Cities Index.
Agenda packet

La Cañada Flintridge City Council
June 3, 2026

Document
Agenda packet
Meeting
June 3, 2026
Body
La Cañada Flintridge City Council
Pages
323
Original file
14.0 MB
Text extracted from the city's file for reading and search. Open the original on lcfca.api.civicclerk.com. That file is the official record.

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title New Permit Technician - Full Time - Permanent Department Community Development - Building and Safety Division Requested Amount $114,050
Account Number(s) 01-26-5001 (Salaries Full Time - Building & Safety) 01-11-6061 (Information Technology - Administration)
01-05-8231 (Furnishing & Equipment - Community Development) Background The City has budgeted two full-time Permit Technicians and one part-time Building Permit Technician at 30 hours per week. The Building Permit Technician is responsible for the intake and screening of permit applications to ensure all required information and plans are submitted, coordinating the routing of plans among applicants, City staff, and outside plan check consultants and the majority of interaction with applicants on their permits. Duties also include invoicing and collection of permit fees, verifying that all required approvals from responsible agencies have been obtained, and providing general assistance to the public at the permit counter and via telephone.

Justification The permit processing workload has continued to increase year over year, and this has created a resultant backlog of permit applications. Over the past 3 fiscal years, the following number of permits were submitted:

FY 23-24 = 1915, FY 24-25 = 1945, anticipated for FY 25-26 = 2075 Additionally, surges in applications in 2025 were experienced based on expiring credits for solar projects and the transition to the newly adopted Building Code on 1/1/26.

With the transition from LA County Public Works to m6 Consulting in October 2024, several areas were identified where improvements to the development review process could be made to increase efficiency and reduce timeframes while minimizing costs. This includes moving the basic screening of permit applications and materials from the plan checker to the permit technicians, increasing the capacity of the plan checkers.

The department has been monitoring permit and plan check activity for the past 2.5 years, and has found that there is consistently at least 25-30 permits within the “submitted” queue waiting to be processed and that uncollected building permit and plan check fees (projects waiting to be processed or issued) are consistently over $3.75 million dollars.

The proposed request would result in one additional full-time Permit Technician, for a total of four full-time City Building & Safety Division staff. This increase in hours would enhance customer service within the Building and Safety Division by providing additional staffing capacity to eliminate the backlog of permit applications awaiting initial screening and to minimize processing delays for applicants.

The costs for salary and benefits, IT (hardware & software licensing) as well as a one-off cost for furniture modification are:

Fiscal Impact $100,450 (Salary & Benefits)
$3,600 (Information Technology)
$10,000 (Furnishings & Equipment)
Recurring Annual
Cost
$114,050
CD 7

Page 213 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Increase Contract Amount for Sustainability Analyst Consultant Department Community Development Department – Planning Division Requested Amount $80,000
Account Number 01-25-6061 (Professional Services)
Background On October 21, 2025, the City Council approved a 9-month contract with Cascadia Consulting Group Inc. for a consultant Sustainability Analyst, which would provide support to City staff and the Sustainability and Resilience Commission (SRC) through June 2026. In March, the City Council authorized a contract increase of $40,000, for a total contract amount of $102,750 through June 2026.

Justification The establishment of the new commission has taken more resources than initially anticipated, as acknowledged through the mid-year increase in the contract. An increase in the contract was required to account for the additional consultant services required as a result of additional SRC meetings above the once monthly meeting identified within the resolution establishing the Commission and five unanticipated subcommittee meetings. Additionally, the Commission has requested numerous agenda items that are loosely related to the Climate Action and Adaptation Plan, but not one of the identified implementation actions, that have necessitated additional research hours over and above the number anticipated for the year.

As staff do not have technical expertise in the sustainability realm, there is a need for the consultant Sustainability Analyst to attend all meetings and to undertake the additional research requests asked by the Commission. It is anticipated that the Commission will continue in the upcoming year to request subcommittee meetings between the Commission’s regular meetings to further explore topics. In this effort, additional funding for consultant costs is requested for the upcoming fiscal year to cover the work identified by the Commission as part of their ongoing workplan.

Fiscal Impact $80,000 (to be added to the budgeted amount of $100,000 for a total of $180,000)
Recurring Annual Cost $180,000
CD 8

Page 214 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Professional Services for Sustainable Mobility and Mode Shift Pilot Department Community Development – Planning Division
Requested Amount $100,000
Account Number(s) 01-25-6061 (Professional Services)
Background Request from the Sustainability and Resilience Commission:

The Climate Action and Adaptation Plan identifies transportation emissions reduction as a primary strategy to meet climate goals, with a focus on both reducing vehicle miles traveled and transitioning away from internal combustion engine vehicles. Expanding sustainable mobility options, including active transportation, micromobility, and electric vehicles, is essential to achieving these targets. These efforts directly support CAAP strategies related to mode shift, active transportation, and zero-emission vehicle adoption, including reduction of city-wide vehicle miles traveled, increasing EV infrastructure, and promotion of anti-idling benefits to reduce green house gas emissions.

The Sustainability and Resilience Commission recommends advancing a Sustainable Mobility Pilot to evaluate infrastructure, programs, and policies that support mode shift and reduce reliance on single-occupancy vehicle trips.

Justification Achieving meaningful mode shift requires a coordinated approach that integrates infrastructure, access, and user behavior. A pilot-based framework allows the City to test and refine strategies in a controlled and cost-effective manner before pursuing broader capital investments.

This effort will evaluate opportunities to improve pedestrian and bicycle connectivity, enable micromobility solutions, and support increased electric vehicle adoption. A key component of this work will include testing light, quick -build infrastructure such as temporary protected bike lanes, designated pedestrian corridors, signage, and shared mobility hubs near schools, parks, and employment centers. These installations allow the City to observe real-world usage, safety outcomes, and community response prior to permanent investment.

The pilot will assess how residents interact with different mobility options, identify barriers to adoption, and evaluate performance across different locations and user groups. Findings will inform a scalable approach to improving accessibility, safety, and connectivity across the City’s transportation network.

The outcome will be a comprehensive mobility framework outlining priority corridors, infrastructure typologies, and phased implementation pathways. This approach provides the City Council with a clear basis to evaluate opportunities before committing to capital expenditures while aligning future investments with demonstrated community needs.

This work will position the City to pursue external funding opportunities, including grants from the Southern California Association of Governments, California Air Resources Board, Los Angeles County Metro, and Clean Power Alliance, which support active transportation, zero-emission mobility, and community-based transportation programs.

Consultant support is required to conduct technical analysis, coordinate outreach, design pilot installations, and establish performance metrics for evaluation and scaling.

Fiscal Impact $100,000
Recurring Annual Cost None
CD 9

Page 215 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Professional Services for Transportation Demand Management and Shared Transit Department Community Development - Planning Division
Requested Amount $100,000
Account Number(s) 01-25-6061 (Professional Services)
Background Request from the Sustainability and Resilience Commission:

The 2024 Climate Action and Adaptation Plan identifies transportation as the largest source of greenhouse gas emissions, accounting for approximately 60 percent of total emissions. Reducing vehicle miles traveled and transitioning to lower-emission transportation systems are core strategies to meet the City’s climate goals while improving air quality and public health. These efforts directly support CAAP transportation strategies related to vehicle miles traveled reduction, transportation demand management, and mode shift, including Transportation Goals (T1, T2, and T3) strategy groupings.

The Sustainability and Resilience Commission recommends advancing a Transportation Demand Management and Shared Transit Pilot to evaluate targeted strategies that reduce single-occupancy vehicle trips. This includes electrified shuttle services, employer- and school-based commute programs, and improved connectivity to regional transit systems including the Los Angeles Metro network.

Justification Effective VMT reduction requires strategies tailored to local travel behavior, land use patterns, and community needs. A structured pilot approach allows the City to test targeted solutions at a limited scale while generating local performance data to inform future investment decisions.

This effort will focus on identifying and reducing high-frequency trip patterns by key user groups, including commuters, students, and families. The pilot will evaluate shared and electrified transit options, including coordinated shuttle routes, first- and last-mile connections to regional transit, and partnerships with major employers and schools to reduce peak-period vehicle trips.

In addition to service design, the pilot will assess route efficiency, scheduling, ridership demand, and connectivity to existing transportation networks. This approach reflects best practices used by comparable communities to improve mobility access while reducing reliance on single-occupancy vehicles.

The outcome will be a targeted implementation framework identifying priority corridors, service models, and partnership opportunities to support shared transit solutions. This framework will provide the City Council with a clear basis to evaluate next steps before committing to larger-scale capital or operational investments.

This initiative also positions the City to compete for external funding, including programs through the Southern California Association of Governments, California Air Resources Board, Los Angeles County Metro, and Clean Power Alliance, which support transportation demand management, zero-emission transit pilots, and regional mobility integration.

Consultant support is required to conduct technical analysis, develop pilot program design, coordinate stakeholder partnerships, and establish performance metrics for evaluation.

Fiscal Impact $100,000
Recurring Annual Cost None
CD 10

Page 216 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 ANNUAL BUDGET REVIEW
Request Title Professional Services for Greenways Coalition and Concept Planning Initiative Department Community Development – Planning Division
Requested Amount $25,000
Account Number(s) 1-25-6061 (Professional Services)
Background Request from the Sustainability and Resilience Commission:

The City’s Climate Action and Adaptation Plan identifies Green Community as a focus area, with goals to expand green space and improve resilience through nature-based solutions. Relevant supportive strategies include improving transportation network connectivity and reducing sources of vehicle miles traveled, as well as increasing, preserving and enhancing biodiversity in green spaces.

As part of the ongoing General Plan updates, including the Open Space and Recreation Element and Conservation Element, the Sustainability and Resilience Commission recommends advancing a Greenways and Resilient Infrastructure Concept Planning Initiative. This effort will evaluate opportunities to preserve and expand green space while integrating stormwater management, heat mitigation, and recreational access.

Justification This request funds a focused preliminary planning effort to evaluate the feasibility of transforming existing stormwater infrastructure into multi-benefit greenways. Much of the City’s drainage system was designed for rapid conveyance and does not reflect current best practices for stormwater capture, groundwater recharge, and heat mitigation. The 1934 infrastructure may be insufficient to manage peak flows associated with atmospheric rivers and more frequent storm events. Modern hydrological approaches favor living systems that attenuate flow, capture runoff, and support groundwater recharge, turning excess water into a resource that enhances resilience and reduces heat impacts.

This initial phase will focus on the Winery Canyon Channel and a 22 -acre utility easement site parallel to the Trail Loop to identify opportunities, constraints, and high-level design concepts for transitioning from single-use flood control to a multi-benefit greenway corridor. The effort will include preliminary technical review, site assessment, and identification of feasible approaches for further study.

The outcome will be a high-level feasibility summary and concept framework outlining potential design directions, implementation considerations, and funding opportunities. This will provide the City Council with a clear basis to evaluate whether and how to proceed with more detailed planning before committing to capital expenditures.

This phased approach is intended to position the City to pursue external funding for further study, feasibility, and design visioning, including approximately $500,000 from the Los Angeles County Safe Clean Water Program (Measure W), $250,000 from the Arroyo Verdugo Subregional Program (Measure M), and up to $1,000,000 from State climate and infrastructure funding sources. These programs are designed to support development of shovel-ready plans and would enable the City to advance this concept without reliance on the General Fund for future phases.

The effort will be led by a consultant with oversight from the Sustainability and Resilience Commission to ensure alignment with City priorities and CAAP goals. Consultant support will focus on targeted technical analysis, coordination with relevant stakeholders, and preparation of a concise deliverable to inform next steps and potential implementation phases. The consultant will also engage relevant agencies and utility partners to identify requirements and build early alignment, helping establish a viable pathway for future project development and funding.

Fiscal Impact $25,000
Recurring Annual
Cost
None ($1.7 million in External Feasibility Funding)
CD 11

Page 217 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Sustainability & Resilience Commission (SRC) Community Outreach & Engagement Implementation
Department Community Development – Planning Division
Requested Amount $36,840
Account Number(s) 01-25-6061 (Professional Services)
Background Request from the Sustainability and Resilience Commission:

The Climate Action and Adaptation Plan identifies community education and outreach as necessary to achieve emissions reductions and strengthen resilience. Key topics include available rebates and incentives such as AQMD and Clean Power Alliance programs, PACE financing, home energy audits, and building electrification including heat pumps; mobility strategies such as active transportation and antiidling awareness; community engagement efforts including workshops and pilot programs to support new initiatives; and resilience measures such as composting, stormwater capture, native landscaping, and home hardening for wildfire risk reduction. These efforts directly support energy, climate resilience, built environment, transportation, and resource conservation goals (Strategies E3.5, E3.6, E1.1, CR3.1, BE2.1, T3.2, and RC6.2).

