Approve and authorize the purchase of furniture, fixtures, and equipment... Page 161 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
16 146.00 2,336.00 46.33 741.28 68.27204 %FT181.1148T
+Upper Tile,11" h,48" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
16 126.00 2,016.00 39.98 639.68 68.27205 %FT181.1136T
+Upper Tile,11" h,36" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
12 118.00 1,416.00 37.44 449.28 68.27206 %FT181.1130T
+Upper Tile,11" h,30" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
16 109.00 1,744.00 34.59 553.44 68.27207 %FT181.1124T
+Upper Tile,11" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
12 182.00 2,184.00 57.75 693.00 68.27208 %FT170.3048P
+Lower Tile, Pntd 30H 48W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
12 161.00 1,932.00 51.09 613.08 68.27209 %FT170.3036P
+Lower Tile, Pntd 30H 36W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
6 148.00 888.00 46.96 281.76 68.27210 %FT170.3030P
+Lower Tile, Pntd 30H 30W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 31 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 162 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
12 140.00 1,680.00 44.42 533.04 68.27211 %FT170.3024P
+Lower Tile, Pntd 30H 24W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
1 520.00 520.00 165.00 165.00 68.27212 %FV2D2.S36FR
+Square Open Support Leg,for Sq-Edge Surface, 36"D,Fxd Hght,Rt 91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
1 520.00 520.00 165.00 165.00 68.27213 %FV2D2.S36FL
+Square Open Support Leg,for Sq-Edge Surface, 36"D,Fxd Hght,Lft 91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 61.00 366.00 19.36 116.16 68.27214 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white
1ST FLOOR WORKSTATIONSTag:
6 61.00 366.00 19.36 116.16 68.27215 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white
1ST FLOOR WORKSTATIONSTag:
6 51.00 306.00 16.18 97.08 68.27216 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 32 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 163 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
6 51.00 306.00 16.18 97.08 68.27217 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white
1ST FLOOR WORKSTATIONSTag:
8 108.00 864.00 34.27 274.16 68.27218 %FT160.68BP
+Finished End,Base Cover Ptd 68H
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
2 71.00 142.00 22.53 45.06 68.27219 %FT156M.DT
@Controlled Receptacle, 4 Circuit, 20 Amp, Circuit D, Isolated Ground
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish @white
1ST FLOOR WORKSTATIONSTag:
2 265.00 530.00 84.08 168.16 68.27220 %FT155.B
+15 Amp Receptacle 4 Circuit, Duplex, Circuit B 6/Pkg
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white
1ST FLOOR WORKSTATIONSTag:
2 265.00 530.00 84.08 168.16 68.27221 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 33 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 164 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
6 224.00 1,344.00 71.08 426.48 68.27222 %FT150.48
+Base Power Harness 48W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
8 200.00 1,600.00 63.46 507.68 68.27223 %FT150.36
+Base Power Harness 36W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
7 186.00 1,302.00 59.02 413.14 68.27224 %FT150.24
+Base Power Harness 24W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
1 253.00 253.00 80.28 80.28 68.27225 %FT140.06
+Power Entry, External Direct Connect 6'long
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
2 47.00 94.00 14.91 29.82 68.27226 %FT126.4AP
+Top Cap, Conn 90-Deg, Connects-4 Frame Top Caps Ptd
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
2 47.00 94.00 14.91 29.82 68.27227 %FT126.3AP
+Top Cap, Conn 90-Deg, Connects-3 Frame Top Caps Ptd
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
7 47.00 329.00 14.91 104.37 68.27228 %FT126.2AP
+Top Cap, Conn 90-Deg, Connects-2 Frame Top Caps, 90-Deg Ptd 91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 34 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 165 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
7 101.00 707.00 32.05 224.35 68.27229 %FT123.268BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 68H
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
2 83.00 166.00 26.34 52.68 68.27230 %FT123.168BP
+Conn Cover 90-Deg, 1 Side Covered,Base Cover Ptd 68H
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
8 65.00 520.00 20.62 164.96 68.27231 %FT112.48AP
+Frame Top Cap,Standard Ptd 48W
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
8 54.00 432.00 17.13 137.04 68.27232 %FT112.36AP
+Frame Top Cap,Standard Ptd 36W
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 49.00 294.00 15.55 93.30 68.27233 %FT112.30AP
+Frame Top Cap,Standard Ptd 30W
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
8 46.00 368.00 14.60 116.80 68.27234 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
2 394.00 788.00 125.02 250.04 68.27235 %FT110.6848N
+Frame,Base Covers, no knockouts 68H 48W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 415.00 2,490.00 131.68 790.08 68.27236 %FT110.6848J
+Frame,Base Covers, Pwr/Data knockouts 68H 48W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 35 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 166 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 374.00 2,992.00 118.67 949.36 68.27237 %FT110.6836J
+Frame,Base Covers, Pwr/Data knockouts 68H 36W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 337.00 2,022.00 106.93 641.58 68.27238 %FT110.6830N
+Frame,Base Covers, no knockouts 68H 30W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
1 321.00 321.00 101.85 101.85 68.27239 %FT110.6824N
+Frame,Base Covers, no knockouts 68H 24W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
7 337.00 2,359.00 106.93 748.51 68.27240 %FT110.6824J
+Frame,Base Covers, Pwr/Data knockouts 68H 24W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 609.00 3,654.00 199.57 1,197.42 67.23241 %G6160.AB
+Twist LED Task Light,Single unit,Brkt Att
CITY CLERK
FINANCE
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
6 35.00 210.00 10.77 64.62 69.23242 %G1331.
+Cord Cleat 2/Pkg
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 36 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 167 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 82.00 246.00 25.23 75.69 69.23243 %G1190.01
@Carpet Grippers 25/Pkg
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
2 103.00 206.00 32.68 65.36 68.27244 %FV696.48
+Stiffener, 48W
1ST FLOOR WORKSTATIONSTag:
12 50.00 600.00 15.87 190.44 68.27245 %FT128.68
+Connection Hardware, Frame-to-Frame 68H
1ST FLOOR WORKSTATIONSTag:
2 174.00 348.00 55.21 110.42 68.27246 %FT121.457
+Conn 90,Universal,4way-for 53H frames and higher
1ST FLOOR WORKSTATIONSTag:
2 155.00 310.00 49.18 98.36 68.27247 %FT121.357
+Conn 90,Universal,3way-for 53H frames and higher
1ST FLOOR WORKSTATIONSTag:
7 137.00 959.00 43.47 304.29 68.27248 %FT121.257
+Conn 90,Universal,2way,90 deg-for 53H frames and higher 1ST FLOOR WORKSTATIONSTag:
2 .00 .00 .00 .00249 %232092-275
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 37 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 168 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 .00 .00 .00 .00250 %232092-241
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00251 %232092-240
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00252 %232092-239
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00253 %232092-238
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00254 %232092-237
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 38 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 169 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 .00 .00 .00 .00255 %232092-236
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
4 898.00 3,592.00 351.21 1,404.84 60.89256 %LW100.20BBF +Ped W-Pull,Freestd 20D B/B/F
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
2F Base Height +raised height
3M Drawer Interior +drawer divider in one box drawer, pencil tray in one box drawer, 2 file converters in file drawer 1ST FLOOR WORKSTATIONSTag:
8 875.00 7,000.00 277.64 2,221.12 68.27257 %FT170V.3048L Vary Easy Lower Tile, 30" high, 48" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
1ST FLOOR WORKSTATIONSTag:
4 776.00 3,104.00 246.22 984.88 68.27258 %FT170V.3036L
Vary Easy Lower Tile, 30" high, 36" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 39 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 170 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 730.00 2,920.00 231.63 926.52 68.27259 %FT170V.3030L
Vary Easy Lower Tile, 30" high, 30" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
1ST FLOOR WORKSTATIONSTag:
8 683.00 5,464.00 216.72 1,733.76 68.27260 %FT170V.3024L Vary Easy Lower Tile, 30" high, 24" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
1ST FLOOR WORKSTATIONSTag:
1 1,967.00 1,967.00 769.29 769.29 60.89261 %LW400.4226
+Storage Case,W-Pull 42W 26H
SC/36/26
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
1ST FLOOR WORKSTATIONSTag:
4 1,858.00 7,432.00 589.54 2,358.16 68.27262 %FV43P.F81536HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,36" w,high-pressure lam case & dr,lock
FV43P.F8153
6HL
KA Lock Option @keyed alike
91 Case/Edge Finish +white (CP)
91 Door/Edge Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
2 889.00 1,778.00 282.08 564.16 68.27263 %FT188.48F
+Off-Module Upper Tile,48" w,fabric
UOMF11
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
18 614.00 11,052.00 194.82 3,506.76 68.27264 %FT183.2248 +Upper Window Tile,22" h,48" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 40 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 171 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
6 537.00 3,222.00 170.39 1,022.34 68.27265 %FT183.2236
+Upper Window Tile,22" h,36" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
4 501.00 2,004.00 158.97 635.88 68.27266 %FT183.2230
+Upper Window Tile,22" h,30" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
14 461.00 6,454.00 146.28 2,047.92 68.27267 %FT183.2224 +Upper Window Tile,22" h,24" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
2 203.00 406.00 64.41 128.82 68.27268 %FT181.2248T
+Upper Tile,22" h,48" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
4 173.00 692.00 54.89 219.56 68.27269 %FT181.2236T
+Upper Tile,22" h,36" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
42 146.00 6,132.00 46.33 1,945.86 68.27270 %FT181.1148T +Upper Tile,11" h,48" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 41 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 172 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
16 126.00 2,016.00 39.98 639.68 68.27271 %FT181.1136T
+Upper Tile,11" h,36" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
8 118.00 944.00 37.44 299.52 68.27272 %FT181.1130T
+Upper Tile,11" h,30" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
28 109.00 3,052.00 34.59 968.52 68.27273 %FT181.1124T
+Upper Tile,11" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
1ST FLOOR WORKSTATIONSTag:
2 1,808.00 3,616.00 707.11 1,414.22 60.89274 %LG500.4226 +Bookcase 42W 26H
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
32 182.00 5,824.00 57.75 1,848.00 68.27275 %FT170.3048P +Lower Tile, Pntd 30H 48W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
12 161.00 1,932.00 51.09 613.08 68.27276 %FT170.3036P
+Lower Tile, Pntd 30H 36W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 42 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 173 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 148.00 592.00 46.96 187.84 68.27277 %FT170.3030P
+Lower Tile, Pntd 30H 30W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
20 140.00 2,800.00 44.42 888.40 68.27278 %FT170.3024P
+Lower Tile, Pntd 30H 24W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
1ST FLOOR WORKSTATIONSTag:
8 61.00 488.00 19.36 154.88 68.27279 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
8 61.00 488.00 19.36 154.88 68.27280 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
12 51.00 612.00 16.18 194.16 68.27281 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
12 51.00 612.00 16.18 194.16 68.27282 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 43 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 174 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
14 108.00 1,512.00 34.27 479.78 68.27283 %FT160.68BP
+Finished End,Base Cover Ptd 68H
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
1 71.00 71.00 22.53 22.53 68.27284 %FT156M.DT
@Controlled Receptacle, 4 Circuit, 20 Amp, Circuit D, Isolated Ground
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish @white (CP)
1ST FLOOR WORKSTATIONSTag:
2 265.00 530.00 84.08 168.16 68.27285 %FT155.B
+15 Amp Receptacle 4 Circuit, Duplex, Circuit B 6/Pkg
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
2 265.00 530.00 84.08 168.16 68.27286 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
12 224.00 2,688.00 71.08 852.96 68.27287 %FT150.48
+Base Power Harness 48W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 44 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 175 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 200.00 800.00 63.46 253.84 68.27288 %FT150.36
+Base Power Harness 36W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
8 186.00 1,488.00 59.02 472.16 68.27289 %FT150.24
+Base Power Harness 24W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
1 253.00 253.00 80.28 80.28 68.27290 %FT140.06
+Power Entry, External Direct Connect 6'long
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
LZ Wiring Type +PVC-free
1ST FLOOR WORKSTATIONSTag:
3 47.00 141.00 14.91 44.73 68.27291 %FT126.4AP
+Top Cap, Conn 90-Deg, Connects-4 Frame Top Caps Ptd
4A
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
4 47.00 188.00 14.91 59.64 68.27292 %FT126.3AP
+Top Cap, Conn 90-Deg, Connects-3 Frame Top Caps Ptd
3A
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 47.00 282.00 14.91 89.46 68.27293 %FT126.2AP
+Top Cap, Conn 90-Deg, Connects-2 Frame Top Caps, 90-Deg Ptd 2A
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 101.00 606.00 32.05 192.30 68.27294 %FT123.268BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 68H
2/68B
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 45 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 176 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 83.00 332.00 26.34 105.36 68.27295 %FT123.168BP
+Conn Cover 90-Deg, 1 Side Covered,Base Cover Ptd 68H
1/68B
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
20 65.00 1,300.00 20.62 412.40 68.27296 %FT112.48AP
+Frame Top Cap,Standard Ptd 48W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
8 54.00 432.00 17.13 137.04 68.27297 %FT112.36AP
+Frame Top Cap,Standard Ptd 36W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
4 49.00 196.00 15.55 62.20 68.27298 %FT112.30AP
+Frame Top Cap,Standard Ptd 30W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
14 46.00 644.00 14.60 204.40 68.27299 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
8 394.00 3,152.00 125.02 1,000.16 68.27300 %FT110.6848N +Frame,Base Covers, no knockouts 68H 48W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 46 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 177 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
12 415.00 4,980.00 131.68 1,580.16 68.27301 %FT110.6848J +Frame,Base Covers, Pwr/Data knockouts 68H 48W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
4 353.00 1,412.00 112.01 448.04 68.27302 %FT110.6836N
+Frame,Base Covers, no knockouts 68H 36W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
4 374.00 1,496.00 118.67 474.68 68.27303 %FT110.6836J
+Frame,Base Covers, Pwr/Data knockouts 68H 36W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
4 337.00 1,348.00 106.93 427.72 68.27304 %FT110.6830N
+Frame,Base Covers, no knockouts 68H 30W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
6 321.00 1,926.00 101.85 611.10 68.27305 %FT110.6824N
+Frame,Base Covers, no knockouts 68H 24W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 47 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 178 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 337.00 2,696.00 106.93 855.44 68.27306 %FT110.6824J
+Frame,Base Covers, Pwr/Data knockouts 68H 24W
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Base Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
1 106.00 106.00 34.21 34.21 67.73307 %E2931.R
+Work Surf Support Bracket,Right, Pkg of 4
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
1 106.00 106.00 34.21 34.21 67.73308 %E2931.L
+Work Surf Support Bracket,Left, Pkg of 4
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
91 Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
2 393.00 786.00 124.70 249.40 68.27309 %FV2A2.2AFS
+Open Support Leg,Archtrl Foot,Fxd Hght, 12D Shared
91 Surface Finish +white (CP)
1ST FLOOR WORKSTATIONSTag:
4 609.00 2,436.00 199.57 798.28 67.23310 %G6160.AB
+Twist LED Task Light,Single unit,Brkt Att
TL/TW
1ST FLOOR WORKSTATIONSTag:
8 35.00 280.00 10.77 86.16 69.23311 %G1331.
+Cord Cleat 2/Pkg
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 48 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 179 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
20 50.00 1,000.00 15.87 317.40 68.27312 %FT128.68
+Connection Hardware, Frame-to-Frame 68H
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
2 322.00 644.00 102.17 204.34 68.27313 %FT127.B
+Connector Kit, Off-Module 90 deg, for off-module tile(eq or COH frames)
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 174.00 522.00 55.21 165.63 68.27314 %FT121.457
+Conn 90,Universal,4way-for 53H frames and higher
1ST FLOOR WORKSTATIONSTag:
4 155.00 620.00 49.18 196.72 68.27315 %FT121.357
+Conn 90,Universal,3way-for 53H frames and higher
1ST FLOOR WORKSTATIONSTag:
6 137.00 822.00 43.47 260.82 68.27316 %FT121.257
+Conn 90,Universal,2way,90 deg-for 53H frames and higher 1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00317 %232092-280
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00318 %232092-279
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 49 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 180 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 .00 .00 .00 .00319 %232092-278
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00320 %232092-277
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
2 .00 .00 .00 .00321 %232092-276
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00322 %232092-245
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00323 %232092-244
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 50 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 181 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 .00 .00 .00 .00324 %232092-243
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 .00 .00 .00 .00325 %232092-242
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
1ST FLOOR WORKSTATIONSTag:
3 82.00 246.00 25.23 75.69 69.23326 %G1190.01
@Carpet Grippers 25/Pkg
IT
WORK/STOR
AGE 234
1ST FLOOR WORKSTATIONSTag:
4 46.00 184.00 14.60 58.40 68.27327 %FT151.
