OF IONE
Agenda Item I. 1.
CITY OF IONE
IONE, CA 95640
ALIFORNI
DATE: JANUARY 17TH, 2025
TO: GEORGE LEE, CITY MANAGER
FROM: JESSIE CRUZ, BUILDING TECHNICIAN
SUBJECT: JANUARY 2026 BUILDING DEPARTMENT REPORT
To provide information regarding the activities of the Building Department for the month of January 2026.
Permits Issued:
• ADU/SFD: $0.00
• Demolition: 0 $0.00
• Garage/Carport: 0 • $0.00
• HVAC: 2 $444.53
• Meter Panel: $0.00
• Misc. Building: 2 $929.69
• Misc. Electrical: $0.00
• Misc. Plumbing: 3 $1172.40
• Patio Cover: 0 $0.00
• Pool/Spa: $0.00
• Repair: 0 $0.00
Reroof: 4 $1113.32
• Sign: 0 $0.00
• Solar: 4 $3853.44
• Tenant Improvement: 1 $1048.80
• Tesla Powerwall: 1 $529.45
• Water Heater: 2 $443.00
• Windows: 0 $0.00
TOTAL 19 $9,534.63
OF
TONE
CITY OF IONE
IONE, CA 95640
ALIFORN
Inspections Completed:
• Code Enforcement: 2
• Consultation: 2
• Drywall: 0
• Electrical: 0
• Final Inspections: 27
• Footings: 1
• Foundation:
Frame, Rough MEP
...
• Garage/Carport:
• Gas Line/Yellow Tag:
• HVAC Final:
• Insulation:
• Lath:
• Mechanical:
• Misc. Inspection:
• Patio Cover:
• Pool/Spa:
Re-Roof:
• Rough MEP:
• Sewer Lateral:
Shear Nailing:
• Solar P/V Final:
• Structural Slab:
• Stucco:
• Water Heater: 1
• Water Lateral: 0
TOTAL 45
Agenda Item I. 2.
sCITY OF IONE
FIRE DEPARTMENT
JAN 2026
Status Report
TYPE OF CALL NUMBER OF CALLS
Emergency Medical 81
Vehicle Accidents 10
Mutual Aid Fires 1
Lift assist 16
Station Cover assignments 25
Public Assist 3
Cooking Fire ( Stove top) 1
Landing Zone coordinator 2
Residential Smoke alarm activation 5
Flood related incidents 2
Appliance Over heat 2
Lock outs 1
Misc Fires 2
CO alarm activation 1
Structure fire - Commercial (Castle Oaks Dr $100. damage) 1 Structure fire - Residential (Castle Oaks Dr $30 - S. Buena Vista St $2,000) 2 Total Fire Loss in the city $ 2,130. Total number of Incidents: 155 Agenda Item I. 3.
MONTHLY
OPERATIONS
REPORT
forthe: City of lone
Castle Oaks and the Wastewater Treatment
Facilities
Wastewater Services
January 2026
RE: JANUARY 2026 MONTHLY OPERATIONS REPORT
Dear Mr. Lee:
WaterStone Services is pleased to present our monthly operations report detailing our operations and maintenance activities at your wastewater treatment facilities during the previous month. Our report addresses the following key areas of concern:
Monthly Operations Summary
2. Plant Compliance
3. Plant Process and Performances
4. Collection System
5. Items for Client Approval
6. Process Chemicals
7. Solids Disposal
8. Safety
Should you have any questions or concerns regarding this report or any aspect of our operation, please don't hesitate to contact me.