The Sustainability and Resilience Commission has prioritized development of a centralized, web-based CAAP hub to provide residents and businesses with clear and actionable information. The CAAP also identifies interdepartmental coordination as a foundational strategy. A centralized platform supports consistent communication across departments and improves alignment as new programs and policies are introduced.

Justification This request establishes a durable communication asset that reduces reliance on higher-cost, one-time outreach methods. A centralized web-based hub allows the City to update and distribute information in real time at minimal marginal cost. It also provides a consistent platform to support Council-adopted programs, policy changes, and ongoing community engagement, including surveys and feedback.

Implementation falls within the current Sustainability Analyst scope and requires coordination with Communications, IT, and the City’s website vendor. Timing will align with federally mandated ADA compliance updates currently underway through the website redesign. Implementation will occur in two cost-effective phases:

Phase I (Q3/Q4 2026): Use existing communication channels to share information on rebates, grants, sustainability practices, and home hardening. Channels include the City newsletter, social media, email distributions, existing web page updates, local media, and partnerships with community organizations and the Chamber of Commerce. Concurrently, staff and the consultant will develop the content and materials for the CAAP hub within the redesigned website.

Phase II (Q1/Q2 2027): Launch the CAAP hub with program information, implementation tracking, and community feedback tools.

Consultant will support and assist with content development, feedback and input surveys, City communications, and reporting on SRC initiatives. (Estimated time for consultant completion - 154 hours)
Fiscal Impact $36,840
Recurring Annual Cost $20,000
CD 12

Page 218 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 ANNUAL BUDGET REVIEW
Request Title Citywide Street Resurfacing
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $2,800,000
Source of Funding SB1 ($576,350), Measure M ($550,000), Measure R ($90,000), General Fund ($1,583,650) Account Number(s) 31-2x01
Background The Public Works Department annually assembles a list of proposed street segments for the next resurfacing project as part of the recurring Capital Improvement Program. The first criteria in the selection process is a review of the latest Pavement Condition Report prepared by the Los Angeles County Department of Public Works. The basis for the selection of streets is the Pavement Condition Index (PCI). A street with a PCI below 58 is rated as poor; below 40 is rated as failed. Streets within those two categories are ranked in numerical order from lowest to highest.

From the recommended streets, four additional factors are then considered to further prioritize the list: (1) condition of the concrete curb, gutter, cross gutters, and sidewalk; (2) need for additional sidewalk; (3) need for drainage improvements; and (4) groupings of streets to allow formaximum efficiency and more competitive pricing. The Road Repair and Accountability Act of 2017 (SB 1) is an eligible source of funding for this project as long as the City meets its Maintenance of Effort (MOE) funding.

For FY 2026-27, Public Works is recommending the following 3.53 centerline miles of streets at an estimated cost of $2,800,000 for the design and construction of the Project. The overall PCI for these streets is 60, just above the rating of poor.

Proposed Streets
• Starlight Crest Drive (from Burning Tree Dr. to Gleneagle Place) • Gleneagle Place (from Starlight Crest Dr. to Cul-De-Sac) • Tondolea Lane (from Palm Drive to Lone Pine Lane)
• Solliden Lane (from Jesson Drive to Cul-De-Sac)
• Sunnybank Drive (from Castle Road to Cul-De-Sac)
• Patagonia Drive (from Castle Road to Cul-De-Sac)
• Littleton Place (from Foothill Blvd. to Cul-De-Sac)
• Lyans Drive (from Rosebank Drive to Palm Drive)
• Ocean View Blvd. (from Foothill Blvd. to Cross Street) • Earlmont Avenue (from Fairmount Ave. to Alta Canyada Rd.) • Cross Street (from Ocean View Blvd. to Castle Road)
• Rosebank Drive (from Lyans Dr. to Cross Street)
• Georgian Road (from Commonwealth Ave. to Woodleigh Lane) • Conle Way (from Ocean View Blvd. to Cul-De-Sac)
• Leir Drive (from Conle Way to Cul-De-Sac)
• Saranne Street (from Ocean View Blvd. to Cul-De-Sac)
• Matley Road (from Cross Street to Cul-De-Sac)
• Castle Lane (from Foothill Blvd. to Castle Road)
• Via Venado Street (from Castle Road to Cul-De-Sac)
Justification To maintain City streets for all users–pedestrians, bicyclists, and motorists Fiscal Impact $2,800,000
Recurring Annual Cost Reduced annual maintenance cost of the streets included in the project Eligible Sources of
Funding
SB1, Measure M, Measure R, General Fund
PW 01

Page 219 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 ANNUAL BUDGET REVIEW
Request Title Miscellaneous Concrete Repairs
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $200,000
Source of Funding TDA ($16,960); General Fund ($183,040) Account Number(s) 31-2x02
Background As part of the City’s annual maintenance program, the City repairs damaged or broken concrete sidewalks and installs or repairs damaged ADA curb ramps throughout the City.

Each year, the Public Works Department receives numerous public requests for the repair of sidewalks, curbs, gutters, and cross gutters. From the assembled list, priority is given to ADA compliance.

Public Works is requesting $200,000 in FY 2025-26 for design and construction of the proposed project.

Justification Concrete repairs improve the drainage flow and pedestrian accessibility.

Fiscal Impact $200,000
Recurring Annual Cost Reduced annual maintenance costs for those areas that are improved.

Eligible Sources of
Funding
Transportation Development Act (TDA), General Fund
PW 02

Page 220 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Drought Tolerant Landscape Medians
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $1,375,000
Sources of Funding General Fund
Account Number(s) 31-2409
Background In FY 2023-24, Public Works submitted a funding request for a Drought Tolerant Median Landscaping project based on a successful pilot of drought tolerant median on Foothill Boulevard between Indiana Avenue and Alta Canyada Road. The City Council approved $250,000 for the preparation of Plans, Specifications & Estimates (PS&E), which was completed in June 2025. The total estimated construction cost is $2.6 million. Staff submitted a funding request for this amount in FY 2025-26, but the project was not funded.

Staff recommends phasing the construction into two phases: (I) Briggs Avenue to Chevy Chase Drive, and (II) Angeles Crest Highway to Oak Grove Drive. Accordingly, staff is requesting $1,375,000 in FY2026-27 to finance the construction cost for one phase.

Justification The existing landscaping in the medians is in poor condition and in need of replacement.

Fiscal Impact $1,375,000
Recurring Annual Cost Annual maintenance should be less than what the City currently spends on the maintenance of these medians since less water would be required Eligible Sources of
Funding
General Fund
PW 03

Page 221 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Miscellaneous Bridge Repair
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $50,000
Source of Funding General Fund
Account Number(s) 31-27xx
Background There are a total of seven (7) City bridges, not including the bridges over the State Route 210 Freeway. The City contracts with the Los Angeles County Department of Public Works to perform biannual inspection of all the City bridges. The inspection reports provide the evaluation and assessment of the condition of each bridge and makes recommendations as to the maintenance and repair. This project allows for the recommended repairs identified in the inspection reports.

The most recent bridge inspection report identified that the northeast section of the railing of Oak Grove Bridge over Flint Canyon Wash needs to be repaired.

Justification Preventative maintenance will maintain the bridges in a state of good repair.

Fiscal Impact $50,000
Recurring Annual
Cost
Routine maintenance
Eligible Sources of
Funding
General Fund
PW 04

Page 222 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Miscellaneous Guardrail Repair
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $50,000
Source of Funding General Fund
Account Number(s) 31-27xx
Background The City owns and maintains guardrails along narrow road segments throughout the City. Guardrail segments in the City meet both Federal and City design criteria for placement at locations with steep side slopes and/or horizontal curves to improve public safety.

The City routinely receives reports of existing guardrails that have been damaged and inquiries regarding the absence of guardrails on winding roads.

The goal of this project is to improve road safety conditions throughout the City by repairing damaged guardrails and improving existing segments.

Justification Improved traffic safety for all road users – vehicles, bikes, and pedestrians Fiscal Impact $50,000
Recurring Annual Cost Routine maintenance
Eligible Sources of
Funding
General Fund
PW 05

Page 223 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 ANNUAL BUDGET REVIEW
Request Title Miscellaneous Pavement Repairs
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $75,000
Source of Funding General Fund
Account Number(s) 31-2x04
Background There has been an increase in the number of pavement depressions forming throughout the City due to loose compacted soil mainly along the existing sewer lines.

Public Works is requesting $75,000 in FY 2026-27 to perform necessary repairs to City streets due to settlements that occur during the year.

Justification Repairs to pavement depressions to enhance safety for all users of City streets – pedestrians, bicyclists and motorists.

Fiscal Impact $75,000
Recurring Annual Cost Reduced annual maintenance costs for those areas that are improved.

Eligible Sources of Funding General Fund
PW 06

Page 224 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 ANNUAL BUDGET REVIEW
Request Title 2026-27 Miscellaneous Storm Drain Repairs Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $125,000
Source of Funding General Fund
Account Number(s) 31-2x03
Background The City owns and maintains an extensive local drainage system. During the year, Public Works receives complaints from residents about flooding caused by blocked or broken drains and surface runoff. The City also independently inspects and evaluates drainage facilities for potential improvements.

Public Works is requesting $125,000 in FY 2026-27 for design and construction of the following proposed drainage repairs:
1- Padres Trail and Forest Hill Drive Intersection - Ongoing surface drainage runoff is causing significant erosion to the roadway impacting the pavement of the roadway. It is proposed to replace the asphalt pavement with concrete pavement and other modifications to direct the surface runoff to the existing County Channel. 2- It is proposed to enlarge the existing catch basin at the N/W corner of Knight Way and Gould Avenue to increase the its intake capacity to accommodate the significant volume of water that runs across the intersection.

The total estimated project cost is $200,000, however, unspent funds in the Miscellaneous Storm Drain Repair projects from FY 2024-25 ($35,000) and FY 2025-26 ($40,000) may be reallocated to this project, reducing the funding request to $125,000.

Justification To eliminate surface water runoof across the roadway and capture it into drainage facilities and thus preventing flooding.

Fiscal Impact $125,000
Recurring Annual Cost Reduced annual maintenance costs
Eligible Sources of Funding General Fund
PW 07

Page 225 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Trails Council Link Accessibility Improvements Department Public Works
Fund (Program) General Fund (Landscape, Trails and Rights-of-Way) Requested Amount $30,000
Source of Funding General Fund
Account Number(s) 01-45-7110
Background In FY 2025-26, the City hired a consultant to conduct an assessment of city-owned or maintained trails to identify potential accessibility improvements to improve trail access and conditions for all users. As a result of the assessment, staff identified the Trails Council Link as the best trail segment
The Trails Council Link trail is primarily a dirt path but also includes a concrete overpass over I-210, a wooden footbridge, as well as crosswalks across Verdugo Boulevard and Foothill Boulevard. The assessment identified accessibility improvement related to the crosswalk on Foothill at Indiana, which are currently reviewed as part of the Foothill at Indiana HAWK CIP project (31-2608).

The remaining accessibility enhancement elements to be included in the project:
• Repairs to the dirt path resulting from erosion
• Accessibility signage
• Repairs to the footbridge
• Repairs to elevation changes at surface junctions
Justification Improved accessibility for all trail users Fiscal Impact $30,000
Recurring Annual Cost Routine maintenance
PW 08

Page 226 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Foothill Resurfacing & ADA Enhancement Concept Plan Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $500,000
Source of Funding Prop C ($100,000), Measure M ($100,000), General Fund ($300,000) Account Number(s) 31-27xx
Background Foothill Boulevard is a major corridor traversing the City in east -west direction from Oak Grove Drive to Briggs Ave. Through the past years, the City has implemented many improvements projects along Foothill Blvd related to median and road improvements, upgrade of traffic signals including curb ramps, striping and signage, bike lanes and pedestrians.

The pavement condition along Foothill Blvd is currently in fair to poor condition and requires rehabilitation soon. In addition, many curb ramps, driveways and sidewalks need to be upgraded to meet the latest ADA guidelines.

Staff is requesting $500,000 to hire a consultant to assess the condition of the pavement, curb ramps, driveways and sidewalks and provide appropriate recommendations, including cost estimates. The Consultant will also study the feasibility of including other amenities to make the corridor as a complete street.

Justification Improved traffic safety for all road users – vehicles, bikes, and pedestrians
Fiscal Impact $500,000
Recurring Annual Cost N/A
Eligible Sources of Funding Prop C, Measure M, General Fund PW 09

Page 227 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Soundwall Phase V
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $75,000
Source of Funding Measure M
Account Number(s) 31-2606
Background In FY 2025-26, the City Council funded $250,000 of staff’s $500,000 request for the development of Project Approval and Environmental Document (PA&ED) for I-210 Freeway Soundwall Improvements Project, Phase V, which consists of one wall segment (S322) located on the north side of the freeway between Commonwealth Ave and Angeles Crest Highway. The scope includes a revised concept plan and updates various technical studies to support the preparation of an updated Project Report.

