22 Propare Final Project Analysis for City (Lotter Memo) + Meeting with City (Verily Scoping) "Wed 5/18/22" Wed 5/18/22 Mating with City (Verily Scoping) PSRE/Permitting Documents 75 days Thu 5/19122 Wed B/31228 PSRE/Permitting Documents 475 daya = Preliminary PSRE/Permitting Documents 32 days Thu 5/19/22 Fri 7/4/22 Preliminary PSRE/Permitting Documents • 32 days
Prepare Draft PSRE 4 viks Thu 5/19/22: Wed 6/15/22 Prepare Draft PRET 4 wks Propare Draft Caltrans/Environmental Docs *Thu 5/19/22" Wed 6/15/22 Prepare Draft Caltrans/Environmental Does Y 4 wks
Cly Roviow 2 viks 'Thu 6/16/22 Wed 6/29/22 City Review 2 wka LA Metro Review 2 wks Thu 6/16/22 Wed 6/20122 LA Metro Review * -2 wks "Review Meeting" Thu 8/30/22 : Thu 8/30/22 Review Meeting Stakeholder/Final Design Meeting # 7/1/22 Fa7/1/22 Stakeholder/Final Design Meeting 7.

Final PSRE/Permitting Documents 43 days Mon 714/22 Wed 8/31/22 Final PSRE/Permitting Documents E → Aug 31 Prepare Final PSRE 2 wks Mon 714/22 FR17/15/22 Prepare Final PREY - 2 wks
Proparo Final Caltrans/Environmental Doca 2 wks Mon 714/22 Fr7/15/22 Propare Final Caltrans/Environmental Does + Stakeholder/Final Design Meeting 1 day Mon 7/18/22 Mon 7/18/22 Stakeholder/Final Design Meeting I Caltrans (CT) Review and Approval" 6.4 wks Tue 7719/22 Wed 8/31/22 Caltrans (CTC) Reviow and Approval t 6.4 wks SECTION 10: COMPLIANCE WITH RFP AND CONTRACT AGREEMENT
Statements)
At this time, we have no objections to the terms or conditions of the RFP or to the City's standard agreement for professional services. Our insurance coverage meets or exceeds the minimum insurance requirements outlined in the City's agreement for professional services. A sample copy of our insurance certificate is shown below.

ACO DATE (MA/DO/YYYY)

CERTIFICATE OF LIABILITY INSURANCE
9/22/2021
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONPERS NO RIGHTS UPON THE CERTIPICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND.

BELOW. THIS CERTIFICATE OF INSURANGE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ios) must have ADDITIONAL INSURED provisions or be endorsed.

IF SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may requira an andorsement. A statement on this carticle does not conter sights to the certificate holder in lie of such endorsements).

IA Insurance Services Betty Tran
30 Vantis, 250 949-297-5982 THE Mo: 949-297-5980
Aliso Viejo, CA 92656
beity:[email protected]
INSUREN; AFFORDING COVERAGE MAICE
CA License #0E67768 INSURERA! RLI insurance Company 13055 INSURER D: Travelers Casualty and Surety Co America 31194 West & Associates Engineering. Inc.
18 Апасара INSURERC
Foothill Ranch CA 92610-2436 INSURER OL

SURER U
BORERS
COVERAGES CERTIFICATE NUMBER: 64065479: REVISION NUMBER:

MAY BE ISSUED OR MAY PERTAIN, THE DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.

EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

TYPE OF INSURANCE POLICY NUNTER LIMITS
/ COMMERCIAL GENERAL LIABILITY PSB0006154 9:19/2021 9/19/2022 I$2,000,000 I CANS-MADE / OSCUR Schedulod Al End: $ 1 000,000
8PP83130212
/ Prim/NonCon Professional Services MED EXP (Any one person. $10,000 4 Wur of Subr. PERSONAL & ADV INJURY 52,000,000
perormed oy une insured
GEN AGGREGATE LIMIT APPLIES PER ore Excludod GENERAL AGGREGATE $4,000,000 POLY BEST PRODUCTS COMPIOP AGG 54,000,000
AUTOMOBILE LIABILITY PSA0003094 9/19/2021 9/19/2022 1$1,000,000 / ANY AUTO Designated Insured Endt BOOLY URY (Per porson #CA20481013; Prim/NonCon BODY INJURY (Per socident)! 5
DONLY
OS ONLY included on pa 2 of Form PHOPERTY RAMASE
UMBRELLA LIAS PSE0002695 9/19/2021 9/19/2022 EACH OCCURRENCE $1,000,000 Excludos Professional AGGREGATE $1,000,000
Llabitity
Loso RETENTIONS
ORKERS COMPENSATIO PSW0004148 9/19/2021 8/19/2022 TeR™

ND EMPLOYERS LARILA
YIN Naiver of Subrogation EL. EACH ACCIDENT $ 1.000.000 KiA Endl #WC0403060484
E.L. DISEASE. EA EMPLOVEE 51.000.000
BE METON ON OPERATICHS Lea EL. D'SEASE - POLICY LIMIT $ $1.000.000 Professional Liability 106587562 9/18/20219/19/2022 $2.000,000 Each Claim Claime Matte $2.000.000 Annual Aggregale
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additonal Resharks Schedule, anay be attached if chore spice is required)

CERTIFICATE HOLDER CANCELLATION
• Per ACORD Additional Remarks Schedute
City of Alhambra, its officials, officers. EXPIRATION
ACCORDANCE WITH THE POLICY PROVISIONS.

Alhambra CA

AUINOKDEDRISRESENTATIYEI
LAVC) Alicia K, gram
@ 1988-2019 ACORD CORPORATION. All rights roserved.

ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD WEST&ASSOCIATES Proposal for: City of Huntington Park - Project Approval and Environmental Design (PA&ED) Services Section 10 - Page 1 of 1

WEST ASSOCIATES
ATTACHMENT "B"
Proposal for

PROFESSIONAL PROJECT APPROVAL AND

ENVIRONMENTAL DESIGN (PA&ED) SERVICES FOR
CIP 2019-14 ATP CYCLE V
Welcome

HUNTINGTON
PARK
Prepared for
The City of Huntington Park
Prepared by
March 3, 2022

ENGINEERS
3060 Saturn Street, Suite 250
Brea, CA 92821
Phra: (714) 940-0700
www.infrastructure-engineers.com

SAGINEERS
March 3, 2022
Cesar Roldan, Director of Public Works
City of Huntington Park
6550 Miles Avenue
Huntington Park, CA 90255
Subject: Proposal for Professional Project Approval and Environmental Design (PA&ED) Services for CIP 2019- 14 ATP Cycle V Project
Dear Mr. Roldan,
Infrastructure Engineers is pleased to submit our proposal to the City of Huntington Park to provide Project Approval & Environmental Documents (PA&ED) prior to the design of several complete streets in your City. Improving and enhancing safe travel for pedestrians, bicyclists, motorists and transit riders of all ages and abilities has been a focal point of our team since our inception over 28 years ago. We are committed to providing continued exceptional service to your City as we have in the past. The City of Huntington Park is a valued client. We have completed a broad range of public works design and construction projects for the City including safety enhancements and traffic improvement projects, such as the HAWK Signal at Gage Avenue-and Bissell Street, ATP Cycle 2 Uncontrolled Crosswalk and Safety Enhancements, i-Park System Implementation Design and Construction, and the Signal Synchronization/Bus Speed Improvements projects, among others.

With this in mind, we are proposing a highly skilled team of technical experts to field investigate and prepare environmental studies to complete this project's PA&ED phase in preparation for the development of Plans, Specifications and Estimate (PS&E). We are eager to begin the initial stages of this project to deliver ramp improvements, sidewalk replacement, transit bus pads, and more in conjunction with pedestrian safety and mobility enhancements. Our team will be led by Amir Farahani, PE, a veteran civil engineer. The team has prepared numerous PA&EDs with Caltrans oversight and Greenbook specifications for many traffic safety projects such as Lynwood's ATP Cycle 2 Project, Baldwin Park's ATP Cycle 3 Pedestrian and Bicycle Safety Enhancement Project, and Hawaiian Garden's HSIP Cycle 8 Carson Street and Norwalk Boulevard Safety Improvement Projects.

We are confident the references provided will assure your evaluation team that we have the hands-on experience and know-how for this work and that we consistently meet deadlines and budgets. Additionally, we know how to reach important fast-tracked deadlines for projects where the safety of residents, pedestrians and bicyclists is at stake. Our entire team stands ready to assist the City with this important project as soon as the notice to proceed is given.

We have read, understand, and agree to all statements in the Request for Proposal and acknowledge receipt of all addendums/amendments as well as to the terms, conditions, and attachments referenced.

As Chief Operations Officer of Infrastructure Engineers, I am authorized to bind the firm to all commitments made in this proposal. If you have any questions about our proposal, please contact our proposed Project Manager, Amir Farahani, PE, TE, by phone at (714) 940-0100 or by email at [email protected]. We thank you for this opportunity to continue to be of service to the City of Huntington Park.

Sincerely
Infrastructure Engineers
amir fatal
Farzad Dorrani, MSC Amir Farahani, PE, TE
Chief Operations Officer Project Manager
Page i
City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Table of Contents
Cover Letter.

Infrastructure Engineers' Background 1
Qualifications and Experience of Personnel. 2
Project Approach 5
Proposed Personnel.. ...7
Quality Assurance/Quality Control .. 12
References .. 13
Schedule and Schedule Control ....... ....14
Page. ii
City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Infrastructure Engineers' Background
For over 28 years, Infrastructure Engineers has performed a variety professional engineering and municipal work for cities throughout Southern California, including the City of Huntington Park. We offer a full range of services in civil engineering, architectural design, traffic and city planning, environmental studies and California Environmental Quality Act and National Environmental Policy Act (CEQA/NEPA) compliance, construction management and inspection, plan checking, and building and safety. Our team is committed to making a difference in the communities we serve by improving infrastructure and supporting civic functions. Many of our staff have been city employees in managing and supporting roles so they understand the concerns regarding schedules, budgets, and keeping change orders to an absolute minimum.

They also possess first-hand knowledge of the City's operations and priorities, which empowers them to be strong advocates for every community our firm is fortunate to hold as a client, including the City of Huntington Park.

Infrastructure Engineers is uniquely qualified to perform the Project Approval & Environmental Design (PA&ED) constructability review for the street improvement projects in the City of Huntington Park. We have provided design, constructability reviews, and construction management services on a number of streets throughout your City. Our expertise gives us the unparalleled skill to identify potential issues before they occur, resulting in a smoother construction process and reduced cost overruns.

Our team consists of experienced construction managers, inspectors and field engineers who have worked closely with contractors and construction documents during all phases of construction, including pre-construction. We know the construction and design process and have many years of solid field experience overseeing the design and construction of pedestrian signals and rehabilitation of city streets. In fact, we completed the Various Street Improvement Project in your City just last year, which included design, construction management and inspection for the rehabilitation of 11 streets. Our years of experience will strengthen the construction manager's ability to oversee the project and keep surprises to a minimum. The proposed team's experience includes, but is not limited to, the following disciplines:
• Civil Engineering • Project and Construction
• Master Planning Management
• Roadways & Streets Design * Program Management
• Pavement Rehabilitation * Construction Management &
Inspection
→ Grading & Earthwork Analysis
• Constructability Reviews
• Erosion & Sedimentation
• Construction Methods & Solutions
• Street Lighting & Utilities
• Traffic Engineering • Value Engineering
• Environmental Compliance
→ Traffic Impact & Analysis
→ Traffic Signage & Striping Design → PA&ED Document Preparation • Traffic Control & Detour Design • NPDES Compliance
→ CEQA Studies and Compliance

Page 1 ends

City of PA&ED Services for CIP. 2019-14 ATP Cycle V Project -
HUNTINGTON PARK March 3, 2022
Qualifications and Experience of Personnel
Key Personnel
The following matrix provides a summary of the relevant work experience, work history, training, education, and special certifications of Infrastructure Engineers' team personnel.

Experience
PA&ED Constructability Reviews Bicycle Routes, Sharrows, and Signage Prepare Environmental Documents (CEQA) Conduct Field Review Develop and Maintain Project Schedule Permitting and Regulations Pedestrian Safety/Mobility Enbancements Street and Sidewalk Improvements Project Management Signal Modifications
and prate role Highest Degree Licenses / Yrs. Office
Certs. Exp. Location
Farzad Dorrani,
MSC MS, Civil
Principal-in- Engineering Brea
Charge
Amir Farahani,
PE, TE BS, Civil PE, TE 30
Engineering Brea
Project Manager
hawn Mousavi

AS, PI MS,
Engineering Transportation TE 5+ Brea
Design Lead Engineering
Kimberly Castro High School
Administrative Diploma 3 Brea
Assistant

Page 2 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Relevant Experience
Our team has performed numerous safety improvement engineering design services including High-Intensity Activated Crosswalk beacon (HAWK) traffic signals, pedestrian push buttons, bulb-out designs, and curb ramps. The following examples illustrate our ability to conduct constructability reviews and PA&EDs.

ATP Cycle II -Uncontrolled Crosswalk Pedestrian Safety Enhancement Project, City of Huntington Park
Infrastructure Engineers was required to review and revise existing Plans, Specifications and Estimate (PS&E) for intersection improvements of 22 unprotected crosswalks in the City of Huntington Park. Features include ADA ramps, bulb-outs, advanced yield and stop markings, countdown signals, updated pedestrian signs, repainting exiting marking/pavement labels and ladder-stripe crosswalks.

HAWK Signal Gage-Bissell Project, City of Huntington Park Infrastructure Engineers provided
design of the HAWK signal as well as a
signed CEQA check-off list certifying
that all environmental clearances and
permits had been addressed. The traffic
study concluded that a HAWK should be
installed at the intersection of Gage
Avenue and Bissell Street as a
countermeasure to improve pedestrian
safety.

Active Transportation Program Cycle II - Various Streets, City of Lynwood Infrastructure Engineers provided design, preparation of PS&E for roadway, concrete and ADA improvements at various City streets. Additionally, we provided geotechnical investigations, survey, project management and administration for the project. Other duties included construction support, responding to RFIs and Submittals, and attending meetings and field visits during the construction phase of the project.

Page 3 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
HSIP Cycle 8 - Florence Avenue and Eastern Avenue Regional Surface Transportation Improvements and Environmental Document, City of Bell Gardens Infrastructure Engineers conducted a Categorical Exemption environmental analysis per CEQA Guidelines as well as constructability review for this project. The traffic signal system components for the intersection were upgraded as well. Our firm assisted the City with right-of-way acquisition before continuing with the PS&E.

ATP Cycle III - Main Avenue/Pacific Avenue Complete Street Project, City of Baldwin Park
Infrastructure Engineers performed a Constructability Review of the plans and specifications for Phase IB of the Maine Avenue Complete Street Project. We incorporated the findings of our review into the final revised specifications and prepared a revised bid schedule that strictly conformed to the identified improvements. We also completed the PS&E design for Phase 2 of the project.

Page 4 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Project Approach
Project Understanding- conforming with the project RFP, IE understand the scope of work and what is required to provide an all-inclusive Project Approval & Environmental Design/Documents (PA&ED) and make ready for the next phase of the project: Plans, Specifications and Estimate (PS&E) documents by a professional licensed engineer.

PA&ED phase for a federal- and state-funded project requires completing specific tasks as defined by Caltrans Local Assistance Procedures Manual (LAPM) Chapter 5:
• Completing a Preliminary Environmental Study (PES) package and • Submitting the PES package to Caltrans for review and approval of a Categorical Exemption for the project per CEQA and NEPA requirements. • The documents must be submitted as part of a Project Study Report (PSR) Equivalent. Caltrans requires when a local agency proposes a STIP project off the State Highway System (SHS), they must prepare a "PSR Equivalent." The City needs to complete the PA&ED tasks before Constructability Review submitting a request to California Transportation Process Commission (CTC) for allocation of funds for the PS&E
phase. Preliminary & Long Range
Planning
This pedestrian safety project is to address the highest rates of fatalities and injuries in California for persons under 15 years old along 4 school corridors as follow: Project Scoping / Public Input Gage Avenue
• 10 pedestrian ramp improvements
• 600' sidewalk replacement to improve safety and Traffic, Engineering, & Environmental Studies
encourage active transportation for 10 close-by
schools
State Street Draft Environmental Document
• Add 4 transit bus pads including Benefits & Impacts
• Improve 6 pedestrian ramps
• Replace and improve 4,204: sidewalk serving 7
schools 888 Public Hearing / Public Input
California Avenue
• Improve pedestrian ramp at 42 locations
Select Preferred Alternative
Install Hawk Beacons at:
• 3 critical mid-block locations in the City
• Intersection of Florence/Bissell to improve N-S pedestrian safety to school near Salt Lake Park.

The PA&ED Phase is intended to assure that all design alternatives and proposed preferred alternative are constructible base on the available level of detail.

Page 5 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Tasks and Methodology-
Task 1- Preparation for Scoping/Kickoff Meeting. Upon award of project, IE will contact the City to obtain all pertinent data to the project. Our team will prepare a spreadsheet with the data, tasks described in the RFP, and all Caltrans requirements.

The spreadsheet shall be distributed in the kickoff meeting to ensure all parties agree.

Any changes to the spreadsheet shall be reflected on the project schedule.

Task 2 - Conduct Field Review and Surveys
IE will conduct a comprehensive field review and reconnaissance survey at each of the subject locations along Gage Avenue, State Street, California Avenue, Florence Avenue/Bissell Street, and 3 mid-block crossings per the grant application to prepare appropriate environmental documents for the project. We will list and evaluate reasonable alternatives and feasible mitigation for each location.

Task 3 -Caltrans LAPM Chapter 6 Environmental Procedures Our team will complete Exhibit 7-B prior to the field review and send a copy with a location map to each of the interested parties attending the field review.

Representatives from Caltrans and the FHWA will be contacted to determine if their participation in the field review is required. Our team will fill out Exhibit 6-A Preliminary Environmental Study (PES) form and include both Exhibit 7-B (Field Review form) and Exhibit 6-A (PES form) in a formal PSR Equivalent document including relevant technical and environmental studies and submit to Caltrans for approval of the CEQA environmental document for the project and issuance of Categorical Exemption (CE) per CEQA. Our team will also assist the City to complete and submit Caltrans LAPM Chapter 13 Right-of-way Short Form Exhibit 13-A to Caltrans for Right-of-Way Clearance Certification that will be required for CTC fund allocation request package for the project's PS&E phase and a Finance Letter. As the PA&ED phase is a Caltrans- controlled process, our team will monitor and inform the City of Caltrans's oversight, concurrence, and approval at each step in each phase of the process, including the review and approval of the various required document submittals and technical reports, the selection of project alternatives, and the environmental review process under CEQA.

Infrastructure Engineers will develop and maintain Project Schedule for approval based on City's approval process and applicable date restrictions and conduct scoping meeting with the City to discuss any deviation from initial tasks.

Task 4 - Permitting and Regulations
Our team will observe all laws, rules, and regulations concerning environmental permitting to fully entitle the project to move into the design and ultimately the construction phase. The task will include incorporating environmental requirements (as applicable), mitigation measures, NPDES requirements (including adherence to MS4 LID requirements), BMPs, air/water quality, and erosion/sediment control into Project construction documents as required. IE will also provide a signed check-off list certifyina that all environmental clearances/permits (CEQA) have been completed and all mitigation measures will have to be incorporated into the PS&E prior to the advertisement of the Project for construction.

Task 5 - Meetings
Our team will schedule and attend the following minimum number of meetings during the course of the project:
1- Scoping/Kick-off (1)
2- Stakeholder/Final Design meetings (2)
3- Review Meetings with City staff (5)

Page 6 ends

city of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Proposed Personnel
Farzad Dorrani, MSC
Education: Principal-in-Charge/QA/QC
MS, Civil Engineering
Farzad Dorrani has 32 years of experience in a variety of BS, Civil Engineering
civil engineering projects. He has worked extensively on major infrastructure and public works improvement and
Years of Experience: 32
rehabilitation projects throughout southern California for various agencies, such as the cities of La Puente,
Montebello, Anaheim, Irwindale, Malibu, as well as the Alameda Corridor-East Construction Authority. Farzad's experience includes roadway design projects, parks, and downtown revitalization design projects, contract procurement, construction management, project management and administration.

Project Experience
Project Manager, ATPL Federally Funded Project, ATPL 5373, Citywide Safety Enhancement - ATP, City of Bell Gardens.

This project involved safety improvements to the intersections at Eastern Avenue and Lubec Street Intersection and Garfield Avenue and Loveland Street Intersection.

Infrastructure Engineers provided PS&E, project management, administration, construction management and inspection, fund administration and labor compliance for this project.

Project Manager, Montebello Boulevard Bike Lane and Sidewalk Improvement Project Phases I & II, Montebello.

Infrastructure Engineers provides providing preparation of plans, specifications and estimates for roadway
improvements, utility adjustments, ADA improvements, a class II bike lane, traffic signal improvements, pedestrian lighting, landscape, and irrigation plans along Montebello Boulevard. The pavement analysis and alternate rehabilitation strategies will include budget analysis to complete as much of the street improvements within the fixed project budget. Infrastructure Engineers will also provide project management and contract administration, and construction management and inspection services.

