Cities Index.
Agenda packet, regular meeting

La Mesa City Council
July 22, 2025

Document
Agenda packet, regular meeting
Meeting
July 22, 2025
Body
La Mesa City Council
Pages
274
Original file
36.9 MB
Text extracted from the city's file for reading and search. Open the original on pub-lamesa.escribemeetings.com. That file is the official record.

6 The Sewage Spill Field Report form in Attachment A can be used by the Wastewater Maintenance Supervisor or designated backup person to capture the relevant information needed to respond to a report of a possible sewage spill and help initiate the work order assignment.

Operations Division Personnel Notifications of Possible Sewage Spills Possible and actual sewage spills detected by maintenance personnel during their regular duties are reported immediately to the Wastewater Maintenance Supervisor or designated backup.

Personnel on-site observing the sewage spill should begin efforts to contain and minimize its effects, as further described in subsection 2.5 below.

2.2 First Responder Responsibilities
Based on the information provided during the notification of a possible sewage spill, the Wastewater Maintenance Supervisor or the designated back-up person shall proceed to the sewage spill location to assess the cause and extent of the sewage spill. The City staff person who arrives first at the location is considered the First Responder. The First Responder will determine whether to direct a wastewater crew, other City personnel, and/or approved contractors to the sewage spill location if the spill cannot be fully contained or recovered, or it has reached public waters. The information obtained by the First Responder during the initial notification of a possible sewage spill may warrant the First Responder, in their best professional judgment, to immediately dispatch crews or other City personnel to the sewage spill location before proceeding to the reported sewage spill location.

The First Responder is responsible for protecting the health and safety of the public by mitigating the impacts of the sewage spill to the maximum extent possible. Areas where public contact with sewage is possible shall be isolated using barricades, signs, or other effective means. Upon determining the sewage spill originated in the City’s jurisdiction, the First Responder will perform the following:
 Determine the cause of the sewage spill, e.g., sewer line blockage, or pipeline break, etc.;  Identify and request, if necessary, additional personnel, materials, and equipment necessary to minimize, contain, or isolate the impact of the sewage spill;  Control public access to affected area; and
 Implement efforts to stop the spill.

If the First Responder determines the sewage spill is not within the City’s jurisdiction, the City should notify the responsible agency to respond to the spill. If the sewage spill poses an imminent danger to the public, public health, property, or public waterways of the United States, the First Responder should take prudent emergency actions to mitigate the sewage spill until the responsible agency’s staff arrives.

Page 139 of 274 ends

7 Figure 1
Process for Alerting Staff of a Possible Sanitary Sewer Overflow If the First Responder cannot locate the sewage spill or the reported problem, he/she shall attempt to obtain additional information from the initial caller or Police Dispatch Operator to clarify reported data and to locate the problem. If the sewage spill or reported problem still cannot be located, the First Responder shall check the system for normal flows, advise dispatch of the status, and prepare the final field report.

2.3 Dispatch of Crew(s) to Sewage Spill Location
Failure of any element within the wastewater collection system that threatens to cause or causes a sewage spill triggers an immediate response to isolate and correct the problem. City Operations Division crews and equipment are stationed at the City’s Public Works Yard, from where they are dispatched. The equipment is available 24 hours a day, and staff are placed “on-call” on a rotational schedule to respond to any site of a reported sewage spill. Additional City maintenance personnel are “on call” if additional crews are necessary. Attachment B contains the names, contact information, and on-call schedule for City staff.

All employees dispatched to a sewage spill location shall proceed immediately to the site. All necessary precautionary measures to ensure staff safety shall be in place. Overflows within the Discovery and Notification
of Potential Sanitary
Sewer Overflow by Citizen
or City Staff
During Normal Business
Hours
Calls are received by
Public Works Department
(619) 667-1450
Calls routed to Wastewater
Maintenance Supervisor or
designated back-up person
During Non-Business
Hours and Weekends
Calls are received by
Police Dispatch
(619) 469-6111

Page 140 of 274 ends

8 City’s jurisdiction that enter areas outside the City’s authority will continue to be contained, and the affected agency will be notified of the sewage spill to ensure proper cleaning and notifications are completed.

Photos
Responders must take several photos of the spill location and downstream spill path, capture, and/or result, and take photos from several angles to ensure the spill is documented.

2.4 Requesting Additional Resources
If the First Responder decides that notifying additional staff beyond the “on-call” sewage spill response crews is needed and/or City-approved contractors are required to fully contain and recover the spill, the Wastewater Maintenance Supervisor or designated backup will mobilize the necessary resources. The City can access extra support from its own staff as well as outside oncall contractors that can be mobilized in case of an emergency or major sewage spills. The list of City-approved contractors and equipment rental vendors is provided in Attachment C.

Coordination with Stormwater Agencies
The Public Works Department of the City of La Mesa has combined sewer and storm drain resource personnel; therefore, coordination is implied.

2.5 Overflow Containment, Correction, and Clean-up
This section describes specific actions to be performed by the Operations Division staff and additional crews responding during a sewage spill. The objectives of the specific actions described in this section include:
 Protect public health, the environment, and property from sewage spills and restore the surrounding area to its original condition;
 Contain the sewage discharged to the maximum extent possible and prevent the discharge of sewage into surface waters;
 Control traffic and crowds to limit public access by establishing perimeters and control zones with cones, barricades, sign postings, caution tape, vehicles, and/or terrain;  When appropriate, promptly notify regulatory agencies of preliminary sewage spill information and potential impacts; and
 Minimize the City’s exposure to any regulatory agency penalties and fines.

Under most circumstances, the City will oversee, manage, and perform the tasks necessary to effectively and adequately correct, contain, and clean up sewage spills. The City shall respond with its staff, equipment, and/or contractors. These personnel have the skill and experience to respond rapidly and in the most appropriate manner. An emergency response's critical importance is ensuring that the temporary actions necessary to divert flows and fix the problem do not produce a problem elsewhere in the system. If the matter is not handled correctly, subsequent sewer system back-ups may occur, creating other sewage spills.

Initial Containment Measures
The following are initial measures to contain the sewage spill and recover, where possible, sewage that has already spilled to minimize impact to the public or environment. The City crew responding to the incident shall:

Page 141 of 274 ends

9 1. Determine the immediate destination of the spill (e.g., street curb gutter, storm drain, drainage channel, creek bed, body of water, etc.);

2. Take immediate steps to contain and recover the spill (e.g., block storm drain, recover sewage with a vacuum truck, dig or construct a containment pond, divert flow into a downstream manhole, etc.).

3. Identify and request, if necessary, assistance or additional City and/or Contractor resources (materials and equipment) to contain or isolate the spill;

4. Large spills greater than 10,000 gallons include all the above, a requirement to build additional emergency containment areas downstream of the sewage spill, if possible, and initiating an access plan into storm or flood control channels to contain sewage spills that enter the storm drain system.

Additional Measures for Prolonged Overflow Conditions
In the event of a prolonged sewer line blockage or collapse, the responding City crew shall set up a portable bypass pumping system around the obstruction, continuously or periodically monitor the bypass operation, and carry out emergency repairs to stop the spill. Table 1 can be used as a guide to select the appropriate pump.

Table 1
Pump Capacity Estimating Table
Pump Size
(inches)
Estimated
Capacity (GPM)
Equivalent Gravity
Sewer Flow
(half full sewer)
2 X 2 200 6-inch diameter
3X3 450 8-inch diameter
4 X 4 600 10-inch diameter
6 X 6 1,000 12-inch diameter
8 X 8 1,600 15-inch diameter
10 X 10 2,800 18-inch diameter
Correction of Sewage Spill Cause
Once the sewage spill has been contained and the cause determined, efforts to correct the cause of the sewage spill should commence. These efforts may involve, but not be limited to, removing the pipe blockage by flushing or rodding and repairing a damaged pipeline or manhole. Care must be taken to prevent additional sewage spills from occurring as a result of the corrective action taken to resolve the identified problem.

Clean-up
All sewage spill sites must be thoroughly cleaned as soon as possible after a spill. No readily identifiable residue (e.g., sewage solids, papers, plastics, etc.) is to remain. Clean-up of all sewage spills will be handled according to the following procedures:
 The sewage spill site must be secured to prevent contact by members of the public until the site has been thoroughly cleaned;
 Where practical, the area shall be thoroughly flushed and cleaned of any sewage or washdown water using a high-pressure water hose or Vactor truck; wash-down water shall be

Page 142 of 274 ends

10 contained and recovered; solids and debris shall be flushed, swept, raked, or manually removed, and hauled away for proper disposal;
 Where appropriate (typically in areas with hard surfaces), areas that were in contact with the sewage shall be disinfected and deodorized; proper contact time for proper disinfection must be ensured;
 Where sewage resulted in ponding, the pond must be pumped dry and the residue removed and disposed of properly;
 If sewage discharged into a body of water that may contain fish or other aquatic life, disinfection will not be performed, and the appropriate agency will be contacted; and  Where appropriate, disinfect and deodorize the sewage spill site using liquid bleach, commercial sanitizers (such as HTH®), etc.

2.6 Traffic and Crowd Control
The purpose of traffic and crowd control is to restrict public access to areas that could be affected by unpermitted sewage discharges. The following traffic and crowd control recommendations can serve as a guide for different types of sewage spills.

Small sewage spill (Up to 1,000 gallons)
 Set up cones to direct traffic away from the spill area; and  Use City personnel to control traffic and pedestrians.

Medium sewage spill (1,000 to 10,000 gallons)
 Perform lane closures as necessary;
 Place proper signage for any lane closures and contaminated area signs;  Close affected entrances or exits from public and private facilities; and  Place caution tape and barricades to protect pedestrians from the contaminated area.

Large sewage spill (greater than 10,000 gallons)
 Assess the spill situation;
 Inform City Police Department of any law enforcement assistance necessary for roadway closures and traffic control;
 Delegate responsibility to County Department of Environmental Health Quality for informing the public of hazards;
 Place signage to inform the public of potential hazards to public health and safety; and  Block public access to the area using barricades, cones, and caution tape.

2.7 Preliminary Assessment of Damage to Private and Public Property
Initial assessment of the sewage spill site is performed by the First Responder, who may be the Wastewater Maintenance Supervisor, the designated back-up person, or other City staff. The First Responder will determine whether the sewage spill originated from the City’s collection system, a private business, or a residence. Once the source of the sewage spill is determined, containment and cleanup procedures are executed, and a Sewer Spill Field Report (see Attachment A) will be completed.

Page 143 of 274 ends

11 Public Source Sewage Spill
If it is determined that the source of the sewage spill is from the City’s wastewater collection system, containment and cleanup procedures are executed to prevent the sewage spill from reaching adjacent private properties, local water bodies, and the storm drain system. Once the sewage spill is contained and cleaned, proper documentation utilizing the appropriate forms will be completed.

If it is determined that the sewage spill has reached a private residence or business, the sewage spill is reported to the City’s Risk Management personnel prior to Wastewater Maintenance personnel leaving the site. A Damage Report to Private Property (see Attachment D) is completed and forwarded with the Sewer Spill Field Report to the City’s Risk Management. Photographs and/or video footage should be taken of the spill and the area impacted by the sewage spill.

Photographs and/or video footage should be filed with the Sewer Spill Field Report.

Private Source Sewage Spill
If it is determined that the source of the sewage spill is from a private property, the First Responder and crew will use discretion in assisting the property owner/occupant as reasonably as they can.

City staff are cautioned that the City and the Operations Division may be liable for further damages inflicted on private property during such assistance. If City staff enter private property, it should be with the explicit permission of the owner/occupant of the property. The City crew should not enter private property to assess damage. Staff is directed to take appropriate photographs and video footage, if possible, of the surrounding and impacted area to document the nature and extent of the impacts thoroughly. Photographs and/or video footage should be filed with the Sewer Spill Field Report.

2.8 Notification Requirements
A sewage spill's volume, impact, and location determine the notifications required to comply with City and regulatory requirements. Table 2 summarizes the officials and agencies who should be informed of a sewage spill as soon as practicable, without impeding containment or other emergency response measures. Attachment B lists the specific names and numbers of the individuals holding these positions. The City is not required to send reports to the SDRWQCB; this reporting is now achieved using the web-based online sewage spill reporting system, CIWQS, which is further described in Chapter 4.0 below.

2.9 Regulatory Agency Notification Plan
The Regulatory Agency Notification Plan establishes procedures that the City will follow to provide formal notice to the SDRWQCB, Environmental Protection Agency (EPA), Department of Environmental Health Division of San Diego County, and other City agencies as necessary in the event of a sewage spill. Written notification, when required, shall be made within five (5) business days.

Page 144 of 274 ends

12 Table 2
Sewage Spill Notification Requirements
Agency/Official Reasons to Notify When to Notify
La Mesa Police Department,
Emergency Services
Public Safety concerns, such as assistance with traffic control Immediately
Governor’s Office of
Emergency Services Category 1 sewage spill conditions
Within 2 hours of
notification of sewage
spill
San Diego County Public
Works An sewage spill impacts the County’s facilities As soon as practicable La Mesa Risk Management sewage spill from City system enters private property or causes an sewage spill on private property
Prior to leaving sewage
spill site
La Mesa Public Works
Engineering Division
To begin a capital improvement solution to replace
temporary repair
After sewage spill is
stopped
La Mesa Wastewater
Maintenance Supervisor All sewage spills reported to Wastewater Supervisor Immediately La Mesa Director of Public
Works
All major sewage spills reported to Director of Public
Works.

As soon as determined
necessary
La Mesa City Manager's
Office
sewage spill in anticipation of media coverage or
heightened scrutiny, or environmental impact.

As soon as determined
necessary
Initial Notification
In the event of a significant spill (any sewage spill greater than 10,000 gallons per day), the City must notify Federal and State Agency representatives no later than 2 hours of becoming aware of the spill. Table 2-2 identifies who should be notified and when based on the type and volume of sewage spill. The initial and any updated spill reports will then be faxed or mailed to the various agencies as identified in the Sewage Spill Notification List, provided in Attachment B. The supervisor in charge will contact the regulatory agencies.

Secondary Notification
After the sewage spill notifications (Table 2) have been made, the City will contact the other regulatory agencies using the Sewage Spill Notification List (Attachment B) as required and other impacted parties if there has been a spill.

2.10 Monitoring and Mitigation
The First Responder who confirmed the sewage spill must ensure that the provisions of this SERP and other directives are met. City staff shall assess the impacts following a sewage spill.

Appropriate mitigation and monitoring measures shall be implemented following the assessment to monitor the site for potential future sewage spills and to prevent sewage spills from re-occurring.

For sewage spills that reach surface waters, the City must conduct the following activities:
 Obtain water quality samples.
 Gather samples upstream and downstream of any location where the sewage spill reached surface water.
 Log the sample location, time, and water temperature on the chain of custody form.  Create a map of the sample locations so that follow-up testing can be performed.

Page 145 of 274 ends

13  Collect samples at the location where the sewage spill entered the water. When taking the sample, submerge the bottle below the surface of the water with the cap on. Once the bottle is under the surface, remove the cap and fill the bottle. Gloves should be worn while sampling to avoid infecting any open wounds.
 Analyze the sample for at least the following constituents:
o Ammonia Nitrogen;
o Biochemical Oxygen Demand (BOD);
o Dissolved Oxygen (DO);
o Total Fecal Coliform;
o Total Suspended Solids (TSS); and
o Additional sampling requirements as imposed by the SDRWQCB.

2.11 Sewage Spill Documentation
Documenting sewage spills and their causes provides information for:
 Management for performance measurement and decision-making;  Regulators to meet established reporting requirements;  Planning future maintenance and repair activities;
 Engineering determinations regarding capacity, rehabilitation, or replacement; and  Reference for historical performance or claims.

The First Responder shall ensure the sewage spill is properly investigated and documented.

Information compiled during the investigation of the sewage spill shall be recorded on the Sewage Spill Report (Attachment A). Copies of supporting information shall be compiled. The minimum information required from the investigation is:
 Cause of sewage spill;
 Volume of sewage spill, including volume released and volume recovered;  Location of point of discharge, including Thomas Guide map page;  Ultimate destination of the sewage spill;
 Impact and extent of impact;
 Estimated start time of sewage spill;
 Time City received notification of sewage spill;
 Arrival time of crew(s) and time to correct the sewage spill;  End time of sewage spill;
 Water body impacted and results of bacteriological monitoring, if applicable;  Actions taken to mitigate the sewage spill; and
 Notifications to regulators and others.

There are various approaches to estimating sewage spill volumes. Attachment E guides estimating the volume of sewage that escaped from the wastewater collection system and the amount of sewage recovered.

The City will follow up, in person or by telephone, with the person(s) initially reporting the sewage spill. The cause of the sewage spill and its resolution should be disclosed.

Page 146 of 274 ends

14 3 Public Advisory of Sewage Contamination
Procedures
This chapter describes the action the City must take to limit public access to surface waters and other areas potentially impacted by sewage spills from the wastewater collection system.

The City is primarily responsible for determining when to post notices of polluted surface waters or ground surfaces resulting from uncontrolled wastewater discharges from its facilities. The County Department of Environmental Health Quality may also make a determination and direct the City to post notices. The postings do not necessarily prohibit the use of recreational areas, unless posted otherwise, but provide a warning of potential public health risks due to sewage contamination.

Notices shall be posted as soon as practicable following the initial response to the spill. Signs should be posted on either side of the entry point where sewage entered the body of water or public facility, and the nearest public access point to that body of water or public facility. Examples of signs are included in Attachment F.

Staff shall regularly inspect the posted notices and replace any missing or damaged warning signs. Posted notices shall not be removed until it is determined that the threat to public health and safety is eliminated or at the direction of the County Department of Environmental Health Quality.

Should additional notification of sewage contamination be deemed necessary, City staff shall, in cooperation with the City’s public information officer, provide further notices through the use of pre-scripted notices made available to the printed or electronic news media for immediate publication or airing, or by other measures, such as door hangers.

Page 147 of 274 ends

15 4 Sewage Spill Monitoring and Reporting
Requirements
City staff shall monitor and report sewage spills regardless of size and recovery originating from the City’s wastewater collection system. The City must also report any known sewage spills on private property from private laterals. This chapter details the reporting procedures necessary to comply with SWRCB and City requirements.

4.1 Sewage Spill Identification, Tracking, and Logging
A work order must be created to track and monitor each sewage spill event. Using a completed Sewage Spill Field Report form (Attachment A), the Wastewater Maintenance Supervisor can create or update the work order and enter the necessary data. All forms, documentation, and monitoring results should be kept with the work order.

4.2 Sewage Spill Category Classification
Sewage spills are categorized into three types:

Category 1 Sewage Spills: All discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that:
 Reach surface water and/or drainage channel tributary to a surface water; or  Reach a Municipal Separate Storm Sewer System (MS4) and are not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly.

Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or ground water infiltration basin (e.g., infiltration pit, percolation pond).

Category 2 Sewage Spills: Discharges of untreated or partially treated wastewater of 1,000 gallons or greater resulting from an enrollee’s sanitary sewer system failure or flow condition that do not reach surface water, a drainage channel, or a MS4 unless the entire sewage spill discharged to the storm drain system is fully recovered and disposed properly.

Category 3 Sewage Spills: All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition.

Private Lateral Sewage Discharge (PLSD): Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or other private sewer assets. PLSDs that the enrollee becomes aware of may be voluntarily reported to the California Integrated Water Quality System (CIWQS) Online Database.

Figure 2 is a flow chart that will guide City staff in determining the category classification of a sewage spill and the necessary reporting requirements.

4.3 Online Reporting Requirements
The WDRs require that the City report sewage spills using the California Integrated Water Quality System (CIWQS) Online Database per the current Order 2022-0103-DWQ and associated 2022 MRP.

Page 148 of 274 ends

16 Reporting Authority and Access
At a minimum, the City must have one (1) Legally Responsible Official (LRO) registered with the State of California to officially sign and certify sewage spill reports submitted via the CIWQS website. The City has identified at least one additional LRO as a backup.

The City also identified Data Submitters. These are individuals registered with the State to enter sewage spill data, create and edit sewage spill reports, and review data. Data Submitters cannot certify reports. The City can identify and register as many Data Submitters as deemed necessary.

Each Agency is assigned a unique Waste Discharge Identification Number (WDID). The City of La Mesa’s number is WDID #9SSO10652. All LROs and Data Submitters receive a unique login and password. This information should be guarded and protected. If an authorized user suspects his or her login and password have been lost, stolen, or otherwise compromised, that person shall contact the SWRCB via the CIWQS help desk at 866-792-4977.

Mandatory Information to Report via CIWQS
Before finalizing and certifying a sewage spill report, specific mandatory information must be included for each sewage spill report submitted via CIWQS.

The following information is required for all Category 2 sewage spills:

1. Location of sewage spill using Global Positioning System (GPS) coordinates;

2. Regional Water Board 9;

3. San Diego County;

4. Whether the sewage spill entered a drainage channel and/or surface water;

5. Whether the sewage spill was discharged into a storm drain pipe that was not fully captured and returned to the wastewater collection system;

6. Estimated sewage spill volume in gallons;

7. Sewage spill source (e.g., manhole, cleanout, pipeline, etc.);

8. Sewage spill cause (e.g., mainline blockage, roots, grease, etc.);

9. Time of sewage spill notification or discovery;

10. Estimated operator arrival time;

11. Sewage spill destination; and

12. Estimated sewage spill end time.

Page 149 of 274 ends

17 Notification List: Matt Bell (619) 954-5339, Jose Ornelas (619) 841-9908. *Water quality sampling (Over 50,000 gallon spill). Joe Kuhn 619-948-0587

CITY OF LA MESA (INCLUDES PRIVATE LATERALS AND PRIVATE SYSTEMS) 2659
Contact Numbers: California Office of Emergency Services (CAL OES): (800) 852-7550 Did spill reach surface waters or spilled in a location where it probably will be discharged to surface water? Was the overflow from a City or Private system?
PRIVATE = PLSD
CITY = SSO
NO
NO
SSO Category 3 and 4:  CIWQS Reporting: Submit certified report within 30 calendar days of the end month in which SSO occurred. (Category 4 is under 50 gallons.)
YES
1) Is the spill over ≥ 1,000 gallons?
AND
2) Did spill reach surface waters or spilled in
a location where it probably will discharged to surface water? NO
 Notify CAL OES and obtain a notification control number within two hours of becoming aware of spill.
 CIWQS Reporting: Submit report within 30 calendar days of the end month in which SSO occurred.