During the year, staff obtained a fee proposal in the amount of $309,053 from Ardurra Group, Inc., one of the On-Call Civil Engineering consultants, for the preparation of PA&ED for the Project. The City Council approved the cost proposal on February 3, 2026, and included $15,947 for contingencies for a total fee of $325,000.

Staff is requesting an additional $75,000 to fund the remaining amount of the Task Order.

Justification To complete the preparation of the PA&ED for the Project.

Fiscal Impact $75,000
Recurring Annual Cost None
Eligible Sources of Funding Measure M
PW 10

Page 228 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Hillard (Foothill to Fairmount)
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $250,000
Source of Funding Measure R
Account Number(s) 31-2208
Background In FY 2024-25, in response to additional complaints on Hillard related to excessive speeding, City Council approved $100,000 to hire a consultant for the development of a concept plan and to solicit community input on the proposed improvements.

Staff held a town hall in April 2025, and the community feedback was to request additional design concepts.

The project has $78,790 in unspent funds. An additional $250,000 is requested for the continued development of concepts and Plans, Specifications, and Estimates (PS&E).

Justification Improved traffic safety for all road users – vehicles, bikes, and pedestrians
Fiscal Impact $250,000
Recurring Annual Cost None
Eligible Sources of Funding Measure R
PW 11

Page 229 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Inverness Storm Drain & Resurfacing
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $150,000
Source of Funding Measure R
Account Number(s) 31-2609
Background In FY 2025-26, the City Council funded $75,000 to design a drainage system to channelize the surface runoff and mudflows over the road generated from the hillside runoff in the vicinity of 312 Inverness Drive to an existing facility at Corona Dr.

During the year, staff obtained a fee proposal from a consultant form the On-Call Civil Engineering List for the preparation of Plans, Specifications, & Engineering (PS&E) but it was too high and we are in the process of soliciting another fee proposal.

Staff is asking for an additional $150,000 to complete the PS&E and advertise the project for construction bids in FY 2026-27.

Justification Additional funding to finance the design cost of the Project.

Fiscal Impact $150,000
Recurring Annual Cost Reduced annual maintenance of the streets included in the project Eligible Sources of Funding Measure R
PW 12

Page 230 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Green Alley II
Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $105,000
Source of Funding Measure W
Account Number(s) 18-2601
Background In FY 2025-26, the City Council funded $100,000 for the design phase for Green Alley II, located from Valley Sun Lane/Hill Street to Angeles Crest Highway.It is proposed to install porous pavers pavement, instead of conventional asphalt pavement, to capture rainwater and allow it to infiltrate back into the ground, which provides stormwater quality and MS4 Permit compliance benefits.

During the year, staff obtained a fee proposal in the amount of $48,800 from Aufbau, Inc., one of the On-Call Civil Engineering consultants, for the preparation of a feasibility study to determine the feasibility of installing porous pavers. Based on the study, it was determined that the site is feasible and we can proceed with the preparation of the Plans, Specifications, and Estimates (PS&E) for the Project.

Current project cost estimate:

Staff is requesting an
additional amount of
$105,000 increasing the
project funding to
$160,000 to complete the PS&E for the project. It is expected that design will be completed in Spring 2027, after which the project will be advertised for construction bids. The construction costs are estimated to range between $750,000 and $900,000 and funding will be requested in FY 2027-28 Budget.

Design
Original Funding $100,000
Estimated Cost to Date ($45,000)
Balance $55,000
Justification To complete the preparation of PS&E.

Fiscal Impact $105,000
Recurring Annual
Cost
$TBD
Eligible Sources of
Funding
Measure W
PW 13

Page 231 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Citywide Bulk Street Repaving Strategy and Accelerated Pavement Program Department Public Works
Requested Amount $150,000
Account Number(s) 01-42-6061
Background The current budget includes a standard annual resurfacing request for 2025-26 Citywide Street Resurfacing in the amount of $2.5 million, covering 2.6 centerline miles of streets selected using Pavement Condition Index data and other prioritization factors, including grouping projects for efficiency and more competitive pricing.

That annual resurfacing model is logical as an ongoing maintenance practice, but it also means the City is addressing street deterioration incrementally, a few miles at a time, over many years. This request would direct staff to step back and evaluate whether a much larger one-time or limited-phase paving strategy would make more financial and operational sense.

Specifically, staff would be asked to return with an analysis of scenarios for resurfacing or rehabilitating approximately 50%, 75%, and up to 100% of the City’s paved street network over a compressed time period rather than continuing with the current pace of roughly one annual paving package at a time. It may even include discussions and estimates with vendors.

The requested study/plan should evaluate:
● the approximate cost of each large-scale paving scenario, ● whether larger bundled construction would reduce unit costs through economies of scale,
● how such a program would affect the City’s overall pavement condition baseline,
● financing options, including cash, reserves, grants, and/or debt, ● project phasing options,
● operational impacts on neighborhoods and traffic,
● which streets should be grouped first, and
● whether the long-term maintenance burden would be reduced by resetting a larger share of the network at once.

Justification The annual paving program is useful, but it may not be the most efficient longterm strategy if the City is perpetually trying to catch up. A larger bulk paving approach could potentially:
● lower mobilization and procurement costs per mile,
● improve contractor pricing through larger bundled work, ● reduce deferred maintenance exposure,
● improve resident satisfaction more quickly, and
● reset the City’s pavement network to a healthier baseline in a shorter timeframe.

PW 14

Page 232 of 323 ends

Before continuing indefinitely with a slower annual model, the Council should understand whether a more ambitious catch-up strategy would actually save money over time and deliver better results.

Importantly, this request is not yet asking Council to approve a massive paving contract. It is asking for the work needed to give Council real options: what 50%, 75%, or 100% accelerated paving would cost, how it could be phased, how it could be funded, and whether it would outperform the current incremental approach.

Fiscal Impact $150,000
Recurring Annual
Cost
None
PW 14

Page 233 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Eliminate Solid Resource Fee on Residential Refuse Service (Reduce from 10% to 0%)
Department Public Works/Finance
Requested Amount $776,300
Account Number(s) 01-00-4420
Background The City’s Solid Waste program manages three authorized waste haulers and oversees refuse, recycling, and related contract administration, regulatory compliance, and community education. The adopted budget also reflects that the City maintains a dedicated Solid Waste program with staffing and operating costs for these services.

In addition to the underlying cost of refuse service, residents currently pay a City-imposed Solid Resource Fee through their waste hauler bills.

Because this charge is embedded in the customer bill rather than levied directly and separately through the normal tax-setting process, many residents do not understand that a portion of what they are paying is effectively a City surcharge.

This request would direct staff to return to the City Council with all actions necessary to reduce the Solid Resource Fee from 10% to 0%, including analysis of the revenue impact, any franchise agreement implications, implementation timing, and any related ordinance, resolution, or contract amendments required to carry out the change.

Justification This item is intended to eliminate what many residents experience as a hidden tax on a basic household service. Trash service is not optional for most residents, and the fee is paid broadly regardless of household circumstances. If the City wishes to collect revenue for general governmental purposes, that revenue should be discussed transparently and justified openly rather than embedded in a utility-style bill.

Eliminating the fee would:
● provide direct cost-of-living relief to residents,
● improve transparency in City revenue practices,
● reduce the amount residents are required to pay through mandatory waste-hauler billing, and
● force a more transparent discussion of whether this revenue is truly necessary and, if so, how it should be collected.

This request is not intended to disrupt core solid waste services or staff’s contract-management role. Rather, it is intended to remove the surcharge layered on top of those services.

Fiscal Impact Eliminating the Solid Resource Fee on Residential Refuse Service by reducing the fee from 10% to 0% will eliminate this revenue source. The FY 2026-27 projected revenue of $776,300 would no longer be received.

Recurring Annual Cost $776,300
PW15

Page 234 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Angeles Crest Highway – Condition Assessment Department Public Works
Fund (Program) General Fund (Engineering)
Requested Amount $250,000
Source of Funding General Fund
Account Number(s) 01-43-6061
Background In April 2025, Public Works, in partnership with the California Department of Transportation (Caltrans), held a town hall meeting with the residents to learn about future improvements on Angeles Crest Highway (ACH) that control speed and enhance safety for motorists, cyclists and pedestrians. Discussion about the possible relinquishment of ACH between I-210 On/Off-Ramps and Northern City was explored at the meeting, which would allow the City to have control on the operation of the road and implementation of future improvements.

On November 6, 2025, the City Council discussed the subject of relinquishment and authorized staff to send a letter to Caltrans expressing the City’s interest in pursuing the relinquishment. On January 21, 2026, Caltrans responded to the City’s letter informing us that they will start the development of a Relinquishment Assessment Report (RAR) to determine the feasibility of transferring the road to the City.

Staff is requesting $250,000 to hire a consultant to evaluate the existing condition of ACH and provide recommendations for any improvements required for the road to be undertaken by the City to enhance safety for the traveling residents.

Justification To assist the City in the relinquishment process with Caltrans Fiscal Impact $250,000
Recurring Annual Cost N/A
Eligible Sources of Funding General Fund
PW 16

Page 235 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Angeles Crest Hwy at Green Lane Traffic Signal Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $550,000
Source of Funding General Fund
Account Number(s) 31-2605
Background The City Council approved staff’s FY 2025-26 funding request for $100,000 to fund the design phase for the installation of a traffic signal on Angeles Crest Highway at Green Lane.

In FY 2025-26, staff solicited a consultant to conduct a Traffic Signal Warrant Study, as a first step for the installation of a traffic signal within Caltrans’ rightof-way. The study found that the traffic signal is warranted at the intersection, and the report was submitted to Caltrans for review and concurrence. Upon acceptance by Caltrans, staff will begin the development of Plans, Specifications, & Engineering (PS&E).

Staff informed the City Council with the original funding request that additional funding would be requested in FY 2026-27 to fund the construction phase for the project.

Current project schedule and cost estimates are:

Design Construction
Funded $100,000 $0
Estimated Cost to Date $7,600 $0
Remaining Funds $92,400 $0
Estimated Total Cost $100,000 $500,000*
Additional Funding Request $50,000 $500,000*
Estimated Completion Spring 2027 Summer 2028
*Rough estimate and will be adjusted in FY2027-28 Budget, if needed.

Justification Speed mitigation on Angeles Crest Highway Fiscal Impact $550,000
Recurring Annual Cost Annual traffic signal maintenance of $1,000 Eligible Sources of
Funding
General Fund
PW 17

Page 236 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title No Parking During Red Flag Warning Program Department Public Works
Fund (Program) General Fund
Requested Amount $75,000
Source of Funding General Fund
Account Number(s) 01-42-8231
Background On October 21, 2025, the City Council received a presentation that outlined the draft Red Flag No Parking Program that was developed in coordination with the Los Angeles County Fire Department and traffic engineers. The proposed program would restrict parking on designated streets during a National Weather Serviceissued Red Flag Warning to allow emergency vehicle access while facilitating resident evacuation. Restrictions included:
• Major Collector streets: No parking on both sides, regardless of street width
• Streets under 30 feet wide: No parking on both sides
• Streets with a single point of access: No parking on one side (ingress or egress)
• Potential evacuation routes requiring two-way traffic: No parking on one side (ingress or egress)
The City Council directed staff to separate its discussion of the proposed Red Flag Program into two distinct options:
• Option 1 — Staff’s recommended Selected-Street Program, focusing on specific streets identified as critical for emergency access and evacuation. • Option 2 — The Public Safety Commission's Citywide Concept, which would apply restrictions on all public streets during Red Flag Warnings.

On November 18, 2025, the City Council held a public hearing, received public testimony, discussed the proposal, and adopted the “No Parking During Red Flag Warning Policy”.

Staff is requesting $75,000 in FY 2026-27 to install approximately 105 “No Parking” signs, as shown in the attached sheets, at the intersection of each streets that were designated based on the above criteria. This will minimize the pollution of signs along these designated streets. Upon installation, staff will evaluate the effectiveness of these signs and determine if additional signs will be required Justification Implementation of the No Parking During Red Flag Warning Policy Fiscal Impact $75,000
Recurring Annual
Cost
$2,000 for replacement of damaged signs
Eligible Sources of
Funding
PW 18

Page 237 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Community Center Improvements
Department Public Works
Fund (Program) Capital Improvement Project Fund
Requested Amount $125,000
Source of Funding General Fund
Account Number(s) 31-27xx
Background The Community Center is a City-owned facility leased by the La Cañada Flintridge Community Center (CCLCF). CCLCF is responsible for ongoing maintenance, while the City is responsible for major repairs and improvements.

CCLCF has requested the following facility improvements:

1. Improve the entrance to the main office by making it ADA accessible. The entrance immediately in front of the doorway is angled, there is a vertical obstruction due to trim at the bottom of the door, and a step immediately inside the doorway. The scope requires the reconstruction of the entrance or the relocation of the main entrance to a different door.

