Fee Name Change
Aquatics Lessons
Non-Resident Fee add $10 Fee removed due to redundancy. The Non-resident Fee is listed for all aquatics lessons above.
Facility Rental Categories
All Non-profit Groups (resident, nonresident) FeeFee moved to Department-wide section of the Fee Schedule.
City Sponsored Rental
Programs/Classes Fee
Fee moved to Department-wide section of the Fee
Schedule.
Nan Couts Cottage Girl or Boy Scout
Overnight Fee
Fee moved to Nan Couts Cottage section of the Fee
Schedule.
Alcohol Permit w/Rental Fee An exception to the Cost Recovery Policy is added on page 3-2 to provide 50% cost recovery for alcohol
permits for events located in parks.
Report to Mayor and Councilmembers
April 26, 2022
Fee Name Change
Community Center Monday –
Thursday (full Arbor View Room) Fee
2 Hours Minimum Flat Rate Fee Fee changed to an “Hourly Rate, 2 hour minimum” to provide more options and potentially lower facility
rental costs.
4 Hour Package Fee Fee changed to an “Hourly Rate, if 4 or more hours booked” to provide more options and potentially lower
facility rental costs.
Community Center Arbor View Room
Friday – Sunday: (full Arbor View
Room)
Package (Friday – eight hours) Fee Fee removed and Friday added to be the same price as Package Fee for Sundays to lower price and
encourage rental on Fridays.
Community Center South
2 Hour Minimum Flat Rate Fee Fee changed to an “Hourly rate, 2 hour minimum” to provide more options and potentially lower facility
rental costs.
4 Hour Package Fee Fee changed to an “Hourly Rate, if 4 or more hours booked” to provide more options and potentially lower
facility rental costs.
Additional Hours Above Minimum
(hourly rate) Fee
Fee removed due to redundancy. Rental rates are
proposed to be charged hourly.
4 Hour Package Fee Fee changed to an “Hourly Rate, if 4 or more hours booked” to provide more options and potentially lower
facility rental costs.
Community Center North
2 Hour Minimum Flat Rate Fee Fee changed to an “Hourly rate, 2 hour minimum” to provide more options and potentially lower facility
rental costs.
4 Hour Package Fee Fee changed to an “Hourly Rate, if 4 or more hours booked” to provide more options and potentially lower
facility rental costs.
Additional Hours Above Minimum
(hourly rate) Fee
Fee removed due to redundancy. Rental rates are
proposed to be charged hourly.
Report to Mayor and Councilmembers
April 26, 2022
Community Center Executive
Conference Room
In conjunction with Community
Center rental (flat rate)
Fee added for facility rental that includes the
Community Center.
Hourly Rate if 4 or more hours
booked (Mon – Thu)
Fee added for facility rental that requires 4 or more
hours.
Fee Name Change
Recreation Center Performing Arts
Rooms
Hourly Rate if 4 or more hours
booked (Mon – Thu)
Fee added for facility rental that requires 4 or more
hours.
Fee Name Change
Adult Enrichment Center Membership
& Activities
Social Functions Fee Fee removed due to redundancy. Fee is included in Drop-in activities for specific facility rentals or
Department-wide Fees for rental programs or classes.
Health Services Fee Fee removed due to redundancy. Fee is included in Drop-in activities for specific facility rentals or
Department-wide Fees for rental programs or classes.
Special Classes Fee Fee removed due to redundancy. Fee is included in Drop-in activities for specific facility rentals or
Department-wide Fees for rental programs or classes.
Transportation $20 Taxi Script
Booklet
Fee removed due to the Rides4Neighbors program no
longer being offered.
Transportation Rides4Neighbors
Initial Application Processing Fee
Fee removed due to the Rides4Neighbors program no
longer being offered.
Transportation Rides4Neighbors
Application Annual Renewal Fee
Fee removed due to the Rides4Neighbors program no
longer being offered.
Police Department
The Non-digital Photograph Fee is being removed due to the service no longer being offered. The Weapon Impound Fee is being removed to encourage residents to voluntarily turn in firearms. The Animal Control Fees on page 5-18 and 5-19 are being removed due to
Report to Mayor and Councilmembers
April 26, 2022
the City’s contract with the San Diego Humane Society for animal services. There are no other fees being proposed and no other fees being deleted from the Police Department Fee Schedule.
Fire Department
There are no new fees being proposed and no fees being deleted in the Fire Department section of the Fee Schedule.
General Government – City Clerk’s Office
The Data Disk per CD Fee on page 5-27 is being removed due to data requests now being provided on flash drives. There are no new fees being proposed and no other fees being deleted in the General Government section of the Fee Schedule.
CONCLUSION:
Staff recommends the City Council adopt a Resolution updating the Fee Schedule for Fiscal Year 2022-2023. Upon City Council approval, the revised Fee Schedule would become effective July 1, 2022.
Reviewed by: Respectfully submitted by:
____________________ ____________________
Greg Humora Carlo Tomaino
City Manager Assistant City Manager
____________________
Lyn Dedmon
Senior Management Analyst
Attachments: A. MGT User Fee Study Summary of Findings
B. Proposed FY 2022-2023 Fee Schedule
Section 1 – Resolution
Section 2 – Cost Recovery Policy
Section 3 – Exceptions to the Cost Recovery Policy
Section 4 – Annual Update Process
Report to Mayor and Councilmembers
April 26, 2022
Section 5 – List of Fees
Section 6 – 2018 Building Valuation Schedule
C. Resolution Adopting a Fee Schedule for Fiscal Year 2022-2023
www.mgtconsulting.com
CITY OF LA MESA
COST RECOVERY STUDY
Report of Findings
April 26, 2022
TABLE OF CONTENTS
I EXECUTIVE SUMMARY
INTRODUCTION 1STUDY SCOPE & OBJECTIVES 1STUDY FINDINGS 2CITY POLICY 4METHODOLOGY 4LEGAL, ECONOMIC & POLICY CONSIDERATIONS 6RECOMMENDATIONS GOING FORWARD 7
II USER FEE SUMMARIES BY DEPARTMENT
COMMUNITY DEVELOPMENT ‐ PLANNING 8COMMUNITY DEVELOPMENT ‐ BUILDING 11PUBLIC WORKS ‐ ENGINEERING 12PUBLIC WORKS ‐ WASTEWATER ENGINEERING 14COMMUNITY SERVICES 15POLICE 16FIRE 18CITY CLERK 22FINANCE 23
III FULLY BURDENED HOURLY RATES
COMMUNITY DEVELOPMENT ‐ PLANNING 24COMMUNITY DEVELOPMENT ‐ BUILDING 25ENGINEERING 26COMMUNITY SERVICES 27POLICE 28FIRE 29CITY CLERK 30FINANCE 31PUBLIC WORKS 32
SECTION I
EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
INTRODUCTION MGT Consulting Group (MGT) is pleased to present the City of La Mesa with this summary of findings for the recently completed cost of services study. This study is an update of a study that MGT most recently performed for the City in 2020. La Mesa has a long history of reviewing its fees and charges and first underwent a detailed cost of services study in the early 1990’s. From that point until 2004, the City made some minor adjustments to the original calculations, but largely maintained the fee structure that was developed as a result of that early study. At that time, La Mesa became interested in accurately reporting the true cost of providing various fee‐related services and exploring the possibilities of modifying current fees to better reflect cost. In 2004, the City contracted with Public Resource Management Group (PRM) to perform a detailed user fee cost analysis and the City took that opportunity to also develop a comprehensive cost recovery policy. In 2006 the city again contracted with PRM to update the 2004 study. In 2008 the city contracted with MGT (In August 2007 PRM merged with MGT of America Consulting, LLC.) to update the 2006 study, as well as every other year since then. Finally, in January of this year, La Mesa contracted again with MGT to update the cost analysis to reflect the City’s current budget, staffing, and user fee activity.
STUDY SCOPE AND OBJECTIVES This study included a review of fee‐for‐service activities within the following areas:
Community Development – Planning and Building Inspection Public Works ‐ Engineering and Wastewater Engineering Community Services Police Fire City Clerk Finance
Page
1 The study was performed under the general direction of the City Manager’s Office with the participation of Finance and other city departments. The primary goals of the study were to:
Define what it costs the City to provide various fee‐related services. Determine whether there are any opportunities to implement new fees. Identify service areas where the City might adjust fees based on the full cost of services and other economic or policy considerations. Develop revenue projections based on recommended increases (or decreases) to fees.
The information summarized in this report addresses each of these issues and provides the City with the tools necessary to make informed decisions about any proposed fee adjustments and the resulting impact on city revenues.
STUDY FINDINGS While the purpose of this study is to identify the cost of fee‐related activities, one of the outcomes of the analysis is to provide a complete picture of the full cost of all services offered. It is necessary to identify all costs, whether fee‐related or not, so that there is a fair and equitable distribution of all indirect or overhead costs (discussed in a later section of this report) across all activities, thereby ensuring a definitive relationship between the cost of the service and the fee that is charged. No service should be burdened with costs that cannot be directly or indirectly linked to that service. Therefore, the first task in this study is to separate the fee‐for‐service activities from the non‐fee activities. Some non‐fee related activities are appropriately funded by general fund monies (or other special revenue sources), such as public safety or public improvement projects. The costs of these other services are identified and set aside from the user fee services. The study's primary objective is to provide the City's decision‐makers with basic data needed for setting fees. This report details the full cost of services, and presents fees and potential revenues and presents proposed fees and projected revenues based on established city policy for user fee cost recovery levels. The exhibit on the following page displays the costs and revenues of each department/division into the following categories: Column A, Total Costs – Displays the total costs of each department. This includes fee and non‐fee related service costs. Non‐fee related service costs are set aside from the analysis. Column B, User Fee Costs – Of the $49.922 million in total costs analyzed, $5.649 million of that total is related to user fee services. It is this $5.649 million that is the focus of this study and represents the total potential for user fee‐related revenues for the City. Column C, Current Revenues – Based on current individual fee levels, the City generates fee‐related revenues of $3.829 million and is experiencing a 68% overall cost recovery level. Within each department, current cost recovery levels range from 39% for Community Services up to 96% for Fire.
Column D, Current Subsidy – Current fee revenues recover 68% of full cost, leaving 32% or $1.820 million to be funded by other funding sources.
This $1.820 million represents an opportunity for the City to increase fees and revenues, with a corresponding decrease in the subsidization of services. While it is not likely (nor would MGT recommend) that the City completely recover all costs for fees, it is possible for the City to implement moderate increases to current fees and implement new fees for some services. Column E, Recommended Recovery – Adjusting fees to the adopted cost recovery policy levels would increase the specified fee revenue to $4,002,028. This would bring the overall cost recovery level up to 71%. Column F, Increased Revenue – $173,470 in potential new revenue could be generated. This would represent an increase of 4.54% over the revenue currently being collected for these activities by the City on an annualized basis.
User Fee Department (A) Total Costs (B) Costs, User Fee Services (F) Increased Revenue Community Development
Planning $ 1,597,112 $ 1,014,485 $ 872,400 86% 142,085 $ 14% 962,866 $ 95% 90,466 $ Building Inspection $ 1,430,736 $ 1,251,351 $ 1,151,814 92% 99,537 $ 8% 1,251,351 $ 100% 99,537 $ Public Works
Engineering $ 935,882 $ 466,911 $ 414,998 89% 51,912 $ 11% 460,234 $ 99% 45,236 $ WW Engineering* $ 1,970,060 $ 59,831 $ 91% 5,367 54,464 $ 9% 59,599 $ 100% $ 5,135 Community Services $ 2,726,798 $ 2,081,991 $ 804,390 39% 1,277,601 $ 61% 718,300 $ 35% (86,090) $ Police $ 25,519,574 $ 369,218 $ 150,780 41% 218,438 $ 59% 158,237 $ 43% $ 7,457 Fire $ 13,265,824 $ 387,285 $ 371,277 96% 16,008 $ 4% 382,486 $ 99% 11,209 $ City Clerk $ 691,085 $ 16,850 $ 48% 8,775 8,075 $ 52% 8,585 $ 51% $ 510 Finance $ 1,785,077 $ 600 $ 60% 360 $ 40% 370 240 $ 62% $ 10 Totals: 49,922,150 $ 5,648,522 $ 3,828,558 $ 68% 1,819,963 $ 32% 4,002,028 $ 71% 173,470 $ * ‐ Please note that Wastewater Engineering is not part of the General Fund. Costs, revenues and subsidies for this activity should be credited to the Wastewater Fund. (C) Current Revenue (D) Current Subsidy (E) Cost Recovery Policy City of La Mesa
User Fee Cost & Revenue Analysis
FY 2021/2022
CURRENT RECOMMENDED
CITY POLICY
The city currently has a user fee cost recovery policy that it annually adopts by resolution. This resolution establishes cost recovery levels (listed as percentage of total costs) by department. Exceptions to the policy are also noted. This report presents recommendations that are in accordance with city policy.
METHODOLOGY A cost of service study is comprised of two basic elements:
Hourly rates of staff providing the service. Time spent to provide the service.
The product of the hourly rate calculation times the time spent yields the cost of providing the service. HOURLY RATES The hourly rate methodology used in this study builds indirect costs into city staff hourly salary and benefit rates to arrive at fully burdened hourly rates. Fully burdened hourly rates are a mechanism used to calculate the total cost of providing services. Total cost is generally recognized as the sum of the direct cost together with a proportionate share of allowable indirect costs. The proper identification of all costs (including labor, operating expense, department administration and citywide support) as “direct” or “indirect” is crucial to the determination of the total cost of providing services. Direct costs are typically defined as those that can be identified specifically to a particular function or activity, including labor, and possibly materials or supplies. Indirect costs are those that support more than one program area and are not easily identifiable to specific activities. Examples of indirect costs are: departmental administrative and support staff, training and education time, public counter and telephone time, some service and supply costs, and citywide overhead costs from outside of the department as identified in the City’s cost allocation plan. MGT’s hourly rate calculation methodology includes the following: Personnel Services Analysis – each staff classification within the department or division is analyzed in the study. The first burden factor is comprised of compensated absences such as vacation/holidays/sick leave days taken in a year’s time. Staff classifications are then categorized as either direct (operational) or indirect (administrative or supervisory) labor. In some cases, a classification will have both direct and indirect duties. The total indirect portion of staff cost is incorporated into hourly overhead rates.
Page
4 Indirect Cost Rate – a ratio of indirect cost to direct labor (salaries plus benefits) is established. There are three elements of indirect cost incorporated, including:
Indirect Labor – includes compensated absences, administrative and supervisory staff costs. Other Operating Expenses – most services and supplies are included as a second layer of indirect cost. There are some service and supply expenses classified as “allowable direct”; these expenditures are not part of the indirect cost rate but will be included as directly supporting specific program areas.
External Indirect Allocations – this represents citywide overhead (from the City’s cost allocation plan).
Cost Allocation Plan. Many of the costs that support all city programs and services are budgeted in centralized activities such as 1) Finance, which provides payroll, budgeting, accounting and financial reporting, 2) Building Maintenance, which provides building maintenance and custodial services, and 3) Information Systems, which provides computer and telephone support. The costs of these activities and other centralized services are considered indirect overhead that support fee‐for‐service activities, as well as other programs and functions within the City.
Fully Burdened Hourly Rates – incorporates all the elements that comprise the hourly rates used in this cost analysis. Each direct or operational staff classification is listed, together with the average annual salary. The hourly salary rate is calculated by the taking annual salary and dividing by 2,080 available hours in a year. The benefit rate reflects the average benefit rate multiplied against the salary rate. The overhead rate is derived by multiplying the internal and external indirect cost rates against the salary plus benefit rates.
The total combines the salary, benefits and overhead rates. This is the fully burdened rate for each staff classification.
MGT prepared indirect overhead rates and corresponding hourly rate calculations using FY 2021/2022 budgeted expenditures. The hourly rate schedules may be seen in Section III of this report.
TIME SPENT Once fully burdened hourly rates were developed for city staff, the next step in the process was to identify staff time spent directly on each of the user fee activities. Each staff person involved in the user fee services identified time spent to complete each task associated with all user fee services. Annual volume statistics were also gathered in order to develop total annual workload information. This information is provided in detailed user fee workbooks which will be provided to the City upon completion of the study.
Page
5 FEE CALCULATIONS AND REVENUE PROJECTIONS
Given this information, MGT was able to calculate the cost of providing each service, both on a per‐unit and total annual basis (per‐unit cost multiplied by annual volume equals total annual cost). As mentioned above, costs were calculated by multiplying per‐unit time estimates by the hourly labor rates; additional operating expenses directly associated with certain services were also added in. Finally, if other departments or divisions provided support into certain user fee activities, this time was accounted for and added into the analysis as a crossover support activity. Full costs are then compared to current fees/revenues collected, and subsidies (or over‐recoveries) are identified. User fee summaries by department may be seen in Section II of this report.
LEGAL, ECONOMIC & POLICY CONSIDERATIONS Calculating the true cost of providing city services is a critical step in the process of establishing user fees and corresponding cost recovery levels.
Although it is a principal factor, other factors must also be given consideration. City decision‐makers must also consider the effects that establishing fees for services will have on the individuals purchasing those services, as well as the community as a whole. The following legal, economic and policy issues help illustrate these considerations. Legal restrictions – In California user fees are limited to the "estimated reasonable cost of providing a service" by Government Code section 66014(a) and other supplementary legislation. Proposition 26 was approved by California voter in November of 2010 and clarified which charges are considered user fees and which are considered taxes. The significance of this distinction is that user fees may be raised by Council action up to the limit of actual cost, whereas taxes may not be increased without a majority vote of the public. None of the fee adjustments recommended by MGT are considered taxes per Proposition 26 guidelines. It should be noted that fees charged for the use of government property are exempt from Proposition 26. These include fees for parks and facility rentals as well as green fees, cart and other equipment rental fees. All of these fees may be set at a price the market will bear. Economic barriers ‐ It may be a desired policy to establish fees at a level that permits lower income groups to use services that they might not otherwise be able to afford.
Community benefit ‐ If a user fee service benefits the community as a whole to some extent, it is appropriate to subsidize a portion of the fee. Many public health fees have very moderate cost recovery levels. Some programs are provided free of charge or for a minimal fee regardless of cost. Culture and recreation programs also tend to have the low recovery levels. Private benefit ‐ If a user fee primarily benefits the fee payer, the fee is typically set at, or close to 100% full cost recovery. Development related fees generally fall into this category; however, exceptions are sometimes made for services such as appeal fees or fees charged exclusively to residential applicants.
Service driver ‐ In conjunction with the third point above, the issue of who is the service recipient versus the service driver should also be considered. For example, code enforcement activities benefit the community as a whole, but the service is driven by the individual or business owner that violates city code. Managing demand ‐ Elasticity of demand is a factor in pricing certain city services; increasing the price of some services results in a reduction of demand for those services, and vice versa.
Competition ‐ Certain services, such as park usage or facility rentals, may be provided by neighboring communities or the private sector, and therefore demand for these services can be highly dependent on what else may be available at lower prices. Furthermore, if the City's fees are too low, demand enjoyed by private‐sector competitors could be adversely affected. Incentives ‐ Fees can be set low to encourage participation in a service, such as obtaining a water heater permit. Disincentives ‐ Penalties can be instituted to discourage undesirable behavior. Examples include fines for construction without a building permit and fines for excessive false alarms within a one‐year period.
RECOMMENDATIONS GOING FORWARD MGT recommends that the City build on its investment in this cost‐of‐service analysis by continuing to analyze its fees and charges. Once the commitment is made to understand the full cost of providing services, it is important to review and update the analysis in order to keep pace with changes in service delivery, staffing changes, and demand levels. Most of our agencies ask us at the conclusion of the study: how often should this type of study be undertaken? Our advice is to undergo this detailed analysis at least every three but not more than five years, with minor adjustments in the non‐study years (to keep pace with economic impacts).
Some of our clients undergo these studies every other year, some have opted to split the study over the course of three years (i.e. a subset of departments gets studied every year, with each department’s fees being analyzed once every three years), and finally we have other clients who have chosen to review fees every fourth or fifth year. Virtually every client has set up for minor adjustments (typically using CPI percentages) in the off years, to mitigate any significant increases that may occur when the detailed cost analysis is undertaken in future years. This is particularly helpful once an agency has chosen to adopt a cost recovery policy – whether 100% of cost or something less – in order to keep fees at the desired level. MGT also recommends that our clients consider a phase‐in approach to some fees where the increase necessary to reach the proposed recovery level is so high that a one‐year implementation is too cost prohibitive.
Page
7 SECTION II
USER FEE SUMMARIES BY DEPARTMENT
COMMUNITY DEVELOPMENT - PLANNING
User Fee Study Summary Sheet
City of La Mesa
Planning (1401)2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 Zone Change Flat Fee 13,696.00 1 $ $ 15,881.85 86% 15,882 $ $ 13,696 $ 2,186 95% 15,065.00 $ $ 15,065 $ 1,369 $ 817 2 Zoning Ordinance Amend Flat Fee 15,889.00 1 $ $ 18,382.71 86% 18,383 $ $ 15,889 $ 2,494 95% 17,477.00 $ $ 17,477 $ 1,588 $ 906 3 Variance: Resi 1‐3 units or Non‐Resi <2,500 sf Flat Fee 2,099.00 2 $ $ 4,626.36 45% 9,253 $ $ 4,198 $ 5,055 50% 2,308.00 $ $ 4,616 $ 418 $ 4,637 4 Variance ‐ Resi 4+ units or Non‐Resi >2,500 sf Flat Fee 4,127.00 1 $ $ 4,550.17 91% 4,550 $ $ 4,127 $ 423 100% 4,539.00 $ $ 4,539 $ 412 $ 11 5 Special Permit ‐ Resi 1‐3 units or Non‐Resi <2,500 sf Flat Fee 2,047.00 2 $ $ 4,623.41 44% 9,247 $ $ 4,094 $ 5,153 49% 2,251.00 $ $ 4,502 $ 408 $ 4,745 6 Special Permit ‐ Resi 4+ units or Non‐Resi >2,500 sf Flat Fee 4,023.00 2 $ $ 4,547.22 88% 9,094 $ $ 8,046 $ 1,048 97% 4,425.00 $ $ 8,850 $ 804 $ 244 7 Cond Use Permit ‐ 1‐3 units, <2,500 sf Flat Fee 2,089.00 2 $ $ 4,745.76 44% 9,492 $ $ 4,178 $ 5,314 48% 2,297.00 $ $ 4,594 $ 416 $ 4,898 8 Cond Use Permit ‐ 4+ units, >2,500 sf Flat Fee 4,134.00 1 $ $ 4,698.10 88% 4,698 $ $ 4,134 $ 564 97% 4,547.00 $ $ 4,547 $ 413 $ 151 9 Cond Use Permit ‐ Medical Marijuana (B) Flat Fee 11,770.00 1 $ $ 13,019.77 90% 13,020 $ $ 11,770 $ 1,250 100% 13,019.00 $ $ 13,019 $ 1,249 $ 1 10 Cond Use Permit ‐ Medical Marijuana Initial Review (A) Flat Fee1 $ 3,918.00 $ 4,309.29 91% 4,309 $ $ 3,918 $ 391 100% 4,309.00 $ $ 4,309 $ 391 $ 0 11 Adult Use Cannabis BL Fee Co‐Location Flat Fee 4,383.00 15 $ $ 4,937.82 89% 74,067 $ $ 65,745 $ 8,322 100% 4,937.00 $ $ 74,055 $ 8,310 $ 1212 Adult Use Cannabis BL Fee Phase 1 Review Flat Fee 833.00 20 $ $ 911.31 91% 18,226 $ $ 16,660 $ 1,566 100% 911.00 $ $ 18,220 $ 1,560 $ 613 Adult Use Cannabis BL Fee Phase 2 Rev: Cultivate & Man Flat Fee2 9,489.00 0 $ $ 10,795.07 88% 215,901 $ $ 189,780 $ 26,121 100% 10,795.00 $ $ 215,900 $ 26,120 $ 1 14 Adult Use Cannabis BL Fee Phase 2 Rev: Distr & Test Lab Flat Fee 6,821.00 20 $ $ 7,576.14 90% 151,523 $ $ 136,420 $ 15,103 100% 7,576.00 $ $ 151,520 $ 15,100 $ 315 Site Plan Review 1‐3 units or 0‐2,500 sf Flat Fee 1,404.00 2 $ $ 3,094.86 45% 6,190 $ $ 2,808 $ 3,382 50% 1,544.00 $ $ 3,088 $ 280 $ 3,102 16 Site Plan Review 4‐10 units or 2,500‐25k sf Flat Fee 3,743.00 3 $ $ 4,101.61 91% 12,305 $ $ 11,229 $ 1,076 100% 4,101.00 $ $ 12,303 $ 1,074 $ 2 17 Site Plan Review 10+ units or 25k+ sf Flat Fee 4,904.00 5 $ $ 5,318.89 92% 26,594 $ $ 24,520 $ 2,074 100% 5,318.00 $ $ 26,590 $ 2,070 $ 4 18 Gen Plan Amend/Specific Plan Flat Fee 15,122.00 1 $ $ 17,667.14 86% 17,667 $ $ 15,122 $ 2,545 94% 16,634.00 $ $ 16,634 $ 1,512 $ 1,03319 Subd: Parcel Map Waiver / Bound Adj Plat Flat Fee 4 $ 2,278.00 $ 2,412.10 94% 9,648 $ $ 9,112 $ 536 100% 2,412.00 $ $ 9,648 $ 536 $ 0 20 Subd: Tent Parcel Map Flat Fee 5,861.00 3 $ $ 6,490.04 90% 19,470 $ $ 17,583 $ 1,887 99% 6,447.00 $ $ 19,341 $ 1,758 $ 129 21 Subd: Tent Tract Map Flat Fee 7,519.00 2 $ $ 8,707.81 86% 17,416 $ $ 15,038 $ 2,378 95% 8,270.00 $ $ 16,540 $ 1,502 $ 876 22 Planned Residential Development Flat Fee 5,378.00 1 $ $ 6,025.72 89% 6,026 $ $ 5,378 $ 648 98% 5,915.00 $ $ 5,915 $ 537 $ 111 23 Design Review ‐ Resi 1‐3 units, Non‐Resi <2,500 sf Flat Fee 1,896.00 2 $ $ 4,113.83 46% 8,228 $ $ 3,792 $ 4,436 51% 2,085.00 $ $ 4,170 $ 378 $ 4,058 24 Design Review ‐ Resi 4+ units, Non‐Resi >2,500 sf Flat Fee 3,260.00 3 $ $ 3,497.41 93% 10,492 $ $ 9,780 $ 712 100% 3,497.00 $ $ 10,491 $ 711 $ 1 25 Extension/Revision Flat Fee 510.00 2 $ $ 633.61 80% 1,267 $ $ 1,020 $ 247 89% 561.00 $ $ 1,122 $ 102 $ 145 26 Certificate of Compliance Flat Fee 1,469.00 2 $ $ 1,558.98 94% 3,118 $ $ 2,938 $ 180 100% 1,558.00 $ $ 3,116 $ 178 $ 2 27 Envtal Impact Report Contract Admin Flat Fee ‐ 8,277.00 $ $ 8,579.91 96% ‐$ ‐$ ‐$ 100% 8,579.00 $ $ ‐ $ ‐ $ ‐ 28 Envtal Assessmt/Initial Study 1‐3 units, <2,500 sf Flat Fee 1,430.00 1 $ $ 3,075.05 47% 3,075 $ $ 1,430 $ 1,645 51% 1,573.00 $ $ 1,573 $ 143 $ 1,502 29 Envtal Assessmt/Initial Study 4+ units, >2,500sf Flat Fee 3,015.00 1 $ $ 3,236.84 93% 3,237 $ $ 3,015 $ 222 100% 3,236.00 $ $ 3,236 $ 221 $ 1 30 Env Review/Tech Study Review Contract Admin (non‐EIR) Flat Fee 2,828.00 4 $ $ 3,041.55 93% 12,166 $ $ 11,312 $ 854 100% 3,041.00 $ $ 12,164 $ 852 $ 2 31 Environmental Exemption Flat Fee 101.00 25 $ $ 223.02 45% 5,576 $ $ 2,525 $ 3,051 50% 111.00 $ $ 2,775 $ 250 $ 2,801 32 Public Notice (per notice) Flat Fee 671.00 21 $ $ 729.44 92% 15,318 $ $ 14,091 $ 1,227 100% 729.00 $ $ 15,309 $ 1,218 $ 9 33 Certificate of Non‐Conforming Use Flat Fee 2,987.00 1 $ $ 3,328.20 90% 3,328 $ $ 2,987 $ 341 99% 3,285.00 $ $ 3,285 $ 298 $ 43 34 Parking In‐Lieu (per space) Mitigation Fee ‐ 25,000.00 $ ‐$ 0% ‐$ ‐$ ‐$ ‐‐ in‐lieu mitigation fee, adopted by City Council Resolution 2015‐020 ‐‐35 Annual Inspection ‐ Med Marijuana CUP Flat Fee ‐ 2,457.00 $ $ 2,684.56 92% ‐$ ‐$ ‐$ 100% 2,684.00 $ $ ‐ $ ‐ $ ‐ 36 Annual Compliance Review ‐ Med Marijuana CUP Varies ‐ ‐$ ‐$ 0% ‐$ ‐$ ‐$ $ ‐ $ ‐ $ ‐ $ ‐ Per Unit Annual Per Unit Annual
Current Recommendations
Page
8 User Fee Study Summary Sheet
City of La Mesa
Planning (1401)2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy Per Unit Annual Per Unit Annual
Current Recommendations
37 F&W: Negative Declaration DELETE 2,548.00 ‐ $ ‐$ 0% ‐$ ‐$ ‐$ ‐‐ department recommends removing this fee from the fee schedule ‐‐ 38 F&W: Mitigated Negative Declaration DELETE 2,548.00 ‐ $ ‐$ 0% ‐$ ‐$ ‐$ ‐‐ department recommends removing this fee from the fee schedule ‐‐39 F&W: Environmental Impact Report DELETE 3,539.25 ‐ $ ‐$ 0% ‐$ ‐$ ‐$ ‐‐ department recommends removing this fee from the fee schedule ‐‐40 F&W: Envtal Document pursuant to a CRP DELETE 1,203.55 ‐ $ ‐$ 0% ‐$ ‐$ ‐$ ‐‐ department recommends removing this fee from the fee schedule ‐‐41 County Clerk Processing Fee DELETE ‐ $ 50.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ department recommends removing this fee from the fee schedule ‐‐42 Appeals Flat Fee 100.00 1 $ $ 5,519.62 2% 5,520 $ $ 100 $ 5,420 2% 100.00 $ $ 100 $ ‐ $ 5,42043 Annexation ‐ 100% Consent Flat Fee 2,939.00 1 $ $ 3,127.80 94% 3,128 $ $ 2,939 $ 189 100% 3,127.00 $ $ 3,127 $ 188 $ 1 44 Annexation ‐ Other Flat Fee 11,757.00 1 $ $ 12,511.20 94% 12,511 $ $ 11,757 $ 754 100% 12,511.00 $ $ 12,511 $ 754 $ 0 45 Holiday Merch Sales & Inflatable Balloons Flat Fee 183.00 1 $ $ 212.35 86% 212 $ $ 183 $ 29 95% 201.00 $ $ 201 $ 18 $ 11 46 Sign Permits Flat Fee 186.00 40 $ $ 207.22 90% 8,289 $ $ 7,440 $ 849 98% 204.00 $ $ 8,160 $ 720 $ 129 47 Temporary Banner Permit Flat Fee 48.00 5 $ $ 53.69 89% 268 $ $ 240 $ 28 97% 52.00 $ $ 260 $ 20 $ 8 48 Building Plan Check (Planning) Cal'd Fee 288.07 475 $ $ 310.28 93% 147,383 $ $ 136,832 $ 10,551 100% 310.00 $ $ 147,250 $ 10,418 $ 133 49 Building Inspection (Planning) Flat Fee 105 364.00 $ $ 447.08 81% 46,943 $ $ 38,220 $ 8,723 89% 400.00 $ $ 42,000 $ 3,780 $ 4,943 50 Grading Plan Check (Planning) Cal'd Fee 851.68 18 $ $ 880.60 97% 15,851 $ $ 15,330 $ 521 100% 880.00 $ $ 15,840 $ 510 $ 11 51 Liquor License ABC Application (also req Public Notice) Flat Fee 1,552.00 1 $ $ 1,800.78 86% 1,801 $ $ 1,552 $ 249 95% 1,707.00 $ $ 1,707 $ 155 $ 94 52 Misc Business License Review Flat Fee 108.00 1 $ $ 114.13 95% 114 $ $ 108 $ 6 100% 114.00 $ $ 114 $ 6 $ 053 Setback Exception Flat Fee 371.00 1 $ $ 821.95 45% 822 $ $ 371 $ 451 50% 408.00 $ $ 408 $ 37 $ 414 54 Zoning Letter Flat Fee 194.00 15 $ $ 210.27 92% 3,154 $ $ 2,910 $ 244 100% 210.00 $ $ 3,150 $ 240 $ 4 55 Junior ADU Covenant Fee Flat Fee 118.00 5 $ $ 119.04 99% 595 $ $ 590 $ 5 100% 119.00 $ $ 595 $ 5 $ 0 56 HPC Site Plan Review Flat Fee 158.00 8 $ $ 697.89 23% 5,583 $ $ 1,264 $ 4,319 25% 173.00 $ $ 1,384 $ 120 $ 4,199 57 HP Landmark without Mills Act Contract Flat Fee 629.00 1 $ $ 2,720.70 23% 2,721 $ $ 629 $ 2,092 25% 691.00 $ $ 691 $ 62 $ 2,030 58 HP Landmark with Mills Act Contract Flat Fee 2,491.00 1 $ $ 2,692.17 93% 2,692 $ $ 2,491 $ 201 100% 2,692.00 $ $ 2,692 $ 201 $ 0 59 Sign Program Flat Fee 2,573.00 2 $ $ 2,941.91 87% 5,884 $ $ 5,146 $ 738 96% 2,830.00 $ $ 5,660 $ 514 $ 224 60 Landscape Plan Review for Large Projects Flat Fee 867.00 1 $ $ 915.71 95% 916 $ $ 867 $ 49 100% 915.00 $ $ 915 $ 48 $ 1 61 Residential Wireless Review Deposit 1,000.00 1 $ $ 4,745.76 21% 4,746 $ $ 1,000 $ 3,746 23% 1,100.00 $ $ 1,100 $ 100 $ 3,646 62 Mobile Home Park Relocation Plan Review Flat Fee 4,686.00 1 $ $ 4,937.22 95% 4,937 $ $ 4,686 $ 251 100% 4,937.00 $ $ 4,937 $ 251 $ 0 63 Abandoned Shopping Cart Plan Annual Exemption Flat Fee ‐ $ 95.00 ‐$ 0% ‐$ ‐$ ‐$ $ ‐ $ ‐ $ ‐ $ ‐ 64 Annual Review for Abandoned Shopping Cart Plan Flat Fee ‐ 650.00 $ $ ‐ 0% ‐$ ‐$ ‐$ $ ‐ $ ‐ $ ‐ $ ‐ 65 Adult Business Application Fee Flat Fee 1,410.00 1 $ $ 1,649.30 85% 1,649 $ $ 1,410 $ 239 94% 1,551.00 $ $ 1,551 $ 141 $ 98 66 City‐Initiated Environmental Review Non‐Fee 2 ‐$ 5,137.25 $ 0% 10,275 $ ‐$ 10,275 $ ‐‐ no fees chgd for this service ‐‐ 67 City‐Initiated Code Amendment Non‐Fee 2 ‐$ 24,353.19 $ 0% 48,706 $ ‐$ 48,706 $ ‐‐ no fees chgd for this service ‐‐ 68 Annual Review ‐ Guava Garden Non‐Fee 1 ‐$ 641.96 $ 0% 642 $ ‐$ $ 642 ‐‐ no fees chgd for this service ‐‐ 69 Quarterly AVA Report to PD Non‐Fee 4 ‐$ 247.75 $ 0% 991 $ ‐$ $ 991 ‐‐ no fees chgd for this service ‐‐ 70 Code Enforcement Non‐Fee 1 ‐$ $ 154,149.48 0% 154,149 $ ‐$ 154,149 $ ‐‐ 10% of code enf re‐allocated as overhead thru above fees ‐‐71 Spec Event Permit 250‐499 X‐Suppt 3 ‐$ 389.64 $ 0% 1,169 $ ‐$ $ 1,169 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ 72 Spec Event Permit 500‐999 X‐Suppt ‐ ‐$ 389.64 $ 0% ‐$ ‐$ ‐$ ‐‐ recovery comes from special event fees charged by City Clerk ‐‐73 Spec Event Permit 1000+ X‐Suppt 3 ‐$ 389.64 $ 0% 1,169 $ ‐$ $ 1,169 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ 74 Final Map Reviews X‐Suppt 2 ‐$ 1,949.27 $ 0% 3,899 $ ‐$ $ 3,899 ‐‐ recovery comes from fees charged by Engineering ‐‐
Page
9 User Fee Study Summary Sheet
City of La Mesa
Planning (1401)2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy Per Unit Annual Per Unit Annual
Current Recommendations
Total User Fees $1,014,485 $872,400 $142,085 $962,866 $90,466 $51,619% of Full Cost 86% 14% 95% 10% 5% Total Other Services $582,627 $0 $582,627 $0 $0 $361,627 % of Full Cost 0% 100%Department Totals $1,597,112 $872,400 $724,712 $962,866 $90,466 $413,247 % of Full Cost 55% 45% 60% 10% 26%
Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost. 48 Building Plan Check (Planning) Building Plan Check (Planning) fees are currently recovering 93% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.0771 needs to be applied.
