Cities Index.
Agenda

Jurupa Valley City Council
May 5, 2022

Document
Agenda
Meeting
May 5, 2022
Body
Jurupa Valley City Council
Pages
15
Original file
72.4 MB
Text extracted from the city's file for reading and search. Open the original on www.jurupavalley.org. That file is the official record.

Page - 1 -

REGULAR MEETING AGENDA

OF THE JURUPA VALLEY CITY COUNCIL
Thursday, May 5, 2022
Regular Meeting: 7:00 p.m.

City Council Chamber
8930 Limonite Avenue, Jurupa Valley, CA 92509

1. 7:00 PM - CALL TO ORDER AND ROLL CALL FOR REGULAR MEETING ● Chris Barajas, Mayor
● Leslie Altamirano, Mayor Pro Tem
● Lorena Barajas Bisbee, Council Member
● Brian Berkson, Council Member
● Guillermo Silva, Council Member

2. INVOCATION

3. PLEDGE OF ALLEGIANCE
A. As a courtesy to those in attendance, we ask that cell phones be turned off or set to their silent mode and that you keep talking to a minimum so that all persons can hear the comments of the public and City Council.

B. A member of the public who wishes to speak u nder Public Comments must fill out a “Speaker Card” and submit it to the City Clerk BEFORE the Mayor calls for Public Comments on an agenda item. Each agenda item up will be open for public comments before taking action. Public comments on subjects that are not on the agenda can be made during the “Public Appearance/Comments” portion of the agenda.

C. If the Meeting is conducted via teleconferencing pursuant to Government Code Section 54953(e), the public may submit comments to the City Council via email or via telephone prior to the Mayor calling the item. Email comment shall be sent to:

[email protected]. Telephone comments may be made by calling (951) 332- 6464, Ext. 140. Email and telephone comments are subject to the same rules as in-person comments.

D. Members of the public who wish to comment on the CONSENT CALENDAR may do so during the Public Comment portion of the Agenda prior to the adoption of the Consent Calendar.

E. As a courtesy to others and to assure that each person wishing to be heard has an opportunity to speak, please limit your comments to 3 minutes.

Page - 2 -

4. APPROVAL OF AGENDA

5. PRESENTATIONS
A. RIVERSIDE COUNTY DEPARTMENT OF ANIMAL SERVICES -
INTRODUCTION OF “PET OF THE MONTH”
B. PRESENTATION FROM GRID ALTERNATIVES

6. PUBLIC APPEARANCE/COMMENTS

7. INTRODUCTIONS, ACKNOWLEDGEMENTS, COUNCIL COMMENTS AND

ANNOUNCEMENTS

8. CITY COUNCIL MEMBER ORAL/WRITTEN REPORTS REGARDING

REGIONAL BOARDS AND COMMISSIONS

A. MAYOR CHRIS BARAJAS

1. UPDATE ON THE WESTER N RIVERSIDE COUNCIL OF
GOVERNMENTS BOARD MEETING OF MAY 2, 2022

B. COUNCIL MEMBER LORENA BARAJAS BISBEE

1. UPDATE ON THE WESTER N RIVERSIDE COUNTY R EGIONAL
CONSERVATION AUTHORITY MEETING OF MAY 2, 2022

C. COUNCIL MEMBER BRIAN BERKSON

1. UPDATE ON THE RIVERSIDE COU NTY TRANSPORTATION
COMMISSION MEETING OF APRIL 13, 2022

2. UPDATE ON THE METROL INK / SOUTHERN CALIF ORNIA
REGIONAL RAIL AUTHORITY MEETING OF APRIL 22, 2022

Persons wishing to address the City Council on subjects other than those listed on the Agenda are requested to do so at this time. A member of the public who wishes to speak under Public Appearance/Comments OR the Consent Calendar must fill out a “Speaker Card” and submit it to the City Clerk BEFORE the Mayor calls for Public Comments on an agenda item. When addressing the City Council, please come to the podium and state your name and address for the record. While listing your name and address is not required, it helps us to provide follow -up information to you if needed. In order to conduct a timely meeting, we ask that you keep your comments to 3 minutes. Government Code Section 54954.2 prohibits the City Council from taking action on a specific item until it appears on an agenda.

Page - 3 -

3. UPDATE ON THE RIVERS IDE COUNTY TRANSPORT ATION
COMMISSION – WESTERN RIVERSIDE COUNTY PROGRAMS
AND PROJECTS COMMITTEE MEETING OF APRIL 25, 2022

4. UPDATE ON THE RIVERS IDE TRANSIT AGENCY M EETING OF
APRIL 28, 2022

9. CITY MANAGER’S UPDATE

10. APPROVAL OF MINUTES

A. APRIL 21, 2022 REGULAR MEETING

11. CONSENT CALENDAR (COMMENTS ON CONSENT AGENDA TAKEN HERE) (All matters on the Consent Calendar are to be approved in one motion unless a Councilmember requests a separate action on a specific item on the Consent Calendar. If an item is removed from the Consent Calendar, it will be discussed individually and acted upon separately.)

A. COUNCIL APPROVAL OF A MOTION TO WAIVE THE READING OF

THE TEXT OF ALL ORDINANCES AND RESOLUTIONS INCLUDED IN

THE AGENDA

Requested Action: That the City Council waive the reading of the text of all ordinances and resolutions included in the agenda.

B. CONSIDERATION OF CHECK REGISTER IN THE AMOUNT OF
$5,300,321.72

Requested Action: That the City Council ratify the check registers dated March 30 and April 6, 13, and 20, 2022 as well as the payroll registers dated March 31 and April 1, and 15, 2022.

C. FIRST AMENDMENT TO AGREEMENT FOR THE FOOD PANTRY
LOCATED AT 5626 MISSION BOULEVARD WITH UNITED SIKH

MISSION
Requested Action: That the City Council approve the First Amendment between the City of Jurupa Valley and United Sikh Mission to install, maintain and repair kitchen equipment and authorize the City Manager to execute the First Agreement in substantially the form and format attached to the staff report as approved by the City Attorney.

D. A RESOLUTION OF INTENTION OF THE CITY COUNCIL OF THE

CITY OF JURUPA VALLEY TO ESTABLISH CITY OF JURUPA VALLEY COMMUNITY FACILITIES DISTRICT NO. PS 2022 -001 (PUBLIC

SAFETY, EMERALD RIDGE SOUTH) AND TO AUTHORIZE THE LEVY

OF A SPECIAL TAX WITHIN CITY OF JURUPA VALLEY COMMUNITY

Page - 4 -

FACILITIES DISTRICT NO. PS 2022 -001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH); GENERALLY LOCATED ALONG AVALON STREET,
CANAL STREET, CANAL STREET EXTENSION, AND 30TH STREET,
TTM 37640

Requested Action: That the City Council adopt Resolution No. 2022-37, entitled:

A RESOLUTION OF INTENTION OF THE CITY COUNCIL OF THE

CITY OF JURUPA VALLEY, CALIFORNIA, TO ESTABLISH CITY OF JURUPA VALLEY COMMUNITY FACILITIES DISTRICT N O. PS 2022- 001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH) AND TO

AUTHORIZE THE LEVY OF A SPECIAL TAX WITHIN CITY OF
JURUPA VALLEY COMMUNITY FACILITIES DISTRICT N O. PS 2022 - 001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH)

12. CONSIDERATION OF ANY ITEMS REMOVED FROM THE CONSEN T

CALENDAR

13. PUBLIC HEARINGS

A. PUBLIC HEARING TO CONSIDER (1) AN ORDINANCE TO AMEND CHAPTER 3.75 OF THE MUNICIPAL CODE TO CLARIFY THE

METHOD USED FOR CALCULATING DEVELOPMENT IMPACT FEES

FOR RETAIL/SERVICE/OFFICE, BUSINESS PARK, INDUSTRIAL, AND

RESIDENTIAL USES AND COMMERCIAL LODGING AND MIXED USE
DEVELOPMENTS, AND (2) A RESOLUTION TO ADOPT A

DEVELOPMENT IMPACT FEE FOR ACCESSORY DWELLING UNITS,

AND MAKING A FINDING OF EXEMPTION UNDER CEQA
Requested Action: That the City Council open and continue the public hearing to the regularly scheduled City Council meeting on May 19, 2022. The public hearing is to consider a proposed Ordinance amending Chapter 3.75 of the Jurupa Valley Municipal Code to clarify the method for calculating development impact fees (“DIF”) for retail/service/office, business park, industrial, and residential uses, and commercial lodging and mixed used developments, and making other conforming revisions; and a proposed Resolution establishing the rate and method for calculating DIF for accessory dwelling units (“ADUs”).

B. PUBLIC HEARING REGARDING THE ANNEXATION OF TERRITORY (ZONE Y) TO THE CITY OF JURUPA VALLEY LANDSCAPE AND
LIGHTING MAINTENANCE DISTRICT NO. 89 -1-CONSOLIDATED
(THE “DISTRICT”) AND THE LEVY AND COLLECTION OF
ASSESSMENTS WITHIN SUCH TERRITORY; ON THE SOUTH SIDE OF MARKET STREET WEST OF HALL AVENUE AND NORTH OF 24TH

STREET (WHEELER UPFITTERS)

Page - 5 -

1. Requested Action: That the City Council open the public hearing and receive any public testimony;

2. That the City Council adopt Resolution No. 2022-38, entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

JURUPA VALLEY , ORDERING THE ANNEXATION OF
TERRITORY (ZONE Y); LOCATED ON THE SOUTH SIDE OF

MARKET STREET, WEST OF HALL AVENUE AND NORTH OF
24TH STREET TO CITY OF JURUPA VALLEY LANDSCAPE AND
LIGHTING MAINTENANCE DISTRICT NO. 89 -1-

CONSOLIDATED, CONFIRMING A DIAGRAM AND

ASSESSMENT, ORDERING THE IMPROVEMENTS AND THE

LEVY AND COLLECTION OF ASSESSMENTS WITHIN SUCH
TERRITORY FOR FISCAL YEAR 2022 -23 PURSUANT TO THE
PROVISIONS OF PART 2 OF DIVISION 15 OF THE CALIFORNIA

STREETS AND HIGHWAYS CODE AND AS PROVIDED BY

ARTICLE XIII D OF THE CALIFORNIA CONSTITUTION

C. PUBLIC HEARING TO CONSIDER AN EXTENSION OF TIME FOR SITE DEVELOPMENT PERMIT N O. 20010 FOR A 90,26 2 SQUARE FOOT COMMERCIAL CENTER; AND EXTENSION OF TI ME FOR
CONDITIONAL USE PERM IT NO. 19003 FOR A P ROPOSED GAS

STATION, CAR WASH, A ND CONVENIENCE STORE (WITH

CONCURRENT SALE OF B EER AND WINE FOR OFF -PREMISES

CONSUMPTION) LOCATED AT THE SOUTHEAST CO RNER OF VAN
BUREN BOULEVARD AND RUTILE STREET / APNS: 167 -330-006; 167- 330-010; 167 -330-015 AND 167 -110-039 (AP PLICANT: CONTROL MANAGEMENT, INC.)

1. Requested Action: That the City Council open the public hearing and receive any public testimony;

2. That the City Council adopt Resolution No. 2022-39, entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

JURUPA VALLEY, CALIFORNIA, APPROVING AN EXTENSION
OF TIME FOR CONDITIO NAL USE PERMIT NO. 1 9003 AND AN
EXTENSION OF TIME FO R SITE DEVELOPMENT P ERMIT NO.
20010 TO PERMIT CONSTRUCTION OF A 90,262 SQUARE-FOOT
COMMERCIAL CENTER ON APPROXIMATELY 15.9 ACRES OF

REAL PROPERTY LOCATED AT THE SOUTHEAST CORNER OF
VAN BUREN BOULEVARD AND RUTILE STREET (A PNS: 167 -
330-006, -010, -015; AND 167-110-039) IN THE SCENIC HIGHWAY

COMMERCIAL (C -P-S) Z ONE, AND DETERMIN ING THAT NO

FURTHER CEQA REVIEW IS REQUIRED

Page - 6 -

14. COUNCIL BUSINESS

15. CITY ATTORNEY’S REPORT

16. COUNCIL MEMBER REPORTS AND COMMENTS

17. ADJOURNMENT
Adjourn to the Regular Meeting of May 19, 2022 at 7:00 p.m. at the City Council Chamber, 8930 Limonite Avenue, Jurupa Valley, CA 92509.

In compliance with the Americans with Disabilities Act and Government Code Section 54954.2, if you need special assistance to participate in a meeting of the Jurupa Valley City Council or other services, please contact Jurupa Valley City Hall at (951) 332 -6464. Notification at least 48 hours prior to the meeting or time when services are needed will assist staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service.

Agendas of public meetings and any other writings distributed to all, or a majority of, Jurupa Valley City Council Members in connection with a matter subject to discussion or consideration at an open meeting of the City Council are public records. If such writing is distributed less than 72 hours prior to a public meeting, the writing will be made available for public inspection at the City of Jurupa Valley, 8930 Limonite Avenue, Jurupa Valley, CA 92509, at the time the writing is distributed to all, or a majority of, Jurupa Valley City Council Members. The City Council may also post the writing on its Internet website at www.jurupavalley.org.

Agendas and Minutes are posted on the City’s website at www.jurupavalley.org.

AGENDA ITEM NO. 10.A
-1-

MINUTES

OF THE REGULAR MEETING

OF THE JURUPA VALLEY CITY COUNCIL
April 21, 2022

1. 6:00 PM - CALL TO ORDER AND ROLL CALL FOR CLOSED SESSION ● Chris Barajas, Mayor
● Leslie Altamirano, Mayor Pro Tem
● Lorena Barajas Bisbee, Council Member
● Brian Berkson, Council Member
● Guillermo Silva, Council Member
Mayor Chris Barajas called the closed session meeting to order at 6:06 p.m.

Council Member Lorena Barajas Bisbee was absent.

2. CONVENE TO CLOSED SESSION
A. PUBLIC COMMENTS PERTAINING TO CLOSED SESSION ITEMS
There were no public comments regarding the closed session items.

B. CITY MANAGER ANNUAL PERFORMANCE EVALUATION. The City Council met in closed session pursuant to Government Code Section 54957 to evaluate the performance of the City Manager and establish goals and performance objectives for the next year as required by the City Manager’s Employment Agreement. The Council will also provide direction to the City Attorney pursuant to Government Code Section 54957.6 concerning changes, if any, to the City Manager’s Employment Agreement as to salary, compensation and/or benefits of the City Manager. Any such change would be considered and acted upon at a future City Council Meeting in open session.

C. CONFERENCE WITH REAL PROPERTY NEGOTIATOR S. The City Council met in closed session pursuant to Government Code Section 54956.8 regarding the potential purchase of certain re al property interests in the real property located at APN. 171020001, Pyrite Street between Mission Boulevard and the SR 60 Freeway in the City of Jurupa Valley 92509. The parties to the negotiations for the purchase of the property are: City of Jurupa Val ley and Panorama Development, LLC. Negotiators for the City of Jurupa are: Rod Butler, Michael Flad and Peter Thorson. Under negotiation are the price and terms of payment for the potential purchase of the property.

3. RECONVENE IN OPEN SESSION
A. ANNOUNCEMENT OF ANY REPORTA BLE ACTIONS IN CLOSE D

SESSION

RETURN TO AGENDA

-2-

City Attorney Peter Thorson announced that there were no reportable actions taken.

4. 7:00 PM - CALL TO ORDER AND ROLL CALL FOR REGULAR SESSION ● Chris Barajas, Mayor
● Leslie Altamirano, Mayor Pro Tem
● Lorena Barajas Bisbee, Council Member
● Brian Berkson, Council Member
● Guillermo Silva, Council Member
Mayor Chris Barajas called the regular meeting to order at 7:04 p.m. Council Member Lorena Barajas Bisbee was absent.

5. INVOCATION

6. PLEDGE OF ALLEGIANCE was led by Joe Perez.

7. APPROVAL OF AGENDA
A motion was made by Mayor Pro Tem Altamirano , seconded by Council Member Guillermo Silva, to approve the Agenda.

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

8. PRESENTATIONS
A. PROCLAMATION PROCLAIMING DONATE LIFE MONTH
Allen Jolley, representing One Legacy discussed the importance of organ donation.

He spoke in honor of his daughter Caitlyn whose death made possible the gift of life for an 8-month old child and helped provide needed organs to two others. He thanked the Council for their recognition and encouraged greater awareness of organ and tissue donation.

B. PROCLAMATION CELEBRATING THE 40 TH ANNIVERSARY OF

CALIFORNIA FAMILY LIFE CENTER
Jeremy Mann, representing the Rubidoux Youth Opportunity Center and representing California Family Life Center, provided information on the services they provide which includes being a foster agency, adoption services, job training, and transitional youth homes. Mr. Mann thanked the Council for their recognition of this noteworthy milestone.

-3-

9. PUBLIC APPEARANCE/COMMENTS
Bobby Renae spoke on behalf of homeowners from Mira Loma who are concerned about high-density clustered apartments and single -family dwellings that will impact the ir equestrian and animal keeping community. The residents would like open and productive discussion over such quality of life issues.

Luis Diaz spoke as a 30 year -resident of Dodge Street, stating that he is concerned about the new rolled curbs that are a danger to horseback riders. The curbs will als o impact the location of mailboxes which will cause damage to the horse trail.

Thomas Elder voiced a concern that the current state of Mira Loma needs to be cleaned up as there are couches, furniture and graffiti scattered throughout the neighborhood and he is tired of the way it looks.

10. INTRODUCTIONS, ACKNOWLEDGEMENTS, COUNCIL COMMENTS AND

ANNOUNCEMENTS
Council Member Brian Berkson discussed the drive-thru pet vaccine clinic that was held a few weeks ago which provided over 250 vaccinations at no charge. Due to the success of the clinic, the County Animal Control Services will host another drive -thru vaccine clinic on Friday, April 29th at the City’s Operations Center at 5293 Mission Boulevard.

Mayor Chris Barajas advised that the previous speaker may address his concerns regarding the rolled curb to Paul Toor, Public Works Director. He announced that the City’s new food bank in partnership with the United Sikh Mission will have their grand open ing this Saturday at 10:00 am. The event will include a food distribution for the first 500 attendees.

11. CITY COUNCIL MEMBER ORAL/WRITTEN REPORTS REGARDING

REGIONAL BOARDS AND COMMISSIONS

A. MAYOR CHRIS BARAJAS

1. Mayor Barajas gave an update on the W estern Riverside Council of Governments – Administration & Finance Committee meeting of April 13, 2022.

2. Mayor Barajas gave an update on the Western Community Energy Joint meeting of the Board of Directors and Technical Advisory Committee of April 13, 2022.

B. COUNCIL MEMBER BRIAN BERKSON

1. Council Member Berkson gave an update on the Metrolink / Southern California Regional Rail Authority meeting of April 8, 2022.

-4-

2. Council Member Berkson gave an update on the Transportation Now Coalition meeting of April 14, 2022.

3. Council Member Berkson gave an update on the Mobile Source Air Pollution Reduction Review Committee meeting of April 21, 2022.

C. COUNCIL MEMBER GUILLERMO SILVA

1. Council Member Silva gave an update on the Northwest Mosquito and Vector Control District meeting of April 21, 2022.

12. CITY MANAGER’S UPDATE

A. COMMUNITY NEWS AND UPCOMING EVENTS

City Manager Rod Butler gave a presentation on the following upcoming events:
1) the Jurupa Valley Food Pantry grand opening on April 23, 2022; 2) a Town Hall meeting for Council District 4 on April 26, 2022; 3) a drive-through pet adoption clinic for Jurupa Valley residents at the Jurupa Valley Operations Center on April 29, 2022; 4) a Spring Community Clean up on Saturday, April 30, 2022; 5) Mayor’s Prayer Breakfast on May 5, 2022 ; 6) a blood donation event on May 26, 2022; 7) and a Save the Date for the upcoming Veterans Parade on November 12, 2022.

Additional information is available on the City’s website at: www.jurupavalley.org

Joe Perez, Community Development Director, announced that the City received some excellent news today that he wanted to share with members of the audience.

The City of Jurupa Valley’s General Plan Housing Element has been certi fied by the California Department of Housing and Community Development (HCD), signifying the City’s compliance with State Housing Element law. Mr. Perez noted that Jurupa Valley is only the second city in the County of Riverside to have a certified Housin g Element. He commended Jean Ward and Mary Wright and members of the Community Development Department team for their efforts.

Further discussion followed.

Mayor Chris Barajas commended everyone who had input on the Housing Element, while still protecting the City’s rural areas. He specifically thanked City staff, the members of the City Council, and members of the Planning Commission.

Thomas Elder discussed the new housing legislation that will bring higher density housing to the City. He asked that the Council not put any time or energy into the Sikh Mission.

Bobby Renae stated that she loves Jurupa Valley and she urges everyone to take care of each other and respect all people.

-5-

13. SHERIFF’S DEPARTMENT UPDATE

Mayor Chris Barajas announced that this item will be continued to the May 19, 2022 meeting.

14. APPROVAL OF MINUTES

A. APRIL 7, 2022 REGULAR MEETING
A motion was made by Mayor Pro Tem Leslie Altamirano , seconded by Council Member Guillermo Silva, to approve the Minutes of the April 7, 2022 regular meeting.

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

15. CONSENT CALENDAR
A. COUNCIL APPROVAL OF A MOTION TO WAIVE THE READING OF

THE TEXT OF ALL ORDINANCES AND RESOLUTIONS INCLUDED IN

THE AGENDA

Requested Action: That the City Council waive the reading of the text of all ordinances and resolutions included in the agenda.

B. REAFFIRM FINDINGS AUTHORIZING CITY COUNCIL TO MEET IN

WHOLE OR IN PART BY TELECONFERENCING UNDER
GOVERNMENT CODE SECTION 54953(e) DURING THE COVID -19

STATE AND LOCAL EMERGENCY

Requested Action: That the City Council adopt Resolution No. 2022 -32, entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA

VALLEY, CALIFORNIA, AUTHORIZING PUBLIC MEETINGS OF THE

CITY COUNCIL TO BE HELD WITH A TELECONFERENCE OPTION

FOR MEMBERS OF THE CITY COUNCIL AND THE PUBLIC DUE TO
THE GOVERNOR’S DECLARATION OF EMERGENCY AND THE CITY
COUNCIL’S DECLARATION OF LOCAL EMERGENCY PURSUANT TO
GOVERNMENT CODE SECTION 54953(e), AND MAKING FINDINGS

AND DETERMINATIONS REGARDING THE SAME

C. APPROVAL OF JOINT COMMUNITY FACILITIES AGREEMENT BY AND

BETWEEN JURUPA UNIFI ED SCHOOL DISTRICT, CENTURY

COMMUNITIES OF CALIFORNIA, LLC, AND THE CITY OF JURUPA

VALLEY FOR IMPROVEMENTS RELATED TO TENTATIVE TRACT MAP

-6-

NO. 37640 EMERALD RIDG E SOUTH; AVALON STRE ET, CANAL
STREET, CANAL STREET EXTENSION, AND 30TH STREET

1. Requested Action: That the City Council approve the Joint Community Facilities Agreement by and Between Jurupa Unified School District, the City of Jurupa Valley, and Century Communities of California, LLC; and

2. Authorize the City Manager to execute the agreement in substantially the form and format attached to the staff report as approved by the City Attorney.

D. APPROVAL OF FINAL PARCEL MAP NO. 37528, GEN ERALLY

LOCATED ON THE SOUTHEAST CORNER OF RUBIDOUX

BOULEVARD AND EL RIVINO ROAD, INCLUDING ACCEPTANCE OF

OFFERS OF DEDICATION, AND ACCEPTANCE OF IMPROVEMENT

FINANCIAL SECURITIES BONDS (AGUA MANSA COMMERCE

PREDEV, LLC)

1. Requested Action: That the City Council approve Final Parcel Map 37528 and accept the following dedications:
a. the real property described as an easement for public street and public utility purposes over Lots “A” through “F”, inclusive, as shown on Parcel Map No. 37528.
b. the real property described as an easement for public utility purposes together with the right of ingress and egress for emergency vehicles over and within Lots “G” through “W”, inclusive, as shown on Parcel Map No. 37528.

2. Authorize the Mayor and City Clerk to sign Final Parcel Map No. 37528;

3. Approve and authorize the Mayor and City Clerk to execute the Subdivision Agreements; and

4. Accept the surety bonds for construction of related off -site improvements, and placement of survey monumentation.

A motion was made by Council Member Brian Berkson , seconded by Mayor Pro Tem Leslie Altamirano, to approve the Consent Calendar.

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

-7-

16. CONSIDERATION OF ANY ITEMS REMOVED FROM THE CONSENT

CALENDAR

17. PUBLIC HEARINGS

A. PUBLIC HEARING FOR THE COMMUNITY DEVELOPMENT BLOCK
GRANT (CDBG) ANNUAL ACTION PLAN (2022-2023)

Staff Report presented by Amy Sells, Principal Management Analyst.

Mayor Chris Barajas opened the public hearing and called for any public comments.

Tyler Byrne expressed his disappointment in the decision to deny some of the applicants that applied for CDBG grant funding. After going through the CDBG workshop, studying the inform ation and requirements and submitting his application to the CDAC, he did not anticipate the outcome.

Leonard Jarman, representing Path of Life Ministries, gave an update on the services they provide which includes an outreach team, transitional housing, crisis intervention, Veterans housing, and short-term housing.

Thomas Elder discussed his views of how the funding for the CDBG grant funding is being allocated.

There being no further comments, the public hearing was closed.

A motion was made by Mayor Pro Tem Leslie Altamirano , seconded by Council Member Guillermo Silva , to receive and file the 2022 -2023 Annual Action Plan; and adopt Resolution No. 2022-33, entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA

VALLEY, CALIFORNIA, ADOPTING THE ANNUAL ACTION PLAN
(2022-2023) FOR THE CITY’S COMMUNITY DEVELOPMENT BLOCK

GRANT (CDBG) PROGRAM

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

B. PUBLIC HEARING TO CONSIDER (1) AN ORDINANCE TO AMEND CHAPTER 3.75 OF THE MUNICIPAL CODE TO CLARIFY THE

METHOD USED FOR CALCULATING DEVELOPMENT IMPACT FEES

FOR RETAIL/SERVICE/OFFICE, BUSINESS PARK, INDUSTRIAL, AND

RESIDENTIAL USES AND COMMERCIAL LODGING AND MIXED USE
DEVELOPMENTS, AND (2) A RESOLUTION TO ADOPT A

-8-

DEVELOPMENT IMPACT FEE FOR ACCESSORY DWELLING UNITS,

AND MAKING A FINDING OF EXEMPTION UNDER CEQA
Mayor Chris Barajas opened the public hearing and called for any public comments.

There being no further comments, the public hearing was continued to the May 5, 2022 Council meeting.

By consensus, the City Council continued the public hearing to the regularly scheduled City Council meeting on May 5, 2022.

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee
C. PUBLIC HEARING TO CONSIDER A RESOLUTION ADDING AN SB 9

TWO-UNIT DEVELOPMENT APPLICATION FEE TO THE SCHEDULE

OF ZONING FEES AND AN URBAN LOT SPLIT APPLICATION FEE TO

THE SCHEDULE OF SUBDIVISION FEES

Staff Report presented by Dianne Guevara, Deputy Director of Community Development. Ms. Guevara provided background on Senate Bill 9, noting that the legislation requires the ministerial approval of a subdivision of one lot into two lots in a single -family residential zone and a second dwelling unit in a single -family residential zone. Last January, the Council adopted an urgency ordinance with design standards in order to limit the impacts from the density increases in single - family zones. Tonight, the Council is being asked to consider the associated fee that is needed to cover the costs to process proposed SB 9 applications.

Mayor Chris Barajas opened the public hearing and called for any public comments.

Bobby Renae commented on the SB 9 legisl ation. She asked how the legislation will affect future development and how she could set up a meeting with Council to become better informed.

Mayor Chris Barajas outlined some of the main provisions of Senate Bill 9 and future housing bills that are being considered by the legislature.

Council Member Brian Berkson discussed how state legislation is eroding local control over housing and zoning issues and how the Council has limited authority once the legislation is passed.

There being no further comments, the public hearing was closed.

A motion was made by Mayor Pro Tem Leslie Altamirano , seconded by Council Member Guillermo Silva, to adopt Resolution No. 2022-35, entitled:

-9-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF J URUPA

V ALLEY, CALIFORNIA, AMENDING THE SCHEDULE OF ZONING
FEES ESTABLISHED PURSUANT TO SECTION 3.65.030 OF THE
JURUPA V ALLEY MUNICIPAL CODE TO ADD AN SB 9 TWO -UNIT

DEVELOPMENT APPLICATION FEE, AND AMENDING THE

SCHEDULE OF SUBDIVISION FEES ESTABLISHED PURSU ANT TO
SECTION 3.65.060 OF THE JURUPA V ALLEY MUNICIPAL CODE TO

ADD AN URBAN LOT SPLIT APPLICATION FEE, AND FINDING THE

ACTION EXEMPT FROM CEQA PURSUANT TO CEQA GUIDELINES
SECTIONS 15061 AND 15378 AND PUBLIC RESOURCES CODE
SECTION 21080(b)(8)(A)

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

18. COUNCIL BUSINESS

A. CONSIDERATION TO RES TRUCTURE THE TRAFFIC SAFETY

COMMITTEE

Staff Report presented by Paul Toor, Director of Public Works. Mr. Toor explained that this proposal is to expand the roles and responsibilities of the Traffic Safety Committee by adding additional duties such as reviewing and recommending Public Works programs and other infrastruc ture obligations. Additionally, the Committee could assist the Council in reviewing and developing tree maintenance policies; review and recommend refuse rates and recycling programs, and review and recommend Capital Improvement Projects.

Mayor Chris Barajas complimented Mr. Tool for his efforts on this item. He voiced his full support for a new Public Works Committee.

Members of the Council echoed Mayor Barajas’s comments and voiced support of a Public Works Committee.

A motion was made by Council Member Guillermo Silva, seconded by Mayor Pro Tem Leslie Altamirano, to direct staff to prepare an ordinance and/or resolution restructuring the City’s Traffic Safety Committee to a Public Works Committee and establish the role and responsibilities of the Public Works Committee.

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

-10-

B. ADOPTION OF THE FIVE-YEAR MEASURE ‘A’ LOCAL STREETS AND

ROADS CAPITAL IMPROVEMENT PROGRAM

Staff Report presented by Paul Toor, Director of Public Works. Mr. Toor reported that Measure A is voter approved Measure to impose a 0.5% sales tax to be used for transportation system improvements. Measure A was first approved by Riverside County voters in 1988 for a 20 year period. In 2002, voters approved a 30 year extension to continue funding ro ad improvements. To be eligible for Measure A funding, the City is required to submit a five-year Capital Improvement Project report to the Riverside County Transportation Commission , who oversees the program by May 1, 2022. Mr. Toor presented the key pr ojects that will be recommended for funding.

Further discussion followed.

A motion was made by Mayor Pro Tem Leslie Altamirano , seconded by Council Member Guillermo Silva, to adopt Resolution No. 2022-36, entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA
VALLEY, CALIFORNIA, ADOPTING THE FIVE -YEAR MEASURE “A”

LOCAL STREETS AND ROADS CAPITAL IMPROVEMENT PROGRAM
FOR FISCAL YEARS 2022/2023 THROUGH 2026/2027

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

C. DISCUSSION OF DOWNEY PARK REOPENING PLAN

Staff Report presented by Keith Clarke, Building Department Director.

City Manager Rod Butler read into the record a message from Council Member Lorena Barajas Bisbee that she does not support the reopening of the Downey Street Park as it will disturb the surrounding community by causing traffic, noise, and litter and will strain the resources of the City’s Code Enforcement and Sheriff’s Department.

Further discussion followed.

By consensus, the Council directed City staff to come back with a plan for the reopening, which includes hours of operation, how the new park and trail at Paradise Knolls will be integrated with the Downey Street Park, and how some of the quality of life issues will be mitigated and at what cost.

-11-

Ayes: L. Altamirano, C. Barajas, B. Berkson, G. Silva
Noes: None

Absent: L. Barajas Bisbee

19. CITY ATTORNEY’S REPORT
City Attorney Peter Thorson had no report.

20. COUNCIL MEMBER REPORTS AND COMMENTS
Council Member Guillermo Silva thanked members of the audience for being respectful while voicing their concerns. He encouraged concerned residents to reach out to City Staff or to contact the City Council by email.

Mayor Chris Barajas requested that City staff bring back a plan for the City’s street sweeping program with a schedule so residents know when their streets will be swept and a proposal of what it would cost to install no-parking signs and enforce the program.

Mayor Pro Tem Leslie Altamirano thanked members of the audience for coming out and giving their feedback. The Council welcomes and encourages public participation and are available to listen to concerns and answer questions. She encouraged community members to visit the City’s website and social media platforms to stay informed . She announced that a Town Hall meeting for Council District 4 will be held Tuesday, April 2 6th at 6:00 p.m. at the Eddie Dee Smith Senior Center.

21. ADJOURNMENT
There being no further business before the City Council, Mayor Chris Barajas adjourned the meeting at 9:28 p.m.

The next meeting of the Jurupa Valley City Council will be held May 5, 2022 at 7:00 p.m. at the City Council Chamber, 8930 Limonite Avenue, Jurupa Valley, CA 92509.

Respectfully submitted,

____________________________
Victoria Wasko, CMC
City Clerk

Page | 1
120

STAFF REPORT
DATE: MAY 5, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ROD BUTLER, CITY MANAGER
BY: CONNIE CARDENAS, ADMINISTRATIVE SERVICES DIRECTOR
SUBJECT: AGENDA ITEM NO. 11.B

CHECK REGISTERS

RECOMMENDATION
That the City Council ratify the check registers dated March 30 and April 6, 13, and 20, 2022 as well as the payroll registers dated March 31 and April 1, and 15, 2022.

The City Council of the City of Jurupa Valley authorizes expenditures through the annual budget process. The FY 2021-22 Budget was adopted on June 17, 2021. Expenditures not included in the annual budget process are approved by resolution throughout the fiscal year.

ANALYSIS
All expenditures on the attached check registers have been approved by the City Council and are in conformance with the authority provided by Section 37208 of the Government Code. The check register dated March 03, 2022 includes payments of $14,043.28 and $15,890.22 to Chase Card Services. The statement with purchase details is attached herewith.

OTHER INFORMATION
None.

FINANCIAL IMPACT
Check registers:
03/30/22 $ 418,868.55
04/06/22 $ 198,707.33
04/13/22 $ 1,880,477.71
04/20/22 $ 2,325,588.74

RETURN TO AGENDA

Page | 1

STAFF REPORT
DATE: MAY 5, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ROD BUTLER, CITY MANAGER
SUBJECT: AGENDA ITEM NO. 11.C

FIRST AMENDMENT TO AGREEMENT FOR THE FOOD PANTRY
LOCATED AT 56 26 MISSION BOULEVARD WITH UNITED SIKH

MISSION

RECOMMENDATION
1) That the City Council ap prove the First Amendment between the City of Jurupa Valley and United Sikh Mission to install, maintain and repair kitchen equipment and authorize the City Manager to execute the First Agreement in substantially the form and format attached and as approved by the City Attorney.

BACKGROUND
On May 21, 2020, the Council approved th e acquisition of a building 5626 Mission Boulevard from the County of Riverside and legally took possession on July 1, 2020.

Although there was no purchase cost to the City, the City was responsible for the ongoing costs associated with maintaining the facility.

As Covid-19 restrictions began to loosen in the spring of 2021, the City Council directed staff to begin meeting with local non -profit organizations in an effort to determine what types of uses are most needed in the community. Staff met with several local non-profit and governmental organizations over the next few months including the Jurupa Valley Unified School District, Jurupa Area Recreation and Park District, Reach Out / Healthy Jurupa Valley, First Five Riverside, Riverside County Parks and Open Space District, Jurupa Mountains Discovery Center, United Sikh Mission (USM) and Jurupa Valley Boxing Club.

On September 16, 2021, City Council directed staff to negotiate exclusively with the United Sikh Mission to operate a food distribution and pantry at 5625 Mission Blvd.

RETURN TO AGENDA

Page | 2

At the start of the global pandemic, members of the Sikh community from the Jurupa Valley Temple took immediate action to alleviate the need for food distribution to those in the community who were suffering economically. What started out as an operation serving approximately 175 meals daily outside of the temple grew into a significant project that provided as many as 40,000 meals per week. During those months, residents thanked and praised the efforts of the Sikh community, voicing their concerns about the need for a food pantry in the heart of the City of Jurupa Valley.

In recognition of the unmet need in the community and in the interest of developing a long- range plan to feed the hungry , the USM began to discuss the possibility of a permanent food bank for the residents of Jurupa Valley. According to the USM the City facility is an ideal location for a USM food bank because of its proximity to the Sikh Gurdwara temple, which has been a valued community organization since 1985.

The USM is a philanthropic charitable organization incorporated in Southern California and also in Punjab, India since 2005 for the purposes of Human and Environmental Welfare.

In addition to food distribution, the United Sikh Mission ha s helped more than 200,000 people receive quality eye care serv ices. The eye care service consists of more than 25,000 eye surgeries and 140,000 pairs of glasses. It is their desire to begin with a food pantry and then possibly grow their services with eye care, medical services, clothing donations and youth services.

On October 21, 2021 the City Council approved a contract with the USM to operate a food pantry. They have plans to serve at least 500 hot meals per month directly to those in need and also provide food through 10 additional food pantries who will pick up food for their own distributions centers each week.

ANALYSIS

In January 2022, City Staff began developing recommendations to be considered by the City Council for the expenditure of unspent funding in the Community Development Block Grant COVID-19 (CDBG-CV3) program. This CDBG-CV3 funding has strict requirements, and must be used to mitigate the effects of COVID -19. Any unspent CDBG funds at the local level are returned to the U.S. Department of Housing and Urban Development. One available option approved by Council, was to purchase kitchen equipmen t for the new food bank. A kitchen allows the USM to store food safely and to cook and serve hot meals and to those who are impacted by the pandemic as well as for any family who is experiencing food insecurities. On March 17, 2022, the City Council awarded the CDBG- CV3 funding to purchase the kitchen equipment for the food pantry.

The kitchen equipment will be owned by the City for the life of the appliances. This agreement allows the City to purchase the kitchen equipment with these grant funds. The USM will be responsible for the costs of installation, maintenance, repair, and any utility costs associated with the kitchen equipment.

Page | 3

FINANCIAL IMPACT
The City’s CDBG-CV3 allocation provides $50,000 for the purchase of kitchen equipment.

ALTERNATIVES

1. Do not approve agreement

2. Provide Staff with alternate direction

************************** SIGNATURES ON FOLLOWING PAGE********************

Page 1 of 2 ends

AMENDMENT NO. 1 TO LICENSE AND OPERATING AGREEMENT

FOR USE OF THE CITY OF JURUPA VALLEY COMMUNITY CENTER
LOCATED AT 5626 MISSION BOULEVARD BETWEEN CITY OF

JURUPA VALLEY AND UNITED SIKH MISSION
This Amendment No. 1 (“First Amendment”) to the October 21, 2021 License and Operating Agreement (“Agreement”) between the City of Jurupa Valley , a California municipal corporation (“City”) and United Sikh Mission, Inc. , a California nonprofit corporation (“Non-Profit”) is dated May 5, 2022, and is between City and Non-Profit.

RECITALS
A. City and Non-Profit entered into the Agreement granting Non-Profit and its agents, employees and contractors the exclusive right to enter onto and use the community center located at 5626 Mission Boulevard (the “Center”) for the purpose of the providing community programs and services.

B. City and Non-Profit desire to amend the Agreement to update Non-Profit’s obligations to include the installation, maintenance, and repair of any kitchen equipment purchased by the City for use at the Center.

The parties therefore agree as follows:

Section 1. Section 5.B of the Agreement is hereby amended by adding Paragraph 9 to read as follows:
“Install, maintain, and repair any kitchen equipment purchased by the City for use at the Center. Non-Profit shall be responsible for any utility costs associated with such kitchen equipment.”
Section 2. The person or persons executing this First Amendment on behalf of Non-Profit warrants and represents that he or she has the authority to execute this First Amendment on behalf of Non-Profit and has the authority to bind Non-Profit to the performance of its obligations hereunder.

Section 3. Except as expressly modified or supplemented by this First Amendment, all other provisions of the Agreement shall remain unaltered and in full force and effect. In the event of a conflict between the provisions of this First Amendment and the provisions of the Agreement, the provisions of this First Amendment shall control. [SIGNATURE PAGE FOLLOWS]

Page 2 of 2 ends

The parties are signing this First Amendment on the date stated in the introductory clause.

ATTEST:

By:

Victoria Wasko, CMC, City Clerk

CITY OF JURUPA VALLEY

By:

Rod B. Butler, City Manager

APPROVED AS TO FORM:

By:

Peter M. Thorson, City Attorney
UNITED SIKH MISSION, INC.

By:

Name:

Title:

By:

Name:

Title:

Page | 1

STAFF REPORT
DATE: MAY 5, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ROD BUTLER, CITY MANAGER
BY: PAUL TOOR, PUBLIC WORKS DIRECTOR
SUBJECT: AGENDA ITEM NO. 11.D

A RESOLUTION OF INTENTION OF THE CITY COUNCIL OF THE CITY

OF JURUPA VALLEY TO ESTABLISH CITY OF JURUPA VALLEY
COMMUNITY FACILITIES DISTRICT N O. PS 202 2-001 (PUBLIC

SAFETY, EMERALD RIDGE SOUTH ) AND TO AUTHORIZE THE LEVY

OF A SPECIAL TAX WITHIN CITY OF JURUPA VALLEY COMMUNITY FACILITIES DISTRICT NO. PS 2022-001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH ); GENERALLY LOCATED ALONG AVALON STREET,
CANAL STREET, CANAL STREET EXTENSION, AND 30 TH STREET, TTM 37640

RECOMMENDATION
1) That the City Council adopt Resolution No. 2022-37, entitled:

A RESOLUTION OF INTENTION OF THE CITY COUNCIL OF THE CITY OF

JURUPA VALLEY, CALIFORNIA, TO ESTABLISH CITY OF JURUPA VALLEY COMMUNITY FACILITIES DISTRICT No. PS 2022 -001 (PUBLIC SAFETY,

EMERALD RIDGE SOUTH ) AND TO AUTHORIZE THE LEVY OF A SPECIAL

TAX WITHIN CITY OF JURUPA VALLEY COMMUNITY FACILITIES DISTRICT No. PS 2022-001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH)

BACKGROUND
The State legislature enacted the Mello -Roos Act of 1982 (the “Act”) to assist public agencies in financing certain public services. The developer , Century Communities of California, LLC, requested that the City assist them in forming a district for the City to mitigate public safety impacts created by the new developments within the Emerald Ridge South area.

RETURN TO AGENDA

Page | 2

The Mello-Roos Community Facilities Act of 1982 (the “Act”) authorizes the initiation of the establishment of community facilities districts upon receipt by the City of a petition requesting institution of proceedings by owners of not less than 10% of the area of land proposed to be included within the district. The City has received the signed petition from the land owners.

The CFD boundary includes the area within a proposed subdivision known as Tentative Tract Map No. 37640, Emerald Ridge South. The subdivision proposes 214 lettered lots (118 townhome lots, 96 single family residences, and 25 residential lots ) subject to the assessment, and sixteen lots designated as open space that are not subject to CFD assessment. The CFD is comprised of approximately 11 taxable acres within 25 acres.

The CFD will set up a special tax to generally cover cost associated with providing law enforcement protection services, including but not limited to:
 The costs of contracting services.
 Equipment, vehicles, supplies.
 The salaries and benefits of City staff that directly provide police protection services and other services as defined herein, respectively.  City overhead costs associated with providing such services within the District.  Services related thereto, including collection and accumulation of funds to pay for anticipated operating cost shortfalls.

ANALYSIS

Approval of the attached Resolution is required under the Act to levy a special tax and fund certain services. The attached Resolution declares the City Council’s intention t o form the proposed CFD No. PS 2022-001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH) and to authorize the levy of a special tax in accordance with the attached Rate and Method of Apportionment of Special T ax. The attached Resolution is the initi al step for forming the CFD pursuant to the procedures prescribed by the Act, which include holding a public hearing and submitting the formation of the proposed CFD No. PS 2022-001 to the landowners at a special election to be conducted by mailed ballot.

The base year (FY2023-2024) special tax was set in the following amount:

TAX A
SFR (D/U) $220.00
MFR (D/U) $180.00
Approved Property $100.00

These rates will increase based on the percentage increase in the Consumer Price Index, for Riverside-San Bernardino-Ontario area, with a maximum annual increase of 6% and a minimum annual increase of 2% of the Maximum Special Tax in effect in the previous fiscal year. The owners have filed a petition representing their willingness to move forward.

Page | 3

OTHER INFORMATION

A public hearing on this matter will take place on June 16, 2022 or as soon thereafter and at that time the Council will hear any testimony concerning the formation and take action to adopt the “Resolution of Formation.”

FINANCIAL IMPACT

The individual property owners are responsible for the annual payments of special taxes.

The City will work with the County concerning the filing of the annual special tax to the County Auditor-Controller.

The property owner s posted a deposit with its application to form the CFD in order to cover City costs incurred in connection with the formation. Approval of this resolution does not in any way commit the City to any financial contribution or liability by the CFD.

The City’s cost to administer the CFD annually will be reimbursed through the special taxes charged to property owners.

The revenue and expense will be part of the City’s FY202 3-2024 adopted budget and there are no additional fiscal impacts.

ALTERNATIVES

1. Take no action.

2. Provide staff with further direction.

**************************SIGNATURES ON FOLLOWING PAGE**************************

-1-
RESOLUTION NO. 2022-37

A RESOLUTION OF INTENTION OF THE CITY COUNCIL OF THE

CITY OF JURUPA VALLEY, CALIFORNIA, TO ESTABLISH CITY OF JURUPA VALLEY COMMUNITY FACILITIES DISTRICT NO. PS 2022- 001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH) AND TO

AUTHORIZE THE LEVY OF A SPECIAL TAX WITHIN CITY OF
JURUPA VALLEY COMMUNITY FACILITIES DISTRICT NO. PS 2022- 001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH)

RECITALS:

WHEREAS, this City Council (the “City Council”) of the City of Jurupa Valley (the “City”) has received a petition (the “Petition”) requesting the institution of proceedings, which is signed by the owner of the land proposed for inclusion in a proposed community facilities district (the “Owner” ) and which meet the requirements of Sections 53318 and 53319 of the Mello-Roos Community Facilities Act of 1982, as amended, being Chapter 2.5 of Division 2 of Title 5 of the California Government Code (the “Act”); and

WHEREAS, the Act authorizes the City Council to establish a community facilities district and to levy special taxes within that district; and

WHEREAS, in accordance with the request set forth in the Petition, the City Council desires to undertake proceedings to establish a community facilities district pursuant to the Act to finance certain services which are in addition to services currently provided in the territory of the proposed district and are necessary to meet increased demands placed upon the City as a result of the development of such land;

NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF JURUPA VALLEY:

1. Intention. The City Council hereby declares its intention to conduct proceedings for the formation of a community facilities district under the terms of the Act.

2. Name of District. The name of the proposed community facilities district is "City of Jurupa Valley Community Facilities District No. PS 2022 -001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH)" (the "District").

3. Boundaries of District. The exterior boundaries of the District are shown on the map now on file in the office of the City Clerk entitled “Boundary Map - Community Facilities District No. PS 2022 -001 (PUBLIC SAFETY, EMERALD RIDGE SOUTH)” (the “Map”). The Map indicates by a boundary line, the extent of the territory included in the proposed District and shall govern for all details as to the extent of the District. On the original and one copy of the Map, the City Clerk shall endorse the certificate evidencing the date and adoption -2-
of this Resolution. The City Clerk shall file the original of the Map in her office and, within fifteen days after the adoption of this Resolution, the City Clerk shall file a copy of the Map so endorsed in the records of the County Recorder, County of Riverside, State of California, and in any event this Map shall be filed no later than fifteen days before the public hearing specified in Section 6 below.

4. Services. The type of services proposed to be provided within the District and to be financed under the Act shall consist of those set forth on Exhibit "A" (the "Services"), attached hereto and incorporated herein by reference. The Services are in addition to services currently provided in the District and are necessary to meet increased demands placed upon the City as a result of the development occurring in the District.