+Power Harness Extender
1ST FLOOR WORKSTATIONSTag:
HPLCONTRACT
2 419.75 839.50 242.85 485.70 42.14328 %
Rectangular Top 1-1/4" x 30"W x 48"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
3 380.25 1,140.75 220.00 660.00 42.14329 %
Rectangular Top 1-1/4" x 24"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 51 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 182 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HPLCONTRACT
1 234.57 234.57 135.72 135.72 42.14330 %
Common Top 1-1/4" x 20"W x 36"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
2 456.79 913.58 264.29 528.58 42.14331 %
Rectangular Top 1-1/4" x 30"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
2 479.01 958.02 277.14 554.28 42.14332 %
Rectangular Top 1-1/4" x 24"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
2 380.25 760.50 220.00 440.00 42.14333 %
Rectangular Top 1-1/4" x 24"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
3 567.90 1,703.70 328.57 985.71 42.14334 %
Rectangular Top 1-1/4" x 30"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 52 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 183 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HPLCONTRACT
3 479.01 1,437.03 277.14 831.42 42.14335 %
Rectangular Top 1-1/4" x 24"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
3 395.06 1,185.18 228.57 685.71 42.14336 %
Rectangular Top 1-1/4" x 18"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
1 246.91 246.91 142.85 142.85 42.14337 %
Common Top 1-1/4" x 19.38"W x 41.5"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
1 518.52 518.52 300.00 300.00 42.14338 %
Rectangular Top 1-1/4" x 36"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
6 419.75 2,518.50 242.85 1,457.10 42.14339 %
Rectangular Top 1-1/4" x 30"W x 48"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 53 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 184 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HPLCONTRACT
6 380.25 2,281.50 220.00 1,320.00 42.14340 %
Rectangular Top 1-1/4" x 24"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
1 234.57 234.57 135.72 135.72 42.14341 %
Common Top 1-1/4" x 20"W x 36"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
4 567.90 2,271.60 328.57 1,314.28 42.14342 %
Rectangular Top 1-1/4" x 30"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
2 353.09 706.18 204.29 408.58 42.14343 %
Rectangular Top 1-1/4" x 30"W x 51"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
2 419.75 839.50 242.85 485.70 42.14344 %
Rectangular Top 1-1/4" x 30"W x 48"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 54 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 185 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:08:26 PM
G
Quote # 205819
1ST FLOOR WORKSTATIONSDepartment:
Contract
HPLCONTRACT
8 479.01 3,832.08 277.14 2,217.12 42.14345 %
Rectangular Top 1-1/4" x 24"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
4 380.25 1,521.00 220.00 880.00 42.14346 %
Rectangular Top 1-1/4" x 24"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
1 234.57 234.57 135.72 135.72 42.14347 %
Common Top 1-1/4" x 20"W x 36"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
1ST FLOOR WORKSTATIONSTag:
1 .00 .00 3,522.56 3,522.56348 %
Laminate Customization fee
1ST FLOOR WORKSTATIONSTag:
Product Subtotal: $143,139.11
Project DesignerAccount Executive: Frances ArceCiana White Page: 55 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 186 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:28 PM
H
Quote # 205819
1ST FLOOR- CONFERENCE ROOMSDepartment:
Contract
SITONIT
12 1,192.00 14,304.00 582.65 6,991.80 51.121 %6422T.A111 Prava, Midback, Swivel Tilt Cntrl, A111 Arm
1ST
FLOOR-LARG
E CONF 113
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG2 Fabric Grade SelectiFabric Grade 2
ELEMENT Fabric Grade 2 SelecElement Standard Color Selection ONYX Element Color SelectElement Onyx
~ Base Selection Std Black Nylon
C22 Caster Options Hard Floor and Carpet Casters
~ Headrest SelectionNo Selection
AB Packaging OptionsAssembled in a Bag (Southern California) 1ST FLOOR- CONFERENCE ROOMSTag:
8 1,192.00 9,536.00 582.65 4,661.20 51.122 %6422T.A111
Prava, Midback, Swivel Tilt Cntrl, A111 Arm
1ST
FLOOR-MEDI
UM CONF 132
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG2 Fabric Grade SelectiFabric Grade 2
ELEMENT Fabric Grade 2 SelecElement Standard Color Selection ONYX Element Color SelectElement Onyx
~ Base Selection Std Black Nylon
C22 Caster Options Hard Floor and Carpet Casters
~ Headrest SelectionNo Selection
AB Packaging OptionsAssembled in a Bag (Southern California) 1ST FLOOR- CONFERENCE ROOMSTag:
5 1,192.00 5,960.00 582.65 2,913.25 51.123 %6422T.A111
Prava, Midback, Swivel Tilt Cntrl, A111 Arm
1ST
FLOOR-SMAL
L CONF 127
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG2 Fabric Grade SelectiFabric Grade 2
ELEMENT Fabric Grade 2 SelecElement Standard Color Selection ONYX Element Color SelectElement Onyx
~ Base Selection Std Black Nylon
C22 Caster Options Hard Floor and Carpet Casters
~ Headrest SelectionNo Selection
AB Packaging OptionsAssembled in a Bag (Southern California) 1ST FLOOR- CONFERENCE ROOMSTag:
BYRNE
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 187 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:28 PM
H
Quote # 205819
1ST FLOOR- CONFERENCE ROOMSDepartment:
Contract
BYRNE
1 1,368.44 1,368.44 977.45 977.45 28.574 %BE07564-2-2-Z939-UBCC7/UBCC5-1 12" M2XB Multi Outlet
LARGE CONF
113
Side One Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) HDMI Port (w 18" Cable)
Side Two Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) CAT6 Port (w 120" Cable)
Finish: Z939
1ST FLOOR- CONFERENCE ROOMSTag:
1 1,512.76 1,512.76 1,080.53 1,080.53 28.575 %BE07564-2/2-3/1-Z939-UBCC9/UBC 12" M2XB Multi Outlet
LARGE CONF
113
Side One Includes: (2) Power Outlet
(2) Dual USB-C 45W Charger
Side Two Includes: (3) Power Outlet
(1) Dual USB-C 45W Charger
Finish: Z939
1ST FLOOR- CONFERENCE ROOMSTag:
HON
1 3,122.00 3,122.00 1,643.42 1,643.42 47.366 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M597733 M597733
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR- CONFERENCE ROOMSTag:
1 1,436.00 1,436.00 755.91 755.91 47.367 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M611185 M611185
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR- CONFERENCE ROOMSTag:
HON SPECIALS
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 188 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:28 PM
H
Quote # 205819
1ST FLOOR- CONFERENCE ROOMSDepartment:
Contract
HON SPECIALS
3 1,485.00 4,455.00 781.70 2,345.10 47.368 %SPLH-PRES-LHPANL-MDC
CUSTOM LAMINATE BASE
.M611628 M611628
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR- CONFERENCE ROOMSTag:
2 1,485.00 2,970.00 781.70 1,563.40 47.369 %SPLH-PRES-LHPANL-MDC
CUSTOM LAMINATE BASE
.M611628 M611628
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR- CONFERENCE ROOMSTag:
1 .00 .00 2,341.27 2,341.2710 %
Customization fee
1ST FLOOR- CONFERENCE ROOMSTag:
HON
1 1,178.00 1,178.00 620.10 620.10 47.3611 %HTLC4284
84"Wx42"D Rect Shaped Lam Top
SMALL CONF
127
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR- CONFERENCE ROOMSTag:
1 816.00 816.00 429.54 429.54 47.3612 %HTLP84
Lam Pan BaseFor 84" W Table Tops
SMALL CONF
127
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR- CONFERENCE ROOMSTag:
BYRNE
2 15.04 30.08 10.74 21.48 28.5713 %BE07591-EF
Grey Distribution Block
LARGE CONF
113
1ST FLOOR- CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 189 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:28 PM
H
Quote # 205819
1ST FLOOR- CONFERENCE ROOMSDepartment:
Contract
BYRNE
1 15.04 15.04 10.74 10.74 28.5714 %BE07591-E
Black Distribution Block
LARGE CONF
113
1ST FLOOR- CONFERENCE ROOMSTag:
1 111.88 111.88 79.91 79.91 28.5715 %BE07590-E-72
72" Power Infeed
LARGE CONF
113
1ST FLOOR- CONFERENCE ROOMSTag:
2 4.52 9.04 3.23 6.46 28.5716 %BEHK-000122
Cord Management Clips (6-Pack)
LARGE CONF
113
1ST FLOOR- CONFERENCE ROOMSTag:
2 34.42 68.84 24.59 49.18 28.5717 %BE07592-E-48
48" Straight Jumper
LARGE CONF
113
1ST FLOOR- CONFERENCE ROOMSTag:
HON
1 520.00 520.00 273.73 273.73 47.3618 %HTBEAM168
PRESIDE SUPPORT BEAM FOR 168W TABLE TOPS
54" x 14'
1ST FLOOR- CONFERENCE ROOMSTag:
1 246.00 246.00 129.49 129.49 47.3619 %HTBEAM96
PRESIDE SUPPORT BEAM FOR 96W TABLE TOPS
4' x 96"W
1ST FLOOR- CONFERENCE ROOMSTag:
BYRNE
1 1,284.52 1,284.52 917.51 917.51 28.5720 %BE04076-0002263 Custom M2XB: 4 Port
1ST FLOOR- CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 190 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:28 PM
H
Quote # 205819
1ST FLOOR- CONFERENCE ROOMSDepartment:
Contract
Product Subtotal: $27,811.47
Project DesignerAccount Executive: Frances ArceCiana White Page: 5 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 191 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,431.00 3,431.00 1,806.08 1,806.08 47.361 %HNL3672RPRBF 72x36x29-1/2 RP Desk rect top bkft frost mod
OFFICE 122
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,431.00 3,431.00 1,806.08 1,806.08 47.362 %HNL3672LPRBF 72x36x29-1/2 LP Desk rect top bkft frost mod
OFFICE 124
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,431.00 3,431.00 1,806.08 1,806.08 47.363 %HNL3672LPRBF 72x36x29-1/2 LP Desk rect top bkft frost mod
OFFICE 123
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 192 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,431.00 3,431.00 1,806.08 1,806.08 47.364 %HNL3672LPRBF 72x36x29-1/2 LP Desk rect top bkft frost mod
OFFICE 126
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,431.00 3,431.00 1,806.08 1,806.08 47.365 %HNL3672RPRBF 72x36x29-1/2 RP Desk rect top bkft frost mod
OFFICE 128
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,431.00 3,431.00 1,806.08 1,806.08 47.366 %HNL3672RPRBF 72x36x29-1/2 RP Desk rect top bkft frost mod
OFFICE 129
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 193 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,431.00 3,431.00 1,806.08 1,806.08 47.367 %HNL3672RPRBF 72x36x29-1/2 RP Desk rect top bkft frost mod
OFFICE 130
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.368 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 124
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.369 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 118
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 194 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3610 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 119
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3611 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 117
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3612 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 122
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 195 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3613 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 123
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3614 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 126
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3615 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 128
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 5 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 196 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3616 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 129
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3617 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 130
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3618 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
CITY
ENGINEER
121
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 6 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 197 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,066.00 3,066.00 1,613.94 1,613.94 47.3619 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
DIRECTOR
105
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3620 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
OFFICE 117
.M597625 M597625
.G Smooth, Flat
SW Skyline Walnut
.G1 Pop Up Port
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3621 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 108
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3622 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
DIRECTOR 1
.M597625 M597625
.G 2MM/Flat
SW Skyline Walnut
.G1 Pop Up Port
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 7 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 198 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3623 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DIRECTOR
120
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3624 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DIRECTOR
120
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3625 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DIRECTOR
125
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3626 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DIRECTOR
125
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 8 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 199 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3627 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
OFFICE 118
.M597626 M597626
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3628 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
OFFICE 118
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3629 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 118
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3630 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
OFFICE 119
.M597625 M597625
.G 2MM/Flat
SW Skyline Walnut
.G1 Pop Up Port
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 9 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 200 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3631 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
OFFICE 119
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3632 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 119
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3633 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
OFFICE 117
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3634 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 117
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
Project DesignerAccount Executive: Frances ArceCiana White Page: 10 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 201 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3635 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 108
.M597627 M597627
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HON
2 1,417.00 2,834.00 745.91 1,491.82 47.3636 %HNL233028PLF 30Wx23-1/8Dx28-1/2H Lateral File Pedestal
OFFICE 108
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3637 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
CITY ENGIN
.M597626 M597626
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3638 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
CITY
ENGINEER
121
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 11 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 202 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3639 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
CITY
ENGINEER
121
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3640 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
DIRECTOR 1
.M597626 M597626
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3641 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DIRECTOR
105
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3642 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DIRECTOR
105
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
Project DesignerAccount Executive: Frances ArceCiana White Page: 12 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 203 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3643 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
RECORD SPE
.M597627 M597627
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 1,417.00 1,417.00 745.91 745.91 47.3644 %HNL233028PLF 30Wx23-1/8Dx28-1/2H Lateral File Pedestal
RECORD
SPECIALIST
104
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3645 %HNLRC2472
72W x 24D Rectangle Worksurface
DIRECTOR
120
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,358.00 3,358.00 1,767.65 1,767.65 47.3646 %HNL243665SLL 36x24x64-3/4 Storage Cab/Lat File; lam drs
DIRECTOR
120
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 13 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 204 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 444.00 444.00 233.72 233.72 47.3647 %HNLRC3048
48W x 30D Rectangle Worksurface
OFFICE 124
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 628.00 628.00 330.58 330.58 47.3648 %HNLRC3072
72W x 30D Rectangle Worksurface
DIRECTOR
125
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 444.00 444.00 233.72 233.72 47.3649 %HNLRC3048
48W x 30D Rectangle Worksurface
DIRECTOR
125
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3650 %HNLRC2472
72W x 24D Rectangle Worksurface
DIRECTOR
125
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 3,358.00 3,358.00 1,767.65 1,767.65 47.3651 %HNL243665SLL 36x24x64-3/4 Storage Cab/Lat File; lam drs
DIRECTOR
125
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 14 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 205 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 541.00 541.00 284.78 284.78 47.3652 %HNLRC2472
72W x 24D Rectangle Worksurface
OFFICE 118
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3653 %HNLRC2472
72W x 24D Rectangle Worksurface
OFFICE 119
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3654 %HNLRC2472
72W x 24D Rectangle Worksurface
OFFICE 117
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 543.00 543.00 285.84 285.84 47.3655 %HNLRC3060
60W x 30D Rectangle Worksurface
OFFICE 122
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 543.00 543.00 285.84 285.84 47.3656 %HNLRC3060
60W x 30D Rectangle Worksurface
OFFICE 123
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 15 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 206 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 543.00 543.00 285.84 285.84 47.3657 %HNLRC3060
60W x 30D Rectangle Worksurface
OFFICE 126
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 543.00 543.00 285.84 285.84 47.3658 %HNLRC3060
60W x 30D Rectangle Worksurface
OFFICE 128
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 543.00 543.00 285.84 285.84 47.3659 %HNLRC3060
60W x 30D Rectangle Worksurface
OFFICE 129
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 543.00 543.00 285.84 285.84 47.3660 %HNLRC3060
60W x 30D Rectangle Worksurface
OFFICE 130
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
2 380.00 760.00 200.03 400.06 47.3661 %HNLRC2442V
42W x 24D Rectangle Worksurface vert grain
OFFICE 108
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 16 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 207 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 541.00 541.00 284.78 284.78 47.3662 %HNLRC2472
72W x 24D Rectangle Worksurface
CITY
ENGINEER
121
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3663 %HNLRC2472
72W x 24D Rectangle Worksurface
DIRECTOR
105
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 380.00 380.00 200.03 200.03 47.3664 %HNLRC2442V
42W x 24D Rectangle Worksurface vert grain
RECORD
SPECIALIST
104
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
LESRO
36 931.00 33,516.00 540.72 19,465.92 41.9265 %BK1101
Brooklyn Guest Chair, 22.5"W x 23.5"D x 34"H
1ST FLOOR
E Finishes on Maple Mocha (E)
6 Fabric Grades Grade 6 Fabrics
~ Grade 6 Fabrics CF Stinson Artisan Marled upholstery gr 6 WAC Armpads SelectionWood Armcaps (standard)
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 553.00 553.00 291.10 291.10 47.3666 %HCTRND36
Arrange Table 36" Round Top
DIRECTOR
120
.N No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
.SW Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 17 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 208 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 553.00 553.00 291.10 291.10 47.3667 %HCTRND36
Arrange Table 36" Round Top
DIRECTOR
125