2. Address drainage issues for the Ceramic Patio area. The scope requires the removal and repouring of the concrete patio, as well as the installation of new drainage equipment.

Justification Accessibility improvements to the Community Center are consistent with the City’s ongoing accessibility improvements to City facilities and rights-of-way, and drainage improvements are required to eliminate seasonal flooding from the Ceramic Patio area to the gym.

Fiscal Impact $125,000
Recurring Annual Cost None
Eligible Sources of Funding General Fund
PW 19

Page 238 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Pet Waste Stations
Department Public Works
Fund (Program) General Fund (Landscape, Trails, and Rights-of-Way) Requested Amount $6,500
Source of Funding General Fund
Account Number(s) 01-45-8231
Background The City currently has twenty (20) pet waste collection stations located at trailheads and parksthroughout the City which are serviced by the City’s landscaping contractor. Due to an increase in complaints related to pet waste left on trails, in parks, and at trailheads, this request is to add ten (10) pet waste collection stations at the following locations:

1. North Side of Memorial Park

2. South Side of Memorial Park

3. Mayors Discovery Park

4. South side of Olive Lane at Open Space Trail crossing

5. South Side of El Vago Street at Open Space Trail crossing

6. Indiana Ave at LC open Space Trail trailhead (north of Foothill Blvd)

7. Sugar Loaf Drive at Cherry Canyon Fire Road trailhead

8. Canon de Paraiso at Gould Canyon Trail trailhead

9. East side of Crown Ave at Gould Canyon Trail crossing

10. East side of Woodleigh Lane at Flint Canyon Trail crossing Justification In addition to being unsightly and creating an unpleasant recreational environment, pet waste may have harmful bacteria that can wash into storm drains and flow directly into streams during runoff events. Pet waste stations provide waste bags and receptacles for recreational users with pets to properly dispose of pet waste.

Fiscal Impact $6,500
Recurring Annual Cost $3,500 annual maintenance for supplies and services Eligible Sources of Funding General Fund
PW 20

Page 239 of 323 ends

COUNCIL CONSIDERATION ITEM
FY 2026-27 ANNUAL BUDGET REVIEW
Request Title Parks and Facilities Maintenance Crew
Department Administration
Fund (Program) General Fund (LANDSCAPE, TRAILS AND RIGHTS-OF-WAY) Requested Amount $21,940
Source of Funding General Fund
Account Number(s) 1-45-5001
Background As the City’s programs have grown and daily demanded response times have increased. A maintenance and facilities crew member can lock and unlock facilities, check restrooms, assist with recreation and park events, be more responsive to increasing litter and vandalism, and complete other maintenance/repair-related tasks traditionally given to a contracted vendor which require days of lead time.

In FY 2025-26 Budget, the City Council added a position of Maintenance Assistant, on a part-time basis, to augment the existing resources to improve responsiveness to various requests within the public right of ways and facilities.

Justification During FY25-26, the added position was very successful by increasing our responses to many tasks such as regular inspection cleanup and vandalism repairs within public right of ways and upkeep of the city’s facilities, including parks and fields.

Staff is requesting that the Maintenance Assistant position be upgraded to a full-time position in FY2026-27.

Fiscal Impact $21,940
Recurring Annual Cost COLA
Eligible Sources of
Funding
General Fund
PW 21

Page 240 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Pedestrian Crossing – Foothill Blvd at Indiana Ave (HSIP Cycle 12) Department Public Works
Fund (Program) Capital Projects Fund
Requested Amount $300,000
Source of Funding Prop C ($300,000)
Account Number(s) 31-2608
Background The City was successful in securing $350,000 of HSIP funds under Cycle 12 of the grant program to upgrade the existing overhead flashing beacon signal on Foothill Blvd at Indiana Ave to a High-Intensity Activated CrossWalk (HAWK). The existing overhead flashing beacon signal is uncontrolled, and an upgrade to a HAWK system will increase pedestrian safety. In addition, $40,000 in General Funds was included in FY 2025-26 Budget totaling $390,000 toward the design and construction costs of the project.

During FY 2025-26, a Task Order in the amount of $57,485 was awarded to an On-Call Civil Engineering Consultant for the design phase of the project, leaving a balance of $345,000. Design is expected to be completed by June 30, 2026.

Based on current 65% design plans, construction costs are estimated to be $645,000. We request an additional $300,000 to be included in FY 2026-27 Budget to finance the construction phase of the project.

Justification Upgrade the existing outdated traffic signal equipment for improved pedestrian safety
Fiscal Impact $300,000
Recurring Annual Cost Annual traffic signal maintenance of $1,000 Eligible Sources of Funding Prop C
PW 22

Page 241 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title City Vehicle
Department Public Works
Fund (Program) Air Quality Management District
Requested Amount $85,000
Source of Funding AQMD Trust
Account Number(s) 37-00-8231
Background The City currently has four (4) vehicles in its fleet, of which the oldest is a 2011 Chevy Silverado hybrid used by Public Works.

In January 2025, the City purchased a fully electric Chevy Silverado with AQMD funds. The 2025 purchase was intended to replace the 2011 truck, however, with the addition of a Public Works Maintenance Assistant position in December 2025, the 2011 Chevy Silverado was put back into service.

Justification The City’s 2011 Chevy Silverado hybrid truck has 73,000 miles and is nearing the end of its useful life. The replacement of the vehicle with a fully electric truck is consistent with the Climate Action and Adaptation Plan and will result in a reduction of greenhouse gas emissions.

Fiscal Impact $85,000
Recurring Annual Cost $1,500 annual maintenance after warranty expiration Eligible Sources of Funding AQMD
PW 23

Page 242 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title ADA Compliance – PDF Remediation for Archived City Council Agendas, Minutes, and Staff Reports
Department Administration
Requested Amount $200,000
Account Number(s) 01-04-6061
Background The City Clerk’s Office maintains an archive of City Council agendas, agenda reports, and minutes that are currently available in PDF format. While accessible for general use, these documents do not meet current ADA (Americans with Disabilities Act) accessibility standards. As a result, individuals using screen readers or other assistive technologies may not be able to fully access the content.

Recent laws and best practices for public agencies emphasize the importance of ensuring digital records, including historical documents, are fully ADA compliant.

By April 24, 2026, cities with a population of 50,000 or more must ensure that web content and mobile applications comply with the Web Content Accessibility Guidelines (WCAG) 2.1 Level AA, an international standard for web content accessibility. Cities with populations less than 50,000 must comply by April 26, 2027.

Staff has identified three possible options:
(1) $50,000: Remove all non-compliant documents from the City’s website and approve funds to begin remediation of the City’s most recent documents. This includes funds to comply with accessibilityrelated public records requests. (2) $300,000: Remediate the last three years of agendas, minutes, and staff reports as funding allows. Remove all non-compliant documents from the City’s website.
(3) $1,200,000: Immediately remediate all public facing non-compliant documents.

Justification Engaging a professional PDF remediation service will ensure that archived agenda materials and minutes are accurately converted into ADA-compliant formats. These services provide manual tagging, document structuring, and quality assurance that automated tools cannot reliably achieve.

This effort will:
-Ensure compliance with ADA standards
-Reduce legal risk and potential complaints
-Improve transparency and equitable access to public records -Align with the City’s commitment to inclusivity and accessibility Admin 1

Page 243 of 323 ends

Fiscal Impact $200,000
- The cost to remediate original (born-digital) PDFs ranges from $5 to $8 per page.
- The cost to remediate scanned PDFs ranges from $8 to $13 per page.

For a typical agenda packet, which includes two separate agendas (one for a special meeting and one for a regular meeting), along with agenda reports and minutes, the estimated one-time cost is $3,000 - $5,000 per meeting.

The final cost for each agenda packet will depend on the total number of pages and the type of PDFs contained within the packet. The City Council may choose to only initially remedy agendas and minutes to reduce the number of pages and cost.

Recurring Annual Cost If necessary, these costs may be spread over multiple fiscal years. Should this be completed in phases, the City Council can consider a dedicated amount of funds each fiscal year until the remediation is completed.

Ongoing compliance for new documents can be integrated into existing workflows or managed through separate tools and processes.

Admin 1

Page 244 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Age Friendly Project – Annual Printed Newsletter for Older Adults Department Policy and Executive Management / Administration Requested Amount $12,000
Account Number(s) 01-13-6087
Background In 2021, the City Council established an Age-Friendly Community Project Team. This Project Team did work over multiple years and summarized its research and recommendations in an Age-Friendly Master Plan. The Project Team identified and studied seven domains of livability which include (1) Outdoor Space and Buildings, (2) Transportation, (3) Housing, (4) Communication and Information, (5) Health Services and Community Supports, (6) Public Safety, and (7) Community Engagement.

Throughout this process, the overarching themes included support for improved communications, accessibility improvements to City infrastructure, more health and wellness activities, more resources for aging in place, and more community engagement opportunities.

Staff have worked both internally and with community partners to improve communications and broaden emergency preparedness efforts, including a focus on incorporating age-friendly projects whenever possible.

Justification Policy and Executive Management staff can work with its Communications Consultant and Administration staff to develop an annual newsletter which targets the older adult community. It was stated during community surveys that advertisements and mailers are still a popular communication method for a large segment of the residential population.

Fiscal Impact $12,000
Recurring Annual Cost $7,500
Admin 2

Page 245 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title All-Weather Track Conversion at FIS Lower Field Department Policy and Executive Management / Joint Operations Team Requested Amount $310,000
Account Number(s) 01-32-7107
Background FIS Lower Field and Track is a joint use facility under an agreement with the La Cañada Unified School District. FIS Lower is one of the most popular fields in the community. It is home to youth sports groups such as soccer, baseball and football, as well as district tenant programs, summer camps, and Community Center programs. Many residents also use the track and outdoor fitness equipment for regular exercise.

Justification The FIS Lower Field facility in the past has been topic of discussion to implement major enhancements to increase the use time and durability of the field, including the conversion of the dirt track to a rubberized surface.

A rubberized all-weather track provides significant advantages over the existing dirt track for people utilizing the track as well as for staff maintaining it. It would provide shock absorption to protect runners’ joints, year-round usability, consistent traction, and durability for up to 20 years, if well maintained. Current maintenance involves redistributing the dirt,filling in holes, dragging and nailing (scarifying) as needed to improve the safety of those using the track.

The track is about 3,110 square yards, and resurfacing is expected to be about $99.03 per square yard. In addition to the cost of the resurfacing, the track would require installing a concrete curb around the field and may require installation of an asphalt base, similar to how the LCHS Track & Field track is built. An estimate for those costs will be requested if City Council would like to move forward with this budget request.

In February 2026, the Parks and Recreation Commission recommended that the City consider the project.

Fiscal Impact $310,000
Recurring Annual Cost N/A
Admin 3

Page 246 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Audio Visual Staff for Broadcasting Public Meetings Department Administration
Requested Amount $81,000
Account Number(s) 01-11-6061
Background California SB 707 (2025-2026) passed in October 2025, and it significantly amended the Ralph M. Brown Act. It updated open meeting laws to include mandatory hybrid meeting options, strict teleconferencing rules (including video for disability accommodations), permanent social media use rules for officials, and translation requirements for eligible legislative bodies in certain jurisdictions. SB 707 applies to La Cañada Flintridge City Council Meetings and will take effect on July 1, 2026. SB 707 does not currently apply to City Commissions and other City legislative bodies, such as the Joint Operations Team and Emergency Preparedness Coordinating Committee meetings. While the mandatory hybrid meeting options are not required of the Commissions, staff do receive requests regularly for remote participation from both Commissioners and members of the public.

Currently, only City Council and Planning Commission utilize onsite AV staffing. The City Council could consider funding for additional AV staffing to provide hybrid meeting options for other Commissions/bodies.

Justification While SB707 currently does not apply to Commissions and other bodies, the legislature may amend that in the future. In addition, staff do receive regular requests for remote participation.

About $750 per meeting ($15,000 for 23 meetings)
Fiscal Impact Contracted AV staffing costs approximately $750 per meeting, or $9,000 annually per Commission (assuming 12 meetings).

The City Council could choose to allow hybrid meeting options to all Commissions/bodies or phase them in one by one.

A funding level of $81,000 assumes 9 additional Commissions/bodies with 12 annual meetings (acknowledging not all have 12 meetings a year, and some host special meetings).

Recurring Annual Cost $81,000
Admin 4

Page 247 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Citizen Connect
Department Administration – IT / Community Development
Requested Amount $21,000
Account Number(s) 01-11-6061
Background Tyler's Citizen Connect is a map-centric portal that allows agencies to view and analyze development trends in their area. It allows local governments to use data to offer the public a geospatial view for trend analysis and alert notification.