This means the fee would change from 37% of the Building Plan Check Fee to 40% of the Building Plan Check Fee. 50 Grading Plan Check (Planning) Grading Plan Check (Planning) fees are currently recovering 97% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.034 needs to be applied.
This means the fee would change from 20% of the Engineering Plan Check Fee to 20.7% of the Engineering Plan Check Fee. 63 Abandoned Shopping Cart Plan Annual Exemption Abandoned shopping cart fees are set by City Council Resolution 2005‐036; these fees are not subject to cost‐of‐service study.64 Annual Review for Abandoned Shopping Cart Plan Abandoned shopping cart fees are set by City Council Resolution 2005‐036; these fees are not subject to cost‐of‐service study.
COMMUNITY DEVELOPMENT - BUILDING
User Fee Study Summary Sheet
City of La Mesa
Building Inspection (2301)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 Building Permits & Inspection Total Progr 354, 1 $ 225 $ 435,728 81% $ 435,728 $ 354,225 $ 81,503 100% $ 435,728 $ 435,728 $ 81,503 $ ‐ 2 Plan Review Total Progr 369, 1 $ 817 $ 371,349 100% $ 371,349 $ 369,817 $ 1,532 100% $ 371,349 $ 371,349 $ 1,532 $ ‐ 3 State Energy Compliance Total Progr 57, 1 $ 281 $ 44,233 129% $ 44,233 $ 57,281 $ (13,047) 100% $ 44,233 $ 44,233 $ (13,047) $ ‐ 4 State Accessiblity Compliance Total Progr 109, 1 $ 783 $ 87,986 125% $ 87,986 $ 109,783 $ (21,797) 100% $ 87,986 $ 87,986 $ (21,797) $ ‐ 5 Mechanical Permits & Inspection Total Progr 86, 1 $ 725 $ 104,476 83% $ 104,476 $ 86,725 $ 17,751 100% $ 104,476 $ 104,476 $ 17,751 $ ‐ 6 Plumbing Permits & Inspection Total Progr 64, 1 $ 207 $ 82,412 78% $ 82,412 $ 64,207 $ 18,205 100% $ 82,412 $ 82,412 $ 18,205 $ ‐ 7 Electrical Permits & Inspection Total Progr 106, 1 $ 488 $ 121,449 88% $ 121,449 $ 106,488 $ 14,960 100% $ 121,449 $ 121,449 $ 14,960 $ ‐ 8 Grading Permits & Inspection Total Progr 3,288 1 $ $ 3,719 88% $ 3,719 $ 3,288 $ 430 100% $ 3,719 $ 3,719 $ 430 ‐$ 9 Code Enf (Mobilehomes) Non‐Fee 7,249 1 $ $ 15,422 47% $ 15,422 $ 7,249 $ 8,172 47% $ 7,249 $ 7,249 $ ‐ $ 8,172 10 Code Enforcement Non‐Fee 1 $ ‐ $ 130,708 0% $ 130,708 $ ‐ $ 130,708 0% $ ‐ ‐$ ‐$ $ 130,708 11 Public Counter & Telephone Overhead 1 $ ‐ $ ‐ 0% ‐ $ ‐$ ‐$ ‐‐ re‐allocated as overhead across #'s 1‐8 above ‐‐ 12 City Projects Non‐Fee 1 $ ‐ $ 19,141 0% $ 19,141 ‐$ $ 19,141 0% $ ‐ ‐$ ‐$ $ 19,141 13 Fire Plan Review X‐Suppt 1 $ ‐ $ 1,888 0% $ 1,888 ‐$ $ 1,888 ‐‐ included as crossover costs to Fire plan check fees ‐‐ 14 Building Records Management Overhead 1 $ ‐ $ ‐ 0% ‐ $ ‐$ ‐$ ‐‐ re‐allocated as overhead across #'s 1‐8 above ‐‐ 15 Planning Records Management Overhead 1 $ ‐ $ 12,226 0% $ 12,226 ‐$ $ 12,226 ‐‐ included as overhead costs to Planning fees ‐‐ Total User Fees $1,251,351 $1,151,814 $99,537 $1,251,351 $99,537 $0 % of Full Cost 92% 8% 100% 9% 0%
Total Other Services $179,385 $7,249 $172,135 $7,249 $0 $158,022% of Full Cost 4% 96%Department Totals $1,430,736 $1,159,063 $271,673 $1,258,601 $99,537 $158,022% of Full Cost 81% 19% 88% 9% 11% Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost. 1 Building Permits & Inspection Building Permits & Inspection fees are currently recovering 81% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.2301 needs to be applied. 2 Plan Review Plan Review fees are currently recovering 100% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.0041 needs to be applied.3 State Energy Compliance State Energy Compliance fees are currently recovering 129% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 0.7722 needs to be applied.4 State Accessiblity Compliance State Accessiblity Compliance fees are currently recovering 125% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 0.8015 needs to be applied.5 Mechanical Permits & Inspection Mechanical Permits & Inspection fees are currently recovering 83% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.2047 needs to be applied.6 Plumbing Permits & Inspection Plumbing Permits & Inspection fees are currently recovering 78% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.2835 needs to be applied. 7 Electrical Permits & Inspection Electrical Permits & Inspection fees are currently recovering 88% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.1405 needs to be applied. 8 Grading Permits & Inspection Grading Permits & Inspection fees are currently recovering 88% of cost. In order to achieve the 100% of cost as stated in the City's master fee schedule, a factor of 1.1309 needs to be applied.
Per Unit Annual Per Unit Annual
Current Recommendations
PUBLIC WORKS - ENGINEERING
User Fee Study Summary Sheet
City of La Mesa
Engineering (3201)2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 Encroachment Permit Fixed Fee 19 $ 487.00 $ 503.91 97% 9,574 $ $ 9,253 $ 321 100% 503.00 $ $ 9,557 $ 304 $ 17 2 Encroachment Permit (Wireless Facility) Fixed Fee 10 $ 939.00 $ 970.62 97% 9,706 $ $ 9,390 $ 316 100% 970.00 $ $ 9,700 $ 310 $ 6 3 Grading Plan Check Calc'd Fee 17 3, $ 344.75 $ 3,494.09 96% 59,400 $ $ 56,861 $ 2,539 100% 3,494.00 $ $ 59,398 $ 2,537 $ 2 4 Public Improvement Plan Check Calc'd Fee 2, 3 $ 201.27 $ 2,430.14 91% 7,290 $ $ 6,604 $ 687 100% 2,430.00 $ $ 7,290 $ 686 $ 0 5 Grading Inspection Calc'd Fee 7, 8 $ 456.57 $ 7,980.56 93% 63,845 $ $ 59,653 $ 4,192 100% 7,980.00 $ $ 63,840 $ 4,187 $ 5 6 Public Improvement Inspection Calc'd Fee 17 2, $ 529.08 $ 2,802.64 90% 47,645 $ $ 42,994 $ 4,651 100% 2,802.00 $ $ 47,634 $ 4,640 $ 11 7 Inspection Managment & Overhead Calc'd Fee 1 $ 402.00 $ 445.08 90% 445 $ $ 402 $ 43 100% 445.00 $ $ 445 $ 43 $ 0 8 Vacation/Street Easement Fixed Fee 2, 1 $ 994.00 $ 3,076.79 97% 3,077 $ $ 2,994 $ 83 100% 3,076.00 $ $ 3,076 $ 82 $ 1 9 Parcel Map (Final) Base + per lot 1 4, $ 611.00 $ 5,189.37 89% 5,189 $ $ 4,611 $ 578 100% 5,189.00 $ $ 5,189 $ 578 $ 0 10 Parcel Map Waiver Base + per lot 5 2, $ 800.00 $ 2,896.23 97% 14,481 $ $ 14,000 $ 481 100% 2,896.00 $ $ 14,480 $ 480 $ 111 Subdivision Map (Final) Base + per lot 1 9, $ 192.00 $ 9,930.17 93% 9,930 $ $ 9,192 $ 738 100% 9,930.00 $ $ 9,930 $ 738 $ 0 12 Block Party/Street Closure Fixed Fee 50.00 5 $ $ 541.48 9% 2,888 $ $ 267 $ 2,621 9% 50.00 $ $ 267 $ ‐ $ 2,621 13 Trans Permit & Field Inspection Statute 16.00 24 $ $ 157.74 10% 3,786 $ $ 384 $ 3,402 10% 16.00 $ $ 384 $ ‐ $ 3,402 14 Soil/Geotech Report Review Fixed Fee 6 $ 230.00 $ 238.48 96% 1,431 $ $ 1,380 $ 51 100% 238.00 $ $ 1,428 $ 48 $ 3 15 Hydrology/Hydraulics/Drainage Report Review New ‐ Fixed Fee 60 ‐$ $ 390.78 0% 23,447 $ ‐$ 23,447 $ 100% 390.00 $ $ 23,400 $ 23,400 $ 47 16 Tentative Parcel Map Fixed Fee 1, 2 $ 316.00 $ 1,462.65 90% 2,438 $ $ 2,193 $ 244 100% 1,462.00 $ $ 2,437 $ 243 $ 1 17 Site Plan Review (DAB) Fixed Fee 7 $ 577.00 $ 596.21 97% 4,173 $ $ 4,039 $ 134 100% 596.00 $ $ 4,172 $ 133 $ 1 18 Tentative Subdivision Map Fixed Fee 1, 1 $ 385.00 $ 1,534.20 90% 1,534 $ $ 1,385 $ 149 100% 1,534.00 $ $ 1,534 $ 149 $ 0 19 Certificate of Correction Fixed Fee 1 $ 482.00 $ 531.17 91% 531 $ $ 482 $ 49 100% 531.00 $ $ 531 $ 49 $ 0 20 Field Verification (Monumentation) Base + per lot 1 $ 479.00 $ 502.90 95% 503 $ $ 479 $ 24 100% 502.00 $ $ 502 $ 23 $ 1 21 Maps/Plans (blue prints) Fixed Fee 42.00 9 $ $ 43.82 96% 394 $ $ 378 $ 16 100% 43.00 $ $ 387 $ 9 $ 7 22 Design Criteria Copy Fixed Fee 42.00 1 $ $ 43.82 96% 44 $ $ 42 $ 2 100% 43.00 $ $ 43 $ 1 $ 1 23 Address Change Fixed Fee 1 $ 394.00 $ 407.51 97% 408 $ $ 394 $ 14 100% 407.00 $ $ 407 $ 13 $ 1 24 Monitoring Well (Encroachment Permit) Fixed Fee 1 $ 478.00 $ 494.69 97% 495 $ $ 478 $ 17 100% 494.00 $ $ 494 $ 16 $ 1 25 Monitoring Well (Inspection) Fixed Fee 1 $ 309.00 $ 319.72 97% 320 $ $ 309 $ 11 100% 319.00 $ $ 319 $ 10 $ 1 26 Bldg Site Plan Review: $0 ‐ $10,000 Fixed Fee 55 $ 141.00 $ 146.06 97% 8,033 $ $ 7,755 $ 278 100% 146.00 $ $ 8,030 $ 275 $ 3 27 Bldg Site Plan Review: $10,001 ‐ $49,999 Fixed Fee 80 $ 247.00 $ 255.60 97% 20,448 $ $ 19,760 $ 688 100% 255.00 $ $ 20,400 $ 640 $ 48 28 Bldg Site Plan Review: over $50,000 Fixed Fee 100 $ 443.00 $ 457.57 97% 45,757 $ $ 44,300 $ 1,457 100% 457.00 $ $ 45,700 $ 1,400 $ 57 29 Document Preparation (Liens & Deeds) Fixed Fee 24 $ 189.00 $ 195.90 96% 4,702 $ $ 4,536 $ 166 100% 195.00 $ $ 4,680 $ 144 $ 22 30 Bond Document Preparation Fixed Fee 66 $ 346.00 $ 357.72 97% 23,610 $ $ 22,836 $ 774 100% 357.00 $ $ 23,562 $ 726 $ 4831 Minor Encroachment Permit Fixed Fee 115 $ 183.00 $ 189.88 96% 21,836 $ $ 21,045 $ 791 100% 189.00 $ $ 21,735 $ 690 $ 101 32 Minor Encroachment Inspection Fixed Fee 87 $ 336.00 $ 347.12 97% 30,200 $ $ 29,232 $ 968 100% 347.00 $ $ 30,189 $ 957 $ 11 33 Traffic Control Plan Review Fixed Fee 163 $ 169.00 $ 175.27 96% 28,569 $ $ 27,547 $ 1,022 100% 175.00 $ $ 28,525 $ 978 $ 4434 Annexation Fixed Fee 1, 1 $ 074.00 $ 1,109.85 97% 1,110 $ $ 1,074 $ 36 100% 1,109.00 $ $ 1,109 $ 35 $ 1 35 Sewer Service Agreement w/o Annexation Fixed Fee 1, 2 $ 069.00 $ 1,104.98 97% 2,210 $ $ 2,138 $ 72 100% 1,104.00 $ $ 2,208 $ 70 $ 2 36 Traffic Commission Appeals Fixed Fee 1 $ 100.00 $ 254.29 39% 254 $ $ 100 $ 154 39% 100.00 $ $ 100 $ ‐ $ 154 37 Water Quality Plan Review ‐ Admin Fee Fixed Fee 1 $ 105.00 $ 110.77 95% 111 $ $ 105 $ 6 100% 110.00 $ $ 110 $ 5 $ 1 38 Traffic Impact Review ‐ Admin Fee Fixed Fee 3 $ 249.00 $ 259.38 96% 778 $ $ 747 $ 31 100% 259.00 $ $ 777 $ 30 $ 1 Per Unit Annual Per Unit Annual
Current Recommendations
User Fee Study Summary Sheet
City of La Mesa
Engineering (3201)2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy Per Unit Annual Per Unit Annual
Current Recommendations
39 Steet Light Connection Proc Fee Base + per svc 1 $ 169.00 $ 175.27 96% 175 $ $ 169 $ 6 100% 175.00 $ $ 175 $ 6 $ 0 40 Traffic Control Plan Renewal Fee Fixed Fee 20 42.00 $ $ 43.82 96% 876 $ $ 840 $ 36 100% 43.00 $ $ 860 $ 20 $ 16 41 Encroachment Permit Renewal Fee Fixed Fee 26 42.00 $ $ 43.82 96% 1,139 $ $ 1,092 $ 47 100% 43.00 $ $ 1,118 $ 26 $ 21 42 Temp Encroachment Permit Fixed Fee 22 $ 155.00 $ 160.67 96% 3,535 $ $ 3,410 $ 125 100% 160.00 $ $ 3,520 $ 110 $ 15 43 Oversize Digital Document Production Fixed Fee 70.00 1 $ $ 73.03 96% 73 $ $ 70 $ 3 100% 73.00 $ $ 73 $ 3 $ 0 44 Traffic Impact Fee Impact Fee ‐ 2, $ 583.32 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ not a fee‐for‐service; fee is set by SANDAG ‐‐ 45 Re‐inspection Fee Full Cost 1 ‐$ $ 438.42 0% 438 $ ‐$ $ 438 100% 438.00 $ $ 438 $ 438 $ 046 Self‐Certified Permits Fixed Fee 79.00 1 $ $ 82.21 96% 82 $ $ 79 $ 3 100% 82.00 $ $ 82 $ 3 $ 0 47 Micromobility Permit Fee Fixed Fee ‐ $ 25.00 ‐$ 0% ‐$ ‐$ ‐$ 100% $ ‐ $ ‐ $ ‐ $ ‐ 48 Micromobility Impound Fee Full Cost ‐ ‐$ ‐$ 0% ‐$ ‐$ ‐$ 100% $ ‐ $ ‐ $ ‐ $ ‐ 49 Spec Event Permit 250‐499 X‐Suppt 9 ‐$ $ 73.03 0% 657 $ ‐$ $ 657 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐50 Spec Event Permit 500‐999 X‐Suppt 1 ‐$ $ 73.03 0% 73 $ ‐$ $ 73 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ 51 Spec Event Permit 1000+ X‐Suppt 3 ‐$ $ 219.09 0% 657 $ ‐$ $ 657 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ Total User Fees $466,911 $414,998 $51,912 $460,234 $45,236 $6,676 % of Full Cost 89% 11% 99% 11% 1%
Total Other Services $468,971 $0 $468,971 $0 $0 $467,584 % of Full Cost 0% 100%Department Totals $935,882 $414,998 $520,884 $460,234 $45,236 $474,260 % of Full Cost 44% 56% 49% 11% 51%
Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost. 1 Encroachment Permit In addition to the permit fee above, a deposit of 100% of construction cost or $600 is also collected, for the duration of the encroachment. 3 Grading Plan Check Current fee is $1,432 for 1st 2 sheets, plus $620 each add'l sheet; current fee shown above is the average fee collected per project.4 Public Improvement Plan Check Current fee is 4% of engineer's estimate, $467 minimum; current fee shown above is the average fee collected per project. 5 Grading Inspection Current fee is 10% of engineer's estimate, $539 minimum; current fee shown above is the average fee collected per project. 6 Public Improvement Inspection Current fee is 6% of engineer's estimate, $812 minimum; current fee shown above is the average fee collected per project. 9 Parcel Map (Final) Current fee is $3,579 base fee, plus $344 per lot; current fee shown above represents typical project with three lots. 10 Parcel Map Waiver Current fee is $2,250 base fee, plus $275 per lot; current fee shown above represents typical project with three lots.11 Subdivision Map (Final) Current fee is $5,212 base fee, plus $398 per lot; current fee shown above represents typical project with ten lots. 19 Field Verification (Monumentation) Current fee is $289 base fee, plus $19 per lot; current fee shown above represents typical project with ten lots. 23 Monitoring Wells (Encroachment Permit) In addition to the permit fee above, a bond/deposit of $1,000 per well is also collected, for the duration of the encroachment.
PUBLIC WORKS - WASTEWATER ENGINEERING
User Fee Study Summary Sheet
City of La Mesa
Wastewater Engineering (4141)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 Industrial Waste Permit Flat Fee 183. 2 $ 00 $ 201.02 91% 335 $ $ 305 $ 30 100% $ 201.00 $ 335 $ 30 $ 0 2 Industrial Waste Compliance Monitoring Full Cost 196. 1 $ 00 $ 214.96 91% 215 $ $ 196 $ 19 100% $ 214.00 $ 214 $ 18 $ 1 3 FOG Discharge Permit (5‐yr) Flat Fee 115 292.00 $ $ 320.71 91% $ 36,989 $ 33,677 $ 3,312 100% $ 320.00 $ 36,907 $ 3,229 $ 82 4 Annual FOG Inspection Flat Fee 178.00 58 $ $ 195.79 91% $ 11,356 $ 10,324 $ 1,032 100% $ 195.00 $ 11,310 $ 986 $ 46 5 FOG Re‐Inspection Flat Fee 169. 1 $ 00 $ 185.17 91% 247 $ $ 225 $ 22 100% $ 185.00 $ 247 $ 21 $ 0 6 NPDES Water Quality Inspection Flat Fee 167. 2 $ 00 $ 183.68 91% 429 $ $ 390 $ 39 100% $ 183.00 $ 427 $ 37 $ 2 7 Modified Annual NPDES Inspection Flat Fee 142 $ 58.00 $ 63.70 91% $ 9,024 $ 8,217 $ 808 100% $ 63.00 $ 8,925 $ 708 $ 99 8 Notice of Violation Flat Fee 348. 1 $ 00 $ 381.39 91% 381 $ $ 348 $ 33 100% $ 381.00 $ 381 $ 33 $ 0 9 Grease Disposal Mitigation Flat Fee 469. 2 $ 00 $ 512.84 91% 855 $ $ 782 $ 73 100% $ 512.00 $ 853 $ 72 $ 1 10 Sewer Connection Fee Assessment ‐ 5, $ 840.00 ‐$ 0% ‐ $ ‐$ ‐$ ‐‐ fee included in wastewater utility fee calc's (not in user fee study scope) ‐‐ 11 Initiation of Sewer Liens Flat Fee ‐ $ 54.00 $ 67.51 80% ‐ $ ‐$ $ ‐ 100% $ 67.00 $ ‐ ‐$ ‐$ Total User Fees $59,831 $54,464 $5,367 $59,599 $5,135 $232 % of Full Cost 91% 9% 100% 9% 0%Total Other Services $1,910,229 $0 $1,910,229 $0 $0 $1,910,229% of Full Cost 0% 100%Department Totals $1,970,060 $54,464 $1,915,596 $59,599 $5,135 $1,910,461% of Full Cost 3% 97% 3% 9% 97% Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost. 10 Sewer Connection Fee Sewer connection fees are assessed on all new development and significant redevelopment where existing buildings are being replaced or where no sewer connection fees had previously been paid.
Per Unit Annual Per Unit Annual
Current Recommendations
COMMUNITY SERVICES
User Fee Study Summary Sheet
City of La Mesa
Community Services (5102‐5106)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 Flag Day Parade (1309) Non‐Fee 1 $ 64, ‐ $ 944.56 0% 64,945 $ $ ‐ $ 64,945 ‐‐ this is not a fee‐for‐service program ‐‐2 AEC ‐ Adult Center Activities Total Progr 22, 1 $ 500.00 $ 471,027.69 5% 471,028 $ $ 22,500 $ 448,528 3% $ 14,720.00 $ 14,720 $ (7,780) $ 456,308 3 AEC ‐ Adult Center Rentals Total Progr 28, 1 $ 640.00 $ 120,159.57 24% 120,160 $ $ 28,640 $ 91,520 26% $ 31,280.00 $ 31,280 $ 2,640 $ 88,880 4 AQ ‐ Aquatics Adult Programs Total Progr 4, 1 $ 070.00 $ 34,597.59 12% 34,598 $ $ 4,070 $ 30,528 17% $ 6,000.00 $ 6,000 $ 1,930 $ 28,598 5 AQ ‐ Aquatics Youth Programs Total Progr 8, 1 $ 150.00 $ 51,362.21 16% 51,362 $ $ 8,150 $ 43,212 19% $ 10,000.00 $ 10,000 $ 1,850 $ 41,362 6 AQ ‐ Swim Lessons Total Progr 90, 1 $ 950.00 $ 126,129.94 72% 126,130 $ $ 90,950 $ 35,180 64% $ 81,000.00 $ 81,000 $ (9,950) $ 45,130 7 AQ ‐ Pool Rental Total Progr 8, 1 $ 150.00 $ 37,719.39 22% 37,719 $ $ 8,150 $ 29,569 21% $ 8,000.00 $ 8,000 $ (150) $ 29,719 8 AQ ‐ Public/Lap Swim Total Progr 24, 1 $ 420.00 $ 64,492.96 38% 64,493 $ $ 24,420 $ 40,073 39% $ 25,000.00 $ 25,000 $ 580 $ 39,493 9 CL ‐ Contract Activities Total Progr 215, 1 $ 600.00 $ 319,839.34 67% 319,839 $ $ 215,600 $ 104,239 50% $ 160,000.00 $ 160,000 $ (55,600) $ 159,839 10 CL ‐ Non‐Contract Camps Total Progr 121, 1 $ 300.00 $ 277,812.05 44% 277,812 $ $ 121,300 $ 156,512 32% $ 90,000.00 $ 90,000 $ (31,300) $ 187,81211 RE ‐ CS Rentals Total Progr 178, 1 $ 200.00 $ 344,174.06 52% 344,174 $ $ 178,200 $ 165,974 55% $ 190,000.00 $ 190,000 $ 11,800 $ 154,174 12 RE ‐ Parks Total Progr 44, 1 $ 600.00 $ 152,153.22 29% 152,153 $ $ 44,600 $ 107,553 30% $ 45,000.00 $ 45,000 $ 400 $ 107,153 13 SP ‐ Adult Sports Leagues Total Progr 26, 1 $ 590.00 $ 23,518.09 113% 23,518 $ $ 26,590 $ (3,072) 112% $ 26,400.00 $ 26,400 $ (190) $ (2,882) 14 SP ‐ Youth Sports Leagues Total Progr 6, 1 $ 940.00 $ 38,664.17 18% 38,664 $ $ 6,940 $ 31,724 18% $ 6,900.00 $ 6,900 $ (40) $ 31,764 15 SP ‐ Field Lights Total Progr 24, 1 $ 280.00 $ 20,340.35 119% 20,340 $ $ 24,280 $ (3,940) 118% $ 24,000.00 $ 24,000 $ (280) $ (3,660) 16 Foundation Support Non‐Fee 1 $ 62, ‐ $ 936.13 0% 62,936 $ $ ‐ $ 62,936 ‐‐ this is not a fee‐for‐service program ‐‐ 17 Special Events/Comm Activities Non‐Fee 1 $ 246, ‐ $ 514.65 0% 246,515 $ $ ‐ $ 246,515 ‐‐ this is not a fee‐for‐service program ‐‐18 Special Projects Non‐Fee 1 $ 182, ‐ $ 489.94 0% 182,490 $ $ ‐ $ 182,490 ‐‐ this is not a fee‐for‐service program ‐‐ 19 Volunteer Program X‐Suppt 1 $ 74, ‐ $ 425.36 0% 74,425 $ $ ‐ $ 74,425 ‐‐ this is a non‐fee program; some costs re‐allocated to other depts ‐‐ 20 Engineering Support X‐Suppt 1 $ 12, ‐ $ 383.60 0% 12,384 $ $ ‐ $ 12,384 ‐‐ this is a non‐fee program; costs re‐allocated to Engineering ‐‐21 Citywide Safety Support Citywide 1 $ 1, ‐ $ 113.45 0% 1,113 $ $ ‐ $ 1,113 ‐‐ this is not a fee‐for‐service program ‐‐ Total User Fees $2,081,991 $804,390 $1,277,601 $718,300 ‐$86,090 $1,363,691% of Full Cost 39% 61% 35% ‐11% 65%Total Other Services $644,808 $0 $644,808 $0 $0 $0% of Full Cost 0% 100%Department Totals $2,726,798 $804,390 $1,922,408 $718,300 ‐$86,090 $1,363,691% of Full Cost 29% 71% 26% ‐11% 50% Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost.