5. Special Tax.

a. Except where funds are otherwise available to pay for the Services, it is the intention of the City Council, commencing Fiscal Year 2023- 2024, to levy annually in accordance with procedures contained in the Act a special tax (the "Special Tax") within the District sufficient to pay for the costs thereof, including incidental expenses. The types of incidental expenses proposed to be incurred are set forth in Exhibit “B.” The Special Tax will be secured by recordation of a continuing lien against all non-exempt real property in the District and will be collected in the same manner as ordinary ad valorem property taxes are collected, or in such other manner as may be provided by the City Council including, without limitation, direct billing of the affected property owner, and shall be subject to the same penalties, procedure, sale and lien priority in case of delinquency as applicable for ad valorem property taxes. In the first year in which the Special Tax is levied, the levy shall include a sum sufficient to repay to the City all amounts, if any, transferred to the District pursuant to Section 53314 of the Act and interest thereon.

b. The proposed Rate and Method of Apportionment of the Special Tax (the “Rate and Method”) among parcels of real property in the District, in sufficient detail to allow each resident or landowner within the proposed District to estimate the maximum amount such resident or owner will have to pay, is shown in Exhibit "C," attached hereto and incorporated herein by reference. The City Council hereby determines the Rate and Method set forth in Exhibit “C” to be reasonable.

6. Hearing. A public hearing on the establishment of the District, the extent of the District, the furnishing of Services within the District, and the proposed Rate and Method (the "Hearing") shall be held on June 16, 2022, at 7:00 p.m., or as soon thereafter as practicable, at the chamber of the City Council of the City of Jurupa Valley, 8930 Limonite, Jurupa Valley, California 92509. At the Hearing, any interested person or taxpayer, including all persons owning lands or registered to -3-
vote within the proposed District, may appear and be heard.

7. Report. The Staff of the City is directed to study the proposed District and prepare for filing at the Hearing the report required by Section 53321.5 of the Act. The staff of the City may delegate to consultants of the City the duty to perform the study and prepare the report.

8. Advances. The City may accept advances of funds or work in -kind from any source, including, but not limited to, private persons or private entities, and is authorized and directed to use such funds or that work in -kind for any authorized purpose, including, but not limited to, paying any cost incurred by the City in creating the District. The City may enter into an agreement with the person or entity advancing the funds or work -in-kind, to repay all or a portion of the funds advanced, or to reimburse the person or entity for the value, or cost, whichever is less, of the work -in-kind, as determined by the City Council, with or without interest.

9. Published Notice. The City Clerk is hereby directed to publish a notice of the Hearing ("Notice") pursuant to Section 6061 of the California Government Code in a newspaper of general circulation published in the area of the proposed District. Such Notice shall be substantially in the form specified in Section 53222 of the Act. Publication of the Notice shall be completed at least seven days prior to the date of the Hearing.

10. Mailed Notice. The City Clerk is hereby directed to send a copy of the Notice of the Hearing by first-class mail, postage prepaid, to each registered voter and to each landowner within the proposed District as shown on the last equalized assessment roll. Mailing of the Notice shall be completed at least fifteen days prior to the date of the Hearing.

11. Voting. Should the City Council determine to form the District, a special election will be held within the District to authorize the levy of the Special Tax in accordance with the procedures contained in Section 53326 of the Act. If held, the proposed voting procedure at the election will be a landowner vote with each landowner who is the owner of record of land within the District at the close of the Hearing, or the authorized representative thereof, having one vote for each acre or portion thereof owned within the District. Ballots for the special election may be distributed by mail with return postage prepaid or by personal service.

12. Exemptions from Special Tax . Except as may otherwise be provided in Exhibit “C” hereto or by law, all lands owned by any public entity, including the United States, the State of California and/or the City, or any departments or political subdivisions thereof, shall be omitted from the levy of the Special Tax to be made to cover the costs and expenses of the Services. In addition, reference is hereby made to Exhibit “C” for a description of other lands which shall be omitted from the levy of the Special Tax.
-4-

13. Election to Perform Work. Pursuant to 53329.5(c) of the Act, the City Council finds that, in its opinion, the public interest will not be served by allowing property owners in the District to enter into a contract pursuant to Section 53329.5(a).

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Jurupa Valley on this 5th day of May, 2022.

______________________________
Chris Barajas
Mayor

ATTEST:

Victoria Wasko, CMC
City Clerk

-5-

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.

CITY OF JURUPA VALLEY )
I, Victoria Wasko, City Clerk of the City of Jurupa Valley, do hereby certify that the foregoing Resolution No. 2022-37 was duly passed and adopted at a meeting of the City Council of the City of Jurupa Valley on the 5th day of May, 2022 by the following votes, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Jurupa Valley, California, this 5th day of May, 2022.

________________________________
Victoria Wasko, City Clerk
City of Jurupa Valley

A-1
EXHIBIT "A"

DESCRIPTION OF SERVICES
Authorized Services for the Special Tax shall be the following:

The cost associated with providing law enforcement services, including but not limited to (i) the costs of contracting services, (ii) equipment, vehicles, supplies, (iii) the salaries and benefits of City staff that directly provide law enfo rcement services, (iv) City overhead costs associated with providing such services within the District, and (v) all other services necessary or useful for, or in connection with, the authorized services listed above, including building a reserve fund for replacement and maintenance and for anticipated operating cost shortfalls.

B-1

EXHIBIT "B"

INCIDENTAL EXPENSES

The cost of the Services shall include incidental expenses, including costs associated with formation of the District, determination of the amount of the Special Tax, collection of the Special Tax, payment of the Special Tax, costs incurred in order to car ry out the authorized purposes of the District, and the costs of engineering, inspecting, coordinating, completing, planning and designing the Services, including the costs of any environmental evaluations.

The following incidental expenses are examples o f those that may be incurred in the formation of the District: engineering services, publishing, mailing and posting of notices, governmental notification and filing costs, Election costs, and charges and fees of the City other than those waived.

The following incidental expenses are examples of those that may be incurred in each annual Special Tax levy: necessary consultant costs, costs of posting and collecting the special taxes, and administrative costs of the City related to each annual Special Tax levy.

C-1

EXHIBIT “C”

RATE AND METHOD OF APPORTIONMENT OF SPECIAL TAX

(Please see attached)

RATE AND METHOD OF APPORTIONMENT OF SPECIAL TAX FOR
COMMUNITY FACILITIES DISTRICT No. PS 2022-001 (PUBLIC SAFETY,

EMERALD RIDGE SOUTH) OF THE CITY OF JURUPA VALLEY, COUNTY OF

RIVERSIDE

STATE OF CALIFORNIA

A Special Tax (all capitalize d terms are defined in Section A., “Definitions, below) shall be applicable to each Parcel of Taxable Property located within the boundaries of Community Facilities District No. PS 2022-001 (Public Safety, Emerald Ridge South ).

The amount of Special Tax to be levied on a Parcel in each Fiscal Year, commencing in Fiscal Year 2023 -2024, shall be determined by the City Council of the City of Jurupa Valley, acting in its capacity as the legislative body of the CFD by applying the appropriate Special Tax as set for th in Section s B., C. , and D., be low. All of the real property within the CFD, unless exempted by law or by the provisions of Section E. below, shall be taxed for the purposes, to the extent and in the manner herein provided.

A. DEFINITIONS

The terms hereinafter set forth have the following meanings:

“Acre or Acreage ” means the land area of a Parcel as indicated on the most recent Assessor’s Parcel Map, or if the land area is not shown on the Assessor’s Parcel Map, the land area shown on the applicabl e Final Map, condominium plan, or other recorded County map or the land area calculated to the reasonable satisfaction of the Administrator using the boundaries set forth on such map or plan. The square footage of a Parcel is equal to the Acreage of such Parcel multiplied by 43,560.

“Act” means the Mello -Roos Community Facilities Act of 1982, as amended, being Chapter 2.5 of Part 1 of Division 2 of Title 5 of the Government Code of the State of California.

“Administrative Expenses ” means all actual o r reasonably estimated costs and expenses of the City that are chargeable or allocable to carry out its duties as the administrator of the CFD as allowed by the Act, which shall include without limitation, all costs and expenses arising out of or resulting from the annual levy and collection of the Special Tax (whether by the City or designee thereof or both), any litigation or appeal involving the CFD, and other administrative expenses of the City or designee thereof, or both, directly related to the CFD. Administrative Expenses shall al so include amounts estimated or advanced by the City or CFD for attorney’s fees and other costs related to commencing and pursuing to completion any foreclosure as a result of delinquent Special Taxes.

“Administrator” means an offici al of th e City, or d esignee thereof, responsible for determining the annual amount of the levy and collection of the Special Taxes.

“Approved Property” means all Parcels of Taxable Property: (i) that are included in a Final Map that was recorded prior to the January 1st preceding the Fiscal Year in which

the Special Tax is being levied, and (ii) that have not been issued a Building Permit prior to the April 1st preceding the Fiscal Year in which the Special Tax is being levied.

“Assessor” means the Assessor of the County.

“Assessor’s Parcel Map ” means an official map of the Assessor of the County designating Parcels by Assessor’s Parcel Number.

“Assessor’s Parcel Number ” means the number assigned to a lot o r Parcel for purposes of identification as determined from an Assessor Parcel Map or the applicable assessment roll.

“Base Year” means the Fiscal Year ending June 30, 2023.

“Boundary Map” means a recorded map of the CFD which indicates by a boundar y line the extent of the territory identified to be subject to the levy of Special Taxes.

"Building Permit" means the first legal document issued by a local agency giving official permission for new construction. For purposes of this definition, "Buildin g Permit" shall not in clude any subsequent Building Permits issued or changed after the first issuance.

“CFD” means Community Facilities District No. PS 2022-001 (Public Safety, Emerald Ridge South) of the City of Jurupa Valley.

“City” means the City of Jurupa Valley, California.

“Consumer Price Inde x” means the Con sumer Price Index published by the U.S.

Bureau of Labor Statistic for “All Urban Consumers in the Riverside-San Bernardino- Ontario Area, measured as of the month of April in the Calendar Year which ends in the previous Fisca l Year. In the event this ind ex ceases to be published, the Consumer Price Index shall be another index as determined by the Administrator that is reasonably comparable to the Consumer Price Index f or the Riverside-San Bernardino -Ontario Area.

“Council” means the City Council of th e City acting as the legislative body of the CFD.

“County” means the County of Riverside, California.

“Developed Property” means all Parcels of Taxable Property: ( i) that are included in a Final M ap that was recorded pri or to Januar y 1 st preceding the Fiscal Year in which the Special Tax is being levied, and (ii) for which a Building Permit for new construction has been issued prior to April 1 st preceding the Fiscal Year in which the Special Tax is being levied.

“Dwelling Unit” or “(D/U) ” means a residential unit that is used or intended to be used as a domicile by one or more persons, as determined by the Administrator.

“Exempt Property” means any Parcel w hich is exempt from Special Taxes pursuant to Section E., below.

“Final Map” means a subdivision of property by recordation of a n Assessor’s Parcel Map or lot line adjustment, pursuant to the Subdivision Map Act (California Government Code Section 66410 et seq .) or recordation of a con dominium plan pursuant t o California Civil Code 1352 that creates individual lots for which Building Permits may be issued without further subdivision.

“Fiscal Year” means the 12 month period starting on July 1 of any calendar year and ending the following June 30.

“Incidental Expenses ” means the costs associated with formation of the District, determination of the amount of the Special Tax, collection of the Special Tax, payment of the Special Tax, costs incurred in o rder to carry out the authorized purposes of the District, and the costs of engineering, inspecting, coordinating, completing, planning and designing the Services, including the costs of any environmental evaluations.

“Land Use Class” means any of the classes listed in Table 1 of Section C. below.

“Maximum S pecial Tax ” means for each P arcel in each Fiscal Year, the greatest amount of Special Tax, determined in accordance with Section C, below, which may be levied on such Parcel in such Fiscal Year

“Multifamily Residential Property ” means all Parcels of D eveloped Pro perty that consists of a building or buildings comprised of attached Dwelling Units available for rental by the general public, not for sale to an end user, and under common management.

“Non-Residential Property ” means all Parcels of Develop ed Property for which a Building Permit was issued, permitting the construction of one or more non -residential structures.

“Parcel(s)” means a lot or parcel within the CFD shown on an Assessor’s P arcel Map with an assigned Assess or’s Parcel Number valid as of July 1st for the Fiscal Year for which the Special Tax is being levied.

“Property Owner’s Association Property ” means all Parcels which have been conveyed, dedicated to, or irrevocably offe red for dedication to a property owner association, inclu ding any mas ter or sub -association, prior to April 1 st preceding the Fiscal Year in which the Special Tax is being levied.

“Proportionately” means for Parcels of Taxable Property that are (i) Single Family Property, that the rati o of t he actual Special Tax levy to Maximum Special Ta x is the same for all Parcels of Single Family Property, (ii) Multifamily Residential Property, that the ratio of the actual Special Tax levy to the Maximum Special Tax is the same for all Parcels of Multifamily Residential Property, and (iii) Approved Property, that the ratio of the actual Special Tax levy to the Maximum Special Tax is the same for all Parcels of Approved Property.

“Public Property” means all Parcels which, as of April 1st preceding the Fiscal Year in which the Special Tax is being levied, are (i) used for rights-of-way or any other purpose and is owned by, dedicated to, or irrevocably offered for dedication to the federal government, the State, the Co unty, City or any other public ag ency, provided, however, that any pr operty leased by a public agency to a private entity and subject to taxation under Section 53340.1 of the Act shall be taxed and classified according to its use; or (ii) encumbered by an unmanned utility easement making impractical its utilizat ion for other than the purpose set forth in the easement.

“Residential Property” means all Parcels of Developed Property for which a Building Permit has been issued permitting the construction of one or more residential Dwelling Units.

“Single Family P roperty” means all Parcels o f Residential Property, other than Multifamily Residential Property.

“Special Tax (es)” means the Special Tax to be levied in each Fiscal Year on each Parcel of Taxable Property in accordance with Section D.

“Special Tax Req uirement” means for each Fisca l Year, that amount required to: (i) pay the estimated cost of Special Tax Services for such Fiscal Year as determined by the City; (ii) pay amount required to establish or replenish any reserv e fund established in connection with the CFD, (iii) pay Admin istrative Expenses; (iv) pay for the actual or anticipated shortfall due to Special Tax delinquencies in the current or prior Fiscal Year; and (v) less a credit for funds available to reduce the annual Specia l Tax levy as determined by the Administrator.

“Special Tax Services” means t he cost associat ed with providing law enforcement services, including but not limited to (i) the cost s of contracting services, (ii) equipment, vehicles, supplies, (i ii) the sala ries and benefits of City staf f that directly pr ovide law enforcement services, ( iv) City over head costs associated with provid ing such services within the District, (v) all other services necessary or useful for, or in connection with, the authorized services listed above, including building a reserve fund for replacement and maintenance and for a nticipated operating cost shortfa lls, and (vi ) Incidental Expenses.

“State” means the State of California.

“Taxable Property” means all Parcels within the boundary of the CFD pursuant to the Boundary Map w hich are not exempt from the Special Tax pursuant to Section E., below.

“Taxable Unit” means either a Dwelling Unit or an Acre, as shown in Table 1.

“Undeveloped Property ” means all Parcels of Taxable P roperty not classi fied as Developed Prop erty, Ap proved Property, Public P roperty or Property Owner’s Association Property.

B. ASSIGNMENT TO LAND USE CLASS

Each Fiscal Year, commencing with Fiscal Year 2023 -2024, all Parcels of Taxable Property shall be c lassified as eithe r Developed Property, Approved Property, Undeveloped Property, Public Property or Property Owner’s Association Property, and subject to the levy of Special Taxes in accordance with this Rate and Method of Apportionment as determined pursuant to Sections C. and D.

Parcels of Developed Property shall further be classified as Residential Property or Non-Residential Property. Parcels of Residential Property shall further be classified as Single Family Property or Multifamily Residential Property.

C. MAXIMUM SPECIAL TAX RATES

1. Developed Property

The Maximum Special Tax that may be levied and escalated, as explained further in Section C.1. (a) below , in any Fiscal Year for each Parcel classified as Developed Property shall be determined by reference to Table 1 below.

TABLE 1
Maximum Special Tax Rates for Developed
Property for Fiscal Year 2023-2024

Land
Use
Class
Description Taxable
Unit
Maximum
Special Tax per
Taxable Unit
1 Single Family Residential Property
D/U
Dwelling
Unit $ 220.00
2 Multifamily Residential Property
Dwelling
Unit $ 180.00

(a) Increase in the Maximum Special Tax

On each July 1, following the Base Year, the Maximum Special Tax, identified in Table 1, above, shall be increased annually, commencing July 1, 2024, based on the percen tage incre ase in th e Consumer Price Index w ith a maximum annual increase of six percent (6%) and a minimum annual increase of two percent ( 2%) of the Maximum Special Tax in effect in the previous Fiscal Year.

(b) Multiple Land Use Classes

In some instances, a Parcel of D eveloped Property may co ntain more than one Land Use Class. The Maximum Special Tax that may be levied on such Parcel shall be the sum of the Maximum Special Tax that can be levied for each Land Use Class located on that Parcel. For a Parcel that contains more than one Land

Use Class, the Acreage of such Parcel shall be allocated to each type of property based on the amount of Acreage designated for each land use as determined by reference to the site p lan approved for such P arcel. The Administrator’s allocation to each Land Use Class shall be final.

2. Approved Property

The Maximum Special Tax that may be levied and escalated, as explained further in Section C. 2. (a) below, in any Fiscal Year for each P arcel classified as Approved Property shall be determined by reference to Table 2 below.

TABLE 2
Maximum Special Tax Rates for Approved
Property for Fiscal Year 2023-2024

Land
Use
Class
Description Taxable
Unit
Maximum
Special Tax per
Taxable Unit
3 Approved Property Lot $ 100.00

(a) Increase in the Maximum Special Tax

On each July 1, following the Base Year, the Maximum Special Tax, identified in Table 1, above, shall be increased annually, commencing July 1, 20 24, based on the percentage inc rease in the Consumer Price Index w ith a maximum annua l increase of six percent (6%) and a minimum annual increase of two percent ( 2%) of the Maximum Special Tax in effect in the previous Fiscal Year.

3. Undeveloped Property

No Special Tax shall be levied on Undeveloped Property.

D. METHOD OF APPORTIONMENT OF THE SPECIAL TAX

Commencing with Fiscal Year 2023-2024 and for each following Fiscal Year, the Administrator shall levy the Special Tax on all Taxable Property until the amount of Special Tax equal s the Special Tax Requir ement in ac cordance with the following steps:

First: The Special Tax shall be levied Proportionately on each Parcel of Developed Property a t up to 100% of the applicable Ma ximum Special Tax as needed to satisfy the Special Tax Requirement; and

Second: If additional moneys are needed to satisfy the Special Tax Requirement after the first step has been completed, the Special Tax shall be levi ed Proportionately on each Parcel of Approved Property at up to 100% of the Maximum Spec ial Tax for Approved Proper ty. Notwit hstanding the forgo ing sentence, no Special Tax shall be levied on Approved Property to fund items (ii) and (iii) of the Special Tax Requirement.

E. EXEMPTIONS

The CFD shall not levy Special Taxes on Public Property an d Property Owner’s Association Property within the CFD . Exempt Property status will be assigned by the Administrator in the chronological order in which Parcels b ecomes Public Property and/or Property Owner’s Association Property. Parcels which cannot be classified as Exempt wi ll continue to be classified a s Taxable Property, and will continue to be subject to Special Taxes accordingly.

F. MANNER OF COLLECTION

The Special Tax shall be collecte d in the same manner and at the same time as ordinary ad valorem property taxes and shall be su bject to the same p enalties, the same procedure, sale and lien priority in the case of delinquency; provided, however, that the Administrator may directly bill t he Special Tax, may collect Special Taxes at a different time or in a different mann er if neces sary to meet the fi nancial obligations of the CFD, and provided further that the CFD may covenant to foreclose and may actually foreclose on Parcels having delinquent Special Taxes as permitted by the Act.

G. APPEALS

Any taxpayer may file a wr itten appeal of the Special Ta x on his/her Parcel(s) with the Administrator, provided that the appellant is current in his/her payments of Special Taxes. During pendency o f an appeal, all Special Taxes must be paid on or before the payment due date establ ished when the levy was made. The appeal must specify the reasons why the appellant claims the Special Tax is in error. The Administrator shall review the appeal, meet wi th the appellant if the Administrator deems necessary, and advise the appellant of i ts determination. If the Admi nistrator agrees with the appellant, the Administrator shall grant a credit to eliminate or reduce future Spe cial Taxes on the appellant’s Parcel(s). No refunds of previously paid Special Taxes shall be made.

The Administrat or shall in terpret this Rate a nd Method of Apportionment and make determinations relative to the annual levy and administration of the Spec ial Tax and any taxpayer who appeals, as herein specified.

H. TERM OF THE SPECIAL TAX

The Special Tax shall be levi ed annually in perpetuity unle ss terminated earlier by the City.

BOUNDARY MAPBOUNDARY MAP
COMMUNITY FACILITIES DISTRICT NO. PS 2022-001 (EMERALD RIDGE)COMMUNITY FACILITIES DISTRICT NO. PS 2022-001 (EMERALD RIDGE) q

VICINITY MAP

LIST OF ASSESSOR PARCEL NUMBERS
LOCATED WITHIN BOUNDARIES OF CFD NO.

PS 2022-001 AS OF FISCAL YEAR 2022-2023
179-060-004
179-060-006
179-060-007
178-191-001
178-191-002
178-191-004
178-191-015

CITY OF JURUPA VALLEYCITY OF JURUPA VALLEY

COUNTY OF RIVERSIDE, STATE OF CALIFORNIACOUNTY OF RIVERSIDE, STATE OF CALIFORNIA

CFD BOUNDARY
¬

NOT TO SCALE

I HEREBY CERTIFY THAT THE WITHIN MAP SHOWING THE PROPOSED BOUNDARIES OF COMMUNITY FACILITIES DISTRICT NO. PS 2022-001 (EMERALD RIDGE) OF THE CITY OF JURUPA VALLEY, RIVESIDE COUNTY, STATE

OF CALIFORNIA, WAS APPROVED BY THE CITY OF JURUPA VALLEY AT A REGULAR MEETING THEREOF, HELD ON THE ____ DAY OF ______________ 2022, BY ITS RESOLUTION NO. ___________.

FILED IN THE OFFICE OF THE CITY CLERK OF THE CITY OF JURUPA VALLEY, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA THIS _________ DAY OF _______________________ 2022.

RECORDED THIS ___ DAY OF ___________ 2022 AT THE HOUR OF ___ O'CLOCK __ IN BOOK _________ OF MAPS OF ASSESSMEENT AND COMMUNITY FACILITIES DISTRICTS AT PAGE _______ , IN THE OFFICE OF THE COUNTY RECORDER IN THE COUNTY OF RIVERSIDE, STATE OF CALIFORNIA.

REFERENCE IS HEREBY MADE TO THE ASSESSOR MAPS OF THE COUNTY OF RIVERSIDE, FOR FISCAL YEAR 2022-2023 FOR AN EXACT DESCRIPTION OF THE LINES AND DIMENSIONS OF EACH LOT/PARCEL. ________________________________

CITY CLERK

CITY OF JURUPA VALLEY
________________________________

CITY CLERK

CITY OF JURUPA VALLEY
FEE ______ DOCUMENT NO. _______________.

PETER ALDANA, RIVESIDE COUNTY ASSESSOR-CLERK-RECORDER
BY: ________________________________
DEPUTY
PREPARED BY:
1260 Corona Pointe Court Suite 305
Corona, CA 92879-2013
855.900.4742

AVALON STREET

CANAL STREET
STATE ROUTE 60
30TH STREET

ALTA STREET
SR-60
Rubidoux Blvd.
30th St.

Avalon St.

Paramount Dr.

Muriel Dr.

Canal St.
28th St.29th St.
179-060-004
179-060-006
179-060-007
178-191-001
178-191-002
178-191-004
178-191-015

Page | 1

STAFF REPORT
DATE: MAY 5, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ROD BUTLER, CITY MANAGER
BY: TIM JONASSON, SENIOR MANAGER
SUBJECT: AGENDA ITEM NO. 13.A
PUBLIC HEARING TO CONSIDER (1) AN ORDINANCE TO AMEND
CHAPTER 3.75 OF THE MUNICIPAL CODE TO CLARIFY THE METHOD

USED FOR CALCULATING DEVELOPMENT IMPACT FEES FOR

RETAIL/SERVICE/OFFICE, BUSINESS PARK , INDUSTRIAL, AND

RESIDENTIAL USES AND COMMERCIAL LODGING A ND MIXED USE
DEVELOPMENTS, AND (2) A RESOLUTION TO ADOPT A

DEVELOPMENT IMPACT FEE FOR ACCESSORY DWELLING UNITS,

AND MAKING A FINDING OF EXEMPTION UNDER CEQA

RECOMMENDATION
That the City Council open and continue the public hearing to the regularly scheduled City Council meeting on May 19 , 2022. The public hearing is to consider a proposed Ordinance amending Chapter 3.75 of the Jurupa Valley Municipal Code to clarify the method for calculating development impact fees (“DIF”) for retail/service/office, business park, industrial, and residential uses , and commercial lodging and mixed used developments, and making other conforming revisions; and a proposed Resolution establishing the rate and method for calculating DIF for accessory dwelling units (“ADUs”).

BACKGROUND
On January 21, 2021, the City Council adopted Resolution No. 2021 -02 approving the “Development Impact Fee Calculation and Nexus Report fo r the City of Jurupa Valley” (“Nexus Report”) and the “Master Faci lities Plan” referenced therein. Resolution No. 2021-02 also approved the method and rate for calculating DIF . On February 4, 2021, the City Council adopted Ordinance No. 2021 -02 amending Chapter 3.75 of the Jurupa Valley Municipal Code (“Municipal Code”) pertaining to DIF based on the Nexus Report.

Staff subsequen tly determined there were some ambiguities and inconsistencies between Resolution No. 2021-02, Ordinance No. 2021-02 and the Nexus Report. Staff is proposing some amendments to Chapter 3.75 of the Municipal Code, consistent with the

RETURN TO AGENDA

Page | 1
120

STAFF REPORT
DATE: MAY 5, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ROD BUTLER, CITY MANAGER
BY: PAUL TOOR, P.E., DIRECTOR OF PUBLIC WORKS
SUBJECT: AGENDA ITEM NO. 13.B

PUBLIC HEARING REGAR DING THE ANNEXATION OF TERRITORY
(ZONE Y) TO THE CITY OF JURUP A VALLEY LANDSCAP E AND
LIGHTING MAINTENANCE DISTRICT NO. 89 -1-CONSOLIDATED (THE “DISTRICT”) AND THE LEVY AND COLLECTION OF ASSESSMENTS
WITHIN SUCH TERRITORY ; LOCATED ON THE SOUTH SIDE OF
MARKET STREET WEST O F HALL AVENUE AND NO RTH OF 24 TH

STREET (WHEELER UPFITTERS)

RECOMMENDATION
1) That the City Council adopt Resolution No. 2022-38, entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA VALLEY, CALIFORNIA, ORDERING THE ANNEXAT ION OF TERRITORY (ZONE Y);

LOCATED ON THE SOUTH SIDE OF MARKET STREET WEST OF HALL AVENUE AND NORTH OF 24TH STREET TO CITY OF JURUPA VALL EY LANDSCAPE AND LIGHTING MAINTE NANCE DISTRICT NO. 8 9-1-

CONSOLIDATED, CONFIR MING A DIAGRAM AND A SSESSMENT,

ORDERING THE IMPROVE MENTS AND THE LEVY A ND COLLECTION OF ASSESSMENTS WITHIN S UCH TERRITORY FOR FI SCAL YEAR 2022-23 PURSUANT TO THE PROV ISIONS OF PART 2 OF DIVISION 15 OF THE

CALIFORNIA STREETS A ND HIGHWAYS CODE AND AS PROVIDED BY

ARTICLE XIII D OF THE CALIFORNIA CONSTITUTION

BACKGROUND
The Landscaping and Lighting Act of 1972, being Part 2 of Division 15 of the California Streets and Highways Code (the “Act”) and Article XIII D of the California Constitution (“Proposition 218”), requires the City Council conduct proceedings to annex territory into

RETURN TO AGENDA
Page | 2

an assessment district formed under the Act and to levy assessments within such territory.

In connection with the City’s incorporation in 2011, the Local Agency Formation Commission of Riverside County (LAFCO) adopted its Resolution No. 12 -10 on July 22, 2010, to establish the Terms and Conditions of Incorporation, which require that the authority and responsibility for special assessment districts within the incorporated City associated with a ny County Landscape Maintenance District be transferred to the City upon its incorporation.

By its Resolution No. 2011-26, adopted on July 1, 2011, the City Council assumed all authority and responsibility for the special assessment districts within the i ncorporated City associated with any County Landscape Maintenance District and specifically assumed responsibility for any and all special assessments levied in connection with such districts.

The County’s Landscape and Lighting Maintenance District No. 8 9-1-Consolidated (the “County District”), established pursuant to the provisions of the Act includes various territories located both within the incorporated boundaries of the City (the “City Territory”) and outside the incorporated boundaries of the City (the “County Territory”). Pursuant to its Resolution No. 2016-01 adopted on February 4, 2016, the City declared that the City Territory is a district under the 1972 Act, which is separate and distinct from the County Territory, and designated such territor y as the “Jurupa Valley Landscape and Lighting Maintenance District No. 89-1-Consolidated.”

At its March 17, 2022 meeting, the City Council adopted Resolution No. 2022-16 initiating proceedings for the annexation of territory to the Jurupa Valley Landscap e and Lighting Maintenance District No. 89 -1-Consolidated (the “District”) as Zone Y and the levy and collection of assessments within such territory. Zone Y currently includes three assessable parcels, generally located on the south side of Market Street west of Hall Avenue and north of 24th Street.

Further, the City Council adopted Resolution No. 2022-18 declaring its intention to annex territory to the District and to levy and collect assessments with in such territory for fiscal year 2022-2023. Resolution No. 2022-77 set May 5, 2022 as the public hearing date for protests to the levy of annual assessments and the annexation.

Subsequent to the March 17, 2022 meeting and in accordance with the Act and Proposition 218, notice was mailed to the owners o f the properties within the territory to be annexed, along with an assessment ballot for such owners to indicate support for, or opposition to, the proposed annexation. The notice indicated the amount of the proposed assessment for their respective parcels and the date, time and place of the public hearing.

Page | 3

ANALYSIS

It is proposed to include the additional parcels within the boundaries of the District and to levy assessments within such territory for fiscal year 2022-2023. Such territory is shown on a map on file in the office of the City Clerk and is open to public inspection.

At the public hearing, the City Council must hear and consider all oral and written statements, protests, objections or other communications made or filed with respect to the annexation of territory to the District and the levy and collection of annual assessments within such territory.

The assessment ballots must be tabulated at the public hearing. A majority protest exists if ballots submitted in opposition to the assessment and annexation exceed the ballots submitted in favor of the assessment and annexation. In tabulating the ballots, the ballots shall be weighted according to the proportional financial obligation of the affected property. In the absence of a majority protest, the City Council may adopt a resolution ordering the annexation and levy and collection of assessments within the territory.

OTHER INFORMATION

 City Council initiated proceedings for the annexation on March 17, 2022.

FINANCIAL IMPACT

The property owners are responsible for the annual payments of the special assessment.

The City will file the special assessment with the County Auditor-Controller for collection via the annual property tax bills . The property owners have posted a deposit with their application to form Zone Y, in order to cover City costs incurred in connection with the annexation. Approval of this resolution does not in any way com mit the City to any financial contribution or liability for the Zone Y. The City’s cost to administer Zone Y annually will be reimbursed through the special assessment charged to property owners.

The fiscal year 2022-2023 (base year) maximum assessment for landscape maintenance and street lighting for each parcel is $6,200 and is subject to escalation beginning in FY 2023-2024 to account for reasonable increase cost for maintenance and inflation.

The revenue from this special assessment will be deposited into City of Jurupa Valley L&LMD 89-1-C and will be used to pay for the services provided in Zone Y. Both the revenue and expenses will be part of the City’s FY 2022-2023 Adopted Budget, and there is no anticipated impact to the General Fund.

CONCLUSION
It is recommended that the City Council adopt Resolution No. 2022 -38, ordering annexation of territory to the District and the levy and collect assessments with in such territory for fiscal year 2022-2023.

Page | 4

ALTERNATIVES

1. Take no action.

2. Provide staff with further direction.

************************** SIGNATURES ON FOLLOWING PAGE **************************

-1-
RESOLUTION NO. 2022-38

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA

VALLEY, CALIFO RNIA, ORDERING THE ANNEXATION OF
TERRITORY (ZONE Y); LOCATED ON THE SOUTH SIDE OF MARKET STREET, WEST OF HALL STREET AND NORTH OF 24TH STREET, TO

CITY OF JURUPA VALLEY LANDSCAPE AND LIGHTING
MAINTENANCE DISTRICT NO. 89 -1-CONSOLIDATED, CONFIRMING

A DIAGRAM AND ASSESSMENT, ORDERING THE IMPROVEMENTS

AND THE LEVY AND COLLECTION OF ASSESSMENTS WITHIN SUCH
TERRITORY FOR FISCAL YEAR 2022 -2023 PURSUANT TO THE
PROVISIONS OF PART 2 OF DIVISION 15 OF THE CALIFORNIA

STREETS AND HIGHWAYS CODE AND ARTICLE XIII D OF THE

CALIFORNIA CONSTITUTION

THE CITY COUNCIL OF THE CITY OF JURUPA VALLEY HEREBY FINDS, DETERMINES, RESOLVES AND ORDERS AS FOLLOWS:

Section 1. Pursuant to the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (hereinafter referred to as the "Act"), the City Council of the City of Jurupa Valley initiated proceedings for the annexation of territory to City of Jurupa Valley Landscape and Lighting Maintenance District No. 89-1- Consolidated (hereinafter referred to as the "District") and the levy and collection of assessments within such territory for the 2022-2023 fiscal year and caused to be prepared a written report (the "Engineer's Report") in accordance with the Act and Article XIII D of the California Constitution.

Section 2. Following notice duly given in accordance with law, the City Council has held a full and fair public hearing regarding the Engineer's Report, the annexation of territory to the District, and the levy and collection of the proposed assessment within such territory for fiscal year 2022-2023. All interested persons were afforded the opportunity to hear and be heard. The City Council considered all oral and written statements, protests and communications made or filed by interested persons and tabulated all ballots. The City Council hereby finds that a majority protest does not exist as defined in Section 4(e) of Article XIII D of the California Constitution. All protests and objections to the annexation of territory to the District and the levy and collection of the proposed assessment against lots or parcels of property within the annexed territory for fiscal year 2022-2023 are hereby overruled by the City Council.

Section 3. The City Council hereby orders the annexation of territory, which is described as Assessor ’s Parcel Numbers (APNs) 178 -330-018, 178-330-024, and 178 - 330- 025 to the District. The District will continue to be designated as City of Jurupa Valley Landscape and Lighting Maintenance District No. 89-1- Consolidated.

-2-
Section 4. Based upon its review of the Engineer's Report and other reports and information, the City Council hereby finds and determines that (i) the land within the annexed territory will be benefited by the improvements as described in such Engineer 's Report, (ii) the annexed territory includes all of the lands so benefited , (iii) the net amount to be assessed upon the lands within the annexed territory for the 2022-2023 fiscal year, in accordance with the Engineer's Report, is apportioned by a formula and method which fairly distributes the net amount among all assessable lots or parcel s in proportion to the estimated benefits to be received by each such lot or parcel from the improvements; and (iv) only special benefits are assessed and no assessment is imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel.

Section 5. The City Council hereby orders the proposed improvements to be made, which improvements are briefly described as follows: The installation and planting of landscaping, including trees, shrubs, grass and other ornamental vegetation within the public right- of-way parkway landscaped area on Market Street, Hall Avenue, and 24th Street, as identified on the approved L&LMD Landscape Plans for this ZONE Y; the installation or construction of any facilities which are appurtenant to any of the foregoing, or which are necessary or convenient for the maintenance or servicing thereof, including, but not limited to, grading, clearing, removal of debris; the installation or construction of curbs, gutters, walls, sidewalks or paving, water irrigation, drainage or electrical facilities; the operation and maintenance cost of streetlights located within the public right-of-way on Market Street, Hall Avenue, and 24th Street, as identified on the approved Streetlight Plans for the Wheelers Upfitter project; and the maintenance and/or servicing of any of the foregoing.

Section 6. Lots or parcels of land within the annexed territory that are owned or used by any county, city, city and county, special district or any other local governmental entity, the State of California, or the United States shall be assessed unless the City demonstrates by clear and convincing evidence that such lots or parcels receive no special benefit from the proposed improvements.

Section 7. The City Council hereby confirms the diagram and assessment, with respect to the annexed parcels, as originally proposed in the Engineer's Report and as revised by the diagram, attached hereto as Exhibit A and incorporated herein as though set forth in full.

Section 8. The assessment is in compliance with the provisions of the Act and Article XIIID of the California Constitution.

Section 9. The assessment is levied without regard to property valuation.

Section 10. The assessment is levied for the purpose of paying the costs and expenses of the improvements described in Section 5 above for the fiscal year commencing on July 1, 2022 and ending on June 30, 2023.

Section 11. The adoption of this Resolution constitutes the levy of an assessment for

-3-
the fiscal year commencing July 1, 2022 and ending June 30, 2023.

Section 12. The improvements shall be performed pursuant to law.

Section 13. The County Auditor of Riverside County shall enter on the County Assessment Roll opposite each lot or parcel of la nd the amount of the assessment and such assessments shall then be collected at the same time and in the same manner as the County taxes are collected. After collection by the County, the net amount of the assessments shall be paid to the City Administrative Services Director.

Section 14. The Administrative Director shall deposit all moneys representing assessments collected by the County to the credit of a special fund known as "City of Jurupa Valley L&LMD 89 -1-C Zone Y" and such moneys shall be expended only for the improvements described in Section 5 above.

Section 15. The City Clerk is hereby authorized and directed to file the diagram and assessment, or a certified copy of the diagram and assessment with the County Auditor, together with a certified copy of this Resolution upon its adoption.

Section 16. A certified copy of the diagram and assessment shall be filed in the office of the City Engineer, with a duplicate copy on file in the office of the City Clerk and open for public inspection

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Jurupa Valley on this 5th day of May, 2022.

______________________________
Chris Barajas
Mayor

ATTEST:

Victoria Wasko, CMC
City Clerk

-4-

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.

CITY OF JURUPA VALLEY )
I, Victoria Wasko, City Clerk of the City of Jurupa Valley, do hereby certify that the foregoing Resolution No. 2022-38 was duly passed and adopted at a meeting of the City Council of the City of Jurupa Valley on the 5th day of May, 2022 by the following votes, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Jurupa Valley, California, this 5th day of May, 2022.

________________________________
Victoria Wasko, City Clerk
City of Jurupa Valley

A-1

EXHIBIT A

Engineer’s Report

Page | 1
120

STAFF REPORT
DATE: MAY 5, 2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ROD BUTLER, CITY MANAGER
BY: JOE PEREZ, COMMUNITY DEVELOPMENT DIRECTOR
SUBJECT: AGENDA ITEM NO. 13.C

PUBLIC HEARING TO CONSIDER AN EXTENSION OF TIME FOR SITE DEVELOPMENT PERMIT NO. 20010 FOR A 90,262 SQUARE FOOT
COMMERCIAL CENTER; AND EXTENSION OF TIME FOR
CONDITIONAL USE PERMIT NO. 19003 FOR A PROPOSED GAS

STATION, CAR WASH, AND CONVENIENCE STORE (WITH

CONCURRENT SALE OF BEER AND WINE FOR OFF -PREMISES

CONSUMPTION) LOCATED AT THE SOUTHEAST CORNER OF VAN
BUREN BOULEVARD AND RUTILE STREET / APNS: 167-330-006; 167- 330-010; 167 -330-015 AND 167 -110-039 (APPLICANT: CONTROL MANAGEMENT, INC.)

RECOMMENDATION
1) That the City Council adopt Resolution No. 2022-39, entitled:

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF JURUPA VALLEY,

CALIFORNIA, APPROVIN G AN EXTENSION OF TI ME FOR CONDITIONAL USE PERMIT NO. 19003 AND AN EXTENSION OF TIME FOR SITE DEVELOPMENT PERMIT N O. 20010 TO PERMIT CO NSTRUCTION OF A 90,262 SQUARE-FOOT C OMMERCIAL CENTER ON APPROXIMATELY 15.9

ACRES OF REAL PROPERTY LOCATED AT THE SO UTHEAST CORNER OF VAN BUREN BOULEVARD AND RUTILE STREET (APNS: 167-330-006, -010, -015; AND 167 -110-039) IN THE SCENIC HI GHWAY COMMERCIAL (C -P-S)

ZONE, AND DETERMINING THAT NO FURTHER CEQA REVIEW IS

REQUIRED

BACKGROUND
On April 22, 2020, the Planning Commission adopted Resolution No. 2020-04-22-01 (see Attachment 2), adopting a Mitigated Negative Declaration with Mitigation Monitoring and Report Program and approving the entitlements (Case Number: MA19041) for a 90,262

RETURN TO AGENDA
Page | 2

square foot commercial center on 15.9 acres located at the southeast corner of Van Buren Blvd. and Rutile St. See Exhibit 1 for site location.

EXHIBIT 1: SITE LOCATION

The adopted resolution includes approval of the following entitlements:

1. Site Development Permit No. 20010 to develop approximately 15.9 acres of real property with a 90,262 square foot commercial center.

2. Conditional Use Permit No. 19003 to construct a gasoline station, with concurrent sale of beer and wine for off premises consumption, a convenience store, including the sale of motor vehicle fuel, and car wash.

The development was approved in two (2) Phases:
 Phase 1: construction of the gas station, convenience store, drive-thru car wash, anchor market (building 4), and full service restaurant (building 5); furthermore, it includes all off -site public right -of-way and street improvements, including signalization and on -site parking, landsc aping, decomposed granite trail and equestrian fencing.

Page | 3

 Phase 2: construction of drive-thru restaurant (building 1), retail building/drive-thru restaurant (building 2), and retail suites (buildings 3, 6, 7, and 8).

Exhibit 2 below is the approved site plan. Table 1 presents the details of the buildings per phase. The Planning Commission staff report is provided as Attachment No. 3 and the approved architectural set of plans is provided as Attachment No. 4.

EXHIBIT 2: APPROVED SITE PLAN

TABLE 1 – MA19041 PHASE 1 & 2
PHASE 1
Building Name Land Use Square Footage (Area)
GSC Gas Station Canopy 3,456
CS Convenience Store 2,976
CW Drive-thru Car Wash 5,043
“4” Anchor Market 38,000
“5” Full-Service Restaurant 7,650
PHASE 2
Building Name Land Use Square Footage (Area)
“1” Drive-Thru Restaurant 3,452
“2” Retail Building with Drive-thru Restaurant 4,166
“3” Retail 5,100
Page | 4

“6” Retail 5,130
“7” Retail 3,360
“8” Retail - Freestanding 11,929
Grand Total 90,262

LOCATION
The property is located at the southwest corner of Van Buren Blvd. and Rutile St. The property is across the street from Arabella Ranch and more residential to the south of the project site. A narrow commercial strip is located north of the site.

The property has a General Plan Land Use Designati on of Commercial Retail (CR), a Zoning Designation of Scenic Highway Commercial (C -P-S), and has an Equestrian Lifestyle Overlay (ELO). Table 2 below outlines the existing land use and zoning designations.

TABLE 2: GENERAL PROJECT INFORMATION
General Plan Land Use Designation CR (Commercial Retail) Zoning Classification Scenic Highway Commercial (C-P-S) Existing Land Use Vacant

PROJECT DESCRIPTION
The Applicant (“Applicant” or “Control Management, Inc.”) requests approval of a one (1) year Extension of Time (EOT) to the approved Site Development Permit and Conditional Use Permit for the approved construction of a 90,262 square foot commercial center (“Van Buren Marketplace”) on approximately 15.9 acres of real property. Applicant’s request is included as Attachment No. 6. According to the applicant, t he request for Extension of Time is due to the unexpected impacts of the C ovid-19 pandemic that caused multiple prospective tenants of this site to become or remain uncommitted to a lease . The Applicant stated that without committed lessees, development of the project was nonviable. For this reason, the Applicant could not begin construction. Table 3 presents the details of the approval date and expiration dates. No changes to the project are proposed with this Extension of Time applications.

TABLE 3. EXPIRATION DATES OF ENTITLEMENTS

CUP SDP
Approval Date April 22, 2020 April 22, 2020
Expiration Date April 22, 2022 April 22, 2022
Requested Expiration Date April 22, 2023 April 22, 2023 Page | 5

Future extensions available
if this EOT is approved
None. Cannot be extended
further than April 22, 2023
Can be extended to April
22, 2025

ANALYSIS
The Conditional Use Permit (CUP) and Site Development Permit (SDP) are set to expire on April 22, 2022. On March 3, 2022, the Applicant submitted applications for Extensions of Time (EOT) prior to the expiration date. Approval of the EOT applications would extend the approval periods for one (1) year to April 22, 2023. The approval of this extension of time would extend the approval period of CUP to the maximum period of three (3) years.

The zoning code allows the approval period of a SDP to be a maximum period of five (5) years.

Section 9.240.280(5) of the Jurupa Valley Municipal Code requires that a CUP be used within one (1) year of the effective date or within such additional time as may be set in the Conditions of Approval which shall not exceed a total of three (3) years, otherwise the permit shall be null and void. Per Condition of Approval No. 8 of MA19041, Conditional Use Permit No. 19003 shall be used within tw o (2) years of the April 22, 2020 approval date. Prior to the expiration date, the applicant may request an extension of time in which to use the permit.

Section 99.240.330(7) of the Jurupa Valley Municipal Code, requires that a Site Development Permit be used within two (2) year s of the effective date or within such additional time as may be set in the Conditions of Approval which shall not exceed a total of five (5) years. Per Condition of Approval No. 9 of MA19041, the Site Development Permit shall be used within two (2) years of the April 22, 2020 approval date. Prior to the expiration, the applicant may request an extension of time in which to use the Site Development Permit.

An Extension of Time for a Conditional Use Permit and a Site Development Permit may be granted upon determination that valid reason exists for the applicant not using the site development permit within the required period of time. The Applicant submitted a letter explaining that the impacts of Covid -19 pandemic halted their timing for construction. In summary, because of a volatile economy and closing of businesses, prospective tenants became uncertain of their involvement with this project resulting in multiple t enants backing out which created a delay in development. At this time with the improvement of the economy, there are commitments for the anchor grocery store, two drive -thru restaurants, and the convenience store with the gas station. There are more commitments for other retail spaces that are under negotiation. Currently, the applicant has pending street improvement plans, mass grading plan, and precise grading plans that are under review. Thus, the applicant is confident that the center will be under construction this year.

ENVIRONMENTAL REVIEW
A Mitigated Negative Declaration for the project was adopted by the Planning Commission on April 22, 2020. The California Environmental Quality Act (CEQA) allows a previously adopted Mitigated Negative Declaration (MND) to be used as the environmental assessment for a project (including a request for an extension of time) if it is determined

ATTACHMENT NO. 1
Resolution No. 2022-39
- 1 -

RESOLUTION NO. 2022-39

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF JURUPA VALLEY , CALIFORNIA, APPROVING AN

EXTENSION OF TIME FOR CONDITIONAL USE PERMIT
NO. 19003 AND AN EXTENSION OF TIME FOR SITE
DEVELOPMENT PERMIT N O. 20010 TO PERMIT
CONSTRUCTION OF A 90,262 SQUARE -FOOT
COMMERCIAL CENTER ON APPROXIMATELY 15.9

ACRES OF REAL PROPER TY LOCATED AT THE

SOUTHEAST CORNER OF VAN BUREN BOULEVARD
AND RUTILE STREET (APNS: 167-330-006, -010, -015; AND
167-110-039) IN THE SCENIC HIGHWAY COMME RCIAL
(C-P-S) ZONE, AND DETERMINING THAT NO FURTHER

CEQA REVIEW IS REQUIRED

THE CITY COUNCIL OF THE CITY OF JURUPA VALLEY DOES RESOLVE AS FOLLOWS:

Section 1. Project. Control Management, Inc. (the “Applicant”) has applied for an Extension of Time for Conditional Use Permit No. 19003 and an Extension of Time for Site Development Permit No. 20010 (Master Application No. 22043 or MA No. 22043) to permit the phased construction of a 90,262 square -foot commercial center (“Van Buren Marketplace”), including a proposed gasoline service station with concurrent sale of beer and wine for off -site consumption, a proposed convenience store, including the sale of motor vehicle fuel , and a proposed car wash, on approximately 15.9 acres of real property located at the southeast corner of Van Buren Boulevard and Rutile Street (APNs: 167-330-006, -010, -015; and 167-110-039) in the Scenic Highway Commercial (C -P-S) Zone and designated Commercial Retail (CR) with an Equestrian Lifestyle Protection (ELO) General Plan overlay (the “Project”).