The Community Development Department would use Citizen Connect to display its planning entitlements and building permits. Members of the public would be able to view the projects on a map and click for limited information about the permit. The portal would permit the public to view the status of projects through all stages of development, from initial submittal through the end of construction.

The City already uses Tyler’s permitting and licensing software so would be working with the same team from Tyler on implementation.

Justification Adding self-serve features improves the public’s ability to view current projects and have basic questions answered. The features allow the public to sort by address, permit type or zoom into a location via the map feature to find all data within the specified areas. The system also allows for the public to create custom alerts for when new records are added to the system.

Fiscal Impact $21,000:

Initial Cost of $9,000 in Professional Implementation Services Annual Cost of $12,000
Recurring Annual Cost $12,000
Admin 5

Page 248 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Geotechnical Investigation of Cornishon Tennis Courts Department Policy and Executive Management / Joint Operations Team Requested Amount $100,000
Account Number(s) 01-32-7107
Background The Cornishon Tennis Courts are a joint use facility under an agreement with the La Cañada Unified School District. These courts are regularly permitted to user groups throughout the year, as well as district tenant programs, summer camps, and Community Center Programs. Residents also utilize these courts for recreational tennis on a first-come, first serve basis.

Justification The City maintains eight tennis courts at 4490 Cornishon Avenue, La Cañada Flintridge. For the past several years, the foundation under the Cornishon Tennis Courts shifted, causing cracks to appear on the courts.

As a minimally invasive remedy, the courts have undergone multiple rounds of crack repairs and resurfacing to maintain the integrity of the courts on a surface level.

To determine what is required to safely repair or replace the foundation, a geotechnical investigation is needed to evaluate the subsurface soil, rock and groundwater conditions at this site. The investigation also determinesthe engineering properties of the ground to guide safe, costeffective foundation design, and reduce structural risks like settlement, landslides and ground water issues.

The geotechnical investigation would be a necessary first step to determine the estimated construction cost related to perform major repair or completely replace the foundation of the tennis courts. The estimated costs for the geotechnical investigation for the preparation of the design plans would be about $100,000.

In February 2026, the Parks and Recreation Commission recommended that the City consider remediation of the Cornishon tennis courts.

Fiscal Impact $100,000
Recurring Annual Cost None
Admin 6

Page 249 of 323 ends

City of La Cañada Flintridge

COUNCIL CONSIDERATION ITEM
FY 2026-27 BUDGET REVIEW
Request Title Playground Equipment at Memorial Park
Department Administration / Public Works / Joint Operations Team Requested Amount $1,000,000
Account Number(s) 01-31-8231
Background Memorial Park is the City's most used park. Community members reserve the picnic area and the gazebo area for private parties, and several community events take place at the park, including the City's Summer Music in the Park concert series. The park includes the largest playground of the City’s parks spanning various ages.

Justification The Memorial Park playground structure is used daily. During major events, the playground offers an area for kids to be active with parents close by to watch over them but still be part of the event taking place at the park.

The City installed the current play equipment over 26 years ago according to the historical data available. Based on manufacturing guidelines, playgrounds are recommended to be redone every 20 years. Over the last seven years, the City has noticed an increasing number of failures with parts and equipment requiring increasing maintenance needs. The tire swing was recently removed from the playground when it was deemed beyond repair and could not be replaced with a similar product due to ADA-accessibility issues.

As the equipment is reaching its end of its useful life, the City should consider replacing the equipment. The City previously reached out to a vendor to discuss possible revitalizing the playground equipment options. The City has two possible options:

Option 1 Play Equipment Replacement: approximately $800,000 This option would include replacing the old play equipment with newer, more ADA-friendly, play-friendly equipment. With this option, the new equipment would be confined to the existing area and limit the flexibility and options that are available and limit the play area. The layout and feel of the playground would remain the same.

Option 2 (Play Equipment Replacement and Resurfacing): approximately $1,000,000
This option is the redesign and rebuild of the playground and to build an entirely new playground footprint, as well as resurfacing the entire play area. This option would redesign the playground from scratch, optimize the space, and introduce new features unavailable 26 years ago and resurface the play area that would make the site accessible under ADA guidelines.

Fiscal Impact $1,000,000
Recurring Annual
Cost
None
Admin 7

Page 250 of 323 ends

Preliminary Budget FY 2026-27 City of La Cañada Flintridge Section Seven: Appendix

Page 251 of 323 ends

City of La Cañada Flintridge
Preliminary Budget and
Financial Plan
Fiscal Year 2026-27
(Supporting Documents)

Page 252 of 323 ends

Preliminary Budget (Supporting Documents)
Table of Contents
Policy and Executive Management Department
Policy and Executive Management Division
City Council (01)...............................................................................................................1 Legal Services (02)............................................................................................................2 City Manager Office Division
City Manager (03) .............................................................................................................3 Human Resources (07) .....................................................................................................4 Risk Management and General Services (12) .....................................................................5 Public Information and Special Events (13)........................................................................6 Public Safety (21)..............................................................................................................7 City-LCUSD Programs and Joint Use Facilities (32).............................................................9 Community Group Support (33) ......................................................................................10 Administration and Public Services Department
Administrative Services Division
Administration (09).........................................................................................................11 City Clerk (04).................................................................................................................12 Information Technology (11)............................................................................................13 Parks, Recreation, and Culture Division
Parks and Recreation (31) ...............................................................................................14 Lanterman Auditorium (50) .............................................................................................15 Finance Department
Finance (10) ..................................................................................................................16 Community Development Department
Planning Division
Community Development (05) ........................................................................................17 Planning (25) ..................................................................................................................18 Building and Safety Division
Building and Safety (26) ..................................................................................................19 Code Enforcement Division
Code Enforcement (27) ..................................................................................................20 Public Works Department
Public Works and Engineering Division
Public Works (42) ...........................................................................................................21 Engineering (43)..............................................................................................................22 Landscape, Trails and Rights-of-Way (45)........................................................................23 Solid Waste and Environmental Quality Division
Solid Waste (52) .............................................................................................................25 Storm Water/NPDES (53) ................................................................................................26 Facilities Division
Lanterman House (49) ....................................................................................................27 Civic Center (55).............................................................................................................28

Page 253 of 323 ends

General Fund Transfers Out ..............................................................................................29 Special Purpose Fund
Public Safety Funds
Traffic Safety (02)............................................................................................................30 Supplemental Law Enforcement Services (SLESF) (35).....................................................31 Environmental Quality and Community Assistance Funds
Community Development Block Grant (CDBG) (11) .........................................................32 Measure W (18) ..............................................................................................................33 Air Quality Management District (AQMD) (37)...................................................................34 Sewer and Sanitation Funds
Sewer Debt Service - 04-1 (43).........................................................................................35 Sewer Maintenance 04-1 (44)..........................................................................................36 Street and Transportation Funds
State Gas Tax (03)...........................................................................................................37 Transportation Development Act (05)..............................................................................38 Proposition A (30) ...........................................................................................................39 Proposition C (29)...........................................................................................................40 Measure M (27)...............................................................................................................41 Measure R (28) ...............................................................................................................42 Capital and Major Project Funds
Federal Emergency/ARPA (07) .........................................................................................43 Capital Projects (31) .......................................................................................................44 Property Acquisition (38).................................................................................................46 Civic Center Debt Service (39).........................................................................................47

Page 254 of 323 ends

Policy and Executive Management
Department
(General Fund)

Page 255 of 323 ends

Policy and Executive Management Division

Page 256 of 323 ends

FY 2026-27 Budget
General Fund (01), City Council (01)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-01-6032 Books & Publications $100
Miscellaneous $100
01-01-6052 Travel Conferences & Meetings $21,120
League of California Cities $2,000
CA Contract Cities Association (SAC/Indian Wells) $13,440 California Joint Powers Insurance Authority $2,500
Chamber of Commerce $680
Kiwanis Installation $380
Sheriff's Contract Cities BBQ $120
Sacramento $2,000
01-01-6053 Membership & Dues $51,400
California League of Cities - CA $11,000
San Gabriel Valley Council of Gov'ts (50% exp to GF) $10,000 California Contract Cities Association $6,000
Southern California Assoc. of Governments $3,000
San Gabriel Valley Regional Housing Trust $2,800
National League of Cities $2,900
LAC Local Agency Formation Comm (LAFCO) $1,000
Miscellaneous $700
Sanitation District #34 fees (22% incr. fr. PYs) $14,000 01-01-6061 Professional Services $32,000
Sacramento Lobbyist ($2,500/month) $30,000
Miscellaneous $2,000
City of La Cañada Flintridge 1 FY 2026-27 Budget Supporting Documents

Page 257 of 323 ends

FY 2026-27 Budget
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-02-6053 Membership & Dues $5,400
San Gabriel Valley Empl. Labor Consortium membership $5,400 01-02-6061 Professional Services $178,240
Retainer ($14,800/month) $178,240
01-02-6062 Litigation $400,000
Ongoing and Unanticipated Litigation $400,000
01-02-6064 Special Counsel $240,000
Special Projects (PRAs/Planning/various) $170,000
Employment Attorney (A&W) $5,000
City Prosecutor - (Dapeer Rosenblit) $20,000
Public Works Projects $25,000
Labor Attorney (Liebert Cassidy) $15,000
Miscellaneous $5,000
General Fund (01), Legal Services (02)
City of La Cañada Flintridge 2 FY 2026-27 Budget Supporting Documents

Page 258 of 323 ends

City Manager Office Division

Page 259 of 323 ends

FY 2025-26 Budget
General Fund (01), City Manager (03)
Account Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-03-6032 Books & Publications $1,500
LA Times Newspapers $1,500
01-03-6052 Travel Conferences & Meetings $18,300
California Joint Powers Authority $2,500
San Gabriel Valley City Managers Association $500
California Contract Cities Association $4,200
League of California Cities (CM and Legist.) $4,500
Kiwanis $300
Chamber events $300
MMASC Conference $3,500
CAPIO Conference $2,000
Miscellaneous $500
01-03-6053 Membership & Dues $1,740
Kiwanis $480
San Gabriel Valley City Managers Association $60
MMASC $300
CAPIO $900
01-03-6054 Employee Training & Education $1,300
MMASC Forum $800
Miscellaneous $500
01-03-6061 Professional Services $200,000
Grant Monitoring/Writing/Management $200,000
01-03-6081 Programs $1,500
Chamber Summer Intern $1,500
City of La Cañada Flintridge 3 FY 2026-27 Budget Supporting Documents

Page 260 of 323 ends

FY 2026-27 Budget
General Fund (01), Human Resources (07)
Account
Number Account Name & Sub-items
FY 2025-26
Budget Notes/Description
01-07-6034 Printing & Publishing $2,580
Job advertisements $2,580
01-07-6045 Personnel Administration $16,390
Recruitments $9,190
On-boarding $2,100
COBRA $1,500
ADP employee self service portal $3,600
01-07-6051 Auto & Mileage Allowance $1,240
HR mileage costs to/from conferences $1,240
01-07-6052 Travel Conferences & Meetings $5,700
CalPELRA $3,810
CJPIA $1,030
SCPLRC $310
Webinars $550
01-07-6053 Membership & Dues $1,600
CalPELRA $430
IPMA $410
MMASC $140
SCPLRC $310
HR Weekly $310
01-07-6061 Professional Services $5,000
Misc. $5,000
City of La Cañada Flintridge 4 FY 2026-27 Budget Supporting Documents

Page 261 of 323 ends

FY 2026-27 Budget
General Fund (01), Risk Management and General Services (12) Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-12-6031 Office Supplies $38,500
Office Supplies $38,500
01-12-6033 Postage $12,000
Postage $12,000
01-12-6038 Lease Agreements $54,230
Copy machines $30,000
Southern California Edison $10,230
Cerro Negro $7,500
Postage machine $2,000
Caltrans lot $4,500
01-12-6041 Insurance Premiums $620,500
General Liability $520,000
Property $90,000
Retrospective Adjustment $1,700
Crime $5,300
Environmental $3,500
01-12-6042 Surety & Emp. Bond Premiums $900
3 notaries @ $300/each $900
01-12-6052 Travel Conferences & Meetings $14,500
City Council & staff meetings $9,000
California Joint Powers Insurance Authority $2,500
CJPIA Academy $1,000
Risk Management Training $2,000
01-12-6061 Professional Services $85,000
ADA Digital Compliance & Website Svcs $80,000
ADA Translation Services $5,000
01-12-8231 Furnishings & Equipment $15,000
Ergonomic furniture $15,000
City of La Cañada Flintridge 5 FY 2026-27 Budget Supporting Documents