Current revenue figures shown above are actually a 4‐year average (FY18 ‐ FY21). Closures due to facility construction and the COVID pandemic have resulted in significant reductions in program offerings and participation levels.
Department management project that the upcoming fiscal year will continue to show reductions, but is actively working towards scaling back up to pre‐pandemic levels.
Per Unit Annual Per Unit Annual
Current Recommendations
POLICE
User Fee Study Summary Sheet
City of La Mesa
Police (2101‐2108)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 Fingerprinting (Livescan) Flat Fee 3,000 $ 20.00 $ 36.45 55% 109,338 $ $ 60,000 $ 49,338 55% 20.00 $ $ 60,000 ‐$ 49,338 $ 2 Fingerprints (Ink) Flat Fee 150 $ 17.00 $ 19.78 86% 2,967 $ $ 2,550 $ 417 100% 19.00 $ $ 2,850 $ 300 $ 117 4 Initial Background Check for Medical Marijuana CUP Per Empl 5 $ 616.00 $ 662.53 93% 3,313 $ $ 3,080 $ 233 100% 662.00 $ $ 3,310 $ 230 $ 3 5 Annual Background Check for Medical Marijuana CUP Per Empl 30 $ 216.00 $ 234.03 92% 7,021 $ $ 6,480 $ 541 100% 234.00 $ $ 7,020 $ 540 $ 1 6 Photos ‐ non‐digital DELETE ‐ $ 76.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 7 Photos ‐ digital Flat Fee 500 $ 47.00 $ 51.38 91% 25,690 $ $ 23,500 $ 2,190 100% 51.00 $ $ 25,500 $ 2,000 $ 190 8 Report Copies Flat Fee 5,000 $ 0.10 $ 29.41 0% $ 147,065 $ 500 $ 146,565 0% 0.10 $ $ 500 $ ‐ $ 146,565 9 Traffic Reports Flat Fee 520 $ 0.10 $ 14.71 1% 7,647 $ $ 7,595 52 $ 1% 0.10 $ $ 52 ‐$ $ 7,595 10 False Alarms Flat Fee 150 $ 193.00 $ 205.95 94% 30,893 $ $ 28,950 $ 1,943 100% 205.00 $ $ 30,750 $ 1,800 $ 143 11 Crime Prevention Report Flat Fee 10 39.00 $ $ 42.30 92% 423 $ $ 390 $ 33 100% 42.00 $ $ 420 $ 30 $ 3 12 Clearance Letter Flat Fee 50 29.00 $ $ 31.62 92% 1,581 $ $ 1,450 $ 131 100% 31.00 $ $ 1,550 $ 100 $ 31 13 Audio Tape Copying Service Flat Fee 10 65.00 $ $ 69.80 93% 698 $ $ 650 $ 48 100% 69.00 $ $ 690 $ 40 $ 8 14 Video Copying Service Flat Fee 50 $ 265.00 $ 284.30 93% 14,215 $ $ 13,250 $ 965 100% 284.00 $ $ 14,200 $ 950 $ 15 15 Civil Discovery/Subpoenas Flat Fee 30 24.00 $ $ 204.21 12% 6,126 $ $ 720 $ 5,406 12% 24.00 $ $ 720 ‐$ $ 5,406 16 Haz Spill Cleanup Security Hourly Rate ‐ $ ‐ $ 151.48 0% ‐$ ‐$ $ ‐ 100% 151.00 $ ‐$ ‐$ ‐$ 17 Release of Impound Vehicle Flat Fee 20 $ 217.00 $ 233.51 93% 4,670 $ $ 4,340 $ 330 100% 233.00 $ $ 4,660 $ 320 $ 10 18 Weapon Impound Fee DELETE ‐ $ 52.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; fee no longer required ‐‐ 19 Records Research Flat Fee 10 $ 132.00 $ 141.71 93% 1,417 $ $ 1,320 $ 97 100% 141.00 $ $ 1,410 $ 90 $ 7 20 Child Safety Seat Installation (non‐resident) Flat Fee 10 70.00 $ $ 75.74 92% 757 $ $ 700 $ 57 100% 75.00 $ $ 750 $ 50 $ 7 21 Correctible Cite Signoff Flat Fee 50 30.00 $ $ 32.60 92% 1,630 $ $ 1,500 $ 130 100% 32.00 $ $ 1,600 $ 100 $ 30 22 Commercial Sound Amplification Flat Fee 25 25.00 $ $ 84.04 30% 2,101 $ $ 625 $ 1,476 30% 25.00 $ $ 625 ‐$ $ 1,476 23 Civil Court Appearance (sworn) Flat Fee ‐ $ 275.00 ‐$ 0% ‐$ ‐$ $ ‐ $ 275.00 ‐$ ‐$ ‐$ 24 Civil Court Appearance (non‐sworn) Flat Fee ‐ $ 150.00 ‐$ 0% ‐$ ‐$ $ ‐ $ 150.00 ‐$ ‐$ ‐$ 25 Handicap Cite Quick Dismissal Flat Fee 25 $ 8.00 $ 8.82 91% 221 $ $ 200 $ 21 100% 8.00 $ $ 200 ‐$ $ 21 26 Alcohol Permit Flat Fee 1 $ 228.00 $ 240.81 95% 241 $ $ 228 $ 13 100% 240.00 $ $ 240 $ 12 $ 1 27 In‐House Transcription Svc Flat Fee 59.00 5 $ $ 63.45 93% 317 $ $ 295 $ 22 100% 63.00 $ $ 315 $ 20 $ 2 28 Dead Animal Disposal DELETE ‐ $ 41.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 29 Relinquished Dogs & Cats DELETE ‐ $ 28.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 30 Shelter Impound DELETE ‐ $ 40.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 31 Shelter Boarding ‐ Daily DELETE ‐ $ 23.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 32 Transfer Fee DELETE ‐ $ 5.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 33 Animal Trap Rental DELETE ‐ $ 55.00 ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 34 Vicious Dog Hearing DELETE ‐ ‐$ ‐$ 0% ‐$ ‐$ ‐$ ‐‐ remove from Master Fee Schedule; service no longer provided ‐‐ 35 Alarm Permits New Fee 25 $ ‐ $ 35.51 0% 888 $ ‐$ $ 888 100% 35.00 $ $ 875 $ 875 $ 13 36 Loud Party Response No Fee 15 ‐$ $ 89.27 0% 1,339 $ ‐$ $ 1,339 0% ‐$ ‐$ ‐$ $ 1,339 Per Unit Annual Per Unit Annual
Current Recommendations
User Fee Study Summary Sheet
City of La Mesa
Police (2101‐2108)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy Per Unit Annual Per Unit Annual
Current Recommendations
37 OPM Background Check No Fee 500 ‐$ $ 21.98 0% 10,992 $ ‐$ 10,992 $ 0% ‐$ ‐$ ‐$ 10,992 $ 38 Alcohol Sales Bus Lic Investigation Bus Lic Inv 1 $ ‐ $ 151.48 0% 151 $ ‐$ $ 151 ‐‐ business license investigation fees added on to license fees ‐‐39 Adult Ent Bus Lic Investigation Bus Lic Inv 1 $ ‐ $ 833.12 0% 833 $ ‐$ $ 833 ‐‐ business license investigation fees added on to license fees ‐‐ 40 Dance Hall Bus Lic Investigation Bus Lic Inv 1 $ ‐ $ 833.12 0% 833 $ ‐$ $ 833 ‐‐ business license investigation fees added on to license fees ‐‐ 41 Massage Establ Bus Lic Investigation Bus Lic Inv 1 $ ‐ $ 833.12 0% 833 $ ‐$ $ 833 ‐‐ business license investigation fees added on to license fees ‐‐42 Massage Tech Bus Lic Investigation Bus Lic Inv 30 $ ‐ $ 757.38 0% 22,721 $ ‐$ 22,721 $ ‐‐ business license investigation fees added on to license fees ‐‐ 43 Massage Tech Bus Lic Renewal Bus Lic Inv 30 $ ‐ $ 530.17 0% 15,905 $ ‐$ 15,905 $ ‐‐ business license investigation fees added on to license fees ‐‐44 Solicitor Bus Lic Investigation Bus Lic Inv 1 $ ‐ $ 605.91 0% 606 $ ‐$ $ 606 ‐‐ business license investigation fees added on to license fees ‐‐45 Spec Event Permit 250‐499 X‐Suppt 3 ‐$ $ 44.78 0% 134 $ ‐$ $ 134 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ 46 Spec Event Permit 500‐999 X‐Suppt ‐ ‐$ $ 44.78 0% ‐$ ‐$ ‐$ ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ 47 Spec Event Permit 1000+ X‐Suppt 3 $ ‐ $ 2,881.51 0% 8,645 $ ‐$ $ 8,645 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ Total User Fees $369,218 $150,780 $218,438 $158,237 $7,457 $210,981 % of Full Cost 41% 59% 43% 5% 57%
Total Other Services $25,150,356 $0 $25,150,356 $0 $0 $25,099,694 % of Full Cost 0% 100%Department Totals $25,519,574 $150,780 $25,368,794 $158,237 $7,457 $25,310,675 % of Full Cost 1% 99% 1% 5% 99%
Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost. 16 Haz Spill Cleanup Security This fee is charged using full cost hourly rates. The current fee above reflects the calculated full cost rate for a Police Officer position.20 Child Safety Seat Installation (non‐resident) This service is provided free of charge to City of La Mesa residents. Non‐residents are charged at 100% of cost.21 Correctible Cite Signoff This service is provided free of charge if the citation was issued by La Mesa PD. Other citations are charged at 100% of cost. 23 Civil Court Appearance (sworn) This fee is mandated by Govt Code Section 68097.2B to be $275, regardless of cost. 24 Civil Court Appearance (non‐sworn) This fee is mandated by Govt Code Section 68097.2B to be $150, regardless of cost.
FIRE
User Fee Study Summary Sheet
City of La Mesa
Fire (2201‐2206)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 ANNUAL INSPECTION SERVICES2 Routine Fire Inspection Hourly ‐ 107 $ $ 96% ‐ 110.96 $ ‐$ $ ‐ 100% $ 110.00 $ ‐ ‐$ ‐$ 3 Convalescent Homes Inspections Flat Fee 5 $ 237 $ 247.93 96% $ 1,240 $ 1,185 $ 55 100% $ 247.00 $ 1,235 $ 50 $ 54 Reinspections ‐ 2nd & subsequent Flat Fee 200 $ 139 $ 143.45 97% $ 28,691 $ 27,800 $ 891 100% $ 143.00 $ 28,600 $ 800 $ 915 Licensed Care Facilities ‐ 25 or less Flat Fee 4 $ 50 $ 186.23 27% 745 $ $ 200 $ 545 27% $ 50.00 $ 200 $ ‐ $ 545 6 Licensed Care Facilities ‐ 26 or more Flat Fee 10 $ 100 $ 300.65 33% $ 3,006 $ 1,000 $ 2,006 33% $ 100.00 $ 1,000 $ ‐ $ 2,006 7 Apartments Insp: 3‐5 units Flat Fee 111 $ 104 $ 106.47 98% $ 11,818 $ 11,544 $ 274 100% $ 106.00 $ 11,766 $ 222 $ 52 8 Apartments Insp: 6‐14 units Flat Fee 126 $ 113 $ 117.71 96% $ 14,831 $ 14,238 $ 593 100% $ 117.71 $ 14,831 $ 593 ‐$ 9 Apartments Insp: 15‐50 units Flat Fee 94 $ 140 $ 145.45 96% $ 13,672 $ 13,160 $ 512 100% $ 145.00 $ 13,630 $ 470 $ 42 10 Apartments Insp: 51‐100 units Flat Fee 32 $ 286 $ 303.72 94% $ 9,719 $ 9,152 $ 567 100% $ 303.00 $ 9,696 $ 544 $ 23 11 Apartments Insp: 101‐150 units Flat Fee 10 $ 313 $ 331.46 94% $ 3,315 $ 3,130 $ 185 100% $ 331.00 $ 3,310 $ 180 $ 5 12 Apartments Insp: 151‐200 units Flat Fee 8 $ 367 $ 386.94 95% $ 3,096 $ 2,936 $ 160 100% $ 386.00 $ 3,088 $ 152 $ 813 Apartments Insp: 201‐250 units Flat Fee 1 $ 421 $ 442.42 95% 442 $ $ 421 $ 21 100% $ 442.00 $ 442 $ 21 $ 0 14 Apartments Insp: 251‐300 units Flat Fee ‐ $ 457 $ 479.41 95% ‐ $ ‐$ $ ‐ 100% $ 479.00 $ ‐ ‐$ ‐$ 15 Apartments Insp: 301+ units ea add'l 50 3 $ 178 $ 192.76 92% 578 $ $ 534 $ 44 100% $ 192.00 $ 576 $ 42 $ 2 16 Hotel and Motel Insp: 2‐14 units Flat Fee ‐ $ 156 $ 162.72 96% ‐ $ ‐$ $ ‐ 100% $ 162.00 $ ‐ $ ‐ $ ‐ 17 Hotel and Motel Insp: 15‐50 units Flat Fee 3 $ 210 $ 218.19 96% 655 $ $ 630 $ 25 100% $ 218.00 $ 654 $ 24 $ 118 Hotel and Motel Insp: 51‐100 units Flat Fee 3 $ 264 $ 273.67 96% 821 $ $ 792 $ 29 100% $ 273.00 $ 819 $ 27 $ 2 19 Hotel and Motel Insp: 101‐150 units Flat Fee 2 $ 317 $ 329.15 96% 658 $ $ 634 $ 24 100% $ 329.00 $ 658 $ 24 $ 0 20 Hotel and Motel Insp: 151 ‐200 units Flat Fee ‐ $ 371 $ 384.63 96% ‐ $ ‐$ $ ‐ 100% $ 384.00 $ ‐ ‐$ ‐$ 21 Hotel and Motel Insp: 201‐250 units Flat Fee ‐ $ 425 $ 440.11 97% ‐ $ ‐$ $ ‐ 100% $ 440.00 $ ‐ ‐$ ‐$ 22 Hotel and Motel Insp: 251‐300 units Flat Fee ‐ $ 461 $ 477.10 97% ‐ $ ‐$ $ ‐ 100% $ 477.00 $ ‐ ‐$ ‐$ 23 Hotel and Motel Insp: 301+ units ea add'l 50 ‐ $ 156 $ 162.72 96% ‐ $ ‐$ $ ‐ 100% $ 162.00 $ ‐ ‐$ ‐$ 24 Hospital Inspection Flat Fee 4,510 1 $ 4, $ 760.20 95% 4,760 $ $ 4,510 $ 250 100% $ 4,760.00 $ 4,760 $ 250 $ 0 25 Mid‐Rise Bldg Insp (2‐4) Flat Fee 2 $ 267 $ 277.37 96% 555 $ $ 534 $ 21 100% $ 277.00 $ 554 $ 20 $ 1 26 Hi‐Rise Bldg Insp (5+) Flat Fee ‐ $ 587 $ 606.55 97% ‐ $ ‐$ $ ‐ 100% $ 606.00 $ ‐ ‐$ ‐$ 27 Large Commercial Bldg Insp (50,000 sf or greater) Flat Fee 15 $ 514 $ 535.35 96% $ 8,030 $ 7,710 $ 320 100% $ 535.00 $ 8,025 $ 315 $ 5 28 Mobile Food Preparation Vehicle Inspection Flat Fee ‐ $ 71 $ 75.04 95% ‐ $ ‐$ $ ‐ 100% $ 75.00 $ ‐ ‐$ ‐$ 29 Hydrogen Fueling Facility Flat Fee 1 $ 71 $ 75.04 95% 75 $ $ 71 $ 100% 4 $ 75.00 $ 75 $ 4 $ 0 30 After‐Hours Inspections OT Hourly 5 $ 161 $ 166.44 97% 832 $ $ 805 $ 27 100% $ 166.00 $ 830 $ 25 $ 2 31 ANNUAL PERMITS32 Aerosol Products Flat Fee 1 $ 165 $ 171.96 96% 172 $ $ 165 $ 100% 7 $ 171.00 $ 171 $ 6 $ 1 33 Amusement Buildings Flat Fee 1 $ 219 $ 224.20 98% $ 224 $ 219 $ 100% 5 $ 224.00 $ 224 $ 5 $ 0 34 Battery Systems Flat Fee 5 $ 156 $ 162.72 96% 814 $ $ 780 $ 34 100% $ 162.00 $ 810 $ 30 $ 4 35 Blasting Flat Fee 1 $ 99 $ 108.77 91% 109 $ $ 99 $ 10 100% $ 108.00 $ 108 $ 9 $ 1 36 Carnivals and Fairs Flat Fee 1 $ 236 $ 248.70 95% 249 $ $ 236 $ 13 100% $ 248.00 $ 248 $ 12 $ 1 Current Recommendations
Per Unit Annual Per Unit Annual
User Fee Study Summary Sheet
City of La Mesa
Fire (2201‐2206)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy Current Recommendations
Per Unit Annual Per Unit Annual
37 Carbon Dioxide Systems Beverage Dispensing Flat Fee 50 $ 114 $ 116.94 97% $ 5,847 $ 5,700 $ 147 100% $ 116.00 $ 5,800 $ 100 $ 47 38 Cellulose Nitrate Film Flat Fee 1 $ 289 $ 304.18 95% 304 $ $ 289 $ 15 100% $ 304.00 $ 304 $ 15 $ 0 39 Combustible Dust Producing Opers Flat Fee 2 $ 218 $ 230.21 95% 460 $ $ 436 $ 24 100% $ 230.00 $ 460 $ 24 $ 0 40 Combustible Fibers Flat Fee 1 $ 125 $ 128.66 97% 129 $ $ 125 $ 100% 4 $ 128.00 $ 128 $ 3 $ 1 41 Compressed Gases Flat Fee 75 $ 147 $ 153.47 96% $ 11,510 $ 11,025 $ 485 100% $ 153.00 $ 11,475 $ 450 $ 35 42 Cryogenic Fluids Flat Fee 1 $ 268 $ 287.22 93% 287 $ $ 268 $ 19 100% $ 287.00 $ 287 $ 19 $ 0 43 Cutting and Welding Flat Fee 30 $ 138 $ 144.22 96% $ 4,327 $ 4,140 $ 187 100% $ 144.00 $ 4,320 $ 180 $ 7 44 Dry Cleaning Plants Flat Fee 2 $ 293 $ 307.88 95% 616 $ $ 586 $ 30 100% $ 307.00 $ 614 $ 28 $ 2 45 Exhibits and Trade Shows Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 46 Explosives Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 47 Flammable & Combustible Liquids Flat Fee 10 $ 277 $ 294.47 94% $ 2,945 $ 2,770 $ 175 100% $ 294.00 $ 2,940 $ 170 $ 5 48 Floor Finishing Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 49 Haunted Houses (Commercial) Flat Fee 2 $ 191 $ 202.47 94% 405 $ $ 382 $ 23 100% $ 202.00 $ 404 $ 22 $ 1 50 Hazardous Materials Flat Fee 10 $ 279 $ 295.70 94% $ 2,957 $ 2,790 $ 167 100% $ 295.00 $ 2,950 $ 160 $ 7 51 Hazardous Production Materials Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 52 High‐Piled Storage Flat Fee 10 $ 286 $ 303.72 94% $ 3,037 $ 2,860 $ 177 100% $ 303.00 $ 3,030 $ 170 $ 7 53 Hot Work Operations Flat Fee 1 $ 210 $ 218.19 96% 218 $ $ 210 $ 100% 8 $ 218.00 $ 218 $ 8 $ 0 54 Industrial Ovens Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 55 Lumber Yards & Woodworking Plants Flat Fee 1 $ 286 $ 287.22 100% 287 $ $ 286 $ 100% 1 $ 287.00 $ 287 $ 1 $ 0 56 Liquid/Gas Fueled Veh/Eq in Assembly Bldg Flat Fee 1 $ 154 $ 163.48 94% 163 $ $ 154 $ 100% 9 $ 163.00 $ 163 $ 9 $ 0 57 Liquified Petroleum Gas Flat Fee 30 $ 156 $ 162.72 96% $ 4,881 $ 4,680 $ 201 100% $ 162.00 $ 4,860 $ 180 $ 21 58 Magnesium Working Flat Fee 1 $ 152 $ 161.17 94% 161 $ $ 152 $ 100% 9 $ 161.00 $ 161 $ 9 $ 0 59 Misc Combustible Storage Flat Fee 10 $ 277 $ 294.47 94% $ 2,945 $ 2,770 $ 175 100% $ 294.00 $ 2,940 $ 170 $ 5 60 Open Burning Flat Fee 1 $ 137 $ 146.99 93% 147 $ $ 137 $ 10 100% $ 146.00 $ 146 $ 9 $ 1 61 Open Flames and Torches Flat Fee 1 $ 156 $ 162.72 96% 163 $ $ 156 $ 100% 7 $ 162.00 $ 162 $ 6 $ 1 62 Open Flames and Candles Flat Fee 30 $ 158 $ 166.05 95% $ 4,982 $ 4,740 $ 242 100% $ 166.00 $ 4,980 $ 240 $ 2 63 Organic Coatings Flat Fee 1 $ 268 $ 287.22 93% 287 $ $ 268 $ 19 100% $ 287.00 $ 287 $ 19 $ 0 64 Places of Assembly Flat Fee 200 $ 183 $ 190.46 96% $ 38,091 $ 36,600 $ 1,491 100% $ 190.00 $ 38,000 $ 1,400 $ 9165 Private Fire Hydrants Flat Fee 1 $ 268 $ 285.23 94% 285 $ $ 268 $ 17 100% $ 285.00 $ 285 $ 17 $ 0 66 Pryroxylin Plastics Flat Fee 1 $ 154 $ 163.48 94% 163 $ $ 154 $ 100% 9 $ 163.00 $ 163 $ 9 $ 0 67 Pyrotechnic Special Effects Material Flat Fee 2 $ 333 $ 351.18 95% 702 $ $ 666 $ 36 100% $ 351.00 $ 702 $ 36 $ 0 68 Refrigeration Equipment Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 69 Repair Garages & Motor Fuel Dispensing Flat Fee 20 $ 277 $ 294.47 94% $ 5,889 $ 5,540 $ 349 100% $ 294.00 $ 5,880 $ 340 $ 9 70 Rooftop Heliports Flat Fee 1 $ 174 $ 181.21 96% 181 $ $ 174 $ 100% 7 $ 181.00 $ 181 $ 7 $ 0 71 Spraying or Dipping Flat Fee 1 $ 286 $ 303.72 94% 304 $ $ 286 $ 18 100% $ 303.00 $ 303 $ 17 $ 1 72 Storage of Scrap Tires & Tire Byproducts Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0
User Fee Study Summary Sheet
City of La Mesa
Fire (2201‐2206)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy Current Recommendations
Per Unit Annual Per Unit Annual
73 Temporary membrane structures and tents Flat Fee 20 $ 209 $ 220.96 95% $ 4,419 $ 4,180 $ 239 100% $ 220.00 $ 4,400 $ 220 $ 19 74 Tire Rebuilding Plants Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 75 Waste Handling Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 76 Wood Products Flat Fee 1 $ 277 $ 294.47 94% 294 $ $ 277 $ 17 100% $ 294.00 $ 294 $ 17 $ 0 77 PLAN SUBMITTAL FEES (F PERMITS ‐ PLAN REVIEW AND INSPECTION)78 Auto Spr Sys: 1‐4 heads Flat Fee 20 $ 153 $ 163.28 94% $ 3,266 $ 3,060 $ 206 100% $ 163.00 $ 3,260 $ 200 $ 6 79 Auto Spr Sys: 5‐20 heads Flat Fee 20 $ 153 $ 163.28 94% $ 3,266 $ 3,060 $ 206 100% $ 163.00 $ 3,260 $ 200 $ 6 80 Auto Spr Sys: 21‐50 heads Flat Fee 10 $ 181 $ 193.26 94% $ 1,933 $ 1,810 $ 123 100% $ 193.00 $ 1,930 $ 120 $ 3 81 Auto Spr Sys: 51‐100 heads Flat Fee 10 $ 276 $ 293.19 94% $ 2,932 $ 2,760 $ 172 100% $ 293.00 $ 2,930 $ 170 $ 2 82 Auto Spr Sys: 101‐500 heads Flat Fee 5 $ 314 $ 333.17 94% $ 1,666 $ 1,570 $ 96 100% $ 333.00 $ 1,665 $ 95 $ 1 83 Auto Spr Sys: ea add 500 heads Flat Fee 1 $ 314 $ 333.17 94% 333 $ $ 314 $ 19 100% $ 333.00 $ 333 $ 19 $ 0 84 Underground Hydrostatic Test Flat Fee 25 $ 134 $ 143.29 94% $ 3,582 $ 3,350 $ 232 100% $ 143.00 $ 3,575 $ 225 $ 785 Acceptance/Final Inspection Flat Fee 50 $ 81 $ 89.45 91% $ 4,472 $ 4,050 $ 422 100% $ 89.00 $ 4,450 $ 400 $ 22 86 Standpipes Flat Fee 5 $ 96 $ 103.32 93% 517 $ $ 480 $ 37 100% $ 103.00 $ 515 $ 35 $ 2 87 Fire Alarm Sys: 1‐5 Flat Fee 20 $ 96 $ 103.32 93% $ 2,066 $ 1,920 $ 146 100% $ 103.00 $ 2,060 $ 140 $ 688 Fire Alarm Sys: 6‐25 Flat Fee 10 $ 115 $ 123.30 93% $ 1,233 $ 1,150 $ 83 100% $ 123.00 $ 1,230 $ 80 $ 3 89 Fire Alarm Sys: ea add 50 Flat Fee 5 $ 115 $ 123.30 93% 617 $ $ 575 $ 42 100% $ 123.00 $ 615 $ 40 $ 2 90 Auto Hood System: Single System Flat Fee 10 $ 134 $ 143.29 94% $ 1,433 $ 1,340 $ 93 100% $ 143.00 $ 1,430 $ 90 $ 3 91 Auto Hood System: Multi‐System, 1st Sys Flat Fee 5 $ 143 $ 153.29 93% 766 $ $ 715 $ 51 100% $ 153.00 $ 765 $ 50 $ 1 92 Specialized Fire Protection System Flat Fee 5 $ 105 $ 113.31 93% 567 $ $ 525 $ 42 100% $ 113.00 $ 565 $ 40 $ 2 93 FALSE ALARMS94 False Alarm Resp (3 in 6 mos/2 in 30 days) Penalty 70 $ 430 $ 349.90 123% $ 24,493 $ 30,100 $ (5,607) 100% $ 349.00 $ 24,430 $ (5,670) $ 63 95 Commercial Medical Alarms Penalty 1 $ 351 $ 333.75 105% 334 $ $ 351 $ (17) 100% $ 333.00 $ 333 $ (18) $ 1 96 ADMINISTRATIVE FEES97 Fire Incident Report Per Page 60 $ 0.10 $ 23.93 0% $ 1,436 $ 6 $ 1,430 0% $ 0.10 $ 6 $ ‐ $ 1,430 98 Investigative Photographs Flat Fee 2 $ 37 $ 35.21 105% 70 $ $ 74 $ (4) 100% $ 35.00 $ 70 $ (4) $ 0 99 Plan Check & Inspection ‐ B Permits Flat Fee 315 $ 338 $ 349.53 97% $ 110,101 $ 106,470 $ 3,631 100% $ 349.00 $ 109,935 $ 3,465 $ 166 100 Consultation ‐ Fire Marshal Hourly 50 $ 191 $ 207.18 92% $ 10,359 $ 9,550 $ 809 100% $ 207.00 $ 10,350 $ 800 $ 9 101 Consultation ‐ Deputy Fire Marshal New Hourly 20 $ ‐ $ 134.92 0% $ 2,698 $ ‐ $ 2,698 100% $ 134.92 $ 2,698 $ 2,698 $ ‐ 102 Consultation ‐ Fire Inspector II Hourly ‐ $ 107 $ 110.96 96% ‐ $ ‐$ $ ‐ 100% $ 110.96 $ ‐ ‐$ ‐$
User Fee Study Summary Sheet
City of La Mesa
Fire (2201‐2206)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy Current Recommendations
Per Unit Annual Per Unit Annual
103 Administrative Fines (Per City Policy) Set by Ordinance 1 $ ‐ $ ‐ 0% ‐ $ ‐$ $ ‐ 100% ‐ $ ‐$ ‐$ ‐$ 104 CROSSOVER SUPPORT TO OTHER DEPT'S FEES105 Filming Permits X‐Suppt 1 $ ‐ $ 321.73 0% 322 $ $ ‐ $ 322 ‐‐ this cost is added to Community Services Special Programs ‐‐106 Spec Event Permit 250‐499 X‐Suppt 3 $ ‐ $ 114.55 0% 344 $ $ ‐ $ 344 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ 107 Spec Event Permit 500‐999 X‐Suppt ‐ $ ‐ $ 210.77 0% ‐ $ ‐$ ‐$ ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ 108 Spec Event Permit 1000+ X‐Suppt 3 $ ‐ $ 210.77 0% 632 $ $ ‐ $ 632 ‐‐ recovery comes from special event fees charged by City Clerk ‐‐ Total User Fees $387,285 $371,277 $16,008 $382,486 $11,209 $4,799 % of Full Cost 96% 4% 99% 3% 1%
Total Other Services $12,878,539 $0 $12,878,539 $0 $0 $12,877,241 % of Full Cost 0% 100%Department Totals $13,265,824 $371,277 $12,894,547 $382,486 $11,209 $12,882,040 % of Full Cost 3% 97% 3% 3% 97%
Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost.