BOTH NO CIWQS Reporting: Submit report within 30 calendar days after the month that the PLSD occurred.

Was the spill ≥ 1,000 gallons?
Did spill reach surface water and/or reach a drainage channel tributary to a surface water? OR Did the spill reach a MS4 and was not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly? NO

BOTH NO

YES TO EITHER
SSO Category 1:  CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date. YES
Did spill reach a drainage channel tributary to a surface water or a MS4 and was not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly? YES
SSO Category 2:  CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date.

SSO Category 1:  Notify CAL OES and obtain a notification control number within 2 hours of becoming aware of spill.
 CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date. Did spill reach a drainage channel tributary to a surface water or a MS4 and was not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly? YES SSO Category 1:
 Notify CAL OES and obtain a notification control number within 2 hours of becoming aware of spill.
 CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date.
*If the spill is ≥ 50,000 gallons:
 Conduct water quality sampling within 48 hours after initial SSO notification.  Submit a SSO Technical Report within 45 days after the end date of the spill.

SSO Category 2:  Notify CAL OES and obtain a notification control number within 2 hours of becoming aware of spill.
 CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date.

BOTH YES
YES TO ONLY #1
YES TO ONLY #2
 CIWQS Reporting: Submit report within 30 calendar days of the end month in which SSO occurred.
 CIWQS Reporting: Submit report within 30 calendar days of the end month in which SSO occurred.

Definitions of Areas: Municipal Separate Storm Sewer System (MS4) = gutter, curb inlets, storm drain boxes, storm drain pipesDrainage Channel: Any open concrete or natural channel Figure 2: Sewer Spill Reporting Flow Chart

Page 150 of 274 ends

18 The following information is required for all Category 1 sewage spills :

1. All information listed for Category 2 sewage spills ;

2. Estimated sewage spill volume that reached surface water, drainage channel, or not recovered from a storm drain;

3. Estimation methods used to calculate spill volume;

4. Estimated sewage spill volume recovered;

5. Response and corrective action taken;

6. If bacteriological samples were taken, identify which regulatory agencies received sample results; if no samples were taken, then N/A must be selected;

7. The parameters that samples were analyzed for (if applicable);

8. Whether health warning signs were posted;

9. Beach(es) impacted, if none then N/A must be selected;

10. Whether there is an ongoing investigation;

11. Steps taken or planned to reduce, eliminate, and prevent recurrence of the sewage spill and a schedule of major milestones for those steps;

12. OES control number (if applicable);

13. Date OES was initially called (if applicable);

14. Time OES was initially called (if applicable);
SDRWQCB requires that all private lateral sewage spills brought to the attention of the City must be reported. The following information is required for Private Lateral Sewage Discharges:

1. All information listed for Category 2 sewage spills;

2. Identification of sewage discharge as a private lateral sewage discharge; and

3. Responsible party contact information, if known.

The CIWQS reporting requirements are not in lieu of other reporting requirements. The City must also perform Regional Board reporting requirements, the Governor’s Office of Emergency Services reporting, and notifications to the County Department of Environmental Health Quality.

Once the data is properly entered into the CIWQS database and the sewage spill investigation is complete, the LRO must certify the sewage spill report based on Table 3.

Monthly Reporting Requirement If No Sewage Spills
For each month in which no sewage spills are identified and reported via CIWQS, the City’s LRO must prepare and submit a statement in CIWQS certifying that there were no sewage spills for the designated month. This report must be submitted within 30 days after the end of each calendar month with no sewage spills, as noted in Table 3.

Page 151 of 274 ends

19 Table 3
CIWQS Reporting Time Requirements
Sewage Spill Type Initial CIWQS Report Certification Requirements Category 1 Sewage Spill Within 3 business days Within 15 days of the conclusion of the sewage spill response and remediation
Category 2 sewage spill Within 3 business days Within 3 days of becoming aware of the sewage spill and certify within 15 calendar days of the sewage spill.

Category 3 Sewage Spill Within 30 calendar days Within 30 calendar days of the end of the month.

Private Lateral Sewage
Spill Prior to Certification Within 30 days after the end of the month in which the sewage spill occurred Sewage Spill Technical
Report With 45 calendar days
Submit within 45 calendar days after the end date or
any Category 1 sewage spill of 50,000 gallons or
greater.

Collection System
Questionnaire N/A Update and Certify every 12 months
No Monthly Sewage
Spills N/A Within 30 days after the end of the month in which no sewage spills occurred Alternative Reporting Procedures When Online Reporting Is Unavailable If CIWQS is not available to submit required reports or certify reports, the City must fax all required information to the SDRWQCB office in accordance with the time schedules identified in Table 3.

The City must also enter all required information into CIWQS as soon as practicable.

Water Quality Monitoring
Conduct water quality sampling within 48 hours after any initial sewage spill notification for Category 1 sewage spills in which 50,000 gallons or greater are spilled to surface waters.

4.4 Record Keeping and Document Retention
The City must retain individual sewage spill records for a minimum of five (5) years from the date of the sewage spill occurrence. This period may be extended when requested by a SDRWQCB Executive Officer. All records shall be made available for review upon State or Regional Board staff’s request.

Specific records that must be retained include, but are not limited to:
 Sewage Spill Event Records
 Records documenting Sanitary Sewer Management Plan (SSMP) implementation and changes/updates to the SSMP.
 Records to document Water Quality Monitoring for sewage spills of 50,000 gallons or greater spilled to surface waters.
 Collection system telemetry records, if relied upon to document and/or estimate sewage spill volume.

Page 152 of 274 ends

20 4.5 Water Quality Monitoring Plan for Major Spills
In accordance with the Monitoring and Reporting Program (MRP) for Order 2022-0103-DWQ, the City shall implement water quality monitoring for all Category 1 Sanitary Sewer Overflows (SSOs) of 50,000 gallons or greater that reach surface waters. The purpose of the monitoring is to assess the extent and impact of the spill on receiving waters and to support any required public health notifications and environmental assessments.

The following requirements apply:

Timing of Sampling:

Water quality sampling must begin as soon as feasible, but no later than 48 hours after the City becomes aware of the SSO.

Minimum Required Analytes:

At a minimum, the City must analyze these parameters at each sampling location:
 Ammonia
 Total Coliform
 Fecal Coliform
 Enterococcus
Additional sampling parameters may be required by the SDRWQCB based on site-specific conditions.

Sampling Locations:

The City shall collect samples at the following locations, at a minimum:

1. Upstream of the point of entry to surface water (to establish background conditions)

2. Downstream of the point of entry (to assess impact)

3. At the point where the sewage spill entered the surface water Documentation and Reporting:

Water quality sampling results must be documented and included in the Sewage Spill Technical Report required for all Category 1 SSOs of 50,000 gallons or more, as described in Section 4.3.

The Sewage Spill Technical Report must be submitted to CIWQS within 45 calendar days of the end date of the sewage spill.

Quality Assurance/Quality Control (QA/QC):

All sampling and laboratory analysis shall follow applicable QA/QC procedures as outlined in Attachment C of the MRP for Order 2022-0103-DWQ, including use of State-certified laboratories and proper chain-of-custody documentation.

Page 153 of 274 ends

21 5 Training
Appropriate staff will participate in regularly scheduled training sessions to help response crews understand their responsibilities and carry out their duties. These sessions will be organized based on the latest SERP and other reference materials. They will also include hands-on field demonstrations to prepare all response personnel for anticipated situations.

City staff should be provided with an overview of the Sewer System Management Plan (SSMP) and the SERP. This will instruct staff on the SSMP, sewage spills, and necessary documentation.

Field demonstrations will be conducted to test equipment, response times, training effectiveness, resources, and staffing capabilities.

Training and event participation will be documented and maintained. The City of La Mesa has historically conducted quarterly wastewater training. All records of training attendees are kept in the City's wastewater files.

Page 154 of 274 ends

22 6 Updating this SERP
This SERP reflects the City’s established procedures for responding to reports of possible and confirmed sewage spills originating from its wastewater collection system. As policies change and response procedures are refined, the SERP will be reviewed and modified to reflect all necessary changes.

6.1 SERP Availability
The SERP will be reviewed annually to ensure that all information is updated. The amended SERP will be distributed to the appropriate staff, City Departments, and SDRWQCB and made available to the public for review. Staff shall ensure that this SERP is readily available to wastewater maintenance personnel and that said personnel are familiar with the plan and always comply with it.

6.2 Review and Update of the SERP
City staff shall maintain this SERP and amend or update it as necessary by adding new facilities or changes in the operation or maintenance of the wastewater collection system that may materially affect the potential for sewage spills. At a minimum, the plan will be reviewed annually, including updating telephone numbers and forms in the appendices and a review of procedures.

The annual review of the plan will also ensure that all its provisions are being met and implemented. City staff shall also review and amend this SERP as appropriate after any sewage spill occurrence. SERP deficiencies and updates will be addressed and modified accordingly. The plan’s performance will be routinely evaluated, reviewed, and updated.

Page 155 of 274 ends

Attachment A
Sanitary Sewer Overflow Field Report Form and Flow Chart

Page 156 of 274 ends

City of La Mesa SSOERP Page 1 of 5 Rev. 4/2023
E:\0840 Wastewater\70 Master Plans\SSMP\2025 WDR Update SSMP\Deliverables\Final Draft\SERP\Att A-1 SSO fieldoffice report.docx Attachment A
Certified by: (Print Name) (Signature) (Date)
CIWQS Identifier: SR/WO# Reviewed By:
(Date)
Other WOs# _____________ ______________ ______________ ______________ ____________ WDID# _____________________ Certification Confirmation# ____________________ Red text indicates fields that MUST by completed by field personnel.

Blue text indicates reference information
This report is: Preliminary Final Revised
Has the Cartegraph Request/Task been updated with details of the incident and closed? Yes No Has CIWQS report been completed and certified within allotted time? Yes No If the answer to either of the above questions are “no”, this SSO event may not be closed.

SSO Details
Estimated Overflow START: Date: Time: (AM/PM)
Estimated ARRIVAL of Operator: Date: Time: (AM/PM)

Estimated Overflow STOP: Date: Time: (AM/PM)
Duration of Spill (in minutes) = Minutes
Did SSO Reach?: Storm Drain Drainage Channel Surface Water Body None of the Above (Did NOT reach water system)
Total Volume of SSO: (1) gal
SSO Volume Recovered: (2) gal
SSO Volume Lost: (3) gal
Estimated Overflow Rate: (4) gpm

1. Multiply flow rate with the duration of spill in minutes

2. “Recovered” shall mean that no portion of the SSO has reached open water and has flowed downstream to the ocean/bay. Examples of SSO recovery could be diversion of flow away from storm drain system or open channel by any means such vacuuming, damming the SSO in or outside the storm drain system and flushing the flow into sewer system, diverting the flow into a planter or retention area; sun-drying of the flow and removing solid debris and in short any means to keep the SSO getting to the open waters.

3. This is the flow that reaches the open water directly or indirectly through the storm drain system. The goal is to keep this to zero.

4. Use the manhole overflow pictures to estimate the rate of flow.

Page 157 of 274 ends

City of La Mesa SSOERP Page 2 of 5 Rev. 2/2020
E:\0840 Wastewater\70 Master Plans\SSMP\2025 WDR Update SSMP\Deliverables\Final Draft\SERP\Att A-1 SSO fieldoffice report.docx Attachment A
SSO Cause: Debris Flow Exceeded Capacity FOG Rainfall Roots Structural Problem Pump Station Failure Vandalism
Other:

Private Lateral Spill: Yes No
If spill reached a storm drain, was all wastewater fully captured and returned to the sewer system? Yes No N/A (did NOT reach storm water system)
Reporting Details
Name & Title of Person Filling Out this Report:

Phone # Date: Time: (AM/PM)
Name of Person First Reporting SSO:

Phone # Date: Time: (AM/PM)

Location of Overflow
Street Address: Nearest Cross Street:

Latitude of SSO: Longitude of SSO:

City: County: San Diego
Location of Potential Blockage or Problem Point: From MH#: To MH#:

Pipe ID’s Affected:

SSO Appearance Point: Building Force Main Manhole Sewer Pump Station Other:

Where Did Failure Occur? Upper Lateral Main Lower Lateral (Right of Way) Other:

Terrain at SSO Location: Flat Mixed Steep
Diameter of Sewer: in Material of Sewer: Estimated Age: yrs SSO Destination Details
SSO Final Destination: Building Paved Surface Unpaved Surface Storm Drain Curb & Gutter Surface Water Other:

Page 158 of 274 ends

City of La Mesa SSOERP Page 3 of 5 Rev. 2/2020
E:\0840 Wastewater\70 Master Plans\SSMP\2025 WDR Update SSMP\Deliverables\Final Draft\SERP\Att A-1 SSO fieldoffice report.docx Attachment A
If SSO reached a storm drain, give street location (Specify N/S/E/W side):

Describe distance (feet) and path taken from SSO to storm drain inlet:

If SSO reached surface waters, describe Receiving Waters:

San Diego River Chollas Creek Sweetwater River
Response
Response Activities (Check ALL that Apply): Contained All or Part of SSO Restored Flow Returned All or Part of SSO to Sewer Cleaned Up CCTV
Other:

Responding City Personnel: Time Arrived: Time Departed:

Equipment Used:

Other Responding Agency/Contractor:

SSO Clean-up Details
Materials Used for Containment:

Wastewater Disposal Method:

Miscellaneous (Attach photos, correspondence, or follow-up reports that provide detailed information.) Remarks:

Prevention Plan
Steps, taken or planned, to reduce or eliminate re-occurrence of SSO:

Schedule of any MAJOR milestones or improvements:

Page 159 of 274 ends

City of La Mesa SSOERP Page 4 of 5 Rev. 2/2020
E:\0840 Wastewater\70 Master Plans\SSMP\2025 WDR Update SSMP\Deliverables\Final Draft\SERP\Att A-1 SSO fieldoffice report.docx Attachment A

Steps, taken or planned, to mitigate the impacts of the SSO:

Schedule of any MAJOR milestones or improvements:

Notification Contact List (Check all who were notified.) If Spill is over 10,000 gallons and not recovered, you MUST legally notify CAL OES (800-852-7550) within 2 HOURS of becoming aware of an SSO reaching drainage channels, and/or surface waters.

If Spill is greater than 1000 gallons and under 10,000 gallons and not recovered, CAL OES must still be notified as soon as possible, however there is no 2 hour legal requirement.

Once Cal OES is notified, they will notify other state and local agencies.

Critical Phone Numbers
Name/Agency Phone # Time Date
WW Maintenance Supervisor619-433-7028
Director of Public Works 619-667-1388
Asst. Director of Public Works 619-841-9908
CAL OES 800-852-7550
Police Dept.-Emergency Services 619-667-1416
(If there is a public hazard)
Secondary Phone Numbers
Risk Management 619-667-1178
City’s Claims Adjustor 619-895-0246
La Mesa Fire Department 619-667-1355
Public Works 619-667-1450
WW Lead Worker 619-954-5539
Public Works Inspector- ENG 619-954-4309
Storm Water Program Manager 619-948-0587
WW Engineering Project Manager 619-667-1153
City Manager 619-667-1195
Other
Cal OES Control #
Public Use Closures
Were signs posted warning of contaminants? Yes No Dates Posted:

Location of Postings:

Were samples obtained of contaminated water? Yes No (Sampling required for spills over 50,000 gallons. Contact Storm Water Program Manager for Sampling) SKETCH OF AREA: (Include manholes, intersections, location of blockage, etc. A marked-up copy of the sewer and storm drain map may be used to attach to the report.)

Page 160 of 274 ends

City of La Mesa SSOERP Page 5 of 5 Rev. 2/2020
E:\0840 Wastewater\70 Master Plans\SSMP\2025 WDR Update SSMP\Deliverables\Final Draft\SERP\Att A-1 SSO fieldoffice report.docx Attachment A
Completed by: Date:

Page 161 of 274 ends

Notification List:

Matt Bell (619) 954-5339, Jose Ornelas (619) 841-9908. *Water quality sampling (Over 50,000 gallon spill). Joe Kuhn 619-948-0587

CITY OF LA MESA SANITARY SEWER OVERFLOW REPORTING FLOW CHART (INCLUDES PRIVATE LATERALS AND PRIVATE SYSTEMS) 2659
Contact Numbers: California Office of Emergency Services (CAL OES): (800) 852-7550 Did spill reach surface waters or spilled in a location where it probably will be discharged to surface water? Was the overflow from a City or Private system?
PRIVATE = PLSD
CITY = SSO
NO
NO
SSO Category 3 and 4:  CIWQS Reporting: Submit certified report within 30 calendar days of the end month in which SSO occurred. (Category 4 is under 50 gallons.)
YES
1) Is the spill over ≥ 1,000 gallons?
AND
2) Did spill reach surface waters or spilled in
a location where it probably will discharged to surface water? NO
 Notify CAL OES and obtain a notification control number within two hours of becoming aware of spill.
 CIWQS Reporting: Submit report within 30 calendar days of the end month in which SSO occurred.

BOTH NO CIWQS Reporting: Submit report within 30 calendar days after the month that the PLSD occurred.

Was the spill ≥ 1,000 gallons?
Did spill reach surface water and/or reach a drainage channel tributary to a surface water? OR Did the spill reach a MS4 and was not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly? NO

BOTH NO

YES TO EITHER
SSO Category 1:  CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date. YES
Did spill reach a drainage channel tributary to a surface water or a MS4 and was not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly? YES SSO Category 2:  CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date.

SSO Category 1:  Notify CAL OES and obtain a notification control number within 2 hours of becoming aware of spill.
 CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date.

Did spill reach a drainage channel tributary to a surface water or a MS4 and was not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly? YES SSO Category 1:
 Notify CAL OES and obtain a notification control number within 2 hours of becoming aware of spill.
 CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date.
*If the spill is ≥ 50,000 gallons:
 Conduct water quality sampling within 48 hours after initial SSO notification.  Submit a SSO Technical Report within 45 days after the end date of the spill.

SSO Category 2:  Notify CAL OES and obtain a notification control number within 2 hours of becoming aware of spill.
 CIWQS Reporting: Submit draft report within 3 business days of becoming aware of spill & certify within 15 calendar days of SSO end date.

BOTH YES
YES TO ONLY #1
YES TO ONLY #2
 CIWQS Reporting: Submit report within 30 calendar days of the end month in which SSO occurred.
 CIWQS Reporting: Submit report within 30 calendar days of the end month in which SSO occurred.

Definitions of Areas: Municipal Separate Storm Sewer System (MS4) = gutter, curb inlets, storm drain boxes, storm drain pipesDrainage Channel: Any open concrete or natural channel

Page 162 of 274 ends

Attachment B
Sewage Spill On-Call Response Personnel and
Notification List

Page 163 of 274 ends

City of La Mesa SERP Revised 6/2025
Attachment B
City of La Mesa
Sanitary Sewer Overflow
On Call Personnel List
City Staff Contact Name Office Telephone
Number
Mobile
Number
Wastewater Maintenance
Supervisor
Matt Bell 619-954-5339
Wastewater Lead Worker Jason Mount 619-729-5466
City of La Mesa Risk
Management Office Beatriz Cruz-Rivera 619-667-1178 -
Asst. Dir. Public Works Jose Ornelas 619-841-9908
City of La Mesa
Sanitary Sewer Overflow Notification List
Contact List Contact Name Telephone Number
Office of Emergency Services
Warning Center (CAL OES) - 800-852-7550
San Diego County Department of
Public Works - 858-514-4990
City of La Mesa Risk Management
Office Beatriz Cruz-Rivera 619-667-1178
La Mesa Police Department – Watch
Commander - 619-667-1416
La Mesa Police Department -
Dispatch during Non-Business Hours - 619-667-1400
La Mesa Fire Department - 619-667-1355
City of La Mesa Engineering Joe Kuhn 619-667-1340
619-948-0587
Director of Public Works Michael Throne 619-667-1388
City Manager Greg Humora 619-667-1146
Caltrans District 11- Main Number - 619-688-6699
California Highway Patrol (CHP) –
Non Emergency
- 800-835-5247

Page 164 of 274 ends

Attachment C
Approved Contractors and Equipment Rental

Page 165 of 274 ends

City of La Mesa SSOERP
Attachment C revised 6/2025
Approved Contractors and Equipment Rental Vendors
Contractors:

Contractor Name Address Telephone No. Contact Name Services Provided Patriot Environmental Services
3464 Pickett St. San Diego, CA 92110
619.449.9014 Any major Haz Mat or other major
clean up operation of which we are not equipped to handle.

MJC Construction 3015 Sylvia St Bonita CA 619.472.5619 Javier Major Pipe Repair/Replacement MacIntosh Co Inc 619-249-4129 Sam Major Pipe Repair/Replacement Equipment Vendors:

Vendor Name Address Telephone No. Contact Name Available Equipment White Cap 430 Raleigh Ave El
Cajon
619-590-2001 Pipes and Associated
Furguson 1149 N Marshall Ave El
Cajon
619-596-5600 Pipes and Associated

Page 166 of 274 ends

Attachment D
Damage Report for Private Property

Page 167 of 274 ends

City of La Mesa SSOERP
Attachment D revised10/2008
Private Property
Initial Damage Assessment Form
The information requested on this form is for the purpose of documenting the possible impacts and extent of damage caused by a sanitary sewer overflow at, or as close to, the time of the event. By using this form, the City, its employees, elected officials, contract staff, and volunteers do not admit liability or culpability for the damage being documented.

INSTRUCTIONS: City staff at the SSO location are instructed to write notes, take photographs, and, if possible, video record the visible area without entering the private property. Please complete as much of this form a possible. Keep a copy and submit this form to Risk Management.

SSO INFORMATION
Date of SSO event: Task Order #:

Location of SSO Event:
(ADDRESS)
Cross Street: Thomas Brothers Grid:

AFFECTED PROPERTY
Address of Private Property:

Zip Code:

Owner/Occupant Name(s):

Owner/Occupant Telephone Number(s):

INITIAL DAMAGE ASSESSMENT
Brief Description of Damage:

Reported by (name and title):

Dated:
(attach sketches, photographs, and other items documenting the extent and impact of damage)

Page 168 of 274 ends

Attachment E
Possible Methods for Estimating Spill Volume

Page 169 of 274 ends

Possible Methods for Estimating Spill Volume
A variety of approaches exist for the estimation of the volume of a sanitary sewer overflow. This attachment documents three methods that are most often employed. Other methods are also possible. The person preparing the estimate shall use the method most appropriate to the SSO in question using his/her judgment. Every effort shall be made to make the best possible estimate of the volume.

