Cities Index.
Agenda packet, regular meeting

La Cañada Flintridge City Council
September 15, 2026

Document
Agenda packet, regular meeting
Meeting
September 15, 2026
Body
La Cañada Flintridge City Council
Pages
411
Original file
29.3 MB
Text extracted from the city's file for reading and search. Open the original on lcfca.api.civicclerk.com. That file is the official record.

City Council Tuesday, September 15, 2026 Page 1 of 5
Notice and Agenda
Regular Meeting
of the
La Cañada Flintridge City Council
Tuesday, September 15, 2026 at 6:00 PM
City Hall
One Civic Center Drive
La Cañada Flintridge, CA 91011
Jeanne K. Hobson, Mayor
Stephanie Fossan, Mayor Pro Tem
Quemars S. Ahmed, Councilmember
Kim Bowman, Councilmember
Keith Eich, Councilman

Page 1 of 411 ends

City Council Tuesday, September 15, 2026 Page 2 of 5
How to Attend and Participate in the Meeting Remotely
City Council meetings are held in person and on Zoom. The City Council Chambers are open to the public. If you cannot attend in person, you can join and speak remotely.

To watch the meeting (view only, no speaking), go to the City’s website: https://lcf.ca.gov/city-clerk/agendaminutes/ To access the meeting and provide public comment, log into the Zoom meeting or dial the telephone number.

You will be muted until the public comment period begins. Use the “Raise Hand” feature at the bottom of your screen, and when called on, unmute yourself.

Zoom Meeting Link: https://us02web.zoom.us/j/87948782036 Meeting ID: 879 4878 2036 One-Tap Mobile: +16694449171,,87948782036# OR +16699009128,,87948782036# US Telephone Number: 1-669-444-9171
Technical Disruptions - If a technical issue prevents remote public observation or participation and City personnel cannot immediately correct the problem, the City Council will recess the meeting while the City takes further corrective action. If remote access cannot be restored within one hour, the City Council may continue the meeting only after confirming that the City made good faith efforts to restore service and finding that the public interest in proceeding outweighs the need for remote access. These procedures also apply to disruptions affecting Councilmembers participating remotely.

Comments from the Public - The public is encouraged to address the City Council on any matter posted on the agenda or on any other matter within its jurisdiction. If you wish to address the City Council, you may do so during the Comments from the Public period noted on the agenda. Each person is allowed 3-minutes speaking time.

Pursuant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The City Council may direct staff to investigate and/or schedule certain matters for consideration at a future City Council meeting.

Agenda Materials - Copies of staff reports and supporting documentation pertaining to agenda items are available for public viewing and inspection at City Hall, 2nd Floor Lobby Area, during regular business hours, and on the City’s website https://lcf.ca.gov. For further information regarding agenda items, please contact the office of the City Clerk at (818) 790-8880 or via e-mail at [email protected].

SB 343 – Any writings relating to an agenda item distributed to a majority of the City Council less than 72 hours prior to the meeting will be available for public review in the City Clerk’s Office during normal business hours and/or posted on the City’s website.

Levine Act - To promote transparency and fairness in government decision-making, the Levine Act imposes contribution prohibitions and disclosure requirements. Specifically, any elected or appointed City officer is prohibited from making or attempting to influence a decision in a proceeding involving a license, permit, or other entitlement for use if the officer received a contribution of more than $500 within the preceding 12 months from a party or their agent. (Gov. Code § 84308(c)(1).) Additionally, parties to proceedings involving a license, permit, or other entitlement for use pending before any elected or appointed City officer must disclose any campaign contributions exceeding $500 that they made within the preceding 12 months. (Gov. Code § 84308(e)(1).) For more information please visit: https://lcf.ca.gov/city-clerk/levine-act/.

Reasonable Accommodations - In compliance with the Americans with Disabilities Act and Government Code Section 54953(g), the City Council has adopted a "reasonable accommodations" policy to expedite accommodation requests. The policy can also be found on the City’s website. Please contact the City Clerk’s Office, (818) 790-8880 to make an accommodation request, or to obtain an electronic or printed copy of the policy.

Page 2 of 411 ends

City Council Tuesday, September 15, 2026 Page 3 of 5
6:00 PM City Council Regular Meeting
Preliminary Business
Call to Order Next Ordinance: 536
Next Resolution: 26-41
Roll Call Jeanne K. Hobson, Mayor
Stephanie Fossan, Mayor Pro Tem
Quemars S. Ahmed, Councilmember
Kim Bowman, Councilmember
Keith Eich, Councilman
Pledge of Allegiance
Comments from the Public - Public Comment cards are in the holder on the wall in the lobby.

Limited to 3 minutes per speaker for items on the Consent Calendar, items not on the Agenda, or any issue within the subject matter jurisdiction of the City Council. Public comment is limited to a maximum of 20 minutes. Speakers not able to speak due to the 20-minute time limit will be provided with the opportunity to speak at the end of the meeting. Please give a completed Public Comment Card to the City Clerk prior to the conclusion of this item. Speakers will be called in the order that public comment cards are received.

If the matter on which you wish to speak is an Agenda item (other than a Consent Calendar item), you will be provided the opportunity to address the City Council when the matter is considered. Please give a completed Public Comment Card to the City Clerk prior to the beginning of the item.

Presentations
• Public Safety Update
• Update from the Grant Management Team
• Staff update on pending projects
Reordering of and Additions to the Agenda
Consent Calendar
Items on the Consent Calendar will be enacted by one motion and roll call vote without individual discussion. If discussion is desired, the item will be removed and considered separately. 1) Waive the Full Reading of All Ordinances Considered on This Agenda and Direct the City Attorney That They Be Read by Title Only
2) Approval of Minutes of the City Council Meetings
a. Special and Regular City Council Meetings of June 16, 2026 b. Regular City Council Meeting of August 4, 2026
3) Approval of Warrant Resolution No. 26-14 Dated September 15, 2026, for $1,764,677.45 4) Receive and File Commission Meeting Action Agendas
a. Design Commission Action Minutes for July 2, 2026, and July 16, 2026

Page 3 of 411 ends

City Council Tuesday, September 15, 2026 Page 4 of 5
5) Receive and File the Public Safety Reports for July and August 2026 6) Receive and File the Capital Improvement Project Status Update 7) Adoption of Plans, Specifications and Estimates (PS&E), Filing of a Notice of Exemption and Authorization to Advertise for Construction Bids, with an Engineer’s Estimate Ranging Between $481,600 and $561,800, for the Traffic Signal (HAWK) Improvement Project (HSIPL-5417(029); Contract 25/26-5) on Foothill Boulevard at Indiana Avenue Mid-Block Pedestrian Crossing 8) Resolution Amending the City’s Conflict of Interest Code and Rescinding Resolution No. 24-32, and Mandating Biennial Ethics Training for Designated Officials and Employees 9) Approval of Professional Services Agreement with Willdan Financial Services for a Comprehensive User Fee Study and Cost Allocation Plan
10) Approve and Authorize Release of RFP for Professional Services to Develop a New City Website 11) Receive and File City’s Operational Calendar – FY 2026-27 Quarter 2 12) Approval of Lease Renewal with Citizens Business Bank and Related Budget Amendment 13) Approval and Delegation of Authority to City Manager to Execute a Purchase Order, in the Amount of $61,885.00, to ACCO Engineered Systems for the Repairing of the City Hall’s Second Floor HVAC System
Public Hearings: None
Ordinances
14) First Reading and Introduction of an Ordinance Adding Chapter 4.25, Prohibition of Use of Small Gas-Powered Landscape Equipment to Title 4, Public Welfare, of the La Cañada Flintridge Municipal Code and Finding the Municipal Code Amendment Exempt from the California Environmental Quality Act
RECOMMENDATION: Motion to direct the City Attorney to read the title of the ordinance, waive further reading, and introduce the ordinance on a roll call vote Other Business: None
Concluding Business
• Meetings attended at the expense of the local agency
• Regional and local representation
• Subcommittee updates
• Request for future agenda items
• Councilmembers’ comments
• City Manager closing comments
Adjournment

Page 4 of 411 ends

City Council Tuesday, September 15, 2026 Page 5 of 5
Motion to Adjourn
I certify under penalty of perjury that the agenda was posted on the City Hall bulletin board at One Civic Center Drive at least 72 hours prior to the meeting, in accordance with Government Code Section 54954.2.

Tania Garcia
City Clerk

Page 5 of 411 ends

City of La Cañada Flintridge
City Council Minutes
Special Meeting
Tuesday, June 16, 2026
City Hall
One Civic Center Drive
La Cañada Flintridge, CA 91011

SPECIAL CITY COUNCIL MEETING
CALL TO ORDER: Mayor Bowman called the Special Meeting to order at 5:30 p.m.

ROLL CALL: Councilmember Michael T. Davitt, Councilman Keith Eich (via teleconference), Councilmember Fossan, Mayor Pro Tem Jeanne K. Hobson, and Mayor Kim Bowman.

COMMENTS FROM THE PUBLIC: None

CLOSED SESSION
Assistant City Attorney Cohen read the Closed Session title into the record. 1) CONFERENCE WITH LEGAL COUNSEL — EXISTING LITIGATION
[Pursuant to Government Code Sections 54954.5(c), 54956.9(d)(1)] 600 Foothill Owner, LP v. City of La Cañada Flintridge; et al.

Los Angeles County Superior Court Case Number: 23STCP02575 Number of cases: One
RECONVENE OPEN SESSION AND ANNOUNCE ANY ACTION TAKEN:

Assistant City Attorney Cohen reported on Closed Session Item One, noting that there was a brief discussion, but no reportable action was taken.

ADJOURNMENT
Mayor Bowman adjourned the Special City Council meeting at 6:17 p.m.

_________________________________
Tania Garcia, City Clerk
Minutes approved by the City Council on __________________________.

Page 6 of 411 ends

City of La Cañada Flintridge
City Council Minutes
Regular Meeting
Tuesday, June 16, 2026
City Council Chambers
One Civic Center Drive
La Cañada Flintridge, CA 91011

REGULAR CITY COUNCIL MEETING
Call to Order: Mayor Bowman called the Regular Meeting to order at 6:18 p.m.

Roll Call: Councilmember Michael T. Davitt, Councilman Keith Eich (via teleconference), Councilmember Stephanie Fossan, Mayor Pro Tem Jeanne K. Hobson, and Mayor Bowman.

Staff Present: City Manager Jordan, Assistant City Attorney Cohen, Assistant City Manager Parseghian, Director of Administrative Services Cook, Director of Community Development Koleda, Director of Finance Kim, Director of Public Works/City Engineer El-Rabaa, Assistant Director of Community Development Gardea, and City Clerk Garcia.

Pledge of Allegiance: Led by Sustainability and Resilience Commissioner Quemars Ahmed.

Mayor Bowman wished everyone a happy Pride Month and noted that the fiscal year budget will be discussed later in the evening.

Comments from the Public:

Public comments were received from Pat Anderson and David Haxton.

Presentations
Presentation by Southern California Edison (“SCE”)
Southern California Edison Affairs Region Manager Marissa Castro-Salvati introduced EVP and Chief Operating Officer Jill Anderson, who provided the presentation titled "SCE Update on LCF Service and Haskell Circuit." Ms. Anderson then introduced Director of Distribution Engineering Joseph Jacunski, who continued with the presentation. The SCE team then answered questions from the City Council regarding potential underground efforts, notification alert system, easement procurement process, momentary outages and longer outages, the annual reliability report, advocacy for projects, and the 600 miles program.

Mayor Bowman opened the public comment period at 7:10 p.m.

Public comments were received from Tanya N.

Mayor Bowman closed the public comment period at 7:13 p.m.

Ms. Anderson answered questions from the public about joint operations with other utility companies for underground projects.

The City Council thanked SCE for investing in local grid upgrades and improving reliability, especially on the Haskell Circuit, but stressed that problems and mistrust remain. They highlighted

Page 7 of 411 ends

City Council Minutes Page 2 of 9 June 16, 2026
Regular Meeting
that residents still experience disruptive momentary outages and unreliable alerts, and asked SCE to provide better data, keep project information current, and give clear undergrounding timelines.

The City Council noted that the City is ready to help with easements, permits, and pole removal.

Public Safety Update
Chief Sprengel provided the public safety report for May.

Captain Vienna provided the public safety report for April and May.

Staff update on pending projects
Director of Public Works/City Engineer El-Rabaa provided a brief update on five projects.

Reordering of and Additions to the Agenda: None
Consent Calendar
Mayor Pro Tem Hobson recused herself from Warrant Item 24357 due to a conflict of interest, but voted on the remaining Consent Calendar.

Staff and Assistant City Attorney Cohen addressed questions from the City Council regarding Consent Calendar Items 13, 16, 32, and 39.

Before the vote, Assistant City Attorney Cohen read a statement regarding Consent Calendar Item 35 to comply with Senate Bill 1436.

A MOTION was made by Councilmember Davitt, seconded by Councilmember Fossan, and (5 - 0) to approve Consent Calendar Items one through 44 with the abovementioned recusal.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Davitt, Eich, Fossan, Hobson, and Bowman
NOES: None; ABSTAIN: None; ABSENT: None
1) Waive the Full Reading of All Ordinances Considered on This Agenda and Direct the City Attorney That They Be Read by Title Only
(Approved 5 – 0, as recommended)
2) Approval of Minutes of the City Council Meetings
a. Special and Regular City Council Meetings of May 5, 2026 b. Special City Council Meeting of May 18, 2026
c. Canceled Regular City Council Meeting of May 19, 2026 d. Canceled Regular City Council Meeting of June 2, 2026 (Approved 5 – 0, as recommended)
3) Approval of Warrant Resolution No. 26-10 Dated June 16, 2026, for $2,967,673.65 (Approved 5 – 0, with the abovementioned recusal)
4) Receive and File the Action Minutes from the Commission Meetings:
a. Design Commission Action Minutes for May 7, 2026
b. Parks and Recreation Commission Action Minutes for April 8, 2026 (Approved 5 – 0, as recommended)
5) Receive and File the Public Safety Reports for April and May 2026 (Approved 5 – 0, as recommended)

Page 8 of 411 ends

City Council Minutes Page 3 of 9 June 16, 2026
Regular Meeting
6) Receive and File Quarterly Report of Investments ending May 2026 (Approved 5 – 0, as recommended)
7) Receive and File the Capital Improvement Project Status Update (Approved 5 – 0, as recommended)
8) Approve a Two-Year Agreement for Services with Polar Bear Lighting for an Amount not to Exceed $35,000, for Banner and Flag Hanging Services (Approved 5 – 0, as recommended)
9) Approve a Five-Year Lease Agreement with KYOCERA Document Solutions West, LLC with a monthly rate of $1,424.43 for Copier and Printer Services (Approved 5 – 0, as recommended)
10) Approval of a Request for Parade and Special Event Permit Waiver of Costs and Fees for the La Cañada Flintridge Chamber of Commerce and Community Association "Temporary Relocation of the Farmers Market"
(Approved 5 – 0, as recommended)
11) Approve a One-Year Agreement for Services with Two Possible Two-Year Extensions with Blue Raster for an Amount not to Exceed $35,000 for GIS Consultant Services (Approved 5 – 0, as recommended)
12) Approve a One-Year Amendment to the Agreement for Contract Services with Intelesys for an Amount Not to Exceed $198,020 for IT Services
(Approved 5 – 0, as recommended)
13) Approval of a Request for Parade and Special Event Permit, Filming/Still Photography Permit, and Recreational Facility Use Waiver of Costs and Fees for the YMCA of the Foothills "Take Back Sports" Event
(Approved 5 – 0, as recommended)
14) Adoption of Plans, Specifications and Estimates (PS&E), Filing of a Notice of Exemption and Authorization to Advertise for Construction Bids, with an Engineer’s Estimate Ranging Between $1,600,000 and $1,850,000, for the 2026 Citywide Street Resurfacing Program Project (Contract 25/26-1; CIP 31-2601) (Approved 5 – 0, as recommended)
15) Approval of a Maintenance Agreement with Coastal Building Services, Inc., for a Period of Three (3) Years for a Total Three-Year Commitment Not-To-Exceed the Amount of $497,716, to Provide City Janitorial/Custodial Services (Approved 5 – 0, as recommended)
16) Approval of a Maintenance Agreement with Brightview Landscape Services, Inc., for a Period of Three (3) Years for a Total Three-Year Commitment Not-To-Exceed the Amount of $992,900, to Provide Landscape Maintenance Services for the City’s Joint Use Facilities
(Approved 5 – 0, as recommended)
17) Approval of a Maintenance Agreement with Brightview Landscape Services, Inc., for a Period of Three (3) Years for a Total Three-Year Commitment Not-To-Exceed the

Page 9 of 411 ends

City Council Minutes Page 4 of 9 June 16, 2026
Regular Meeting
Amount of $1,073,080, to Provide Landscape Maintenance Services for the City Parks, Medians, Facilities, and Rights-of-Way
(Approved 5 – 0, as recommended)
18) Approval of a Maintenance Agreement with Eric’s Tree and Landscape Pest Services, Inc., for a Period of Three (3) Years for a Total Three-Year Commitment Not-To-Exceed the Amount of $208,540, to Provide Citywide Tree Spraying Services (Approved 5 – 0, as recommended)
19) Approval and Delegation of Authority to City Manager to Execute Change Order No. 1, in the Amount of $8,235.00, to TAIT & Associates, Inc. for Additional Design Services for the City Hall Window Replacement Project
(Approved 5 – 0, as recommended)
20) Approval of Amendment No. 1 to the Agreement with Urban Graffiti Enterprises, Inc. for Bus Shelter Maintenance Services for a Period of Three (3) Years for a Total ThreeYear Commitment Not-To-Exceed the Amount of $150,000 (Approved 5 – 0, as recommended)
21) Approval of Amendment No. 2 to the Professional Services Contract with MSW Consultants, Inc. for Solid Waste Consulting Services, Extending the Term Through June 30, 2029, and Increasing the Cumulative Not-to-Exceed Amount from $250,000 to $390,000
(Approved 5 – 0, as recommended)
22) Approval of a Cost Sharing Agreement with the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority (GWMA) for Toxic Pollutant Monitoring Pursuant to the Harbor Toxic Pollutants Total Maximum Daily Load (TMDL)
(Approved 5 – 0, as recommended)
23) Approval and Delegation of Authority to City Manager to Execute a Task Order, for a Not-to-Exceed Amount of $123,500, to Willdan Engineering to Provide National Pollutant Discharge Elimination System (NPDES) Consulting Services, for Fiscal Year 2026-27
(Approved 5 – 0, as recommended)
24) Approval and Delegation of Authority to City Manager to Execute a Task Order, for a Not-To-Exceed Amount of $190,000, to Willdan Engineering to Provide Traffic Engineering Services, for Fiscal Year 2026-27
(Approved 5 – 0, as recommended)
25) Approve and Accept the Work by Paveco Construction, Inc., for the 2026 Miscellaneous Pavement Repairs Improvements Project (CIP 31-2604; Contract 25/26-02) For a Final Contract Cost of $56,534.65
(Approved 5 – 0, as recommended)
26) Approve and Accept the Work by DBX, Inc., for the Traffic Signal Improvements at Foothill Boulevard and Oakwood Avenue Project (CIP 31-2107; Contract 23/24-15) For a Final Contract Cost of $1,071,228.33
(Approved 5 – 0, as recommended)

Page 10 of 411 ends

City Council Minutes Page 5 of 9 June 16, 2026
Regular Meeting
27) Approve and Accept the Work by PTM General Engineering Services, Inc., for the Traffic Signal Improvements at Foothill Boulevard and Viro Road Project (CIP 31-2404; Contract 23/24-5) For a Final Contract Cost of $626,282.62 (Approved 5 – 0, as recommended)
28) Approve and Accept the Work by J&S Striping Company, Inc., for the Oakwood Avenue Safety Improvements Project, (CIP 31-2607; Contract 25/26-4) (Approved 5 – 0, as recommended)
29) Approve and Accept the Work by PTM General Engineering Services, Inc., for the Traffic Signal Improvements at Verdugo Boulevard and Descanso Drive/Alta Canyada Road Project (CIP 31-2210; Contract 22/23-3) For a Final Contract Cost of $768,996.56 (Approved 5 – 0, as recommended)
30) Adoption of a Resolution Authorizing the Proposed FY 2026-27 SB 1 Road Repair and Accountability Act Funds for the FY 2026-27 Annual Citywide Street Resurfacing Program
(Approved 5 – 0, as recommended)
31) Approval and Delegation of Authority to City Manager to Execute a Task Order, in the amount of $116,792, to TAIT and Associates, Inc. for the Preparation of Plans, Specifications and Estimates (PS&E) for the Hillard Avenue Street Improvements Project (CIP 31-2208) and any Change Orders up to $25,000 Each, Provided such Change Orders do not Exceed the Total Amount of $149,450 (Approved 5 – 0, as recommended)
32) Adopt a Resolution to Adopt a Policy Entitled “Policy Governing Remote Participation and Enhancement of Public Participation in City Council and Commission Meetings” to implement Senate Bill No. 707
(Approved 5 – 0, as recommended)
33) Resolution Appointing a Voting Delegate and Alternate Voting Delegate to the 2026 League of California Cities Annual Conference
(Approved 5 – 0, as recommended)
34) Extend the Application Deadline for Filling the Unscheduled Vacancy on the Design Commission
(Approved 5 – 0, as recommended)
35) Adoption of a Resolution Establishing Salary Ranges for Fiscal Year 2026-27, effective July 1, 2026
(Approved 5 – 0, as recommended)
36) Approval of a Professional Services Agreement by and between the City of La Cañada Flintridge and Willdan for Code Enforcement Services for FY 2026-2027 (Approved 5 – 0, as recommended)
37) Adoption of a Resolution Approving the Final Parcel Map 85076, a Two-Lot Subdivision Located at 1237 Descanso Drive
(Approved 5 – 0, as recommended)

Page 11 of 411 ends

City Council Minutes Page 6 of 9 June 16, 2026
Regular Meeting
38) Approval of Professional Services Agreement with Kimley-Horn for Development of a Citywide Evacuation Plan
(Approved 5 – 0, as recommended)
39) Approval of Professional Services Agreement with Tripepi Smith & Associates for Citywide Communications Services
(Approved 5 – 0, as recommended)
40) Approval of the Contract Renewal with All City Management Services for Crossing Guard Services for FY 2026-27
(Approved 5 – 0, as recommended)
41) Receive and File the City Operational Calendar for 2026 Quarter 3 (Approved 5 – 0, as recommended)
42) Approval of an Agreement with Willdan Engineering for Administration of the City's Community Development Block Grant (CDBG) Program for Fiscal Year 2026-27 (Approved 5 – 0, as recommended)
43) Approval of a Professional Services Agreement by and between the City of La Cañada Flintridge and m6 Consulting, Inc. for Building and Safety Services for FY 2026-27 (Approved 5 – 0, as recommended)
44) Adopt the City’s Investment Policy for Fiscal Year 2026-27 (Approved 5 – 0, as recommended)
Public Hearings
45) AB 2561 Annual Reporting on Job Vacancies and Recruitment and Retention Efforts Human Resources Manager Williams provided a presentation titled "AB 2561 Report:

Vacancy, Recruitment and Retention Efforts."
Human Resources Manager Williams provided a brief staff report.

Mayor Bowman opened the public comment period at 8:13 p.m. Seeing no comments, he closed the public comment period.

No further discussion or questions occurred. The report was received and filed by consensus of the City Council, without a formal motion or vote.

Ordinances
46) First Reading and Introduction of an Ordinance to Repeal and Replace Chapter 11.33 (Accessory Dwelling Units) of Title 11 (Zoning) of the La Cañada Flintridge Municipal Code and Finding the Ordinance exempt from the California Environmental Quality Act Assistant Director of Community Development Gardea presented a PowerPoint presentation titled "Zoning Code Text Amendment (Plan-2025-0005) Accessory Dwelling Units." Mayor Bowman opened the public comment period at 8:18 p.m. Seeing no comments, he closed the public comment period.

Page 12 of 411 ends

City Council Minutes Page 7 of 9 June 16, 2026
Regular Meeting
No further discussion or questions occurred.

A MOTION was made by Councilmember Davitt, seconded by Mayor Pro Tem Hobson, and (5 - 0) to direct the Assistant City Attorney to read by title only, waive further reading, and introduce the ordinance on a roll call vote.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Davitt, Eich, Fossan, Hobson, and Bowman
NOES: None; ABSTAIN: None; ABSENT: None
Other Business
47) Adopt a Resolution Adopting the Fiscal Year 2026-27 Annual Budget City Manager Jordan presented a PowerPoint presentation titled "Fiscal Year 2026-27 Final Budget."
Mayor Bowman opened the public comment period at 8:28 p.m.

Public comments were received from David Haxton.

Mayor Bowman closed the public comment period at 8:32 p.m.

After a brief discussion and deliberation, the City Council agreed that they would be adopting the resolution as presented.

A MOTION was made by Councilmember Fossan, seconded by Councilmember Davitt, and (5 - 0) to adopt a resolution adopting the Fiscal Year 2026-27 Annual Budget.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Davitt, Eich, Fossan, Hobson, and Bowman
NOES: None; ABSTAIN: None; ABSENT: None
48) Approve a Resolution Adopting the Appropriations Limit for Fiscal Year 2026-27 at $30,477,789
City Manager Jordan provided a brief staff report.

Mayor Bowman opened the public comment period at 8:37 p.m. Seeing no comments, he closed the public comment period.

No further discussion or questions occurred.

A MOTION was made by Councilmember Fossan, seconded by Councilmember Davitt, and (5 - 0) to adopt a resolution adopting the appropriations limit for Fiscal Year 2026-27 at $30,477,789.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Davitt, Eich, Fossan, Hobson, and Bowman
NOES: None; ABSTAIN: None; ABSENT: None
49) Discussion and Direction Regarding the Summer 2026 City Council Meeting Schedule

Page 13 of 411 ends

City Council Minutes Page 8 of 9 June 16, 2026
Regular Meeting
City Clerk Garcia provided a brief staff report.

Mayor Bowman opened the public comment period at 8:38 p.m. Seeing no comments, he closed the public comment period.

After discussion and deliberation, the City Council agreed to cancel the regular meetings scheduled for July 7 and August 18. All other regular meetings will remain on the calendar.

Mayor Bowman reopened the public comment period at 8:46 p.m.

Public comments were received from David Haxton.

Mayor Bowman closed the public comment period at 8:48 p.m.

Before moving to the concluding business, Councilmember Fossan noted that during the City Council's discussion on Item 47, the Fiscal Year 2026-27 Annual Budget, and prior to the initial vote, she had announced her intention to recuse herself from voting on the funding for Soundwall Phase 5 due to a conflict of interest. However, after the initial vote, she realized that she had not followed through with her recusal. Therefore, she requested that the City Council take a second vote to ensure her recusal was properly recorded. Following the advice of the Assistant City Attorney, the City Council reopened Item 47 for a new motion and roll call.

Councilmember Davitt moved to adopt Item 47, with Mayor Pro Tem Hobson seconding.

Councilmember Fossan recused herself only from the soundwall funding vote. During the roll call for this item, Councilmember Eich briefly lost power and Zoom connection but rejoined by phone to cast his vote. Mayor Bowman informally referred to redoing the vote on Item 47 as a “mulligan.” A MOTION was made by Councilmember Davitt, seconded by Mayor Pro Tem Hobson, and (5 - 0) to adopt a resolution adopting the Fiscal Year 2026-27 Annual Budget with Councilmember Fossan recusing herself from the soundwall funding only.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Davitt, Eich, Fossan, Hobson, and Bowman
NOES: None; ABSTAIN: None; ABSENT: None
Concluding Business
Meetings attended at the expense of the local agency: None Regional and local representation
Councilmember Fossan and Mayor Pro Tem Hobson reported they attended a Pride in the Park event.

Councilmember Fossan announced that Descanso Gardens’ Water Reclamation Project received $80,000 from the Santa Monica Mountains Conservancy.

Subcommittee updates: None
Request for future agenda items: None
Councilmembers’ comments

Page 14 of 411 ends

City Council Minutes Page 9 of 9 June 16, 2026
Regular Meeting
Mayor Bowman recognized the City Council's proclamations made in June.

City Manager closing comments: None

ADJOURNMENT
Mayor Bowman adjourned the Regular City Council meeting at 9:04 p.m. in memory of community member and organizer Rachel Koelzer and the eight people lost in the B-52 mishap at Edwards Air Force Base.
_________________________________
Tania Garcia, City Clerk

Minutes approved by the City Council on ________________________.

Page 15 of 411 ends

City of La Cañada Flintridge
City Council Minutes
Regular Meeting
Tuesday, August 4, 2026
City Council Chambers
One Civic Center Drive
La Cañada Flintridge, CA 91011

REGULAR CITY COUNCIL MEETING
Call to Order: Mayor Hobson called the Regular Meeting to order at 6:01 p.m.

Roll Call: Councilmember Quemars S. Ahmed, Kim Bowman (via teleconference), Councilman Keith Eich (via teleconference), Mayor Pro Tem Stephanie Fossan, and Mayor Jeanne K. Hobson.

Councilmember Bowman stated that he will participate remotely in accordance with Government Code section 54953.83(c)(7) under the "just cause" exception of the Brown Act. He is currently serving under official written orders as a member of the United States Air Force Reserve and is located more than 50 miles outside the boundary of the City, which prevents him from attending in person.

Staff Present: City Manager Jordan, City Attorney Guerra, Assistant City Manager Parseghian, Director of Administrative Services Cook, Director of Community Development Koleda, Director of Finance Kim, Director of Public Works/City Engineer El-Rabaa, Assistant Director of Community Development Gardea, Assistant Planner Fabela, Management Analyst Guillot, and City Clerk Garcia.

Pledge of Allegiance: Led by Pat Anderson.

Comments from the Public
In-person public comments were received from Pat Anderson and Foothill Municipal Water District Board of Directors Member Laura Olhasso.

City Manager Jordan encouraged Ms. Olhasso to stay for the Staff updates on pending projects.

Presentations
Public Safety Update
Chief Sprengel provided the public safety report for June, along with the safety tip for the month.

Lieutenant Carr provided the crime report update for June and addressed questions from the City Council.

Staff update on pending projects
Director of Public Works/City Engineer El-Rabaa provided an update on construction of a few projects. He noted a correction to the Capital Improvement Project Status report, Item 4 on the Consent Calendar. He then answered questions from the City Council regarding the Foothill Boulevard Dip Project.

Mayor Pro Tem Fossan commended staff on the Viro Road light project.

Page 16 of 411 ends

City Council Minutes Page 2 of 8 August 4, 2026
Regular Meeting
Director of Public Works/City Engineer El-Rabaa answered questions about the design changes for Mayor’s Discovery Park.

Mayor Hobson requested that staff keep everyone updated on the status of the Foothill Boulevard Dip Project including the Foothill Municipal Water District.

Reordering of and Additions to the Agenda: None
Consent Calendar
Councilmember Ahmed recused himself from Consent Calendar Item 2, line 81 of the Warrant Resolution due to a conflict of interest related to that specific payment.

Councilmember Bowman recused himself from Consent Calendar Item 2, line 21 of the Warrant Resolution due to a conflict of interest related to that specific payment.

City Manager Jordan pulled Consent Calendar Item Seven from the agenda. He noted that to avoid any potential conflict-of-interest, staff wants to recheck whether any Councilmembers need recuse themselves given the locations of the proposed red curbs.