Principal-in-Charge, HSIP Cycle 8 Project- Various Intersection Improvements, Bell Gardens.

Responsible for high-lever oversight of the preparation of PS&E, project management, administration, construction management and inspection, fund administration and labor compliance for the intersections at Eastern Avenue and Lubec Street and Garfield Avenue and Loveland Street. The project also included the addition of video detection on all intersection approaches and the reconstruction of the pavement within the intersection with concrete. The signal design included field surveys, signing and striping, geotechnical investigations.

Principal-in-Charge, HSIP Cycle 7 Project - Various Intersections Improvements, Montebello. Infrastructure Engineers is providing the preparation of PS&E for roadway improvements, pavement rehabilitation, concrete improvements, ADA improvements and utility adjustments at three intersections: Garfield Avenue and Whittier Boulevard, Garfield Avenue and Via Campo, and Via Campo and Findlay Avenue.

Page 7 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Amir Farahani, PE, TE
Education: Project Manager/Principal Engineer
BS, Civil Engineering
Amir Farahani has more than 30 years of experience in
Registrations/Certifications:

Professional Civil Engineer, CA, No. various traffic and civil engineering disciplines. He has C54235 experience with contract administration, design
experience, and regulatory compliance. In working with
Professional Traffic Engineer, CA, the City of Orange as an Engineering Tech. II an No. T2363
eventually as a Senior Traffic Engineer, he has been
Years of Experience: 30 involved in all aspects of the projects that cities have designed and constructed. This includes coordinating
with local, county, state and federal agencies, and various utilities to ensure successful project completion. Amir understands the level of detail and problem-solving skills required to complete high-profile projects on time and within budget.

Project Experience
Senior Traffic Engineer/Manager-Transportation Services/City Traffic Engineer, City of Orange.

Amir utilized his many years of experience to manage various traffic and civil engineering projects. He also managed traffic and civil construction projects during his employment with the City of Orange.

Amir planned, managed, and provided oversight of the daily functions, operations and activities of Traffic and Transportation Division of the City of Orange, including Traffic Management Center (TMC), traffic signal timing, operation and maintenance, review of residential and commercial developments; and was responsible for leading the Traffic Operation and Transportation Planning team. Amir also managed and participated in the development and implementation of goals, objectives, policies and prioritize for the division. He also provided recommendations within departmental policy regarding appropriate service and staffing levels.

Oversew and participated in the development and administration of the operation and capital improvement division annual budget; participated in the forecast of funds needed for staffing, equipment, materials, and supplies; monitored and approved expenditures; implemented adjustments. Attended and participated as City Traffic Engineer at City Council, Commissions, committees, and other agency meetings as required. Prepared and presented technical information, analysis, and recommendations. Oversaw the development of consultant requests for proposal for professional and/or construction services and the advertising and bid processes; evaluated proposals and recommended project award; administered contracts after award.

Collaborated with other City departments, Police, Fire, Caltrans, OCTA and other outside agencies to plan, implement and complete projects and initiatives to improve traffic safety and mobility around the City. Identified outside funding sources for City Traffic and Transportation programs; directed and prepared funding applications. Responded to traffic and transportation related resident and commuters' inquiries and requests.

Oversaw traffic signal plans preparation and coordination programs; developed and approved traffic engineering standards and policies for the City. Reviewed and analyzed studies, environmental impact reports, proposals, and negotiations with other agencies to secure projects and policies favorable to the City.

Page 8 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Senior Civil Engineer/Associate Civil Engineer/ Assistant Civil Engineer/Engineering Tech. II, City of Orange.

Planned, prioritized, assigned, supervised, reviewed, and participated in the work of staff responsible for providing traffic engineering services within the assigned section. Developed and prepared construction plans, specifications, and estimates for various in-house design projects including traffic, streets, sewers, and storm drains. Participated in the selection of engineering staff; provided or coordinated staff training; worked with employees to correct deficiencies; implemented discipline procedures.

Reviewed and prepared transportation and traffic engineering studies; prepared for proposals; reviewed environmental impact reports; reviewed transportation models. Performed project management for the design and construction of Capital Improvement Projects for City Departments including Public Works, Community Services, Economic Development and Fire. Ensured conformance with state, federal, and local standards, and procedures in carrying out projects.

Prepared and applied for project funding from federal, state, and utility grant programs including Highway Bridges Rehabilitation and Replacement (HBRR), Arterial Highway Rehabilitation Program (AHRP), Safe Route to Schools (SR2S/SRTS), Highway Safety Improvement Program (HSIP), Transportation Enhancement Activities (TEA), Orange County Sanitation District Cooperative Projects, State-Local Transportation Partnership Program (SLTPP), Community Development Block Grant (CDBG), City Engineers Flood Control Advisory Committee (CEFCAC).

Interacted and communicated with the public, City management and departments, contractors, consultants, and other governmental agencies to resolve issues.

Prepared and processed various documents including Council Agenda reports, consultant agreements, hydrology and hydraulic studies, Requests for Proposals, plan check, consultant selection, bid evaluation, insurance certificates, environmental compliance, encroachment permits, right-of-way, and reimbursement packages. Revised and maintained City Standard Plans and Specifications.

Page 9 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Shawn Mousavi, MS, PE
Education: Engineering Associate
MS, Transportation Shawn Mousavi has 5 years of design experience Engineering
including the development of traffic signal plans, signal BS, Civil Engineering hardware upgrades, and signal synchronization timing Registrations/Certifications: improvements. Utilizing AutoCAD and GIS, he is highly Registered Civil Engineer, CA, proficient in drafting specifications and phase diagrams, No. 91696 calculating cost estimates, and generating schedules.

Shawn has produced signal warrant reports in
Years of Experience: 5
compliance with state and city regulations including the California Manual on Uniform Traffic Control Devices. Additionally, he has provided plan check assistance by organizing and assessing plan check fees from the Building and Safety Department.

Project Experience
Engineering Assistant, Prepare Project Schedule for Public Works Department, City of Baldwin Park.

Organized the status of multiple capital improvement projects. Created a schedule and cost estimate needed to fund community development and public works projects.

Engineering Assistant, HSIP Cycle 7 Project, Intersections Improvements - City of Montebello.

Shawn oversaw the upgrade of signal hardware to improve the timing for three traffic intersections. He was responsible for the design, specifications, and providing cost estimates. Duties included changing the phase diagram to protective-permissive and relocating existing k-rails to improve traffic flow and safety.

Engineering Assistant, Signal Synchronization and Bus Speed Improvement Design Phase - City of Huntington Park.

Shawn designed the signal synchronization system to provide smooth movement of traffic for three arterial street corridors. Using AutoAD and GIS to develop the design, he wrote the specifications and calculated the cost estimate to implement the program.

Engineering Assistant, New Traffic Signal Long Beach Blvd and Louise St - City of Lynwood.

Shawn was responsible for the design of the traffic signal, striping plans, specifications, and cost estimate for the new traffic signal intersection. Activities included using AutoCAD to create the general notes, construction notes, conductor schedule, traffic signal plan, and phase diagram.

Engineering Assistant, Florence and Eastern Intersection Improvement - City of Bell Gardens.

This improvement project entailed upgrading the traffic signal design with a new additional lane. Shawn designed the replacement of all traffic signal poles and created a new conductor schedule and phase diagram.

Page 10 ends

HUNTENGTON PARK PA&ED Services for CIP 2019-14 ATP Cycle V Project March 3, 2022
Kimberly Castro
Administrative Assistant
Years of Experience: 3
Kimberly is experienced with administrative and clerical duties, social media applications, photography, and drone operation. She possesses exceptional customer skills can be utilized to assist clients. She continually seeks the opportunity to continue learning and growing.

Project Experience
Executive Administrative Assistant/Social Media Coordinator, Infrastructure Engineers.

Kimberly is Executive Assistant to the Chief Operations Officer at Infrastructure Engineers.

She also manages all social media platforms, is the in-house photographer, and drone operator.

Page 11 ends

City of PA&ED. Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
Quality Assurance/Quality Control
Quality assurance and quality control (QA/QC) are top priorities for Infrastructure Engineers. Producing engineering and compliance documents of the highest caliber is what keeps us in business. Our QA/QC practice involves a comprehensive process to ensure delivery of quality products and services to meet your stringent criteria.

Infrastructure Engineers appoints an experienced and qualified QA/QC reviewer to provide leadership and guidance in producing complete and comprehensive documents to meet all industry standards as well as the City's expectations. Our monitoring and inspection documents will result in meeting the City's expectations and will provide clear understanding to your staff and constituency of all related requirements.

Key elements of our quality control are the assignment of skilled personnel who are experienced in the particular discipline, effective and constant communications, and monitoring of project progress. The quality control process includes the following principles:
• Assignment of skilled professionals begins a comprehensive and interactive orientation of the project goals and the means to achieving these goals • Daily contact by the Project Manager with each on-going activity to provide support and guidance, to maintain focus and momentum, and to monitor the quality of work → Maintaining regularly scheduled project staff meetings for reviewing work status, reviewing technical elements of the project, coordinating and interfacing of activities, reviewing budget parameters, discussing upcoming activities and responsibilities
→ Internal (peer review) audits of municipal services for quality, accuracy, and completeness
* Strictly and rigorously following Infrastructure Engineers-developed QA/QC standards and guidelines
• Review by the Project Manager prior to submittal to assure services meet all standards and codes, project goals and objectives, and contract requirements » QA/QC of design documents are carried out by our highly experienced and licensed professional civil engineers
• Constructability reviews during the design phase are carried out by our experienced construction managers and inspectors

Page 12 ends

City of PA&ED Services for CIP 2019-14 ATP Cycle V Project HUNTINGTON PARK March 3, 2022
References
Montebello Way Traffic Signal Improvement Project, City of Montebello Our firm conducted a Preliminary Environmental Study, design and construction management and inspection services for the improvement of numerous intersections.

Client Contact:

James Enriquez, PE, Director of Public Works/City Engineer, City of Montebello Phone: (323) 887-1462
Email: [email protected]
HSIP Cycle 8 - Florence Avenue and Eastern Avenue Regional Surface Transportation Improvements and Environmental Document, City of Bell Gardens Infrastructure Engineers a conducted a Categorical Exemption environmental analysis, per CEQA Guidelines for this project.

Client Contact:

Chau Vu, former Director of Public Works, City of Bell Gardens (currently Huntington Beach)
Phone: (714) 374-5345
Email: [email protected]
San Gabriel River Bikeway Path Project, City of Baldwin Park Infrastructure Engineers provided engineering and environmental permitting services for a 2.5 bicycle and pedestrian path.

Client Contact:

Sam Gutierrez, Director of Public Works, City of Baldwin Park Phone: (626) 813-5255, Ext. 460
Email: [email protected]
ATP Cycle II, City of Lynwood
Thomas Thornton, PE, Director of Public Works, City of Lynwood Phone: (310) 603-0220, ext. 801
Email: [email protected]

Page 13 ends

Infrastructure Engineers Schedule and Schedule Control
3060 Saturn Street, Suite 250 Project Timeline Schedule Brea, CA 92821 City of Huntington Park ATP Cycle 5 PA&ED Project Project PA&ED Completion Date: August 22, 2022
Task Description March 2022 April 2022 May 2022 June 2022 July 2022 August 2022 3/21 3/28 4/4| 4/4| 4/11| 4/12 4/25 5/2| 5/9| 5/16 5/23 5/30 6/6 6/13 6/14 6/15 6/17 One (1) Kickoff Scoping Meeting
Two(2) Stakeholders/Final Design Meetings
Five (5) Review Meetings with City Staff
• Procedures ritAl pical Caltrans Local Asiance
5 Survey, Data Collection, Permitting and Regulations
Duration
City Review Period (1 week)
Caltrans Review and Approcal Period (9 Weeks)
Project Milestones
1 Notice to Proceed (assumed 3/21/22)
2 Field Review/Investigation/Surveys Completion (3/28/22) 3 Submittal of Draft Field Review, PES, and PSR-Equivalent (4/4/22) 4 City's Review and Signatures - 1 Week (4/4/22)|
5 Submittal to Caltrans for Review and Approval (4/12/22) 6 PA&ED Approval by Caltrans - 9 weeks (6/14/22)|
7 Submittal of CTC Allocation Request for PS&E (6/17/22) 8 CTC Approval (8/18/22)
M Meetings
Kickoff/Scoping - 3/21/22
Progress Meetings with Staff - 4/4/22, 4/11/22, 6/13/22, TBD

IE WILL BE FLEXIBLE ON THE MEETING DATES PER THE CITY'S REQUEST & THE PROJECT NEED
Stakeholder Meetings (4/12/22, 6/15/22)
Final Meeting with Staff 8/22/22)

PROPOSAL TO PROVIDE
Professional Project Approval and Environmental Design (PA&ED) Services for
CIP 2019-14 ATP Cycle V Project

FOR THE CITY OF HUNTINGTON PARK
PID - Proiest Initiation Documents
• Preliminary Alternative Concepts anfires the type of
• Preliminary Scoping
• Preliminary Costs
/ Results in a Project Study Report (PSR)
City of Huntington Park Project
PA/ED - Project Approval / EnvironmentalDocumentation
Preliminary Design, refined cost estimates
Technical Environmental Studies
Draft Environmental Document
Draft Project Report
Final Environmental Document/Final Project Report
Caltrans Signed Project Report = Profect Approval
Right of Way
Vernon Finel Design Plans
Permits
Maywood Right of Way Acquisition
Approval allows Agency to Advertise for Construction
10 Ramp Improvements
Construction
• Bid and Award
• Construct in Stages with Traffic Handling
• Project Completion
sage Ave
Improvement of Pedestrian
Hawk Beacons Ramps at 42 Locations
Hinh
Florence Ave intensity
HAWK
Botivated
4 Transit Bus Pads CrossWalk
Wainul Park
California Ave
Major Roadways Cudahy
Collector Streets
South Gate
900
PREPARED FOR:

CITY OF HUNTINGTON PARK

PUBLIC WORKS DEPARTMENT
6550 Miles Avenue
Huntington Park, CA 90255
PREPARED BY:

MINAGAR & ASSOCIATES, INC.

TRAFFIC/CIVIL/ELECTRICAL ENGINEERING - ITS - TRANSPORTATION PLANNING - CEM 23282 Mill Creek Drive, Suite 120
Laguna Hills, CA 92653
Tel: (949)707-1199 12 Years of Excellence
March 3, 2022
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works

TABLE OF CONTENTS

1. Cover Letter

2. Consultant's Background

3. Qualifications and Experience of Consultant's Personnel

4. Project Approach
Scope of Services
Task I - Submit Caltrans LAPM Chapter 6 Environmental Procedures Task 2 - Survey, Data Collection, Permitting and Regulations Proposed Personnel

6. Quality Assurance/Quality Control

7. References
Schedule and Schedule Control

9. Fee Schedule/Cost Proposal (Separate Sealed Envelope) Appendices
Appendix A: Minagar & Associates, Inc. Additional SOQ
Appendix B: Key Personnel Resumes
MINAGAR & ASSOCIATES, INC. 29
YEARS
Traffic/Civil/Electrical Engineering - ITS - Transportation Planning & CEM - 1993-2022 2019 Section 1: Cover Letter
March 3, 2022
018
Mr. Cesar Roldan, PE
Public Works Director
2016 Public Works Department
City of Huntington Park
6550 Miles Ave
2016 Huntington Park, CA 90255
015 Re: RFP: Professional Project Approval and Environmental Design (PA&ED) Services for CIP 2019-14 ATP Cycle V Project
2014 Dear Mr. Roldan,
On behalf of the Minagar & Associates, Inc. Team, I would like to take this opportunity to present to you our N proposal to provide Professional Project Approval and Environmental Design (PA&ED) Services for 201 CIP 2019-14 ATP Cycle V Project in the City of Huntington Park. We recognize the importance of these services to Huntington Park and its residents who will benefit from our wide range of services in support of 2011 the City's Pedestrian Safety Initiative and the outcomes from recently completed or ongoing safety projects of relevance. The following proposal and statement of qualifications demonstrates why Minagar & Associates, Inc. is so uniquely qualified to perform these services for the City of Huntington Park:
2011 We understand the complex traffic, and residents needs of the Huntington Park community and adjacent local jurisdictions, having completed over 250 projects in Los Angeles County alone. We have successfully completed numerous Local Roadway Safety Plans (LRSP), Federal and State Highway Safety Improvement 2010 Program (HSIP), Safe Routes to School (SR2S) and Active Transportation Program (ATP) Projects such as the following:
• City of Huntington Park's Local Roadway Safety Plan (LRSP) in Los Angeles County 2009 • City of Guadalupe's Local Roadway Safety Plan (LRSP) in Santa Barbara County • City of Yucca Valley's SRZS Engineering and PS&E
• City of Burbank's HSIP Cycle 3 Engineering Services for Verdugo & Keystone. 2009 • City of Burbank's HSIP Cycle 4 Engineering Services for Verdugo Ave Bike Lane Extension. • City of Coachella's HSIP-5294 (006) Engineering Services for Citywide Traffic Control & Street Name Sign Upgrade.
2007 • City of Coachella's ATP Cycle I ST-86 PS&E & Engineering Services for Citywide ATP. • City of Coachella's ATP Cycle 2 ST-100 PS&E and Engineering Services for Citywide ATP. • City of Coachella's SR2S Cycle 8 PS&E Engineering Services for Citywide Safe Routes to School DWA 2005 Improvement Project.

As the Officer-in-Charge, I HAVE READ, UNDERSTOOD, AND AGREED TO ALL STATEMENTS IN THIS

REQUEST FOR PROPOSAL AND ACKNOWLEDGE RECEIPT OF ALL ADDENDUMS/AMENDMENTS AS WELL AS TO THE TERMS, CONDITIONS, AND ATTACHMENTS REFERENCED. I also commit all the resources of our firm for the most successful project deliveries. We do have all the necessary expertise and staff availabilities to provide the required services.
2003
Sincerely,
MINAGAR & ASSOCIATES, INC.
(A California Corporation)
hal Mige
2000
President/Senior Project Manager
23282 Mill Creek Road, Suite 120, Laguna Hills, CA 92653 Tel: (949) 707-1199, Web: www.minagarinc.com
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Section 2
Consultant's Background
Minagar & Associates, Inc. is a traffic/civil/electrical engineering, transportation planning and ITS professional consulting firm specialized in the areas of:

Traffic Engineering Founded in 1993
Intelligent Transportation Systems (ITS) Design & Deployment Civil Engineering
Environmental Engineering & Planning Support Services
Electrical Engineering
Transportation Planning 2004 - 2017-
Municipal Engineering Services
Construction Engineering Management
Since Minagar & Associates, Inc. inception in 1993, the firm has completed Incine. CA over 900 traffic engineering projects in || counties and 76 cities in the State Present of California, as well as 17 other states from Hawaii to New York. Former and current public clients include the Cities of Huntington Park, South Gate, Bell, Vernon, Los Angeles, Inglewood, Commerce, Compton, Santa Fe Laguna Hills CA Springs, La Mirada, South Pasadena, Culver City, Santa Monica, Beverly Hills, Baldwin Park, Irwindale and El Monte.

Over the last 29 years, our primary expertise has consisted of initial environmental assessments, designing, coordinating and deploying a variety of municipal traffic engineering, signal and arterial design, timing, optimization and synchronization projects. We provide a diverse range of professional traffic engineering services, including traffic signal design, engineering studies & surveys; traffic counts, ITS and systems communication PS&E; temporary traffic control plans; traffic modeling & traffic impact analysis studies; construction bid & advertisement services; and CM/inspection services for traffic signal, ITS and surface transportation projects. Our firm is recipient to numerous, local, regional, state and national awards, chiefly for California-based ITS Projects, as outlined in the Qualifications section of this proposal. Some of our most notable awards include:

Orange County Engineering Council's (OCEC) Outstanding Engineering Services Award (2019) ASCE's Outstanding Civil Engineer in the Private Sector Award in the State of California (2016) ASCE Los Angeles Section's Outstanding Civil Engineer in the Private Sector Award (2016) ASCE Orange County's Outstanding Civil Engineer in the Private Sector Award (2016) Orange County Engineering Council's (OCEC) Outstanding Engineering Services Award (2016) Cal-EPA/California Air Resource Board's Cool California Climate Leader Award (2012) ASCE's Outstanding Private Sector Civil Engineering Project in Metropolitan Los Angeles (2009) Caltrans' Excellence in Transportation Award (2009)
ASCE's Outstanding Public/Private Sector Civil Engineering Project in Metropolitan LA. (2007) APWA's Best Traffic Congestion Mitigation Project of the Year in So. California (2005) AENG CA-ITS Award of Excellence for the Best California Return on Investment (2002) PTI's Best Transportation Technology Solutions Award (2002) Los Angeles County Metro's Award of Excellence (2000, 2010 and 201I) The foundation of our planning & engineering services that we have provided to public agencies over the last 29 years has been the direct and active involvement of our company's President-Fred Minagar, MS, PE, RCE, FITE-to manage each project and task on a day-by-day basis. Fred is a recognized national authority in the areas of environmental planning, traffic engineering, Intelligent Transportation Systems MINAGAR & ASSOCIATES, INC. 4
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
(ITS) and transportation planning, and has over 38 years of real-world practice, public office and instructive experience. Fred has engineered, managed and administered over 900 traffic engineering/transportation planning projects and over 100 ITS projects in 17 states across the United States. In addition, he has accomplished the following:

Currently serving as his second term as Mayor for the City of Laguna Niguel, in Orange County Prior to his City Council appointment, and for a consecutive 15-year period, Mr. Minagar was re- appointed/re-elected as Traffic & Transportation and Planning Commissioner and Chairman for the City of Laguna Niguel;
Conducted over 120 traffic engineering and ITS workshops for FHWA (Federal Highway Administration), ITE National, Caltrans, Metro, various DOTs, cities and Governments of China & South Korea.