Method 1 Eyeball Estimate
The volume of very small SSOs can be estimated using an “eyeball estimate.” To use this method, imagine the amount of water that would spill from a bucket or a barrel. A bucket contains 5 gallons and a barrel contains 50 gallons. If the SSO is larger than 50 gallons, try to break the standing water into barrels and then multiply by 50 gallons. This method is useful for contained spills up to 100 gallons.

Method 2 MeasuredVolume
The volume of some small SSOs can be estimated using this method if it is not raining.

In addition, the shape, dimensions, and depth of the spilled sewage are needed. The shape and dimensions are used to calculate the area of the spill and the depth is used to calculate the volume.

Step 1 Sketch the shape of the contained sewage
Step 2 Measure or pace off the dimensions
Step 3 Measure the depth in several locations
Step 4 Convert the dimensions, including depth to feet.

Step 5 Calculate the area using the following formulas:

Rectangle Area = length x width
Circle Area = diameter x diameter x

0.785 Triangle Area = base x height x 0.5
Step 6 Multiply the area times the depth
Step 7 Multiply the volume by 7.5 to convert it to gallons Method 3 Duration and FlowRate
Calculating the volume of SSOs where it is difficult or impossible to measure the area and depth requires a different approach. In this method, separate estimates are made of the duration

Page 170 of 274 ends

of the SSO and the flow rate. The methods of estimating duration and flow rate are:

Duration: The duration is the elapsed time from the start time to the end time, when the SSO stopped.

Start time is sometimes difficult to establish. Here are two approaches:
• For very large overflows, changes in flow on a downstream flow meter can be used to establish the start time. Typically, the daily flow peaks are “cut off” or flattened by the loss of flow. This can be identified by comparing hourly flow data.

Conditions at the SSO site change with time. Initially, there will be limited deposits of grease and toilet paper. After a few days to a week, the grease forms a light- c o l o r e d residue. After a few weeks to a month the grease turns dark.

In both cases the quantity of toilet paper and other materials of sewage origin increase in amount. These changes with time can be used to estimate the start time in the absence of other information.
• Sometimes it is simply not possible to estimate the start time.

End time is usually much easier to establish. Field crews on-site observe the “blow down” that occurs when the blockage has been removed. The “blow down” can also be observed in downstream flow meters.

Flow Rate: The flow rate is the average flow left in the sewer system during the time the SSO stopped. There are three ways to estimate the flow rate:
• San Diego Manhole Flow Rate Reference Sheet: This sheet, presented in Figure G1, showsthe sewage flowing from a manhole cover for a variety of flow rates.

The observations of the field crew are used to select the approximate flow rate from the chart.
• Flow meter: Changes in flows in the downstream flow meters can be used to estimate the flow rate during the spill (better for large SSOs). • Estimate based on up-stream connections: Once the location of the SSO is known, the number of upstream connections can be determined from system maps.

Multiply the number of connections by 200 to 250 gallons per day per connection, 8 to 10 gallons per hour per connection, or other flow rates that are consistent with the City’s data for its connections.

Once duration and flow rate have been estimated, the volume of the SSO is the product of the duration in hours or days timesthe flow rate in gallons per hour or gallons per day.

Page 171 of 274 ends
Page 172 of 274 ends

Attachment F
Warning Sign Samples

Page 173 of 274 ends

WARNING
RAW
SEWAGE

CITY OF LA MESA
(619) 667-1450

Page 174 of 274 ends

Appendix C – Design Standards
and Construction Specifications

Page 175 of 274 ends
Page 176 of 274 ends
Page 177 of 274 ends
Page 178 of 274 ends
Page 179 of 274 ends
Page 180 of 274 ends
Page 181 of 274 ends
Page 182 of 274 ends
Page 183 of 274 ends

E:\0840 Wastewater\95 Regulations Policies & Procedures\CCTV Deliverable Policy\CCTV Deliverable Policy • Rev 2023.doc

CCTV DELIVERABLE POLICY

PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION
8130 Allison Avenue, La Mesa, CA 91941
Phone: (619) 667-1166 • Fax: (619) 667-1380
Standards for Delivery of CCTV files for Sewer and Storm Drain Data:

The City of La Mesa is currently using the following software programs to maintain & access its Sewer and Storm Drain information:
• ESRI’s ArcGIS v.10.3 (GIS layers)
• CarteGraph OMS v.8.0 (Work Orders and Reporting)
• GraniteNET (Video capture and inspections)
It is preferred that any deliverables be in the same format as the above-mentioned programs for efficient data exchange. The sections below describe in detail the process for receiving and delivering data related to CCTV activities.

Database samples, templates, and maps can be provided upon request. A sample of the data deliverable should be submitted for final approval.

GIS Layers:

Upon working with and delivering any type of GIS layers to the City, ensure that the unique feature ID is included as part of the attribute table (see feature types and ID field names below).

Dataset Feature class ID Field
Sewer Collection:

Gravity Main Pipe ID
Manhole Facility ID
Stormwater Collection:

Gravity Main Pilot ID
Inlet/Outlet Pilot ID
Clean Out Pilot ID
Cross Gutter Pilot ID
Databases:

With any CCTV deliverable, a database should be submitted listing the PipeID and relationships to other pertinent information (photos, videos, inspections, observations, etc.). If using GraniteNET, exported database must be version

3.6.5 or above. If not using Cues products, export database using NASSCO formatting.

Videos & Photos:

Any video or photo captured should be associated to an existing GIS feature by unique ID. Video files must be delivered in .mp4 format. File naming convention should inlclue the unique feature ID or node-node.

Videos: .mp4
Photos: .jpg
Inspection Report: .pdf
Videoing Process
The CCTV shall be done using a proper sewer camera with a rotating head and distance measuring gauge, capable of annotating on the video. Unless the CCTV is of a sewer lateral, no CCTV footage using push camera is allowed.

Page 184 of 274 ends

E:\0840 Wastewater\95 Regulations Policies & Procedures\CCTV Deliverable Policy\CCTV Deliverable Policy • Rev 2023.doc The video shall have at the beginning of the clip date, the pipe ID, length, D/S MH ID, U/S MH ID, length, the pipe material and the name of the street.

During the CCTV, the video clip shall continue to have pipe ID throughout the footage. The video footage shall be MH to MH and in case of multiple runs, the video clips shall be truncated to each segment.

While videoing coming across defects in the pipe, the camera will be stopped and the operator shall record/annotate the nature and extent of the defect according to NASSCO standards while panning and zooming to the defect.

If a sewer lateral connection is encountered, the camera shall be panned to the lateral and record the connection condition. Details of the connection shall be annotated.

Deliverables:

Electronic files of the CCTV footage complying to these conditions shall be submitted to the City Engineer or his/her designee.

PDF summary report to the CCTV shall be created and submitted to the City. A sample of a summary report is attached.

For City Use Only:

Upon receiving a CCTV deliverable, please submit to the GIS Technician on staff for further processing.

APPROVAL:

Michael Throne, PE
Director of Public Works/City Engineer

Page 185 of 274 ends

Main Inspections Pipe Run with Images Page 1 of 2
Project name:

Phase 6
Start date/time:
2/24/2021 9:05 AM
Shape:

C
Mainline ID:

PUX055.00
Direction:

U
Material:

VCP
City:

City
Weather:
1 Height:
6 in.

Street:

Pearson St
Location code:

Width:

SAMPL
CUES, Inc.
3600 Rio Vista Avenue
Orlando, FL 32805
Phone: 407-849-0190
Fax: 407-425-1569
Main Inspections Pipe Run with Images
E

Page 186 of 274 ends

Main Inspections Pipe Run with Images Page 2 of 2
Project name: Mainline ID: Start date/time: Direction:

Phase 6
Weather:
1 PUX055.00 2/24/2021 9:05 AM U

Page 187 of 274 ends

3-1 City of La Mesa
Wastewater Collection System Master Plan
October 2008
Chapter 3
Wastewater Generation Analysis
This chapter describes the methodologies used to develop existing unit generation rates for wastewater flows from the City of La Mesa. Wastewater flows are then compared and calibrated to existing metered flows, to develop uniform generation rates used to establish existing flows by basin and project future wastewater flows. Future wastewater flows are then compared to the City’s contracted capacity in the Metro system. This chapter presents future wastewater generation projections that can be used by the City to establish a basis for future Metro capacity needs.

3.1 Background
As described in Chapter 2, wastewater generated within the City of La Mesa is collected by Cityowned facilities which connect to Metro conveyance and treatment facilities for treatment and disposal. The City currently has capacity rights in the Metro system of 6.634 mgd.

The City has Metro flow meters at seven (7) locations, and has a number of small interagency connections as shown on Figure 3-1. Based on meter records and information provided by Metro Technical Advisory Committee (Metro TAC) and the City, existing flows from each of the sewer basins was determined as shown in Table 3-1. A summary of all interagency connections is provided in Appendix A.

Table 3-1
City of La Mesa Existing Wastewater Flows by Basin
Basin Existing Flow (mgd)
Alvarado 3.040
University 1.286
Spring Valley 0.648
Lemon Grove 0.193
San Diego(1) 0.106
Total 5.27
(1) Includes small interagency connections with the City of San Diego.

Reference Figure 3-1.

3.2 Wastewater Generation Rates
The existing City flows were compared with land use data and population projections to develop unit wastewater generation rates within each sewer basin. Unit generation rates were estimated independently using two sources: 1) the City’s current land use data; and 2) population

Page 188 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-2 City of La Mesa
Wastewater Collection System Master Plan
October 2008
projections compiled by SANDAG (Series 7), for comparison purposes in developing the unit generation rates.

3.2.1 Generation Rates Using City Land Use Data
As shown in Figure 2-1, the City’s existing land uses include single-family residential, multifamily residential, industrial, commercial and institutional. When the GIS land use coverage is overlaid with the City’s parcel database, it was possible to determine the number of single-family and multi-family dwelling units (DU) and acres of industrial, commercial and institutional acreage for each basin. The number of dwelling units and land use acreages, by parcel and basin, are included in Appendix B. Unit wastewater generation rates were “calibrated” to less than 10% of existing flows through an iterative process using typical local-agency standards as guides.

Typically, design standards for agencies in San Diego County assume wastewater flows between 200-400 gpd/du for single-family residential, with multi-family residential ranging from 60% to 75% of single-family residential, and 500-1500 gpd/acre for nonresidential land uses.

Table 3-2 summarizes the calibration of sewer flows for each basin with estimated unit wastewater generation rates summarized by land use. All basins were estimated to have a nonresidential (commercial, institutional, and industrial) unit wastewater generation rate of 500 gpd/ac. Wastewater flows for park land use were not included as these flows are assumed negligible. All basins, with the exception of the University Basin, were estimated to have a calibrated single-family residential and multi-family residential unit generation rate of 270 gpd/du and 180 gpd/du respectively. The University Basin had a calibrated single-family and multifamily residential unit generation rate of 195 gpd/du and 130 gpd/du respectively. All of these unit generation rates are within typical planning and design standards of local county agencies.

Although the University Basin’s residential unit generation rates are slightly lower, they appear reasonable based upon the sewer basin characteristics. The University Basin is an older area of the City, both demographically and by sewer infrastructure age. For that reason, there are generally fewer people per household and a population that is likely more conscious of water usage. The calibrated unit generation rates for the University Basin will be utilized for the existing system capacity analysis. The higher calibrated unit generation rates will be used for all future development including development within the University Basin.

The 2000 census projected 2.78 persons per single family dwelling unit and 2.22 persons per household for multi-family units. Assuming three (3) people per single-family dwelling unit and two (2) people per multi-family dwelling unit, the residential flow per capita ranges from 65 to 90 gallons per day per capita (GPDC). Typically, planning and design standards for sewer agencies in San Diego County typically assume wastewater flows between 65 and 100 gpdc for residential land uses. The aforementioned per capita unit generation rates will be used for comparison with the unit generation rates utilizing existing SANDAG population projections.

Page 189 of 274 ends

!( !( !( !(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!( !(
!(
!(
!(
!( !(
!(
!(
#*
#*
#*
#*
#*
#*
#*
AÀ
!"_$
A×
AÀ
!"_$

CITY OF

LA MESA

SAN DIEGO

SAN DIEGO COUNTY

EL CAJON

LEMON GROVE
LM-7
LM-2
LM-4
LM-5
LM-8
LM-1
LM-3
EC-2
EC-1
SV-1 SV-2
SV-LM
LG-8
LG-7
LG-3 LG-5 LG-6
LG-2
MT-U2
MT-U1
MT-U4
MT-U5
MT-A5
MT-A4
MT-A3
MT-A1
MT-A7
MT-A8
LG-SD
MT-SD2
MT-SD3
MT-SD1
MT-A2
MT-A11 MT-A11 MT-A6
LG-4
LG-1
MT-U3
MT-A9

LAKE MURRAY

MOUNT HELIX LAKE

CHOLLAS HEIGHTS RESERVOIR
Source: SanGIS, 2007
2,500 0 2,500
Feet
−
10/14/08 KM-KM Z:\Projects\IS\LaMesa\Mxd\ReportFigures\WastewaterMP\Final Report\FlowMonitoringLocations.mxd FIGURE 3-1

FLOW MONITORING LOCATIONS AND INTERAGENCY CONNECTIONS
Legend
#* Metro Flow Meters
!( Interagency Connections
Sewer MainMunicipal Lines
Sewer Sub Basin
AlvaradoLemon GroveSan DiegoSpring ValleyUniversity

Page 190 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-5 City of La Mesa
Wastewater Collection System Master Plan
October 2008
Table 3-2
Unit Wastewater Generation Rate Calibration based on Land Use Basin Units Unit Generation Rate
Estimated Wastewater
Generation
Alvarado
Single-Family Residential 5,038 DU 270 gpd/DU 1,360,260 gpd Multi-Family Residential 7,834 DU 180 gpd/DU 1,410,120 gpd Commercial 304.9 ac 500 gpd/ac 152,470 gpd
Industrial 32.2 ac 500 gpd/ac 16,110 gpd
Institutional 184.7 ac 500 gpd/ac 92,340 gpd
Subtotal 3.031 mgd
Existing Flow = 3.040 mgd
Calibration = -0.3 %
University
Single-Family Residential 4,042 DU 195 gpd/DU 788,190 gpd Multi-Family Residential 3,571 DU 130 gpd/DU 464,230 gpd Commercial 121.3 ac 500 gpd/ac 60,646 gpd
Industrial 0.9 ac 500 gpd/ac 434 gpd
Institutional 126.3 ac 500 gpd/ac 63,138 gpd
Subtotal 1.377 mgd
Existing Flow = 1.286 mgd
Calibration = 7.1 %
Spring Valley
Single-Family Residential 1,515 DU 270 gpd/DU 409,050 gpd Multi-Family Residential 1,119 DU 180 gpd/DU 201,420 gpd Commercial 35.2 ac 500 gpd/ac 17,621 gpd
Industrial 9.6 ac 500 gpd/ac 4,811 gpd
Institutional 23.1 ac 500 gpd/ac 11,530 gpd
Subtotal 0.644 mgd
Existing Flow = 0.648 mgd
Calibration = -0.6 %
Lemon Grove
Single-Family Residential 315 DU 270 gpd/DU 85,050 gpd
Multi-Family Residential 646 DU 180 gpd/DU 116,280 gpd
Commercial 1.4 ac 500 gpd/ac 721 gpd
Industrial 1.5 ac 500 gpd/ac 748 gpd
Institutional 9.5 ac 500 gpd/ac 4,756 gpd
Subtotal 0.208 mgd
Existing Flow = 0.193 mgd
Calibration = 7.5 %
San Diego
Single-Family Residential 331 DU 270 gpd/DU 89,370 gpd
Multi-Family Residential 92 DU 180 gpd/DU 16,560 gpd
Commercial 0.0 ac 500 gpd/ac 0 gpd
Industrial 0.0 ac 500 gpd/ac 0 gpd
Institutional 0.0 ac 500 gpd/ac 0 gpd
Subtotal 0.106 mgd
Existing Flow = 0.106 mgd
Calibration = -0.1 %

Page 191 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-6 City of La Mesa
Wastewater Collection System Master Plan
October 2008

3.2.2 Generation Rates Using SANDAG Population
SANDAG provided 2007 residential and employment population projections by basin for the City. These projections were extrapolated from SANDAG (Series 7) data. Through an iterative process, per capita generation rates for residential and employment populations were estimated. Table 3-3 summarizes the estimated unit generation rates by population through the flow calibration process. Per capita unit generation rates were calibrated to less than ten (10) percent of existing flows.

Table 3-3
SANDAG Unit Generation Rates Calibration
Basin
Existing
Population Unit Generation Rate Estimated Wastewater Generation Alvarado
Residential 29,493 90 gpdc 2,654,370 gpd
Employment 32,728 15 gpdc 490,920 gpd
Subtotal 3.145 mgd
Existing Flow = 3.040 mgd
Calibration = 3.5 %
University
Residential 18,893 60 gpdc 1,133,580 gpd
Employment 18,407 15 gpdc 276,105 gpd
Subtotal 1.410 mgd
Existing Flow = 1.286 mgd
Calibration = 9.6 %
Spring Valley
Residential 6,050 90 gpdc 544,500 gpd
Employment 5,549 15 gpdc 83,234 gpd
Subtotal 0.628 mgd
Existing Flow = 0.648 mgd
Calibration = -3.1 %
Lemon Grove
Residential 2,451 75 gpdc 183,788 gpd
Employment 1,839 15 gpdc 27,585 gpd
Subtotal 0.211 mgd
Existing Flow = 0.193 mgd
Calibration = 9.5 %
San Diego
Residential 1,025 90 gpdc 92,205 gpd
Employment 728 15 gpdc 10,920 gpd
Subtotal 0.103 mgd
Existing Flow = 0.106 mgd
Calibration = -2.7 %
Existing (2007) population data was obtained by averaging the 2004 and 2010 SANDAG Series 7 data

Page 192 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-7 City of La Mesa
Wastewater Collection System Master Plan
October 2008
Typically, design standards for agencies in San Diego County assume per capita wastewater generation rates between 65-100 gpdc for residential and 15-35 gpdc for employment populations. Table 3-3 summarizes the calibration for each sewer basin. All basins had an estimated employment per capita unit generation rate of 15 gpdc. All basins, with the exception of the University and Lemon Grove Basins, had an estimated residential per capita unit generation rate of 90 gpdc. This per capita unit generation rate is equivalent to the one estimated from the land use calibration. The University and Lemon Grove Basins had calibrated residential per capita unit generation rates of 60 and 75 gpdc, respectively. The Lemon Grove Basin’s per capita unit generation rate is slightly lower than the other basins’ rate. The University Basin rates, similar to the land use calibration methodology, were also slightly lower than typical standards for County agencies. As discussed above, we believe these rates are reasonable and will be used in the hydraulic model analysis of the existing conditions.

A comparison of the estimated flows for the Land Use and SANDAG-based flow generation methodologies shows a reasonable calibration. Typical standards for calibration to average-day sewer flows range from 5 to 15 percent. The City’s sewer generation rates for each basin were calibrated to less than 10 percent.

3.2.3 Recommended Unit Generation Rates
For future development within the City, it is important to develop uniform unit generation rates.

The City has relatively uniform wastewater generation for land use and population projections based on our unit generation rate analyses. Therefore, for the existing system analysis, the calibrated unit generation rates shown above will be used and for future wastewater generation, the more uniform and conservative generation rates will be used. The sewer generation rates to estimate future flows are summarized in Table 3-4. To determine Equivalent Dwelling Units (EDUs) for non-single family residential land uses, simply calculate the estimated flow based on the recommended unit generation rate for single-family residential land use. The City of San Diego and the County of San Diego utilize 280 and 240 gpd/EDUs respectively.

Table 3-4
Recommended Unit Generation Rates
Land Use / Population
Recommended Unit
Generation Rate
Land Use
Single-Family Residential 270 gpd/DU
Multi-Family Residential 180 gpd/DU
Commercial 500 gpd/AC
Industrial 500 gpd/AC
Institutional 500 gpd/AC
Population
Single-Family Residential 90 gpdc
Multi-Family Residential 15 gpdc

Page 193 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-8 City of La Mesa
Wastewater Collection System Master Plan
October 2008
50000
55000
60000
65000
70000
75000
2000 2010 2020 2030
Year
Population
Residential Population
Employment Population

1.16% Annual Growth

0.13% Annual Growth

0.40% Annual Growth 0.83% Annual Growth

0.18% Annual Growth

0.57% Annual Growth

3.3 Population Growth Forecasts
SANDAG population estimates and projections were available for 2004, 2010, 2020, and 2030.

Table 3-5 summarizes the residential and employment projections for each sewer basin. Based on the projections shown in the table, the average annual residential growth rates are 1.16%,

0.13%, and 0.63%, for the periods 2004 to 2010, 2010 to 2020, and 2020 to 2030, respectively.

The employment growth rates are 0.83%, 0.18%, and 0.57%, for the same periods. Figure 3-2 illustrates the projected City growth rates.

Table 3-5
SANDAG Population Projections
Residential Employment
Basin 2004 2007 2010 2020 2030 2004 2007 2010 2020 2030 Alvarado 28,271 29,493 30,715 30,950 32,515 31,842 32,728 33,614 34,206 36,072 University 18,225 18,893 19,561 20,095 20,095 17,908 18,407 18,906 19,342 20,306 Lemon Grove 2,348 2,451 2,553 2,482 2,882 1,761 1,839 1,917 1,876 2,140 Spring Valley 6,074 6,050 6,026 6,103 6,521 5,560 5,549 5,538 5,627 6,011 San Diego 1,039 1,025 1,010 996 1,055 738 728 719 710 748 Total 55,957 57,911 59,865 60,626 63,068 57,809 59,252 60,695 61,761 65,278 2007 Population data was obtained by averaging the 2004 and 2010 SANDAG Series 7 data Figure 3-2
SANDAG Population Growth Projections

Page 194 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-9 City of La Mesa
Wastewater Collection System Master Plan
October 2008

3.4 Wastewater Flow Projections
By applying the recommended unit generation rates to the projected increase in population, wastewater flow projections were determined at ten (10) year increments through 2030. These projections form the basis for sewer input flows to the hydraulic model, and analyses of future capacity needs in the wastewater collection system.