City Attorney Guerra added that there is a possibility of a "public generally" exception under the Fair Political Practices Commission (FPPC) regulations. He noted that staff need additional time to conduct the necessary analysis before bringing the item back for consideration. He also pointed out a correction to Consent Calendar Item Four, the following sentence is being removed: “The City Council will consider approval and acceptance of the contractor's work under a separate item on tonight's agenda.”
A MOTION was made by Mayor Pro Tem Fossan, seconded by Councilman Eich, and carried (5 - 0) to approve Consent Calendar Items One through 14 with the abovementioned recusals and correction to Item Four. Consent Calendar Item Seven was pulled from the agenda.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Ahmed, Bowman, Eich, Fossan, and Hobson
NOES: None; ABSTAIN: None; ABSENT: None
1) Waive the Full Reading of All Ordinances Considered on This Agenda and Direct the City Attorney That They Be Read by Title Only
(Approved 5 – 0, as recommended)
2) Approval of Warrant Resolution No. 26-12 Dated August 4, 2026, for $2,159,250.80 (Approved 5 – 0, with the abovementioned recusals)
3) Receive and File Commission Meeting Action Agendas
a. Design Commission Action Minutes for May 21, 2026
b. Planning Commission Action Minutes for April 9, April 23, May 14, May 28, and June 11, 2026
(Approved 5 – 0, as recommended)
4) Receive and File the Capital Improvement Project Status Update (Approved 5 – 0, as recommended)
5) Receive and File the Public Safety Reports for June 2026 (Approved 5 – 0, as recommended)

Page 17 of 411 ends

City Council Minutes Page 3 of 8 August 4, 2026
Regular Meeting
6) Approval of a Memorandum of Agreement with the San Gabriel Valley Council of Governments for Participation in the San Gabriel Valley Regional Food Recovery Program Through June 30, 2028
(Approved 5 – 0, as recommended)
7) Adoption of a Resolution for the Installation of Red Curb on the Approach to Various Marked and Unmarked Crosswalks in Accordance with AB 413 (Item removed from the agenda)
8) Approval of Memorandum of Agreement (MOA) Between the City of La Cañada Flintridge and the San Gabriel Valley Council of Governments (SGVCOG) and Eighteen Agencies Regarding the Administration and Cost Sharing for Implementing the Coordinated Integrated Monitoring Program (CIMP) and Watershed Management Plan (WMP) for the Upper Los Angeles River Watershed Management Area
(Approved 5 – 0, as recommended)
9) Approve and Accept the Work by Crosby Plumbing, Inc. for the Mayor’s Discovery Park Improvements Project, (CIP 31-2213; Contract 23/24-16)
(Approved 5 – 0, as recommended)
10) Update on the Implementation of CivicPlus for Agenda Management Software and Media Streaming Services for City Council and City Commission/Committee Meetings (Approved 5 – 0, as recommended)
11) Proposed Timeline to Fill an Unscheduled Vacancy on the Sustainability and Resilience Commission
(Approved 5 – 0, as recommended)
12) Receive and File the Attendance Report for City Commission and Committee Members for the Second Quarter of 2026, Covering April 1 - June 30, 2026 (Approved 5 – 0, as recommended)
13) Adopt a Resolution Approving the Updated Bail Schedule for Municipal Code and Vehicle Code Violations
(Approved 5 – 0, as recommended)
14) Approve Letter of Support for the California JPIA Formation of the Coalition to Protect Community Services
(Approved 5 – 0, as recommended)
Public Hearings
15) Appeal of Design Review (DEV-2026-0012) by RNF Signs for New Signage Associated with Wells Fargo Bank located at 555 Foothill Boulevard Councilman Eich noted that he would be recusing himself because he has banked with Wells Fargo in the last 12 months and has a relationship with them. Therefore, he chose to recuse himself out of an abundance of caution and leave the meeting for that item.

Mayor Hobson asked if the City Council members need to recuse themselves from the discussion if they bank with Wells Fargo.

Page 18 of 411 ends

City Council Minutes Page 4 of 8 August 4, 2026
Regular Meeting
A brief break was taken and the meeting resumed at 6:47 p.m.

City Attorney Guerra explained the five categories of financial interests identified by the FPPC that could create a conflict of interest. He clarified that having a checking or interest-bearing account with Wells Fargo does not count as the type of "investment" that leads to a conflict in this decision. Even if interest is earned, it is standardized and not significantly affected by the approval or denial of this specific sign. Therefore, he does not believe there is a disqualifying financial conflict under FPPC rules for Councilmembers who simply bank at Wells Fargo, allowing them to participate in the decision-making process.

Mayor Hobson stated that she believes she does not need to recuse herself and can make an objective decision.

Councilman Eich still chose to recuse himself out of an abundance of caution.

Councilmember Bowman noted that, in accordance with state law and common law, he does not see a conflict of interest and participated in the discussion.

Assistant Planner Fabela provided a staff report. He addressed questions from the City Council regarding the raceway and sign content.

Mayor Hobson opened the public hearing at 7:00 p.m.

In-person public comments were received from Jimmy Fuller, a representative of RNF Signs Inc., who represents Wells Fargo. No additional public comments were submitted.

Mayor Hobson closed the public hearing at 7:02 p.m.

Director of Community Development Koleda and Assistant Planner Fabela addressed questions from the City Council.

After a brief discussion and deliberation, the City Council acknowledge that businesses should be able to read the City’s sign rules, comply, and reasonably expect approval without “one‑off” extra conditions. Overall, the City Council agreed on content neutrality, supported consistency with past approvals, and acknowledged fair treatment of businesses that follow the sign code.

A MOTION was made by Councilmember Bowman, seconded by Mayor Hobson, and carried (4 – 0, Councilman Eich recused) to find the project exempt from CEQA and adopt a City Council Resolution upholding the appeal and approving Design Review (DEV-2026-0012) for Wells Fargo Bank at 555 Foothill Boulevard, with the removal of Condition #11 requiring that all wall signs are not illuminated and do not include raceways.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Ahmed, Bowman, Fossan, and Hobson
NOES: None; ABSTAIN: None; RECUSED: Eich; ABSENT: None
16) General Plan Amendment (PLAN-2026-0001), Adoption of Updates to the General Plan Open Space and Recreation, Conservation Element, and Circulation Elements

Page 19 of 411 ends

City Council Minutes Page 5 of 8 August 4, 2026
Regular Meeting
Assistant Director of Community Development Gardea provided a staff report. He addressed questions from the City Council regarding the active transportation plan versus the multimodal plan.

Mayor Hobson opened the public hearing at 7:16 p.m.

In-person public comments were received from Randy Strapazon.

Mayor Hobson closed the public hearing at 7:25 p.m.

Assistant Director of Community Development Gardea addressed questions from the City Council.

After a brief discussion and deliberation, the City Council recognized that Ms. Strapazon's comments were substantive, especially for grant funding and accuracy. They decided not to adopt the updates as presented since there is no urgent deadline. Instead, they continued the public hearing and asked staff to incorporate the suggested changes, including removing Action Item

1.2.5 from the Open Space Element and addressing Ms. Strapazon’s comments. Staff supported the approach.

A MOTION was made by Councilmember Bowman, seconded by Councilman Eich, and carried (5 – 0) to continue the public hearing on the General Plan Open Space and Recreation, Conservation Element, and Circulation Elements to the September 1, 2026, regular meeting.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Ahmed, Bowman, Eich, Fossan, and Hobson
NOES: None; ABSTAIN: None; ABSENT: None
17) Adoption of a Resolution Amending the Master Schedule of Fees and Charges Management Analyst Guillot presented a PowerPoint presentation titled "Fiscal Year 2026-2027 Master Fee Schedule.” She answered questions from the City Council.

Mayor Hobson opened the public hearing at 7:39 p.m. Seeing no comments, she closed the public hearing.

The City Council and City Manager expressed their appreciation to the staff for the comprehensive report and update they provided.

A MOTION was made by Mayor Pro Tem Fossan, seconded by Councilmember Ahmed, and carried (5 - 0) to adopt a resolution revising the Master Schedule of Fees and Charges.

A roll call vote was taken, and the results were read by City Clerk Garcia as follows:

AYES: Ahmed, Bowman, Eich, Fossan, and Hobson
NOES: None; ABSTAIN: None; ABSENT: None
Ordinances: None
Other Business
18) Discussion and Direction Regarding the Future Operation of Lanterman Auditorium

Page 20 of 411 ends

City Council Minutes Page 6 of 8 August 4, 2026
Regular Meeting
Assistant City Manager Parseghian provided a brief staff report. He addressed questions from the City Council regarding future use of Lanterman Auditorium if returned to La Cañada Unified School District (LCUSD).

Mayor Hobson opened the public comment period at 7:58 p.m.

In-person public comments were made by Randy Strapazon. Virtual comments were received from a phone number ending in 5645, identified as David Haxon.

Mayor Hobson closed the public comment period at 8:01 p.m.

After discussion and deliberation, the City Council recognized that the Lanterman Auditorium is an important resource for the community. They agreed to include this topic in a broader conversation without delaying it. By consensus, the City Council directed staff to continue discussions with the LCUSD regarding the proposed options and to return with further analysis and recommendations. No formal motion or vote was conducted. 19) Discussion Regarding Hybrid Meetings for the City's Commissions and Committees and Provide Direction to Staff as Appropriate
City Clerk Garcia provided a brief staff report.

Mayor Hobson opened the public comment at 8:12 p.m. Seeing no comments, she closed the public hearing.

Director of Administrative Services Cook addressed questions from the City Council regarding the participation of Commissioners and the public.

After discussion and deliberation, the City Council recognized the interest in expanding access and transparency. However, they expressed concerns about implementing a hybrid model for all legislative bodies right away due to the costs, staffing needs, and technical complexities. By consensus, the City Council agreed to explore hybrid format for commissions and committees as a pilot program, but they do not intend to roll it out all at once. They directed staff to develop a phased pilot program that will identify which commissions and committees should transition to a hybrid format first, along with the necessary staffing and audiovisual (AV) requirements, as well as cost estimates. No formal motion or vote was taken.

Concluding Business
Meetings attended at the expense of the local agency
Councilmember Ahmed, Councilmember Bowman, Mayor Pro Tem Fossan, and Mayor Hobson attended a Sanitation District meeting.

Regional and local representation
Mayor Hobson and Councilmember Ahmed attended a ribbon cutting of a new hair salon.

Subcommittee updates
Assistant City Manager Parseghian provided an update from the Citywide Notifications Subcommittee.

Request for future agenda items

Page 21 of 411 ends

City Council Minutes Page 7 of 8 August 4, 2026
Regular Meeting
Mayor Hobson expressed her desire to begin work early on the Housing Element cycle, which is due in 2029. She proposed creating a subcommittee or similar group that would include City Council members, Planning Commissioners, and community members. The goal is to plan the structure, process, and public engagement for the next Housing Element well before the official deadline.

City Attorney Guerra noted that a subcommittee would be limited to two Councilmembers.

Councilmember Bowman supported the idea of bringing this back for a broader discussion.

Mayor Pro Tem Fossan seconded Mayor Hobson’s future agenda item request.

Councilmember Ahmed requested a future staff report on Cal Fire’s “Fire Risk Reduction Community” list that would explain why La Cañada Flintridge was not included on the July 1, 2026, list a detail what specific actions the City would need to take to qualify and apply for inclusion on the next list, which is expected to be published in two years (application deadline July 1, 2027).

Mayor Pro Tem Fossan seconded Councilmember Ahmed’s future agenda item request.

Councilman Eich requested a future agenda item to revisit the City’s community groups funding policy. Specifically, to re-examine the reimbursement-only model for smaller organizations receiving City funds. He noted that smaller groups are struggling because they must front costs out of pocket, then wait for reimbursement from the City.

Councilmember Bowman seconded Councilman Eich’s future agenda item request.

Councilman Eich requested a future presentation from the Los Angeles County RegistrarRecorder/County Clerk regarding the election administration process. City Manager Jordan confirmed that the presentation is scheduled for September 15.

Councilmembers’ comments
Councilmember Bowman commended the Mayor on her first meeting in this role.

Councilman Eich announced that he is relocating to the East Coast due to his job. He will no longer be a resident of La Cañada Flintridge and cannot continue his role on the City Council. He expects the September 1, 2026, meeting to be his last, with formal resignation details to be submitted to the City Clerk. He will continue serving fully until then and stated that serving the community for over six and a half years has been one of the greatest honors of his life.

The City Council expressed gratitude for his service to the community. They noted that there would be formal recognition of his contributions at a future meeting, once he submits his official resignation. The City Council will then consider options for filling the vacancy, ensuring that the process remains public and transparent.

City Attorney Guerra explained that when the seat becomes officially vacant, the City Council has 30 days to either appoint a new member or call a special election. This decision, along with the appointment process, which may include the submission of applications and interviews, must take place during a public meeting that is properly noticed.

City Manager closing comments: None

Page 22 of 411 ends

City Council Minutes Page 8 of 8 August 4, 2026
Regular Meeting

ADJOURNMENT
Mayor Hobson adjourned the Regular City Council meeting at 8:38 p.m. _________________________________
Tania Garcia, City Clerk

Minutes approved by the City Council on ________________________.

Page 23 of 411 ends

CITY OF LA CAÑADA FLINTRIDGE CM Review: DJ
WARRANT RESOLUTION NO. 26-14
Fiscal Review: TK
The following charges have been received by the City of La Cañada Flintridge and are herewith submitted for approval and payment:

Vendor Name Purpose Amount
Warrant
#
1 ADS, LLC Flow monitoring system maintenance - August 2,500.00 24932 2 Ahee Han Stipend - August 2026 50.00 24933
3 Alarm Relay Annual alarm monitoring - Lanterman House - 8/31/27 131.40 24934 4 Aleshire & Wynder LLP Legal services - zoning code update - thru 7/31/26 362.70 24935 5 Aleshire & Wynder LLP Legal svcs - General services retainer - thru 7/31/26 15,408.80 24935 6 Aleshire & Wynder LLP Legal services - Special projects - thru 7/31/26 1,060.20 24935 7 Aleshire & Wynder LLP Legal svcs - General services projects - thru 7/31/26 12,415.50 24935 8 Aleshire & Wynder LLP Legal services - Records requests - 7/31/26 13,645.20 24935 9 Aleshire & Wynder LLP Legal services - Litigation - thru 7/31/26 1,529.88 24935 10 Aleshire & Wynder LLP Legal services - City real property - 7/31/26 2,660.30 24935 11 Aleshire & Wynder LLP Legal services - 600 Foothill - thru 7/31/26 7,640.50 24935 12 Aleshire & Wynder LLP Legal services - CVWD v. LCF - thru 7/31/26 708.00 24935 13 All City Management Services, Inc. School crossing guards - 08/02/26-08/15/26 3,066.94 24936 14 Amanda Merlo Expense reimbursement - August 185.83 24937 15 Amazon Capital Services Office supplies 2,258.25 24938 16 Amazon Capital Services Office supplies 225.40 24939 17 Argam DerHartunian Stipend - August 2026 50.00 24940 18 AT&T Mobility Employee iPads with cell service & cell phones - July 392.86 24941 19 Barr Electric Intrusion alarm maintenance - City Hall - October 130.00 24942 20 Barr Electric Audio & visual repairs - City Hall - October 260.00 24942 21 Barr Electric Repairs - Street lights - October 805.15 24942 22 Barr Electric PW Consulting - various items - October 520.00 24942 23 Barr Electric Receiving bark - City Hall - October 260.00 24942 24 Barr Electric Lock installation - Pickle Ball courts - November 195.00 24942 25 Barr Electric Building maint. - City Hall - November 490.57 24942 26 Barr Electric Special events - Electricity - December 1,365.00 24942 27 Barr Electric PW Consulting - Verdugo/Foothill Signal Proj. - Dec 780.00 24942 28 Barr Electric PW Consulting - Mayors Discover Park Proj. - Dec 780.00 24942 29 Barr Electric Calsense repairs - Foothill - December 1,300.00 24942 30 Barr Electric Holiday lighting - Electrical work - December 780.00 24943 31 Barr Electric Holiday lighting - Electrical work - December 4,485.00 24943 32 Barr Electric Purchase - Street signs - December 4,149.72 24943 33 Barr Electric PW Consulting - Street Sign Inventory - December 390.00 24943 34 Barr Electric Installation - Street signs - December 555.95 24943 35 Barr Electric Lighting repairs - Lanterman Auditorium - December 557.96 24943 36 Barr Electric Lighting repairs - Memorial Park - December 880.93 24943 37 Barr Electric PW Consulting - various items - April 2,080.00 24943 38 Barr Electric Maintenance - Street signs - April 1,180.36 24943 39 Barr Electric Park maintenance - Mayors Discovery Park - April 1,644.63 24943 40 Barr Electric Alarm maintenance - City Hall - December 260.00 24943 41 Barr Electric Maintenance - Memorial Park - April 260.00 24944 42 Barr Electric Admin consultation - April-May 715.00 24944 43 Barr Electric Lighting repairs - Lanterman Auditorium - April 484.69 24944 44 Barr Electric Install information board - City Hall - April 130.00 24944 45 Barr Electric Street sign maint. - Berkshire Bridge - April-May 879.21 24944 46 Barr Electric Calsense repairs - April 336.05 24944
47 Barr Electric Install new lock - Pickle Ball courts - May 260.55 24944 48 Barr Electric Fire alarm maintenance - City Hall - May 195.00 24944

Page 1 of 10 ends
Page 24 of 411 ends

Vendor Name Purpose Amount
Warrant
#
49 Barr Electric PW Consulting - Oakwood Safety Improvements - May 1,300.00 24944 50 Barr Electric Lighting repairs - Memorial Park - May 310.69 24944 51 Barr Electric Tech svcs - Lanterman Auditorium - May 520.00 24944 52 Barr Electric Park maintenance - Mayors Discovery Park - April 235.95 24945 53 Barr Electric PW Consulting - various items - May 390.00 24945 54 Barr Electric Restore AV System - Council Chamber - May 195.00 24945 55 Barr Electric HVAC maintenance - City Hall - May 538.09 24945 56 Barr Electric Flag repairs - Foothill - May 393.32 24945 57 Barr Electric Inspection During Outage - City Hall - May 390.00 24945 58 Barr Electric PW Consulting - various items - May 390.00 24945 59 Barr Electric Fire alarm testing - City Hall - May 260.00 24945 60 Barr Electric Lighting repairs - Memorial Park - May 1,722.82 24945 61 Barr Electric Street sign maint. - Foothill/Verdugo - May 205.36 24945 62 Barr Electric Electrical support - Music in the Park - May-June 2,800.00 24945 63 Barr Electric Electrical repairs - Memorial Park - May 888.26 24946 64 Barr Electric TC-45 Maintenance & repairs - Traffic accident - May 4,246.37 24946 65 Barr Electric Street sign maint. - Foothill - May 140.36 24946 66 Barr Electric Repairs - Median irrigation - June 187.50 24946 67 Barr Electric Location prep - Music in the Park - June 194.89 24946 68 Barr Electric Audio maint. - Lanterman Auditorium - June 1,561.30 24946 69 Barr Electric Electrical maint. - Lanterman Auditorium - June 260.00 24946 70 Barr Electric TC-45 Maint. & repairs - Traffic accident - June 260.00 24946 71 Barr Electric Electrical maint. - Music in the Park - June 511.49 24946 72 Barr Electric PW Consulting - Hawk at Indiana - June 260.00 24946 73 Barr Electric Fire alarm maint. - City Hall - June 540.00 24946 74 Barr Electric Event programing & standby - Memorial Park - Oct-Feb 650.00 24947 75 Barr Electric Event set up & tear down - Fiesta Days - May 780.00 24947 76 Barr Electric Electrical supplies - City Hall - June 947.07 24947 77 Barr Electric Electrical supplies - City Hall - June 2,086.36 24947 78 Barr Electric Electrical supplies - City Hall - June 1,241.73 24947 79 Barr Electric Audio maint. - Lanterman Auditorium - June 1,455.66 24947 80 Barr Electric Audio supplies - Lanterman Auditorium - June 3,558.09 24947 81 Barr Electric Audio maint. - Lanterman Auditorium - June 1,145.55 24947 82 Barr Electric Memorial Park events - April-May 1,430.00 24947 83 Barr Electric AV maint. - Lanterman Auditorium - June 3,241.25 24947 84 Barr Electric Electrical supplies - City Hall - June 1,241.73 24947 85 Barr Electric Building maint. - Lanterman Auditorium - June 1,632.94 24948 86 Blais & Associates, LLC Grant research & support services thru 7/31/26 1,750.00 24949 87 Byungmok Kim Refund C&D - Bel Aire Dr 6,000.00 24950 88 CAPIO Staff membership renewal - thru 8/23/27 - M. Dedrick 300.00 24951 89 City of Glendale Recycled water 7/4/26 to 8/3/26 74.70 24952 90 CliftonLarsonAllen LLP Audit services for FY 25-26 - thru 08/25/26 800.00 24953 91 Coastal Building Services Janitorial services - Lanterman Auditorium - August 1,670.00 24954 92 Coastal Building Services Janitorial services - Joint Use - August 950.00 24954 93 Coastal Building Services Janitorial services - August 6,530.00 24954 94 Cogent Communications Inc Internet - backup system - September 775.00 24955 95 Constant and Associates, Inc. AAR Phase II services thru 7/31/26 12,270.54 24956 96 Crosby Plumbing, Inc. Stage floor repairs - Lanterman Auditorium 34,500.00 24957 97 Debra and Michael Barsom Partial Refund Setback Mod. - Chevy Chase 726.25 24958 98 Debra and Michael Barsom Partial Refund Review App - Chevy Chase 3,371.25 24958 99 Department of Industrial Relations Elevator compliance order - City Hall - 7/29/26 225.00 24959 100 Department of Transportation Caltrans parking lot lease - LAX210-0021-04 - October 370.00 24960 101 Dynasty Fitness Wellness Equipment for Sheriff personnel 4,569.48 24961 102 Ellison Wilson Advocacy, LLC State lobbyist fee - September 2,500.00 24962

Page 2 of 10 ends
Page 25 of 411 ends

Vendor Name Purpose Amount
Warrant
#
103 Equipment Management Company Battery-powered rescue combi tool - Fire Dept 16,735.48 24963 104 Ernest Koeppen Stipend - August 2026 50.00 24964
105 First American Data Tree, LLC GIS Parcel Data thru 8/31/26 1,000.00 24965 106 Francis Pollara Stipend - Sus. & Res. Comm. - August 2026 50.00 24966 107 Global Sanitation Services Portable restrooms - MIP Memorial Park - 8/14-8/31/26 700.50 24967 108 Henry Oh Stipend - August 2026 50.00 24968
109 Home Renew 360 Refund building plan review - Bel Aire Dr 193.61 24969 110 Intelesys Monthly IT services - October 2026 15,353.65 24970 111 Kimley-Horn & Associates, Inc. CS - Circ/Conserv. Element Consultants - thru 6/30/26 12,010.20 24971 112 Kimley-Horn & Associates, Inc. Citywide Evacuation Plan Dev Svcs - thru 7/31/26 4,550.98 24971 113 Kimley-Horn & Associates, Inc. Pavement management system service thru 7/31/26 10,203.50 24971 114 Kimley-Horn & Associates, Inc. CS - Circ/Conserv. Element Consultants - thru 7/31/26 5,172.70 24971 115 Kiwanis Club of La Canada Monthly dues - July 40.00 24972 116 Kristina Aslanian DBA Kris and Company Refund C&D - Gould Ave 8,670.00 24973 117 Kyung AE Hong, Jayhee Kimberline Jung Refund C&D - Haskell St 10,000.00 24974 118 La Canada Flintridge Coordinating CounciContribution for FY 2026-27 1,500.00 24975 119 La Canada Flintridge Employees Assn Association dues 01/23/26 & 08/21/26 500.00 24976 120 La Cañada Printsmith Business cards - Council - Hobson 110.50 24977 121 La Canada Unified School District Building Permit Fees - May & June 46,793.67 24978 122 La Canada Valley Beautiful Inc Contribution for FY 2026-2027 25,000.00 24979 123 LA County Sheriff's Department Law enforcement contract services - July 341,861.11 24980 124 LA County Sheriff's Department Directed patrols - SAO CSU OT - 7/1-7/31/26 23,676.03 24980 125 LA County Sheriff's Department Special Event - CSU OT - 07/07/26-07/30/26 36,371.94 24980 126 Liebert Cassidy Whitmore Legal services - General - July 250.00 24981 127 Los Angeles Co - Auditor-Controller Cerro Negro lease payment - October 596.18 24982 128 Los Angeles County Public Works Industrial waste services - June 343.91 24983 129 Los Angeles County Public Works Vegetation control - June 19,015.69 24983 130 Los Angeles County Public Works Litter & debris removal - June 370.67 24983 131 Los Angeles County Public Works Curb, gutter & sidewalk inspections - June 4,195.57 24983 132 Los Angeles County Public Works Pavement patching - June 13,602.90 24983 133 Los Angeles County Public Works LCF Street inspections - June 7,190.29 24983 134 Los Angeles County Public Works Emergency sign installation - June 251.94 24983 135 Los Angeles County Public Works Install "No Parking" sign @ Oakwood - June 1,458.53 24983 136 Los Angeles County Public Works Special event - Fiesta Days - June 530.90 24983 137 Los Angeles County Public Works Street sign installation - June 484.67 24983 138 Los Angeles County Public Works Street sign installation - June 205.58 24983 139 Los Angeles County Public Works Rumble strip removal - June 12,976.88 24984 140 Los Angeles County Public Works Street sign services - June 24984 658.66 141 Los Angeles County Public Works Stop sign replacement - June 24984 223.54 142 Los Angeles County Public Works Post "No Parking" signs LCBSA- June 24984 4,522.86 143 Los Angeles County Public Works Traffic signal maintenance - June 24984 8,070.04 144 Maged El-Rabaa Expense reimbursement - August 24985 40.00 145 Matrix Consulting Group, Ltd. Community Development processing rev thru 7/31/26 24986 7,030.00 146 MCCi, LLC Laserfiche lic. renewal & support - 11/9/26-11/8/27 24987 37,377.00 147 MMASC Staff membership renewal - L. Brancheau 24988 125.00 148 Natures Image Inc. Annual brush clearance - FY 25-26 24989 123,493.00 149 Nerses Aposhian Stipend - August 2026 24990 50.00
150 Numbers Plumbing 2021 Fountain repairs - Memorial Park 24991 177.78 151 NV5 West Traffic signal improvements inspection svcs - July 24992 14,414.10 152 NV5 West Inverness storm drain & resurfacing svcs - July 24992 12,340.00 153 Oakridge Landscape Inc Landscape maintenance service - Medians - Nov-Jun 24993 117,389.65 154 Pasadena Humane Society & SPCA Animal control services - August 24994 10,055.00 155 Printefex Inc LCF FALL Vista Newsletter 24995 5,386.88 156 Printefex Inc Banner - Community Preparedness 24995 121.55

Page 3 of 10 ends
Page 26 of 411 ends

Vendor Name Purpose Amount
Warrant
#
157 Productive Home Renovation, Inc. Refund building plan review -Alminar Ave 24996 615.78 158 Psomas Housing planner consulting services - 06/26-07/23/26 24997 4,205.00 159 Samir Mehrotra Stipend - August 2026 24998 50.00
160 Sareen Bezdikian / Sebough Hagopian Refund C&D - Commonwealth 24999 20,000.00 161 Sareen Bezdikian / Sebough Hagopian Refund Certificate of Occ. - Commonwealth 24999 205.17 162 Southern California Edison Electricity charges - 07/09/26 to 08/12/26 25000 788.08 163 Southern California Edison Electricity charges - 07/15/26 to 08/12/26 25001 253.32 164 Southern California Edison Electricity charges - 07/10/26 to 08/09/26 25002 678.71 165 Stubbies Promotions, Inc. Blankets - City's 50th Anniversary 25003 2,951.80 166 Tait & Associates, Inc. Hillard Ave rehab proj thru 7/31/26 25004 6,140.00 167 Tripepi Smith & Associates Communication consultant - August 25005 12,230.00 168 TSI Incorporated Calibration of noise meter 25006 299.76 169 Urban Graffiti Enterprises, Inc. Maintenance - Bus Shelter - July 2026 25007 3,126.78 170 USC Verdugo Hills Hospital Foundation Contribution for FY 2026-2027 25008 23,154.00 171 Walters Wholesale Electric Co Commemorative Street Sign - Michael T. Davitt 25009 149.18 172 West Coast Arborists Inc Misc. Concrete Repairs - 5/28/26 25010 2,556.00 173 West Coast Arborists Inc Clear vegetation around signs on Verdugo 25010 284.00 174 West Coast Arborists Inc Tree trimming - Flock clearance - 7/14/26 25010 146.10 175 West Coast Arborists Inc Electrical work - Streets - 7/31/26 25010 1,972.35 176 West Coast Arborists Inc Grid pruning - 7/16/26-8/15/26 25010 75,388.50 177 West Coast Arborists Inc Tree maintenance - 7/16/26-8/15/26 25010 3,360.30 178 Willdan Engineering Hawk TS - Foothill Blvd. @ Indiana thru 7/31/26 25011 4,775.50 179 Willdan Engineering Lot line adjustment - Hampstead Rd 25011 210.00 180 Willdan Engineering Hay Cyn feasibility update thru 7/31/26 25011 57,282.25 181 Willdan Engineering NPDES water quality services thru 7/31/26 25011 12,451.25 182 Willdan Engineering Local road safety plan svcs - thru 7/31/26 25011 12,007.50 183 Willdan Engineering Traffic Engineer thru 7/31/26 25011 10,140.00 184 Willdan Engineering ACH @ Green signal study thru 08/28/26 25011 1,207.50 185 Willdan Engineering Code Enforcement Services - PT & FT - July 25011 16,460.00 186 Xerox IT Solutions, LLC Adobe subscription - 8/2/26-8/1/27 25012 6,935.00 Sub-Total $ 1,450,463.00
The following warrants have already been paid:
1 ADP, Inc Payroll processing - PE 8/21/26 128,966.20 EFT 2 ADP, Inc Payroll tax processing - PE 8/21/26 38,277.89 EFT 3 MissionSquare Retirement Employee's 457 plan contribution for PE 8/21/26 12,465.52 EFT 4 CalPERS PE 7/31/26 retirement contribution - Classic council 41.76 EFT 5 CalPERS PE 7/31/26 retirement contribution - PEPRA council 214.84 EFT 6 CalPERS PE 8/7//26 retirement contribution - Classic 14,293.34 EFT 7 CalPERS PE 7/24/26 retro adj. retirement contribution - Classic 32.88 EFT 8 CalPERS PE 8/7/26 retirement contribution - PEPRA 15,703.57 EFT 9 CalPERS Health premiums - September 45,397.06 EFT
10 American Fidelity Assurance HRA payment for October 14,426.57 24913 11 American Fidelity Assurance Company Various employee insurance lines - August 2,083.50 24914 12 County Sanitation Districts of FY 2026-27 SD #34 admin cost sharing 11,013.00 24915 13 Crescenta Valley Water District Water charges - Glenhaven Park - 7/15/26-8/15/26 645.29 24916 14 David Haxton Fire Hardening Vent Rebate - Belita Ln 500.00 24917 15 Delta Dental Insurance Company Employee dental benefits - September 42.60 24918 16 Delta Dental of California Employee dental benefits - September 1,951.93 24919 17 Elan Financial Services City membership 65.00 24920
18 Elan Financial Services Office supplies, meeting & training expenses, sub. 1,979.10 24920 19 Elan Financial Services Meeting expense 86.35 24920
20 Elan Financial Services Vehicle fuel & maintenance 122.25 24920 21 Elan Financial Services Office supplies, conference registration, meeting exp. 1,806.24 24920 22 Elan Financial Services Conference registration, meeting exp., staff support 1,048.33 24920

Page 4 of 10 ends
Page 27 of 411 ends

Vendor Name Purpose Amount
Warrant
#
23 Los Angeles Times Newspaper subscription thru 9/15/27 1,222.00 24921 24 Mike Bubalo Construction Co., Inc. Inspection - Foothill Blvd 48" Pipe 7,500.00 24922 25 San Gabriel Valley City Managers' AssociaFY 2026-2027 membership dues 55.00 24923 26 Southern California Edison Electricity charges - 07/13/26 to 08/12/26 4,014.34 24924 27 Standard Insurance Company Life, AD&D & EAP Insurance - September 905.20 24925 28 Standard Insurance Company Employee LTD Insurance - September 502.07 24926 29 Texas Life Insurance Company Employee life insurance - September 48.25 24927 30 Valley Water Company Water charges - Various locations - July 6,015.87 24928 31 Verizon Wireless Wireless telephone charges - August/September 473.91 24929 32 VISION SERVICE PLAN Employee benefits - September 1,007.15 24930 33 Wells Fargo Vendor Fin Serv Copiers lease - September 1,307.44 24931 Sub-Total $ 314,214.45
Total $ 1,764,677.45
Approved for presentation to the City Council of the City of La Cañada Flintridge at their meeting of September 15, 2026 PASSED, APPROVED AND ADOPTED this 15th day of September, 2026 _______________________
Jeanne K. Hobson, Mayor
ATTEST:

Tania Garcia, City Clerk
APPROVED AS TO FORM:

Adrian R. Guerra, City Attorney

Page 5 of 10 ends
Page 28 of 411 ends

Payee name Line Item Description Amount Payment
number
Account
number
Invoice number
Payment date 9/15/2026
ADS, LLC Flow Monitoring System maintenance - Aug $2,500.00 24932 44-00-7113 23000-0826 Ahee Han Han - Aug 26 $50.00 24933 01-25-6035 08-2026
Alarm Relay Annual alarm monitoring - 9/1/26-8/31/27 $131.40 24934 01-49-6061 933436 Aleshire & Wynder LLP Legal svcs - General services retainer - 7/31/26 $15,408.80 24935 01-02-6061 107742 " Legal services - Litigation - 7/31/26 $1,529.88 " 01-02-6062 107746 " Legal services - 600 Foothill - 7/31/26 $7,640.50 " 01-02-6062 107750 " Legal svcs - CVWD v. LCF - thru 7/31/26 $708.00 " 01-02-6062 107752 " Legal services - zoning code update - thru 7/31/26 $362.70 " 01-02-6064 108742 " Legal services - Special projects - thru 7/31/26 $1,060.20 " 01-02-6064 107743 " General services projects - thru 7/31/26 $12,415.50 " 01-02-6064 107744 " Legal services - Records requests - 7/31/26 $13,645.20 " 01-02-6064 107745 " Legal services - City real property - 7/31/26 $2,660.30 " 01-02-6064 107747 All City Management Services, Inc. School crossing guards - 08/02/26-08/15/26 $3,066.94 24936 01-32-6061 PS-INV107397 Amanda Merlo live scan - Custodian of Rec - A. Merlo $110.00 24937 01-07-6045 080126 " snacks - employee ben fair - A. Merlo $75.83 " 01-07-6045 " Amazon Capital Services (4) sandwich boards - community emergency prep $291.68 24938 01-21-6082 1RRC-G7MQ-PGF9 " Amazon - custom fit floor liners $267.30 " 01-12-6031 1MQY-1R3P-G76F " Amazon - (4)USB C triple display docking stations $685.80 " 01-12-6031 1QGM-G1L6-VVCX " Amazon - trash can $209.14 " 01-12-6031 17QH-RNQX-QG97 " Amazon - acrylic sign holders $79.77 " 01-12-6031 1MLQ-G4GV-L3RJ " Amazon - personalized pickleball paddle $49.71 " 01-12-6031 13RD-6T1T-YTLH " Amazon - tea bags & box fan $52.06 " 01-12-6031 116P-XF16-73QX " Amazon - archival paper $139.61 " 01-12-6031 146D-L3JC-GDJ4 " Amazon - extra strength tape $20.48 " 01-12-6031 13QD-NY67-H6YN " Amazon - (4) liquid hand soap $33.96 " 01-12-6031 1VPR-9M3M-6CMP " Amazon - (2) ink cartridges $428.74 " 01-12-6031 1XH4-QYK9-P7DG " Amazon - (2) cable safe cord covers $225.40 24939 01-12-6031 1YKG-96W3-GDL4 Argam DerHartunian DerHartunian - Aug 26 $50.00 24940 01-25-6035 08-2026 AT&T Mobility Employee iPads with cell svc/cell phone - Jul 26 $392.86 24941 01-11-6098 287339196970X0810202 Barr Electric Repairs - Street lights - Oct $805.15 24942 01-42-7113 25179 " PW Consulting - various items - Oct $520.00 " 01-42-7113 25185 " Calsense repairs - Foothill - Dec $1,300.00 " 01-45-7109 25199 " Intrusion alarm maintenance - City Hall - Oct $130.00 " 01-55-6061 25177 " AV repairs - City Hall - Oct $260.00 " 01-55-6061 25178 " Special events - Electricity - Dec $1,365.00 " 01-31-6081 25196 " Lock installation - Pickle Ball courts - Nov $195.00 " 01-32-7107 25192 " Building maint. - City Hall - Nov $490.57 " 01-55-7104 25193 " PW Consulting - Verdugo/Foothill Signal Proj. - De $780.00 " 31-00-7000 25197 " PW Consulting - Mayors Discover Park Proj. - Dec $780.00 " 31-00-7000 25198 " Receiving bark - City Hall - Oct $260.00 " 01-31-7105 25186 Barr Electric Lighting repairs - Memorial Park - Dec $880.93 24943 01-31-7105 25219 " Park maintenance - Mayors Discovery Park - Apr $1,644.63 " 01-31-7105 26075 " Alarm maintenance - City Hall - Dec $260.00 " 01-55-7104 25218 " Holiday lighting - Electrical work - Dec $780.00 " 01-31-6081 25201 " " $4,485.00 " 01-31-6081 25202
" Lighting repairs - Lanterman Auditorium - Dec $557.96 " 01-50-7103 25217 " Purchase - Street signs - Dec $4,149.72 " 01-42-7113 25203 " PW Consulting - Street Sign Inventory - Dec $390.00 " 01-42-7113 25209 " Installation - Street signs - Dec $555.95 " 01-42-7113 25216 " PW Consulting - various items - Apr $2,080.00 " 01-42-7113 26070 " Maintenance - Street signs - Apr $1,180.36 " 01-42-7113 26072 Barr Electric Street sign maint. - Berkshire Bridge - April-May $879.21 24944 01-42-7113 26086 " Lighting repairs - Lanterman Auditorium - Apr $484.69 " 01-50-7103 26081 " Admin consultation - April-May $195.00 " 01-55-6061 26078 " Install information board - City Hall - April $130.00 " 01-55-6061 26085 " Calsense repairs - April $336.05 " 01-45-7109 26088
" Admin consultation - April-May $130.00 " 01-31-6081 26078 " Fire alarm maint. - City Hall - May $195.00 " 01-55-7104 26091 " Tech svcs - Lanterman Auditorium - May $520.00 " 01-50-6061 26097 " PW Consulting - Oakwood Safety Improvements - May $1,300.00 " 31-00-7000 26092 " Install new lock - Pickle Ball courts - May $260.55 " 01-32-7107 26090 " Admin consultation - April-May $390.00 " 01-13-6072 26078 " Maintenance - Memorial Park - Apr $260.00 " 01-31-7105 26077 " Lighting repairs - Memorial Park - May $310.69 " 01-31-7105 26094 Barr Electric Park maintenance - Mayors Discovery Park - Apr $235.95 24945 01-31-7105 26098 " Lighting repairs - Memorial Park - May $1,722.82 " 01-31-7104 26108 " Electrical support - Music in the Park - May-June $2,800.00 " 01-31-6081 26111 " Flag repairs - Foothill - May $393.32 " 01-31-6061 26103 " Restore AV System - Council Chamber - May $195.00 " 01-55-6061 26100 " HVAC maintenance - City Hall - May $538.09 " 01-55-6061 26101 " Inspection During Outage - City Hall - May $390.00 " 01-55-6061 26104 " Fire alarm testing - City Hall - May $260.00 " 01-55-6061 26106 " PW Consulting - various items - May $390.00 " 01-42-7113 26099 " " $390.00 " 01-42-7113 26105
" Street sign maint. - Foothill/Verdugo - May $205.36 " 01-42-7113 26113 Barr Electric TC-45 Maintenance & repairs - Aug. $4,246.37 24946 01-42-7113 26118 " Street sign maint. - Foothill - May $140.36 " 01-42-7113 26119 " Repairs - Median irrigation - Jun $187.50 " 01-42-7113 26120 " TC-45 Maint. & repairs - Traffic accident - Jun $260.00 " 01-42-7113 26125 " Fire alarm maint. - City Hall - Jun $540.00 " 01-55-6061 26130 " Audio maint. - Lanterman Auditorium - Jun $1,561.30 " 01-50-7103 26122 " Electrical maint. - Lanterman Auditorium - Jun $260.00 " 01-50-7103 26123 " Location prep - Music in the Park - Jun $194.89 " 01-31-6081 26121 " Electrical maint. - Music in the Park - Jun $511.49 " 01-31-6081 26126 " PW Consulting - Hawk at Indiana - Jun $260.00 " 31-00-7000 26127

Page 29 of 411 ends

" Electrical repairs - Memorial Park - May $888.26 " 01-31-7105 26115 Barr Electric Event programing&standby - Memorial Park - Oct-Feb $650.00 24947 01-31-6027 26166 " Memorial Park events - Apr-May $1,430.00 " 01-31-6027 26167 " Electrical supplies - City Hall - Jun $947.07 " 01-55-7103 26156 " " $2,086.36 " 01-55-7103 26157
" " $1,241.73 " 01-55-7103 26159
" " $1,241.73 " 01-55-7103 26158
" Event set up & tear down - Fiesta Days - May $780.00 " 01-13-6072 26169 " Audio maint. - Lanterman Auditorium - Jun $1,455.66 " 01-50-7103 26160 " Audio supplies - Lanterman Auditorium - Jun $3,558.09 " 01-50-7103 26161 " Audio maint. - Lanterman Auditorium - Jun $1,145.55 " 01-50-7103 26162 " AV maint. - Lanterman Auditorium - Jun $3,241.25 " 01-50-7103 26171 " Building maint. - Lanterman Auditorium - Jun $1,632.94 24948 01-50-7103 26172 Blais & Associates, LLC Grant research & support - 7/1-7/31/26 $1,750.00 24949 01-03-6061 BA_10047_2026 Byungmok Kim Refund C&D - Bel Aire Dr $6,000.00 24950 92-00-2341 080726 BKim California Association of Public Information Officials CAPIO - renewal - M. Dedrick - thru 8/23/27 $300.00 24951 01-03-6053 28712 City of Glendale City of Glendale - Recycled water - 7/4-8/3/26 $74.70 24952 01-45-6023 081226-0677-00 CliftonLarsonAllen LLP Audit services for FY25-26 - thru 08/25/26 $800.00 24953 01-10-6061 L261529354 Coastal Building Services Janitorial services - Aug $3,580.00 24954 01-45-7105 45275 " " $2,950.00 " 01-55-6037 "
" " $950.00 " 01-32-7107 45277
" " $1,670.00 " 01-50-6037 45276
Cogent Communications Inc Internet - backup system - Sep 2026 $775.00 24955 01-11-6098 090126-COGENT Constant and Associates, Inc. AAR Phase II services thru 7/31/26 $12,270.54 24956 01-21-6061 CA2026-1051 Crosby Plumbing, Inc. Stage floor repairs - Lanterman Auditorium $17,250.00 24957 01-50-7103 985 " Stage floor repairs - Lanterman Auditorium $17,250.00 " 01-00-4710 " Debra and Michael Barsom Part. RF Setback Mod. - REC-003891 - Chevy Chase $726.25 24958 01-00-4530 082726 D&MBarsom " Part. RF 2nd fl rev. - REC-001388 - Chevy Chase $726.25 " 01-00-4530 082726 D&MBarsomB " RF Hillside App & PH Notice - REC-001389 - Chevy $2,557.50 " 01-00-4530 " " Part. RF Comp. Trck - REC--001389 - Chevy Chase $17.50 " 01-00-4552 " " Part. RF Engineer Rev. - REC-001389 - Chevy Chase $70.00 " 01-00-4535 " Department of Industrial Relations Elevator compliance order - City Hall - 7/29/26 $225.00 24959 01-55-7103 E2314433MR Department of Transportation Dep of Transp. - 07-LAX- 210-0021-04 - Oct 26 $370.00 24960 01-12-6038 OCT 2026 Dynasty Fitness Wellness Equipment for Sheriff personnel $4,569.48 24961 01-21-7101 1122 Ellison Wilson Advocacy, LLC EWL - State lobbyist fee - Sep 26 $2,500.00 24962 01-01-6061 2026-09-05 Equipment Management Company Battery-powered rescue combi tool - Fire Dept $16,735.48 24963 01-21-8231 69795 Ernest Koeppen Koeppen - Aug 26 $50.00 24964 01-25-6035 08-2026 First American Data Tree, LLC GIS Parcel Data thru 8/31/26 $1,000.00 24965 01-11-6099 7146678 Francis Pollara Pollara - Sus. & Res. Com. - Aug 26 $50.00 24966 01-25-6035 08-2026 Global Sanitation Services Portable restrooms - MIP Memorial Park - 8/14-8/17 $233.50 24967 01-31-6081 I40141 " Portable restrooms - MIP Memorial Park - 8/21-8/24 $233.50 " 01-31-6081 I40426 " Portable restrooms - MIP Memorial Park - 8/28-8/31 $233.50 " 01-31-6081 I40692 Henry Oh Oh - Aug 26 $50.00 24968 01-25-6035 08-2026
Home Renew 360 Ref building plan rev - REC-044539 - Bel Aire $193.61 24969 01-00-4562 09026 HomeRenew360 Intelesys Monthly IT services - Oct 2026 $15,353.65 24970 01-11-6061 123713 Kimley-Horn & Associates, Inc. Pavement management system svc thru 7/31/26 $10,203.50 24971 01-43-6061 36759902 " CS - Circ/Conserv. Element Consul. - thru 6/30/26 $12,010.20 " 01-25-6065 36284688 " CS - Circ/Conserv. Element Consul. - thru 7/31/26 $5,172.70 " 01-25-6065 36791906 " Citywide Evac Plan Dev Srvs - thru 7/31/26 $4,550.98 " 01-21-6061 36696143 Kiwanis Club of La Canada Kiwanis - Monthly dues - Jul 26 $40.00 24972 01-03-6053 073126 Kristina Aslanian DBA Kris and Company Design Refund C&D - REC-0320022 - Gould Ave $8,670.00 24973 92-00-2341 082426 KAslanian Kyung AE Hong, Jayhee Kimberline Jung Refund C&D - REC-034448 - Haskell St $10,000.00 24974 92-00-2341 082426 KHongJJung La Canada Flintridge Coordinating Council LCF Coordinating Council FY 26/27 $1,500.00 24975 01-33-6073 FY 26-27 CONTRIB La Canada Flintridge Employees Assn Association dues 08/21/26 $250.00 24976 01-00-2275 082126 " Association dues 01/23/26 $250.00 " 01-00-2275 012326 La Cañada Printsmith Business cards - Council - Hobson $110.50 24977 01-12-6031 1410 La Canada Unified School District REC-042772 - La Granada Wy $9,285.32 24978 01-00-2310 MAY 2026 " REC-042855 - San Juan Wy $4,136.00 " 01-00-2310 "
" REC-042939 - Chevy Chase Dr $3,133.02 " 01-00-2310 "
" REC-043036 - Chevy Chase Dr $4,136.00 " 01-00-2310 "
" REC-042996 - Belita Ln $5,149.32 " 01-00-2310 "
" REC-034644 - Indiana Ave -$3,376.01 " 01-00-2310 "
" REC-043055 - Leland Pl Unit A & B $7,206.98 " 01-00-2310 JUN 2026 " REC-043157 - Carmel Rd $5,552.58 " 01-00-2310 "
" REC-043251 - Oakwood Ave $6,679.64 " 01-00-2310 "
" REC-043327 - Journeys End Dr $4,890.82 " 01-00-2310 " La Canada Valley Beautiful Inc LaCanadaValleyBeautifulContribution for FY 25-26 $25,000.00 24979 01-33-6073 FY26-27CONTRIB LA County Sheriff's Department LAC Sheriff - 14.5% Liability Insurance - Jul $42,975.86 24980 01-21-6056 270124AY " LACSheriff - Special events - 07/01/26-07/31/26 $2,998.27 " 01-21-6056 270098EB " LACSheriff - Special events - 07/07/26-07/30/26 $4,606.05 " 01-21-6056 270099EB " Crime Suppression OT - 07/07/26-07/30/26 $31,765.89 " 01-21-6058 " " LAC Sheriff - Deputy svc Unit - 307 - Jul $275,722.50 " 01-21-6059 270124AY " LAC Sheriff Grant Special Asgmt Deputy - 312 - Jul $23,162.75 " 01-21-6059 " " LACSherifSpecial Patrol SAO (902 OT)07/01-07/31/26 $20,677.76 " 01-21-6059 270098EB Liebert Cassidy Whitmore Legal services - General - Jul 26 $250.00 24981 01-02-6064 330998 Los Angeles Co - Auditor-Controller County of LA - Cerro Negro lease payment - Oct 26 $596.18 24982 01-12-6038 OCT 2026 Los Angeles County Public Works R9LCF73580 $530.90 24983 01-13-6072 26081200478 " R9LCF26049 $19,015.69 " 03-00-7113 26081200413
" R9LCF26088 $370.67 " 03-00-7113 26081200414
" R9LCF26129 $4,195.57 " 03-00-7113 26081200415
" R9LCF26130 $13,602.90 " 03-00-7113 26081200416
" R9LCF26132 $7,190.29 " 03-00-7113 26081200417
" N948273046 $251.94 " 03-00-7113 26081200422
" N948273434 $1,458.53 " 03-00-7113 26081200463
" N948273591 $484.67 " 03-00-7113 26081200491
" N948273611 $205.58 " 03-00-7113 26081200492
" W0379010 $343.91 " 01-53-6060 26081200384
" N948273593 $658.66 24984 03-00-7113 26081200500

Page 30 of 411 ends

" N948273633 $223.54 " 03-00-7113 26081200501
" N948273613 $4,522.86 " 03-00-7113 26081200502
" TS MAINT DDG - Jun 26 $8,070.04 " 03-00-6064 26081200760 " N948273621 $12,976.88 " 31-00-7000 26081200493
Maged El-Rabaa meeting registration - CCEA - M. El-Rab $40.00 24985 01-42-6052 08-2026 Matrix Consulting Group, Ltd. C.D. processing review thru 7/31/26 $7,030.00 24986 01-03-6061 1 MCCi, LLC Laserfiche support - 11/9/26-11/8/27 $7,000.00 24987 01-04-6061 RN31092 " Laserfiche license renewal - 11/9/26-11/8/27 $30,377.00 " 01-11-6061 " MMASC MMASC dues - L. Brancheau $125.00 24988 01-05-6053 16981 Natures Image Inc. Annual brush clearance - FY 25-26 $123,493.00 24989 01-21-7118 002941 Nerses Aposhian Aposhian - Aug 2026 $50.00 24990 01-25-6035 08-2026 Numbers Plumbing 2021 Fountain repairs - Memorial Park $177.78 24991 01-31-7105 9191 NV5 West Traffic signal improvements inspection svcs- Jul $14,414.10 24992 01-43-6061 535596 " Inverness storm drain & resurfacing svcs - Jul $12,340.00 " 31-00-7000 537243 Oakridge Landscape Inc Various medians/dogipots - Jun 26 $13,234.67 24993 01-45-7109 INV5628 " Various medians/dogipots - Nov 25 $14,566.51 " 01-45-7109 INV6134 " Various medians/dogipots - Feb 26 $13,235.70 " 01-45-7109 INV6144 " Various medians/dogipots - Mar 26 $13,870.91 " 01-45-7109 INV6145 " Various medians/dogipots - Apr 26 $13,616.13 " 01-45-7109 INV6146 " Various medians/dogipots - May 26 $13,234.67 " 01-45-7109 INV6147 " Various medians/dogipots - Dec 25 $13,238.80 " 01-45-7109 INV6142 " Loop Trail - Jun 26 $3,005.48 " 01-45-7110 INV5628
" Loop Trail - Nov 25 $2,909.47 " 01-45-7110 INV6134
" Loop Trail - Feb 26 $3,005.48 " 01-45-7110 INV6144
" Loop Trail - Mar 26 $3,005.48 " 01-45-7110 INV6145
" Loop Trail - Apr 26 $3,005.48 " 01-45-7110 INV6146
" Loop Trail - May 26 $3,005.48 " 01-45-7110 INV6147
" Loop Trail - Dec 25 $3,005.48 " 01-45-7110 INV6142
" Rockridge Terrace - Jun 26 $208.08 " 01-52-6025 INV5628 " Rockridge Terrace - Nov 25 $201.43 " 01-52-6025 INV6134 " Rockridge Terrace - Feb 26 $208.08 " 01-52-6025 INV6144 " Rockridge Terrace - Mar 26 $208.08 " 01-52-6025 INV6145 " Rockridge Terrace - Apr 26 $208.08 " 01-52-6025 INV6146 " Rockridge Terrace - May 26 $208.08 " 01-52-6025 INV6147 " Rockridge Terrace - Dec 25 $208.08 " 01-52-6025 INV6142 Pasadena Humane Society & SPCA PHS - Animal control services - Aug 26 $10,055.00 24994 01-21-6070 AUG2026LCF Printefex Inc Banner - Community Preparedness $121.55 24995 01-21-6082 8626 " Printefex - LCF FALL Vista Newsletter $5,386.88 " 01-13-6087 8010 Productive Home Renovation, Inc. Ref building plan rev - REC-044499 - Alminar $615.78 24996 01-00-4562 090126 ProductionHom Psomas Housing planner consulting services - 06/26-07/23 $4,205.00 24997 01-25-6061 238608 Samir Mehrotra Mehrotra - Aug 26 $50.00 24998 01-25-6035 08-2026 Sareen Bezdikian / Sebough Hagopian Refund Certificate of Occ. - REC-032682 - Commonwealth $205.17 24999 01-00-4561 082526 SBezdikianSHa " Refund C&D - REC-021934 - Commonwealth $10,000.00 " 92-00-2341 081726 SBezdikian " Refund C&D - REC-026221 - Commonwealth $10,000.00 " 92-00-2341 " Southern California Edison SCE - Electricity charges - 07/15/26 to 08/12/26 $35.63 25000 03-00-6064 081726-2305 " SCE - fee $0.20 " 03-00-6064 "
" SCE - Electricity charges - 07/15/26 to 08/12/26 $32.28 " 03-00-6064 081726-4379 " SCE - fee $0.28 " 03-00-6064 "
" SCE - Electricity charges - 07/15/26 to 08/12/26 $13.57 " 03-00-6064 081726-4435 " SCE - Electricity charges - 07/09/26 to 08/06/26 $135.96 " 03-00-6064 081126-2976 " " $145.05 " 03-00-6064 081126-5172
" " $52.73 " 03-00-6064 081126-6551
" " $108.96 " 03-00-6064 081126-9068
" " $218.63 " 03-00-6064 081126-9409
" " $13.57 " 01-45-6027 081126-0622
" $15.59 " 01-45-6027 081126-7760
" SCE - Electricity charges - 07/15/26 to 08/12/26 $15.63 " 01-45-6027 081726-1745 Southern California Edison " $61.21 25001 01-45-6027 081726-4752 " " $16.15 " 01-45-6027 081726-5678
" SCE - Electricity charges - 07/15/26 to 08/12/26 $39.21 " 01-45-6027 081726-6338 " " $16.93 " 01-45-6027 081726-7170
" SCE - fee $0.55 " 03-00-6064 081726-7146
" SCE - Electricity charges - 07/15/26 to 08/12/26 $37.76 " 03-00-6064 081726-8961 " " $81.51 " 03-00-6064 081726-7146
Southern California Edison SCE - Electricity charges - 07/10/26 to 08/09/26 $678.71 25002 01-49-6027 081226-6449 Stubbies Promotions, Inc. (200) Blankets - City's 50th Anniversary $2,951.80 25003 01-13-6088 26036 Tait & Associates, Inc. Hillard Ave rehab proj thru 7/31/26 $6,140.00 25004 31-00-7000 170488 Tripepi Smith & Associates Communication support consultant - Aug 26 $12,230.00 25005 01-13-6061 17834 TSI Incorporated Calibration of noise meter $299.76 25006 01-27-6061 92100162 Urban Graffiti Enterprises, Inc. Maintenance - Bus Shelter - Jul 26 Prop A $3,126.78 25007 30-00-6061 LCF22607 USC Verdugo Hills Hospital Foundation VHHF - Contribution for FY 2026-2027 $23,154.00 25008 01-33-6073 08272026 Walters Wholesale Electric Co Commemorative Street Sign - Michael T. Davitt $149.18 25009 01-13-6081 S130250027.001 West Coast Arborists Inc Misc. Concrete Repairs - 5/28/26 $2,556.00 25010 31-00-7000 245118 " WCA - Grid pruning - 7/16/26-8/15/26 $75,388.50 " 01-45-7120 248155 " WCA - Tree maintenance - 7/16/26-8/15/26 $3,360.30 " 01-45-7120 248156 " Clear vegetation around signs - Verdugo $284.00 " 01-42-7113 245129 " Tree trimming - Flock clearance - 7/14/26 $146.10 " 01-42-7113 247057 " Electrical work - Streets - 7/31/26 $1,972.35 " 01-42-7113 247619 Willdan Engineering Hawk ts - Foothill Blvd. @ Indiana thru 07/31/26 $4,775.50 25011 31-00-7000 00632989 " ACH @ Green signal study thru 08/28/26 $1,207.50 " 31-00-7000 00633055 " Code Enforcement Services - PT & FT - Jul 26 $16,460.00 " 01-27-6061 00238884 " Local road safety plan svcs - thru 7/31/26 $12,007.50 " 01-43-6061 00633023 " Traffic Engineer thru 7/31/26 $10,140.00 " 01-43-6061 00633041 " Lot line adj. - REC-042117 - Hampstead Rd $210.00 " 92-00-2350 00632997 " Hay Cyn feasiblity update thru 7/31/26 $57,282.25 " 18-00-6061 00342942 " NPDES water quality services thru 7/31/26 $12,451.25 " 18-00-6061 00342946 Xerox IT Solutions, LLC Adobe subscription - 8/2/26-8/1/27 $6,935.00 25012 01-11-6099 05131110 Payment date 8/26/2026 to 9/4/2026

Page 31 of 411 ends

ADP, Inc Payroll processing - PE 8/21/26 128,966.20 EFT Various AUG 27 JE ADP, Inc Payroll tax processing - PE 8/21/26 38,277.89 EFT " AUG 27 JE MissionSquare Retirement Employee's 457 plan contribution for PE 8/21/26 12,465.52 EFT 01-00-2280 0821226 CalPERS PE 7/31/26 retirement contribution - Classic council 41.76 EFT Various AUG0726A1 CalPERS PE 7/31/26 retirement contribution - PEPRA council 196.15 EFT " AUG0726B1 CalPERS PE 7/31/26 retirement contribution - PEPRA council 18.69 EFT " AUG2126B1 CalPERS PE 8/7//26 retirement contribution - Classic 14,293.34 EFT Various AUG0726A2 CalPERS PE 7/24/26 retro adj. retirement contribution - Classic 32.88 EFT " JUL2426A2 CalPERS PE 8/7/26 retirement contribution - PEPRA 15,703.57 EFT " AUG0726B2 CalPERS Health premiums - September 45,397.06 EFT Various 100000018397549 Payment date 9/2/2026
American Fidelity Assurance Admin fees - Oct 2026 $80.00 24913 01-10-6061 2748748 " Oct 2026 $14,346.57 " 01-12-5013 "
American Fidelity Assurance Company AFA Aug 26 $59.82 24914 01-00-2264 E004824 " " $16.12 " 01-00-2269 "
" " $553.45 " 01-00-2260 "
" " $593.22 01-00-2265 "
" " $577.91 " 01-00-2266 "
" " $210.92 " 01-00-2267 "
" " $72.06 " 01-00-2268 "
County Sanitation Districts of Sanitation District #34 FY26-27 cost sharing $11,013.00 24915 01-01-6053 53415 Crescenta Valley Water District CVWD charges - Glenhaven Park - 7/15/26-8/15/26 $99.91 24916 01-31-6023 081526-019505 " CVWD charges - Glenhaven Park - 7/15/26-8/15/26 $545.38 " 01-31-6023 081526-019506 David Haxton Fire Hardening Vent Rebate - Belita Ln $500.00 24917 01-21-6081 082726 DHaxton Delta Dental Insurance Company Delta Dental - Sep 2026 $26.52 24918 01-04-5020 BE007193683 " " $16.08 " 01-09-5020 "
Delta Dental of California Delta Dental - Sep 2026 $76.25 24919 01-52-5020 BE007194560 " " $152.50 " 01-43-5020 "
" " $318.10 " 01-25-5020 "
" " $76.25 " 01-26-5020 "
" " $76.25 " 01-09-5020 "
" " $206.34 " 01-45-5020 "
" " $40.74 " 01-07-5020 "
" " $325.97 " 01-05-5020 "
" " $165.60 " 01-01-5009 "
" " $157.73 " 01-03-5020 "
" " $40.74 " 01-04-5020 "
" " $122.22 " 01-10-5020 "
" " $40.74 " 01-31-5020 "
" " $152.50 " 01-42-5020 "
Elan Financial Services office supplies - City membership $65.00 24920 01-10-6053 AUG 26 - AK 6651 " training - LCC - T. Garcia $200.00 " 01-04-6054 AUG 26 - AP 1121 " lunch - CPR Training $176.36 " 01-21-6054 "
" treats - Sister Cities Meeting $96.25 " 01-01-6052 "
" registration - League of CA Cities - Q. Ahmed $725.00 " 01-01-6052 AUG 26 - TK 7953 " registration - CCC Meeting - A. Parseghian $10.00 " 01-03-6052 AUG 26 - AP 1121 " refund - City Clerk Conference -$311.95 " 01-04-6052 " " refreshments - Staff Meeting $19.98 " 01-05-6052 AUT 26 - SK 4056 " " $15.98 " 01-05-6052 "
" training - Infomsa - L. Brancheau $219.00 " 01-05-6052 " " storage - Microsoft $21.30 " 01-11-6099 AUG 26 - AP 1121 " kitchen supplies - City Hall $16.56 " 01-12-6031 "
" laundering - Tablecloths $277.50 " 01-12-6031 "
" fuel - City Vehicle - 73713 $90.99 " 01-42-6051 "
" fuel - City Vehicle - 73931 $104.25 " 01-42-6051 AUG 26 - ME 2358 " card - Staff Condolences $5.51 " 01-42-6052 AUT 26 - SK 4056 " flowers - Staff Condolences $137.82 " 01-07-6045 AUG 26 - TK 7953 " snacks - Sister Cities Meeting $218.51 " 01-12-6052 AUG 26 - AP 1121 " sodas - Council Chambers $20.97 " 01-12-6052 "
" snacks - Sister Cities Meeting $46.93 " 01-12-6052 "
" snacks - CCM & JOT $36.04 " 01-12-6052 "
" supplies - Joint Operations Meeting $33.08 " 01-12-6052 " " dinner - City Council Meeting $185.51 " 01-12-6052 AUG 26 - TK 7953 " " $89.95 " 01-12-6052 AUG 26 - DJ 5549
" rebate - CC Meeting - Jersey Mikes -$3.60 " 01-12-6052 " " water - CPR Training $20.67 " 01-12-6052 AUT 26 - SK 4056 " treats - Staff Farewell $66.33 " 01-12-6052 AUG 26 - AP 1121 " lunch - Staff Celebration $62.86 " 01-12-6052 "
" lunch - JPIA Audit Meeting $106.93 " 01-12-6052 "
" " $96.57 " 01-12-6052 "
" sodas - Council Chambers $48.93 " 01-12-6052 "
" rebate - La Cabanita Restaurant -$4.28 " 01-12-6052 " " mail add on - Website $99.00 " 01-12-6061 "
" search engine - Website $31.00 " 01-12-6061 "
" post - Social Media $58.22 " 01-13-6061 "
" software - Graphics $400.00 " 01-13-6061 "
" newsletter - City Subscribers $81.00 " 01-13-6061 "
" registration - APA Conference - H. Harris $350.00 " 01-25-6052 AUT 26 - SK 4056 " office supplies - Building Code Books $1,175.10 " 01-26-6034 " " wash - City Vehicle $9.00 " 01-42-7101 AUG 26 - ME 2358 " " $9.00 " 01-42-7101 "
Los Angeles Times L.A. Times subscription thru 9/15/26 $1,222.00 24921 01-03-6032 081226 Mike Bubalo Construction Co., Inc. Inspection - Foothill Blvd 48" Pipe $7,500.00 24922 31-00-7000 3662 San Gabriel Valley City Managers' Association SGV City Mgrs. Assoc dues FY26/27 - D. Jordan $55.00 24923 01-03-6053 081926-SGVCMA Southern California Edison SCE- Electricity charges - 07/13/26 to 08/10/26 $3,515.61 24924 01-32-6064 081326-4128 " SCE - Electricity chgs-school flds-7/13-8/10 $59.24 " 01-32-6064 081326-9895 " SCE - charges - 07/09/26 to 08/06/26 $77.61 " 01-31-6027 081126-8028 " SCE - charges - 07/15/26 to 08/12/26 $210.03 " 01-31-6027 081726-1356

Page 32 of 411 ends

" SCE - Electricity charges - 07/15/26 to 08/12/26 $151.85 " 01-31-6027 081726-5189 Standard Insurance Company Standard Life, AD&D & EAP - Sep 26 $11.90 24925 01-12-5023 081726LIFE " " $71.10 " 01-01-5008 "
" " $94.80 " 01-03-5008 "
" " $47.40 " 01-09-5008 "
" " $23.70 " 01-11-5008 "
" " $94.80 " 01-25-5008 "
" " $47.40 " 01-26-5008 "
" " $71.10 " 01-43-5008 "
" " $47.40 " 01-04-5008 "
" " $71.10 " 01-05-5008 "
" " $94.80 " 01-10-5008 "
" " $23.70 " 01-31-5008 "
" " $47.40 " 01-42-5008 "
" " $47.40 " 01-45-5008 "
" " $87.50 " 01-00-2260 "
" " $23.70 " 01-52-5008 "
" Employee LTD Insurance - Sep 26 $502.07 24926 01-00-2265 081726LTD Texas Life Insurance Company Employee life insurance - Sep 26 $48.25 24927 01-00-2260 SM0EL720260816001 Valley Water Company VW charges - 4423 Cornishon Ave - 6/29-7/30/26 $1,090.29 24928 01-32-6023 073126-14512R " VW charges - 4436 Cornishon Ave - 6/29-7/30/26 $2,751.64 " 01-32-6023 073126-7108R " VW charges - 4465 Oak Grove Dr - 6/29-7/30/26 $2,173.94 " 01-32-6023 073126-9732R Verizon Wireless Wireless telephone charges - 8/14-9/13 $473.91 24929 01-11-6098 6151035441 VISION SERVICE PLAN VSP - Sep 26 $23.66 24930 01-31-5020 825811396 " " $70.98 " 01-10-5020 "
" " $84.73 " 01-01-5007 "
" " $81.58 " 01-03-5020 "
" " $118.99 " 01-05-5020 "
" " $57.92 " 01-04-5020 "
" " $68.52 " 01-42-5020 "
" " $23.66 " 01-07-5020 "
" " $108.39 " 01-45-5020 "
" " $34.26 " 01-52-5020 "
" " $92.18 " 01-43-5020 "
" " $57.92 " 01-26-5020 "
" " $126.44 " 01-25-5020 "
" " $57.92 " 01-09-5020 "
Wells Fargo Vendor Fin Serv 12 printers 8/27/26-9/26/26 $1,574.08 24931 01-12-6038 5039787716 " credit - overpayment -$266.64 " 01-12-6038 "

Page 33 of 411 ends

City Council Agenda Report
Meeting Date: September 15, 2026
Subject: Receive and File Commission Meeting Action Agendas a. Design Commission Action Minutes for July 2, 2026, and July 16, 2026
Presenter: Tania Garcia, City Clerk
Proposed Action: Motion to receive and file the attached action minutes from the Commission meetings
Environmental Impact: None
Fiscal Impact: None
Discussion/Analysis:

Receive and file the attached action minutes from the Commission meetings.