Served as Expert Witness on numerous legal cases in California & Massachusetts.

Served as the designated City Traffic Engineer for 9 cities (listed below), including the City of Colton and numerous others for many years on a day-by-day basis:

Current and former Contract City Traffic Engineer for 9 public agencies:

Agency County
City of Beaumont Riverside
City of El Monte Los Angeles
City of Gardena Los Angeles
City of South Pasadena Los Angeles
City of Colton San Bernardino
City of San Bernardino San Bernardino
City of Chino Hills San Bernardino
City of Baldwin Park Los Angeles
• City of Rancho Santa Margarita Orange
As part of the City of Huntington Park's procurement for Professional Project Approval and Environmental Design (PA&ED), the City will need a consultant that is locally knowledgeable, reliable, cost-effective, and highly experienced in the traffic/transportation engineering and entitlement profession.

Minagar & Associates, Inc. Team is the right team to bring these qualifications and expertise to the City As a traffic engineering, transportation planning and Intelligent Transportation System (ITS) consulting firm having functioned as the current and former contract City Traffic Engineering Consultant for nine (9) California cities we fully understand the range of transportation engineering and planning services needec by local municipalities.

Minagar's experience with similar design work include numerous projects for public agencies involving traffic signal systems, signal design and optimization. Recently completed related projects along with several other relevant projects, include:
• City of Burbank's Highway Safety Improvement Program (HSIP Cycle 4) Traffic Signal Modifications and ITS Improvements on Verdugo Avenue
• City of Lawndale's Citywide Traffic Signal Intersection Upgrades Project Additional Minagar & Associates, Inc. SOQ is provided in Appendix A.

M MINAGAR & ASSOCIATES, INC. 5
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Section 3
Qualifications and Experience of Consultant's Personnel Our team is led by Company President, Principal Engineer, and proposed Project Manager, Fred Minagar, MS, RCE, PE, FITE. Currently, the company is comprised of ten (10) employees. All six (6) key staff members of our firm have worked together to produce successful work for the many traffic safety studies we have been engaged on with numerous public agencies. A Key Personnel Responsibility and Availability Chart detailing project commitments, in percent of available time to allocate to this project as well as the team's organization chart are provided below.

Project Manager
The foundation of our success providing traffic engineering services for the last 29 years is the leadership and active involvement of our company's President-Fred Minagar, MS, PE, RCE, FITE-to manage each project and task on a day-by-day basis. Fred is a recognized national authority in the areas of traffic engineering, intelligent transportation systems (ITS), and transportation planning. He has over 38 years of real-world practice and public office experience as Mayor/Mayor Pro Tem/Council Member, appointed Planning Commission Chairman/Commissioner and Traffic Commission Chairman/ Commissioner in the City of Laguna Niguel.

Key Personnel
Minagar & Associates, Inc. is home to ten traffic engineer, transportation planner, civil/electrical engineer, and design staff members with over 140 years of combined work experience. Each Minagar staff member has been directly involved in Minagar's traffic safety review and analysis process for various cities over the last 29 years. Resumes of key personnel detailing staff title, experience, education, licenses and certifications, and past projects are included in Appendix B. As shown below, all of our in-house key and support individuals listed below are proposed for this contract. Project commitments, in percent of available time to allocate to this project, are also listed below.

Kev Personnel Responsibility and Availability Chart
Experience and Expertise
Consulting Traffic Engineering Staff Years of Experience Percent Available (%) Services Team Staff Permitting & Regulations
Project Coordinatio and Meetings Project Administi Preliminary Environmental Studs Survey, Data Collection. Caltrans CEOA & < < Report Preparation City Council Presentation:

PS&E
Fred Minagar, MS, PE, RCE, FITE
Arian Abrishami, MSEE, PE, PMP 31 < < <
Firoz Vohra, MS, TE 36
Serge Tavour, ASCE 36 90
Jenny Tu Tran, BSEE 3 75
Michelle Nguyen, BSCE 3 75 r
1 < \ <
Dam Hesham Basrawi, BSCE 2 90
MINAGAR & ASSOCIATES, INC.

PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Team Organization
¿ City of Huntington Park.

Cesar Roldan, PE
Public Works Director
M MINAGAR & ASSOCIATES, INC.

Fred Minagar, MS, PE, RCE, FITE
Project Manager
MINAGAR & ASSOCIATES, INC. MINAGAR & ASSOCIATES, INC.

Arian Abrishami, BSEE, PE, PMP Firoz Vohra, MS, TE
Principal Engineer roject Engineer/Principal Traffic Enginee MINAGAR & ASSOCIATES, INC. O MINAGAR & ASSOCIATES, INC.

Jenny Tran, BSEE Serge Tarvour, ASCE
CEQA & Environmental Process Geometry Evaluation
MINAGAR & ASSOCIATES, INC. MINAGAR & ASSOCIATES, INC.

Adam Hesham Basrawi, BSCE lichelle Nguyen, BS
Report and Caltrans Form Preparations eport Preparatic
Section 4
Project Approach
Project Management
Fred Minagar, MS, RCE, PE, FITE, President of Minagar & Associates, Inc. shall serve as our Project Manager for the City of Huntington Park's CIP 2019-14 ATP Cycle V Project (phase: Professional Project Approval and Environmental Design) and will function as the focus person for the day-to-day project management of this Safety Improvement project. Mr. Minagar shall oversee:
• Communication with staff of the different City departments and agencies on an as-needed basis to keep the City abreast of project development, delivery, and report preparation efforts. • Project scheduling to ensure project is approved with respect to its time sensitive manner. • Internal auditing to any disclose all inconsistencies, inaccuracies, ambiguities, and conflicts found during the project.
• Updating the schedule and budgeting plan with accurate milestones. • The Project Approval & Environmental Design of this CIP 2019-14 ATP Cycle 4 Project.

Project Understanding & Scope of Services
The City of Huntington Park plans to enhance pedestrian safety by implementing safety measures along Gage Avenue where ten ramp improvements and 600 linear feet of sidewalk replacement will improve safety and encourage active transportation for ten schools along Gage Avenue. The City Project will also add four transit bus pads, improve six ramps along State Street, and replace 4,204 linear feet of sidewalk (M) MINAGAR & ASSOCIATES, INC. 7
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
that serves seven schools. Along the residential corridor of California Avenue, pedestrian ramps at 42 locations will be improved. Additionally, HAWK beacons at three critical mid-block locations in the City including the intersection of Florence Avenue and Bissell Street will improve north-south pedestrian safety to schools near Salt Lake Park. A summary and discussion of the proposed scope of services to be completed by Minagar & Associates, Inc. has been provided below.

Summary List of Scope of Services
Task / - Submit Caltrans LAPM Chapter 6 Environmental Procedures • Prepare Final CEQA Environmental Document in accordance with Caltrans Local Assistance Procedures Manual Chapter 6 - Environmental Procedures. • Ultimately obtain Project's approval from Los Angeles Metropolitan Transportation Authority's and Caltrans, the CEQA lead agency.
• Develop and maintain Project Schedule for approval based on City approval process and applicable date restrictions.

Task 2 - Survey, Data Collection, Permitting and Regulations • Observe all laws, rules, and regulations concerning environmental permitting. • Document, design, and incorporate environmental requirements into Project construction TASK I - SUBMIT CALTRANS LAPM CHAPTER 6 ENVIRONMENTAL PROCEDURES Minagar & Associates, Inc. will work on this phase of the CIP 20/9-14 ATP Cycle V Project which is known as the Project Approval & Environmental Design (PA&ED) phase. Minagar & Associates, Inc. will complete this phase of the project by providing PA&ED Services to be in compliance with the California Environmental Quality Act (CEQA) that potentially requires specific mitigation measures to assure a better environment. Minagar & Associates, Inc. will work with the City of Huntington Park to ultimately demonstrate to the Los Angeles Metropolitan Transportation Authority's and Caltrans that this project will not have a significant impact on the environment and that if it does, then Minagar & Associates, Inc. will develop and recommend feasible mitigation measures to ensure that this project does not have a significant impact on the environment.

The ultimate PA&ED approval is at the discretion of the lead CEQA agency, Caltrans therefore, Minagar & Associates, Inc. will ensure that the appropriate environmental document is prepared and submitted o Caltrans in accordance with Caltrans' latest Local Assistance Procedures Manual (LAPM) Chapter ( Environmental Procedures (January 2022) and Standard Specifications for Public Works Construction (Greenbook 202I). The Preliminary Environmental Study (PES) Form and Categorical Exclusion (CE) Process Flowchart from LAPM has been provided in Appendix C. The final CEQA environment al document shall be certified by Caltrans, along with any supporting 2022 technical studies in order to obtain a finance letter for the next phase of the project, Plans, Specifications, and Estimates (PS&E). Minagar & Associates, Inc. will develop and maintain the Project's Schedule for approval based on the City's approval process and applicable date restrictions.

TASK 2 - SURVEY, DATA COLLECTION, PERMITTING AND REGULATIONS M MINAGAR & ASSOCIATES, ING.

PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Since this project's phase, PA&ED is an environmental approval phase requiring the ultimate approval of the lead CEQA agency, Caltrans, Minagar & Associates, Inc. will perceive all laws, rules, and regulations concerning environmental permitting. As part of the entitlement process, Minagar & Associates, Inc. will include all necessary steps in the project development and permitting proves to fully entitle the project to begin with the next phase, (PS&E). Minagar & Associates, Inc. will document, design, and incorporate applicable environmental requirements, feasible mitigation measures, National Pollutant Discharge Elimination System (NPDES) permit requirements (including adherence to MS4 LID requirements), BMPs, air/water quality, and erosion/sediment control into Project construction documents.

Minagar & Associates, Inc. will prepare a milestone check off list certifying that all environmental clearances/permits (CEQA) have been completed and all feasible mitigation measures have been incorporated into the next phase of the project, PS&E before the final construction phase of the project.

Minagar & Associates, Inc. will incorporate all applicable federal, state, and local laws, rules, and regulations concerning Public Works. Minagar & Associates, Inc. will ensure that this PA&ED is in compliance with the Public Contract Code Section 1012.

Mr. Minagar shall oversee the coordination of a "kick-off" meeting with City staff to discuss the project parameters and address any unclear issues as necessary. Memos summarizing work completed by Minagar & Associates, Inc. at different stages of development shall be provided to the City by Minagar Staff in regularly occurring project status meetings. Minagar & Associates, Inc. shall arrange and attend the following minimum number of meetings:

One (I) - Scoping / Kick off
Two (2) - Stakeholders/Final Design
Five (5) - City Staff
Section 5
Proposed Personnel
A 2-page resume for our Project Manager, Fred Minagar and I-page resume for each of the other key personnel has been provided in Appendix B.

Section 6
Quality Assurance/Quality Control
Because Fred is our hands-on, centralized Project Manager, he also provides oversight over project controls, budgets and delivery schedules. His QA/QC methods involve working closely with those key personnel directly involved a given project task to track the overall progress on an on-going basis. This includes constantly coordinating with in-house staff and with the City's PM. In the many years that Minagar & Associates, Inc. has served agencies in the Los Angeles County basin, our firm has never failed to provide sufficient resources to deliver projects on time and at a high standard of quality.

QUALITY ASSURANCE/QUALITY CONTROL APPROACH
Following the NTP issuance, Project Manager, Fred Minagar will provide the City of Huntington Park with a draft quality assurance document outlining our team's traffic operations and capacity improvements (M MINAGAR & ASSOCIATES, INC. 9
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
QA/QC policies, procedures, report preparation and review/revision efforts for the project. The memo will outline the roles and responsibilities of all our team membersincluding PM, technical engineering and planning staff, and supporting personnel—as well as items needed from the City on any given task order or project. The DA report will govern the controls of each project or task moving forward, identify responsibilities of each provided team member, and summarize our QA/QC methodology which we will use to minimize delays in the data collection, evaluation, and properly engage the community as needed. QA/QC measures for this project will include items such as:
• Maintaining a QA checklist with the City.
• Providing adequate time for the City and/or any other community groups or peer reviewers as appropriate, to thoroughly review project materials and deliverables. • Properly translate the City's and citizens' concerns to our technical staff in conducting all traffic engineering analyses, obtaining field-verified information and developing plans and reports to be accessible and functional to all stakeholders.
• Updating the schedule and budgeting plan with accurate milestones. • Thoroughly reviewing data and materials obtained from the City in building baseline conditions, for accuracy and identification of errors prior to our submissions to the City. • Providing internal auditing to any disclose all inconsistencies, inaccuracies, ambiguities and conflicts found during the project.
• Provide any Value Engineering (VE) for areas of possible alternatives and cost savings to the project at each stage.

All work items will be completed in-house and directed through Mr. Minagar, who will provide quality control and assurance before delivering final products) to the City.

Section 7
References
Minagar & Associates, Inc. currently provides traffic engineering services to the following four clients and municipalities in Southern California.

List of References

1. CITY OF COLTON, CA (Has been serving the City of Colton since 1995):

City of Colton
160 South 10th St.

Colton, CA 92324
Mr. Victor Ortiz, PE, Assistant Director of Public Works/City Engineer E-mail: [email protected] Tel: (909)370-5065

2. CITY OF CALABASAS, CA (Has been serving the City of Calabasas since 2003):

City of Calabasas
100 Civic Center Way
Calabasas, CA 91302
Mr. Robert Yalda, P.E., T.E., Public Works Director/City Engineer E-mail: [email protected] Tel: (818)224-1600

3. CITY OF BALDWIN PARK, CA (Has been serving the City of Baldwin Park since 1995):

City of Baldwin Park
14403 East Pacific Ave.

Baldwin Park, CA 91706
MINAGAR & ASSOCIATES, INC. 10
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Mr. David Lopez, PE, Project Manager
E-mail: [email protected] Tel: (626)960-4011, Ext. 458

4. CITY OF CHINO HILLS, CA (Has served the City of Chino Hills Intermittently since 1996):

City of Chino Hills
14000 City Center Drive
Chino Hills, CA 91709
Mr. Joe Dyer, PE, Assistant City Engineer/City Traffic Engineer E-mail: [email protected] Tel: (909)364-2771
Section 8
Schedule and Schedule Control
Minagar & Associates, Inc. has prepared the following project schedule that demonstrates the asks, activities, and deliverables identified in the scope of services. The following project schedule also accounts for reasonable review and feedback periods for draft deliveries by the City.

Proposed Project Schedule by Minagar & Associates, Inc.

PROPOSED PROJECT SCHEDULE
Part Description Year 2022
Task #
Month March April May
NTP = Week 2 3 |4. 5 7 9 10 11 12
Submit Caltrans LAPM Chapter 6 Environmental Procedures • Conduct Scoping Meeting with the City
• Observe and Apply Local Assistance Procedures Manual Chapter 6 1W A • Develop Draft California Environmental Quality Act (CEQA) document • Develop Final Californla Environmental Quality Act (CEQA) document 1W* • Obtain Professional Project Approval and Environmental Design (PA&ED) approval from Los Angeles Metropolitan Transportation Authority's and Caltrans 1W* 2 Survey, Data Collection, Permitting and Regulations
• Observe all laws, rules, and regulations concerning environmental permitting • include ail necessary steps in the project development and permitting provess * 8 WKS
to fully entitle the Project
• Document. design. and incorporate applicable environmental requirements. mitigation measures, NPDES requirements, BMPs, air/water quality, and 8 WKS * erosion/sediment control into Project construction documents as required • Prepare a signed check off list certitying that all environmental clearances/permits (CEOA) have been completed and all mitigation measures have been incoporated into the PS&E
• incorporate all federal. state, and local laws, rules, and regulations concerning Public Works as applicable 1W*
• Arrange and Attend one (1) Scoping/Kick off Meeting 1W* • Arrange and Attend minimum of two (2) Stakeholders/Final Design Meetings 1W 1W A • Arrange and Attend minimum of five (5) City Staff Meetings 1W 1W 1W 1W 1W 1 WK: Within One Week Milestone • Deliverable * Tentative NTP Date Section 9
Fee Schedule/Cost Proposal
The detailed cost estimate for performing specific tasks identified in the RFP is provided in a separate sealed envelope.

MINAGAR & ASSOCIATES, INC. 11
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Appendix A:

Minagar & Associates, Inc. Additional SOQ
(M MINAGAR & ASSOCIATES, INC.

Introduction to Minagar & Associates, Inc. Founded in Irvine, California in 1993...

MINAGAR & ASSOCIATES, INC. • Nationwide:
• 4 Projects for the Federal Highway Administration
• Central & Northern California: 29 Years of Excellence EIR/EIS/EA Projects
• Ohio:

Traffic Impact Reports/Analyses Projects 1 Signal Optimization Project Parking Studies • Washington:

TDM Projects • 2 EIR/EIS/EA Projects
. 1 Traffic Impact Report/Analysis Project • New York:

Transportation Planning Projects
7 Computer Simulation Projects 3 EIR/EIS/EA Projects
• 550 Synchronized/Retimed Signals • Oregon: • 4 Traffic Impact Reports/Analysis Computer Modeling Projects 1 EIR/EIS/EA Project Projects 16 Signal Timing & Optimization Projects • 1 Traffic Impact Report/Analysis Project • 1 Toll Road/Financial Study Project 10 System Evaluation Projects 4 Traffic Engineering Projects 5 Construction Management/Inspection/ • Idaho: 1 Traffic Control Plan Project Installation Projects • 1 EIR/EIS/EA Project 1 Signing & Striping Project Teaching & Training Projects • 1 ITS Proiect
• 1 Traffic Impact Report/Analysis Project
6 "Before" & "After" Studies
11 ITS Projects • Massachusetts:
4 PS&E Projects • 1 Computer Modeling -
Subway Transit Project
• Southern California:
15 EIR/EIS/EA Projects
88 Traffic Impact Reports/Analyses Projects • Connecticut:
43 Parking Studies • 1 Signal Design Project
25 Transportation Planning Projects
23 System Evaluation Projects • 1 Interconnect Design Project 18 Municipal Engineering Projects
41 Traffic Engineering Projects • New Jersey:
4 Traffic Management Plan Projects 1 Traffic Impact Report/ Analysis • 747 Synchronized/Retimed Signals Project
2 TDM Projects 1 Toll Road/Financial Study Project
17 Computer Modeling Projects 1 Computer Modeling Project 8 Rail Transit Projects 1 PS&E Project
3 Seaport Projects 2 Traffic Engineering Projects
1 Airport Project • 1 Port Project
13 Toll Roads/Financial Studies Projects
34 Signal Timing Projects • Washington, D.C.:
21 Signal Optimization Projects • 1 Signal Timing & Optimization 59 Signal Design Projects Project
31 Interconnect Design Projects
71 PS&E Projects : 1 ratic Engineering Project
22 Traffic Signal Systems Design Projects
15 Computer Simulation Projects
• Virginia:
• 28 Construction Management/Inspection/ • Hawaii: • Louisiana:

Installation Projects • 1 Traffic/Civil 1 Traffic Engineering Project 1 Traffic Impact Report/Analysis • 1 Signal Timing & Optimization • 110 Teaching/Training Projects Engineering Project 1 Toll Road/ Financial Study 25 Traffic Control Plan Projects Project
1 Traffic Engineering Project
23 Signing & Striping Plan Projects 1 Signal Design Project 8 Speed Survey Projects • Colorado: 1 PS&E Project
1 Toll Road/Financial • New Mexico: • Florida: • 2 ITS Projects 43 "Before" & "After" Studies • 1 Traffic Engineering Project 1 Parking 28 ITS Projects Study Project
• North Carolina:
• People's Republic of China: • South Korea: • 2 Traffic Impact Reports/Analysis • Kingdom of Saudi Arabia Projects
• 5 ITS/Traffic Training Projects • 1 ITS/Traffic Training Projects • 1 ITS/Traffic/Parking Project • 1 Computer Modeling Project
MINAGAR & ASSOCIATES, INC.
29 Years of Excellence
TTS: TraFie

CORPORATE SUMMARY
Minagar & Associates, Inc. is a professional Traffic Engineering, Transportation Planning & Intelligent Transportation Systems (ITS), firm based in Irvine, CA. Since its inception in 1993, over 23 years ago, the firm has completed over 300 traffic engineering projects in 11 counties and 76 cities in the State of California alone, as well as 16 other states from Hawaii to New York. Successful completed projects have comprised:
42 ITS Projects;
123 Transportation Planning Projects & Traffic Studies; 249 Signal Design Projects;
16 Construction Engineering Management (CEM) Projects;
47 Parking Studies;
25 EIS/EIR Projects;
25 Traffic Control Plans (TCP);
77 Traffic Signal, ITS, Interconnect PS&E Projects
1,600+ Synchronized & Retimed Signals
The firm is recipient to numerous, local, regional, state, national as well as international awards, such as:

Cal-EPA/California Air Resources Board's 2012 Cool California Climate Leader ASCE's 2009 Outstanding Private Sector Civil Engineering Project in Metropolitan Los Angeles • Caltrans' State Route 66 Adaptive Traffic Signal Control System Project Caltrans' 2009 Excellence in Transportation Award
• Caltrans' State Route 66 ATCS Project
ASCE's 2007 Outstanding Public/Private Sector Civil Engineering Project in Metropolitan Los Angeles • Intelligent Transportation Management System (ITMS) & Traffic Signal Interconnect for Metro and the City of Santa Clarita
APWA's 2005 Best Traffic Congestion Mitigation Project of the Year in Southern California • L.A. County Metro/City of Palmdale's Avenue R (ITS) Traffic Signal & Fiber-Optic Interconnect Projects
CA-ITS 2002 Award of Excellence for the Best California Return on Investment • Traffic Signal Synchronization of 121 City of Modesto, County & Caltrans Traffic Signals in Northern California
MINAGAR & ASSOCIATES, INC.