.N No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
.SW Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 553.00 553.00 291.10 291.10 47.3668 %HCTRND36
Arrange Table 36" Round Top
CITY
ENGINEER
121
.N No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
.SW Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 553.00 553.00 291.10 291.10 47.3669 %HCTRND36
Arrange Table 36" Round Top
DIRECTOR
105
.N No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
.SW Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 428.00 428.00 225.30 225.30 47.3670 %HNLMP7228
72W x 27-7/8H Modesty / Back Panel
DIRECTOR
120
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 303.00 303.00 159.50 159.50 47.3671 %HNLEP2428L
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Left
DIRECTOR
120
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 527.00 527.00 277.41 277.41 47.3672 %HLSL72TW
Tackboard for 72" W Wallmount Tackboard
DIRECTOR
120
$(A) Grd A Fabric
.APN Appoint
16 Nimbus
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
Project DesignerAccount Executive: Frances ArceCiana White Page: 18 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 209 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.3373 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range
DIRECTOR
120
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
1 2,519.00 2,519.00 999.29 999.29 60.3374 %DV7AC.24D1
@Ht Adj Base Kit w/ C-Foot,24" d (23" surf size),electric ext range,legs outbd (no surf mounted storage)
OFFICE 124
STS Switch Option @simple up/down touch switch
MS Leg/Foot Finish @metallic silver leg with metallic silver foot 57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 428.00 428.00 225.30 225.30 47.3675 %HNLMP7228
72W x 27-7/8H Modesty / Back Panel
DIRECTOR
125
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 303.00 303.00 159.50 159.50 47.3676 %HNLEP2428R
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Right
DIRECTOR
125
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 527.00 527.00 277.41 277.41 47.3677 %HLSL72TW
Tackboard for 72" W Wallmount Tackboard
DIRECTOR
125
$(A) Grd A Fabric
.APN Appoint
16 Nimbus
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.3378 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range
DIRECTOR
125
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
Project DesignerAccount Executive: Frances ArceCiana White Page: 19 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 210 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 428.00 428.00 225.30 225.30 47.3679 %HNLMP7228
72W x 27-7/8H Modesty / Back Panel
OFFICE 118
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 303.00 303.00 159.50 159.50 47.3680 %HNLEP2428R
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Right
OFFICE 118
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.3381 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range OFFICE 118
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 428.00 428.00 225.30 225.30 47.3682 %HNLMP7228
72W x 27-7/8H Modesty / Back Panel
OFFICE 119
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 303.00 303.00 159.50 159.50 47.3683 %HNLEP2428L
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Left
OFFICE 119
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.3384 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range OFFICE 119
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
Project DesignerAccount Executive: Frances ArceCiana White Page: 20 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 211 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 428.00 428.00 225.30 225.30 47.3685 %HNLMP7228
72W x 27-7/8H Modesty / Back Panel
OFFICE 117
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 303.00 303.00 159.50 159.50 47.3686 %HNLEP2428L
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Left
OFFICE 117
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.3387 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range OFFICE 117
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
1 2,519.00 2,519.00 999.29 999.29 60.3388 %DV7AC.24D1
@Ht Adj Base Kit w/ C-Foot,24" d (23" surf size),electric ext range,legs outbd (no surf mounted storage)
OFFICE 122
STS Switch Option @simple up/down touch switch
MS Leg/Foot Finish @metallic silver leg with metallic silver foot 57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
1 2,519.00 2,519.00 999.29 999.29 60.3389 %DV7AC.24D1
@Ht Adj Base Kit w/ C-Foot,24" d (23" surf size),electric ext range,legs outbd (no surf mounted storage)
OFFICE 123
STS Switch Option @simple up/down touch switch
MS Leg/Foot Finish @metallic silver leg with metallic silver foot 57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
1 2,519.00 2,519.00 999.29 999.29 60.3390 %DV7AC.24D1
@Ht Adj Base Kit w/ C-Foot,24" d (23" surf size),electric ext range,legs outbd (no surf mounted storage)
OFFICE 126
STS Switch Option @simple up/down touch switch
MS Leg/Foot Finish @metallic silver leg with metallic silver foot 57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 21 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 212 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HERMANMILLER
1 2,519.00 2,519.00 999.29 999.29 60.3391 %DV7AC.24D1
@Ht Adj Base Kit w/ C-Foot,24" d (23" surf size),electric ext range,legs outbd (no surf mounted storage)
OFFICE 128
STS Switch Option @simple up/down touch switch
MS Leg/Foot Finish @metallic silver leg with metallic silver foot 57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
1 2,519.00 2,519.00 999.29 999.29 60.3392 %DV7AC.24D1
@Ht Adj Base Kit w/ C-Foot,24" d (23" surf size),electric ext range,legs outbd (no surf mounted storage)
OFFICE 129
STS Switch Option @simple up/down touch switch
MS Leg/Foot Finish @metallic silver leg with metallic silver foot 57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
1 2,519.00 2,519.00 999.29 999.29 60.3393 %DV7AC.24D1
@Ht Adj Base Kit w/ C-Foot,24" d (23" surf size),electric ext range,legs outbd (no surf mounted storage)
OFFICE 130
STS Switch Option @simple up/down touch switch
MS Leg/Foot Finish @metallic silver leg with metallic silver foot 57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
2 264.00 528.00 138.97 277.94 47.3694 %HNLMP3028
30W x 27-7/8H Modesty / Ped Back Panel
OFFICE 108
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
2 4,301.00 8,602.00 1,706.21 3,412.42 60.3395 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range OFFICE 108
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
Project DesignerAccount Executive: Frances ArceCiana White Page: 22 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 213 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 428.00 428.00 225.30 225.30 47.3696 %HNLMP7228
72W x 27-7/8H Modesty / Back Panel
CITY
ENGINEER
121
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 303.00 303.00 159.50 159.50 47.3697 %HNLEP2428R
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Right
CITY
ENGINEER
121
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 527.00 527.00 277.41 277.41 47.3698 %HLSL72TW
Tackboard for 72" W Wallmount Tackboard
CITY
ENGINEER
121
$(A) Grd A Fabric
.APN Appoint
16 Nimbus
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.3399 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range CITY
ENGINEER
121
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 428.00 428.00 225.30 225.30 47.36100 %HNLMP7228
72W x 27-7/8H Modesty / Back Panel
DIRECTOR
105
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 303.00 303.00 159.50 159.50 47.36101 %HNLEP2428R
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Right
DIRECTOR
105
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 23 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 214 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 527.00 527.00 277.41 277.41 47.36102 %HLSL72TW
Tackboard for 72" W Wallmount Tackboard
DIRECTOR
105
$(A) Grd A Fabric
.APN Appoint
16 Nimbus
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.33103 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range
DIRECTOR
105
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 264.00 264.00 138.97 138.97 47.36104 %HNLMP3028
30W x 27-7/8H Modesty / Ped Back Panel
RECORD
SPECIALIST
104
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 4,301.00 4,301.00 1,706.21 1,706.21 60.33105 %DV7FC.24D @C-Foot 3 Leg Base Kit,24" d (23" surf size),electric ext range RECORD
SPECIALIST
104
STS Switch Option @simple up/down touch switch
MS Base Finish @metallic silver
57 Glides @glides
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 1,008.00 1,008.00 530.61 530.61 47.36106 %HUSAMOD1360 Acrylic Modesty 13h x 60w
DIRECTOR
120
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
1 2,544.00 2,544.00 1,339.16 1,339.16 47.36107 %HNL1572FD 72x15x15 Wall Mount Storage frosted drs
DIRECTOR
120
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 24 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 215 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 767.00 767.00 403.75 403.75 47.36108 %HCT29MX
Arrange Seated Height X-base for 36" Surfaces
DIRECTOR
120
$(P1) P1 Paint Opts
.PLAT Platinum Textured
1ST FLOOR - PRIVATE OFFICESTag:
1 1,008.00 1,008.00 530.61 530.61 47.36109 %HUSAMOD1360 Acrylic Modesty 13h x 60w
DIRECTOR
125
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
1 2,544.00 2,544.00 1,339.16 1,339.16 47.36110 %HNL1572FD 72x15x15 Wall Mount Storage frosted drs
DIRECTOR
125
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 767.00 767.00 403.75 403.75 47.36111 %HCT29MX
Arrange Seated Height X-base for 36" Surfaces
DIRECTOR
125
$(P1) P1 Paint Opts
.PLAT Platinum Textured
1ST FLOOR - PRIVATE OFFICESTag:
1 1,008.00 1,008.00 530.61 530.61 47.36112 %HUSAMOD1360 Acrylic Modesty 13h x 60w
OFFICE 118
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
1 1,008.00 1,008.00 530.61 530.61 47.36113 %HUSAMOD1360 Acrylic Modesty 13h x 60w
OFFICE 119
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
1 1,008.00 1,008.00 530.61 530.61 47.36114 %HUSAMOD1360 Acrylic Modesty 13h x 60w
OFFICE 117
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
2 522.00 1,044.00 274.78 549.56 47.36115 %HSDSL29
Abode Shared Leg
OFFICE 108
$(P1) P1 Paint Opts
.P8T Titanium
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 25 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 216 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,008.00 1,008.00 530.61 530.61 47.36116 %HUSAMOD1360 Acrylic Modesty 13h x 60w
CITY
ENGINEER
121
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
1 2,544.00 2,544.00 1,339.16 1,339.16 47.36117 %HNL1572FD 72x15x15 Wall Mount Storage frosted drs
CITY
ENGINEER
121
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 767.00 767.00 403.75 403.75 47.36118 %HCT29MX
Arrange Seated Height X-base for 36" Surfaces
CITY
ENGINEER
121
$(P1) P1 Paint Opts
.PLAT Platinum Textured
1ST FLOOR - PRIVATE OFFICESTag:
1 1,008.00 1,008.00 530.61 530.61 47.36119 %HUSAMOD1360 Acrylic Modesty 13h x 60w
DIRECTOR
105
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
1 2,544.00 2,544.00 1,339.16 1,339.16 47.36120 %HNL1572FD 72x15x15 Wall Mount Storage frosted drs
DIRECTOR
105
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
1ST FLOOR - PRIVATE OFFICESTag:
1 767.00 767.00 403.75 403.75 47.36121 %HCT29MX
Arrange Seated Height X-base for 36" Surfaces
DIRECTOR
105
$(P1) P1 Paint Opts
.PLAT Platinum Textured
1ST FLOOR - PRIVATE OFFICESTag:
1 1,008.00 1,008.00 530.61 530.61 47.36122 %HUSAMOD1360 Acrylic Modesty 13h x 60w
RECORD
SPECIALIST
104
$(P1) P1 Paint Opts
.P71 Black
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 26 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 217 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 522.00 522.00 274.78 274.78 47.36123 %HSDSL29
Abode Shared Leg
RECORD
SPECIALIST
104
$(P1) P1 Paint Opts
.P8T Titanium
1ST FLOOR - PRIVATE OFFICESTag:
1 136.00 136.00 71.59 71.59 47.36124 %HLSLZ5SC54
42"W External Stiffener
DIRECTOR
120
.P Black
1ST FLOOR - PRIVATE OFFICESTag:
1 136.00 136.00 71.59 71.59 47.36125 %HLSLZ5SC54
42"W External Stiffener
DIRECTOR
125
.P Black
1ST FLOOR - PRIVATE OFFICESTag:
1 91.00 91.00 47.90 47.90 47.36126 %HHN831130
Flat Bracket 30D
DIRECTOR
125
.S Charcoal
1ST FLOOR - PRIVATE OFFICESTag:
1 136.00 136.00 71.59 71.59 47.36127 %HLSLZ5SC54
42"W External Stiffener
OFFICE 118
.P Black
1ST FLOOR - PRIVATE OFFICESTag:
1 136.00 136.00 71.59 71.59 47.36128 %HLSLZ5SC54
42"W External Stiffener
OFFICE 119
.P Black
1ST FLOOR - PRIVATE OFFICESTag:
1 136.00 136.00 71.59 71.59 47.36129 %HLSLZ5SC54
42"W External Stiffener
OFFICE 117
.P Black
1ST FLOOR - PRIVATE OFFICESTag:
HERMANMILLER
1 103.00 103.00 32.68 32.68 68.27130 %FV696.48
+Stiffener, 48W
1ST FLOOR - PRIVATE OFFICESTag:
1 103.00 103.00 32.68 32.68 68.27131 %FV696.48
+Stiffener, 48W
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 27 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 218 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HERMANMILLER
1 103.00 103.00 32.68 32.68 68.27132 %FV696.48
+Stiffener, 48W
1ST FLOOR - PRIVATE OFFICESTag:
1 103.00 103.00 32.68 32.68 68.27133 %FV696.48
+Stiffener, 48W
1ST FLOOR - PRIVATE OFFICESTag:
1 103.00 103.00 32.68 32.68 68.27134 %FV696.48
+Stiffener, 48W
1ST FLOOR - PRIVATE OFFICESTag:
1 103.00 103.00 32.68 32.68 68.27135 %FV696.48
+Stiffener, 48W
1ST FLOOR - PRIVATE OFFICESTag:
HON
1 136.00 136.00 71.59 71.59 47.36136 %HLSLZ5SC54
42"W External Stiffener
CITY
ENGINEER
121
.P Black
1ST FLOOR - PRIVATE OFFICESTag:
1 136.00 136.00 71.59 71.59 47.36137 %HLSLZ5SC54
42"W External Stiffener
DIRECTOR
105
.P Black
1ST FLOOR - PRIVATE OFFICESTag:
1 514.00 514.00 270.57 270.57 47.36138 %HLED17AUO
17"LED Lt w/8"JmprCordDaisyChain(FOLLOWR)
DIRECTOR
120
1ST FLOOR - PRIVATE OFFICESTag:
1 628.00 628.00 330.58 330.58 47.36139 %HLED17A
17" LED Light W/PwrSupplyForDaisyChain(STARTER)
DIRECTOR
120
1ST FLOOR - PRIVATE OFFICESTag:
1 514.00 514.00 270.57 270.57 47.36140 %HLED17AUO
17"LED Lt w/8"JmprCordDaisyChain(FOLLOWR)
DIRECTOR
125
1ST FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 28 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 219 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:32 PM
I
Quote # 205819
1ST FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 628.00 628.00 330.58 330.58 47.36141 %HLED17A
17" LED Light W/PwrSupplyForDaisyChain(STARTER)
DIRECTOR
125
1ST FLOOR - PRIVATE OFFICESTag:
1 514.00 514.00 270.57 270.57 47.36142 %HLED17AUO
17"LED Lt w/8"JmprCordDaisyChain(FOLLOWR)
CITY
ENGINEER
121
1ST FLOOR - PRIVATE OFFICESTag:
1 628.00 628.00 330.58 330.58 47.36143 %HLED17A
17" LED Light W/PwrSupplyForDaisyChain(STARTER)
CITY
ENGINEER
121
1ST FLOOR - PRIVATE OFFICESTag:
1 514.00 514.00 270.57 270.57 47.36144 %HLED17AUO
17"LED Lt w/8"JmprCordDaisyChain(FOLLOWR)
DIRECTOR
105
1ST FLOOR - PRIVATE OFFICESTag:
1 628.00 628.00 330.58 330.58 47.36145 %HLED17A
17" LED Light W/PwrSupplyForDaisyChain(STARTER)
DIRECTOR
105
1ST FLOOR - PRIVATE OFFICESTag:
Product Subtotal: $129,906.54
Project DesignerAccount Executive: Frances ArceCiana White Page: 29 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 220 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:57 PM
J
Quote # 205819
1ST & 2ND FLOOR SHELVINGDepartment:
Contract
WESTERNPACIFIC
45 6.32 284.40 4.52 203.40 28.511 %PB3018
Particle Board,29 13/16 X 17 13/16
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
50 .90 45.00 .54 27.00 40.002 %TP2
Tie Plate,Riv II,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
120 10.97 1,316.40 6.58 789.60 40.003 %SS48
Support,Double Rivet,48 in,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
20 9.70 194.00 5.82 116.40 40.004 %SS42
Support,Double Rivet,42 in,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
20 8.40 168.00 5.04 100.80 40.005 %SS36
Support,Double Rivet,36 in,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
120 7.16 859.20 4.30 516.00 40.006 %SS30
Support,Double Rivet,30 in,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
250 4.56 1,140.00 2.74 685.00 40.007 %SS18
Support,Double Rivet,18 in,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 221 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:57 PM
J
Quote # 205819
1ST & 2ND FLOOR SHELVINGDepartment:
Contract
WESTERNPACIFIC
100 1.08 108.00 .65 65.00 40.008 %SF
Foot Plate,Single,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
60 11.62 697.20 8.30 498.00 28.559 %PB4818
Particle Board,47 13/16 x 17 13/16
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
10 12.24 122.40 8.74 87.40 28.5910 %PB4218
Particle Board,41 13/16 X 17 13/16
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
10 11.32 113.20 8.09 80.90 28.5611 %PB3618
Particle Board,35 13/16 x 17 13/16
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
100 12.41 1,241.00 7.45 745.00 40.0012 %06LURH
Upright,Standard,06 ft,Gray
FLR 1&2-
C006-C007 &
C010-C011 &
C018
1ST & 2ND FLOOR SHELVINGTag:
Product Subtotal: $3,914.50
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 222 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:59 PM
K
Quote # 205819
2ND FLOOR - RECEPTIONDepartment:
Contract
HERMANMILLER
1 840.00 840.00 328.52 328.52 60.891 %LW110.20BF
+Ped W-Pull,Mobile 20D B/F
RECEPTION
205
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
5M Drawer Interior +pencil tray in box drawer, 2 file converters in file drawer H1 Handle +hand grip only
2ND FLOOR - RECEPTIONTag:
1 1,814.00 1,814.00 709.46 709.46 60.892 %LW200.421
+Lat File,W-Pull Freestd 2 Dwr Raised Hgt 42W
RECEPTION
205
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
1R Drawer Interior +front-to-back filing rail
2ND FLOOR - RECEPTIONTag:
1 1,667.00 1,667.00 651.96 651.96 60.893 %LW200.361
+Lat File,W-Pull Freestd 2 Dwr Raised Hgt 36W
RECEPTION
205
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
1R Drawer Interior +front-to-back filing rail
2ND FLOOR - RECEPTIONTag:
HPLCONTRACT
1 239.51 239.51 138.57 138.57 42.144 %
Rectangular Top 1-1/4" x 24"W x 33"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR - RECEPTIONTag:
1 753.09 753.09 435.72 435.72 42.145 %
Corner Worksurface Surface w/ Return: 1-1/4" x 30"W x 72"L Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR - RECEPTIONTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 223 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:59 PM
K
Quote # 205819
2ND FLOOR - RECEPTIONDepartment:
Contract
HPLCONTRACT
1 234.57 234.57 135.72 135.72 42.146 %
Common Top 1-1/4" x 19.38"W x 41.63"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR - RECEPTIONTag:
1 246.91 246.91 142.85 142.85 42.147 %
Common Top 1-1/4" x 19.38"W x 35.63"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR - RECEPTIONTag:
HERMANMILLER
1 1,621.00 1,621.00 514.34 514.34 68.278 %FT351.C5366R
@Pari Screen, Surface Attached, Canvas Surf Att, Tack Fabric Horz 53H 66W
RECEPTION
205
G2 Bracket Finish @graphite satin
2V Fabric +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR - RECEPTIONTag:
1 272.00 272.00 106.38 106.38 60.899 %LG890.220
+Pedestal Add-On Cushion Top 2H 20D
RECEPTION
205
1HA Cushion Top Fabric+medley-Pr Cat 2
01 1HA_Colors +medley stone
2ND FLOOR - RECEPTIONTag:
1 672.00 672.00 213.23 213.23 68.2710 %FV2A2.30FR
+Open Support Leg,Archtrl Foot,Fxd Hght,Rt 30D
RECEPTION
205
91 Surface Finish +white
2ND FLOOR - RECEPTIONTag:
1 672.00 672.00 213.23 213.23 68.2711 %FV2A2.30FL
+Open Support Leg,Archtrl Foot,Fxd Hght,Lft 30D
RECEPTION
205
91 Surface Finish +white
2ND FLOOR - RECEPTIONTag:
1 393.00 393.00 124.70 124.70 68.2712 %FV2A2.2AFS
+Open Support Leg,Archtrl Foot,Fxd Hght, 12D Shared
RECEPTION
205
91 Surface Finish +white
2ND FLOOR - RECEPTIONTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 224 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:59 PM
K
Quote # 205819
2ND FLOOR - RECEPTIONDepartment:
Contract
HERMANMILLER
1 641.00 641.00 203.39 203.39 68.2713 %FV2A2.24FR
+Open Support Leg,Archtrl Foot,Fxd Hght,Rt 24D
RECEPTION
205
91 Surface Finish +white
2ND FLOOR - RECEPTIONTag:
ELEVATE
1 82.00 82.00 29.32 29.32 64.2514 %GMSPW
Elevate™ Surge Protector
RECEPTION
205
White
2ND FLOOR - RECEPTIONTag:
HERMANMILLER
1 35.00 35.00 10.77 10.77 69.2315 %G1331.