Options:

1. Receive and file the attached action minutes from the Commission meetings; or

2. Defer action at this time.

Recommendation:

Option No. 1 - It is recommended that the City Council take the following action(s): Receive and file the attached action minutes from the Commission meetings Attachments:

1. ActionMins_DC_2026-07-02

2. ActionMins_DC_2026-07-16

Page 34 of 411 ends

City of La Cañada Flintridge July 2, 2026
Design Commission Minutes City Council Chambers
Regular Meeting One Civic Center Drive
La Cañada Flintridge, CA 91011

REGULAR COMMISSION MEETING
CALL TO ORDER: Chair Markari called the Regular Meeting to order at 8:01 a.m.

ROLL CALL: Chair Markari, and Commissioners Bethel and Yuhan.

Vice Chair Pollara was absent.

STAFF PRESENT: Director Koleda, Planner Gjolme, Assistant Planner Fabela and Management Analyst Karaguozian.

PLEDGE OF ALLEGIANCE: Led by Chair Markari.

COMMENTS FROM THE PUBLIC: None.

REORDERING OF AND ADDITIONS TO THE AGENDA: None.

CONSENT CALENDAR:

A MOTION was made by Chair Markari, seconded by Commissioner Bethel, and carried 3 – 0, (Vice Chair Pollara was absent) to approve the Design Commission minutes from May 21, 2026.

1. Approval of Minutes of the Design Commission Meeting:
a) Design Commission Regular Meeting of May 21, 2026.
(Approved 3 – 0, as recommended)
PUBLIC HEARINGS:

2. Design Review (DEV-2026-0030); Apelian; 1101 Foothill Boulevard: A request to allow a new reverse channel letter wall sign at 1101 Foothill Boulevard.

Planner Gjolme provided a staff report and addressed questions from the Commission.

Chair Markari opened the public hearing at 8:17 a.m.

The following individual provided public comment: Arman Bubushyan.

Chair Markari closed the public hearing at 8:21 a.m.

A MOTION was made by Commissioner Bethel, seconded by Commissioner Yuhan and carried 3 – 0, (Vice Chair Pollara was absent) to adopt the proposed Design Commission Resolution No.

Page 35 of 411 ends

Design Commission Minutes Page 2 of 2 July 2, 2026
Regular Meeting
26-xx approving Design Review (DEV-2026-0030) for a new reverse channel letter wall sign at 1101 Foothill Boulevard.

OTHER BUSINESS:

3. Design Review (DEV-2026-0009): Atamian; 930 Foothill Boulevard: Information item regarding painted wall sign on the west side of the subject building.

Assistant Planner Fabela provided a staff report and addressed questions from the Commission.

CONCLUDING BUSINESS:

Comments from Commissioners
There were none.

Comments from Staff
Planner Gjolme mentioned that there will be items on the agenda for the July 16th Commission meeting.

ADJOURNMENT
A MOTION was made by Commissioner Bethel, seconded by Commissioner Yuahn, and carried 3 – 0, (Vice Chair Pollara was absent) to adjourn the Regular Design Commission meeting at 8:32 a.m.
__________________
Antonio Gardea, AICP
Assistant Director of Community Development
Minutes approved by the Design Commission on September 3, 2026.

Page 36 of 411 ends

City of La Cañada Flintridge July 16, 2026
Design Commission Minutes City Council Chambers
Regular Meeting One Civic Center Drive
La Cañada Flintridge, CA 91011

REGULAR COMMISSION MEETING
CALL TO ORDER: Chair Markari called the Regular Meeting to order at 8:06 a.m.

ROLL CALL: Chair Markari, Vice Chair Pollara and Commissioners Bethel and Yuhan.

STAFF PRESENT: Assistant Director Gardea, Planner Gjolme, Assistant Planner Fabela and Management Analyst Karaguozian.

PLEDGE OF ALLEGIANCE: Led by Chair Markari.

COMMENTS FROM THE PUBLIC: None.

REORDERING OF AND ADDITIONS TO THE AGENDA: None.

CONSENT CALENDAR: None.

PUBLIC HEARINGS:

2. Design Review (DEV-2026-0022); St.George's Episcopal Church; 808 Foothill Boulevard:

A request to allow a new ground/monument sign and refacing of an existing pole sign at 808 Foothill Boulevard.

Assistant Planner Fabela provided a staff report and addressed questions from the Commission.

Chair Markari opened the public hearing at 8:17 a.m.

The following individual provided public comment: None.

Chair Markari closed the public hearing at 8:17 a.m.

A MOTION was made by Vice Chair Pollara, seconded by Commissioner Bethel and carried 4 – 0, to adopt the proposed Design Commission Resolution No. 26-xx approving Design Review (DEV-2026-0022) for a new ground/monument sign and refacing of an existing pole sign at 808 Foothill Boulevard with conditions.

3. Design Review (DEV-2026-0039); Carter Permit Consulting; 442 Foothill Boulevard: A request to allow a new wall sign at 442 Foothill Boulevard.

Planner Gjolme provided a staff report and addressed questions from the Commission.

Chair Markari opened the public hearing at 8:37 a.m.

Page 37 of 411 ends

Design Commission Minutes Page 2 of 2 July 16, 2026
Regular Meeting
The following individual provided public comment: Kendall Credi.

Chair Markari closed the public hearing at 8:39 a.m.

A MOTION was made by Vice Chair Pollara, seconded by Commissioner Bethel and carried 4 – 0, to adopt the proposed Design Commission Resolution No. 26-xx approving Design Review (DEV-2026-0039) for a new wall sign at 442 Foothill Boulevard.

OTHER BUSINESS: None.

CONCLUDING BUSINESS:

Comments from Commissioners
Chair Markari asked about the sign ordinance. Assistant Director Gardea stated it would return at a future meeting. Commissioner Pollara requested materials be provided before the agenda release.

Commissioner Yuhan raised concerns about excessive lighting, and staff noted outreach to businesses using temporary lighting.

Comments from Staff
Assistant Director Gardea provided an update on the appealed Wells Fargo item, which will be brought before the City Council in August.

ADJOURNMENT
A MOTION was made by Commissioner Yuhan, seconded by Commissioner Bethel, and carried 4 – 0, to adjourn the Regular Design Commission meeting at 8:48 a.m. __________________
Antonio Gardea, AICP
Assistant Director of Community Development
Minutes approved by the Design Commission on September 3, 2026.

Page 38 of 411 ends

City Council Agenda Report
Meeting Date: September 15, 2026
Subject: Receive and File the Public Safety Reports for July and August 2026 Presenter: Tania Garcia, City Clerk
Proposed Action: Motion to receive and file the Public Safety Reports for July and August 2026
Environmental Impact: None
Fiscal Impact: None
Discussion/Analysis:

Receive and file the Public Safety Reports for the months of July and August 2026 as prepared and submitted by the Los Angeles County Fire and Los Angeles County Sheriff’s Departments.

Options:

1. Receive and file the Public Safety Reports for July and August 2026; or

2. Defer action and provide direction to staff.

Recommendation:

Option No. 1 - It is recommended that the City Council take the following action(s): receive and file the Public Safety Reports for July and August 2026.

Attachments:

1. Fire Activity Report for July

2. Fire Activity Report for August

3. Crime Statistics for July

4. Crime Activity Report for August

Page 39 of 411 ends

2 85
1 0
39 0
10 20
30 40
50 60
70 80
90 TOTAL: 127

ALL RESPONSES
Fire Medical
Public Service Hazardous Situation
No Emergency
1 2
3 1 1 1 1
6 1
7 2
15 4
17 4
13 6
0 2
4 6
8 10
12 14
16 18

PATIENTS SEEN
Total Patients Seen: 85*

NOTEWORTHY INCIDENTS
7/3/26 Vehicle Fire Berkshire Place
7/8/26 Vehicle Fire Westbound 210 East of Angeles Crest Highway
MONTHLY ACTIVITY REPORT – LA CAÑADA FLINTRIDGE
JULY 2026
*Total Patients Seen may be higher than Total Medical Responses due to multiple patients at any given incident.

Page 40 of 411 ends

MEDICAL INCIDENTS BY LOCATION TYPE
TRAFFIC COLLISIONS TOTAL: 13
Note: Where two streets are listed, the first street is the street on which the collision occurred; the second street is the closest cross-street. Th two streets listed do not necessarily mean the collision occurred in the intersection.

SAFETY TIP OF THE MONTH:

Did you know that you can text 911? If you find yourself in need of 911 assistance, but are unable to voice a call, or are in an area with poor cell reception, you can send a text message to 911. But there are some things you need to keep in mind when texting 911:
• Texting 911 is like calling 911 . . . the text will go to the nearest law enforcement agency. • Please provide as much information as you can in your initial text to 911, especially the following:
o Do you need law enforcement (crime in progress) or fire department (fire or medical issue)? o Address or location where you need help.
• Be prepared for a text conversation with the Dispatcher (if you are able to engage); as long as you have provided your address or location, help is being dispatched, but if you are able to engage in the text conversation, dispatchers will attempt to obtain more information or provide you with instructions.

NOTEWORTHY TRAFFIC COLLISIONS
7/12/26 Eastbound 210 west of Foothill TC vs. Pedestrian – CHP officer out of his vehicle, while attending to abandoned vehicle, was sideswiped by a vehicle that slowed down in the area but swerved; transported. 7/23/26 4400 block of Cornishon Avenue TC vs. Pedestrian – Patient in parking lot had a vehicle brush her leg; transported.

Page 41 of 411 ends

3 101
3 0
45 0
20 40
60 80
100
120
TOTAL: 152

ALL RESPONSES
Fire Medical
Public Service Hazardous Situation
No Emergency
2 2
4 3
4 3
1 1
5 1
4 3
1 23
1 6
23 1
9 4
0 5
10 15
20 25

PATIENTS SEEN
Total Patients Seen: 101*

NOTEWORTHY INCIDENTS
8/3/26 Vehicle Fire 5769 Summit Crest Drive
8/21/26 Vehicle Fire Westbound 210 east of Angeles Crest Highway
Semi truck/trailer hauling hay well involved with fire; hay bales loaded too close to exhaust, causing ignition. Approx. 75% of the hay bales were burned. 8/21/26 Fire, other 4285 Mesa Vista Drive Smoldering insulation on a trailer.

MONTHLY ACTIVITY REPORT – LA CAÑADA FLINTRIDGE
AUGUST 2026
*Total Patients Seen may be higher than Total Medical Responses due to multiple patients at any given incident.

Page 42 of 411 ends

MEDICAL INCIDENTS BY LOCATION TYPE
TRAFFIC COLLISIONS TOTAL: 9
Note: Where two streets are listed, the first street is the street on which the collision occurred; the second street is the closest cross-street. Th two streets listed do not necessarily mean the collision occurred in the intersection.

SAFETY TIP OF THE MONTH:

It only takes a few seconds for a child to drown. Drowning accidents are a leading cause of death for children under four years old. Tips to keep you and your family safe:
• Never take your eyes off a child when he/she is in or near any body of water. • Don’t rely on barriers, such as fences or walls, near a pool or spa. Constant supervision is essential. • Remove toys and ensure your pool is covered when not in use. • Don’t rely on inflatable devices to keep your child afloat and keep a life ring accessible. • Learn CPR and rescue breathing.

NOTEWORTHY TRAFFIC COLLISIONS
8/3/26 Angeles Crest Highway / Bay Tree
Road
TC involving Bus – a bus was cut off and swerved into a block wall. No injuries reported to bus passengers, except some minor glass shards landing on some. CHP escorted bus down the hill to a parking lot for passengers to transfer to a new bus.
8/5/26 Angeles Crest Highway / Mile Marker
26-50
TC Over the Side – Assisted Pasadena Fire with one patient who was actually a bystander rescuer to the vehicle over the side incident who injured his knee when he stepped into a hole. Pasadena Fire handled the over the side incident.

Page 43 of 411 ends

LOS ANGELES COUNTY SHERIFF’S DEPARTMENT

CRESCENTA VALLEY STATION
4554 N. Briggs Avenue, La Crescenta, CA 91214
(818) 248-3464

City of La Cañada Flintridge
Crime Statistics
July 2026
Prepared By: Marisa Tomlinson, Crime Analyst August 11, 2026

FOR LAW ENFORCEMENT USE ONLY / NOT FOR PUBLICATION

FOR YOUR EYES ONLY / NOT FOR PUBLICATION

Page 44 of 411 ends

PART I OFFENSES
Classification Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec YTD 2026
YTD
2025
YTD
2024
YTD
2023
YTD
2022
YTD
2021
YTD
5 Yr Chg
YTD
1 Yr Chg
Homicide 0 0 0 0 0 0 0 0 0 0 0 0 0 No Change No Change
Rape 0 0 0 0 1 0 0 1 1 0 1 0 1 No Change No Change
Robbery 0 1 0 2 1 1 0 5 4 3 4 3 1 400% 25%
Agg Assault 2 4 0 1 0 1 3* 11 0 3 12 14 6 83% Not Calc.

Resi Burglary 4 4 1 5 6 1 1 22 51 45 28 43 24 -8% -57%
Other Burglary 1 2 2 1 1 2 0 9 9 12 12 13 8 13% No Change Larceny-Theft 10 19 17 24 8 6 9 93 90 115 145 133 110 -15% 3% GTA 0 1 0 0 0 1 0 2 7 2 8 5 7 -71% -71%
Arson 1 0 0 0 0 0 0 1 1 0 0 1 0 Not Calc. No Change
Total 18 31 20 33 17 12 13 0 0 0 0 0 144 163 180 210 212 157 -8% -12% * Note: In July 2026 there was one aggravated assault incident with three victims PART II OFFENSES – VANDALISM, NARCOTICS, & ID THEFT/FRAUD Classification Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec YTD 2026
YTD
2025
YTD
2024
YTD
2023
YTD
2022
YTD
2021
YTD
5 YR Chg
YTD
1 YR Chg
Vandalism 0 1 0 0 2 1 1 5 7 13 10 18 12 -58% -29%
Narcotics 1 0 3 0 1 4 2 11 6 5 8 11 6 83% 83%
Identity Theft
/ Fraud 2 4 5 8 5 10 9 43 25 30 19 36 46 -7% 72%
All data extracted from LARCIS as of 8/11/2026– Unverified and subject to change. Red depicts +30% increases and green depicts -30% decreases

Page 45 of 411 ends

3 TRAFFIC
***Information Analysis:

The classification of total collisions document the total number of collisions for the month and year to date.

The sub categories document the individual statistical categories of each collision and may not equal the total number of collisions For example: injury accident on private property will be counted in the injury accident and private property sub categories.

FLOCK RELATED CASES
In July 2026, there was one Flock Safety System related vehicle stop of a felony vehicle involved in an LAPD incident.

TRESPASSING / ILLEGAL SHOOTING CALLS / INCIDENTS
8 trespassing / possible trespassing calls and 1 trespassing report in July 2026. 0 illegal shooting calls and 0 illegal shooting incident reports in July 2026.

Classification July 2026 YTD 2026 YTD 2025 YTD 2024
YTD 2021
(5 yrs ago)
Total Collisions 14 103 96 100 69
Non-Injury Collisions 8 66 66 81 45
Injury Collisions 6 37 30 19 24
Fatal 0 1 0 0 0
Private Property 5 30 30 35 11
Warnings 218 901 332 354 790
Citations 180 1961 1394 926 1898

Page 46 of 411 ends

4 All data extracted from LARCIS as of 8/11/2026– Unverified and subject to change.

Page 47 of 411 ends

LOS ANGELES COUNTY SHERIFF’S DEPARTMENT

CRESCENTA VALLEY STATION
4554 N. Briggs Avenue, La Crescenta, CA 91214
(818) 248-3464

City of La Cañada Flintridge
Crime Statistics
August 2026
Prepared By: Marisa Tomlinson, Crime Analyst September 8, 2026

FOR LAW ENFORCEMENT USE ONLY / NOT FOR PUBLICATION

FOR YOUR EYES ONLY / NOT FOR PUBLICATION

Page 48 of 411 ends

PART I OFFENSES
Classification Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec YTD 2026
YTD
2025
YTD
2024
YTD
2023
YTD
2022
YTD
2021
YTD
5 Yr Chg
YTD
1 Yr Chg
Homicide 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No Change No Change Rape 0 0 0 0 1 0 0 0 1 1 0 0 0 1 No Change No Change
Robbery 0 1 0 2 1 1 0 3 8 4 3 6 5 1 700% 100%
Agg Assault 2 4 0 1 0 1 3 1 12 0 5 13 14 7 71% Not Calc.

Resi Burglary 4 4 1 5 6 1 1 2 24 56 54 31 49 26 -8% -57% Other Burglary 1 2 2 1 1 2 0 0 9 11 15 16 15 9 No Change -18% Larceny-Theft 10 19 17 24 8 6 9 2 95 110 127 166 155 120 -21% -14% GTA 0 1 0 0 0 1 0 0 2 8 5 8 5 8 -75% -75%
Arson 1 0 0 0 0 0 0 0 1 1 1 0 1 0 Not Calc. No Change
Total 18 31 20 33 17 12 13 8 0 0 0 0 152 191 210 240 244 172 -12% -20% PART II OFFENSES – VANDALISM, NARCOTICS, & ID THEFT/FRAUD Classification Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec YTD 2026
YTD
2025
YTD
2024
YTD
2023
YTD
2022
YTD
2021
YTD
5 YR Chg
YTD
1 YR Chg
Vandalism 0 1 0 0 2 1 1 0 5 10 15 15 20 12 -58% -50%
Narcotics 1 0 3 0 1 4 2 0 11 7 5 11 14 8 38% 57%
Identity Theft
/ Fraud 2 4 5 8 5 10 9 6 49 29 32 25 43 51 -4% 69%
All data extracted from LARCIS as of 9/8/2026– Unverified and subject to change. Red depicts +30% increases and green depicts -30% decreases

Page 49 of 411 ends

3 TRAFFIC
***Information Analysis:

The classification of total collisions document the total number of collisions for the month and year to date.

The sub categories document the individual statistical categories of each collision and may not equal the total number of collisions For example: injury accident on private property will be counted in the injury accident and private property sub categories.

FLOCK RELATED CASES
In August 2026, there were no Flock Safety System related vehicle stops or arrests.

TRESPASSING / ILLEGAL SHOOTING CALLS / INCIDENTS
7 trespassing / possible trespassing calls and no trespassing reports in August 2026.

No illegal shooting calls and no illegal shooting incident reports in August 2026.

Classification August 2026 YTD 2026 YTD 2025 YTD 2024
YTD 2021
(5 yrs ago)
Total Collisions 18 121 111 117 88
Non-Injury Collisions 11 75 78 97 60
Injury Collisions 6 44 33 20 28
Fatal 1 2 0 0 0
Private Property 6 35 34 40 18
Warnings 196 1097 389 400 953
Citations 270 2299 1631 1120 2175

Page 50 of 411 ends

4 All data extracted from LARCIS as of 9/8/2026– Unverified and subject to change.

Page 51 of 411 ends

City Council Agenda Report
Meeting Date: September 15, 2026
Subject: Receive and File the Capital Improvement Project Status Update Presenter: Maged El-Rabaa, P.E., Director of Public Works Proposed Action: Receive and File
Environmental Impact: The environmental analysis will be prepared for each project and submitted to City Council for review and approval
Fiscal Impact: The fiscal impact is determined for each project as part of the City Council review and approval process
Discussion/Analysis:

A. PROJECTS IN CONSTRUCTION PHASE

1. 2026 Citywide Street Resurfacing Program (CIP 31-2601): As part of the City’s annual street maintenance program, the City Council approved the following 3.92 centerline miles of streets for resurfacing:

Street From To Length
(mile)
Knight Way Oliveta Place Crown Avenue 0.29
Oliveta Place Knight Way Cul-De-Sac 0.15
Mellow Lane Crown Avenue Cul-De-Sac 0.17
Redwillow Lane Knight Way Cul-De-Sac 0.41
Noren Street Redwillow Lane Crown Avenue 0.08
Starlight Crest Drive Angeles Crest
Hwy.

Burning Tree Drive 0.33
Del Monte Road San Juan Way Santa Inez Way 0.27
Carmel Road San Juan Way Santa Inez Way 0.23
Cannon De Paraiso
Lane
Santa Inez Way Cul-De-Sac 0.26
Houseman Street Indianola Way Hampton Road 0.23
Alminar Avenue Daleridge Road Cul-De-Sac 0.39
Revlon Drive Alminar Avenue Alminar Avenue 0.26
Georgian Road Woodleigh Lane Foothill Boulevard 0.85
TOTAL 3.92

Page 52 of 411 ends

The overall PCI for these streets is 60, just above the rating of poor. The proposed project will improve the pavement of the above road segments, which will enhance the rideability for the motorists and increase the corresponding service life by 20 years. On June 16, 2026, the City Council approved the PS&E and authorized Public Works to advertise the project for construction bids. The project was then advertised on June 25, 2026, and bids were submitted on July 23,2026. On September 1, 2026, the City Council awarded the construction contract to Gentry Brothers, Inc., in the amount of $1,538,764.50. The contract agreement and other related documents are under preparation.

2. 2026 Citywide Miscellaneous Concrete Repairs (CIP 31-2602): As part of the City’s annual maintenance program, the City proposes to repair sidewalk, curbs, and gutters that are damaged by traffic or by tree roots or have simply deteriorated due to age or use and repair/install ADA curb ramps throughout the City to meet ADA requirements. Staff completed the Plans, Specifications, and Estimates (PS&E) for the project. On February 17, 2026, the City Council adopted the PS&E and authorized Public Works to advertise the project for construction bids. On April 7, 2026, the City Council awarded a construction contract to Gentry Brothers, Inc., in the amount of $222,185, and construction started on May 11, 2026 and was substantially completed on July 31, 2026. Contractor is currently working on the punch list items and submittal of final documentation.

3. Mid-Block Pedestrian Crosswalk Traffic Signal (HAWK) at 200 Foothill Boulevard (Project No. 31-2610/07-2423d): The project consists of upgrading the existing flashing beacon on Foothill Boulevard at 200 Foothill Boulevard (near Saint Francis High School) to a Pedestrian Hybrid Beacon (HAWK). The general scope includes the removal of the existing yellow flashing beacon poles, installation of new mast arm poles, vehicle heads, pedestrian heads, pedestrian push buttons, and other related electrical equipment. The proposed improvements will upgrade the existing flashing beacon to a traffic signal (HAWK) which will enhance safety for pedestrians and motorists. On November 18, 2025, the City Council awarded the construction contract to Elecnor Belco Electric, Inc., in the amount of $313,137. On December 18, 2025, a Notice to Proceed was issued to the contractor for the procurement of the materials and staff completed the review of all material submittals related to the long lead traffic signal equipment. Contractor has completed potholing at the location of the new poles to verify any conflict with existing utilities. As a result, one pole needs to be modified due to its relocation to avoid conflict with utility. Construction started on June 22, 2026 and to be completed on September 9, 2026. Majority of the civil works was completed on July 31, 2026, and the installation of the signal poles is scheduled in early September pending their delivery and the energization of the new service cabinet by SCE to provide power to the new signal. SCE installed the new meter and energized the service cabinet on September 12, 2026.

B. PROJECTS IN DESIGN PHASE

1. Foothill Boulevard Street Remediation (Dip) – (CIP 31-2306): The project consists of the repair of the road segment between EL Camino Porto and Cypress Drive by pressure grouting method to stabilize the subgrade to a depth of approximately 45 feet; repair of the existing Corrugated Metal Pipe (CMP) located at approximately 45 feet under this segment of Foothill Boulevard and the parking lot of Lutheran Church in the Foothills (LCIF) by jacking a 36” High Density Polyethylene (HDPE) pipe to strengthen the existing CMP; construction of a jacking pit in the parking lot of the LCIF; installation of FMWD’s temporary diversion water line during construction; installation of FMWD’s permanent 24-inch water line; removal and replacement of the median, curb and gutter; landscaping improvements; resurfacing of the pavement; and other related work.

On December 3, 2024, the City Council awarded the design contract to GMU Geotechnical and Geologists, Inc. for the preparation of Plans, Specifications and Estimate (PS&E) and design support during construction. On May 6, 2025, the City Council awarded a contract to Willdan Engineering to provide Construction Management and Inspection Services during construction of the Project.

Page 53 of 411 ends

Construction is expected to be done in three phases. The first phase consists of construction of a jacking pit in LCIF parking lot; jacking a 36” High Density Polyethylene (HDPE) pipe northerly and southerly from the jacking pit to strengthen the existing CMP located at approximately 45 feet under Foothill Boulevard and the LCIF parking lot; and other related work. On February 17, 2026, the City Council approved the right of entry agreement with LCIF, adopted the PS&E and authorized Public Works to advertise the first phase the project for construction bids. Three bids were uploaded to Planet Bids on March 19, 2026. Upon staff review of all bid proposals, the apparent lowest bidder was found to be non-responsive due to missing vital information in the proposal and discrepancies in pricing of many items. Also, the bidder was found not responsible due to lack of experience in projects with similar scope and complexity. On April 17, 2026, the City Council rejected all bids. Staff will explore and recommend to the City Council other construction methods at a future meeting. Staff conducted another survey on July 29, 2026, and found out of 73 survey points, of which 29 points showed additional settlement between 0.03 and less than 0.06 feet and 44 points showed additional settlement less than 0.03 feet. The additional settlement is considered negligible compared to the previous results dated April 15, 2024. Staff is currently working with a contractor, who is experienced in similar projects, for the development of an alternative scope to strengthen the existing CMP.

2. Hillard Ave Street Improvements Project - Foothill Boulevard to Fairmount Avenue (CIP 31- 2208): The existing asphalt pavement is in poor condition and the segment from Foothill Blvd to near 4720 Hillard does not have curb and gutter similar to northern segment to Fairmount Avenue. In addition, Public Works has received numerous complaints about excessive speeding on the street.

In FY 2024-25, the City Council approved the selection of Onward Engineering, one of the approved On-Call consultants, to develop a concept plan and to solicit community input on the proposed improvements. Staff held a town hall in April 2025 and presented three alternatives to the community. The feedback received from the community was to develop additional design concepts to minimize impacts to existing landscaping improvements.

On October 3, 2025, the City Council approved the selection of thirteen (13) On-Call consultants, on an as-needed basis, to assist in the design and delivery of the CIP projects. Staff solicited a fee proposal from TAIT & Associates, Inc., one of the approved consultants, for updating the concept plans and presenting them to the community for their input and the preparation of Plans, Specifications, and Estimates (PS&E) based on the approved concept plan by the City Council. On June 16, 2026, the City Council approved TAIT & Associates Fee Proposal in the amount of $116,792, after which a Task Order was issued to TAIT & Associates. A community meeting to present the updated concept design will be scheduled next month. Design is in progress.

3. Angeles Crest Highway at Green Lane Traffic Signal (CIP 31-2605): In April 2025, the city held a joint town hall with Caltrans to address the speeding on Angeles Crest Highway (ACH). Based on feedback received from residents at the meeting, staff concluded that the community’s preferred design element is the installation of traffic signals at various intersections along ACH to mitigate speeding. It is proposed to install a new traffic signal on ACH at Green Lane as a first phase. On October 3, 2025, the City Council approved the selection of thirteen (13) On-Call Consultants, on an as-needed basis, to assist in the design and delivery of the CIP projects. Staff solicited a fee proposal from Willdan Engineering, one of the approved consultants, for the preparation of a Traffic Signal Warrant Study and to submit it to Caltrans for review and approval. On November 12, 2025, a Task Order in the amount of $7,600 was issued to Willdan Engineering for the said services. The completed study concluded that a traffic signal is warranted at this intersection. The study was then submitted to Caltrans for review and concurrence. Consultant revised the study per Caltrans’ comments, and it was resubmitted for their review and approval. Caltrans requested us to study the feasibility of a roundabout in comparison to a traffic signal.