In order to determine more accurately the magnitude, location and timing of future sewer flows, specific land development information was researched with the City Planning Department. The City provided a current list of approved developments that ranged in size from a few dwelling units up to several hundred units. In addition, the City maintains a list of various development proposals that was used to estimate development beyond the next 3-4 years.

The City’s vacant land for future development is less than five (5) percent and, accordingly, most planned development projects are re-development in nature. The City has several specific planning areas of re-development including Alvarado Creek and Fletcher Parkway. These redevelopment areas are likely the City’s greatest potential for significant residential growth. In addition, the Grossmont Shopping Center may re-develop with a housing element and the Grossmont Hospital site may undergo additional expansion. These have been assumed in this study.

Based on coordination and input from the Planning Department, future development including approved, proposed, and re-development projects were applied to the parcel database to develop build-out flow projections. Our approach used land use and dwelling unit estimates to generate future flow estimates. Figure 3-3 represents the City’s current development planning.

Table 3-6 summarizes the City’s estimated future flows based on our assumed development absorption through 2030.

Table 3-6
City of La Mesa EDU Demand Projections
2000 2007 2010 2020 2030
Approved Project Sites(1) 0 EDU 818 EDU 0 EDU 0 EDU
Proposed Project Sites(2) 0 EDU 0 EDU 1,427 EDU 0 EDU
Redevelopment Areas(3) 0 EDU 200 EDU 700 EDU 700 EDU
Grossmont Center Redevelopment(4) 0 EDU 50 EDU 500 EDU 550 EDU Total Dwelling Units 0 EDU 1,068 EDU 2,627 EDU 1,250 EDU Cumulative Dwelling Units 0 EDU 1,068 EDU 3,695 EDU 4,945 EDU Cumulative Demand (270 GPD/EDU)(5) 5.27 MGD 5.56 MGD 6.27 MGD 6.61 MGD SANDAG Flow Projections (90/15 gpdc) 5.27 MGD 5.47 MGD 5.55 MGD 5.82 MGD Re-Rated Metro Capacity 6.993 MGD 6.993 MGD 6.993 MGD 6.993 MGD 6.993 MGD Existing Metro Capacity 6.634 MGD 6.634 MGD 6.634 MGD 6.634 MGD 6.634 MGD (1) Assumes 100% of 2006 Approved Residential Development Projects are built by 2010. (2) Assumes 100% of Proposed Projects are built by 2020. (3) Projections for the Alvarado Creek (1,000 EDU), Civic Center (100 EDU) and Fletcher Parkway (500 EDU) Re-development Projects. (4) Assumed Re-development Potential for Shopping Center, including Commercial Development and Hospital (100 EDU) (5) Based on 270 GPD/cap; 3.0 people per unit

Page 195 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-10 City of La Mesa
Wastewater Collection System Master Plan
October 2008
The City may choose to give flow credits for properties when demolition and redevelopment occurs. The City shall estimate the average flow rate of the existing property utilizing the recommended unit generation rates or existing flow meter data.

Using the methodologies outlined above, projected wastewater flow rates generated under City build-out conditions (year 2030) are 6.61 mgd based upon the current City planning and 5.82 mgd based solely upon SANDAG population projections. Figure 3-4 graphically presents the projected wastewater flows through 2030. Both estimates are conservative in that the University Basin under ultimate flows was assumed at the higher unit generation rates (40 percent higher) than its existing generation.

Figure 3-4
Wastewater Flow Projections

4.00 5.00

6.00 7.00

8.00 2000 2005 2010 2015 2020 2025 2030
Year
Flow Rate (MGD)
City Planning Projections
SANDAG Projections
Existing Flow (5.27 MGD)
Re-Rated METRO Capacity (6.993 MGD)
Existing METRO Capacity (6.634 MGD)
1,100 EDU by 2010 3,000 EDU by 2020

Page 196 of 274 ends

AÀ
AÀ
!"_$
!"_$
A×

CITY OF

LA MESA

SAN DIEGO

SAN DIEGO COUNTY

EL CAJON

LEMON GROVE
M
UR
R
AY
D
R

BROADWAY

MONTEZUMA
RD

COLLEGE AV

MASSACHUSETTS AV
W
M
AIN
S
T
LA
MESA
BL
CA
M
P
O
R
D
LE
M
O
N
G
R
O
V
E
WY

SPRING ST

W CHASE AV

JACKSON DR
G
ROSSM
O
NT
BL
EL
C

AJON BL

COLLEGE
AV

FLETCHER PY
70TH ST

COLLEGE AV
LAKE
MURRAY
BL

UNIVERSITY
AV

UNIVERSITY AV
JACKSO
N
D
R

COLLEGE AV

EL CAJON BL

EL CAJON BL
9 9
9 9
5 9
15 3
25 20
20 9
11 9
4 9
4 23
21 2
1 19
17 10
6 8
12 16
14 19
7 16
24 16
22 18
13 LAKE MURRAY

MOUNT HELIX LAKE
2,000 0 2,000
Feet
/
FIGURE 3-3

CITY OF LA MESA DEVELOPMENT PLANS
Source: SanGIS, 20076/24/08 KM-KM Z:\Projects\IS\LaMesa\Mxd\ReportFigures\WastewaterMP\Final Report\DevelopmentPlans.mxd Sewer Sub Basin
AlvaradoLemon GroveSan DiegoSpring ValleyUniversityAlvarado Creek (1,000 EDUs)Civic Center (100 EDUs)Fletcher Parkway (500 EDUs)Grossmont Center (1,000 EDUs)Grossmont Hospital (100 EDUs) Redevelopment AreasLegendDevelopment Areas
1, ARAGON (58 Units)2, BOUGAINVILLES WALK PRD (16 Units)3, BRIERCREST SENIOR HOUSING (150 Units)4, FAIRFIELD APARTMENTS (527 Units)5, HILLTOP (38 Units)6, LOWELL ST CONDOMINIUMS (12 Units)7, PALM AVENUE TOWNHOMES (12 Units)8, REYNOLDS COMMUNITIES (23 Units)9, SERRAMAR (228 Units)10, TALMADGE CONDOMINUIMS (30 Units)11, ALVARADO RV PARK SITE (925 Units)12, ASPEN LA MESA CONDOMINIUMS (35 Units)13, BALTIMORE DRIVE CONDOS (5 Units)14, COLONY DRIVE CONDOMINIUMS (23 Units)15, DENVER & MONTE DR (15 Units)16, EL CAJON (186 Units, Site 12 & 13)17, EL CAJON BLVD (76 Units; 7353, 7581, 7604)18, EL PASO ST - MU (18 Units)19, GROSSMONT TERRACE REDEVELOPMENT (58 Units)20, HIGHFIELD (31 Units)21, KB HOMES REDEVELOPMENT (56 Units)22, LEMON AVENUE COURTYARD (10 Units)23, OLD BOB STALL AUTO SITE (500 Units)24, PALM TERRACE (28 Units)25, PORTOLA (178 Units)Approved (818 EDUs)Proposed (1,427 EDUs)

Page 197 of 274 ends

Chapter 3
Wastewater Generation Analysis
3-13 City of La Mesa
Wastewater Collection System Master Plan
October 2008

3.5 Metro Capacity
The City currently has capacity rights in the Metro system (comprised of conveyance, treatment, and disposal facilities) equal to 6.634 mgd. Metro is in the process of completing a re-rating study, which will re-allocate capacity to all the participating agencies driven by the new South Bay Reclamation Plant and increased Metro system treatment capacity. This effort has been ongoing for the past three (3) years and can not be officially allocated until the City of San Diego has completed financial audits. Our latest estimate is by late 2008 participating agencies will have received formal notice of their increase in Metro capacity. The preliminary re-rating studies to date have allocated an additional 0.65 mgd of sewer capacity to the City resulting in a total capacity of 6.993 mgd in the Metro System.

The City estimated their average 2006 and 2007 flows at 5.148 mgd, and is currently being billed on 5.148 mgd for Fiscal Year 2008 by San Diego Metro. Based on the current billing flow, La Mesa has an estimated 1.486 mgd of available capacity in the Metro system.

Figure 3-4 shows Metro capacity thresholds based on the future flow estimates given in Table 3-6. Based on current projections, the City’s existing Metro capacity rights will be reached by year 2030, assuming the more conservative population forecast. Additional capacity due to the expected re-rating would indicate that the City will have available capacity to serve planned development at build-out based on both the population and land use forecasts.

3.6 Conclusions
Existing average wastewater flows generated within the City of La Mesa are approximately 5.27 mgd. Currently, the City is being billed by the City of San Diego for 5.148 mgd for Fiscal Year 2008. Based on land use and City planning information, the estimated average flow rate at build-out of the City per the current General Plan is 6.61 mgd. Based on SANDAG population projections, the average flow rate at build-out is estimated as 5.82 mgd.

The City’s current capacity right in the Metro system is 6.634 mgd. Based on the City’s current General Plan projections, the average flow is expected to reach the current capacity around 2030. However, based on the Metro re-rating the City will receive an increase to approximately

6.993 mgd of Metro capacity. Therefore, it is our opinion that with the re-rating the City does not need to acquire any additional sewer capacity. Moreover, because our projections are relatively close to the Metro capacity values, it is unlikely that the City would be in any short-term position to sell excess sewer capacity to another participating agency. The City would be prudent to maintain its current ownership of Metro capacity as other re-development projects may be proposed that would require additional sewer capacity.

Page 198 of 274 ends

Appendix D
Training Program Materials

Page 199 of 274 ends

City of La Mesa Department of Public Works

SAMPLE TRAINING AGENDA
Waste Water Quarterly Meeting
I. Meeting Background/Format, Organization, and Frequency II. SSO Response
• Worksheets/Procedures Review
• SSO Response Procedures
• Cat 1,2,3,4 Spills
• Roundtable Scenarios
• Director’s Update
III. Smart Covers/Meters
IV. Redlines
V. CCTV Status
VI. CIP Update
VII. Other/Adjourn

Page 200 of 274 ends

Appendix E
Equipment and Inventory Lists

Page 201 of 274 ends

City of La Mesa SSOERP
Attachment B revised 10/2008
City of La Mesa
Sewer Equipment List
Equipment Contact Name Telephone
Number
Gap Vax Matt Bell 619-954-5339
Pipes and Appurtenances Matt Bell 619-954-5339
Manhole Lids Matt Bell 619-954-5339
Manhole Pullers/Composite Tools Matt Bell 619-954-5339
Confined Space Equipment Matt Bell 619-954-5339
Cleaning Supplies Matt Bell 619-954-5339

Page 202 of 274 ends

REPORT to the MAYOR and MEMBERS of the CITY COUNCIL
From the CITY MANAGER
DATE: July 22, 2025
SUBJECT: RESOLUTION AUTHORIZING A TASK ORDER WITH

COMPASS ROSE GIS TO PROVIDE AS-NEEDED MAPPING

AND GEOGRAPHICAL INFORMATION SYSTEM SERVICES

FOR THE PUBLIC WORKS DEPARTMENT FOR FISCAL
YEAR 2026
ISSUING DEPARTMENT: Public Works
SUMMARY:

Issues:

Should the City Council approve a resolution authorizing a task order with Compass Rose GIS to provide as-needed mapping and geographic information system services for Fiscal Year 2026 for the Public Works Department, in the amount of $150,000? Recommendation:

That the City Council approve a resolution authorizing a task order with Compass Rose GIS to provide as-needed mapping and geographic information system services for Fiscal Year 2026 for the Public Works Department, in the amount of $150,000.

Fiscal Impact:

Funds for the task order are available in the following FY26 Operating Budget accounts for professional services.

TASK ORDER TO COMPASS ROSE GIS FOR FY26 GIS SERVICES
Fund Source Account Amount Requested Amount Available
PW Administration 3101-6430 $ 10,000 $ 10,000
PW Engineering 3201-6430 $ 20,000 $ 150,000
Wastewater Engineering 4141-6430 $ 110,000 $ 349,300
Wastewater Operations 4142-6430 $ 10,000 $ 120,000
TOTAL: $150,000 $ 629,300

Page 203 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 2 of 3
City’s Strategic Goals:
 Invest in infrastructure to serve the needs of the community.

BACKGROUND:

The City has transitioned from paper maps to electronic Geographic Information System (GIS) mapping to enhance record-keeping and access. The GIS system combines graphical and database information, delivering fast and efficient service to both external and internal customers.

The City does not have in-house resources or staff with adequate expertise to perform this work efficiently, so most of it is outsourced to specialized consultants. By outsourcing, the City has been able to retain expert support in a rapidly evolving industry on an as-needed basis, while maintaining fiscal responsibility.

The City has benefited significantly from the use of this GIS data, which has provided infrastructure records for both capital and private development projects. Maintenance activities have been streamlined through integration with Cartegraph, a software tool for infrastructure asset maintenance. This data is also used for capital improvement and maintenance budgeting as well as performance measurements.

In August 2024, a Master Agreement was executed with Compass Rose GIS to provide GIS and Mapping Services. The terms of the Master Agreement allow for the issuance of task orders in accordance with the City’s Purchasing Policy. The Purchasing Policy requires the City Council to approve contracts exceeding $50,000.

DISCUSSION:

With advancing technology and the dynamic nature of the City’s infrastructure, there is a need to constantly update and upgrade the City’s infrastructure maps. In the coming fiscal year, the City, using Compass Rose GIS services, will be performing the following:
 As-needed infrastructure map updates
 Continuing digitization of parks and buildings
 Digitization of traffic signal inventories and implementation of maintenance tracking on Cartegraph
 Assistance with the implementation of See-Click-Fix software  Integration of GIS mapping with the Laserfiche system  Preparation of special study and presentation maps
 Operation, maintenance, and asset management software (Cartegraph) updates  Administration of on-line GIS maps and cloud server
 Maintenance and administration of GraniteNet Software (CCTV software for videoing the sewer infrastructure) with GIS maps

Page 204 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 3 of 3
CONCLUSION:

Staff recommends that the City Council approve a resolution authorizing a task order with Compass Rose GIS to provide as-needed mapping and geographic information system services for Fiscal Year 2026 for the Public Works Department, in the amount of $150,000.

Reviewed by: Respectfully submitted by:
____________________ ____________________________
Greg Humora Michael Throne, PE
City Manager Director of Public Works
____________________________
Carly Cubberley, PE
Engineering Project Manager
Attachments: A. Resolution
B. FY26 Proposal

Page 205 of 274 ends

RESOLUTION NO. 2025-

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
AUTHORIZING A TASK ORDER WITH COMPASS ROSE GIS FOR ASNEEDED MAPPING AND GEOGRAPHIC INFORMATION SYSTEM SERVICES FOR FISCAL YEAR 2026
WHEREAS, this project will advance the City’s goal of investing in infrastructure to serve the needs of the community;
WHEREAS, the City has converted all its paper maps to electronic maps and the City’s changing infrastructure requires frequent updating of the maps; WHEREAS, the City has implemented infrastructure asset maintenance and management software; and it is essential to keep the system up-to-date and running efficiently; WHEREAS, the City has made the maps available online and maintains a cloud server and the online system needs to remain in operation by updating the server and the maps; WHEREAS, in May 2024, a formal Request for Qualifications, RFQ 25-01 was advertised and Compass Rose GIS was selected to provide as-needed Geographical Information System Services;
WHEREAS, on August 6, 2024, the City executed a Master Agreement with Compass Rose GIS in accordance with RFQ 25-01 and terms of the Master Agreement allow for the issuance of task orders in accordance with the City’s Purchasing Policy; and WHEREAS, funding for this task order is budgeted in Public Works FY26 operating budgets.

NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED that the Mayor is hereby authorized and instructed to execute a task order between the City of La Mesa and Compass Rose GIS, for as-needed mapping and geographic information system services for Fiscal Year 2026 in the amount of $150,000 for Public Works support services. Said contract is on file in the Office of the City Clerk.

PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 22nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

Page 206 of 274 ends

CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2025- , duly passed and adopted by the City Council of said City on said date and by the vote therein recited.

MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 207 of 274 ends

4140 Oceanside Blvd. #159-152, Oceanside, Ca 92056 • Telephone: 619.884.8608 • www.compassrosegis.com City of La Mesa
GIS Proposal FY 25-26
June 30, 2025

PROJECT OVERVIEW
The City of La Mesa’s Public Works Department continues to improve their GIS program and serve a wider audience with data and web mapping applications. Compass Rose GIS has been supporting these efforts by providing overall GIS program management and technical services.

Details for on-going and future projects are included in the Scope of Work below. The GIS project team will work closely with the City’s project manager to continue to prioritize projects.

SCOPE OF WORK
The section below highlights three project categories. The GIS team will track and report monthly on progress and estimate to complete.

1. GIS Database Management
• Monthly red-lines
• Scanning & processing of drawings
• Documentation & training associated with GIS data updates • Enterprise database management
• Map service publishing & maintenance

2. Online Mapping
• Management of the City’s ArcGIS Online account
o Licensing
o Users & roles
o Map application design & maintenance
o Training
• Requirements gathering for online map requests
o Development
o Testing
o Publication

Page 208 of 274 ends

4140 Oceanside Blvd. #159-152, Oceanside, Ca 92056 • Telephone: 619.884.8608 • www.compassrosegis.com

3. Enterprise GIS
• Support administration of City’s AWS account
• Cartegraph OMS
• Granite NET
• Technical and end user support
• Documentation & training associated with enterprise systems listed above

PROJECT LIST
• ArcGIS Online
o Continue to improve & enhance existing applications
▪ Internal & external map galleries
o Configure data collection apps as needed for City asset inventory o Train staff to edit and manage subject matter data sets o Share data with partner agencies and public via Open Data Portal • Database management
o Continue to maintain City assets in enterprise geodatabase o Project priorities
▪ Sewer
▪ Storm Water
o Documentation & metadata preparation and maintenance
• Cartegraph
o Synchronize assets as needed
o Expand functionality using container components
▪ Traffic Signals
▪ Parks
▪ Facilities
o Data export and mapping
o Technical support – end user experience
o Customizations and automation as needed
• Granite Net
o Support City staff as needed
▪ Engineering users
▪ Truck data updates
▪ Troubleshooting
o Create new users and demo application for Engineering contractors o Edit or upload project inspection files

SCHEDULE
The GIS project team will work with the City’s project manager to define individual project needs and schedule to complete.

Page 209 of 274 ends

4140 Oceanside Blvd. #159-152, Oceanside, Ca 92056 • Telephone: 619.884.8608 • www.compassrosegis.com FEES SCHEDULE FY 25-26
• GIS Project Manager $140
• Solutions Architect $125
• GIS Technician $80
The fee for the GIS Services described in this scope of work is not to exceed $150,000. Estimated breakdown per category is as follows:

Task Description Budget
1 GIS Database Management $ 70,000.00
2 Online Mapping $ 40,000.00
3 Enterprise GIS $ 40,000.00
Totals $ 150,000.00

Page 210 of 274 ends
Page 211 of 274 ends

REPORT to the MAYOR and MEMBERS of the CITY COUNCIL
From the CITY MANAGER
DATE: July 22, 2025
SUBJECT: RESOLUTION AUTHORIZING A TASK ORDER TO BWE,
INC. FOR DESIGN SERVICES FOR THE NANCY DRIVE

STREET DRAINAGE IMPROVEMENTS (CAPITAL
IMPROVEMENT PROJECT NO. 8323)
ISSUING DEPARTMENT: PUBLIC WORKS
SUMMARY:

Issues:

Should the City Council approve the attached Resolution authorizing the issuance of a task order to BWE, Inc., to provide stormwater drainage design services for the Nancy Drive Street Drainage Improvements project in the amount of $75,545? Recommendation:

Approve the attached resolution authorizing the issuance of a task order to BWE, Inc., to provide stormwater drainage design services for the Nancy Drive Street Drainage Improvements project in the amount of $75,545.

Fiscal Impact:

This task order is funded under Capital Improvement Project No. 8323, Sidewalk Construction, which aims to address sidewalk gaps throughout the city and utilizes Community Development Block Grant funding for eligible areas. Due to the drainage impacts and ponding on the adjacent sidewalks, primarily at the driveway aprons, curb and gutter replacement are being replaced as part of the sidewalk construction.

City’s Strategic Goals:
 Invest in infrastructure to serve the needs of the community.

Page 212 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 2 of 2
BACKGROUND:

The City received concerns of ponding along the street gutter line on Nancy Drive between Gregory Street and Earl Street. Staff investigated the concerns and concluded that replacing the curb and gutter and repairing driveway apron grades would remedy the situation and protect the street pavement from further deterioration.

In May 2024, the City issued a request for qualifications (RFQ 25-01) and conducted a formal selection process to select highly qualified firms capable of providing various professional services. BWE, Inc. was chosen to provide stormwater drainage design services, and in August 2024, a master agreement was executed. The terms of the master agreement allow for the issuance of task orders to authorize specific items of work on an as-needed basis to the selected consultants.

DISCUSSION:

The Nancy Drive Street Drainage Improvements project design will provide the City with construction improvement drawings to properly lay out the replacement of curb and gutter, as well as the replacement of driveway aprons along the street segment. After the design is completed, the City shall program the project for future construction in the Capital Improvement Program.

CONCLUSION:

Staff recommends that the City Council adopt the attached resolution authorizing the issuance of a task order to BWE, Inc., to provide stormwater drainage design services for the Nancy Drive Street Drainage Improvements project in the amount of $75,545.

Reviewed by: Respectfully submitted by:
____________________ ____________________________
Greg Humora Michael Throne, PE
City Manager, Director of Public Works
Mike Kinnard
Engineering Project Manager
Attachments: A. Resolution
B. Task order

Page 213 of 274 ends

RESOLUTION NO. 2025-____

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
AUTHORIZING A TASK ORDER WITH BWE, INC. FOR DESIGN SERVICES

FOR THE NANCY DRIVE STREET DRAINAGE IMPROVEMENTS (CAPITAL IMPROVEMENT PROJECT NO. 8323)
WHEREAS, concerns of drainage issues were reported along Nancy Drive between Gregory Street and Earl Street;
WHEREAS, City staff determined that the slopes of the existing gutter and driveway aprons were causing drainage issues and needed to be redesigned and replaced to properly mitigate the ponding and drainage issues;
WHEREAS, engineering design services are needed to complete the redesign and replacement of curb and gutter, and driveway aprons;
WHEREAS, the City of La Mesa solicited proposals, RFP 25-01, for as-needed specialized professional design services and BWE, Inc. was selected as one of three firms to perform storm water and pollution prevention design;
WHEREAS, the terms of the master agreement allow for the issuance of task orders to authorize specific items of work on an as-needed basis to the selected consultants; and WHEREAS, a scope of work and fee were negotiated with BWE, Inc. to provide design services for CIP No. 8323, Nancy Drive Street Drainage Improvements.

NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, that the Mayor is hereby authorized to execute a task order with BWE, Inc. to provide design services for Capital Improvement Project No. 8323, Nancy Drive Street Drainage Improvements, in the amount of $75,545.

PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 22nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

Page 214 of 274 ends

CERTIFICATE OF CITY CLERK
I, MEGAN WEIGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2025- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.

MEGAN WEIGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 215 of 274 ends

9449 Balboa Avenue, Suite 270, San Diego, CA 92123 | 619.299.5550 | bwesd.com | 1 of 7 Structural Engineering Civil Engineering Land Surveying June 25, 2025

CITY OF LA MESA, PUBLIC WORKS
18130 Allison Av
La Mesa, CA 91942
Project: Nancy Drive Street Drainage Improvements
Proposal for Land Surveying and Civil Engineering Services Location: Nancy Dr. between Earl St. and Gregory St., La Mesa, CA 91942 Dear Mr. Michael Kinnard:

BWE is pleased to present this Proposal for our Land Surveying and Civil Engineering Services for the project referenced above. Our fee proposal is based on email and telephone correspondence with yourself and BWE staff as well as the provided document:
• City of La Mesa - Nancy Drive Drainage Project
• Map 02940 & ROS 03236
It is our understanding that the project consists of design and construction documents for design of driveways, sidewalks, curb & gutter for the purposes of addressing issues pertaining to drainage, driveway sloping, and path of travel along Nancy Drive. Exhibit “A” details our Land Surveying Scope of Work, Exhibit “B” details our Civil Engineering Scope of Work and Exhibit “C” our Summary of Fees. All services will be performed in accordance with our executed Master Agreement dated August 15, 2024.

This scope and fee are valid for a period of 90 days from the date of the proposal, with project kick-off occurring no later than one calendar year from the date of the proposal. If these durations are exceeded, we reserve the right to review this scope and fee and update according to current standards.

Please call us if you have any questions or comments. We look forward to the opportunity to work with you on this project.

Respectfully,
BWE, Inc.

Michael Slawson, PE
Principal
Please note that this is not a contract. We can provide a contract based upon this scope and fee if you would like to proceed based on this document.

Page 216 of 274 ends

619.299.5550 | bwesd.com | 2 of 7
Exhibit “A”
Nancy Drive Street Drainage Improvements
Nancy Dr. between. Earl St. & Gregory St., La Mesa CA 91942 Land Surveying Scope of Work

1.0 LAND SURVEYING SERVICES

1.1 Topographic and Limited Boundary Survey
• Professional Land Surveyor services to research record title documents and maps with the City of La Mesa and County of San Diego.
• Field surveying services to tie into a City of La Mesa vertical benchmark and set on-site horizontal and vertical survey control.
• Field and office surveying services to locate the right-of-way (RoW) and property lines along the area delineated with red above, more commonly known as the property at Nancy Drive between Earl St. and Gregory St., La Mesa, CA.
• Field and office surveying services to collect and process survey data of existing improvements.

Topographic features include ground elevations, existing structures, pavement, curb and gutters, fencing, including storm drain, sewer, water, gas and electric. BWE expects three (3) full days of two (2) man field crew at prevailing wage to perform the field survey. • Field and office surveying services to collect and process survey data of visible, above-ground utility structures and risers.

Page 217 of 274 ends

619.299.5550 | bwesd.com | 3 of 7
• Office surveying services to prepare an AutoCAD Civil 3D Drawing, depicting the topographic survey, boundary elements, and easements (if applicable) within the project area.

Land Survey Assumptions
a) No title report will be provided and RoW will be established by record drawings. b) Subcontracting a utility mark-out service provider is not included. If this service is needed, BWE can contract with a utility locator firm at an additional cost. c) The referencing of setbacks and zoning information is not included in this proposal. d) Preparation and processing of easements for public utilities are not included. e) The scope and fee above assume that the record property corner monuments of said property lines can be recovered by a field survey completed within an eight (8) hour work period. In the event said record monuments cannot be recovered; an additional hourly fee will apply at our standard two-man field crew rate of $325 an hour to complete the above scope of work. f) Setting monuments or filing a Record-Of-Survey with the County are not included. g) No monumentation, corner records (Pre-construction and post-construction), or records of survey are included. If these items are required by either the owner or regulatory requirements, they will be provided on a time and materials basis.
h) Excludes construction staking. A proposal for these services may be provided upon request.

Page 218 of 274 ends

619.299.5550 | bwesd.com | 4 of 7
Exhibit “B”
Nancy Drive Street Drainage Improvements
Nancy Dr. between. Earl St. & Gregory St., La Mesa CA 91942 Civil Engineering Scope of Work

2.0 CONCEPT DESIGN (Public Improvement Plan Permit)

2.1 Field Investigation
BWE staff will perform a field review to become familiar with the existing project site and adjacent site conditions and document with photographs.

2.2 Civil Concept Design
Review relevant project documentation and any available as-builts, applicable design for road classification type; coordinate and prepare two options, one full width improvement and one modified to fit existing RoW improvements. Concept options will include typical replacement for driveway, sidewalk, and curb and gutter.
h

3.0 DESIGN DEVELOPMENT/ CONSTRUCTION DOCUMENTS (Public Improvement Plan Permit) Construction Documents will be prepared in AutoCAD 2D on standard engineering “D” sheets at 10 & 20 scale. Milestone submittals include for this package are 60%, 100% and Final.

3.1 Public Improvement Plan Preparation
BWE will prepare an Improvement Plan set to install driveway, sidewalk, and curb and gutter concepts as applicable, that will include a Title Sheet, Notes, Demolition Plan(s), Precise Grading and Drainage Plans, Site Cross Sections, Signing and Striping, Details, as well as Erosion Control Plan. The Precise Grading and Drainage Plans will show project slopes with contours at one-foot intervals, general spot elevations, and general slope percentages. BWE will directly submit this plan set to the City of La Mesa for review and comment prior to official submittal.

Excludes: Design of site retaining walls, detailing of architectural walls/fencing, hardscape (color, finish), and site furniture (poured in place or affixed).

3.2 Revisions to Plans, Report & Forms –Permit Package
BWE will respond to reasonable Agency requests for plan revisions. BWE has assumed 2 cycles of review. Included is the coordination with city plan reviewers (pertaining to civil engineering comments).

Upon approval, BWE will plot mylars and will submit the signed mylars to the City of La Mesa.

Note: Should additional cycle reviews be required, then BWE will provide the client with a Change Order.

4.0 MEETINGS, COORDINATION and BID SUPPORT

4.1 Design Meetings and Project Coordination
BWE will attend a maximum of 2 teleconference and 2 in person, meetings with the Client during the design process. All project coordination (internal and external) will be performed under this task.

4.2 Bidding and Outreach Support
We shall provide written text responses to RFIs during the bidding process. Assist City of La Mesa in preparation of applicable addenda required to sufficiently obtain competitive bids for the items included in our scope of work.

Page 219 of 274 ends

619.299.5550 | bwesd.com | 5 of 7

5.0 LIMITED CONSTRUCTION OBSERVATION

5.1 Limited Construction Observation & Coordination
BWE will respond to General Contractor RFIs, submittals telephone calls and emails for document interpretation. BWE has therefore allocated a maximum of one (1) on-site construction coordination meeting on an as requested basis.

Note: Revisions to plans based on contractor errors or unforeseen field conditions shall be additional services. Should additional onsite construction meetings be required, then BWE will provide the client with a Change Order.

6.0 PROJECT CLOSE OUT

6.1 Punch Walk and Punch List
BWE will conduct a post-construction as-built site walk and generate a punch list for contractor use.

6.2 Preparation of As-Builts - (Lump Sum)
To close out the project and to release the bond, the City of La Mesa requires the preparation of project-specific as-built plans. BWE will develop a set of as-built plans and will directly submit these to the City of La Mesa. Included in this task is the processing and coordination with city staff.

Note: The Contractor shall be required to accurately and periodically maintain a set of fields asconstructed redlines for the owner’s records. These contractors redlines will be provided to BWE to assist with the final project as-built documentation.

Excluded: The preparation of an As-Graded Soils report is excluded from this fee proposal. If required by the City of La Mesa, then it is to be provided by the geotechnical engineer of record.

Page 220 of 274 ends

619.299.5550 | bwesd.com | 6 of 7
Civil Engineering Assumptions
a) Any items not specifically mentioned in the scope of services are excluded from this proposal. b) Preparation of soils reports or soils testing including pavement section recommendations provided by others (if required).
c) Excludes design, processing approvals for franchise utilities, which include gas, electric, telephone, cable or switches.
d) Excludes utility locating and/or utility potholing.
e) Excludes the preparation of construction costs estimates. f) Excludes the design of street lights (if required).
g) Excludes the preparation of a curb utilization plan. h) Excludes the attendance of weekly onsite-construction meetings. i) Excludes the preparation of a Traffic Study or Traffic Control Plans. j) Excludes the preparation of Photometric Light Study. k) Value Engineering (VE) efforts, if requested will require an additional fee. l) Excludes detailed analysis of existing upstream and downstream storm drain system. m) Excludes all soil remediation services to mitigate and manage risks from contaminated soils that could be harmful to human health and the environment.
n) Excludes infiltration and percolation tests.
o) Excludes the preparation of geotechnical reports, greenhouse gas studies, archaeological studies, paleontological studies, biological studies, environmental impact reports, and hazardous materials surveys.
p) Excluded is the preparation of a Storm Water Pollution Prevention Plan (SWPPP). q) Excludes the preparation of landscaping plans.

Page 221 of 274 ends

619.299.5550 | bwesd.com | 7 of 7
Exhibit “C”
Nancy Drive Street Drainage Improvements
Nancy Dr. between. Earl St. & Gregory St., La Mesa CA 91942 Civil Engineering & Surveying Fee

PROPOSED FEE SUMMARY
The estimated fees are based on Prevailing Wage rates for field services according to the Rate Schedule included in our Master Agreement dated August 15, 2024. Items not included in the scope of work including additional meetings and site visits will be provided, if required as an additional service billed on a time and materials basis.

Fee
Survey 1.1 Topographic and Limited Boundary $ 19,300.00 SUBTOTAL $ 19,300.00

2.1 Field Investigation $ 1,400.00

2.2 Civil Concept Design $ 9,200.00
SUBTOTAL $ 10,600.00

3.1 Public Improvement Plan Preparation $ 30,655.00

3.2 Revisions to Plans, Report and Forms $ 4,600.00
SUBTOTAL $ 35,255.00

4.1 Design Meetings and Project Coordination $ 1,900.00

4.2 Bidding and Outreach Support $ 1,900.00
SUBTOTAL $ 3,800.00
Construction
Observation 5.1 Limited Construction Observation and Coordination $ 2,300.00 SUBTOTAL $ 2,300.00

6.1 Punch Walk and Preparation of Contractor Punch List $ 1,170.00

6.2 Processing of As-Builts $ 3,120.00
SUBTOTAL $ 4,290.00
GRAND TOTAL $ 75,545.00
Project Close Out
Tower Street Improvements
BWE Scope of Work
Meetings, Coord. &
Bid Support
Design Devlopment/
Construction
Documents
Concept Design

Page 222 of 274 ends

CERTIFICATE OF CITY/DIRECTOR OF FINANCE
Certification of Unappropriated Reserves
I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose as docketed is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated.

Amount$
Purpose
Date
Fund _________________ _
Director of Finance
City of La Mesa
By
Unappropriated Reserves Available Balance $
Certification of Unencumbered Balance
I HEREBY CERTIFY that the indebtedness and obligation as docketed can be incurred; that sufficient monies to meet the obligations are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn; and that said monies now actually in the treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered.

Fund:
530
Purpose:

Amount Not to Exceed $74,545.00
Date: 07/22/2025 By: Michael Throne
Dept. Account: Activity:
8323 $74,545.00 from Account 8323 {Amount Available $463,000.00) Resolution awarding a task order to BWE, Inc. for design services for Nancy Drive Street Drainage Improvements {CIP No. 8323)
CERTIFICATE NO. 1942

Page 223 of 274 ends

REPORT to the MAYOR and MEMBERS of the CITY COUNCIL
From the CITY MANAGER
DATE: July 22, 2025
SUBJECT: RESOLUTION AUTHORIZING A TASK ORDER WITH
ARDURRA GROUP, INC. FOR ON-CALL

ENCROACHMENT PERMIT INSPECTION SERVICES
ISSUING DEPARTMENT: Public Works
SUMMARY:

Issues:

Should the City of La Mesa authorize a task order with Ardurra Group, Inc. for OnCall Encroachment Permit Inspection Services in the amount of $103,740? Recommendation:

Adopt the attached resolution authorizing a task order with Ardurra Group, Inc. for On-Call Encroachment Permit Inspection Services in the amount of $103,740 Fiscal Impact:

Funds for the task order are available in Engineering’s Professional Services Operating Account 3201-6430.

City’s Strategic Goals:
 Invest in infrastructure to serve the needs of the community.

BACKGROUND:

In May 2024, the City issued a request for qualifications (RFQ 25-01) and conducted a formal selection process to select highly qualified firms capable of providing various professional services. Ardurra Group Inc. was selected to provide construction management and inspection services, and in August 2024, a master agreement was

Page 224 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 2 of 2
executed. The terms of the master agreement allow for the issuance of task orders to authorize specific items of work on an as-needed basis to the selected consultants.

DISCUSSION:

The task order will augment staff with encroachment permit inspection services, including construction management and field observation/inspection services. In addition, the scope of services will include submittal, shop drawing review, requests-for-information review, construction monitoring, and inspection of the stormwater pollution prevention plan.

CONCLUSION:

Staff recommends that City Council adopt the attached resolution authorizing a task order with Ardurra Group, Inc. for On-Call Encroachment Permit Inspection Services in the amount of $103,740.

Reviewed by: Respectfully submitted by:
____________________ ____________________________
Greg Humora Michael Throne, PE
City Manager Director of Public Works
Carly Cubberley
Engineering Project Manager
Attachments:A. Resolution
B. Proposal

Page 225 of 274 ends

RESOLUTION NO. 2025-

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
AUTHORIZING A TASK ORDER WITH ARDURRA GROUP, INC. FOR ONCALL ENCROACHMENT PERMIT INSPECTION SERVICES WHEREAS, in May 2024, the City advertised a request for qualifications for as-needed engineering services;
WHEREAS, Ardurra Group, Inc., was selected as a qualified firm to provide as-needed construction management and inspection services;
WHEREAS, the City of La Mesa has a need for as-needed encroachment permit within the City right-of-way; and
WHEREAS, funds for the task order are available in Engineering’s Professional Services Operating Account 3201-6430.

NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, that the Mayor is hereby authorized and instructed to execute for and on behalf of said City, a task order for as-needed encroachment permit inspection services between the City of La Mesa and Ardurra Group, Inc., for an amount of $103,740.

PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 22nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

CERTIFICATE OF THE CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2025- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.

MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 226 of 274 ends

▪
▪
▪

Page 227 of 274 ends

▪
▪
▪
▪
▪

Page 228 of 274 ends
Page 229 of 274 ends

REPORT to the MAYOR and MEMBERS of the CITY COUNCIL
From the CITY MANAGER
DATE: July 22, 2025
SUBJECT: RESOLUTION AUTHORIZING A TASK ORDER WITH
ARDURRA GROUP, INC. FOR STORMWATER

COLLECTION SYSTEMS SERVICES FOR THE LA

MESITA PARK DRAINAGE IMPROVEMENTS PROJECT
(CAPITAL IMPROVEMENT PROJECT NO. 8502)
ISSUING DEPARTMENT: Public Works
SUMMARY:

Issues:

Should the City Council approve the attached Resolution authorizing the issuance of a task order with Ardurra Group, Inc. to provide stormwater collection systems services for the La Mesita Park Drainage Improvements Project in the amount of $81,534?
Recommendation:

Approve the attached resolution authorizing the issuance of a task order with Ardurra Group, Inc. to provide stormwater collection systems services for the La Mesita Park Drainage Improvements Project in the amount of $81,534.

Fiscal Impact:

The task order for Capital Improvement Project No. 8502, La Mesita Park Drainage Improvements, in the amount of $81,534, is funded by the local Highway Users Tax Account (HUTA) 26 and RTIP LAM44 Roadway Drainage Improvements 26.

Page 230 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 2 of 3
City’s Strategic Goals:
 Invest in infrastructure to serve the needs of the community.  Maintain a community where residents and visitors feel safe.

BACKGROUND:

An existing 60-inch storm drain line runs through La Mesita Park between Dallas Street and a manhole located within Caltrans right-of-way adjacent to the park. The line was originally built in the mid-1900s and conveyed large flows from the areas north of Dallas Street as well as runoff from the park itself. In the early 2000s, off-site flows were diverted to a newly constructed 84-inch reinforced concrete pipe (RCP), which was built within the Caltrans right-of-way.

A preliminary drainage and feasibility study was performed by Ardurra Group, Inc. to assess the existing condition of the pipe, assess the preliminary hydrology and hydraulics of the site and storm drain, and provide remediation alternatives.

In May 2024, the City issued a request for qualifications (RFQ 25-01) and conducted a formal selection process to select highly qualified firms capable of providing various professional services. Ardurra Group Inc. was selected to provide construction management and inspection services, and in August 2024, a master agreement was executed. The terms of the master agreement allow for the issuance of task orders to authorize specific items of work on an as-needed basis to the selected consultants.

DISCUSSION:

The existing 60-inch storm drain is in poor condition and is much larger than is needed to convey drainage from La Mesita Park since off-site flows are now diverted. City staff recommends constructing a new smaller storm drain adjacent to the existing main line and abandoning the existing 60-inch storm drain.

The scope of the work proposed is to develop a construction-ready plan set and specification package, and engineer’s estimate to construct a new 24-inch storm drain line and abandon the existing 60-inch storm drain. Having the same consultant that prepared the preliminary drainage and feasibility study prepare the construction-ready design plans, Ardurra Group, Inc., is cost effective.

Page 231 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 3 of 3
CONCLUSION:

Staff recommends that the City Council adopt the attached resolution authorizing a task order with Ardurra Group, Inc., to provide stormwater collection systems services for the La Mesita Park Drainage Improvements Project in the amount of $81,534.

Reviewed by: Respectfully submitted by:
____________________ _______________________ _____
Greg Humora Michael Throne, PE
City Manager Director of Public Works
_______________________________
Carly Cubberley
Engineering Project Manager
Attachments: A: Resolution
B: Ardurra Group, Inc. Proposal

Page 232 of 274 ends

RESOLUTION NO. 2025-

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
AUTHORIZING A TASK ORDER WITH ARDURRA GROUP, INC. FOR

STORMWATER COLLECTION SYSTEMS SERVICES FOR THE LA MESITA

PARK DRAINAGE IMPROVEMENTS PROJECT (CAPITAL IMPROVEMENT PROJECT NO. 8502)
WHEREAS, the City performed a preliminary drainage and feasibility study at La Mesita Park;
WHEREAS, the study concluded the capacity of the existing 60-inch storm drain line in La Mesita Park is no longer needed and the storm drain line is in disrepair; WHEREAS, in April 2024, the City advertised a Request for Qualifications RFQ 25-01 for as-needed engineering services;
WHEREAS, Ardurra Group, Inc. was selected as a qualified firm to provide as-needed stormwater collection system services;
WHEREAS, the terms of the master agreement allow for the issuance of task orders to authorize specific items of work on an as-needed basis to the selected consultants; and WHEREAS, a scope of work and fee were negotiated with Ardurra Group, Inc. to provide construction-ready plans, specifications, and an engineer’s estimate to replace the storm drain line in La Mesita Park, identified as the La Mesita Park Drainage Improvements Project.

NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, that the Mayor is hereby authorized to execute a task order with Ardurra Group, Inc. to provide stormwater collection systems services for Capital Improvement Project No. 8502, La Mesita Park Drainage Improvements Project in the amount of $81,534.

PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 22nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

Page 233 of 274 ends

CERTIFICATE OF THE CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2025- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.

MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 234 of 274 ends

3737 Birch Street, Suite 250 | Newport Beach, CA 92660 | 949.428.1500 | www.ardurra.com May 23, 2025
Ms. Carly Cubberly
Engineering Project Manager
Public Works – Engineering
City of La Mesa
8130 Allison Avenue
La Mesa, CA 91942
SUBJECT: PROPOSAL FOR DESIGN ENGINEERING SERVICES FOR LA MESITA PARK

DRAINAGE IMPROVEMENTS
Dear Ms. Cubberly:

Pursuant to your request, Ardurra Group, Inc. (Ardurra) is submitting our proposal to provide professional engineering, geotechnical, and survey services for the La Mesita Park improvement project. We appreciate the opportunity to continue supporting the City of La Mesa (City). Ardurra’s project understanding, proposed team, and estimated fee are presented herein for your consideration.

PROJECT UNDERSTANDING
Ardurra understands the City is seeking a consulting firm to provide final engineering design services for the replacement of the existing 60” CMP pipe that traverses La Mesita Park as shown in Figure 1. Ardurra prepared a drainage memo for La Mesita Park identifying four alternatives to mitigate the damaged existing 60” CMP pipe. The selected alternative consisted of introducing a new smaller mainline adjacent to the existing mainline, connecting the existing laterals to this new mainline, and abandoning the existing 60” CMP.

For the final design, Ardurra will prepare a final drainage study in accordance with the County of San Diego Hydrology Manual to size the new mainline. The existing pipe would need to be backfilled with material to assure the pipe does not collapse, creating voids and possibly creating soil failures on the surface. Ardurra’s scope of work and deliverables are further detailed below.

Figure 1 – La Mesita Park and Existing 60” CMP

Page 235 of 274 ends

Ms. Carly Cubberly
La Mesita Park Drainage Design Project
City of La Mesa
May 23, 2025

Page 2 of 6 ends

3737 Birch Street, Suite 250 | Newport Beach, CA 92660 | 949.428.1500 | www.ardurra.com

SCOPE OF WORK
Task 1. Project Management, Coordination, Meetings, and QA/QC The Project Management task is directed as resource management of the Project Team. Activities include scheduling and monitoring the project team, cost control, and implementing our quality management program (QMP).