Representative Private Sector Clients Tree
29 Years of Excellence
Bankof America
BDEINE
Centex
Sele
LOCKHEED THE IRVINE COMPANY 5 SunCal Companies
MARTIN Pulte
NRDC • Washington Mutual ADVANCEREAUTYCOLLEGEZ
Hooday 9rn
Haver Deve opment Company Inc. MAY Centen EXPRESS
St. Nicho Experian
BLACK & VEATCH!
McMillin Commercial
ite=
ALTSHULER BERZON LIT Valley Crest
SUBWAY Chevron RITE On Want

AID MBK HOMES

FLUOR DANIEL TARGET

WPERMARELT
76 Hilton Booz | Allen | Hamiltoni SHOPKINS

BAY HARBOUR

MANAGEMENT
ARCO Congs Druga HOME
TrammellCrowCompany PRESS TELEGRAM LOFTS
Raytheon
January 1. 2016
MINAGAR & ASSOCIATES, INC.

Representative Public Clients Tree
29 Years of Excellence

CITYOR INIMONE
LADOT
SAN GABRIEL VALLEY Maving LA Forward
•. City of Industry
Metro
America's - Best
Federal Highway
Administration
January 1, 2016
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
MUNICIPAL ENGINEERING, TRAFFIC ENGINEERING, TMP, TCP, SIGNING & STRIPING PLANS and SPEED SURVEY PROJECTS Project Location
Municipal Engineering Traffic Engineering Traffic Management Traffic Control Pian (TCP) Signing & Striping Plan Engineering & Traffic "Speed" Survey Plan (TMP)
• Traffic Control Plans for Castaic Lake Water Company's Main Station & Pipelines Santa Clarita, CA • Stop Sign Installation Design for Olive/Phelan/Blecker Baldwin Park, CA + 2004 Citywide Radar Speed Survey (Engineering & Traffic Survey) for 54 Locations Baldwin Park, CA + Warrant Assessment for the Installation of a New Traffic Signal at Willow Ave./Badillo St. Baldwin Park, CA • Traffic Signal Installation Warrant Assessment for a Private Driveway at 47th St. E. Palmdale, CA • Warrant Assessment for a Left-Turn at Ave. K & 32nd St. West for Fieldstone Communities Lancaster, CA • Investigating Traffic Signal Operations Malfunctions for 2 Signals along Reche Canyon Colton, CA • City of Irvine's FY 2004-2007 On-Call Consulting Services Irvine, CA • Traffic Control Plans for the Sandhill 30" Raw Water Conveyance Pipeline Rialto, CA • Signing & Striping and Traffic Control Plans for 1 New Signal & 2 Signal Modifications San Clemente, CA • Traffic Signal Warrant Assessment for Stewart at Baldwin Park Blvd. Baldwin Park, CA • Signing and Striping and Traffic Control Plans for Boeing's Douglas Park Development Long Beach & Lakewood, CA • Signing & Striping Plans, Speed Humps & Speed Limit Assessment, Palmilla Gated Community Laguna Niguel CA • Traffic Control Device Design for City's Transfer Station & Signal Warrant Assessment for Puente at Cummings Baldwin Park, CA * Signing & Striping Plans for 1,300' on Heacock Street Moreno Valley, CA + Signing & Striping and Traffic Control Plans for VTT # 16595 at Lake View & Bastanchury Yorba Linda, CA * Restriping Plan for the Traffic Signal Modification of Protected Left-turn Lane Colton, CA • Traffic Control Plans for the Ultimate Street Improvements of Perris Valley 96" Pipeline Riverside & Riverside County, CA • Interstate 10 FRWY & Baldwin Park Bivd. Queuing & Traffic Analysis Baldwin Park, CA • Traffic Signal Timing Chart for Baldwin Park Bivd. & Foster Baldwin Park, CA • Traffic Control Plans Preparations for Brea Canyon Road Diamond Bar, CA • Stop Sign Installation Warrant Assessment Rancho Santa Margarita, CA • Traffic Control Plans Preparations for Harbor Bivd. & Westminster Bivd. Garden Grove, CA Santa Ana, CA
January 1,2018
Sheet 1 of 4
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
MUNICIPAL ENGINEERING, TRAFFIC ENGINEERING, TMP, TCP, SIGNING & STRIPING PLANS and SPEED SURVEY PROJECTS Project Location
Municipal Engineering Traffic Engineering Traffic Management Traffic Control Plan (TCP) Signing & Striping Plan Engineering & Traffic "Speed" Survey Plan (TMP)
• Truck Route Feasibility Study for Vulcan Materials Plant Baldwin Park, CA + Sight Distance Assessment for the Proposed Sign Installation at Hacienda Rd. & Whittier Bivd. La Habra, CA • Left-Turn Lane Feasibility Assessment for Garvey & Lee for a New Starbucks South El Monte, CA • Restriping Plans for a New AutoZone at Sunnymead Bivd. and Graham St. Moreno Valley, CA • Conducting 2 Stop Signs Installation Assessment at Olive/Center & Center/Benbow Baldwin Park, CA • Traffic Signal/Stop Sign/Flashing Beacon Warrant Assessment for Maine/Ohio Baldwin Park, CA • U-Tum Feasibility Assessments for 2 Locations along Valley Blvd. at Rancho & 3rd Colton, CA • Crystal Cove/Newport Coast's Stop Sign Assessment for Reef Point Dr. at Canyon Club Dr. Newport Coast, CA • Signing & Striping Plans for 18,000 LF of Roadways for 500 Now Pulte Homes Riverside County, CA • Ave. L & 10th St. W. Signing & Striping and Traffic Control Plans Lancaster, CA • Traffic Control Plans for Newport Coast Community Center at Newport Coast Drive Nowport Beach, CA • Perris Valley 48" Water Pipeline Traffic Control Plans along 13,000° of Cactus Ave. for MWD & EMWD Moreno Valley, CA • Traffic Signal Warrant Assessment for Olive St. & Landis Ave. Baldwin Park, CA • Traffic Design Investigation for Barton/La Cadena Colton, CA • Signing & Strping Plans for 1,400 LF of Lake Forest Dr. Extension Irvine, CA + Signing & Striping Plans for 1,400 LF along State Highway 111 for Desert Cities Industrial Park Riverside County, CA • Traffic Control Plans for MWD's 96" Perris Valley Pipe Line between I-215 & Mission Grove Riverside & Riverside County, CA • Citywide Speed Survey 1l Rancho Santa Margarita, CA
• Via Regresso & Via Arribo Traffic Evaluation Rancho Santa Margarita, CA + City of Rancho Santa Margarita Speed Limit Sign Inventory Rancho Santa Margarita, CA • Engineering & Traffic Survey for Los Flores Rancho Santa Margarita, CA • Crosswalk Assessment at the City of Rancho Santa Margarita Beach Club Rancho Santa Margarita, CA • Traffic Control Plans for Irvine Water Ranch District's Dyer Road Facility Santa Ana, CA • Redondo Beach's Engineering & Traffic Survey for 12 Corridors Redondo Beach, CA Sheet 2 of 4
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
MUNICIPAL ENGINEERING, TRAFFIC ENGINEERING, TMP, TCP, SIGNING & STRIPING PLANS and SPEED SURVEY PROJECTS Project Location
Municipal Engineering Traffic Engineering Traffic Management Traffic Control Plan (TCP) Signing & Striping Plan Engineering & Traffic "Speed" Survey Plan (TMP)
• Design of an All-Way Stop Sign, Median and Pavement Striping & Signage for Olive/Landis Baldwin Park, CA • Traffic Study for Press-Telegram's Magnolia Ave./ 6th St. Long Beach, CA • Internal Signing & Striping Plans for Irvine Company's Planning Area-18 North Development Irvine, CA • Signing & Striping Plans for Irvine Company's Panning Area 18 South Development Irvine, CA • Traffic Control Plans for Cactus Ave. 48" Feeder Pipeline under I-215 Interchange Moreno Valley, CA • Hawall's Queen Kaahumanu Highway (19) & Kohanaiki Way's Guard Rail Assessment North Kona, HI + Traffic Control Plans for WMWD's Meridian Sewer Pipes along Alessandro Rd. & Sycamore Canyon Bivd. Riverside & Riverside Cty., CA • Traffic Control Plans for Sandhill Water Treatment Plant for the Proposed 8" Sewer Lines Rialto, CA • Traffic Control Plans for WMWD's Riverside-Corona Feeder 54" Water Pipeline on Van Buren Bivd. Riverside, CA • Consulting Traffic Engineering for Avenue R & 5th Street East Intersection Improvement Palmdale, CA • Traffic Control Plans for Vintage Shores Sr. Apartments on Camino De Estrella San Clemente, CA • Traffic Control Plans for Neilson Way for Water & Sewer Lines Repair Santa Monica, CA • Traffic Control Plans for Huntington Beach's Central Park & Sports Complex Huntington Beach, CA • Traffic Signal & Stop Sign Warrant Assessment for 11 Locations Baldwin Park, CA • Engineering & Traffic Survey Including 9 Radars for 3 Corridors Redondo Beach, CA • Preparing Signing & Striping Plans for Alta Vista & Copper Hill Los Angeles County, CA • Governor's Island Ferry Stacking for the U.S. Coast Guard Manhattan, NY • Interstate 80/River Drive Interchange Preliminary Engineering Northern NJ • Cross Westchester Expressway (I-287) From Route 120 to I-95 Westchester County, NY • Traffic Evaluation of the Causeway-Earhart Interchange New Orleans, LA • Capital Beltway (I-495) Springfield Interchange Traffic Improvements Washington, DC • 1-287/New York Thruway/Route 17 Interchange Design Improvements New York & New Jersey • Broadway Final Design Traffic Evaluation for NYCDOT New York, NY • Virginia Beach's Atlantic Anenue Traffic Study Virginia Beach, VA Sheet 3 of 4
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
MUNICIPAL ENGINEERING, TRAFFIC ENGINEERING, TMP, TCP, SIGNING & STRIPING PLANS and SPEED SURVEY PROJECTS Project Location
Municipal Engineering Traffic Engineering Traffic Management Traffic Control Plan (TCP) Signing & Striping Plan Engineering & Traffic "Speed" Survey Plan (TMP)
• City Traffic Engineering/Municipal Engineering Services Colton, CA • City Traffic Engineering/Municipal Engineering Services Baldwin Park, CA • City Traffic Engineering/Municipal Engineering Services Rancho Santa Margarita, CA + City Traffic Engineering/Municipal Engineering Services Chino Hills, CA • On-Call Traffic Engineering Services Palmdale, CA
• Caltrans District 12's Interstate 5 & State Route 55 Flyover TMP & TCP Santa Ana, CA • MTA's Evaluation of RSTI Projects for 7 Agencies Los Angeles County, CA • Conducting Signal & Stop Sign Warrant Assessments for 16 Locations Baldwin Park, CA • Assessment of Right-Turn-On-Red for Baldwin Park Bivd. & Dalewood Avonue Baldwin Park, CA • Peyton Avenue Restriping & Resigning Plans Preparation Chino Hills, CA • Ruben Ayala High School Internal Circulation Study Chino Hills, CA • Traffic Control Plans for PCH Sower Lines Repair & Permit Application for Caltrans D-7 Santa Monica, CA • Santa Monica Pier's Parking Striping Plans Santa Monica, CA • Experian Corporation HQ Signal Warrants & Queue Studies- Anton Avenue Costa Mesa, CA • City of Tustin's Main Street Water Facility- Traffic Control Plans Tustin, CA • On-Call Traffic Engineering/Traffic Control Plans for Anaheim Water Department Anaheim, CA • St. Nicholas Parish Traffic Signal Warrant Study Laguna Woods, CA • Citywide Speed Survey for 5 Major Arterials- Phase I Rancho Santa Margarita, CA + Long Beach Freoway (710) NB Off-ramp at Imperial Highway Traffic Signal Warrant Assessmenti • Traffic Signal Modification Assessment for 7th St. & La Cadena Colton, CA • San Bernardino Freeway (I-10) WB Off-ramp at 9th St./ Valley Traffic Study Colton, CA • McBean Parkway & Baywood Lane Signing & Striping Plan Santa Clarita, CA • Corona Industrial Park Traffic Signal Warrant & Trip Generation Assessment Corona, CA Sheet 4 of 4
> 23 Years of Excellence <
MINAGAR & ASSOCIATES, INC.'S
40 Engineering and Traffic Survey (E&TS) Project Experience Roadway
Agency Year Segments
City of South Pasadena 2014-15 60
City of Santa Fe Springs 2014 115

3. City of Colton 2013-14 44

4. City of Culver City 2013 70

5. City of Lawndale 2013 22

6. City of South Pasadena 2012 5

7. City of San Marino 2011 59

8. City of South Pasadena 2010 6

9. City of Manhattan Beach 2010 51

10. City of Santa Fe Springs 2009 115

11. City of Baldwin Park 2009 54

12. City of Rancho Santa Margarita 2004

13. City of Baldwin Park 2004 54
MADE N

14. 11 I City of Redondo Beach 2003 57
redonde

15. 4. City of Rancho Santa Margarita 2000 36
759 Total Radar Speed Zone Segments Surveyed
15 Engineering and Traffic Surveys (E&TS) Completed
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

EIS, EIR, EA, TRAFFIC IMPACT REPORTS, PARKING STUDIES, TDM, TRANSPORTATION PLANNING, COMPUTER MODELING, AIRPORT, SEAPORT, RAIL TRANSIT and TOLL ROADS/ FINANCIAL STUDIES PROJECTS Project Location Traffic Impact Report/Analysis Tolf Roads/Financial Studies Parking Study Transportation Planning Computer Modeling EIR/EIS/EA Rail Transit Airport Seaport
TDM
• Massachusetts Bay Transit Authority's Red Line Transit Computer Modeling Boston, MA • Drew University Campus Expansion Development Los Angeles, CA + North San Diego County Future Urbanizing Area Traffic Study San Diego, CA • Paularino Medical Center, Parking Study, CUP & Variance Applications Costa Mesa, CA • Grown Valley PKWY DEIR Across the Arroyo Trabuco in Orange County Orange County, CA • Traffic Circulation & Parking Assessment for Margaret Landell School Cypress, CA • Los Angeles Grand Sports Arena/Concert Hall for Los Angeles Clippers Los Angeles, CA • Interstate 10 FRWY & Baldwin Park Blvd. Queue & Traffic Analysis Baldwin Park, CA • Lockheed Martin Aircraft Facility Plant Traffic Study Palmdale, CA • Lockheed Martin Master Plan EIR Palmdale, CA
+ Modesto's "J" Street Traffic Improvements Including Roundabouts Computer Modeling Modesto, CA •Woadbridge Development's Heath Terrace Parking Study & Variance Application Anaheim, CA • Chrysler Corporation's Countywide Auto Delership & Sarvice Center Garden Grove, CA • Honali Plaza Parking Study, Varlance & CUP Applications Laguna Hills, CA Washington Mutual Bank's El Toro Site Parking Study, CUP & Variance Applications Laguna Hills, CA • Washington Mutual Bank's El Toro Site Parking Study, CUP & Variance Applications Laguna Woods, CA Sunshine Bookstore Parking Inventory & Study Mission Viejo, CA * Experian Corporation HQ Development Traffic Impact Study Costa Mesa, CA + Serra Catholic School Traffic Impact Report Review Rancho Santa Margarita, CA The Gallery Traffic Impact Report San Clemente, CA
• Calabasas Volvo Delership Traffic Impact Study Calabasas, CA * Review of Draft Traffic Impact Report for the Port of Los Angeles' West Basin Los Angeles, CA • Los Angeles Worid Airports' Palmdale Airport Master Plan Traffic Engineering & System Planning Palmdale, CA laruary 1, 2010 Sheet 1 of 7
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

EIS, EIR, EA, TRAFFIC IMPACT REPORTS, PARKING STUDIES, TDM, TRANSPORTATION PLANNING, COMPUTER MODELING, AIRPORT, SEAPORT, RAIL TRANSIT and TOLL ROADS/ FINANCIAL STUDIES PROJECTS Project: Location Traffic Impact Report/Analysis
Parking Study Transportation Planning Computer Modeling Volt Roads Financial Studiec EIR/EIS/EA Rail Transit Airport Seaport
TDM
• 3 Million SF Rye Canyon Business Park North & South Campuses Santa Clarita, CA • Lockheed Martin Traffic Impact Analysis Palmdale, CA
• Rye Canyon Business Park North Campus TIR Santa Clarita, CA • First Congregational Church of Long Beach Parking & Circulation Study Long Beach, CA * Tesoro Development's Traffic Analysis & Signal Warrant Los Angeles County, CA + Bodies-In-Motion Parking Study & CUP Application Laguna Hills, CA • Trammell Crow Company's Development in Corona Corona, CA • SunCal's Tesoro Development Impact Fee Assessment Los Angoles County, CA • Quartz Hill Traffic & Fee Impact Studies Palmdale, CA • Legacy's Tentative Tract # 51828- South Campus Santa Clarita, CA • Consulting Services for Metrolink Railroad Cossings & Signal Pre-emption Palmdale, CA • Providing Traffic Monitoring for Rye Canyon Business Park Santa Clarita, CA • Wal-Mart Corporation's Traffic Impact Report for Rye Canyon Business Park Santa Clarita, CA • Assessment of Fair Share Traffic Impact Fees for West Corona Business Park Corona, CA • Chrysler Corporation's Dodge Delership Traffic Impact Lompoc, CA • Caltrans AB-680 Highway 118-126 Toll Road Los Angeles/Ventura, CA • Leisure World/Laguna Woods Village Access Control Gate 16 Traffic Study Laguna Woods, CA • Chevron South Pasadena Gas Station & Convenience Store Traffic Study South Pasadena, CA • Identification of Funding STIP & CIP Programs for Metrolink/ SCRRA Southern California, CA • City of Villa Park Parcel Map No. 97-232 Sight Distance Evaluation Villa Park, CA • Palmdale Airport Plaza Traffic Impact Report Palmdale, CA • Village Court Yard at Camino Real Shopping Center Traffic Impact Report San Cemente, CA City of Chino - State Surplus Property Disposition at College Park Chino, CA Sheet 2 of 7
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
Project Location Traffic Impact Report/Analysis Toll Roads/Financial Studies Parking Study Transportation Planning Computer Modeling EIR/EIS/EA Rail Transit Airport Seaport
TDM
• City of Irvine's FY 2004-2007 On-Call Transportation Services Irvine, CA • Metrolink's Application, Railroad Pre-emption & Signal Timing for Garvey & Francisquito Baldwin Park, CA + Rite-Aid Shopping Center / Halferty Development Traffic Impact Study Palmdale, CA • Vallarta Shopping Center Traffic Impact Study at NEC of State Route 138 and Ave. R Palmdale, CA • Lake Elsinore View Estates 70-Acre, 174 Homes Traffic Impact Analysis Lake Elsinore, CA • Los Jardines Shopping Center & Market Place Traffic Impact Analysis Bell Gardens, CA • ABT-Haskell Biosolids & Green Waste Composting Facility at Agua Manza Rd. Traffic Impact Study Colton, CA • Tom's Restaurant #27 Shopping Center Traffic Impact Study at SWC of State Route 138 and Ave. R Palmdale, CA • Traffic Analysis for Lake Forest Center's Now Retail Center with Starbucks & Subway Restaurants Lake Forest, CA • Traffic Analysis Report for Two (2) Residential Tracts Along K-4 between 30th St. & 40th St. West Lancaster, CA • Kalama Developments' Banquet Hall/Meeting & Night Club TIR & Fair Share Analysis Colton, CA • Corona Industrial Park Trip Generation & Traffic Signal Warrant Assessment Corona, CA • Technical Memo for WB Left-Turn Allowance on Imperial Hwy. & Duncan Lynwood, CA • Chevron Service Station & Convenience Store Traffic Analysis South Pasadena, CA + Westchester Lutheran School Traffic Study Litigation Evaluation Los Angeles, CA • 76 Convenience Store & Service Station Traffic Impact Study near Escondido County of San Diego, CA • Forest Center Plaza Left-Turn Stacking Analysis/Computer Simulation Traffic Analysis Lake Forest, CA • Jack-In-The-Box & Gas Station Development Traffic Study Review Irwindale, CA + Rite-Aid Technical Memo of Traffic Analysis for Caltrans D-7 & City of Palmdale at State Route 138 & Ave. R Palmdale, CA * Mar Vista Community EIS Review for Santa Monica City Attorney Santa Monica & Los Angeles, CA • Sycamore Canyon Business Park Traffic Impact Report Riverside, CA • Left-Turn Vehicle Queuing Analysis & Computer Modeling for Forest Plaza Center Lake Forest, CA • Parking Analysis for Proposed 2024-2025 Ventura Bivd. Development Camarillo, CA Sheet 3 of 7
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