4. I-210 Soundwall Improvements Project, Phase V (CIP 31-2606): This phase includes one soundwall segment (S322) on the north side of I-210 between Angeles Crest Highway and

Page 54 of 411 ends

Commonwealth Avenue. On October 3, 2025, the City Council approved the selection of thirteen (13) On-Call Consultants, on an as-needed basis, to assist in the design and delivery of the CIP projects. Staff solicited a fee proposal from Ardurra Group, who is one of the approved consultants, for the preparation of Project Approval and Environmental Document (PA&ED), which include the preparation of a revised concept plan and the update of various technical studies required studies to support the preparation of an updated Project Report. On February 17, 2026, the City Council approved a fee proposal from Ardurra Group, in the amount of $309,053, for the preparation of the PA&ED, after which a Task Order was issued to Ardurra Group. Staff started coordination with Caltrans for the preparation of the required cooperative agreement. Caltrans submitted to the City the draft cooperative agreement for review. Staff completed their review and provided their comments back to Caltrans.

5. Mid-Block Pedestrian Crosswalk Traffic Signal (HAWK) on Foothill Boulevard at Indiana Ave (HSIP-Cycle 12; CIP 31-2608): The City was successful in securing $350,000 of HSIP funds under Cycle 12 of the grant program for the installation of a High-Intensity Activated CrossWalk (HAWK) Traffic Signal on Foothill Blvd at Indiana Ave. The project consists of the removal of the existing yellow flashing beacon poles, installation of new mast arm poles, vehicle heads, pedestrian heads, pedestrian push buttons, and other related electrical equipment. The proposed improvements will upgrade the existing flashing beacon to a traffic signal which will enhance safety for pedestrians and motorists. On October 3, 2025, the City Council approved the selection of thirteen (13) On-Call consultants, on an as-needed basis, to assist in the design and delivery of the CIP projects. Staff solicited a fee proposal from Willdan Engineering, one of the approved consultants, for the preparation of Plans, Specifications, and Estimates (PS&E) for the project. On December 2, 2025, the City Council approved Willdan Engineering’s Fee Proposal in the amount of $57,485, after which a Task Order was issued to Willdan Engineering. Staff reviewed and provided comments to the Consultant on the 90% plans for incorporation. Consultant completed the final PS&E, and the City Council will consider the approval of the PS&E and authorization to advertise the project for construction bids under a separate item on tonight’s agenda.

6. Inverness Drive Storm Drain and Resurfacing (CIP 31-2609): The project consists of the construction of a storm drain system, from 340 Inverness Dr to Inverness Dr/Corona Dr intersection, to mitigate the current erosion and mud flow from the hillside across the roadway and connect the new drain system to a near storm drain facility, and resurfacing this segment of the roadway. On October 3, 2025, the City Council approved the selection of thirteen (13) On-Call consultants, on an as-needed basis, to assist in the design and delivery of the CIP projects. Staff solicited a fee proposal from NV5, Inc., one of the approved consultants, for the preparation of Plans, Specifications, and Estimates (PS&E) for the project. On May 19, 2026, the City Council approved NV5’s Fee Proposal in the amount of $68,700, after which a Task Order was issued to NV5.

Consultant has submitted 60% PS&E to the City for review and comments.

7. 2027 Citywide Street Resurfacing Program (CIP 31-2701): As part of the City’s annual street maintenance program, the City Council approved the following 2.47 centerline miles of streets for resurfacing:

Street From PCI* To Length
(mile)
Starlight Crest Drive Burning Tree Dr 19 Gleneagle Place 0.64 Gleneagle Place Starlight Crest Dr 19 Cul-De-Sac 0.08
Patagonia Drive Castle Road 26 Cul-De-Sac 0.07
Ocean View Blvd Foothill Blvd 41 Cross Street 0.26
Earlmont Avenue Fairmount Ave 35 Alta Canyada Rd 0.57
Cross Street Ocean View Blvd 26 Castle Road 0.20

Page 55 of 411 ends

Georgian Road Commonwealth Ave 25 Woodleigh Lane 0.28
Conle Way Ocean View Blvd 28 Cul-De-Sac 0.11
Leir Drive Conle Way 65 Cul-De-Sac 0.07
Saranne Street Ocean View Blvd 65 Cul-De-Sac 0.03
Matley Road Cross Street 39 Cul-De-Sac 0.08
Castle Lane Foothill Blvd 41 Castle Road 0.08
TOTAL 2.47
*Based on the Updated 2026 Pavement Management System Report The proposed project will improve the pavement of the above road segments, which will enhance the rideability for the motorists and increase the corresponding service life by 20 years. Staff requested fee proposals from the approved list of On-Call Consultants for the preparation of Plans, Specifications, and Estimates (PS&E).

8. 2027 Citywide Miscellaneous Concrete Repairs (CIP 31-2702): As part of the City’s annual maintenance program, the City proposes to repair sidewalk, curbs, and gutters that are damaged by traffic or by tree roots or have simply deteriorated due to age or use and repair/install ADA curb ramps throughout the City to meet ADA requirements. Staff is preparing the Plans, Specifications, and Estimates (PS&E).

9. 2027 Miscellaneous Pavement Repairs (CIP 31-2704): As part of the City’s annual maintenance program, the City proposes to repair deteriorated pavement throughout the City due to depression, tree roots intrusion, surface water damage and age. Staff is preparing the Plans, Specifications, and Estimates (PS&E).

10. Memorial Park Playground Equipment Replacement (CIP 31-2707): The project consists of replacing the existing playground equipment at Memorial Park to meet the current standards. Staff is soliciting fee proposals from the approved list of On-Call Consultants for the preparation of Plans, Specifications, and Estimates (PS&E).

11. Green Alley II – Hill Street/Valley Sun Lane Alley (Project No. 18-2601):The pavement on the public alley Valley Sun Lane/Hill Street between Angeles Crest Highway and 100 feet north of Foothill Blvd is in poor condition and requires resurfacing. As an alternative to conventional asphalt pavement resurfacing, the site can be redesigned to capture rainwater and reuse it on site to allow rainwater to infiltrate back into the ground, which provides stormwater quality and MS4 Permit compliance benefits and thereby qualifies for Measure W funds. The scope of work includes: (i) installation of pervious pavement and/or paver stones over an infiltration gravel bed; and (ii) narrow planting beds for low-profile or climbing plants at the outer edges of the alley. On October 3, 2025, the City Council approved the selection of thirteen (13) On-Call consultants, on as-needed basis, to assist in the design and delivery of the CIP projects. Staff solicited a fee proposal from Aufbau, Inc., who is one of the approved consultants, for the preparation of a Feasibility Study. On February 17, 2026, the City Council approved a fee proposal, in the amount of $48,800, from Aufbau, Inc. for the preparation of the study, after which a Task Order was issued to Aufbau, Inc. The study concluded that the installation of pervious paver stones is feasible, and the Consultant submitted a Fee Proposal for the preparation of the Plans, Specifications and Estimates (PS&E). On September 1, 2026, the City Council approved a Fee Proposal from Aufbau, Inc. in the amount of $93,350 for the preparation of the PS&E, after which a Task Order was issued to Aufbau, Inc.

12. City Hall Window Replacement (Project No. 38-00-8233): The project consists of the replacement of all windows in the City Hall due to a leakage problem during rain events creating water damage to the walls and floors. On October 3, 2025, the City Council approved the selection

Page 56 of 411 ends

of thirteen (13) On-Call consultants, on an as-needed basis, to assist in the design and delivery of the CIP projects. Staff solicited a fee proposal from TAIT & Associates, Inc., one of the approved consultants, for the preparation of Plans, Specifications, and Estimates (PS&E) for the project. On February 17, 2026, the City Council approved a fee proposal, in the amount of $61,190, from TAIT & Associates, Inc. for the preparation of PS&E, after which a Task Order was issued to TAIT & Associates. Design is ongoing. On June 16, 2026, The City Council approved a change order to the Consultant for the preparation of additional structural analysis. Building and Safety approved the plans and Consultant is currently preparing has completed and submitted the final PS&E for review.

Options:

1. Receive and file this informational report; or

2. Provide further directions to staff.

Recommendation:

Option No. 1 - It is recommended that the City Council take the following action(s): Receive and file this informational report
Attachments:

None

Page 57 of 411 ends

City Council Agenda Report
Meeting Date: September 15, 2026
Subject: Adoption of Plans, Specifications and Estimates (PS&E), Filing of a Notice of Exemption and Authorization to Advertise for Construction Bids, with an Engineer’s Estimate Ranging Between $481,600 and $561,800, for the Traffic Signal (HAWK) Improvement Project (HSIPL5417(029); Contract 25/26-5) on Foothill Boulevard at Indiana Avenue Mid-Block Pedestrian Crossing
Presenter: Maged El-Rabaa, P.E., Director of Public Works Proposed Action: Motion to: (i) Find the Project Categorically Exempt in accordance with CEQA Guidelines and Direct the City Clerk to File a Notice of Exemption with the Los Angeles County Registrar Office; (ii) Adopt the attached Plans and Specifications for the Traffic Signal (HAWK) Improvement Project (HSIPL-5417(029); Contract 25/26-5) on Foothill Boulevard at Indiana Avenue Mid-Block Pedestrian Crossing; and (iii) Authorize the Director of Public Works to Advertise the Project for Construction Bids with an Engineer’s Estimate Ranging Between $481,600 and $561,800
Environmental Impact: This Project is Categorically Exempt pursuant to Section 15301, Class 1(c)–Existing Facilities, as the Project will involve the repair and minor alteration of existing facilities within the public right-of-way Fiscal Impact: Not known at this time; it will be determined at the time of the contract award by the City Council after the bids are received
Discussion/Analysis:

The Mid-Block Traffic Signal Improvement (HAWK) Project on Foothill Boulevard at Indiana Avenue is part of the adopted Fiscal Year 2026-27 Capital Improvements Program (CIP). The scope of work consists of removal and installation of new traffic signal equipment; relocation of the existing electrical pedestal and rewiring the intersection; removal and replacement of ADA curb ramps, sidewalk, and curb and gutter; construction of new bulb-outs; removal and replacement of asphalt concrete pavement; relocation of bus stop sign; and signage and striping modification.

Construction of the Project is tentatively scheduled to start in Spring 2027 and be completed in Fall 2027, pending the procurement and delivery of the traffic signal equipment which are considered long lead items and will take approximately 4-5 months.

The Engineer’s Estimate ranges between $481,600 and $561,800.

Page 58 of 411 ends

Options:

1. Motion to: (i) Find the Project Categorically Exempt in accordance with CEQA Guidelines and Direct the City Clerk to File a Notice of Exemption with the Los Angeles County Registrar Office; (ii) Adopt the attached Plans and Specifications for the Traffic Signal (HAWK) Improvement Project (HSIPL-5417(029); Contract 25/26-5) on Foothill Boulevard at Indiana Avenue Mid-Block Pedestrian Crossing; and (iii) Authorize the Director of Public Works to Advertise the Project for Construction Bids with an Engineer’s Estimate Ranging Between $481,600 and $561,800; or

2. Provide directions to staff.

Recommendation:

Option No. 1 - It is recommended that the City Council take the following action(s): (i) Find the Project Categorically Exempt in accordance with CEQA Guidelines and Direct the City Clerk to File a Notice of Exemption with the Los Angeles County Registrar Office; (ii) Adopt the attached Plans and Specifications for the Traffic Signal (HAWK) Improvement Project (HSIPL-5417(029); Contract 25/26-5) on Foothill Boulevard at Indiana Avenue Mid-Block Pedestrian Crossing; and (iii) Authorize the Director of Public Works to Advertise the Project for Construction Bids with an Engineer’s Estimate Ranging Between $481,600 and $561,800.

Attachments:

1. BidSpecs_Foothill-Indiana_HAWK-TS_09.01.26

2. BidPlans_Foothill-Indiana_HAWK-TS_09.01.26

Page 59 of 411 ends

September 24, 2026
CITY OF LA CAÑADA FLINTRIDGE

PEDESTRIAN CROSSWALK TRAFFIC

SIGNAL (HAWK) FOOTHILL

BOULEVARD AT INDIANA AVENUE
HSIPSL-5417(029)
CONTRACT 25/26-05

CONTRACT DOCUMENTS, SPECIFICATIONS, AND

STANDARD DRAWINGS

Page 60 of 411 ends

CONTRACT DOCUMENTS

SPECIFICATIONS AND STANDARD DRAWINGS
FOR

PEDESTRIAN CROSSWALK TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
Prepared by: ________________________ DATE: 9/01/2026
Miguel Angel Obregon Arreola, P.E.

Willdan Engineering
APPROVED: DATE: ______9/03/2026_______
Maged El-Rabaa, P.E.

Director of Public Works

Page 61 of 411 ends

TABLE OF CONTENTS
NOTICE INVITING BIDS………………………………………………………………………………………. A-1 – A-2 INSTRUCTIONS TO BIDDERS…………………………………………………………………………………B-1 – B-8 PROPOSAL………………………………………………………………………………………………………… C-1 – C-11 GENERAL SPECIFICATIONS ..................................................................................GS-1 – GS-5 SPECIAL PROVISIONS…………………………………………………………………………………… SP-1 – SP-65 PROJECT PROVISIONS……………………………………………………………………………………… PP-1 – PP-9 NPDES REQUIREMENTS FOR CONSTRUCTION PROJECTS.……………………….………. APPENDIX “A” CONSTRUCTION AND DEMOLITION REQUIREMENTS FOR CITY PROJECTS…………APPENDIX “B” LIST OF CITY APPROVED WASTE HAULERS……………………………………………………. APPENDIX “C” SELF-HAUL REQUIREMENTS………………………….……………………………………………... APPENDIX “D” TRAFFIC CONTROL REQUIREMENTS…………………………….………………………………… APPENDIX “E” STANDARD PLAN FOR NON-ILLUMINATED PED XING SIGN………………………….….. APPENDIX “F” APS PUSH BUTTON CUSTOM VOICE MESSAGE………………………………....……………. APPENDIX “G” SAMPLE CONTRACT AGREEMENT…………………………………………………....……………. APPENDIX “H”

Page 62 of 411 ends

A-1
Specs 25/26-05

NOTICE INVITING BIDS
ENGINEER’S ESTIMATE BASE BID $481,600 – $561,800
THE CITY OF LA CAÑADA FLINTRIDGE (CITY) IS SOLICITING BID PROPOSALS FROM QUALIFIED CONTRACTORS FOR THE FOLLOWING PROJECT:

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
SCOPE OF WORK. The work to be done consists of furnishing all labor, materials, equipment, tools, and incidentals as required by the Plans (Drawing Number 1182 Sheets 1 through 9), Specifications, and Contract Documents. The general items of work include, but not limited to, clearing and grubbing; removal and installation of new traffic signal equipment; relocation of the existing electrical pedestal and rewiring the intersection; removal and replacement of ADA curb ramps, sidewalk, and curb and gutter; construction of new bulb-outs; removal and replacement of asphalt concrete pavement; relocation of bus stop sign; and signage and striping modification. Clean up and leave in an operable and acceptable condition all the work and other items not mentioned that are required by the Plans and Specifications.

PLANS AND SPECIFICATIONS. The City participates with Planet Bids and bidders must be registered with Planet Bids to download the Plans, Specifications, and other contract documents.

BID PROPOSALS. Bid proposals must be uploaded electronically to Planet Bids no later than 10:00 a.m. on Wednesday, October 21, 2026.

QUERIES/ADDENDA. All queries related to the Project shall be submitted on Planet Bids no later than 2:00 p.m. on Wednesday, October 14, 2026. The last day to issue any addendum is Thursday, October 15, 2026. All Addenda and responses to queries, if any, will only be posted on Planet Bids. Any questions regarding the Project shall be directed to the Public Works Department at (818) 790-8882.

COMPLETION OF WORK. Upon execution of the Contract, a written “Notice to Proceed with Procurement” will be issued for the procurement of equipment. The procurement period shall be up to a maximum of 200 calendar days. Upon receiving confirmation of the scheduled delivery date of the equipment from the Contractor, a “Notice to Proceed with Construction” will be issued thirty (30) calendar days before the scheduled arrival of the equipment on site. The work shall commence within fifteen (15) calendar day after the date set forth in the “Notice to Proceed with Construction.” Total duration of the construction period is Forty (40) working days from the date of the written “Notice to Proceed with Construction”. The product submittals shall be submitted within ten (10) working days from the date of the “Notice to Proceed with Procurement”.

LICENSING REQUIREMENTS. All bidders shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor’s license, Class A at the time of bid submittal. The successful Contractor and his subcontractors will be required to possess business licenses from the City.

Page 63 of 411 ends

A-2
Specs 25/26-05
PRE-BID MEETING. There is no pre-bid meeting for this project.

LIQUIDATED DAMAGES. In the event the contractor did not complete the work within the above specified time, liquidated damages in the amount of One Thousand Five Hundred Dollars ($1,500) per calendar day, as specified in the Special Conditions, shall be paid by the contractor to the City for each working day in excess of the specified time.

GUARANTEE. Each bid shall be made on the proposal form furnished by the City and shall be in accordance with the Plans, Specifications, and Contract Documents and shall be accompanied by a certified check, cashier’s check, or bidder’s bond, payable to the City in a sum not less than ten percent (10%) of the amount of the bid, as a guarantee that the bidder will enter into the contract for the work, the full amount of such guarantee to be forfeited to the City should said bidder fail to enter into said Contract. The successful bidder will be required to furnish a Faithful Performance Bond in the amount of not less than one hundred percent (100%) of the contract price, and a Labor and Material Bond in an amount of not less than one hundred percent (100%) of the contract price, said bonds to be underwritten by sureties qualified to do business in the State of California, carrying a rating of A+ or better, in the current edition of Bests Insurance Guide.

PREVAILING WAGES. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of the California Labor Code Section 1773.2, the minimum prevailing rate of per diem wages for each craft, classification, or type of worker needed to execute the Contract shall be those determined by the Director of Industrial Relations of the State of California.

PAYMENT RETENTION. A 5 percent retention will be applied in this Contract. The Contractor may elect to receive 100 percent of the payments due under the contract without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 4590 of the Government Code. Said securities if deposited by the Contractor shall be valued by the City whose decision shall be final.

CITY’S RIGHTS RESERVED. The City reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the City. No bidder may withdraw his bid for a period of ninety (90) days after the bid opening.

CITY OF LA CAÑADA FLINTRIDGE
Dated: September 24, 2026 Tania Garcia
City Clerk
La Cañada Flintridge Outlook Valley Sun
Ad to run September 24 & October 1, 2026
PO

Page 64 of 411 ends

B-1
1 1
Specs 25/26-05

INSTRUCTIONS TO BIDDERS

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
BID PROPOSAL. The City participates with Planet Bids and bidders must upload their bid proposal to Planet Bids as instructed in the Notice Inviting Bids. It is the bidder’s sole responsibility to see that its proposal is uploaded in proper time. The bids will be posted on Planet Bids.

DISCREPANCIES IN PROPOSALS. The bidder shall furnish a price for all bid items in the bid proposal and shall be properly executed with all items filled in; numbers shall be stated both in figures and in writing. In the event words and figures do not agree, the words shall govern, and the figures shall be disregarded. Failure to do so will render the proposal informal and may cause its rejection. In the event the total indicated for the schedule does not agree with the sum of the prices bid on the individual items, the prices bid on the individual item shall govern and the total for the schedule will be corrected accordingly. If the unit price and the total amount named by a bidder for any item are not in agreement, the unit price alone shall be considered as representing the bidder’s intention and the totals shall be corrected to conform thereto.

Unauthorized conditions, limitations, or provisions attached to a proposal will render it informal and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Oral, telegraphic, or telephonic proposals or modifications will not be considered.

EXAMINATION OF PLANS, GENERAL SPECIFICATIONS, SPECIAL PROVISIONS, PROJECT

PROVISIONS, CALTRANS STANDARD PLANS LISTS AND SPECIAL PROVISIONS AND SITE OF WORK. The bidder shall carefully examine the site of the proposal and the plans and specifications for the work contemplated. It will be assumed that the bidder has investigated and is satisfied with the conditions to be encountered as to the character, quality, and quantities of work to be performed and materials to be furnished and as to the requirements of the specifications. It is mutually agreed that submission of a proposal shall be prima facie evidence that the bidder has made such examinations and is so satisfied. The plans for the work will show conditions as they are supposed or believed by the Engineer to exist but is not intended nor is to be inferred that the conditions as shown thereon constitute a representation by the City or its officers that such conditions are actually existent. Neither the City nor any of its officers shall be liable for any loss sustained by the Contractor as a result of any variance between conditions as shown on the plans and actual conditions revealed during the progress of the work or otherwise. The Contractor is to assume all risks as to natural conditions and contingencies attending the work.

CONTRACTOR’S PRE-START REPRESENTATIONS. The Contractor represents that he or she has familiarized himself or herself with the work, the locality and with all local conditions including federal, state and local laws, ordinances, rules and regulations that may in any manner affect performance of the work, and represents that he or she has correlated his or her efforts and observations with the requirements of the Contract Documents and assumes full responsibility for having familiarized himself or herself with the nature and extent of the Contract Documents.

Page 65 of 411 ends

B-2
2 2
Specs 25/26-05
The Contractor shall carefully study and compare the Contract Documents; check and verify pertinent figures shown thereon and verify all applicable field measurements prior to commencing work. He or she shall at once report in writing to the Engineer any conflict, error, or discrepancy that he or she may discover. The Contractor shall be responsible for exercising reasonable care and skill in reviewing the Contract Documents to determine whether there is any conflict, error, or discrepancy. No claim for additional compensation shall be made by the Contractor for extra work created by conflicts, errors, or discrepancies in the Contract Documents that the Contractor should have discovered prior to submitting his or her bid.

No information derived from inspection of records or investigations or compilations of same made by the City will, in any way, relieve the Contractor from his or her obligations under the Contract Documents nor entitle the Contractor to any additional compensation. The Contractor will not and agrees not to make any claims against the City based upon ignorance or misunderstanding of any condition of the work site or of the requirements set forth in the Contract Documents.

DISCOVERY OF UNFORESEEN SUBSURFACE CONDITIONS. The Contractor shall promptly, and before the following conditions are disturbed, notify the City in writing of any:
(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. In addition, reference is made to Section 14-11 of Caltrans Standard and Revised Standard Specifications.
(2) Subsurface or latent physical conditions at the site differing from those indicated. (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents.

The City shall promptly investigate the conditions, and if it finds that the conditions so materially differ, or do involve hazardous waste, and cause a decrease or increase in the contractor’s cost of, or the time required for, performance of any part of the work, the City shall issue a change order under the procedures set forth in the Contract Documents.

In the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the work, the Contractor shall not be released from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the Contract. The Contractor shall retain any and all rights provided either by contract or by law that pertain to the resolution of disputes and protests between the contracting parties.

For purposes of this provision, prompt notice shall mean notice three (3) calendars days from the discovery of the unforeseen subsurface conditions or prior to the discovered condition being disturbed, whichever is earlier.

BID PROPOSAL SUBSTITUTIONS. Any and all requests for substitutions of “an equal” item and all supporting materials shall be submitted to the Engineer at least seventy-two (72) hours prior to the bid opening. If no requests for substitutions are received, the Contractor waives any right

Page 66 of 411 ends

B-3
3 3
Specs 25/26-05
to request any substitution.

INTERPRETATION OF PLANS. If any person contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the Contract Documents, or finds discrepancies in, or omissions from, these Documents, he or she may submit to the Engineer a written request for an interpretation of correction thereof. Any interpretation or correction of the Contract Documents shall be made only by addendum and provided to each person receiving a set of such documents. The Engineer will only be responsible for explanations or interpretations of the Contract Documents as requested pursuant to and provided for by this paragraph. Any omissions from these Contract Documents not called to the attention of the Engineer shall not affect the validity of the bid process or the contract eventually awarded.

PROPOSAL GUARANTEE. Each proposal shall be accompanied by a certified or cashier's check or bid bond in the amount of not less than ten (10%) percent of the total amount named in the proposal. Said check or bond shall be made payable to the City of La Cañada Flintridge and shall be given as a guarantee that the bidder, if awarded the work, will enter into a contract within ten (10) calendar days after date of written notice of award and will furnish satisfactory Faithful Performance Bond and Labor and Material Bond, each of said bonds to be in the amount stated in the Notice Inviting Bids. In case of refusal or failure to enter into said contract, each check or bond, as the case may be, shall be forfeited to the City. If the bidder elects to furnish a bid bond as his proposal guarantee, he shall use the form furnished by the City, or one conforming substantially to it in form.

Bidder understands that a bid is required for the entire work that the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts and words shall govern over figures.

IMMIGRATION REFORM AND CONTROL ACT. The successful bidder will be required to comply with all requirements of the Immigration Reform and Control Act of 1986 (“Act”). The successful bidder agrees to defend, indemnify and hold the City harmless from penalties imposed as a result of non-compliance with the Act.

CLAYTON AND CARTWRIGHT ACTS. By submitting a bid, the bidder offers and agrees that if the bid is accepted, it will assign the City all rights, titles, and interest in and to all causes of action it may have under § 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2 commencing with § 16700) of Part 2 Division 7 of the Business and Profession Code, arising from purchases of goods, materials or services by the bidder for sale to the City pursuant to the bid.

Such assignment shall be made and become effective at the time the City tenders final payment to the bidder.

ADDENDA OR BULLETINS. Any addenda or bulletins issued during the time of bidding which form a part of the specifications and/or contract documents shall be covered in the bid and shall be made part of the contract.

Page 67 of 411 ends

B-4
4 4
Specs 25/26-05
COMPETENCY OF BIDDERS. In selecting the lowest responsible bidder, consideration will be given not only to the financial standing but also to the general competency of the bidder for the performance of the work covered by the proposal. To this end, each proposal shall be accompanied by a statement of the bidder's experience as to recent date on the form furnished by the City entitled "INFORMATION REQUIRED OF BIDDER."
All bidders shall be licensed in accordance with provisions of Chapter 9, Division 3 of the Business and Professions Code of the State of California and shall possess a State Contractor’s license, Class A at the time of bid submittal. The bidder must state, under penalty of perjury, the license number and expiration date. The successful Contractor and his subcontractors will be required to obtain a current business license from the City prior to start of the work.

DISQUALIFICATION OF BIDDERS. More than one proposal form from an individual, firm, partnership, corporation, or association under the same or different names will not be considered.

Reasonable grounds for believing that any bidder is interested in more than one proposal for the work contemplated will cause the rejection of all proposals in which such bidder is interested. If there is reason for believing that collusion exists among the bidders, all bids will be rejected and none of the participants in such collusion will be considered for future proposals.

No proposal for work will be accepted from a contractor who is not licensed in accordance with the provisions of the Business and Professions Code; and who do not possess a State Contractor’s license, Class A at the time of bid submittal.

AWARD OF CONTRACT TO THE LOWEST RESPONSIVE RESPONSIBLE BIDDER. The award of the Contract, if made by the City through action of the City Council, will be to the Lowest Responsive and Responsible Bidder whose proposal complies with all the requirements prescribed.

The City reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the City. Bids shall remain valid for a period of ninety (90) days or until the contract is awarded, whichever is earlier.

The basis for the award of contract shall be the Contractor’s Base Bid. If additive alternates are included in the Scope of Work, the City reserves the right to include the work described in any of the additive alternates as part of the contract based on the bids received and the City’s budget at the time of contract award.

BID PROTESTS. Bidders may file a protest to another’s bid by complying with the following:

1. The protest must be filed with the City Clerk within seven (7) calendar days after the bid opening.

2. The protest must clearly specify the irregularity in the bid that is being protested or the grounds for the protest.

3. The protest must identify the proposed City action or recommendation that is being protested.

4. The protest must specify in detail the grounds of the protest and all facts supporting the protest.

5. The protest must include all documents supporting the protest.

If the protest does not comply with each of these requirements, it will be invalid.

Page 68 of 411 ends

B-5
5 5
Specs 25/26-05
If the protest meets the aforesaid requirements, the Director of Public Works or his/her designee shall review the basis of the protest and all relevant information. The Director of Public Works will provide a written decision to the protestor. If the protester or any affected party disagrees with the decision, the decision may be appealed to the City Council. Such appeal shall be heard when the City Council considers the award of the contract.

The City may reject any bid which, in its opinion when compared to other bids received, or by the City’s internal estimates, does not accurately reflect the cost to perform the work. The City may reject as non-responsive any bid which unevenly weighs or allocates costs, including, but not limited to, overhead and profit to one or more particular bid items.

RESPONSIVE BIDDER. A responsive bidder shall mean a bidder who has submitted a bid, which conforms in all material respects with the Bid Documents.

RESPONSIBLE BIDDER. A responsible bidder shall mean a bidder who has the capability in all respects, to perform fully the requirements of the Contract Documents and the moral and business integrity and reliability, which will assure good faith performance. In determining responsibility, the following criteria will be considered: (i) the ability, capacity and skill of the bidder to perform the Work of the Contract Documents; (ii) whether the bidder can perform the Work of the Contract Documents promptly and within the time specified, without delay or interference; (iii) the character, integrity, reputation, judgment, experience and efficiency of the bidder; (iv) the quality of performance of the bidder on previous contracts, by way of example only, the following information will be considered; (a) the administrative, consultant or other cost overruns incurred by the City on pervious contracts with the bidder; (b) the bidder's compliance record with contract general conditions on other projects; (c) the submittal by the bidder of excessive and/or unsubstantiated extra cost proposals and claims on the other projects; (d) the bidder's record for completion of work within the contract time and the bidder's compliance with scheduling and coordination requirements on the other projects; (e) the bidder's demonstrated cooperation with the City and other contractors on previous contracts; (f) whether the work performed and materials furnished on previous contracts were in accordance with the Contract Documents; (v) the previous and existing compliance by the bidder with laws and ordinances relating to contracts; (vi) the sufficiency of the financial resources and ability of the bidder to perform the work of the Contract Documents; (vii) the quality, availability and adaptability of the goods or services to the particular use required; (viii) ability of the bidder to provide future maintenance and service for the warranty period of the Contract; (ix) whether the bidder is in arrears to an City on debt or contract or is a defaulter on any surety bond; (x) such other information as may be secured by the City having a bearing on the decision to award the Contract, to include without limitation the ability, experience and commitment of the bidder to properly and reasonably plan, schedule, coordinate and execute the Work of the Contract Documents and whether the bidder has ever been debarred from bidding or found ineligible for bidding on any other projects. The purpose of the above is to enable the City in its opinion, to select the bid, which is in the best interests of the City; the ability of the low bidder to provide the required bonds will not of itself demonstrate responsibility of the bidder.

RETURN OF PROPOSAL GUARANTEE. Within ten (10) days after award of the contract, the City will return all proposal guarantees to their respective bidder except those accompanying proposals submitted by the three lowest responsible bidders. Those three will be held until the contract

Page 69 of 411 ends

B-6
6 6
Specs 25/26-05
has been finally executed after which they will be returned to the respective bidders whose proposal they accompany.

EXECUTION OF CONTRACT. The bidder to whom award is made shall execute a written contract with the City on the form of agreement provided, and shall secure all insurance, securities, and bonds required by the Specifications within ten (10) calendar days after date of written Notice of Award. Failure or refusal to enter into a Contract Agreement as herein provided or to conform to any of the stipulated requirements in connection therewith shall be just cause for annulment of the award and the forfeiture of the proposal guarantee. If the successful bidder refuses or fails to execute Contract Agreement, the City may award the contract to the second lowest responsible bidder. If the second lowest responsible bidder refuses or fails to execute the contract, the City may award the contract to the third lowest responsible bidder. On the failure or refusal to such second or third lowest bidders to execute Contract Agreement, such bidders' guarantee likewise shall be forfeited to the City. The work may then be re-advertised.

NON-DISCRIMINATION IN EMPLOYMENT. Contracts for work under this proposal will obligate the contractors and subcontractors not to discriminate against any person on account of race, color, religion, physical handicap, medical condition, marital status, age (over 40), sex, or national origin.

WAGE DETERMINATIONS. As required by the California Labor Code, the contractor shall, as a penalty, forfeit to the City twenty-five dollars ($25.00) for each calendar day, or portion thereof, for each workman paid less than the stipulated prevailing rates for such work or craft in which such workman is employed for work done under this contract by him or by any subcontractor under him. In addition, the difference between such stipulated prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than the stipulated prevailing wage rate, shall be paid to each workman by the Contractor.