Ardurra will coordinate with the City, as necessary, to complete the project tasks. The project schedule, work plan of deliverables, and roles and responsibilities will be defined and mutually agreed upon at the start of the project. Ardurra assumes that there will be no more than four (4) meetings during design; with the initial meeting being a field visit to assess the current existing conditions, and subsequent meetings to be held virtually using the video platform preferred by the City.

Deliverable: Project Management time, Meeting attendance (in person and virtual), Invoicing (PDF) Task 2. Assessment of Existing Conditions
2A. Topographic Survey
Ardurra has secured Aguirre Surveying to perform a survey of the existing park inlets and the invert elevations of the existing manholes within the project area. The survey information will be transposed onto the existing survey from the City’s GIS website. The City’s GIS website has existing 2ft contours that will be utilized for design. Ardurra will use the existing contours to create an existing surface for use in the final drainage study as well as for design of the proposed drainage system. It is anticipated that there are no utilities crossing the main line that will require locating or potholing.

Deliverable: Civil3D topo and boundary (DWG)
2B. Geotechnical Investigation
Ardurra has secured Nova Services, Inc. (Nova) for the geotechnical investigation of the park for the purpose of providing trenching recommendations for the new storm drain line. Nova will perform field investigations and perform their analysis to develop a geotechnical report that will include recommendations for trenching, temporary shoring, pipeline support, backfill and compaction, and soil corrosivity. It is presumed that the project site is accessible to limited access or truck-mounted drilling equipment. Please see Attachment B for the detailed geotechnical project scope.

Deliverable: Geotechnical Report (PDF)
2C. Base Map
Ardurra will prepare a base map from the available contours from the City’s GIS website and overlay the inlets onto the map for use in design.

Deliverable: Site visit, Base map (DWG)

Page 236 of 274 ends

Ms. Carly Cubberly
La Mesita Park Drainage Design Project
City of La Mesa
May 23, 2025

Page 3 of 6 ends

3737 Birch Street, Suite 250 | Newport Beach, CA 92660 | 949.428.1500 | www.ardurra.com Task 3. Preliminary Design (35% Design)
3A. Drainage Study
Using the topographic survey and available GIS data, Ardurra will update the preliminary drainage memo for the purpose of verifying the size of the replacement mainline storm drain pipe. The drainage study will be performed in accordance with the San Diego County Hydrology and Hydraulics Manuals. Using the results from the hydrology analysis, a hydraulic analysis will be performed to verify capacity of the mainline.

Additionally, the drainage analysis will be limited to La Mesita Park and will not include tributary areas outside of the area, including Caltrans.

Deliverable: Updated Drainage Memo (PDF)
3B. Preliminary Improvement Plans
Ardurra will prepare a preliminary plan of the proposed storm drain improvements. The preliminary improvement plan will show the proposed storm drain mainline and the lateral connections from the existing inlets. The proposed laterals will intercept the existing laterals and connect to the new mainline. It will be assumed that the laterals will not require resizing or that inlets will require relocation; however, in the event areas are identified as being deficient, Ardurra will coordinate with the City to add new inlets and laterals. It is anticipated that the preliminary improvements will be shown on a single plan to coordinate with the City for review and approval.

Deliverable: Preliminary Storm Drain Plan (PDF)
3C. Preliminary Opinion of Probable Construction Costs
Ardurra will prepare a preliminary opinion of probable construction costs based on the preliminary storm drain improvements. Recent available public bids in the vicinity will be used to establish unit costs. The costs will be provided to the City for review and approval.

Deliverable: Preliminary Opinion of Probable Construction Costs (PDF) Task 4. Final Engineering Design
4A. Final Improvement Plans
Ardurra will prepare final engineering plans of the proposed storm drain improvements. The final plans will show sufficient information for the improvements to be constructed. It is understood that the plan sheet set will include plan view of the proposed main line and the laterals. This includes one review and response to comments. Plans will consist of 24”x36” plans at 1”=20’ scale and it is anticipated that there will be the following list of plans:
• Title and Notes Sheet (1 sheet)
• Plan Sheets (2 sheets)
• Detail Sheet (1 sheet)
• Temporary Erosion Control Plan (1 Sheet)
Deliverable: Improvement Plans (PDF)

Page 237 of 274 ends

Ms. Carly Cubberly
La Mesita Park Drainage Design Project
City of La Mesa
May 23, 2025

Page 4 of 6 ends

3737 Birch Street, Suite 250 | Newport Beach, CA 92660 | 949.428.1500 | www.ardurra.com 4B. Project Specifications
Ardurra will prepare project technical specifications for the proposed improvements. The City will be responsible for the front-end specifications. This includes one review and response to comments.

Deliverable: Project Specifications (DOC)

4C. Final Opinion of Probable Construction Costs
Ardurra will generate an opinion of probable construction costs for the proposed improvements. The estimate will be prepared in accordance with the final design and specifications package and will be calculated using the unit pricing used for the preliminary estimate.

Deliverable: Final Opinion of Probable Construction Costs (PDF)

Task 5. Bid Support
Ardurra is prepared to assist the City during the Bidding period. We will answer questions and inquiries during the bidding period, up to 10 RFIs. We will also assist with up to two addendums that may result from changes to the plans. Ardurra will also offer opinions relative to the bids received by the City, should this be requested.

Deliverable: RFI Responses (PDF), Bid Addenda Plan Sheets (PDF), Opinion on Bid Technical Adherence (Email)

Task 6. Engineering Support During Construction
Ardurra understands the need to provide support during construction and we are committed to supporting the project and the City during this critical stage. Ardurra anticipates responding to requests for information from the contractor (up to 10), review submittals and perform no more than one (1) site visit to observe construction of the proposed improvements. We have proposed twenty-six (26) hours for Construction Support. Should this duration not be sufficient, we reserve the right to request an additional budget to continue to support this effort.

Deliverable: RFI Responses (PDF), Review of Submittals, Site Visits, Project Engineer time

CITY RESPONSIBILITIES
The city will be responsible for the following:

1. Provide access to the site.

2. Provide all pertinent records maintained by the city.

Page 238 of 274 ends

Ms. Carly Cubberly
La Mesita Park Drainage Design Project
City of La Mesa
May 23, 2025

Page 5 of 6 ends

3737 Birch Street, Suite 250 | Newport Beach, CA 92660 | 949.428.1500 | www.ardurra.com

3. City staff will scope the existing laterals and identify slope, alignment, and location of lateral connections to mainline.

4. City will provide boilerplate specifications for use in preparing project specific technical specifications and autocad title blocks.

EXCLUSIONS/ASSUMPTIONS
The following exclusions and assumptions were made in the preparation of the scope of work:

1. It is assumed the City will coordinate with Ardurra prior to performing the field work to scope the existing laterals so that an Ardurra team member can observe this effort to gather pertinent information.

2. Rough order of magnitude costs will be based on available data and there is no guarantee that the costs will be accurate at the time of construction.

3. The proposed project schedule is subject to change due to unforeseen circumstances and review durations.

4. It is assumed that an updated drainage memo will be provided and a full drainage study is not included nor required for this scope of work.

5. It is assumed that the City of La Mesa will be the only approving agency for the proposed improvements.

6. It is assumed that any major change in direction or additional analysis from this scope may be considered additional scope.

7. It is assumed that there will not be any Caltrans component to this project.

8. It is assumed that a Stormwater Quality Assessment, Report, or Design will not be required.

9. Environmental, structural, or landscape services are not included in this scope.

10. It is assumed that any changes after the 35% alignment will require additional fees.

11. The hydraulic grade line will be shown on the mainline only.

12. Profiles will not be included.

13. Water Surface Pressure Gradient analysis will not be included.

14. It is assumed that if there is a permit required for geotechnical investigation, it will be at no cost.

PROJECT SCHEDULE
The Ardurra Team will prepare and maintain a project design schedule that will be implemented to match the city’s timeline. We estimate that the survey and geotechnical investigation will take approximately four (4) weeks, and the design will take fourteen (14) weeks from issuance of the notice to proceed (NTP).

Page 239 of 274 ends

Ms. Carly Cubberly
La Mesita Park Drainage Design Project
City of La Mesa
May 23, 2025

Page 6 of 6 ends

3737 Birch Street, Suite 250 | Newport Beach, CA 92660 | 949.428.1500 | www.ardurra.com

ESTIMATED FEE
The estimated fee for this task order is:

Task Fee
1 Project Management & Coordination $4,788
2 Assessment of Existing Conditions
• Ardurra ( $2,850)
• Survey ($10,461)
• Geotechnical ($22,000)
$35,311
3 Preliminary Design $10,305
4 Final Design $23,700
Sub-Total for Design $74,580
5 Bid Support $1,580
6 Engineering Support During Construction $5,850
Total $81,534
Ardurra appreciates the opportunity to submit our proposal for this work. We look forward to continuing our existing positive working relationship with the City’s team on this project. Please let us know if you have any questions or need additional information.

Respectfully submitted,
Carmen Kasner, PE Jose Hernandez, PE
Southwest Operations Director Senior Project Manager
760.525.9995 714.458.7929
[email protected] [email protected]
Attachments:

Attachment A – Survey Proposal
Attachment B – Geotechnical Proposal

Page 240 of 274 ends

AGUIRRE & ASSOCIATES
8363 CENTER DRIVE, SUITE 5A • LA MESA, CA 91942 • PH: (619)464-6978 • FAX: (619)464-7203 SURVEYING • MAPPING • RIGHT-OF-WAY ENGINEERING
LA MESITA PARK, LA MESA – APN’S 485-600-23, -24 & -25
Survey and Mapping Scope and Fee Breakdown
April 17, 2025
PLS LS Crew

1. Research, coordination 1 4

2. Tie to primary control & City Benchmark 2 3

3. Set and survey suppl. control, trig level between same 1 2

4. Perform reconnaissance for monuments 1 3

5. Survey, dip and detail 15 storm drain structures 2 6

6. Prepare drawing with record lot lines and structures 3 Total Hours 1 13 14
Other Direct Costs
Reference Maps $40.00

SUMMARY
PLS 1 Hrs. @ $200 $ 200.00
LS 13 Hrs. @ $180 2,340.00
2-man Crew 14 Hrs. @ $495 6,930.00
ODC’s 40.00
Total $ 9,510.00
Assumptions, Conditions, Limitations

1. Horizontal control is NAD 83 per published data. Vertical control is per City La Mesa BM. Said survey control may or may not agree with previous aerial mapping provided by the City.

2. Scope of work per phone discussion with Dave Segal at Ardurra 4/16/25.

3. Site elevations will be GPS derived. Level loop from Benchmark not included in scope.

4. This scope includes up to a maximum of 15 storm drain structures (MH’s, clean outs, grates and inlets) to be located and dipped. Only features that are readily visible will be surveyed.

5. Storm drain details will be shown on the field dip sheets only and not drafted.

6. This project will not require a Caltrans Right of Entry Permit.

7. Landnet basemap will be record based on ROS 17628.

8. Unhindered access to all portions of the site necessary for the survey will be provided.

9. Deliverables will be an AutoCAD drawing (dwg) file, Basis of Coordinates statement, a .txt points file, and pdf’s of dip details.

Signed: 4/17/25
Michael A. Havener, PLS Date
Attachment A Page 241 of 274

GEOTECHNICAL

MATERIALS
SPECIAL INSPECTION DVBE  SBE  SDVOSB  SLBE
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
usa-nova.com 16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
Jose Hernandez | Senior Project Manager May 22, 2025
Ardurra
3737 Birch Street, Suite 250
Newport Beach, CA 92660
Subject: Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
8855 Dallas Street La Mesa, California 91942
Dear Mr. Hernandez:

NOVA Services, Inc. (NOVA) is pleased to submit this proposal to perform a geotechnical investigation for the subject project. Based on discussions with you and review of the provided technical memo, we understand the project may consist of replacement of an existing 60-inch storm drain main line at La Mesita Park located at 8855 Dallas Street in La Mesa, California. Based on our experience in the area and review of historic mapping, we anticipate the site will be underlain by fill soils associated with the infilling of an historic drainage. Beneath the fill the site is underlain by alluvium and/or Stadium Conglomerate (Tst). Based on the 1997 Foundation Report prepared by Law/Crandall for the Dallas Street Overcrossing project, perched groundwater is anticipated to be encountered at depths of about 25 feet below the existing ground surface (bgs).

SCOPE OF WORK
The purpose of our services will be to address the geotechnical issues of the proposed development.

Specifically, our scope of work will consist of the following:
• Reviewing geologic maps, prior geotechnical reports, and other readily available literature pertinent to the geotechnical conditions at the site.
• Coordinating with City of La Mesa personnel and Ardurra for site access. • Performing site reconnaissance and marking the proposed boring locations. Underground Service Alert will be notified for underground utility mark-out services. • Hiring a private utility locator to mark potential subsurface conflicts at investigation locations. • Drilling two hollow-stem auger borings to depths up to 15 feet below the ground surface (bgs), or refusal if shallower, using a track-mounted, limited-access drill rig. A NOVA geologist will log the borings and obtain samples for examination and laboratory testing. Figure 1 presents the proposed boring locations.

Attachment B Page 242 of 274
Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
2 Figure 1. Proposed Boring Locations
• Logging the borings, noting physical descriptions of the soils encountered; soil classifications in accordance with the Unified Soil Classification System (USCS); water table/groundwater if encountered; and obtaining samples for examination and laboratory testing. • Backfilling the borings in accordance with San Diego County Department of Environmental Health requirements.
• Performing laboratory tests on selected soil samples to evaluate material classifications in accordance with the USCS and other pertinent engineering properties including in-situ unit weight and moisture content, grain-size distribution, Atterberg limits, and corrosivity (pH, resistivity, chlorites, and sulfates).

We will prepare a geotechnical report that includes a subsurface investigation map, boring logs, and laboratory test results. We will submit an electronic copy of the report. The report will provide applicable conclusions and recommendations regarding:
• Subsurface conditions beneath the site, including groundwater levels, if encountered, dewatering specifications, and seasonal variations of the water table.

Page 243 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
3 • Potential geologic hazards.
• Excavation characteristics.
• Temporary shoring.
• Pipeline support.
• Backfill material and compaction.
• Suitability of existing soils for use as backfill.
• Soil corrosivity.

Please note that it is anticipated that the project site and subsurface materials are free of environmental contamination or pollution. The scope and fee presented herein do not include assessment, sampling, analysis, or management of suspected contaminated materials. However, unexpected conditions can always arise. Should we encounter soil or groundwater that is suspected to be contaminated, either because of odors, colors, free liquids, or other suspicious conditions, we will immediately notify the client. The client should take necessary initial measures to protect workers, the site, and other personnel.

LIMITATIONS AND EXCLUSIONS
Site Access
NOVA’s proposal is based on the understanding that site access will be available during standard workday hours.

Utilities
NOVA will make reasonable efforts to locate surface and subsurface utilities in order to prevent accidental damage to utilities during subsurface exploration activities. NOVA will contact USA to obtain utility locations within the boundaries of the investigation area. A private utility locating contractor will also be notified. NOVA will not be responsible for costs related to damage to any underground utility lines or structures.

Excavated Soils
NOVA will backfill the proposed subsurface explorations in accordance with appropriate regulatory requirements. This proposal assumes that soil cuttings generated during the subsurface exploration will not be affected by hazardous or regulated substances; that there will be no need to conduct special testing to containerize the soils for disposal at a regulated facility, i.e., soils may be disposed of without concern for the presence of regulated chemical constituents. Any such requirements for special soil characterization and disposal will be billed on a time and expense basis.

Stormwater
Please note that stormwater infiltration testing is not within the scope of this proposal. If required, a proposal for ‘design-phase infiltration testing’ can be provided at a later date.

Page 244 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
4 Off-Site Disposal of Hazardous Materials
Client acknowledges that NOVA is not and shall not be required to be in any way a ‘generator’, ‘arranger’, ‘operator’, or ‘transporter’ of hazardous materials present at or near the project site, as these terms are defined in applicable Federal or State Statutes. In addition, Client shall sign all manifests for the disposal of substances affected by regulated contaminants.

However, if the parties mutually agree that NOVA sign such manifests and/or to hire for Client a contractor to transport, treat, or dispose of the hazardous materials, NOVA shall do so only as Client’s agent. Client agrees to defend, indemnify, and hold harmless NOVA, its officers, directors, employees and agents from any claim, suit, arbitration, or administrative proceeding, damages, penalties or liability that arise from the executing of such manifests on Client’s behalf.

Further, NOVA will, at Client’s request, help Client identify appropriate alternatives for off-site treatment, storage, or disposal of such substances, but NOVA shall not make any independent determination about the selection of a treatment, storage, or disposal facility.

SCHEDULE
We will begin our investigation as soon as notice to proceed is received. We will mark the investigation locations and notify USA. USA requires 48-hour notice before drilling can start. We will also hire a private utility locator. We anticipate that the fieldwork can be completed within two weeks of the notice to proceed. Laboratory testing and the final report can be completed within five weeks of completing the fieldwork.

FEE ESTIMATE
We will provide the outlined geotechnical investigation scope of work for a lump sum fee of $18,000.

Design development tasks are services that NOVA provides after the geotechnical report has been completed, such as responding to City review comments, design team meetings, answering questions from the design team, and reviewing plans and specifications. For this project, design development services are estimated to be about $2,000 and will be billed as work progresses. Table 1 below presents a breakdown of the fee. The fee is based on our attached 2025 Schedule of Fees and the understanding that this project is subject to prevailing wage law.

The cost of our services may exceed this estimate if unanticipated conditions are encountered that would warrant additional investigation or analysis, or if the proposed plans are changed from our previously stated understanding of the project.

Table 1. Fee Estimate

FEE ITEM COST
Geotechnical Investigation and Report – Fixed Fee $ 18,000.00 Design Development Services – Time & Materials $ 2,000.00 Total Contract Amount: $ 20,000.00

Page 245 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
5 BILLING SCHEDULE
NOVA will bill $9,000 upon the completion of the subsurface exploration. The remainder of the fees will be billed and payable following submittal of the report.

AUTHORIZATION
This proposal is valid for 90 days. NOVA will accept authorization to proceed upon approval of this proposal and receipt of the Professional Services Agreement signed by an officer of your firm. In turn, we will send you a fully executed copy for your records.

CLOSURE
NOVA appreciates the opportunity to prepare this proposal, and we look forward to working with you on this project. If you have any questions, please contact us at 858.292.7575 Respectfully submitted,
NOVA Services, Inc.
______________________ ___________________
Andrew K. Neuhaus, PG, CEG Tom Canady, PE
Senior Engineering Geologist Principal Engineer
Distribution: Jose Hernandez via email at [email protected] Attachments: General Terms and Conditions and Acceptance of Professional Services NOVA 2025 Schedule of Fees

Page 246 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
1 Client’s Initials NOVA’s Initials

TERMS AND CONDITIONS FOR PERFORMANCE OF SERVICES
This agreement is made by and between NOVA Services, Inc., herein referred to as “NOVA,” and, Ardurra, hereinafter referred to as “Client.” The term “Client” includes Jose Hernandez, who is the Client’s project representative agent and/or, who is the Client’s designated agent for all notices and communications between NOVA and Client. All notices and communications from NOVA to Client are to be addressed to:

Jose Hernandez
Ardurra
3737 Birch Street, Suite 250
Newport Beach, CA 92660
This agreement between the parties consists of these Terms, the attached Proposal for Geotechnical Investigation, La Mesita Park Drainage Improvements Project, 8855 Dallas Street, La Mesa, California dated May 22, 2025, and any exhibits or attachments noted in the proposal.

Table 1. Fee Estimate

FEE ITEM COST
Geotechnical Investigation and Report – Fixed Fee $ 18,000.00 Design Development Services – Time & Materials $ 2,000.00 Total Contract Amount: $ 20,000.00

SUMMARY OF DOCUMENTS
Client and NOVA agree to perform this contract in accordance with the following contract documents which are incorporated herein by reference and made part of this contract:

Exhibit 1 NOVA Proposal
Exhibit 2 Terms and Conditions for Performance of Services Exhibit 3 2025 Schedule of Fees
Together, these elements will constitute the entire Agreement superseding any and all prior negotiations, correspondence, or agreements either written or oral. Any change to this Agreement must be mutually agreed to in writing.

TO EXECUTE THIS AGREEMENT, PLEASE INITIAL PAGES 1-4 AND SIGN PAGE 4.

Page 247 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
2 Client’s Initials NOVA’s Initials
NOVA SERVICES, INC. GENERAL TERMS AND CONDITIONS
(3 Pages, Items 1-20)

1. SCOPE OF WORK. NOVA Services, Inc. (the “Company”) shall perform the services defined in this Agreement and shall invoice the Client in accordance with the compensation section of this Agreement. Any estimate of cost to the Client as stated in this Agreement or any of the accompanying schedules shall not be considered as a fixed price, but only an estimate (unless otherwise specifically stated in this Agreement). The Company will provide additional services under this Agreement as requested by the Client in writing subject to acceptance by the Company. Client will be invoiced for additional services at the Company’s standard rates or as mutually agreed upon, including but not limited to, re-reviews, re-inspections, re-tests, stand-by time, scope changes, services outside normal business hours or services provided beyond the estimated project duration. To the extent these General Terms and Conditions are part of a proposal for services, the proposal shall be valid for ninety (90) days unless otherwise stated. Once a proposal is accepted, these General Terms and Conditions shall apply to all services performed and shall survive any termination of the Agreement or completion of services.

2. RIGHT OF ENTRY. The Client will provide for right of entry of the Company personnel and all necessary equipment to the project site or sites, in order to complete the work.

3. INVOICES. The Company will submit invoices to Client monthly and a final bill upon completion of services. There shall be no retainage, unless otherwise agreed upon in the Agreement. The Company shall furnish insurance certificates, lien waivers, affidavits or other available documents as and when requested by Client provided all amounts due to the Company have been paid. Payment is due within thirty (30) days after the receipt of invoice. Interest charges will start to accrue forty-five (45) days from the invoice date. Client agrees to pay an interest charge equal to the lesser of one and one-half percent (1½%) per month, or the maximum rate allowed by law, on past due accounts. Any attorney’s fees, collection fees or other costs incurred in collecting any delinquent amount shall be paid by Client. The Client agrees to pay the Company for its services in accordance with the above Agreement, regardless of whether or not he has been paid by his client.