Section 2. Extension of Time - Conditional Use Permit.
(a) The Applicant is seeking approval of a one year Extension of Time for Conditional Use Permit No. 19003 to permit the construction of a proposed gasoline service station with concurrent sale of beer and wine for off-site consumption , a proposed convenience store, including the sale of motor vehicle fuel , and a proposed car wash on real property located at the southeast corner of Van Buren Boulevard and Rutile Street (APNs: 167-330-006, -010, -015; and 167-110-039) in the Scenic Highway Commercial (C-P-S) Zone. (b) The Planning Commission originally approved Conditional Use Permit No. 19003 on April 22, 2020, with an expiration date of April 22, 2022. Additionally, the Planning Commission approved an application fo r Site Development Permit No. 20010 submitted concurrently with Conditional Use Permit No. 19003 (collectively, Master Application No. 19041).
(c) The Applicant filed an application for a one year extension of time for Conditional Use Permit No. 19003 on March 3, 2022, prior to the April 22, 2022 expiration date. -2-

(d) Section 9.240.280.(5) of the Jurupa Valley Municipal Code provides that if a Conditional Use Permit is required to be used within less than three (3) years, the permittee may, prior to its e xpiration, request an extension of time in which to use the permit . The term “use” means the beginning of substantial construction of the use that is authorized, which construction must thereafter be pursued diligently to completion, or the actual occupancy of existing buildings or land under the terms of the authorized use.
(e) Further, Section 9.240.280.(5) of the Jurupa Valley Municipal Code provides that a request for extension of time shall be made to the City Council, on forms provided by the Planning Department and shall be filed with the Planning Director, accompanied by the fee set forth in County Ordinance No. 671. Within thirty (30) days following the filing of a request for an extension, the Planning Director shall review the applications, make a recommendation thereon, and forward the matter to the City Clerk, who shall place the matter on the regular agenda of the City Council.
(f) Further, Section 9.240.280.(5) of the Jurupa Valley Municipal Code provides that an extension of time may be granted by the City Council upon a determination that valid reason exists for the permittee not using the permit within the required period of time. If an extension is granted, the total time allowed for use of the permit shall not exceed a period of three (3) years, calculated from the effective date of the issuance of the permit. The effective date of a permit shall be determined pursuant to either Section 9.240.250 or 9.240.260 of the Jurupa Valley Municipal Code.

Section 3. Extension of Time - Site Development Permit. (a) The Applicant is seeking approval of a one year Extension of Time for Site Development Permit No. 20010 to permit the construction of a 90,262 square -foot commercial center (“Van Buren Marketplace”) on real property located at the southeast corner of Van Bure n Boulevard and Rutile Street (APNs: 167-330-006, -010, -015; and 167-110-039) in the Scenic Highway Commercial (C-P-S) Zone.
(b) The Planning Commission originally approved Site Development Permit No. 20010 on April 22, 2020, with an expiration date of April 22, 2022. Additionally, the Planning Commission approved an application for Conditional Use Permit No. 19003 submitted concurrently with Site Development Permit No. 20010 (collectively, Master Application No. 19041).
(c) The Applicant filed an application for a one year extension of time for Site Development Permit No. 20010 on March 3, 2022, prior to the April 22, 2022 expiration date. (d) Section 9.240.330.(a) of the Jurupa Valley Municipal Code provides that if a Site Development Permit is required to be used within less than five (5) years, the applicant or his/her successor-in-interest may, prior to its expiration, request an extension of time in which to use the Site Development Permit.
(e) Further, Section 9.240.330.(a) of the Jurupa Valley Municipal Code provides that a request for extension of time must be made on forms provided by the Planning Department and filed with the Community Development Director, accompanied by the fee set forth -3-

in Ordinance No. 671 as the fee for extension of the time within which to use a Conditional Use Permit. Within thirty (30) days following the filing of a request for an extension, it must be considered by the hearing body or officer that originally approved the Site Development Permit. (f) Further, Section 9.240.330.(a) provides that a n extension of time may be granted upon a determination that valid reason exists for the applicant or his/her successor -in- interest not using the Site Development Permit within the required period of time. If an extension is granted, the total time allowed for use of the Site Development Permit may not exceed a period of five (5) years, calculated from the effective date of the issuance of the Site Development Permit.

The term “use” shall mean the beginning of substantial construction of the use that is authorized, which construction must thereafter be pursued diligently to completion, or the actual occupancy of existing buildings or land under the terms of the authorized use. The effective date of a Site Development Permit shall be determined pursuant to Section 9.240.330 of the Jurupa Valley Municipal Code.

Section 4. Procedural Findings. The City Council of the City of Jurupa Valley does hereby find, determine and declare that:
(a) The application for MA No. 22043 was processed including, but not limited to, a public notice, in the time and manner prescribed by State law and Jurupa Valley Ordinances. (b) On May 5, 2022, the City Council of the City of Jurupa Valley held a public hearing on MA No. 22043, at which time all persons interested in the Project had the opportunity and did address the City Council on these matters. Following the receipt of public testimony the City Council closed the public hearing.
(c) All legal preconditions to the adoption of this Resolution have occurred.

Section 5. California Environmental Quality Act Findings. The City Council of the City of Jurupa Valley does hereby make the following environmental findings and determinations in connection with the approval of the Project:
(a) Pursuant to the California Environmental Quality Act (“CEQA”) (Cal. Pub.

Res. Code §21000 et seq.) and the State Guidelines (the “Guidelines”) (14 Cal. Code Regs. §15000 et seq.), City staff has considered the potential environmental impacts of the Extensi on of Time for Conditional Use Permit No. 19003 and the Extension of Time for Site Development Permit No. 20010. City staff has also reviewed the Initial Study and Mitigated Negative Declaration (“MND”) prepared for Conditional Use Permit No. 19003 and Site Development Permit No. 20010, and adopted by the Planning Commission on April 22, 2020, including the impacts and mitigation measures identified therein and the Mitigation Monitoring and Reporting Program (MMRP) adopted by the Planning Commission on April 22, 2020 , and prepared a Previous Environmental Document Review Determination in accordance with CEQA for the Project. Based on that review, the City of Jurupa Valley Planning Department has determined that the Project and the circumstances under which the Project is undertaken do not involve substantial changes which will result in new significant environmental effects, and that the Project does not involve new information of substantial importance which shows that the Project will have significant eff ects not discussed in the prior MND. All potential environmental impacts associated with Conditional -4-

Use Permit No. 19003 and Site Development Permit No. 20010, and the Extensions of Time for Conditional Use Permit No. 19003 and Site Development Permit No . 20010, are adequately addressed by the prior MND, and the mitigation measures contained in the prior MND and MMRP will reduce those impacts to a level that is less than significant. (b) The City Council has independently reviewed the Previous Environmental Document Review Determination , and based upon the whole record before it, the Previous Environmental Document Review Determination, and its independent review and judgment, finds that that the Project, as modified, is not subject to further environmental review pursuant to the Guidelines because:
1) The Project and the circumstances under which the Project is undertaken do not involve substantial changes which will result in new significant environmental effects, and that the Project does not involve new information of substantial importance which shows that the Project will have significant effects not discussed in the prior MND; and 2) All potential environmental impacts associated with Conditional Use Permit No. 19003 and Site Development Permit No. 20010, and the Extensions of Time for Conditional Use Permit No. 19003 and Site Development Permit No. 20010 are adequately addressed by the prior MND, and the mitigation measures contained in the prior MND and MMRP will reduce those impacts to a level that is less than significant. (c) The custodian of records for the prior MND, and all other materials that constitute the record of proceedings up on which the City Council’s recommendation is based, is the Planning Department of the City of Jurupa Valley. Those documents are available for public review in the Planning Department located at 8930 Limonite Avenue, Jurupa Valley, California 92509.

Section 6. Findings for Approval of Extension of Time for Conditional Use Permit No. 19003. The City Council of the City of Jurupa Valley does hereby find, determine, and declare that the proposed Extension of Time for Conditional Use Permit No. 19003 should be granted because the Applicant has demonstrated the following valid reason s for the Applicant not using the permit within the initially approved two (2) year period of time:
(a) Unexpected impacts of the COVID -19 pandemic , including a volatile economy and business closures, have caused multiple prospective tenants for the Project to become uncommitted or completely back out from the Project. The development of the Project was nonviable without committed lessees. For that reason, the Applicant could not begin construction within the initially approved two (2) year period of time.

Section 7. Findings for Approval of Extension of Time for Site Development Permit No. 20010. The City Council of the City of Jurupa Valley does hereby find, determine , and declare that the proposed Extension of Time for Site Development Permit No. 20010 should be granted because the Applicant has demonstrated the following valid reasons for the Applicant not using the permit within the initially approved two (2) year period of time:
(a) Unexpected impacts of the COVID -19 pandemic , including a volatile economy and business closures, have caused multiple prospective tenants for the Project to become -5-

uncommitted or completely back out from the Project. The development of the Project was nonviable without committed lessees. For that reason, the Applicant could not begin construction within the initially approved two (2) year period of time.

Section 8. Approval of Master Application No. 22043, with Conditions. Based on the foregoing, the City Council of the City of Jurupa Valley hereby approves a one year Extension of Time for Conditional Use Permit No. 19003 and a one year Extension of Time for Site Development Permit No. 20010 (Master Application No. 22043 or MA No. 22043) to permit the phased const ruction of a 90,262 square -foot commercial center (“Van Buren Marketplace”), including a proposed gasoline service station with concurrent sale of beer and wine for off -site consumption, a proposed convenience store, including the sale of motor vehicle fue l, and a proposed car wash, on approximately 15.9 acres of real property located at the southeast corner of Van Buren Boulevard and Rutile Street (APNs: 167-330-006, -010, -015; and 167-110-039) in the Scenic Highway Commercial (C -P-S) Zone and designated Commercial Retail (CR) with an Equestrian Lifestyle Protection (ELO) General Plan overlay , subject to the recommended conditions of approval attached hereto as Exhibit “A .” Conditional Use Permit No. 19003 and Site Development Permit No. 20010 shall expire on April 22, 2023. No further extensions may be granted for Conditional Use Permit No. 19003 per Section 9.240.280.(5) of the Jurupa Valley Municipal Code.

Section 9. Certification. The City Clerk shall certify to the adoption of this Resolution.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Jurupa Valley on this 5th day of May, 2022.

______________________________
Chris Barajas
Mayor

ATTEST:

Victoria Wasko, CMC
City Clerk

-6-

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.

CITY OF JURUPA VALLEY )
I, Victoria Wasko, City Clerk of the City of Jurupa Valley, do hereby certify that the foregoing Resolution No. 2022-39 was duly passed and adopted at a meeting of the City Council of the City of Jurupa Valley on the 5th day of May, 2022 by the following votes, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Jurupa Valley, California, this 5th day of May, 2022.

________________________________
Victoria Wasko, City Clerk
City of Jurupa Valley

EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 1 of 15 ends

EXHIBIT A

PLANNING DEPARTMENT

1. PROJECT PERMITTED.

MA19041 (CUP19003 & SDP20010) is for a two (2) phased development of the Van Buren Marketplace, a 90,262 square foot commercial center on a 15.9-acre site. Project site located at the south west corner of Van Buren Boulevard and Rutile Street, APNS:
167-330-006; 167-330-010; 167-330-015 and 167-110-039.

The project must be phased according to the approved Colored Phasing Plan. Phase 1 consists of the construction of the following aspects of the Van Buren Marketplace:
• Gas Station Canopy: 3,456 sq. ft.
• Convenience Store: 2,976 sq. ft.
• Drive-thru Car Wash: 5,043 sq. ft.
• Anchor Market (Bldg. 4): 38,000 sq. ft.
• Full-Service Restaurant (Bldg. 5): 7,650 sq. ft.

Phase 2 is for the future construction of the remaining portion of the Van Buren Marketplace:
• Drive-thru Restaurant (Bldg. 1): 3,452 sq. ft.
• Retail Building/Drive-thru Restaurant (Bldg. 2): 4,166 sq. ft. • Retail (Bldg. 3): 5,100 sq. ft.
• Retail (Bldg. 6): 5,130 sq. ft.
• Retail (Bldg. 7): 3,360 sq. ft.
• Retail (Bldg. 8): 11,929 sq. ft.

MA22043 (CUP19003EOT & SDP20010EOT) is for a one (1) year Extension of Time (EOT) to the approved Site Development Permit (SDP20010) and Conditional Use Permit (CUP19003) for the approved construction of a 90,262 square foot commercial center (“Van Buren Marketplace”) on a 15.9 -acre site located at the southwest corner of Van Buren Boulevard and Rutile Street, APNS: 167-330-006; 167-330-010; 167-330-015 and 167-110-039.

2. PH ASING 1 SCHEDULE. The requirements for Phase 1 are as follows:
a. Construction of Phase 1 shall be consistent with the approved Colored Phasing Plan.
b. Construction of the buildings for the anchor tenant (Building 4) and full -service restaurant (Building 5) must be constructed prior to or concurrently the gas station, convenience store and car wash may be constructed concurrently with Building 4 (Anchor tenant) and Building 5 (full-service restaurant). c. No Certificate of Occupancy shall be issued for the gas station, convenience store or car wash until a Certificate of Occupancy have been issued for both Building 4 (anchor tenant) and Building 5 (full-service restaurant).

3. INDEMNIFY CITY. The applicant, the property owner or other holder of the right to the development entitlement(s) or permit(s) approved by the City for the project, if different from the applicant (herein, collectively, the “Indemnitor”), shall indemnify, defend, and hold harmless the City of Jurupa Valley and its elected city council, its appointed boards, EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 2 of 15 ends

commissions, and committees, and its officials, employees, and agents (herein, collectively, the “Indemnitees”) from and against any and all claims, liabilities, losses, fines, penalties, and expenses, including without limitation litigation expenses and attorney’s fees, arising out of either (i) the City’s approval of the project, including without limitation any judicial or administrative proceeding initiated or maintained by any person or entity challenging the validity or enforceability of any City permit or approval relating to the project, any condition of approval imposed by City on such permit or approval, and any finding or determination made and any other action taken by any of the Indemnitees in conjunction with such permit or approval, including without limitation any action taken pursuant to the California Environmental Quality Act (“CEQA”), or (ii) the acts, omissions, or operations of the Indemnitor and the directors, officers, members, partners, employees, agents, contractors, and subcontractors of each person or entity comprising the Indemnitor with respect to the ownership, planning, design, construction, and maintenance of the project and the property for which the project is being approved. The City shall notify the Indemnitor of any claim, lawsuit, or other judicial or administrative proceeding (herein, an “Action”) within the scope of this indemnity obligation and request that the Indemnitor defend such Action with legal counsel reasonably satisfactory to the City. If the Indemnitor fails to so defend the Action, the City shall have the right but not the obligation to do so and, if it does, the Indemnitor shall promptly pay the City’s full cost thereof. Notwithstanding the foregoing, the indemnity obligation under clause (ii) of the first sentence of this condition shall not apply to the extent the claim arises out of the willful misconduct or the sole active negligence of the City.

4. CONSENT TO CONDITIONS. Within thirty (30) days after project approval, the owner or designee shall submit written consent to the required conditions of approval to the Planning Director or designee.

5. M ITIGATION MEASURES . This project shall be subject to, and comply with, all of the mitigation measures set forth in the Mitigation Monitoring and Reporting Program adopted by the Planning Commission Resolution No. 2020 -04-22-01 in connection with the adoption of a Mitigated Negative Declaration prepared for the project.

6. F
EES. The approval of MA19041 (CUP19003 & SDP20010) shall not become effective until all planning fees have been paid in full.

7. I NCORPORATE CONDITIONS . Prior to the issuance of any building permit , the owner or designee shall include within the first four pages of the working drawings a list of all conditions of approval imposed by the project’s final approval.

8. CUP - APPROVAL PERIOD. This Extension of Time approval shall be used by April 22, 2023; otherwise, it shall become null and void and of no effect whatsoever. By “use”, it shall mean the beginning of substantial construction contemplated by this approval by April 22, 2023 , which is thereafter diligently pursued to completion or to the actual occupancy of existing buildings or land under the terms of the authorized use.

9. S
DP - APPROVAL PERIOD. This Extension of Time approval shall be used by April 22, 2023; otherwise, it shall become null and void and of no effect whatsoever. By use is meant the beginning of substantial construction contemplated by this approval by April 22, 2023, which is thereafter diligently pursued to completion or to the actual occupancy of existing buildings or land under the terms of the authorized use. Prior to the expiration of the Extension of Time on April 22, 2023, the permittee may request up to two (2) years of extension of time in which to begin substantial construction or use of this permit. Should EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 3 of 15 ends

the extension be obtained and no substantial construction or use of this permit be initiated within five (5) years of the original approval date this permit, it shall become null and void.

10. CONFORMANCE TO APPROVED EXHIBITS . The project shall be in conformance to the approved plans (listed below dates ranging from March 1, 2020 to April 16, 2020) with any changes in accordance to these conditions of approval:
a. Site Work Plans
b. Site Details Plans
c. Civil Engineering (Grading)
d. Landscape Plans
e. Architectural Set of Plans
f. Colored Phasing Plan (dated: April 16, 2020)

11. INSTALL VEHICLE CHARGING STATIONS. A minimum of two vehicle charging stations shall be constructed in the shopping center. Plan shall be submitted with a minimum of two vehicle charging stations for Planning Director approval prior to the issuance of the first building permit of the shopping center. The vehicle charging stations shall be installed prior to the issuance of the first Certificate of Occupancy of the shopping center.

12. F ARM STYLE ARCHITECTURE. The shopping center shall be designed and constructed consistent with Farm-style Architecture as illustrated on the Planning Department style sheet for Farm style. Plans shall be submitted with farm style architecture for Planning Director approval prior to the issuance of the first building permit.

13. PLANNING REVIEW OF GRADING PLANS . Prior to the issuance of any grading permit, the aesthetic impact of slopes and grade differences where the project adjoins streets or other properties shall be approved by the Planning Director.

14. ON-SI TE LANDSCAPING . The following items shall be approved by the Planning Director, including landscape and irrigation plans as modified in accordance with this condition prior to the issuance of the first building permit:
a. Complete “Professional Services (PROS)” application (Planning) for the review of the final landscape, irrigation, and shading plans.
b. Initial deposit for PROS application.
c. The total cost estimate of landscaping, irrigation, labor, and one- year maintenance.
d. C ompleted “City Faithful Performance Bond for Landscape Improvements” form with original signatures after the City provides the applicant with the required amount of bond. This bond is for landscaping not within publicly maintained areas. e. C ompleted City Landscape Agreement with original signatures after the City has reviewed the submitted cost estimate.
f. T hree (3) sets of final on- site landscape, irrigation plans, shading plan with digital copies in 8.5” x 11” on a CD that shall address all of the following requirements:

1. Compliance with Chapter 9.283 Water Efficient Landscape Design Requirements
EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 4 of 15 ends

2. Consistent with the approved conceptual plans

3. Provide an inventory of on-site existing trees 4” caliper or larger. Indicate caliper, approximate height, and condition. Provide an exhibit indicating which existing trees will be preserved.

4. Provide landscape erosion control planting and irrigation for all manufactured slopes 3 feet or taller or otherwise provide retaining walls at the property line.

5. Provide a preliminary horticultural soils report and recommendations upon which initial soil preparation specifications are based.

6. Add minimum 12-inch planter area adjacent to Buildings 1 and 2 along drive-thru lanes.

7. Add raised planters to include yew pine shrubs of sufficient width and height to properly screen the seating areas at Buildings 1 and 2.

8. Provide a “Detailed Site Furnishings” plan which includes detailed information and location of the tables, chairs, planter pots, benches, trash receptacles, bike racks, hitching post st ructure and other on -site amenities. Such plan shall require the review and approval of the Planning Director.

Prior to the issuance of the first Certificate of Occupancy for MA19041 (CUP19003 & SDP20010) the following events shall be satisfied in the order it is listed:

1. Substantial Conformance Letter : The Landscape Architect of Record shall conduct an inspection and submit a letter to the City of Jurupa Valley Planning Department once the landscape architect has deemed the installation is in conformance to the approved plans.

2. C
ity Inspection : The City landscape architect shall conduct an inspection of the installation to confirm the landscape and irrigation plan was constructed in accordance to the approved plans.

15. A CCESSORY STRUCTURES OR EQUIPMENT FOR THE GAS STATION. Prior to the issuance of any building permit, the applicant shall submit plans indicating the location of accessory structures or equipment (including the vapor recovery system, air and water dispensers). These accessory structures or equipment shall not be located within 10 feet from the rights-of-way.

16. M ASTER SIGN PROGRAM .
a. Architectural Style. The Master Sign Program shall be consistent with the architectural style of the shopping center. If the City approves a different architectural style than the Farm -style for the shopping center, the Master Sign Program shall be revised accordingly and submitted for the Planning Director’s review and approval.
b. P rior to the issuance of the first Building permit , the applicant shall submit a Site Development Permit (SDP) to the Planning Departmen t for review and approval of the Master Sign Program by the Planning Director. The Master Sign Program shall include the following:
i. Include a provision consistent with the following requirement: “No advertising of alcoholic beverages on gasoline islands; no lighted EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 5 of 15 ends

advertising of alcoholic beverages on the exterior of the building or within window areas;”
ii. The Master Sign Program shall be consistent with the Jurupa Valley Municipal Code, Title 9 (Planning and Zoning), including the maximum surface area for wall signs.
iii. All signage, including freestanding signs , shall incorporate the development’s architectural theme.

17. A DVERTISING SIGNAGE. Window signage shall be prohibited.

18. DELIVERIES.
a. Restricted Loading / Unloading Times. Hours of delivery for the project site shall only occur between the hours of 7:00 am – 6:00 pm on Mondays to Fridays. Failure to comply with this condition is a violation of this approval of MA19041 (CUP19003 & SDP20010). If the applicant does not correct the violation or has repeatedly violated this condition, the applicant shall be subject to a Planning Commission’s public hearing to resolve the violation. If the violation cannot be cured for any reason after the Planning Commission’s public hearing, (CUP19003 & SDP20010) may be subject to revocation.

19. O
WNERSHIP AND MAINTENANCE OF COMMON AREA. In the event that ownership changes, and there is more than one owner, the following conditions shall be satisfied:
a. Formation of a Permanent Organization. Prior to the recordation of the final map, the applicant shall form a permanent organization, such as a property owners’ association, for the ownership and maintenance of all common areas including, but not limited to, landscaping, parking areas, and circulation sy stems (areas) in perpetuity.
b. C
ovenants, Conditions, and Restrictions (CC & Rs). Prior to the recordation of the final map , the applicant shall submit Covenants, Conditions, and Restrictions (CC&Rs) for the Planning Director review and approval. The CC&Rs shall identify the common areas for ownership and maintenance with text and an exhibit. The common areas shall include the following items:
i. Access and Circulation Areas
ii. Drainage Facilities
iii. Landscaping and Irrigation
iv. Parking Areas
v. On-site Exterior Lighting Fixtures
vi. Trash Enclosures
vii. Walls and Fencing
viii. Any additional item that may be required by the Planning Director c. Reciprocal Access, Parking and Circulation. Prior to the issuance of any building permit, the Applicant, or his/her designee, shall record a reciprocal non- exclusive easement for vehicular and other rights of ingress and egress over the EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 6 of 15 ends

parking areas and driveways to allow access from public streets between any parcels which will not be merged. Said access easement shall be approved by both the Planning and Engineering Departments.

20. PERIMETER WALL & FENCE. Prior to the issuance of any Building permit , the applicant shall submit a Wall & Fence plan that satisfies this condition for the review and approval of the Planning Director.
• S plit -face Wall and Fence. Split-face walls and fencing shall be constructed per the conceptual wall and fence plan per sheet WP1 and site details sheets SD1 and SD2 within the architectural set of plans noted in Condition No. 11.

21. E QUESTRIAN TRAIL . In the event that the Applicant desires to implement the 10- foot equestrian trail shown on the approved plans, the following shall apply: Prior to the issuance of any Building permit:
a. The applicant, or his/her designee, shall submit a detailed plan showing the precise location and design of the 10- foot wide DG (decomposed granite) trail and trail fence as shown along Rutile and Galena Streets to the satisfaction of the JARPD and the Planning Director.
b. The applicant, or his/her designee, shall dedicate the 10 -foot wide easement for trail purposes to JARPD. Proof of such dedication shall be provided to the Planning Department.
c. T rail Fence. The split-rail fencing for the trail shall be constructed per the Jurupa Area Recreation Parks Department (JARPD) trail fence detail. Prior to the issuance of any Building permit, the applicant shall submit exhibits that satisfy this condition for the review and approval of the JARPD and the Planning Director.

22. L
ANDSCAPE ALTERNATIVE TO EQUESTRIAN TRAIL . In the event that the equestrian trail is not implemented as shown on the approved plans, the plans shall provide for trees and landscaping instead of the 10-foot trail. Landscape and irrigation plans shall be approved by the Planning Director prior to the first building permit of the shopping center.

23. HITCHING POST. Applicant shall submit detailed plans for the hitching post structure to the satisfaction of the Planning Director.

24. GR AFFITI PROTECTION FOR WALLS . Plans that include anti- graffiti coating or protection for the exterior side of all perimeter walls and exterior of building walls to half the height of the structure, or 12 feet, whichever is greater, shall be approved by the Planning Director prior to the issuance of any building permit.

The applicant shall remove any graffiti on the property as soon as possible. In addition, if the applicant was notified by the City, the applicant shall remove the graffiti within seven (7) days of the City’s notice.

25. PEDESTRIAN ON-SITE PATHWAYS. All on-site pedestrian access pathways shall be constructed with decorative paving such as colored concrete pavers or stamped concrete to the satisfaction of the Planning Director.

26. D
ECORATIVE DRIVEWAY ENTRY AREAS. All driveways shall be constructed with decorative paving such as colored concrete pavers or stamped concrete to the satisfaction of the Planning Director.

EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 7 of 15 ends

27. EFFECTIVE DATE OF CONDITIONAL USE PERMIT (SALE OF BEER AND WINE) .

The Conditional Use Permit shall not take effect until the following conditions of approval are satisfied:
a. S ecurity System. The applicant shall install (1) an alarm system and (2) a surveillance monitoring system. The surveillance monitoring system shall include the surveillance monitoring of all entrances and exits. The surveillance plan shall be reviewed and approved by the Planning Department and by the Riverside County Sheriff’s Department.
b. L .E.A.D. Certificate . The applicant and any employees of the retail selling alcoholic beverages for off-site consumption shall provide the “Licensee Education on Alcohol and Drugs” (L.E.A.D.) completion certificate to the Planning Department.

28. A DDITIONAL REQUIREMENTS RELATED TO SALE OF BEER & WINE FOR CONVENIENCE STORE AT GAS STATION.
a. Education for Public. Applicant shall educate the public regarding laws related to alcohol such as driving under the influence of intoxicating beverages, minimum age for purchase and consumption of alcoholic beverages. Applicant shall provide proof of satisfying the condition when requested by the City. b. P
ermitted Display/Storage Locations of Beer and Wine. The display or storage of alcoholic beverages shall only be as shown on the approved floor plans. No displays of beer and wine within 5 feet of any entrance or checkout counter. Cold beer or wine must be sold or displayed in permanently fixed electrical coolers only. c. On-s
ite Advertisement for Beer or Wine . No advertising of alcoholic beverages on gasoline islands; no lighted advertising of alcoholic beverages on the exterior of the building or within window areas.
d. E mployees’ Minimum Age to sell alcohol. Employees must be at least 21 years of age if selling any alcoholic beverages between the hours of 10:00 pm and 2:00 am.
e. D
rive -Thru Sales Prohibited. If future development included a dr ive-thru for the convenience store, the following restriction shall apply: no alcoholic beverage sales shall be made from a drive-in window.

29. L IMITED SALES OF ALCOHOLIC BEVERAGES. The following types of alcoholic beverages (beer and wine) for off-site consumption are prohibited:
a. Single can or bottle of alcoholic beverage less than or equal to forty (40) ounces. b. Packages containing less than six (6) cans, or bottles, to a case.

30. IMMEDIATE REMOVAL OF LOITERERS. The applicant shall remove any loiterer once discovered. If the applicant fails to immediately remove any loiterer, the Conditional Use Permit for the sale of beer and wine for off-site consumption may be subject to revocation.

31. A CCESS POINTS OF THE CONVENIENCE STORE. All exterior access points to the building shall be secured and illuminated to identify any person and/or activity during late night hours. Employees shall limit trash removal and any unnecessary opening of exterior access points during late night hours.

EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 8 of 15 ends

32. MAINTENANCE OF PROPERTY. The applicant shall maintain the shopping center and be kept free of debris, weeds, abandoned vehicles, code violations, and any other factor or condition that may contribute to potential blight or crime.

33. A RB SIGN FOR IDLING. Prior to the issuance of final o ccupancy p ermit, signs limiting the amount of time allowed for truck engine idling shall be installed. The applicant shall submit a plan that includes the location and details of a sign stating that “The driver of a diesel-fueled motor vehicle with a gross vehicle weight rating (GVWR) greater than 10,000 pounds is prohibited from idling the vehicle’s primary engine for more than five (5) minutes at any location and may not operate a diesel fueled auxiliary power system (APS) for more than 5 minutes at any location on the property. The minimum penalty for an idling violation is $300.00. To report a violation, please contact 1-800-END-SMOG.” A sign shall be placed at the truck entrance of the property and one sign at each row of truck parking at a height from the ground of 5 to 6 feet and shall not be less than 24 square inches in size.

All truck idling time (including off-road equipment used during construction or operation) with a gross vehicle weight rating (GVWR) 10,000 pounds or less shall be limited to a maximum of three (3) minutes within the site.

34. TRASH COLLECTION.
a. Detailed plans for trash enclosure(s) shall be approved by the Planni ng Director prior to the issuance of any building permit . Walls of the enclosure and any solid gates shall have graffiti protection coating.
b. An approval or clearance letter from the waste collection agency shall be submitted to the Planning Department prior to the issuance of any building permit.

35. OUTDOOR LIGHTING. All outdoor lighting fixtures shall be maintained in good condition.

Light fixtures shall be shielded to prevent any light to flood onto adjacent properties.

Photometric Plan. A ph otometric plan and exhibits of lighting fixtures shall be approved by the Planning Director prior to the issuance of any building permit. Lighting shall not flood or glare onto adjacent properties.

36. R OOFTOP EQUIPMENT . All rooftop equipment shall be screened from public view.

37. JURUPA AREA RECREATION AND PARK DISTRICT. Prior to the issuance of any building permit, the applicant shall submit proof of satisfying any fees, dedications, or requirements by the Jurupa Area Recreation and Park District to the Building Official.

38. IM PACT FEES. The applicant shall the pay the following impact fees (unless exempt) in accordance to Title 3 of the Municipal Code:
a. D evelopment Impact Fee (DIF) Program. Prior to final occupancy. The applicant shall pay any owed DIFs by the required deadline pursuant to Chapter

3.75 of the Jurupa Valley Municipal Code.
b. M ultiple Species Habitat Conservation Plan Mitigation (MSHCP) Fee . Prior to the issuance of any building permit, the applicant shall pay any owed MSHCP fees by the required deadline pursuant to Chapter 3.80 of the Municipal Code. c. T ransportation Uniform Mitigation Fee (TUMF) Program . Prior to final occupancy. The applicant shall show proof of payment of TUMF fees by the required deadline pursuant to Chapter 3.70 of the Municipal Code.

EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 9 of 15 ends

d. Road, Bridge Benefit District Fee (RBBD) Program. Prior to final occupancy.

The applicant shall show proof of payment of RBBD fees.

39. S ALE OF INDIVIDUAL BUILDINGS. No structure constructed on Project site may be sold until the subject Project on which the structure is located is divided and a final map recorded in accordance with the City’s subdivision regulations such that the structure is located on a separate legally divided parcel.

ENGINEERING CONDITIONS

1. GENERAL REQUIREMENTS

1.1. The use hereby conditioned is for a Conditional Use Permit (CUP 19003) of the project site located at the southwest corner of Van Buren Boulevard and Rutile Street, identified as Assessor Parcel Numbers 167- 330-006, 167-330-010, 167- 330-015, and 167 -110- 039, for commercial purposes that generally include a gas station, convenience store, restaurants, and anchor market store. Exhibits titled Van Buren Marketplace Plot Plan, prepared by Heady Design, Inc.; dated March 25, 2020, and Site Plan (Phase I), prepared by Heady Design, Inc.; dated March 25, 2020 are hereby referenced.

1.2. It is assumed that any easements shown on the referenced exhibits are shown correctly and include all the easements that encumber the subject property. The Applicant shall secure approval from all (if any) easement holders for all grading and improvements which are proposed over the respective easement or provide evidence that the easement has been relocated, quitclaimed, vacated, abandoned, easement holder cannot be found, or is otherwise of no affect. Should such approvals or alternate action regarding the easements not be provided, the Applicant may be required to amend or revise the permit.

1.3. All onsite stormwater and w ater qu ality manag ement post-cons truction f acilities and features (BMPs) will require mai ntenance by the property owner and/or a Property Owner’s Association (POA).

1.4. All offsite stormwater and water quality management post -construction facilities and features (BMPs) will require maintenance by a Public Agency. To ensure that the general public is not und uly burdened with future costs, t he Ap plicant shall annex to Jurupa Valley L&LMD 89 -1-C to pr ovide f or mai ntenance of w ater quality treatment BMPs in perpetuity subject to the approval of the City Engineer.

1. 5. The project sh all be annexed to Jurupa Valley L&LMD 89-1-C f or stree t lighting and maintenance of lan dscape/irrigation within the public right-of- way unless provided by a different public agency.

1.6. All utility extensions within the development shall be placed underground.

1.7. Applicant shall provide mechanism to allow for cross-lot drainage. CC&Rs for this project shall capture the responsibilities and an easement will be required among parcel(s) as applicable and opportune.

1.8. Applicant shall provide mechanism for reciprocal access among parcels. CC&Rs for this project shall capture the responsibilities and an easement will be required among parcel(s) as applicable and opportune.

1.9. Old Rutile Street alignment is shown on exhibits provided by the applicant, applicant is EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 10 of 15 ends

responsible to identify all (if any) utilities that lay within the easement and of any related relocation as required by utility purveyor(s). If easement abandonment is required, the applicant will be responsible for the application and related cost.

2. PRIOR TO GRADING PERMIT

2.1. No grading permit, including mass, rough, a nd/or prec ise, sh all be issued u ntil the associated Planning application and pertinent permits are approved and in effect.

2.2. All grading shall conform to the California Building Code, as adopted by the City of Jurupa Valley, the City’s Municipal Code Title 8, and all other relevant laws, rules, and regulations governing grading in the city of Jurupa Valley. Grading shall be performed in accordance with the recommendations of the geotechnical report. Plans shall be approved by the city Engineer and securities shall be in place prior to permit issuance.

2.2.1. Prior to approval of the grading plan, the Applicant shall submit a project specific final geotechnical report for review and approval of the Engineering department.

The final geotechnical report should address comments provided during the entitlement review of the preliminary geotechnical report.

2.2.2. Final Geotechnical report shall address comments made on preliminary report, including but not limited to:

2.2.2.1. Reference to current site plan.

2.2.2.2. Updated groundwater depth information using California State Water Resources Control Board and/or other appropriate resource.

2.2.2.3. Recommendations for remedial grading for non -building areas such as walls, parking areas, drive isles, hardscape, etc.

2.2.2.4. Recommendations for lateral distance beyond the site wall foundations and remedial grading required (if any) at site walls proposed to avoid undermining existing structures.

2.2.2.5. Soil corrosivity and soluble sulfate content as it relates to concrete to be used on site.

2.2.2.6. Statement regarding planned infiltration at site will have an impact on the liquefaction hazard on the site; as well as, if settlement related to collapsible soils is a concern for the project. Appropriate recommendations to mitigate these conditions should be included on the report.

2.2.2.7. All other comments included in the Engineering inter -office memo pertaining geotechnical report comments.

2.3. Rough grading shall include the entirety of the site (Phase I through III inclusive). Precise grading plans may be on a per phase basis.

2.3.1. Precise grading plans shall show appropriate clearance for onsite vehicle circulation. For example, carwash vehicle parking, southeasterly entrance circulation and alignment conflicts (traffic control required), etc.

2.4. Prior to approval of the precise grading plan, the Applicant shall prepare a detailed final flood hazard/hydrology and hydraulics report for review and approval of the city engineer.

2.4.1. Final hydrology report shall be for entire project site.

2.4.2. Final hydrology report shall verify protection of adjacent properties against site runoff, particularly abutting residences.

2.4.3. Final hydrology report shall address effects of required offsite improvements on drainage patterns and runoffs. For example, any ponding and drainage effects on Rutile Street intersection with Woodbridge Lane area. Applicant will be required to mitigate low point and ponding issues, if any, at transition from proposed improvements to existing improvements.

2.5. Project is proposing buildings and structures over property lines; prior to issuance of the EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 11 of 15 ends

precise grading permit, the applicant shall identify survey application to adjust onsite property lines. An application shall be filed with the appropriate department.

2.5.1. Application may be for a tentative parcel map, lot l ine adjustment, and/or parcel merger as proposed by the applicant’s surveyor of work and approved by the City Engineer.

2.5.2. Precise grading permit will not be issued until the appropriate application has been filed.

2.6. A hauling permit may be required for this project for the import/export of material using city streets, the review and approval of the haul route by the Engineering Department will be required. Where grading involves import or export the Applicant shall obtain approval for the import/export location, from the Engineering Department if located in the City. All materials for import/export shall be approved in accordance with Title 8 of the City of Jurupa Valley Code of Ordinances. If import/export location is outside of the City, the Applicant shall provide evidence that the jurisdictional agency has provided all necessary approvals for import/export to/from the site.

2.7. The grading plan shall provide for acceptance and proper disposal of all off-site drainage flowing onto or through the site. Should the quantities exceed the street capacity , the Applicant shall provide ad equate drainage facilities and/or appropriate easements as approved by the city engineer. All drainage easements shall be shown on the grading plans and noted as follows: "Drainage Easement - no building, obstructions, or encroachments by landfills are allowed", drainage easement record information shall be shown on the plans. If quantities exceed the existing infrastructure capacity, the applicant is responsible to provide design and adequate sizing of the affected infrastructure.

2.8. It shall be the sole responsibility of the Applicant to obtain any and all proposed or required easements and/or permissions necessary to perform the grading shown on the tentative map exhibit.

2.9. Temporary erosion control measures shall be implemented immediately following rough/mass grading to prevent transport a nd de position of d ebris on to downstream properties, public rights-of-way, or other drainage facilities. Erosion Control Plans showing these measures shall be submitted along with the grading plan for approval by the City Engineer.

2.10. If grading is required offsite , the Applicant shall obtain written permission from the property owner(s) to grade as necessary and pro vide a copy to the Engineering Department.

2.11. It is assumed that the conceptual grading and the provisions for water quality management shown on the referenced exhibits and conceptual drawings accompanying this application can comply with all requirements for a Final Water Quality Management Plan (F-WQMP) without substantial change. Prior to approval of the precise grading plan, the Applicant shall prepare, or cause to be prepared, a Final WQMP in conformance with the requirements of the Riverside County Flood Control and Water Conservation District (RCFC&WCD) for approval of the city engineer.

2.12. Prior to approval of the grading plan for disturbance of one or more acres the Applicant shall provide evidence that it has prepared and submitted to the State Water Resources Control Board (SWRCB) a Storm Water Pollution Prevention Plan (SWPPP) and that SWRCB issued a WDID number which shall be included on the face of the grading plan.

2.13. Precise grading plans shall show all existing and proposed improvements and be consistent with the approved site plan and conditions of approval.

2.14. The Applicant shall provide plans for approval of the city engineer for all public EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 12 of 15 ends

improvements on Van Buren Boulevard for review and approval of the City Engineer.

Improvements generally include:
a) Dedication of right -of-way to provide for ultimate right -of-way width of 81 feet from median centerline to the property line. Corner cutbacks are required per Riverside County Standard No. 805.
b) Applicant is responsible for constructing and/or installing the following geometrics four southbound lanes: including acceleration lane (#4 lane) as an access - controlled lane, and concrete paved transition lane (curb lane). c) Southeast intersection of Van Buren Boulevard and Rutile Street shall provide for a 35 -foot radius curb return. Widening of road to meet approved section may require relocation of improvements at this intersection, applicant is responsible to show relocation on improvement plans and for the installation/construction of such. d) Design shall include transition from the proposed road width to the existing road width east of the project – at acceleration lane terminus. e) Streetlights at site frontage.
f) All driveways shall be per Riverside County standard 207A. g) Parkway improvements include 6- foot sidewalk and curb adjacent parkway landscape.
h) Provide ADA compliant access ramps at crossing (i.e. driveways) and update existing access ramps to current ADA standards.
i) Separate landscape plans for landscape and irrigation within the public right -of- way is required.
j) Project main entrance shall be traffic signal controlled. Separate traffic signal plans shall be submitted for proposed new traffic signal at project entrance.

2.15. The Applicant shall provide plans for approval of the city engineer for all public improvements on Rutile Street for review and approval of the City Engineer.

Improvements generally include:
a) Dedication of right -of-way to provide corner cutbacks, per Riverside County Standard No. 805, is required.
b) Parkway improvements such as, but not limited to, curb & gutter, curb adjacent landscape, and 6 -foot sidewalk. Improvements shall extend throughout the property’s frontage and connect to the south to existing improvements. Plans shall clearly show transition to existing infrastructure.
c) Provide ADA compliant access ramps at crossing (i.e. driveways) and update existing access ramps to current ADA standards. Including ramps at Rutile Street and Woodbridge Lane intersect ion.
d) All driveways shall be per Riverside County standard 207A. e) Design shall include transition from the proposed improvements to existing improvements and connection.
f) Streetlights at site frontage.
g) Separate landscape plans for landscape and irrigation wit hin the public right -of- way is required – one set for all landscape and irrigation within the public right -of- way.

2.16. The Applicant shall provide plans for approval of the city engineer improvements identified on the Traffic Impact Analysis report and the mitigation measures related to this project. Including
a) Van Buren Boulevard and Bellegrave Avenue – applicant is responsible for the traffic signal timing modification and optimization of the existing signalized intersection for the PM peak hour to allow fo r longer westbound left -turn phase; cycle length shall remain the same. Applicant is responsible for any and all EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 13 of 15 ends

equipment that this improvement may require.
b) Rutile Street and Galena Avenue – applicant is responsible for the procurement and installation of a new traffic signal at this intersection, at existing one -way stop- controlled intersection. New traffic signal will need to be coordinated with nearby railroad crossing, existing intersection of Van Buren Boulevard and Rutile Street, and proposed traffic signal on Van Buren at project site entrance. Rutile Street and Galena Avenue signal will operate as an additional pre -signal for the Van Buren Boulevard and Rutile Street intersection due to the sort intersection spacing.

Applicant will be responsible for furnishing any and all new equipment and parts required for the signal(s) and signals coordination, i.e. a second master controller that can oversee the operations of the various signal sets to allow for coordination and the rail road pre -emption operation.
c) Etiwanda Avenue and Van Buren Boulevard – Re-timing and optimizing existing signalized intersection for both the AM/PM peak hour to accommodate added volumes; cycle length shall remain the same. This intersection is coordinated with the Caltrans traffi c signal at the westbound SR -60 off -ramp and the new traffic signal at the intersection of Etiwanda Avenue and Riverside Drive. A coordination plan shall be prepared between all of these signals.

2.17. Applicant is required to annex into Jurupa Valley Landscape & Lighting Maintenance District 89 -1-C for maintenance of the landscape parkway improvements.

The Applicant shall submit landscape and irrigation plans for review and approval of the City Engineer.

2.17.1. The annexation shall be in a manner approved by the City E ngineer and City Attorney.

2.17.2. For landscaping within public road rights -of-way separate landscape and irrigation plans shall be prepared for approval of the City Engineer. The improvements shall comply with the City’s Submittal Guideline and Riverside County Ordinance 461, and Riverside County Ordinance 859, as adopted by the City.

2.17.3. Landscaping plans shall depict ONLY such landscaping, irrigation and related facilities as are to be placed within the public rights -of-way.

2.17.4. Applicant shall prepare Landscape and Ir rigation plans for annexation. Plans shall be prepared per Riverside County Ordinance 859 and per the City’s submittal guidelines and package.

2.17.5. Improvements to be included in the annexed zone include, but are not limited to, the maintenance of the following :
a) Parkway landscape maintenance;
b) Parkway tree trimming;
c) Streetlight maintenance (if not by different public agency).

3. PRIOR TO ISSUANCE OF BUILDING PERMIT

3.1. Rough grading must be completed as shown on the conceptual grading plans.

3.2. The Geotechnical Engineer shall certify to the completion of grading in conformance with the approved grading plans and the recommendations of the geotechnical report approved for this project and a licensed land surveyor shall certify to the completion of grading in conformance with the lines and grades shown on the approved grading plans.

3.3. The Applicant shall prepare a precise grading plan for each phase of the project. The precise grading plan shall be approved by the city engineer and securities in place.

3.4. The required water system, including fire hydrants, shall be installed and accepted by the appropriate service district prior to combustible materials being stored on site. All EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 14 of 15 ends

utility extensions within the development shall be placed underground unless otherwise specified or allowed by these Conditions of Approval.

3.5. All offsite improvement plans shall be approved per these conditions of approval.

3.6. Offsite improvement bonds shall be in place and/or improvements installed and accepted by the City Engineer.

3.7. Prior to issuance of building permit, the applicant shall have completed application, and record document/final map, to adjust location of the property lines per these conditions of approval.

3.8. Applicant shall finish abandonment of any, if any, easements wi thin the site that are required for the development of the site. For example, any related to the old Rutile Street alignment.

3.9. Applicant shall have approved cost estimates for fair-share payments required from this project identified on these conditions of approval and the mitigation measures related to this project. Cost estimates shall be submitted, reviewed, and approved by the City Engineer.

4. PRIOR TO BUILDING PERMIT FINAL INSPECTION/ CERTIFICATE OF OCCUPANCY

4.1. The Applicant is responsible for the completion of all grading and improvements for each parcel for which plans are required and shall comply with all requirements within public and private road rights-of-way shown on those Plans. Prior to the first certificate of occupancy, all improvements within the public right-of-way shall be completed and accepted by the City.

4.2. Prior to completion and acceptance of improvements or prior to the final building inspection for the first building, whichever occurs first and as determined by the City Engineer, assurance of maintenance is required by compl eting annexation to Jurupa Valley L&LMD 89-1-C for landscaping and irrigation, and streetlights unless otherwise maintained by a different public agency. In case another public agency will be maintaining the improvements, prove of the annexation and completion of the process will be required to be submitted to the Engineering department.

4.3. Prior to the first certificate of occupancy, applicant shall ensure that all streetlights within the public right of way, required from this project, a re energized.

4.4. Prior to the first certificate of occupancy, applicant is responsible for providing all fair - share payments identified on the TIA, including:

4.4.1. Applicant is responsible for providing fair -share payment for the improvement of northbound approach on Van Buren Boulevard and Bellegrave Avenue intersection from two existing northbound through lanes, to three northbound through lanes.

4.4.2. Applicant is responsible for providing fair -share payment for the improvements required at Pedley Road and Mission Boulevard intersection. Improvements include the re-timing existing signalized intersection to have eastbound/west bound left turn movement run on protective/permissive phasing. This will accommodate increased left turn movements, including new traffic signal equipment that would be required to make this change; cycle length to remain the same.

EXTENSION OF TIME (CUP19003EOT & SDP20010EOT) MAY 5, 2022 CONDITIONS OF APPROVAL FOR MA22043

Page 15 of 15 ends

The Applicant hereby agrees that these Conditions of Approval are valid and lawful and binding on the Applicant, and its successors and assigns, and agrees to the Conditions of Approval.

Applicant’s name (Print Form): __________________________________________

Applicant’s name (Signature): ___________________________________________

Date: ________________

ATTACHMENT NO. 2
Resolution No. 2020-04-22-01

ATTACHMENT NO. 3
April 22, 2020 Planning Commission Hearing Staff Report

Page | 18

STAFF REPORT

DATE: APRIL 22, 2020
TO: CHAIR PRUITT AND MEMBERS OF THE PLANNING COMMISSION FROM: THOMAS G. MERRELL, AICP, PLANNING DIRECTOR
BY: ROCIO LOPEZ, SENIOR PLANNER
SUBJECT: AGENDA ITEM NO. 6.1
MASTER APPLICATION (MA) NO. 19041: CONDITIONAL USE PERMIT (CUP) NO. 19003 AND SITE DEVELOPMENT PERMIT (SDP) NO. 20010 (VAN BUREN MARKETPLACE COMMERCIAL CENTER)
LOCATION: SOUTHWEST CORNER OF VAN BUREN BOULEVARD
AND RUTILE STREET / APNS: 167 -330-006; 167-330-010; 167-330-015 AND 167-110-039 (COMBINED 15.9 ACRES)
APPLICANT: CONTROL MANAGEMENT, INC.

RECOMMENDATION
By motion, adopt Planning Commission Resolution No. 2020 -04-02-01: 1) adopting a Mitigated Negative Declaration and Mitigation Monitoring Reporting Program; 2) approving Conditional Use Permit No. 19003; and 3) approving Site Development Permit No. for the development of the Van Buren Marketplace, a 90,262 square foot commercial center on a 15.9 -acre site, subject to the conditions of approval.