WORKING HOURS. As required by the California Labor Code, the contractor shall, as a penalty, forfeit to the City twenty-five ($25.00) for each workman employed in the execution of the contract by the contractor or by any subcontractor under him for each calendar day during which such workman is required or permitted to work more than eight (8) hours in any one (1) calendar day and forty (40) hours in any one (1) calendar week, unless such worker received compensation for all hours worked in excess of eight (8) hours per day at not less than 1.5 times the basic rate of pay.

PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE. The Contractor shall assume all responsibility for damages to property or injuries to persons, including accidental death, which may be caused by the Contractor's performance of the contract, whether such performance be by himself, his subcontractor, or anyone directly or indirectly employed by him and whether such damage shall accrue or be discovered before or after termination of contract. The Contractor shall obtain and maintain during the life of the contract a Primary Comprehensive Liability policy, including Contractual Liability, which shall protect him and the City from claims for such damages.

Said policy shall name the City of La Cañada Flintridge, its agents, officers, and employees as additional insured under the policy. (Refer to Section 5-4 of the Special Provisions.

Page 70 of 411 ends

B-7
7 7
Specs 25/26-05
In addition, such policy shall contain a Severability of Interest clause and provide that the coverage shall be primary for losses arising out of the contractor's performance of the contract.

Neither the City nor any of its insurers shall be required to contribute to any such loss.

The Contractor shall furnish a certificate of insurance countersigned by an authorized agent of the Insurance Carrier on a form of the Insurance Carrier setting forth the general provisions of the insurance coverage. This countersigned certificate shall verify that the City of La Cañada Flintridge, its agents, officers, and employees are named as additional insured under the policy.

The certificate by the Insurance Carrier shall contain a statement of obligation on the part of the Carrier to notify the City of any material change, cancellation or termination of the coverage at least thirty (30) days in advance of the effective date of any such material change, cancellation or termination. The required certificate shall be furnished by the contractor prior to execution of the contract by the City.

WORKERS' COMPENSATION INSURANCE. Prior to execution of Contract Agreement by the City, the Contractor shall furnish a Certificate of Workers' Compensation Insurance.

NONDISCRIMINATION CLAUSE (STD 17A) - NONDISCRIMINATION CLAUSE (OCP -1)

1. During the performance of this contract, Contractor and its subcontractors shall not unlawfully discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, physical handicap, medical condition, marital status, age (over 40) or sex. Contractors and subcontractors shall insure that evaluation and treatment of their employees and applicants for employment are free of such discrimination. Contractors and subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code, Section 12900 et seg.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code, Section 12990, set forth in Chapter 5 of Division 4 of Title 2 of the California Administration Code are incorporated into this contract by reference and made a part hereof as if set forth in full. Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

2. This Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract.

AB44, EFFECTIVE JULY 1, 2014. If a bidder submits a bid that includes a subcontractor who would be performing work in amount in excess of ½ of 1% of the bidder's total bid or in the case of bids for the construction of streets or highways, including bridges, in excess of ½ of 1% of the bidder's total bid or $10,000, whichever is less, then in addition to the subcontractor's name and business address, the subcontractor's State contractor's license number must be included as part of the information submitted for that proposed subcontractor. Failure to provide the subcontractor's license number shall render the bid non-responsive.

SB854, EFFECTIVE MARCH 1, 2015, Contractors and Subcontractors wishing to work on a public works project must be registered with the State of California, Department of Industrial Relations. All public works projects with bids submitted after March 1, 2015, or awarded on or after April 1, 2015, shall use only registered contractors and subcontractors. No bid will be accepted nor any contract entered into without proof of the Bidder’s and its subcontractors’

Page 71 of 411 ends

B-8
8 8
Specs 25/26-05
current registration with the Department of Industrial Relations. Bidder shall certify that Bidder and all listed subcontractors are currently registered with the Department of Industrial Relations to perform public work. Bidder shall provide its registration number in the Information Required of Bidder and the registration number for each listed subcontractor in the Designation of Subcontractors Form. Failure to submit this information may render the Bid non-responsive.

In accordance with Labor Code section 1773.3, the City may be required to provide notice of the award to the Department of Industrial Relations on the Form PWC-100. The Bidder who is awarded the Contract shall submit to the City a completed Form PWC-100 including identification of the worker classifications for the Bidder and all listed subcontractors, within three (3) days of notice of the award. Failure to provide a completed Form PWC-100 prior to execution of the Contract may result in forfeiture of the Bidder’s Bid deposit or bond to the City, and the City may award the Contract to the next lowest responsive and responsible Bidder or may call for new Bids.

The Form PWC-100 may be obtained from the Department of Industrial Relations or upon request to the City. The Bidder’s failure to make a request to the City, or City’s failure to respond to a request shall not relieve the Bidder of any obligations under this section.

LABOR CODE CONCERNING APPRENTICES. Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code, concerning the employment of apprentices by the Contractor or any subcontractor under him. The Contractor and any subcontractor under him shall comply with the requirements of said sections in the employment of apprentices. It shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements.

Page 72 of 411 ends

Specs 25/26-05 C-1

PROPOSAL

TO THE CITY COUNCIL
CITY OF LA CAÑADA FLINTRIDGE
LA CAÑADA FLINTRIDGE, CALIFORNIA
The undersigned bidder hereby proposes to furnish all labor, material, equipment, tools, and services necessary to perform all work required under the City of La Cañada Flintridge Specifications entitled:

CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
In accordance with the intent of said Specifications, Plans, and all addenda issued by said City prior to opening of the proposals. Said bidder agrees that, within ten (10) calendar days after date of written Notice of Award of the Contract by said City, he will execute a contract in the required form of which the Notice Inviting Bids, Instructions to Bidders, Proposal, Specifications, Plans, and all addenda issued by said City prior to the opening of proposals, are a part, and will secure the required insurance and bonds; and that upon failure to do so within said time, then the Proposal Guarantee furnished by said bidder shall be forfeited to said City as liquidated damages for such failure; provided, that if said bidder shall execute the Contract and secure the required insurance and bonds within said time, his check, if furnished shall be returned to him within five (5) days thereafter, and the Bid Bond, if furnished, shall become void.

Said bidder further agrees to complete all work required under the Contract within the time stipulated in said Specifications, and to accept in full payment therefor the prices named in the Bid Schedule. Said bidder further certifies that is registered with the Department of Industrial Relations to bid on and perform public work.

Dated: Bidder
Signature
Name (Print/Type)
Title

Page 73 of 411 ends

Specs 25/26-05 C-2

BID SCHEDULE

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
BID

ITEM DESCRIPTION QTY UNIT UNIT PRICE
EXTEND
AMOUNT

BID SCHEDULE A (HSIP FUNDED)

1. Traffic Control 1 LS $ $

2. Remove Existing and Construct Curb &
Gutter Type A2-8 Per SPPWC Std Plan
120-3.
267 LF $ $

3. Remove Existing And Construct Curb &
Gutter (MOD) Transition Type A2, Per
SPPWC Std Plan 120-3. Curb Face
Height Var 8” to 10”.
15 LF $ $

4. Remove Existing and Construct PCC
Curb Ramp Per SPPWC Std Plan 111-5
With Detectable Warning Surface, Case
Per Plan.(Mod With Ret Curb)
4 EA $ $

5. Furnish and Install Signing and Striping
complete per plan. 1 LS $ $

6. Furnish and Install New Type 332L
Cabinet and ATC EX2070 Controller.
1 EA $ $

7. Modify Existing Type III-BF Service
Cabinet.
1 EA $ $

8. Remove and Dispose of Existing
Flashing Beacon Pole.
2 EA $ $

9. Furnish and Install Polara INS 2-Wire
Touchless APS Push Button System. 2 EA $ $

10. Furnish and Install Type 15TS Pole
Complete.
2 EA $ $

11. Furnish and Install Type 19 Pole
Complete.
2 EA $ $

12. Furnish and Install LED Luminaire. 4 EA $ $

13. Furnish and Install 3-12" LED HAWK
Cluster Vehicle Head.
6 EA $ $

14. Furnish and Install LED Countdown
Pedestrian Head.
2 EA $ $

Page 74 of 411 ends

Specs 25/26-05 C-3

15. Furnish and Install #5 Pull Box. 4 EA $ $

16. Furnish and Install #6 Pull Box. 1 EA $ $

17. Furnish and Install 2" SCH 80 PVC
Conduit.
60 LF $ $

18. Furnish and Install 3" SCH 80 PVC
Conduit.
325 LF $ $

19. Furnish and Install Traffic Signal
Wiring Complete.
1 LS $ $

20. Furnish and Install Video Detection
System Complete.
1 LS $ $

21. Furnish and Install Internally
Illuminated Street Name Sign.
2 EA $ $

22. Furnish and Install Reflective Street
Name Sign.
2 EA $ $

23. Remove And Construct 4" Thick PCC
Sidewalk Per SPPWC Std Plan 113-2.
1,431 SF $ $

24. Remove And Construct Full Depth AC
To Match Exist Pavement, 8-Inch
Thick Min.
3,775 SF $ $

25. Construct Slurry Seal, Type II Crack
Seal All Cracks Greater Than1/4 Inch
Prior To Placement Of Coat Seal.
970 SY $ $

26. Remove Existing and Construct Partial
Longitudinal Gutter Per SPPWC STD
Plan 122-3, W=3.
20 LF $ $

27. Adjust Water Valve Frame and Cover
To Grade.
6 EA $ $

28. Double Adjust Storm Drain Manhole
Frame and Cover to Grade.
1 EA $ $

29. Double Adjust Sanitary Sewer
Manhole Frame and Cover to Grade.
1 EA $ $

30. Unclassified Excavation for bulb-out
planting areas.
34 CY $ $

31. Furnish and Install class "A" topsoil in
planting area as indicated on the plan.
50 CY $ $

32. Furnish and Install 1-gal. shrub
complete per plan including soil
preparation and fertilizers.
31 EA $ $

Page 75 of 411 ends

Specs 25/26-05 C-4

33. Furnish and Install 1" Sch 40 PVC
mainline including connection to existing
irrigation mainline.
80 LF $ $

34. Furnish and Install 3/4" Sch 40 PVC
control wire conduit.
65 LF $ $

35. Furnish and Install 2" Sch 40 PVC
sleeve.
35 LF $ $

36. Furnish and Install 1-1/2" Sch 40 PVC
sleeve by trenching in roadway and
sidewalk.
195 LF $ $

37. Furnish and Install 1" drip zone
remove control valve assembly
complete per plan including valve box
and control wires to existing
controller.
1 EA $ $

38. Furnish and Install subterranean drip
irrigation system complete per plan
including flush valve, operation
indicator and serving lateral lines.
992 SF $ $

39. Furnish and Install bronze gate valve
(shut-off) in valve box, size per plan. 1 EA $ $

40. Furnish and Install 3" layer of
shredded redwood mulch as topdress.
10 CY $ $

41. Perform 90-calendar day landscape
maintenance period.
1 LS $ $
Subtotal $
TOTAL BID SCHEDULE IN FIGURE $

TOTAL BID SCHEDULE IN WORDS
_______________________________________________________________ ____________________________________________________________________ LEGEND: EA=Each, HR=Hour, LF=Lineal Foot, LS=Lump Sum, SF=Square Foot, SY=Square Yard, TON=Ton. Yard, TON=Tonnage.

NOTE: Items not specifically mentioned above which are necessary for the performance and completion of work shall be considered as included in the various related bid items and no additional compensation will be made therefor.

When no bid item is provided for work/improvement shown or indicated on the plans and specifications, payment for such work/improvement will be considered to be included in various applicable items of work.

Page 76 of 411 ends

Specs 25/26-05 C-5
Each bidder must bid on each item shown on the Bidder’s Proposal. If any bidder shall make any alteration, interlineations, or deviation in any of the printed matter of the proposal or if the signature of the bidder is incomplete, the bid will be considered informal and it may be rejected.

The unit price bid shall include all sales, use, or other taxes as applicable.

Bids shall include all taxes, permits, licenses, fees, shipping, material, and installation costs.

All costs for mobilization, demobilization, and final cleanup shall be included in the Contract unit prices.

There shall be no further additional compensation and/or adjustments to the Contract unit prices for mobilization, demobilization, and final cleanup based on any changes to the scope of work during construction.

All blank spaces appearing above must be filled in. Failure to fill in any blank spaces may render the bid non-responsive. In case of discrepancy between unit prices and item totals, the unit prices shall prevail. In case of a discrepancy between item totals and the grand total, the item totals shall prevail.

The grand total will be subject to adjustment by the City in the event of a discrepancy. The contract award shall be made on the basis of the grand total as described above from among responsive and responsible bidders.
*The basis for award of contract shall be made based on the Bid Schedule (Bid Items 1-41) Total as described above from among responsive and responsible bidders.

Page 77 of 411 ends

Specs 25/26-05 C-6

DESIGNATION OF SUBCONTRACTORS

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts shall be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts.

The subcontractor listed below will perform work of labor or render service to the contractor on this project, or are subcontractors licensed by the State of California who will, under subcontract to the contractor, specially fabricate and install a portion of the work or improvement according to details contained in the Drawings and Specifications in an amount in excess of one-half of one percent (½ of 1%) of the contractor’s total base bid or ten thousand dollars ($10,000), whichever is greater.

If a contractor, whose bid is accepted, wants to substitute any subcontractor in place of a subcontractor listed in its original bid, any changes shall be subject to City and must comply with Public Contract Code Sections 4107 and 4107.5.

SUBCONTRACTOR LISTING

NAME AND ADDRESS

TELEPHONE AND

E-MAIL ADDRESS

LICENSE
NUMBER
DIR

REGISTRATION
NUMBER

WORK TO BE

PERFORMED
COST
OF
WORK
1 2
3 4
5 6
7 8
If the Bidder fails to specify a subcontractor for any portion of the work, the Bidder agrees to perform the work with his own crews. (Alternative subcontractors for the same work are prohibited by provisions of the California Government Code). Prior to Award of Contract, Contractor shall submit a list of suppliers and vendors, in writing, to the City Engineer.

Page 78 of 411 ends

Specs 25/26-05 C-7

INFORMATION REQUIRED OF BIDDER

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
The Bidder is required to supply the following information. Additional sheets may be attached, if necessary. If requested by the City, the Bidder shall furnish a notarized financial statement, references, or other information sufficiently comprehensive to permit an appraisal of his current financial condition.

1. Address: _______________________________________________________________________

2. Telephone: Fax: E-mail:__________________

3. Type of Firm: Individual ( ) Partnership ( ) Corporation ( )

4. Corporation organized under the laws of the State of ___________________________________

5. Contractor’s License: State License No. __________________________

6. Names and Titles of all officers of the firm:

7. Number of years of experience in projects of this type __________________________________

8. Three projects of this type recently completed:

Contract Type of Date Name and Address
Amount Project Completed of Agency

9. Person who inspected site of the proposed work for your firm:

Date Inspected

10. Subcontractors who will perform work in excess of one-half percent of the total bid price:

Name Address Work Subcontracted

Page 79 of 411 ends

Specs 25/26-05 C-8
IF the bidder fails to specify a subcontractor for any portion of the work, the Bidder agrees to perform the work with his own crews. (Alternative subcontractors for the same work are prohibited by provisions of the California Government Code).

Page 80 of 411 ends

Specs 25/26-05 C-9

BID BOND

KNOW ALL MEN BY THESE PRESENTS,
That ______________________________________________________________________as Principal, and ________________________________________________________________________________as Surety, are held and firmly bound unto the City in the sum of: __________________________________ ________________________________________________________________($ ____________________), (not less than 10 percent of the total amount of the bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a bid to said City to perform all work required under the City’s Specifications entitled:

CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
NOW THEREFORE, if said Principal is awarded a contract by said City, and, within the time and in the manner required under the heading “Instructions to Bidders” bound with said Specifications, enters into a written contract on the form of Agreement bound with said Specifications and furnished the required insurance and required bonds, one to guarantee faithful performance and the other to guarantee payment of labor and materials, then this obligation shall be null and void, otherwise it shall remain in full force and effect.

In the event suit is brought upon this bond by said City and judgment is recovered, said Surety shall pay all costs incurred by said City in such suit, including a reasonable attorney’s fee to be fixed by the court.

Principal Surety
By _____________________________By_______________________________________ Its ____________________________Its_______________________________________ By ___________________________By_______________________________________ Its ______________________________Its______________________________________ Surety signatures on this bond must be acknowledged before notary publics, and a legally sufficient power of attorney must be attached to the bond to verify the authority of any party signing on behalf of a surety.

All notices or demands to the surety shall be delivered via first class or certified mail to the following:

Page 81 of 411 ends

Specs 25/26-05 C-10

STATEMENT OF COMPLIANCE

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
_____________________________________________________________(hereinafter referred (Company Name)
to as “prospective contractor”) hereby certifies, unless specifically exempted, compliance with Government Code Section 12990 and California Administrative Code, Title II, Division 4, Chapter 5, in matters relating to the development, implementation and maintenance of a nondiscrimination program. Prospective Contractor agrees not to unlawfully discriminate against any employee or applicants for employment because of race, religion, color, national origin, ancestry, physical handicap, medical condition, marital status, sex or age (over forty).

I,_____________________________________________________hereby swear that I am duly (Name of Official)
authorized to legally bind the prospective contractor to the above described certification.

I am fully aware that this certification executed on ____________________________________ (Date)
in the County of______________________________is made under the penalty of perjury under (County)
the laws of the State of California.
(Signature)
(Title)

Page 82 of 411 ends

Specs 25/26-05 C-11

NON-COLLUSION AFFIDAVIT

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)

STATE OF CALIFORNIA )
COUNTY OF ) ss
__________________________________________________________, being first duly sworn, deposes and says that he is _____________________________________________________________________ (Sole owner, partner, president, secretary, etc.)
of __________________________________________________________________________________, the party making the foregoing bid; that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization or corporation; that such bid is genuine and not collusive or sham; that such bidder has not directly or indirectly colluded, conspired, connived or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that said bidder has not in any manner, directly or indirectly, sought by agreement, communication or conference with anyone to fix the bid price of said bidder or of any other bidder, or to fix any overhead, profit or cost element of such bid price, or of that of any other bidder, or to secure an advantage against the public body awarding the contract or anyone interested in the proposed contract; that all statements contained in such bid price or of that of any other bidder, or to secure an advantage against the public body awarding the contract or anyone interested in the proposed contract; that all statements contained in such bid are true; and, further, that said bidder has not, directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid and will not pay any fee in connection therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any other individual except to such person or persons as have a partnership or other financial interest with said bidder in his general business.

Date Bidder
Authorized Signature
STATE OF CALIFORNIA ) Name (Print/Type)
) SS
COUNTY OF ) _______ __________________________
Title
On , 2026 before me, __________________________
Personally appeared ____________________________________________ Who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledge to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument, the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph I true and correct.
(Notary Seal)
Signature of Notary Public

Page 83 of 411 ends

GS-1
1 Spc25/26-05

GENERAL SPECIFICATIONS

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)

SCOPE OF WORK
The work to be done consists of furnishing all labor, materials, equipment, tools, and incidentals as required by the Plans (Drawing Number 1182 Sheets 1 through 9), Specifications, and Contract Documents. The general items of work include, but not limited to, clearing and grubbing; removal and installation of new traffic signal equipment; relocation of the existing electrical pedestal and rewiring the intersection; removal and replacement of ADA curb ramps, sidewalk, and curb and gutter; construction of new bulb-outs; removal and replacement of asphalt concrete pavement; relocation of bus stop sign; and signage and striping modification. Clean up and leave in an operable and acceptable condition all the work and other items not mentioned that are required by the Plans and Specifications.

LOCATION OF WORK
The locations and limits of the work are shown on the plans.

TIME OF COMPLETION
Upon execution of the Contract, a written “Notice to Proceed with Procurement” will be issued for the procurement of equipment. The procurement period shall be up to a maximum of 180 calendar days. Upon receiving confirmation of the scheduled delivery date of the equipment from the Contractor, a “Notice to Proceed with Construction” will be issued thirty (30) calendar days before the scheduled arrival of the equipment on site. The work shall commence within fifteen (15) calendar day after the date set forth in the “Notice to Proceed with Construction.” Total duration of the construction period is Forty (40) working days from the date of the written “Notice to Proceed with Construction”. The product submittals shall be submitted within ten (10) working days from the date of the “Notice to Proceed with Procurement”.

The Contractor shall comply with the prosecution of work as specified in Section 6 of Part 1 - General Provisions; otherwise, liquidated damages will be applicable for each individual item of work.

HOURS OF WORK
The Contractor shall observe the hours of work as specified in Section 6-3 of Part 1 - General Provisions.

TRAFFIC REQUIREMENTS
The Contractor’s attention is directed to Part 6 - Special Provisions and Appendix “E” for the traffic control requirements.

Page 84 of 411 ends

GS-2
2 Spc25/26-05

PERMITS
The Contractor shall be solely responsible for obtaining and paying for any permits that may be required by outside agencies.The Contractor is also responsible to obtain an Encroachment Permit from the City for any work within City Street Rights-of-Way or use of City Street Rights-of-Way of any kind, including construction staging or storage areas, regardless of whether they are shown on the plans or not. The City will issue the permit at no fee to the Contractor.

CONSTRUCTION AND DEMOLITION RECYCLING REQUIREMENTS FOR CITY PROJECTS The Contractor’s attention is directed to Appendices “B”, “C”, and “D” for compliance. A minimum of sixty-five percent (65%) of the project’s waste including soil/dirt is required to be recycled or reused. Prior to the start of work, the Contractor shall submit a performance security, calculated as the lesser of three percent (3%) of the project bid or $10,000 in a form acceptable to the City.

Such performance security shall be forfeited to the City if the recycling requirements are not satisfied. Prior to the start of work, the Contractor shall obtain written authorization from the Engineer for the following: (i) proposed haul route (see Appendix “D”) and (ii) any proposed selfhauling of materials. Any monitoring of the self-hauling deemed necessary by the Engineer shall be at the sole expense (deposit may be required) of the Contractor.

Demolition/Construction Waste Management Reports. The Contractor shall fill out and submit a demolition/construction Solid Waste Management and Recycling Plan (SWMRP-01) to the Engineer prior to removing any waste and other materials from job sites. If any material will be reused on site, the Contractor shall indicate the material and estimated quantity (in yards and/or tons).

Upon completion of the job, the Contractor shall provide the Engineer all disposal/recycle tickets for all material transported and submit the final Construction and Demolition Debris Management Report for approval. The 5% retention will not be released until the Debris Management Report is approved by the City.

The Contractor shall reproduce the forms, as needed.

STANDARD PLANS AND SPECIFICATIONS
Except as noted herein, on the Plans and/or within Permit requirements, all Work shall be performed in accordance the Standard Specifications of the City contained in the 2021 Edition of the Standard Specifications for Public Works Construction “Greenbook”, including any supplements, as written and promulgated by Public Works Standards, Inc. and General Specifications herein. Copies of these Standard Specifications are available from the publisher, BNI Building News, 990 Park Center Drive, Suite E, Vista, California 92081; telephone:
760-734- 1113. www.bnibooks.com

PRECEDENCE OF CONTRACT DOCUMENTS
If there is a conflict between Contract Documents, the highest in precedence shall control. The order of precedence shall be as follows:

1. Permits from other agencies as may be required by law.

Page 85 of 411 ends

GS-3
3 Spc25/26-05

2. Notice Inviting Bids, Instructions to Bidders, and General Specifications.

3. City Special and Project Provisions

4. Agreement between City and Contractor.

5. Contract Plans.

6. Standard Plans.

7. Contract Specifications.

8. GREENBOOK Standard Specifications.

9. Contractor’s Proposal.

Change orders and approved revisions to Plans and Specifications will take precedence over Items 5 through 9 above.

RECORD DRAWINGS.

The Contractor shall maintain at the job site a set of Contract Documents, Plans and Specifications available at all times for inspection by the City, exclusively, and so marked for recording all changes in the work. The Contractor shall be responsible for seeing that any and all changes are recorded on this set each day. The Contractor shall submit the marked drawings to the Engineer for review by the 25th day of each month. Failure to update the marked drawings may result in the withholding of ten percent (10%) of the progress payment.

EMERGENCY INFORMATION
The names, addresses, and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Engineer and the County Sheriff’s Department prior to beginning work.

NOTIFICATION
The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:

AGENCY CONTACT PERSON TELEPHONE
CITY OF LA CAÑADA FLINTRIDGE PUBLIC WORKS

DEPARTMENT
Maged El-Rabaa 818-790-8882
DESCANSO GARDENS Juliann Rooke 818-949-7983

LOS ANGELES COUNTY DEPARTMENT OF PARKS

AND RECREATION
John Gargan 661-294-3518

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
(LACDPW) TRAFFIC STREET LIGHTS
Vilong Truong 626-300-4856

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
(LACDPW) TRAFFIC SIGNALS
Pedro Cruz 626-674-7164
UNITED STATES POST OFFICE Rosslyn Strawther 818-790-4178 LOS ANGELES COUNTY SANITATION DISTRICT (LACSD) Matt Eaton 562-908-4288 Ext#2429
CRESCENTA VALLEY WATER DISTRICT (CVWD) Nem Ochoa 818-248-3925 FOOTHILL MUNICIPAL WATER DISTRICT (FMWD) Nina Jazmadarian 818-790-4036 LA CAÑADA IRRIGATION DISTRICT (LCID) Justin Bailey 818-790-6749 LIBERTY UTILITIES WATER Gabriel Gomez 562-805-2094
VALLEY WATER COMPANY (VWC) Bob Fan 818-790-5516
SOUTHERN CALIFORNIA EDISON COMPANY (SCE) Marissa Castro 626-3038422 THE GAS COMPANY Jessica Alvarenga 818-551-7144
AT&T Armando Osorio 562-229-6318
CHARTER CABLE TELEVISION Jason Hartung 818-463-1975

Page 86 of 411 ends

GS-4
4 Spc25/26-05
ALLIED WASTE SERVICES 888-742-5234
ATHENS SERVICES 888-336-6100
NASA 888-888-0388

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

SEWER MAINTENANCE DIVISION
Sandra Medina 626-300-3363
LOS ANGELES COUNTY FIRE DEPARTMENT (STATION 19) 818-249-1562 LOS ANGELES COUNTY FIRE DEPARTMENT (STATION 82) 818-790-4686 LOS ANGELES COUNTY SHERIFF’S DEPARTMENT 818-248-3464
LA CAÑADA UNIFIED SCHOOL DISTRICT (LCUSD) Monica Perela or Randy Smith
818-952-8320
818-952-8321
CAL-OSHA, MINING AND TUNNELING UNIT Matthew Switzer 818-901-5420 UNDERGROUND SERVICE ALERT 800-227-2600
All work shall be coordinated and scheduled in cooperation with the Los Angeles County Fire Department Station No. 82 at 352 Foothill Boulevard, La Cañada Flintridge, CA 91011.

ANTITRUST CLAIMS
The Contractor’s attention is directed to the following provisions of California Government Code, Sections 4552, 4553 and 4554, which shall be applicable to the Contractor and his or her Subcontractors:

In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or Subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials by the Contractor or Subcontractor pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgement by the parties.

If the City receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under this chapter, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the City any portion of the recovery, including treble damages, attributable to overcharges that were paid by the assigner but were not paid by the City as part of the bid price, less the expenses incurred in obtaining that portion of the recovery.

Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under this part if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action.

PREVAILING WAGES
Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of the California Labor Code Section 1773.2, the minimum prevailing rate of per diem wages for each craft, classification, or type of worker needed to execute the Contract shall be those determined by the Director of Industrial Relations of the State of

Page 87 of 411 ends

GS-5
5 Spc25/26-05
California, which are on file in the Public Works Department at City Hall and are available to any interested party on request. The Contractor shall have affirmative obligations to verify that all subcontractors are currently and validly registered with the Department of Industrial Relations and shall not permit a subcontractor of any tier to perform work on the project without first verifying the subcontractor’s registration. The Contractor shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain valid registration for the duration of the Project.

In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations on a weekly basis and in the format prescribed by the Department of Industrial Relations, which may include electronic submission. Contractor shall comply with all requirements and regulations from the Department of Industrial Relations relating to labor compliance monitoring and enforcement.

It shall be mandatory upon the contractor and any of subcontractor under him to pay not less than the higher of the Federal and the State prevailing wage rates to all workers employed by them in the execution of the work. The applicable Federal prevailing wage rates are those that are in effect ten
(10) calendar days prior to bid opening date, as set forth on the U.S. Department of labor website:
http://www.wdol.gov/wdol/scafiles/davisbacon/ca31.dvb. Lower State wage rates for work classifications not specifically listed in the Federal wage decision are not acceptable.

PAYMENT RETENTION. A payment retention of 5% will be applicable in this contract. The Contractor may elect to receive 100 percent of the payments due under the contract without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 4590 of the Government Code. Said securities if deposited by the Contractor shall be valued by the City whose decision shall be final.

Page 88 of 411 ends

Spc25/26-05 SP-1

SPECIAL PROVISIONS

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
These Special Provisions are supplementary and in addition to the 2018 GREENBOOK Standard Specifications. Only those sections requiring elaborations, amendments, specifying of options, or additions are called out.

PART 1 - GENERAL PROVISIONS
SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS 1-2 DEFINITIONS
AGENCY: City of La Cañada Flintridge (City)
Board: City Council of the City of La Cañada Flintridge Caltrans: State of California, Department of
Transportation County: Los Angeles
Engineer: The City Engineer of the City of La Cañada Flintridge or his Authorized Representative
Federal: United States of America
Contractor: The word Contractor is supplemented by adding thereto the following:

The term Contractor means the Contractor as defined herein or his Authorized Representative.
1-6 BIDDING AND SUBMISSION OF THE BID
1-6.1 General
Subsection 1-6.1 is hereby amended by adding thereto the following:

The bidder shall examine carefully the entire site of the work, including but not restricted to the conditions and encumbrances related thereto, the Plans and Specifications, and the Proposal and Contract forms therefore. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and scope of the work to be performed, the quantities of material to be furnished and as to the requirements of the proposal, Plans, Specifications, and the Contract.

Page 89 of 411 ends

Spc25/26-05 SP-2
1-7 AWARD AND EXECUTION OF CONTRACT AGREEMENT
1-7.1 General. Within 10- calendars days after the date of the AGENCY’S Notice of Award, the Contractor shall execute and return the following Contract Documents to the AGENCY:
• Agency’s Contract Agreement
• Faithful Performance Bond
• Labor and Material Bond
• Public Liability and Property Damage Insurance Certificate & Endorsements • Auto Insurance Certificate & Endorsement
• Worker’s Compensation Insurance Certificate
• W-9 Form
• City Business License issued by the City (no cost to Contractor) • Encroachment Permit issued by the City (no cost to Contractor) • Construction & Demolition (C&D) Debris Management Report – Part 1 • C&D Performance Security Deposit
• Self-Haul Agreement (issued by City if self-hauling)
• Limited Use Haul Route Plan (if self-hauling)
• C&D Management Plan (if self-hauling)
Failure to comply with the above will result in annulment of the award and forfeiture of the Proposal Guarantee.

The Contract Agreement shall not be considered binding upon the AGENCY until executed by the authorized AGENCY officials.

A corporation to which an award is made may be required, before the Contract Agreement is executed by the AGENCY, to furnish evidence of its corporate existence, of its right to enter into contracts in the State of California, and that the officers signing the Contract and bonds for the corporation have the authority to do so. 1-7.2 CONTRACT BONDS
Subsection 1-7.2 is hereby amended by adding thereto the following:

The Material and Labor Bond shall remain in force until 60 days after the date of recordation of the Notice of Completion.

The Contractor shall provide the following supplemental information for each bond as required herein.
a. Surety company or agency name providing bond.
b. Name of agent.
c. The business address of the surety company and/or agency and agent. d. The business telephone number of the surety company and/or agency and agent.