4. SAFETY. The Company is only responsible for the safety on site of its own employees and subcontractors. However, this shall not be construed to relieve the Client or any of its contractors from their responsibilities for maintaining a safe jobsite. Neither the professional activities of the Company, nor the presence of the Company’s employees and subcontractors shall be construed to imply the Company has any responsibility for job safety or any activities on site performed by personnel other than the Company’s employees or subcontractor.

5. STANDARD OF CARE. Service performed by the Company under this Agreement will be conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the location where the services are to be performed. No other warranty, expressed or implied, is made, including without limitation, any warranty of fitness for a particular purpose.

6. INSURANCE & GENERAL LIABILITY. The Company represents and warrants that it and its agents, staff and consultants employed by it are protected by worker’s compensation insurance and that the Company has such coverage under public liability and property damage insurance policies which the Company deems to be adequate and in line with other professional service firms currently practicing under similar conditions. Certificates for all such policies of insurance shall be provided to Client upon request in writing.

Additional insurance, if requested in writing by Client prior to commencement of services, will be obtained by the Company, if procurable, and charged to the Client.

7. DISPUTES. All claims, disputes, controversies or matters in question arising out of, or relating to, this Agreement or any breach thereof, including but not limited to disputes arising out of alleged design defects, breaches of contract, errors, omissions, or acts of professional negligence, (collectively “Disputes”) shall be submitted to non-binding mediation before and as a condition precedent to pursuing any other remedy. Upon written request by either party to this Agreement for mediation of any dispute, Client and the Company shall select a neutral mediator by mutual agreement. If a Dispute cannot be settled through mediation as set forth above, then such Dispute, if involving amounts less than $100,000, shall be decided by binding arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association then in effect, or any other appropriate rules upon which the parties may agree following termination of mediation. Notwithstanding any other provisions of this Section, in no event shall a demand for mediation be made, or any other proceeding initiated, more than two (2) years from the date the party making demand knew or should have known of the dispute or five (5) years from the date of substantial completion of Nova’s Services, whichever date shall occur earlier. All mediation or arbitration shall take place in San Diego County, California, unless the parties agree otherwise. The fees of the mediator or arbitrator(s) and the costs of transcription and other costs incurred by the mediator or arbitrator(s) shall be apportioned equally between the parties.

Thereafter, with respect to any Disputes involving amounts equal to or greater than $100,000, if any legal action or other proceeding is brought with respect to such Dispute, the successful or prevailing party or parties shall be entitled to recover reasonable attorneys' fees, costs and expenses, incurred in that action or proceeding, in addition to any other relief to which such party or parties may be entitled.

8. DELAYS IN WORK. In no event, will the Company be responsible for delays in the work which is beyond our reasonable control or caused by Client or its agents, consultants, contractors or subcontractors. Stand-by or non-productive time for delays in our work

Page 248 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
3 Client’s Initials NOVA’s Initials
caused by Client or its agents, consultants, contractors or subcontractors may be charged to the Client unless provided for as a separate item in the Agreement or otherwise as mutually agreed upon.

9. TERMINATION. This Agreement may be terminated by either party upon thirty (30) days written notice in the event of substantial failure by the other party to perform in accordance with the terms of the Agreement. Such termination shall not be effective if that substantial failure has been remedied before expiration of the period specified in the written notice. In all events of termination, the Company shall be paid for services performed up to and through the date of termination plus reasonable expenses to demobilize. In the event of termination, or suspension for more than three (3) months, prior to completion of all reports contemplated by this Agreement, the Company may complete such analyses and records as are necessary to complete its files and may also complete a report on the services performed to date of notice of termination or suspension. The expenses of termination or suspension shall include all direct costs of the Company in completing such analyses, records, and reports and shall be due and payable by Client promptly upon invoice from the Company.

10. ASSIGNS. This Agreement may not be assigned by either party without the prior written consent of the other party, provided, however, that the Company may assign this Agreement in the case of sale of all or substantially all of its assets or equity. To the extent consent is required, it shall not be unreasonably withheld.

11. OWNERSHIP OF DOCUMENTS. All reports, boring logs, field data, field notes, laboratory test data, calculations, estimates and other documents prepared by the Company, as instruments of service, shall remain the property of the Company. Client agrees that all reports and other work furnished to the Client or his agents, which are not paid for, will be returned upon demand and will not be used by the Client for any purpose whatsoever. The Company will retain all pertinent records relating to the services performed for a period of three (3) years following submission of the report, during which period the records will be made available to the Client at all reasonable times and an administrative fee may be charged to the Client for retrieval and reproduction of such records.

12. FAILURE TO FOLLOW RECOMMENDATIONS. The Company will not be held liable for problems that may occur if the Company’s recommendations are not followed.

13. LIMITATION OF LIABILITY. Client agrees that the work created pursuant to this Agreement is for the sole and exclusive use of Client and is not for the benefit of any third parties. Client acknowledges and agrees that in no event shall the liability of the Company in connection with this Agreement or the services provided pursuant thereto exceed the fee actually paid to and received by the Company under this Agreement. This Agreement and the services to be performed hereunder shall in no way be construed as a guarantee of deficient-free construction.

14. INDEMNIFICATION BY CLIENT. Client shall indemnify and hold harmless the Company, the Company’s affiliates, subsidiaries and clients, and all of their respective directors, officers, employees, managers, members, shareholders and representatives (collectively, the “Indemnitees”) from and against all damages, liabilities, losses, damages, costs and expenses (including without limitation, reasonable attorney’s fees and costs) (collectively, “Losses”), which any and all such Indemnitees hereafter may suffer or incur in connection with any claim, action, proceeding, or right of action (at law or in equity) (individually and collectively, a “Claim”) because of or arising from the acts, omissions, negligence, gross negligence or willful misconduct on the part of Client, or any of the Client’s contractors, subcontractors, sub-subcontractors, materialmen, or agents of any tier or their respective employees (collectively, the “Client Parties”). Recognizing that it may be difficult to allocate total responsibility for a particular act or omission by a Client Party from the work and services being performed by the Company, if any such Losses are caused in whole or in part by any act, omission, or default by the Indemnitees, then the aggregate amount of the Client’s (and Client Parties’) liability for such Losses shall not exceed the greater of $250,000 or twelve times the amount of fees charged by the Company for its services under this Agreement (the “Shared Fault Limitation”). The parties agree that the Shared Fault Limitation bears a reasonable commercial relationship to the services provided by the Company and that the indemnification provided herein is considered a part of the project specifications.

Notwithstanding the foregoing, in no event shall any Client Party have any duty of indemnification hereunder for Losses resulting from the gross negligence, or willful, wanton or intentional misconduct, of the Company or its officers, directors, agents or employees. Except as set forth in the preceding sentence, the Company Parties’ rights to indemnification shall include, without limitation, indemnification for any and all Losses which may be suffered by any the Company Party as a result of any (i) failure of Client to follow or implement any of its recommendations, (ii) any breach by Client of its obligations under the Agreement, and (iii) exposure of the Company’s employees or agents to any hazardous materials at the jobsite.

15. HAZARDOUS MATERIALS. It is acknowledged by both parties that the Company’s scope of services does not include any services related to asbestos or hazardous or toxic materials unless specifically identified in our scope of services. In the event the Company or any other party encounters asbestos or hazardous materials at the jobsite, or should it become known in any adjacent areas that may affect the performance of the Company’s services, the Company may, without liability for consequential or any other damages, suspend performance of services on the project until the Client retains appropriate specialist consultants or contractors to identify, abate and/or remove the asbestos, hazardous or toxic materials and warrant that the jobsite is in full compliance with applicable laws and regulations.

16. SAMPLE DISPOSAL. Unless other arrangements are made, the Company will dispose of all samples remaining at the time of report completion. Further storage or transfer of samples can be arranged at Client’s prior written request, subject to a reasonable charge by the Company. In addition, Client acknowledges that contaminated drill cuttings, sample spoils, wash water, and other materials may

Page 249 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
4 Client’s Initials NOVA’s Initials
be produced as a result of encountering hazardous materials at the site. In such event, the Company shall properly contain, label, and store such materials on-site, and Client shall be responsible for its proper transportation and disposal.

17. AQUIFER CONTAMINATION. Client acknowledges that it is impossible for the Company to know the exact composition of a site’s subsurface, even after conducting a comprehensive exploratory program. As a result, there is a risk that drilling and sampling may result in contamination of certain subsurface areas. Although the Company will take reasonable precautions to avoid such an occurrence, Client waives any claim against, and (without limiting the generality of Section 14 hereof) agrees to indemnify and hold harmless the Company from any claim or liability for injury or loss which may arise as a result of subsurface contamination caused by drilling, sampling, or monitoring well installation. Client also agrees to adequately compensate the Company for any time spent and expenses incurred in defense of any such claim.

18. DEFINITIONS. As used herein, the following words and their derivative words or phrases have the meanings indicated, unless otherwise specified in the various sections of this Agreement:

AGREEMENT: means the Agreement between the parties, which shall describe and govern Client’s engagement of the Company to provide services in connection with the project or work identified in the proposal (Proposal), and consists of the Proposal, these General Terms and Conditions, and any exhibits or attachments referenced in any of these documents.

CERTIFY, CERTIFICATION: the Company’s opinion based on its observation of conditions, knowledge, information and beliefs. It is expressly understood such opinions relieve no other party of any responsibility or obligation he or she has accepted by contract or custom.

ESTIMATE: An opinion of probable cost for services made by the Company. The accuracy of probable cost for services opinion cannot be guaranteed.

INSPECT, INSPECTION: The visual observation of certain aspects of construction to permit the Company to render its professional opinion as to whether the contractor is performing the Work in a manner indicating that, when completed, the Work will be in general accordance with the approved documents. Such observations do not relieve any party from fulfillment of their customary and contractual responsibilities and obligations.

19. LIMITED LIABILITY COMPANY PROTECTION. It is intended by the parties to this Agreement that the Company’s services under this Agreement shall not subject the Company’s individual employees, officers, shareholders, managers, members or directors to any personal legal exposure for the risks associated with the services to be rendered or the project. Therefore, and notwithstanding anything to the contrary contained herein, the Client agrees that as the Client’s sole and exclusive remedy, any claim, demand or suit shall be directed and/or asserted only against the Company, a California limited liability company, and not against any of the Company’s employees, shareholders, officers, managers, members or directors.

20. MISCELLANEOUS.

Governing Law: This Agreement shall be governed by and construed in accordance with the laws of the State of California, without regard to its principles of conflicts of law.

Amendment: This Agreement may be amended, modified or supplemented, but only in writing signed by each of the parties hereto.

Waivers: The failure of a party hereto at any time or times to require performance of any provision hereof shall in no manner affect its right at a later time to enforce the same. No waiver by a party of any condition or of any breach of any term contained in this Agreement shall be effective unless in writing and signed by the waiving party, and no waiver in any one or more instances shall be deemed to be a continuing waiver of any such condition or breach in other instance or a waiver of any other condition or breach of any other term.

Severability: If any provision or sub-provision of this Agreement is or becomes invalid, illegal or unenforceable in any respect, the validity, legality and enforceability of the remaining provisions or sub-provisions contained herein shall not be affected thereby.

Integration: This Agreement represents the entire understanding and agreement among the parties with respect to the subject matter hereof, and supersedes all other negotiations, understandings and representations (if any) made by and among such parties ACKNOWLEDGEMENT NOVA Services, Inc.

Client: Authorized By:

Authorized By: Print Name:

Print Name: Title:

Title: Date:

Date:

Page 250 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025
2025 PREVAILING WAGE RATES FOR PROFESSIONAL AND TECHNICAL

SERVICES

SERVICES UNIT RATE
Professional Staff
Principal Geotechnical Engineer Hour $ 275.00
Principal Engineer/Geologist Hour $ 260.00
Senior Engineer/Geologist Hour $ 240.00
Project Manager Hour $ 220.00
Project Engineer/Geologist Hour $ 220.00
Staff Engineer/Geologist Hour $ 190.00
Technical Staff
Special Inspector: Concrete, Steel, Masonry, Post-Tension Concrete, Fireproofing, Batch Plant, Roofing
Hour $ 148.00
Firestopping/Fire Caulking Inspector Hour $ 155.00
ACI Concrete Technician Hour $ 145.00
Non-Destructive Testing: Ultrasonic, Magnetic Particle, Liquid Penetrant Hour $ 155.00 Geotechnical Supervisor Hour $ 165.00
Soils Technician Hour $ 148.00
Lab Technician, services outside normal business hours Hour $ 98.00 Equipment and Expenses
Coring Two Man Crew Hour $ 400.00
Nuclear Gauge Day $ 45.00
Pachometer – Reinforcing Steel Day $ 65.00
Skidmore/Wilhelm Day $ 225.00
Schmidt Hammer Day $ 65.00
Floor Flatness Visit $ 1,800.00
Support Services and Other Expenses
Technical Drafter (CAD) Hour $ 115.00
Pick-Up/Delivery within San Diego County Trip $ 85.00
Expert Witness Testimony Hour $ 400.00
Monthly MetaField Reporting Month $ 500.00

ADMINISTRATIVE FEE
A charge of 5% of the monthly invoice total will apply to all invoices for administrative and dispatch costs.

TRAVEL TIME AND MILEAGE
For projects that are greater than 25 miles from NOVA’s Office, $0.85/per excess mile to and from the project will be charged for inspectors and technicians.

EXPENSES AND OUTSIDE SERVICES
Outside services and reimbursable expenses not included in this fee schedule (samples sent to outside laboratory for testing, samples sent to outside fabricator or machine shop, equipment, subcontractors, vendor credentialing and billing programs, etc.) are charged at cost plus 20%. Per Diem (meals only) charged at $85.00 per day.

Based on CA DIR Determination 07/01/2024. Field Technician and Inspector Rates will increase by 5% after 6/30/2025 per DIR pre-determined increase.

Page 251 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025

LABORATORY TESTING
Test ASTM Rate
Soil and Aggregate
Compaction Curve, Modified, D1557 $ 285.00
Compaction Curve, Standard, D698 $ 285.00
Compaction Check Point $ 93.00
Oversize Rock Correction D4718 $ 93.00
Sieve Analysis, with Wash C136, D6913, CT 202 $ 160.00
Sieve Analysis, fine with Hydrometer D6913, D7928, D422 $ 250.00 Percent Finer than #200 C117 $ 88.00
Specific Gravity and Absorption, Coarse C127, CT 206 $ 185.00 Specific Gravity and Absorption, Fine C128, CT 207 $ 140.00 Unit Weight and Voids in Aggregate C29, CT 212 $ 93.00
Moisture Content D2216, CT 226 $ 48.00
Moisture Content and Dry Density D2937 $ 48.00
Atterberg Limits: PL, LL, PI D4318, CT 204 $ 235.00
Sand Equivalent D2419, CT 217 $ 105.00
Durability Index D3744 $ 275.00
Cleanness Value CT 227 $ Quote
Los Angeles Abrasion (LA Rattler) C131, C535 $ Quote
Expansion Index D4829 $ 245.00
R-Value D2844 $ 390.00
Consolidation D2435 $ 260.00
Direct Shear D3080 $ 345.00
Direct Shear Remold $ 655.00
Sulfate and Chloride Content $ 135.00
pH and Resistivity CT 643 $ 170.00
Unconfined Compression D2166 $ 185.00
California Bearing Ratio D1883 $ 670.00
Asphalt Concrete
Hveem Stability and Unit Weight D1560 $ 385.00
Wet Track Abrasion D3910 $ 240.00
Maximum Theoretical Specific Gravity (Rice) D2041 $ 155.00 Percent Asphalt with Gradation (ignition oven) C6307 $ 260.00 Unit Weight Only (compacted sample or core) D2726, D1188 $ 58.00 Unit Weight Requiring Compaction D2726 $ 260.00
Asphalt Mix Design Review (per hour) $ 260.00
Concrete and Masonry
Concrete Cylinder Compression Test (4x8) C39, CT 521 $ 44.00 Concrete Cylinder Compression Test (6x12) C39, CT 521 50.00 Compression Test, Mortar, Grout C780, C1019 $ 54.00
Compression Test, High-Strength Grout C1107 $ 63.00
Compression Test, Core (includes sample prep) C42 $ 105.00 Compression Test, Lightweight Concrete (insulating, fill) C495 $ 63.00 Compression Test, Shotcrete Panel, set of four cut cores C42 $ 398.00 Flexural Strength, 6X6 beam C78, C293, CT 523 $ 135.00
Fiber Reinforced Polymer D7565 $ 925.00
Unit Weight Fresh Concrete C138, CT 518 $ 58.00

Page 252 of 274 ends

Proposal for Geotechnical Investigation
La Mesita Park Drainage Improvements Project
San Diego, California
May 22, 2025

LABORATORY TESTING
Test ASTM Rate
Concrete and Masonry (continued)
Concrete Drying Shrinkage, set of three specimens C157 $ 465.00 Unit Weight, Lightweight Concrete C567 $ 90.00
Concrete Mix Design Review (per hour) $ 260.00
Moisture Vapor Emission Kit F1869 $ 58.00
Shotcrete Nozzleman Certification – mock-up panel, coring, and grading (per nozzleman)
$ 2,750.00
Composite Prism Masonry Unit C1314 $ 250.00
Compression Test, Block C140 $ 75.00
Compression Test, Brick C67 $ 65.00
Absorption, Unit Weight, and Received Moisture, Masonry Block
C140 $ 198.00
Lineal Shrinkage, Masonry Block C426 $ 305.00
Masonry Block Conformance (absorption, unit weight,
shrinkage, compressive strength)
C90 $ 725.00
Steel and Fireproofing
Bolt-Nut-Washer Conformance Testing F606 $ 885.00
Bolt-Nut-Washer, Hardness Only F606 $ 205.00
Reinforcing Steel, Tensile Test, < No. 6 bar A370 $ 115.00 Reinforcing Steel, Tensile Test, No. 7 or higher bar A370 $ Quote Reinforcing Steel, Bend Test, No. 6 bar or smaller A370 $ 115.00 Reinforcing Steel, Tensile Test, No. 7 bar or higher A370 $ Quote Tensile Strength Mechanical Splice $ Quote
Fireproofing – Density Test (template/displacement) E605 $ 90.00 Fireproofing Adhesion/Cohesion E736 $ 38.00

ADDITIONAL TERMS AND CONDITIONS
• Overtime occurs in the following instances:
­ work more than 8 hours per day is charged at time-and-a-half. ­ work more than 40 hours per week is charged at time-and-a-half. ­ work performed outside the hours between 6:30 a.m. and 4:00 p.m., Monday through Friday is charged at time-and-ahalf; work up to 12 hours per day on Saturday is charged at time-and-a-half. ­ work more than 12 hours in one day, or over 8 hours on the 7th consecutive day or worked Sundays/holidays is charged at double time.
• Hourly rates are charged on a portal-to-portal basis. • Mileage will be charged at $0.85 per mile for services performed outside a 25-mile radius of this office. • A 4-hour minimum is charged for field services. Work performed more than 4 hours will be charged at 8 hours. Work performed over 8 hours is charged in half-hour increments. • 24-hour notice is required for testing and inspection services. There will be a 4-hour minimum charge (show-up time) for cancellations without notification.
• Same Day Callouts will be subject to a 1-hour project management fee. • When personnel are required by job conditions to work more than 5 consecutive hours without the ability to take a onehalf hour uninterrupted lunch period, an additional hour will be billed at regular time in addition to actual hours worked. • Laboratory testing that is required to be performed outside regular hours will be billed for Lab Technician time in addition to the lab test rate. Weekend sample pickups, if required, will incur additional charges. • Please note that our services are billed on a time and materials basis. Our fees are determined by the construction schedule as well as the type and frequency of services requested and specified by local jurisdictions and their representatives.
• Any required retainers must be paid prior to the start of services.

Page 253 of 274 ends

CERTIFICATE OF CITY/DIRECTOR OF FINANCE
Certification of Unappropriated Reserves
I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose as docketed is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated.

Amount$
Purpose
Date
Fund __________________ _
Director of Finance
City of La Mesa
By
Unappropriated Reserves Available Balance$
Certification of Unencumbered Balance
I HEREBY CERTIFY that the indebtedness and obligation as docketed can be incurred; that sufficient monies to meet the obligations are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn; and that said monies now actually in the treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered.

Fund:
530
Purpose:

Amount Not to Exceed $81,534.00
Date: 07/22/2025 By: Michael Throne
Dept. Account: Activity:
8502 $81,534.00 from Account 8502 (Amount Available $550,000.00) RESOLUTION AWARDING A TASK ORDER TO ARDURRA GROUP, INC.

FOR WASTEWATER AND STORMWATER COLLECTION SYSTEMS

SERVICES FOR THE LA MESITA PARK DRAINAGE IMPROVEMENTS
PROJECT (CIPNO. 8502)
CERTIFICATE NO. 1941

Page 254 of 274 ends

REPORT to the MAYOR and MEMBERS of the CITY COUNCIL
From the CITY MANAGER
DATE: July 22, 2025
SUBJECT: RESOLUTION AUTHORIZING CONTRACT CHANGE
ORDER NO. 1 WITH AMERICAN ASPHALT SOUTH,
INC. FOR BID 25-16, 2025 ANNUAL SLURRY SEAL
PROJECT (CAPITAL IMPROVEMENT PROJECT NO.
8305)
ISSUING DEPARTMENT: Public Works
SUMMARY:

Issues:

Should the City Council approve the attached Resolution authorizing Contract Change Order No.1 with American Asphalt South, Inc. for Bid 25-16, 2025 Slurry Seal Project in the amount of $116,479.30?
Recommendation:

Approve the attached resolution authorizing Contract Change Order No.1 with American Asphalt South, Inc. for Bid 25-16, 2025 Slurry Seal Project in the amount of $116,479.30.

Fiscal Impact:

Contract Change Order 1 in the amount of $116,479.30 to Capital Improvement Project No. 8305 2025 Annual Slurry Project will be funded by the Road Maintenance & Rehabilitation Account (SB1) 26.

City’s Strategic Goals:
 Invest in infrastructure to serve the needs of the community.  Promote a high quality of life that current and future generations can afford to call home.
 Maintain a community where residents and visitors feel safe.

Page 255 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 2 of 2
BACKGROUND:

On March 23, 2025, a notice inviting bids was advertised, and bid documents were distributed. On May 2, 2025, three bids were received electronically. The apparent responsive, responsible low bidder was identified as American Asphalt South, Inc. On May 27, 2025, American Asphalt South was awarded the 2025 Slurry Seal Project with a base bid of $2,355,359.13 plus alternate bid price of $303,023.90 for a total bid price of $2,658,383.03, per Resolution 2025-053.