EIS, EIR, EA, TRAFFIC IMPACT REPORTS, PARKING STUDIES, TDM, TRANSPORTATION PLANNING, COMPUTER MODELING, AIRPORT, SEAPORT, RAIL TRANSIT and TOLL ROADS/ FINANCIAL STUDIES PROJECTS Project Location Traffic Impact Report/Analysis
Parking Study Transportation Planning Computer Modeling Toll Roads/Financial Studies EIR/EIS/EA Rail Transit Airport Seaport
IDM:
• Lone Hill Plaza / Route 66 Promenade Center Parking Survey for Bank of America, Del Taco, Starbucks & etc. Glendora, CA • Starbucks Coffee & Subway Stores Left-Turn Pocket Analysis at Dimension & Lake Forest Dr. Lake Forest, CA Now Advance Beauty College Parking Utilization Study Santa Ana, CA ARCO Convenience Store/Service Station & Truck Stop Traffic Impact Study for Caltrans & Los Angeles County Castaic, CA • Parking Study for Proposed Village at Mission Lakes/Paradise Springs Desert Hot Springs, CA * 500,000-SF Palmdale Gateway's Home Depot & Target Shopping Center TIS & EiR for Caltrans & City of Palmdale Palmdale, CA • Starbucks Left-Turn Lane Feasibility Assessment at SR-19 & Rosemead Bivd. & Garvey South El Monte, CA • Traffic Engineering/Transportation & Parking Planning Services for New Kiddie Academy Irvine, CA • Traffic Engineering Services for Sunshine Canyon Landfill EIR Los Angeles County, CA • New DMV Traffic Assessment at Sycamore Canyon Bivd. & Sierra Ridge Riverside, CA • Traffic Study for I-10 Freeway at Pepper Ave. & Valley Bivd. Colton, CA Review of Gateway Specific Plan Report for Laguna Niguel Mayor & City Council Laguna Niguel, CA • Loma Linda Korean Seventh Day Adventist Church Traffic Impact Study San Bernardino County, CA • Mountain Meadows/l-15 Regional Shopping Center Traffic Analysis & TIF for McMillin Commercial San Diego County, CA • Lancaster Baptist Church & West Coast Baptist College Traffic Study Lancaster, CA • SR-57/60 Interchange Improvement Feasibility Study Traffic/Transportation/ROW Engineering Diamond Bar & Industry, CA • Hanaro Church Development Traffic Study & Parking Study at English Rd. & Peyton Drive Chino Hills, CA • Traffic Study for 136 Tract Homes for APN # 510-010-08 & -07 Ridgecrest, Kern County, CA • Rancho Vista Bivd. (Ave. P) Grade Separation Computer Modeling & Traffic Analysis Palmdale, CA + Friendly Hills Association Traffic Study & Survey for 16107 Aurora Crest Drive Whittier, CA • 1-10 Freeway / Valley Bivd. / Mt. Vernon Queue Lengths Traffic Investigation Colton, CA • 56 Sycamore Canyon 316,225-SF Industrial Park Traffic Impact Study Riverside, CA Sole Technology's 20161 & 20162 Windrow Dr. and 26921 Fuerte Dr. Parking Study & Survey (3 Buildings) Lake Forest, CA Sheet 4 of 7
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

EIS, EIR, EA, TRAFFIC IMPACT REPORTS, PARKING STUDIES, TDM, TRANSPORTATION PLANNING, COMPUTER MODELING, AIRPORT, SEAPORT, RAIL TRANSIT and TOLL ROADS/ FINANCIAL STUDIES PROJECTS Project. Location Traffic Impact Report/Analysis Toll Roads/Financial Studies Parking Study Transportation Planning Computer Modeling EIR/EIS/EA Rail Transit a roora seaport
TDM
• State Route 33 Diamond Rock Sand/Gravel EIR Transportation Planning Study & Review Ojai / Ventura County, CA + West Palmdale Residential Complex Traffic Study for Palmdale & L.A. County at 10th St. W. / Auto Center Dr. Palmdale, CA + SR-74/Ortega Highway Widening MND & Traffic Study Review San Juan Capistrano, CA • Bethel University/Seminary Traffic Study; CUP # 88-0277 at 6116 Arosa St. San Diego, CA • Press-Telegram Mixed-Use High Rise Lofts Development Traffic Study Long Beach, CA + May Center's Plaza Vallarta Development Traffic Study for Caltrans D-7 & City of Palmdale Palmdale, CA • Griffith Park's Autry Natonal Center DEIR Review of Traffic Section Los Angeles, CA + Longs Drugs Retail Center Development Traffic Study for CUP# 07-11 at 20th St. W. & Ave. K Palmdale & Lancaster, CA • Grand Plaza 87,560-SF Retall Center Traffic Impact Study Glendora, CA • Hilton Hotel Traffic & Parking Study at 17662 Armstrong Avenue Irvine, CA Lynwood, CA
+ Child Day Care Traffic & Parking Study at 1700 West La Habra Blvd. La Habra, CA • Rite-Aid Development Traffic Study for Caltrans D-7 & City of Palmdale Palmdale, CA * Korean Presbyterian Church of America & Theological Seminary Traffic Study Santa Fe Springs, CA • Vallarta Shopping Center 107,360 SF Development Traffic Impact Study for Caltrans D-7 & City of Palmdale Palmdale, CA • Lone Hill Plaza Traffic Queuing & Circulation Assessment for a New Starbucks Glendora, CA • Randolph Village Shopping Center Parking Survey & Study Delano, CA • Denver 470 Toll Revenue Study for Engineer 470 Partnership Denver, CO + New Jersey Turnpike Widening Transportation & Toll Plaza New Jersey State, NJ • North Carolina State University Campus Expansion Raleigh, NC • Tampa's Ybor City Historic District Parking Study Tampa, FL • Peter's Landing- Huntington Beach Parking Study Huntington Beach, CA • City of Sacramento's Local Area Transportation/Parking Supply/Demand Studies Sacramento, CA Sheet 5 of 7
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

EIS, EIR, EA, TRAFFIC IMPACT REPORTS, PARKING STUDIES, TDM, TRANSPORTATION PLANNING, COMPUTER MODELING, AIRPORT, SEAPORT, RAIL TRANSIT and TOLL ROADS/ FINANCIAL STUDIES PROJECTS Project Location Traffic Impact Report/Analysis
Parking Study Transportation Planning Computer Modeling Toll Roads/Financial Studies EIR/EIS/EA Rail Transit Airport Seaport
TDM
* GWF's Five Power Plants Traffic Impacts in the Bay Area Air Quality Management District Contra Costa County, CA • Somerset County's Landfill & Bellemead Development Montomery Township, NJ •Riis Park Aquatic & Athletic Complex- National Recreation Area NY & NJ New York, NY • Port Liberte (Caven Point) Traffic Impact Study
+ Crossroads Park Shopping Center Raleigh, NC
• Lehman's Shopping Plaza Long Island, NY
• Packard/Bambergers Traffic Impact, Cost Estimating & Alternatives Studies Hackensack, NJ • North Carolina State University Campus Expansion Raleigh, NC • North Main Street Grade Separation Draft Traffic Analysis & Preliminary Conceptual Design • California Plaza Office Development
+ Arden-Arcade LATS Parking Alternatives for Exposition Center Sub-Area • Local Area Transportation Study Forecast Model for Arden-Arcade • California Exposition Center Expansion Draft EIR & Traffic Impact Study • Arden-Fair Mail Expansion: Fourth Anchor Tenant Traffic Impact & EIR • Transportation Improvement Program for Arden-Arcade LATS • Columbia River Salmon Flow Measures Draft EIS
• 10 Million SF Hunters Point Waterfront Development EIS • Evaluation of the Causeway-Earhart Interchange for Greater New Orleans Expressway Commission • U.S. Army Depot TMP Preparation Including Reg. XV Implementation •
• Los Angeles County's Municipal Court EIR
• Los Angeles County's San Gabriel Reservoir's Environmental Study • Columbia University's Audubon Research Park's PDEIS
• Lower Snake Comensation Plan Environmental Assessment (EA) & Traffic Study ID, OR & WA Sheet 6 of 7
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

EIS, EIR, EA, TRAFFIC IMPACT REPORTS, PARKING STUDIES, TDM, TRANSPORTATION PLANNING, COMPUTER MODELING, AIRPORT, SEAPORT, RAIL TRANSIT and TOLL ROADS/ FINANCIAL STUDIES PROJECTS Přoject Location Traffic Impact Report/Analysis Toll Roads/Financial Studies Parking Study Transportation Planning Computer Modeling EIR/EIS/EA Rail Transit Airport Seaport
TDM
• Port of San Diego's Redevelopment of the B-Street Pier San Diego, CA • Metrolink Commuter Rail System's Traffic Engineering & Design Los Angeles, CA • Metrolink's Traffic Engineering & Design for Chatsworth Train Station & Lassen Grade Crossing Chatsworth, CA • Metrolink's North Main Street Grade Separation Traffic & Preliminary Design Los Angeles, CA * Metrolink's Maintenance Facility Access Road Traffic Analysis Los Angeles, CA • Metrolink's Upland & San Bernardino Train Stations Local Street Improvements Upland & San Bernardino, CA • Port of Long Beach's SCAQMD Emission Control Improvement at Port's Roadway Long Beach, CA • City of Palmdale's Traffic Impact Fee Assessment & TRANPLAN Modeling Palmdale, CA • • Route 24 Expansion Traffic Study Utilizing UTPS Computer Model Morristown, NJ Sheet 7 of 7
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

TRAFFIC CONTROL PLANS (TCP) & CONSTRUCTION SUPPORT PROJECTS Project Location
Traffic Engineering Traffic Management Traffic Control Plan (TCP) Signing & Striping Plan Plan (TMP)
• TCP for Castaic Lake Water Company's Station & Pipelines Santa Clarita, CA • Ave. L & 10th St. W. Signing & Striping and TCP Lancaster, CA • TCP for Newport Coast Community Center at Newport Coast Drive Newport Beach, CA • Perris Valley 48" Water Pipeline TCP along 13,000* of Cactus Ave. for MWD & EMWD Moreno Valley, CA • TCP for MWD's 13,000 Feet Perris Valley 96", 98" & 109" Water Pipeline between I-215 & Mission Grove Riverside City & Riverside County, CA • TCP for WMWD's Riverside-Corona Feeder 54" Water Pipeline on Van Buren Blvd. Riverside, CA • TCP for Cactus Ave, 48" Feeder Pipeline under I-215 for Caltrans District 8 Moreno Valley, CA • Caltrans District 12's Interstate 5 & State Route 55 Flyover TMP & TCP Santa Ana, CA • TCP for the Sandhill 30" Raw Water Conveyance Pipeline Rialto, CA • Signing & Striping and Traffic Control Plans for 1 New Signal & 2 Signal Modifications San Clemente, CA • Traffic Control Plans for PCH Sewer Lines Repair & Permit Application for Caltrans District 7 Santa Monica, CA • Signing & Striping and Traffic Control Plans for Boeing's Douglas Park Development Long Beach & Lakewood, CA • TCP for WMWD's Meridian Sewer Pipes along Alessandro Rd. & Sycamore Canyon Bivd. Riverside City & Riverside County, CA • TCP for Sandhill Water Treatment Plant for the Proposed 8" Sewer Lines Rialto, CA • City of Tustin's Main Street Water Facility- Traffic Control Plans Tustin, CA • TCP for Huntington Beach's Central Park & Sports Complex Huntington Beach, CA • Restriping Plan for Traffic Signal Modification & Street Improvements at Bastanchury Rd./Lakeview Ave. Yorba Linda, CA • Traffic Control Plans Preparations for Brea Canyon Road Diamond Bar, CA January 1,2016
Sheet 1 of 2
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

TRAFFIC CONTROL PLANS (TCP) & CONSTRUCTION SUPPORT PROJECTS Project Location Traffic Control Plan (TCP)
Traffic Engineering Traffic Management Signing & Striping Plan Plan (TMP)
• Irvine Ranch Water District's Dyer Road Facility TCP Santa Ana, CA • Governor's Island Ferry Stacking for the U.S. Coast Guard Manhattan, NY Garden Grove, CA
+ Traffic Control Plans for Harbor Blvd. & Westminster Bivd. Santa Ana, CA • TCP for Vintage Shores Senior Apartments on Camino De Estrella San Clemente, CA • TCP for Neilson Way for Water & Sewer Lines Repair Santa Monica, CA • Temporary Traffic Signal Modification Design for MWD & WMWD's Perris Valley Pipeline Construction Riverside, CA Sheet 2 of 2
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
Other Support Services

CIVIL ENGINEERING, CONSTRUCTION ENGINEERING MANAGEMENT, CONSTRUCTION INSPECTION, GRANT APPLICATION, PLAN

CHECKING, REP WORKSCOPE DEVELOPMENT, EXPERT WITNESS/LITIGATION & ELECTRICAL ENGINEERING PROJECTS Project Location Engineering Management
Construction Construction inspection Civil Engineering Plan Checking Grant Application RFP Work Scope Development Program Development =xpert Witness structural engineering • Construction Engineering Management for SR 14 & Avenue S Ramps' Signals Palmdale, CA • Plan Check Services for a Signal at Mount Vernon & Cooley Drive Colton, CA + Signal Inspection Services for Ramona Bivd./ Merced Avenue and Romona Bivd./ Badillo/ Lozano Baldwin Park, CA + Work Scope Development for MTA's Signal Operations & Maintenance Training Los Angeles, CA • Widening of Avenue P - Grant Application for LACTA Palmdale, CA + Consulting Design Services for Avenue R& 5th Street East Intersection Improvement Palmdale, CA • Expert Witness Services - Paularino Medical Group Costa Mesa, CA • Villa Pacifica's Tract # 15870 Street Lighting Plan Check San Clemente, CA • City of Baldwin Park Merced Avenue, Bridge Widening Baldwin Park, CA • Plan Checking for Signal & Striping at Peyton Drive & Olympic View Drive Chino Hills, CA • Long Beach Community College's Program Development for Traffic Signal Technicians Long Beach, CA • Caltrans TSM Grant Application Preparation Oceanside, CA + Interstates 5 & 405 Confluence "El Toro Y" TSM & Construction Engineering Management Orange County, CA • Traffic Signal Inspections for 3 New Locations Colton, CA + Los Angeles County MTA - Scope of Work Development for Traffic Signal Training Program Los Angeles, CA • Massachusetts Bay Transit Authority's Beacon Hill Computer Modeling Boston, MA + Traffic Signal CEM & Inspection for Earl/ Frazier, Merced/ Market Place & Merced/ Vineland Baldwin Park, CA * Review of Draft Traffic Impact Report for the Port of Los Angeles' Berth 100-102 Container Terminal Facility West Basin Los Angeles, CA Bran 1 201A
Sheet 1 of 2
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
Other Support Services

CIVIL ENGINEERING, CONSTRUCTION ENGINEERING MANAGEMENT, CONSTRUCTION INSPECTION, GRANT APPLICATION, PLAN

CHECKING, RFP WORKSCOPE DEVELOPMENT, EXPERT WITNESS/LITIGATION & ELECTRICAL ENGINEERING PROJECTS Project Location Engineering Management
Construction Construction Inspection Civil Engineering Plan Checking Grant Application RFP Work Scope Development Program Development Expert Witness Structural Engineering • Metro/LA County MTA On-Call FY 04-08 A & E Bench Contract for Electrical Engineering Los Angeles County, CA • Evaluation of the Westchester Luthern School Traffic Study for Litigation Los Angeles, CA • Litigation Support for the Fourth Cause of Action of the Lawsuit on Mar Vista Community Santa Monica & L.A., CA • On-Call Traffic Engineering Design Plan Checking Services for the City of Irvine Irvine, CA • Construction Engineering Management of a New TOC/TC in Santa Clarita Santa Clarita, CA + CEM/Inspection/Installation of Timing Charts for Metrolink's RR Grade Crossings at Garvey/Francisquito Baldwin Park, CA • CEM Support Services for ITMS & Traffic Signal Interconnect Projects Santa Clarita, CA • Professional Traffic Engineering Expert Services for Sunshine Canyon Landfill EIR Los Angeles County, CA • CEM for a New Traffic Signal at Maine St. & Ohio Ave./Hallwood Dr. Baldwin Park, CA • CEM for 3 Signals along Los Angeles St. at Bresee, Center & Stewart Baldwin Park, CA • CEM for Traffic Signal Modification & As-Built for Alameda/Lake Baldwin Park, CA • Expert Traffic Engineering Services for SR-33, Review of FEIR for Diamond Rock Sand & Gravel Ojai, Ventura County, CA • Expert Traffic Engineering Services for Lower SR-74/Ortega Highway Widening's MND & Traffic Study San Juan Capistrano, CA • Expert Traffic Engineering Services for Griffith Park's Autry National Center DEIR Los Angeles, CA • Hawail's Queen Kaahumanu Highway 19 Guard Rail Runout Length Assessment for the Shores at Kohanaiki North Kona, HI Sheet 2 of 2
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

TRAFFIC SIGNAL TIMING, DESIGN, OPTIMIZATION, COMPUTER MODELING, SYSTEMS & INTERCONNECT DESIGN PROJECTS Project Location Traffic Signal Systems Design
Number of Intersections Signal Timing Signal Optimization Signal Design Interconnect Design Computer Simulation System Evaluation "Before" & "After" Construction Management/ Inspection/Installation Teaching & Training PS&E.
+ Traffic Signal Synchronization of 145 City & Caltrans D-10 Signals along 22 Arterials Outside the CBD - FY 2007 Modesto, CA + Traffic Signal Synchronization, Implementation & Fine Tuning for City of Modesto & Caltrans D-10 • Traffic Signal Synchronization, Implementation & Fine Tuning for City of Modesto, Stanislaus County & Caltrans D-10 Stanislaus County, CA + Los Angeles County MTA's Evaluation of SMART/Santa Monica FRWY ITS Systems on 420 Multijurisdictional Signals Los Angeles County, CA + Traffic Signal Synchronization, Implementation & Fine Tuning for City of Ceres & Caltrans D-10 Ceres, CA • Traffic Signal Synchronization, Implementation & Fine Tuning for Downtown Modesto & Caltrans D-10 Modesto, CA • Palmdale Traffic Signal Coordination, Retiming & Fine Tuning for City of Palmdale, LA County & Caltrans D-7 Palmdale, CA + Traffic Signal Retiming, Installation & Fine Tuning for City of Baldwin Park & Los Angeles County Baldwin Park, CA • Traffic Signal Synchronization along McBean Pkwy, Valencia Blvd., Magic Mtn. Pkwy & San Fernando Road Santa Clarita, CA • Santa Clarita Thoroughfare Signal Interconnect for 30 Miles Santa Clarita, CA + Los Angeles County MTA's Evaluation of Regional Surface Transportation Improvement (RSTI) Projects Los Angeles County, CA + Rye Canyon Business Park/Legacy Partners' Traffic Signal PS&E for City of Santa Clarita Santa Clarita, CA • On-Call Traffic Signal Timing & Design Services for City of Palmdale Palmdale, CA • PS&E Preparation for SR-133/Laguna Canyon Rd. & Lake Forest Drive Irvine, CA - • Ave. R. Traffic Signal Interconnect & CCTV Design Palmdale, CA • Baldwin Park's Master Interconnect Design and PS&E Baldwin Park, CA + Upgrade of Calabasas Regional Traffic Operations Center, Interconnect, CCTV & Signal Timing Calabasas, CA • Los Angeles County MTA's Signal Systems Training of 88 Cities, LA County & Caltrans D-7 Los Angeles Countywide, CA • Los Angeles County MTA's Traffic Signal Operation & Maintenance Training Workshaps of 90 Agencies Los Angeles Countywide, CA:
• Los Angeles County MTA's Traffic Signal Timing Training Workshops of 88 Cities, LA County & Caltrans D-7 Los Angeles Countywide, CA • Los Angeles County MTA's Video Detection & Surveillance Training Workshops of 88 Cities, LA County & Caltrans D-7 Los Angeles Countywide, CA + Los Angeles County MTA's Type 170 Controller Training Workshops of 88 Cities, LA County & Caltrans D-7 Los Angeles Countywide, CA • Los Angeles County MTA's Systems (Data, Video & Audio) Communications Training Workshops of 90 Agencies Los Angeles Countywide, CA Лопетту 1, 2016
Sheet 1 of 5
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