Page 90 of 411 ends

Spc25/26-05 SP-3
SECTION 2 - SCOPE OF THE WORK
2-2 PERMITS
Subsection 2-2 is hereby deleted IN ITS ENTIRETY and replaced with the following:

Prior to the start of any work, the Contractor shall take out the applicable AGENCY permits and make arrangements for AGENCY inspections. The AGENCY will issue the permits at no charge to the Contractor. The Contractor shall be responsible for obtaining and paying for any outside agency permits. The Contractor and all subcontractors shall be licensed in accordance with State Business and Professions Code. The Contractor shall also obtain any and all other permits, licenses, inspections, certificates, or authorizations required by any governing body or entity. The Contractor shall pay all cost incurred by the permit and license requirements.
2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES
2-5.1 General
Subsection 2-5.1 is hereby amended by adding thereto the following:

A noise level limit of 86 dB at a distance of 25-feet shall apply to all construction equipment on or related to the job whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided, except in those cases required for the protection of personnel.

The staging location(s) for equipment and material shall be subject to the approval of the Engineer. No additional cost will be allowed in the event that the Contractor is requested to move his staging area to a different location, regardless of the number of moves.

Contractor shall be solely responsible for obtaining and/or paying for any staging area(s) outside of the public right-of-way.
2-5.2 Temporary Utility Services
Subsection 2-5.2 is hereby amended by adding thereto the following:

The Contractor shall obtain any water necessary for construction at its own expense. The Contractor shall contact the water company for point(s) of connection and provide facilities for conveying the water from source designated by the water Company to points of use, as well as an eddy valve for each fire hydrant that is used as a water source. Deposit for each eddy valve shall be at the Contractor’s expense.
2-5.4 Haul Routes.

Subsection 2-5.4 is hereby amended by adding thereto the following:

The Contractor’s attention is directed to Appendix “E” – TRAFFIC CONTROL REQUIREMENTS, hereby referenced and made a part of these Contract Documents.

Page 91 of 411 ends

Spc25/26-05 SP-4

EXTRA WORK
Section 2-8 is hereby deleted in its entirety and replaced with the following:

2.8.1 Extra Work: Definition and Notice
When work is not covered by the Contract Unit Prices, Stipulated Unit Prices or is outside the scope of work on the Contract, such work shall be classified as Extra Work. Written notice of such Extra Work shall be provided by the Contractor to the Agency within three (3) working days of the discovery of such Extra Work. Such written notice shall describe the Extra Work, shall specify when the Contractor became aware of the Extra Work and shall describe why the work qualifies as Extra Work. Such written notice shall be accompanied by all then-available information and documents supporting the Contractor’s position that the work qualifies as Extra Work. As updated or additional information becomes available to the Contractor, it shall provide such information to the Agency. The Agency shall evaluate all information provided and shall notify the Contractor whether or not the work qualifies as Extra Work and whether any price adjustment is warranted. The Agency and Contractor shall endeavor to reach an agreement on whether Extra Work exists and what impact any work deemed Extra Work has on the Contract. 2-8 CHANGED CONDITIONS
Section 2-9 is hereby amended by adding thereto the following:

The Contractor shall notify his sureties and the carriers of the insurance furnished and maintained by him of any changes affecting the general scope of the work or change in the contract price, or time, or a combination thereof, and the amount of the applicable bonds and the coverage of the insurance shall be adjusted accordingly. The Contractor shall furnish proof of such adjustments to the City.

SECTION 3 - CONTROL OF THE WORK
3-2 SELF-PERFORMANCE
Subsection 3-2 is hereby deleted in its entirety and replaced with the following:

The Contractor shall perform or provide, with its own organization, contract labor, materials, and equipment amounting to at least 50 percent of the contract price. The contract labor performed or provided by the Contractor shall amount to at least 25 percent of the total contract labor for the Contract. Contract labor shall exclude superintendence.

Any designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed may be deducted from the contract price before computing the amount of contract labor, materials, and equipment required to be performed or provided by the Contractor with its own organization. Where an entire item is subcontracted, the value of contract labor, materials, and equipment subcontracted will be based on the contract unit or lump sum price. When a portion of an item is subcontracted, the value of contract labor, materials, and equipment subcontracted willbe based on the estimated percentage of the contract unit or lump sum price, determined

Page 92 of 411 ends

Spc25/26-05 SP-5
from information submitted by the Contractor, subject to approval by the Engineer. 3-3 SUBCONTRACTORS
Second Paragraph of Subsection 3-3 is hereby deleted in its entirety and replaced with the following:

Prior to Award of Contract, the otherwise qualifying low bidder shall submit a list of all subcontractors intended to perform work on the project. This list shall include the name and location of the place of business each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half of one percent of the prime contractors total bid. The prime contractor shall provide a description by bid item number or otherwise fully designated the portion of work to be performed by each subcontractor. 3-6 THE CONTRACTOR’S REPRESENTATIVE.

Subsection 3-6 is hereby amended by adding thereto the following:

The Contractor shall assign and designate a project superintendent responsible for the project who will be on the site full time and will be in charge of all subcontract work being supplied. No change in the project superintendent shall be allowed without obtaining written authorization from the City and Engineer. Failure to comply with this provision may be grounds for the issuance of a “STOP WORK” order by the City at the sole expense of the Contractor. Additionally, failure to have the appropriate superintendent on the site will result in damages being sustained by the City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. For each calendar day such superintendent is not on the site, the Contractor shall pay the City, or have withheld from monies due it, the sum of $1,500. Execution of the Contract shall constitute agreement by the City and Contractor the $1,500 per calendar day is the minimum value of the costs and actual damage caused by the failure of the Contractor to have the superintendent on site. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payment due the Contractor if such absence occurs.

The City shall have sole discretion in the approval and /or removal of the Contractor’s personnel including, but not limited to, project manager, superintendent, and foreman. 3-7 CONTRACT DOCUMENTS
3-7.1 General.

Subsection 3-7.1 is hereby amended by adding thereto the following:

Page 93 of 411 ends

Spc25/26-05 SP-6
The Contractor shall maintain a control set of Plans and Specifications on the project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on this control set to show the as-built conditions. Upon completion of all work, the Contractor shall return the control set tothe Engineer. Final payment will not be made until this requirement is met. The Contractor shall be responsible for recording any and all changes on this set each day. The Contractor shall submit the updated record drawings to the Engineer for review by the 25th day of each month. Failure to update the record drawings may result in the withholding of ten percent (10%) of the progress payment.
3-10 SURVEYING
3-10.1 General.

Subsection 3-10.1 is amended by adding thereto the following:

The Contractor shall be responsible for providing all survey service including, but not limited to, survey control, construction staking, and cut sheets, as deemed necessary and to the satisfaction of the Engineer to complete the scope of work. Failure to provide any or all survey service shall be cause for the Engineer to issue a stoppage of work until such time as the survey service is provided. Any delay as a result of the work stoppage shall be at the Contractor’s sole expense including any liquidated damages arising therefrom. 3-10.3 Line and Grade.

Subsection 3-10.3 is hereby amended by adding thereto the following:

The line and grades for construction will be parallel to and offset from the position of the work. From the established lines and grades, the Contractor shall extend the necessary lines and grades for construction of the work and shall be responsible for the correctness of same.
3-10.4 Survey Work and Preservation of Survey Monuments. Subsection 3-10.4 is hereby added to Section 3 as follows:

The Contractor shall be responsible for the protection and preservation of existing, permanent survey monuments and benchmarks during construction. Damaged or lost monuments and bench marks shall be restored to existing condition by a Registered Civil Engineer or a Land Surveyor licensed by the State of California at no increase in cost to the City.

The Contractor, at its own expense, shall employ a qualified surveyor to perform all survey work required for the completion of the project as specified in the Plans and these Specifications, comply with the requirements as Section 8771 of the Land Surveyors Act as amended and submit the documents from the County Surveyor as proof of compliance to the City of La Cañada Flintridge. The final retention amount will not be released until the receipt of the required survey documents from the County Recorder’s office confirming the re-established centerline corner/monument(s), if required.

Page 94 of 411 ends

Spc25/26-05 SP-7
3-12 WORK SITE MAINTENANCE
3-12.1 General.

Subsection 3-12.1 is hereby amended by adding thereto the following:

A waste disposal container shall be provided by the Contractor at the construction site for the duration of the construction.

Throughout all phases of construction, including suspension of work, and until final acceptance of the project, the Contractor shall keep the work site clean and free from rubbish and debris. The Contractor shall also abate dust nuisance by cleaning and sweeping, or other means, as necessary.

Materials and equipment shall be removed from the site as soon as they are no longer necessary; and upon completion of the work and before final inspection, the entire worksite shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the Contractor's bid items.

Failure of the Contractor to comply with the Engineer's cleanup orders may result in an order to suspend work until the condition is corrected. No additional compensation or extension of contract completion time will be allowed as a result of such suspension.

After completion of all other work on the project, and before making application for acceptance of the work, the Contractor shall clean the site of their operations, including all areas under the control of the City that have been used by the Contractor in connection with the work on the project, and shall remove all debris, surplus material, and equipment of whatever nature, unless otherwise approved by the City. Final acceptance of the work by the City will be withheld until the Contractor has satisfactorily complied with the foregoing requirements for final cleanup of the project site. All cleanup costs shall be included in the Contractor's bid items.
3-12.3 Noise Control.

Subsection 3-12.3 is hereby amended by adding thereto the following:

The Contractor shall conform to the regulations set in the City of La Cañada Flintridge Municipal Code. All equipment used in the project must be the quietest available for this type of work, said equipment shall not exceed 86 dB measured at an unobstructed distance of 25 feet unless a permit and variance has been obtained from the City. 3-12.6 Water Pollution Control.
3-12.6.1 General Subsection
3-12.6.1 is hereby amended by adding thereto the following:

Earth dams will not be permitted at catch basin openings, local depressions, or elsewhere,

Page 95 of 411 ends

Spc25/26-05 SP-8
except in time of emergency. Temporary dams of sandbags, asphaltic concrete, or other acceptable material may be permitted when necessary to protect the work, provided their use does not create a hazard or nuisance to the public. Such dams shall be removed from the site as soon as their use is no longer necessary.

The Contractor shall be responsible for complying with all regulations of the Clean Water Act, including those associated with the National Pollutant Elimination Discharge System Permit. The Contractor shall comply with the regulations set forth in the City of La Cañada Flintridge Municipal Code, and any other State and Federal programs targeted at preventing and eliminating storm water and urban runoff pollution and shall abide to those regulations throughout all phases of the project.

SECTION 4 - CONTROL OF MATERIALS
4-1. General.

Subsection 4 .1 is hereby amended by adding thereto the following :

The Contractor and all subcontractors, suppliers, and vendors, shall guarantee that the entire work will meet all requirements of this contract as to the quality of materials, equipment, and workmanship. The Contractor, at no cost to the City, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one year after the date of recordation of the Notice of Completion. Within this year period, the Contractor shall also restore to full compliance with requirements of this contract any portion of the work, which is found to not meet those requirements. The Contractor shall hold the City harmless from claims of any kind arising from damages due to said defects or noncompliance. The Contractor shall make all repairs, replacements, and restorations within 30 days after the date of the Engineer’s written notice. 4-5 Certificate of Compliance
Subsection 4-5 is amended by adding thereto the following:

A Certificate of Compliance shall be furnished prior to the use of any materials for which these specifications or the special provisions require that such a certificate be furnished.

In addition, when so authorized in these specifications or in the special provisions, the Engineer may permit the use of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate of Compliance. The certificate shall be signed by the manufacturer of the material or the manufacturer of assembled materials and shall state that the materials involved comply in all respects with the requirements of the Specifications. A Certificate of Compliance shall be furnished with each lot of material delivered to the work and the lot so certified shall be clearly identified in the certificate.

All materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material in the work

Page 96 of 411 ends

Spc25/26-05 SP-9
which conforms to the requirements of the Plans and Specifications, and any such material not conforming to such requirements will be subject to rejection whether in place or not.

The AGENCY reserves the right to refuse to permit the use of material on the basis of Certificate of Compliance. The form of the Certificate of Compliance and its disposition shall be as directed by the Engineer.
4-6 Trade Names or Equals.

Subsection 4-6 is amended by adding thereto the following:

Approval of equipment and materials offered as equivalents to those specified must be obtained prior to the opening of bids as set forth in the Instruction to Bidders.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-3.1 Labor
Subsection 5-3.1 is hereby amended by adding thereto the following:

The Contractor, and all subcontractors, suppliers and vendors, shall comply with all AGENCY, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments.

The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers.
5-4 INSURANCE
5-4.1 General
Subsection 5-4.1 is hereby amended by adding thereto the following:

The Contractor shall notify his sureties and the carriers of the insurance furnished and maintained by him of any changes affecting the general scope of the work or change in the contract price, or time, or a combination thereof, and the amount of the applicable bonds and the coverage of the insurance shall be adjusted accordingly. The Contractor shall furnish proof of such adjustments to the City.
5-4.2 General Liability Insurance
Subsection 5-4.2 is hereby deleted in its entirety and replaced with the following:

Page 97 of 411 ends

Spc25/26-05 SP-10
The Contractor shall furnish the AGENCY a policy or certificate of liability insurance in which the AGENCY and all of its officers, consultants and agents are named insured or are named as an additional insured with the Contractor. Notwithstanding any inconsistent statements in the policy or any subsequent endorsement attached thereto, the AGENCY and all of its officers, consultants and agents shall be the insured or named as an additional insured covering the work, whether liability is attributable to the Contractor or the AGENCY or its officers, consultants or agents. The policy shall insure AGENCY and all of its officers, consultants and agents, while acting within the scope of their duties of the work, against all claims arising out of or in connection with the work.

The Contractor may file insurance acceptable to the AGENCY covering more than one project. The coverage shall provide the following minimum limits:

Insurance Coverage Requirements Limit Requirements General Liability $2,000,000 per occurrence
$4,000,000 aggregate
Worker’s Compensation $1,000,000 Comprehensive
Automobile Liability $1,000,000
Pollution Liability $1,000,000
Transportation Pollution Liability $5,000,000
The Contractor shall include all sub-contractors as insured under its policies or shall furnish separate certificates and certified endorsements for each sub-contractor. All coverage for each subcontractor shall include all requirements stated herein.

The Contractor shall save, keep, and hold harmless the AGENCY and all of its officers, consultants, and agents from all damages, costs or expenses in law or equity that may at any time arise or be set up because of damages to property, or of personal injury received by reason of or in the course of performing work, which may be caused by any willful or negligent act or omission by the Contractor, any of the Contractor’s employees, or any Subcontractor. The AGENCY and all of its officers, consultants, and agents will not be liable for any accident, loss, or damage to the work prior to the completion or acceptance. 5-7.7 Security and Protective Devices
Subsection 5-7.7.1 is hereby amended by adding thereto the following:

Page 98 of 411 ends

Spc25/26-05 SP-11
It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as his operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public service, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this Contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer, may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the AGENCY for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the AGENCY does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
Section 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK Subsections 6-1.1, Construction Schedule and Subsection 6-1.2 are deleted in its entirety and replaced with the following:

The contractor’s proposed construction schedule shall be submitted to the Engineer within 10- working days after the date of the CITY’S execution of the Contract Agreement. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered. No parking will be allowed within 48 hours from trash pickup day for each street.

Prior to issuing the Notice to Proceed with the Work, the Engineer will schedule a pre- construction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods, and clarify inspection procedures.

The Contractor shall submit progress reports to the Engineer by the 10th day of each month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.

Failure to submit the updated progress report may result in the withholding of ten

Page 99 of 411 ends

Spc25/26-05 SP-12
percent (10%) of the progress payment.
6-2 PROSECUTION OF WORK
The work under this contract shall be completed in accordance with the project schedule. 6-3 TIME OF COMPLETION
6-3.1 General. The time for completion shall be as noted in the General Specifications. 6-

3.2 Contract Time Accounting.

Subsection 6-3.2 is hereby deleted in its entirety and replaced with the following:

Working Day. In general, the Contractor’s activities shall be confined to the hours between 8:30 a.m. and 2:30 p.m., Monday through Friday. In addition, no work shall be performed by the CONTRACTOR between 5:00 PM on Friday and 7:00 AM on Monday, or on AGENCY-designated holidays.

Days designated as holidays by the AGENCY include New Years’ Eve; New Years’ Day; Martin Luther King Day; and Presidents’ Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veteran’s Day; Thanksgiving Day; Day After Thanksgiving; Christmas Eve; Christmas Day. No work will be allowed on Foothill Boulevard between November 15th and January 2nd of each year.

Deviation from these restrictions will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates, including benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor.
6-4 DELAYS AND EXTENSIONS OF TIME
6-4.2 Extensions of Time
Subsection 6-4.2 is hereby deleted in its entirety and replaced with the following:

If granted, extensions of time will be based upon the effect of delays to the critical path of the Work as determined by the current accepted Contract Schedule. Delays to minor portions of the Work that do not affect the critical path will not be eligible for extensions of time.
6-4.3 Payment for Delays
Subsection 6-4.3 is hereby deleted in its entirety and replaced with the following:

Page 100 of 411 ends

Spc25/26-05 SP-13
Consistent with Public Contract Code Section 7102, the Contractor will be compensated for damages incurred due to delays for which the City is responsible. The parties agree that determining Contractor’s exact delay damages are and will continue to be impracticable and extremely difficult. As such, for each calendar day in excess of the time specified for completion of the work, as adjusted in accordance with Section 6-4, the City shall pay to the Contractor One Thousand Dollars ($1,000) per workday. Such amount shall constitute the only payment allowed for any City caused delays and shall necessarily include all overhead, all profits, all administrative costs, all bond costs, all labor, materials, equipment and rental costs and any other costs, expenses and fees incurred or sustained as a result of such delays.
6-4.4 Written Notice and Report.

Subsection 6-4.4 is hereby deleted in its entirety and replaced with the following:

If the Contractor desires payment for a delay as specified in Subsection 6-4.3 of the Standard Specifications, he/she shall notify the Engineer, in writing, within 3 working days of beginning of the delay. If the Contractor desires an extension of time as specified in Subsection 6-4.2 of the Standards Specifications, he shall notify the Engineer, in writing, within 3 working days of beginning of the delay. Such notice shall specify the nature of the delay, cause, and the conditions which set the beginning time for the delay.

The request for payment or extension must be made at least 15 days before the specified completion date. Failure by the Contractor to file these items within the times specified will be considered ground for refusal by the Agency to consider such request. 6-5 LIQUIDATED DAMAGES
The liquidated damages value is hereby amended to be One Thousand Five Hundred dollars ($1,500) per calendar day.

SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT
7-3.1 General.

Subsection 7-3.1 is hereby amended by adding thereto the following:

The total base bid amount shall include all work as provided in the Contract Documents.

Any work not specifically identified in the Bid Schedule but included in any portion of the Contract Document or Plans and Specifications shall be considered as included in the various bid items and no additional compensation will be made therefor. 7-3.2 Partial and Final Payment.

Subsection 7-3.2 is hereby deleted in its entirety and replaced with the following:

Page 101 of 411 ends

Spc25/26-05 SP-14
The closure date for the purpose of making partial progress payments will be the last day of each month. The Contractor shall prepare the approximate measurement of the work performed through the closure date and submit it to the AGENCY for approval by the 10th day of the following month.

When the work is complete, the Engineer will determine the final quantities of the work performed and prepare the final progress payment report.

Payments are commonly authorized and made within 30 days following the 10th day of the month in which the submitted invoice is approved by the Engineer. However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as-built conditions.

A full five percent (5%) retention will be deducted from all progress payments. An additional ten percent (10%) for each of the following items may be deducted:
failure to submit (i) a monthly as-built mark-up and (ii) an updated progress report, per the General Specifications and Section 6-1 of these Part 1 - General Provisions. The final retention will be authorized for final payment 30 days after the date of recordation of the Notice of Completion.

The Contractor, however, may receive interest on the retained amount, or receive the retained amount itself so long as the securities equivalent to the retained amounts are substituted with escrow holder approved by the AGENCY.

At the request and expense of the Contractor, retained amounts or securities equivalent to the retained amounts may be deposited with the State Treasurer or a State or Federally chartered bank approved by the AGENCY as the escrow agent, who shall return such monies or securities to the Contractor upon satisfactory completion of the contract.

Securities eligible for investment shall include those listed in Section 16430 of the State Government Code or bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, and standby letters of credit.

Any escrow agreement entered into shall be substantially similar to the form “Escrow Agreement for Security Deposits” in lieu of retention as contained in Section 4590 of Chapter 13 of Division 5 Title 1 of the Government Code. 7-3.2.1 Alternative Dispute Resolution. After submittal of the proposed final estimate to the Contractor, a meeting shall be held promptly between Contractor and AGENCY, attended by the individuals with decision-making authority regarding the dispute, to attempt in good faith to negotiate a resolution of claims arising under or related to performance of the contract.

Page 102 of 411 ends

Spc25/26-05 SP-15
If, within 30 days after such meeting, the parties have not succeeded in negotiating a resolution of the claims, they will jointly appoint a mutually acceptable neutral person not affiliated with either of the parties (the “neutral”). If they have been unable to agree upon such appointment within 40 days from the initial meeting, the parties shall seek assistance in finding a mutually acceptable neutral. If the parties are unable to agree on a neutral, either party may request that the presiding judge of the Superior Court which would have jurisdiction of the matter if a suit were filed, to appoint the neutral. The fees of the neutral shall be shared equally by the parties.

In consultation with the neutral, the parties will select or devise an alternative dispute resolution procedure (“ADR”) by which they will attempt to resolve the dispute, and, if the parties are unable to agree on such matters within 20 days after the initial consultation with the neutral, the procedure, time, and place for the ADR to be held will be decided by the neutral. Unless circumstances require otherwise, the ADR shall be held not later than 60 days after selection of the neutral.

The parties agree to participate in good faith in the ADR to its conclusion as determined by the neutral. If the parties are not successful in resolving the dispute through the ADR, then the parties may agree to submit the matter to binding arbitration, or a private adjudicator, or either party may seek an adjudicated resolution through the appropriate court, assuming all other claim requirements set forth in the Contract Documents are atisfied.
7-3.3 Delivered Materials.

Subsection 7-3.3 is hereby deleted in its entirety and replaced with the following:

Materials and equipment delivered but not incorporated into the work will not be included in the estimate for progress partial payment.
7-3.4 Mobilization.

Subsection 7-3.4 is hereby deleted in its entirety and replaced with the following:

All costs for mobilization, demobilization, and final cleanup shall be included in the Contract unit prices. There shall be no additional compensation and no adjustments to the Contract unit prices for mobilization, demobilization, and final cleanup based on any changes to the scope of work during construction.
7-3.9 Scope of Work Contract Unit Prices. Subsection 7-3.9 is hereby added as follows:

There will be no increase to the Original Scope of Work Contract Unit Prices presented in the Proposal Bid Schedule allowed throughout the duration of the Contract due to inflation and/or increase in materials costs.
7-4 PAYMENT FOR EXTRA WORK
7-4.1 General.

Page 103 of 411 ends

Spc25/26-05 SP-16
Subsection 7-4.1 is hereby amended by adding thereto the following: Extra Work:

Definition and Notice
When work is not covered by the Contract Unit Prices, Stipulated Unit Prices or is outside the scope of work on the Contract, such work shall be classified as Extra Work. Written notice of such Extra Work shall be provided by the Contractor to the Agency within three working days of the discovery of such Extra Work. Such written notice shall describe the Extra Work, shall specify when the Contractor became aware of the Extra Work and shall describe why the work qualifies as Extra Work. Such written notice shall be accompanied by all then-available information and documents supporting the Contractor’s position that the work qualifies as Extra Work. As updated or additional information becomes available to the Contractor, it shall provide such information to the Agency. The Agency shall evaluate all information provided and shall notify the Contractor whether or not the work qualifies as Extra Work and whether any price adjustment is warranted. The Agency and Contractor shall endeavor to reach an agreement on whether Extra Work exists and what impact any work deemed Extra Work has on the Contract.
7-4.2 Basis of Establishing Costs.

Subsection 7-4.2.1 is hereby deleted and replaced with the following:
7-4.2.1(a) Labor.

The Contractor will be paid the cost of labor for the workmen (including foremen when authorized by the Engineer), used in the actual and direct performance of the work. No payment shall be made for any direct or indirect supervision by Contractor personnel.

Direct and indirect supervision shall be considered as included in the overhead and mark up and no additional compensation will be made therefor. The cost of labor, whether the employer is the Contractor, subcontractor or other forces will be the sum of the following:
7-4.2.1(a).1 Actual Wages. The actual wages paid shall include any employer payments to or on behalf of the workmen for health and welfare, pension, vacation and similar purposes.
7-4.2.1(a).2 Labor Surcharge. To the actual wages, as defined in Section 7- 4.2.1(a).1, will be added a labor surcharge set forth in the Department of Transportation publication entitled “Labor Surcharge and Equipment Rental Rates,” which is in effect on the date upon which the work is accomplished and which is a part of the contract. Said labor surcharge shall constitute full compensation for all payments imposed by State and Federal laws and for all other payments made to, or on behalf of, the workmen, other than actual wages as defined in Section 7-4.2.1(a).1 and subsistence and travel allowance as specified in Section 7-4.2.1(a).3.
7-4.2.1(a).3 Subsistence and Travel Allowance. The actual subsistence and travel allowance paid to such workmen.
7-4.2.3 Tools and Equipment Rental

Page 104 of 411 ends

Spc25/26-05 SP-17
The first sentence of Subsection 7-4.2.3 is hereby deleted and replaced with the following:

No payment will be made for the use of tools which have a replacement value of $1,000 or less.
7-4.3 Markup.

Subsection 7-4.3.1 is hereby deleted in its entirety and replaced with the following:
7-4.3.1 (a) Work by Contractor. The following percentage shall be added to the Contractor’s costs and shall constitute the markup for all supervision and management (direct or indirect); home office and field overhead and all profits, which shall be deemed to include all items of expense not specifically designated as cost or equipment rental in Sections 7-4.2.2, “Materials,” and 7-4.2.3, “Tools and Equipment Rental.” Labor 20
Materials 15
Equipment Rental 15
Other Items and Expenditures 15
To the sum of the costs and markups provided for in this subsection, a maximum of one percent (1%) shall be added as compensation for bonding upon proof of actual payment to the surety(ies).

Subsection 7-4.3.2 is hereby deleted in its entirety and replaced with the following:
7-4.3.2 (b) Work by Subcontractor. When all or any part of the extra work is performed by a subcontractor, the markup established in Subsection 7-4.3.1 (a) shall be applied to the subcontractor’s actual cost of such work, to which a markup of 10 percent on the first $2,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $2,000 of the subcontracted portion of the extra work may be added by the Contractor.

PAYMENT FOR CHANGES REQUESTED BY THE CONTRACTOR
Subsection 7-5 is hereby deleted in its entirety and replaced thereto by the following:

Payment for extra work by cost plus a differential for labor, materials and equipment shall be considered payment under force account basis. The labor, materials and equipment provided shall be subject to the approval of the Engineer and compensation will be determined as provided herein.

Subsection 7-6 is hereby added to Section 7 as follows:

Final Pay Quantities. When a specific portion of the work is designated in the Bid Schedule by the letter (F) as final payment, payment will be at the amount stated in the item total listed in the Bid Schedule. For purposes of such specified portions of the work, the estimated quantities shall be deemed to be the final quantities for which payment for such

Page 105 of 411 ends

Spc25/26-05 SP-18
specific portion of the work will be made unless the dimensions of said portions of the work shown on the Plans are revised by the Engineer. If such dimensions are revised and such revisions result in an increase or decrease in the quantities of such work, payment will be at the unit price for the estimated quantity of the revised area resulting from the changes in the dimensions. The estimated quantities for the specified portion of the work shall be considered as approximate only, and no guarantee is made that the quantities determined during or after performance of the specified portion of the work will equal the estimated quantities. No allowance will be made in the event that there is any discrepancy between quantities determined during or after performance of the specified portion of the work and the estimated quantities.

See PROJECT PROVISIONS Section for additional payments information.

Page 106 of 411 ends

Spc25/26-05 SP-19
SECTION 8 - FACILITIES FOR AGENCY PERSONNEL
Not Used

Page 107 of 411 ends

Spc25/26-05 SP-20

SPECIAL PROVISIONS
PART 2

CONSTRUCTION MATERIALS

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
SECTION 200 – ROCK MATERIALS
200-1 ROCK PRODUCTS
200-1.3 Gravel. Pea gravel for irrigation valve box shall have 100 percent passing the 3/8-inch sieve and less than 5 percent passing No. 8 sieve.

SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE
201-1.1 Requirements.
201-1.1.1 General.

The same brand type, source of cement, and aggregate shall be used for all Portland cement concrete per the approved submittal.

Fly ash shall not be used.
201-1.2 Materials.
201-1.2.4 Chemical Admixtures.

Retarding Densifyer. The material shall be of the hydroxylated carboxylic acid type in liquid form and shall not entrain air or cause foaming. The retarding densifyer shall be used in strict compliance with the printed recommendations of the manufacturer. There shall be no reduction in the cement content of the concrete mix because of the addition of the retarding densifyer.

The admixture shall be such that its addition to the concrete mix will:
a. Decrease drying shrinkage;
b. Increase compressive strength for all concrete strength for all concrete ages from 3 days to 1 year;

Page 108 of 411 ends

Spc25/26-05 SP-21
c. Increase flexural strengths, modulus of elasticity and abrasion resistance;
d. Increase the slump and placement workability;
e. Retard the initial set and increase the density; and f. Shall contain no calcium or tri-ethanolamine.

At the discretion of the Engineer, the Contractor may be required to submit proof that the admixture he proposed to use meets the foregoing requirements. Such proof shall be in the form of comparative tests of plain and admixture containing mixes performed by an acceptable local laboratory with testing based on use of the project materials and in accordance with the requirements of ASTM C 157. An approved admixture
conforming to these requirements is plastiment retarding densifyer in liquid form.
201-3 EXPANSION JOINT FILLER AND JOINT SEALANTS
201-3.1 General.

Contractor shall submit materials to Engineer for approval. 201-3.4 Type “A” Sealant (Two-Part Polyurethane Sealant). Sealant shall be Type “A” with Polyethylene foam filler. Submit two samples to the Engineer for approval.

SECTION 203 - BITUMINOUS MATERIALS
203-6 ASPHALT CONCRETE
203-6.1 General. Asphalt concrete material used for remove and replace repairs within the roadway shall be Class and Grade B-PG 64-10
SECTION 214 – Traffic Striping, Curb and Pavement Markings, and Pavement Markers Section 214 is hereby deleted in its entirety and replaced with the following:

All equipment, materials, and components for signing and striping, and the installation thereof, shall conform to the 2025 Caltrans Standard Plans, and Standard Specifications, Section 81, “Miscellaneous Traffic Control Devices,” Section 82 “Signs and Markers”, and Section 84, "Markings", unless otherwise noted in these Special Provisions and on the Plans. These Plans and Specifications are hereinafter referred to as State Standard Plans and State Standard Specifications. Copies of these documents are available from Caltrans, District 7 office at 100 South Main Street, Los Angeles, California 90012 or from Caltrans, 6002 Folsom Boulevard, Sacramento, California 95819, (916) 445-3520.

All materials required for the completion of work as shown on the Plans shall be provided by the Contractor.

Page 109 of 411 ends

Spc25/26-05 SP-22
SECTION 81 – MISCELLANEOUS TRAFFIC CONTROL DEVICES
81-3 PAVEMENT MARKERS
81-3.02 Materials.
81-3.02E Epoxy Adhesive. Adhesive for raised pavement markers shall be rapid set type epoxy.

Removal of pavement markers shall be per Section 81-8.03B, "Remove Pavement Markers," of the State Standard Specifications.

SECTION 82 – SIGNS AND MARKERS
82-3 ROADSIDE SIGNS
Proposed signs shall be in current compliance with 2026 CA MUTCD. Contractor to submit all proposed signs to the city for approval. Material submittal shall include size sizes, quantities, and pertinent sign information.