+Cord Cleat 2/Pkg
RECEPTION
205
2ND FLOOR - RECEPTIONTag:
1 103.00 103.00 32.68 32.68 68.2716 %FV696.48
+Stiffener, 48W
RECEPTION
205
2ND FLOOR - RECEPTIONTag:
1 37.00 37.00 11.74 11.74 68.2717 %FT29B.1
+Surface Ganging Bracket,single
RECEPTION
205
2ND FLOOR - RECEPTIONTag:
3 .00 .00 .00 .0018 %232092-273
Lock Plug & Keys
RECEPTION
205
2ND FLOOR - RECEPTIONTag:
2 .00 .00 .00 .0019 %232092-272
Lock Plug & Keys
RECEPTION
205
2ND FLOOR - RECEPTIONTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 225 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:09:59 PM
K
Quote # 205819
2ND FLOOR - RECEPTIONDepartment:
Contract
Product Subtotal: $4,002.58
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 226 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:03 PM
L
Quote # 205819
2ND FLOOR LOBBY AND BREAKROOMSDepartment:
Contract
ERG
6 2,395.00 14,370.00 1,434.13 8,604.78 40.121 %3912
Malibu 22" Straight Module
2ND
FLR-CIRCUL
ATION 200
GR3 Fabric Grade SelectiGrade 3
~ Grade 3 Pattern SeleStinson Satchel Flint SAT28 Flint ~ CA 133 Option No Selection
~ Moisture Barrier OptNo Selection
~ Leg Finish Option Standard Powder Coat
BA Powder Coat FinishBrushed Aluminum
~ Fixed Blade Tablet ONo Tablet
GD1 Ganging Device OptioRatchet Ganging Device (Reconfigurable) ~ Multiple Fabric OptiNo Selection
~ Floor Mount Glide OpNo Selection
~ Cove Flush Mount OptNo Selection
2ND FLOOR LOBBY AND BREAKROOMSTag:
4 2,395.00 9,580.00 1,434.13 5,736.52 40.122 %3912
Malibu 22" Straight Module
2ND
FLR-CIRCUL
ATION 200
GR3 Fabric Grade SelectiGrade 3
~ Grade 3 Pattern SeleStinson Satchel Flint SAT28 Flint ~ CA 133 Option No Selection
~ Moisture Barrier OptNo Selection
~ Leg Finish Option Standard Powder Coat
BA Powder Coat FinishBrushed Aluminum
~ Fixed Blade Tablet ONo Tablet
GD1 Ganging Device OptioRatchet Ganging Device (Reconfigurable) ~ Multiple Fabric OptiNo Selection
~ Floor Mount Glide OpNo Selection
~ Cove Flush Mount OptNo Selection
2ND FLOOR LOBBY AND BREAKROOMSTag:
2 2,342.00 4,684.00 1,402.39 2,804.78 40.123 %DUN1426
Duncan - 14" x 26" Rectangle End Table (4 legs)
2ND
FLR-CIRCUL
ATION 200
LAM Surface Type SelectiLaminate Top Surface
~ Laminate Finish OptiWILSONART PHANTOM ECRU 8212K-28
~ Leg Finish Option Standard Powder Coat
BA Powder Coat FinishBrushed Aluminum
~ Cove Flush Mount OptNo Selection
2ND FLOOR LOBBY AND BREAKROOMSTag:
HON
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 227 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:03 PM
L
Quote # 205819
2ND FLOOR LOBBY AND BREAKROOMSDepartment:
Contract
HON
1 652.00 652.00 343.21 343.21 47.364 %HTLC3060
Preside 60W x 30D Rectangular Shaped Laminate Top
STAFF
BREAK 224
.G 2MM/Flat
PE Phantom Ecru
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LPE1 Phantom Ecru
2ND FLOOR LOBBY AND BREAKROOMSTag:
1 670.00 670.00 352.69 352.69 47.365 %HFTLS36
Flock 36 Square Laminate Top
STAFF
BREAK 224
.G 2MM Edge
PE Phantom Ecru
.N No Grommet
$(L2STD) Grd L2 Standard Laminates
.LPE1 Phantom Ecru
2ND FLOOR LOBBY AND BREAKROOMSTag:
ERG
2 2,342.00 4,684.00 1,402.39 2,804.78 40.126 %DUN1426
Duncan - 14" x 26" Rectangle End Table (4 legs)
2ND
FLR-CIRCUL
ATION 200
LAM Surface Type SelectiLaminate Top Surface
~ Laminate Finish OptiWILSONART PHANTOM ECRU 8212K-28
~ Leg Finish Option Standard Powder Coat
BA Powder Coat FinishBrushed Aluminum
~ Cove Flush Mount OptNo Selection
2ND FLOOR LOBBY AND BREAKROOMSTag:
HON
2 1,487.00 2,974.00 782.76 1,565.52 47.367 %HFSS74L
Flock Stool 4-Leg
STAFF
BREAK 224
$(11) Grade 11 Uph
.SMHMAPT Apt
20 Botanic
.PR8 Silver Texture
2ND FLOOR LOBBY AND BREAKROOMSTag:
2 1,271.00 2,542.00 669.05 1,338.10 47.368 %HFCG6
Flock Casual Guest
STAFF
BREAK 224
$(11) Grade 11 Uph
.SMHMAPT Apt
20 Botanic
.PR8 Silver Texture
2ND FLOOR LOBBY AND BREAKROOMSTag:
KNOLL
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 228 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:03 PM
L
Quote # 205819
2ND FLOOR LOBBY AND BREAKROOMSDepartment:
Contract
KNOLL
1 8,036.00 8,036.00 3,999.52 3,999.52 50.239 %KL6HBG
k. lounge Bench, with high back, three seat, single upholstery, glides STAFF
BREAK 224
~ Cutout Option No Cutout
(K1925) Textile Type SelectiTEX: Prairie (B)
K192518 Prairie Color SelectCOL: Bison
2ND FLOOR LOBBY AND BREAKROOMSTag:
HON
1 827.00 827.00 435.33 435.33 47.3610 %HTXLEGSH
Preside Standing Height Aluminum X-Leg
STAFF
BREAK 224
$(P2) P2 Paint Opts
.PR6 Silver
2ND FLOOR LOBBY AND BREAKROOMSTag:
1 1,087.00 1,087.00 572.20 572.20 47.3611 %HT29FB3060
Preside 29.5H Footed Base for 30x60 Top
STAFF
BREAK 224
$(P2) P2 Paint Opts
.PR6 Silver
2ND FLOOR LOBBY AND BREAKROOMSTag:
ERG
23 116.00 2,668.00 69.46 1,597.58 40.1212 %GD1
RATCHET GANGING DEVICE
2ND
FLR-CIRCUL
ATION 200
2ND FLOOR LOBBY AND BREAKROOMSTag:
Product Subtotal: $30,155.01
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 229 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:05 PM
M
Quote # 205819
2ND FLOOR STORAGE ROOMS & ISLANDDepartment:
Contract
HERMANMILLER
4 2,099.00 8,396.00 997.65 3,990.60 52.471 %26-4220-3
+Lateral File Std Pull 3-High 42W 20D
FINANCE
STORAGE
ISLAND
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
T2 Top +1 1/4"-high painted metal top with squared edge E Module Selection +fixed front 13-1/8
9P Interior Selection +Front to Back Hanging
KA Lock +keyed alike
E Module Selection #2+fixed front 13-1/8
9P Interior Selection # +Front to Back Hanging
E Module Selection #3+fixed front 13-1/8
9P Interior Selection # +Front to Back Hanging
CB Counterweight +counterweight
B2 Base Selection +Base 1-1/2 in H
2ND FLOOR STORAGE ROOMS & ISLANDTag:
4 2,055.00 8,220.00 976.74 3,906.96 52.472 %26-4220-3
+Lateral File Std Pull 3-High 42W 20D
FINANCE
STORAGE
ISLAND
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
T2 Top +1 1/4"-high painted metal top with squared edge J Module Selection @Open Full Back 13-1/8
J Module Selection #2+Open Full Back 13-1/8
J Module Selection #3+Open Full Back 13-1/8
NO Counterweight +no counterweight
B2 Base Selection +Base 1-1/2 in H
2ND FLOOR STORAGE ROOMS & ISLANDTag:
2 3,899.00 7,798.00 1,524.90 3,049.80 60.893 %LW200.425 +Lat File,W-Pull Freestd Flip Dr W/Pullout Shf,4 Dwr 42W
STORAGE
204
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
3R Drawer Interior +front-to-back filing rail and dividers in flipper 2ND FLOOR STORAGE ROOMS & ISLANDTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 230 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:05 PM
M
Quote # 205819
2ND FLOOR STORAGE ROOMS & ISLANDDepartment:
Contract
HERMANMILLER
2 3,899.00 7,798.00 1,524.90 3,049.80 60.894 %LW200.425 +Lat File,W-Pull Freestd Flip Dr W/Pullout Shf,4 Dwr 42W FILE
STORAGE
236
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
3R Drawer Interior +front-to-back filing rail and dividers in flipper 2ND FLOOR STORAGE ROOMS & ISLANDTag:
1 3,570.00 3,570.00 1,396.23 1,396.23 60.895 %LW200.365 +Lat File,W-Pull Freestd Flip Dr W/Pullout Shf,4 Dwr 36W FILE
STORAGE
236
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
3R Drawer Interior +front-to-back filing rail and dividers in flipper 2ND FLOOR STORAGE ROOMS & ISLANDTag:
3 3,285.00 9,855.00 1,284.76 3,854.28 60.896 %LW200.305 +Lat File,W-Pull Freestd Flip Dr W/Pullout Shf,4 Dwr 30W FILE
STORAGE
236
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
3R Drawer Interior +front-to-back filing rail and dividers in flipper 2ND FLOOR STORAGE ROOMS & ISLANDTag:
HPLCONTRACT
2 629.63 1,259.26 364.29 728.58 42.147 %
Common Top 1-1/4" x 40"W x 84"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR STORAGE ROOMS & ISLANDTag:
HERMANMILLER
3 .00 .00 .00 .008 %232092-274
Lock Plug & Keys
STORAGE
204
2ND FLOOR STORAGE ROOMS & ISLANDTag:
GMHARDWARE
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 231 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:05 PM
M
Quote # 205819
2ND FLOOR STORAGE ROOMS & ISLANDDepartment:
Contract
GMHARDWARE
2 .00 .00 .80 1.609 %GM HARDWARE
GM L-BRACKET
STORAGE
204
2ND FLOOR STORAGE ROOMS & ISLANDTag:
HERMANMILLER
5 .00 .00 .00 .0010 %232092-275
Lock Plug & Keys
FINANCE
STORAGE
ISLAND
2ND FLOOR STORAGE ROOMS & ISLANDTag:
7 .00 .00 .00 .0011 %232092-255
Lock Plug & Keys
FILE
STORAGE
236
2ND FLOOR STORAGE ROOMS & ISLANDTag:
GMHARDWARE
8 .00 .00 .80 6.4012 %GM HARDWARE
GM L-BRACKET
FILE
STORAGE
236
2ND FLOOR STORAGE ROOMS & ISLANDTag:
Product Subtotal: $19,984.25
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 232 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
ELEVATE
3 82.00 246.00 29.32 87.96 64.251 %GMSPW
Elevate™ Surge Protector
HR
WORKSTATI
ONS
White
2ND FLOOR- WORKSTATIONSTag:
2 82.00 164.00 29.32 58.64 64.252 %GMSPW
Elevate™ Surge Protector
IT
WORK/STOR
AGE 234
White
2ND FLOOR- WORKSTATIONSTag:
2 82.00 164.00 29.32 58.64 64.253 %GMSPW
Elevate™ Surge Protector
IT
WORKSTATI
ONS
White
2ND FLOOR- WORKSTATIONSTag:
4 82.00 328.00 29.32 117.28 64.254 %GMSPW
Elevate™ Surge Protector
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
White
2ND FLOOR- WORKSTATIONSTag:
4 82.00 328.00 29.32 117.28 64.255 %GMSPW
Elevate™ Surge Protector
FINANCE
WORKSTATI
ONS
White
2ND FLOOR- WORKSTATIONSTag:
4 82.00 328.00 29.32 117.28 64.256 %GMSPW
Elevate™ Surge Protector
CITY
MANAGER
WORKSTATI
ONS
White
2ND FLOOR- WORKSTATIONSTag:
HERMANMILLER
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 233 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 751.00 1,502.00 238.29 476.58 68.277 %SA928643
Vary Easy Lower Tile
FINANCE
WORKSTATI
ONS
Standard Product Reference:FT170V.3024LZZ9Z3W9191
Standard Product Reference::FT170V.3024LZZ9Z3W9191
Deviation::Width
Tile Type:S:standard
Height:30:30" high
Width:18:18" wide
Surface Material:L:high-pressure laminate with squared edge and vertical grain Surface Finish:ZZ:open line high-pressure laminate (nonstandard) Open Line Laminate Entry:9Z3W:phantom pearl
Horizontal Bead Finish:91:white (CP)
Edge Finish:91:white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 840.00 2,520.00 328.52 985.56 60.898 %LW110.20BF
+Ped W-Pull,Mobile 20D B/F
HR
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
5M Drawer Interior +pencil tray in box drawer, 2 file converters in file drawer H1 Handle +hand grip only
2ND FLOOR- WORKSTATIONSTag:
2 1,474.00 2,948.00 576.48 1,152.96 60.899 %LW200.301
+Lat File,W-Pull Freestd 2 Dwr Raised Hgt 30W
HR
WORKSTATI
ONS
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
1R Drawer Interior +front-to-back filing rail
2ND FLOOR- WORKSTATIONSTag:
2 823.00 1,646.00 261.14 522.28 68.2710 %FT170V.3042L
Vary Easy Lower Tile, 30" high, 42" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 234 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 1,858.00 3,716.00 589.54 1,179.08 68.2711 %FV43P.F81536HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,36" w,high-pressure lam case & dr,lock
HR
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white (CP)
91 Door/Edge Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 1,715.00 3,430.00 544.17 1,088.34 68.2712 %FV43P.F81524HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,24" w,high-pressure lam case & dr,lock
HR
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white (CP)
91 Door/Edge Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 574.00 1,148.00 182.13 364.26 68.2713 %FT183.2242
+Upper Window Tile,22" h,42" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 537.00 1,074.00 170.39 340.78 68.2714 %FT183.2236
+Upper Window Tile,22" h,36" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 450.00 900.00 142.79 285.58 68.2715 %FT183.2218
+Upper Window Tile,22" h,18" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
12 173.00 2,076.00 54.89 658.68 68.2716 %FT181.2236T
+Upper Tile,22" h,36" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 235 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 147.00 1,176.00 46.64 373.12 68.2717 %FT181.2224T
+Upper Tile,22" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
4 137.00 548.00 43.47 173.88 68.2718 %FT181.1142T
+Upper Tile,11" h,42" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
16 126.00 2,016.00 39.98 639.68 68.2719 %FT181.1136T
+Upper Tile,11" h,36" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
8 109.00 872.00 34.59 276.72 68.2720 %FT181.1124T
+Upper Tile,11" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
4 105.00 420.00 33.32 133.28 68.2721 %FT181.1118T
+Upper Tile,11" h,18" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
4 252.00 1,008.00 79.96 319.84 68.2722 %FT170.3048T
+Lower Tile, Tackable Fabric 30H 48W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 236 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 225.00 675.00 71.39 214.17 68.2723 %FT170.3036T
+Lower Tile, Tackable Fabric 30H 36W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
2 195.00 390.00 61.87 123.74 68.2724 %FT170.3024T
+Lower Tile, Tackable Fabric 30H 24W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
1 129.00 129.00 40.93 40.93 68.2725 %FT170.1136T
+Lower Tile, Tackable Fabric 11H 36W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
3 272.00 816.00 106.38 319.14 60.8926 %LG890.220
+Pedestal Add-On Cushion Top 2H 20D
HR
WORKSTATI
ONS
1HA Cushion Top Fabric+medley-Pr Cat 2
01 1HA_Colors +medley stone
2ND FLOOR- WORKSTATIONSTag:
1 307.00 307.00 97.41 97.41 68.2727 %FT174.36
+Tile,Lower Open 36W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 182.00 728.00 57.75 231.00 68.2728 %FT170.3048P
+Lower Tile, Pntd 30H 48W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 171.00 342.00 54.26 108.52 68.2729 %FT170.3042P
+Lower Tile, Pntd 30H 42W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 5 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 237 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
11 161.00 1,771.00 51.09 561.99 68.2730 %FT170.3036P
+Lower Tile, Pntd 30H 36W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
6 140.00 840.00 44.42 266.52 68.2731 %FT170.3024P
+Lower Tile, Pntd 30H 24W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 134.00 268.00 42.52 85.04 68.2732 %FT170.3018P
+Lower Tile, Pntd 30H 18W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 91.00 91.00 28.87 28.87 68.2733 %FT170.1136P
+Lower Tile, Pntd 11H 36W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 509.00 509.00 161.51 161.51 68.2734 %FV2D2.S30FR
+Square Open Support Leg,for Sq-Edge Surface, 30"D,Fxd Hght,Rt OS30
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 509.00 509.00 161.51 161.51 68.2735 %FV2D2.S30FL
+Square Open Support Leg,for Sq-Edge Surface, 30"D,Fxd Hght,Lft OS30
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 362.00 724.00 114.86 229.72 68.2736 %FT2A1.12FL
+Open Support,Archtrl Foot,Frame-Att,Fxd Hght,Lft 12D Shared Mid-Run OS12FL
91 Surface Finish @white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 61.00 122.00 19.36 38.72 68.2737 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
HR
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 6 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 238 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 61.00 122.00 19.36 38.72 68.2738 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
HR
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 51.00 102.00 16.18 32.36 68.2739 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd HR
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 51.00 153.00 16.18 48.54 68.2740 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd HR
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 108.00 432.00 34.27 137.08 68.2741 %FT160.68BP
+Finished End,Base Cover Ptd 68H
HR
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 265.00 530.00 84.08 168.16 68.2742 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
HR
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 224.00 896.00 71.08 284.32 68.2743 %FT150.48
+Base Power Harness 48W
HR
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
3 200.00 600.00 63.46 190.38 68.2744 %FT150.36
+Base Power Harness 36W
HR
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
4 186.00 744.00 59.02 236.08 68.2745 %FT150.24
+Base Power Harness 24W
HR
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 7 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 239 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 253.00 253.00 80.28 80.28 68.2746 %FT140.06
+Power Entry, External Direct Connect 6'long
HR
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
4 47.00 188.00 14.91 59.64 68.2747 %FT126.2AP
+Top Cap, Conn 90-Deg, Connects-2 Frame Top Caps, 90-Deg Ptd 2A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 47.00 188.00 14.91 59.64 68.2748 %FT126.1AP
+Top Cap, Conn 90-Deg, Connects-1 Frame Top Caps Ptd
1A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 126.00 504.00 39.98 159.92 68.2749 %FT123.333NP
+Conn Cover 90-Deg, 3 Sides Covered,No Base Ptd 33H
3/33
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 101.00 404.00 32.05 128.20 68.2750 %FT123.268BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 68H
2/68B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 81.00 324.00 25.70 102.80 68.2751 %FT123.235BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 35H
2/35B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 65.00 260.00 20.62 82.48 68.2752 %FT112.48AP
+Frame Top Cap,Standard Ptd 48W
HR
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 61.00 122.00 19.36 38.72 68.2753 %FT112.42AP
+Frame Top Cap,Standard Ptd 42W
HR
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 54.00 432.00 17.13 137.04 68.2754 %FT112.36AP
+Frame Top Cap,Standard Ptd 36W
HR
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 8 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 240 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 46.00 184.00 14.60 58.40 68.2755 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
HR
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 44.00 88.00 13.96 27.92 68.2756 %FT112.18AP
+Frame Top Cap,Standard Ptd 18W
HR
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 374.00 748.00 118.67 237.34 68.2757 %FT110.6842N
+Frame,Base Covers, no knockouts 68H 42W
HR
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
5 353.00 1,765.00 112.01 560.05 68.2758 %FT110.6836N
+Frame,Base Covers, no knockouts 68H 36W
HR
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 374.00 1,122.00 118.67 356.01 68.2759 %FT110.6836J
+Frame,Base Covers, Pwr/Data knockouts 68H 36W
HR
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 337.00 1,348.00 106.93 427.72 68.2760 %FT110.6824J
+Frame,Base Covers, Pwr/Data knockouts 68H 24W
HR
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 304.00 608.00 96.46 192.92 68.2761 %FT110.6818N
+Frame,Base Covers, no knockouts 68H 18W
HR
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 353.00 1,412.00 112.01 448.04 68.2762 %FT110.3548J
+Frame,Base Covers, Pwr/Data knockouts 35H 48W
HR
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 9 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 241 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 106.00 106.00 34.21 34.21 67.7363 %E2931.L
+Work Surf Support Bracket,Left, Pkg of 4
FINANCE
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 528.00 1,056.00 173.03 346.06 67.2364 %G6160.CB
+Twist LED Task Light,Add-on unit,Brkt Att
HR
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 733.00 1,466.00 240.20 480.40 67.2365 %G6160.BB
+Twist LED Task Light,Starter unit,Brkt Att
HR
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
3 35.00 105.00 10.77 32.31 69.2366 %G1331.
+Cord Cleat 2/Pkg
HR
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 82.00 164.00 25.23 50.46 69.2367 %G1190.01
@Carpet Grippers 25/Pkg
HR
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
1 103.00 103.00 32.68 32.68 68.2768 %FV696.57
+Stiffener, 57 3/8W
STF57
2ND FLOOR- WORKSTATIONSTag:
8 50.00 400.00 15.87 126.96 68.2769 %FT128.68
+Connection Hardware, Frame-to-Frame 68H
2ND FLOOR- WORKSTATIONSTag:
2 38.00 76.00 12.06 24.12 68.2770 %FT128.35
+Connection Hardware, Frame-to-Frame 35H
2ND FLOOR- WORKSTATIONSTag:
4 137.00 548.00 43.47 173.88 68.2771 %FT121.257
+Conn 90,Universal,2way,90 deg-for 53H frames and higher 2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 10 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 242 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 90.00 360.00 28.56 114.24 68.2772 %FT121.246
+Conn 90,Universal,2way,90 deg-for 46H frames and lower 2ND FLOOR- WORKSTATIONSTag:
5 .00 .00 .00 .0073 %232092-254
Lock Plug & Keys
HR
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 .00 .00 .00 .0074 %232092-253
Lock Plug & Keys
HR
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
5 .00 .00 .00 .0075 %232092-252
Lock Plug & Keys
HR
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 898.00 1,796.00 351.21 702.42 60.8976 %LW100.20BBF
+Ped W-Pull,Freestd 20D B/B/F
IT
WORK/STOR
AGE 234
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
2F Base Height +raised height
3M Drawer Interior +drawer divider in one box drawer, pencil tray in one box drawer, 2 file converters in file drawer 2ND FLOOR- WORKSTATIONSTag:
2 730.00 1,460.00 231.63 463.26 68.2777 %FT170V.3030L
Vary Easy Lower Tile, 30" high, 30" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 11 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 243 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 137.00 1,096.00 43.47 347.76 68.2778 %FT181.1142T
+Upper Tile, Tackable Fabric 11H 42W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
2 126.00 252.00 39.98 79.96 68.2779 %FT181.1136T
+Upper Tile, Tackable Fabric 11H 36W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
12 118.00 1,416.00 37.44 449.28 68.2780 %FT181.1130T
+Upper Tile, Tackable Fabric 11H 30W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
4 109.00 436.00 34.59 138.36 68.2781 %FT181.1124T
+Upper Tile, Tackable Fabric 11H 24W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
4 236.00 944.00 74.88 299.52 68.2782 %FT170.3042T
+Lower Tile, Tackable Fabric 30H 42W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
4 204.00 816.00 64.73 258.92 68.2783 %FT170.3030T
+Lower Tile, Tackable Fabric 30H 30W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 12 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 244 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 195.00 390.00 61.87 123.74 68.2784 %FT170.3024T
+Lower Tile, Tackable Fabric 30H 24W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
1 129.00 129.00 40.93 40.93 68.2785 %FT170.1136T
+Lower Tile, Tackable Fabric 11H 36W
IT
WORK/STOR
AGE 234
91 Horizontal Bead Fini+white
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
1 307.00 307.00 97.41 97.41 68.2786 %FT174.36
+Tile,Lower Open 36W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
91 Horizontal Bead Fini+white
2ND FLOOR- WORKSTATIONSTag:
4 171.00 684.00 54.26 217.04 68.2787 %FT170.3042P
+Lower Tile, Pntd 30H 42W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
91 Horizontal Bead Fini+white
2ND FLOOR- WORKSTATIONSTag:
6 148.00 888.00 46.96 281.76 68.2788 %FT170.3030P
+Lower Tile, Pntd 30H 30W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
91 Horizontal Bead Fini+white
2ND FLOOR- WORKSTATIONSTag:
2 140.00 280.00 44.42 88.84 68.2789 %FT170.3024P
+Lower Tile, Pntd 30H 24W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
91 Horizontal Bead Fini+white
2ND FLOOR- WORKSTATIONSTag:
1 91.00 91.00 28.87 28.87 68.2790 %FT170.1136P
+Lower Tile, Pntd 11H 36W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
91 Horizontal Bead Fini+white
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 13 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 245 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 663.00 663.00 210.37 210.37 68.2791 %FT2A2.B36FR
+Open Support Leg,Archtrl Foot,Pen/D-Shpd Surf Attchd,Outbound, for 36"D Peninsula,Fxd Hght,Rt
IT
WORK/STOR
AGE 234
91 Surface Finish @white
2ND FLOOR- WORKSTATIONSTag:
2 61.00 122.00 19.36 38.72 68.2792 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
IT
WORK/STOR
AGE 234
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 61.00 122.00 19.36 38.72 68.2793 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
IT
WORK/STOR
AGE 234
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 51.00 102.00 16.18 32.36 68.2794 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd IT
WORK/STOR
AGE 234
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 51.00 102.00 16.18 32.36 68.2795 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd IT
WORK/STOR
AGE 234
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 91.00 182.00 28.87 57.74 68.2796 %FT160.46BP
+Finished End,Base Cover Ptd 46H
IT
WORK/STOR
AGE 234
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 265.00 265.00 84.08 84.08 68.2797 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
IT
WORK/STOR
AGE 234
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 211.00 844.00 66.95 267.80 68.2798 %FT150.42
+Base Power Harness 42W
IT
WORK/STOR
AGE 234
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 14 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 246 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 200.00 200.00 63.46 63.46 68.2799 %FT150.36
+Base Power Harness 36W
IT
WORK/STOR
AGE 234
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
2 193.00 386.00 61.24 122.48 68.27100 %FT150.30
+Base Power Harness 30W
IT
WORK/STOR
AGE 234
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
2 186.00 372.00 59.02 118.04 68.27101 %FT150.24
+Base Power Harness 24W
IT
WORK/STOR
AGE 234
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
1 253.00 253.00 80.28 80.28 68.27102 %FT140.06
+Power Entry, External Direct Connect 6'long
IT
WORK/STOR
AGE 234
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
4 47.00 188.00 14.91 59.64 68.27103 %FT126.2AP
+Top Cap, Conn 90-Deg, Connects-2 Frame Top Caps, 90-Deg Ptd IT
WORK/STOR
AGE 234
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 87.00 348.00 27.61 110.44 68.27104 %FT123.246BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 46H
IT
WORK/STOR
AGE 234
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 61.00 244.00 19.36 77.44 68.27105 %FT112.42AP
+Frame Top Cap,Standard Ptd 42W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 54.00 54.00 17.13 17.13 68.27106 %FT112.36AP
+Frame Top Cap,Standard Ptd 36W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 15 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 247 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
6 49.00 294.00 15.55 93.30 68.27107 %FT112.30AP
+Frame Top Cap,Standard Ptd 30W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 46.00 92.00 14.60 29.20 68.27108 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
IT
WORK/STOR
AGE 234
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 352.00 1,408.00 111.69 446.76 68.27109 %FT110.4642J
+Frame,Base Covers, Pwr/Data knockouts 46H 42W
IT
WORK/STOR
AGE 234
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 332.00 332.00 105.34 105.34 68.27110 %FT110.4636J
+Frame,Base Covers, Pwr/Data knockouts 46H 36W
IT
WORK/STOR
AGE 234
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 298.00 1,192.00 94.56 378.24 68.27111 %FT110.4630N
+Frame,Base Covers, no knockouts 46H 30W
IT
WORK/STOR
AGE 234
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 315.00 630.00 99.95 199.90 68.27112 %FT110.4630J
+Frame,Base Covers, Pwr/Data knockouts 46H 30W
IT
WORK/STOR
AGE 234
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 299.00 598.00 94.87 189.74 68.27113 %FT110.4624J
+Frame,Base Covers, Pwr/Data knockouts 46H 24W
IT
WORK/STOR
AGE 234
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 280.00 280.00 88.84 88.84 68.27114 %FT29A.