PROJECT DESCRIPTION
The Applicant (“Applicant” or “Control Management, Inc.”) has submitted the following applications:
• Conditional Use Permit (CUP) No. 19003: For the development of a gasoline service station with concurrent sale of beer and wine for off -site consumption within a proposed convenience store, including the sale of motor vehicle fuel and car wash • Site Development Permit (SDP) No. 20010: For the proposed development of the Van Buren Marketplace commercial center consisting of the following:

PHASE 1
Building Name Land Use Square Footage (Area)
GSC Gas Station Canopy 3,456
CS Convenience Store 2,976
CW Drive-thru Car Wash 5,043
“4” Anchor Market 38,000
“5” Full-Service Restaurant 7,650

Page | 18

PHASE 2
Building Name Land Use Square Footage (Area)
“1” Drive-Thru Restaurant 3,452
“2” Retail Building with Drive-Thru Restaurant 4,166
“3” Retail 5,100
“6” Retail 5,130
“7” Retail 3,360
“8” Retail - freestanding 11,929
Grand Total 90,262
Table 1 outlines the existing land use and zoning designations.

TABLE 1: GENERAL PROJECT INFORMATION
GENERAL PLAN LAND USE DESIGNATION CR (Commercial Retail) GENERAL PLAN OVERLAY AREA Equestrian Lifestyle Protection Overlay (ELO)
ZONING CLASSIFICATION Scenic Highway Commercial
(C-P-S)

LOCATION AND SURROUNDING LAND USES
The triangular shaped property is located at the southwest corner of Van Buren Boulevard and Rutile Street. The site is located adjacent to residential developments to the south and west, Rutile Street followed by commercial development to the east, and Van Buren Boulevard followed by industrial development to the north. The site is bound by Van Buren Boulevard on its northern boundary and a small commercial strip center beyond, Rutile Street on its western boundary, and residential developments on its southern boundary.

Existing and surrounding land uses are shown in Table 2.

TABLE 2: EXISTING AND SURROUNDING LAND USES
Location Existing Use
Site Vacant land
North Van Buren Blvd. followed by commercial and industrial development further to the north
South Single-family residential development
East Light industrial development
West Rutile Street followed by residential development to the west Source: Field Inspection, March 2019

Exhibit 1 provides an aerial view of the project site. Exhibits 2 and 3 provide the existing General Plan Land Use (GPLU) designations and zoning of the site and surrounding parcels . Exhibit 4 depicts the Equestrian Lifestyle Protection Overlay (ELO) from the General Plan.

Page | 18

EXHIBIT 1: SITE LOCATION MAP
EXHIBIT 2: LAND USE MAP

Page | 18

EXHIBIT 3: ZONING MAP

EXHIBIT 4: EQUESTRIAN LIFESTYLE PROTECTION OVERLAY (ELO)

A-1: Light Agricultural
C-P-S: Scenic Highway Commercial
R-1: One Family Dwellings
R-A: Residential Agricultural
M-SC: Manufacturing Service
Commercial

Page | 18

REQUIRED ENTITLEMENTS
Per the City’s Municipal Code, Title 9 (Planning and Zoning), Chapter 9.125 (C-P-S) Zone, Section

9.125.020 (Uses Permitted), gasoline service stations, with the concurrent sale of beer and wine for off-premises consumption and convenience stores, including the sale of motor vehicle fuel, are permitted uses subject to the approval of a Conditional Use Permit (CUP).

Additionally, the sale of alcoholic beverages for off -premises consumption within a C-P-S zone shall comply with Sec tion 9.240.490, Alcoholic Beverage Sales. Since the proposed off-sale license is not located within an over concentrated census tract, the City does not need to make the findings for a Public Convenience or Necessity (PCN).

Finally, the commercial retail and restaurant development are permitted uses subject to the approval of a Site Development Permit (SDP) pursuant to Section 9.240.330.

SITE DEVELOPMENT
The project is proposed in two (2) Phases: Phase 1 will include the development of the gas station, convenience store and car wash, and will also include the 38,000 square foot anchor market and 7,650 square foot full-service restaurant (Building 5). Phase 1 also includes all off-site public right -of-way and street improvements , including signalization and on -site parking, landscaping, decomposed granite (dg) trail and equestrian fencing. Phase 2 is for the future development of the remaining commercial structures and two (2) drive-thru restaurants see Exhibit 6.

EXHIBIT 6: COLORED PHASING PLAN

Page | 18

The project demonstrates compliance with all development standards set forth in Section

9.125.040 (Development Standards) of the C-P-S zone. The following table provides a summary of the project’s compliance with development standards pertaining to setbacks, height and parking.

TABLE 3: DEVELOPMENT STANDARDS
Standards Does the Project
comply with the
standards?
Supporting Information
Minimum Lot Area: None Yes As shown on the site plan
Setbacks for buildings under 35 feet:

None
Yes As shown on the
elevations
No building or structure shall exceed fifty
(50) feet in height
Yes As shown on the
elevations
Landscaping: 11% minimum interior Yes 19% interior and 23.75 overall landscaping
provided as shown on the
site and landscape plans
Parking as required by Section 9.120.240:
454 parking spaces

Yes

482 parking spaces
provided as shown on the
site plan
Site Layout
The site has been designed to minimize any impacts to the adjacent single-family residential land uses. The placement of the car wash, vacuum equipment, gas station and convenience store are located as far away from any sensitive residential land uses as possible to reduce any potential noise impacts. As analyzed in the Noise Study prepared for this project and within the Noise Section of the Initial Study, residential uses are located more than 200 feet from Rutile Street and 500 feet to the south o f the proposed car wash. Additionally, the two drive -thru restaurants (Buildings 1 and 2) are located between 200 and 500 feet from the nearest home and are located approximately 24 feet from the front property line along Van Buren Boulevard. Based on the analysis described in the Noise Section and the Mitigation Monitoring and Reporting Program (MMRP) incorporated within the Initial Study/Mitigated Negative Declaration (IS/MND), the project contains mitigation measures which effectively reduce any potential noise impacts to a “Less than Significant Impact”, see Exhibit A of Attachment 1.

The entrance areas to Buildings 3 through 8 are located facing the interior parking lot area, away from the residential land uses. There is also a proposed 20-foot landscaped setback area with Afghan pine trees planted 25 feet on center, along with an eight (8) foot high split face wall, along the entire southern property line. Additionally, the center proposes a 10-foot wide equestrian trail easement with 42-inch high equestrian fencing along the western property line and an equestrian hitching post area with decomposed granite to complement the existing Equestrian Lifestyle Protection Overlay (ELO).,See the General Plan section of this report for further details.

Site Access and Circulation
Access to the site will be provided via two (2) proposed driveways:
• A 55-foot wide driveway along Van Buren Boulevard includes a new signalized full-turn traffic signal; and
• A 40-foot wide driveway is proposed along the rear of the commercial center along Rutile Street.

Page | 18

Both driveways will feature stamped and stained concrete entries . Staff is recommending a condition to require reciprocal access and parking. The site contains adequate traffic circulation as determined by the Jurupa Valley Municipal Code (JVMC) and the City’s Traffic Engineer.

Furthermore, staff circulated the development plans to various internal City departments and external agencies for comment and recommended conditions. Comments from the departments and agencies have been considered and incorporated as modifications and/or conditions to this project as deemed appropriate by Planning staff, including a condition to limit the delivery of fuel to this location during “off-peak” business hours.

Architectural Style
The site is located within the eastern Mira Loma community and is primarily surrounded by single- family residential land uses. As there are existing trails within the area, the community has a rural, equestrian character. The project therefore features design elements which create a Farm style architectural theme. The development features various building materials typically associated with farm style architecture such as corrugated metal roofing, hardiplank and shiplap siding and trimming, stone veneering, and decorative barnlike lighting fixtures. The project includes rusted red, beige and other earth tone colors to complement the farm -style architectural theme . See Colored Elevations within the Architectural Plans Attachment.

The vacuum area near the ca r wash features trellis structures to provide shading within the parking area. The development also includes several trash enclosure units . One (1) trash enclosure unit serving each primary building throughout the site. The enclosure units will contain color stucco, vinyl coated aluminum trellis and wrought iron doors with opaque screening to match the new development and they are in compliance with City standards.

The site will contain ample parking lot lighting and building mounted lighting of sufficient coverage as shown the Photometric Plan. Lighting fixtures shall be consistent with the architectural theme, as shown on the colors and materials sheet. As demonstrated in the previous section, the development meets the zoning code parking requirement s per Section 9.120.240 (Off-Street Vehicle Parking).

Landscaping and Walls
The Conceptual Landscape Plan features a variety of 24 -inch box shade trees, large screen shrubs, a variety of groundcovers and colorful plant materials to accent the site with an overall coverage area of 23.75%. Additionally, a minimum of 50% of the parking area will be shaded by tree canopies. Exhibit 7 depicts the proposed 20-foot landscaped setback area and eight (8) foot high wall along the entire southern property line.

The plan was reviewed by the City’s Landscape Architect who approved the concept plan. Formal landscape and irrigation plans will be subject to final review and approval by the City’s Landscape Architect. The Conceptual Landscape Plan is provided under Attachment 5 (Sheets L1 thru L4).

As part of Phase 1, landscaping along the entire site perimeter, including the entire sou thern property line and landscaping directly related to those buildings within Phase 1, shall be installed prior to the issuance of final occupancy of the first building within Phase 1. The remainder of the interior landscaping shall be completed during the development of Phase 2.

Page | 18

EXHIBIT 7: SOUTH PROPERTY LINE SECTION

Split face walls with decorative caps and pilasters are proposed along a portion of the western and entire southern property lines. The entire length of the wall will be eight (8) feet in height along the southern property line and six (6) feet in height solid split face wall with wrought iron and pilasters along the entire western side of the property. See Attachment 5 (Sheet WP1). Staff has recommended a condition to require all walls to have an anti-graffiti coating.

Signage
The staff has recommended a condition of approval to require the applicant to submit a M aster Sign Program for the commercial center to ensure the signs are compatible and consistent with the overall architecture of the center . It must be approved prior to the issuance of first building permit of the center.

On-Site Utility and Drainage Improvements
Water and sewer service to the project site will be provided by the Jurupa Community Services District (JCSD). The project will connect to an existing 10-inch diameter water line in Rutile Street.

Sewer service is available for the p roject from an existing 8-inch diameter sewer line at the intersection of Rutile Street and Woodbridge Lane.

Development of the project will increase impervious surface coverage on the site and increase surface runoff. Surface run off, however, will be directed to the water qu ality infiltration basin proposed to be located on the south east end of the site before discharging in the storm drain system located beneath the roadways.

Public Right-of-Way Improvements
The project requires public right-of-way (ROW) dedication to accommodate 81 feet from the median centerline to the property line along the entire project frontage on Van Buren Boulevard.

ROW parkway improvements along Van Buren Boulevard include, but are not limited to , a new six (6) foot wide sidewalk, curb adjacent landscaping, and curb and gutter.

Page | 18

Proposed parkway landscaping will serve as a safety buffer between moving vehicles and pedestrians It will also provide a shaded and continuously level pathway for pedestrians, thereby increasing aesthetic value of the area.

Along Rutile Street, there is an existing six (6) foot wide sidewalk adjacent to curb and gutter which extends through the midpoint of the subject site. I mprovements will therefore include a transition from the existing sidewalk to a new six (6) foot wide sidewalk adjacent to curb and gutter and a six (6) foot wide landscaped parkway adjacent to property line.

Staff is recommending a condition to require a a Commercial/Industrial Landscape Maintenance Agreement for the continual maintenance of the landscaping in the public right -of-way. See Exhibits 8 and 9 for a view of the street sections.

EXHIBIT 8: VAN BUREN BLVD. STREET SECTION

EXHIBIT 9: RUTILE STREET SECTION

ALCOHOLIC BEVERAGE SALES
The sale of alcoholic beverages for off -premise consumption is allowed within the C -P-S zone with an approved Conditional Use Permit (CUP). The property is within census tract 404.03 (Exhibit 10). According to the Alcohol Beverage Control Board (ABC), thr ee (3) off-sale alcohol licenses are permitted within this census tract. There are two (2) existing off-sale licenses (shown

Page | 18

as yellow circles on Exhibit 10), and the proposed Type 20 (beer and wine) license would result in three (3) licenses. As of April 7, 2020, the following locations held active off-sale licenses within census tract 404.03:
• Perez Market at 9790 Jurupa Road – Type 20; and
• Jurupa Dairy at 9775 Jurupa Road – Type 20
In addition to reviewing the project based on the maximum number of licenses permitted within this census tract, staff considered existing businesses that sell alcoholic beverages for off -site consumption in adjacent census tracts. The closest businesses that sell alcoholic beverages for off-site consumption are the Stater Brothers grocery store and Plaza Liquor.

The convenience store will offer ancillary food sales such as coffee, prepackaged and prepared pastries, candies, soft drinks, beer, wine, etc. typically offered at convenience stores. The facility will provid e vehicle fuel through twelve ( 12) fueling dispensers located under the proposed canopy.

The store and fueling hours are proposed at 24 hours per day, seven (7) days a week, with alcohol sales for off-site consumption between the hours of 6:00 a.m. to 2:00 a.m. as permitted by the State Alcohol Beverage Control Board. The Applicant indicates that there will be at least three (3) employees at the store.

EXHIBIT 10: EXISTING OFF-SALE LOCATIONS ON CENSUS TRACT MAP

Comments from Sheriff’s Department. The Sheriff’s Department has reviewed and considered the proposed sale of beer and wine at the proposed convenience store. The Sheriff’s Department does not consider the project location to be in a high crime area and ha s no concerns with the proposed off-site alcohol sales.

The Sheriff’s Department typically provides the following comments for beer and wine applications:
a. Limit alcohol sales to packages containing no less than 6 cans or bottles to a case. b. Prohibit the sales of single cans or bottles less than or equal to 40 ounces.

Page | 18

c. The placement of alcoholic beverages must be stored in the back of the store or behind the sales counter.
d. The owner must immediately remove any loiterers. If the owner does not immediately remove any loiterers, the Sheriff’s Department will remove the loiterer and the approval for the sales of alcoholic beverages may be subject to revocation. e. Digital security cameras should be installed and used for monitoring activity on the property.
f. An alarm system should be installed and used especially at the entrances.

The proposed alcohol display area is consistent with the Sheriff’s Department’s recommendation.

Beer and wine products will be located within a section of the refrigerator cooler. Of the 10 overall cooler doors, one (1) door will be devoted to beer and wine products, measuring approximately 127 square feet . In addition, the Applicant prop oses to store 12 and 24 pack cases of non - refrigerated beer, averaging 24 square feet near the dry foods rack, located more than 15 feet away from the store entrance. Per the Sheriff’s Department recommendation , however, staff recommends a condition that would require any alcoholic beverages to be moved to the back of the store and away from the main entrance. Overall, alcohol display area represents 5.6% of the overall store floor area. See Exhibit 11 below.

EXHIBIT 11: FLOOR PLAN

Section 9.240.490(c) - Development Standards. The project complies with all the development standards under this section, see Table 4, and as incorporated in the conditions of approval.

TABLE 4: SECTION 9.240.490(c) ALCOHOLIC BEVERAGE SALES DEVELOPMENT STANDARDS IN COMPLIANCE?
Conditional Use Permit required in C-P-S zone Yes - Applied Such facilities shall not be situated in such a manner that vehicle traffic from the facility may reasonably be believed to be a potential hazard to a school, church, public park or playground.

Yes
Alcohol display areas

Page | 18

Notice of hearing shall be given to all owners of property within 1,000 feet of the subject facility, to any elementary school or secondary school district within whose boundaries the facility is located and to any public entity operating a public park or playground within 1,000 feet of the subject facility. The Planning Director may require that additional notice be given, in a manner the Director deems necessary or desirable, to other persons or public entities.

Yes. Notice was provided.

Additionally, there are no
schools or parks located
within 1,000 feet of the
subject site.

Only beer & wine may be sold Yes. No request for distilled spirits.

Educate the public regarding laws related to alcohol such as driving under the influence of intoxicating beverages, minimum age for purchase and consumption of alcoholic beverages, etc.

Yes. It is made part of the
conditions of approval.

No displays of beer and wine within five (5) feet of any entrance or checkout counter
Yes. It is made part of the
conditions of approval.

On the floor plan, the
display areas are at more
than five (5) feet from any
entrance or checkout
counter.

Cold beer or wine must be sold or displayed in permanently fixed electrical coolers only
Yes. It is made part of the
conditions of approval.

No advertising of alcoholic beverages on gasoline islands; no lighted advertising of alcoholic beverages on the exterior of the building or within window areas.

Yes. It is made part of the
conditions of approval.

Employees must be at least 21 years of age if selling any alcoholic beverages between the hours of 10:00 pm and 2:00 am.

Yes. It is made part of the
conditions of approval.

No alcoholic beverage sales made from a drive-in window. Yes. It is made part of the conditions of approval.

GENERAL PLAN
The General Plan land use designation is Commercial Retail (CR) which allows for commercial development. The project has been reviewed and evaluated for consistency with the City’s General Plan policies that apply to this project. The following four policies relating to design, infrastructure, and mitigation of potential impacts apply to this project:

LU 23.3: Site buildings along sidewalks, pedestrian areas, and bicycle routes and include amenities that encourage pedestrian activity.

Project: The development has been designed so that Building 1 and Building 2 are oriented towards the public right-of-way along the Van Buren Boulevard frontage. Additionally, Buildings 3 through 8 are located so that they are conveniently accessible to pedestrians who reside within walking distance from this future neighborhood retail center.

The development also includes a 10-foot wide equestrian trail with split rail vinyl fencing and public right-of-way improvements along Rutile Street which further provides connectivity for pedestrians,

Page | 18

equestrian riders, and bicyclists. In addition, the development features an on -site sidewalk connecting the public sidewalk along both Van Buren Blvd. and Rutile Street for easy access to the commercial center. These features encourage pedestrian activity.

With the proposed on and off -site required improvements and connectivity, the pr oject layout is consistent with similar commercial developments within the area. As such, staff believes that the intent of policy LU 23.3 has been met.

LU 23.5: Concentrate commercial uses near transportation facilities and high density residential areas and require the incorporation of facilities to promote the use of public transit, such as bus turnouts.

Project: The Riverside Transit Authority (RTA) will not require a bus stop at this location, as there is currently no route running on Van Buren Blvd. The closest active bus stops are on Van Buren Blvd. and Jurupa Road, with service running on Jurupa R oad. The project will provide for ADA compliant walkways connected to ADA compliant public sidewalks. Thus, the project will be ready to serve future bus stop facilities w hen RTA service does become available closer to this project,
LU 23.6: Require that commercial projects abutting residential properties protect the residential use from the impacts of noise, light, fumes, odors, vehicular traffic, parking, and operational hazards.

Project: Residential properties are located to the west and south of the project site. To buffer the use from residences to the west and south of project site, the project provides the following:
• Westerly property line : A proposed six (6) foot high decorative solid wall with on -site landscaping will be constructed up to the proposed driveway along Rutile Street, after which the project includes a six -foot-high wrought iron fence with dense landscaped setback area.
• Southerly property line: An eight (8) foot high decorative masonry wall and a 20 foot wide dense landscaped area.

Additionally, the Mitigation Monitoring Reporting Program (MMRP) provides mitigation measures to reduce potential impacts such as, but not limited to, noise, air pollution, traffic, etc. to levels of non-significance.

LU 23.7: Require that adequate and available circulation facilities, water resources, and sewer facilities exist to meet the demands of the proposed land use.

Project: Recommended condition would require dedication on Van Buren Boulevard to accommodate widening and full improvements per City Engineering standards. Water and sewer service to the project site will be provided by the Jurupa Community Services District (JCSD).

LU 23.9: Require that commercial development be designed to consider their surroundings and visually enhance, not degrade the character of the surrounding area.

The architecture of the project has been deemed to be consistent with the predominately rural/equestrian lifestyle of the Mira Loma community and densely landscaped parkways will enhance the character of the surrounding area. Restricting hours of alcoholic beverage sales and other alcohol related restrictions, as well as limiting hours of deliveries also promote compatibility.

Page | 18

EXHIBIT 12: GENERAL PLAN MOBILITY ELEMENT – EQUESTRIAN TRAIL ROUTES

EQUESTRIAN LIFESTYLE PROTECTION OVERLAY
The project site is located within the Equestrian Lifestyle Protection Overlay (ELO). Equestrian uses are commonplace in certain areas of the City and the purpose of the following policies is to protect the equestrian character of the areas throughout the City:

Policies:

LUE 5.3 Land Use Compatibility: New land use entitlement applications, whether for residential, commercial, industrial, or institutional uses, shall be designed such that there will be no interference with surrounding equestrian neighborhoods.

The project does not present any obstacle or interference with the surrounding equestrian neighborhoods.

LUE 5.1.6 Hitching Posts: Require that within the Overlay, new development shall install hitching posts and related facilities to allow safe short -term equestrian “parking” and to create a design statement that the area encourages equestrian uses.

The project provides hitching posts conveniently located to provide direct access from the trail to the shopping center.

Subject
Site

Page | 18

Proposed Equestrian Trail
While there is no General Plan requirement to construct a trail along the east side of Rutile Street, the project has been designed to include a trail along the east side of Rutile Street. It is proposed as an equestrian amenity providing connectivity from the proposed commercial center to adjacent equestrian neighborhoods and to the existing Arabella Ranch Community Trail.

The 10-foot decomposed granite (dg) trail with 42 -inch high vinyl trail fencing is designed per JARPD standards. This new equestrian amenity trail is proposed from the southwest corner of the proj ect site, within the shopping center western boundary along Rutile Street up to the northeast corner of the site at Galena and Van Buren. Additionally, the project provides hitching posts conveniently located to provide direct access from the trail to the shopping center.

Overall, the project is consistent with the goals and policies of the CR land use designation.

EXHIBIT 13: JARPD TRAILS MAP

FINDINGS FOR APPROVAL OF A CONDITIONAL USE PERMIT (CUP) Per Section 9.240.280.(4), “a Conditional Use Permit shall not be granted unless the applicant demonstrates that the proposed use will not be detrimental to the health, safety or general welfare of the community. Any permit that is granted shall be subject to such conditions as shall b e necessary to protect the health, safety or general welfare of the community.” Staff has reviewed the project and determined that the proposed use meets the following required findings:

1. The proposed sale of alcoholic beverages (beer and wine) for off-site consumption will not adversely affect or be materially detrimental to the public health, safety or general welfare of the community in that the area devoted to alcohol sales would only be 5.6% of the retail floor area. Furthermore, the use is consistent w ith other similar fueling stations with convenience stores offering the sale of alcoholic beverages for off-site consumption.

2. The proposed use will not be detrimental to the health, safety or general welfare of the community, in that the proposed sale of b eer and wine for off -site consumption will be conducted as an ancillary use to the primary sales of prepackaged cold and hot foods, sundry items, non-alcoholic beverages and fueling for vehicles. Furthermore, the use will not pose a threat to surrounding l and uses with the recommended conditions by staff

Page | 18

(includes Riverside County Sheriff’s Department comments). Furthermore, and ABC would impose their own conditions on the ABC license,

3. The proposed use will not be detrimental to the health, safety or general welfare of the community, in that the site shall be developed and conditioned to ensure that adequate dense landscaping, masonry walls, increased setbacks, restricted delivery hours and other mitigation, such as shielded lighting, are imposed to reduce impacts to adjacent land uses. As such, the project is not expected to create any significant adverse impacts from noise, odor, or light upon the community as analyzed in the Initial Study and Mitigated Negative Declaration.

Proposed Mitigation Measures include, but are not limited to:
➢ The project will be required to shield outdoor lighting to contain glaring. ➢ The project shall comply with the Air Quality Management District’s rules regulating air quality.
➢ The project will require public improvements along both Van Buren Blvd. and Rutile St. which will serve to update the project site and help improve traffic circulation per the General Plan standards.
➢ The project will require a construction related noise mitigation plan.

With the approved applicati on and required conditions of approval, the project demonstrates consistency with the General Plan and Zoning sections within the Jurupa Valley Municipal Code (JVMC) and applicable state and federal laws . Additionally, the Applicant is required to agree to the conditions of approval within 30 days of project approval by completing the signature block located at the last page of the Conditions of Approval.

FINDINGS FOR APPROVAL OF A SITE DEVELOPMENT PERMIT (SDP) Per Section 9.240.330 (3) Requirements for Approval , no Site Development Permit shall be approved unless it complies with the following standards:
(a) The proposed use must conform to all the requirements of the Jurupa Valley General Plan and with all applicable requirements of State law and the ordinances of the City.

The subject site has a General Plan Land Use Designation of Commercial Retail (CR) and is zoned C -P-S (Scenic Highway Commercial). The proposed commercial development demonstrates consistency with the General Plan and compliance with Title 9 (Planning and Zoning) of the Jurupa Valley Municipal Code.
(b) The overall development of the land shall be designed for the protect ion of the public health, safety and general welfare; to conform to the logical development of the land and to be compatible with the present and future logical development of the surrounding property. The plan shall consider the location and need for dedi cation and improvement of necessary streets and sidewalks, including the avoidance of traffic congestion; and shall take into account topographical and drainage conditions, including the need for dedication and improvements of necessary structures as a part thereof.

In order to minimize impacts to adjacent residential land uses, t he structures as proposed far away from residential, incorporates adequate landscaped buffer setbacks, and provides an eight (8) foot high masonry wall.

The proposed shopping center is compatible with the surrounding community because it will provide the necessary services and retail in this community. Furthermore, the project will enhance the community with its attractive architecture, dense landscaping, new trees, equestrian trail and decorative perimeter walls . The project will require public improvements in the form of new

Page | 18

landscaped parkway, new street lighting, curb and gutter, new sidewalk and pedestrian walkways connecting to the center. The creation of a new sidewalk along the property’s entire frontage, on Van Buren Boulevard, will enable pedestrians to safely access the shopping center. Furthermore, the site will be graded and will drain per Engineering conditions. (c) All site development permits which permit the construction of more than one structure on a single legally divided parcel shall, in addition to all other requirements, be subject to a condition which prohibits the sale of any existing or subsequently constructed structures on the parcel until the parcel is divided and a final map recorded in accordance with Title 7 in such a manner that each building is located on a separate legally divided parcel.

A condition of approval shall be included to prohibit the sale of any existing or subsequently constructed structures on the parcel until the parcel is divided per Title 7 ( Subdivisions) of the Jurupa Valley Municipal Code.

ENVIRONMENTAL REVIEW
The City of Jurupa Valley has prepared and intends to a dopt a Mitigated Negative Declaration (MND) for the Project, see Attachment 1 (a) (Exhibit A). The proposed Mitigated Negative Declaration is supported by an Initial Study that evaluated potential effects with respect to Aesthetics, Agriculture and Forest Resources, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation/Traffic, and Utilities and Service Systems.

The proposed Mitigated Negative Declaration determines that although the proposed Project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made or agreed to by the Applicant. Staff has recommended a condition which requires that all mitigation measures of the Mitigation Monitoring and Reporting Program (MMRP) be incorporated into the Conditions of Approval.

Public Review Period. The public comment period for the MND began on March 28, 2020 and ended on April 16, 2020 . To date, no comments have been received. The Mitigated Negative Declaration and MMRP are available at Jurupa Valley City Hall and on the City’s website.

PUBLIC COMMENTS
The Planning Department mailed notices to surrounding property owners within a 1,000 foot from the boundaries of the project site, and extended the radius to include all properties within the same block, see Attachment 4. Additionally, legal advertisements were published in the Press Enterprise. To date, no comments have been received.

CONCLUSION
The proposed commercial development adheres to the applicable goals and policies within the General Plan and is consistent with the requirements in the City’s zoning code. The project features site upgrades which include new public improvements, attractiv e architectural building design, decorative perimeter walls/fencing and landscape screening, equestrian trail and fencing and, overall site improvements. Potential impacts have been analyzed and mitigation measures have been incorporated to reduce any impacts to a “less than significant level.” Based upon the findings set forth in the attached Resolution No. 2020 -04-22-01, staff recommends approval of Conditional Use Permit (CUP) No. 19003 and Site Development Permit (SDP) No. 20010 subject to the Conditions of Approval.

Page | 18

Prepared by: Submitted by:

Rocio Lopez Thomas G. Merrell, AICP
Senior Planner

Planning Director

Reviewed by:

__//s// Serita Young____________
Serita Young
Deputy City Attorney

ATTACHMENTS:

1. Resolution No. 2020-04-22-01
a. Exhibit A. “Initial Study Checklist / Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program”
b. Exhibit B. Recommended Conditions of Approval

2. Existing Off-Sale Licenses in Census Tract 404.03

3. Number of Authorized Licenses by Census Tracts

4. Public Notice Radius map

5. Colored Phasing Plan (dated: 4-16-20)

6. Architectural Set of Plans (dated: 4-10-20)

ATTACHMENT NO. 4
MA19041 Approved Architectural Plans

VAN BUREN BLVD

JURUPA VALLEY, CA
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/7/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/7/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020

Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/6/2020

Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/6/2020

UNAUTHORIZED VEHICLES

PARKED IN DESIGNATED

ACCESSIBLE SPACES

DISTINGUISHING PLACARDS

OR LICENSE PLATES

ISSUED FOR PERSONS

WITH DISABILITIES

WILL BE TOWED AWAY AT
OWNER'S EXPENSE.

TOWED VEHICLES MAY BE

XXXXX, CA
(XXX-XXX-XXXX)
XXXXX POLICE DEPT.

RECLAIMED AT:

UNAUTHORIZED VEHICLES

PARKED IN DESIGNATED

ACCESSIBLE SPACES

DISTINGUISHING PLACARDS

OR LICENSE PLATES

ISSUED FOR PERSONS

WITH DISABILITIES

WILL BE TOWED AWAY AT
OWNER'S EXPENSE.

TOWED VEHICLES MAY BE

XXXXX, CA
(XXX-XXX-XXXX)
XXXXX POLICE DEPT.

RECLAIMED AT:

ENTRANCE
"MINIMUM
FINE
$250"
"MINIMUM FINE
$250"

HANDICAPPED

PARKING ONLY VAN

ACCESSIBLE

UNAUTHORIZED VEHICLES

PARKED IN DESIGNATED

ACCESSIBLE SPACES

DISTINGUISHING PLACARDS

OR LICENSE PLATES

ISSUED FOR PERSONS

WITH DISABILITIES

WILL BE TOWED AWAY AT
OWNER'S EXPENSE.

TOWED VEHICLES MAY BE

XXXXX, CA
(XXX-XXX-XXXX)
XXXXX POLICE DEPT.

RECLAIMED AT:

ENTRANCE
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020

Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020

Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020

LANE #2
LANE #1
LANE #3
LANE #4
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WB-67D - "Double Bottom" Semi-trailer/Trailer
SU-40 - Single Unit Truck
WB-67 - Interstate Semi-Trailer
W
S
W
W
W
W
W
W
W
W
W
W

PROPOSED PLANT LEGEND
NOTES:

MAXIMUM APPLIED WATER ALLOWANCE :

SHEET INDEX
2'-0"
9'-0"
10"8'-0"
2"
#5 VERT.

REBAR @ 32"
O.C.

PRECAST

CONCRETE
CAP

FOR FOOTING SIZE SEE
STRUCTURAL SHEET, #10/S5.02
#5 VERT. REBAR @
32" O.C.
2'-0"
7'-0"
8"6'-0"4"
#5 VERT.

REBAR @ 32"
O.C.

PRECAST

CONCRETE
CAP
2" SQ.TUBE VERT. WROUGHT
IRON FENCE @ 6'-0" H. W/4"
O.C. PICKETS

FOR FOOTING SIZE SEE
STRUCTURAL SHEET S5.02
DETAIL #10
NOTE:

ALL WALL & PILASTER

BLOCK MATERIAL TO BE
SPLIT FACE .

AS NOTED
THK

CITY OF
JURUPA
Sheet of Sheets
Plan No.: Scale:

File No.:

ENGINEERING

DIVISION
Benchmark: Basis of Bearing
Drawn by:

CONCEPTUAL LANDSCAPE PLAN

JURUPA, CA
VAN BUREN BLVD.

Know what's below.
before you dig.Call
R
Date: 2/13/2019
18-070
CCS ZONE 6 FOR ELEVATION CCS ZONE 6 FOR BASIS OF BEARINGS L1 4
Scale: 1" = 30'
30 0 30 60 90
Date
Renewal Date
Signature
3-25-20
5-31-21
CA License 3602
AZ Registration 33915

LANDSCAPE ARCHITECT
Lake Forest, CA 92630
26482 Elmcrest Way
[email protected]
(949) 348-9150
L

ICENSED

LANDSCAPE ARCHITECT
STATE

OF CA L I FORN
IA
THOM
AS
H . KOCH
No
.36
02 SITE

VICINITY MAP
N.T.S.

JURUPA ROAD

BELLGRAVE ROAD
VAN BUREN BLVD.ETIWANDA BLVD.
15 60

SHEET INDEX MAP
N.T.S.

PROPOSED THREE RAIL VINYL
FENCE PER JARPD, SEE DETAIL #6
/SD4
X X
SYMBOL
1,830'
PROPOSED 6' TALL IRON FENCE
WITH 2'X2' PILASTER COLUMN AT
30' INTERVALS PER DETAIL #2
554' LF
PROPOSED 8' TALL CMU BLOCK
WALL WITH 2'X2' PILASTER
COLUMN AT 30' INTERVALS PER
DETAIL #1
1,734' LF
1/2"=1'-0"1/2"=1'-0"

WALL LENGTH DESCRIPTION
NOTE:

SEE SHT. L4 FOR 3 RAIL
FENCE ELEVATION.

LANE #2
LANE #1
LANE #3
LANE #4

X X X X X X
X X

X X X XS
S
W
W
W
W
W
W
W
W
W
W
W
W
W

PW PW PW PW PW PW PW PW PW PW PW PW PW PW

PROPOSED PLANT LEGEND
NOTES:

AS NOTED
THK

CITY OF
JURUPA
Sheet of Sheets
Plan No.: Scale:

File No.:

ENGINEERING

DIVISION
Benchmark: Basis of Bearing
Drawn by:

CONCEPTUAL LANDSCAPE PLAN

JURUPA, CA
VAN BUREN BLVD.

Know what's below.
before you dig.Call
R
Date: 2/13/2019
18-070
CCS ZONE 6 FOR ELEVATION CCS ZONE 6 FOR BASIS OF BEARINGS L2 4
W
Scale: 1" = 30'
30 0 30 60 90
Date
Renewal Date
Signature
3-25-20
5-31-21
CA License 3602
AZ Registration 33915

LANDSCAPE ARCHITECT
Lake Forest, CA 92630
26482 Elmcrest Way
[email protected]
(949) 348-9150
L

ICENSED

LANDSCAPE ARCHITECT
STATE

OF CA L I FORN
IA
THO
M
AS
H . KOCH
No
.3
6 02
E #3LANE #4
LANE #2
LANE #1
LANE #3
LANE #4

X X X X X X X X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W

PROPOSED PLANT LEGEND
NOTES:
20'
FS
PL

RESIDENTIAL
FG
FG
8'
9'

BLOCK WALL

W/ PILASTER BEYOND
6' 10' 15'
FS FS
RUTILE ST.

CURB
6'

SIDEWALK
BLOCK WALL OR W.I.

FENCE W/ PILASTER
BEYOND
6'
7'
TRAIL 3 RAIL FENCE
20' S.B. 10' 6' 5'
30" BERM
FS
FS
FS
PL
VAN BUREN BLVD.

SIDEWALK

CURB OR PLANTER
FG FG
PL

AS NOTED
THK

CITY OF
JURUPA
Sheet of Sheets
Plan No.: Scale:

File No.:

ENGINEERING

DIVISION
Benchmark: Basis of Bearing
Drawn by:

CONCEPTUAL LANDSCAPE PLAN

JURUPA, CA
VAN BUREN BLVD.

Know what's below.
before you dig.Call
R
Date: 2/13/2019
18-070
CCS ZONE 6 FOR ELEVATION CCS ZONE 6 FOR BASIS OF BEARINGS L3 4
Scale: 1" = 30'
30 0 30 60 90
Date
Renewal Date
Signature
3-25-20
5-31-21
CA License 3602
AZ Registration 33915

LANDSCAPE ARCHITECT
Lake Forest, CA 92630
26482 Elmcrest Way
[email protected]
(949) 348-9150
L

ICENSED

LANDSCAPE ARCHITECT
STATE

OF CA L I FORN
IA
THOM
AS
H . KOCH
No
.36
02 1/8"=1'-0" 1/8"=1'-0" 1/8"=1'-0"VAN BUREN BLVD.RUTILE ST.SOUTH

PROPERTY LINE
LANE #2
LANE #1
LANE #3
LANE #4
LANE #2
LANE #1
LANE #3
LANE #4
LANE #2
LANE #1
LANE #3
LANE #4

W W W W W W W X X X X X X X
X
S
S
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW

PW PW PW PW PW PW PW

PARKING & SHADE AREAS

PROPOSED PLANT LEGEND
L4 4
Date
Renewal Date
Signature
3-25-20
5-31-21
CA License 3602
AZ Registration 33915

LANDSCAPE ARCHITECT
Lake Forest, CA 92630
26482 Elmcrest Way
[email protected]
(949) 348-9150
L

ICENSED

LANDSCAPE ARCHITECT
STATE

OF CA L I FORN
IA
THO
M
AS
H . KOCH
No
.3
6 02
1" = 60'
THK

CITY OF
JURUPA
Sheet of Sheets
Plan No.: Scale:

File No.:

ENGINEERING

DIVISION
Benchmark: Basis of Bearing
Drawn by:

TREE SHADING PLAN

JURUPA, CA
VAN BUREN BLVD.

Know what's below.
before you dig.Call
R
Date: 2/13/2019
18-070
CCS ZONE 6 FOR ELEVATION CCS ZONE 6 FOR BASIS OF BEARINGS Scale: 1" = 60'
60 0 60 120 180

SPLIT RAIL STYLE FENCE
N.T.S. COLOR / WHITE
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/24/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/24/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/24/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/23/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/26/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/25/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
4/10/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

VAN BUREN BLVD.,

JURUPA VALLEY, CA
VAN BUREN MARKETPLACE HEADY DESIGN INC.
7365 Carnelian St. Suite 233
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
DRAWING:

JOB NO:

DRAWN BY:

DATE:

SCALE:
3/30/2020
Drawing: S:\HDA Projects 2018\CMI-001 - Jurupa Valley\Drawings\2-Planning\CMI-001 SP_PHOTO SHEET.dwg ;PS1 Last Modified: Feb. 11, 19 - 12:22
User: DRAFTER2
DRAWING: Rev. # Date Revision DescriptionDocuments prepared by Heady Design Inc., including this document, are to be
used only for the specific project and
specific use for which they were intended.

Any extension of use to any other projects,
by owner or by any other party, without the
expressed written consent of Heady Design
Inc. is done unlawfully and at the users
own risk. If used in a way other than that
specifically intended, user will hold Heady
Design Inc. harmless from all claims and
losses.

JOB NO:

DRAWN BY:

DATE:

SCALE:

VAN BUREN BLVD

JURUPA VALLY, CA
NEW SERVICE STATION HEADY DESIGN INC.
7365 Carnelian St. Suite 239
Rancho Cucamonga, CA 91730
Phone: (909) 581-1202
Email: [email protected]
ATTACHMENT NO. 5
Previous Environmental Review Determination (3-23-2020)

Initial Study/Mitigated Negative
Declaration
Van Buren Marketplace

City of Jurupa Valley Master Application 19041

Conditional Use Permit No. 19003
Site Development Permit No. 20010

City of Jurupa Valley
8930 Limonite Avenue
Jurupa Valley, CA 92509
Contact: Rocio Lopez, Senior Planner
(951) 332-6464
[email protected]

Applicant:

Control Management Inc.

P.O. Box 7398
La Verne, CA 91750

March 23, 2020

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

i

TABLE OF CONTENTS

1.0 INTRODUCTION ............................................................................................................................................. 1

1.1 Purpose of the Initial Study ............................................................................................................................ 1

1.2 Purpose of a Mitigated Negative Declaration ......................................................................................... 1

1.3 Initial Study /Mitigated Negative Declaration Document .................................................................. 1

1.4 Public Review and Processing of the Document .................................................................................... 1

2.0 PROJECT BACKGROUND ............................................................................................................................. 3

2.1 Project Location ................................................................................................................................................... 4

2.2 Project Description ............................................................................................................................................. 4

2.3 Existing Site Conditions/Environmental Setting .................................................................................. 5

2.4 Existing General Plan/Zoning Designations ............................................................................................ 6

3.0 INITIAL STUDY CHECKLIST ...................................................................................................................... 9

3.1 AESTHETICS ..................................................................................................................................................... 14

3.2 AGRICULTURE AND FORESTRY RESOURCES .................................................................................... 18

3.3 AIR QUALITY .................................................................................................................................................... 22

3.4 BIOLOGICAL RESOURCES ............................................................................................................................ 33

3.5 CULTURAL RESOURCES .............................................................................................................................. 40

3.6 ENERGY .............................................................................................................................................................. 44

3.7 GEOLOGY AND SOILS ................................................................................................................................... 47

3.8 GREENHOUSE GAS EMISSIONS ................................................................................................................ 56

3.9 HAZARDS AND HAZARDOUS MATERIALS .......................................................................................... 60

3.10 HYDROLOGY AND WATER QUALITY .................................................................................................... 66

3.11 LAND USE AND PLANNING ....................................................................................................................... 73

3.12 MINERAL RESOURCES ................................................................................................................................ 75

3.13 NOISE .................................................................................................................................................................. 77

3.14 POPULATION AND HOUSING ................................................................................................................... 85

3.15 PUBLIC SERVICES........................................................................................................................................... 87

3.16 RECREATION ................................................................................................................................................... 92

3.17 TRANSPORTATION ........................................................................................................................................ 94

3.18 TRIBAL CULTURAL RESOURCES .......................................................................................................... 101

3.19 UTILITIES AND SERVICE SYSTEMS .................................................................................................... 103

3.20 WILDFIRE ...................................................................................................................................................... 112

3.21 MANDATORY FINDINGS OF SIGNIFICANCE ................................................................................... 113

4.0 REFERENCES ............................................................................................................................................. 116

5.0 REPORT PREPARATION PERSONNEL .............................................................................................. 117

6.0 MITIGATION MONITORING AND REPORTING PROGRAM ......................................................... M-1

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

ii

LIST OF EXHIBITS

Exhibit 1: Project Location Map/Aerial Photo............................................................................................................. 7 Exhibit 2: Site Plan ................................................................................................................................................................ .. 8 Exhibit 3: Operational Noise Levels ............................................................................................................................... 82

LIST OF TABLES

Table 1: Existing and Surrounding Land Uses ........................................................................................................... 5 Table 2: Existing and Surrounding General Plan and Zoning Designations/Classifications .................. 6 Table 3: Attainment Status of Criteria Pollutants in the South Coast Air Basin ........................................ 23 Table 4: South Coast Air Quality Management District Air Quality Significance Thresholds .............. 26 Table 5: Maximum Daily Peak Construction Emissions ....................................................................................... 27 Table 6: Maximum Daily Peak Operational Emissions ......................................................................................... 28 Table 7: Construction Localized Significance Threshold Emissions ............................................................... 29 Table 8: Operational Localized Significance Threshold Emissions ................................................................. 29 Table 9: Estimated Construction Electricity Usage ................................................................................................ 44 Table 10: Estimated Construction Fuel Consumption .......................................................................................... 45 Table 11: Estimated Construction Worker Fuel Consumption ......................................................................... 45 Table 12: Estimated Construction Vendor Fuel Consumption .......................................................................... 45 Table 13: Total Project Greenhouse Gas Emissions .............................................................................................. 57 Table 14: Typical Construction Noise Levels ........................................................................................................... 78 Table 15: Level of Service (LOS) Thresholds ............................................................................................................ 95 Table 16: Study Area Intersections .............................................................................................................................. 95 Table 17: Study Area Roadway Segments ................................................................................................................. 96 Table 18: Summary of Impacts at Study Area Intersections and Roadway Segments ........................... 97

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

iii

MASTER APPLICATION 19041 SUMMARY

Project Description: Commercial shopping center with an anchor market, sit-down restaurant, two (2) drive -thru restaurants, gas station with convenience store and a drive-thru car wash on a 16.2 acre site.

Project Location: Southeast corner of Van Buren Boulevard and Rutile Street. The Project site is also identified by the f ollowing Assessor Parcel Numbers: APNs: 167-330-006,010,015 and 167-110-039.

FINDINGS AND CONCLUSIONS

The Project would result in no impacts or less than significant impacts with implementation of Plans, Policies, Programs, or Project Design Fe atures to the environment under the following issue areas:

• Aesthetics
• Air Quality
• Agriculture and Forestry Resources
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Mineral Resources
• Population and Housing
• Public Services
• Recreation
• Transportation
• Wildfire

The Project would result in potentially significant impacts to the following issue areas, but the Project will incorporate mitigation measures that would avoid or mitigate effects to a point where clearly no significant environmental impacts on the environment would occur:

• Biological Resources
• Cultural Resources
• Geology and Soils (Paleontological Resources)
• Greenhouse Gas Emissions
• Noise
• Tribal Cultural Resources
• Utilities and Service Systems

Therefore, based on the finding s of the Initial Study , the City of Jurupa Valley determined that a Mitigated Negative Declaration is the appropriate CEQA determination for the Project pursuant to CEQA Guidelines § 15070(b).

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Introduction Page 1

1.0. INTRODUCTION

1.1 Purpose of an Initial Study

The California Environmental Quality Act (CEQA) requires that before a public agency makes a decision to approve a project that could have one or more adverse effects on the physical environment, the agency must inform itself about the project’s potential envir onmental impacts, give the public an opportunity to comment on the environmental issues, and take feasible measures to avoid or reduce potential harm to the physical environment.

The purpose of this Initial Study is to provide an analysis of a proposed action to determine whether a Negative Declaration, Mitigated Negative Declaration, or an Environmental Impact Report should be prepared for a pro ject. An Initial Study also enables an applicant or the City of Jurupa Valley to modify a project, mitigating adverse impacts in lieu of preparing an Environmental Impact Report, thereby potentially enabling the project to qualify for a Negative Declaration or a Mitigated Negative Declaration.

1.2 Purpose of a Mitigated Negative Declaration

A Mitigated Negative Declaration is a written statement by the City of Jurupa Valley that the Initial Study identified potentially significant environmental effects of the Project but the Project is revised or mitigation measures are required to eliminate or mitigate impacts to less than significant levels.

1.3 Initial Study/Mitigated Negative Declaration Document

This document in its entire ty is an Initial Study/Mitigated Negative Declaration prepared in accordance with the California Environmental Quality Act (CEQA), inc luding all criteria, standards, and procedures of CEQA (California Public Resource Code Section 21000 et seq.) and the CEQA Guidelines (California Code of Regulations, Title 14, Division 6, Chapter 3, Section 15000 et seq.).

1.4 Public Review and Processing of the Initial Study/Mitigated Negative Declaration

This Initial Study /Mitigated Negative Declaration and a Notice of Intent to adopt the Mitigated Negative Declaration was distributed to the following entities for a 20-day public review period:

1) Organizations and individuals who have previously requested such notice in writing to the City of Jurupa Valley;

2) Responsible and trustee agencies (public agencies that have a level of discretionary approval over some component of the proposed Project); and

3) The Riverside County Clerk.

The Notice of Intent also was noticed to the general public in the Riverside Press-Enterprise, which is a primary newspaper of circulation in the areas affected by the Project.

The Notice of Intent identifies the location(s) w here the Initial Study /Mitigated Negative Declaration and its associated Mitigation Monitoring Reporting Program and technical reports are

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Introduction Page 2

available for public review. During the 20 -day public review period, co mments on the adequacy of the Initial Study Checklist/Mitigated Negative Declaration document may be submitted to the City of Jurupa Valley Planning Department.

Following the 20 -day public review period, the City of Jurupa Valley Planning Department will review any comment letters received during the public review period to determine whether any substantive comments were provided that may warrant revisions or recirculatio n to the Initial Study/Mitigated Negative Declaration document. If recirculation is not required (as defined by CEQA Guidelines §15073.5(b)), written and/or oral responses will be provided to the decision making body for the Project (e.g. Planning Director, Planning Commission, or City Council).

At the conclusion of the public hearin g pr ocess, the decision making body will take action to approve, conditionally approve, or deny the proposed Project. If approved, the decision making body will adopt findings relative to the Project’s environmental effects as disclosed in the Initial Study /M itigated Negative Declaration and a Notice of Determination will be filed with the Riverside County Clerk.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Project Background Page 3

2.0 PROJECT BACKGROUND

2.1 Project Location

The City of Jurupa Valley covers approximately 43.5 square miles within the County of Riverside. The City is bordered by the City of Fontana and County of San Bernardino to the north, City of Norco and the City of Riverside to the south, City of Eastvale to the west, and City of Riverside and County of San Bernardino to the east. Specifically, the Pr oject is located on the southeast corner of Van Buren Boulevard and Rutile Street. The Project site is also identified by the f ollowing Assessor Parcel Numbers: APNs: 167-330-006,010,015 and 167-110-039.