Page 262 of 323 ends

FY 2026-27 Budget
General Fund (01), Public Information & Special Events (13) Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-13-6034 Printing & Publishing $36,000
CASP education $5,000
Mailers $7,000
Ad publishing (one off) $7,500
Outlook Reocurring Ad $16,500
01-13-6061 Professional Services $246,680
Communication consultant $200,000
PC Broadcasting $25,000
GAC $8,180
Remote Government Access Channel broadcast $4,000
Social Media Post Boosting $1,500
Miscellaneous $8,000
01-13-6072 Special Events Setup/Teardown $115,360
July 4th $5,000
Memorial Day & YMCA Run $38,000
Halloween $6,000
Block Parties $10,000
Private Porter Service $4,000
Thanksgiving Day Run $33,000
Every 15 Minutes $0
LCBSA Summer Smash $3,860
Community Prepardness Day $7,000
LCFTRA Float/Judging Barricades $7,000
LCF Earth & Arbor Day Sustainability Celebration $1,500 01-13-6081 Programs $25,500
Public Service Announcements (PSAs) $8,000
Public education (2 events @ $1K each) $2,500
Porter Service $5,000
Special Trophies and Awards $5,000
Reception to Recog. Outgoing City Comm and Cmte Memb $4,000 Youth Council Activites $1,000
01-13-6087 Community Newsletter $27,900
Printing & mailing 4 issues $21,900
Annual Budget at a Glance $6,000
CCI - $18,000 Biannual Emergency Preparedness
01-13-6088 City Communications/Special Events $33,800
Community Survey $13,300
City Mixer/Special Celebration $15,000
Special Event Supplemental Communication $5,000
Sister Cities Annual Reg. $500
City of La Cañada Flintridge 6 FY 2026-27 Budget Supporting Documents CCI - $12,000 Newsletter Age Friendly Item

Page 263 of 323 ends

FY 2026-27 Budget
General Fund (01), Public Safety (21)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-21-6030 Material & Supplies $4,500
Parking Permits $2,500
Citation Supplies $2,000
01-21-6035 Stipend $2,750
11 meetings @$250/mtg $2,750
01-21-6038 Lease Agreements $35,000
Alert LCF systems $15,000
Alert LCF enhancements $5,000
Public Safety Internal Communication System $15,000
01-21-6052 Travel Conferences & Meetings $6,000
SAD, Captain & Chief $2,000
Public Saftey Training $1,500
Annual First Responder Appreciation $2,500
01-21-6053 Membership & Dues $300
Emergency Managment Association $300
01-21-6054 Employee Training & Education $9,000
CSTI Training $3,000
Public Safety Training $6,000
01-21-6056 SAFER Liability Insurance $707,650

14.5 % of Sheriff costs, including SLESF $707,652
01-21-6058 LA County Sheriff s Overtime $340,230
Directed patrols $251,228
Other events $22,000
Memorial Weekend $8,000
Fiesta Days Parade $18,000
Fiesta Days Run $18,000
Run for the Hungry $18,000
Float Escort $5,000
01-21-6059 LA County Sheriff s Dept. $4,540,130
Patrol deputies, 2 Law Enf Tech $3,300,433
2 Law Enf Tech $263,832
1 Growth Special Assign Deputy w vehicle $359,837
1 Special Assign Deputy w vehicle $262,151
Citywide Camera Monitoring Program $25,000
1 Special Assignment Sergent w Vehicle 328,874
01-21-6061 Professional Services $364,500
Flock camera license agreements $162,500
Peafowl census $2,500
Vandalism $6,500
Dataticket Citation Appeal $6,000
After Action Report Phase II $187,000
CCI - $20,000 Flock Traffic Analytics
CCI - $25,000 Flock Saftey Cameras
CCI - $180,000 City-wide Evacuation Plan
01-21-6070 Pasadena Humane Society $120,660
Animal control services $120,660
City of La Cañada Flintridge 7 FY 2026-27 Budget Supporting Documents

Page 264 of 323 ends

FY 2026-27 Budget
General Fund (01), Public Safety (21)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-21-6081 Programs $60,000
Fire Hardening Rebate Program $60,000
CCI - $40,000 Home Anti-Burglary
01-21-6082 Emergency Preparedness $23,400
Materials & supplies $3,100
Exercises $2,000
Satellite phone air time $1,300
City Hall disaster preparation kits $1,000
Community Emergency Preparedness $16,000
CCI - $5,000 Joint Agency Emergency
01-21-6083 CERT Program $1,000
CERT training (1 course) $1,000
01-21-7101 Equip. Maint./Service Agreemts $33,000
EM training & equipment $3,000
Radio & radar maintenance/re-certification $3,000
Fire Department Equipment 6,000
Sheriff Department Equipment 6,000
Digital Parking Citation System 15,000
CCI - $22,000 E-bike for Specialized Operations
CCI - $29,750 (ALPR) Deployment
CCI - $39,000 Flock License Plate Reader (LPR)
CCI - $50,000 Flock Mobile Security Trailer
CCI - $16,000 Unmanned Aerial System
01-21-7118 Property Maintenance $98,620
Other Location $98,615 To be reimbursed by Cal Fire Grant 01-21-8231 Furnishings & Equipment $120,470
Cerro Negro structure repairs $5,600
Vehicle for Special Assignment Sergeant $114,870
CCI - $40,000 Sheriff Special Operation Vehicle
CCI - $15,000 Battery-Powered Rescue Tool
City of La Cañada Flintridge 8 FY 2026-27 Budget Supporting Documents

Page 265 of 323 ends

FY 2026-27 Budget
General Fund (01), City-LCUSD Programs and Facilities (32) Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-32-6023 Water $100,000
Joint-Use Fields $100,000
01-32-6034 Printing & Publishing $2,500
LCHS Boosters program/ads $2,500
01-32-6057 LA Co. Sheriff Spcl Assgn Dep $281,500
School Resource Officer $281,500
01-32-6061 Professional Services $319,600
School crossing guards $304,000
Summer school crossing guard $15,600
01-32-6064 Lighting (School Fields) $48,000
User groups $48,000
01-32-6086 Joint Use Library $85,500
Support for librarian staffing $85,500
01-32-7107 Joint Use Site Maintenance $415,080
Contractor $314,956
Fertilization $78,143
Facility signs $1,032
Vandalism repair $1,032
Electrical $5,160
Miscellaneous repair $8,256
Gophers Management $6,502
CCI - $310,000 Track Conversion FIS Field
CCI - $100,000 All-Weather Track Conversion
01-32-8231 Furnishings & Equipment $8,000
Field Equipment $8,000
City of La Cañada Flintridge 9 FY 2026-27 Budget Supporting Documents

Page 266 of 323 ends

FY 2026-27 Budget
General Fund (01), Community Group Support (33)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-33-6073 Contribution to Comm. Groups $0
LCF Coord. Council
One City, One Book
LCHS Music Parents
LC Playhouse
Action Lg. of the Foothills
LCF Sister Cities
USC Vrdgo Hills Hosp.

LC Valley Beautiful
YMCA of the Foothills
LCF Trn. of Roses Assoc.

LCF Trails Council
LCF Trails Council
LCF Chamber of Comm.

Comm. Center of LCF
City of La Cañada Flintridge 10 FY 2026-27 Budget Supporting Documents

Page 267 of 323 ends

Administration and Public Services
Department
(General Fund)

Page 268 of 323 ends

Administrative Services
Division

Page 269 of 323 ends

FY 2026-27 Budget
General Fund (01), Administration (09)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-09-6051 Auto & Mileage Allowance $800
Mileage Reimbursement $800
01-09-6052 Travel Conferences & Meetings $3,000
MMASC Conference $500
CJPIA Conference $2,500
01-09-6053 Membership & Dues $300
MMASC $300
01-09-6054 Employee Training & Education $1,000
Accessibility Training $1,000
01-09-6061 Professional Services $2,000
Translater/transcription services $1,000
Brailing $1,000
01-09-8231 Furnishings & Equipment $3,000
Office Furniture $3,000
City of La Cañada Flintridge 11 FY 2026-27 Budget Supporting Documents

Page 270 of 323 ends

FY 2026-27 Budget
General Fund (01), City Clerk (04)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-04-6031 Office Supplies $1,000
Election Supplies $1,000
01-04-6032 Books & Publications $1,000
Archival Books $1,000
01-04-6034 Printing & Publishing $65,000
Election Printing & Publishing $5,000
Public Hearing & Legal Notices $60,000
01-04-6051 Auto & Mileage Allowance $750
Mileage @ $20/month $750
01-04-6052 Travel Conferences & Meetings $6,950
CMCA Conference $3,500
New Law & Election Seminar $1,550
ARMA CA Summer Conference $400
Master Municipal Academy $1,500
01-04-6053 Membership & Dues $1,500
CCAC $600
ARMA $530
IIMC $370
01-04-6054 Employee Training & Education $2,100
ARMA Greater Los Angeles Chapter Meetings $100
IIMC Training $300
BB&K PRA Training $1,000
National Notary Association $700
01-04-6060 Contract Services $125,000
General Municipal Election $125,000
01-04-6061 Professional Services $65,850
Municipal Code updates $5,500
Records Management Program $7,000
Shredding $700
Records Retention Schedules Annual Update $450
Document Scanning $50,000
Integration of Laserfiche / Civic Plus $2,200
CCI - $200,000 ADA Compliance
01-04-8231 Furnishings & Equipment $11,000
Existing Bulletin Board replacement $11,000
City of La Cañada Flintridge 12 FY 2026-27 Budget Supporting Documents

Page 271 of 323 ends

FY 2026-27 Budget
General Fund (01), Information Technology (11)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-11-6051 Auto & Mileage Allowance $500
Mileage Reimbursement $500
01-11-6052 Travel Conferences & Meetings $2,000
IT Conference - MISAC $2,000
01-11-6053 Membership & Dues $500
MISAC $500
01-11-6054 Employee Training & Education $2,500
Staff Training on IT/Cyber Security $2,500
01-11-6061 Professional Services $371,170
Computer/IT services $198,020
Records Management System $40,000
Tyler Energov Assist Complete $81,000
IT special projects $10,000
GIS enhancements $5,000
Security System Configuration and Training $2,000
GIS consultant $30,000
Miscellaneous Equipment Maintenance $5,150
CCI - $81,000 Audio Visual Staff
CCI - $21,000 Citizen Connect
01-11-6098 IT Service Providers $63,550
Back-up internet $9,360
Cable TV $3,720
Fiber Optic service $33,990
Cell Phones (service) $16,480
01-11-6099 Software, Licenses & Subscriptions $361,110
Permit Tracking & Business License Software $161,460
DocuSign agreement $11,750
MS Office accts $20,000
Virtual City Hall phone system software $28,330
Recreation reservation software $17,260
Bluebeam PDF $5,360
AdobePro $7,000
AutoCAD $6,200
Teleconferencing $1,500
Bid/Quote software $9,220
6 Google-App accounts $600
Civic Plus $16,450
ESRI GIS maintenance& ArcGIS Online $30,200
C&D Processing Software (Green Halo) $2,370
GIS Parcel Data $12,000
Finance Debtbook $7,500
FE Software $17,620
ChargePoint $2,100
Social Media Archiving Solution $4,190
01-11-8237 Computer Equipment $75,700
LAR-IAC $25,000
Tablet computers/monitors/warranties $36,500
New Employees - Initial Workstation $14,200
City of La Cañada Flintridge 13 FY 2026-27 Budget Supporting Documents

Page 272 of 323 ends

Parks, Recreation, and Culture
Division

Page 273 of 323 ends

FY 2026-27 Budget
General Fund (01), Parks and Recreation (31)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-31-6023 Water $100,000
Parks $100,000
01-31-6027 Electricity $35,000
Electricity $35,000
01-31-6030 Material & Supplies $3,000
Miscellaneous $3,000
01-31-6034 Printing & Publishing $14,000
Hometown Heroes/Gold Star Banners $14,000
01-31-6035 Stipend $2,750
11 meetings @$250/mtg $2,750
01-31-6051 Auto & Mileage Allowance $1,000
$83/month *12 $1,000
01-31-6052 Travel Conferences & Meetings $2,500
CPRS Conference $2,500
01-31-6061 Professional Services $61,000
Hometown Heros Flag Hanging $11,000
Parks Master Plan $50,000
01-31-6081 Programs $86,430
AV: MIP & Chamber Memorial Day $25,750
Bands: MIP $35,020
Portable Restrooms $5,150
Olberz Park Events $10,000
MIP on site electrical $7,210
Movie License - SWANK $2,000
Music Licenses - SESAC & ASCAP $1,300
01-31-6081 Furnishings & Equipment $0
CCI - $1,000,000 Playground Equipment
City of La Cañada Flintridge 14 FY 2026-27 Budget Supporting Documents