+Peninsula Support Bracket
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 16 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 248 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 35.00 70.00 10.77 21.54 69.23115 %G1331.
+Cord Cleat 2/Pkg
IT
WORK/STOR
AGE 234
2ND FLOOR- WORKSTATIONSTag:
2 82.00 164.00 25.23 50.46 69.23116 %G1190.01
@Carpet Grippers 25/Pkg
IT
WORK/STOR
AGE 234
2ND FLOOR- WORKSTATIONSTag:
2 103.00 206.00 32.68 65.36 68.27117 %FV696.57
+Stiffener, 57 3/8W
IT
WORK/STOR
AGE 234
2ND FLOOR- WORKSTATIONSTag:
8 39.00 312.00 12.37 98.96 68.27118 %FT128.46
+Connection Hardware, Frame-to-Frame 46H
IT
WORK/STOR
AGE 234
2ND FLOOR- WORKSTATIONSTag:
4 90.00 360.00 28.56 114.24 68.27119 %FT121.246
+Conn 90,Universal,2way,90 deg-for 46H frames and lower IT
WORK/STOR
AGE 234
2ND FLOOR- WORKSTATIONSTag:
2 .00 .00 .00 .00120 %232092-257
Lock Plug & Keys
IT
WORK/STOR
AGE 234
2ND FLOOR- WORKSTATIONSTag:
2 .00 .00 .00 .00121 %232092-256
Lock Plug & Keys
IT
WORK/STOR
AGE 234
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 17 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 249 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 751.00 751.00 238.29 238.29 68.27122 %SA928643
Vary Easy Lower Tile
FINANCE
WORKSTATI
ONS
Standard Product Reference:FT170V.3024LZZ9Z3W9191
Standard Product Reference::FT170V.3024LZZ9Z3W9191
Deviation::Width
Tile Type:S:standard
Height:30:30" high
Width:18:18" wide
Surface Material:L:high-pressure laminate with squared edge and vertical grain Surface Finish:ZZ:open line high-pressure laminate (nonstandard) Open Line Laminate Entry:9Z3W:phantom pearl
Horizontal Bead Finish:91:white (CP)
Edge Finish:91:white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 898.00 1,796.00 351.21 702.42 60.89123 %LW100.20BBF
+Ped W-Pull,Freestd 20D B/B/F
IT
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
2F Base Height +raised height
3M Drawer Interior +drawer divider in one box drawer, pencil tray in one box drawer, 2 file converters in file drawer 2ND FLOOR- WORKSTATIONSTag:
2 776.00 1,552.00 246.22 492.44 68.27124 %FT170V.3036L
Vary Easy Lower Tile, 30" high, 36" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 683.00 1,366.00 216.72 433.44 68.27125 %FT170V.3024L
Vary Easy Lower Tile, 30" high, 24" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 18 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 250 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 1,858.00 3,716.00 589.54 1,179.08 68.27126 %FV43P.F81536HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,36" w,high-pressure lam case & dr,lock
IT
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white (CP)
91 Door/Edge Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 1,715.00 3,430.00 544.17 1,088.34 68.27127 %FV43P.F81524HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,24" w,high-pressure lam case & dr,lock
IT
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white (CP)
91 Door/Edge Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 537.00 1,611.00 170.39 511.17 68.27128 %FT183.2236
+Upper Window Tile,22" h,36" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 461.00 922.00 146.28 292.56 68.27129 %FT183.2224
+Upper Window Tile,22" h,24" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 450.00 450.00 142.79 142.79 68.27130 %FT183.2218
+Upper Window Tile,22" h,18" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
10 173.00 1,730.00 54.89 548.90 68.27131 %FT181.2236T
+Upper Tile,22" h,36" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 19 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 251 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
6 147.00 882.00 46.64 279.84 68.27132 %FT181.2224T
+Upper Tile,22" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
16 126.00 2,016.00 39.98 639.68 68.27133 %FT181.1136T
+Upper Tile,11" h,36" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
10 109.00 1,090.00 34.59 345.90 68.27134 %FT181.1124T
+Upper Tile,11" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
2 105.00 210.00 33.32 66.64 68.27135 %FT181.1118T
+Upper Tile,11" h,18" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
3 252.00 756.00 79.96 239.88 68.27136 %FT170.3048T
+Lower Tile, Tackable Fabric 30H 48W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
2 225.00 450.00 71.39 142.78 68.27137 %FT170.3036T
+Lower Tile, Tackable Fabric 30H 36W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 20 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 252 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 195.00 195.00 61.87 61.87 68.27138 %FT170.3024T
+Lower Tile, Tackable Fabric 30H 24W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
1 148.00 148.00 46.96 46.96 68.27139 %FT170.1148T
+Lower Tile, Tackable Fabric 11H 48W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
1 348.00 348.00 110.42 110.42 68.27140 %FT174.48
+Tile,Lower Open 48W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 182.00 546.00 57.75 173.25 68.27141 %FT170.3048P
+Lower Tile, Pntd 30H 48W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
12 161.00 1,932.00 51.09 613.08 68.27142 %FT170.3036P
+Lower Tile, Pntd 30H 36W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
7 140.00 980.00 44.42 310.94 68.27143 %FT170.3024P
+Lower Tile, Pntd 30H 24W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 134.00 134.00 42.52 42.52 68.27144 %FT170.3018P
+Lower Tile, Pntd 30H 18W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 21 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 253 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 98.00 98.00 31.10 31.10 68.27145 %FT170.1148P
+Lower Tile, Pntd 11H 48W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 61.00 122.00 19.36 38.72 68.27146 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
IT
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 61.00 122.00 19.36 38.72 68.27147 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
IT
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 51.00 204.00 16.18 64.72 68.27148 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd IT
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 51.00 204.00 16.18 64.72 68.27149 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd IT
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
5 108.00 540.00 34.27 171.35 68.27150 %FT160.68BP
+Finished End,Base Cover Ptd 68H
IT
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 71.00 71.00 22.53 22.53 68.27151 %FT156M.DT
@Controlled Receptacle, 4 Circuit, 20 Amp, Circuit D, Isolated Ground IT
WORKSTATI
ONS
91 Finish @white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 265.00 530.00 84.08 168.16 68.27152 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
IT
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 22 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 254 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 224.00 896.00 71.08 284.32 68.27153 %FT150.48
+Base Power Harness 48W
IT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
3 200.00 600.00 63.46 190.38 68.27154 %FT150.36
+Base Power Harness 36W
IT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
3 186.00 558.00 59.02 177.06 68.27155 %FT150.24
+Base Power Harness 24W
IT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
1 253.00 253.00 80.28 80.28 68.27156 %FT140.06
+Power Entry, External Direct Connect 6'long
IT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
2 47.00 94.00 14.91 29.82 68.27157 %FT126.3AP
+Top Cap, Conn 90-Deg, Connects-3 Frame Top Caps Ptd
3A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 47.00 47.00 14.91 14.91 68.27158 %FT126.2AP
+Top Cap, Conn 90-Deg, Connects-2 Frame Top Caps, 90-Deg Ptd 2A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 47.00 141.00 14.91 44.73 68.27159 %FT126.1AP
+Top Cap, Conn 90-Deg, Connects-1 Frame Top Caps Ptd
1A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 126.00 378.00 39.98 119.94 68.27160 %FT123.333NP
+Conn Cover 90-Deg, 3 Sides Covered,No Base Ptd 33H
3/33
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 101.00 101.00 32.05 32.05 68.27161 %FT123.268BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 68H
2/68B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 23 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 255 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 81.00 162.00 25.70 51.40 68.27162 %FT123.235BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 35H
2/35B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 83.00 166.00 26.34 52.68 68.27163 %FT123.168BP
+Conn Cover 90-Deg, 1 Side Covered,Base Cover Ptd 68H
1/68B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 60.00 60.00 19.04 19.04 68.27164 %FT123.135BP
+Conn Cover 90-Deg, 1 Side Covered,Base Cover Ptd 35H
1/35B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 65.00 260.00 20.62 82.48 68.27165 %FT112.48AP
+Frame Top Cap,Standard Ptd 48W
IT
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 54.00 432.00 17.13 137.04 68.27166 %FT112.36AP
+Frame Top Cap,Standard Ptd 36W
IT
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
5 46.00 230.00 14.60 73.00 68.27167 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
IT
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 44.00 44.00 13.96 13.96 68.27168 %FT112.18AP
+Frame Top Cap,Standard Ptd 18W
IT
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
5 353.00 1,765.00 112.01 560.05 68.27169 %FT110.6836N
+Frame,Base Covers, no knockouts 68H 36W
IT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 374.00 1,122.00 118.67 356.01 68.27170 %FT110.6836J
+Frame,Base Covers, Pwr/Data knockouts 68H 36W
IT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 24 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 256 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 321.00 642.00 101.85 203.70 68.27171 %FT110.6824N
+Frame,Base Covers, no knockouts 68H 24W
IT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 337.00 1,011.00 106.93 320.79 68.27172 %FT110.6824J
+Frame,Base Covers, Pwr/Data knockouts 68H 24W
IT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 304.00 304.00 96.46 96.46 68.27173 %FT110.6818N
+Frame,Base Covers, no knockouts 68H 18W
IT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 353.00 1,412.00 112.01 448.04 68.27174 %FT110.3548J
+Frame,Base Covers, Pwr/Data knockouts 35H 48W
IT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 528.00 1,056.00 173.03 346.06 67.23175 %G6160.CB
+Twist LED Task Light,Add-on unit,Brkt Att
IT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 733.00 1,466.00 240.20 480.40 67.23176 %G6160.BB
+Twist LED Task Light,Starter unit,Brkt Att
IT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 35.00 70.00 10.77 21.54 69.23177 %G1331.
+Cord Cleat 2/Pkg
IT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 82.00 164.00 25.23 50.46 69.23178 %G1190.01
@Carpet Grippers 25/Pkg
IT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 25 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 257 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
6 50.00 300.00 15.87 95.22 68.27179 %FT128.68
+Connection Hardware, Frame-to-Frame 68H
2ND FLOOR- WORKSTATIONSTag:
2 38.00 76.00 12.06 24.12 68.27180 %FT128.35
+Connection Hardware, Frame-to-Frame 35H
2ND FLOOR- WORKSTATIONSTag:
2 155.00 310.00 49.18 98.36 68.27181 %FT121.357
+Conn 90,Universal,3way-for 53H frames and higher
2ND FLOOR- WORKSTATIONSTag:
1 105.00 105.00 33.32 33.32 68.27182 %FT121.346
+Conn 90,Universal,3way-for 46H frames and lower
2ND FLOOR- WORKSTATIONSTag:
1 137.00 137.00 43.47 43.47 68.27183 %FT121.257
+Conn 90,Universal,2way,90 deg-for 53H frames and higher 2ND FLOOR- WORKSTATIONSTag:
2 90.00 180.00 28.56 57.12 68.27184 %FT121.246
+Conn 90,Universal,2way,90 deg-for 46H frames and lower 2ND FLOOR- WORKSTATIONSTag:
4 .00 .00 .00 .00185 %232092-259
Lock Plug & Keys
IT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 .00 .00 .00 .00186 %232092-258
Lock Plug & Keys
IT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 26 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 258 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 751.00 1,502.00 238.29 476.58 68.27187 %SA928643
Vary Easy Lower Tile
FINANCE
WORKSTATI
ONS
Standard Product Reference:FT170V.3024LZZ9Z3W9191
Standard Product Reference::FT170V.3024LZZ9Z3W9191
Deviation::Width
Tile Type:S:standard
Height:30:30" high
Width:18:18" wide
Surface Material:L:high-pressure laminate with squared edge and vertical grain Surface Finish:ZZ:open line high-pressure laminate (nonstandard) Open Line Laminate Entry:9Z3W:phantom pearl
Horizontal Bead Finish:91:white (CP)
Edge Finish:91:white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 779.00 779.00 304.67 304.67 60.89188 %LW100.20FF
+Ped W-Pull,Freestd 20D F/F
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
2F Base Height +raised height
1M Drawer Interior +2 file converters in each file drawer 2ND FLOOR- WORKSTATIONSTag:
4 898.00 3,592.00 351.21 1,404.84 60.89189 %LW100.20BBF +Ped W-Pull,Freestd 20D B/B/F
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
2F Base Height +raised height
3M Drawer Interior +drawer divider in one box drawer, pencil tray in one box drawer, 2 file converters in file drawer 2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 27 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 259 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 1,474.00 4,422.00 576.48 1,729.44 60.89190 %LW200.301 +Lat File,W-Pull Freestd 2 Dwr Raised Hgt 30W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
1R Drawer Interior +front-to-back filing rail
2ND FLOOR- WORKSTATIONSTag:
1 875.00 875.00 277.64 277.64 68.27191 %FT170V.3048L
Vary Easy Lower Tile, 30" high, 48" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 776.00 776.00 246.22 246.22 68.27192 %FT170V.3036L
Vary Easy Lower Tile, 30" high, 36" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 730.00 2,920.00 231.63 926.52 68.27193 %FT170V.3030L
Vary Easy Lower Tile, 30" high, 30" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 683.00 2,049.00 216.72 650.16 68.27194 %FT170V.3024L
Vary Easy Lower Tile, 30" high, 24" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 28 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 260 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 614.00 614.00 194.82 194.82 68.27195 %FT183.2248
*Upper Window Tile,22" h,48" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 537.00 537.00 170.39 170.39 68.27196 %FT183.2236
*Upper Window Tile,22" h,36" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 501.00 4,008.00 158.97 1,271.76 68.27197 %FT183.2230
*Upper Window Tile,22" h,30" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 461.00 1,383.00 146.28 438.84 68.27198 %FT183.2224
*Upper Window Tile,22" h,24" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 450.00 900.00 142.79 285.58 68.27199 %FT183.2218
+Upper Window Tile,22" h,18" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 203.00 1,624.00 64.41 515.28 68.27200 %FT181.2248T
*Upper Tile,22" h,48" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 29 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 261 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 161.00 1,288.00 51.09 408.72 68.27201 %FT181.2230T
*Upper Tile,22" h,30" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
8 147.00 1,176.00 46.64 373.12 68.27202 %FT181.2224T
*Upper Tile,22" h,24" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
10 146.00 1,460.00 46.33 463.30 68.27203 %FT181.1148T
*Upper Tile,11" h,48" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
2 126.00 252.00 39.98 79.96 68.27204 %FT181.1136T
*Upper Tile,11" h,36" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
24 118.00 2,832.00 37.44 898.56 68.27205 %FT181.1130T
*Upper Tile,11" h,30" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
14 109.00 1,526.00 34.59 484.26 68.27206 %FT181.1124T
*Upper Tile,11" h,24" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 30 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 262 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 105.00 420.00 33.32 133.28 68.27207 %FT181.1118T
+Upper Tile,11" h,18" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
4 204.00 816.00 64.73 258.92 68.27208 %FT170.3030T
*Low Tile,30" h,30" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
1 195.00 195.00 61.87 61.87 68.27209 %FT170.3024T
*Low Tile,30" h,24" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
1 110.00 110.00 34.90 34.90 68.27210 %FT170.1124T
*Low Tile,11" h,24" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
6 2,001.00 12,006.00 634.92 3,809.52 68.27211 %FV43P.F81548HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,48" w,high-pressure lam case & dr,lock
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white
91 Door/Edge Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 252.00 252.00 79.96 79.96 68.27212 %FT174.24
+Low Open Tile,24" w
91 +white (CP)
91 +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 31 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 263 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
9 182.00 1,638.00 57.75 519.75 68.27213 %FT170.3048P
*Low Tile,30" h,48" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 161.00 161.00 51.09 51.09 68.27214 %FT170.3036P
*Low Tile,30" h,36" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
16 148.00 2,368.00 46.96 751.36 68.27215 %FT170.3030P
*Low Tile,30" h,30" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 140.00 1,120.00 44.42 355.36 68.27216 %FT170.3024P
*Low Tile,30" h,24" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 134.00 268.00 42.52 85.04 68.27217 %FT170.3018P
+Low Tile,30" h,18" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 81.00 81.00 25.70 25.70 68.27218 %FT170.1124P
*Low Tile,11" h,24" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 61.00 244.00 19.36 77.44 68.27219 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 32 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 264 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
5 61.00 305.00 19.36 96.80 68.27220 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
3 51.00 153.00 16.18 48.54 68.27221 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
3 51.00 153.00 16.18 48.54 68.27222 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
7 108.00 756.00 34.27 239.89 68.27223 %FT160.68BP
+Finished End,Base Cover Ptd 68H
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 265.00 795.00 84.08 252.24 68.27224 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 224.00 896.00 71.08 284.32 68.27225 %FT150.48
+Base Power Harness 48W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 33 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 265 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 193.00 579.00 61.24 183.72 68.27226 %FT150.30
+Base Power Harness 30W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
5 186.00 930.00 59.02 295.10 68.27227 %FT150.24
+Base Power Harness 24W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
1 253.00 253.00 80.28 80.28 68.27228 %FT140.06
+Power Entry, External Direct Connect 6'long
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
5 47.00 235.00 14.91 74.55 68.27229 %FT126.3AP
*90° Con Top Cap,for 3 frame top caps,painted
3A
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 47.00 94.00 14.91 29.82 68.27230 %FT126.2BP
*90° Con Top Cap,for 2 frame top caps, 180°,painted
2B
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 47.00 188.00 14.91 59.64 68.27231 %FT126.2AP
*90° Con Top Cap,for 2 frame top caps, 90°,painted
2A
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 101.00 404.00 32.05 128.20 68.27232 %FT123.268BP
*90° Con Cover,2 sides covered,68" h,base cover/to-the-floor tile,painted 2/68B
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
9 83.00 747.00 26.34 237.06 68.27233 %FT123.168BP
*90° Con Cover,1 side covered,68" h,base cover/to-the-floor tile,painted 1/68B
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 34 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 266 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
5 65.00 325.00 20.62 103.10 68.27234 %FT112.48AP
+Frame Top Cap,Standard Ptd 48W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 54.00 54.00 17.13 17.13 68.27235 %FT112.36AP
+Frame Top Cap,Standard Ptd 36W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
12 49.00 588.00 15.55 186.60 68.27236 %FT112.30AP
+Frame Top Cap,Standard Ptd 30W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
6 46.00 276.00 14.60 87.60 68.27237 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 44.00 88.00 13.96 27.92 68.27238 %FT112.18AP
+Frame Top Cap,Standard Ptd 18W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 394.00 394.00 125.02 125.02 68.27239 %FT110.6848N
+Frame,Base Covers, no knockouts 68H 48W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 35 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 267 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 415.00 1,660.00 131.68 526.72 68.27240 %FT110.6848J
+Frame,Base Covers, Pwr/Data knockouts 68H 48W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 353.00 353.00 112.01 112.01 68.27241 %FT110.6836N
+Frame,Base Covers, no knockouts 68H 36W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
9 337.00 3,033.00 106.93 962.37 68.27242 %FT110.6830N
+Frame,Base Covers, no knockouts 68H 30W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 353.00 1,059.00 112.01 336.03 68.27243 %FT110.6830J
+Frame,Base Covers, Pwr/Data knockouts 68H 30W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 321.00 321.00 101.85 101.85 68.27244 %FT110.6824N
+Frame,Base Covers, no knockouts 68H 24W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
5 337.00 1,685.00 106.93 534.65 68.27245 %FT110.6824J
+Frame,Base Covers, Pwr/Data knockouts 68H 24W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 36 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 268 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
2 304.00 608.00 96.46 192.92 68.27246 %FT110.6818N
+Frame,Base Covers, no knockouts 68H 18W
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 528.00 1,584.00 173.03 519.09 67.23247 %G6160.CB
+Twist LED Task Light,Add-on unit,Brkt Att
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
3 733.00 2,199.00 240.20 720.60 67.23248 %G6160.BB
+Twist LED Task Light,Starter unit,Brkt Att
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 35.00 140.00 10.77 43.08 69.23249 %G1331.