2.2 Project Description

The Project Applicant,
Control Management Inc., submitted the following application s to the City of Jurupa Valley, which comprise the proposed Project: Conditional Use Permit (CU P) 19003 and Site Development Permit No. 20010 . The City of Jurupa Vall ey also refers to this application as Master Application (MA) No. 19041 . The Project’s application materials are on file with the City of Jurupa Valley Planning Department, 8930 Limonite Avenue, Jurupa Valley, CA 92509 and are hereby incorporated by reference.

The Project proposes a c ommercial shopping center with an anchor market, sit -down restaurant, two (2) drive -thru restaurants, gas station with convenience store and a drive- thru car wash on a

16.2 acre site. The building square footage is as follows:

Phase 1
• 3,456 sq. ft. gas station canopy with 12 fueling pumps. • 2,976 sq. ft. convenience store.
• 5,043 sq. ft. freestanding drive-thru car wash.
• 38,000 sq. ft. major anchor building. (Building 4).
• 7,650 sq. ft. restaurant (Building 5).

All off-site improvements to Van Buren Boulevard and Rutile Street will be constructed in Phase 1.

Phase 2
• 3,452 sq. ft. drive-thru restaurant (Building 1)
• 2,766 sq. ft. retail building with drive-thru component and 1,400 sq.ft. retail component. (Building 2)
• 13,590 sq. ft. combined retail area adjacent to the major anchor building (Buildings, 3, 6, and 7)
• 11,929 sq. ft. detached retail building (Building 8)
Total building square footage is 90,262 sq. ft.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Project Background Page 4

Site Improvements

The primary site improvements are described as follows:

Street Improvements and Access

Van Buren Boulevard and Rutile Street are both fully improved roadways that currently meet City standards. In addition, t he Project is proposing to construct one (1) new driveway approach each on both Van Buren Boulevard and Rutile Street.

Water and Wastewater Improvements

Water: The Project will connect to the existing 10-inch diameter water main in Rutile Street.

Sewer: The Project will connect to the existing 8-inch diameter sewer main at the intersection of Rutile Street and Woodbridge Lane.

Drainage Improvements

Currently the site drains from northwest to southeast at Van Buren Blvd. as overland flow. The site is bounded on 3 sides, 2 sides by streets on the west and northeast and the 3rd side the south by existing homes. Both of the streets will be improved as part of this project. On the south are existing homes will have a new wall constructed and a shallow landscaping / retention area to help desilt and clarify the water before it will be picked up by catch basins and convey ed to the underground detention basin. The area is designed for only 6” depth of water to allow for water to settle. At 6” in depth the water will flow into the catch basins. If the basins were to plug up, the water will get to a depth of 1’ before the wat er will overflow to the next basin and so on till it will eventually flow to the above ground detention basin in the southeast corner of the site. All of these basins are below the adjacent grade to the south to keep the water from flowing to the south and from the site. The wall along the south property line will keep the water from leaving the site and flowing to the south.

Operational Characteristics

The Project wo uld be operated as a commercial shopping center . As such, typical operational characteristics include employees and customers traveling to and from the site, delivery of merchandise and supplies to the site, and maintenance activities.

2.3 Existing Site Conditions/Environmental Setting

CEQA Guidelines §15125 establishes requirements for de fining the environmental setting to which the environmental effects of a proposed project must be compared. The environmental setting is defined as “…the physical environmental conditions in the vicinity of the project, as they exist at the time the Notice of Preparation is published, or if no Notice of Preparation is published, at the time the environmental analysis is commenced…” (CEQA Guidelines §15125[a]). A Notice of Preparation was not required at the t ime the Initial Study was commenced. Thus the e nvironmental setting for the Project is the approximate date that the Project’s Initial Study Checklist commenced in March, 2019.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Project Background Page 5

The 16.2 -acre site is triangular in shape and is located at the southeast corner of Van Buren Boulevard and Rutile Street. T he Site is located adjacent to residential developments to the south and west, Rutile Street followed by commercial development to the east, and Van Buren Boulevard followed by industrial development to the north. The site is bound by Van Buren Boulevard o n its northern boundary, Rutile Street on its western boundary, and residential developments on its southern boundary.

The Project site primarily consists of vacant, undeveloped land that has been subject to a variety of anthropogenic disturbances that was historically used for agricultural land uses. Due to existing land uses, no native plant communities or natural communities of special concern were observed on or adjacent to the project site. The Project site no longer is used for agricultural activities but has been subject to on -going weed abatement activities and disturbance associated with surrounding development and equestrian use (e.g., horse rings, trails).

The vegetation on -site can be characterized as a heavily disturbed land cover type that i s sparsely vegetated with a variety of non -native and early successional weedy plant species. Early successional and non-native weedy plant species compose a majority of the project site as a result of the on -going disking/weed abatement activities. Plant species observed on -site include Russian thistle (Salsola tragus), puncture vine ( Tribulus terrestris), sow thistle ( Sonchus oleraceus), London rocket ( Sisymbrium irio ), ragweed ( Ambrosia psilostachya ), wild oat ( Avena sp.), goldenbush (Isocoma menziesii), cheeseweed (Malva parviflora), pigweed (Chenopodium album), ripgut (Bromus diandrus), red brome ( Bromus madritensis ssp. rubens ), lambs quarters ( Chenopodium album), and silverleaf nighshade (Solanum elaeagnofolium).

Existing and surrounding land uses are shown in Table 1 and General Plan/Zoning designations are shown in Table 2

Table 1. Existing and Surrounding Land Uses
Location Existing Use
Site Vacant land

North Van Buren Blvd. followed by industrial development further to the north South Single-family residential development
East Single-family residential development

West

Rutile Street followed by commercial and residential development further to the west
Source: Field Inspection, March, 2019

2.4 Existing General Plan Land Use and Zoning Designations The Project site’s General Plan land use designation is CR (Commercial Retail). The Project’s zoning classification is C -P-S (Scenic Highway Commercial). A summary of the existing General Plan land use designations and zoning classifications for the Project site and surrounding properties is provided in Table 2.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Project Background Page 6

Table 2. Existing and Surrounding General Plan and Zoning Designations/Classifications Location General Plan Designation Zoning Classification Site

CR (Commercial Retail) C-P-S (Scenic Highway Commercial) North

BP (Business Park) M-SC Manufacturing-Service Commercial South LDR (Country Neighborhood)

R-1 One Family Dwellings
R-A Residential Agricultural
East

BP (Business Park)
LDR (Country Neighborhood)

M-SC Manufacturing-Service Commercial
R-A Residential Agricultural
West

CR Commercial Retail)
LDR (Country Neighborhood)
A-1 Light Agriculture
Source: City of Jurupa Valley-General Plan Land Use Map May, 2018

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Project Background Page 7

Exhibit 1: Project Location Map/Aerial Photo

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Project Background Page 8

Exhibit 2: Illustrative Site Plan

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Initial Study/Environmental Checklist Page 9

3.0 INITIAL STUDY CHECKLIST

Evaluation Format

This Initial Study Checklist has been prepared in compliance with the California Environmental Quality Act (CEQA) Guidelines. The Project is evaluated based on i ts potential effect on twenty-one (21) environmental factors categorized as follows, as well as Mandatory Findings of Significance:

1. Aesthetics 11. Land Use & Planning

2. Agriculture & Forestry Resources 12. Mineral Resources

3. Air Quality 13. Noise

4. Biological Resources 14. Population & Housing

5. Cultural Resources 15. Public Services

6. Energy 16. Recreation

7. Geology & Soils 17. Transportation

8. Greenhouse Gas Emissions 18. Tribal Cultural Resources

9. Hazards & Hazardous Materials 19. Utilities and Service Systems

10. Hydrology & Water Quality 20. Wildfire

21. Mandatory Findings of Significance

Each factor is analyzed by responding to a series of questions pertaining to the impact of the Project on the particular factor in the form of a checklist . This Initial Study provides a manner to analyze the impacts of the Project on each factor in order to determine the severity of the impact and determine if mitigation measures can be implemented to reduce the impact to less than signi ficant without having to prepare an Environmental Impact Report.

CEQA also requires Lead Agencies to evaluate potential environment al effects based to the fullest extent possible on scientific and factual data (CEQA Guidelines §15064[b]). A determination of whether or not a particular environmental impact will be significant must be based on substantial evidence, which includes facts, reasonable assumptions predicated upon facts, and expert opinion supported by facts (CEQA Guidelines §15064f[5]).

The effects of the Project are then placed in the following four categories, which are each followed by a summary to substantiate why the Project does not impact the particular factor with or without mitigation. If “Potentially Significant Impacts” that cannot be mitigated are determin ed, then the Project does not qualify for a Mitigated Negative Declaration and an Environmental Impact Report must be prepared:

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Initial Study/Environmental Checklist Page 10

Potentially
Significant Impact
Less Than Significant Impact
with Mitigation Incorporated
Less Than
Significant Impact
No Impact
Potentially significant
impact(s) have been
identified or anticipated
that cannot be mitigated
to a level of
insignificance. An
Environmental Impact
Report must therefore be
prepared.

Potentially significant impact(s)
have been identified or
anticipated, but mitigation is
possible to reduce impact(s) to a
less than significant category.

Mitigation measures must then
be identified.

No “significant”
impact(s) identified
or anticipated.

Therefore, no
mitigation is
necessary.

No impact(s)
identified or
anticipated.

Therefore, no
mitigation is
necessary.

Throughout the impact analysis in this Initial Study Checklist, reference is made to the following:

• Plans, Policies, Programs (PPP) − These include existing regulatory requirements such as plans, polici es, or programs applied to the Project based on the basis o f federal, state, or local law currently in place which effectively reduce environmental impacts. • Project Design Features (PDF) − These measures include features proposed by the Project that are already incorporated into the P roject’s design and are specifically intended to reduce or avoid impacts (e.g., water quality treatment basins). • Mitigation Measures (MM) − These measures include requirements that are imposed where the impact analysis determi nes that implementation of the proposed P roject would result in significant impacts. M itigation measures are proposed to reduce impacts to less than significant levels in accordance with the requirements of CEQA.

Plans, Policies, or Programs (PPP) and the Project Design Features (PDF) were assumed and accounted for in the assessment of impacts for each issue area if applicable.

Mitigation Measures (MM) were formulated only for those issue areas where the results of the impact analysis identified significant impacts that could to be reduced to less than significant levels.

All three types of measures described above may be required to be implemented as part of the Project, and will be included in the Mitigation Monitoring and Reporting Program for the Project

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Initial Study/Environmental Checklist Page 11

Environmental Factors Requiting Mitigation

The environmental factor s marked with an “X” below would be affected by this Project and thus require mitigation to reduce impacts to “less than significant ” as indicated by the checklist on the following pages.

Aesthetics
Agriculture and Forestry
Resources Air Quality
Biological Resources Cultural Resources Energy
Geology and Soils Greenhouse Gas Emissions
Hazards and Hazardous
Materials
Hydrology and Water
Quality

Land Use and Planning Mineral Resources
Noise Population and Housing Public Services
Recreation Transportation Tribal Cultural Resources

Utilities and Service
Systems

Wildfire
Mandatory Findings of
Significance

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Initial Study/Environmental Checklist Page 12

Determination

On the basis of this initial evaluation:

I find that the proposed use COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be recommended for adoption.

I find that although the proposal could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the Project have been made by or agreed to by the Project Applicant. A MITIGATED NEGATIVE DECLARATION will be recommended for adoption.

I find that the proposal MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.

I find that the proposal MAY have a significant ef fect(s) on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheet s, if the effect is a “potentially significant impact” or “potentially significant unless mitigated.” An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.

I find that although the proposed Project could have a significant effect on tyhe environment, because all potgentially significnat effect (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION, pursuant to all applicable standards, and (b) have been avoided or mitigated p ursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures are are imposed upon the proposed Project, nothing further is required.

City of Jurupa Valley
Signature Agency

Thomas G. Merrell, AICP, Planning Director March 23, 2020 Printed Name/Title Date

X

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Initial Study/Environmental Checklist Page 13

Appendices (Under Separate Cover or on Compact Disk)

A. Air Quality and Greenhouse Gas Impact Study, MD Acoustics, LLC, October 23, 2019.

B. Biological Resources Assessment and MSHCP Consistency Analysis, Jericho Systems, Inc., December 2018

C. Archaeological and Paleontological Assessment Report, Chambers Group, Inc., December 5, 2018

D. CEQA Energy Review, MD Acoustics, LLC, December 5, 2019

E. Updated Report of Soils and Foundation Evaluations, Soils Southwest Inc., December 10, 2019

F. Report of Water Infiltration Rate, Soils Southwest Inc., July 23, 2018.

G. Preliminary Hydrology Study, Marshall Engineering Group, February 27, 2020 H. Water Quality Management Plan, Marshall Engineering, January 13, 2019.

I. Phase I Environmental Site Assessment, efi global, August 5, 2018

J. Noise Impact Study, MD Acoustics, LLC, February 12, 2019.

K. Traffic Impact Analysis, TJW Engineering, Inc., March 19, 2020 L. Water and Sewer Availability Letter, Jurupa Community Services District, September 12, 2019.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Aesthetics Page 14

3.1 AESTHETICS

Would the Project:

Potentially
Significant
Impact
Less Than
Significant
Impact With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Have a substantial adverse effect on a scenic
vista? 

b. Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings within a
state scenic highway?

c. In non -urbanized areas, substantially
degrade the existing visual character or
quality of public views of the site and its
surroundings? (Public views are those that
are experienced from publicly accessible
vantage point). If the project is in an
urbanized area, would the project conflict
with applicable zoning and other regulations
governing scenic quality?

d. Create a new source of substantial light or
glare, which would adversely affect day or
nighttime views in the area?

3.1 (a) Have a substantial adverse effect on a scenic vista? Determination: Less Than Significant Impact.

Sources: General Plan, Google Earth, Project Application Materials

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impa cts related to scenic vistas. This measure will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.1-1
As required by Municipal Code Section 9.53.C , buildings shall not exceed fifty (50) feet unless a heigh t up to seventy -five (75) feet is approved pursuant to Section

9.240.370.

PPP 3.1-2 As required by the General Plan Land Use Element Table 2.4, the Floor Area Ratio (FAR) shall not exceed 0.35.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Aesthetics Page 15

Impact Analysis

The 16.2 -acre site is triangular in shape and is lo cated at the southeast corner of Van Buren Boulevard and Rutile Street. The s ite is located adjacent to residential developments to the south and west, commercial development to the east, and Van Buren Boulevard and industrial developments to the north. The Project site primarily consists of vacant, undeveloped land that has been subject to a variety of anthropogenic disturbances. According to the General Plan, scenic vistas are points or corridors that are accessible to the public and that provide a view o f scenic areas and/or landscapes. Given the existing site conditions, the Project site does not meet the criteria for a scenic vista.

A scenic vista in the Project vicinity are the Jurupa Mountains located approximately 1.5 miles northeast of the Project site. The public view vantage points for the Jurupa Mountains from the Project site are from Rutile Street traveling northbound.

Both building height and floor area ratio ( which is the measurement of the amount of non - residential building floor area divi ded by site area, in square feet ) serves to limit the lot coverage and the height o f buildings on the Project site, which in turn allows view corridors to scenic resources.

As r equired by PPP 3.1 -1, any building s proposed on the Project site are restricted to 50 feet in height and in no case higher than 75 feet unless a zoning variance is appr oved. As proposed, the highest proposed building height is 35-feet. As such, the Project will not exceed the maximum height allowed. As required by PPP 3.1 -2, maximum floor area ratio allowed is 0.35. The proposed Project has a floor area ratio of 11.5. As such, the Project will not exceed the maximum floor area ratio allowed

Based on the analysis above, development of the Project will not block or completely obstruct views from surrounding public vantage p oints to the Jurupa Mountains visible in the horizon under existing conditions. Impacts to scenic vista are less than significant.

3.1 (b) Substantially damage scenic resources, including, but not limited to, tree s, rock outcroppings, and historic buildings within a state scenic highway? Determination: No Impact.

Sources: California Department of Transportation “Scenic Highway Program Eligible and Officially Designated Routes,” General Plan, General Plan Figure 4.23, Google Earth.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis
California's Scenic Highway Program was created by the Legislature in 1963. Its purpose is to protect and enhance the natural scenic beauty of California highways and adjacent corridors, MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Aesthetics Page 16

through special conservation treatment. The state laws governing the Scenic Highway Program are found in the Streets and Highways Code, Sections 260 through 263.

According to the California Department of Transportation, the Project site is not located within a State Scenic Highway. As such, there is no impact. In addition, according to General Plan Figure 4 - 23: Jurupa Valley Scenic Corridors and Roadways, the Project site is not located within or adjacent to a scenic corridor or roadway.

3.1 (c) In non- urbanized areas, substantially degrade the exi sting visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zon ing and other regulations governing scenic quality?
Determination: Less Than Significant Impact.

Sources: Project Application Materials, General Plan, Municipal Code...

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

According to the Census 2010 Urbanized Area Outline Maps, the P roject site is l ocated in the Riverside-San Bernardino, CA Urbanized Area. As such, the Project is subject to applicable General Plan and zoning regulations governing scenic quality. General Plan Policy COS -9.3 requires that urban development implement the aesthetic princ iples for design context, utilities and signs, streetscapes and major roadways and G eneral Plan Policy COS 9 requires the consideration of the effects of new development, streets and road construction, grading and earthwork, and utilities on views and vis ual quality. In addition, the Project is subject to the development standards required by Municipal Code Section 9.4 for the C-P-S zone and the City’s design standards . Through the Site Development Permit (SDP) review process, the Project has been determi ned to be in c ompliance with these mandatory General Plan and Municipal Code requirements.

Based on the analysis above, the Project will not degrade the existing visual character or quality of public views of the site and its surroundings and impacts are less than significant and no mitigation measures are required.

3.1 (d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Determination: Less Than Significant Impact.

Sources: Project Application Materials.

Plans, Policies, or Programs (PPP)

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Aesthetics Page 17

The following apply to the Project and would help reduce impacts related to light and glare. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.1-3 All outdoor lighting shall be designed and installed to comply with California Green Building Standard Code Section 5.106 or with a local ordinance lawfully enacted pursuant to California Green Building Standard Code Section 101.7, whi chever is more stringent.

Project Design Features (PDF)
PDF 3.1-1 As required by the building elevations submitted as part of the application materials for MA 19041, the primary exterior of the proposed building s will consist of stucco exterior with batten boards, decorative stone, and tempered glass with glazing.

Impact Analysis
The Project would increase the amount of light in the area above what is being generated by the vacant site by directly adding new sources of illumination including security and decorative lighting for the proposed buildings . With implementation of PPP 3.1 -3 and PDF 3.1 -1, impacts relating to light and glare are less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Agriculture and Forestry Resources Page 18

3.2 AGRICULTURE AND FORESTRY RESOURCES

In determining whether impacts to agricultural
resources are significant environmental effects,
lead agencies may refer to the California
Agricultural Land Evaluation and Site Assessment
Model (1997) prepared by the California
Department of Conservation as an optional model
to use in assessing impacts on agr iculture and
farmland. In determining whether impacts to
forest resources, including timberland, are
significant environmental effects, lead agencies
may refer to information compiled by the
California Department of Forestry and Fire
Protection regarding the state’s inventory of forest
land, including the Forest and Range Assessment
Project and the Forest Legacy Assessment Project;
and forest carbon measurement methodology
provided in Forest Protocols adopted by the
California Air Resources Board. Would th e
Project:

Potentially
Significant
Impact
Less Than
Significant
Impact With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland),
as shown on the maps pre pared pursuant to the
Farmland Mapping and Monitoring Program of
the California Resources Agency, to non -
agricultural use?

b. Conflict with existing zoning for agricultural use,
or a Williamson Act contract? 
c. Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code section 12220(g)), timberland
(as defined by Public Resources Code section
4526), or timberland zoned Timberland
Production (as defined by Government Code
section 51104(g))?

d. Result in the loss of forest land or conversion of
forest land to non-forest use? 
e. Involve other changes in the existing
environment which, due to their location or
nature, could result in conversion of Farmland,
to non -agricultural use or conversion o f forest
land to non-forest use?

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Agriculture and Forestry Resources Page 19

3.2 (a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? .

Determination: No Impact
Sources: California Department of Conservation “Farmland Mapping and Monitoring Program.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

The Project site does not contain any lands designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance as mapped by the State Department of Conservation Farmland Mapping and Monitoring Program. The Project site is classified as “ Urban Built -Up Land ” by the State Department of Conservation Farmland Mapping and Monitoring Program. As such, the Project has no potential to convert such lands to a non-agricultural use and no impact would occur.

3.2 (b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? Determination: No Impact.

Sources: General Plan Land Use Map, Zoning Map.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

Agricultural Zoning

The Project site is zoned C-P-S (Scenic Highway Commercial) which allows a variety of commercial uses. The C- P-S Zone is not considered a primary agricultural zone. As such, the Project would not conflict with existing zoning for agricultural use.

Williamson Act

Pursuant to the California Land Conservation Act of 1965, a Williamson Act Contract enables private landowners to voluntarily enter into contracts with local governments for the purpose of restricting specific parcels of land to agricultural or related open spa ce use. In return, landowners receive lower property tax assessments based upon farming and open space uses as opposed to full MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Agriculture and Forestry Resources Page 20

market value. According to the Riverside Coun ty Map My County website , the site is not under a Williamson Act Contract. As such, there is no impact.

3.2 (c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Productio n (as defined by Government Code section 51104(g)?
Determination: No Impact.

Sources: General Plan Land Use Map, Zoning Map.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

The Project site is zoned C -P-S (Scenic Highway Commercial). The Project site does not contain any forest lands, timberland, or timberland zoned as Timberland Production, nor are any forest lands or timberlands located on or nearby the Project site. Because no lands on the Project site are zoned for forestland or timberland, the Project has no potential to impact such zoning . Therefore, no impact would occur.

3.2 (d) Result in the loss of forest land or conversion of forest land to non-forest use? Determination: No Impact.

Source: Field Survey.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

The Project site and surrounding properties do not contain forest land s, are not zoned for forest lands, nor are they identified as containing forest resources by the General Plan . Because forest land is not present on the Project site or in the immediate vicinity of the Project site, the Project has no potential to result in the loss of forest land or the conversion of forest land to non -forest use.

Therefore, no impact would occur.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Agriculture and Forestry Resources Page 21

3.2 (e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? Determination: No Impact.

Sources: California Department of Conservation.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

The Farmland Mapping and Monitoring Program classifies the Project site as “ Urban Built -Up Lands.” There is no land being used primarily for agricultural purposes in the vicinity of the site.

The 16.2 -acre site is triangular in shape and is located at the southeast corner of Van Buren Boulevard and Rutile Street. The site is bound by Van Buren Boulevard on its northern boundary, Rutile Street on its western boundary, and residential developments on its southern boundary. The Project site primarily consists of vacant, undeveloped land that has been subject to a variety of anthropogenic disturbances . In addition, the Project site is pla nned for comme rcial uses by the General Plan and this type of development has been anticipated for the Project site.

Based on the analysis above, the Project would not result in conversion of Farmland to non- agricultural use and no impacts would occur.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 22

3.3 AIR QUALITY

Where available, the significance criteria
established by the applicable air quality
management or air pollution control district may
be relied upon to make the following
determinations. Would the Project:

Potentially
Significant
Impact
Less Than
Significant
Impact With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Conflict with or obstruct implementation of the
applicable air quality plan? 
b. Violate any air quality standard or contribute
substantially to an existing or pro jected air
quality violation?

c. Result in a cumulatively considerable net
increase of any criteria pollutant for which the
project region is non -attainment under an
applicable federal or state ambient air quality
standard (including releasing emissio ns which
exceed quantitative thresholds for ozone
precursors)?

d. Expose sensitive receptors to substantial
pollutant concentrations? 
e. Create objectionable odors affecting a
substantial number of people? 

3.3 (a) Conflict with or obstruct implementation of the applicable air quality plan (South Coast Air Quality Management District)?
Determination: Less Than Significant Impact.

Source: Air Quality and Greenhouse Gas Impact Study (Appendix A).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

Federal Air Quality Standards

Under the Federal Clean Air Act, the Federal Environmental Protection Agency establishes health - based air quality standards that California must achieve. These are called “national (or federal) ambient air quality standards” and they apply to what are called “cr iteria pollutants.” Ambient (i.e. surrounding) air quality standard establish a concentration above which a criteria pollutant is known to cause adverse health effects to people. The national ambient air quality standards apply to the following criteria pollutants:

• Ozone (8-hour standard)
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 23

• Respirable Particulate Matter (PM10)
• Fine Particulate Matter (PM2.5)
• Carbon Monoxide (CO)
• Nitrogen Dioxide (NOx)
• Sulphur Dioxide (SO2), and
• Lead.

State Air Quality Standards

Under the California Clean Air Act, the Ca lifornia Air Resources Board also establishes health-based air quality standards that cities and counties must meet. These are called “state ambient air quality standards” and they apply to the following criteria pollutants:

• Ozone (1-hour standard)
• Ozone (8-hour standard)
• Respirable Particulate Matter (PM
10)
• Fine Particulate Matter (PM2.5)
• Carbon Monoxide (CO)
• Nitrogen Dioxide (NOx)
• Sulphur Dioxide (SO2), and
• Lead

Regional Air Quality Standards

The City of Jurupa Valley is located within the South Coa st Air Basin which is under the jurisdiction of the South Coast Air Quality Management District. The District develops plans and regulations designed to achieve these both the national and state ambient air quality standards described above.

Attainment Designation

An “attainment” designation for an area signifies that criteria pollutant concentrations did not exceed the established standard. In contrast to attainment, a “nonattainment” designation indicates that a criteria pollutant concentration has exceeded the established standard.

Table 3 shows the attainment status of criteria pollutants in the South Coast Air Basin.

Table 3. Attainment Status of Criteria Pollutants in the South Coast Air Basin.

Criteria Pollutant State Designation Federal Designation Ozone – 1 hour standard Nonattainment No Standard
Ozone – 8 hour standard Nonattainment Nonattainment
Respirable Particulate Matter (PM10) Nonattainment Attainment Fine Particulate Matter (PM2.5) Nonattainment Nonattainment Carbon Monoxide (CO) Attainment Attainment
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 24

Criteria Pollutant State Designation Federal Designation Nitrogen Dioxide (N0x) Attainment Attainment
Sulfur Dioxide (SO2) Attainment Attainment
Lead Attainment Attainment
Source: California Air Resources Board, 2015
Air Quality Management Plan
The South Coast Air Quality Management District is required to produce air quality management plans directing how the South Coast Air Basin’s air quality will be brought into attainment with the national and state ambient air quality standards. The most recent air quality management plan is 2016 Air Quality Management Plan and it is applicable to City of Jurupa Valley. The purpose of the 2016 Air Quality Management Plan is to achieve and maintain both the national and state ambient air quality standards described above.

In order to determine if a p roject is consistent with the 2016 Air Quality Management Plan , the South Coast Air Quality Management District has established consistency criterion which are defined in Chapter 12, Sections 12.2 and 12.3 of the South Coast Air Quality Management District ’s CEQA Air Quality Handbook and are discussed below.

Consistency Criterion No. 1: The proposed project will not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations, or delay the ti mely attainment of air quality standards or the interim emissions reductions specified in the 2016 Air Quality Management Plan.

Consistency Criterion No. 1 refers to violations of the California Ambient Air Quality Standards and National Ambient Air Qualit y Standards. As evaluated under Issues 3.3 (b), (c), and (d) below, the air emissions from construction or operation would not exceed regional or localized significance thresholds for any criteria pollutant. Accordingly, the Project’s regional and localize d emissions would not contribute substantially to an existing or potential future air quality violation or delay the attainment of air quality standards.

Consistency Criterion No. 2: The proposed project will not ex ceed the assumptions in the 2016 Air Quality Management Plan.

The 2016 Air Quality Management Plan demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth projections from local general plans adopted by cities in th e district are provided to the Southern California Association of Governments (SCAG), which develops regional growth forecasts, which are then used to develop future air quality forecasts for the AQMP.

The General Plan Land Use Designation current ly assi gned to the Project site is CR (Commercial Retail). The future emission forecasts contained in the 2016 Air Quality Management Plan are primarily based on demographic and economic growth projections provided by the Southern California Association of Gover nments. The Project site was planned for commercial development MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 25

at the time the 2016 Air Quality Management Plan adopted. Therefore, the Project will not exceed the growth forecast estimates used in the 2016 Air Quality Management Plan.

For the reasons sta ted above, the Project would not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations, delay the timely attainment of air quality standards or the interim emissions reductions specif ied in the 2016 Air Quality Management Plan. In addition, the Project would not exceed the growth assumptions in the 2016 Air Quality Management Plan . As such, the Project would be consistent with the 2016 Air Quality Management Plan and impacts would be l ess than significant and no mitigation measures are required.

3.3(b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation?
Determination: Less Than Significant Impact.

Source: Air Quality and Greenhouse Gas Impact Study (Appendix A).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts related to air quality violations. These measures will be included in the Project’s Mitigation Monitoring and Reporting P rogram to ensure compliance:

PPP 3.3-1 The Project is required to comply with the provisions of South Coast Air Quality Management District Rule 403, “Fugitive Dust.” Rule 403 requires implementation of best available dust control measures during construction activities that generate fugitive dust, such as earth moving and stockpiling activities, grading, and equipment travel on unpaved roads.

PPP 3.3-2 The Project is required to comply with the provisions of South Coast Air Quality Management District Ru le 1113 , “Architectural Coatings ” Rule 1113 limits the release of volatile organic compounds (VOCs) into the atmosphere during painting and application of other surface coatings.

PPP 3.3-3 The Project is required to comply with the provisions of South Co ast Air Quality Management District Rule 1186 “PM
10 Emissions from Paved and Unpaved Roads and
Livestock Operations” Adherence to Rule 1186 reduces the release of criteria pollutant emissions into the atmosphere during construction.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

As shown in Table 3 above, the South Coast Air Basin, in which the Project site is located, is considered to be in “non-attainment” status for several criteria pollutants.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 26

The South Coast Air Quality Management District has developed regional and localized significance thresholds for regulated pollutants. Any project in the South Coast Air Basin with daily emissions that exceed any of the indi cated regional or localized significance thresholds would be considered to contribute to a projected air quality violation. The Project’s regional and localized air quality impacts are discussed below.

Regional Impact Analysis
The Project has the poten tial to generate pollutant concentrations during both construction activities and long -term operation. The following provides an analysis based on the applicable regional significance thresholds established by the South Coast Air Quality Management District in order to meet national and state air quality standards which are shown in Table 4 below.

Table 4. South Coast Air Quality Management District Air Quality Regional Significance Thresholds
Pollutant Emissions (Construction)
(pounds/day)
Emissions (Operational)
(pounds/day)
NOx 100 55
VOC 75 55
PM10 150 150
PM2.5 55 55
SOx 150 150
CO 550 550
Source: South Coast Air Quality Management District CEQA Air Quality Significance Thresholds (2009)

Both construction and operational emissions for the Project were estimated by using the California Emissions Estimator Model (CalEEMod) which is a statewide land use emissions computer model designed to provide a uniform platform for government agencies to quantify potential criteria pollutant emissions associated with both construction and operations from a variety of land use projects. The model can be used for a variety of situations where an air quality analysis is necessary or desirable such as California Environmental Quality Act (CEQA) documents and is authorized for use by the South Coast Air Quality Management District.

Construction Related Impacts

It w as assumed that during construction activities that heavy construction equipment would be operating at the Project site for eight hours per day, fi ve days per week . It is mandato ry for all construction activities to comply with several S outh Coast Air Quality Management District Rules, including Rule 403 for controlling fugitive dust, PM
10, and PM 2.5 emissions from construction
activities. Rule 403 requirements include, but are not limited to, applying water in sufficient quantities to prevent the generation of visible dust plumes, applying soil binders to uncovered areas, reestablishing ground cover as quickly as possible, utilizing a wheel washing system to remove bulk material from tires and vehicle undercarriages b efore vehicles exit t he Project site, covering all trucks hauling soil with a fabric cover and maintaining a freeboard height of 12 inches, MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 27

and maintaining effective cover over exposed areas. Compliance with Rule 403 was accounted for in the construction emissions modeling.

Implementation of South Coast Air Quality Management District Rule 1113 governing the content in architectural coating, paint, thinners, and solvents, was accounted for in the construction emissions modeling. Implementation of South Coast Air Quality Manag ement District Rule 1186 to reduce the amount of particulate matter entrained in the ambient air as a result of vehicular travel on paved and unpaved public roads was also accounted for in the construction emissions modeling. These South Coast Air Quality Management District Rule Rules are included as PPP 3.3 -1 through PPP 3.3-

3. Short-term criteria pollutant emissions will occur during site grading, building construction, paving, and architectural coating activities. Emissions will occur from use of equi pment, worker, vendor, and hauling trips, and disturbance of onsite soils (fugitive dust). The estimated maximum daily construction emissions are summarized in Table 5 below. Emissions resulting from the Project construction would not exceed numerical th resholds established by the SCAQMD and therefore no mitigation is required.

Table 5. Maximum Daily Peak Construction Emissions (lbs/day) Source ROG (VOC) NOX CO SOx PM10 PM2.5
Maximum Daily Emissions 59.90 51.19 52.55 0.12 6.99 3.40 Threshold 75 100 550 150 150 55
Significant? No No No No No No
Source: Air Quality and Greenhouse Gas Impact Study (Appendix A).

Based on the analysis above, regional air quality impacts for construction would be less than significant and no mitigation measures are required.

Long-Term Regional Operation Related Impacts
Long-term criteria air pollutant emissions will result from the operation of the commercial facility portion of the Project site. Long-term emissions are categorized as area source emissions, energy demand emissions, and operational emissions. Operational emissions will result from automobile, truck, and other vehicle sources associated with daily trips to and from the commercial facility portion of the Project site. Area source emissions are the combination of many small emission sources that include use of outdoor landscape maintenance equipment, use of consumer products such as cleaning products, and periodic repainting of the proposed commercial facility. Energy demand emissions result from use of electricity and natural gas.

The results of the CalEEMod model for operation of the Project site are summarized in Table 6 below (Maximum Operational Daily Emissions). Based on the results of the model, operational emissions associated with operation the commer cial facility portion of the P roject site will not exceed the thresholds established by SCAQMD.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 28

Table 6.Maximum Daily Peak Operational Daily Emissions (lbs/day) Source ROG
(VOC) NOX CO SOx PM10 PM2.5
Operational Emissions 12.78 43.56 78.11 0.20 14.84 4.18 Threshold 55 55 550 150 150 55
Significant? No No No No No No
Source: Air Quality and Greenhouse Gas Impact Study (Appendix A).

Note: Assumes compliance with mandatory SCAQMD rules

Based on the analysis above, regional air quality impacts for opera tions would be less than significant and no mitigation measures are required.

Localized Impact Analysis

As part of the South Coast Air Quality Management District’s environmental justice program, attention has been focusing more on the localized effects of air quality. Although the region may be in attainment for a particular criteria pollutant, localized emissions from construction and operational activities coupled with ambient pollutant levels can cause localized increases in criteria pollutant that e xceed national and/or State air quality standards. The South Coast Air Quality Management District has established Localized Significance Thresholds (LST) which were developed in response to environmental justice and health concerns raised by the public regarding exposure of individuals to criteria pollutants in local communities.

Localized Significance Thresholds are only applicable to the following criteria pollutants: oxides of nitrogen (NO
X), carbon monoxide (CO), particulate matter less than 10 micro ns in aerodynamic diameter (PM 10) and particulate matter less than 2.5 microns in aerodynamic diameter (PM2.5). Localized Significance Threshold’s represent the maximum emissions from a project that are not expected to cause or contribute to an exceedance of the most stringent applicable national or state ambient air quality standard, and are developed based on the ambient concentrations of that pollutant for each source receptor area and distance to the nearest sensitive receptor.

Construction-Related Localized Emissions
Construction localized impacts were evaluated pursuant to the South Coast Air Quality Management District’s Final Localized Significance Thresholds Methodology for the Project site. This methodology provides screening tables fo r one through five acre project construction scenarios, depending on the amount of site disturbance during a day. Maximum daily oxides of nitrogen (NOX), carbon monoxide (CO), and particulate matter (PM 10 and PM 2.5) emissions will occur du ring building con struction, grading , and paving of parking lots and drive aisles. Table 7 below (Construction Localized Significance Threshold Analysis) summarize on -site emissions as compared to the local screening thresholds established for Source Receptor Area (SRA) 23 (Metropolitan Riverside/Mira Loma) at 25 meters from the closest residential receptor located adjacent to the southern boundary of the Project site. Emissions resulting from construction would not exceed LST numerical thresholds established by the SCAQMD and no mitigation is required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 29

Table 7.

Construction Localized Significance Threshold Emissions (lbs/day) Phase NOX CO PM10 PM2.5
Maximum Daily Emissions 36.83 33.65 13 2.02
Threshold 270 1,577 13 8
Significant? No No No No
Source: Air Quality and Greenhouse Gas Impact Analysis (Appendix A).

Operational-Related Localized Emissions
On-site operational activities can result in localized increases in criteria pollutant levels that can cause air quality standards to be exceed even if standards are not exceeded on a regional level. On - site area and energy sources were evaluated. As shown in Table 8, emis sions result ing from the Project would not exceed LST numerical thresholds established by the SCAQMD and no mitigation is required.

Table 8.

Operational Localized Significance Threshold Emissions (lbs/day).

Phase NOX CO PM10 PM2.5
Maximum Daily Emissions 5.37 8.72 1.56 0.50
Threshold 270 1,577 4 2
Potentially Substantial? No No No No
Source: Air Quality and Greenhouse Gas Impact Analysis (Appendix A).

CO Hot Spots
CO Hot Spots are typically associated with idling vehicles at extremely busy intersections (i.e., intersections with an excess of 100,000 vehicle trips per day). There are no intersections in the vicinity of the Project site which exceed t he 100,000 vehicle per day threshold typically associated with CO Hot Spots. In addition, the South Coast Air Basin has been designated as an attainment area for CO since 2007. Therefore, Project ‐related vehicular emissions would not create a Hot Spot and would not substantially contribute to an existing or projected CO Hot Spot.

Based on the analysis above, impacts would be less than significant and no mitigation measures are required.

3.3(c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non- attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)?
Determination: Less Than Significant Impact.

Source: Air Quality and Greenhouse Gas Impact Analysis (Appendix A).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts related to a cumulatively considerable net increase of any criteria pollutant . These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 30

(Refer to PPP 3.3.1 through PPP 3.3-3 under Issue 3.3(b) above).

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

According to the SCAQMD, individual projects that do not generate operational or construction emissions that exceed the SCAQMD’s recomm ended daily thresholds for project specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which the Basin is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project -related construction and operational emissions that exceed SCAQMD thresholds for project -specific impacts would be considered cumulatively considerable.

As discussed in Issue 3.3(b) above, the Project would not exceed the regional or localized significance thresholds for construction or operational activities. As such, the Project will not result in a cumulatively considerable net increase of any criteria pollutant.

Based on the analysis above, impacts would be less than significant.

3.3(d) Expose sensitive receptors to substantial pollutant concentrations? Determination: Less Than Significant Impact.

Source: Air Quality and Greenhouse Gas Impact Analysis (Appendix A).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts related to a cumulatively considerable net increase of any criteria pollutant . These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

(Refer to PPP 3.3.1 through PPP 3.3-3 under Issue 3.3(b) above).

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

Sensitive receptors (i.e., children, senior citize ns, and acutely or chronically ill people) are more susceptible to the effects of air pollution than the general population. Land uses that are considered sensitive receptors typically include residences, schools, playgrounds, childcare centers, hospitals, convalescent homes, and retirement homes. The closest sensitive receptors in the vicinity of the Project site are the single-family residences adjacent to the southern and western boundaries of the Project site.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 31

As shown on Table 8 above under the discu ssion of Issue 3.3 (b), the Project would not exceed any of the South Coast Air Quality Management District’s Localized Significance Thresholds during near- term construction or long-term operation. In addition, the Project would not create a CO Hot Spot.

Accordingly, Project-related localized emissions would not expose sensitive receptors to substantial pollutant concentrations during construction or long -term operation and impacts would be less than significant.

Fueling Stations

A cancer risk analysis was prepared using the Emission Inventory and Risk Assessment Guidelines for Gasoline Service Stations promulgated by the South Coast Air Quality Management District (SCAQMD). The purpose of the following analysis is to estimate cancer risks from retail gas oline dispensing facilities. The analysis is consistent with (1) SCAQMD’s risk assessment procedures for Rule 1401 and (2) California Air Pollution Control Officer Association (CAPCOA) risk assessment guidance for gasoline service stations.

Emissions from gasoline transfer and dispensing mainly occur during loading, breathing, refueling, and spillage as described below:

• Loading – Emissions occur when a fuel tanker truck unloads gasoline to the storage tanks.

The storage tank vapors, displaced during load ing, are emitted through its vent pipe. A pressure/vacuum valve installed on the tank vent pipe significantly reduces these emissions.

• Breathing – Emissions occur through the storage tank vent pipe as a result of temperature and pressure changes in the tank vapor space.

• Refueling – Emissions occur during motor vehicle refueling when gasoline vapors escape through the vehicle/nozzle interface.

• Spillage – Emissions occur from evaporating gasoline that spills during vehicle refueling.

All retail service stations under SCAQMD jurisdiction have Phase I and II vapor recovery systems to control gasoline emissions. Phase I vapor recovery refers to the collection of gasoline vapors displaced from storage tanks when cargo tank trucks make gasoline deliveries. Phase II vapor recovery systems control the vapors displaced from the vehicle fuel tanks during refueling. In addition, all gasoline is stored underground with valves installed on the tank vent pipes to further control gasoline emissions.

The California A ir Resources Board (CARB ) and the California Air Pollution Control Officers Association (CAPCOA) recommend a 50 -foot separation between gas stations and sensitive receptors; therefore, the approximately 275 -foot separation from the single -family residentia l dwelling units to the west and approximately 610 -foot separation from the southern property line to the fueling pumps is more than adequate.

The Emission Inventory and Risk Assessment Guidelines for Gasoline Service Stations show that the Maximum Indiv idual Cancer Risk at residential receptors 25 meters (the tanks and pumps are located further away @ approximately 84 meters) from the fuel source would not exceed 4.141 in a million (per 1,000,000 gallons of through put); which is a reasonable assumption given the size of MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Air Quality Page 32

the Project and number of pumps). The proposed project is estimated to have approximately 1.87 MM gallons of through put per year which equates to an ap proximate 1.72 in a million cancer risk , at a distance of approximately 75 meters. The risk is below SCAQMD’s 10 in a million threshold.

Based on the preceding analysis, the facility has a Maximum Individual Cancer Risk of 1.72 per million which is less than the screening threshold of 10 per million. Therefore, the fueling station portion of the Project will not expose sensitive receptors to substantial pollutant concentrations.

3.3 (e) Create objectionable odors affecting a substantial number of people? Determination: Less Than Significant Impact.

Source: CEQA Air Quality Handbook, Project Application Materials.

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts related to objectionable odors.

These measures will be included in the Project’s Mitigation Monitoring and Reporting Program:

PPP 3.3-4 The Project is required to comply with the provisions of South Coast Air Quality Management District Rule 402 “ Nuisance.” Adherence to Rule 402 reduces the release of odorous emissions into the atmosphere.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

According to the South Coast Air Quality Management District CEQA Air Quality Handbook, land uses associated with odor complaints typically include agricultural u ses, wastewater treatment plants, food processing plants, chemical plants, composting, refineries, landfills, dairies, and fiberglass molding. The Project does not propose any of the above described uses.

Potential odor sources associated with the propose d Project may result from construction equipment exhaust and the application of asphalt and architectural coatings during construction activities and the temporary storage of typical solid waste (refuse) associated with the proposed Project’s (long -term op erational) uses. The construction odor emissions would be temporary, short-term, and intermittent in nature and would cease upon completion of the respective phase of construction and is thus considered less than significant. It is expected that Project -generated refuse would be stored in covered containers and removed at regular intervals in compliance with the City’s solid waste regulations. The proposed Project would also be required to comply with PPP

3.3-4 to prevent occurrences of public nuisances. Th erefore, odors associated with the proposed Project construction and operations would be less than significant and no mitigation is required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Biological Resources Page 33

3.4 BIOLOGICAL RESOURCES

Would the Project:

Potentially
Significant
Impact
Less Than
Significant
Impact With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Have a substantial adverse effect, either directly
or through habitat modifications, on any
species identified as a candidate, sensitive, or
special status species in local or regional pl ans,
policies, or regulations, or by the California
Department of Fish and Game or U.S. Fish and
Wildlife Service?

b. Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional plans,
policies, regulations or by the California
Department of Fish and Game or U.S. Fish and
Wildlife Service?

c. Have a substantial adverse effect on federally
protected (including, but not limited to, marsh,
vernal pool, coastal, etc.) through direct
removal, filling, hydrological interruption, or
other means?

d. Interfere substantially with the movement of
any native resident or migratory fish or wildlife
species or with established native resident or
migratory wildlife corridors, or impede the use
of native wildlife nursery sites?

e. Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?

f. Conflict with the provisions of an adopted
Habitat Conservation Plan, Natura l Community
Conservation Plan, or other approved local,
regional, or state habitat conservation plan?

3.4(a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
Determination: No Impact.

Source: Biological Resources Assessment and MSHCP Consistency Analysis, Report (Appendix B).

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Biological Resources Page 34

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts related to impacts to candidate, sensitive, or special status species . This measure will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.4-1 The Project is required to pay mitigation fees pursuant to the Western Riverside County Multiple Species Habitat Conservation Plan (MHSCP) as required by Municipal Code Chapter 3.80.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

Existing Conditions

The Project site primarily consists of vacant, undeveloped land that has been subject to a variety of anthropogenic disturbances that was historically used for agricultural land uses. Due to existing land uses, no native plant communities or natural communities of special concern were observed on or adjacent to the Project site. The Project site no longer is used for agricultural activities but has been subject to on -going weed abatement activities and disturbance associated with surrounding development and equestrian use (e.g., horse rings, trails).

The vegetation on -site can be characterized as a heavily disturbed land cover type that is sparsely vegetated with a variety of non -native and early successional weedy plant species. Early successional and non-native weedy plant species compose a majority of the project site as a result of the on -going disking/weed abatement activities. Plant species observed on -site include Russian thistle (Salsola tragus), puncture vine ( Tribulus terrestris), sow thistle ( Sonchus oleraceus), London rocket ( Sisymbrium irio ), ragweed ( Ambrosia psilostachya ), wild oat ( Avena sp.), goldenbush (Isocoma menziesii), cheeseweed (Malva parviflora), pigweed (Chenopodium album), ripgut (Bromus diandrus), red brome ( Bromus madritensis ssp. rubens ), lambs quarters ( Chenopodium album), and silverleaf nighshade (Solanum elaeagnofolium).

Sensitive Species

Based on the propo sed P roject footprint and existing site conditions, none of the special -status plant or wildlife species known to occur in the general vicinity of the P roject site are expected to be directly or indirectly impacted from impl ementation of the proposed P roject except for the Burrowing Owl (BUOW).

Burrowing Owl

Per the literature review, the most recent documented BUOW occurrence is located approximately 2 miles southwest of the Project site near Limonite Avenue and the Santa Ana River. The closest documented BUOW occurrence is located approximately 0.7-mile northwest of the Project site.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Biological Resources Page 35

Despite a systematic search of the Project site, no BUOWs or sign (pellets, feathers, castings, or white wash) were observed on the Projec t site during the habitat assessment. The majority of the Project site does not support suitable burrows of appropriate size (greater than 4 inches in diameter), aspect or shape. No BUOW individuals were observed. Although approximately four to six California ground squirrel burrows were observed in a small portion of the northwest corner of the Project site, the burrows were occupied by ground squirrels and no burrowing owls or sign (i.e., pellets, feathers, castings, or white wash) were observed at the bu rrows. Further, power poles adjacent to the site decrease the likelihood that bu rrowing owls will occur on the P roject site as these features provide perching opportunities for larger raptor species (i.e., red -tailed hawk [Buteo jamaicensis]) that prey on burrowing owls. Based on this information, it was determined that burrowing owls are absent from the P roject site and focused surveys are not recommended.