TRAFFIC SIGNAL TIMING, DESIGN, OPTIMIZATION, COMPUTER MODELING, SYSTEMS & INTERCONNECT DESIGN PROJECTS Project Location Traffic Signal Systems Design
Number or intersections Signal Timing Signal Optimization Signal Design Interconnect Design Computer Simulation System Evaluation "Before" & "After" Construction Management/ Inspection/Installation Teaching & Training PS&E
• Pacific Coast Highway/El Camino Real & Camino Capistrano Traffic Signal for City of San Clemente San Clemente, CA • Traffic Signal Inspection & Construction Engineering Management for City of Baldwin Park Baldwin Park, CA + McBean Parkway & Baywood Lane Signal Design & Preliminary Civil Design Santa Clarita, CA • Kaufman & Broad Coastal's Villa Pacifica Traffic Signal & Interconnect PS&E San Clemente, CA • On-Call Traffic Signal Plan Checking Services for City of Colton Colton, CA • Signal Plan Preparation & Design for the City of Lancaster Lancaster, CA • On-Call Traffic Signal Construction Inspection Services for City of Colton Colton, CA • PS&E Package for New Signals for City of San Bernardino San Bernardino, CA + PS&E for Signal Design Packages for City of Baldwin Park Baldwin Park, CA • PS&E Packages for Traffic Signals Colton, CA
+ Consulting Design & PS&E Services for Railroad Pre-emption at Sierra Highway and Ave. P & R for Metrolink Palmdale, CA • PS&E Preparations for 3 Traffic Signal Modifications at Locust Ave./6th/7th and Pine/7th Long Beach, CA • State Route 14 & Ave. S Signal & Striping PS&E Preparation for City of Palmdale, Los Angeles County & Caltrans D-7 Palmdale, CA • Design Services for the Intersection Modification of Ave. R & 5th St. E. for City of Palmdale Palmdale, CA • PS&E for Experian Corporation HQ Signals for City of Costa Mesa Costa Mesa, CA + City of Ceres Citywide & Caltrans D-10 Traffic Signal Synchronization & Retiming Ceres, CA + Boeing's Douglas Park Traffic Signal, Signing & Striping, and TCP Long Beach & Lakewood, CA + Review of L.A. County's Traffic Signal Synchronization Program along Baldwin Park Blvd., Calais to Tracy (TSSP) Baldwin Park, CA • PS&E Preparation for Burbank Bivd. 3 New Traffic Signals Burbank, CA • KB Homes - PS&E Preparations for 3 New Traffic Signals Modifications along Murrieta Rd. Riverside County, CA • Pulte Homes 500 New Homes Development - PS&E Preparation for 5 New Traffic Signals Riverside County, CA • Caltrans State Route 66 Advanced Traffic Control Systems (ATCS) CCTV & Fiber Optic PS&E La Verne/Pomona/Claremont, CA • Traffic Signal Synchronization, Implementation & Fine Tuning for Downtown Modesto & Caltrans D-10 FY 03/04 Modesto, CA Sheet 2 of 5
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

TRAFFIC SIGNAL TIMING, DESIGN, OPTIMIZATION, COMPUTER MODELING, SYSTEMS & INTERCONNECT DESIGN PROJECTS Project Location Traffic Signal Systems Design
Number ountersections Signal Timing Signal Optimization Sional Desian Interconnect Design Computer Simulation System Evaluation "Before" & "After" construction Management Inspection/Installation Teaching & Training PS&E
• PS&E Preparation for Valley/Rancho & Valley/ard Traffic Signals Colton, CA • Construction Engineering Management & Inspection for I-10 Fwy. at Garvey/Merced Baldwin Park, CA • PS&E Preparation for Mt. Vernon/Colton & La Cadena/Avenue C Traffic Signals Colton, CA • PS&E Preparation for Tentative Tract Map #54157 - Avenue K/32nd Street West Lancaster, CA + Reche Canyon/Shane Dr. & Topanga Canyon Traffic Signal Operations Assessment Colton, CA • Metro/L.A. County MTA FY 04-08 On-Call A & E Electrical Engineering Bench Contract Los Angeles Countywide, CA • On-Call Traffic Engineering Design Services for City of Irvine FY 2004-2007 Irvine, CA • Metra/L.A. County MTA On-Call FY 04-08 A & E Traffic Engineering Bench Contract Los Angeles Countywide, CA • Traffic Signal Synchronization & Timing Charts for 1-10/Garvey, Merced, Puente, & Marketplace Baldwin Park, CA • Avenue R Extension Traffic Signal Interconnect & CCTV Design with 72 SMFO Palmdale, CA • Clinton Keith Rd. & Vista Murrieta High School Traffic Signal Design Modification Murrieta, CA + PS&E for Ave. Vaquero & Via Casadita; 2 Signal Modifications at El Camino Real & Avenida Pico, Cam. Capistrano San Clemente, CA + Metrolink's Application, Railroad Pre-emption & Signal Timing for Garvey Rd. at Francisquito Baldwin Park, CA • Construction Engineering Management for SR 14 and Ave. S for City of Palmdale & Caltrans D-7 Palmdale, CA • U.S. Traffic Corp, LED Countdown Technical Feasibility for the City of Los Angeles Evaluation Los Angeles, CA + Ramona Bivd. & Earl Ave. Traffic Signal Timing Charts and Construction Engineering Management Baldwin Park, CA • PS&E Package for 3 New Signals along Rancho Ave. at Citrus, Johnston & Laurel Colton, CA • Chino Hills Traffic Signal Plan Check Services Chino Hills, CA • Reche Canyon Rd. & Topanga Way Traffic Signal Timing Charts Colton, CA • Rancho Ave. & Valley Blvd. (Southeast Corner) Traffic Signal Modification Colton, CA • Construction of Ramona Blvd. & Maine Ave. Signal - Preparation of Traffic Signal Timing Charts Baldwin Park, CA • Review of Caltrans Timing Plans at 3 Locations along Puente, Merced & 1-10 Baldwin Park, CA • Metrolink Railroad Grade Crossing (Garvey & Francisquito) - Final Timing Charts Installation/Review/CEM/Inspection Baldwin Park, CA Sheet 3 of 5
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

TRAFFIC SIGNAL TIMING, DESIGN, OPTIMIZATION, COMPUTER MODELING, SYSTEMS & INTERCONNECT DESIGN PROJECTS Project Location Traffic Signal Systems Design
Number of Intersections Signal Timing Signal Optimization Signal Design Interconnect Design Computer Simulation System Evaluation "Before" & "After" Construction Management/ Inspection/Installation Teaching & Training PS&E
+ Burke Lake Road's Signal Retiming for the Virginia DOT Northern VA, Washington, D.C. • PS&E Preparation for The Village at Corona & Promenade/Collete Ave. Now Traffic Signals Corona, CA • Interstate I-95 Service Roads & Local Intersections for the Virginia DOT Northern VA, Washington, D.C. • PS&E Preparations for Conversion of 2 Flashing Signals to Pedestrian Signals along Burbank Bivd. Burbank, CA N • U.S. Route 27 Traffic Signal Progression for OKI Regional Council of Governments Cincinnati, OH • Construction Support Services for ITMS & Traffic Signals interconnect Projects Santa Clarita, CA • PS&E Preparation for Traffic Signal Modification for Protected Left-Turn Phases at Mt. Vernon & Rancho Colton, CA • PS&E Preparations for 2 New Traffic Signals along Los Angeles St. at Center & Bresee Baldwin Park, CA + PS&E Preparation for Traffic Signal Modification of Auto Zone at Sunny Mead & Graham Moreno Valley, CA + CEM & Traffic Signal Timing Charts Preparation for Merced/Ahern & Pacific/Big Dalton Baldwin Park, CA • PS&E Preparation for Traffic Signal Modification for New 5-Story Building at Spruce St. & lowa St. Riverside, CA • PS&E Preparation for 2 New Traffic Signals at Maine/Ohio & Olive/Stewart Baldwin Park, CA • Timing Charts & CEM Preparation for 3 Signals along Los Angeles St. Baldwin Park, CA • Timing Charts & CEM Preparation for 1 New Signal at Maine & Ohio/Hallwood Baldwin Park, CA • U.S. Route 7 Relocation Study, Signal Design & Capacity Analysis for Connecticut DOT Norwalk, CT • Packard/Bambergers Development Traffic Signals Cost Estimating Hackensack, NJ • PS&E Preparation for Traffic Signal Modification at Ave. L. & 10th St. W. Lancaster, CA • PS&E Preparation for 3 New Traffic Signals at Baldwin Park Blvd. & Stewart, L.A. Street/Phelan & Puente/Channing Baldwin Park, CA + SR-133 / Laguna Canyon - PS&E Preparation for Traffic Signal Modification Irvine, CA • PS&E Preparation for Traffic Signal Timing Chart for New Traffic Signal at La Cadena/Barton Colton, CA • Traffic Signal Timing Charts Modification for Ahern/Merced & Vineland/Merced Baldwin Park, CA • PS&E Preparation for Traffic Signal Modification & As-Built for Alameda/Lake Baldwin Park, CA • Traffic Signal Timing Charts for Mt. Vernon/Colton Ave. Colton, CA Sheet 4 of 5
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

TRAFFIC SIGNAL TIMING, DESIGN, OPTIMIZATION, COMPUTER MODELING, SYSTEMS & INTERCONNECT DESIGN PROJECTS Project Location Traffic Signal Systems Design
Number of intersections Signal Timing Signal Optimization Signal Design nterconnect Design Computer Simulation System Evaluation "Before" & "After" Construction Management/ Inspection/installation Teaching & Training PS&E
• Traffic Signal Operations Assessment for Fowler Rd. & Mitchell Rd. Ceres, CA • PS&E Preparation for a New Signal at W. Artesia Blvd. & Dalton Gardena, CA • Desert Cities Industrial Park - PS&E Preparation for a New Signal along State Highway 111 & "A" St. Riverside County, CA + Tustin Field II - Harvard at Moffett Traffic Signal Modification Irvine & Tustin, CA * Traffic Signal Modification Design for 20th St. West & Ave. K Lancaster, CA + Traffic Signal Modification Design for 60th St. West & Ave. K Lancaster, CA • 2 Traffic Signal Modification Designs for I-10/Valley/Mt. Vernon & Washington/Mohave Colton, CA • PS&E Preparation for a New Mid-Block/Pedestrian Traffic Signal at Mt. Vernon & Palm Colton, CA • Virginia Beach's Traffic Signal Cost Estimating Virginia Beach, VA + Traffic Signal Timing Charts for Colton Ave. at 10th Street/G Street Colton, CA • Traffic Signal Modification for Reche Canyon Rd. at Topanga Colton, CA + PS&E Preparation for Traffic Signal Modification at Alameda/Victory Bivd. Burbank, CA • PS&E Preparation for a New Traffic Signal at La Cadena Dr. & La Loma Ave. Colton, CA • Traffic Signal Modification for El Camino Real & Barcelona San Clemente, CA + Newport Blvd. Traffic Signal System Improvement for City of Costa Mesa Costa Mesa, CA • Temporary Traffic Signal Modification Design for MWD & WMWD's Perris Valley Pipeline construction Riverside & Riverside Co., CA • • Temporary Traffic Signal Modification Design for Alessandro Blvd. at Meridian Parkway Riverside, CA • Temporary Traffic Signal Modification Design for Alessandro Bivd. between Sycamore Canyon BI. & Mission Grove Riverside, CA • Orange County EMA's Traffic Signal Design & Study of Melinda Road & Las Fieras Rancho Santa Margarita, CA Sheet 5 of 5
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
SYSTEM EVALUATION PROJECTS and "BEFORE" & "AFTER" STUDIES Evaluation Type
Transportation
TS Element
Improvement
Project Location
Number of Intersections Signal Synchronization Signal Retiming: Systems Comm. Red Light Camera Interchange Signalization Lane(s) Additions Grade Separation

ATMS CCTV CMS/VMS

ATIS HAR
+ Los Angeles County MTA's Santa Monica FRWY "SMART" Carridor Evaluation Los Angeles County, CA 420 • City of Temecula's Evaluation of Red Light Camora System Temecula, CA • City of Temecula's Evaluation of ITS Deployment Project Temecula, CA + City of Santa Clarita's Automated Red Light Photo Enforcement Proposal Evaluation Santa Clarita, CA * City of Santa Clarita's Corridors Traffic Signal Synchronization Evaluation Santa Clarita, CA + City of Santa Clarita's Thoroughfare Signal Interconnect Santa Clarita, CA • City of Modesto & Caltrans D-10 Traffic Signal Synchronization Evaluation Modesto, CA 121 • City of Ceres Traffic Signal Synchronization Evaluation Ceres, CA + City of Calabasas Upgrade of Traffic Operations Center Calabasas, CA • City of Palmdale, Los Angeles County & Caltrans D-7 Traffic Signal Coordination & Retiming Evaluation Palmdale, CA + City of Modesto, Stanislaus County & Caltrans D-10 Traffic Signal Synchronization Evaluation Stanislaus County, CA + City of Baldwin Park & Los Angeles County Traffic Signal Retiming Evaluation Baldwin Park, CA = • City of Modesto & Caltrans D-10 Downtown Traffic Signal Synchronization Evaluation Modesto, CA + Los Angeles County MTA's Traffic Signal Timing Training Workshops Southern California • Los Angeles County MTA's Video Detection & Survelllance Training Workshops Southern California + Los Angeles County MTA's Systems Comunication Training Workshops Southern California • Los Angeles County MTA's RSTI-Port of Long Beach's Evaluation of Anaheim St. Grade Separation Port of Long Beach, CA • Los Angeles County MTA's RSTI-City of South Gate's Evaluation of SB I-710/Firestone Interchange South Gate, CA + Los Angeles County MTA's RSTI-City of Los Angeles's Evaluation of Normandie Ave, Improvements Los Angeles, CA + Los Angeles County MTA's RSTI-City of Burbank's Evaluation of North & South Front Street Improvements Burbank, CA • Los Angeles County TA's RSTI-City of Calabasas' Evaluation of Old Town Road Improvements Calabasas, CA + Los Angeles County MTA's RSTI-City of Palmdale's Evaluation of Pearblossom Highway Widening Palmdale, CA • Los Angeles County MTA's RSTI-City of Lancaster's Evaluation of SR14/ Ave. L Corridor Lancaster, CA lanuary 1, 2016 Sheet 1 of 2
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence
SYSTEM EVALUATION PROJECTS and "BEFORE" & "AFTER" STUDIES Evaluation Type
ITS Element Transportation
Improvement
Project Location
Number of Intersections Signal Synchronization Signal Retiming: Systems Comm. Red Light Camera Interchange Signalization Lane(s) Additions Grade Separation

ATMS ATIS CCTV CMS/VMS TMC/TOC HAR
Manhattan Beach, &
+ Los Angeles County MTA's RSTI-City of Manhattan Beach & El Segundo Evaluation of Sepulveda Bivd.

El Segundo, CA
• Metro/LA County MTA FY 04-08 On-Call Bench Contract for Electrical Engineering Los Angeles County • City of Ceres Citywide & Caltrans D-10 Traffic Signal Synchronization Ceres, CA • Technical Evaluation of U.S. Traffic Corp. LED Countdown for the City of Los Angeles •.

Los Angeles, CA
• Preparing B/C Assessment for Proposed Rancho Vista (Ave. P) & Railroad Grade Separation Palmdale, CA • Modesto's 145 Traffic Signal Synchronization along 22 Corridors Modesto & Stanislaus 145 • • Sheet 2 of 2
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLANNING, DESIGN & IMPLEMENTATION PROJECTS No. of
Intersections
Project Location
ITS Design PS&E
Performing Task Orders for USDOT/FHWA/ITE on ITE Standards, Outreach, Education & Training Nationwide Extension of Ave. R Traffic Signal Interconnect & CCTV Design for 72 SMFO b/w Division & 40th E. Palmdale, CA Proparing Signal Systems PS&Es for Boeing's New Douglas Park Development Long Beach & Lakewood, CA Management of Architectural Design for New TOC/TMC in Santa Clarita Santa Clarita, CA Providing Construction Support Services for ITMS, Traffic Signal Interconnect, ITS & TMC/TOC Santa Clarita, CA Caltrans State Route 66 Advanced Traffic Control Systems, CCTV, Fiber-Optic PS&E La Verne, Pomona & Claremont, CA Traffic Signal Synchronization for 145 City & State Locations Outside the CBD-FY 2007 Modesto & Stanislaus County, CA 145 Los Angeles County MTA/Metro's Santa Monica FRY ITS Systems Evaluation Los Angeles County, CA 420 ! Los Angeles County MTA/Metro's Systems Communications Training Workshops Southern California Los Angeles County MTA/Metro's Video Detection & Video Surveillance Training Workshops Southern California Los Angeles County MTA/Metro's Bus/Transit Signal Priority, QuicNet & CtNet Training Workshops Southern California Los Angeles County MTA/Metro's Homeland Security Training Workshops Southern California Los Angeles County TA/Metro's TC Tour of Regional Centers Training Workshops Southern California Caltrans Santa Monica FRWY 1-10 ITS/CCTV Los Angeles, CA City of Modesto CCTV Systems Expansion Modesto, CA 13
Temecula's ITS Deployment: TOC, CCTV & Fiber Optic PS&E Design Temecula, CA ITS & Traffic Signal On-Call Design Services Palmdale, CA 29 Southern California ITS Showcase Program Evaluation for Caltrans HQ Southern California City of Modesto CCTV Systems Modesto, CA 10 |
City of Ceres ATMS Project Ceres, CA
Upgrade of the Calabasas Regional Traffic Operations Center/Las Virgenes Interconnect PS&E Calabasas, CA 20 Santa Clarita Intelligent Transportation Management System Santa Clarita, CA 22 Santa Clarita Thoroughfare Signal Interconnect for 30 miles Santa Clarita, CA 93 Sheet 1 of 3
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLANNING, DESIGN & IMPLEMENTATION PROJECTS No. of
Intersections
Project Location Construction Management/
Initial Implementation Expanded System ITS Planning ITS Implementation Traffic Signal System System Evaluation Bus/Transit Signal Priority Homeland Security Inspection/Installation Teaching & Training ITS Design
PS&E
Caltrans Los Angeles & Ventura Counties ITS EDP Los Angeles & Ventura Counties, CA State of Virginia's 1-95 HOV/TSM/VMS/CCTV Planning & Design Northern VA & Washington, D.C. • • ..

TMP Preparation Including Reg. XV Implementaion-U.S. Army Depot Sacramento, CA Sacramento's Arden/Arcade Local Area Transportation Study TSM Sacramento, CA Caltrans TSM Grant Application Preparation Oceanside, CA Caltrans' Interstates 5 & 405 Confluence "El Toro Y" TSM & CEM Orange County, CA Santa Clarita's Automated Red Light Enforcement Proposal Evaluations Santa Clarita, CA Evaluation of the Red Light Camera System Deployment Temecula, CA Los Angeles County MTA Traffic Signal Timing Training Workshops Los Angeles County, CA Modesto's Traffic Signal Retiming & Coordination Project Stanislaus County, CA 16 City of Modesto Traffic Signal Systems Network Modesto, CA 98 City of Modesto & Caltrans Downtown Signal Systems Network Modesto, CA 72 City of Palmdale/Caltrans & LA County Signal Systems Retiming Palmdale, CA City of Ceres & Caltrans Traffic Signal Systems Network Ceres, CA 17 City of Baldwin Park Master Interconnect Design Baldwin Park, CA • City of Baldwin Park Master Traffic Signal Network Baldwin Park, CA 18 Los Angeles County MTA Type 170 Controller Signal System Training Workshops Southern California Caltrans HQ/SCAG AHS/IVi Work Scope Development Statewide, CA Avenue R Traffic Signal Interconnect & CCTV Design Palmdale, CA Sheet 2 of 3
MINAGAR & ASSOCIATES, INC.
23 Years of Excellence

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PLANNING, DESIGN & IMPLEMENTATION PROJECTS No. of
Intersections
Project Location Bus/Transit Signal Priority Construction Management/ ITS Implementation Traffic Signal System System Evaluation Homeland Security Inspection/installation Teaching & Training PS&E
FHWA Freeway Surveillance & Control Workshope for the U.S. DOT Nationwide • FHWA/NAHSC AHS Operations & Maintenance for State DOTS Nationwide FHWA/NAHSC AHS Outreach & Focus Group for State DOTe Nationwide Government of Peoples Republic of China, Training High Ranking Delegations China City of Ceres CCTV Systems Expansion Ceres, CA
U.S. Coast Guard's Governor's Island Ferry Stacking TSM Project* Manhattan, New York City, NY Dulles International Airport Access Road Ramp Metering Feasibility to E.B. I-66* Northern Virginia, VA Los Angeles County MTA/Metro's TM Tour of Regional Centers Training Workshops Southern California Sheet 3 of 3
PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Appendix B: Key Personnel Resumes
MINAGAR & ASSOCIATES, INC.

MINAGAR & ASSOCIATES, INC.

ITS -Traffic/Civil/Electrical Engineering -Transportation Planning - Homeland Security - CEM Consultants .