+Cord Cleat 2/Pkg
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
3 82.00 246.00 25.23 75.69 69.23250 %G1190.01
@Carpet Grippers 25/Pkg
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
1 46.00 46.00 14.60 14.60 68.27251 %FT151.
+Power Harness Extender
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
10 50.00 500.00 15.87 158.70 68.27252 %FT128.68
*Frame-to-Frame Connection Hardware,68" h
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 37 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 269 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
5 155.00 775.00 49.18 245.90 68.27253 %FT121.357
*90° Universal Con,3 way,for 53"-high frames & higher
2ND FLOOR- WORKSTATIONSTag:
6 137.00 822.00 43.47 260.82 68.27254 %FT121.257
*90° Universal Con,2 way, 90° or 180°,for 53"-high frames & higher 2ND FLOOR- WORKSTATIONSTag:
3 .00 .00 .00 .00255 %232092-282
Lock Plug & Keys
COMMUNITY
DEVELOPME
NT PUBLIC
WORKS
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
5 .00 .00 .00 .00256 %232092-262
Lock Plug & Keys
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
5 .00 .00 .00 .00257 %232092-261
Lock Plug & Keys
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
6 .00 .00 .00 .00258 %232092-260
Lock Plug & Keys
ECONOMIC
DEVELOPME
NT
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 38 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 270 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 1,267.00 5,068.00 602.21 2,408.84 52.47259 %26-3020-2E +File,FS Lat Std Pull,2 13 1/8" Dwr 30W 20D
FINANCE
WORKSTATI
ONS
XS +textured paint on smooth steel
91 +white
T2 Top +1 1/4"-high painted metal top with squared edge KA +keyed alike
B2 +1 1/2"-high base
CB +counterweight (recommended)
9P +front-to-back filing rail
2ND FLOOR- WORKSTATIONSTag:
4 840.00 3,360.00 328.52 1,314.08 60.89260 %LW110.20BF
+Ped W-Pull,Mobile 20D B/F
FINANCE
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
5M Drawer Interior +pencil tray in box drawer, 2 file converters in file drawer H1 Handle +hand grip only
2ND FLOOR- WORKSTATIONSTag:
4 898.00 3,592.00 351.21 1,404.84 60.89261 %LW100.20BBF +Ped W-Pull,Freestd 20D B/B/F
FINANCE
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
2F Base Height +raised height
3M Drawer Interior +drawer divider in one box drawer, pencil tray in one box drawer, 2 file converters in file drawer 2ND FLOOR- WORKSTATIONSTag:
4 1,474.00 5,896.00 576.48 2,305.92 60.89262 %LW200.301 +Lat File,W-Pull Freestd 2 Dwr Raised Hgt 30W
FINANCE
WORKSTATI
ONS
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white
KA Lock +keyed alike
CB Counterweight +counterweight (recommended)
1R Drawer Interior +front-to-back filing rail
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 39 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 271 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 875.00 3,500.00 277.64 1,110.56 68.27263 %FT170V.3048L Vary Easy Lower Tile, 30" high, 48" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 776.00 3,104.00 246.22 984.88 68.27264 %FT170V.3036L
Vary Easy Lower Tile, 30" high, 36" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 730.00 1,460.00 231.63 463.26 68.27265 %FT170V.3030L
Vary Easy Lower Tile, 30" high, 30" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
6 683.00 4,098.00 216.72 1,300.32 68.27266 %FT170V.3024L Vary Easy Lower Tile, 30" high, 24" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 1,967.00 1,967.00 769.29 769.29 60.89267 %LW400.4226
+Storage Case,W-Pull 42W 26H
SC/36/26
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 40 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 272 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
6 2,001.00 12,006.00 634.92 3,809.52 68.27268 %FV43P.F81548HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,48" w,high-pressure lam case & dr,lock
FINANCE
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white
91 Door/Edge Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 1,715.00 1,715.00 544.17 544.17 68.27269 %FV43P.F81524HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,24" w,high-pressure lam case & dr,lock
FINANCE
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white
91 Door/Edge Finish +white
2ND FLOOR- WORKSTATIONSTag:
12 614.00 7,368.00 194.82 2,337.84 68.27270 %FT183.2248 *Upper Window Tile,22" h,48" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 537.00 2,148.00 170.39 681.56 68.27271 %FT183.2236
*Upper Window Tile,22" h,36" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 501.00 1,002.00 158.97 317.94 68.27272 %FT183.2230
*Upper Window Tile,22" h,30" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 461.00 1,844.00 146.28 585.12 68.27273 %FT183.2224
*Upper Window Tile,22" h,24" w
91 @white (CP)
TR *clear
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 41 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 273 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 203.00 1,624.00 64.41 515.28 68.27274 %FT181.2248T
*Upper Tile,22" h,48" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
2 161.00 322.00 51.09 102.18 68.27275 %FT181.2230T
*Upper Tile,22" h,30" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
12 147.00 1,764.00 46.64 559.68 68.27276 %FT181.2224T
*Upper Tile,22" h,24" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
32 146.00 4,672.00 46.33 1,482.56 68.27277 %FT181.1148T *Upper Tile,11" h,48" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
8 126.00 1,008.00 39.98 319.84 68.27278 %FT181.1136T
*Upper Tile,11" h,36" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
6 118.00 708.00 37.44 224.64 68.27279 %FT181.1130T
*Upper Tile,11" h,30" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 42 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 274 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
20 109.00 2,180.00 34.59 691.80 68.27280 %FT181.1124T
*Upper Tile,11" h,24" w,tackable fabric
91 *white (CP)
2V *chain-Pr Cat 1
07 *chain sage
2ND FLOOR- WORKSTATIONSTag:
4 272.00 1,088.00 106.38 425.52 60.89281 %LG890.220
+Pedestal Add-On Cushion Top 2H 20D
FINANCE
WORKSTATI
ONS
1HA Cushion Top Fabric+medley-Pr Cat 2
01 1HA_Colors +medley stone
2ND FLOOR- WORKSTATIONSTag:
28 182.00 5,096.00 57.75 1,617.00 68.27282 %FT170.3048P *Low Tile,30" h,48" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 161.00 644.00 51.09 204.36 68.27283 %FT170.3036P
*Low Tile,30" h,36" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 148.00 592.00 46.96 187.84 68.27284 %FT170.3030P
*Low Tile,30" h,30" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
14 140.00 1,960.00 44.42 621.88 68.27285 %FT170.3024P
*Low Tile,30" h,24" w,painted
91 *white (CP)
91 *white (CP)
2ND FLOOR- WORKSTATIONSTag:
7 61.00 427.00 19.36 135.52 68.27286 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
FINANCE
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 43 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 275 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
7 61.00 427.00 19.36 135.52 68.27287 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
FINANCE
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
8 51.00 408.00 16.18 129.44 68.27288 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd
FINANCE
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
8 51.00 408.00 16.18 129.44 68.27289 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd
FINANCE
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
11 108.00 1,188.00 34.27 376.97 68.27290 %FT160.68BP
+Finished End,Base Cover Ptd 68H
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 71.00 71.00 22.53 22.53 68.27291 %FT156M.DT
@Controlled Receptacle, 4 Circuit, 20 Amp, Circuit D, Isolated Ground
FINANCE
WORKSTATI
ONS
91 Finish @white
2ND FLOOR- WORKSTATIONSTag:
3 265.00 795.00 84.08 252.24 68.27292 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
FINANCE
WORKSTATI
ONS
91 Finish +white
2ND FLOOR- WORKSTATIONSTag:
8 224.00 1,792.00 71.08 568.64 68.27293 %FT150.48
+Base Power Harness 48W
FINANCE
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
4 186.00 744.00 59.02 236.08 68.27294 %FT150.24
+Base Power Harness 24W
FINANCE
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 44 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 276 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 253.00 253.00 80.28 80.28 68.27295 %FT140.06
+Power Entry, External Direct Connect 6'long
FINANCE
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
1 47.00 47.00 14.91 14.91 68.27296 %FT126.4AP
+Top Cap, Conn 90-Deg, Connects-4 Frame Top Caps Ptd
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
5 47.00 235.00 14.91 74.55 68.27297 %FT126.3AP
+Top Cap, Conn 90-Deg, Connects-3 Frame Top Caps Ptd
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 47.00 94.00 14.91 29.82 68.27298 %FT126.2AP
+Top Cap, Conn 90-Deg, Connects-2 Frame Top Caps, 90-Deg Ptd
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 101.00 202.00 32.05 64.10 68.27299 %FT123.268BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 68H
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
5 83.00 415.00 26.34 131.70 68.27300 %FT123.168BP
+Conn Cover 90-Deg, 1 Side Covered,Base Cover Ptd 68H
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
16 65.00 1,040.00 20.62 329.92 68.27301 %FT112.48AP
+Frame Top Cap,Standard Ptd 48W
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 54.00 216.00 17.13 68.52 68.27302 %FT112.36AP
+Frame Top Cap,Standard Ptd 36W
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 45 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 277 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 49.00 147.00 15.55 46.65 68.27303 %FT112.30AP
+Frame Top Cap,Standard Ptd 30W
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
10 46.00 460.00 14.60 146.00 68.27304 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
FINANCE
WORKSTATI
ONS
91 Surface Finish +white
2ND FLOOR- WORKSTATIONSTag:
8 394.00 3,152.00 125.02 1,000.16 68.27305 %FT110.6848N +Frame,Base Covers, no knockouts 68H 48W
FINANCE
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
8 415.00 3,320.00 131.68 1,053.44 68.27306 %FT110.6848J +Frame,Base Covers, Pwr/Data knockouts 68H 48W
FINANCE
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
4 353.00 1,412.00 112.01 448.04 68.27307 %FT110.6836N
+Frame,Base Covers, no knockouts 68H 36W
FINANCE
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 337.00 674.00 106.93 213.86 68.27308 %FT110.6830N
+Frame,Base Covers, no knockouts 68H 30W
FINANCE
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
1 353.00 353.00 112.01 112.01 68.27309 %FT110.6830J
+Frame,Base Covers, Pwr/Data knockouts 68H 30W
FINANCE
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
6 321.00 1,926.00 101.85 611.10 68.27310 %FT110.6824N
+Frame,Base Covers, no knockouts 68H 24W
FINANCE
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 46 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 278 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 337.00 1,348.00 106.93 427.72 68.27311 %FT110.6824J
+Frame,Base Covers, Pwr/Data knockouts 68H 24W
FINANCE
WORKSTATI
ONS
91 Base Finish +white
2ND FLOOR- WORKSTATIONSTag:
2 528.00 1,056.00 173.03 346.06 67.23312 %G6160.CB
+Twist LED Task Light,Add-on unit,Brkt Att
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
1 733.00 733.00 240.20 240.20 67.23313 %G6160.BB
+Twist LED Task Light,Starter unit,Brkt Att
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 609.00 2,436.00 199.57 798.28 67.23314 %G6160.AB
+Twist LED Task Light,Single unit,Brkt Att
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 35.00 140.00 10.77 43.08 69.23315 %G1331.
+Cord Cleat 2/Pkg
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
3 82.00 246.00 25.23 75.69 69.23316 %G1190.01
@Carpet Grippers 25/Pkg
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
14 50.00 700.00 15.87 222.18 68.27317 %FT128.68
+Connection Hardware, Frame-to-Frame 68H
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 174.00 348.00 55.21 110.42 68.27318 %FT121.457
+Conn 90,Universal,4way-for 53H frames and higher
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 47 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 279 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
5 155.00 775.00 49.18 245.90 68.27319 %FT121.357
+Conn 90,Universal,3way-for 53H frames and higher
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
2 137.00 274.00 43.47 86.94 68.27320 %FT121.257
+Conn 90,Universal,2way,90 deg-for 53H frames and higher
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
6 .00 .00 .00 .00321 %232092-267
Lock Plug & Keys
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
6 .00 .00 .00 .00322 %232092-266
Lock Plug & Keys
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
6 .00 .00 .00 .00323 %232092-265
Lock Plug & Keys
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
6 .00 .00 .00 .00324 %232092-264
Lock Plug & Keys
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
8 .00 .00 .00 .00325 %232092-263
Lock Plug & Keys
FINANCE
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 48 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 280 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 751.00 3,004.00 238.29 953.16 68.27326 %SA928643
Vary Easy Lower Tile
FINANCE
WORKSTATI
ONS
Standard Product Reference:FT170V.3024LZZ9Z3W9191
Standard Product Reference::FT170V.3024LZZ9Z3W9191
Deviation::Width
Tile Type:S:standard
Height:30:30" high
Width:18:18" wide
Surface Material:L:high-pressure laminate with squared edge and vertical grain Surface Finish:ZZ:open line high-pressure laminate (nonstandard) Open Line Laminate Entry:9Z3W:phantom pearl
Horizontal Bead Finish:91:white (CP)
Edge Finish:91:white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 898.00 3,592.00 351.21 1,404.84 60.89327 %LW100.20BBF +Ped W-Pull,Freestd 20D B/B/F
CITY
MANAGER
WORKSTATI
ONS
SB Slides +full-extension ball-bearing
XS Paint/Steel Type +textured paint on smooth steel
91 Surface Finish +white (CP)
KA Lock +keyed alike
2F Base Height +raised height
3M Drawer Interior +drawer divider in one box drawer, pencil tray in one box drawer, 2 file converters in file drawer 2ND FLOOR- WORKSTATIONSTag:
8 730.00 5,840.00 231.63 1,853.04 68.27328 %FT170V.3030L Vary Easy Lower Tile, 30" high, 30" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
2 683.00 1,366.00 216.72 433.44 68.27329 %FT170V.3024L
Vary Easy Lower Tile, 30" high, 24" wide, high-pressure laminate with squared edge and vertical grain
ZZ open line high-pressure laminate (nonstandard)
9Z3W phantom pearl
91 white (CP)
91 white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 49 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 281 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 1,973.00 15,784.00 626.03 5,008.24 68.27330 %FV43P.F81542HL @OH Stg Cabinet, Sliding Prtl Encl,Canvas frame connection,15" h,42" w,high-pressure lam case & dr,lock
CITY
MANAGER
WORKSTATI
ONS
KA Lock Option @keyed alike
91 Case/Edge Finish +white (CP)
91 Door/Edge Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
12 501.00 6,012.00 158.97 1,907.64 68.27331 %FT183.2230 +Upper Window Tile,22" h,30" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 450.00 1,800.00 142.79 571.16 68.27332 %FT183.2218
+Upper Window Tile,22" h,18" w
91 Frame Finish @white (CP)
TR Glass Finish +clear
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 188.00 1,504.00 59.65 477.20 68.27333 %FT181.2242T
+Upper Tile,22" h,42" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
8 161.00 1,288.00 51.09 408.72 68.27334 %FT181.2230T
+Upper Tile,22" h,30" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
12 147.00 1,764.00 46.64 559.68 68.27335 %FT181.2224T
+Upper Tile,22" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 50 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 282 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
8 137.00 1,096.00 43.47 347.76 68.27336 %FT181.1142T
+Upper Tile,11" h,42" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
32 118.00 3,776.00 37.44 1,198.08 68.27337 %FT181.1130T +Upper Tile,11" h,30" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
12 109.00 1,308.00 34.59 415.08 68.27338 %FT181.1124T
+Upper Tile,11" h,24" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
8 105.00 840.00 33.32 266.56 68.27339 %FT181.1118T
+Upper Tile,11" h,18" w,tackable fabric
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
4 204.00 816.00 64.73 258.92 68.27340 %FT170.3030T
+Lower Tile, Tackable Fabric 30H 30W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
1 195.00 195.00 61.87 61.87 68.27341 %FT170.3024T
+Lower Tile, Tackable Fabric 30H 24W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 51 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 283 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
1 110.00 110.00 34.90 34.90 68.27342 %FT170.1124T
+Lower Tile, Tackable Fabric 11H 24W
91 Horizontal Bead Fini+white (CP)
2V Surface Finish +chain-Pr Cat 1
07 2V_Colors +chain sage
2ND FLOOR- WORKSTATIONSTag:
1 252.00 252.00 79.96 79.96 68.27343 %FT174.24
+Tile,Lower Open 24W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 171.00 1,368.00 54.26 434.08 68.27344 %FT170.3042P
+Lower Tile, Pntd 30H 42W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
20 148.00 2,960.00 46.96 939.20 68.27345 %FT170.3030P
+Lower Tile, Pntd 30H 30W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
7 140.00 980.00 44.42 310.94 68.27346 %FT170.3024P
+Lower Tile, Pntd 30H 24W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 134.00 536.00 42.52 170.08 68.27347 %FT170.3018P
+Lower Tile, Pntd 30H 18W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 81.00 81.00 25.70 25.70 68.27348 %FT170.1124P
+Lower Tile, Pntd 11H 24W
91 Surface Finish +white (CP)
91 Horizontal Bead Fini+white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 52 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 284 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 61.00 244.00 19.36 77.44 68.27349 %FT290.30R
+Surface Cantilever, for 30"- deep surface,rt-hnd
CITY
MANAGER
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 61.00 244.00 19.36 77.44 68.27350 %FT290.30L
+Surface Cantilever, for 30"- deep surface,lft-hnd
CITY
MANAGER
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 51.00 204.00 16.18 64.72 68.27351 %FT290.24R
+Surface Cantilever, for 20"-or 24" deep surface,rt-hnd CITY
MANAGER
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 51.00 204.00 16.18 64.72 68.27352 %FT290.24L
+Surface Cantilever, for 20"-or 24" deep surface,lft-hnd CITY
MANAGER
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
8 108.00 864.00 34.27 274.16 68.27353 %FT160.68BP
+Finished End,Base Cover Ptd 68H
CITY
MANAGER
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 71.00 71.00 22.53 22.53 68.27354 %FT156M.DT
@Controlled Receptacle, 4 Circuit, 20 Amp, Circuit D, Isolated Ground CITY
MANAGER
WORKSTATI
ONS
91 Finish @white (CP)
2ND FLOOR- WORKSTATIONSTag:
3 265.00 795.00 84.08 252.24 68.27355 %FT155.A
+15 Amp Receptacle 4 Circuit, Duplex, Circuit A 6/Pkg
CITY
MANAGER
WORKSTATI
ONS
91 Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 53 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 285 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 211.00 844.00 66.95 267.80 68.27356 %FT150.42
+Base Power Harness 42W
CITY
MANAGER
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
4 193.00 772.00 61.24 244.96 68.27357 %FT150.30
+Base Power Harness 30W
CITY
MANAGER
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
5 186.00 930.00 59.02 295.10 68.27358 %FT150.24
+Base Power Harness 24W
CITY
MANAGER
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
1 253.00 253.00 80.28 80.28 68.27359 %FT140.06
+Power Entry, External Direct Connect 6'long
CITY
MANAGER
WORKSTATI
ONS
LZ Wiring Type +PVC-free
2ND FLOOR- WORKSTATIONSTag:
1 47.00 47.00 14.91 14.91 68.27360 %FT126.4AP
+Top Cap, Conn 90-Deg, Connects-4 Frame Top Caps Ptd
4A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 47.00 188.00 14.91 59.64 68.27361 %FT126.3AP
+Top Cap, Conn 90-Deg, Connects-3 Frame Top Caps Ptd
3A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 47.00 188.00 14.91 59.64 68.27362 %FT126.2AP
+Top Cap, Conn 90-Deg, Connects-2 Frame Top Caps, 90-Deg Ptd 2A
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 101.00 404.00 32.05 128.20 68.27363 %FT123.268BP
+Conn Cover 90-Deg, 2 Sides Covered,Base Cover Ptd 68H
2/68B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 54 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 286 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 83.00 332.00 26.34 105.36 68.27364 %FT123.168BP
+Conn Cover 90-Deg, 1 Side Covered,Base Cover Ptd 68H
1/68B
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 61.00 244.00 19.36 77.44 68.27365 %FT112.42AP
+Frame Top Cap,Standard Ptd 42W
CITY
MANAGER
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
16 49.00 784.00 15.55 248.80 68.27366 %FT112.30AP
+Frame Top Cap,Standard Ptd 30W
CITY
MANAGER
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
6 46.00 276.00 14.60 87.60 68.27367 %FT112.24AP
+Frame Top Cap,Standard Ptd 24W
CITY
MANAGER
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 44.00 176.00 13.96 55.84 68.27368 %FT112.18AP
+Frame Top Cap,Standard Ptd 18W
CITY
MANAGER
WORKSTATI
ONS
91 Surface Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 392.00 1,568.00 124.38 497.52 68.27369 %FT110.6842J
+Frame,Base Covers, Pwr/Data knockouts 68H 42W
CITY
MANAGER
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
12 337.00 4,044.00 106.93 1,283.16 68.27370 %FT110.6830N +Frame,Base Covers, no knockouts 68H 30W
CITY
MANAGER
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 55 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 287 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 353.00 1,412.00 112.01 448.04 68.27371 %FT110.6830J
+Frame,Base Covers, Pwr/Data knockouts 68H 30W
CITY
MANAGER
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
1 321.00 321.00 101.85 101.85 68.27372 %FT110.6824N
+Frame,Base Covers, no knockouts 68H 24W
CITY
MANAGER
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
5 337.00 1,685.00 106.93 534.65 68.27373 %FT110.6824J
+Frame,Base Covers, Pwr/Data knockouts 68H 24W
CITY
MANAGER
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 304.00 1,216.00 96.46 385.84 68.27374 %FT110.6818N
+Frame,Base Covers, no knockouts 68H 18W
CITY
MANAGER
WORKSTATI
ONS
91 Base Finish +white (CP)
2ND FLOOR- WORKSTATIONSTag:
4 528.00 2,112.00 173.03 692.12 67.23375 %G6160.CB
+Twist LED Task Light,Add-on unit,Brkt Att
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 733.00 2,932.00 240.20 960.80 67.23376 %G6160.BB
+Twist LED Task Light,Starter unit,Brkt Att
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 35.00 140.00 10.77 43.08 69.23377 %G1331.