However, because Burrowing Owls have been known to occupy disturbed sites, Mitigation Measure BIO-1 is required:

Mitigation Measure

MM-BIO-1: Pre-Construction Burrowing Owl Survey. Within 30 calendar days prior to the issuance of a grading permit, a qualified biologist shall conduct a survey of the proposed impact footprint and make a determination regarding the presence or absence of the burrowing owl. The determination shall be documented in a report and shall be submitted, reviewed, and accepted by the City of Jurupa Valley Planning Department prior to the issuance of a grading permit and subject to the following provisions:

a. In the event that the pre
‐construction survey identifies no burrowing owls in the impact area, a grading permit may be issued without restriction.

b. In the event that the pre
‐construction survey identifies the presence of at least one individual but less than three (3) mating p airs of burrowing owl, then prior to the issuance of a grading permit and prior to the commencement of ground ‐disturbing activities on the property, the qualified biologist shall passively or actively relocate any burrowing owls. Passive relocation, including the required use of one
‐way doors to exclude owls from the site and the collapsing of burrows, will occur if the biologist determines that the proximity and availability of alternate habitat is suitable for successful passive relocation. Passive reloca tion shall follow California Department of Fish and Wildlife relocation protocol. If proximate alternate habitat is not present as determined by the biologist, active relocation shall follow California Department of Fish and Wildlife relocation protocol. T he biologist shall confirm in writing to the Planning Department that the species has fledged or been relocated prior to the issuance of a grading permit.

With implementation of BIO-1 and PPP 3.4 -1, impacts related to candidate, sensitive, or special status species are less than significant.

3.4(b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?

Determination: No Impact.

Source: Biological Resources Assessment and MSHCP Consistency Analysis, Report (Appendix B).

Plans, Policies, or Programs (PPP)
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Biological Resources Page 36

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

There are no natural drainage features or riparian vegetation on the Project site As such, there are no impacts.

3.4(c) Have a substantial adverse effect on federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Determination: No impact.

Source: Biological Resources Assessment and MSHCP Consistency Analysis, Report (Appendix B).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

There are no natural drainages on site. No aspect of the site presents any evidence of jurisdictional waters or wetlands. As such, there are no impacts.

3.4(d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: Biological Resources Assessment and MSHCP Consistency Analysis, Report (Appendix B).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project related to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project related to this issue.

Impact Analysis

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Biological Resources Page 37

Wildlife Corridors

Wildlife movement includes seasonal migration along corridors, as well as daily movements for foraging. Migration corridors may include areas of unobstructed movement of deer, riparian corridors providing cover for migrating birds, routes between breeding waters and upland habitat for amphibians, and between roosting and feeding areas for birds. The Project site is surrounded by roads and existing development that already restrict wildlife movement in the project vicinity. The proposed Project would not substantially limit wildlife movement.

Nursery Sites

The P roject site prov ides limited nesting habitat for year -round and seasonal avian residents, as well as migrating songbirds that could occur in the area. Although heavily disturbed, the Project site has the potential to provide nesting opportunities for avian species, in par ticular ground -nesting species such as killdeer ( Charadrius vociferus) Most birds and their active nests are protected from “take” (meaning destruction, pursuit, possession, etc.) under the Migratory Bird Treaty Act and/or Sections 3503 –3801 of California Fish and Game Code. Activities that cause destruction of active nests, or that cause nest abandonment and subsequent death of eggs or young, may constitute violations of one or both of these laws. Therefore, if vegetation is to be removed during the nestin g season, a pre-construction nesting bird survey shall be conducted and avoidance measures taken to ensure that no take of birds or their nests will occur per Mitigation Measure BIO-2.

Mitigation Measure (MM)

MM-BIO-2- Nesting Bird Survey. Prior to the i ssuance of a grading permit, the City of Jurupa Valley Planning D epartment shall ensure vegetation clearing and ground disturbance shall be prohibited during the migratory bird nesting season ( February 1 through August 31 ), unless a migratory bird nesting survey is completed in accordance with the following requirements:

a. A migratory nesting bird survey of the Project’s impact footprint shall be conducted by a qualified biologist within three business (3) days prior to initiating vegetation clearing o r ground disturbance.

b. A copy of the migratory nesting bird survey results report shall be provided to the City of Jurupa Planning Department. If the survey identifies the presence of active nests, then the qualified biologist shall provide the Plannin g Department with a copy of maps showing the location of all active nests and an appropriate buffer zone around each nest sufficient to protect the nest from direct and indirect impact. The size and location of all buffer zones as determined by a qualified biologist, shall be subject to review and approval by the Planning Department. The nests and buffer zones shall be field checked weekly by a qualified biological monitor. The approved buffer zone shall be marked in the field with construction fencing, within which no vegetation clearing or ground disturbance shall commence until the qualified biologist and Planning Department verify that the nests are no longer occupied and the juvenile birds can survive independently from the nests.

With implementation of Mitigation Measure BIO-2, impacts are less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Biological Resources Page 38

3.4(e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?

Determination: No Impact.

Source: Biological Resources Assessment and MSHCP Consistency Analysis, Report (Appendix B).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

No protected species of trees as defined by the General Plan are located on the Project site. As such, there are no impacts and no mitigation measures are required.

3.4(f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: Biological Resources Assessment and MSHCP Consistency Analysis, Report (Appendix B).

The following applies to the Project and would reduce impacts relating to conflicting with the provisions of an adopted Habitat Conservation Plan, Natural Community Cons ervation Plan, or other approved local, regional, or state habitat conservation plan. This measure would be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.4-1 The Project is required to pay mitigation fe es pursuant to the Western Riverside County Multiple Species Habitat Conservation Plan (MHSCP) as required by Municipal Code Chapter 3.80.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project site is located within the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP). The MSHCP, a regional Habitat Conservation Plan was adopted on June 17, 2003. The intent of the MSHCP is to preserve native vegetation and meet the habitat needs of multiple species, rather than focusing preservation efforts on one species at a time. The MSHCP provides coverage (including take authorization for listed species) for special ‐status plant and animal species, as well as mitigation for impacts to sensitive species.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Biological Resources Page 39

Based on the Biological Resources Assessment and MSHCP Consistency Analysis, Report (Appendix B):

1) The site is not mapped within any MSHCP Criteria Cell or subunit.

2) The site is not mapped within an area where additional surveys are required for any Amphibian, Mammal or other Criteria Area Species.

3) The project will not impact any Riparian/Riverine or Vernal Pool areas.

4) The site is not within or adjacent to any MSHCP Conservation Areas and therefore does not require mitigation measures pursuant Section 6.1.4 (pertaining to Urban/ Wildlands Interface) of the MSHCP, which presents guidelines to minimize indirect effects of Projects in proximity to the MSCHP Conservation Areas.

5) The si te is mapped within a Burrowing Owl (BUOW) required habitat suitability assessment survey area. Therefore, to be thorough, a habitat suitability assessment for BUOW was conducted during site visit. The result of the assessment was that no BUOW habitat or B UOW sign was detected on site, and this species is currently considered absent from the Project area. However, because BUOW have been known to occupy disturbed sites, Mitigation Measure BIO-1 is required.

6) The site is mapped within a Narrow Endemic Plan t Species required habitat suitability assessment survey area. Therefore, to be thorough, a habitat suitability assessment for the three listed Narrow Endemic Plant Species was conducted during site visit. Based on habitat requirements for specific species , availability and quality of habitats needed by the three Narrow Endemic Plant Species, it was determined that the project site does not provide suitable habitat for Narrow Endemic Plant species San Diego ambrosia, Brand’s phacelia, and San Miguel Savory.

Conclusion

With implementation of Mitigation Measure BIO -1 and PPP 3.4-1, impacts related to conflicts with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan are less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Cultural Resources Page 40

3.5 CULTURAL RESOURCES

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Cause a substantial adverse change in th e
significance of a historical resource pursuant to
CEQA Guidelines §15064.5?

b. Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to CEQA Guidelines §15064.5?

c. Disturb any human remains, including th ose
interred outside of formal cemeteries? 

3.5(a) Cause a substantial adverse change in the significance of a historical resource as defined in CEQA Guidelines § 15064.5?

Determination: No Impact.

Source: Archaeological and Paleontological Assessment Report (Appendix C).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Historic resources generally consist of buildings, structures, improvements, and remnants associated with a significant historic event or person(s) and/or have a historically significant style, design, or achievement. Damaging or demolition of historic resources is typically considered to be a significant impact. Impacts to historic resources can occur through direct impacts, such as destruction or removal, and indirect impacts, such as a change in the setting of a historic resource.

CEQA Guidelines §15064.5(a) clarifies that historical resources include the following:

1. A resource listed in, or determined to be eligible by the State Historical Resources Commission, for listing in the California Register of Historical Resources.

2. A resource included in a local register of historical resources, as defined in section 5020.1(k) of the Public Resources Code or identified as significant in an historical resource survey meeting the requirements [of] section 5024.1(g) of the Public Resources Code.

3. Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Cultural Resources Page 41

Records Search

A records search dated November 13, 2018, was obtained from the Eastern Information Center (EIC) at the Univers ity of California, Riverside , providing information on all documented cultural resources and previous archaeological investigations within 1 mile of the project area. Resources consulted during the records search conducted by the EIC included the National Register of Historic Places (NRHP), California Historic al Landmarks, California Points of Historical Interest, and the California State Historic Resources Inventory. Results of the records search and additional research 11 previously recorded cultural resources were recorded within the 1 -mile records search ra dius.

None are located within the Project site.

Pedestrian Survey

The Project site’s exposed ground surface was examined for artifacts (e.g., flaked stone tools, tool - making debris, milling tools, ceramics), ecofacts (e.g., marine shell and bone), soil discoloration that might indicate the presence of a cultural midden, and features indicative of the former presence of structures or buildings (e.g., standing exterior walls, postholes, foundations) or historic debris (e.g., metal, glass, ceramics). Ground disturbances such as burrows were visually inspected for both cultural resources and paleontological resources.

Because no surface historic resources were identified within the Project site as a result of the record search or the pedestrian survey, no im pacts to surface historic resources are expected as part of the proposed Project.

3.5(b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to CEQA Guidelines § 15064.5?
Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: Archaeological and Paleontological Assessment Report (Appendix C).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

As noted above, records search, additional research, and a pedestrian survey were conducted for the Project site. No archaeological resources were previously documented within or adjacent to the Project site, therefore, no further archaeological resource investigations are recommended.

However, if buried archaeological materials are encountered during earthmoving operations associated wit h the Project, all work in that area should be halted or diverted until a qualified MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Cultural Resources Page 42

archaeologist can evaluate the nature and significance of the finds per the following mitigation measures:

Mitigation Measures (MMs)

MM- CR-1: Archaeological Monitoring. A qualified archaeologist (the “Project Archaeologist”) shall be retained by the developer to prior to the issuance of a grading permit to be on-call to monitor ground- disturbing activities and excavations on the Project site if archeological resources ar e encountered during grading.

If archaeological resources are e ncountered during grading, activities will be temporarily redirected from the vicinity of the find. The Project Archaeologist will be allowed to temporarily divert or redirect grading or ex cavation activities in the vicinity in order to make an evaluation of the find. If the resource is significant, Mitigation Measure CR-2 shall apply.

MM- CR-2: Archeological Treatment Plan . If a significant archaeological resource(s) is discovered on the property, ground disturbing activities shall be suspended 100 feet around the resource(s). The archaeological monitor, the Project Proponent, and the City Planning Department shall confer regarding mitigation of the discovered resource(s). A treatment plan shall be prepared and implemented by the archaeologist to protect the identified archaeological resource(s) from damage and destruction. The treatment plan shall contain a research design and data recovery program necessary to document the size and content of the discovery such that the resource(s) can be evaluated for significance under CEQA criteria. The research design shall list the sampling procedures appropriate to exhaust the research potential of the archaeological resource(s) in accordance with current professional archaeology standards (typically this sampling level is two (2) to five (5) percent of the volume of the cultural deposit). At the completion of the laboratory analysis, any recovered archaeological resources shall be processed and curat ed according to current professional repository standards. The collections and associated records shall be donated to an appropriate curation facility.

A final report containing the significance and treatment findings shall be prepared by the archaeologist and submitted to the City of Jurupa Valley Planning Department and the Eastern Information Center.

With implementation of Mitigation Measures CR-1 and CR-2, impacts are less than significant.

3.5(c) Disturb any human remains, including those interred outside of formal cemeteries?

Determination: Less Than Significant Impact.

Source: California Health and Safety Code §7050.5, Public Resources Code §5097 et. seq.

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts relating to disturbing human remains. This measure will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.5-1 The project is required to comply with the applicable provisions of California Health and Safety Code §7050.5 as well as Public Resources Code §5097 et. seq.

Project Design Features (PDF)
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Cultural Resources Page 43

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project site does not contain a cemetery and no known formal cemeteries are located within the immediate site vicinity. As noted in the response to Issue 3.5 (a) above, the Project site has been heavily disturbed and the potential for uncovering human remains at the Project site is considered low. Nevertheless, the remote potential exists that human remains may be unearthed during grading and excavation activities associated with Project construction.

In the event that human remains are discovered during Project grading or other ground disturbin g activities, the Project would be required to comply with the applicable provisions of California Health and Safety Code §7050.5 as well as Public Resources Code §5097 et. seq. California Health and Safety Code Section 7050.5 states that no further distur bance shall occur until the County Coroner has made the necessary findings as to origin. Pursuant to California Public Resources Code Section 5097.98(b), remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made by the Coroner.

If the Coroner determines the remains to be Native American, the California Native American Heritage Commission (NAHC) must be contacted and the NAHC must then immediately notify the “most likely descendant(s)” of receiving notification of the discovery. The most likely descendant(s) shall then make recommendations within 48 hours, and engage in consultations concerning the treatment of the remains as provided in Public Resources Code Section 5097.98. Based on t he analysis above, with implementation of PPP 3.5 -1, impacts would be less than significant and no mitigation measures are required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Energy Page 44

3.6 ENERGY

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Result in potentially significant environmental
impact due to wasteful, inefficient, or
unnecessary consumption of energy resources,
during project construction or operation?

b. Conflict with or obstruct a state or lo cal plan for renewable energy or energy efficiency? 

3.6(a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?

Determination: Less Than Significant Impact.

Source: CEQA Energy Review (Appendix D).

Impact Analysis

Short-Term Construction Impacts

Construction of the proposed project would require the use of construction equipment for grading, hauling, and building activities. Electricity use during construction would vary during different phases of construction —the majority of construction equipment during demolition and grading would be gas or diesel powered, and the later construction phases would require electricity - powered equipment, such as for interior construction and architectural coatings. Construction also includes the vehicles of construction workers traveling to and from the project site and haul trucks for the export of materials from site clearing and demolition a nd the export and import of soil for grading. The project area is already served by electrical infrastructure by Southern California Edison (SCE)

The proposed P roject would require site preparation, grading, building construction, paving, and architectural coating during construction. Energy usage are summarized in Tables 9 through 12.

Table 9: Estimated Construction Electricity Usage
Land Use
Proposed Building
Square Footage
(square feet)
Electricity
Usage
(kWh)
Commercial 90,262 22,488
Source: CEQA Energy Review (Appendix D).

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Energy Page 45

Table 10: Estimated Construction Fuel Consumption
Phase
Construction Duration
(Days)
Fuel Consumption
(gal diesel fuel)
Grading 30 9,337
Building Construction 300 37,503
Paving 20 2,292
Architectural Coating 20 243
Total Construction Fuel Demand 49,374
Source: CEQA Energy Review (Appendix D).

Table 11: Estimated Construction Worker Fuel Consumption Phase
Construction Duration
(Days)
Fuel Consumption
(gal diesel fuel)
Grading 30 309
Building Construction 300 43,992
Paving 20 154
Architectural Coating 20 587
Total Construction Fuel Demand 45,042
Source: CEQA Energy Review (Appendix D).

Table 12: Estimated Construction Vendor Fuel Consumption (Medium High Duty Trucks) Activity
Number
of Days Vendor
Trips /
Day
Trip
Length
(miles)
Vehicle
Miles
Traveled
Average
Vehicle Fuel
Economy
(mpg)
Estimated
Fuel
Consumption
(gallons)
Grading
30 0 6.9 0 8.50 0
Building
Construction
300 114 6.9 235,980 8.50 27,762
Paving
20 0 6.9 0 8.50 0
Architectural
Coating
20 0 6.9 0 8.50 0
Total Construction Vendor Fuel Consumption 27,762
Source: CEQA Energy Review (Appendix D).

Construction contractors are required to demonstrate compliance with applicable California Air Resources Board regulations governing the accelerated retrofitting, repowering, or replacement of heavy-duty diesel on - and off-road equipment. In addition, compliance with existing California Air Resources Board idling restrictions and the use of newer engines and equipment would reduce fuel combustion and energy consumption. Overall, construction activities would require limited energy consumption, would comply with all existing regulations, and would therefore not be expected to use large amounts of energy or fuel in a wasteful manner. Thus, impacts related to construction energy usage would be less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Energy Page 46

Long-Term Operational Impacts

Operation of the Project would create additional demands for electricity and natural gas as compared to existing conditions, and would result in increased energy use.

Based on the California Emissions Estimator Model (CalEEMod) which is a statewide land use emissions computer model which provides data on energy consumption, the estimated potential increased electricity demand associated with the proposed Project is 1,512.692.9 kWh per year.

According to the California Energy Commission, Electricity Consumption by County, 2018) , Riverside County consumed approximately 8295.96357 million of gigawatt-hours (GWh) The proposed Project would be less than 0.001 percent of Riverside County’s total electricity demand.

Based on the California Emissions Estimator Model (CalEEMod) which is a statewide land use emissions computer model which provides data on energy consumption, t he estimated potential increased natural gas de mand associated with the proposed P roject is 4,213,970 kBTU per year According to the California Energy Commission, Natural Gas Consumption by County, 2018) , Riverside County consumed approximately 139.193875 million of therms of natural gas. The proposed Project would be less than 0.001 percent of Riverside County’s total electricity demand.

Additionally, plans submitted for building permits of development projects in the Project area would be required to include verification demonstrating compliance with the 2016 Building and Energy Efficiency Standards and are also required to be reviewed. The Project would also be required adhere to the provisions of CALGreen, which established planning and design standards for sustainable site development, energy effic iency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants.

Based on the above analysis, the proposed Project would not result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation.

3.6(b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency?

Determination: Less Than Significant Impact.

Source: California Energy Commission

Impact Analysis

The California Title 24 Building Energy Efficiency Standards are designed to ensure new and existing buildings achieve energy efficiency and preserve outdoor and indoor environmental quality. The se measures (Title 24, Part 6) are listed in the California Code of Regulations. The California Energy Commission is responsible for adopting, implementing and updating building energy efficiency. Local city and county enforcement agencies have the authority to verify compliance with applicable building codes, including energy efficiency.

The Project is required to comply with the California Title 24 Building Energy Efficiency Standards.

As such, the Project will not conflict with or obstruct a state or lo cal plan for renewable energy or energy efficiency

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 47

3.7 GEOLOGY AND SOILS

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Directly or indirectly cause potenti al substantial adverse effects, including the risk of loss, injury, or death involving:
1) Rupture of a known earthquake fault, as
delineated on the most recent Alquist -
Priolo Earthquake Fault Zoning Map Issued
by the State Geologist for the area or based
on other substantial evidence of a known
fault? Refer to Division of Mines and
Geology Special Publication 42.

2) Strong seismic ground shaking? 
3) Seismic-related ground failure, including
liquefaction? 
4) Landslides? 
b. Result in sub stantial soil erosion or the loss of
topsoil? 
c. Be located on a geologic unit or soil that is
unstable, or that would become unstable as a
result of the Project, and potentially result in
on-site or offsite landslide, lateral spreading,
subsidence, liquefaction or collapse?

d. Be located on expansive soil, as defined in the
Uniform Building Code, creating substantial
risks to life or property?

e. Have soils incapable of adequately supporting
the use of septic tanks or alternative waste
water disposal systems where sewers are not
available for the disposal of waste water?

f. Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?

3.7 (a) (1) Expose people or structures to potential substa ntial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist -Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other subs tantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.

Determination: Less Than Significant Impact.

Sources: Archaeological and Paleontological Assessment Report (Appendix C). Updated Report of Soils and Founda tion Evaluations (Appendix E),

Plans, Policies, or Programs (PPP)

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 48

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project site is not located within an Alquist -Priolo Earthquake Fault Zone, and no known faults underlie the site. Because there are no faults located on the Project site, there is no potential for the Project to expose people or structures to adverse effects related to ground rupture.

3.7 (a) (2) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: Strong seismic ground shaking?

Determination: Less Than Significant Impact.

Sources: Geotechnical Investigation (Appendix E).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to seismic ground shaking.

These measures will be included i n the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.7-1 As required by Municipal Code Section 8.05.010, the Project is required to comply with the most recent edition of the California Building Code to preclude signific ant adverse effects associated with seismic hazards.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project site is located in a seismically active area of Southern California and is expected to experience moderate to severe ground shaking during the lifetime of the Project. This risk is not considered substantially different than that of o ther similar properties in the S outhern California area. As a mandatory cond ition of Project approval, the Project would be required to construct the proposed structures in accordance with the California Building Code (CBC). The City’s Building and Safety Department would review the building plans through building plan checks, iss uance of a building permit, and inspection of the building during construction, which wo uld ensure that all required CBC seismic safety measures are incorporated into the building. Compliance with the CBC as verified by the City’s review process, would red uce impacts related to strong seismic ground shaking.

Based on the analysis above, with implementation of PPP 3.7 -1, impacts would be less than significant and no mitigation measures are required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 49

3.7 (a) (3) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: Seismic -related ground failure, including liquefaction?

Determination: Less Than Significant Impact.

Sources: Geotechnical Investigation (Appendix E).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to seismic ground shaking.

These measures will be included in the Project’s Mitigation Monitoring and Reporting Program:

PPP 3.7-1 As required by Municipal Code Sect ion 8.05.010, the Project is required to comply with the most recent edition of the California Building Code to preclude significant adverse effects associated with seismic hazards.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Liquefaction is a phenomenon in which loose, saturated, relatively cohesion -less soil deposits lose shear strength during strong ground motions. The factors controlling liquefaction are:
• Seismic ground shaking of relatively loose, granular soils that are saturated or submerged can cause soils to liquefy and temporarily behave as a dense fluid. For liquefaction to occur, the following conditions have to occur:

o Intense seismic shaking;

o Presence of loose granular soils prone to liquefaction; and

o Saturation of soils due to shallow groundwater.

Based on the Riverside County TLMA Geotechnical/Liquefaction map, the site is located in a”high” liquefaction zone. Detailed design -level geotechnical studies and building plans pursuant to the California Building Code
is a mandatory requirement prior to approval of construction on the Project site, as required by PPP 3.6 -1. Compliance with the recommendations of the geotechnical study for soils conditio ns, is a standard practice and would be required by the City Building and Safety Department. Therefore, compliance with the mandatory requirements of the California Building Code as identified in a site specific geotechnical design would be reviewed by the City for appropriate inclusion, as part of the building plan check and d evelopment review process, will reduce the low potential for liquefaction to a less than significant level.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 50

3.7 (a) (4) Expose people or structures to potential substantial adverse e ffects, including the risk of loss, injury, or death involving: Landslides?

Determination: No Impact.

Source: Field Investigation.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
Generally, a landslide is defined as the downward and outward movement of loosened rock or earth down a hillside o r slope. Landslides can occur either very suddenly or slowly, and frequently accompany other natural hazards such as earthquakes, floods, or wildfires. Landslides can also be induced by the undercutting of slopes during construction, improper artificial co mpaction, or saturation from sprinkler systems or broken water pipes. The Project site is relatively flat and contains no slopes that may be subject to landslides. As such, there are no impacts.

3.7(b) Result in substantial soil erosion or the loss of topsoil?

Determination: Less Than Significant Impact.

Source: Project Application Materials.

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts related to soil erosion. This measure will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP’s 3.91-1 through PPP 3.9-4 in Section 3.9, Hydrology and Water Quality shall apply.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
Construction
Construction of the Project has the potential to contribute to soil erosion and the loss of topsoil.

Grading and excavation activities that would be required for development of the Project will expose and loosen topsoil, which could be eroded by wind or water.

The City’s Municipal Code Chapter 6.05.010, Storm Water/Urban Runoff Management and Discharge Controls, implements the requirements of the National Pollutant Discharge Elimination System (NPDES) stormwater permit, which establishes minimum stormwater management requirements MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 51

and controls that are required to be implemented for construction of the proposed Project. To reduce the potential for soil erosion and the loss of topsoil, a Stormwater Po llution Prevention Plan (SWPPP) is required by the City, (as required by PPP 3.9-2). The SWPPP is required to address site- specific conditions related to specific grading and construction activities. The SWPPP would identify potential sources of erosion an d sedimentation loss of topsoil during construction, identify erosion control Best Management Practices (BMPs) to reduce or eliminate the erosion and loss of topsoil, such as use of: silt fencing, fiber rolls, or gravel bags, stabilized construction entran ce/exit, hydroseeding.

With compliance with the City Municipal Code Chapter 6.05.010, Storm Water/Urban Runoff Management and Discharge Controls , Regional Water Quality Control Board requirements, and the best management practices (BMPs) in the SWPPP, con struction impacts related to erosion and loss of topsoil would be less than significant.

Operation
The Project includes installation of landscaping throughout the development site and areas of loose topsoil that could erode by wind or water would not exist upon operation of the Project. In addition, as described in Section 3.9, Hydrology and Water Quality, the hydrologic features of the Project have been designed to slow, filter, and retain stormwater on the development site, which would also reduce the pot ential for stormwater to erode topsoil. Furthermore, pursuant to Municipal Code Chapter 6.05.010, Storm Water/Urban Runoff Management and Discharge Controls , development of the Project requires the preparation of a Water Quality Management Plan (WQMP), which would ensure that appropriate operational BMPs would be implemented to minimize or eliminate the potential for soil erosion or loss of topsoil to occur during operation of the Project.

Based on the analysis above, with implementation of PPP 3.9-2, impacts are less than significant.

3.7(c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the Project, and potentially result in on -or offsite landslide, lateral spreading, subsidence, liquefaction or collapse?

Determination: Less Than Significant Impact.

Sources: Geotechnical Investigation (Appendix E).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to an unstable geologic unit.

These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.7-1 As required by Municipal Code Section 8.05.010, the Project is required to comply with the most recent edition of the California Building Code to preclude significant adverse effects associated with seismic hazards.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 52

Landslide

As noted in the response to Issue 3.7 (a) (4) above, the Project site is relatively flat and contains no slopes that may be subject to landslides. Therefore the site is not considered susceptible to landslides

Lateral Spreading

Lateral spreading is a term referring to landslides that common ly form on gentle slopes and that have rapid fluid -like flow horizontal movement. Most lateral spreading is caused by earthquakes but it is also caused by landslides. As noted in the response to Issue 3.7 (a) (4) above, the Project site is relatively flat and contains no slopes that may be subject to landslides. Therefore the Project site is not considered susceptible to lateral spreading.

Subsidence

According to the Riverside Coun ty Map My County website , t he Project site is considered “susceptible” to subsidence. With implementation of PPP 3.7-1, impacts are less than significant.

Liquefaction

As noted in the response to Issue 3.7 (a) (3) above, the site is located in a “high” liquefaction zone.

With implementation of PPP 3.7-1, impacts are less than significant.

Collapse

Collapse occurs in saturated soils in which the space between individual particles is completely filled with water. This water exerts a pressure on the soil particles that influences how tightly the particles themselves are pressed together. The soils lose their strength beneath buildings and other structures. The near -surface soils at the site generally consist of loose to medium dense native alluvial sands and silts. Based on the results of laboratory testing, the near -surface soils have the potential to experience collapse. With implementation of PPP 3.7 -1 and impacts are less than significant.

3.7 (d) Be located on expansive soil, as defined in the Uniform Building Code, creating substantial risks to life or property?

Determination: Less than Significant Impact.

Source: Geotechnical Investigation (Appendix E).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to expansive soils. These measures will be included in the Pro ject’s Mitigation Monitoring and Reporting Program to ensure compliance:

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 53

PPP 3.7-1 As required by Municipal Code Section 8.05.010, the Project is required to comply with the most recent edition of the California Building Code to preclude significant adverse effects associated with seismic hazards.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
Expansive soils are those that undergo volume changes as moisture content fl uctuates; swelling substantially when wet or shrinking when dry. Soil expansion can damage structures by cracking foundations, causing settlement and distorting structural elements.

The near -surface soils generally consist of sandy gravelly soils and ar e not considered to have a “very low ” expansion potential. In any event , d esign-level geotechnical plans pursuant to the California Building Code are required prior to approval of cons truction, as required by PPP 3.7 -1.

Compliance with the California Building Code is a standard practice and would be required by the City Building and Safety Department. Therefore, compliance with the requirements of the California Building Standards Code as identified in a site specific geotechnical design would be reviewed by the City, as part of the building plan check and development review process, would ensure that potential soil stability impacts are less than significant

3.6(e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?

Determination: No Impact.

Source: Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, Programs, or Standard Conditions applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project does not propose the use of septic tanks or alternative wast e water disposal systems.

The Project will install domestic sewer infrastructure and connect to the Jurupa Community Service District’s existing sewer conveyance and treatment system. As such, there are no impacts.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 54

3.7(f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: Riverside County Map My County Website.

Plans, Policies, or Programs (PPP)

There are no Plans, Policie s, Programs, or Standard Conditions applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Paleontological Resources

Paleontological resources are the preserved fossilized remains of plants and animals. Fossils and traces of fossils are preserved in sedimentary rock units, particularly fine to medium grained marine, lake, and stream deposits, such as limestone, siltstone, san dstone, or shale, and in ancient soils. They are also found in coarse -grained sediments, such as conglomerates or coarse alluvium sediments. Fossils are rarely preserved in igneous or metamorphic rock units. Fossils may occur throughout a sedimentary unit and, in fact, are more likely to be preserved subsurface, where they have not been damaged or destroyed by previous ground disturbance, amateur collecting, or natural causes such as erosion.

Prior to the survey of the Project area, a paleontological reso urces literature and records search was conducted by the San Diego Natural History Museum (SDNHM) on November 21, 2018. This search included the current Project area with an additional 1 -mile radius. This search included a review of geological maps coverin g the Project footprint to determine the fossil -bearing rock units underlying the Project area. The objective of the records search was to identify fossil specimens or unique geological formations reported within the Project area or surrounding 1- mile vicinity.

Research also included a review of published and unpublished reports relevant to the paleontology and geology of the Project area.

Results of the paleontological records search were positive for significant vertebrate fossil localities within the Project area at depths below 5 -10 feet below surface grade. The deposits at these levels are assigned high paleontological potential according to Riverside County guidelines, based on the possible presence of paleontological resources at an uncertain depth b elow existing surface grade.

Therefore, the following mitigation measures are required.

Mitigation Measure (MM)

MM-GEO-1: Paleontological Monitoring. A qualified paleontologist (the “Project Paleontologist”) shall be retained by the developer prior to t he issuance of a grading permit. The Project Paleontologist will be on -call to monitor ground -disturbing activities and excavations ground-disturbing activities if excavation depth exceed approximately 5 -10 feet below surface grade on the Project site . If MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Geology and Soils Page 55

paleontological resources are encountered during implementation of the Project, ground -disturbing activities will be temporarily redirected from the vicinity of the find. The Project Paleontologist will be allowed to temporarily divert or redirect grading or excavation activities in the vicinity in order to make an evaluation of the find. If the resource is significant, Mitigation Measure GEO-2 shall apply.

MM-GEO-2: Paleontological Treatment Plan. If a significant paleontological resource(s) is discovered on the property, in consultation with the Project proponent and the City, the qualified paleontologist shall develop a plan of mitigation which shall include salvage excavation and removal of the find, removal of sediment from around the specimen (in the laboratory), research to identify and categorize the find, curation in the find a local qualified repository, and preparation of a report summarizing the find.

Based on the analysis above, with implementation of Mitigation Measure GEO-1 and GEO-2, impacts are less than significant.

Unique Geologic Feature

Unique geologic features are those that are unique to the field of Geology. Unique geologic features are not common in Jurupa Valley. The geologic processes that formed the landforms in Jurupa Valley ar e generally the same as those in other parts of the state. What makes a geologic unit or feature unique can vary considerably. A geologic feature is unique if it:

• Is the best example of its kind locally or regionally;

• Embodies the distinctive charact eristics of a geologic principle that is exclusive locally or regionally;

• Provides a key piece of geologic information important in geology or geologic history;

• Is a “type locality” ( the locality where a particular rock type , stratigraphic unit or mineral species is first identified) of a geologic feature;

• Is a geologic formation that is exclusive locally or regionally;

• Contains a mineral that is not known to occur elsewhere in the City; or

• Is used repeatedly as a teaching tool.

The Project site is relatively flat and the subsurface material encountered at the site is underlain by sandy gravelly soils. These features are not considered “unique.”

Based on the analysis above, the Project will not directly or indirectly destroy a unique geo logic feature. There is no impact and no mitigation measures are required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Greenhouse Gas Emissions Page 56

3.8 GREENHOUSE GAS EMISSIONS

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Generate greenhouse gas emissions, either
directly or indirectly, that may have a
significant impact on the environment?

b. Conflict with an applicable plan, policy or
regulation adopted for the purpose of reducing
the emissions of greenhouse gases?

3.8(a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?

3.7(b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: Air Quality and Greenhouse Gas Impact Study (Appendix A). First Update to the Climate Change Scoping Plan, May 22, 2014, Western Riverside County Council of Governments Subregional Climate Action Plan, September 2014,

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to greenhouse gas emissions.

These measures will be included in the Project’s Mitigation Monito ring and Reporting Program to ensure compliance:

PPP 3.8-1 As required by Municipal Code Section 8.05.010, California Energy Code , prior to issuance of a building permit, the Project Applicant shall submit plans showing that the Project will be constructed in compliance with the most recently adopted edition of the applicable California Building Code Title 24 requirements.

PPP 3.8-2 As required by Municipal Code Section 9.283.010, Water Efficient Landscape Design Requirements, prior to the approval of la ndscaping plans, the Project proponent shall prepare and submit landscape plans that demonstrate compliance with this section.

PPP 3.8-3 As required by Municipal Code Section 8.05.010 (8), prior to issuance of a building permit, the Project proponent shall submit plans in compliance with the California Green Building Standards.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Greenhouse Gas Emissions Page 57

GHG Emissions

No single land use project c ould generate enough greenhouse gas ( GHG) emissions to noticeably change the global average temperature. Cumulative GHG emissions, however, contribute to global climate change and its significant adverse environmental impacts. Thus, the primary goal in adopting GHG significance thresholds, analytical methodologies, and mitigation measures is to ensure new land use development provides its fair share of the GHG reductions needed to address cumulative environmental impacts from those emissions.

A final numer ical threshold for determining the significance of greenhouse gas emissions in the South Coast Air Basin has not been established by the South Coast Air Quality Management District.

The City of Jurupa Valley is using the following screening threshold as i nterim thresholds for commercial projects:

• Commercial projects that emit less stationary source green house gas emissions less than 3,000 MTCO2e per year are not considered a substantial greenhouse gas emitter and the impact is less than significant. Projects that emit in excess of 3,000 MTCO2e per year require additional analysis .While not final, these thresholds can be used in the interim on a case-by-case basis to analyze conformance with AB 32.

A summary of the projected annual operational greenhouse g as emissions, including amortized construction-related emissions associated with the development of the Project is provided in Table

13. Table 13. Total Project Greenhouse Gas Emissions (Unmitigated) Source
GHG Emissions MT/yr

CO2

N20

CH4

CO2e
Area 0.01 0.00 0.00 <1
Energy 772.89 0.00 0.03 292
Mobile 5,833.92 0.00 0.34 2,580
Solid Waste 53.71 0.00 3.17 147
Water/Wastewater 59.62 0.00 0.34 397
30-year Amortized
Construction GHG

42.77 0.00 3.88 43.90
TOTAL 6,858.99
SCAQMD Screening
Threshold
10,000
Exceed Threshold? YES

Because the Project that GHG emissions exceed the 3,000 MTCO2e per year screening threshold, the following mitigation measures are required:

Mitigation Measures

MM- GHG-1: GHG Reduction Documentation. Prior to the issuance of a building permit, documentation that the following GHG reduction measures shall be shall be implemented by the project is required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Greenhouse Gas Emissions Page 58

Documentation may consist of a letter stating how the project will comply and identify the verification mechanism for each measure required below (e.g. shown on building plans, landscaping plans, etc.)

1. The project shall devise a comprehensive water conservation strategy to reduce water use during project operation. The strategy will include the following:

• Install drought-tolerant plants for landscaping.
• Install water -efficient irrigation systems, such as weather -based and soil -moisture- based irrigation controllers and sensors, for landscaping according to the California Department of Water Resources Model Efficient Landscape Ordinance.

• Ensure that all landscape and irrigation measures are in compliance with the City’s Municipal, Landscaping and Water Conservation requirements.

MM-GHG-2: Building Design . The project will design building shells, building compon ents, such as windows, roof systems and electrical systems to meet 2016 Title 24 Standards, which are 5 percent more stringent than the 2013 Title 24 Standards for nonresidential buildings.

MM-GHG-3: LEED Features. Buildings will be designed to provide CALGreen Standards with Leadership in Energy and Environmental Design (LEED) features for potential certification and will employ energy and water conservation measures in accordance with such standards. This includes design considerations related to the bui lding envelope, HVAC, lighting, and power systems. Additionally, the architectural expression such as roofs and windows in the buildings will relate to conserving energy.

MM-GHG-4. Energy Efficient Lighting. Prior to the issuance of a building permit, building plans shall require that high -efficiency lighting (such as LED lighting that is 34 percent more efficient than fluorescent lighting) be installed within buildings on-site.

MM-GHG-5. Efficient Building Materials/Equipment. The project will utilize bu ilding materials/methods and heating equipment that are efficient and reduce emissions.

MM-GHG-6.Parking Lot Shading. A parking lot shading plan shall be required, which includes a shading calculation table. Within 15 years after establishment of the aut omobile parking area, the project shall require that a minimum of 50 percent automobile parking area to be shaded by shade trees.

MM-GHG-7: .Reduce Indoor Water Demand. Prior to the issuance of a building permit , building plans shall require that all fau cets, toilets and showers installed in the proposed structures utilize low -flow fixtures that would reduce indoor water demand by 20% per CalGreen Standards.

With implementation of Mitigation Measure s GHG-1 through GHG-6, the P roject’s GHG emissions would be reduced to 4,322.47 MTCO2e per year resulting 37% reduction in GHGs when compared to the unmitigated scenario. Impacts are less than significant.

GHG Plan Consistency

The Project will be subject to the policies and ordinances pertaining to air quality and climate change stated in the City's General Plan. The City of Jurupa Valley is also participating the Western Riverside Council of Governments (WRCOG) Subregional Climate Action Plan. The WRCOG MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Greenhouse Gas Emissions Page 59

Subregional CAP establishes a community -wide emissions reduction target of 15% below 2010, following guidance from CARB and the Governor’s Office of Planning and Research. CARB and the California Attorney General have determined this approach to be consistent with the state- wide AB 32 goal of reducing emissions to 1990 levels.

As the City of Jurupa Valley does not currently have their own Climate Action Plan (CAP), and the goal of the Subregional CAP is to be consistent with AB-32 and the CARB Scoping Plan (based on the goals of AB -32), the Project has been co mpared to the applicable measures of the CARB Scoping Plan.

The California Governor issued Executive Order S -3-05, GHG Emission, in June 2005, which established the following reduction targets:

• 2010: Reduce greenhouse gas emissions to 2000 levels
• 2020: Reduce greenhouse gas emissions to 1990 levels
• 2050: Reduce greenhouse gas emissions to 80 percent below 1990 levels.

In 2006, the California State Legislature adopted AB 32, the California Global Warming Solutions Act of 2006. AB 32 requires CARB, to adopt rules and regulations that would achieve GHG emissions equivalent to statewide levels in 1990 by 2020 through an enforceable statewide emission cap which was phased in starting in 2012.

By reducing the Project's GHG emissions by 37%, the Project w ould contribute to meeting the reduction targets stated above.

Furthermore, all of the post 2020 reductions in GHG emissions are addressed via regulatory requirements at the State level and the project will be required to comply with these regulations as they come into effect. Therefore, the Project will not conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases.

Impacts are considered to be less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hazards and Hazardous Materials Page 60

3.9 HAZARDS AND HAZARDOUS MATERIALS

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Create a significant hazard to the public or the
environment through the routi ne transport,
use, or disposal of hazardous materials?

b. Create a significant hazard to the public or the
environment through reasonably foreseeable
upset and accident conditions involving the
release of hazardous materials into the
environment?

c. Emit hazardous emissions or handle hazardous
or acutely hazardous materials, substances, or
waste within one -quarter mile of an existing or
proposed school?

d. Be located on a site, which is included on a list
of hazardous materials sites compiled pursuant
to Government Code Section 65962.5, and, as a
result, would it create a significant hazard to the
public or the environment?

e. For a project located within an airport land use
plan or, where such a plan has not been
adopted, within two mile s of a public airport or
public use airport, would the Project result in a
safety hazard or excessive noise for people
residing or working in the Project area?

f. Impair implementation of or physically
interfere with an adopted emergency response
plan or emergency evacuation plan?

g. Expose people or structures , either directly or
indirectly, to a significant risk of loss, injury or
death involving wildland fires,

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hazards and Hazardous Materials Page 61

3.9(a) Create a significant hazard to the public or the environment through t he routine transport, use, or disposal of hazardous materials?

3.9(b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?

Determination: Less than Significant Impact.

Source: Phase I Environmental Site Assessment (Appendix I).

Plans, Policies, or Programs (PPP)

There are numerous regulations pertaining to the routine transport, use, or disposal of hazardous materials. The following apply to the Project and would reduce impacts relating to this issue. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.9-1 As required by Health and Safety Code Se ction 25507, if a future business handles a hazardous material or a mixture containing a hazardous material that has a quantity at any one time above the thresholds described in Section 25507(a) (1) through (6). a business shall establish and implement a business plan for emergency response to a release or threatened release of a hazardous material in accordance with the standards prescribed in the regulations adopted pursuant to Section 25503 , aid business shall obtain approval from the Riverside County De partment of Environmental Health prior to occupancy.

Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Existing Conditions

The subject property consists of approximately 16.22 acres of vacant land. The exterior portions of the site consist of undeveloped terrain and dense vegetation. Three sewer drains were observed on the northeastern boundary of the subject property, which appeared to be in good condition. The entire subject property is currently accessible by the general public. No current or evidence of historical improvements were noted. No evidence of illicit dumping, construction debris, or non - hazardous waste were observed during the site reconnaissance. No pole- or pad -mounted transformers or poly-chlorinated biphenyl (PCB) containing equipment were observed on-site.

Based on the results of the Phase I Environmental Site Assessment (Appendix I) prepared for the Project, no recognized environmental conditions, historical recognized environmental condition controlled recognized environmental condition, or de minimis condition were observed in the exterior portions of the subject property.

According to ASTM International:

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hazards and Hazardous Materials Page 62

A recognized environmental condition is defined as “…the presence or likely presence of any hazardous substances or petroleum products in, on, or at a property…”

• A historical recognized environmental condition is defined as “a past release of any hazardous substances or petroleum products that has occu rred in connection with the property and has been addressed to the satisfaction of the applicable regulatory authority or meeting unrestricted use criteria established by a regulatory authority, without subjecting the property to any required controls (for example, property use restrictions, activity and use limitations, institutional controls, or engineering controls).”

• A controlled recognized environmental condition is defined as “a recognized environmental condition resulting from a past release of h azardous substances or petroleum products that has been addressed to the satisfaction of the applicable regulatory authority (for example, as evidenced by the issuance of a no further action letter or equivalent, or meeting risk -based criteria established by regulatory authority), with hazardous substances or petroleum products allowed to remain in place subject to the implementation of required controls (for example, property use restrictions, activity and use limitations, institutional controls, or engineering controls)”

A de minimis condition is defined as "a condition that generally does not present a threat to human health or the environment and that generally would not be the subject of an enforcement action if brought to the attention of appropriate governmental agencies. Conditions determined to be de minimis conditions are not recognized environmental conditions nor controlled recognized environmental conditions."

Construction Activities

Heavy equipment that would be used during cons truction of th e Project would be fueled and maintained by substances such as oil, diesel fuel, gasoline, hydraulic fluid, and other liquid materials that would be considered hazardous if improperly stored or handled. In addition, materials such as paints, roofing materials, solvents, and other substances typically used in building construction would be located on the Project site during construction. Improper use, storage, or transportation of hazardous materials could result in accidental releases or spills, potentially posing health risks to workers, the public, and the environment. The potential for accidental releases and spills of hazardous materials during construction is a standard risk on all construction sites, and there would be no greater risk for improper h andling, transportation, or spills associated with future development that would be a reasonably consequence of the development of the Project than would occur on any other similar construction site. Construction contractors are required to comply with all applicable federal, state, and local laws and regulations regarding hazardous materials, including but not limited requirements imposed by the Environmental Protection Agency, California Department of Toxic Substances Control, South Coast Air Quality Ma nagement District, and the Santa Ana Regional Water Quality Control Board. As such, impacts are less tha n significant.

Operational Activities

Federal and State Community-Right-to-Know laws allow the public access to information about the amounts and type s of chemicals that may be used by the businesses that would operate at the Project site. Laws also are in place that requires businesses to plan and prepare for possible MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hazards and Hazardous Materials Page 63

chemical emergencies. Any business that operates any of the facilities at the Project site and that handles and/or stores substantial quantities of hazardous materials (§ 25500 of California Health and Safety Code, Division 20, Chapter 6.95) would be required to prepare and submit a Hazardous Materials Business Emergency Plan (HMBEP) to the Riverside County Department of Environmental Health (RCDEH) in order to register the business as a hazardous materials handler.

Such business is also required to comply with California’s Hazardous Materials Release Response Plans and Inventory Law, wh ich require immediate reporting to Riverside County Fire Department and State Office of Emergency Services regarding any release or threatened release of a hazardous material, regardless of the amount handled by the business. With mandatory regulatory compliance as required by PPP 3.9 -1 above, potential hazardous materials impacts associated with long-term operation of the Project is not expected to pose a significant hazard to the public or environment through the routine transport, use, or disposal of hazardous materials, nor would the Project increase the potential for accident operations which could result in the release of hazardous materials into the environment.

3.9(c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?

Determination: Less Than Significant Impact.

Sources: Project Application Materials, Google Earth.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project site is not located within 0.25 miles of an existing or proposed school. The nearest school is Mira Loma Middle School located approximately 0.40 miles southwest of the Project site.

In addition, as discussed in the responses to issues 3.9 (b) and 3.9 (c) above, the all hazardous or potentially hazardous materials would comply with all applicable federal, State, and local agencies and regulations with respect to hazardous materials. Impacts are less than significant.

3.9(d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?

Determination: No Impact.

Sources: DTSC's Hazardous Waste and Substances Site List - Site Cleanup (Cortese L ist,) Phase I Environmental Site Assessment (Appendix F).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hazards and Hazardous Materials Page 64

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
The Hazardous Waste and Substances Sites (Cortese) List is a planning document used by the State and local agencies to comply with the California Environmental Quality Act requirements in providing information about the location of hazardous materials release sites pursuant to Government Code Section 65962.5.. Below are the data resources that provide information regarding the facilities or sites identified as meeting the “Cortese List” requirements. • List of Hazardous Waste and Substances sites from Department of Toxic Substances Control (DTSC) EnviroStor database.
• List of Leaking Underground Storage Tank Sites from the State Water Board’s GeoTracker database.
• List of solid waste disposal sites identified by Water Board with waste constituents above hazardous waste levels outside the waste management unit (PDF). • List of “active” CDO and CAO from Water Board (MS Excel, 1,453 KB).

• List of hazardous waste facilities subject to corrective action pursuant to Section 25187.5 of the Health and Safety Code, identified by DTSC.

Based on a review of the Cortese List maintained by the California Environmental Protection Agency website at https://calepa.ca.gov/SiteCleanup/CorteseList/ on January 15, 2020, the Project
site is not identified on the list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. Accordingly there is no impact.

3.9(e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the Project result in a safety hazard or excessive noise for people residing or working in the Project area?

Determination: No Impact.

Source: Flabob Airport Land Use Compatibility Plan.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hazards and Hazardous Materials Page 65

The proposed Project site is located approximately 4.8 miles southeast of the Flabob Airport and is not located within the Airport Influence Area pursuant to the Flabob Airport Land Use Compatibility Plan. Impacts are less than significant.

3.9(g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?

Determination: No Impact.

Sources: General Plan, Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Emergency access to the Project site is available from Van Buren Boulevard and Rutile Street which are both improved roadways meeting City standards. The Project site does not contain any emergency facilities nor does it serve as an emergency evacuation route. During construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the City. Furthermore, the Project would not result in a substantial alteration to the design or capacity of any public road that would impair or interfere with the implementation of evacuation procedures,

3.9 (h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires?

Determination: No Impact.

Source: General Plan.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

According to General Plan Figure 8- 11: Wildfire Severity Zones in Jurupa Valley , the Project site is not located within a high wildfire hazard area. Therefore the Project would not expose people or structures to a significant risk of loss, injury, or death involving wildland fires and no impact would occur. (Also see Issue 3.20, Wildfire).