Page 274 of 323 ends

FY 2026-27 Budget
General Fund (01), Lanterman Auditorium (50)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-50-6023 Water $400
Water $400
01-50-6027 Electricity $5,000
Electricity $5,000
01-50-6029 Gas $200
Gas $200
01-50-6030 Material & Supplies $2,580
Restroom supplies $2,580
01-50-6037 Custodial Service $36,260
Contract $19,570
Supplemental $14,940
Deep cleaning $1,750
01-50-6061 Professional Services $4,950
Carpet cleaning $2,580
Tech supplies $1,240
Green room cleaning $1,130
01-50-7103 Building Maintenance $15,150
Booth rewiring $10,000
Lighting maintenance $3,090
Plumbing maintenance $1,030
Miscellanous $1,030
City of La Cañada Flintridge 15 FY 2026-27 Budget Supporting Documents

Page 275 of 323 ends

Finance Department
(General Fund)

Page 276 of 323 ends

FY 2026-27 Budget
General Fund (01), Finance (10)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-10-6032 Books & Publications $200
Miscellaneous $200
01-10-6034 Printing & Publishing $2,500
Budget and ACFR $2,500
01-10-6035 Stipend $1,000
IFAC $1,000
01-10-6051 Auto & Mileage Allowance $400
CSMFO luncheons & local seminars $400
01-10-6052 Travel Conferences & Meetings $7,850
CSMFO $5,250
CMTA $1,050
MMASC $1,550
01-10-6053 Membership & Dues $1,040
GFOA $500
CSMFO $280
CMTA $130
MMASC $130
01-10-6054 Employee Training & Education $1,630
GFOA webinars $450
CSMFO trainings $580
Government Tax webinar $600
01-10-6061 Professional Services $277,020
LA County property tax administration fee $102,490
Audit services $69,860
PFM investment advisors $31,200
Accounting assistance $7,000
ADP fees $13,300
HDL & other consulting fees $8,200
OPEB actuarial study or GASB 75 $6,200
Blackbaud FE consulting fees $4,000
State Controller Street Report $4,000
HRA administration $1,060
Pension actuarial study $1,700
US Bank custodial services $1,420
CalPERS GASB 67/68 services $400
ACFR/PAFR awards $890
Bank & other filing fees $300
Pairsoft software & implementation $25,000
01-10-6069 Write Off Adjustment $19,500
Miscellaneous $19,500
City of La Cañada Flintridge 16 FY 2026-27 Budget Supporting Documents

Page 277 of 323 ends

Community Development Department
(General Fund)

Page 278 of 323 ends

Planning Division

Page 279 of 323 ends

FY 2026-27 Budget
General Fund (01), Community Development (05)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-05-6051 Auto & Mileage Allowance $600
Mileage - $50/mo $600
01-05-6052 Travel Conferences & Meetings $6,500
American Planning Association Conference $2,500
MMASC $3,500
Staff Meetings $500
01-05-6053 Membership & Dues $1,400
American Planning Association $1,000
MMASC $400
01-05-6054 Employee Training & Education $150
Planning & CEQA seminars $150
01-05-6061 Professional Services $10,000
CDBG consultant $10,000
01-05-6068 Commercial Facade Rehab. $6,000
3 @ $2,000 each $6,000
01-05-6201 Sewer Connection Grant Program $8,000
Sewer Connection Grant Program $8,000
01-05-8231 Furnishings & Equipment $250
Miscellaneous $250
City of La Cañada Flintridge 17 FY 2026-27 Budget Supporting Documents

Page 280 of 323 ends

FY 2026-27 Budget
General Fund (01), Planning (25)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-25-6030 Material & Supplies $0
CCI - Body Cameras and PPE
01-25-6032 Books & Publications $70
Miscellaneous (Soloano Press, landscape, CEQA) $70
01-25-6034 Printing & Publishing $500
Minute books $500
01-25-6035 Stipend $15,000
Stipend $15,000
01-25-6052 Travel Conferences & Meetings $7,500
American Planning Association $3,500
Planning Commissioner Academy $4,000
01-25-6053 Membership & Dues $1,700
American Planning Association $1,700
01-25-6054 Employee Training & Education $300
Planning & CEQA seminars $300
01-25-6061 Professional Services $175,000
Housing Consultant $75,000
Sustainability Analyst $100,000
CCI - $25,000 Greenways Coalition
CCI - $36,250 Sustainability Analyst Consultant
CCI - $36,840 (SRC) Community Outreach
CCI - $80,000 Sustainability Consultant for Cascadia
CCI - $100,000 Early Prep. for the 7th Housing Cycle
CCI - $100,000 Sustainable Mobility & Mode Shift Pilot
CCI - $100,000 Transportation Demand Management
01-25-6065 General Plan Implementation $389,000
Zoning Ordinance $41,000
CEQA Consultant - Zoning Code Update $200,000
Circulation & Conservation Elements Upd. Cnslt Srvs $90,000 Climate Action Plan Implementation $58,000
CCI - $250,000 Housing Element Update Consultant
01-25-6093 Documents/Recordings $500
County CEQA Environmental Filings $500
City of La Cañada Flintridge 18 FY 2026-27 Budget Supporting Documents

Page 281 of 323 ends

Building and Safety Division

Page 282 of 323 ends

FY 2026-27 Budget
General Fund (01), Building and Safety (26)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-26-6034 Printing & Publishing $1,400
Contractor stickers/supplies $1,400
01-26-6054 Employee Training & Education $2,000
Training for Permit Technicians $2,000
01-26-6060 Contract Services $1,600,000
Building Inspection & Plan Check Services $1,600,000
City of La Cañada Flintridge 19 FY 2026-27 Budget Supporting Documents

Page 283 of 323 ends

Code Enforcement Division

Page 284 of 323 ends

FY 2026-27 Budget
General Fund (01), Code Enforcement (27)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-27-6030 Material & Supplies $0
CCI - Body Cameras and PPE
01-27-6061 Professional Services $268,200
Code Enforcement Officer $167,000
Weekend Code Enforcement Officer $93,000
Data Ticket $5,000
Data Tree $2,500
Noise calibration services $700
City of La Cañada Flintridge 20 FY 2026-27 Budget Supporting Documents

Page 285 of 323 ends

Public Works Department
(General Fund)

Page 286 of 323 ends

Public Works and Engineering
Division

Page 287 of 323 ends

FY 2026-27 Budget
General Fund (01), Public Works (42)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-42-6030 Material & Supplies $1,200
Supplies $1,200
01-42-6035 Stipend $3,000
Public Works & Traffic Commission $3,000
01-42-6051 Auto & Mileage Allowance $2,250
City Vehicles $2,000
Mileage $250
01-42-6052 Travel Conferences & Meetings $7,750
CCEA $750
MMASC $1,500
PWOI $2,000
Contract Cities $2,000
JPIA $1,500
01-42-6053 Membership & Dues $530
CCEA $250
MMASC $130
Professional License $150
01-42-6054 Employee Training & Education $1,000
Seminars & tuition $1,000
01-42-6061 Professional Services $60,000
Arborist $30,000
Video Inspection $30,000
CCI - $150,000 Citywide Bulk Repaving
01-42-7101 Equipment Maintenance $8,500
City Vehicles $3,500
Public EV charging stations maintenance $5,000
01-42-7113 Street Maintenance $125,000
Annual maintenance $75,000
Unanticipated traffic accidents $40,000
Miscellaneous $10,000
01-42-8231 Furnishings & Equipment $5,000
Miscellaneous $5,000
CCI - $75,000 No Parking Red Flag
01-42-8239 Street Improvements $25,000
Unanticipated improvements $25,000
City of La Cañada Flintridge 21 FY 2026-27 Budget Supporting Documents

Page 288 of 323 ends

FY 2026-27 Budget
General Fund (01), Engineering (43)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-43-6051 Auto & Mileage Allowance $500
Mileage $500
01-43-6052 Travel Conferences & Meetings $500
CCEA $500
01-43-6053 Membership & Dues $150
CCEA $150
01-43-6054 Employee Training & Education $500
Misceallaneous $500
01-43-6061 Professional Services $465,000
Traffic Engineer $190,000
Engineering & management support $250,000
Speed Survey $25,000
CCI - $250,000 ACH Condition Assessment
City of La Cañada Flintridge 22 FY 2026-27 Budget Supporting Documents

Page 289 of 323 ends

FY 2026-27 Budget
General Fund (01), Landscape, Trails and Rights-of-Way (45) Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-45-6023 Water $49,500
ROW Water $49,500
01-45-6027 Electricity $10,000
ROW Electricity $10,000
01-45-6030 Material & Supplies $10,000
Hardware $2,500
Replace American Flags $7,500
01-45-6052 Travel Conferences & Meetings $4,000
California Trails & Greenways $1,000
MMASC $1,500
JPIA $1,500
01-45-6053 Membership & Dues $130
MMASC $130
01-45-6054 Employee Training & Education $250
Seminars/tuition $250
01-45-7105 Park Maintenance $296,500
Landscape Services $129,300
Fertilization $63,000
Custodial $62,500
Safety/Repair $4,150
Lighting Repairs $3,170
Woodchips $3,110
Electrical $3,000
Misc $10,000
Park/Field Access Security Replacement $7,000
Facility Maintenance $5,000
Memorial Park (Trash Service) $6,270
01-45-7109 Median & Right of Way Maint. $271,890
Landscape Services $211,090
Vandalism maintenance $1,500
Electrical maintenance $4,300
Calsense upgrades $4,500
Holiday Lighting $44,000
Flag Hanging $6,500
01-45-7110 Trail Maintenance & Easements $170,000
Trail Maintenance $155,000
City of La Cañada Flintridge 23 FY 2026-27 Budget Supporting Documents

Page 290 of 323 ends

FY 2026-27 Budget
General Fund (01), Landscape, Trails and Rights-of-Way (45) Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
Emergency $15,000
CCI - $30,000 Trails Council Link
01-45-7118 Property Maintenance $140,000
Annual Brush Clearance $140,000
01-45-7120 Tree Trimming $679,500
Grid Pruning Program $576,800
As-needed Tree Removals $102,700
01-45-7121 Tree Spraying & Inspection $114,450
Spray $66,150
Watering $48,300
01-45-7123 Replanting Trees $13,000
Replanting Trees as needed $13,000
01-45-8231 Furnishings & Equipment $0
CCI - $6,500 Pet Waste Stations
City of La Cañada Flintridge 24 FY 2026-27 Budget Supporting Documents

Page 291 of 323 ends

Solid Waste and Environmental
Quality Division

Page 292 of 323 ends

FY 2026-27 Budget
General Fund (01), Solid Waste (52)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-52-6030 Material & Supplies $1,000
Miscellaneous $1,000
01-52-6034 Printing & Publishing $7,500
Environmental Times $7,500
01-52-6052 Travel Conferences & Meetings $3,000
MMASC $1,500
CRRA $1,500
01-52-6053 Membership & Dues $330
MMASC $130
CRRA $200
01-52-6054 Employee Training & Education $400
SWANA Certification $400
01-52-6061 Professional Services $184,170
Consultant Services Solid Waste $140,000
HHW Program $15,180
Edible Food Recovery Implementation $28,990
01-52-6072 Special Events $6,000
Compost Events $6,000
City of La Cañada Flintridge 25 FY 2026-27 Budget Supporting Documents

Page 293 of 323 ends

FY 2026-27 Budget
General Fund (01), Storm Water/NPDES (53)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-53-6060 Contract Services $148,000
Catch basin cleanouts $106,000
Restaurant/Commercial inspections $42,000
01-53-6061 Professional Services $50,000
SGVCOG ULAR CIMP/EMMP Implementation $35,000
Annual NPDES fees $14,000
Harbor toxins $1,000
01-53-7124 Drainage Facilities Maintenance $24,000
Miscellaneous $24,000
City of La Cañada Flintridge 26 FY 2026-27 Budget Supporting Documents

Page 294 of 323 ends

Facilities Division

Page 295 of 323 ends

FY 2026-27 Budget
General Fund (01), Lanterman House (49)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-49-6021 Telephone Charges $1,630
Telephone Charges $1,630
01-49-6023 Water $6,000
Water $6,000
01-49-6025 Refuse Collection and Recycling Services $2,740 Lanterman House $2,740
01-49-6027 Electricity $5,570
Electricity $5,570
01-49-6029 Gas $1,100
Gas $1,100
01-49-6061 Professional Services $172,000
Security system $500
Administrative Services $18,050
Programs and Services $11,300
Restoration and Conservation $6,200
Staff Salaries $135,950
01-49-7103 Building Maintenance $4,000
Unanticipated repairs $4,000
01-49-7106 Landscape Maintenance $12,500
Landscape Services $12,500
01-49-8233 Building Improvements $11,400
Repairs $11,400
City of La Cañada Flintridge 27 FY 2026-27 Budget Supporting Documents