+Cord Cleat 2/Pkg
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 56 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 288 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
3 82.00 246.00 25.23 75.69 69.23378 %G1190.01
@Carpet Grippers 25/Pkg
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
14 50.00 700.00 15.87 222.18 68.27379 %FT128.68
+Connection Hardware, Frame-to-Frame 68H
2ND FLOOR- WORKSTATIONSTag:
1 174.00 174.00 55.21 55.21 68.27380 %FT121.457
+Conn 90,Universal,4way-for 53H frames and higher
2ND FLOOR- WORKSTATIONSTag:
4 155.00 620.00 49.18 196.72 68.27381 %FT121.357
+Conn 90,Universal,3way-for 53H frames and higher
2ND FLOOR- WORKSTATIONSTag:
4 137.00 548.00 43.47 173.88 68.27382 %FT121.257
+Conn 90,Universal,2way,90 deg-for 53H frames and higher 2ND FLOOR- WORKSTATIONSTag:
4 .00 .00 .00 .00383 %232092-271
Lock Plug & Keys
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 .00 .00 .00 .00384 %232092-270
Lock Plug & Keys
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
4 .00 .00 .00 .00385 %232092-269
Lock Plug & Keys
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 57 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 289 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HERMANMILLER
4 .00 .00 .00 .00386 %232092-268
Lock Plug & Keys
CITY
MANAGER
WORKSTATI
ONS
2ND FLOOR- WORKSTATIONSTag:
HPLCONTRACT
3 456.79 1,370.37 264.29 792.87 42.14387 %
Rectangular Top 1-1/4" x 30"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
2 479.01 958.02 277.14 554.28 42.14388 %
Rectangular Top 1-1/4" x 24"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
2 320.99 641.98 185.72 371.44 42.14389 %
Common Top 1-1/4" x 18"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
1 481.48 481.48 278.57 278.57 42.14390 %
Rectangular Top 1-1/4" x 36"W x 84"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
2 395.06 790.12 228.57 457.14 42.14391 %
Rectangular Top 1-1/4" x 30"W x 60"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 58 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 290 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HPLCONTRACT
2 432.10 864.20 250.00 500.00 42.14392 %
Rectangular Top 1-1/4" x 24"W x 84"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
2 456.79 913.58 264.29 528.58 42.14393 %
Rectangular Top 1-1/4" x 30"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
2 479.01 958.02 277.14 554.28 42.14394 %
Rectangular Top 1-1/4" x 24"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
2 380.25 760.50 220.00 440.00 42.14395 %
Rectangular Top 1-1/4" x 24"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
1 567.90 567.90 328.57 328.57 42.14396 %
Rectangular Top 1-1/4" x 30"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 59 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 291 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HPLCONTRACT
1 518.52 518.52 300.00 300.00 42.14397 %
Rectangular Top 1-1/4" x 30"W x 87"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
1 409.88 409.88 237.14 237.14 42.14398 %
Rectangular Top 1-1/4" x 30"W x 63"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
1 395.06 395.06 228.57 228.57 42.14399 %
Rectangular Top 1-1/4" x 30"W x 60"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
3 479.01 1,437.03 277.14 831.42 42.14400 %
Rectangular Top 1-1/4" x 24"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
4 567.90 2,271.60 328.57 1,314.28 42.14401 %
Rectangular Top 1-1/4" x 30"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 60 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 292 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
HPLCONTRACT
1 456.79 456.79 264.29 264.29 42.14402 %
Rectangular Top 1-1/4" x 30"W x 72"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
8 479.01 3,832.08 277.14 2,217.12 42.14403 %
Rectangular Top 1-1/4" x 24"W x 96"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
2 308.64 617.28 178.57 357.14 42.14404 %
Common Top 1-1/4" x 20"W x 60"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
4 395.06 1,580.24 228.57 914.28 42.14405 %
Rectangular Top 1-1/4" x 30"W x 60"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
4 432.10 1,728.40 250.00 1,000.00 42.14406 %
Rectangular Top 1-1/4" x 24"W x 84"L
One-Piece Top
Top - PL1: WA #7964-78 Skyline Walnut
Edge: 2mm Matching PVC
TAG: N/A
2ND FLOOR- WORKSTATIONSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 61 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 293 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:10:57 PM
N
Quote # 205819
2ND FLOOR- WORKSTATIONSDepartment:
Contract
Product Subtotal: $139,131.36
Project DesignerAccount Executive: Frances ArceCiana White Page: 62 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 294 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:07 PM
O
Quote # 205819
3RD FLOOR LOBBY & OFFICE 311Department:
Contract
SITONIT
1 732.00 732.00 357.80 357.80 51.121 %2222.B1.T.A129
Wit Task, Midback, Mesh Back, Swivel Tilt, Height/Width Adj Arms OFFICE 311
FC1 Wit Frame Color OptiBlack
Z1 Wit Back Support andBlack
~ Wit Arm Color Black Arm
B0 Wit Base Options Standard Black Base
S0 Wit Cylinder HeightStandard Cylinder
C17 Wit Caster OptionsHard Floor and Carpet Casters
MC20 Wit Mesh Back ColorsOnyx
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG1 Fabric Grade SelectiFabric Grade 1
SUGAR Fabric Grade 1 SelecSugar Color Selection
LICORICE Sugar Color SelectioSugar Licorice
AB Packaging OptionsAssembled in Bag, Southern CA
3RD FLOOR LOBBY & OFFICE 311Tag:
ERG
4 3,845.00 15,380.00 2,302.39 9,209.56 40.122 %3914
Malibu 44" Straight Module
3RD
FLR-CHAMBE
RS LOBBY
302
GR3 Fabric Grade SelectiGrade 3
~ Grade 3 Pattern SeleStinson Satchel Flint SAT28 Flint ~ CA 133 Option No Selection
~ Moisture Barrier OptNo Selection
~ Multiple Fabric OptiNo Selection
~ Leg Finish Option Standard Powder Coat
BA Powder Coat FinishBrushed Aluminum
~ Fixed Blade Tablet ONo Tablet
GD1 Ganging Device OptioRatchet Ganging Device (Reconfigurable) ~ Floor Mount Glide OpNo Selection
~ Cove Flush Mount OptNo Selection
3RD FLOOR LOBBY & OFFICE 311Tag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 295 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:07 PM
O
Quote # 205819
3RD FLOOR LOBBY & OFFICE 311Department:
Contract
ERG
8 2,395.00 19,160.00 1,434.13 11,473.04 40.123 %3912
Malibu 22" Straight Module
3RD
FLR-CHAMBE
RS LOBBY
302
GR3 Fabric Grade SelectiGrade 3
~ Grade 3 Pattern SeleStinson Satchel Flint SAT28 Flint ~ CA 133 Option No Selection
~ Moisture Barrier OptNo Selection
~ Leg Finish Option Standard Powder Coat
BA Powder Coat FinishBrushed Aluminum
~ Fixed Blade Tablet ONo Tablet
GD1 Ganging Device OptioRatchet Ganging Device (Reconfigurable) ~ Multiple Fabric OptiNo Selection
~ Floor Mount Glide OpNo Selection
~ Cove Flush Mount OptNo Selection
3RD FLOOR LOBBY & OFFICE 311Tag:
HON
4 2,763.00 11,052.00 1,454.44 5,817.76 47.364 %HWH1SS
West Hill Single Seat Lounge-Std Cushion
OFFICE 311
.B Both Arms
$(1) Grade 1 Uph
.HAML Hamilton
28 Agave
.SM Square Metal
P8V Textured Titanium
3RD FLOOR LOBBY & OFFICE 311Tag:
1 1,561.00 1,561.00 821.71 821.71 47.365 %HSCESS24LM
Laminate End Table Soft Square 24Wx24Lx22H
OFFICE 311
$(L1STD) Grd L1 Standard Laminates
.LDW1 Designer White
DW Designer White
.LSA1 Sterling Ash
$(P1) P1 Paint Opts
.P8V Textured Titanium
3RD FLOOR LOBBY & OFFICE 311Tag:
1 380.00 380.00 200.03 200.03 47.366 %HNLRC2442
42W x 24D Rectangle Worksurface
OFFICE 311
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
3RD FLOOR LOBBY & OFFICE 311Tag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 296 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:07 PM
O
Quote # 205819
3RD FLOOR LOBBY & OFFICE 311Department:
Contract
ERG
9 2,342.00 21,078.00 1,402.39 12,621.51 40.127 %DUN1426 Duncan - 14" x 26" Rectangle End Table (4 legs)
3RD
FLR-CHAMBE
RS LOBBY
302
LAM Surface Type SelectiLaminate Top Surface
~ Laminate Finish OptiWILSONART PHANTOM ECRU 8212K-28
~ Leg Finish Option Standard Powder Coat
BA Powder Coat FinishBrushed Aluminum
~ Cove Flush Mount OptNo Selection
3RD FLOOR LOBBY & OFFICE 311Tag:
HON
1 308.00 308.00 162.13 162.13 47.368 %HNLMP4228
42W x 27-7/8H Modesty / Back Panel
OFFICE 311
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
3RD FLOOR LOBBY & OFFICE 311Tag:
1 303.00 303.00 159.50 159.50 47.369 %HNLEP2428R
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Right
OFFICE 311
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
3RD FLOOR LOBBY & OFFICE 311Tag:
1 303.00 303.00 159.50 159.50 47.3610 %HNLEP2428L
1-1/8Wx23-1/8Dx28-1/2H End Panel for 24D Left
OFFICE 311
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
3RD FLOOR LOBBY & OFFICE 311Tag:
ERG
20 116.00 2,320.00 69.46 1,389.20 40.1211 %GD1
RATCHET GANGING DEVICE
3RD
FLR-CHAMBE
RS LOBBY
302
3RD FLOOR LOBBY & OFFICE 311Tag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 297 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:07 PM
O
Quote # 205819
3RD FLOOR LOBBY & OFFICE 311Department:
Contract
Product Subtotal: $42,371.74
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 298 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:10 PM
P
Quote # 205819
3RD FLOOR MEETING & CONFERENCE ROOMDepartment:
Contract
SITONIT
18 1,322.00 23,796.00 646.19 11,631.42 51.121 %6423T.A111 Prava, Highback, Swivel Tilt Cntrl, A111 Arm
3RD
FLOOR-COU
NCIL
CHAMBERS
308
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG2 Fabric Grade SelectiFabric Grade 2
ELEMENT Fabric Grade 2 SelecElement Standard Color Selection ONYX Element Color SelectElement Onyx
~ Base Selection Std Black Nylon
C22 Caster Options Hard Floor and Carpet Casters
HR1C0 Headrest SelectionHeadrest (to match chair textile) AB Packaging OptionsFully Assembled in a Bag
3RD FLOOR MEETING & CONFERENCE ROOMTag:
10 1,383.00 13,830.00 676.01 6,760.10 51.122 %6423T.A111 Prava, Highback, Swivel Tilt Cntrl, A111 Arm
3RD
FLOOR-ANTE
-CHAMBER
310
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG5 Fabric Grade SelectiFabric Grade 5
~ Fabric Grade 5 Seleccf STINSON
TOR CORE 2.0 PUMICE VINYL
~ Base Selection Std Black Nylon
C22 Caster Options Hard Floor and Carpet Casters
~ Headrest SelectionNo Selection
AB Packaging OptionsAssembled in a Bag (Southern California) 3RD FLOOR MEETING & CONFERENCE ROOMTag:
BYRNE
1 1,368.44 1,368.44 977.45 977.45 28.573 %BE07564-2-2-Z939-UBCC7/UBCC5-1 BE07564-2-2-Z939-UBCC7/UBCC5-12 - 12" M2XB Multi Outlet
ANTE-CHAM
BER 310
12" M2XB Multi Outlet
Side One Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) HDMI Port (w 18" Cable)
Side Two Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) CAT6 Port (w 120" Cable)
Finish: Z939
3RD FLOOR MEETING & CONFERENCE ROOMTag:
GMVENDOR
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 299 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:10 PM
P
Quote # 205819
3RD FLOOR MEETING & CONFERENCE ROOMDepartment:
Contract
GMVENDOR
144 188.00 27,072.00 134.29 19,337.76 28.574 %7025U0K01002590C00 IMPRESSIONS ML 7025 20" PASSIVE LUMBAR CHAIR
COUNCIL
CHAMBERS
308
Revision: U
Finish: Cocoa
Glides: Black
Ganging: Pew
Upholstery: Artisan - Quill , Com
3RD FLOOR MEETING & CONFERENCE ROOMTag:
BYRNE
1 1,512.76 1,512.76 1,080.53 1,080.53 28.575 %BE07564-2/2-3/1-Z939-UBCC9/UBC BE07564-2/2-3/1-Z939-UBCC9/UBCC1-12-- 12" M2XB Multi Outlet
ANTE-CHAM
BER 310
12" M2XB Multi Outlet
Side One Includes: (2) Power Outlet
(2) Dual USB-C 45W Charger
Side Two Includes: (3) Power Outlet
(1) Dual USB-C 45W Charger
Finish: Z939
3RD FLOOR MEETING & CONFERENCE ROOMTag:
HON
1 1,934.00 1,934.00 1,018.06 1,018.06 47.366 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M597736 M597736
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
3RD FLOOR MEETING & CONFERENCE ROOMTag:
HON SPECIALS
2 1,485.00 2,970.00 781.70 1,563.40 47.367 %SPLH-PRES-LHPANL-MDC
CUSTOM LAMINATE BASE
.M611628 M611628
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
3RD FLOOR MEETING & CONFERENCE ROOMTag:
BYRNE
1 111.88 111.88 79.91 79.91 28.578 %BE07590-E-72
72" Power Infeed
ANTE-CHAM
BER 310
3RD FLOOR MEETING & CONFERENCE ROOMTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 300 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:10 PM
P
Quote # 205819
3RD FLOOR MEETING & CONFERENCE ROOMDepartment:
Contract
BYRNE
2 4.52 9.04 3.23 6.46 28.579 %BEHK-000122
Cord Management Clips (6-Pack)
ANTE-CHAM
BER 310
3RD FLOOR MEETING & CONFERENCE ROOMTag:
2 25.84 51.68 18.46 36.92 28.5710 %BE07592-E-36
36" Straight Jumper
ANTE-CHAM
BER 310
3RD FLOOR MEETING & CONFERENCE ROOMTag:
2 15.04 30.08 10.74 21.48 28.5711 %BE07591-EF
Grey Distribution Block
ANTE-CHAM
BER 310
3RD FLOOR MEETING & CONFERENCE ROOMTag:
1 15.04 15.04 10.74 10.74 28.5712 %BE07591-E
Black Distribution Block
ANTE-CHAM
BER 310
3RD FLOOR MEETING & CONFERENCE ROOMTag:
HON
1 418.00 418.00 220.04 220.04 47.3613 %HTBEAM144
PRESIDE SUPPORT BEAM FOR 144IN TABLE TOPS
4' x 12' C
3RD FLOOR MEETING & CONFERENCE ROOMTag:
1 418.00 418.00 220.04 220.04 47.3614 %HTBEAM144
PRESIDE SUPPORT BEAM FOR 144IN TABLE TOPS
4' x 12' C
3RD FLOOR MEETING & CONFERENCE ROOMTag:
CF STINSON
243 61.90 15,041.70 44.21 10,743.03 28.5715 %FABRIC
CF STINSON- Artisan Quill
BERTOLINI
3RD FLOOR MEETING & CONFERENCE ROOMTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 301 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:10 PM
P
Quote # 205819
3RD FLOOR MEETING & CONFERENCE ROOMDepartment:
Contract
Product Subtotal: $53,707.34
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 302 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:13 PM
Q
Quote # 205819
3RD FLOOR STORAGE ROOMDepartment:
Contract
VIRCO
15 1,481.00 22,215.00 743.31 11,149.65 49.811 %6060RHP
VIRCO 6000 SERIES 60" ROUND FOLDING TABLES
STORAGE
312
COLOR Table 600 Series, folding table, traditional 3/4 high pressure laminae surface and stack bumbers, 60'' round
T- mold edge Banding
Laminate Finish Wilsonart Mago Morelia 7985-38
Edge Finish Black Char
Frame Finish Silver Mist
3RD FLOOR STORAGE ROOMTag:
39 767.00 29,913.00 384.96 15,013.44 49.812 %601872HP
VIRCO 6000 SERIES 18x72 RECTANGULAR FOLDING TABLES
STORAGE
312
Table 600 Series, folding table, traditional 3/4 high pressure laminae surface and stack bumbers, 18x72
T- mold edge Banding
Laminate Finish Wilsonart Mago Morelia 7985-38
Edge Finish Black Char
Frame Finish Silver Mist
3RD FLOOR STORAGE ROOMTag:
3 2,316.00 6,948.00 1,162.40 3,487.20 49.813 %HTT6
VIRCO TABLE TRUCK/ STORAGE CART FOR RECTANGLE FOLDING
TABLES 77x31x48
STORAGE
312
HOLDS 16 TRADITIONAL/ 12 CORE- A GATOR TABLES
COLOR CHAR BLACK
3RD FLOOR STORAGE ROOMTag:
2 4,543.00 9,086.00 2,280.13 4,560.26 49.814 %HRTT1
VIRCO TABLE TRUCK/ STORAGE CART FOR ROUND FOLDING TABLES 72x30x55
STORAGE
312
HOLDS 10 TRADITIONAL/ 7 CORE- A GATOR TABLES
COLOR CHAR BLACK
3RD FLOOR STORAGE ROOMTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 303 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:13 PM
Q
Quote # 205819
3RD FLOOR STORAGE ROOMDepartment:
Contract
Product Subtotal: $34,210.55
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 304 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
SITONIT
10 1,383.00 13,830.00 676.01 6,760.10 51.121 %6423T.A111 Prava, Highback, Swivel Tilt Cntrl, A111 Arm
2ND
FLOOR-HR
CONF 240
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG5 Fabric Grade SelectiFabric Grade 5
~ Fabric Grade 5 Seleccf STINSON
TOR CORE 2.0 PUMICE VINYL
~ Base Selection Std Black Nylon
C22 Caster Options Hard Floor and Carpet Casters
~ Headrest SelectionNo Selection
AB Packaging OptionsAssembled in a Bag (Southern California) 2ND FLOOR - CONFERENCE ROOMSTag:
14 1,502.00 21,028.00 734.18 10,278.52 51.122 %6423T.A111 Prava, Highback, Swivel Tilt Cntrl, A111 Arm
2ND
FLOOR-LARG
E CONF 203
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG5 Fabric Grade SelectiFabric Grade 5
~ Fabric Grade 5 SelecNo Selection
TOR CORE 2.0 PUMICE VINYL
B8 Base Selection Brushed Aluminum
C17 Caster Selection Hard Floor and Carpet Casters
~ Headrest SelectionNo Selection
AB Packaging OptionsAssembled in a Bag (Southern California) 2ND FLOOR - CONFERENCE ROOMSTag:
8 1,348.00 10,784.00 658.90 5,271.20 51.123 %6422T.A111 Prava, Midback, Swivel Tilt Cntrl, A111 Arm
2ND
FLOOR-EXEC
CONF 207
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG5 Fabric Grade SelectiFabric Grade 5
~ Fabric Grade 5 SelecNo Selection
TOR CF STINSON CORE 2.0 PUMICE
~ Base Selection Std Black Nylon
C17 Caster Selection Hard Floor and Carpet Casters
AB Packaging OptionsAssembled in a Bag (Southern California) 2ND FLOOR - CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 305 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
SITONIT
8 1,348.00 10,784.00 658.90 5,271.20 51.124 %6422T.A111 Prava, Midback, Swivel Tilt Cntrl, A111 Arm
2ND
FLOOR-MD
CONF 216
FABRIC Fabric or Leather UpFabric Grade Selections
~ CA Technical BulletiNo Selection
FG5 Fabric Grade SelectiFabric Grade 5
~ Fabric Grade 5 SelecNo Selection
TOR CF STINSON CORE 2.0 PUMICE
~ Base Selection Std Black Nylon
C17 Caster Selection Hard Floor and Carpet Casters
AB Packaging OptionsAssembled in a Bag (Southern California) 2ND FLOOR - CONFERENCE ROOMSTag:
BYRNE
1 1,368.44 1,368.44 977.45 977.45 28.575 %BE07564-2-2-Z939-UBCC7/UBCC5-1 BE07564-2-2-Z939-UBCC7/UBCC5-12 - 12" M2XB Multi Outlet HR CONF 240
12" M2XB Multi Outlet
Side One Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) HDMI Port (w 18" Cable)