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hydrology and Water Quality Page 66

3.10 HYDROLOGY AND WATER QUALITY

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Violate any water quality standards or waste
discharge requirements or otherwise
substantially degrade surface or ground water
quality?

b. Substantially decrease groundwater supplies or
interfere substantially with g roundwater
recharge such that the project may impede
sustainable groundwater management of the
basin?

c. Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner that would:
(i) R esult in substantial erosion or siltation on - or off-site? 
(ii) Substantially increase the rate or amount of
surface runoff in a manner which would result in
flooding on- or offsite?

(iii) C reate or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted runoff?

(iv) Impede or redirect flood flows? 
d. In floo d hazard, tsunami, or seiche zones, risk
release of pollutants due to project inundation? 
e. Conflict with or obstruct implementation of a
water quality control plan or sustainable
groundwater management plan?

3.9(a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?

Determination: Less Than Significant Impact.

Sources: Report of Water Infiltration Rate (Appendix F ), Preliminary Hydrology Study (Appendix G ), Preliminary Water Quality Management Plan (Appendix H).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating water quality and waste discharge requirements. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.10-1 As required by Municipal Code Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls , Section B (1), any person performing construction work in the city shall comply with the provisions of this chapter, and MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hydrology and Water Quality Page 67

shall control storm water runoff so as to prevent any likelihood of adversely affecting human health or the environment. The City Engineer shall identify the BMPs that may be implemented to prevent suc h deterioration and shall identify the manner of implementation. Documentation on the effectiveness of BMPs implemented to reduce the discharge of pollutants to the MS4 shall be required when requested by the City Engineer.

PPP 3.10-2 As required by Municipal Code Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls , Section B (2), any person performing construction work in the city shall be regulated by the State Water Resources Control Board in a manner pursuant to and consistent with applicable requirements contained in the General Permit No. CAS000002, State Water Resources Control Board Order Number 2009- 0009-DWQ. The city may notify the State Board of any person performing construction work that has a non -compliant construction site per the General Permit.

PPP 3.10-3 As required by Municipal Code Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls, Section C, new development or redevelopment projects shall control storm water runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. The City Engineer shall identify the BMPs that may be implemented to prevent such deterioration and shall identify the manner of implementation. Documentation on the effectiveness of BMPs implemented to reduce the discharge of pollutants to the MS4 shall be required when requested by the City Engineer. The BMPs may include, but are not limited to, the following and may, among other things, require new developments or redevelopments to do any of the following:
(1) Increase permeable areas by leaving highly porous soil and low lying area undisturbed by:
(a) Incorporating landscaping, green roofs and open space into the project design; (b) Using porous materials for or near driveways, drive aisles, parking stalls and low volume roads and walkways; and
(c) Incorporating detention ponds and infiltration pits into the project design. (2) Direct runoff to permeable areas by orienting it away from impermeable areas to swales, berms, green strip filters, gravel beds, rain gardens, pervious pavement or other approved green infrastructure and French drains by:
(a) Installing rain-gutters oriented towards permeable areas; (b) Modifying the grade of the property to divert fl ow to permeable areas and minimize the amount of storm water runoff leaving the property; and c) Designing curbs, berms or other structures such that they do not isolate permeable or landscaped areas.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hydrology and Water Quality Page 68

(3) Maximize storm water storage for reuse by using retention structures, subsurface areas, cisterns, or other structures to store storm water runoff for reuse or slow release.
(4) Rain gardens may be proposed in -lieu of a water quality basin when applicable and approved by the City Engineer.

PPP 3.10-4 As required by Municipal Code Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls, Section E , any person or entity that owns or operates a commercial and/or industrial facility(s) shall comply with the provisions of this chapter. A ll such facilities shall be subject to a regular program of inspection as required by this chapter, any NPDES permit issued by the State Water Resource Control Board, Santa Ana Regional Water Quality Control Board, Porter -Cologne Water Quality Control Act (Wat. Code Section 13000 et seq. ), Title 33 U.S.C. Section 1251 et seq. (Clean Water Act), any applicable state or federal regulations promulgated thereto, and any related administrative orders or permits issued in connection therewith.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Waste Discharge Requirements

Waste Discharge Requirements (WDRs) are issued by the Santa Ana Regional Board under the provisions of the California Water Code, Division 7 “Water Quality,” Article 4 “Waste Discharge Requirements.” These requirements regulate the discharge of wastes which are not made to surface waters but which may impact the region’s water quality by affecting underlying gr oundwater basins. Such WDRs are issued for Publically Owned Treatment Works’ wastewater reclamation operations, discharges of wastes from industries, subsurface waste discharges such as septic systems, sanitary landfills, dairies and a variety of other activities which can affect water quality.

Water Quality Requirements

The Porter-Cologne Act defines water quality objectives (i.e. standards) as “… the limits or levels of water quality constituents or characteristics which are established for the reasonable protection of beneficial uses of water or the prevention of nuisance within a specific area” (§13050 (h)).

Construction Impacts

Construction of t he Project would involve clearing, grading, paving, utility installation, building construction, and the installation of landscaping, which would result in the generation of potential water quality pollutants such as silt, debris, chemicals, paints, and other solvents with the potential to adversely affect water quality. As such, short -term water quality impac ts have the potential to occur during construction activities in the absence of any protective or avoidance measures.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hydrology and Water Quality Page 69

Pursuant to the requirements of the Santa Ana Regional Water Quality Control Board and the City of Jurupa Va lley, the Project proponent will be required to obtain a National Pollutant Discharge Elimination System Municipal Stormwater Permit for construction activities. The National Pollutant Discharge Elimination System permit is required for all Projects that include construction activities, such as clearing, grading, and/or excavation that disturb at least one acre of total land area.

Compliance with the National Pollutant Discharge Elimination System permit and the Santa Ana River Basin Water Quality Control Program involves the prepar ation and implementation of a Storm Water Pollution Prevention Plan for construction -related activities, including grading. The Storm Water Pollution Prevention Plan would specify the Best Management Practices that the Project would be required to implement during construction activities to ensure that all potential pollutants of concern are prevented, minimized, and/or otherwise appropriately treated prior to being discharged from the site.

Operational Impacts

Storm water pollutants commonly associated with the type of land uses that could occupy the proposed buildings include sediment /turbidity, nutrients, trash and debris, oxygen -demanding substances, organic compounds, bacteria and viruses, oil and grease, and pesticides.

Pursuant to the requirements of the City’s National Pollutant Discharge Elimination System permit, a Water Quality Management Plan is required for managing t he quality of storm water or urban runoff that flows from a developed site after construction is completed and the facilities or structures are occupied and/or operational. A Water Quality Management Plan describes the Best Management Practices that will be implemented and maintained throughout the life of a project to prevent and minimize water pollution that can be caused by storm water or urban runoff.

The site is bounded on 3 sides, 2 sides by streets on the west and northeast and the 3rd side the south by existing homes. Both of the streets will be improved as part of this project. On the south are existing homes will have a new wall constructed and a shallow landscaping / retention area to help desilt and clarify the water before it will be picked up by catch basins and conveyed to the underground detention basin. The area is designed for only 6” depth of water to allow for water to settle. At 6” in depth the water will flow into the catch basins. If the basins were to plug up, the water will get to a depth of 1’ before the water will overflow to the next basin and so on till it will eventually flow to the above ground detention basin in the southeast corner of the site. All of these basins are below the adjacent grade to the south to keep the water from flowing to the south and from the site. The wall along the south property line will keep the water from leaving the site and flowing to the south.

Based on the analysis above, with implementation of PPP 3.10 -1 through PPP 3.10 -5, impacts are less than significant.

3.10(b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?

Determination: Less Than Significant Impact.

Source: Jurupa Community Services District Urban Water Management Plan (2015).

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hydrology and Water Quality Page 70

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Groundwater Supply

The Project site would be served with potable water by the Jurupa Community Services District.

Domestic water supplies from this service provider are reliant on groundwater from the Chino Groundwater Basin as a primary source.

The Chino Basin was adjudicated by the California Superior Court in 1978 to regulate the amount of groundwater that can be pumped from the basin by creating the Chino Basin Water master to oversee management of water rights. The Jurupa Community Services District currently has total production water rights of 14,659 AFY from the Chino Basin. In addition, the District has rights to “carry over” supplies of water that was previously not used. Due to the existing regulations related to groundwater pumping that are implemented by the Chino Basin Watermaster, the Jurupa Community Services District would not pump substantial ground water amounts that could result in a substantial depletion of groundwater supplies.

Groundwater Recharge

Development of the Project would increase impervious surface coverage on the site which would in turn reduce the amount of direct infiltration of runoff into the ground. This would have a less than significant impact on groundwater recharge in the areas of the Chino Groundwater Basin that are managed for that purpose, since those recharge areas do not encompass the Project site.

Based on the above analysis, impacts to groundwater supplies and recharge would be less than significant and no mitigation measures are required

3.10(c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner that would:

(i)
Result in substantial erosion or siltation on- or off-site?

(ii)
Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite?

(iii)
Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff?

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hydrology and Water Quality Page 71

(iv) Impede or redirect flood flows?

Determination: Less Than Significant Impact.

Sources: Hydrology and Hydraulic Report (Appendix G), Preliminary Water Quality Management Plan (Appendix H).

Impact Analysis

Existing Condition

The site drains from west to southeast, where all the water drains to Van Buren Blvd. at the southeast corner of the site.

Post-Development Condition

The site is bounded on 3 sides, 2 sides by streets on the west and northeast and the 3rd side the south by existing homes. Both of the streets will be improved as part of this project. On the south are existing homes will h ave a new wall constructed and a shallow landscaping / retention area to help desilt and clarify the water before it will be picked up by catch basins and conveyed to the underground detention basin. The area is designed for only 6” depth of water to allow for water to settle. At 6” in depth the water will flow into the catch basins. If the basins were to plug up, the water will get to a depth of 1’ before the water will overflow to the next basin and so on till it will eventually flow to the above ground detention basin in the southeast corner of the site. All of these basins are below the adjacent grade to the south to keep the water from flowing to the south and from the site. The wall along the south property line will keep the water from leaving the sit e and flowing to the south.

Conclusion

Based on the design of the Project’s storm water management system as described above and with implementation of PPP 3.10 -1 through 3.10 -4,
all storms have been reduced below the pre-
developed condition to not incur any additional downstream flooding. Impacts are less than significant.

3.10(d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?

Determination: No Impact.

Source: General Plan Figure 8-9: Flood Insurance Rate Map (FIRM).

Plans, Policies, Programs (PPP)

There are no Plans, Policies, Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Hydrology and Water Quality Page 72

According to General Plan Figure 8 -9: Flood Insurance Rate Map (FIRM ), the Project site i s not located within a flood hazard zone . According to the California Department of Conservation, California Official Tsunami Inundation Maps the si te is not located within a tsunami inundation zone. The Project would not be at risk from seiche because there is no water body in the area of the Project site capable of producing as sesiche. As such, there is no impact.

3.10(e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?

Determination: Less Than Significant Impact.

Sources: Hydrology and Hydraulic Report (Appendix G), Preliminary Water Quality Management Plan (Appendix H).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

With implementation of the drainage system improvements and f eatures described under Issues

3.10a, 3.10b, and 3.10c above, the P roject will not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan. Impacts are less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Land Use and Planning Page 73

3.11 LAND USE AND PLANNING

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Physically divide an established community? 
b. Cause a significant environmental impact due
to a conflict with any land use plan, policy, or
regulation adopted for the purpose of avoidin g
or mitigating an environmental effect?

3.11(a) Physically divide an established community?

Determination: No Impact.

Sources: Project Application Materials, Google Earth.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

An example of a Project that has the potential to divide an established community includes the construction of a new freeway or highway through an established neighborhood. The site is bound by Van Buren Boulevard on its northern boundary, Rutile Street on its western boundary, and residential developments on its southern boundary. As such, no impacts would occur with respect to dividing an established community.

3.11(b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Sources: General Plan, South Coast Air Quality Management District, Final 2016 Air Quality Management Plan, Western Riverside County Multiple Species Habitat Conservation Plan, Santa Ana Regional Water Quality Control Board’s Santa Ana River Basin Water Quality Control Program Project Application Materials

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Land Use and Planning Page 74

Plans, Policies, or Programs (PPP)

The applicable plans and policies relating to a conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the Project ( including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect are described in the analysis below.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

As demonstrated throughout this Initial Study/Mitigated Negative Declaration , the Project would otherwise not conflict with any applicable goals, objectives, and policies of the City of Jurupa General Plan or the City of Jurupa Valley Municipal Code. Additionally, the Project would not conflict with any applicable policy document, including the Western Riverside Multiple Species Habitat Conservation Plan, the Santa Ana Regional Water Quality Control Board’s Santa Ana River Basin Water Quality Control Program , the South Coast Air Quality Management District’s Air Quality Management Plan, and the WRCOG Climate Action Plan.

In conclusion, the Project would not conflict with any applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating adverse environmental effects and impacts are less than significant with implementation of the mitigation measures identified throughout this Initial Study/Mitigated Negative Declaration.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Mineral Resources Page 75

3.12 MINERAL RESOURCES

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Result in the loss of availability of a k nown
mineral resource that would be of value to the
region and the residents of the state?

b. Result in the loss of availability of a locally -
important mineral resource recovery site
delineated on a local general plan, specific plan
or other land use plan?

3.12(a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?

Determination: No Impact.

Source: General Plan.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

According to General Plan Figure 4- 16: Jurupa Valley Mineral Resources, the Project site is mapped within MRZ -3, which is defined as “Areas containing known or inferred mineral occurrences of undetermined mineral resources significance.” No mineral resource extraction activity is known to have ever occurred on the Project site. Accordingly, implementation of the Project would not result in the loss of availability of a known mineral resource that would be of value to the region or the residents of the State of California. Therefore, no impact would occur.

3.12(b) Result in the loss of availability of a locally i mportant mineral resource recovery site delineated on a local general plan, specific plan or other land use plan?

Determination: No Impact.

Source: General Plan.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Mineral Resources Page 76

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project site is not delineated on a local general plan, specific plan or other land use plan as a locally important mineral resource recovery site. There is no impact.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 77

3.13 NOISE

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Generation of a substantial temporary or
permanent increase in ambient noise levels in
the vicinity of the project in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies?

b. Generation of ex cessive groundborne vibration
or groundborne noise levels? 
c. For a project located within the vicinity of a
private airstrip or an airport land use plan or,
where such a plan has not been adopted, within
two miles of a public airport or public use
airport, would the project expose people
residing or working in the project area to
excessive noise levels?

3.13(a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standard s established in the local general plan or noise ordinance, or applicable standards of other agencies? Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: Noise Impact Study (Appendix J).

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to noise. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.12-1 As required by Municipal Code Section 11.05.020 (9) , private construction projects located within one -quarter (¼) of a mile from an inhabited dwelling shall not perform construction between the hours of six (6:00) p.m. and six (6:00) a.m. during the months of June through September and between the hours of six (6:00) p.m. and seven (7:00) a.m. during the months of October through May.

PPP 3.12-2 As required by Jurupa Valley Municipal Code Section 11.05.040, no person shall create any sound, or allow the creation of any sound, on any property that causes the exterior sound level on any other occupied property to exceed the sound level standards set forth in Table 1 of this section or that violates the special sound source standards set forth in Section 11.05. 060.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 78

Impact Analysis

Overview of the Existing Noise Environment

Traffic along Van Buren Boulevard and the Union Pacific Railroad to the north are the primary sources of noise impacting the site and the surrounding area. Noise data indicates the ambient noise level ranges between 64.7 dBA Leq to 73.2 dBA Leq over the entire 24 -hour monitoring period. The measured CNEL is 75.7 dBA.

Sensitive Land Uses in the Project Vicinity

Sensitive r eceptors that may be affected by project construction and operational noise include existing residences to the west, and south.

General Plan Noise Standards

General Plan Noise Element Policy NE 1.3 states:

“New or Modified Stationary Noise Sources . Noise created by new stationary noise sources, or by existing stationary noise sources that undergo modifications that may increase noise levels, shall be mitigated so as not exceed the noise level standards of Figure 7 -3. This policy does not apply to noise levels associated with agricultural operations existing in 2017.”

The Project is an commercial use and according to Figure 7-3 of the General Plan, a noise level of up to 70 dBA is considered to be “n ormally acceptable” and up to 77.5 dBA as is considered to be “conditionally acceptable.”

Construction Noise

Project construction would include site preparation, grading, building constru ction, architectural coating, and paving of the commercial development and associated parking lot. As shown on Table 14, noise levels generated by heavy construction equipment can range from approximately 75 dBA to 90 dBA when measured at 50 feet.

Table 14. Typical Construction Equipment Noise Levels
Type of Equipment

Range of Sound Levels Measured
(dBA at 50 feet)

Jack Hammers 75 to 85
Pneumatic Tools 78 to 88
Dozers 85 to 90
Tractors 77 to 82
Front-End Loaders 86 to 90
Graders 79 to 89
Air Compressors 76 to 86
Trucks 81 to 87
Source: “Noise Control for Buildings and Manufacturing Plants”, Bolt, Beranek & Newman, 1987, as cited in the General Plan EIR

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 79

Typical operating cycles for these types of construction equipment may involve one or two m inutes of full power operation followed by three to four minutes at lower power settings. Noise levels will be loudest during the grading phase. A likely worst-case construction noise scenario during grading assumes the use of 1 -grader, 1-dozer, 2-excavators, 2-scrapers and 2-backhoes operating at 50 feet from the nearest sensitive receptor. Assuming a usage factor of 40 percent for each piece of equipment, unmitigated noise levels at 50 feet have the potential to reach 81 dBA Leq at the nearest sensitive r eceptors during building constructionwhich takes into account the existing wall at the southern property line separating the project sitefrom the residences. The existing wall will provide approximately 9 dB of reduction due to the height and current desig n. Noise levels for the other construction phases would be lower, approximately 76 dBA.

Per Section 11.05.020 (9) of the Municipal Code, construction activities occurring between the hours of 6:00 AM and 6:00 PM during the months of June through September and between 7:00 AM and 6:00 PM during the months of October through May are exempt from noise standards.

Regardless of the Project’s consistency with the time limitation on construction noise per the Municipal Code as described above, construction act ivities, especially those involving heavy equipment, will result in noise levels up to 76 dBA. Therefore, the following mitigation measure is required to reduce construction noise impacts to the maximum extent feasible:

Mitigation Measure (MM)

Mitigation Measure NOI -1-Construction Noise Mitigation Plan . Prior to the issuance of a grading permit, the developer is required to submit a construction -related noise mitigation plan to the City Planning Department for review and approval. The plan must depict the location of construction equipment and how the noise from this equipment will be mitigated during construction of this project. In addition, the plan shall require that the following notes are included on grading plans and building plans. Project contract ors shall be required to ensure compliance with the notes and permit periodic inspection of the construction site by City of Jurupa Valley staff or its designee to confirm compliance. These notes also shall be specified in bid documents issued to prospecti ve construction contractors.

“a) Haul truck deliveries shall be limited to between the hours of 6:00am to 6:00pm during the months of June through September and 7:00am to 6:00pm during the months of October through May.

b) Construction contractors shall equip all construction equipment, fixed or mobile, with properly operating and maintained mufflers, consistent with manufacturers’ standards.

c) All stationary construction equipment shall be placed in such a manner so that emitted noise is directed away from any sensitive receptors adjacent to the Project site.

d) Construction equipment staging areas shall be located the greatest distance between the staging area and the nearest sensitive receptors.”

With implementation of Mitigation Measure NOI-1, impacts are less than significant.

Operational Noise (Stationary)

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 80

The operational stationary noise impacts associated with the proposed project would include condenser unit noise from the rooftop HVAC units, and loading/unloading, deliveries, trash truck activities from the rear service area, and the car wash. A total of sixteen (16) receptors were modeled to evaluate the proposed project’ s operational impact. As shown in Exhibit 3, Operational Noise Levels, a receptor is denoted by a yellow dot. All yellow d ots represent either a property line or a sensitive receptor such as an outdoor sensitive area (courtyard, patio, backyard, etc). Receptor number one (1) was used as a calibration point to ensure accuracy for the car wash blower output noise levels and com pared to the manufacturer’s sound level cutsheet data. It should be noted that the model includes a proposed 8-foot wall on the south property lines.

As shown in Exhibit 3, operational noise levels at the adjacent uses are anticipated to range between 38.1 dBA to 48.7 dBA Leq (depending on the location). These noise projections to the adjacent uses are below the City’s 55 dBA residential limit. T he project will increase the worst-case noise level by approximately 0.0 to 0.1 dBA Leq at residential receptors (R2 – R16). It takes a change of 3 dBA to hear a noticeable difference. The incre ase in noise level is below the typical noticeable difference in change of noise levels.

However, because the ambient existing noise levels exceed the City’s noise requirements for residential uses in the Project area, the following mitigation measures are required so as not to exacerbate the existing conditions and reduce impacts to the maximum extent feasible.

Mitigation Measures (MM’s)

Mitigation Measure NOI -2-Sound Wall : Prior to the issuance of building permits, the final site plan shall include an 8 -foot high wall on the property lines separating the project from any existing residences. The wall shall consist of decorative concrete block and shall have no decorative c utouts or other line-of-sight openings between shielded areas and the noise source.

Mitigation Measure NOI -3-HVAC Equipment. Prior to the issuance of building permits, the building plans shall require that any rooftop or ground mounted HVAC units shall be positioned at a physical distance as far as plausible from adjacent residences. In addition, the equipment shall be shielded by a parapet wall with a height equal or greater than the equipment. The height of the wall must be taller than HVAC and be designed to completely shield any noise that may be able to flank around the wall.

With implementation of Mitigation Measures NOI -2 and NOI -3, impacts related to stationary operational noise are less than significant.

Offsite Traffic Noise Impacts.

The primary source of noise generated by the Project will be from the vehicle traffic generated by the vehicle ingress and egress to the Project site. The City of Jurupa Valley considers a project to result in a significant traffic-related noise impact if traffic g enerated by that project would cause or contribute to exterior noise levels at sensitive receptor locations in excess of 65 dBA and the project’s contribution to the noise environment equals 3.0 dBA or more. (A change of 3.0 dBA is considered “barely perce ptible” by the human ear and changes of less than 3.0 dBA generally cannot be perceived except in carefully controlled laboratory environments).

The Project is anticipated to change the noise level 0.4 to 0.5 dBA CNEL. Although there is a nominal increase along these Van Buren Boulevard and Rutile Street , the proposed increase would still be MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 81

below the 65 dBA CNEL residential standard at any off- site receptors. The Existing Plus Project 65 dBA contour would extend an additional 29 from the centerline for t he Van Buren Boulevard and 8 feet from the centerline of Rutile Street. All existing residences are located behind existing barriers and/or are located outside the 65 dBA contour. Although there is an increase in traffic noise levels the impact is consider ed less than significant as the noise levels at or near any existing proposed sensitive receptor would be 65 dBA CNEL or less and the change in noise level is less than 3 dBA.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 82

Exhibit 3. Operational Noise Levels

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 83

3.13(b) Generation of excessive groundborne vibration or groundborne noise levels?

Determination: Less Than Significant Impact.

Source: Noise and Vibration Impact Analysis (Appendix H).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Construction Vibration

Construction of the Project will not employ any pile dr iving, rock blasting, or rock crushing equipment during construction activities, which are the primary sources of ground-borne noise and vibration during construction. Outdoor site preparation for the proposed Project is expected to require the use of a large bulldozer and loaded trucks, which would generate ground -borne vibration of up to 87 VdB (0.089 PPV [in/sec]) and 86 VdB (0.076 PPV [in/sec] when measured at 25 feet, respectively.

At a distance of 50 feet (distance residential structure from the property line), a large bulldozer would yield a worst -case 0.042 PPV (in/sec) which may be perceptible for short periods of time during grading along the southern property line of the Project site, but is below any threshold of damage. The impact is less than significant and no mitigation is required.

Operational Vibration

The proposed Project is a retail use and would not g enerate significant levels of vibration. In addition, vibration levels generated from Project-related traffic on the adjacent roadways are unusual for on -road vehicles because the rubber tires and suspension systems of on-road vehicles provide vibration isolation. Vibration generated from project -related traffic on the adjacent roadways would be less than significant, and no vibration reduction measures are required.

3.13 (c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?

Determination: No Impact.

Source: Flabob Airport Land Use Compatibility Plan.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Noise Page 84

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The proposed Project site is located approximately 4.8 miles southeast of the Flabob Airport and is not located within the Airport Influence Area for noise pursuant to the Flabob Airport Land Use Compatibility Plan. There is no impact.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Population and Housing Page 85

3.14 POPULATION AND HOUSING

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
businesses) or indirect ly (for example,
through extension of roads or other
infrastructure)?

b. Displace substantial numbers of existing
people or housing, necessitating the
construction of replacement housing
elsewhere?

3.14(a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?

Determination: Less than Significant Impact.

Source: Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project would not directly result in population growth because it does not propose any residential dwelling units . According to the General Plan Economic Sustainability Element : “The City is a net exporter of jobs, with more residents working outside the City than non-residents working inside the City.” (General Plan p. 11 -3.). Thus, it is anticipated that new employees generated by the Project would be within commuting distance and would not generate needs for any housing.

Typically, growth would be considered a significant impact pursuant to CEQA if it directly or indirectly affects the ability of agencies to provide needed public services and requires the expansion or new construction of public facilities and utilities.

Water and sewer service to the Project site will be provided by the Jurupa Community Services District. The Project will connect to the existing 10-inch diameter water main in Rutile Street and to the existing 8-inch diameter sewer main at the intersection of Rutile Street and Woodbridge Lane.

No additional infrastructure will be needed to serve the Project site other than connection to th e existing infrastructure in the vicinity of the Project site.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Population and Housing Page 86

In addition, the analysis in Section 3.15, Public Services, of this Initial Study Checklist demonstrates that the impacts on public services are less than significant so the public service provider’s ability to provide services will not be reduced. Based on the above analysis, impacts are less than significant.

3.14(b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere?

Determination: No Impact.

Sources: Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project site contains does not contain any residential units. Therefo re, implementation of the Project would not displace a substantial number of existing housing, nor would it necessitate the construction of replacement housing elsewhere. As such, there is no impact.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Public Services Page 87

3.15 PUBLIC SERVICES

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Would the Project result in substantial adverse
physical impacts associated with the provision
of new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of
which could cause significant environmental
impacts, in order to maintain acceptable service
ratios, response times or other performance
objectives for any of the public services:

1) Fire protection? 
2) Police protection? 
3) Schools? 
4) Parks? 
5) Other public facilities? 

3.15(a) Would the Project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:

FIRE PROTECTION

Determination: Less Than Significant Impact.

Source: Riverside County Fire Department.

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to fire protection. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.15-1 The Project applicant shall comply with all applicable Riverside County Fire Department codes, ordinances, and standard conditions regarding fire prevention and suppression measures relating to water improvement plans, fire hydrants, automatic fire extinguishing systems, fire access, access gates, combustible construction, water availability, and fire sprinkler systems.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Public Services Page 88

PPP 3.15-2 As required by Municipal Code Chapter 3.75, the Project is required to pay a Development Impact Fee that the City can use to improve public facilities and/or, to offset the incremental increase in the demand for public services that would be created by the Project.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Riverside County Fire Department provides fire protect ion services to the Project site . The nearest fire station is the Glen Avon Fire Station No. 17, an existing station located approximately

1.8 roadway miles north of the Project site at 10400 San Sevaine Way.

Development of the Project would impact fire protection services by placing an additional demand on existing fire protection resources should its resources not be augmented. To offset the increased demand for fire protection services, the Project would be conditioned by the City to provide a minimum of fire safety and support fire su ppression activities, including compliance with State and local fire codes, fire sprinklers, a fire hydrant system, paved access, and secondary access routes.

The Project would be required to comply with the provisions of Municipal Code Chapter 3.75 which requires payment of the Development Impact Fee to assist the City in providing for fire protection services. Payment of the Development Impact Fee would ensure that the Project provides fair share funds for the provision of additional public services, in cluding fire protection services, which may be applied to fire facilities and/or equipment, to offset the incremental increase in the demand for fire protection services that would be created by the Project.

In addition, as required by the City’s Inter -Agency Project Review Request process , the Project plans were routed to the Fire Department for review and comment on the impacts to providing fire protection services. The Fire Department did not indicate that the Project would result in the need for new or physically altered fire facilities in order to maintain acceptable service ratios, response times or other performance objectives.

Based on the above analysis, with implementation of PPP 3.15 -1 and PPP 3.15-2, impacts related to fire protection are less than significant.

POLICE PROTECTION

Determination: Less Than Significant Impact.

Sources: Riverside County Sheriff’s Department “Stations,” Riverside County General Plan, Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Public Services Page 89

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Riverside County Sheriff’s Depart ment provides community policing to the Project site via the Jurupa Valley Station located at 7477 Mission Boulevard, Jurupa Valley, CA. Development of the Project would impact police protection services. Consistent with General Plan Policy CSSF 2.1-2, the Project plans were routed to the Sheriff’s Department for review and comment to increase public safety and maintain close coordination with the Sheriff’s Department and law enforcement programs. The Sheriff’s Department did not indicate that new or physically altered Sheriff facilities will be required to serve the Project.

Based on the above analysis, with implementation of PPP 3.15 -2, impacts related to police protection are less than significant.

SCHOOLS

Determination: Less Than Significant Impact.

Sources: California Senate Bill 50 (Greene), Project Application Materials.

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts relating to schools. This measure will be included in the Project’s Mitigati on Monitoring and Reporting Program to ensure compliance:

PPP 3.14-3 Prior to the issuance of building permits, the Project Applicant shall pay required development impact fees to the Jurupa Unified School District following protocol for impact fee collection.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project does not propose any housing and would not directly create additional students to be served by the J urupa Unified School District. However, the Project would be required to contribute fees to the Jurupa Unified School District in accordance with the Leroy F. Greene School Facilities Act of 1998 (Senate Bill 50). Pursuant to Senate Bill 50, payment of sch ool impact fees constitutes complete mitigation under CEQA for Project-related impacts to school services.

Based on the above analysis, with implementation of PPP 3.15-3, impacts related to schools are less than significant.

PARKS

Determination: Less Than Significant Impact.

Source: Project Application Materials
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Public Services Page 90

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts relating to parks. This measure will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.14-4 Prior to the issuance of a building permit, the Project Applicant shall pay required park development impact fees to the Jurupa Area Recreation and Park District pursuant to District Ordinance No. 01-2007 and 02-2008.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
As noted in the response to Issue 3.15 (a) above, the Project will not create an additional need for housing thus directly increasing the overall population of the City and generating additional need for parkland. The payment of development impact fees will reduce any indirect Project impacts related to parks.

Based on the above analysis, with implementation of PPP 3.15-4, impacts related to parks are less than significant.

OTHER PUBLIC FACILITIES

Determination: Less Than Significant Impact.

Source: Project Application Materials.

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to parks. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.15-2 above is applicable to the Project.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

As noted in the response to Issue 3.1 5(a) above, development of the Project would not result in a direct increase in the population of the Project area and would not increa se the demand for public services, including public health services and library services which would require the construction of new or expanded public facilities.

The Project would be required to comply with the provisions of Municipal Code Chapter 3.75 which requires payment of the Development Impact Fee to assist the City in providing public services.

Payment of the Development Impact Fee would ensure that the Project provides fair share of funds MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Public Services Page 91

for additional public services. These funds may be applied to the acquisition and/or construction of public services and/or equipment.

Based on the above analysis, with implementation of PPP 3.15 -2 above, impacts related to other public facilities are less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Recreation Page 92

3.16 RECREATION

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Would the Project increase the use of existing
neighborhood and regional parks or other
recreational facilities such that substantial
physical deterioration of the facility would occur
or be accelerated?

b. Does the Project include recreational facilities or
require the construction or expansion of
recreational facilities, which might have an
adverse physical effect on the environment?

3.16(a) Would the proposed Project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
Determination: Less than Significant Impact.

Source: Project Application Materials.

Impact Analysis

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts relating to other public facilities .

These measures will be included in t he Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.15-4 Prior to the issuance of a building permit, t he Project Applicant shall pay required park development impact f ees to the Jurupa Area Recreation and Park District pursuant to District Ordinance No. 01-2007 and 02-2008.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project would not cause a substantial physic al deterioratio n of any park facilities or would accelerate the ph ysical deterioration of any park facilities because the Project does not proposes residential dwelling units which would increase the population that would use parks . The payment of Development Impact F ees will reduce any indirect Project impacts related to recreational facilities.

Based on the above analysis, with implementation of PPP 3.15-4, impacts related to recreational facilities would be less than significant and no mitigation measures are required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Recreation Page 93

3.16(b) Does the Project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse effect on the environment?
Determination: Less than Significant Impact.

Source: Project Application Materials

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis
As not ed in the response to Issue 3.16 (a) above, the Project does not propose any recreational facilities or require the construction or expansion of recreational facilities which might have an adverse effect on the environment . In addition, no offsite parks or recreational improvements are proposed or required as part of the Project.

Based on the above analysis , impacts related to parks and recreational facilities would be less than significant and no mitigation measures are required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Transportation Page 94

3.17 TRANSPORTATION

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Conflict with a program, plan, ordinance or
policy addressing the circulation system, ta king
into account all modes of transportation
including transit, roadway, bicycle and
pedestrian facilities?

b. Conflict or be inconsistent with CEQA Guidelines
section 15064.3, subdivision (b)? 
c. Substantially increase hazards due to a
geometric design feature (e.g., sharp curves or
dangerous intersections) or incompatible uses
(e.g., farm equipment)?

d. Result in inadequate emergency access? 

3.17(a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non -motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, h ighways and freeways, pedestrian and bicycle paths, and mass transit?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source. Traffic Impact Analysis (Appendix K).

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts relating to transportation/traffic.

These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.17-1 The Project Proponent shall make required per -unit fee payments associated with the Western Riverside County Transportation Uniform Mitiga tion Fees (TUMF) pursuant to Chapter 3.70 of the Municipal Code.

PPP 3.17-2 As required by Municipal Code Chapter 3.75 , the Project is required to pay a Development Impact Fee to assist the City in providing revenue that the City can use to fund transportation improvements such as r oads, bridges , major improvements and traffic signals.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Transportation Page 95

Impact Analysis

Motor Vehicle Analysis

For purposes of determining the significance of traffic impacts generated by the Project, the City relies upon the County of Riverside Traffic Impact Analysis Preparation Guidelines which contains the following significance criteria:

1) When existing traffic conditions exceed the General Plan target Level of Service (LOS).

2) When project traffic, when added to existing traffic w ill deteriorate the LOS to below the target LOS, and impacts cannot be mitigated through project conditions of approval.

3) When cumulative traffic exceeds the target LOS, and impacts cannot be mitigated through the TUMF network (or other funding mechani sm), project conditions of approval, or other implementation mechanisms.

Table 15 shows the Level of Service (LOS) Thresholds.

Table 15. Level of Service (LOS) Thresholds.

Level of Service (LOS) Signalized Intersection Unsignalized Intersection A ≤10 seconds ≤10 seconds
B 10–20 seconds 10–15 seconds
C 20–35 seconds 15–25 seconds
D 35–55 seconds 25–35 seconds
E 55–80 seconds 35–50 seconds
F >80 seconds >50 seconds
Source: County of Riverside Traffic Impact Analysis Preparation Guidelines

Study Area Intersections

The following study intersections were included in the analysis as shown on Table 16.

Table 16. Study Area Intersections
Intersection ID
#
Description
1 Etiwanda Avenue/Van Buren Blvd.

2 Van Buren Blvd/Bellegrave Avenue

3 Rutile Street/Galena Avenue (South)

4 Rutile Street/Van Buren Blvd.

5 Rutile Street/Galena Avenue (North)

6 Van Buren Blvd/Jurupa Road

7 Etiwanda Avenue/Bellegrave Avenue

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Transportation Page 96

Intersection ID
#
Description
8 Bain Street/Bellegrave Avenue

9 Bain Street/Galena Street

10 Bellegrave Avenue/Mission Blvd.

11 Bain Street/Jurupa Road

12 Rutile Street/Jurupa Road

13 Mission Blvd/Ben Nevis Blvd.

14 Lindsay Street/Mission Blvd.

15 Rutile Street/Bellegrave Avenue

16 Pedley Road/Mission Blvd.

17 Pedley Road/Jurupa Road

Source: Traffic Impact Analysis (Appendix K).

The following study area roadway segments were included in the analysis as shown on Table 17.

Table 17. Study Area Roadway Segments
Roadway Segment Description
1 Van Buren Blvd between Bellegrave Avenue and Jurupa Road 2 Bellegrave Avenue between Etiwanda Ave and Mission Blvd.

Source: Traffic Impact Analysis (Appendix K).

Traffic Scenarios Analyzed

The Traffic Impact Analysis prepared for the Project examined the following scenarios:

• Existing Conditions;
• Existing Plus Project (EP) Conditions;
• Existing Plus Ambient Plus Cumulative (EAC) Conditions; and • Existing Plus Ambient Plus Cumulative Plus Project (EACP) Conditions.

Trip Generation

The proposed Project is projected to generate 512 AM net peak hour trips, 652 PM net peak hour trips and 7,363 net daily trips after pass-by trip adjustments.

Summary of Impacts

Table 18 summarizes the results of the intersection level of service analysis based on the City of Jurupa Valley thresholds of significance for analyzing transportation impacts.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Transportation Page 97

Table 18. Summary of Significant Impacts at Study Intersections and Roadway Segments Intersectio
n ID #

EP EAC EACP
1 Etiwanda Avenue/Van Buren Blvd.

Cumulative

2 Van Buren Blvd/Bellegrave Avenue

Cumulative

Cumulative
3 Rutile Street/Galena Avenue (South)

4 Rutile Street/Van Buren Blvd.

5 Rutile Street/Galena Avenue (North)

Cumulative

Direct
6 Van Buren Blvd/Jurupa Road

Cumulative
7 Etiwanda Avenue/Bellegrave Avenue

8 Bain Street/Bellegrave Avenue

9 Bain Street/Galena Street

10 Bellegrave Avenue/Mission Blvd.

11 Bain Street/Jurupa Road

12 Rutile Street/Jurupa Road

13 Mission Blvd/Ben Nevis Blvd.

14 Lindsay Street/Mission Blvd.

15 Rutile Street/Bellegrave Avenue

16 Pedley Road/Mission Blvd.

Cumulative

17 Pedley Road/Jurupa Road

Cumulative

Cumulative

Roadway Segments Less Than Significant
Source: Traffic Impact Analysis (Appendix K).

As shown in Table 15, the Project will result in direct and cumulative impacts to six (6) study area intersections thus requiring mitigation.

Mitigation Measures

MM TR-1: Roadway and Signal Improvements. The project applicant shall construct the following improvements prior to the issuance of the first occupancy permit

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Transportation Page 98

1) Van Buren Blvd/Bellegrave Ave . – Re-time/optimize existing signalized intersection for the PM peak hour to allow for a longer westbound left -turn phase. Cycle length to remain the same. This improvement may require additional equipment as determined by the Public Works Department.

2) Rutile St/Galena Ave . (N) – Convert existing one -way stop controlled intersection into a signalized intersection. Signal to be coordinated with nearby railroad crossing, existing intersection of Van Buren Blvd/Rutile St., and future traffic signal on Van Buren at project site entrance. Rutile St/Galena Ave. signal will operate as an additional pre- signal for the Van Buren/Rutile intersection due to the short intersection spacin g. Applicant will be responsible for furnishing any and all new equipment and parts required for the signal(s) and signals coordination; i.e. a second master controller that can “oversee” the operations of the various signal sets to allow for coordination and the RR pre-emption operation.

3) Etiwanda Ave/Van Buren Blvd . – Re-time/optimize existing signalized intersection for the both the AM/PM peak hour to accommodate added volumes. Cycle length to remain the same. This intersection is coordinated with t he Caltrans traffic signal at the WB SR60 Off- Ramp and the new traffic signal at the intersection of Etiwanda Avenue and Riverside Drive. A coordination plan shall be prepared between all of these signals.

MM TR -2: Fair Share Payment- Van Buren Blvd/Bell egrave Ave. - The project applicant shall contribute fair share funding as determined by the Public Works Department for the following improvement prior to issuance of the first occupancy permit: Van Buren Blvd/Bellegrave Ave – Improve northbound approach from two existing northbound through lanes, to three northbound through lanes.

Transit Service Analysis

There are no existing transit services within a one -quarter mile walking distance of the proposed Project site. The nearest transit service is Rive rside Transit Route 21, with a stop at the Rutile Street/Jurupa Road intersection. In addition, the Project is not proposing to construct any improvements would interfere with any future bus service. There is no impact.

Bicycle & Pedestrian Facilities Analysis

The Project is not proposing to construct a ny improvements that will interfere with bicycle and pedestrian use. Pedestrian and bicycle access will be ava ilable to the Project sit e from Van Buren Boulevard and Rutile Street . In addition, bicycle pa rking will be provided on the Project site.

Therefore, the Project will not conflict with an applicable plan, ordinance or policy applying to non- motorized travel. Impacts are less than significant.

3.17(b) Conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?

Determination: No Impact.

Source: CEQA Guidelines

Impact Analysis

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Transportation Page 99

LOS has been used as the basis for determining the significance of traffic impacts as standard practice in CEQA documents for decades. In 2013, California Senate Bill (SB) 743 was passed, which is intended to balance the need for LOS for traffic planning with the need to build infill housing and mixed-use commercial developments within walking distance of mass transit facilities, downtowns, and town centers and to provide greater flexibility to local governments to balance these often competing needs. At full implementation of SB 743, the California Governor’s Office of Planning and Research (OPR) is expected to replace LOS as the metric against which traffic impacts are evaluated, with a metric based on vehicle miles traveled (VMT). On December 28, 2018, the OPR adopted several new changes to the CEQA Guidelines, including the requirement that lead agencies implement a VMT -based analysis, rather than a LOS metric, in reviewing traffic impacts. These changes to the Guidelines, however, also provide a “grace period,” and do not require lead agencies to apply a VMT metric until July 1, 2020. Because this Mitigated Negative Declaration is circulated for public review before July 1, 2020, the City, as the lead agency, was not required to use a VMT metric in its analysis of traffic impacts. For this reason, this Mitigated Negative Declaration uses a LOS metric in its traffic analysis as described in Sectio n 3.17 (a) above, and is thus in compliance with the standards in effect at the time of its circulation. As such, there is no impact.

3.17(c) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?

Determination: No Impact.

Source: Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Access to the site is from V an Buren Boulevard and Rutile Street which are existing improved roadways abutting the site. Van Buren Boulevard and Rutile Street are both fully improved roadways that currently meet City standards. In addition, the Project is proposing to construct one (1) new driveway approach each on both Van Buren Boulevard and Rutile Street that will also meet City standards.

The Project is a loc ated in an area with residential , commercial, and industrial uses. T he Project would not be incompatible with existing development in the surrounding area to the extent that it would create a transportation hazard as a result of an in compatible use (e.g. farm equipment) .

Accordingly, the Project would not substantially increase hazards due to a design feature or incompatible use. Impacts would be less than significant and mitigation is not required.

3.16(d) Result in inadequate emergency access?

Determination: Less Than Significant Impact.

Source: Project Application Materials.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Transportation Page 100

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

The Project would resul t in a new commercial use which would increase the need for emergency access to-and-from the site. Adequate emergency access would be provided to the Project site from Van Buren Boulevard and Rutile Street. During the course of the preliminary review of the Project, the Project’s transportation design was reviewed by the City’s Engineering Department, County Fire Department, and County Sheriff’s Department to ensure that adequate access to and from the site would be provided for emergency vehicles.

With the adherence to mandatory requirements for emergency vehicle access, impacts would be less than significant and no mitigation measures are required.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Tribal Cultural Resources Page 101

3.18 TRIBAL CULTURAL RESOURCES

Would the project cause a substantial adverse
change in the significance of a tribal cultural
resource, defined in Public Resources Code section
21074 as either a site, feature, place, cultural
landscape that is geographically defined in terms
of the size and scope of the landscape, sacred
place, or object with cultural value to a California
Native American tribe, and that is:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code section 5020.1(k)?

b. A resource determined by the lead agency, in its
discretion and supported by substantial
evidence, to be significant pursuant to criteria
set forth in subdivision (c) of Public Resources
Code Section 5024.1. In applying the criteria set
forth in subdivision (c) of Public Resource Code
Section 5024.1, the lead agency shall consider
the significance of the resource to a California
Native American tribe?

3.18(a) Listed or eligible for listing in the California Register of Historical Resources, or in a local regi ster of historical resources as defined in Public Resources Code section 5020.1(k)?

3.18(b A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?

Determination: Potentially Significant Impact With Mitigation Incorporated.

Source: AB 52 Consultation.

Tribal Cultural Resources consist of the following:

1. A tribal cultural resource listed in, or determined to be eligible by the State Historical Resources Commission, for listing in the California Register of Historical Resources.

(2) Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:

(A) Included or determined to be eligible for inclusion in the California Register of Historical Resources.

(B) Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Tribal Cultural Resources Page 102

(2) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. In applying the criteria set forth in subdivision (c) of Section 5024.1 for the purposes of this paragraph, the lead agency shall consider the significance of the resource to a California Native American tribe.

Assembly Bill (AB) 52 created a process for consultation with California Native American Tribes in the CEQA process. Tribal Governments can request consultation wi th a lead agency and give input into potential impacts to tribal cultural resources before the agency decides what kind of environmental assessment is appropriate for a proposed project.

The Planning Department notified the following California Native Am erican Tribes per the requirements of AB52:

• Gabrieleño Band of Mission Indians – Kizh Nation
• Soboba Band Luiseño Indians
• Torres Martinez Band of Cahuilla Indians.

The Soboba Band Luiseño Indians requested consultation and indicated that tribal cultural resources could be present on the site . As a result the AB52 consultation process, the following mitigation measure is required:

Mitigation Measure (MM)

TCR-1- NATIVE AMERICAN MONITORING, TREATMENT OF DISCOVERIES, AND DISPOSITION OF DISCOVERIES.

I.
a) TREATMENT PLAN: Prior to the issuance of a grading permit, the applicant shall submit a treatment plan in accordance with II (b) “Treatment of Discoveries” of this mitigation measure for the review and approval of the Planning Director.
b) ARCHAEOLOGICAL MONITOR: Prior to the issuance of the grading permit, the applicant shall submit documentation that a qualified archeological monitor meeting the professional standards of the appropriate culturally affiliated Native American tribes or bands. will be present for all ground -disturbing activities. The documentation shall include the archaeological contact information. An archaeological monitor shall be present for all ground- disturbing activates in conjunction with the project.

II.
a) MONITORING: Prior to the issuan ce of a grading permit, the applicant shall contact the consulting Native American Tribe(s) that have requested monitoring through consultation with the City during the AB 52 process ( Gabrieleño Band of Mission Indians – Kizh Nation and the Soboba Band Luiseño Indians). The applicant shall coordinate with the Tribe(s) to develop a Tribal Monitoring Agreement(s). A copy of the agreement shall be provided to the Jurupa Valley Planning Department prior to the issuance of a grading permit. In the event that evidence is provided to the City and Soboba Band Luiseño Indians that monitoring occurred by MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Tribal Cultural Resources Page 103

an archeological monitor meeting the professional standards of the Soboba Band Luiseño Indians for the proposed area of disturbance, Mitigation Measure TCR -1 in its entirety may be waived.
b) TREATMENT OF DISCOVERIES: If a significant tribal cultural resource is discovered on the property, ground disturbing activities shall be suspended 100 feet around the resource(s). A representative of the consulting Native American T ribe(s), the Project Proponent, and the City Planning Department shall confer regarding mitigation of the discovered resource(s). A treatment plan shall be prepared and implemented to protect the identified tribal cultural resources from damage and destruc tion. The treatment plan shall contain a research design, possible avoidance, and if necessary a data recovery program necessary to document the size and content of the discovery such that the resource(s) can be evaluated for significance under CEQA criteria. The research design shall list the procedures (limited to non -destructive analysis), appropriate to exhaust the research potential of the tribal cultural resources in accordance with current professional archaeology standards. The treatment plan shall require monitoring by the appropriate Native American Tribe(s) during data recovery and shall require that all recovered artifacts undergo basic field analysis and documentation, whichever is appropriate. At the completion of the basic field analysis and d ocumentation, any recovered tribal cultural resources shall be temporarily curated according to current professional repository standards until the course for final disposition is determined. A final report containing the significance and treatment findings shall be prepared by the archaeologist and submitted to the Jurupa Valley Planning Department, the Eastern Information Center, and the appropriate Native American Tribes.
c) DISPOSITION OF DISCOVERIES : In the event that Native American cultural resources ar e inadvertently discovered during the course of grading for this project. The following procedures will be carried out for treatment and disposition of the discoveries:

The landowner(s) shall relinquish ownership of all cultural resources, including sacred items, burial goods, and all archaeological artifacts and non -human remains as part of the required mitigation for impacts to tribal cultural resources. The applicant shall relinquish the artifacts through one or more of the following methods and provide the Jurupa Valley Planning Department with evidence of same:

1. The land owner shall accommodate the option for reburial of discovered artifacts onsite .

This shall include measures and provisions to protect the future reburial area from any future impacts. Re burial shall not occur until all cataloguing and basic recordation have been completed.