SECTION 84 - MARKINGS
84-2 TRAFFIC STRIPES AND PAVEMENT MARKINGS
84-2.02 Materials.
84-2.02A General. Traffic stripes, pavement markings, crosswalks, and arrow markings shall be thermoplastic unless otherwise shown on the Plans. Curb markings shall be paint, two (2) coats. Contractor shall repaint all curb markings within the project limits as noted on the plans.

The glass beads used in both layers must be surface treated for use with thermoplastic under the bead manufacturer's instructions. 84-2.02C Thermoplastic. Traffic striping shall be thermoplastic including crosswalks, arrows and other pavement legends.

Curb markings shall be paint. Paint shall be ready-mixed rapid dry type.

Ready-mixed paints shall be suitable for use on either asphalt concrete or Portland cement concrete.

Page 110 of 411 ends

Spc25/26-05 SP-23

SPECIAL PROVISIONS
PART 3

CONSTRUCTION METHODS

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
SECTION 300 - EARTHWORK
300-1 CLEARING AND GRUBBING
Subsection 300-1.4 is hereby deleted in its entirety and replaced with the following:

A. Clearing and grubbing shall conform to the Provisions of Section 300 and these Special Provisions. It shall include all excavation, grading, removal of tree, pruning of tree and landscaping; relocation, repair, and reinstallation of existing affected irrigation system, hardscaping, and mailbox; removal and disposal of spoils and excavated materials as shown on the Plans that are necessary to construct the proposed improvements for all components of work that are not specifically included under the other bid items. The Contractor shall bear all expenses involved in the disposal of the material. Burning shall not be permitted.

B. Concrete and AC paving removal and disposal shall conform to the Provisions of Section 300 and these Special Provisions. In cutting concrete the Contractor shall saw-cut at score lines or as directed by the Engineer. Materials removed shall be disposed of off-site at the Contractor’s expense.

C. Payment for clearing and grubbing, including saw cutting, removal, hauling away and disposal, backfilling, cleanup, payment of all fees, and doing all work involved in the removals to facilitate the construction, shall be considered as included in the various related bid items and no additional compensation will be made therefor. 300-2 UNCLASSIFIED EXCAVATION
300-2.1 General
Unclassified excavation shall consist of all excavation, including soil, rock, cobble, bituminous pavement, concrete pavement, curb, gutter, cross gutter, walk, and driveway.

Page 111 of 411 ends

Spc25/26-05 SP-24
300-2.1.1 Requirements. Subsection 300-2.1.1 is hereby added to Section 300 as follows:
(a) Bituminous Pavement. Bituminous pavement shall be removed to neatly sawed edges. Saw cuts shall be to a minimum depth of 3- inches. Where only the surface of existing bituminous pavement is to be removed, the method of removal shall be approved by the Engineer, and a minimum laying depth of 1-inch of new pavement material shall be provided at the join line. Where bituminous pavement adjoins a trench, the edges adjacent to the trench shall be saw cut to neat straight lines before resurfacing to ensure that all areas to be resurfaced are accessible to the rollers used to compact the subgrade or paving materials.
(b) Concrete Curb, Gutter, Cross Gutter, Walk, and Driveway. Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 12-inches. Concrete sidewalk or driveway to be removed shall be neatly sawed in straight lines either parallel to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than 30-inches in either length or width. If the saw cut in sidewalk, or driveway would fall within 30- inches of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge, except that where the saw cut would fall within 12-inches of a score mark, the saw cut shall be made in and along the score mark. Curb and gutter shall be sawed to a depth of 12-inches on a neat line at right angles to the curb face.

Unclassified excavation shall be considered as included in the various related bid items and no additional compensation will be made therefor.
300-4 300-4 UNCLASSIFIED FILL
300-4.1 General.

Subsection 300-4.1 is hereby amended by adding thereto the following:

Finish grades shall slope to drain without water pockets or irregularities and shall conform to the intent of all plans and sections, after thorough settlement, and compaction of the soil. Finished grades shall meet all existing or established controls of sidewalks, curbs, and walls and shall be of uniform slope and grade between points of fixed elevations or elevation controls from such point to established grades. 300-4.9 Measurement and Payment.

Subsection 300-4.9 is hereby deleted in its entirety and replaced with the following:

Page 112 of 411 ends

Spc25/26-05 SP-25
Full compensation for furnishing all labor, materials, tools, and equipment, and doing all the work involved in unclassified fill construction shall be considered as included in the other items of work. No separate payment shall be made therefor. In addition, the unclassified fill shall include all costs for grading, shaping, compacting spreading, consolidating, placing selected site materials, furnishing, and other work that is required under this subsection.

SECTION 301 - SUBGRADE PREPARATION, TREATED MATERIALS, AND PLACEMENT OF BASE

MATERIALS
301-1 SUBGRADE PREPARATION
301-1.3 Relative Compaction.

The first paragraph of Subsection 301-1.3 is hereby deleted in its entirety and replaced with the following:

When pavement is to be placed directly on subgrade material or when base or subbase material, curb, gutter, sidewalk, or driveway are to be placed on the subgrade material, the top 6 inches of such subgrade material shall be compacted to a relative compaction of 95 percent.

Payment for subgrade preparation required for PCC curb, gutter, sidewalk, driveway, and other masonry retaining wall construction shall be considered included in those items of work, and no separate payment will be made therefor.

SECTION 302 - ROADWAY SURFACING
302-4 SLURRY SEAL SURFACING
302-4.1 General
Replace paragraph 1 with the following:

Slurry Seal shall consist of the mixing, spreading and application of Rubberized emulsionaggregate slurry (REAS) conforming to 302-4.4. The combined aggregate gradation of the slurry seal mixture (REAS) shall be as specified in the special provisions.

CONTRACTOR SHALL WAIT 7 DAYS FROM THE DAY THE STREET IS SLURRY SEALED TO BEGIN STRIPING.
302-4.4 Rubberized Emulsion-Aggregate Slurry (EAS)
302-4.4.1.1 Aggregate.

The text of Subsection 302-4.4.1.1 of the Standard Specifications is hereby added to the specifications.

Aggregate shall be Type II conforming to 200-1.7.

Page 113 of 411 ends

Spc25/26-05 SP-26
302-4.5 Continuous-Flow Mixers
302-4.5.1 General.

Add the following:

The slurry mixer shall be a multiblade or spiral continuous flow in good working condition capable of accurately delivering a predetermined proportion of aggregate, water, emulsion, additive and asphalt modifier to the mixer and of discharging the thoroughly mixed slurry on a continuous basis. Each mixer shall have a metering device to measure the quantity of water in liters (gallons) used in each load of slurry and a separate metering device or equivalent which meets the approval of the Engineer to measure the quantity of emulsified asphalt used in each load of slurry.

The mixing shall be performed by a continuous-flow mixer. All aggregate particles will be uniformly saturated and coated with asphalt.

The spreader box shall be equipped with flexible material in contact with the pavement and shall be maintained so as to prevent loss of slurry. It shall be adjustable to ensure a uniform controlled spread and be equipped with a mechanical or hydraulic type horizontal shifting device. 302-4.5.5 Verification Testing
Add the following:
302-4.5.5.1 Material Testing
Take two 1-quart samples of asphaltic emulsion and polymer modified asphaltic emulsion for Material Testing.

Contractor shall perform material testing on each day they perform slurry seal applications.
302-4.5.5.2 Polymer Modified Asphaltic Emulsion
For asphaltic emulsions, the quality control laboratory must perform sampling and testing at the specified frequency and location for the quality characteristics shown in the following table:

Tests on Emulsion Specification Test Method
Minimum
Sampling
and Testing
Frequency
Viscosity, @ 25°C, sec, SFs 15-90 AASHTO T59
Settlement, 5 day, % < 5.0 AASHTO D244

Page 114 of 411 ends

Spc25/26-05 SP-27
Storage Stability, 1 day, % < 1.0 AASHTO T59 Minimum 1
per day per
batch
Sieve Test, % < 0.30 AASHTO T59
Residue by Evaporation, % > 62 AASHTO T59
Tests on Residue from
Evaporation Test Specification Test Method
Minimum
Sampling
and Testing
Frequency
Penetration, 25°C, 100g,
5s 40-90 AASHTO T49 Minimum 1
per day per
batch Softening Point, 25°C > 57 AASHTO T53
Torsional Recovery % > 20% CA Test 332
When the Engineer determines that the material being used does not conform to the requirements in the above table, the Contractor shall take immediate corrective action as specified in SSPWC Section 302-4.8.2.2, Corrective Action.
302-4.8 Spreading and Application.

Subsection 302-4.8 Spreading and Application is hereby amended thereto by adding the following paragraph:

The sites for stockpiling and batching materials shall be clean and free from objectionable materials. Arrangements for these sites shall be the responsibility of the Contractor.

Hand squeegees and other hand equipment shall be provided to remove spillage and spread slurry in areas inaccessible to the spreader box.

The Contractor shall always have two fully operational mixers for use at the project site.

These mixers shall be available for inspection by the Agency at least 48 hours prior to commencing work.

The application of slurry shall not commence until after 7:00 a.m. and the slurry shall be sufficiently cured to be open to traffic by 4:00 p.m. The streets to be sealed shall be closed from the time the application begins until the Engineer determines the mixture has achieved sufficient set to be opened to traffic.

Prior to applying slurry, the surface to be sealed shall be cleaned by the Contractor unless otherwise specified. Immediately ahead of the mixer, the pavement shall be prewetted by a pressure water distribution system equipped with a fog-type spray bar which will completely fog the surface of the pavement. The need for application and the rate of application will be determined by the Engineer.

Evidence of solidification of the asphalt, balling or lumping of the aggregates, or the presence of uncoated aggregate will be cause for rejection of the slurry.

Slurry shall be applied in such a manner that no ridges shall remain.

The Contractor shall prevent slurry from being deposited on other than asphalt concrete surfaces and shall remove slurry from surfaces not designated to be sealed at no cost to

Page 115 of 411 ends

Spc25/26-05 SP-28
the Agency. The method of slurry removal shall be approved by the Engineer.

At the direction of the Engineer, the Contractor shall repair and reseal all areas of the streets which have not been sealed properly or completely, at no cost to the Agency.

Where the completed slurry is not uniform in color, the street shall be treated to eliminate the color variation at the Contractor's expense. The method of treatment shall be approved by the Engineer.
302-4.8.2 Rubberized Emulsion-Aggregate Slurry (REAS)
302-4.8.3.2 Aggregate Application Rate.

Add the following:

The work shall consist of mixing asphaltic emulsion, aggregate, additive, and water and spreading the mixture on the pavement where shown on the Plans. Type II slurry shall be applied at the application rate shown in SSPWC Table 302-4.8.3.2
In addition, an Extra Long Ton of slurry is made up of 2000 pounds (907 kg) of dry aggregate plus emulsified asphalt, accelerator or retardant, and water. Quantities and application rate shall be approved by the Engineer.

When the Engineer determines that the application rate does not conform to the requirements, the Contractor shall take immediate corrective action as specified in SSPWC Section 302-4.8.2.2, Corrective Action. 302-5 Asphalt Concrete Pavement
302-5.1 General.

Subsection 302-5.1 General is hereby amended by adding the following Subsection:
302-5.1.1 Preparation Crack Treatment
A singular crack shall be considered to be a crack on the perimeter of an otherwise uncracked asphalt pavement area, a pavement block, exceeding 4 feet in minimum dimension. Such pavement area is defined by the cracks forming its perimeter. If asphalt concrete pavement is being constructed directly upon an existing asphalt concrete pavement: 1) Contractor shall spray all weeds in cracks with an approved herbicide, such as brand Roundup, a minimum of 1 week prior to paving. All weeds shall be resprayed if rain occurs within 48 hours after application; 2) all holes and cracks exceeding 1.5 inches deep by 5 inches wide by 7 inches long in all 3 dimensions shall be cleaned, tacked and filled with temporary 3/8” (cutback) asphalt concrete compacted level with the top of the existing

Page 116 of 411 ends

Spc25/26-05 SP-29
pavement; 3) all cracks and holes with weeds shall be routed clear to a depth of one-inch; 4) All cracks and joints 1/4 inch or greater in width shall be blown clear with high pressure air; and 5) all singular cracks and joints shall be filled. Crack and joint filling shall utilize a banding type applicator (Crack banding machine or equivalent) or a “shoe” attachment on a wand, capable of spreading a band 2 to 3 inches wide over the crack, while at the same time striking off the crackfiller at a uniform thickness between 3/32 and 5/32-inch. Thickness shall not exceed 5/32-inch, but if so, crackfiller shall be reheated and replaned to the specified thickness by a method approved by the Engineer.

Engineer shall be notified in writing 24 to 48 hours prior to performing crack filling.

302-5.4 Tack Coat.

Asphalt tack coat material shall be Thermoplastic Polymer Modified HPS No Track Tack (No Track Tack) by Paramount Petroleum, or an approved equal.

This item shall consist of full coverage of No Track Tack to be applied as tack coat between all contact surfaces for overlay and patch repairs. The Material is to be applied at 325 to 425 degrees F with a distributor truck at typical application rates of 0.08 to 0.15 gal/square yard. The exact application rate will be determined by surface conditions at time of application.

The Thermoplastic Polymer Modified HPS No Track Tack shall meet the following criteria:

Test Method Typical Properties Specification
Digested
whole tire
rubber
2 1-3
Softening
Point
Degree F
D36 165 160
Min
Penetration
@ 77 Deg.

F 100g, 5
sec, Dmm
D-5 16 10
Min
Brookfield
Viscosity @
275 Deg. F
cPs*
D4402 975 3000
Max
Brookfield
Viscosity @
350 Deg. F
D4402 185 300
Max

Page 117 of 411 ends

Spc25/26-05 SP-30
cPs*
*BKF LV II, spdl #21 @ 20 RPM
On all vertical joins of AC patching, apply SS-1H tack coat uniformly in two coats of .20 gallons per square yard each with full "break" in between, or .20 gallons per square yard of HPS No Track Tack uniformly in one coat. Tack coat shall not be applied when the temperature of the surface to be tacked is below 40o F in the shade. A tack coat shall be applied at the following:

1. Pavement joins;

2. Areas where new pavement meets existing pavements;

3. Areas where lift sections from pavement placed on different days meet;

4. Trenches;

5. Areas where existing striping has been sandblasted; and

6. Raised valves and manhole covers
302-5 ASPHALT CONCRETE PAVEMENT
302-5.1 General
Subsection 302-5.1 is hereby amended by adding thereto the following:

AC pavement repairs and PCC pavement repairs shall be placed the same day as removals are performed.

Maximum gross vehicle weight of trucks on the pavement shall be 27 tons. 302-5.4 Tack Coat.

Asphalt tack coat material shall be Thermoplastic Polymer Modified HPS No Track Tack (No Track Tack) by Paramount Petroleum, or an approved equal.

This item shall consist of full coverage of No Track Tack to be applied as tack coat between all contact surfaces for overlay and patch repairs. The Material is to be applied at 325 to 425 degrees F with a distributor truck at typical application rates of 0.08 to 0.15 gal/square yard. The exact application rate will be determined by surface conditions at time of application.

The Thermoplastic Polymer Modified HPS No Track Tack shall meet the following criteria:

Test Method Typical
Properties
Specification
Digested
whole tire
rubber
2 1-3
Softening D36 165 160 Min

Page 118 of 411 ends

Spc25/26-05 SP-31
Point
Degree F
Penetration
@ 77 Deg.

F 100g, 5
sec, Dmm
D-5 16 10 Min
Brookfield
Viscosity @
275 Deg. F
cPs*
D4402 975 3000
Max
Brookfield
Viscosity @
350 Deg. F
cPs*
D4402 185 300 Max
*BKF LV II, spdl #21 @ 20 RPM
The tack coat shall be applied to the existing pavement on the areas to receive the ARHM or AC, or slurry where specified. The Engineer shall approve the exact rate and number of applications. Two heavy coats of SS 1h shall be applied to vertical joints for patching.

All contact surfaces with new asphalt shall be painted tack coat immediately before the asphalt concrete is placed.

The tack coat shall be applied as specified in Subsection 302-5.4 of the Standard specifications and these special Provisions. Thermoplastic Polymer Modified No Track Tack shall be applied only when the existing surface is dry and the atmospheric temperature is 50 deg. F and rising. NO material shall be applied when rain is imminent.

Existing concrete curb faces and all concrete not to be overlaid shall be protected against disfigurement from the asphalt tack coat. Residue of the material shall be removed from concrete surfaces to return the concrete to its original condition unless otherwise directed by the Engineer.

Excessive tracking of tack coat onto adjacent pavements will require immediate clean-up.

If significant amounts of asphalt tack coat are tracked onto existing adjacent pavements, the contractor shall be required to clean it off to the satisfaction of the City Engineer or provide a slurry seal to restore the pavement at their own expense. This shall apply to the entirety of asphalt haul routes to and from the project sites.

On all vertical joins of AC patching, apply SS-1H tack coat uniformly in two coats of .20 gallons per square yard each with full "break" in between, or .20 gallons per square yard of HPS No Track Tack uniformly in one coat. Tack coat shall not be applied when the temperature of the surface to be tacked is below 40o F in the shade. A tack coat shall be applied at the following:

1. Pavement joins;

2. Areas where new pavement meets existing pavements;

3. Areas where lift sections from pavement placed on different days meet;

4. Trenches;

5. Areas where existing striping has been sandblasted; and

Page 119 of 411 ends

Spc25/26-05 SP-32

6. Raised valves and manhole covers.
302-5.9 Measurement and Pavement
Subsection 302-5.9 is hereby deleted in its entirety and replaced with the following:

Payment for removal and construction asphalt concrete pavement shall be made at the contract unit price as called out in the Bid Schedule.
303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, AND DRIVEWAYS 303-5.1.1 General.

Subsction 303-5.1.1 is hereby amended by adding thereto the following:

Concrete areas behind sidewalks, driveways and right-of-way limits shall be considered as walks.
303-5.9 Measurement and Payment.

Subsection 303-5.9 is hereby deleted in its entirety and replaced with the following:

Payment for removal and construction of curb and gutter, cross gutter, sidewalk, and driveway shall include forming and finishing and be made at the contract unit price as called out in the Bid Schedule.

SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT Markers Section 314 is hereby deleted in its entirety and replaced with the following:

All equipment, materials, and components for signing and striping, and the installation thereof, shall conform to the 2025 Caltrans Standard Plans, and Standard Specifications, Section 82 “Signs and Markers”, and Section 84, "Markings", unless otherwise noted in these Special Provisions and on the Plans. These Plans and Specifications are hereinafter referred to as State Standard Plans and State Standard Specifications. Copies of these documents are available from Caltrans, District 7 office at 100 South Main Street, Los Angeles, California 90012 or from Caltrans, 6002 Folsom Boulevard, Sacramento, California 95819, (916) 445-3520.

All materials required for the completion of work as shown on the Plans shall be provided by the Contractor.

SECTION 82 – SIGNS AND MARKERS
82-3 ROADSIDE SIGNS
82-3.03 Construction. Relocated signs shall be installed using existing posts at new locations and shall be set at a minimum 30-inch depth and at a minimum 12-inch

Page 120 of 411 ends

Spc25/26-05 SP-33
square Portland Cement Concrete (PCC). The post depth of the concrete footing shall be sufficient to extend at least 6-inches below the bottom of the posts. ¼- inch expansion paper shall be placed between the sign foundation and sidewalk.

New signs shall be installed using metal posts set at a minimum of 30-inch depth in a minimum 12-inch square PCC, except as specified otherwise, the metal post shall be a 2-inch square 14-gauge Telespar “Qwik Punch” post. The steel slip base inserted into the ground shall be 2 ¼ inch 12 gauge. The length shall be sufficient to extend from the top of the sign to 30-inches below the top of the concrete footing and provide a 7-foot clearance between the finished grade and the bottom of the sign. The depth of the concrete footings shall be sufficient to extend at least 6-inches below the bottom of the posts. ¼-inch expansion paper shall be placed between the sign foundation and sidewalk.

Drill holes for bolts, threaded rods, or expansion anchorage devices drilled in existing concrete by a method that will not shatter the concrete adjacent to the holes.

Repair any spalling or chipping of concrete structures at contractor’s expense.

Marker and delineators shall conform to the provision in Section 81, "Miscellaneous Traffic Control Devices."
SECTION 84 - MARKINGS
84-2 TRAFFIC STRIPES AND PAVEMENT MARKINGS
84-2.03 Construction.
84-2.03A General. The Contractor shall furnish the necessary control points for all striping and markings and shall be responsible for the completeness and accuracy thereof to the satisfaction of the Engineer.

The Contractor shall establish all traffic striping between these points by stringline or other method to provide striping that will vary less than ½- inch in 50-feet from the specified alignment.

When no previously applied figures, markings, or traffic striping are available to serve as a guide, suitable layouts shall be spotted in advance of the permanent paint application. Traffic lines may be spotted by using a rope as a guide for marking spots every 5-feet, by using a marking wheel mounted on a vehicle, or by any other means satisfactory to the Engineer.

The Contractor shall mark or otherwise delineate the traffic lanes in the new roadway or portion of roadway, or detour before opening it to traffic.

The Contractor shall provide an experienced technician to supervise the location, alignment, layout, dimensions, and application of the paint.

Page 121 of 411 ends

Spc25/26-05 SP-34
Spotting shall be completed prior to the removal of any existing stripes.

Existing stripes and markings shall be removed prior to painting new stripes and markings, but in no case shall any section of street be left without the proper striping for more than 24 hours, or over weekends or holidays.

The installation of traffic stripes includes placement of raised pavement markers when called for on the plans.

Adhesive for raised pavement markers shall be per Section 81, “Pavement Markers.”
Existing traffic stripes (including raised pavement markers), pavement legends, and markings that do not conform to the plans shall be removed by wet sandblasting per Section 81-8.03B, “Remove Pavement Markers,” and Section 84-9.03B, "Remove Traffic Stripes and Pavement Markings" of the State Standard Specifications.

Page 122 of 411 ends

Spc25/26-05 SP-35

SPECIAL PROVISIONS
PART 4

EXISTING IMPROVEMENTS

PEDESTRIAN CROSSING TRAFFIC SIGNAL (HAWK) AT

FOOTHILL BOULEVARD AND INDIANA AVENUE
CONTRACT 25/26-05
STATE PROJECT NUMBER: HSIPSL-5417(029)
PART 4 – EXISTING IMPROVEMENTS
400 PROTECTION AND RESTORATION 400-1 General
The second paragraph of Subsection 400-1 is hereby deleted and replaced with the following:

The Contractor shall relocate, repair, replace, or re-establish all existing improvements within the project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, etc.) which are damaged or removed as a result of his operations or as required by the Plans and Specifications.

Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectivity reduced by the Contractor’s operations, such striping or markings shall also be considered as existing improvements and the Contractor shall repaint or replace such improvements. Relocations, repairs, replacements, or re-establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.

The following paragraph is hereby added at the end of Subsection 400-1:

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re-establishing existing improvements including trees, plants, sprinkler system, and fire protection shall be considered as included in the various bid items and no additional compensation will be made therefor.

Subsection 400-4 is hereby added to as follows:

FIRE PROTECTION. In the event that access will be blocked completely during construction and that the staging of a fire engine, as determined by the Engineer, is necessary to maintain fire protection, the Contractor shall provide 72 hour advance written notice for coordination with the Fire Department. The Contractor shall allow a one-hour window for the arrival of the fire engine. If there is a delay in the arrival of the fire engine, the Contractor will be granted an extension of time, but no additional compensation will be made therefor. At the end of each day, the Contractor shall provide written notice of whether the fire engine will be required for the next day.

Page 123 of 411 ends

Spc25/26-05 SP-36
The Contractor shall provide one person solely dedicated to guarding the fire engine for the duration of the construction. The cost of providing this service shall be considered as included in the various bid items and no additional compensation will be made therefor.

PROTECTION OF EXISTING TREES (PUBLIC AND PRIVATE). The Contractor shall be responsible for the construction work within the confines of the existing trees and shall provide all measures necessary to protect the trees. Subject to the approval of the City, the Contractor may perform limited trimming/pruning/raising of trees in accordance with ANSI standards and/or industry practices and without any impacts to the trees. The raising or trimming of any tree shall be limited to a maximum height of ten (10) feet or less. If after the trimming, trees are still impacting Contractor’s work, Contractor must still accomplish the work and no additional compensation shall be paid. The Contractor shall notify the City five (5) working days in advance for any tree work. All tree work must be performed by a licensed tree contractor approved by the Engineer.

Tree roots within the construction area shall be treated as if they were underground utilities and the Contractor shall be responsible for potholing and exposing the roots prior to start any excavation activities. If tree roots are exposed during any excavation activities in the construction area, the Contractor shall not cut any roots 3 inches in diameter or larger and shall notify the City five (5) working days in advance for the City’s arborist to inspect the exposed roots and recommend to the Engineer which roots should be removed and which should be protected. Additional potholing may be required if requested by the City’s Arborist. The Contractor shall then provide the methods of excavation to the Engineer, as recommended by the City’s Arborist, for review and approval, five (5) working days prior to resume any excavation activities. The Contractor shall use means approved by the City Arborist to expose and prevent damage to the roots that are to remain. All tree trimming and root pruning shall be performed under the observation of the City’s Arborist.

Any trees that are to be protected shall have the following treatment:
• No stockpiling of soils or construction materials within their drip line. • No fill to be placed within their drip line, except as approved by the Engineer in writing.
• Maintain the existing grade at the crown
• Maintain positive drainage away from trees, do not allow water to accumulate or stand within the drip line.
• Do not use complete fertilizers on existing vegetation unless soils test indicated specific nutrient deficiencies
All work necessary to protect the existing trees shall be considered as included in the various bid items and no additional compensation will be made therefor.

FOR TREE DAMAGES CAUSED BY THE CONTRACTOR’S OPERATIONS, THE CONTRACTOR SHALL PAY TO THE CITY, OR HAVE WITHELD FROM MONIES DUE HIM: (I) THE

Page 124 of 411 ends

Spc25/26-05 SP-37
EQUIVALENT VALUE OF THE EXISTING TREE, AS DETERMINED BY THE CITY’S ARBORIST AND (II) ALL COSTS TO REMOVE AND REPLACE THE TREE. THE AMOUNT NOT TO EXCEED $1,500.

Should there be other provisions in the contract documents regarding the protection of trees that conflict with these provisions, then the most restrictive of the provisions shall apply.
400-2 PERMANENT SURVEY MARKERS
Subsection 400-2 PERMANENT SURVEY MARKERS paragraph two (2) is hereby deleted and amended thereto by the following paragraph(s):

The Contractor shall submit to the Engineer a minimum of seven (7) days prior to the start of Work a list of controlling survey monuments which may be disturbed. The Contractor shall bear the expense of replacing any survey monuments that may be disturbed without permission. Payment of preservation and replacement of survey monuments shall be made per Subsections 3-10 Surveying, 309-4 Payment and 400-3 Payment. Replacement shall be done only under the direction of the Engineer by Registered (licensed) Licensed Land Surveyor of a Registered Civil engineer authorized to practice land surveying within the state. The Contractor will hire a licensed Engineer to:
a) Set survey points outside the affected work area that reference and locate each controlling survey monument that may be disturbed,
b) File a Corner Record or Record Survey with the County Surveyor after setting the survey points to be used for re-establishment of the disturbed controlling survey monuments, and
c) File a Corner Record or Record Survey with the County Surveyor after reestablishment of the disturbed controlling survey monuments. 400-3 PAYMENT
Subsection 400-3 PAYMENT first paragraph is hereby deleted and amended thereto by the following paragraph:

No separate or additional payment will be made for 1) protection of existing improvements, and 2) restoration of existing improvements. All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or reestablishing existing improvements shall be included in the bid. Permanent survey markers will be restored at the Contractor’s own expense.
401 – REMOVAL
401-2 ASPHALT CONCRETE PAVEMENT
Add the following:

Page 125 of 411 ends

Spc25/26-05 SP-38
Bituminous pavement shall be removed to neatly sawed edges. Saw cuts shall be to a minimum depth of 3 inches. Where only the surface of existing bituminous pavement is to be removed, the method of removal shall be approved by the Engineer, and a minimum laying depth of 1 inch of new pavement material shall be provided at the join line. Where bituminous pavement adjoins a trench, the edges adjacent to the trench shall be saw cut to neat straight lines before resurfacing to ensure that all areas to be resurfaced are accessible to the rollers used to compact the subgrade or paving materials.

Bituminous pavement on curb and gutter, sidewalk or drive approaches shall be removed by heating with a torch to soften the pavement without creating smoke.

Softening shall be performed until the bituminous material can be easily scraped away down to the underlying PCC surface. The blade used for scraping shall be maintained straight along its edge and clean. Bituminous material shall be scraped in this manner until it is completely removed.
401-3 CONCRETE AND MASONRY IMPROVEMENTS.
401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway, and Alley Intersections.

Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 1½-inches. Concrete sidewalk, or driveway to be removed shall be neatly sawed in straight lines either parallel to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than 30 inches in either length or width. If the saw cut in sidewalk, access ramp, or driveway would fall within 30 inches of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge, except that where the saw cut would fall within 12 inches of a score mark, the saw cut shall be made in and along the score mark. Curb and gutter shall be sawed to a depth of 1½- inches on a neat line at right angles to the curb face.

All new concrete shall be placed within 3-working days after removal of existing concrete. Excavations shall not be left open over weekends or holidays. 402 – UTILITIES
402-1 LOCATION. Subsection 402-1 is hereby deleted in its entirety and replaced with the following:

The Contractor shall comply with the provisions of Section 4216 of the California Government Code, which requires the Contractor to contact Underground Service Alert of Southern California (USA) at 811 at least 2 working days but not more than 14 calendar days prior to performing any excavation or drilling. Caltrans is not a member of this regional notification center. The Contractor shall contact Caltrans for the location of Caltrans' substructures when working in or near Caltrans' right-of-way.

Page 126 of 411 ends

Spc25/26-05 SP-39
If practical, the Contractor shall delineate with white paint or other suitable markings any area to be excavated. If the Contractor determines that this is not practical because the markings may confuse or mislead motorists or for other reasons, it shall contact USA to advise the utility owners that the area to be excavated will be identified in another manner sufficient to enable the utility owner to determine the area of the excavation.

Where underground distribution conduits for water, gas, sewer, electric power, telephone, cable television, or other utilities are present, the Contractor, for the purpose of preparing a bid, shall assume that every property parcel will be served by a service connection for each type of utility.

The Agency may arrange for and conduct a preconstruction meeting between the Contractor, the Engineer, and the utility companies to discuss scheduling, coordination of any required utility relocations, and the protection of existing utilities. The Contractor shall attend any preconstruction meeting scheduled by the Agency and shall cooperate with all utility owners performing utility relocation or installation work on the Work site.

Where water lines exist, at each angle point, cross connection and "T" connection, the Contractor, for bidding purposes, shall assume the existence of a concrete thrust block located such as to resolve thrust loads. Any and all costs resulting from the existence of a thrust block, including costs for its removal and restoration, if required, shall be deemed as being included in the prices bid for the various items of work.

The Contractor shall determine the location and depth of all utilities, including service connections, which have been marked by the respective utility owner and which may affect or be affected by its operations prior to the start of any mainline or lateral trench construction. Any utility found to be mis-marked (not within 2') as indicated must be located by the utility owner.

The Engineer may, at his discretion, require one or more exploratory excavations to be dug prior to any trenching to be performed, or in advance of other construction operations to confirm the location of utilities. Exploratory excavations ordered by the Engineer shall be paid for at the unit bid price for additional pothole, including backfilling and restoration of pavement or concrete.

The commencement of exploratory excavations for storm drain and sewer construction shall be in accordance with Section 6-1, as amended.

The Contractor shall determine the location of all subsurface installations, except for non- pressurized sewer lines and storm drains by excavating with hand tools within the approximate area of subsurface installations as determined by the field markings provided by the utility owners before using any power-operated or power-driven excavation or boring equipment within the approximate location of the subsurface installation. However, power-operated or power-driven excavating or boring equipment may be used for the removal of any existing pavement if there are no subsurface installations contained in the pavement. If mutually

Page 127 of 411 ends
← All documents from this meeting