CITY CLERK
User Fee Study Summary Sheet
City of La Mesa
City Clerk (1302)
2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommended Subsidy 1 Resident Alien Certification Fixed Fee 25.00 1 $ $ 26.73 94% 27 $ $ 25 $ 2 100% 26.00 $ $ 26 $ 1 $ 1 2 Records Certification Fixed Fee 11 25.00 $ $ 26.73 94% 294 $ $ 275 $ 19 100% 26.00 $ $ 286 $ 11 $ 8 3 Release of Weed Abate Liens Fixed Fee 1 $ 152.00 $ 26.73 569% 27 $ $ 152 $ (125) 100% 26.00 $ $ 26 $ (126) $ 1 4 Spec Event Permit ‐ Parade Fixed Fee 1 $ 406.00 $ 911.53 45% 912 $ $ 406 $ 506 50% 455.00 $ $ 455 $ 49 $ 457 5 Spec Event Permit 250‐499 Fixed Fee 1 $ 482.00 $ 1,071.92 45% 1,072 $ $ 482 $ 590 50% 535.00 $ $ 535 $ 53 $ 537 6 Spec Event Permit 500‐999 Fixed Fee ‐ 583. $ 00 $ 1,297.31 45% ‐$ ‐$ $ ‐ 50% 648.00 $ ‐$ ‐$ ‐$ 7 Spec Event Permit 1000+ Fixed Fee 2, 3 $ 245.00 $ 4,839.71 46% 14,519 $ $ 6,735 $ 7,784 50% $ 2,419.00 $ 7,257 $ 522 $ 7,262 8 Amend to Spec Event 250‐499 Fixed Fee ‐ 222. $ 00 $ 495.86 45% ‐$ $ ‐ $ ‐ 50% 247.00 $ ‐$ ‐$ ‐$ 9 Amend to Spec Event 500‐999 Fixed Fee ‐ 253. $ 00 $ 568.46 45% ‐$ ‐$ $ ‐ 50% 284.00 $ ‐$ ‐$ ‐$ 10 Amend to Spec Event 1000+ Fixed Fee ‐ 1, $ 060.00 $ 2,288.59 46% ‐$ ‐$ $ ‐ 50% 1,144.00 $ ‐$ ‐$ ‐$ 11 Appeals ‐ Engineering (Traffic Comm) X‐Suppt ‐ $ ‐ $ 106.93 0% ‐$ ‐$ ‐$ ‐‐ recovery comes from fee charged by Engineering ‐‐ 12 Appeals ‐ All Others X‐Suppt ‐ $ ‐ $ 106.93 0% ‐$ ‐$ ‐$ ‐‐ recovery comes from appeals fees charged by other departments ‐‐ 13 Appeals ‐ Planning (Planning Comm) X‐Suppt 4 $ ‐ $ 106.93 0% 428 $ ‐$ $ 428 ‐‐ recovery comes from fee charged by Planninging ‐‐ 14 Initiation of Sewer Liens X‐Suppt 49 ‐$ $ 26.73 0% 1,310 $ ‐$ $ 1,310 ‐‐ recovery comes from fee charged by Wastewater Engineering ‐‐ 15 Release of Engineering Liens X‐Suppt 12 ‐$ $ 26.73 0% 321 $ ‐$ $ 321 ‐‐ recovery comes from fee charged by Engineering ‐‐ Total User Fees $16,850 $8,075 $8,775 $8,585 $510 $8,265 % of Full Cost 48% 52% 51% 6% 49%
Total Other Services $674,235 $0 $674,235 $0 $0 $672,177% of Full Cost 0% 100%Department Totals $691,085 $8,075 $683,010 $8,585 $510 $680,442 % of Full Cost 1% 99% 1% 6% 98%
Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost. 10) ‐ 12) Appeals ‐ This cost is added to all Appeal fees originating from other departments (Engineering, Finance, Planning) Current Recommendations
Per Unit Annual Per Unit Annual
FINANCE
User Fee Study Summary Sheet
City of La Mesa
Finance (1305)2021/2022
Ord Service Name Fee Description Annual Volume Current Fee Full Cost Current Recovery % Annual Cost Annual Revenue Annual Subsidy Recovery Level Fee @ Policy Level Annual Revenue2 Increased Revenue Recommen ded Subsidy 1 Dog Licenses‐ New & Renewal DELETE ‐ ‐ ‐ 0% ‐$ ‐$ ‐$ ‐‐ remove from Fee Schedule; dog licenses no longer issued the the City ‐‐ 2 Returned Checks Flat Fee ‐ 25.00 ‐ 0% ‐$ ‐$ $ ‐ 25.00 ‐$ ‐$ ‐$ 3 Returned Check ‐ Small Claim Flat Fee 100.00 ‐ ‐ 0% ‐$ ‐$ $ ‐ 100.00 ‐$ ‐$ ‐$ 4 Invoice Billing Late Fee Flat Fee 10 26.00 27.91 93% 279 $ $ 260 $ 19 100% 27.00 $ 270 $ 10 $ 9 5 Appeals Flat Fee 100.00 1 321.10 31% 321 $ $ 100 $ 221 31% 100.00 $ 100 $ ‐ $ 221 Total User Fees $600 $360 $240 $370 $10 $230% of Full Cost 60% 40% 62% 3% 38%Total Other Services $1,784,477 $0 $1,784,477 $0 $0 $1,784,477 % of Full Cost 0% 100%Department Totals $1,785,077 $360 $1,784,717 $370 $10 $1,784,707% of Full Cost 0% 100% 0% 3% 100% Footnotes Please see "Exceptions to Cost Recovery Policy" in the City's Master Fee Schedule for discussion on fees recommended at other than 100% of cost. 1 Dog Licenses‐ New & Renewal Remove from Master Fee Schedule; the City of La Mesa no longer issues dog licenses.2 Returned Checks The fee for returned checks is set at $25 by state law.3 Returned Check ‐ Small Claim The fee for returned checks through the small claims process is set at by state law at 3x the face value of the check, $100 minimum and $1,500 maximum.
Per Unit Annual Per Unit Annual
Current Recommendations
SECTION III
FULLY BURDENED HOURLY RATES
COMMUNITY DEVELOPMENT - PLANNING
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Planning (1401)Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin External Support Total 1 1 Admin Coordinator $ 58,799 $ 45.46 $ 36.00 $ 37.72 $ 119.18 2 2 Assoc/Asst Planner $ 71,903 $ 55.59 $ 44.02 $ 46.13 $ 145.743 3 Code Compl Officer II $ 67,191 $ 51.95 $ 41.14 $ 43.11 $ 136.194 4 Director of Comm Devel $ 153,572 $ 118.73 $ 94.02 $ 98.53 $ 311.28 5 5 Devel Svcs Tech I/II $ 54,195 $ 41.90 $ 33.18 $ 34.77 $ 109.85 6 6 Asst Comm Devel Director $ 126,741 $ 97.99 $ 77.59 $ 81.31 $ 256.89 7 7 CD Program Coordinator $ 83,880 $ 64.85 $ 51.35 $ 53.82 $ 170.02 Notes:
Internal admin/indirect rate of 79.2% is applied to hourly personnel rate.External admin/indirect rate of 83% is applied to hourly personnel rate.
Hourly
COMMUNITY DEVELOPMENT - BUILDING
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Building Inspection (2301)Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin External Support Total 1 1 Bldg Inspector I $ 66,691 $ 53.81 $ 46.03 $ 25.98 $ 125.82 2 2 Bldg Inspector II $ 73,372 $ 59.20 $ 50.64 $ 28.59 $ 138.43 3 3 Building Official $ 121,167 $ 97.77 $ 83.63 $ 47.21 $ 228.60 4 4 Devel Svcs Tech I (B) $ 55,603 $ 44.86 $ 38.38 $ 21.66 $ 104.90 5 5 Asst Comm Devel Director $ 126,740 $ 102.26 $ 87.47 $ 49.38 $ 239.11 6 6 Admin Coordinator $ 58,800 $ 47.44 $ 40.58 $ 22.91 $ 110.94 7 7 Assoc Planner $ 80,765 $ 65.17 $ 55.74 $ 31.47 $ 152.38 8 8 Code Compl Officer II $ 67,193 $ 54.22 $ 46.38 $ 26.18 $ 126.779 9 Devel Svcs Tech II (P) $ 53,264 $ 42.98 $ 36.76 $ 20.75 $ 100.49 10 10 Comm Devel Director $ 153,570 $ 123.91 $ 105.99 $ 59.83 $ 289.73 Notes:
Internal admin/indirect rate of 85.5% is applied to hourly personnel rate.
External admin/indirect rate of 48.3% is applied to hourly personnel rate.
Hourly
ENGINEERING
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Engineering (3106, 3201, 4141)Fiscal Year: 2019/2020 Ord Position Annual Salary Salary & Benefits Internal Dept Admin Citywide Overhead Total 1 Admin Coordinator $ 59,398 $ 48.20 $ 11.85 $ 32.87 $ 92.91 2 Admin Office Asst $ 45,310 $ 36.76 $ 9.04 $ 25.08 $ 70.88 3 Associate Engineer $ 96,132 $ 78.00 $ 19.17 $ 53.20 $ 150.38 4 Asst Director of Public Works $ 133,088 $ 107.99 $ 26.54 $ 73.66 $ 208.195 Cust Service Specialist II $ 53,808 $ 43.66 $ 10.73 $ 29.78 $ 84.17 6 Cust Service/Finance Asst $ 47,480 $ 38.53 $ 9.47 $ 26.28 $ 74.27 7 Dir of PW/City Engineer $ 166,560 $ 135.15 $ 33.22 $ 92.18 $ 260.55 9 Engineering Tech I $ 58,876 $ 47.77 $ 11.74 $ 32.58 $ 92.10 10 Engineering Tech II $ 67,234 $ 54.55 $ 13.41 $ 37.21 $ 105.17 11 Engr Project Manager $ 118,202 $ 95.91 $ 23.57 $ 65.42 $ 184.9012 PW Inspector II $ 73,644 $ 59.75 $ 14.69 $ 40.76 $ 115.20 13 Senior Accountant $ 95,695 $ 77.65 $ 19.09 $ 52.96 $ 149.69 14 Senior Management Analyst $ 95,694 $ 77.65 $ 19.09 $ 52.96 $ 149.69 19 Stormwater Program Mgr $ 92,916 $ 75.39 $ 18.53 $ 51.42 $ 145.35 Notes:
Internal admin/indirect rate of 24.6% is applied to hourly personnel rate.External admin/indirect rate of 68.2% is applied to hourly personnel rate.
Hourly
COMMUNITY SERVICES
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Community Services (5102‐5106)Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin External Support Total 1 1 Management Analyst $ 83,184 $ 59.65 $ 18.74 $ 42.48 $ 120.86 2 2 Admin Coordinator $ 58,798 $ 42.16 $ 13.24 $ 30.02 $ 85.43 3 3 Custodian $ 40,319 $ 28.91 $ 9.08 $ 20.59 $ 58.58 4 4 Director of Comm Svcs $ 153,572 $ 110.12 $ 34.59 $ 78.42 $ 223.13 5 5 Rec Supvsr ‐ Fac & Classes $ 67,928 $ 48.71 $ 15.30 $ 34.69 $ 98.69 6 6 Rec Supvsr ‐ Aquatics/ Sports $ 65,500 $ 46.97 $ 14.75 $ 33.45 $ 95.17 7 7 Rec Supvsr ‐ AEC $ 68,779 $ 49.32 $ 15.49 $ 35.12 $ 99.93 Notes:
Internal admin/indirect rate of 31.4% is applied to hourly personnel rate.External admin/indirect rate of 71.2% is applied to hourly personnel rate.
Hourly
POLICE
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Police (2101‐2108)Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin External Support Total 1 1 Crime Prev Spec I $ 61,032 $ 51.29 $ 28.47 $ 15.70 $ 95.46 2 2 Exec Secy to the Chief $ 58,798 $ 49.41 $ 27.43 $ 15.12 $ 91.96 3 3 Comm Supervisor $ 81,140 $ 68.19 $ 37.85 $ 20.87 $ 126.90 4 4 Police Chief $ 182,554 $ 153.41 $ 85.16 $ 46.95 $ 285.52 5 5 Dispatcher $ 64,876 $ 54.52 $ 30.26 $ 16.68 $ 101.476 6 Police Svcs Manager $ 116,928 $ 98.26 $ 54.55 $ 30.07 $ 182.88 7 7 Police Svcs Tech $ 56,418 $ 47.41 $ 26.32 $ 14.51 $ 88.24 8 8 Captain $ 169,337 $ 142.30 $ 79.00 $ 43.55 $ 264.85 9 9 Lieutenant $ 153,531 $ 129.02 $ 71.62 $ 39.48 $ 240.13 10 10 Sergeant $ 136,988 $ 115.12 $ 63.90 $ 35.23 $ 214.25 11 11 Officer $ 96,851 $ 81.39 $ 45.18 $ 24.91 $ 151.48 12 12 Property Officer I/II $ 56,240 $ 47.26 $ 26.24 $ 14.46 $ 87.96 13 13 Comm Svcs Officer $ 53,330 $ 44.82 $ 24.88 $ 13.71 $ 83.41 14 14 Animal Control Officer $ 56,439 $ 47.43 $ 26.33 $ 14.51 $ 88.27 15 15 Crime Analyst $ 72,015 $ 60.52 $ 33.59 $ 18.52 $ 112.63 17 17 Police Svcs Specialist $ 61,053 $ 51.31 $ 28.48 $ 15.70 $ 95.49 18 18 Downtown Oper Asst $ 49,194 $ 41.34 $ 22.95 $ 12.65 $ 76.94 Notes:
Internal admin/indirect rate of 55.5% is applied to hourly personnel rate.
External admin/indirect rate of 30.6% is applied to hourly personnel rate.
Hourly
FIRE
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Fire (2201‐2206)Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin External Support Total 1 1 Management Analyst $ 83,186 $ 72.30 $ 52.29 $ 20.72 $ 145.32 2 2 Fire Division Chief $ 139,632 $ 121.37 $ 87.78 $ 34.78 $ 243.93 3 3 Fire Marshal $ 118,598 $ 103.08 $ 74.55 $ 29.54 $ 207.184 4 Captain $ 114,471 $ 99.50 $ 71.96 $ 28.52 $ 199.97 5 5 Fire Engr/ Engr Paramedic $ 103,456 $ 89.92 $ 65.04 $ 25.77 $ 180.73 6 6 Firefighter/FF Paramedic $ 90,012 $ 78.24 $ 56.58 $ 22.42 $ 157.24 7 7 Fire Inspector I $ 63,517 $ 55.21 $ 39.93 $ 15.82 $ 110.96 8 8 Battalion Chief $ 126,426 $ 109.89 $ 79.48 $ 31.49 $ 220.86 9 9 Deputy Fire Marshal $ 77,235 $ 67.13 $ 48.55 $ 19.24 $ 134.92 10 10 Admin Office Assistant $ 41,092 $ 35.72 $ 25.83 $ 10.24 $ 71.78 11 11 Emer Prep Coord $ 83,875 $ 72.90 $ 52.73 $ 20.89 $ 146.52 Notes:
Internal admin/indirect rate of 72.3% is applied to hourly personnel rate.
External admin/indirect rate of 28.7% is applied to hourly personnel rate.
Hourly
CITY CLERK
Full Cost Hourly Rates
Agency: City of La MesaDepartment: City Clerk (1302)Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin External Support Total 1 1 Deputy City Clerk $ 64,331 $ 49.84 $ 15.94 $ 50.73 $ 116.51 2 2 Rec & Elec Mgr/City Clerk $ 112,794 $ 87.39 $ 27.94 $ 88.95 $ 204.28 Notes:
Internal admin/indirect rate of 32% is applied to hourly personnel rate.External admin/indirect rate of 101.8% is applied to hourly personnel rate.
Hourly
FINANCE
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Finance (1305)Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin External Support Total 1 1 Accounting Technician $ 62,870 $ 52.34 $ 37.09 $ 21.43 $ 110.86 2 2 Business License Officer $ 51,819 $ 43.14 $ 30.57 $ 17.66 $ 91.37 3 3 Director of Finance $ 139,290 $ 115.95 $ 82.17 $ 47.48 $ 245.60 4 4 Sr Management Analyst $ 95,693 $ 79.66 $ 56.45 $ 32.62 $ 168.73 5 5 Purchasing Officer $ 95,693 $ 79.66 $ 56.45 $ 32.62 $ 168.73 6 6 Admin Coordinator $ 58,798 $ 48.95 $ 34.69 $ 20.04 $ 103.68 7 7 Cust Svc / Fin Asst $ 47,481 $ 39.53 $ 28.01 $ 16.18 $ 83.72 8 8 Admin Office Assistant $ 41,092 $ 34.21 $ 24.24 $ 14.01 $ 72.46 9 9 Senior Accountant $ 95,693 $ 79.66 $ 56.45 $ 32.62 $ 168.73 10 10 Senior Accounting Technician $ 69,134 $ 57.55 $ 40.79 $ 23.56 $ 121.90 11 11 Admin Analyst $ 66,190 $ 55.10 $ 39.05 $ 22.56 $ 116.71 Notes:
Internal admin/indirect rate of 70.9% is applied to hourly personnel rate.External admin/indirect rate of 40.9% is applied to hourly personnel rate.
Hourly
PUBLIC WORKS
Full Cost Hourly Rates
Agency: City of La MesaDepartment: Public Works (1311, 1402, 3101‐3109, 3201, 4141‐4142, 5150‐515Fiscal Year: 2021/2022 I Ord Position Annual Salary Salary & Benefits Internal Dept Admin Citywide Overhead Total 4 1 Admin Analyst II $ 69,488 $ 59.35 $ 13.52 $ 31.20 $ 104.06 8 2 Admin Coordinator $ 56,373 $ 48.14 $ 10.97 $ 25.31 $ 84.42 1 3 Admin Office Assistant $ 43,201 $ 36.90 $ 8.40 $ 19.40 $ 64.706 4 Associate Engineer $ 96,132 $ 82.10 $ 18.70 $ 43.16 $ 143.96 12 5 Asst Director of Public Works $ 133,089 $ 113.66 $ 25.89 $ 59.75 $ 199.31 13 6 Bldg Maintenance Supervisor $ 73,289 $ 62.59 $ 14.26 $ 32.90 $ 109.75 5 7 Bldg Maintenance Worker II $ 53,682 $ 45.85 $ 10.44 $ 24.10 $ 80.39 14 8 Code Compliance Officer II $ 67,191 $ 57.38 $ 13.07 $ 30.17 $ 100.6220 9 Cust Service Specialist II $ 53,808 $ 45.95 $ 10.47 $ 24.16 $ 80.58 15 10 Cust Svc/Finance Asst $ 47,480 $ 40.55 $ 9.24 $ 21.32 $ 71.10 16 11 Custodian $ 40,319 $ 34.43 $ 7.84 $ 18.10 $ 60.38 3 12 Director of Public Works/City Engr $ 166,560 $ 142.25 $ 32.40 $ 74.78 $ 249.43 7 13 Director of Finance $ 139,300 $ 118.97 $ 27.10 $ 62.54 $ 208.61 17 14 Downtown Operations Asst $ 49,194 $ 42.01 $ 9.57 $ 22.09 $ 73.67 18 15 Engineering Tech I $ 58,876 $ 50.28 $ 11.45 $ 26.43 $ 88.17 9 16 Engineering Tech II $ 67,234 $ 57.42 $ 13.08 $ 30.19 $ 100.69 19 17 Engr Project Manager $ 118,202 $ 100.95 $ 22.99 $ 53.07 $ 177.01 10 18 Envtal Program Manager $ 88,510 $ 75.59 $ 17.22 $ 39.74 $ 132.55 11 19 Equipment Operator $ 56,982 $ 48.67 $ 11.08 $ 25.58 $ 85.33 21 20 Equipment Service Worker $ 44,683 $ 38.16 $ 8.69 $ 20.06 $ 66.9122 21 Fleet Maint Supervisor $ 73,289 $ 62.59 $ 14.26 $ 32.90 $ 109.7523 22 Heavy Equipment Operator $ 59,800 $ 51.07 $ 11.63 $ 26.85 $ 89.5524 23 Irrigation Technician $ 54,372 $ 46.44 $ 10.58 $ 24.41 $ 81.4225 24 Lead Mechanic $ 69,072 $ 58.99 $ 13.44 $ 31.01 $ 103.4426 25 Mechanic II $ 59,070 $ 50.45 $ 11.49 $ 26.52 $ 88.4627 26 PW Inspector II $ 73,644 $ 62.90 $ 14.33 $ 33.06 $ 110.2828 27 PW Maint Lead Worker $ 56,835 $ 48.54 $ 11.06 $ 25.52 $ 85.1129 28 PW Maint Supervisor $ 73,289 $ 62.59 $ 14.26 $ 32.90 $ 109.7530 29 PW Maint Worker I $ 43,973 $ 37.55 $ 8.55 $ 19.74 $ 65.85 31 30 PW Maint Worker III $ 54,372 $ 46.44 $ 10.58 $ 24.41 $ 81.4232 31 Park Maint Lead Worker $ 62,661 $ 53.52 $ 12.19 $ 28.13 $ 93.8433 32 Park Maint Supervisor $ 74,189 $ 63.36 $ 14.43 $ 33.31 $ 111.1034 33 Park Maint Worker I $ 44,940 $ 38.38 $ 8.74 $ 20.18 $ 67.3035 34 Park Maint Worker II $ 49,444 $ 42.23 $ 9.62 $ 22.20 $ 74.0436 35 Park Maint Worker III $ 54,872 $ 46.86 $ 10.67 $ 24.64 $ 82.17 37 36 Senior Accountant $ 95,695 $ 81.73 $ 18.62 $ 42.96 $ 143.3138 37 Senior Management Analyst $ 95,694 $ 81.73 $ 18.62 $ 42.96 $ 143.3039 38 Stormwater Program Manager $ 92,916 $ 79.35 $ 18.07 $ 41.72 $ 139.1440 39 Tree Trimmer $ 54,100 $ 46.20 $ 10.52 $ 24.29 $ 81.02 41 40 WW Maint Worker III $ 53,725 $ 45.88 $ 10.45 $ 24.12 $ 80.45 Notes:
Internal admin/indirect rate of 22.8% is applied to hourly personnel rate.External admin/indirect rate of 52.6% is applied to hourly personnel rate.
Hourly
FEE SCHEDULE
FISCAL
YEAR
2022-2023
CITY OF LA MESA
FEE SCHEDULE
FISCAL YEAR 2022-2023
Section 1 - Resolution
Section 2 - Cost Recovery Policy
Section 3 - Exceptions to the Cost Recovery Policy
Section 4 - Annual Update Process
Section 5 - List of Fees
Section 6 - 2018 Building Valuation Schedule
CITY OF LA MESA
FEE SCHEDULE
FISCAL YEAR 2022-2023
Section 1 - Resolution
RESOLUTION NO. 2022-
RESOLUTION ADOPTING A FEE SCHEDULE TO BE CHARGED BY VARIOUS CITY DEPARTMENTS FOR FISCAL YEAR 2022-2023
________________________________________________________________ WHEREAS, in 2003-2004 the City of La Mesa hired Public Resource Management Group (PRM), now part of MGT of America Consulting, LLC, to develop a Fee Study and Cost Allocation Plan (the Study);
WHEREAS, the City Council gave final approval of the Cost Recovery Policy, Exceptions to the Cost Recovery Policy, Annual Fee Update Process, Listing of Fees, and Building Valuation Schedule at its meeting on May 25, 2004; WHEREAS, the Listing of Fees represents reimbursement for costs reasonably borne by the City in providing direct services to particular individuals or groups rather than to the general populace of the City of La Mesa;
WHEREAS, in order for the City to continue to provide said services, it is necessary for the City to recover the costs of providing such services; WHEREAS, in order to continue to meet cost recovery objectives, the adopted Annual Fee Update Process calls for fees to be adjusted annually as part of the City budget process; WHEREAS, the adopted Annual Fee Update Process calls for a formal update of the City’s User Fee Study and Cost Allocation Plan in even numbered years and adjustments to fees based on the Study results;
WHEREAS, MGT of America Consulting, LLC was hired to update the Fee Study and Cost Allocation Plan for Fiscal Year 2022-2023;
WHEREAS, Government Code Section 66017(a) specifies that the effective date of all development project fees shall be no sooner than 60 days following the final action on the adoption of fees; and
WHEREAS, the effective date of all fee changes shall be July 1, 2022.
BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, that 1) fees as described in the accompanying staff report are justified in that any adjustments do not exceed the estimated reasonable costs of providing the services and that the requisite findings and determinations required pursuant to Government Code Section 66000 et seq. for specified fees have been made in supporting documentation (i.e., this Resolution, and accompanying staff report) and 2) the adjustments recommended thereby are hereby adopted by this resolution.
PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 26th day of April 2022, by the following vote, to wit:
AYES:
NOES:
ABSENT:
CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2022- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.
MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)
CITY OF LA MESA
FEE SCHEDULE
FISCAL YEAR 2022-2023
Section 2 - Cost Recovery Policy
Council Basis For
Department/Division Policy Cost Allocation
Community Development - Building
Building Permits 100% Total Costs
Plan Checks 100% Total Costs
Mechanical/Electrical/Plumbing Permits 100% Total Costs Other Building Fees 100% Total Costs
Community Development - Planning
Legislative Actions 100% Total Costs
Discretionary Permits and Environmental Review 100% Total Costs Discretionary Permits and Environmental Review - Small Projects 50% (1) Total Costs Historic Preservation Review 100% Total Costs
Historic Preservation Review Without Mills Act Contract 25% Total Costs Other, Ministerial Permits and Licenses 100% Total Costs Plan Checks 100% Total Costs
Subdivisions 100% Total Costs
Annexations 100% Total Costs
Services Requiring Deposits 100% Total Costs
Public Works - Engineering
Plan Checks 100% Total Costs
Inspections 100% Total Costs
Subdivisions 100% Total Costs
Other Engineering Fees 100% Total Costs
Services Requiring Deposits 100% Total Costs
Community Services
Community Services Fees 60% (2) Total Costs
Police
Police Department Fees 100% Total Costs
Fire
Fire Department Fees 100% Total Costs
General Government
Downtown Parking Fees 100% Total Costs
City Clerk Fees - Outdoor Assemblage Permits 50% Total Costs City Clerk Fees - All Other 100% Total Costs
Finance Fees - Dog Licenses (New and Renewal) 50% Total Costs Finance Fees - All Other 100% Total Costs
CITY OF LA MESA
COST RECOVERY POLICY
(1) Small projects are defined as: Residential - 1-3 dwelling units or Non-Residential - less than 2,500 square feet.
(2) Community Services cost recovery objectives vary based on fee categories and market rate comparisons.The overall cost recovery ratio for all fee categories is 60%.
2-1 2-1
CITY OF LA MESA
FEE SCHEDULE
FISCAL YEAR 2022-2023
Section 3 - Exceptions to the Cost
Recovery Policy
CITY OF LA MESA
EXCEPTIONS TO COST RECOVERY POLICY
Community Development - Building
Cost Recovery Objective: 100% of Total Costs.
Exceptions:
Appeals are set at $100.
Quimby Act Parkland Dedication In-Lieu Fee and Park Improvement Fee are waived for projects including 100% of dwelling units deed-restricted for rent at an affordable rent (as defined in California Health and Safety Code section 50053), or for sale, for 55 years or more to persons and families of extremely low, very low, low or moderate income (as defined in California Health and Safety Code section 50093). The initial $2,000 of incurred City fees shall be waived for accessory dwelling unit (ADU) and junior accessory dwelling unit (JADU) building permit applications. The applicant shall be responsible for the full amount of fees due to any other agency, which shall be calculated based on the assessed full permit fees prior to application of the waiver.
Community Development - Planning
Cost Recovery Objective: 100% of Total Cost, except for Discretionary Permits and Environmental Review for “small” projects (50% of total costs), Historic Preservation Commission site plan review (25% of total costs), and Historic Preservation Review for projects without a Mills Act Contract (25% of total costs).
Exceptions:
Provide a "discount" for concurrent processing to reflect efficiencies: 100% for first service, 75% for second service, 50% for third and any additional services. Environmental Exemption set at 50% cost recovery.
Parking in-lieu fees were adopted by City Council Resolution 2015-020. Environmental Filing Fees are set by the Department of Fish and Game pursuant to Fish and Game Code Section 711.4.
Appeals are set at $100.
Setback Exception set at 50% cost recovery.
Abandoned shopping cart program fees are set by City Council Resolution 2005-036.
Public Works - Engineering
Cost Recovery Objective: 100% of Total Costs.
3-1
Exceptions:
Block Party/Street Closure fee is set at $50.
Transportation Permit & Inspection fee is set by the State at $16. Appeals are set at $100.
Sewer Connection Fee is waived for projects including 100% of dwelling units deedrestricted for rent at an affordable rent (as defined in California Health and Safety Code section 50053), or for sale, for 55 years or more to persons and families of extremely low, very low, low or moderate income (as defined in California Health and Safety Code section 50093).
Sewer Connection Fee is waived for affordable dwelling units, constructed in mixedincome housing developments, that are in excess of the calculated base density and that are deed-restricted for rent at an affordable rent (as defined in California Health and Safety Code section 50053), or for sale, for 55 years or more to persons or families of extremely low, very low, low or moderate income (as defined in California Health and Safety Code section 50093).
Community Services`
Cost Recovery Objective: 60% of Total Costs. (Community Services cost recovery objectives vary based on fee categories and market rate comparisons. Adjustments to fees will be based on the approved City Council Policy. The overall cost recovery ratio for all fee categories is 60%.) Exceptions:
Cost recovery for department set to 46% for Fiscal Year 2018-2019. Community Services will continue to have differentiated fees for residents and nonresidents. A reduced facility rental rate was adopted for civic/non-profit groups and service clubs. Alcohol Permit w/Rental Fee set at 50% cost recovery.
Police
Cost Recovery Objective: 100% of Total Costs.
Exceptions:
The California Department of Justice allows for fees up to $20 for fingerprinting (Livescan roll fee only).
The fee for both Police Report Copies and Traffic Reports is $0.10 per page to facilitate access to public information.
3-2
Pursuant to Evidence Code Section 1536, the fee for Civil Discovery/Subpoenas is set at $24 per hour per person.
The fee for Hazardous Spill Cleanup Security and Outdoor Assembly (1,000+) is actual cost per officer hour.
Child Safety Seat Installations are provided free of charge as a public service to residents of the City of La Mesa. Non-residents are charged at 100% cost recovery. Correctible Cite Signoff fee is waived for citations originally issued by La Mesa Police. Commercial Sound Amplification Fee is set at $25.
The fee for Civil Court Appearances is set at $275 for sworn/public safety staff by Government Code Section 68097.2(b) and at $275 for non-sworn/non-public safety staff by Government Code Section 68096.1(b).
Vicious Dog Hearings are held by the Chief of Police and Animal Control Officer to determine the status of potentially dangerous dogs. Dog owners who successfully go through the process are required to pay shelter fees to the El Cajon Animal Shelter and are potentially required to provide additional safeguards for housing of the animal. No fee is charged for these hearings so as to not add a further financial burden to dog owners in this situation.
Relinquished Dogs and Cats fee set at the El Cajon shelter fee charged to the public. Shelter Impound and Boarding fees set at the El Cajon shelter fees charged to the public.
Fire
Cost Recovery Objective: 100% of Total Costs.
Exceptions:
Licensed Day Care Inspection fees are capped by the California Health and Safety Code at $50 for the pre-inspection of a facility with a capacity to serve 25 or fewer persons and $100 for a pre-inspection of a facility with a capacity to serve 26 or more persons. The California Fire Code allows the agency having jurisdiction to determine the frequency of renewal for Section 105 Fire Code Permits. Due to staffing levels, the fire department prioritizes the renewal of these permits based on hazard level. As a result, not all processes are permitted on an annual basis.