2 A curation agreement with an appropriate qualified repository within Riverside County that meets federal standards per 36 CFR Part 79 and therefore would be professi onally curated and made available to other archaeologists/researchers for further study. The collections and associated records shall be transferred, including title, to an appropriate curation facility within Riverside County, to be accompanied by payment of the fees necessary for permanent curation.

3. If more than one Native American Group is involved with the project and cannot come to a consensus as to the disposition of cultural materials, they shall be curated at the Western Science Center by default.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Tribal Cultural Resources Page 104

4. Should reburial of collected cultural items be preferred, it shall not occur until after the Phase IV monitoring report has been submitted to the Jurupa Valley Planning Department.

Should curation be preferred, the developer/permit applicant is res ponsible for all costs and the repository and curation method shall be described in the Phase IV monitoring report.

With implementation of Mitigation Measure TCR-1, impacts are less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Utilities and Service Systems Page 105

3.19 UTILITIES AND SERVICE SYSTEMS

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Require or result in the relocation or
construction of new or expanded water,
wastewater treatment or storm water,
drainage, ele ctric power, natural gas, or
telecommunications facilities, the construction
or relocation of which could cause significant
environmental effects?

b. Have sufficient water supplies available to
serve the project and reasonably foreseeable
future devel opment during normal, dry and
multiple years?

c. Result in a determination by the wastewater
treatment provider, which serves or may serve
the project that it has adequate capacity to
serve the project's projected demand in
addition to the provider's existing
commitments?

d. Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the
attainment of solid waste reduction goals?

e. Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?

3.19(a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water, drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Utilities and Service Systems Page 106

Water Facilities

The Project will connect to the existing 8-inch diameter water main in Rutile Street.

Wastewater Treatment Facilities

The Project will connect to the existing 8-inch diameter sewer main at the intersection of Rutile Street and Woodbridge Lane.

Storm Drainage Facilities

The site is bounded on 3 sides, 2 sides by streets on the west and northeast and the 3rd side the south by existing homes. Both of the streets will be improved as part of this project. On the south are existing homes will have a new wall constructed and a shallow landscaping / retention area to help desilt and clarify the water before it will be picked up by catch basins and conveyed to the underground detention basin. The area is designed for only 6” depth of water to allow for water to settle. At 6” in depth the water will flow into the catch basins. If the basins were to plug up, the water will get to a depth of 1’ before the water will overflow to the next basin and so on till it will eventually flow to the above ground detention basin in the southeast corner of the site. All of these basins are below the adjacent grade to the south to keep the water from flowing to the south and from the site. The wall along the south property line will keep the water from leaving the site and flowing to the south.

Electric Power Facilities

The Project will connect to the existing Southern California Edison electrical distribution facilities available in the vicinity of the Project site.

Natural Gas Facilities

The Project will connect to the existing Southern California Gas natural gas distribution facilitie s available in the vicinity of the Project site.

Telecommunication Facilities

The Project will connect to the existing facilities available in the vicinity of the Project site.

Conclusion

The installation of the facilities at the locations as described above are evaluated through out this Initial Study . In instances where impacts have been identified, Plans, Policies, Programs (PPP), Project Design Features (PDF), or Mitigation Measures (MM) are required to reduce impacts to less- than-significant levels. Accordingly, additional measures beyond those identified through out this Initial Study would not be required.

3.19(b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple years?

Determination: Less Than Significant Impact.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Utilities and Service Systems Page 107

Source: Jurupa Community Services District 2015 UWMP, Water and Sewer Will Serve Letter (Appendix J).

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis

Water use for the Project was estimated by using The Californ ia Emissions Estimator Model (CalEEMod). The model can be used to estimate water usage for analysis in CEQA documents. The Project is estimated to have a water demand of 8. 15 million gallons per year (or 22 ,328 gallons per day).

Water supplies to the P roject area are provided by Jurupa Community Services District, which serves 40.5 square miles of western Riv erside County and includes the Project site. Based on the most recent Jurupa Community Services District Urban Water Management Plan (2015) , the Jurupa Community Services District had a water demand of 22,381 acre- feet, and based on land use and growth projections it anticipated a demand of 24,997 acre- feet in 2020, which would be a 10 percent increase over 2015 demands (an increase of 2,616 acre- feet). The Urban Water Management Plan details that the Jurupa Community Services District has water supply to meet the projected demands over the next 20 years and beyond.

The proposed Project land uses would be consistent with existing land use and growth projections that are included in the Urban Water Management Plan projections; and thus, is included in the Urban Water Management Plan projections and Jurupa Community Services District would be able to meet all of the anticipated water supply needs. The W ater and Sewer Availability Letter (Appendix J) issued for the Project by the Jurupa Community Services District indicates that the District’s current water supply exceeds the projected daily demand projected in the next five (5) years. Therefore, the proposed Project would have sufficient water supplies available to serve the Project, and impacts would be less than significant.

3.19(c) Result in a determination by the wastewater treatment provider, which serves or may serve the project that it has adequ ate capacity to serve the project's projected demand in addition to the provider's existing commitments?

Determination: No Impact.

Source: Project Application Materials.

Plans, Policies, or Programs (PPP)

There are no Plans, Policies, or Programs applicable to the Project relating to this issue.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Utilities and Service Systems Page 108

Impact Analysis

Sanitary sewer service to the Project site would be provided by the Jurupa Community Services District (“District”). The District purchases treatment capacity at the Riverside Water Quality Control Plant (RWQCP), which is located on Acorn Street in the City of Riverside.

Wastewater use for the Project was estimated by using Th e California Emissions Estimator Model (CalEEMod). The model can be used to estimate wastewater usage for analysis in CEQA documents.

The Project is estimated to have an indoor water demand of 8.15 million gallons per year which includes wastewater. Assuming (a maximum) that all the water is discharged to the sewer system, the increase in wastewater from the proposed Project would be 25.0 AF/YR (acre feet per year).

The current capacity of the RWQCP is 40 million gallons per day (approximately 123 acre -feet per day). The City of Riverside is currently in the early planning stages for construction of additions to the plant. Quantities of wastewater collected and conveyed by the District to the RWQCP in 2015 was 2,212 AF/yr. The quantities projected to be co nveyed by District and treated by the City of Riverside over the next 25 years are: 2,290 AF/yr in 2020; 2,310 AF/yr in 2025; 2,320 AF/yr in 2030; 2,330 AF/yr in 2035; and 2,350 SF/yr in 2040. In addition, the Water and Sewer Availability Letter (Appendix J) issued for the Project by the Jurupa Community Services District indicates that the District presently maintains excess wastewater capacity at the RWQCP.

Therefore, implementation of the proposed Project would not result in impacts related to wastewater treatment provider capacity, and impacts would be less than significant.

3.19(d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?

Determination: Less Than Significant Impact.

Sources: Riverside County Waste Management, Cal Recycle Facility/Site Summary Details,

Plans, Policies, or Programs (PPP)

The following apply to the Project and would reduce impacts relating to la ndfill capacity. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

PPP 3.17-1 The Project shall comply with Section 4.408 of the 2013 California Green Building Code Standards, which requires new development projects to submit and implement a construction waste management plan in order to reduce the amount of construction waste transported to landfills. Prior to the issuance of building permits, the City of Jurupa Valley shall confirm that a sufficient plan has been submitted, and prior to final building inspections, the City of Jurupa shall review and verify the Contractor’s documentation that confirms the volumes and types of wastes that were diverted from landfill disposal, in accordance wi th the approved construction waste management plan.

Project Design Features (PDF)
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Utilities and Service Systems Page 109

Construction Related Impacts

Waste generated during the construction phase of the P roject would primarily consist of discarded materials from the construction of streets , common areas, infrastructure installation, and other project-related construction activities. The California Green Building Standards Code (“CALGreen’), requires all newly constructed buildings to prepare a Waste Management Plan and divert construction waste through recycling and source reduction methods. The City of Jurupa Valley Building and Safety Department reviews and approves all new construction projects required to submit a Waste Management Plan. Mandatory compliance with CALGreen solid waste requirements will ensure that construction waste impacts are less than significant.

In addition, a ccording to the Cal Recycle Facility/Site Summary Details website accessed on September 30 , 2019 , the landfills serving the Project site as described below rece ive well below their maximum permitted daily disposal volume and demolition and construction waste generated by the Project is not anticipated to cause these landfills to exceed their maximum permitted daily disposal volume. Furthermore, none of these regi onal landfill facilities are expected to reach their total maximum permitted disposal capacities during the Project’s construction period. As such, these regional landfill facilities would have sufficient daily capacity to accept construction solid waste generated by the commercial facility.

Operational Related Impacts

The California Emissions Estimator Model (CalEEMod) is a statewide land use emissions computer model designed to provide a uniform platform for government agencies to quantify potential ai r quality criteria pollutant emissions associated with both construction and operations from a variety of land use projects. The model can also be used to estimate solid waste generation rates for various types of land uses for analysis in CEQA documents. Waste disposal rates by land use and overall composition of municipal solid waste in California is primarily based on CalRecycle data. Based on solid waste generation usage obtained from CalEEMod, the Project would generate appr oximately 66 tons of solid waste per year or 361 pounds per day.

According to the Cal Recycle Facility/Site Summary Details w ebsite accessed on January 3, 2020, the Badlands Sanitary Landfill has a permitted disposal capacity of 4,000 tons per day with a remaining capacity of 15,748,799 cubic yards. The Badlands Sanitary Landfill is estimated to reach capacity, at the earliest time, in the year 2022 . The El Sobrante Landfill is has a permitted disposal capacity of 16,034 tons per day with a remaining capacity of 145,530,000 tons. T he El Sobrante Landfill is estimated to reach capacity, at the earliest time, in the year 2045.

Solid waste generated during long-term operation of the Project would be disposed at the Badlands Sanitary Landfill and/or the El Sobrante Landfill. During long -term operation, the Project’s solid waste generation of 361 pounds per day would represent a minimal amount of the daily permitted disposal capacity at the Badlands Sanitary Landfill and the El Sobrante Landfill.

The Project is not anticipated to cause these landfills to exceed their maximum permitted daily disposal volume. Because the Project would generate a relatively small am ount of solid waste per day, as compared to the permitted daily capacities for Badlands Sanitary Landfill and the El Sobrante Landfill, these regional landfill facilities would have sufficient daily capacity to accept solid waste generated by the Project.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Utilities and Service Systems Page 110

Based on the above analysis, impacts are less than significant.

3.19(e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?

Determination: Less Than Significant Impact.

Sources: California Assembly Bill 939 (Sher), Riverside County Waste Resources Management District, Riverside County Integrated Waste Management Plan, Riverside County Waste Management Department, Solid Waste System Study Report, Waste Management “El Sobrante Landfill”

Plans, Policies, or Programs (PPP)

The following applies to the Project and would reduce impacts relating to solid waste. This measure will be included in the Project’s Mitigation Monitoring and Reporting Program:

PPP 3.19-1 The Project shall comply with Section 4.408 of the 2013 California Green Building Code Standards, which requires new development projects to submit and implement a construction waste management plan in order to reduce the amount of construction waste transported to landfills. Prior to the issuance of building permits, the City of Jurupa Valley shall confirm that a sufficient plan has been submitted, and prior to final building inspections, the City of Jurupa shall review and verify the Contractor’s documentation that confirms the volumes an d types of wastes that were diverted from landfill disposal, in accordance with the approved construction waste management plan.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Impact Analysis.

Construction Related Impacts

Waste generated during the c onstruction of the Project would primarily consist of discarded materials from the construction of driveways , common areas, infrastructure installation, and other project-related const ruction activities. According to the Riverside County Waste Management Department, solid waste generated with in the City of Jurupa Valley is deposited at the Badlands Sanitary Landfill and the El Sobrante Landfill.

According to the Cal Recycle Facility/Site Summary Details website accessed on September 30 , 2019, these landfills receive below their maximum permitted daily disposal volume and demolition and construction waste generated by the Project is not anticipated to cause these landfills to exceed their maximum permitted daily disposal volume. Furthermore, none of these regional landfill facilities are expected to reach their total maximum permitted disposal capacities during the construction period for the commercial facility. As such, these regional landfill facilities would have sufficient daily capacity to accept construction solid waste generated by the Project.

Operational Related Impacts
MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Utilities and Service Systems Page 111

The California Integrated Waste Management Act established an integrated waste management system that focuse d on source reduction, recycling, composting, and land disposal of waste. In addition, the Act established a 50% waste reduction requirement for cities and counties by the year 2000, along with a process to ensure environmentally safe disposal of waste that could not be diverted. Per the requirements of the Integrated Waste Management Act, the Riverside County Board of Supervisors adopted the Riverside Countywide Integrated Waste Management Plan which outlines the goals, policies, and programs the County an d its cities will implement to create an integrated and cost effective waste management system that complies with the provisions of California Integrated Waste Management Act and its diversion mandates.

The Project operator (s) would be required to coordin ate with the waste hauler to develop collection of recy clable materials for the commercial facility on a common schedule as set forth in applicable local, regional, and State programs. Recyclable materials that would be recycled by the commercial facility include paper products, glass, aluminum, and plastic.

Additionally, the Project’s waste hauler would be required to comply with all applicable local, State, and Federal solid waste disposal standards, thereby ensuring that the solid waste stream to the landfills that serve the commercial facility are reduced in accordance with existing regulations.

Based on the above analysis, impacts are less than significant.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Wildfire Page 112

3.20 WILDFIRE

WILDFIRE -- If located in or near state
responsibility areas or lands class ified as very
high fire hazard severity zones, would the project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Substantially impair an adopted emergency
response plan or emergency evacuation plan?


b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to, pollutant concentrations from a
wildfire or the uncontrolled spread of a wildfire?


c) Require the i nstallation or maintenance of
associated infrastructure (such as roads, fuel breaks,
emergency water sources, power lines or other
utilities) that may exacerbate fire risk or that may
result in temporary or ongoing impacts to the
environment?


d) Exp ose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff , post -fire slope
instability, or drainage changes?

Determination: No Impact.

Sources: General Plan, Cal Fire.

Impact Analysis

A wildfire is a nonstructural fire that occurs in vegetative fuels, excluding prescribed fire. Wildfires can occur in undeveloped areas and spread to urban areas where the landscape and structures are not designed and maintained to be ignition resi stant. As stated in the State of Calif ornia’s General Plan Guidelines: “California’s increasing population and expansion of development into previously undeveloped areas is creating more ’wildland -urban interface’ issues with a corresponding increased risk of loss to human life, natural resources, and economic assets associated with wildland fires .” To address this issue, the state passed Senate Bill 1241 to require that General Plan Safety Elements address the fire severity risks in State Responsibility Ar eas (SRAs) and Local Responsibility Areas (LRAs). As shown in General Plan Figure 8 -11, Jurupa Valley contains several areas within Very High and High fire severity zones that are located in an SRA. SRAs are those areas of the state in which the responsibility of preventing and suppressing fires is primarily that of the Department of Forestry and Fire Protection, also known as CAL FIRE.

According to General Plan Figure 8 -11, Wildfire severity zones in Jurupa Valley, the Project site is located in the “Urba n-Unzoned” fire hazard area and is thus not located in or near state responsibility areas or lands classified as very high fire hazard severity zones. As such, there are no impacts.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Mandatory Findings of Significance Page 113

3.21 MANDATORY FINDINGS OF SIGNIFICANCE

Would the Project:

Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Does the Project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildl ife species, cause
a fish or wildlife population to drop
below self -sustaining levels, threaten to
eliminate a plant or animal community,
substantially reduce the number or
restrict the range of a rare or endangered
plant or animal or eliminate important
examples of the major periods of
California history or prehistory?

b. Does the Project have impacts that are
individually limited, but cumulatively
considerable? (“Cumulatively
considerable” means that the incremental
effects of a Project are considerable when
viewed in connection with the effects of
past projects, the effects of other current
projects, and the effects of probable
future projects)?

c. Does the Project have environmental
effects, which will cause substantial
adverse effects on human beings, either
directly or indirectly?

Impact Analysis

3.20(a) Does the Project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to dr op below self -sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: This Initial Study Checklist.

Impact Analysis

As noted in the analysis througho ut this Initial Study, the following apply to the Project and would reduce impacts relating t o this issue. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Mandatory Findings of Significance Page 114

Plans, Policies, or Programs (PPP)

All Plans, Policies, or Programs pertaining to Biological Resources and Cultural Resources shall apply.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Mitigation Measures (MM)

BIO-1, BIO-2, CR-1, CR-2, GEO-1, and TCR-1 shall apply.

In instances where impacts have been identified, the Plans, Policies, or Programs were applied to the Project based on the basis of federal, state, or local law currently in place which effectively reduces environmental impacts, or Mitigation Measures are required to reduce impacts to less than significant levels. Therefore, Project does not have impacts which would have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory.

3.19(b) Does the Project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a Project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: This Initial Study Checklist.

Impact Analysis

As noted in the analysis th roughout this Initial Stud y, the following apply to the Project and would reduce impacts relating to this issue. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

Plans, Policies, or Programs (PPP)

All Plans, Policies, or Programs (PPP) identified in this Initial Study Checklist document shall apply.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Mitigation Measures (MM)

BIO-1, BIO-2, CR-1, CR-2, GEO-1, GHG-1 through GHG -6, NOI-1 through NOI-3, TR-1 and TR-2, and TCR-1 shall apply.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Mandatory Findings of Significance Page 115

In instances where impacts have been identified, the Plans, Policies, or Programs were applied to the Project based on the basis of federal, state, or local law cur rently in place which effectively reduces environmental impacts, or Mitigation Measures are required to reduce impacts to less than significant levels. Therefore, Project does not have impacts that are cumulatively considerable.

3.19(c) Does the Project have environmental effects which would cause substantial adverse effects on human beings, either directly or indirectly?

Determination: Less Than Significant Impact With Mitigation Incorporated.

Source: This Initial Study Checklist.

Impact Analysis

As noted in the analysis throughout this Initial Study Checklist, t he following apply to the Project and would reduce impacts relating to this issue. These measures will be included in the Project’s Mitigation Monitoring and Reporting Program to ensure compliance:

Plans, Policies, or Programs (PPP)

All Plans, Policies, or Programs pertaining to Aesthetics, Agriculture and Forestry Resources, Air Quality, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Noise, Public Services, Transportation/Traffic, and Utility and Service Systems shall apply.

Project Design Features (PDF)

There are no Project Design Features applicable to the Project relating to this issue.

Mitigation Measures (MM)

GHG-1 through GHG-6, NOI-1 through NOI-3 shall apply.

In instances where impacts have been identified, the Plans, Policies, or Programs were applied to the Project based on the basis of federal, state, or local law currently in place which effectively reduces environmental impacts. Therefore, the Project does not have impacts which would cause substantial adverse effects on human beings, either directly or indirectly.

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

6References Page116

4.0 REFERENCES

California Environmental Quality Act (CEQA) Guidelines. http://opr.ca.gov/m_ceqa.php

California Environmental Quality Act (CEQA) Air Quality Handbook. http://opr.ca.gov/m_ceqa.php

City of Jurupa Valley General Plan, 2017 www.jurupavalley.org

City of Jurupa Valley General Plan EIR, 2017 www.jurupavalley.org

California Department of Toxic Substances Control, www.dtsc.ca.gov

Countywide Integrated Waste Management Plan www.rivcowom.org

Flood Insurance Rate Maps, Federal Emergency Management Agency, https://msc.fema.gov

South Coast Air Quality Management District,
www.aqmd.gov
.

South Coast Air Quality Management District, Final 2016 Air Quality Management Planwww.aqmd.gov

Western Riverside County Multiple Species Habitat Conservation Plan. http://www.rctlma.org/mshcp/

Western Riverside Council of Governments Subregional Climate Action Plan, September 2014. http://www.wrcog.cog.ca.us/community/sustainability

MA 19041
Initial Study/Mitigated Negative Declaration
March 23, 2020

Report Preparation Personnel Page 117

5.0 REPORT PREPARATION PERSONNEL

LEAD AGENCY:

City of Jurupa Valley
Planning Department
8930 Limonite Avenue
Jurupa Valley, Ca 92509

Ernest Perea, CEQA Administrator

M-1

6.0 MITIGATION MONITORING REPORTING PROGRAM

PROJECT NAME: MA 19041

DATE: March 25, 2020

PROJECT MANAGER: Rocio Lopez, Senior Planner

PROJECT DESCRIPTION: Commercial shopping center with an anchor market, sit -down restaurant, two (2) drive -thru restaurants, gas station with convenience store and a drive-thru car wash on a 16.2 acre site.

PROJECT LOCATION: Southeast corner of Van Buren Boulevard and Rutile Street. The Project site is also identified by the following Assessor Parcel Numbers: APNs: 167-330-006,010,015 and 167-110-039.

Throughout this Mitigation Monitoring and Reporting Program, reference is made to the following:

• Plans, Policies, or Programs (PPP) − These include existing regulatory requirements such as plans, policies, or programs applied to the Project based on the basis of federal, state, or local law currently in place which effectively reduce environmental impacts. • Project Design Features (PDF) − These measures include features proposed by the Project that are already incorporated into the Project’s design and are specifically intended to reduce or avoid impacts (e.g., architectural features). • Mitigation Measures (MM) − These measures include requirements that are imposed where the impact analysis determines that implementation of the proposed Project would result in significant impacts; mitigation measures are proposed in accordance with the requirements of CEQA.

Plans, Policies, or Programs (PPP) and Project Design Features (PDF) were assumed and accounted for in the assessment of impacts for each issue area. Mitigation Measures were formulated only for those issue areas where the results of the impact analysis identified significant impacts. All three types of measures described above will be required to be implemented as part of the Project.

M-2

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:

AESTHETICS
PPP 3.1 -1 As required by Municipal Code Section 9.148 -040 (3)(b), buildings shall not exceed fifty (50) feet unless a height up to seventy -five (75) feet is approved pursuant to Section 9.240.370.

Planning Department Prior to the issuance of
building permits

PPP 3.1 -2 As required by the General Plan Land Use Element, the Floor Area Ratio (FAR) shall not exceed 0.60
Planning Department Prior to the issuance of
building permits

PPP 3.1 -3 All outdoor lighting shall be designed and installed to comply with California Green Building Standard Code Section 5.106 or with a local ordinance lawfully enacted pursuant to California Green Building Standard Code Section 101.7, whichever is more stringent.

Planning Department Prior to the issuance of
building permits

PDF 3.1-1 As required by the building elevations submitted as part of the application materials for MA 19041, the primary exterior of the proposed buildings will consist of stucco exterior with batten boards, decorative stone, an d tempered glass with glazing.

Planning Department Prior to the issuance of
building permits

AIR QUALITY
PPP 3.3-1 The Project is required to comply with the provisions of South Coast Air Quality Management District Rule 403, “Fugitive Dust.” Rule 40 3 requires implementation of best available dust control measures during construction activities that generate fugitive dust, such as earth moving and stockpiling activities, grading, and equipment travel on unpaved roads.

Public Works and Engineering
Department
During grading
PPP 3.3-2 The Project is required to comply with the provisions of South Coast Air Quality Management District Rule 1186 “PM10 Emissions from Paved and Unpaved Roads and Livestock Operations” and Rule 1186.1, “Less -Polluting Street Sweepers.” Adherence to Rules 1186 and 1186.1 reduces the release of criteria pollutant emissions into the atmosphere during construction.

Building & Safety Department During construction
PPP 3.3-3 The Project is required to comply with the provisions of South Coast Air Quality Management District Rule 402 “ Nuisance.” Adherence to Rule 402 reduces the release of odorous emissions into the atmosphere.

Building & Safety Department
Engineering Department
Planning Department
During construction and
on-going

PPP 3.3-4 The Project is required to comply with the provisions of South Coast Air Quality Management District Rule 402 “ Nuisance.” Adherence to Rule 402 Planning Department On-going

M-3

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
reduces the release of odorous emissions into the atmosphere.

PPP 3.3-5 The Project is required to comply with the provisions of South Coast Air Quality Management District Rule 402 “ Nuisance.” Adherence to Rule 402 reduces the release of odorous emissions into the atmosphere.

BIOLOGICAL RESOURCES
PPP 3.4-1 The Project is required to pay mitigation fees pursuant to the Western Riverside County Multiple Species Habitat Conservation Plan (MHSCP) as required by Municipal Code Chapter 3.80.

Planning Department Prior to the issuance of a
grading permit

MM-BIO-1: Pre-Construction Burrowing Owl Survey. Within 30 calendar days prior to the issuance of a grading permit, a qualified biologist shall conduct a survey of the proposed impact footprint and make a determination regarding the presence or absence of the burrowin g owl. The determination shall be documented in a report and shall be submitted, reviewed, and accepted by the City of Jurupa Valley Planning Department prior to the issuance of a grading permit and subject to the following provisions:

a. In the event th at the pre -construction survey identifies no burrowing owls in the impact area, a grading permit may be issued without restriction.

b. In the event that the pre -construction survey identifies the presence of at least one individual but less than three (3 ) mating pairs of burrowing owl, then prior to the issuance of a grading permit and prior to the commencement of ground-
disturbing activities on the property, the
qualified biologist shall passively or actively relocate any burrowing owls. Passive relocation, including the required use of one -way doors to exclude owls from the site and the collapsing of burrows, will occur if the biologist determines that the proximity and availability of alternate habitat is suitable for successful passive relocation. Pass ive relocation shall follow California Department of Fish and Wildlife relocation protocol. If proximate alternate habitat is not present as determined by Planning Department Prior to the issuance of a
grading permit

M-4

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
the biologist, active relocation shall follow California Department of Fish and Wildlife relocation protocol. The biologist shall confirm in writing to the Planning Department that the species has fledged or been relocated prior to the issuance of a grading permit.

MM-BIO-2- Nesting Bird Surv ey. Prior to the issuance of a grading permit, the City of Jurupa Valley Planning Department shall ensure vegetation clearing and ground disturbance shall be prohibited during the migratory bird nesting season (February 1 through September 15), unless a migratory bird nesting survey is completed in accordance with the following requirements:

a. A migratory nesting bird survey of the Project’s impact footprint shall be conducted by a qualified biologist within three business (3) days prior to initiating vegetation clearing or ground disturbance.

b. A copy of the migratory nesting bird survey results report shall be provided to the City of Jurupa Planning Department. If the survey identifies the presence of active nests, then the qualified biologist shal l provide the Planning Department with a copy of maps showing the location of all active nests and an appropriate buffer zone around each nest sufficient to protect the nest from direct and indirect impact. The size and location of all buffer zones as determined by a qualified biologist, shall be subject to review and approval by the Planning Department. The nests and buffer zones shall be field checked weekly by a qualified biological monitor. The approved buffer zone shall be marked in the field with cons truction fencing, within which no vegetation clearing or ground disturbance shall commence until the qualified biologist and Planning Department verify that the nests
Planning Department Prior to the issuance of a
grading permit

CULTURAL RESOURCES
MM- CR-1: Archaeological Monitoring . A qualified archaeologist (the “Project Archaeologist”) shall be retained by the developer prior to the issuance of a grading permit. The Project Archaeologist will be on -call to monitor ground- disturbing activities and exc avations on the Project site following identification of potential cultural resources by project personnel. If archaeological resources are encountered during implementation of the Project, ground- disturbing activities will be temporarily redirected from t he vicinity of the find. The Project Archaeologist will be allowed to temporarily divert or redirect grading or Planning Department Prior to the issuance of a
grading permit

M-5

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
excavation activities in the vicinity in order to make an evaluation of the find. If the resource is significant, Mitigation Measure CR-2 shall apply.

MM- CR-2: Archeological Treatment Plan . If a significant archaeological resource(s) is discovered on the property, ground disturbing activities shall be suspended 100 feet around th e resource(s). The archaeological monitor, the Project Proponent, and the City Planning Department shall confer regarding mitigation of the discovered resource(s). A treatment plan shall be prepared and implemented by the archaeologist to protect the ident ified archaeological resource(s) from damage and destruction. The treatment plan shall contain a research design and data recovery program necessary to document the size and content of the discovery such that the resource(s) can be evaluated for significance under CEQA criteria. The research design shall list the sampling procedures appropriate to exhaust the research potential of the archaeological resource(s) in accordance with current professional archaeology standards (typically this sampling level is t wo (2) to five (5) percent of the volume of the cultural deposit). At the completion of the laboratory analysis, any recovered archaeological resources shall be processed and curated according to current professional repository standards. The collections a nd associated records shall be donated to an appropriate curation facility. A final report containing the significance and treatment findings shall be prepared by the archaeologist and submitted to the City of Jurupa Valley Planning Department and the East ern Information Center.

Public Works and Engineering
Department
Planning Department
During grading and in the
event of discovery of
resources during grading

GEOLOGY AND SOILS
PPP 3.7 -1 As required by Municipal Code Section 8.05.010, the Project is required to comply with the most recent edition of the California Building Code to preclude significant adverse effects associated with seismic hazards.

Building & Safety Department Prior to the issuance of
building permits

PPP’s 3.10 -1 through PPP 3.10 -4 in Section 3.9, Hydrology and Water Quality shall apply.

Engineering Department Prior to the issuance of a
grading permit and during
operation

M-6

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:

MM-GEO-1: Paleontological Monitoring. A qualified paleontologist (the “Project Paleontologist”) shall be reta ined by the developer prior to the issuance of a grading permit. The Project Paleontologist will be on -call to monitor ground- disturbing activities and excavations on the Project site following identification of potential paleontological resources by proje ct personnel. If paleontological resources are encountered during implementation of the Project, ground- disturbing activities will be temporarily redirected from the vicinity of the find.

The Project Paleontologist will be allowed to temporarily divert or redirect grading or excavation activities in the vicinity in order to make an evaluation of the find. If the resource is significant, Mitigation Measure GEO-2 shall apply.

Panning Department Prior to the issuance of a
grading permit.

MM-GEO-2: Paleontological Treatment Plan. If a significant paleontological resource(s) is discovered on the property, in consultation with the Project proponent and the City, the qualified paleontologist shall develop a plan of mitigation which shall include salvage excavat ion and removal of the find, removal of sediment from around the specimen (in the laboratory), research to identify and categorize the find, curation in the find a local qualified repository, and preparation of a report summarizing the find.

Public Works and Engineering
Department
Planning Department
During grading and in the
event of discovery of
resources during grading

GREENHOUSE GAS EMISSIONS
PPP 3.8 -1 As required by Municipal Code Section 8.05.010, California Energy Code, prior to issuance of a b uilding permit, the Project Applicant shall submit showing that the Project will be constructed in compliance with the most recently adopted edition of the applicable California Building Code Title 24 requirements.

Building & Safety Department Prior to the issuance of
building permits

PPP 3.8 -2 As required by Municipal Code Section 9.283.010, Water Efficient Landscape Design Requirements , prior to the approval of landscaping plans, the Project proponent shall prepare and submit landscape plans that demon strate compliance with this section.

Building & Safety Department Prior to the issuance of
building permits

M-7

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:

PPP 3.8 -3 As required by Municipal Code Section 8.05.010 (8), the Project proponent shall comply with the California Green Building Standards Building & Safety Department Prior to the issuance of
building permits

MM- GHG-1: GHG Reduction Documentation. Prior to the issuance of a building permit, documentation that the following GHG reduction measures shall be shall be implemented by the project is required. Documentation may consist of a letter stating how the project will comply and ident ify the verification mechanism for each measure required below (e.g. shown on building plans, landscaping plans, etc.)

1. The project shall devise a comprehensive water conservation strategy to reduce water use during project operation. The strategy will include the following:

• Install drought-tolerant plants for landscaping.
• Install water -efficient irrigation systems, such as weather -based and soil-moisture- based irrigation controllers and sensors, for landscaping according to the California Department o f Water Resources Model Efficient Landscape Ordinance.

Ensure that all landscape and irrigation measures are in compliance with the City’s Municipal, Landscaping and Water Conservation requirements.

Building & Safety Department Prior to the issuance of
building permits

MM-GHG-2: Building Design. The project will design building shells, building components, such as windows, roof systems and electrical systems to meet 2016 Title 24 Standards, which are 5 percent more stringent than the 2013 Title 24 Standards for nonresidential buildings.

Building & Safety Department Prior to the issuance of
building permits

MM-GHG-3: LEED Features . Buildings will be designed to provide CALGreen Standards with Leadership in Energy and Environmental Design (LEED) feature s for potential certification and will employ energy and water conservation measures in accordance with such standards. This includes design considerations related to the building envelope, HVAC, lighting, and power systems. Additionally, the architectural expression such as roofs and windows in the buildings will relate to conserving energy.

Building & Safety Department Prior to the issuance of
building permits

M-8

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:

MM-GHG-4. Energy Efficient Lighting. Prior to the issuance of a building permit, building pla ns shall require that high -efficiency lighting (such as LED lighting that is 34 percent more efficient than fluorescent lighting) be installed within buildings on-site.

Building & Safety Department Prior to the issuance of
building permits

MM-GHG-5. Eff icient Building Materials/Equipment. The project will utilize building materials/methods and heating equipment that are efficient and reduce emissions.

Building & Safety Department Prior to the issuance of
building permits

MM-GHG-6.Parking Lot Shading. A parking lot shading plan shall be required, which includes a shading calculation table. Within 15 years after establishment of the automobile parking area, the project shall require that a minimum of 50 percent automobile parking area to be shaded by shade trees.

Planning Department Prior to the issuance of
building permits

MM-GHG-7: Reduce Indoor Water Demand. Prior to the issuance of a building permit, building plans shall require that all faucets, toilets and showers installed in the proposed stru ctures utilize low -flow fixtures that would reduce indoor water demand by 20% per CalGreen Standards.

Building & Safety Department Prior to the issuance of
building permits

HAZARDS AND HAZARDOUS MATERIALS
PPP 3.9 -1 As required by Health and Safety Code Section 25507, if a future business handles a hazardous material or a mixture containing a hazardous material that has a quantity at any one time above the thresholds described in Section 25507(a) (1) through (6). a business shall establish and implement a business plan for emergency response to a release or threatened release of a hazardous material in accordance with the standards prescribed in the regulations adopted pursuant to Section 25503, aid business shall obtain approval from the Riverside County Department of Environmental Health prior to occupancy.

Planning Department Planning Department to
confirm if Riverside
County Department of
Environmental Health
requires a Business Plan
prior to occupancy

HYDROLOGY AND WATER QUALITY

M-9

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:

PPP 3.10 -1 As requi red by Municipal Code Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls , Section B (1), any person performing construction work in the city shall comply with the provisions of this chapter, and shall control storm water runoff so as to prevent any likelihood of adversely affecting human health or the environment. The City Engineer shall identify the BMPs that may be implemented to prevent such deterioration and shall identify the manner of implementation. Documentation on the effe ctiveness of BMPs implemented to reduce the discharge of pollutants to the MS4 shall be required when requested by the City Engineer.

Public Works and Engineering
Department
Prior to the issuance of
grading permits

PPP 3.10 -2 As required by Municipal Cod e Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls , Section B (2), any person performing construction work in the city shall be regulated by the State Water Resources Control Board in a manner pursuant to and consistent with applicable requirements contained in the General Permit No. CAS000002, State Water Resources Control Board Order Number 2009 -0009-DWQ. The city may notify the State Board of any person performing construction work that has a non-compliant construction site per the General Permit.

Public Works and Engineering
Department
Prior to the issuance of
grading permits and
during construction

PPP 3.10 -3 As required by Municipal Code Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls , Section C, n ew development or redevelopment projects shall control storm water runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. The City Engineer shall identify the BMPs that may be implemented to prevent such deterioration and shall identify the manner of implementation. Documentation on the effectiveness of BMPs implemented to reduce the discharge of pollutants to the MS4 shall be required when requested by the City Engineer. The BMPs may inc lude, but are not limited to, the following and may, among other things, require new developments or redevelopments to do any of the following:
(1) Increase permeable areas by leaving highly porous soil and low lying area undisturbed by:
(a) Incorporatin g landscaping, green roofs and open space into the project Public Works and Engineering
Department
Prior to the issuance of
grading permits and
during operation

M-10

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
design;
(b) Using porous materials for or near driveways, drive aisles, parking stalls and low volume roads and walkways; and
(c) Incorporating detention ponds and infiltration pits into the proje ct design.
(2) Direct runoff to permeable areas by orienting it away from impermeable areas to swales, berms, green strip filters, gravel beds, rain gardens, pervious pavement or other approved green infrastructure and French drains by:
(a) Installing rain-gutters oriented towards permeable areas; (b) Modifying the grade of the property to divert flow to permeable areas and minimize the amount of storm water runoff leaving the property; and
(c) Designing curbs, berms or other structures such that the y do not isolate permeable or landscaped areas.
(3) Maximize storm water storage for reuse by using retention structures, subsurface areas, cisterns, or other structures to store storm water runoff for reuse or slow release.
(4) Rain gardens may be prop osed in-lieu of a water quality basin when applicable and approved by the City Engineer.

PPP 3.10 -4 As required by Municipal Code Chapter 6.05.050, Storm Water/Urban Runoff Management and Discharge Controls , Section E, any person or entity that owns or operates a commercial and/or industrial facility(s) shall comply with the provisions of this chapter. All such facilities shall be subject to a regular pro gram of inspection as required by this chapter, any NPDES permit issued by the State Water Resource Control Board, Santa Ana Regional Water Public Works and Engineering
Department
During operation

M-11

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:

Quality Control Board, Porter -Cologne Water Quality Control Act (Wat ). Code Section 13000 et seq. ), Title 33 U.S.C. Section 1251 et seq. (Clean Water Act), any applicable state or federal regulations promulgated thereto, and any related administrative orders or permits issued in connection therewith.

NOISE
PPP 3.13 -1 As required by Municipal Code Section 11.05.020 (9), private construction projects located within one -quarter (¼) of a mile from an inhabited dwelling shall not perform construction between the hours of six (6:00) p.m. and six (6:00) a.m. during the months of June through September and between the hours of six (6:00) p.m. and seven (7:00) a.m. during the months of October through May.

Building & Safety Department Prior to the issuance of a building permit

PPP 3.13-2 As required by Jurupa Valley Municipal Code Section 11.05.040, no person shall create any sound, or allow the creation of any sound, on any property that causes the exterior sound level on any other occupied property to exceed the sound level standards set forth in Table 1 of this se ction or that violates the special sound source standards set forth in Section 11.05. 060.

Building & Safety Department During operation
Mitigation Measure NOI -1-Construction Noise Mitigation Plan . Prior to the issuance of a grading permit for Conditional Use Permit No. 17004, the developer is required to submit a construction -related noise mitigation plan to the City Planning Department for review and approval. The plan must depict the location of construction equipment and how the noise from this equip ment will be mitigated during construction of this project. In addition, the plan shall require that the following notes are included on grading plans and building plans. Project contractors shall be required to ensure compliance with the notes and permit periodic inspection of the construction site by City of Jurupa Valley staff or its designee
to confirm compliance. These notes also shall be specified in bid documents issued to prospective construction contractors.

“a) Haul truck deliveries shall be limi ted to between the hours of 6:00am to 6:00pm during the months of June through September and 7:00am to 6:00pm Planning Department Prior to the issuance of a
grading permit

M-12

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
during the months of October through May.

b) Construction contractors shall equip all construction equipment, fixed or mobile, with properly oper ating and maintained mufflers, consistent with manufacturers’ standards.

c) All stationary construction equipment shall be placed in such a manner so that emitted noise is directed away from any sensitive receptors adjacent to the Project site.

d) Constr uction equipment staging areas shall be located the greatest distance between the staging area and the nearest sensitive receptors.” Mitigation Measure NOI -2-Sound Wall : Prior to the issuance of building permits, the final site plan shall include an 8-foot high wall on the property lines separating the project from any existing residences. The wall shall consist of decorative concrete block and shall have no decorative cutouts or other line -of- sight openings between shielded areas and the noise source.

Planning Department Prior to the issuance of a
building permit

Mitigation Measure NOI -3-HVAC Equipment. Prior to the issuance of building permits, the building plans shall require that any roo ftop or ground mounted HVAC units shall be positioned at a physical distance as far as plausible from adjacent residences. In addition, the equipment shall be shielded by a parapet wall with a height equal or greater than the equipment. The height of the wall must be taller than HVAC and be designed to completely shield any noise that may be able to flank around the wall.

Planning Department Prior to the issuance of a
building permit

PUBLIC SERVICES
PPP 3.15 -1 The Project applicant shall comply with a ll applicable Riverside County Fire Department codes, ordinances, and standard conditions regarding fire prevention and suppression measures relating to water improvement plans, fire hydrants, automatic fire extinguishing systems, fire access, access gates , combustible construction, water availability, and fire sprinkler systems.

Fire Department Prior to issuance of a
building permit or
occupancy permit

M-13

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:

PPP 3.15-2 As required by Municipal Code Chapter 3.75, the Project is required to pay a Developme nt Impact Fee that the City can use to improve public facilities and/or, to offset the incremental increase in the demand for public services that would be created by the Project.

Building & Safety Department Per Municipal Code
Chapter 3.75

PPP 3.15 -3 Prior to the issuance of any building permit, the Project Applicant shall pay required development impact fees to the Jurupa Unified School District following protocol for impact fee collection.

Building & Safety Department Prior to the issuance of
building permits

PPP 3.15 -4 Prior to the issuance of a ny building permit, the Project Applicant shall pay required park development impact fees to the Jurupa Area Recreation and Park District pursuant to District Ordinance No. 01-2007 and 02-2008.

Building & Safety Department Prior to the issuance of
building permits

TRANSPORTATION
PPP 3.17-1 Prior to the issuance of any building permit, the Project Proponent shall make required per -unit fee payments associated with the Western Riverside County Transportation Uniform Mitigation Fees (TUMF), and the City of Jurupa Valley Development Impact Fee (DIF).

Building & Safety Department Prior to the issuance of
building permits

PPP 3.17-2 As required by Municipal Code Chapter 3.75, the Project is required to pay a Development Impact Fee to assist the City in providing revenue that the City can use to fund transportation improvements such as roads, bridges, major improvements and traffic signals.

Building & Safety Department Prior to the issuance of
building permits

MM TR -1: Roadway and Signal Improvements. The project applicant shall construct the foll owing improvements prior to the issuance of the first occupancy permit

1) Van Buren Blvd/Bellegrave Ave . – Re-time/optimize existing signalized intersection for the PM peak hour to allow for a longer westbound left- turn phase. Cycle length to remain the s ame. This improvement may require additional equipment as determined by the Public Works Department.

2) Rutile St/Galena Ave . (N) – Convert existing one -way stop controlled Public Works and Engineering
Department
Prior to the issuance of the
first occupancy permit

M-14

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
intersection into a signalized intersection. Signal to be coordinated with nearb y railroad crossing, existing intersection of Van Buren Blvd/Rutile St., and future traffic signal on Van Buren at project site entrance. Rutile St/Galena Ave. signal will operate as an additional pre -signal for the Van Buren/Rutile intersection due to the short intersection spacing. Applicant will be responsible for furnishing any and all new equipment and parts required for the signal(s) and signals coordination; i.e. a second master controller that can “oversee” the operations of the various signal sets to allow for coordination and the RR pre -emption operation.

3) Etiwanda Ave/Van Buren Blvd . – Re-time/optimize existing signalized intersection for the both the AM/PM peak hour to accommodate added volumes.

Cycle length to remain the same. This intersec tion is coordinated with the Caltrans traffic signal at the WB SR60 Off -Ramp and the new traffic signal at the intersection of Etiwanda Avenue and Riverside Drive. A coordination plan shall be prepared between all of these signals.

MM TR -2: Fair Share Payment - Van Buren Blvd/Bellegrave Ave . - The project applicant shall contribute fair share funding as determined by the Public Works Department for the following improvement prior to issuance of the first occupancy permit: Van Buren Blvd/Bellegrave Ave – Improve northbound approach from two existing northbound through lanes, to three northbound through lanes.

Public Works and Engineering
Department
Prior to the issuance of the
first occupancy permit

TRIBAL CULTURAL RESOURCES
TCR-1- NATIVE AMERICAN MONITORING, TREATMENT OF DISCOVERIES, AND DISPOSITION OF DISCOVERIES.

I.
c) TREATMENT PLAN : Prior to the issuance of a grading permit, the applicant shall submit a treatment plan in accordance with II (b) “Treatment of Discoveries” of this mitigation measure for the review and approval of the Planning Director.

Planning Department
Engineering Department
Prior to the issuance of a
grading permit and during
grading

M-15

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
d) ARCHAEOLOGICAL MONITOR : Prior to the issuance of the grading permit, the applicant shall submit document ation that an archeological monitor meeting the professional standards of the Secretary of Interior’s Standards will be present for all ground -disturbing activities.

The documentation shall include the archaeological contact information, too. An archaeolog ical monitor shall be present for all ground - disturbing activates in conjunction with the project.

II.
d) MONITORING: Prior to the issuance of a grading permit, the applicant shall contact the consulting Native American Tribe(s) that have requested monitoring through consultation with the City during the AB 52 process (Gabrieleño Band of Mission Indians – Kizh Nation and the Soboba Band Luiseño Indians). The applicant shall coordinate with the Tribe(s) to develop a Tribal Monitoring Agreement(s). A copy of the agreement shall be provided to the Jurupa Valley Planning Department prior to the issuance of a grading permit.
e) TREATMENT OF DISCOVERIES: If a significant tribal cultural resource is discovered on the property, ground disturbing activities shall be suspended 100 feet around the resource(s). A representative of the consulting Native American Tribe(s), the Project Proponent, and the City Planning Department shall confer regarding mitigation of the discovered resource(s). A treatment plan shall be prepared and implemented to protect the identified tribal cultural resources from damage and destruction. The treatment plan shall contain a research design, possible avoidance, and if necessary a data recovery program necessary to document the size and content of the discovery such that the resource(s) can be evaluated for significance under CEQA criteria.

The research design shall list the procedures (limited to non -destructive analysis), appropriate to exhaust the research potential of the tribal cultural resources in accordance with current professional archaeology standards. The treatment plan shall require monitoring by the appropriate Native American Tribe(s) during data recovery and shall require that all recovered artifacts undergo basic field analysis and documentation, whichever is appropriate. At the completion of the basic

M-16

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
field analysis and documentation, any recovered tribal cultural resources shall be temporarily curated according to current professional repository standards until the course for final disposition is determined. y. A final report containing the significance and treatment findings shall be prepared by the archaeologist and submitted to the Jurupa Valley Planning Department, the Eastern Information Center, and the appropriate Native American Tribes.
f) DISPOSITION OF DISCOVERIES: In the event that Native American cultural resources are inadvertently discovered during the course of grading for this project. The following procedures will be carried out for treatment and disposition of the discoveries:

The landowner(s) shall relinquish ownership of all cultural resources, including sacred items, burial goods, and all archaeological artifacts and non-human remains as part of the required mitigation for impacts to tribal cultural resources. The app
licant shall relinquish the artifacts
through one or more of the following methods and provide the Jurupa Valley Planning Department with evidence of same:

2. A fully executed reburial agreement with the appropriate culturally affiliated Native American tribe s or bands. This shall include measures and provisions to protect the future reburial area from any future impacts. Reburial shall not occur until all cataloguing and basic recordation have been completed.

3. A curation agreement with an appropriate qualified repository within Riverside County that meets federal standards per 36 CFR Part 79 and therefore would be professionally curated and made available to other archaeologists/researchers for further study. The collections and associated records shall be tran sferred, including title, to an appropriate curation facility within Riverside County, to be accompanied by payment of the fees necessary for permanent curation.

4. If more than one Native American Group is involved with the project and cannot come to a conse nsus as to the disposition of

M-17

MITIGATION MEASURE (MM)

PLANS, POLICIES, OR PROGRAMS (PPP)

PROJECT DESIGN FEATURES (PDF)

RESPONSIBILITY

FOR IMPLEMENTATION
TIME

FRAME/MILESTONE

VERIFIED
BY:
cultural materials, they shall be curated at the Western Science Center by default.

5. Should reburial of collected cultural items be preferred, it shall not occur until after the Phase IV monitoring report has been submitted to
the Jurupa Valley Planning Department. Should curation be preferred, the developer/permit applicant is responsible for all costs and the repository and curation method shall be described in the Phase IV monitoring report.

UTILITY AND SERVICE SYSTEMS
PPP 3.19 -1 The Project shall comply with Section 4.408 of the 2013 California Green Building Code Standards, which requires new development projects to submit and implement a construction waste management plan in order to reduce the amount of construction waste transported to landfills. Prior to the issuance of building permits, the City of Jurupa Valley shall confirm that a sufficient plan has been submi tted, and prior to final building inspections, the City of Jurupa shall review and verify the Contractor’s documentation that confirms the volumes and types of wastes that were diverted from landfill disposal, in accordance with the approved construction waste management plan.

Building & Safety Department Prior to the issuance of
building permits

ATTACHMENT NO. 6
Extension of Time Request Letter

← All documents from this meeting