FRED MINAGAR, MS, RCE, PE

EDUCATION
• Harvard University, John F. Kennedy School of Government, Cambridge, Massachusetts, Leadership Decision Making, Executive Education Program Diploma • The George Washington University, Washington, D.C., ITS Program Diploma Pepperdine University School of Law, Malibu, California, Negotiation Skills and Advocacy St. John's University, New York, New York, Management Diploma New York University, New York, New York, Management Practice • University of Cincinnati, Cincinnati, Ohio, M.S. Transportation Engineering Thesis and Research work with computer analysis at Transportation Research Center of Ohio University of Louisiana, Lafayette, B.S.C.E. Civil Engineering

REGISTRATION
• NATIONAL:
• National Council of Examiners for Engineering & Surveying, No. 9112 STATE:

California: Registered Civil Engineering. No. C053466
• New Jersey: Registered Professional Engineer. No. GE33090

EXPERIENCE
• 37 Years of Professional Public & Private Consulting Experience Engineered, Managed & Administered Over 100 ITS and 800 Traffic/Civil/Electrical Engineering, Transportation Planning Projects in Over 17 States

EXPERTISE
• Intelligent Transportation System (ITS); ATMS, ATIS, System Communications • Traffic Engineering, Computer Modeling/Simulation, Signal & Interconnect Design Transportation Planning, EIR & EIS, TDM, TMP & TSM Special Studies

AWARDS/HONORS
• Re-Elected to City Council as Mayor & City Council Member after 18 years serving as Planning & Tra and Transportation Commissions Chairman/Commissioner, City of Laguna Niguel, California, Nov. 2019
• Winner of the ASCE 2007 Outstanding Public/Private Civil Engineering/ITS Project of the Year for Metro & City of Santa Clarita
• Winner of the Best Traffic Congestion Mitigation Award in Los County for the City of Palmdale and Metro's Ave R Traffic Signal Interconnect & CCTV PS&E Project, 2005 • Recipient of the PT's Best Transportation Technology Solutions for Synchronizing 121 Caltrans, County & City Traffic Signals Award in the U. S., 2003
• Awarded the United States Congressional Order of Merit, 2003 & 2006 • Recipient of the 2002 National Leadership Award
Training Program, 2000
Re-appointed to Traffic & Transportation Commissioner by the Mayor & Council of the City of Laguna Niguel, California for 1997-1999, 1999-2001, 2001-2003
• Publicity/Public Relations Chairman, 1s' Annual Meeting of California Alliance for Advanced Transportation System (CAATS), Newport Beach, 1995
• Certificates of Appreciation, Western ITE Newsletter Technical Editor, 1990-1994 Recipient of 1990 ITE International Award, Orlando, Fiorida, USA Recipient of 1989 ITE International Award, San Diego California, USA Recipient of 1988 ITE International Award, Vancouver, Canada Certificate of Appreciation, ITE Metropolitan Section of New York & New Jersey, 1987 and 1989 Founded and Organized ITE Student Chapter at University of Cincinnati, 1984 The Southwestern Award of Merit, 1981
Outstanding Young Man of America for 1982
MINAGAR & ASSOCIATES, INC.

ITS -Traffic/Civil/Electrical Engineering -Transportation Planning - Homeland Security - CEM Consultants

FRED MINAGAR, MS, RCE, PE, FITE

Page 2 ends

SYNOPSIS of PROFESSIONAL EXPERIENCE:

Civil/Traffic Engineering & Transportation Planning
City of Huntington Park's Citywide LRSP (Local Roadway Safety Plan), Huntington Park, CA City of Guadalupe's Citywide LRSP (Local Roadway Safety Plan), Guadalupe, CA City of La Puente's Citywide Street Name Sign, Traffic Control Devices Inventory & LSRP, La Puente, CA City of South Gate's Citywide Parking Space Asset Inventory and Study, South Gate, CA City of Burbank's HSIP Cycle 3 Engineering Services for Verdugo & Keystone, Burbank, CA City of Burbank's HSIP Cycle 4 Engineering Services for Verdugo Bike Lane Extension, Burbank, CA City of Coachella's HSIP-5294 (006) Engineering Services for Citywide Traffic Control & Street Name Sign Upgrade, Coachella, CA
City of Coachella's ATP Cycle 1 ST-86 PS&E & Engineering Services for Citywide Active Transportation Plan City of Coachella's ATP Cycle 2 ST-100 PS&E & Engineering Services for Citywide Active Transportation Plan City of Coachella's SR2S Cycle 8 PS&E Engineering Services for Citywide Safe Route To School Improvement Los Angeles County MTA's Interstate 210 Freeway Truck Origin-Destination Study, LA, CA • Los Angeles County MTA's Evaluation of the Santa Monica Freeway/Smart Corridor, L.A., CA • Los Angeles County MTA's Evaluation of RSTI Projects, Evaluated 10 Major Projects, Los Angeles County, CA • Los Angeles County MTA's State Routes 57 & 60 Interchange Improvements Feasibility Traffic Study . Los Angeles County MTA's Countywide Traffic Signal Operation and Maintenance Training Workshops Identification of Funding, STIP & CIP Programs for Metrolink Commuter Rail System, Southern CA • Metrolink's Traffic Engineering Analysis of the New Maintenance Facility Design Requirements for a New Access Road for SCRRA, Los Angeles, CA
• Metrolink's Traffic Engineering and Cost Estimating for local Street Improvement near San Bernardino and Upland Train Stations for SCRRA, Southern CA
• Metrolink Commuter Rail System's Traffic Engineering Design & Study Reports for Chatsworth Train Station and Lassen Grade Crossing for SCRRA, Southern CA
• Los Angeles World Airport-Palmdale Airport Master Plan, Transportation Planning & Computer Modeling Utilizing TRANPLAN & EMME Il Computer Models
. Massachusetts Bay Transit Authority's Red Line Subway Systems Computer Modeling, Boston, Beacon Hill and Cambridge, MA
• City of Palmdale's Traffic Impact Fee Assessment a Traffic Model Using TRANPLAN Model, Palmdale, CA • Rote 24 Extension Traffic Study Utilizing UTPS Computer Model, Morristown, NJ • North Carolina State University Campus Expansion Traffic Study, Raleigh, North Carolina Consultant to FHWA/NAHSC on AHS O&M Components & Institutional Constraints Consultant to FHWA/NAHSC on AHS Outreach Program, Conducting Focus Group Meeting in Boston, MA, Denver, CO & Washington, D.C.

Southern California ITS Deployment Plan for Caltrans District 7, Los Angeles, California • Caltrans TSM Grant Application Preparation for the City of Oceanside, California . City of Sacramento's Arden/Arcade Local Area Transportation Study TSM & Traffic Op Studies, Sacramento, CA Governor's Island Ferry Stacking TSM Project - U.S. Coast Guard. Manhattan, New York City TMP Preparation Including Reg. XV Implementation for the U.S. Army Depot. Sacramento, CA Wal-Mart Traffic and Parking Impact Study, Santa Clarita, California 720 Paularino Parking Study, Variance, and CUP Application for the City of Costa Mesa, CA Rye Canyon Business Park, 3 million SF North South Campus Traffic Parking Impact Studies, Santa Clarita, CA Truck Route Feasibility Study for Vulcan Materials Plant in Irwindale for City of Baldwin Park, CA Los Angeles Grand Sports Arena Traffic Engineering Feasibility Study for a Private Developer near Downtown Los Angeles, California
Caltrans AB-680 Highway 118-126 Toll Road, Los Angeles and Ventura Counties, CA Denver W-470 Toll Revenue Study for Engineer 470 Partnership, Denver, Colorado New Jersey Turnpike Widening Transportation & Toll Plaza Study for the NJ Turnpike Authority Port of Long Beach's SCAQMD's Grant for Air Quality/Emission Control Improvements at Port's Roadways/Highways, Long Beach, CA
• Port Liberte (Caven Point) Traffic Impact Study, Jersey City, New Jersey Review of Draft Traffic Impact Report for the Port of Los Angeles' West Basin, Los Angeles, CA Palmdale Airport Plaza Traffic Impact Report, Palmdale, CA MINAGAR & ASSOCIATES, INC.

Civil Engineering-Traffic Engineering-Transportation Planning Consultants

FIROZ VOHRA, MS, TE

EDUCATION
• University of Cincinnati, Cincinnati, Ohio, MSCR in Transportation Engineering • Maharaja Sayajirao University of Baroda, Baroda, India, BSCE in Highway Engineering

PROFESSIONAL CAPABILITIES/SUMMARY
Firoz Vohra is an experienced traffic engineer with over 34 years of experience. He began his career in the private sector where responsibilities included planning and designing highway alignments, developing traffic demand projections and preparing and analyzing traffic studies. He then moved to the public sector as a City Traffic Engineer for the City of Modesto where he served in that position for 15 years and then served the City as Deputy Director of Public Works for 7 years. The experience and knowledge gained throughout my career presents an invaluable asset to my clients.

He is a proven team player with a focus on utilizing his public-service experience to achieve the He is a proven rearm payer

PROFESSIONAL EXPERIENCE
Senior Traffic Engineer for Minagar & Associates, Inc.

Jul 2018 - Present
Senior Engineer for the Public Works Transportation Division of Stockton, CA 2010-2018
Responsibilities include administering & managing the recently combined Transportation Engineering Division within the Public Works Department. The purpose is to bring Transportation projects to the County by leveraging Federal & State grant funds with Local transportation dollars; improve traffic flow, enhance safety & reduce congestion by prioritizing projects based on roadway capacity & safety.

Manager III for the Public Works Engineering Support Division of Modesto, CA 2009 - 2010
Responsible for the Development Services, Community Service Districts, Landscape and Lighting Districts, Encroachment and Transportation Permits, County Surveys, Mapping Services and Traffic Engineering Units. Responsibilities include managing and implementing the workload, people and resources of these units. Provide supervision, attend public meetings, develop projects and perform traffic analysis. Duties also include development and maintenance of Development Design Standards and Master Plan Standards. Produce and process annual engineer reports for Community Service Districts, Landscaping and Lighting Districts. Act as County Project Manager on major projects.

Deputy Director for the Public Works Department of Modesto, CA Headed the Streets and Traffic Services Division of the Public Works Department. Reported to Department Director and City Manager. Assumed Acting Director of Public Works role during the Director's absence. Supervised Streets Engineering, Traffic Engineering/Operation and Street Maintenance staff (52 FTEs). Permanent substitute for the City Manager at the StanCOG Technical Advisory Committee. Regularly briefed the Mayor and Council Members on policy Developed the ARRA-2009 (Stimulus Package) projects proposal. Developed county-wide MINAGAR & ASSOCIATES, INC.

Traffic/Civil/Electrical Engineering - ITS - Transportation Planning - CEM Consultants

JENNY TRAN, BSCE

EXPERIENCE
2 Years Professional Experience

EDUCTION
• University of California, Irvine, BSC&E Civil & Environmental Engineering

EXPERTISE
:

Safety Assessment
VMT & GHG Analysis& Assessment

RELATED SKILLS
Use of various Traffic Engineering and Transportation Planning software:

HCS, SYNCHRO, SimTraffic
AUTOCAD & MicroStation
Advanced Surveying
Highway Design (InRoads, CaiCe)
ArcGIS
MATLAB 2018, SketchUp, SolidWorks 2018, Stella, Spartan SYNOPSIS of PROFESSIONAL EXPERIENCE
• Engineering Assistant for the Preparation of Traffic Signal Modification, Interconnect Plans and Fiber Optic Systems for the City of Chino. Performed field investigations followed up by utilizing ACAD 2020 computer software for the base Engineering Plans • Prepared a Left Turn Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of Schaefer at Roswell for the City of Chino, CA • Prepared a Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of 7* Street at Valley Blvd. for the City of Colton, CA • Engineering Assistant for the Evacuation Plan Improvement Traffic Study utilizing Synchro 10.0 Micro-computer Modeling and Sim Traffic Micro-computer Simulation for 5 Wildfire and 1 Tsunami Evacuation Plans via Pacific Coast Highway City of Malibu Prepared a Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of San Bernardino Ave. at Sycamore Street for the City of Colton, CA Prepared a Traffic Signal and Stop Sign Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of "C" Street at Meridian for the City of Colton, CA Prepared a Technical Memo for Federal/State and City ADA Compliance at the Existing Handicap Ramps at the Two Signalized Intersections of Roswell at Schaefer and Pipeline at Schaefer in the City of Chino, CA
Prepared a Technical Memo for the Establishment of Policies and Procedures for Red- Curb Zones within the Residential and Commercial Areas for the City of Gardena, CA Prepared a Traffic Impact Study for the Proposed Retail/Commercial Center at 81933 Indio Bivd for the City of Indio. Analyzed the Potential Impacts of the Proposed Project on the Existing and Future Capacity and Operations of the 6 Existing Signalized Intersections
Prepared a Traffic Impact Study for the Proposed Retail/Commercial Center at Jefferson Ave at Varner for the City of Indio. Analyzed the Potential Impacts of the Proposed Project on the Existing and Future Capacity and Operations of the 6 Existing Signalized Intersections.
• Prepared a Traffic Impact Study for the Proposed Bloomington Truck Stop within the Bloomington Unincorporated area of San Bernardino County for the County of San Bernardino. Analyzed the Potential Impacts of the Proposed Project on the Existing and Future Capacity and Operations of the 15 Existing Signalized Intersections as well as 4 Future Intersections. Analyzed the Capacity and Operations of the 17 intersections utilizing Synchro 10.0 & HCS 2000+ software.

MINAGAR & ASSOCIATES, INC.

Traffic/Civil/Electrical Engineering - ITS- Transportation Planning - CEM Consultants

JENNY TRAN, BSCE

Page 2 ends

SYNOPSIS of PROFESSIONAL EXPERIENCE CONTINUED:

Prepared a Technical Memo for the Development and Establishment of VMT ( Vehicle Miles Travelled) for the Transportation Impact Analysis of the CEQA Requirement based upon the Senate Bill (SB) 743 for the City of Colton, CA • Prepared a Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of Olive Street at Meridian for the City of Colton • Prepared a Traffic Impact Study for Commercial Center and a Focused Driveway Feasibility Analysis for the City of Clovis in Central California, Clovis, CA Prepared a Traffic Impact Study for the Gateway Plaza for the City of Tracy in Northern California, Tracy, CA
Prepared the VMT (Vehicle Miles Traveled) Analysis and Assessment for the Pennsylvania Avenue Widening Project for the City of Beaumont, Beaumont, CA • Assisted in the Preparation of the Traffic Operation Analysis Report (TOAR) document for the Pennsylvania Avenue at I-10 Freeway Interchange Improvements for the State of California Department of Transportation (Caltrans District 8), Beaumont, CA • Prepared Traffic Control Plans (TCP) for the Metropolitan Water District of Southern California (MWD) Orange County Feeder Extension Pipeline Realignment in the Cities of Costa Mesa and Newport Beach for the Cities of Costa Mesa and Newport Beach and MWD
Prepared Traffic Control Plans (TCP) for the Metropolitan Water District of Southern MWD
Prepared a Traffic Signal Warrant Assessment for the intersection of Magnolia Ave at Vermont Ave. and Union Pacific Railroad Tracks for the Cities of Gardena, Los Angeles and Union Pacific Railroad Company. The project was fully fund by the Los Angeles County MTA (Metro).

Prepared a Technical Memo for the ADA Requirements and compliance with the City of Chino's New Ordinance, Caltrans and the Federal Requirements of the two intersection of Schaefer Ave at Pipeline and Schaefer Avenue at Roswell Ave for the City of Chino, CA
Prepared a traffic Impact Study and Parking Survey for the Learning Academy in the City of South Gate, South Gate, CA
MINAGAR & ASSOCIATES, INC.

Traffic/Civil/Electrical Engineering - ITS - Transportation Planning - CEM Consultants

MICHELLE NGUYEN, BSC&E

EXPERIENCE
2 Years Professional Experience

EDUCTION
• University of California, Irvine, BSC&E Civil & Environmental Engineering

EXPERTISE
Traffic & Transportation Engineering
Signing & Striping
Traffic Control Analysis
Transportation Planning
Traffic Signal Timing
Highway Capacity
Safety Assessmen
/MT Analysis & Assessmen

RELATED SKILLS
Use of Various Traffic Engineering and Transportation Planning Software:
• Synchro 10
• SimTraffic
• TransCAD
AutoCAD 2020
MATLAB
SketchUp

SOLIDWORKS

SYNOPSIS OF PROFESSIONAL EXPERIENCE
• Prepared the 2020 Engineering & Traffic Survey (E & TS) Report for 131 street segments the City of Pomona, CA
• Prepared a Technical Memo Regarding Electrical Vehicle (EV) Charging Station for the City of South Gate, CA
City of Costa Mesa
•
Prepared Work Orders for Street Maintenance
Conducted Stop Sign & Traffic Signal Warrant Analysis by Utilizing 2014 CA MUTCD
Performed Field Investigations into Service Requests Regarding the Operation of Traffic Signals
Investigated Citizen Request for Speeding Countermeasures Verified the Recommended Posted Speed for the City's 2018 Engineering and Traffic Survey
• Inventoried and Prepared a Citywide Posted Speed Signs Map Prepared an Updated Citywide Average Daily Traffic Map for the Year 2019 repared an in-Kind Service Report from the Orange County Transportatio uthority for funding of a Traffic Signal Synchronization Project for Harbo Boulevard
Performed Testing of Emergency Vehicle Preemption (EVPs) at Applicable Intersections Citywide
• City of Anaheim
Conducted a Field Survey of road side units and on board units along Harbor Blvd & Anaheim Bld to Test the Interoperability Among Different Vendors MINAGAR & ASSOCIATES, INC.

ITS -Traffic/Civil/Electrical Engineering -Transportation Planning - CEM Consultants SERGE S. TAVOUR

EDUCATION
• Tehran Institute of Technology, Civil Engineering

PROFESSIONAL EXPERIENCE
26 years of Engineering Land Surveying and Pure Civil Engineering Design LAND SURVEYING EXPERIENCE:

Key projects:

Surveying work - Topographic surveys, boundary surveys and staking. • Survey and Street Design - HSIP Federal Project for Verdugo Street, Burbank CA • Survey and Street Design - HSIP State Project for Verdugo Street Bike Lane Extension.

Burbank CA.
• Designed Base project survey for Caltrans - Route 66
Traffic control plans - Modesto, CA.
: Create lans and prie and ration moday ura returntrol application, signing and striping CIVIL DESIGNER EXPERIENCE:

Key projects:
• Street Improvement Plan - Costa Mesa, CA
Water Line - La Habra, CA
Retaining wall- Moulton Parkway
• Utility plans- Caltrans I-5 widening project
Project Designer
Key projects:
• Andalucia Apartment Complex - Mission Viejo, CA
• Sun City Shopping Center - Sun City, CA
• Dos Lagos Golf Course - Corona, CA
Project Designer
Key projects:
• Madison Single Family Housing - Irvine, CA
• Whispering Heights Single Family Housing - Riverside, CA • Westborne single family housing - Irvine, CA
Project Designer
Key projects:

Granada Hills Townhouses - Granada Hills, CA
Housing Tract Project - Riverside, CA
• Townhouse Project - Bellflower, CA
• Talega Golf Course Driving Range - San Clemente, CA
• Royal Cabinets - Pomona, CA
Designed, per contract, specifications for a variety of projects:

Traffic improvement plans
• Bike pad improvement plans
• Railroad track improvement plans and profiles
• Land field grading plans
• Commercial, residential, and industrial precise & rough grading plans • Street, sewer, and water improvement plans
Senior CADD Operator
• SCRRA (Metrolink) Commuter Rail Project
MINAGAR & ASSOCIATES, INC.

Traffic/Civil/Electrical Engineering - ITS- Transportation Planning - CEM Consultants

ADAM BASRAWI, BSCE

EXPERIENCE
1 Year Professional Experience

EDUCTION
• California State Polytechnic University, Pomona, BSCE Civil Engineering

EXPERTISE
:
•
•

RELATED SKILLS
Use of various Traffic Engineering and Transportation Planning software:

HCS, SYNCHRO, SimTraffic
AUTOCAD & MicroStation
Advanced Surveying
Highway Design (InRoads, CaiCe)
Civil 3D
MATlab 2018
. Adobe Photoshop & Adobe Illustrator
SYNOPSIS of PROFESSIONAL EXPERIENCE
• Project Engineer for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Huntington Park in Los Angeles County
• Project Engineer for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Guadalupe in Santa Barbara County
• Engineering Assistant for the Preparation of the 2021 City of Santa Fe Springs Citywide Engineering & Traffic Survey for 115 Street Segments, analyzed traffic collisions from SWITRS and UC Berkeley TIMS data sources
• Engineering Assistant for the Preparation of the 2021 City of South Gate Citywide Engineering & Traffic Survey for 49 Street Segments, analyzed traffic collisions from SWITRS and UC Berkeley TIMS data sources
• Performed over a dozen Traffic Signal & Stop Sign Warrant Assessment for the City of Colton, CA
• Prepared a Channelizers Feasibility Study for the Chandi Square Project for the City of Indio, CA
• Prepared a Modification of Curb Markings for the City of Colton, CA • Prepared a Traffic Impact Analysis for a Proposed Distribution Center/Warehouse for the City of La Mirada, CA
Prepared the Traffic Impact Analysis for My Kkids for the City of South Pasadena, CA Prepared a Truck Turning Template at La Cadena & M Street for the City of Colton, CA Evaluated the Existing Union Pacific Railroad At-grade Crossing at Magnolia and Vermont Ave for the City of Gardena, CA
Performed a Protected Left Turn Phase Traffic Signal Warrant Assessment for the Intersection of 1st St and Beaumont Ave for the City of Beaumont, CA Conducted a Parking Study for the City of Hermosa Beach, CA .. Performed a Traffic Impact Study and a Parking Study for the Proposed JetSuite Relocation at John Wayne Airport, Santa Ana & Costa Mesa, CA Performed a Crosswalk and Stop Sign Assessment for the City of Gardena, CA Conducted Field Measurements for the Proposed Electric Vehicle Charging Station Designs for the City of South Gate, CA
• Conducted a Traffic Impact Analysis and Vehicle Miles Traveled for a Proposed Lolo's Hacienda Bed & Breakfast Inn for the City Temecula, CA
Performed a Protected Left Turn Phase Traffic Signal Warrant Assessment for the Intersection of 6st St and Beaumont Ave for the City of Beaumont, CA PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-|4 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works
Appendix C:

Preliminary Environmental Study (PES) Form
and Categorical Exclusion (CE) Process
Flowchart
(M MINAGAR & ASSOCIATES, INC.