As a public service churches are not charged for Open Flames or Candle Permits. For Commercial Fireworks and Pyrotechnics specific use permits, the fee is the permit fee plus the cost of providing a fire engine for stand-by services at the event. Plan check costs do not include fees charged by an outside plan check consultant. The consultant’s fees are charged in addition to the City of La Mesa’s plan check fees. These fees are paid directly to the consultant by the applicant.
3-3
The fee for copies of Fire Incident Reports is $0.10 per page.
General Government
Cost Recovery Objective: 100% of Total Costs, except for Outdoor Assemblage Permits and Animal Control (i.e., dog licenses) (50% of Total Costs).
Exceptions:
Business license fees can only be adjusted by a vote of the people. Parking meter and permit rates in the downtown parking district were ratified by City Council action on September 13, 2005.
The initiative processing fee is set at $200.00 per Elections Code Section 9202(b). The Document Retrieval Fee for Campaign Disclosures is set at $5.00 per Government Code Section 81008.
To encourage community events, a 50% cost recovery policy was adopted for Special Event Permits; provided, however, any materials or required staffing for the event is charged at full cost recovery unless a specific exception has been approved by the City Council. Amendment to Special Event Permits should not exceed 60% of Special Event Permits.
Photocopy fees are $0.10 per page to facilitate access to public information. The maximum fee for returned checks is $25 set by State law. The fee for returned checks through the Small Claims process is set by State law at 3x the face amount; minimum is $100, maximum is $1,500.
Audio disk and DVD copies are charged at actual cost, not to exceed $10.00 per disk. Appeals are set at $100.
3-4
CITY OF LA MESA
FEE SCHEDULE
FISCAL YEAR 2022-2023
Section 4 - Annual Update Process
CITY OF LA MESA
ANNUAL UPDATE PROCESS
In order to maintain User Fee Cost Recovery Objectives, the City Council of the City of La Mesa adopted the following Annual Update Process:
1. Fees shall be updated annually as part of the City budget process.
2. During the year the biennial budget is adopted (odd-numbered years), fees shall be updated by the percent change in each relevant department or division budget (total budget or personnel budget only depending on how fee related costs are budgeted).
3. During the mid-biennium budget update year (even-numbered years), the City shall complete a formal update of its User Fee Study and adjust fees based on the Study results.
Any changes to this Annual Update Process shall be made by an action of the City Council.
4-1 4-1
CITY OF LA MESA
FEE SCHEDULE
FISCAL YEAR 2022-2023
Section 5 - List of Fees
Community Development – Building 5-1
Community Development – Planning 5-7
Public Works – Engineering, Wastewater 5-9
Community Services 5-12
Police 5-18
Fire 5-20
General Government –
Parking Meters, City Clerk, Finance 5-26
Business License Fees 5-28
DESCRIPTION
COMMUNITY DEVELOPMENT – BUILDING FEE A FEE B FEE A FEE B Building Permit Fees:(E)
VALUATION FEES
$1.00 to $500.00 $40.70 $44.70
FEE A for the first $500.00 plus FEE B for each additional $100.00 or fraction thereof, to and including $2,000.00 $40.70 $3.00 $44.70 $3.30
FEE A for the first $2,000.00 plus FEE B for each additional $1,000.00 or fraction thereof, to and including $25,000.00 $85.70 $16.00 $94.20 $17.60
FEE A for the first $25,000.00 plus FEE B for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $453.70 $11.60 $499.00 $12.70
FEE A for the first $50,000 plus FEE B for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $744.90 $10.10 $819.30 $11.10
FEE A for the first $100,000.00 plus FEE B for each additional $1,000.00 or fraction thereof, to and including $500,000.00 $1,254.40 $5.70 $1,379.80 $6.20
FEE A for the first $500,000.00 plus FEE B for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 $3,550.40 $5.00 $3,905.40 $5.50
FEE A for the first $1,000,000.00 plus FEE B for each
additional $1,000.00 or fraction thereof
$6,050.40 $4.00 $6,655.40 $4.40
Other Building Inspections and Fees:(E)
1. Inspections outside of normal business hours - Minimum charge one (1) hour
2. Reinspection fees assessed under provisions of Section 305(g)
3. Inspections for which no fee is specifically indicated - Minimum charge one (1) hour
4. Additional plan review changes, additions or revisions to approved plans - Minimum charge one (1) hour
Plan Review Fee:(E)
Plan Check Fee for State Energy Regulations:(E)
Plan check fee for reviewing plans and calculations for compliance with Title 24 State Energy Regulations
State Energy Regulations Inspection Fee
State Accessibility Regulations Plan Check Fee
State Accessibility Regulations Inspection Fee
Grading Plan Review Fees:(E)
50 cubic yards or less $48.90 $53.70
51 to 100 cubic yards $59.00 $64.90
101 to 1000 cubic yards $85.70 $94.20
1001 to 10,000 cubic yards $118.50 $130.30
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
When a plan or other data is required to be submitted for plan review, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be 76% of the building permit fee.
Reduction of up to 75% of the plan review fee may be granted by the Building Official when identical plans were approved previously within one calendar year and same code requirements apply to both submittals.
FY 21-22 FEES
PROPOSED
10% of Plan Check Fee
10% of Permit Fee
36% of Plan Check Fee
36% of Permit Fee
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
FY 22-23 FEES
11% of Plan Check Fee
11% of Permit Fee
40% of Plan Check Fee
40% of Permit Fee
5-1
DESCRIPTION
COMMUNITY DEVELOPMENT – BUILDING FEE A FEE B FEE A FEE B
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
FY 21-22 FEES
PROPOSED
FY 22-23 FEES
10,001 to 100,000 cubic yards- FEE A for the first 10,000 cubic yards, plus FEE B for each additional 10,000 cubic yards or fraction thereof
$118.50 $59.00 $130.30 $64.90
100,001 to 200,000 cubic yards- FEE A for the first 100,000 cubic yards, plus FEE B for each additional 10,000 cubic yards or fraction thereof
$629.30 $33.90 $692.20 $37.20
200,001 cubic yards or more- FEE A for the first 200,000 cubic yards, plus FEE B for each additional 10,000 cubic yards or fraction thereof
$972.30 $17.65 $1,069.50 $19.40
Other Fees:(E)
Additional plan review required by changes, additions or revisions to approved plans - Minimum charge one (1) hour $98.60 $108.40
Grading Permit Fees:(E)
50 cubic yards or less $52.40 $57.60
51 to 100 cubic yards $75.90 $83.40
101 to 1,000 cubic yards - FEE A for the first 100 cubic yards plus FEE B for each additional 100 cubic yards or fraction thereof
$75.90 $37.60 $83.40 $41.30
1,001 to 10,000 cubic yards - FEE A for the first 1000 cubic yards plus FEE B for each additional 1,000 cubic yards or fraction thereof
$397.10 $30.30 $436.80 $33.30
10,001 to 100,000 cubic yards- FEE A for the first 10,000 cubic yards, plus FEE B for each additional 10,000 cubic yards or fraction thereof
$668.70 $136.30 $735.50 $149.90
100,001 cubic yards or more- FEE A for the first 100,000 cubic yards, plus FEE B for each additional 10,000 cubic yards or fraction thereof
$1,884.10 $75.70 $2,072.50 $83.20
Mechanical Permit Fees:
Permit Issuance:(E)
1. For the issuance of each permit $51.70 $56.80
2. For issuing each supplemental permit $30.80 $33.80
Unit Fee Schedule:
1. For the installation or relocation of each forced-air or gravitytype furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h
$63.10 $69.40
2. For the installation or relocation of each forced-air or gravitytype furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h
$71.70 $78.80
3. For the installation or relocation of each floor furnace, including vent
$63.10 $69.40
4. For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater
$63.10 $69.40
5. For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit
$32.60 $35.80
6. For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code $62.00 $68.20
5-2
DESCRIPTION
COMMUNITY DEVELOPMENT – BUILDING FEE A FEE B FEE A FEE B
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
FY 21-22 FEES
PROPOSED
FY 22-23 FEES
7. For the installation or relocation of each boiler or compressor to and including three horse-power, or each
absorption system to 2nd including 100,000 Btu/h
$63.10 $69.40
8. For the installation or relocation of each boiler or compressor over three horse-power to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu/h
$114.70 $126.10
9. For the installation or relocation of each boiler or compressor over 15 horse-power to and including 30 horsepower, or each absorption system over 500,000 Btu/h and including 1,000,000 Btu/h
$155.10 $170.60
10. For the installation or relocation of each boiler or compressor over 30 horse-power to and including 50 horsepower, or each absorption system over 1,000,000 Btu/h and including 1,750,000 Btu/h
$230.30 $253.30
11. For the installation or relocation of each boiler or refrigeration compressor over 50 horse-power, or each
absorption system over 1,750,000 Btu/h
$386.30 $424.90
12. For each air-handling unit to and including 10,000 cubic feet per minute, ducts attached thereto.
NOTE: This fee shall not apply to an air-handing unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.
$45.80 $50.30
13. For each air-handling unit over 10,000 cfm $75.80 $83.30
14. For each evaporative cooler other than portable type $45.80 $50.30
15. For each ventilation fan connected to a single duct $32.00 $35.20
16. For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit $45.80 $50.30
17. For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood
$45.80 $50.30
18. For the installation or relocation of each domestic-type incinerator
$75.80 $83.30
19. For the installation or relocation of each commercial or industrial-type incinerator
$309.30 $340.20
20. For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code
$45.80 $50.30
For each gas piping system of one to four outlets $20.60 $22.60 For each gas piping system of five or more outlets per outlet $4.20 $4.60 Plumbing Permit Fees:(E)
1. Plumbing Issuance Fee $63.30 $69.60
2. Bathtub $13.00 $14.30
3. Dental Unit/Cuspidor $13.00 $14.30
4. Floor Drain $13.00 $14.30
5. Gas Outlet (I-5) $13.00 $14.30
6. Gas Outlet (over 5) $2.80 $3.00
7. Building Sewer $40.70 $44.70
8. Interceptors/Pump $13.00 $14.30
21. When Chapter 12 is applicable (see Section 103), permit fees for fuel gas piping shall be as follows:
5-3
DESCRIPTION
COMMUNITY DEVELOPMENT – BUILDING FEE A FEE B FEE A FEE B
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
FY 21-22 FEES
PROPOSED
FY 22-23 FEES
9. Lavatory $13.00 $14.30
10. Laundry Tubs $13.00 $14.30
11. Backflow Prevented $13.00 $14.30
12. Receptor & Floor Sink $13.00 $14.30
13. Shower Drain $13.00 $14.30
14. Sink - Kitchen $13.00 $14.30
15. Sink - Other $13.00 $14.30
16. Urinal $13.00 $14.30
17. Washing Machine Drain $13.00 $14.30
18. Water Closet $13.00 $14.30
19. Water Heater $13.00 $14.30
20. Water Pipe Repair/Replace $13.00 $14.30
21. Water Softener $13.00 $14.30
22. Drain-Vent Repair/Alternate $13.00 $14.30
23. Hose Bib $13.00 $14.30
24. Drinking Fountain $13.00 $14.30
Electrical Permit Fees:(E)
1. For the issuance of each permit $31.00 $34.10
2. New Construction - for each ampere of main service,
switch, fuse or breaker
$0.40 $0.40
3. New Service on existing building - for each ampere in main service, switch, fuse or breaker
$0.40 $0.40
4. Remodel or alteration with no change in service for each circuit
$10.10 $11.10
5. Temporary service or pole $16.30 $17.90
6. Upgrade existing service - for each ampere of main service, switch, fuse or breaker added
$0.40 $0.40
Solar Permit Fees:
1. For each issuing permit $35.30 $38.80
2. For Collectors (including related piping and regulating devices) - up to 1000 sq. ft. (93m2)
$11.50 $12.60
1001 sq. ft. (93.1m2) and above - FEE A plus FEE B/1000 sq. ft.
$15.60 $4.40 $17.10 $4.80
3. For Storage Tanks (including related piping and regulating devices) - up to 750 gallons (3m3)
$6.90 $7.50
751 gallons (3m3) and above - FEE A plus FEE B/1000 sq. ft
$11.50 $3.50 $12.60 $3.80
4. For Rock Storage - Up to 1500 cu. ft. (42m3) $6.70 $7.30 1501 cu. ft. (42m3) and above - FEE A plus FEE B/1000 sq. ft
$11.50 $4.40 $12.60 $4.80
5. For each appliance or piece of equipment regulated by this Code for which no fee is listed
$6.70 $7.30
7. Reinspection fee - Fourth and subsequent
1. Residential - Minimum charge two (2) hours
2. Commercial - Minimum charge four (4) hours
Rooftop solar energy system (plan check and inspection) Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Photovoltaic System:
6. Plan check fee. Where specific plans are required, a plan check fee shall be charged equal to one-half (1/2) the total permit fee, including the permit issuance fee
5-4
DESCRIPTION
COMMUNITY DEVELOPMENT – BUILDING FEE A FEE B FEE A FEE B
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
FY 21-22 FEES
PROPOSED
FY 22-23 FEES
Residential Land Use
Single Family
Quimby Act Parkland Dedication In-Lieu Fee $3,882.00 PENDING Park Improvement Impact Fee $1,559.00 PENDING
Total – Quimby Fee + Improvement Fee $5,441.00 PENDING
Multi-Family
Quimby Act Parkland Dedication In-Lieu Fee $2,815.00 PENDING Park Improvement Impact Fee $1,130.00 PENDING
Total – Quimby Fee + Improvement Fee $3,945.00 PENDING
Microfilming Fee:
Compliance Survey Fee:
Compliance Survey of an existing structure
Unsafe and Substandard Building Administrative Fee $983.70 $1,082.00 House Moving Fees:
(a) Salvaging, wrecking permit fee: The permit fee for
salvaging or wrecking any structure shall be as follows:
$102.70 $112.90
(b) Moving permit fee $207.20 $227.90
Microfilm Copies:
Each Copy $0.60 $0.60
Each Appeal (E) $100.00 $100.00
Business License Inspection Fee
Record Research/Report $34.30
Green Building Standards Code:
Cal Green Code plan check & inspection - Minimum charge two (2) hours
NOTE:
The fee for microfilming plans and calculations of new residential buildings, new and remodel/alteration of commercial and industrial buildings shall be an amount equal to the projected cost for processing and filming such documents.
Full cost hourly rate Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Full cost hourly rate
Appeal to the Uniform Building Code Board of Appeals:
(E) See Exceptions to Cost Recovery Policy
Fee A is the primary fee and Fee B is any secondary amount Parkland Acquisition and Improvements Fee Schedule
(Resolution 2005-050):(E)
5-5
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
COMMUNITY DEVELOPMENT – PLANNING
Discretionary Permits (subject to "discount"):(1)
Zone Change* $13,696.00 $15,065.00
Zoning Ordinance Amendment* $15,889.00 $17,477.00
Variance:*
Residential - 1-3 dwelling units
Non-residential - less than 2,500 sq. ft.
$2,099.00 $2,308.00
Residential - 4 or more dwelling units
Non-residential - 2,500 sq. ft. or greater
$4,127.00 $4,539.00
Special Permit:*
Residential - 1-3 dwelling units
Non-residential - less than 2,500 sq. ft.
$2,047.00 $2,251.00
Residential - 4 or more dwelling units
Non-residential - 2,500 sq. ft. or greater
$4,023.00 $4,425.00
Conditional Use Permit:*
Residential - 1-3 dwelling units
Non-residential - less than 2,500 sq. ft.
$2,089.00 $2,297.00
Residential - 4 or more dwelling units
Non-residential - 2,500 sq. ft. or greater
$4,134.00 $4,547.00
Medical Marijuana Activity Zone Conditional Use Permit (nonrefundable fee) $11,770.00 $13,019.00
Medical Marijuana Initial Application (non-refundable fee) $3,918.00 $4,309.00 Adult-use Cannabis Business License Fee
Co-location**
$4,383.00 $4,937.00
Adult-use Cannabis Business License Fee
Phase one review**
$833.00 $911.00
Adult-use Cannabis Business License Fee
Phase two review**
Cultivation and Manufacturing $9,489.00 $10,795.00
Distribution and Testing Laboratory $6,821.00 $7,576.00 Site Plan Review:
Residential - 1-3 dwelling units
Non-residential - less than 2,500 sq. ft.
$1,404.00 $1,544.00
Residential - 4 - 10 units
Non-residential - 2,500 - 25,000 sq. ft.
$3,743.00 $4,101.00
Residential - 10 or more units
Non-residential - 25,000 sq. ft. or greater
$4,904.00 $5,318.00
General Plan Amendment/Specific Plan* $15,122.00 $16,634.00 Subdivision:
Parcel Map Waiver/Boundary Adjustment Plat $2,278.00 $2,412.00 Tentative Parcel Map* $5,861.00 $6,447.00
Tentative Subdivision Map* $7,519.00 $8,270.00
Planned Residential Development $5,378.00 $5,915.00
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
(1) A "discount" is provided when two or more applications are submitted for concurrent review to reflect efficiencies: 100% for first service, 75% for second service, 50% for third and any additional services. "Discount" only applies to planning and zoning portion of the fees.
NOTE: The Initial Application fee is included as part of the Medical Marijuana Activity Zone Conditional Use Permit fee and is required at first application submittal. The remaining balance of the Medical Marijuana Activity Zone Conditional Use Permit fee is due after obtaining initial clearance.
5-6
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
COMMUNITY DEVELOPMENT – PLANNING
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Other Planning Fees:
Design Review:
Residential - 1-3 dwelling units
Non-residential - less than 2,500 sq. ft.
$1,896.00 $2,085.00
Residential - 4 or more dwelling units
Non-residential - 2,500 sq. ft. or greater
$3,260.00 $3,497.00
Extension Requests/Revisions $510.00 $561.00
Certificate of Compliance $1,469.00 $1,558.00
Environmental Impact Report - Minimum $50,000.00 deposit toward contract in addition to fee
$8,277.00 $8,579.00
Environmental Assessment/Initial Study (Neg Dec/MND):
Residential - 1-3 dwelling units
Non-residential - less than 2,500 sq. ft.
$1,430.00 $1,573.00
Residential - 4 or more dwelling units
Non-residential - 2,500 sq. ft. or greater
$3,015.00 $3,236.00
Env. Review/Tech Study Review Contract Admin. (non-EIR) - Deposit also required per contract
$2,828.00 $3,041.00
Environmental Exemption (E) $101.00 $111.00
Public Notice (per notice) $671.00 $729.00
Certificate of Non-conforming Use $2,987.00 $3,285.00
Parking In-Lieu (per space) (E) $25,000.00 $25,000.00
Annual Inspection - Med. Marijuana CUP $2,457.00 $2,684.00 Annual Medical Marijuana Maintenance Reports $18,800 - $24,480 $18,800 - $24,480 Negative Declaration (ND) $2,406.75 FEE REMOVED
Mitigated Negative Declaration (MND) $2,406.75 FEE REMOVED Environmental Impact Report (EIR) $3,343.25 FEE REMOVED Environmental Document pursuant to a Certified
Regulatory Program (CRP)
$1,136.50 FEE REMOVED
County Clerk Processing Fee $50.00 FEE REMOVED
Appeals (E) $100.00 $100.00
Annexations or Reorganization:
100% Consent $2,939.00 $3,127.00
Other $11,757.00 $12,511.00
Holiday Merchandise Sales & Inflatable balloons - $500.00 refundable deposit required in addition to fee
$183.00 $201.00
Sign Permit $186.00 $204.00
Temporary Banner Permit $48.00 $52.00
Building Plan Check (Planning) - 37% Building Plan Check Building Inspection (Planning) $364.00 $400.00
Grading Plan Check (Planning) - 20% of Grading Permit Fee Liquor License ABC Application (also requires Public Notice)* $1,552.00 $1,707.00 Misc. Business License Review $108.00 $114.00
Setback Exception* (E) $371.00 $408.00
Zoning Letter $194.00 $210.00
Junior Accessory Dwelling Unit Covenant Fee
(per State law)
$118.00 $119.00
HPC Site Plan Review (E) $158.00 $173.00
Environmental Filing Fees - Department of Fish and
Wildlife requirement for CEQA projects: (E)
5-7
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
COMMUNITY DEVELOPMENT – PLANNING
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
HP Landmark without Mills Act contract* (E) $629.00 $691.00 HP Landmark with Mills Act contract* $2,491.00 $2,692.00 Sign Program* $2,573.00 $2,830.00
Landscape Plan Review for Large Projects - flat fee or 1.0%-
3.5% of estimated cost of landscape improvements (deposit towards contract fee)
$867.00 $915.00
Residential Wireless Review - Minimum deposit toward
contract fee
$1,000.00 $1,000.00
Mobile Home Park Relocation Plan Review - Fee plus
$10,000 deposit toward contract fee
$4,686.00 $4,937.00
Abandoned Shopping Cart Plan Annual Exemption (E) $95.00 $95.00 Annual Review for Abandoned Shopping Cart Plan (E) $650.00 $650.00 Adult Business Application fee $1,410.00 $1,551.00
NOTES:
**State Mandated City of La Mesa Business License still required.
* May also require environmental review and/or public hearing notice fees (E) See Exceptions to Cost Recovery Policy
5-8
DESCRIPTION
PUBLIC WORKS - ENGINEERING FEE A FEE B FEE A FEE B
ENGINEERING FEES:
Encroachment Permit $487.00 $503.00
Encroachment Permit - Wireless Facility $939.00 $970.00 Encroachment Permit Deposit - 100% of construction cost or FEE A min
$600.00 $600.00
Plan Check (Grading) - FEE A 1st 2 sheets plus FEE B each add'l sheet
$1,432.00 $620.00 $1,495.00 $647.00
Plan Check (Public Improvements) - FEE A min or FEE B of eng est.
$576.00 4.0% $635.00 4.0%
Inspection (Grading) - FEE A min or FEE B of eng est. $1,298.00 10.0% $1,388.00 11.0% Inspection (Public Improvements) - FEE A min or FEE B of eng est.
$1,020.00 6.0% $1,129.00 7.0%
Inspection Management and Overhead
Vacation Fee/Street Easement - FEE A plus appraisal fee & preliminary report
$2,994.00 $3,075.00
Parcel Map (Final) - FEE A plus FEE B per lot $3,579.00 $344.00 $4,027.00 $387.00 Parcel Map Waiver - FEE A plus FEE B per lot $2,250.00 $275.00 $2,326.00 $284.00 Subdivision Map (Final) - FEE A plus FEE B per lot $5,212.00 $398.00 $5,629.00 $429.00 Block Party/Street Closure (E) $50.00 $50.00
Transportation Permit & Field Inspection (E) $16.00 $16.00 Soil/Geotech Report Review $230.00 $238.00
Hydrology/Hydraulics/Drainage Report Review NEW FEE $390.00 Tentative Parcel Map $1,316.00 $1,462.00
Site Plan Review (DAB) $577.00 $596.00
Tentative Subdivision Map $1,385.00 $1,534.00
Certificate of Correction $482.00 $530.00
Field Verification (Monumentation) - FEE A plus FEE B per lot
$289.00 $19.00 $303.00 $19.00
Maps/Plans $42.00 $43.00
Design Criteria Copy $42.00 $43.00
Address Change $394.00 $407.00
Monitoring Wells (Encroachment Permit) $478.00 $494.00
Monitoring Wells (Inspection) $309.00 $319.00
Monitoring Well Bond/Deposit - FEE A per well $1,000.00 $1,000.00 Building Site Plan Review:
Construction Costs less than $10,000
$141.00 $146.00
Building Site Plan Review:
Construction Costs greater than or equal to $10,000 and less than $50,000
$247.00 $255.00
Building Site Plan Review:
Construction Costs greater than or equal to $50,000
$443.00 $457.00
Document preparation (Liens & Deeds) $189.00 $195.00
Bond Document Preparation $346.00 $357.00
Minor Encroachment Permit (e.g., sidewalks, driveways,
swimming pools)
$183.00 $189.00
Inspection (Minor Encroachment) $336.00 $347.00
Traffic Control Plan Review $169.00 $175.00
Annexation $1,074.00 $1,109.00
Sewer Service Agreement w/o Annexation $1,069.00 $1,104.00 NPDES Water Quality Construction Inspections - FEE A or 4% of engineer's estimate
$167.00 4% $183.00 4%
Traffic Commission Appeals (E) $100.00 $100.00
Water Quality Plan Review - FEE A deposit plus FEE B
administration fee
$2,500.00 $105.00 $2,500.00 $110.00
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
17% of inspection costs
FY 22-23 FEES
16% of inspection costs
FY 21-22 FEES
PROPOSED
DESCRIPTION
PUBLIC WORKS - ENGINEERING FEE A FEE B FEE A FEE B
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
FY 21-22 FEES FY 22-23 FEES
PROPOSED
Traffic Impact Review - FEE A deposit plus FEE B
administration fee
$500.00 $249.00 $500.00 $259.00
Street Light Connection Processing Fee - FEE A per service point plus FEE B processing fee
$35.00 $169.00 $36.00 $175.00
Traffic Control Plan Renewal Fee $42.00 $43.00
Encroachment Permit Renewal Fee $42.00 $43.00
Temp Minor Encroachment Permit
(e.g., dumpsters)
$155.00 $160.00
Oversized Digital Document Production $70.00 $73.00
Traffic Impact Fee - FEE A per dwelling unit (1) $2,583.82 $2,688.21 Reinspection Fee - Fourth and subsequent
Self-Certified Permits - dumpster permit, simple traffic control on residential street permit, haul route permit
$79.00 $82.00
Other Charges:
Other engineering inspection services not specifically
identified
Micromobility Permit Fee - per unit/device $25.00 $25.00 Micromobility Impound Fee - per unit/device
Industrial Waste:
Industrial Waste Permit $183.00 $201.00
Industrial Waste Compliance Monitoring - FEE A based on City of San Diego costs plus FEE B processing fee
Full cost
recovery
$196.00 Full cost
recovery
$214.00
FOG FEES:
FOG Discharge Permit (5-yr permit) $292.00 $320.00
Annual FOG Inspection $178.00 $195.00
FOG Re-inspection $169.00 $185.00
Modified Annual NPDES Inspection $58.00 $63.00
Notice of Violation $348.00 $381.00
Grease Disposal Mitigation $469.00 $512.00
BI-MONTHLY SEWER SERVICE FEES: (3)
Single Family Residential - FEE A base fee + FEE B per 100 c.f. up to a maximum of 2,800 c.f. for single family
$37.64 $4.05 $38.72 $4.20
Multi-Family Residential - FEE A base fee + FEE B per 100 c.f.
$37.64 $4.05 $38.72 $4.20
Commercial-Industrial
Low Strength - FEE A base fee + FEE B per 100 c.f. $37.64 $4.25 $38.72 $4.44 Medium Strength - FEE A base fee + FEE B per 100 c.f. $37.64 $5.91 $38.72 $6.38 High Strength - FEE A base fee + FEE B per 100 c.f. $37.64 $6.74 $38.72 $7.35 Extra High Strength (Septage Haulers) - FEE A base fee
+ FEE B per 100 c.f.