Side Two Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) CAT6 Port (w 120" Cable)
Finish: Z939
2ND FLOOR - CONFERENCE ROOMSTag:
1 1,368.44 1,368.44 977.45 977.45 28.576 %BE07564-2-2-Z939-UBCC7/UBCC5-1 BE07564-2-2-Z939-UBCC7/UBCC5-12 -- 12" M2XB Multi Outlet
LARGE CONF
203
12" M2XB Multi Outlet
Side One Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) HDMI Port (w 18" Cable)
Side Two Includes: (2) Power Outlet
(1) Dual USB-C 45W Charger
(1) CAT6 Port (w 120" Cable)
Finish: Z939
2ND FLOOR - CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 306 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
BYRNE
1 1,512.76 1,512.76 1,080.53 1,080.53 28.577 %BE07564-2/2-3/1-Z939-UBCC9/UBC BE07564-2/2-3/1-Z939-UBCC9/UBCC1-12-- 12" M2XB Multi Outlet HR CONF 240
12" M2XB Multi Outlet
Side One Includes: (2) Power Outlet
(2) Dual USB-C 45W Charger
Side Two Includes: (3) Power Outlet
(1) Dual USB-C 45W Charger
Finish: Z939
2ND FLOOR - CONFERENCE ROOMSTag:
HON
1 2,337.00 2,337.00 1,230.20 1,230.20 47.368 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M597735 M597735
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
BYRNE
2 1,512.76 3,025.52 1,080.53 2,161.06 28.579 %BE07564-2/2-3/1-Z939-UBCC9/UBC BE07564-2/2-3/1-Z939-UBCC9/UBCC1-12-- 12" M2XB Multi Outlet
LARGE CONF
203
12" M2XB Multi Outlet
Side One Includes: (2) Power Outlet
(2) Dual USB-C 45W Charger
Side Two Includes: (3) Power Outlet
(1) Dual USB-C 45W Charger
Finish: Z939
2ND FLOOR - CONFERENCE ROOMSTag:
HON
1 1,503.00 1,503.00 791.18 791.18 47.3610 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M598134 M598134
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 307 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
HON
1 2,067.00 2,067.00 1,088.07 1,088.07 47.3611 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M597734 M597734
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
1 1,436.00 1,436.00 755.91 755.91 47.3612 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M611185 M611185
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
1 1,436.00 1,436.00 755.91 755.91 47.3613 %SPLH-PRES-LTBL 2 piece-CUSTOM PRESIDE LAMINATE TABLE
.M611185 M611185
.G 2MM/Flat
SW Skyline Walnut
.N No Grommets
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
HON SPECIALS
2 1,485.00 2,970.00 781.70 1,563.40 47.3614 %SPLH-PRES-LHPANL-MDC
CUSTOM LAMINATE BASE
.M611628 M611628
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 308 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
HON SPECIALS
3 1,485.00 4,455.00 781.70 2,345.10 47.3615 %SPLH-PRES-LHPANL-MDC
CUSTOM LAMINATE BASE
.M611628 M611628
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
2 1,485.00 2,970.00 781.70 1,563.40 47.3616 %SPLH-PRES-LHPANL-MDC
CUSTOM LAMINATE BASE
.M611628 M611628
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
2 1,485.00 2,970.00 781.70 1,563.40 47.3617 %SPLH-PRES-LHPANL-MDC
CUSTOM LAMINATE BASE
.M611628 M611628
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - CONFERENCE ROOMSTag:
HON
1 311.00 311.00 163.71 163.71 47.3618 %HTBEAMMID
PRESIDE SUPPORT BEAM FOR 72W ADDER SECTION
54" x 16'
2ND FLOOR - CONFERENCE ROOMSTag:
1 331.00 331.00 174.24 174.24 47.3619 %HTBEAM120
PRESIDE SUPPORT BEAM FOR 120W TABLE TOPS
54" x 16'
2ND FLOOR - CONFERENCE ROOMSTag:
BYRNE
1 111.88 111.88 79.91 79.91 28.5720 %BE07590-E-72
72" Power Infeed
HR CONF 240
2ND FLOOR - CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 5 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 309 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
BYRNE
1 111.88 111.88 79.91 79.91 28.5721 %BE07590-E-72
72" Power Infeed
LARGE CONF
203
2ND FLOOR - CONFERENCE ROOMSTag:
2 4.52 9.04 3.23 6.46 28.5722 %BEHK-000122
Cord Management Clips (6-Pack)
HR CONF 240
2ND FLOOR - CONFERENCE ROOMSTag:
2 25.84 51.68 18.46 36.92 28.5723 %BE07592-E-36
36" Straight Jumper
HR CONF 240
2ND FLOOR - CONFERENCE ROOMSTag:
2 15.04 30.08 10.74 21.48 28.5724 %BE07591-EF
Grey Distribution Block
HR CONF 240
2ND FLOOR - CONFERENCE ROOMSTag:
1 15.04 15.04 10.74 10.74 28.5725 %BE07591-E
Black Distribution Block
HR CONF 240
2ND FLOOR - CONFERENCE ROOMSTag:
HON
1 418.00 418.00 220.04 220.04 47.3626 %HTBEAM144
PRESIDE SUPPORT BEAM FOR 144IN TABLE TOPS
54" x 12'
2ND FLOOR - CONFERENCE ROOMSTag:
BYRNE
3 4.52 13.56 3.23 9.69 28.5727 %BEHK-000122
Cord Management Clips (6-Pack)
LARGE CONF
203
2ND FLOOR - CONFERENCE ROOMSTag:
1 51.64 51.64 36.89 36.89 28.5728 %BE07592-E-72
72" Straight Jumper
LARGE CONF
203
2ND FLOOR - CONFERENCE ROOMSTag:
1 34.42 34.42 24.59 24.59 28.5729 %BE07592-E-48
48" Straight Jumper
LARGE CONF
203
2ND FLOOR - CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 6 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 310 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
BYRNE
1 17.20 17.20 12.29 12.29 28.5730 %BE07592-E-24
24" Straight Jumper
LARGE CONF
203
2ND FLOOR - CONFERENCE ROOMSTag:
3 15.04 45.12 10.74 32.22 28.5731 %BE07591-EF
Grey Distribution Block
LARGE CONF
203
2ND FLOOR - CONFERENCE ROOMSTag:
1 15.04 15.04 10.74 10.74 28.5732 %BE07591-E
Black Distribution Block
LARGE CONF
203
2ND FLOOR - CONFERENCE ROOMSTag:
HON
1 246.00 246.00 129.49 129.49 47.3633 %HTBEAM96
PRESIDE SUPPORT BEAM FOR 96W TABLE TOPS
4' x 96"W
2ND FLOOR - CONFERENCE ROOMSTag:
BYRNE
1 1,284.52 1,284.52 917.51 917.51 28.5734 %BE04076-0002263 Custom M2XB: 4 Port
2ND FLOOR - CONFERENCE ROOMSTag:
HON
1 246.00 246.00 129.49 129.49 47.3635 %HTBEAM96
PRESIDE SUPPORT BEAM FOR 96W TABLE TOPS
4' x 96"W
2ND FLOOR - CONFERENCE ROOMSTag:
BYRNE
1 1,284.52 1,284.52 917.51 917.51 28.5736 %BE04076-0002263 Custom M2XB: 4 Port
2ND FLOOR - CONFERENCE ROOMSTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 7 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 311 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:14 PM
R
Quote # 205819
2ND FLOOR - CONFERENCE ROOMSDepartment:
Contract
Product Subtotal: $47,447.91
Project DesignerAccount Executive: Frances ArceCiana White Page: 8 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 312 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,431.00 3,431.00 1,806.08 1,806.08 47.361 %HNL3672RPRBF 72x36x29-1/2 RP Desk rect top bkft frost mod
DIRECTOR
231
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 3,431.00 3,431.00 1,806.08 1,806.08 47.362 %HNL3672RPRBF 72x36x29-1/2 RP Desk rect top bkft frost mod
OFFICE 130
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
.P Black
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.363 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
MANAGER
212
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 1 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 313 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,066.00 3,066.00 1,613.94 1,613.94 47.364 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 220
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.365 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 214
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.366 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 211
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 2 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 314 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,066.00 3,066.00 1,613.94 1,613.94 47.367 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 215
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.368 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 217
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 3,066.00 3,066.00 1,613.94 1,613.94 47.369 %HNL2436LD4 36x24x59-1/2 Lateral File four drawer
OFFICE 130
.G Smooth, Flat
SW Skyline Walnut
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
Project DesignerAccount Executive: Frances ArceCiana White Page: 3 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 315 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3610 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 220
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,301.00 1,301.00 684.85 684.85 47.3611 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 214
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,301.00 1,301.00 684.85 684.85 47.3612 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 221
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,301.00 1,301.00 684.85 684.85 47.3613 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
GIS 230
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 4 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 316 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3614 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
SYSTEMS EN
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,301.00 1,301.00 684.85 684.85 47.3615 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 206
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,301.00 1,301.00 684.85 684.85 47.3616 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
FINANCE ST
.M597628 M597628
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3617 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
CITY ATTY
.M597625 M597625
.G 2MM/Flat
SW Skyline Walnut
.G1 Pop Up Port
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 5 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 317 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3618 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
CITY ATTY
210
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3619 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
CITY ATTY
210
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3620 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
MANAGER 21
.M597626 M597626
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3621 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
MANAGER
212
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 6 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 318 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3622 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
MANAGER
212
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3623 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
DIRECTOR 2
.M597625 M597625
.G 2MM/Flat
SW Skyline Walnut
.G1 Pop Up Port
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
2 1,551.00 3,102.00 816.45 1,632.90 47.3624 %HNL233628PLF 36Wx23-1/8Dx28-1/2H Lateral File Pedestal
DIRECTOR
213
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3625 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DIRECTOR
213
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 7 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 319 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3626 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 206
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3627 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DIRECTOR
213
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 828.00 828.00 435.86 435.86 47.3628 %HNL1530BK2
30x14-1/4x29-1/2 Bookcase 2-shelf
DIRECTOR
213
.G Smooth, Flat
SW Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3629 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 220
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 8 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 320 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3630 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 214
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3631 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 211
.M597627 M597627
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON
1 1,041.00 1,041.00 547.98 547.98 47.3632 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 211
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3633 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 215
.M597627 M597627
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON
Project DesignerAccount Executive: Frances ArceCiana White Page: 9 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 321 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3634 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 215
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3635 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
OFFICE 217
.M597627 M597627
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON
1 1,041.00 1,041.00 547.98 547.98 47.3636 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 217
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3637 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
DIRECTOR 2
.M597626 M597626
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 10 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 322 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3638 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DIRECTOR
218
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3639 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DIRECTOR
218
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,245.00 1,245.00 655.37 655.37 47.3640 %HNL1530BK5
30x14-1/4x65 Bookcase 5-shelf
DIRECTOR
231
.G Select Edge Detail Smooth Flat
SW Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3641 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DIRECTOR
231
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 11 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 323 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3642 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DIRECTOR
231
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3643 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
OFFICE 221
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3644 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
GIS 230
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3645 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
SYSTEMS
ENGINEER
232
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 12 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 324 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,551.00 1,551.00 816.45 816.45 47.3646 %HNL233628PLF 36Wx23-1/8Dx28-1/2H Lateral File Pedestal
DPTY CM 208
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3647 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
DPTY CM 20
.M597625 M597625
.G 2MM/Flat
SW Skyline Walnut
.G1 Pop Up Port
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3648 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DPTY CM 208
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3649 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DPTY CM 208
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 13 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 325 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,144.00 1,144.00 602.20 602.20 47.3650 %HNL291628PBBF 15-3/4Wx29-1/8Dx28-1/2H Box/Box/File Pedestal
CITY
MANAGER
209
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3651 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
CITY
MANAGER
209
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 4,177.00 4,177.00 2,198.77 2,198.77 47.3652 %SPLH-CONC-RECTWS-BYV
CUSTOM RECTANGULAR
DIRECTOR 2
.M597626 M597626
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 1,041.00 1,041.00 547.98 547.98 47.3653 %HNL231628PFF 15-3/4Wx23-1/8Dx28-1/2H File/File Pedestal
DIRECTOR
239
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 14 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 326 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 1,041.00 1,041.00 547.98 547.98 47.3654 %HNL231628PBBF 15-3/4Wx23-1/8Dx28-1/2H Box/Box/File Pedestal
DIRECTOR
239
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON SPECIALS
1 1,301.00 1,301.00 684.85 684.85 47.3655 %SPLH-CONC-TOP
CUSTOM CONCINITY TOP
FINANCE ST
.M597627 M597627
.G 2MM/Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
HON
2 1,417.00 2,834.00 745.91 1,491.82 47.3656 %HNL233028PLF 30Wx23-1/8Dx28-1/2H Lateral File Pedestal
FINANCE
STORAGE
222
.K Triangle Bar/Silver
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3657 %HNLRC2472
72W x 24D Rectangle Worksurface
CITY ATTY
210
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 15 Job Captain Sanah Grandaw
Approve and authorize the purchase of furniture, fixtures, and equipment... Page 327 of 382 NEW INDIO CITY HALL 205819
CITY OF INDIO
PO #
Sales Order #
Item Qty Product Unit Extended Unit Extended
Discount %
List Price Sell Price
5/15/2025
7:12:21 PM
S
Quote # 205819
2ND FLOOR - PRIVATE OFFICESDepartment:
Contract
HON
1 3,358.00 3,358.00 1,767.65 1,767.65 47.3658 %HNL243665SLL 36x24x64-3/4 Storage Cab/Lat File; lam drs
CITY ATTY
210
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3659 %HNLRC2472
72W x 24D Rectangle Worksurface
MANAGER
212
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 3,358.00 3,358.00 1,767.65 1,767.65 47.3660 %HNL243665SLL 36x24x64-3/4 Storage Cab/Lat File; lam drs
MANAGER
212
.K Triangle Bar/Silver
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3661 %HNLRC2472
72W x 24D Rectangle Worksurface
DIRECTOR
213
.G Smooth, Flat
SW Skyline Walnut
.X No Grommet
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
1 541.00 541.00 284.78 284.78 47.3662 %HNLRC2472
72W x 24D Rectangle Worksurface
DIRECTOR
213
.G Smooth, Flat
SW Skyline Walnut
.T1 Platinum
$(L2STD) Grd L2 Standard Laminates
.LSW1 Skyline Walnut
2ND FLOOR - PRIVATE OFFICESTag:
Project DesignerAccount Executive: Frances ArceCiana White Page: 16 Job Captain Sanah Grandaw