PROPOSAL TO PROVIDE PROFESSIONAL PA&ED SERVICES FOR CIP 2019-14 ATP CYCLE V PROJECT City of Huntington Park - Department of Public Works.

Caltrans Preliminary Environmental Study (PES) Form and Categorical Exclusion (CE) Process Flowchart

LOCAL AGENCY
*N. Iresda deso & CE

1. Evelope complica t. is in the seia
project decriprion &
teased nap i dup prior to corna ca imp with
Sention thosudies

2. Reviews salevat of pensita to She

31. Praguaran Suave of Work/ Si tends complici DEAR
%. Completes FES Comatica Contrari
Fores
34 Matifier pob as

16. Dogin faal saga
Morting
DEAR 19. Tians /18 Full. Seoul tra nevittal letter
nie-ary af signed PES Furasia LA

18. Reseas I1.S Fuen. Aceo 29.3 craned technical reporis do Dat. SUP
Rawar signed PLS Fans to LA
Dise. SEP

36. Staturns signed C. to DE. AT
for teame
Assistance Si Ruine a rid repres 4
• Yo 35. Sign: CE: Pora
chionina

9. Requence lee
Eptata L.P2000
Section 106
A3. Proposes
(pites LP.XK0

13. SignaLL 3t. failatze
→[10
Dist. POS
kiciatio
MINAGAR & ASSOCIATES, INC.

M MINAGAR & ASSOCIATES, INC.

ITS - Traffic/Civil/Electrical Engineering - Transportation Planning - Homeland Security - CEM 2019 Winner of the Orange County Engineering Council's Outstanding Service Award ASCE
2016 Winner of the ASCE's Outstanding Civil Engineer in the Private Sector Award in the State of California 2016 Winner of the ASCE Los Angeles Section's Outstanding Civil Engineer in the Private Sector Award 2016 Winner of the ASCE Orange County Chapter's Outstanding Civil Engineer in the Private Sector Award LASCE 2016 Certificate of Recognition for Dedication to Support the ELTP Program by Los Angeles County MTA/Metro M Metro
2016 Winner of the Orange County Engineering Council's Outstanding Engineering Service Award

ORANGE COUNTY
2015 Orange County Business Journal's 2015 Excellence in Entrepreneurship Award Nominee BUSINESS JOURNAT

ORANGE COUNTY
2014 Orange County Business Journal's 2014 Excellence in Entrepreneurship Award Nominee BUSINESS JOURNAl 2012 Winner of Cal-EPA/California Air Resources Board's alifornia Environmental Protection Agency Cool California Climate Leader Air Resources Board
2011 Award of Excellence in Service by Los Angeles County MTA/Metro in the County of Los Angeles Metro
2011 Award of Excellence in Service by Los Angeles County MTA/Metro M in the County of Los Angeles Metro
2010 Award of Excellence in Service by Los Angeles County MTA/Metro M in the County of Los Angeles Metro
2009 Winner of the ASCE's Outstanding Private Sector Civil Engineering Project ASCE
in Metropolitan Los Angeles
2009 Winner of the Caltrans' 2009 Excellence in Transportation Award in the State of California Gatten
2007 Winner of the ASCE's Outstanding Public/Private Sector ASCE M Civil Engineering Project in Metropolitan Los Angeles Metro 2005 Winner of the APWA's Best Traffic Congestion Mitigation Project of the Year M in Southern California Metro
2004 Top Nominee of Transportation Foundation's Highway Management Program in the State of California
2003 Winner of the PTl's Best Transportation Technology Solutions Award pti
in the United States
2002 Winner of the ITS-CA's Best Return on Investment Project Award ITSICA in the State of California
2000 Award of Excellence in Service by Los Angeles County MTA/Metro in the County of Los Angeles Metro
Traffic Engineering
Transportation Planning
ITS (Intelligent Transportation Systems)
Civil/Electrical Engineering
Homeland Security
Construction Engineering Management
Celebrating 29 Years of Planning & Engineering
MINAGAR & ASSOCIATES, INC.
29 Years of
23282 Mill Creek Drive, Suite 120
Engineering & Planning
Excellence Laguna Hills, CA 92653 Excellence
Tel: (949)707-1199
Web- www.minaaarinc.com
ITEM NO. 9
NETON

CITY OF HUNTINGTON PARK
Department of Public Works
City Council Agenda Report
March 15, 2022
Honorable Mayor and Members of the City Council
City of Huntington Park
6550 Miles Avenue
Huntington Park, CA 90255
Dear Mayor and Members of the City Council:

CONSIDERATION AND APPROVAL OF LOS ANGELES COUNTY SAFE, CLEAN WATER PROGRAM ANNUAL EXPENDITURE PLAN FOR FY 2022-23
IT IS RECOMMENDED THAT CITY COUNCIL:

1. Approve the Los Angeles County Safe, Clean Water Program Annual Expenditure Plan for FY 2022-23.

PURPOSE/JUSTIFICATION OF RECOMMENDED ACTION
On July 21, 2020, the City Council authorized the City Manager to sign the Los Angeles County (County) Safe, Clean Water (SCW) Program Transfer Agreement. The Municipal Program is designed to maximize the ability of the City to address local stormwater and urban runoff challenges and opportunities.

Annual Plans are due April 1st of each year for the upcoming Fiscal Year. The intent of lis plan is to provide a description of projects, programs, Operation and Maintenanc nd other activities that are funded through this program. Projects and program presented in the expenditure plan are required to include water quality benefits. Multi- benefit projects and nature-based solutions are also highly encouraged. The plan includes the expected budget of estimated expenditures, overview of benefits achieved, achievement of the City project/program goals, work schedule, completion date and other objectives that will demonstrate the City's use of funds.

Staff's recommendation is for the approval for funding of stormwater related projects and programs are shown on the following table:

Section Amount
A-1 Design of water quality, multi-benefit and nature-based solution:

Green Street Project - Salt Lake Avenue south of Walnut Street $168,040 A-2 A. IC Inspections/MS4 Permit (West & Associates Engineering, Inc) $101,760 B. CIP Re-Evaluation for Stormwater Improvements Program (West $16,240 & Associates Engineering, Inc)
A-3 A. Nationwide Environmental Services (Catch Basin Cleaning) $68,110 B. Nationwide Environmental Services (Street Sweeping) $70,850

CONSIDERATION AND APPROVAL OF LOS ANGELES COUNTY SAFE, CLEAN WATER PROGRAM ANNUAL EXPENDITURE PLAN FOR FY 2021-22
March 16, 2021

Page 2 of 4 ends

A-4 Stakeholder and Community Outreach $5,000
A-5 Post Construction Monitoring $0
Total = $430,000.00
Upon approval of the recommended actions, staff will proceed to upload the detailed information on the Safe, Clean Water Program's website, as this is the new process to submit the annual expenditure report moving forward.

LEGAL REQUIREMENT

18.06 - Municipal Program Implementation.

A. The Municipal Program shall be implemented in accordance with the provisions of this Section.

B. Each Municipality receiving Municipal Program funding from the SCW Program shall perform the following functions as part of the Municipal Program:

1. Prioritize the development of Projects that, to the extent feasible, assist in achieving compliance with the MS4 Permit.

2. Prepare, prior to the start of that Municipality's fiscal year, a plan for how SCW Program funds will be used in the ensuing fiscal year.

3. Comply with all SCW Program reporting and audit requirements, and provide to the District additional financial and other information, as required by the SCW Program or upon request of the District.

4. As part of the Municipal Program planning process, consider Municipal-level requests for Projects from eligible Infrastructure Program Project Applicants.

5. At least annually, prepare and provide to the public informational materials containing up-to-date information on the Municipality's actual and budgeted use of revenues from the SCW Program.

6. Operate in accordance with best practices for government agencies.

7. Be strictly accountable for all funds, receipts, and disbursements by the Municipality.

8. Identify or establish, and then execute, a plan to engage with Stakeholders in the planning process for use of the Municipal Program funds during the planning and implementation of Projects and Programs.

9. Comply with all Transfer Agreement requirements.

10. Prepare a vector minimization plan addressing vector considerations for the design, operation, and maintenance of each Project.

C. Maintenance of Effort.

1. A Municipality must spend at least seventy percent (70%) of its Municipal Program funds annually on eligible expenses related to Projects or Programs implemented on or after November 6, 2018, which also includes operations and maintenance of Projects built to comply with the MS4 Permit, so long as the Project complies with Municipal Program requirements.

2. Up to thirty percent thirty percent (30%) of a Municipality's Municipal Program funds may be used to pay for costs and expenses incurred on or after November 6, 2018, related to the continuation of Programs implemented or the maintenance of Projects implemented prior to November 6, 2018.

D. Municipal Program Annual Progress/Expenditure Reports.

CONSIDERATION AND APPROVAL OF LOS ANGELES COUNTY SAFE, CLEAN WATER PROGRAM ANNUAL EXPENDITURE PLAN FOR FY 2021-22
March 16, 2021

Page 3 of 4 ends

1. Each Municipality shall prepare and submit an annual report to the District, not later than six months after the end of that Municipality's fiscal year.

2. The annual report shall include the following information:
a. A summary of the expenditures and Water Quality, Water Supply, and Community Investment Benefits realized through use of SCW Program funds;
b. The amount of SCW Program funds expended;
c. Documentation that the SCW Program funds were used for eligible expenditures;
d. A description of work accomplished during the reporting period; e. The milestones or deliverables completed/submitted during the reporting period;
f. The work anticipated to be accomplished during the next reporting period; g. Photo documentation of the above, as appropriate;
h. Additional information as required by the District; and i. A description of the Municipality's stakeholder-engagement activities during the reporting period, including documentation, as appropriate.

3. The District shall review each Municipality's annual report to make a preliminary determination of whether and the extent to which each Municipality's expenditures achieved SCW Program Goals, and the District shall forward its preliminary determination to the ROC.

4. The ROC shall review the Municipalities' annual reports after the District has completed its preliminary determination, to evaluate whether and the extent to which the Municipalities' expenditures achieved SCW Program Goals and develop recommendations as appropriate. The ROC shall report its findings and recommendations to the Board and provide copies to the respective Municipalities. (Ord. 2019-0042 § 11, 2019.)

FISCAL IMPACT/FINANCING
Under the SCW Municipal Program, 40% of the funding is allocated to cities as local return with maximum flexibility. Eligible activities include project development, design, construction, effectiveness monitoring, operations and maintenance, programs anc studies related to protecting and improving water quality. The City will receive direci funding via the Municipal Program proportional to the revenues generated within our boundaries.

The following table includes past allocations and actual amounts received.

Fiscal Year Budgeted Amount County Allocation Unspent
2020-21 $365,850 $419,513.82* $184,013.82
2021-22 $393,960 $428,492.25** $186,150.00
2022-23 $430,000 $430,000.00*** $0.00
* Payment Reference # GAX-PW-21000005444
** Payment Reference # TS31185327
*** Projected County Revenues

CONSIDERATION AND APPROVAL OF LOS ANGELES COUNTY SAFE, CLEAN WATER PROGRAM ANNUAL EXPENDITURE PLAN FOR FY 2021-22
March 16, 2021

Page 4 of 4 ends

SCW Program payments distributed to the City shall be held in a separate interest- bearing account and shall not be combined with other funds. Interest earned from each account shall be used by the City only for eligible expenditures consistent with the requirements of the SCW Program.

CONCLUSION
Upon City Council approval, staff will proceed with the recommended actions.

Respectfully submitted,

RICARDO REYES
City Manager
Cuer Pildar

CESAR ROLDAN
Director of Public Works
ITEM 10

CITY OF HUNTINGTON PARK
City Manager's Office
City Council Agenda Report

SILIFORNIN
March 15, 2022
Honorable Mayor and Members of the City Council
City of Huntington Park
6550 Miles Avenue
Huntington Park, CA
90255
Dear Mayor and Members of the City Council:

CONSIDERATION AND APPROVAL OF A RESOLUTION AUTHORIZING THE

CITY TO RETAIN CABRERA CAPITAL MARKETS, LLC AS SOLE BOND

UNDERWRITER, JONES HALL AS BOND AND DISCLOSURE COUNSEL, NHA

ADVISORS AS MUNICIPAL ADVISOR TO HELP THE CITY ISSUE LEASE

REVENUE BONDS AS SECURED BY MEASURE S REVENUES FOR THE

PURPOSE OF RENOVATING AND IMPROVING THE CITY'S AQUATIC CENTER

AND EVALUATE AND ANALYZE OTHER POTENTIAL BOND RELATED

FINANCINGS
IT IS RECOMMENDED THAT CITY COUNCIL:

Adopt Resolution No. 2022-09 to Authorize the City of Huntington Park to issue Lease Revenue Bonds ("the bonds") as secured by Measure S sales tax revenues for the purpose of renovating and improving the city's aquatic center and hire the above referenced finance team to execute the issuance of the bonds and analyze other potential bond related financings.

PURPOSE/JUSTIFICATION OF RECOMMENDED ACTION
On June 5, 2018, voters of the City of Huntington Park approved Measure S, which raised the City's sales tax rate by one cent ($0.01) to fund general city purposes.

As outlined in the text of Measure S, the purpose of the measure was to:
"Maintain and improve services such as 911 emergency services, public safety, senior services, community programs and prevent significant cuts to essential services, by funding general City services including hiring additionalpolice personnel, maintaining anti-gang and graffiti efforts, youth and after-school parks and recreation services, expanding and improving City parks, fixing City streets and public infrastructure."
As such, the City plans to commence a renovation and improvement project for the City's Aquatic Center for which it will need to issue bonds.

ADOPT RESOLUTION NO. 2022-_ AUTHORIZING THE CITY TO RETAIN CABRERA

CAPITAL MARKETS, LLC AS SOLE BOND UNDERWRITER, JONES HALL AS BOND AND

DISCLOSURE COUNSEL, NHA ADVISORS AS MUNICIPAL ADVISOR TO HELP THE CITY

ISSUE LEASE REVENUE BONDS AS SECURED BY MEASURE S REVENUES FOR THE

PURPOSE OF RENOVATING AND IMPROVING THE CITY'S AQUATIC CENTER AND

EVALUATE AND ANALYZE OTHER POTENTIAL BOND RELATED FINANCINGS March 15, 2022

Page 2 of 3 ends

Furthermore, as municipal bond market rates remain favorable, the City has the opportunity to issue bonds as secured by Measure S at reasonable interest rates. The City is expecting to issue approximately $35 million to fund the Aquatic Center renovation and improvement project.

PROJECT BACKGROUND
The City proposes to construct a new 30,000 square foot, two-story, state-of-the-art aquatic center and related facilities including but not limited to a new Olympic size pool (50-meter pool), locker rooms, showers, saunas, gym/exercise room (overlooking the swimming pool from the second floor), conference rooms, multi-purpose room, public restrooms and related amenities, hereinafter referred to as "Aquatic Center". In addition, the City proposes to construct, install and provide a new playground, football field, along with façade modifications to a separate existing building and related infrastructure modifications at and to existing Salt Lake Park facilities, which will augment, compliment and accommodate the Aquatic Center.

FISCAL IMPACT/FINANCING
As is the case with any municipal bonds issued by the City, the City will carry the obligation to pay the principal and interest on the bonds. The cost of issuing bonds and other bond related fees will be paid from bond proceeds. An estimated summary of the proposed structure and debt service of the bonds is outlined below.

Lease Revenue Bonds - Measure S (Uninsured)*
Rates as of: 3/9/2022
Delivery Date: 6/30/2022
20-Year Amortization 30-Year Amortization
Project Fund Deposit $35,000,000 $35,000,000
Bond Par Amount $35,200,000 $35,135,000
Original Issue Premium $3,004,127 $2,526,299
Issuer Cost of Issuance $300,000 $300,000
Underwriters Discount $352,000 $351,350
Debt Service Reserve Fund $2,551,200 $2,007,100
True Interest Cost 3.25% 3.57%
Total Debt Service $50,971,978 $60,141,887
Annual Debt Service $2,624,791 $2,044,290
*Estimates based on current market rates
ADOPT RESOLUTION NO. 2022- AUTHORIZING THE CITY TO RETAIN CABRERA

CAPITAL MARKETS, LLC AS SOLE BOND UNDERWRITER, JONES HALL AS BOND AND

DISCLOSURE COUNSEL, NHA ADVISORS AS MUNICIPAL ADVISOR TO HELP THE CITY

ISSUE LEASE REVENUE BONDS AS SECURED BY MEASURE S REVENUES FOR THE

PURPOSE OF RENOVATING AND IMPROVING THE CITY'S AQUATIC CENTER AND

EVALUATE AND ANALYZE OTHER POTENTIAL BOND RELATED FINANCINGS March 15, 2022

Page 3 of 3 ends

CONCLUSION
The issuance of Lease Revenue Bonds will allow the City to renovate and improve the City's Aquatic Center. It is staff's recommendation that the City Council approve the and Disclosure Counsel, and NHA Advisors as Municipal Advisor to further assess and execute the issuance of the Lease Revenue bonds as well as analyze other potential bond related financings.

Respectfully submitted,

RICARDO REYES
City Manager

ATTACHMENTS)
A. Resolution No. 2022-09 Authorizing the city to retain Cabrera Capital Markets, LLC as Bond Underwriter, Jones Hall as Bond and Disclosure Counsel, NHA Advisors as Municipal Advisor to help the city issue lease revenue bonds as secured by Measure S sales tax revenues for the purpose of renovating and improving the city's aquatic center as well as evaluate and analyze other potential bond related financings.

ATTACHMENT "A"
RESOLUTION NO. 2022-09

RESOLUTION OF THE CITY OF HUNTINGTON PARK APPROVING A

FINANCING TEAM FOR THE PURPOSE OF AUTHORIZING THE

ISSUANCE OF LEASE REVENUE BONDS SECURED BY MEASURE S

REVENUES FOR FUNDING THE PROJECT OF RENOVATING AND

IMPROVING THE CITY'S AQUATIC CENTER AND EVALUATE AND

ANALYZE OTHER POTENTIAL BOND RELATED FINANCINGS
WHEREAS, the City of Huntington Park (the "City") has previously approved construction of a new 30,000 square foot, two-story, state-of-the-art aquatic center and related facilities including but not limited to a new Olympic size pool (50-meter pool), locker rooms, showers, saunas, gym/exercise room (overlooking the swimming pool from the second floor), conference rooms, multi-purpose room, public restrooms and related amenities, hereinafter referred to as "Aquatic Center"; and WHEREAS, the City at this time wishes to commence the necessary steps to issue Lease Revenue Bonds secured by Measure S revenues for the purpose of financing the construction of the Aquatic Center ("Aquatic Center Bonds") and to also evaluate and analyze other potential bond related financings or refundings on behalf of the City ("Future Bonds"); and
WHEREAS, the City wishes at this time to approve the financing team for the purpose of issuing the Aquatic Center Bonds and to evaluate and analyze the issuance of Future Bonds; and
WHEREAS, the City hereby authorizes and directs the financing team to take all steps necessary and required to issue the Aquatic Center Bonds.

NOW, THEREFORE, the City of Huntington Park does hereby resolve as follows:

SECTION 1. The City hereby approves the following consultants and attorneys (collectively the "Financing Team") for the purpose of issuing the Aquatic Center Bonds:

Cabrera Capital Markets, LLC as sole bond Underwriter
Jones Hall as Bond and Disclosure Counsel
NHA Advisors as Municipal Financial Advisor
The City Manager is authorized to negotiate the appropriate retainer or engagement agreements with the above parties for the purpose of delivering all necessary documents to effectuate the issuance of the Aquatic Center Bonds.

SECTION 2. The Finance Team is also hereby directed to evaluate and analyze the issuance of Future Bonds and bring back to the City and City Council recommendations for other bond issuances or refunding opportunities. By authorizing the Financing Team to take such action, the City is under no obligation to accept or approve the recommendations for Future Bond transactions.

SECTION 3. This resolution shall take effect immediately upon its adoption by the City Council, and the City Clerk shall certify the vote adopting this resolution.

APPROVED AND ADOPTED this 15th day of March, 2022 by members of the City Council of the City of Huntington Park.

CITY OF HUNTINGTON PARK
Graciela Ortiz, Mayor
ATTEST: APPROVED AS TO FORM:

Eduardo Sarmiento, City Clerk Arnold M. Alvarez-Glasman, City Attorney