$37.64 $11.89 $38.72
Sewer Connection Fee - FEE A per equivalent dwelling unit or FEE B per fixture whichever is greater(E)(2)
$5,840.00 $292.00 $5,886.00 $294.00
Initiation of Sewer Liens $54.00 $67.00
Late Penalty Assessment
1 unit = 100 cubic feet of water
Full cost recovery
10% of Sewer Service Charge
Full cost recovery
10% of Sewer Service Charge
Full cost recovery
Full cost recovery
Full cost recovery
1 unit = 100 cubic feet of water
Full cost recovery
DESCRIPTION
PUBLIC WORKS - ENGINEERING FEE A FEE B FEE A FEE B
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
FY 21-22 FEES FY 22-23 FEES
PROPOSED
NOTES:
Fee A is the primary fee and Fee B is any secondary amount that applies as described. (2) Sewer Connection Fees are assessed on all new development and significant redevelopment where existing buildings are being replaced or where no Sewer Connection Fees had been previously paid. (3) FY22-23 fees would become effective July 15, 2022, subject to the Prop. 218 approval process. (1) Fee set by SANDAG
(E) See Exceptions to Cost Recovery Policy
DESCRIPTION
COMMUNITY SERVICES FEE A FEE B FEE A FEE B
Aquatics Lessons: (E)
Private Swim Lessons (1/2 hour rate) $41.00 $41.00
Aquatics Semi-Private Lessons (1/2 hour rate) $31.00 $31.00 Aquatics Adult Programs (hourly rate) $3.00 - $15.00 $3.00 - $15.00 Aquatics Youth Programs (hourly rate) $3.00 - $15.00 $3.00 - $15.00 Aquatics Learn to Swim (hourly rate) $13.00 - $25.00 $13.00 - $25.00 Aquatics Instructional Classes: (E)
Lifeguard/Swimming Instructor Course $150 - $182 $150 - $182 Pool Admission Fees (Lap/Public Swim):
Adult (18 years & over) $5.00 $5.00
Youth, Senior (55 & over), Disabled $3.00 $3.00
Aquatic Special Events - Youth, Senior (55+), Disabled $5.00 $5.00 Aquatic Special Events - Adult (18 - 54 years) $7.00 $7.00 Swim Passes (Lap/Public Swim):
Adult Year Pass $261.00 $261.00
Year Pass (senior, disabled) $156.00 $156.00
Family Summer Pass (2 adults + 2 youth) $156.00 $156.00 Adult 20 Swim Pass $93.00 $93.00
20 Swim Pass (youth, senior, disabled) $51.00 $51.00
Pool Rental Charges:
Private/Commercial Groups (hourly rate - includes two lifeguards) (two hour minimum)
$210.00 $210.00
Non-profit Groups (hourly rate, includes 1 lifeguard) (During operational hours - one hour minimum)
$105.00 $105.00
Non-profit Groups (hourly rate, includes 2 lifeguards) (Closed hours - one hour minimum)
$125.00 $125.00
Additional Lifeguards Full cost recovery Full cost recovery Camps: (E)
Summer Sessions (weekly rate) $125 - $240 $130 - $250
Facility Rental Categories:
City Sponsored Activities No fee No fee
LMSVSD & GUHSD Schools - (school functions only, does not apply to social events)
Breakfast/Lunch Service Clubs - Community Center North (Mon.- Thu during business hours for 2 hours per day with annual contracts) additional hours at non-profit rate (E)
$65.00 $70.00
Private Groups Full Fee Full Fee
Miscellaneous Fees - Facility Rentals
Custodial Setup (one time per contract)
Staffing
Alcohol Permit w/Rentals(E) $228.00 $120.00
Security Guards (if required by contract)
Limited Snack and Beverage Service (per person)
Linens
Full cost recovery
Full cost recovery
Per current Community
Recreation Agreement
Full cost recovery
Full cost recovery
Full cost recovery
Full cost recovery
Full cost recovery
Non-Resident fee + $10.00
Non-Resident fee + $10.00
Full cost recovery
Full cost recovery
Full cost recovery
FY 21-22 FEES FY 22-23 FEES
Non-Resident fee + $10.00 per
week
Per current Community
Recreation Agreement
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Non-Resident fee + $10.00 per
week
Non-Resident fee + $10.00
Non-Resident fee + $10.00
5-12
DESCRIPTION
COMMUNITY SERVICES FEE A FEE B FEE A FEE B
FY 21-22 FEES FY 22-23 FEES
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Projector Rental $50 $50
Facility Use Deposit (per contract) $200.00 - $500.00 $200.00 - $500.00 Additional Hourly Rate for Rental Event Decoration/Prep (applicable after 4 hours booked, includes staff, no discounts)
$50 50
Overnight reservation for next day event
Deposit Forfeiture Fee
(for damage or incident response)
Cancellation Fee - Rentals or Park Permits 50% - 100% 50% - 100% Community Center Monday - Thursday
(full Arbor View Room):
Hourly Rate, 2 hour minimum $170.00 $185.00
Hourly Rate, if 4 or more hours booked $680.00 $175.00
Additional Hours Above Minimum (hourly rate) $175.00 REMOVED Executive Room during business hours or in conjunction with other rental (hourly rate - 2 hour minimum)
$41.00 MOVED TO BELOW
Executive Room during non-business hours (hourly rate - 2 hour minimum)
$61.00 MOVED TO BELOW
Community Center Arbor View Room Friday - Sunday
(full Arbor View Room):
Package (Friday - eight hours) $1,175.00 REMOVED
Package (Saturday - 8 hours) $1,450.00 $1,480.00
Package (Friday & Sunday - 5 hours) $950.00 $975.00
Additional Event Hours Above Package Rates (hourly rate) $195.00 $205.00 Community Center South:
Hourly Rate, 2 hour minimum $150.00 $165.00
Hourly Rate, if 4 or more hours booked $137.00 $160.00
Additional Hours Above Minimum (hourly rate) $156.00 REMOVED Community Center North:
Hourly Rate, 2 hour minimum $105.00 $115.00
Hourly Rate, if 4 or more hours booked $105.00 $110.00
Additional Hours Above Minimum (hourly rate) $110.00 REMOVED Community Center Executive Conference Room
During business hours (hourly rate, 2 hour minimum) $41.00 $45.00 During non-business hours (hourly rate, 2 hour minimum, includes staff)
$61.00 $72.00
In conjunction with Community Center rental (flat rate) NEW FEE $45.00 Nan Couts Cottage:
Saturday Night Package (8 hours) $720.00 $720.00
Friday & Sunday Package (five hours) $475.00 $475.00
Additional hours above package rates (hourly, Fri-Sun) $96.00 $90.00 Hourly Rate (2 hour minimum, Mon-Thu) $75.00 $90.00
Hourly Rate if 4 or more hours booked (Mon - Thu) NEW FEE $85.00 50% of standard rental fee up to
4 hours of set up (no further
discount)
Full cost recovery
NOTE: Includes use of the dance floor (full AVR and AVR South), stage (full AVR and AVR South), kitchen for caterers, round tables, chairs, set up and take down of floor plan and staff time during reserved hours. See fee for additional set up/decorating hours above packaged event time. 50% of standard rental fee up
to 4 hours of set up (no further
discount)
Full cost recovery
5-13
DESCRIPTION
COMMUNITY SERVICES FEE A FEE B FEE A FEE B
FY 21-22 FEES FY 22-23 FEES
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Scout event or overnight up to 4-hours: Sun-Fri. (Staff fees after 4 hours)
$100.00 $100.00
Recreation Center
Performing Arts Rooms:
Saturday Package (8 hours) $660.00 $650.00
Friday & Sunday (5 hours) $425.00 $430.00
Regular Rate (hourly, Fri-Sun) $86.00 $90.00
Additional hours above package rates (hourly, Fri-Sun) $86.00 $80.00 Hourly Rate (2 hour minimum, Mon-Thu) $75.00 $80.00
Hourly Rate if 4 or more hours booked (Mon-Thu) NEW FEE $75.00 West Terrace Patio:
Wedding ceremony set up (without use of Performing Arts Room) $500.00 $525.00 Wedding set up with rental of Performing Arts Room $225.00 $250.00 Kitchen Rental (staffing not included) $25.00 $25.00
Lounge (staffing not included) $25.00 $25.00
West Terrace Room (staffing not included) $45.00 $45.00 Recreation Center rental in conjunction with Arbor View Room Package
25% off base
fee (no further
discounts)
25% off base
fee (no further
discounts)
PARKS:
HGP Amphitheatre (hourly rate with 2 hour minimum) $150.00 $150.00 HGP Amphitheatre (non-profit hourly rate) $105.00 $105.00 Reservable Park Permit areas:
Open air picnic area / inflatable space
Open Air Reserved permit fee (25-50 or fewer) w/attraction - 1 day - Resident: FEE A; Non-resident: FEE B
$40.00 $50.00 $40.00 $50.00
Open Air Reserved permit fee (51-100) - 1 day - Resident: FEE A; Non-resident: FEE B
$100.00 $110.00 $100.00 $110.00
Open Air Reserved permit fee (101-250) - 1 day - Resident: FEE A; Non-resident: FEE B
$180.00 $190.00 $180.00 $190.00
Shade pavilion / inflatable area
Reserved permit fee (25-50 or fewer) w/attraction - 1 day - Resident:
FEE A; Non-resident: FEE B
$90.00 $100.00 $90.00 $100.00
Reserved permit fee (51-100) - 1 day - Resident: FEE A; Nonresident: FEE B $125.00 $135.00 $125.00 $135.00
Reserved permit fee (101-250) - 1 day - Resident: FEE A; Nonresident: FEE B $210.00 $220.00 $210.00 $220.00
Parks Permits: (E)
Inflatable Attraction Space Rental - 1 day up to 25 people - Resident FEE A; Non-Resident FEE B
$40.00 $50.00 $40.00 $50.00
NOTE: Includes tables, chairs kitchen and staff time during reserved hours. Customer set up/break down of tables and chairs required. See fee for additional set up/decorating hours above packaged event time.
NOTE: Includes: tables, chairs, kitchen, West Terrace Room, Vending Room, patio and staff time during reserved hours. Customer set up/break down of tabls and chaires required. See fee for additional set up/deocrating hours beyond packaged event time.
5-14
DESCRIPTION
COMMUNITY SERVICES FEE A FEE B FEE A FEE B
FY 21-22 FEES FY 22-23 FEES
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Park Permit Fee - 1 day (25-50) includes attraction - Resident FEE A; Non-Resident FEE B
$40.00 $50.00 $40.00 $50.00
Park Permit Fee - 1 day (51 - 100) includes attraction - Resident FEE A; Non-Resident FEE B
$80.00 $90.00 $80.00 $90.00
Park Permit Fee - 1 day (101 - 249) includes attraction - Resident FEE A; Non-Resident FEE B
$160.00 $170.00 $160.00 $170.00
LMSVSD & GUHSD Schools (school functions only, does not apply to social/fundraising events)
Private Commercial Use of Public Recreational Property (not including athletic fields)
$78 annual
permit
$7.50 per hour
of use (annual
fee waived after
ten hours on
permit)
$80 annual
permit
$8.00 per hour
of use (annual
fee waived if
ten or more
hours on
permit)
Vendor Operaitons on Public Recreation Property Application Fee $78 annual permit
$80 annual
permit
Field Rentals: (E)
Private/Commercial Groups (hourly rate - all fields) - Resident FEE A; Non-Resident FEE B
$52.00 $62.00 $52.00 $62.00
Athletic Council (A.C.) Members (youth - per participant) - Resident FEE A; Non-Resident FEE B
$5.00 $10.00 $5.00 $10.00
A.C. Members (senior - per participant) - Resident FEE A; NonResident FEE B $7.00 $12.00 $7.00 $12.00
A.C. Members (adult - hourly rate) - Resident FEE A; Non-Resident FEE B
$30.00 $40.00 $30.00 $40.00
Light Use - Based on SDG&E costs
Field Major Maintenance/Replacement (CIP)
Production/Film/Photography Companies:
Filming/photography Permit (public property)
Non-refundable application review/processing fee (Student, noncommercial and non-profit exempt) Permit also requires insurance and business license plus full cost recovery
$50 (more than
10 business
days prior)
$75 (less than
10 business
days prior)
$50 (more than
10 business
days prior)
$75 (less than
10 business
days prior)
Still photography: $25 per day
(Less than 10
people on crew)
$50 per day
(10 or more
people on
crew)
$25 per day
(Less than 10
people on
crew)
$50 per day
(10 or more
people on
crew)
Filming: $200/day
$100/half-day
(less than 10
people on crew)
$500/day $250
half-day (10 or
more people
on crew)
$200/day
$100/half-day
(less than 10
people on
crew)
$500/day $250
half-day (10 or
more people
on crew)
Police Officer Coverage (includes overtime pay, equipment and administrative overhead)
Any other costs incurred by City in connection with a filming or photography permit
Adult Enrichment Center Membership & Activities:
Regular Membership (per year)
Resident FEE A: Non-resident FEE B
$20.00 $30.00 $20.00 $30.00
Per current Community
Recreation Agreement
Full cost recovery
Full cost recovery
Per current Community
Recreation Agreement
Full cost recovery
Per formula set by City Council
Full cost recovery
Full cost recovery
Full cost recovery
Per formula set by City Council
5-15
DESCRIPTION
COMMUNITY SERVICES FEE A FEE B FEE A FEE B
FY 21-22 FEES FY 22-23 FEES
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Resident per year - VIP (includes mailing of monthly bulletin, discount on sponsored trips, etc.)
Resident FEE A: Non-resident FEE B
$28.00 $38.00 $28.00 $38.00
Business/Professional Member (per year) $156.00 $156.00 Travel Partners (tiered program)
Senior Trips - Full cost recovery + FEE B Non-residents Full cost recovery
$10.00 Full cost
recovery
$10.00
Social Functions REMOVED
Health Services REMOVED
Special Classes REMOVED
Sponsored Presentations - Business Host $50.00 $50.00
Transportation $20 Taxi Scrip Booklet $12- $18 REMOVED
Transportation Rides4Neighbors Initial Application Processing Fee $20.00 REMOVED Transportation Rides4Neighbors Application Annual Renewal Fee $10.00 REMOVED AEC Sponsored Dance (per person per event) $5- $10 $5- $10 Drop-in activities per person per meeting. (Note: Different fees apply to programs held as part of the Grossmont District Adult Education Program or contracted instructors.)
$2.00 $2.00 - $5.00
Grossmont District Adult Education Program facility rental (per class per hour)
$5.00 $5.00
Grossmont District Adult Education Custodial Fee per student per class
$3.00 $3.00
Adult Enrichment Center Room Rental Fees (Hourly rate , 2- hour minimum, self service setup)
Fri/Sat/Sun Mon-Thurs Fri/Sat/Sun Mon-Thurs
Full Main Hall $203.00 $150.00 $150.00 $135.00
Main Hall North Section $81.00 $60.00 N/A $60.00
Main Hall Center Section $60.00 $50.00 N/A $50.00
Main Hall South Section $60.00 $40.00 N/A $40.00
Craft Room (staff not included) $58.00 $40.00 $30.00 $30.00 Kitchen optional use w/adjacent room $36.00 $36.00 $36.00 $36.00 Clubhouse (staff not included) $58.00 $40.00 $35.00 $35.00 Drop-In Center (staff not included) $58.00 $40.00 $25.00 $25.00 Miscellaneous Rental Fees - Adult Enrichment Center:
Kitchen Double Cabinet Storage (monthly, 6 month minimum) $30.00 $30.00 Kitchen Single Cabinet Storage (monthly, 6 month minimum) $25.00 $25.00 Kitchen Drawer Storage (monthly, 6 month minimum) $15.00 $15.00 Lobby Display Rack (monthly, 6 month minimum) $20.00 $20.00 Community non-profit / Service Club, 2 hours, Mon-Fri during business hours, Sat/Sun before 11:00 am (reocurring meeting with annual contract). Additional hours at Non-profit rate.
$58.00 $58.00
Contracted Instructional Programs:
Programs held at indoor City facility
Programs held at outdoor City facility
Programs held at Contractor facility
Tier range: $250 - $1,000
Full cost recovery
Full cost recovery
Full cost recovery
Tier range: $250 - $1,000
40% of contracted fee 40% of contracted fee
30% of contracted fee 30% of contracted fee
20% of contracted fee 20% of contracted fee
5-16
DESCRIPTION
COMMUNITY SERVICES FEE A FEE B FEE A FEE B
FY 21-22 FEES FY 22-23 FEES
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Department-wide Fees:
Change Requests - fee per request $10.00 $10.00
Class materiials/supplies Full cost recovery Full cost recovery City Sponsored Rental Programs/Classes 40% of class
fees
40% of class
fees
All Non-profit Groups (resident, non-resident)(E)
(not including field rentals, pool rentals and HGP Amphitheatre) NOTE:
Fee A is the primary fee and Fee B is any secondary amount that applies as described.
For all Community Services activities not specifically defined above, there will be a fee established that will allow the Department of Community Services a direct cost recovery rate as defined by City Council policy.
M-Th. 30% off base fee / Sun or
Fri: 20% off base fee
M-Th. 30% off base fee / Sun or
Fri: 20% off base fee
(E) See Exceptions to Cost Recovery Policy
5-17
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
POLICE
Police Services:
Fingerprinting:
Live Scan (E ) - Plus Department of Justice Fee $20.00 $20.00 Ink $17.00 $19.00
Live Scan for Medical Marijuana Activity Zone Conditional Use Permit (E) - Plus Department of Justice Fee
$20.00 $20.00
Initial Background Check for Medical Marijuana Activity Zone Conditional Use Permit (per employee)
$616.00 $662.00
Annual Background Check for Medical Marijuana Activity
Zone Conditional Use Permit (per employee)
$216.00 $234.00
Photographs:
Non-digital $76.00 FEE REMOVED
Digital $47.00 $51.00
Police Report Copies Per Page (E) $0.10 $0.10
Police Traffic Reports Per Page (E) $0.10 $0.10
False Alarms per LMMC 10.100.060 $193.00 $205.00
Crime Prevention Reports $39.00 $42.00
Clearance Letter $29.00 $31.00
Police Audio Tape Copying Service $65.00 $69.00
Video Copying Service $265.00 $284.00
Civil Subpoenas/Civil Discovery Research (E) $24.00 $24.00 Hazardous Spill Cleanup Security (E) Full cost hourly rate Full cost hourly rate Release of Impounded Vehicle $217.00 $233.00
Weapon Impound Fee $52.00 FEE REMOVED
Records Research Fee $132.00 $141.00
Child Safety Seat Installation for non-residents; free for residents (E) $70.00 $75.00
Correctible Cite Signoff - Moving violations not issued by
LMPD (E)
$30.00 $32.00
Commercial Sound Amplification Fee (E) $25.00 $25.00
Civil Court Appearance (Sworn) - Witness Fees for
sworn/public safety staff and non-sworn/non-public safety staff (set by Govt Sections 68097.2(b) and 68096.1(b) (E) $275.00 $275.00
Civil Court Appearance (Non-sworn) - Witness Fees for
sworn/public safety staff and non-sworn/non-public safety staff (set by Govt Sections 68097.2(b) and 68096.1(b) (E) $150.00 $150.00
Handicap Citation - Quick Dismissal $8.00 $8.00
Alcohol Permit $228.00 $240.00
In-House Transcription Service $59.00 $63.00
Emergency responses as defined in Government Code
Sections 53150-53156
As established by
Government Code
As established by
Government Code
Animal Control: (E)
Dead Animal Disposal (owned) $41.00 FEE REMOVED
Dog Licenses: FEE REMOVED
1 year altered $24.00 FEE REMOVED
2 years altered $42.00 FEE REMOVED
3 years altered $55.00 FEE REMOVED
1 year unaltered $55.00 FEE REMOVED
2 years unaltered $89.00 FEE REMOVED
3 years unaltered $106.00 FEE REMOVED
Late Fee $24.00 FEE REMOVED
Replacement Tags $11.00 FEE REMOVED
Relinquished dogs and cats (E) $25 + $3 facility maint. fee FEE REMOVED
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
5-18
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
POLICE
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Shelter Impound Fee (per occurrence) (E) 1st $40; 2nd $50; 3rd $75 + $3 facility maint. fee
FEE REMOVED
Shelter Boarding - Daily (E) $20 + $3 facility maint. fee FEE REMOVED Transfer Fee $5.00 FEE REMOVED
Animal Trap Rental & Use Agreement $55.00 FEE REMOVED
NOTE:
(E) See Exceptions to Cost Recovery Policy
5-19
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
FIRE
Inspection Services:
Routine Fire Inspection (Hourly) $107.00 $110.00
Convalescent Home Inspection $237.00 $247.00
Hospital Inspections $4,510.00 $4,760.00
Reinspection Fees $139.00 $143.00
Licensed Daycare or other State Licensed In-Home Care - 25 or less (E)
$50.00 $50.00
Licensed Daycare or other State Licensed In-Home Care - 26 or more (E)
$100.00 $100.00
Apartment Inspections:
3 to 5 units $104.00 $106.00
6 to 14 units $113.00 $117.00
15 to 50 units $140.00 $145.00
51 to 100 units $286.00 $303.00
101 to 150 units $313.00 $331.00
151 to 200 units $367.00 $386.00
201 to 250 units $421.00 $442.00
251 to 300 units $457.00 $479.00
Above 300 units - Fee for additional increment of 1 to 50 units above, in addition to the fee listed for 251 to 300 units. $178.00 $192.00
Hotel/Motel Inspections:
2 to 14 units $156.00 $162.00
15 to 50 units $210.00 $218.00
51 to 100 units $264.00 $273.00
101 to 150 units $317.00 $329.00
151 to 200 units $371.00 $384.00
201 to 250 units $425.00 $440.00
251 to 300 units $461.00 $477.00
Above 300 units - Fee for additional increment of 1 to 50 units above, in addition to the fee listed for 251 to 300 units. $156.00 $162.00
Mid-rise building inspection (2-4) $267.00 $277.00
Hi-rise building inspection (5+) $587.00 $606.00
Large commercial building inspection (50,000 sf or greater) $514.00 $535.00 Mobile Food Preparation Vehicle Inspection $71.00 $75.00 Hydrogen Fueling Facility $71.00 $75.00
After hours Inspections (hourly) $161.00 $166.00
Annual Permits: (E)
Aerosol Products: an operational permit is required to
manufacture, store or handle and aggregate quantity of Level 2 or Level 3 aerosol products in excess of 500 pounds net weight. CFC 105.6.1
$165.00 $171.00
Amusment building: an operational permit is required to operate a special amusement building. CFC 105.6.2
$219.00 $224.00
Battery Systems $156.00 $162.00
Blasting (per job site address, could be for multiple blasts) $99.00 $108.00
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
5-20
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
FIRE
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Carnivals and Fairs: an operational permit is required to conduct a carnival or fair. CFC 105.6.4
$236.00 $248.00
Carbon Dioxide Systems Beverage Dispensing $114.00 $116.00 Cellulose Nitrate Film: an operational permit is required to store, handle or use cellulose nitrate film in a Group A occupancy. CFC 105.6.5
$289.00 $304.00
Combustible dust-producing operations: an operational permit is required to operate a grain elevator, flour starch mill, feed mill, or a plant pulverizing aluminum, coal, cocoa,
magnesium, spices or sugar, or other operations producing combustible dusts. CFC 105.6.6
$218.00 $230.00
Combustible fibers: an operational permit is required for the storage and handling of combustible fibers in quantities greater than 100 cubic feet. CFC 105.6.7
$125.00 $128.00
Compressed gases: an operational permit is required for the storage, use of handling at normal temperature and pressure (NTP) of compressed gases. CFC 105.6.8
$147.00 $153.00
Cryogenic Fluids: an operational permit is required to
produce, store, transport on site, use, handle or dispense cryogenic fluids. CFC 105.6.10
$268.00 $287.00
Cutting and welding: an operational permit is required to conduct cutting or welding operations within the jurisdiction.
CFC 105.6.11
$138.00 $144.00
Dry cleaning plants: an operational permit is required to engage in the business of dry cleaning or to change to a more hazardous cleaning solvent used in existing dry cleaning equipment. CFC 105.6.12
$293.00 $307.00
Exhibits and Trade Shows: an operational permit is required to operate exhibits and trade shows. CFC 105.6.13
$277.00 $294.00
Explosives: an operational permit is required for the
manufacture, storage, handling, sale or use of any quantity of explosives, explosive materials,fireworks or pyrotechnic special effect. CFC 105.6.14
$277.00 $294.00
Flammable & combustible liquids: an operational permit is required per CFC 105.6.16
$277.00 $294.00
Floor Finishing: an operational permit is required for floor finishing or surfacing operations exceeding 350 square feet using Class I or Class II liquids. CFC 105.6.17
$277.00 $294.00
Commercial haunted house (includes any area or room used at a carnival, party, or similar event for the purpose of creating a maze to amuse, confuse, or frighten participants) $191.00 $202.00
Hazardous materials: an operational permit is required to store, transport on site, dispense, use or handle hazardous materials. CFC 105.6.20
$279.00 $295.00
Hazardous Production Materials: an operational permit is required to store, handle or use hazardous production
materials. CFC 105.6.21
$277.00 $294.00
High-Piled Storage: an operational permit is required to use a building or portion thereof as a high-piled storage area exceeding 500 square feet. CFC 105.6.22
$286.00 $303.00
Hot Work Operations: an operational permit is required for hot work. CFC 105.6.23
$210.00 $218.00
5-21
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
FIRE
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Industrial Ovens: an operational permit is required for operation of industrial ovens. CFC 105.6.24
$277.00 $294.00
Lumber Yards & Woodworking Plants: an operational permit is required for the storage or processing of lumber exceeding 100,000 board feet. CFC 105.6.25
$268.00 $287.00
Liquid/Gas Fueled Veh/Eq in Assembly Bldg: an operational permit is required to display, operate or demonstrate liquid- or gas-fueled vehicles or equipment in assembly buildings. CFC 105.6.26
$154.00 $163.00
Liquefied petroleum gases: an operational permit is required for any facility installing, storing, or using LPG. A permit fee of four (4) times the normal rate will be applied if LPG
installation is performed without acquiring a permit first. CFC 105.6.27
$156.00 $163.00
Magnesium: any facility that melts, cast, heat treat or grind more than 10 pounds of magnesium. CFC 105.6.28
$152.00 $161.00
Miscellaneous Combustible Storage: an operational permit is required to store in any building or upon any premises in excess of 2,500 cubic feet gross volume of combustible
empty packing cases, boxes, barrels or similar containers, rubber tires, rubber, cork or similar combustible material. CFC 105.6.29
$277.00 $294.00
Open Burning: an operational permit is required for the kindling or maintaining or an open fire or a fire on any public street, alley, road, or other public or private ground. CFC 105.6.30
$137.00 $146.00
Open Flames and Torches: an operational permit is required to remove paint with a torch; or to use a torch or open-flame device in a wildfire risk area. CFC 105.6.31
$156.00 $162.00
Open flames and candles: an operational permit is required to use open flames or candles in connection with assembly
areas, dining areas of restaurants or drinking establishments.
CFC 105.6.32 (E)
$158.00 $166.00
Organic Coatings: an operational permit is required for any organic-coating manufacturing operation producing more than 1 gallon of an organic coating in one day. CFC 105.6.33 $268.00 $287.00
Places of assembly: an operational permit is required to operate a place of assembly. CFC 105.6.34
$183.00 $190.00
Private Fire Hydrants: an operational permit is required for the removal from service, use or operation of private fire
hydrants. CFC 105.6.35
$268.00 $285.00
Pryroxylin Plastics: an operational permit is required for storage or handling of more than 25 pounds (11 kg) of
cellulose nitrate (pyroxylin) plastics and for the assembly or manufacture of articles involving pyroxylin plastics. CFC 105.6.37
$154.00 $163.00
Pyrotechnic special effects material: an operational permit is required for use and handling of pyrotechnic special effects material. CFC 105.36 (E)
$333.00 $351.00
Refrigeration Equipment: an operational permit is required to operate a mechanical refrigeration unit or system. CFC
105.6.38
$277.00 $294.00
5-22
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
FIRE
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Repair garages and motor fuel-dispensing facilities: an operational permit is required for the operation of repair garages and automotive, marine and fleet motor fueldispensing facilities. CFC 105.6.39 $277.00 $294.00
Rooftop Heliports: an operational permit is required for the operation of a rooftop heliport. CFC 105.6.40
$174.00 $181.00
Spraying or Dipping: an operational permit is required to conduct a spraying or dipping operation utilizing flammable or combustible liquids or the application of combustible powders.
CFC 105.6.41
$286.00 $303.00
Storage of Scrap Tires & Tire Byproducts: an operational permit is required to establish, conduct or maintain storage of scrap tires and tire byproducts that exceeds 2,500 cubic feet of total volume of scrap tires and for indoor storage of tires and tire byproducts. CFC 105.6.42
$277.00 $294.00
Temporary Membrane Structures and Tents: an operational permit is required to operate an air-supported temporary membrane structure or a tent having an area in excess of 400 square feet. CFC 105.6.43
$209.00 $220.00
Tire Rebuilding Plants: an operational permit is required for the operation and maintenance of a tire-rebuilding plant. CFC 105.6.44
$277.00 $294.00
Waste Handling: an operational permit is required for the operation of wrecking yards, junk yards and waste materialhandling facilities. CFC 105.6.45 $277.00 $294.00
Wood Products: an operational permit is required to store chips, hogged material, lumber or plywood in excess of 200 cubic feet. CFC 105.6.46
$277.00 $294.00
Specific Use Permits:
1 - 4 heads $153.00 $163.00
5 - 20 heads $153.00 $163.00
21 - 50 heads $181.00 $193.00
51 - 100 heads $276.00 $293.00
101 - 500 heads $314.00 $333.00
each additional 500 or part $314.00 $333.00
Underground Hydrostatic Test $134.00 $143.00
Acceptance/Final Inspection $81.00 $89.00
Standpipes (includes wet or dry standpipes installed in accordance with NFPA 14 If combination system, fee will be included with sprinkler system)
$96.00 $103.00
If applicable, inspection fees for fire protection systems are as follows:
PLAN SUBMITTAL FEES: (E) Plans submitted for review by the La Mesa Fire Department shall be accompanied by a submittal fee. The fee entitles the submitter to an initial review and two (2) resubmittals to correct errors or omissions.
Automatic sprinkler system (shall include all new and modified automatic sprinkler systems, foam water systems and other similar type systems. Systems will include all piping and valves from the water district stub-out to the sprinkler head(s) based upon the number of heads installed:
5-23
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
FIRE
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
1 - 5 $96.00 $103.00
6 - 25 $115.00 $123.00
each additional 50 or part $115.00 $123.00
Single System $134.00 $143.00
Multiple Systems: First System $143.00 $153.00
Specialized Fire Protection System $105.00 $113.00
Emergency Response/Equipment:
Hazardous materials response (per hour or portion) As established by Government Code
As established by
Government Code
Duty Chief & Vehicle As established by
Government Code
As established by
Government Code
Aerial Ladder Truck As established by
Government Code
As established by
Government Code
Engine As established by
Government Code
As established by
Government Code
Rescue Unit As established by
Government Code
As established by
Government Code
Use of specialty equipment (rescue tools, emergency medical equipment, radio equipment, etc.)
As established by
Government Code
As established by
Government Code
Emergency responses as defined in Government Code
Sections 53150-53156 (e.g. Driving Under the Influence (DUI) fee per hour)
As established by
Government Code
As established by
Government Code
Personnel Costs (personnel costs are per hour or portion): Full cost hourly rate Full cost hourly rate False Alarms:
False or nuisance alarm response of two (2) alarms in 30 days or three (3) alarms in six (6) months.
$430.00 $349.00
Medical alarms (emergency response to non-emergency
situation)
$351.00 $333.00
Administrative Fees:
Fire Incident Report - Per page - Includes fire investigation report if applicable (E)
$0.10 $0.10
Investigative Photographs - Fee for copy of photos $37.00 $35.00 Plan Check and Inspection - Building Permits $338.00 $349.00 Consultation/Staff Time (Hourly) - Fire Marshal $191.00 $207.00 Consultation/Staff Time (Hourly) - Deputy Fire Marshal NEW FEE $134.00 Consultation/Staff Time (Hourly) - Fire Inspector II $107.00 $110.00 Plan Check - Fire: 30% of Building Permit Plan
Check Fee
30% of Building Permit Plan
Check Fee
Inspection - Fire: 30% of Building Permit Plan
Check Fee
30% of Building Permit Plan
Check Fee
Plan check services that are not initiated by the Building Department or are not specifically identified in the list of fees will be charged the full cost hourly rate
Full cost hourly rate Full cost hourly rate
Use of heavy equipment (engines, ladder trucks, etc. - Fees are per hour or portion):
Fire alarm system (fee shall be based on number of devices within system. A device shall include: pull stations, detectors, alarm panels and audible and visual alarms):
Automatic hood system (includes exhaust systems with built-in fire suppression capability, installed over commercial cooking equipment):
5-24
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
FIRE
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
NOTE:
(E) See Exceptions to Cost Recovery Policy
Fee A is the primary fee and Fee B is any secondary amount that applies as described.
5-25
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
GENERAL GOVERNMENT
Parking Meters in Downtown Parking District: (E)
On Allison Avenue and in the Allison Avenue municipal parking lot and the La Mesa Blvd. municipal parking lot per hour $0.50 $0.50
On all streets other than Allison Avenue and the Lemon Avenue and Palm Avenue municipal parking lots per hour
$0.75 $0.75
Quarterly Parking Permits in Downtown Parking District: (E) In the Palm Avenue municipal parking lot and the Lemon Avenue municipal parking lot and on Lemon Avenue per quarter
$60.00 $60.00
On Allison Ave. and in the Allison Avenue and La Mesa Blvd. municipal parking lots per quarter
$40.00 $40.00
Parking Violation Administrative Hearing Fee: citation review by personal conference or by mail
NO FEE NO FEE
Annual Parking Permits in Downtown Parking District: (E) In the Palm Avenue municipal parking lot and the Lemon Avenue municipal parking lot and on Lemon Avenue per quarter
$240.00 $240.00
On Allison Ave. and in the Allison Avenue and La Mesa Blvd. municipal parking lots per quarter
$160.00 $160.00
Parking Violation Administrative Hearing Fee: citation review by personal conference or by mail.
No fee No fee
Other Parking Permits:
*Parking Permit Zone on Street (in Residential Zoning Districts)- One year initial issue per vehicle
Full cost recovery Full cost recovery
*One Year Renewal Issue (If no changes in vehicle registration and residence since initial issue).
Full cost recovery Full cost recovery
City Clerk's Office:
Resident Alien Certification $25.00 $26.00
Records Certification $25.00 $26.00
Initiative Processing Fee (per Elections Code 9202(b)) (E) $200.00 $200.00 Document retrieval fee for campaign disclosures and statements of economic interest 5 years and older per G.C. 81008(E) Fee is per request.
$5.00 $5.00
Release of Weed Abatement Liens $152.00 $26.00
Duplication of Meeting Tapes: (E)
Audio Disk Copy Actual cost, not to exceed
$10.00 per disk
Actual cost, not to exceed
$10.00 per disk
DVD Disk Copy Actual cost, not to exceed
$10.00 per disk
Actual cost, not to exceed
$10.00 per disk
Special Event Permit Fees: (E)
Special Event – Parade $406.00 $455.00
Special Event Permit:
a) 250 - 499 persons $482.00 $535.00
b) 500 - 999 persons $583.00 $648.00
Special event permit fees for events permitted for more than one year shall be 50% of the applicable fee for each subsequent year for which the event is approved. Additional Block Party/Street Closure permit and fees may be required.