Page 296 of 323 ends

FY 2026-27 Budget
General Fund (01), Civic Center (55)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-55-6021 Telephone Charges $14,500
Telephone $14,500
01-55-6023 Water $11,000
Water $11,000
01-55-6025 Refuse Collection and Recycling Services $6,300 City Hall $6,300
01-55-6027 Electricity $105,900
Electricity $105,900
01-55-6037 Custodial Service $65,950
Janitorial $47,750
Deep cleaning $4,780
Supplies $6,830
As needed services $2,030
Leased Space Cleaning $4,560
01-55-6061 Professional Services $37,250
Miscellaneous $2,000
Security/fire system monitoring $35,250
01-55-7103 Building Maintenance $54,000
Plumbing $5,000
HVAC $30,000
Generator 8,000
Electrical $5,000
Elevator $6,000
01-55-7104 General Maintenance $8,000
Miscellaneous $8,000
01-55-7106 Landscape Maintenance $12,860
Landscaping $12,360
Plants $500
01-55-7108 Leasehold Maintenance $15,000
Plumbing $3,000
Electrical $2,000
Miscellaneous $10,000
01-55-8231 Furnishings & Equipment $25,000
New cubicles $25,000
01-55-8233 Building Improvements $4,000
Miscellaneous $1,500
City Hall re-key $2,500
City of La Cañada Flintridge 28 FY 2026-27 Budget Supporting Documents

Page 297 of 323 ends

General Fund Transfers Out

Page 298 of 323 ends

FY 2026-27 Budget
General Fund (01), Transfers Out
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
01-00-9203 Transfers Out Fund 3 (State Gas Tax Fund) $155,600 Street Sweeping $155,600
01-00-9239 Transfer Out Fund 39 (Civic Center Debt Service) $611,340 IBank loan payment $276,340
Prepayment set-aside $335,000
City of La Cañada Flintridge 29 FY 2026-27 Budget Supporting Documents

Page 299 of 323 ends

Special Purpose Funds

Page 300 of 323 ends

Public Safety Funds
(Special Purpose Funds)

Page 301 of 323 ends

FY 2026-27 Budget
Traffic Safety Fund (02)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
02-00-9201 Transfers Out Fund 1 (General Fund) $63,000
Law enforcement costs $63,000
City of La Cañada Flintridge 30 FY 2026-27 Budget Supporting Documents

Page 302 of 323 ends

FY 2026-27 Budget
SLESF Fund (35)
Account Name & Sub-items
FY 2026-27
Budget Notes/Description
Transfer Out Fund 1 (General Fund) $210,640
$210,640
City of La Cañada Flintridge 31 FY 2026-27 Budget Supporting Documents

Page 303 of 323 ends

Environmental Quality and Community
Assistance Funds
(Special Purpose Funds)

Page 304 of 323 ends

FY 2026-27 Budget
Community Development Block Grant Fund (11)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
11-00-6202 Residential Rehabilitation 57,820.00
2 rehabilitation projects 57,820.00
City of La Cañada Flintridge 32 FY 2026-27 Budget Supporting Documents

Page 305 of 323 ends

FY 2026-27 Budget
Measure W Fund (18)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
18-00-6060 Contract Services $40,000
Catch basin clean-out $40,000
18-00-6061 Professional Services $133,500
NPDES Permit/Stormwater Program Consultant $93,500
NPDES Monitoring Activities $30,000
Audit $10,000
18-00-7000 Capital Projects $45,000
Green Alley II $45,000
CCI - $105,000 Green Alley II
City of La Cañada Flintridge 33 FY 2026-27 Budget Supporting Documents

Page 306 of 323 ends

FY 2026-27 Budget
AQMD Fund (37)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
37-00-8231 Furnishings & Equipment $0
CCI $85,000 - Electric Vehicle
City of La Cañada Flintridge 34 FY 2026-27 Budget Supporting Documents

Page 307 of 323 ends

Sewer and Sanitation Funds
(Special Purpose Funds)

Page 308 of 323 ends

FY 2026-27 Budget
Sewer DS - 04-1 Fund (43)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
43-00-6037 Principal loan payment $1,622,650
Principal payment $1,622,650
43-00-6039 Interest Expense $42,670
Interest payment $42,670
43-00-6041 Loan Service charge $32,830
Loan charge $32,830
City of La Cañada Flintridge 35 FY 2026-27 Budget Supporting Documents

Page 309 of 323 ends

FY 2026-27 Budget
Sewer Maint 04-1 Fund (44)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
44-00-6011 Professional Services 3A $10,000
Willdan 3A Admin $7,000
City of LA connection reports $3,000
44-00-7113 Sewer Maintenance (SPA 3A) $304,900
City of LA (3A fees) $264,000
ADS (flow monitoring) $40,900
City of La Cañada Flintridge 36 FY 2026-27 Budget Supporting Documents

Page 310 of 323 ends

Street and Transportation Funds
(Special Purpose Funds)

Page 311 of 323 ends

FY 2026-27 Budget
Gas Tax Fund (03)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
03-00-6064 Lighting (Streets and Traffic) $195,000
Lighting (Streets and Traffic) $195,000
03-00-7113 Street Maintenance $360,000
Non-Declared Disaster-Road Clearance & Repair $25,000
Emergency Call-out for PW Road Service $5,000
Street Inspection $40,000
Traffic Sign Installation & Repair $20,000
Vegetation Control $30,000
Litter Debris & Removal $15,000
Pavement Patching $85,000
Roadway Drainage & Facilities Maintenance $60,000
Curb, Gutter, Sidewalk Inspection & Repair $40,000
Striping $25,000
As-Needed Repairs $15,000
03-00-7117 Street Sweeping $155,600
Street Sweeping $155,600
03-00-9231 Transfers Out Fund 31 (Capital Projects Fund) $438,930 (#2601) Street Resurfacing $438,930
City of La Cañada Flintridge 37 FY 2026-27 Budget Supporting Documents

Page 312 of 323 ends

FY 2026-27 Budget
Trans Dev Act Fund (05)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
05-00-9231 Transfers Out Fund 31 (Capital Projects Fund) $0 $0
City of La Cañada Flintridge 38 FY 2026-27 Budget Supporting Documents

Page 313 of 323 ends

FY 2026-27 Budget
Proposition A Fund (30)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
30-00-6053 Membership & Dues $2,800
Arroyo Verdugo Council of Govts JPA $0
San Gabriel Valley Council of Governments $2,800
30-00-6061 Professional Services $754,980
LCF Shuttle Service $561,460
Beeline Fare Subsidy $31,060
Dial-A-Ride $74,790
Bus stop maintenance $65,670
Beach Bus $22,000
30-00-9201 Transfers Out Fund 1 (General Fund) $0
Salary Reimb (15% SMA / 10% Mgmt Aide) $0 Move to 29-00-9201 30-00-9231 Transfers Out Fund 31 (Capital Projects Fund) $150,000 (#2506) Bus Shelter Lighting Improvements $150,000
City of La Cañada Flintridge 39 FY 2026-27 Budget Supporting Documents

Page 314 of 323 ends

FY 2026-27 Budget
Proposition C Fund (29)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
29-00-6053 Membership & Dues $11,890
San Gabriel Valley Council of Governments $4,290
Arroyo Verdugo Communities JPA $7,600
29-00-9201 Transfers Out Fund 1 (General Fund) $23,500
Salary Reimb $23,500
29-00-9231 Transfers Out Fund 31 (Capital Projects Fund) $60,800 (#2410) Fthl Blvd traffic signal synchronize $60,800
City of La Cañada Flintridge 40 FY 2026-27 Budget Supporting Documents

Page 315 of 323 ends

FY 2026-27 Budget
Measure M Fund (27)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
27-00-9231 Transfers Out Fund 31 (Capital Projects Fund) $90,000 (#2606) Soundwall Phase V $90,000
City of La Cañada Flintridge 41 FY 2026-27 Budget Supporting Documents

Page 316 of 323 ends

FY 2026-27 Budget
Measure R Fund (28)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
28-00-9231 Transfers Out Fund 31 (Capital Projects Fund) $75,000 (#2208) Hillard (Foothill to Fairmont) $75,000
City of La Cañada Flintridge 42 FY 2026-27 Budget Supporting Documents

Page 317 of 323 ends

Capital and Major Project Funds
(Special Purpose Funds)

Page 318 of 323 ends

FY 2026-27 Budget
ARPA Fund (7)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
07-00-9201 Transfers Out - General Fund (1) $272,640
Los Angeles County Sheriff's Dept Svcs $272,635
City of La Cañada Flintridge 43 FY 2026-27 Budget Supporting Documents

Page 319 of 323 ends

FY 2026-27 Budget
Account
Number Account Name & Sub-items
FY 2026-27
Budget Project Budget Notes/Description
31-00-2208 Hillard (Foothill to Fairmont) $78,790 $150,000 General Fund $3,790 $50,000
Measure R $75,000 $100,000
31-00-2213 Mayors' Discovery Park Improvement $60,650 $880,000 Grant $0 $190,600
General Fund $60,650 $689,400
31-00-2306 Foothill Blvd Dip - Permanent Repair $5,118,140 $5,250,000 General Fund Reserves $3,368,140 $3,500,000
FMWD Settlement $1,750,000 $1,750,000
31-00-2409 Drought Tolerant Landscape Medians (Design) $15,360 $100,000 General Fund $15,360 $100,000
31-00-2410 Foothill Blvd. Traffic Signal Synchronization $60,800 $110,500 Measure M $0 $45,000
Proposition C $60,800 $65,500
31-00-2503 Misc. Storm Drain Repairs $35,000 $50,000
General Fund $35,000 $50,000
31-00-2506 Bus Shelter Lighting Improvements $150,000 $150,000 Proposition A $150,000 $150,000
31-00-2507 Southside Lease Space Improvement $0 $150,000 General Fund $0 $150,000
31-00-2601 Citywide Street Resurfacing $1,900,000 $2,000,000 General Fund $1,461,070 $1,461,070
Gas Tax (SB1) $438,930 $538,930
31-00-2602 Miscellaneous Concrete Repairs $50,000 $250,000 General Fund $50,000 $233,980
TDA $0 $16,020
31-00-2603 Miscellaneous Storm Drain Repairs $48,800 $50,000 General Fund $48,800 $50,000
31-00-2604 Miscellaneous Pavement Repairs $10,000 $64,000 General Fund $10,000 $64,000
31-00-2605 Angeles Crest Hwy at Green Lane Traffic Signal $90,000 $100,000 General Fund $90,000 $100,000
31-00-2606 Soundwall Phase V $175,000 $250,000
General Fund $85,000 $85,000
Capital Projects Fund (31)
City of La Cañada Flintridge 44 FY 2026-27 Budget Supporting Documents

Page 320 of 323 ends

FY 2026-27 Budget
Account
Number Account Name & Sub-items
FY 2026-27
Budget Project Budget Notes/Description
Capital Projects Fund (31)
Measure M $90,000 $165,000
31-00-2607 Oakwood Operational Safety Improvements $45,000 $100,000 General Fund $45,000 $100,000
31-00-2608 Pedestrian Crossing - Fthl at Indiana (HSIP Cycle 12) $345,000 $390,000 General Fund $40,000 $40,000
HSIP Cycle 12 $305,000 $350,000
31-00-2609 Inverness Storm Drain & Resurfacing $50,000 $75,000 General Fund $50,000 $75,000
31-00-2610 Pedestrian Crosswalk - 200 Foothill $352,540 $372,910 LACMTA Local $60,910 $60,910
LATIP $96,630 $117,000
Measure R $195,000 $195,000
31-00-9201 Transfers Out Fund 1 (General Fund) $264,160 $0 (#1610) Seco Creek Trail $75,160 $0
(#2104) Sister Cities Frienship Path $16,700 $0
(#2202) FY22 Miscellaneous Concrete Repair $7,340 $0
(#2207) Lanterman House Concrete Work $65,880 $0
(#2214) Flint Canyon Trail $52,580 $0
(#2305) Landscape Medians (Link) $740 $0
(#2408) Hampstead Slope Repairs $31,770 $0
(#2412) Soundwall Ph IV - Salisbury Landscaping $690 $0 (#2505) Lanterman House Parking Lot Imprvmnts $13,300 $0 City of La Cañada Flintridge 45 FY 2026-27 Budget Supporting Documents

Page 321 of 323 ends

FY 2026-27 Budget
Property Acq Fund (38)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
38-00-8233 Building Improvements $200,000
Window replacement $200,000
City of La Cañada Flintridge 46 FY 2026-27 Budget Supporting Documents

Page 322 of 323 ends

FY 2026-27 Budget
Civic Center DS Fund (39)
Account
Number Account Name & Sub-items
FY 2026-27
Budget Notes/Description
39-00-6037 Principal loan payment $128,410
Principal payment $128,410
39-00-6039 Interest Expense $135,110
Interest payment $135,110
39-00-6041 Annual loan charge $12,820
Loan charge $12,820
City of La Cañada Flintridge 47 FY 2026-27 Budget Supporting Documents

Page 323 of 323 ends
← All documents from this meeting