Thank you for your time,
Sincerely,
Kathy Stone- Operations Manager
Justin Granados- Facility Manager
1.0 MONTHLY OPERATIONS SUMMARY
• COMPLETED ALL MONTHLY REPORTS
• SUBMITTED DMR REPORT TO WATER BOARDS- NO VIOLATIONS WERE NOTED • ALL PERMIT MONTHLY SAMPLES COMPLETED
• ALL CALIBRATION OF METERS, PROBES AND QA/QC COMPLETED • RESPONDED TO CALL-OUTS AND ALARMS
• BEGAN PREPARING TERTIARY PLANT FOR UPCOMING 2026 IRRIGATION SEASON. • CHECKED AND INSPECTED LIFT STATIONS DAILY
• CHANGED OIL IN THE AERATORS
• GREASED AERATORS
• INSPECTED EYEWASH STATIONS AND EMERGENCY SHOWERS
• FOUR OF THE FIVE BROKEN AERATORS HAVE BEEN FIXED AND BROUGHT BACK ONLINE. • EXERCISED EMERGENCY GENERATOR ON 1/18
• EXERCISED VALVES AROUND BOTH PLANTS
• COMPLETED INSPECTIONS ON COLLECTION SYSTEM HOT SPOTS/CLEANING • SPRAYED PONDS FOR DUCKWEED
• MONITORED WATER FLOWS AND PRESSURES AT TERTIARY PLANT • WEED WHACKED AROUND POND IN A CONTINUED EFFORT.
• CLEANED UP PREVIOUS PROJECTS THROUGHOUT POND PLANT FROM PREVIOUS MONTHS • SPRAYED WEEDS.
• MARKED MONTHLY USA's THROUGHOUT TOWN.
• CALIBRATED ALL CHLORINE ANALYZERS
• REMOVED DEBRIS/RAGS FROM AERATORS AS NEEDED
2.0 PERMIT COMPLIANCE
Central Valley Regional Water Quality Control Board provides a Permit for the Operation of the Pond Treatment System. The WWTP Facilities achieved compliance with weekly parameters, as documented in TaBle 1.1 below.
TABLE 1.1 - PERMIT COMPLIANCE
POND PARAMETER PERMIT LIMIT FREQUENCY AVERAGE MONTHLY HIGH MONTHLY LOW 1 Dissolved Oxygen > 1.0 X 3 Weekly 2.3 2.4 2.2
Dissolved Oxygen >1.0 X 3 Weekly 4.1 4.3 4.0
Dissolved Oxygen >1.0 X 3 Weekly 4.2 4.4 4.0
Dissolved Oxygen 28 2.3
>1.0 X 3 Weekly
Dissolved Oxygen 1.0 x: Weekly
6 Dissolved Oxygen 1.0 X3 Weekly :
Dissolved Oxygen >1.0 X 3 Weekly
POND PARAMETER PERMIT LIMIT FREQUENCY
1 pH 6.0-9.0 Weekly 7.1 7.2 7.0
pH 6.0-9.0 Weekly 7.0 7.5 6.3
pH 6.0-9.0 Weekly 7.0 7.8 6.2
pH 6.0-9.0 Weekly 7.2 7.2 7.0
pH 6.0-9.0 Weekly * * *
6 6.0-9.0 Weekly * * *
pH
7 6.0-9.0 Weekly * * *
pH
POND PARAMETER PERMIT LIMIT FREQUENCY AVERAGE MONTHLY HIGH MONTHLY LOW 1 Freeboard 2.0 Weekly 2.0 2.0 2.0
2 Freeboard 2.0 Weekly 2.0 2.0 2.0
3 Freeboard 2.0 Weekly 2.0 2.0 2.0
4 Freeboard 2.0 Weekly 2.0 2.0 2.0
Freeboard 2.0 Weekly 5.0 5.5 4.5
Freeboard 2.0 Weekly 9.75 10.0 9.5
7 Freeboard 2.0 Weekly 7.25 7.0 7.5
POND PERMIT LIMIT FREQUENCY AVERAGE MONTHLY HIGH MONTHLY LOW
PARAMETER
1 Berm Condition Visual Weekly OK OK OK
2 Berm Condition Visual Weekly OK OK OK
Berm Condition Visual Weekly OK OK OK
4 Berm Condition Visual Weekly OK OK OK
5 Berm Condition Visual Weekly OK OK
Berm Condition Visual Weekly OK OK
- ~ Visual Weekly OK OK OK
Berm Condition
POND PARAMETER PERMIT LIMIT FREQUENCY AVERAGE MONTHLY HIGH MONTHLY LOW 1 Seepage/Odor Weekly OK OK OK
2 Seepage/Odor Weekly OK OK OK
3 Seepage/Odor Visual Weekly OK OK OK
4 Seepage/Odor Visual Weekly OK OK
Seepage/Odor Visual Weekly OK OK
6 Seepage/Odor Visual Weekly OK OK
7 Seepage/Odor Visual Weekly OK
* Pond level too low to safely sample
INFLUENT FLOW - Wastewater Treatment Pond Plant
The total Influent flow of 16.003 MGD of wastewater has been recorded for the month of January. The average daily influent flow for January was 0.516 MGD. A maximum daily flow of
1.207 MGD was recorded on January 5th. A minimum daily flow of 0.016 MGD on January 21st. •
Graph 2 below trends the Influent flow for the month.