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
5-26
DESCRIPTION FY 21-22 FEES FY 22-23 FEES
PROPOSED
GENERAL GOVERNMENT
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
c) 1,000+ persons (plus per officer, per hour rate to be charged for event)
$2,245.00 $2,419.00
Amendment to Special Event Permit:
a) 250 - 499 persons $222.00 $247.00
b) 500 - 999 persons $253.00 $284.00
c) 1,000+ persons $1,060.00 $1,144.00
Public Meeting Notice - per noticed address (addresses to be determined by the City Clerk)
$0.23 $0.23
Photocopying per page (E) $0.10 $0.10
Color photocopies per page $0.42 $0.43
Oversized copies per sheet (18 inch maps/plans) $7.77
Oversized copies per sheet (36 inch maps/plans) $7.76
Electronic copies per page $0.38 $0.42
Data disk per CD (1) $10.00 FEE REMOVED
Data Request on Flash Drive $18.45 $17.46
Finance:
Returned Check Fee plus certified mail fees (E) $25.00 $25.00 Returned Check Fee (Small Claim) (E) - Fee or three times the amount of the check, whichever is greater, plus the amount of the check and court costs
$100.00 $100.00
Invoice Billing Late Fee $26.00 $27.00
Appeals (E) $100.00 $100.00
NOTES:
(E) See Exceptions to Cost Recovery Policy
Report Generation - Requests for information requiring report generation and compilation will be charged at the full cost hourly rate Per G.C. Section 6352.9 (b) NOTE: To encourage community events, the City Council adopted a 50% fee policy for the cost of a Special Event Permit; provided, however, any materials or required staffing for the event is charged at full cost recovery unless a specific exception has been approved by the City Council. *Parking fee does not apply to Wellesley Street neighborhood district (1) Fee includes actual labor and material costs only. Additional charges may be incurred for document scanning and electronic copies.
5-27
DESCRIPTION FY 22-23 FEES
BUSINESS LICENSE FEES:(1)
Amusement devices - Fee plus Gross Receipts $35.00/$70.00 Apartments - up to 4 units plus $5.00/unit $35.00
Auction events - Fee per day of event $15.00
Auction house - Fee plus $3.00/employee $35.00
Auctioneer - Fee plus $3.00/employee $35.00/$70.00
Billboards - Fee plus $70.00/sign $35.00/$70.00
Bingo - Per 6 months $25.00
Bowling alley - Fee plus $35.00 1st lane plus $15.00 each additional lane
$35.00
Brokers/Agents - Fee plus $3.00/employee $35.00
Bus Service $100.00
Cigarette Machine - Fee plus $35.00 per machine $35.00/$70.00 Circus, Show, Tent - Fee per day plus $10.00 per side show $100.00 Closing Out Sale - General/Jewelry (180 days) $50.00/$75.00 Commercial Residential Use $35.00
Contractors/Subcontractors $70.00
Dance Hall - Fee plus $320.00 investigation:
Class A - nightly $70.00
Class B - 3 nights/week $35.00
Class C - 1 night a week $25.00
Class D - club
Delivery Vehicle:
Personal Vehicle Not required
Retail - Per vehicle $70.00
Wholesale - Per vehicle $35.00
Fortune Telling $100.00
Home Occupation $35.00
In-City Unspecified - Fee plus $3.00 per employee $35.00 Juke Box - Fee plus $35.00 per machine $35.00/$70.00
Massage Technician - Fee plus $320.00 investigation $35.00 Renewal - Fee plus $200.00 investigation $35.00
Massage Technician - off premise - Fee plus $320.00
investigation
$35.00/$70.00
Renewal - Fee plus $200.00 investigation $35.00/$70.00
Oktoberfest Booth Rental $15.00
Out-of-City Unspecified $70.00
Pawn Shops (2) $100.00 *
Pool Rooms - Fee plus $35.00 1st pool table plus $15.00 each additional pool table
$35.00
Public Transportation $100.00
Secondhand Dealer - Initial/Renewal $155.00/$75.00
Special Event - 3 days or less $15.00
Solicitors - Fee plus $15.00 planning investigation plus $110.00 investigation
$35.00/$70.00
Swapmeets - Per quarter $1,000.00
Taxicabs - First vehicle plus $35.00 each additional vehicle $70.00 Trailer Parks 2% of gross receipts
Hotel/Motel - Fee plus $3.00/employee (10% gross receipts for Transient Occupancy Tax on quarterly basis is under separate ordinance)
$35.00
Unspecified Office/Professional - Fee plus $3.00 per
employee
$35.00
Reprint of License $5.00
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
5-28
DESCRIPTION FY 22-23 FEES
BUSINESS LICENSE FEES:(1)
CITY OF LA MESA FEE SCHEDULE
FY 2022-2023
Listings:
Business License Listing - Per name, not to exceed $100.00 $0.50 New Business Listing - Per name, not to exceed $100.00 $0.50 NOTES:
(2) Also requires Secondhand Dealer license and fees.
(1) All business licenses are subject to an additional $4.00 CASp state mandated fee.
5-29
CITY OF LA MESA
FEE SCHEDULE
FISCAL YEAR 2022-2023
Section 6 - 2018 Building Valuation Schedule
6-1
2018 BUILDING VALUATION SCHEDULE
Use Type of Construction Valuation per Sq Ft
APARTMENT HOUSES
*Type IA or IB $180.32
Type V or III (Masonry) $147.23
Type V Wood Frame $135.65
Type I Basement Garage $62.86
BANKS
*Type IA or IB $244.83
Type IIA $180.32
Type IIB $175.35
Type IIIA $198.51
Type IIIB $191.90
Type VA $180.32
Type VB $173.70
CAR WASHES
Type IIIA $115.80
Type IIIB $110.84
Type VA $99.26
Type VB $92.64
CHURCHES
Type IA or IB $163.77
Type IIA $124.07
Type IIB $117.45
Type IIIA $134.07
Type IIIB $127.38
Type VA $125.72
Type VB $117.45
CONVALESCENT
HOSPITALS *Type IA or IB $229.94
Type IIA $160.46
Type IIIA $163.77
Type VA $153.85
6-2
Use Type of Construction Valuation per Sq Ft
DWELLINGS ***
Type V Adobe $201.82
Type V Masonry $160.46
Type V Wood Frame $152.19
Basements (semi-finished) $38.05
Additions-Wood Frame $181.97
Solariums $153.85
Cabana-Pool House-Type V $142.27
FIRE STATIONS
Type IA or IB $188.59
Type IIA $124.07
Type IIB $117.45
Type IIIA $135.65
Type IIIB $130.69
Type VA $127.38
Type VB $120.76
FITNESS CENTERS
*Type IA or IB $177.01
Type IIA $119.11
Type IIB $112.49
Type IIIA $122.42
Type IIIB $119.11
Type VA $119.11
Type VB $112.49
HOSPITALS
*Type I or I B $269.65
Type III A $223.33
Type V A $213.40
HOTELS & MOTELS
*Type IA or IB $167.08
Type IIIA $145.58
Type IIIB $137.30
Type VA $125.72
Type VB $124.07
6-3
Use Type of Construction Valuation per Sq Ft
INDUSTRIAL PLANTS
Type IA or IB $94.29
Type IIA $66.17
Type IIB (Stock) $61.21
Type IIIA $72.79
Type IIIB $67.82
Tilt-up $49.63
Type VA $67.82
Type VB $62.86
MEDICAL OFFICES
*Type IA or IB. $198.51
Type IIA $152.19
Type IIB $145.58
Type IIIA $165.43
Type IIIB $153.85
Type VA $148.88
Type VB $143.92
OFFICES
*Type IA or IB $177.01
Type IIA $119.11
Type IIB $112.49
Type IIIA $127.38
Type IIIB $122.42
Type VA $119.11
Type VB $112.49
PRIVATE GARAGES
Wood Frame-Finished $39.70
Wood Frame-Unfinished $39.70
Masonry $46.32
Open Carports $28.12
PUBLIC BUILDINGS
*Type IA or IB $203.47
Type IIA $165.43
Type IIB $158.81
Type IIIA $172.04
Type IIIB $165.43
Type VA $157.16
Type VB $152.19
6-4
Use Type of Construction Valuation per Sq Ft
PUBLIC GARAGES
* Type IA or IB $81.06
*Type I or II Open Parking $61.21
Type IIB $46.32
Type IIIA $61.21
Type IIIB $54.59
Type VA $56.25
RESTAURANTS
Type IIIA $162.12
Type IIIB $155.50
Type VA $147.23
Type VB $142.27
SCHOOLS
Type IA or IB $183.62
Type IIA $125.72
Type IIIA $134.00
Type IIIB $129.03
Type VA $125.72
Type VB $120.76
SERVICE STATIONS
Type IIB $110.84
Type IIIA $115.80
Type VA $99.26
Canopies $46.32
STORES
*Type IA or IB. $135.65
Type IIA $82.71
Type IIB $81.06
Type IIIA $100.91
Type IIIB $95.95
Type VA $86.02
Type VB $79.40
Retail Garden Center-Type VB $65.81
6-5
Use Type of Construction Valuation per Sq Ft
THEATRES
Type IA or IB. $181.97
Type IIIA $132.34
Type IIIB $125.72
Type VA $124.07
Type VB $117.45
WAREHOUSES **
Type IA or IB. $81.06
Type IIA $47.97
Type IIB $46.32
Type IIIA $54.59
Type IIIB $52.94
Type VA $47.97
Type VB $46.32
EQUIPMENT
Air Conditioning (Commercial) $6.95
Air Conditioning (Residential) $5.79
Sprinkler Systems $4.30
* Add 0.5 percent to the total cost for each story over three. ** Deduct 11 percent for mini-warehouses.
***For subdivisions with 10 or more single-family dwellings which have plancheck and building permit issuances in groups of 10 or more, the valuation or the plancheck and building permit fees may be decreased by 10 percent.
6-6
MISCELLANEOUS VALUATIONS
BUILDING VALUATION SCHEDULE (2019-2020)
AUTHORITY TO DETERMINE VALUE - LMMC 14.11.070 (UAC Section 304.2) The determination of value or valuation under any of the provisions of this code shall be made by the Building Official. The value to be used in computing the building permit and building plan review fees shall be the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment.
ADDITIONS
Additions to any building shall be valued at 120% of the value for a new building of the same occupancy and type of construction.
Structure or Item Valuation
AGRICULTURAL BUILDING $28.12 /sq.ft.
ALUMINUM SIDING $8.27 /sq.ft.
ANTENNAS
Radio, over 30 ft. in height $5326.74 each
Dish, 10 ft. dia. w/decoder $6476.46 each
AWNING OR CANOPY (supported by building)
Aluminum $31.43 /sq.ft.
Canvas $13.23 /sq.ft.
BALCONY $21.51 /sq.ft.
CLOSE EXTERIOR WALL OPENING $23.16 /sq.ft.
DECKS (Wood) $21.51 /sq.ft.
DEMOLITION OF BUILDING $6.62 /sq.ft.
6-7
Wire $3.31 /sq.ft.
Masonry $13.23 /sq.ft.
Wrought Iron $8.27 /sq.ft.
FIREPLACES
Concrete or Masonry $5326.74 each
Prefabricated Metal $3621.19 each
GREENHOUSE $8.27 /sq.ft.
INTERIOR PARTITION $79.40 /lin.ft.
INSTALL WINDOW OR SLIDING GLASS DOOR $24.81 /sq.ft.
MANUFACTURED HOUSING (25% of value of "site-built" house) $36.39 /sq.ft.
PATIO
Wood Frame with Cover $13.23 /sq.ft.
Metal Frame with Cover $16.54 /sq.ft.
Wood Frame - Cover and Walls $18.20 /sq.ft.
Metal Frame - Cover and Walls $21.51 /sq.ft.
Screen or Plastic Walls $4.96 /sq.ft.
PILE FOUNDATIONS
Cast-in-Place Concrete $34.74 /lin.ft.
Steel $86.02 /lin.ft.
PLASTERING
Inside $4.96 /sq.ft.
Outside $4.96 /sq.ft.
RELOCATED BUILDINGS (Fee same as for new buildings)
6-8
RETAINING WALL
Concrete or Masonry $26.47 /sq.ft.
REROOFING (1 square = 100 square feet)
Built-up $201.82 /sq.
Composition Shingles $188.59 /sq.
Fiberglass Shingles $188.59 /sq.
Asbestos-Cement Shingles $448.31 /sq.
Wood Shingles $448.31 /sq.
Wood Shakes $448.31 /sq.
Aluminum Shingles $676.60 /sq.
Clay Tile $597.41 /sq.
Concrete Tile $479.74 /sq.
ROOF STRUCTURE REPLACEMENT $21.51 /sq.ft.
SAUNAS $13,908.24 each
SHELL BUILDINGS
A shell building is defined as a building for which HVAC, lighting, suspended ceilings, plumbing and electrical systems, partition layouts and interior finish are not shown on the plans and for which separate tenant improvement plans will be submitted for plan check at a later date showing these items. Warehouses and industrial buildings shall not be considered shell buildings. The valuation for shell buildings shall be taken as 80 percent of the valuation for the completed building.
FOUNDATION ONLY
A foundation only permit for a structure shall be valuated at 25% of the value of the whole building. The permit for the remainder of the building shall be based upon a value of 75% of the building.
6-9
SIGNS AND BILLBOARDS
Non-Illuminated Signs and Billboards
ROOF SIGN
1 Face $40.70 /sq.ft.
2 Face $57.94 /sq.ft.
WALL SIGN
1 Face $27.86 /sq.ft.
PROJECTING SIGN
1 Face $39.36 /sq.ft.
2 Face $57.94 /sq.ft.
POLE SIGN (Values plus supporting structure)
1 Face $40.69 /sq.ft.
2 Face $57.94 /sq.ft.
BILLBOARDS (Values plus supporting structures)
1 Face $40.69 /sq.ft.
2 Face $57.94 /sq.ft.
Illuminated Signs and Billboards
ROOF SIGN
1 Face $66.79 /sq.ft.
2 Face $94.22 /sq.ft.
WALL SIGN
1 Face $57.94 /sq.ft.
PROJECTING SIGN
1 Face $81.39 /sq.ft.
2 Face $94.22 /sq.ft.
POLE SIGN (Values plus supporting structure)
1 Face $66.79 /sq.ft.
2 Face $94.22 /sq.ft.
BILLBOARDS (Values plus supporting structures)
1 Face $66.79 /sq.ft.
2 Face $94.22 /sq.ft.
6-10
SUPPORTING STRUCTURE $94.22 /lin.ft.
SPA OR JACUZZI $10,908.24 each
STAIRS $21.51 /sq.ft.
STONE AND BRICK VENEER $13.23 /sq.ft.
STORAGE RACKS (per cubic foot) $1.65 /cu.ft.
SWIMMING POOL (per sq. ft. of surface area)
Vinyl Lined $56.25 /sq.ft.
Gunite $56.25 /sq.ft.
Fiberglass $61.21 /sq.ft.
TENANT IMPROVEMENTS (Other) $49.93 /sq.ft.
TENANT IMPROVEMENTS (Higher) $69.48 /sq.ft.
The valuation of tenant improvements shall be based on one of the following:
1. $69.48 for banks, churches, medical offices, restaurants and hazardous "H" occupancies.
2. $49.93 for other Tenant Improvements such as stores and offices.
3. An actual construction cost estimate.
RESOLUTION NO. 2022-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
ADOPTING A FEE SCHEDULE TO BE CHARGED BY VARIOUS CITY
DEPARTMENTS FOR FISCAL YEAR 2022-2023
WHEREAS, in 2003-2004 the City of La Mesa hired Public Resource Management Group (PRM), now part of MGT of America Consulting, LLC, to develop a Fee Study and Cost Allocation Plan (the Study);
WHEREAS, the City Council gave final approval of the Cost Recovery Policy, Exceptions to the Cost Recovery Policy, Annual Fee Update Process, Listing of Fees, and Building Valuation Schedule at its meeting on May 25, 2004; WHEREAS, the Listing of Fees represents reimbursement for costs reasonably borne by the City in providing direct services to particular individuals or groups rather than to the general populace of the City of La Mesa;
WHEREAS, in order for the City to continue to provide said services, it is necessary for the City to recover the costs of providing such services; WHEREAS, in order to continue to meet cost recovery objectives, the adopted Annual Fee Update Process calls for fees to be adjusted annually as part of the City budget process; WHEREAS, the adopted Annual Fee Update Process calls for a formal update of the City’s User Fee Study and Cost Allocation Plan in even numbered years and adjustments to fees based on the Study results;
WHEREAS, MGT of America Consulting, LLC was hired to update the Fee Study and Cost Allocation Plan for Fiscal Year 2022-2023;
WHEREAS, Government Code Section 66017(a) specifies that the effective date of all development project fees shall be no sooner than 60 days following the final action on the adoption of fees; and
WHEREAS, the effective date of all fee changes shall be July 1, 2022.
NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, that 1) fees as described in the accompanying staff report are justified in that any adjustments do not exceed the estimated reasonable costs of providing the services and that the requisite findings and determinations required pursuant to Government Code Section 66000 et seq. for specified fees have been made in supporting documentation (i.e., this Resolution, and accompanying staff report) and 2) the adjustments recommended thereby are hereby adopted by this Resolution.
PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 26
th day of April 2022, by the following vote, to wit:
AYES:
NOES:
ABSENT:
CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2022- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.
MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)
REPORT to the MAYOR and MEMBERS of the CITY COUNCIL
From the CITY MANAGER
DATE: April 26, 2022
SUBJECT: CONSIDERATION OF THE COMMUNITY DEVELOPMENT
BLOCK GRANT (CDBG) PROGRAM FOR FISCAL YEAR
2022-23 AND SUBSTANTIAL AMENDMENT TO FISCAL
YEAR 2021-22
ISSUING DEPARTMENT: Community Development
SUMMARY:
Issues:
1. Should the City Council approve CDBG funding allocations for FY 2022-23 and authorize submission of the Annual Action Plan (Attachment C) to the U.S.
Department of Housing and Urban Development (HUD)?
2. Should the City Council approve a substantial amendment to the FY 2021-22 Annual Action Plan (Attachment D) and authorize submission to HUD? Recommendation:
1. Adopt a Resolution (Attachment A) approving the Fiscal Year 2022-23 Annual Action Plan and authorizing submittal to HUD.
2. Adopt a Resolution (Attachment B) approving a substantial amendment to Fiscal Year 2021-22 Annual Action Plan and authorizing submittal to HUD.
Fiscal Impact:
There is no impact to the City’s General Fund. Federal CDBG funds allow the City to support programs and complete projects that benefit low and moderate-income people and eliminate slum and blight. The City’s CDBG entitlement funding allocation for FY 2022-23 has not yet been announced, but is expected to be approximately $450,000. In addition, the City has $60,000 current and prior year funding available to reprogram.
Activities proposed in the Action Plan will be adjusted to match the actual entitlement amount once the actual appropriation amount is known.
Report to Mayor and Councilmembers
Date: April 26, 2022
Page: 2 of 5
City’s Strategic Goals:
Revitalize neighborhoods and corridors
Enhanced recreation and quality of life opportunities Ensure safe and affordable homes for La Mesa's current and future residents
BACKGROUND:
As a CDBG entitlement community with a population of over 50,000, the City receives federal funds from HUD that can be used to carry out a wide range of community development activities directed toward neighborhood revitalization, economic development, and community facilities and services, with priority given to activities benefiting low and moderate income communities. La Mesa has participated in the CDBG program since the 1980s.
To remain eligible, the City is responsible for identifying community needs and priorities through the Consolidated Planning process. Every five years, the City is required to prepare a Consolidated Plan that establishes goals towards addressing those needs. Annual Action Plans are then developed to program activities that carry out the long term goals. The process includes multiple opportunities for citizen participation. Fiscal year 2021-22 is Year 2 of the 2020-2025 Consolidated Planning period. The current CDBG program goals are as follows:
Improve facilities and infrastructure
Fair Housing
Planning and Administration
Homeless Services
Public and Community Services
Conserve the Housing Stock
HUD’s three statutory program goals for serving lower income populations are: decent housing, a suitable living environment, and expanded economic opportunity. All of the City’s CDBGfunded activities meet at least one of the statutory goals.
The CDBG program goals fit within the City Council’s strategies and goals. Projects and activities funded with CDBG revitalize neighborhoods, enhance recreation and quality of life opportunities, and improve access to safe and affordable housing. These projects and activities also help the City to improve public services and infrastructure and increase financial stability and public safety.
DISCUSSION:
The Annual Action Plan for program year 2022-23 (Attachment C) and amended Annual Action Plan for 2021-22 (Attachment D), summarized below, have been developed to align with goals identified in the Consolidated Plan and in consideration of input received at the initial City
Report to Mayor and Councilmembers
Date: April 26, 2022
Page: 3 of 5
Council hearing held on March 22, 2022. In accordance with the City’s adopted Citizen Participation Plan, the plan circulated for a 30-day public review period from March 25, 2022, to April 24, 2022 and notice of the public hearing for this item was published in the Daily Transcript and mailed to interested parties on March 25, 2022.
Improve Facilities and Infrastructure: Collier Park ($364,000) Available Budget: FY 2022-23: $354,000
FY 2021-22: $10,000
CDBG has long supported rehabilitation efforts at Collier Park. A need was identified by the community to create a safer, more active use park with improved connections to the neighborhood. Following adoption of the Collier Park Renovations Project Master Plan in 2015, Phase I improvements were completed in 2018. The Phase I scope included grading, new hardscape, new landscape, and irrigation improvements to the panhandle portion of the park, near the park entry. Implementation of the master plan is continuing. Phase II, which includes grading and landscaping, new restroom facilities, additional parking, roadway improvements, and security upgrades in the heart of the park is planned.
An additional budget of $364,000, as adjusted depending on the actual FY 2022-23 allocation amount, together with prior year CDBG allocations totaling $1.39 million and leveraged with $3 million in State Parks and Recreation funding and Prop 68 funds, will allow the city to complete Phase II in the coming year.
Homeless Services ($60,000)
Available budget: FY 2021-22 $30,000
FY 2022-23: Not to exceed $30,000
An annual public services budget of $30,000 was planned for allocation in 2021-22 for a housing specialist to find homes for people outside of the limited shelter system and to assist with stabilizing clients placed in bridge housing. That activity did not transpire and the funds are available for reallocation. FY 2022-23 funding of up to $30,000 is also available for homeless services, subject to a 15% annual public services cap.
Homeless outreach efforts coordinated through the City’s person-centered Homeless Outreach and Mobile Engagement (HOME) program have identified a shortage of housing solutions. A single, coordinated housing stabilization program will provide a range of housing navigation services. Leveraged with American Rescue Plan Act (ARPA) funding and CDBG Cares Act Homeless Housing Solutions funding, the combined project would fund a prevention and diversion specialist, motel vouchers, and flex funds for rental applications, utility deposits, and move-in cost assistance over a two-year period.
The proposed scope of work fits within the existing Homeless Services and Homeless Housing Solutions project descriptions. Only the budget would change. A provider will be selected through an RFP process.
Report to Mayor and Councilmembers
Date: April 26, 2022
Page: 4 of 5
Fair Housing ($30,000)
Under the Consolidated Plan, fair housing services are funded as a public service program. Fair housing services are provided to the City by the Center for Social Advocacy (CSA) San Diego County. Each year, the City must certify to HUD that the City is affirmatively furthering fair housing and the contract with CSA helps the City meet this CDBG program implementation requirement. The City’s contribution to CSA, combined with that of several other east county jurisdictions, including the cities of El Cajon, Santee, and Lemon Grove, supports this organization and furthers fair housing goals within La Mesa and the region. An allocation of $30,000 is consistent with prior years. This activity falls within the annual 20 percent administrative cap and the 15 percent public services cap.
Planning and Administration ($50,000)
Planned administrative activities include preparation of annual plans and reports, environmental review of projects, contract administration, financial reporting, development of a Notice of Funding Availability for homeless services, subrecipient monitoring, and public outreach. This activity falls within the 20 percent administrative cap.
Conserve the Housing Stock ($6,000)
Administrative activities associated with the housing rehabilitation loan program include monitoring the loan portfolio and processing loan pay-off paperwork. This activity falls within the 20 percent administrative cap.
Program Summary Table
Funding
Level Description
2022-23 Annual Action Plan
Infrastructure Improvements – Collier Park $354,000 To be adjusted based on actual allocation
Fair Housing - CSA San Diego County $30,000
Homeless Services - Housing Stabilization $30,000 Max. $30,000, adjusted not to exceed annual 15% public services cap
CDBG Program Administration $50,000
Housing Program Rehab Administration $6,000
2021-22 Annual Action Plan Amendment
Infrastructure Improvements - Collier Park $10,000 Increase existing budget by $10,000 Homeless Services – Housing Stabilization $30,000 Reallocate to new project
Report to Mayor and Councilmembers
Date: April 26, 2022
Page: 5 of 5
CONCLUSION:
Staff recommends that the Council:
1. Adopt a resolution approving the Fiscal Year 2022-23 Annual Action Plan (Attachment A) and authorizing submittal to HUD within 60 days of the date allocations are announced or no later than August 16, 2022, whichever comes first, and authorizing the Mayor to execute agreements for specialized professional services with CSA San Diego County.
2. Adopt a resolution approving a substantial amendment to Fiscal Year 2021-22 Annual Action Plan (Attachment B) and authorizing submittal to HUD.
Reviewed by: Respectfully submitted by:
____________________ ____________________________
Greg Humora Kerry Kusiak
City Manager Director of Community Development
Attachments:
A. Draft Resolution approving the FY 2022-23 Annual Action Plan B. Draft Resolution approving a substantial amendment to the FY 2021-22 Annual Action Plan C. Draft FY 2022-23 Annual Action Plan
D. Draft Amended FY 2021-22 Annual Action Plan
RESOLUTION NO. 2022-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
ADOPTING THE FISCAL YEAR 2022-2023 ANNUAL ACTION PLAN FOR THE
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM AND
AUTHORIZING SUBMITTAL TO THE UNITED STATES DEPARTMENT OF
HOUSING AND URBAN DEVELOPMENT (HUD)
WHEREAS, the City of La Mesa is an entitlement city in accordance with the regulations of the Community Development Block Grant (CDBG) Program Guidelines established by the United States Department of Housing and Urban Development (HUD); WHEREAS, the City of La Mesa has prepared a five-year Consolidated Plan for Community Development which establishes funding priorities for the CDBG and HOME programs for the period July 1, 2020, to June 30, 2025; WHEREAS, the City is eligible for the Home Investments Partnership Program (HOME) program, a HUD funding program, through membership in the San Diego HOME Consortium, which administers the Down Payment and Closing Cost Assistance Program for first-time homebuyers; WHEREAS, HUD has not released entitlement appropriations to the City and staff has estimated the FY 2022-2023 HUD formula allocation to be $450,000 for CDBG, which has been used to determine the Annual Action Plan activities for funding; WHEREAS, the City of La Mesa has developed an allocation program based on public participation and policy direction from the City Council; WHEREAS, the City of La Mesa affirmatively furthers fair housing by ensuring community access to fair housing as a public service, and the Center for Social Advocacy of San Diego County has submitted an application to provide fair housing and tenant/landlord mediation services in the City;
WHEREAS, the City Council held public hearings on March 22, 2022, and April 26, 2022, with published notification, to ensure adequate opportunity for public participation in the development of the Annual Action Plan for FY 2022-2023; WHEREAS, a 30-day public review period to provide the community with an opportunity to comment on the Annual Action Plan for FY 2022-2023 began on March 25, 2022, and ended on April 24, 2022;
WHEREAS, the City will incorporate public comments received into the final submission of said Plan within 60 days after the date allocations are announced by HUD or no later than August 16, 2022 (whichever comes first); and
WHEREAS, the City Manager will be authorized to approve any necessary adjustments made to the allocation amounts as described in attached Exhibit A when final appropriations are released by HUD.
NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, as follows:
1. That the foregoing fact and determinations are true and hereby made a part hereof.
2. That the City Council hereby approves the Annual Action Plan for FY 2022-2023.
3. That the City Council hereby authorizes allocation and submittal of the Annual Action Plan for FY 2022-2023 to HUD, with the required certifications, applications, and agreements for the full implementation of activities funded under the Plan.
4. That the City Council hereby authorizes the execution of FY 2022-2023 contract between the City of La Mesa and Center for Social Advocacy of San Diego County for fair housing services in the City of La Mesa.
PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 26
th day of April 2022, by the following vote, to wit:
AYES:
NOES:
ABSENT:
CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, the City Clerk of the City of La Mesa, California do hereby certify the foregoing to be a true and exact copy of Resolution No. 2022- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.
MEGAN WIEGELMAN, CMC, City Clerk
EXHIBIT A
ESTIMATED FUNDING AND ADJUSTMENTS UPON APPROPRIATION
Expected Resources Summary FY 2022-23
Funding Source Amount
FY 2022-23 CDBG funding (estimate) $450,000
Prior year unallocated funding $20,000
Summary Annual Plan for Community Development FY 2022-23 Funded Activity Estimated
Funding Adjustment Upon Appropriation
Capital Improvement Program
Collier Park Improvements $354,000
Increased or decreased based on
available funding
Public Service Program (15% cap)
- Fair Housing Services - CSA, San Diego County
- Homeless Services
$30,000
$30,000
Reduced as necessary to
not exceed 15% annual cap
Program Administration (20% cap)
- General program administration
- Housing Program Administration
$50,000
$8,000
Reduced as necessary to
not exceed 20% annual cap
TOTAL $470,000
RESOLUTION NO. 2022-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
APPROVING A SUBSTANTIAL AMENDMENT TO THE FISCAL YEAR 2021- 2022 ANNUAL ACTION PLAN FOR THE COMMUNITY DEVELOPMENT
BLOCK GRANT (CDBG) PROGRAM AND AUTHORIZING SUBMITTAL TO THE
UNITED STATES DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)
WHEREAS, the City of La Mesa is an entitlement city in accordance with the regulations of the Community Development Block Grant (CDBG) Program Guidelines established by the United States Department of Housing and Urban Development (HUD); WHEREAS, the City of La Mesa has prepared a five-year Consolidated Plan for Community Development which establishes funding priorities for the CDBG and HOME programs for the period July 1, 2020, to June 30, 2025; WHEREAS, on April 27, 2021, the City Council adopted a resolution approving the FY 2021-22 Annual Action Plan for HUD funding programs, allocating a total of $443,694 to eligible projects and programs;
WHEREAS, at this time the City of La Mesa has unexpended CDBG funding in the amount of $40,000 available for reallocation;
WHEREAS, public facilities and infrastructure has been identified as a priority community need;
WHEREAS, housing navigation as a homeless services program has been identified as a priority community need;
WHEREAS, the City Council held public hearings on March 22, 2022, and April 26, 2022, with published notification, to ensure adequate opportunity for public participation in the re-programming of funding resources;
WHEREAS, a 30-day public review period to provide the community with an opportunity to comment on the FY 2021-22 Annual Action Plan amendment began on March 25, 2022, and ended on April 24, 2022; and
WHEREAS, the City will incorporate public comments received into the final submission of said Plan.
NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, as follows:
1. That the foregoing fact and determinations are true and hereby made a part hereof.
2. That the City Council hereby approves a substantial amendment to the Annual Action Plan for FY 2021-22 to reallocate $10,000 CDBG funding from Program Administration to Collier Park and $30,000 to a revised homeless services project.
3. That the City Council hereby authorizes allocation and submission of the amended Annual Action Plan for FY 2021-22 to HUD with the required certifications, applications, and agreements for the full implementation of the activities funded under the Plan.
PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 26th day of April 2022, by the following vote, to wit:
AYES:
NOES:
ABSENT:
CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, the City Clerk of the City of La Mesa, California do hereby certify the foregoing to be a true and exact copy of Resolution No. 2022- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.
MEGAN WIEGELMAN, CMC, City Clerk
Annual Action Plan
2022
1 OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Action Plan
2022
2 OMB Control No: 2506-0117 (exp. 09/30/2021)
Contents
Executive Summary.......................................................................................................................................3 AP-05 Executive Summary - 91.200(c), 91.220(b) ....................................................................................3 PR-05 Lead & Responsible Agencies - 91.200(b) ......................................................................................6 AP-10 Consultation - 91.100, 91.200(b), 91.215(l) ...................................................................................7 AP-12 Participation - 91.401, 91.105, 91.200(c).....................................................................................10 Expected Resources....................................................................................................................................11 AP-15 Expected Resources - 91.420(b), 91.220(c)(1,2) ..........................................................................11 Annual Goals and Objectives......................................................................................................................13 AP-35 Projects - 91.420, 91.220(d) .........................................................................................................15 AP-38 Project Summary ..........................................................................................................................16 AP-50 Geographic Distribution - 91.420, 91.220(f) ................................................................................20 AP-75 Barriers to affordable housing -91.420, 91.220(j)........................................................................21 AP-85 Other Actions - 91.420, 91.220(k) ................................................................................................22 Program Specific Requirements..................................................................................................................25
Annual Action Plan
2022
3 OMB Control No: 2506-0117 (exp. 09/30/2021)
Executive Summary
AP-05 Executive Summary - 91.200(c), 91.220(b)
1. Introduction
Program Year 3 Action Plan Executive Summary
The 2022-2023 One-Year Action Plan implements the third year of the 2020-2025 Consolidated Plan and addresses the HUD consolidated planning requirements for the Community Development Block Grant Program (CDBG). This plan includes the funding allocations that the City will make to housing and community development programs and activities.
The City of La Mesa participates in the HOME program under the County of San Diego. HOME funds are being administered directly by the County of San Diego Housing and Community Development Department. Homebuyer assistance if available to current and future La Mesa residents via the County’s HOME-funded Down Payment and Closing Cost Program
2. Summarize the objectives and outcomes identified in the Plan The Action Plan incorporates outcome measures identified in the Consolidated Plan. Activities are selected in accordance with the Federal Register Notice dated March 7, 2006, which require the following Performance Measure Objectives/Outcomes to be associated with each activity funded:
General Objective Categories- Activities will meet one of the following:
• Decent Housing (DH)
• A Suitable Living Environment (SL)
• Economic Opportunity (EO) General
Outcome Categories- Activities will meet one of the following:
• Availability/Accessibility (1)
• Affordability (2)
• Sustainability (3)
The City of La Mesa has a range of housing and community development needs. CDBG funds alone are not adequate to address the various needs identified during the public outreach process and summarized in the Needs Assessment. Recognizing the national objectives of these funding programs and specific program regulations, the City intends to use these funds to coordinate programs and projects to create a decent and suitable living environment to benefit low- and moderate-income households and those with special needs. Needs which have been determined to be a High Priority level will receive funding during this five-year planning period. Needs with a Low Priority may be funded based on the availability of funds. Program goals established in the 2020-2025 Consolidated Plan, which form the basis for establishing objectives and outcomes in the 2022-2023 Action Plan, are as follows:
Annual Action Plan
2022
4 OMB Control No: 2506-0117 (exp. 09/30/2021)
Goal 1 – Improve public facilities and infrastructure to promote a healthy and vibrant city environment.
Goal 2 – Promote equitable access to affordable housing through preservation of existing units, assistance to homeowners, and fair housing services.
Goal 3 – Create programs to prevent and address homelessness and provide access to services.
Goal 4 – Provide local community services to support low- and moderate-income households.
These four goals represent the varied needs that emerged during the ConPlan development process.
Infrastructure emerged as the top priority of survey respondents. The goals identified above specifically address the uses of CDBG and HOME funds in La Mesa.
3. Evaluation of past performance
The City has successfully implemented housing and community development activities in the previous ConPlan cycle, reaching thousands of low- and moderate-income individuals. The City focuses its CDBG funding on infrastructure projects and, having completed 8 (eight) projects, made a significant impact on LMI neighborhoods and individuals in La Mesa. Through CSA San Diego, the City’s fair housing service provider, 450 La Mesa residents were provided with fair housing services over the past five years.
The City’s affordable housing objective is to provide homeownership opportunities using HOME funds available through the County HOME Consortium. In prior years, the City also issued loans to lowerincome homeowners through its Housing Rehabilitation Program, of which 10 loans are outstanding. No recent loans have been issued due to the limited amount of funding available.
Limited CDBG resources have impacted the City’s ability to simultaneously fund capital improvements and public services. The La Mesa City Council has established a policy guideline that suspends the public service program if the City’s annual CDBG funding allocation is below $450,000. One exception to this policy is that the City may pursue funding for homeless services. In addition, the City will continue to support fair housing services such as those that have been provided by the Center for Social Advocacy (CSA) of San Diego County. CSA assists people experiencing housing discrimination. However, the need for public services in the community is extensive.
CDBG funds have primarily supported multi-year improvement projects in low- and moderate-income neighborhoods. Collier Park and Vista La Mesa Park are examples of complex, phased infrastructure rehabilitation projects. In 2016-17, the City completed three large undertakings and restored timeliness.
Due to rising construction costs and COVID-related delays, completion of the Collier Park Improvements Project Collier Park has been deferred to the 2022-23 program year. As the majority of CDBG funds are allocated to this undertaking, it is critical that the City complete this project to meet timeliness expectations.
Annual Action Plan
2022
5 OMB Control No: 2506-0117 (exp. 09/30/2021)
In evaluating past performance, the City recognizes that even relatively small projects are multi-year undertakings requiring multiple funding sources, which makes achieving and maintaining timeliness an ongoing challenge.
4. Summary of Citizen Participation Process and consultation process The City’s community participation process is informed by the Citizen Participation Plan, which guides the implementation of a community engagement process and notification of community meetings and public hearings. In accordance with the adopted Citizen Participation Plan, two noticed public hearings were conducted in the formulation of the 2022-23 Annual Action Plan. Notice of a 30-day public review period and public hearing was published in the Daily Transcript on March 25, 2022. Notice of the first hearing was published in the Daily Transcript on March 9, 2022. Public hearings were held on March 22, 2022, and on April 26, 2022. Public comments are encouraged and all input is considered in the formulation of CDBG needs, priorities, projects, and activities.
5. Summary of public comments
A significant amount of qualitative feedback on community needs was collected through community meetings, stakeholder consultations, a public comment period, and at formal public hearings during the development of the ConPlan. These comments provided insight into community needs and informed the CDBG program goals as well as the Annual Action Plan. Top priority needs were identified as infrastructure, community facilities, housing, homelessness, and transportation. Formal public comments for the ConPlan were received at meetings of City Council and during a public comment period.
6. Summary of comments or views not accepted and the reasons for not accepting them All public comments were accepted and addressed in the Consolidated Plan and subsequent Annual Action Plan review.
7. Summary
Annual Action Plan
2022
6 OMB Control No: 2506-0117 (exp. 09/30/2021)
PR-05 Lead & Responsible Agencies - 91.200(b)
1. Agency/entity responsible for preparing/administering the Consolidated Plan The following are the agencies/entities responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
CDBG Administrator LA MESA Community Development
Department
Table 1 – Responsible Agencies
Narrative
Community Development Department staff are responsible for preparing and administering La Mesa’s consolidated plan.
Consolidated Plan Public Contact Information
City of La Mesa
Community Development Department
8130 Allison Avenue
La Mesa, CA 91942
Annual Action Plan
2022
7 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-10 Consultation - 91.100, 91.200(b), 91.215(l)
1. Introduction
The City of La Mesa has long communicated and collaborates with many governmental and non‐ governmental agencies in the region to address the needs of the City’s LMI population. The City’s formalized collaborative efforts include being a member of the County of San Diego’s HOME Consortium and recipient of Housing Choice Vouchers (Section 8) through the County of San Diego’s voucher program. City staff also works closely with the County of San Diego Health and Human Services Agency, as well as nonprofit health and mental health providers.
Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l)).
The City encourages agencies to work together to leverage resources and prevent duplication of services for the betterment of the people being served. During the community engagement process, the City consulted with these and other agencies and businesses at community meetings, through interviews and an online survey. An outreach list was compiled consisting of 187 agencies, including:
• Nonprofit service providers that cater to the needs of low- and moderate-income households and persons
• with special needs, including persons with disabilities; • Affordable housing providers;
• Housing advocates;
• Housing professionals;
• Public agencies (such as school districts, health services, public works); • Economic development and employment organizations; and • Community and neighborhood groups.
Additionally, members of the City’s governing body work closely with other regional entities and committees throughout the County. These affiliations include:
• San Diego Association of Governments (SANDAG), San Diego County’s federally recognized metropolitan planning organization (MPO)
• Regional Task Force on the Homeless (RTFH), the region’s HUD Continuum of Care (CoC) • San Diego Regional Alliance for Fair Housing
• Quarterly meetings of local CDBG program administrators As of 2018, entitlement jurisdictions must account for narrowing the digital divide and increasing resilience to natural hazards. To do so, the City consulted with 2-1-1 San Diego, the region’s community information exchange, to understand the efforts throughout San Diego County to narrow the digital divide and bring broadband internet service to a broader swath of the population, especially LMI communities.
Annual Action Plan
2022
8 OMB Control No: 2506-0117 (exp. 09/30/2021)
Lastly, RTFH and the City’s fair housing service provider were both interviewed in developing the Consolidated Plan. The City will continue to maintain partnerships with these and other agencies to achieve its long-term housing and community development goals.
Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.
The City works closely with the Regional Task Force on the Homeless (RTFH), San Diego County’s Continuum of Care (CoC) entity. Coordinated activities include the annual Point-in-Time (PIT) count and services and shelters for those experiencing or at risk of homelessness. The PIT allows the community to engage and survey those experiencing homelessness countywide to provide a count of the region’s sheltered and unsheltered homeless community. The 2020 PIT counted a total 52 unsheltered individuals, representing approximately 9 percent of the total homeless population in East San Diego County.
In developing the Consolidated Plan, RTFH was interviewed to provide insight on the challenges and progress on homelessness in the region and in La Mesa.
In response to community concerns and increasing need, the City created a Citizens Taskforce on Homelessness in 2019. Out of that taskforce came a new initiative, the Homeless Outreach and Mobile Engagement (HOME) Program. Launched in 2020 and partially funded with CDBG CARES Act funding, the locally-managed program provides trained specialists, including a full-time outreach worker and mental health clinician, to offer an array of services and housing opportunities.
Describe consultation with the Continuum(s) of Care that serves the jurisdiction’s area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS The City of La Mesa does not administer ESG funds; however, City staff did consult with RTFH in developing the 2020-25 Consolidated Plan.
Annual Action Plan
2022
9 OMB Control No: 2506-0117 (exp. 09/30/2021)
2. Agencies, groups, organizations and others who participated in the process and consultations
Table 2 – Agencies, groups, organizations who participated Identify any Agency Types not consulted and provide rationale for not consulting No single agency or organization was purposely excluded from providing input on the Consolidated Plan.
Other local/regional/state/federal planning efforts considered when preparing the Plan Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the
goals of each plan?
City of La Mesa Housing Element,
2021-2028
City of La Mesa This Consolidated Plan conforms to
the adopted City of La Mesa
Housing Element, 2021-2028
Climate Action Plan City of La Mesa A Climate Action Plan to mitigate the impacts of climate change.
Table 3 - Other local / regional / federal planning efforts Organization Agency/Group/Organization
What Section of the
Plan was addressed by
consultation?
Briefly describe how the
organization was consulted.
What are the anticipated
outcomes of the
consultation or areas of
improved coordination?
2-1-1 San Diego Community Information
Exchange (CIE)
Needs Assessment
Housing Market Analysis
Provided localized data to
inform the ConPlan.
County of San Diego County government – Health
and Human Services Agency,
Housing and Community
Development Services, Office
of Emergency Services
Needs Assessment
Housing Market Analysis
Consulted with various
agencies at the county
government to inform
development of ConPlan
Legal Aid Society of
San Diego
Fair housing legal service
provider
Needs Assessment
Housing Market Analysis
Interviewed staff about fair
housing needs and
challenges in San Diego
Regional Task Force
on the Homeless
Continuum of Care Needs Assessment
Market Analysis
Interviewed staff about
homelessness needs and
challenges.
Annual Action Plan
2022
10 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-12 Participation - 91.401, 91.105, 91.200(c)
1. Summary of citizen participation process/Efforts made to broaden citizen participation Summarize citizen participation process and how it impacted goal-setting Citizen participation is one of the most important components of the Consolidated Plan process. The City of La Mesa follows an adopted Citizen Participation Plan to ensure meaningful community involvement at each step. To obtain public input early in the Action Plan’s development, the La Mesa City Council conducted a public hearing on March 22, 2022. Notice of this hearing was published in the Daily Transcript, a newspaper of general circulation. At the hearing, the City reaffirmed CDBG program goals and priorities established in the Consolidated Plan and considered options for allocating anticipated resources. A copy of the public hearing notice is published in the appendix.
Input received at the first CDBG hearing was incorporated into the draft 2022-23 Action Plan. The plan was made available for 30-day public review on the City’s website and mailed to a list of 20 local agencies and organizations and at the La Mesa Public Library. Notice of the public review period and second hearing was review period and the Daily Transcript on March 25, 2022.
The Consolidated Plan, amendments, Annual Action Plans and performance reports will be available for five years at La Mesa City Hall.
Citizen Participation Outreach
Sort
Order
Mode of
Outreach
Target of Out
reach
Summary of
response/atten
dance
Summary of
comments rec
eived
Summary of com
ments not
accepted
and reasons
URL (If
applica
ble)
1 Newspaper
Ad
Nontargeted/broad
community
N/A N/A
2 Mailing Nontargeted/broad
community
N/A N/A
3 Public
hearing
Nontargeted/broad
community
N/A N/A
Table 4 – Citizen Participation Outreach
Annual Action Plan
2022
11 OMB Control No: 2506-0117 (exp. 09/30/2021)
Expected Resources
AP-15 Expected Resources - 91.420(b), 91.220(c)(1,2)
Introduction
The City’s allocation for Program Year 2022-23 is expected to be approximately $450,000, which is consistent with prior year funding levels. Program Year 2022-23 is Year 3 of the 2020-2025 Consolidated Planning period.
Anticipated Resources
Program Source
of
Funds
Uses of Funds Expected Amount Available Year 3 Expected Amount
Available
Remainder
of ConPlan
$
Narrative
Annual Description
Allocation:
$
Program
Income:
$
Prior Year
Resources:
$
Total:
$
CDBG public
-
federal
Acquisition
Admin and
Planning
Economic
Development
Housing
Public
Improvements
Public
Services 450,000 20,000 470,000 883,831
Estimated
amount
over the
planning
period is
based on
anticipated
annual
funding of
$446,016.
Table 5 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how matching requirements will be satisfied The City has been successful in obtaining grants and identifying other funds to commit to Consolidated Plan priorities for capital improvement projects. As the City continues to work to carry out improvements that implement the Collier Park Master Plan, funding from California Parks, Environment, and Water Bond (Prop 68) are being sought to leverage CDBG resources. In addition, La Mesa Park & Recreation funds were used to resurface the tennis court in Collier Park and restripe for dual use as a pickleball court. In 2021, the City received $3 million in State Parks and Recreation funding and Prop 68 funds to be used for improvements to Collier Park.
Annual Action Plan
2022
12 OMB Control No: 2506-0117 (exp. 09/30/2021)
In recent years the City has received $10.4 million in grant funding towards bike and pedestrian infrastructure improvements, much of which has been located in low-moderate income neighborhoods or adjacent to schools serving low-moderate income areas. The West La Mesa Street Improvement Project, a $6 million undertaking, completed a new road, Junior High Drive, completed missing sidewalk links, and provided over five miles of new Class II or Class III bike lanes adjacent to Helix High School and La Mesa Arts Academy, which are within walking distance of and served by surrounding CDBG eligible neighborhoods.
The City actively applies for grants to complete infrastructure projects in low-moderate income neighborhoods.
If appropriate, describe publically owned land or property located within the jurisdiction that may be used to address the needs identified in the plan Activities to be funded include improvements to a City-owned public park and related street improvements. Collier Park is a publicly-owned local park located in a CDBG-eligible neighborhood.
Right-of-way, including portions of Pasadena Avenue, Palm Avenue, and 4th Street, extend through and around the park. Portions of the adjacent streets are improved with curb, gutter and sidewalks.
Pasadena Avenue, which runs through the park, lacks sidewalks, curb and gutter.
Annual Action Plan
2022
13 OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Goals and Objectives
AP-20 Annual Goals and Objectives - 91.420, 91.220(c)(3)&(e) Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Needs
Addressed
Funding Goal Outcome
Indicator
1 Improve
Facilities and
Infrastructure
2020 2025 Non-Housing
Community
Development
Improve
Facilities and
Infrastructure
CDBG:
$354,000
Public Facility or
Infrastructure
Activities other than
Low/Moderate
Income Housing
Benefit: 28530
Persons Assisted
2 Fair Housing 2020 2025 Affordable
Housing
Non-Homeless
Special Needs
Fair Housing CDBG:
$30,000
Public service
activities other than
Low/Moderate
Income Housing
Benefit: 100
Persons Assisted
3 Planning and
Administration
2020 2025 Administration Planning and
Administration
CDBG:
$50,000
4 Homeless
Services
2020 2025 Homeless Homeless
Services
CDBG:
$30,000
Public service
activities other than
Low/Moderate
Income Housing
Benefit: 25 Persons
Assisted
5 Conserve the
Housing Stock
2020 2025 Affordable
Housing
Planning and
Administration
CDBG:
$6,000
Table 6 – Goals Summary
Goal Descriptions
1 Goal Name Improve Facilities and Infrastructure
Goal
Description
Improve and provide public and community facilities, and make necessary infrastructure improvements to serve low- and moderate-income persons. 2 Goal Name Fair Housing
Goal
Description
Provide fair housing services to foster equal housing opportunity.
Annual Action Plan
2022
14 OMB Control No: 2506-0117 (exp. 09/30/2021)
3 Goal Name Planning and Administration
Goal
Description
Program regulations allow the expenditure of up to 20 percent of the annual allocation to support program administration and planning activities. For the past two years, the City has committed 10-15 percent of the annual grant to fund staff and other administrative costs
4 Goal Name Homeless Services
Goal
Description
Provide support services for those experiencing homeless and those at risk of becoming homeless.
5 Goal Name Conserve the Housing Stock
Goal
Description
Manage the housing rehabilitation loan program. Although there are currently no new loans being granted, there are administrative costs associated with monitoring the loan portfolio and processing loan pay-off paperwork.
Prior to 2014, as a participant of the County's HOME consortium, the City of La Mesa directly received a small allocation of HOME funds for the City's affordable housing activities. HUD revisions to the program now require consortia lead agencies to deliver funds directly to HOME beneficiaries, eligible low-income households. The City no longer receives its specific allocation of HOME funds from the County.
Annual Action Plan
2022
15 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-35 Projects - 91.420, 91.220(d)
Introduction
This plan outlines the action steps that La Mesa will use to address housing and community development needs in the City. The plan includes a listing of activities the City will undertake during FY 2022-2023 (July 1, 2022, through June 30, 2023) that utilize CDBG funds. For FY 2022-23, the City anticipates a CDBG allocation of $450,000, plus $20,000 prior year funds. # Project Name
1 Collier Park Improvements Phase 2
2 Fair Housing (CSA San Diego County)
3 Program Administration
4 Homeless Services
5 Housing Rehabilitation Loan Program Administration
Table 7 – Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The primary obstacle to meeting underserved needs is the lack of financial and staff resources. Each year, the City of La Mesa City Council selects high priority projects for funding. Other projects, which are high priority and are important to the City’s community development goals, are not funded. In spite of the small level of financial resources, the City of La Mesa strives to successfully complete at least one high priority community development project each year.
Annual Action Plan
2022
16 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-38 Project Summary
Project Summary Information
1 Project Name Collier Park Improvements Phase 2
Target Area
Goals Supported Improve Facilities and Infrastructure
Needs Addressed Improve Facilities and Infrastructure
Funding CDBG: $ 354,000
Description CDBG has long supported rehabilitation efforts at Collier Park. A need was identified by the community to create a safer, more active use park with improved connections to the neighborhood. Following adoption of the Collier Park Renovations Project Master Plan in 2015, Phase I improvements were completed in 2018. The Phase I scope included grading, new hardscape, new landscape, and irrigation improvements to the panhandle portion of the park, near the park entry. Implementation of the master plan is continuing.
An additional budget of $354,000, together with prior year CDBG allocations totaling $1.39 million and leveraged with $3 million in State Parks and Recreation funding and Prop 68 funds, will allow the city to complete Phase II in the coming year.
Target Date June 2023
Estimate the number
and type of families that
will benefit from the
proposed activities
An estimated 28,530 persons are expected to benefit from this project.
Location Description Collier Park, 4401 Palm Avenue, La Mesa, 91941 Planned Activities FY 2022-23 CDBG funds will be used to complete the next phase of improvements. The scope of work includes grading and landscaping, facilities, additional parking, roadway improvements, and security upgrades in the heart of the park.
2 Project Name Fair Housing (CSA San Diego County)
Target Area
Goals Supported Fair Housing / Planning and Administration Needs Addressed Fair Housing / Planning and Administration
Annual Action Plan
2022
17 OMB Control No: 2506-0117 (exp. 09/30/2021)
Funding CDBG: $30,000
Description The Center for Social Advocacy (CSA) of San Diego County provides fair housing services to the City.
Target Date June 2023
Estimate the number
and type of families that
will benefit from the
proposed activities
An estimated 100 persons are expected to benefit from this activity.
Location Description City of La Mesa
Planned Activities Each year, the City must certify to HUD that the City is affirmatively furthering fair housing. The contract with CSA San Diego County helps the City meet this CDBG implementation requirement. The City's contribution to CSA, combined with that of several other jurisdictions including the Cities of El Cajon, Santee, National City, and Chula Vista, supports this organization and furthers fair housing goals within La Mesa and the region.
3 Project Name Program Administration
Target Area
Goals Supported Planning and Administration
Needs Addressed Planning and Administration
Funding CDBG: $50,000
Description CDBG Administration is the responsibility of the Housing and Development Division of the Community Development Department.
Target Date June 2023
Estimate the number
and type of families that
will benefit from the
proposed activities
Location Description
Planned Activities Administrative activities include preparing annual plans and reports, public outreach, environmental review of projects, labor compliance monitoring, contract administration, subrecipient monitoring, and fair housing testing. Staff also maintains and updates the low-moderate eligible areas map.
Annual Action Plan
2022
18 OMB Control No: 2506-0117 (exp. 09/30/2021)
4 Project Name Homeless Services
Target Area
Goals Supported Homeless Services
Needs Addressed Homeless
Funding CDBG: $30,000
Description Homeless services continue to be a critically important and an underserved need in the community. Outreach efforts coordinated through the City’s person-centered Homeless Outreach and Mobile Engagement (HOME) program have identified a shortage of housing solutions. A single, coordinated housing stabilization program would most effectively provide a range of housing navigation services.
Leveraged with American Rescue Plan Act (ARPA) funding, the project would fund a prevention and diversion specialist, motel vouchers, and flex funds for rental applications, utility deposits, and move-in cost assistance over a two-year period.
The total proposed CDBG budget is $226,372, including $30,000 FY 2022- 23 CDBG funds. A provider will be selected through an RFP process.
Target Date June 2023
Estimate the number
and type of families that
will benefit from the
proposed activities
An estimated 25 persons are expected to benefit from this activity.
Location Description City of La Mesa
Planned Activities A 2022-23 CDBG allocation of $30,000 would be used for housing navigation services, motel vouchers, and flex funds for rental applications, utility deposits, and move-in cost assistance. 5 Project Name Housing Rehabilitation Loan Program Administration Target Area
Goals Supported Planning and Administration / Conserve the Housing Stock Needs Addressed Planning and Administration / Conserve the Housing Stock Funding CDBG: $6,000
Description Loan portfolio management for the housing rehabilitation program.
Target Date June 2023
Annual Action Plan
2022
19 OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number
and type of families that
will benefit from the
proposed activities
Location Description
Planned Activities Although no new loans are being granted, there are administrative costs associated with monitoring the loan portfolio and processing loan payoff paperwork.
Annual Action Plan
2022
20 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-50 Geographic Distribution - 91.420, 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The City is committed to a policy that uses CDBG funds to construct public improvements that benefit lower income neighborhoods or special needs populations. While there is some overlap between lower income neighborhoods and neighborhoods with minority concentrations, the City does not use minority concentration as a basis for distribution of assistance.
Geographic Distribution
Target Area Percentage of Funds
Table 8 - Geographic Distribution
Rationale for the priorities for allocating investments geographically Priorities for allocation are a result of various community outreach efforts and consultation meetings developed under the Citizen Participation process and approved by the La Mesa City Council. Generally the needs have been determined to be improvements to aging infrastructure systems, park improvements, and affordable housing. The small size of the community (nine square miles) precludes the need to establish specific Target Areas.
Annual Action Plan
2022
21 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-75 Barriers to affordable housing -91.420, 91.220(j) Introduction
Public policies can have a negative effect on the development of affordable housing and residential investment. Public policies with potential negative effects include the complex approval process, permitting and other costs that add to project expenses and most importantly, zoning ordinances that inhibit affordable housing development, conversion or rehabilitation Actions planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment
Individual cities have little influence over market constraints, but can provide incentives or assistance to overcome the impacts of market constraints. Major governmental constraints to affordable housing development include land use policies governed by the Land Use Element of the General Plan, zoning and development codes, development and planning fees, and growth management policies. The City of La Mesa's Housing Element was adopted by the City Council on July 27, 2021, pursuant to State Housing Element Law. The Housing Element provides long-range policy direction consistent with the General Plan planning period, combined with short-term implementation of programs for the current housing element cycle. The Housing Element identifies the need to address and remove governmental constraints affecting the maintenance, improvement, and development of affordable housing and special needs groups. This includes emergency shelters, transitional housing, supportive housing, and SROs.
A number of recent actions have been taken by the City to reduce barriers to affordable housing. In 2017, the City adopted an Affordable Homes Bonus Program to implement State density bonus regulations. In 2019 and 2020, the City adopted accessory dwelling unit (ADU) and junior accessory dwelling unit (JADU) ordinances to comply with state regulations and encourage new ADU development as an effective means to provide affordable housing. The City does not charge sewer connection fees for ADUs, waives sewer fees for any deed-restricted affordable unit, and waives sewer and park fees for all units in 100 percent deed-restricted affordable projects. Also in 2019, the City adopted a new zoning ordinance that allows emergency shelters by-right. In early 2022, the City adopted ordinances to allow for two-unit development and urban lot splits in single-family zones consistent with State law.
Annual Action Plan
2022
22 OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-85 Other Actions - 91.420, 91.220(k)
Introduction
Program goals established in the 2020-2025 Consolidated Plan, which form the basis for establishing objectives and outcomes in the 2022-2023 One-Year Action Plan, are as follows:
Goal 1 – Improve public facilities and infrastructure to promote a healthy and vibrant city environment.
Goal 2 – Promote equitable access to affordable housing through preservation of existing units, assistance to homeowners, and fair housing services.
Goal 3 – Create programs to prevent and address homelessness and provide access to services.
Goal 4 – Provide local community services to support low- and moderate-income households.
These four goals represent the varied needs that emerged during the ConPlan development process.
Infrastructure emerged as the top priority of survey respondents. The goals identified above specifically address the uses of CDBG and HOME funds in La Mesa.
Actions planned to address obstacles to meeting underserved needs The City proactively pursues grant funding from a variety of private and public sources. Over the past five years the City has been awarded several grants for street improvements that help address safe routes to school in CDBG eligible areas. In FY 2018-19, the City received four HSIP grants totaling $1,014,000, two Active Transportation Program (ATGP) Capital Grants totaling $625,000, and one SANDAG Smart Growth Incentive Program Planning Grant for $169,000. These recently awarded funds were be used to improve pedestrian and bike safety and promote walkability citywide, including in and adjacent to CDBG eligible neighborhoods. The West La Mesa Street Improvement Project, a $6 million undertaking, completes a new road, Junior High Drive, completes missing sidewalk links, and provides over five miles of new Class II or Class III bike lanes adjacent to Helix High School and La Mesa Arts Academy, which are within walking distance of and served by surrounding CDBG eligible neighborhoods.
Annual Action Plan
2022
23 OMB Control No: 2506-0117 (exp. 09/30/2021)
Actions planned to foster and maintain affordable housing The Community Development Department is responsible for the City’s housing programs. Staff is assigned to monitor the status of one “at-risk” apartment project, to manage the housing rehabilitation loan portfolio, and to work with the private sector to develop proposals for new affordable housing construction.
In 2017 the City adopted an Affordable Homes Bonus Program to implement a statewide density bonus program that encourages new housing development across all income levels. In 2019 and 2020, the City adopted accessory dwelling unit (ADU) and junior accessory dwelling unit (JADU) ordinances to comply with state regulations and encourage new ADU development as an effective means to provide affordable housing. The City does not charge sewer connection fees for ADUs, waives sewer fees for any deed-restricted affordable unit, and waives sewer and park fees for all units in 100 percent deedrestricted affordable projects. In early 2022, the City adopted ordinances to allow for two-unit development and urban lot splits in single-family zones consistent with State law.
In 2019 the City circulated a request for developer qualifications for an affordable multi-family residential project in the downtown village on the former site of the City’s police station. The 1.27-acre site is approved for a 100% affordable development project consisting of 147 deed-restricted affordable units. Construction expected to begin within the year.
Actions planned to reduce lead-based paint hazards
The City of La Mesa Building Department provides information to the public regarding the implementation of lead-based paint regulations promulgated by the Environmental Protection Agency.
A handout notifies building department customers of the requirement to hire a lead certified contractor.
A slide with contact information for the EPA lead safe housing program and the need to hire qualified contractor is on the City’s government access television station and is posted on the City’s website.
Actions planned to reduce the number of poverty-level families As a small city, La Mesa's actions have little direct impact on reducing the number of families living below the poverty level. The impacts of the policies of the County, the State and the Federal governments have a much greater impact. However, the existing housing stock in La Mesa remains relatively affordable and the City continues to support the production of new affordable housing.
The City has also adopted an Economic Development Strategy to define policies and programs to retain and expand local business opportunity. This long-term project is aimed at providing a full spectrum of jobs in the community. These activities could have a positive impact on very low-income families.