INFLUENT FLOW
1.400
1.200
1.000
0.800
0.600
0.400
0.200
0.000
1/13/2026 1/17/2026 1/21/2026 1/25/2026 1/29/2026 1/31/2026 -Influent Flow
3.0 PLANT PROCESSES AND PERFORMANCE
Solids - Tertiary Treatment Plant
Solids sent to drying beds with small sludge blanket depths of less than a foot in clarifier.
Plant Loads
The plant loading consists of domestic wastewater
Influent Headworks
Station is inspected daily. Filter screen cleaned as needed.
Aeration: Floating aerator on pond 1 down.
Farmer's Irrigation - No RECLAIM USAGE FOR THE MONTH OF JANUARY
4.0 Collection System
DESCRIPTION- WORK SUMMARY DECEMBER 2025
HYDRO MAINTENANCE
CITY HALL
HYDRO VACUUMED AND JETTED FROM MANHOLE #3696 EAST
APPROXIMATELY 60FT. AND WEST APPROXIMATELY 75FT.
(GREASE FOUND THROUGHOUT LINE).
S. CHURCH ST.
HYDRO VACUUMED AND JETTED FROM MANHOLE # 3694
UPSTREAM NORTH TO MANHOLE # 3696 APPROXIMATELY 284FT.
HYDRO JETTED EAST 36FT TO END OF THE LINE.
HYDRO JETTED AND VACUUMED FROM MANHOLE #3685
UPSTREAM TO MANHOLE # 3694; 130FT.
HYDRO JETTED AND VACUUMED FROM MANHOLE # 3685 EAST
UPSTREAM APPROXIMATELY 294FT. TO JACKSON ST. MANHOLE
#4088.
HYDRO JETTED AND VACUUMED FROM MANHOLE # 3685
UPSTREAM TO DEAD END APPROXIMATELY 70FT.
EAST JACKSON ST. HYDRO JETTED AND VACUUMED FROM
MANHOLE # 3683 UPSTREAM TO MANHOLE #3683
APPROXIMATELY 130FT.
HYDRO JETTED AND JETTED FROM MANHOLE #3683 UPSTREAM
BEHIND THE POST OFFICE APPROXIMATELY 90FT.
TOTAL 1,169 FT.
EMERGENCY DISPATCH
FOOTHILL DR.
-CLOGGED DRAIN
HYDRO VACUUMED AND JETTED LINE. RECOMMEND AREA TO BE
DUG OUT TO EXPOSE.
TOTAL LENGTH 1000'
5.0 ITEMS REQUIRING CLIENT APPROVAL
ITEM CRITICALITY STATUS COMPLETION
DATE
INTERCONNECT PROJECT HIGH APPROVED 9/17/2025
CCB FLOW METER HIGH APPROVED
WWTP HEADWORKS MEDIUM N/A
RECONDITIONING
CHEMICAL OVERHANG MEDIUM N/A
Enclosed building with ventilation MEDIUM N/A
around tertiary plant influent
structure
6.0 PROCESS CHEMICALS
The process chemical inventory (chlorine, polymer) are the bulk of chemicals used at the plant. AlI chemicals used are being tracked on a daily basis.
SOLIDS DISPOSAL
Sludge is separated from water and deposited in the solids sludge drying bed. When enough is collected it will be analyzed and sent to the disposal site.
8.0 SAFETY