DISCUSSION:

Staff have observed that because of significant water seepage and precipitation during the winter season, Fletcher Parkway exhibits additional areas of extensive cracking and deterioration. For the street to be properly restored to excellent condition, it is necessary to modify the type of slurry seal to be applied to Memorial Drive.

Staff requests additional funding in the amount of $116,479.30 to facilitate the removal and replacement of approximately 17,376 square feet of pavement affected by winter damage, to pave an additional 370 tons of asphalt, and to alter the treatment methodology for Memorial Drive as detailed in Attachment B.

CONCLUSION:

Staff recommends that the City Council adopt the attached Resolution authorizing Contract Change Order No. 1 with American Asphalt South, Inc. for Bid 25-16, 2025 Slurry Seal Project in the amount of $116,479.30.

Respectfully submitted by:
____________________ ____________________________
Greg Humora Michael Throne, PE
City Manager Director of Public Works
Tristan Leger_______________________
Tristan Leger, PE
Assistant Engineer
Attachments: A. Resolution
B. Contract Change Order 1

Page 256 of 274 ends

RESOLUTION NO. 2025-

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA
AUTHORIZING CONTRACT CHANGE ORDER NO. 1 WITH AMERICAN
ASPHALT SOUTH, INC. FOR BID 25-16, 2025 SLURRY SEAL PROJECT (CAPITAL IMPROVEMENT PROJECT NO. 8305)
WHEREAS, the City of La Mesa has a strategic goal to invest in infrastructure to serve the needs of the community;
WHEREAS, the 2025 Slurry Seal Project is a crucial recurring project that maintains the quality of La Mesa’s road infrastructure and elongates the life of streets in a financially responsible manner;
WHEREAS, on May 2, 2025, a contract was awarded to American Asphalt South, Inc. to provide construction services for the 2025 Slurry Seal Project; WHEREAS, rainy weather caused unforeseen roadway damage prior to construction, necessitating a change order; and
WHEREAS, Administrative Instruction F-13 requires approval by the City Council for Public Works construction change orders over $25,000.

NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, California, that the Mayor is hereby authorized and instructed to execute for and on behalf of said City, Contract Change Order No. 1 for additional construction services between the City of La Mesa and American Asphalt South, Inc., for an amount of $116,479.30 for Capital Improvement Project No. 8305, 2025 Slurry Seal Project.

PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 22nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

Page 257 of 274 ends

CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2025-___, duly passed and adopted by the City Council of said City on the date and by the vote therein recited.

MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 258 of 274 ends

RE Contract: Date:

No.
1 2
3 4
5 The time provided for the contract is

CITY OF LA MESA
You are hereby requested to comply with the listed changes in the contract plans and specifications.

Furnish to the City of La Mesa as follows:

Change in
Contract Price
7/22/2025
Detailed Description of Changes & Quantities or Scope of Work CIP No. 8305, 2025 Annual Slurry Project
CONTRACT CHANGE ORDER NO. 1
Bid No.: 25-16 2025-____
AMERICAN ASPHALT SOUTH, INC.

TOTAL CCO's (+ or -) $ 116,479.30 % Change 4%
Michael Throne, Director of Public Works
working days.

NEW CONTRACT AMOUNT (C + B + A) $ 2,774,862.33 % Change Megan Wiegelman, City Clerk
4%
APPROVED BY:

CCO's PREVIOUSLY APPROVED (+ or -) $ - % Change 0%
NET CHANGE THIS CCO (+ or -) $ 116,479.30 4%
TO:

ORIGINAL CONTRACT AMOUNT
$ 116,479.30
$ 2,658,383.03
American Asphalt South, Inc.

Resolution:

Total Change
$ 22,512.00
Jeff Petty, President
I, THE UNDERSIGNED CONTRACTOR/CONSULTANT, have given careful consideration to the changes proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the price shown above.

Mark Arapostathis, Mayor
$ 71,225.00
$ 3,272.50
$ 8,263.00
$ 11,206.80
Additional CHIP - Memorial Drive
Cold Mill and Pothole (6" & 10" milling)
Cold Mill (3")
Traffic Control and Construction Staging
Additional Asphalt Pavement
% Change
APPROVAL RECOMMENDED BY:

This document shall become an amendment to the contract and all provisions for the contract will apply hereto. The contractor accepts this change order as full compensation for additional work and delay to the project caused by this change order. This change order was requested by the City/Contractor. increased by 18

Page 259 of 274 ends
Page 260 of 274 ends

REPORT to the MAYOR and MEMBERS of the CITY COUNCIL
From the CITY MANAGER
DATE: July 22, 2025
SUBJECT: RESOLUTION CONFIRMING THE REPORT WITH THE

FINAL DETERMINATION OF SEWER SERVICE
CHARGES FOR FISCAL YEAR 2026 TO BE

COLLECTED ON THE COUNTY PROPERTY TAX ROLL

AND DIRECTING THE CITY CLERK TO FORWARD A

COPY OF THE RESOLUTION AND THE REPORT TO

THE OFFICE OF THE SAN DIEGO COUNTY AUDITOR
ISSUING DEPARTMENT: Public Works
SUMMARY:

Issues:

Should the City Council adopt the attached resolution approving the sewer charge amount for each parcel as described in the Fiscal Year (FY) 2026 sewer charge report and authorize the City Clerk to submit the sewer charge for each parcel to the County Auditor for collection on the FY 2026 property tax bills? Recommendation:

That the City Council adopt the attached resolution approving the sewer charge amount for each parcel as described in the FY 2026 sewer charge report and authorize the City Clerk to submit the sewer charge for each parcel to the County Auditor for collection on the FY 2026 property tax bills.

Fiscal Impact:

Through an agreement with the County of San Diego, the City pays a fee of $0.10 per parcel for the collection of sewer service charges on the tax bill. Sewer charges will be levied on an estimated 13,205 parcels in FY 2026, at a total estimated cost of $1,320.50. This amount is deducted by the County from the City’s apportionment of property tax payments.

Page 261 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 2 of 4
The City will collect approximately $13,397,925.18 in sewer revenue from property tax payments in FY 2026. This revenue is received from the County in monthly apportionments, with a majority of the revenue collected in January and May after property tax bills are due. Additionally, the City's Finance Department will directly bill and collect an estimated $1,178,105.28 in sewer service charges from an estimated 219 properties that cannot be placed on the tax roll due to various circumstances. Sewer service revenue is deposited into the Wastewater Fund and is used to fund the City’s sewer program, including operation and maintenance, sewer treatment and conveyance, infrastructure improvements, and debt service.

City’s Strategic Goals:
 Ensure a strong financial outlook through careful planning, sustainable service levels, and fiscal sustainability.
 Invest in infrastructure to serve the needs of the community.

BACKGROUND:

On June 26, 2012, the City Council adopted Ordinance No. 2012-2823 authorizing the collection of La Mesa sewer service charges on the County property tax roll as a fixed charge special assessment.

The City has an agreement with the County of San Diego for the collection of taxes and special assessments. As part of the agreement, the County collects the fixed charge special assessments levied by the City at the same time and in the same manner as County property taxes are collected. A special assessment is defined as a levy placed upon real property (land or land and improvements) for the purpose of paying for a special service, the amount of which is based on the benefit received from the service provided.

Sewer service charges are collected from all users of the City’s sanitary sewer system pursuant to La Mesa Municipal Code Section 17.12 and the laws of the State of California.

The City levies the sewer service fee under the authority of California Health and Safety Code Section 5471. Sewer charges are subject to the limitations prescribed in Article XIIID (Proposition 218) of the California Constitution. On July 22, 2025, the City Council approved a rate increase of 5.96% for the average single-family home customer in FY 2026.

DISCUSSION:

As part of the annual sewer billing process, the City will be mailing the week of July 23 a courtesy notification letter to the record owner of each parcel connected to the City’s sanitary sewer system, with the estimated sewer charge amount to be collected on the

Page 262 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 3 of 4
FY 2026 property tax bill. The letter provides property-specific information to assist property owners with planning and budgeting for property tax payments, rental properties and impound accounts. The courtesy letters also provide information for the property owner to request a sewer billing adjustment before the charges are placed on the property tax bill. Municipal Code Section 17.12.040 authorizes the City Manager to establish policies and grant exceptions from the established sewer service charges in certain situations. The sewer charge adjustment policy and the request form are available on the City’s website. Adjustment requests may be submitted at any time throughout the year; however, the County charges a $15 per parcel correction fee for processing billing changes after the August 10th submittal deadline.

To align with the goals of the Climate Action Plan, residents have the option of opting out of the paper annual courtesy notification. Residents will still be able to obtain their water usage information online from the City’s website. A resident who opts out of the annual notification will continue to receive public hearing notices for sewer fees, pursuant to Article XIIID (Proposition 218) of the California Constitution.

Property owners also can review their annual sewer charges online on the City’s website at http://www.cityoflamesa.us/sewer . The winter water usage and billing calculations are available online going back to 2012 allowing property owners to track changes in their winter water average and the bill amount from year to year.

In order to collect the sewer charges on the property tax roll, Health and Safety Code Section 5473 requires that a written report containing a description of each parcel receiving sewer service and the amount of the charge for each parcel, be prepared each year and filed with the City Clerk. Sewer charges must be computed in conformity with the adopted schedule of sewer service fees. The FY 2026 sewer charge report, with the amount to be levied against each parcel, was filed with the City Clerk on July 11, 2025.

The City Council is required to hold a public hearing prior to making a final determination of the amount of the sewer service charge to be levied against each parcel for the fiscal year. Pursuant to Section 5473.1, a notice of filing of the FY 2026 sewer charge report and the time and place of the public hearing was published two times in the Daily Transcript on July 8, 2025, and July 15, 2025.

On or before August 10 of each year, the City must certify and deliver the adopted resolution and a copy of the approved report with the levy amounts for each parcel, to the County Auditor to be added to the assessment roll for collection on the property tax bill.

Following the public hearing, staff will prepare the final parcel report, along with any changes requested by residents and approved by City staff, for submittal to the County.

Parcels that cannot be placed on the tax roll, such as government agencies or homeowner associations, are billed separately by the City.

Page 263 of 274 ends

Report to Mayor and Councilmembers
Date: July 22, 2025
Page: 4 of 4

CONCLUSION
Staff recommends that the City Council adopt the resolution approving the sewer charge amount for each parcel as described in the FY 2026 sewer charge report and authorize the City Clerk to submit the sewer charge for each parcel to the County Auditor for collection on the FY 2026 property tax roll.

Reviewed by: Respectfully submitted by:
____________________________ ____________________________ Greg Humora Michael Throne, PE
City Manager Director of Public Works
_______________________________
Jacob Martin
Public Works Operations Manager
Attachments:A. Resolution

Page 264 of 274 ends

RESOLUTION NO. 2025-

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA MESA

CONFIRMING THE REPORT WITH THE FINAL DETERMINATION OF SEWER SERVICE CHARGES FOR FISCAL YEAR 2026 TO BE COLLECTED ON THE

COUNTY PROPERTY TAX ROLL AND DIRECTING THE CITY CLERK TO

FORWARD A CERTIFIED COPY OF THIS RESOLUTION, TOGETHER WITH A

COPY OF THE REPORT TO THE OFFICE OF THE SAN DIEGO COUNTY

AUDITOR
WHEREAS, pursuant to the La Mesa Municipal Code and the laws of the State of California, sewer service charges shall be paid by all persons using the sanitary sewer system of the City of La Mesa;
WHEREAS, pursuant to Health and Safety Code Section 5473, the City Council adopted Ordinance No. 2012-2823 electing to have sewer service charges collected on the property tax roll in the same manner, by the same persons, and at the same times as, together with and not separately from, its general taxes and has caused to be prepared and filed with the City Clerk, a sewer service charge report containing the description of each parcel of property receiving services and the amount of the charges for each parcel for Fiscal Year (FY) 2026;

WHEREAS, a courtesy notice will be mailed to the owner of each parcel receiving sewer service from the City of La Mesa with the estimated sewer charge amount to be placed on the property tax roll for FY 2026 for the respective property, the week of July 23, 2025; WHEREAS, the notice included the option to opt out of the annual notice to align with the goals of the Climate Action Plan;
WHEREAS, on July 10, 2025, the FY 2026 sewer charge report, with the amount to be levied against each parcel, was filed with the City Clerk; WHEREAS, pursuant to Section 5473.1, a notice of filing of the FY 2026 sewer charge report and the time and place of the public hearing was published two times in the Daily Transcript on July 8, 2025, and July 15, 2025;
WHEREAS, on July 22, 2025, at 6:00 p.m., a public hearing was held to receive and consider all oral and written testimony regarding the FY 2026 report of sewer service charge amounts to be levied against each parcel for the fiscal year; WHEREAS, pursuant to Health and Safety Code Section 5473.4, on or before August 10th of each year, the City Clerk shall file with the County auditor a copy of the report with an endorsed statement of Final Determination by the legislative body; and WHEREAS, it is estimated that the FY 2026 itemized tax roll will include 13,205 parcels and a total assessment of approximately $13,397,925.18.

Page 265 of 274 ends

NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City Council of the City of La Mesa, as follows:

1. Said report on file in the City Clerk’s office describing each parcel of property receiving services and the amount of the charges for each parcel is hereby confirmed, and the amount levied upon each parcel shall be entered by the County auditor on the assessment roll for FY 2026.

2. The City Clerk is hereby directed to forward a certified copy of this resolution, together with a copy of the final parcel report, along with any changes requested by residents and approved by staff, to the Office of the San Diego County Auditor on or before August 10, 2025.

PASSED AND ADOPTED at a Regular meeting of the City Council of the City of La Mesa, California, held the 22
nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and exact copy of Resolution No. 2025- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited.

MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 266 of 274 ends

DATE: July 22, 2025
TO: Mayor and Members of the City Council
FROM: Megan Wiegelman, City Clerk
VIA: Greg Humora, City Manager
SUBJECT: APPROVAL OF SECOND READING AND ADOPTION OF AN

ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LA MESA

AMENDING THE LA MESA MUNICIPAL CODE (INCLUDING CHAPTER

2.32, SECTION 2.16.15(d)(6), CHAPTERS 9.04, 9.05 AND 9.06) TO DO THE FOLLOWING: (1) RENAME (a) “COMMUNITY SERVICES
DEPARTMENT” TO “PARKS AND RECREATION DEPARTMENT,” (b)
“COMMUNITY SERVICES COMMISSION” TO “PARKS AND
RECREATION COMMISSION,” AND (c) “DIRECTOR OF COMMUNITY
SERVICES” TO “DIRECTOR OF PARKS AND RECREATION;” AND, (2)

SHIFT THE SUPERVISORY RESPONSIBILITY OF LANDSCAPING AND

MAINTENANCE OF PARK AREAS TO THE CITY MANAGER OR HIS OR

HER DESIGNEE
At the July 8, 2025 City Council meeting, the City Council unanimously approved the introduction and first reading of the Ordinance amending the La Mesa Municipal Code (including Chapter 2.32, Section 2.16.15(d)(6), Chapters 9.04, 9.05, and 9.06) to do the following: (1) Rename (a) “Community Services Department” to “Parks and Recreation Department,” (b) “Community Services Commission” to “Parks and Recreation Commission,” and (c) “Director of Community Services” to “Director of Parks and Recreation;” and (2) Shift the supervisory responsibility of landscaping and maintenance of park areas to the City Manager or his or her designee.

Staff recommends the City Council approve the second reading and adoption of the Ordinance.

Attachment: A. Draft Ordinance

Page 267 of 274 ends

ORDINANCE NO. 2025-

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LA MESA AMENDING THE LA MESA MUNICIPAL CODE (INCLUDING CHAPTER 2.32, SECTION 2.16.15(d)(6), CHAPTERS 9.04, 9.05 AND 9.06) TO DO THE FOLLOWING: (1) RENAME (a) “COMMUNITY SERVICES DEPARTMENT” TO “PARKS AND RECREATION DEPARTMENT,” (b) “COMMUNITY SERVICES COMMISSION” TO “PARKS AND RECREATION COMMISSION,” AND (c) “DIRECTOR OF COMMUNITY SERVICES” TO “DIRECTOR OF PARKS AND RECREATION;” AND, (2) SHIFT THE SUPERVISORY RESPONSIBILITY OF

LANDSCAPING AND MAINTENANCE OF PARK AREAS TO THE CITY

MANAGER OR HIS OR HER DESIGNEE
WHEREAS, in 1990, the City renamed the Parks and Recreation Department to the Community Services Department, along with its associated commission; and WHEREAS, on April 8, 2025, the City Council directed staff to restore the department and commission’s name to "Parks and Recreation" and to bring forward a code amendment for consideration.

NOW, THEREFORE, BE IT AND IT IS HEREBY ORDAINED by the City Council of the City of La Mesa, California as follows:

SECTION 1: All references in the La Mesa Municipal Code to “Community Services Department” shall be deleted and replaced (renamed) by the reference “Parks and Recreation Department,” including, specifically, such references in Chapter 2.32 of the La Mesa Municipal Code.

SECTION 2: All references in the La Mesa Municipal Code to “Community Services Commission” shall be deleted and replaced (renamed) by the reference “Parks and Recreation Commission,” including, specifically, such references in the Chapters 2.32 and 9.04 of the La Mesa Municipal Code.

SECTION 3: All references in the La Mesa Municipal Code to “Director of Community Services” shall be deleted and replaced (renamed) by the reference “Director of Parks and Recreation,” including, specifically, such references in the Section 2.16.15(d)(6), and Chapters

9.04, 9.05 and 9.06 of the La Mesa Municipal Code.

SECTION 4: Chapter 9.06 shall be amended to read as follows:
“Maintenance of Parks

9.06.010 Director of Parks and Recreation – Responsibility.

The responsibility for landscaping park areas, direction and assistance to personnel engaged in planning and caring for lawns, trees, shrubs, flowers, and maintenance of all parks, shall be under the supervision of the City Manager or his or her designee.”

Page 268 of 274 ends

SECTION 5: The City Manager is hereby directed to cause all necessary and appropriate administrative actions to implement this Ordinance.

SECTION 6: This Ordinance shall be effective 30 days after its adoption and the City Clerk shall certify to the adoption of this Ordinance. The City Clerk is hereby authorized to use summary publication procedures pursuant to Government Code Section 36933 utilizing a newspaper of general circulation published in the City of La Mesa.

INTRODUCED AND READ at a Regular meeting of the City Council of the City of La Mesa, California, held the 8
th day of July 2025, and thereafter PASSED AND ADOPTED at a Regular meeting of said City Council held the 22nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

APPROVED:
__________________________
MARK ARAPOSTATHIS, Mayor
ATTEST:
___________________________________
MEGAN WIEGELMAN, CMC, City Clerk

CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and correct copy of Ordinance No. 2025- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited and that the same has been duly published according to law.

MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 269 of 274 ends

DATE: July 22, 2025
TO: Mayor and Members of the City Council
FROM: Megan Wiegelman, City Clerk
VIA: Greg Humora, City Manager
SUBJECT: APPROVAL OF SECOND READING AND ADOPTION OF AN

ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LA MESA
AMENDING CHAPTER 17.12 OF THE LA MESA MUNICIPAL CODE TO

ADJUST THE SCHEDULE OF SEWER SERVICE CHARGES FOR
FISCAL YEARS 2026 THROUGH 2027
At the July 8, 2025 City Council meeting, the City Council unanimously approved the introduction and first reading of the Ordinance amending Chapter 17.12 of the La Mesa Municipal Code to adjust the schedule of sewer service charges for Fiscal Years 2026 through 2027.

Staff recommends that the City Council, by a four-fifths vote, approve the second reading and adopt the Ordinance amending Chapter 17.12, specifically Section

17.12.030, of the La Mesa Municipal Code to adjust sewer service charge rates as follows: a 5.96% increase in Fiscal Year 2026 and a 5.04% increase in Fiscal Year 2027.

Attachment: A. Draft Ordinance

Page 270 of 274 ends

ORDINANCE NO. 2025-

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LA MESA AMENDING CHAPTER 17.12 OF THE LA MESA MUNICIPAL CODE TO

ADJUST THE SCHEDULE OF SEWER SERVICE CHARGES FOR FISCAL YEARS 2026 THROUGH 2027
WHEREAS, on May 13, 2025, the City Council approved the noticing and public hearing process, pursuant to the requirements of Proposition 218, for the proposed sewer rate adjustments;
WHEREAS, a notice of public hearing was mailed on May 19, 2025, to affected property owners pursuant to Proposition 218;
WHEREAS, a public hearing was held on July 8, 2025, to hear oral testimony and consider written statements of protest from eligible property owners; WHEREAS, written protest was not received from a majority of affected property owners prior to the close of the public hearing;
WHEREAS, without majority protest, the City Council may authorize the proposed sewer charge adjustments upon a four-fifths vote;
WHEREAS, based upon the information presented at the public hearing, the City Council finds and determines that the proposed sewer service charge adjustments constitute the minimum amount necessary to operate and maintain the City’s sewer system in a safe adequate and sanitary manner; and
WHEREAS, any changes in the schedule of sewer service charges requires an amendment to the Municipal Code Chapter 17.12, specifically Section 17.12.030.

NOW, THEREFORE, BE IT AND IT IS HEREBY ORDAINED by the City Council of the City of La Mesa, California as follows:

SECTION 1: Section 17.120.30 of the La Mesa Municipal Code is hereby amended to read as follows:
“17.12.030 Sewer service charge rates.

The sewer service charge for all users shall be as established by City Council Ordinance No. 2022-. Said Ordinance shall be kept on file at all times with the City Clerk.” SECTION 2: Sewer service charges shall be adjusted effective August 21, 2025, and each July 1st through July 1, 2026, pursuant to the following schedule:

Page 271 of 274 ends

Sewer Rates
Effective 7/1/2024
Proposed Rates
Effective 8/21/25
Proposed Rates
Effective 7/1/26
FY 25 FY 26 FY 27
Single Family * $4.29 $4.54 $4.77
Multi Family $4.29 $4.60 $4.83
Commercial/Industrial
Low Strength $4.54 $5.08 $5.34
Medium Strength $6.49 $6.53 $6.86
High Strength $7.46 $7.69 $8.08
Extra High Strength $13.36 $13.48 $14.16
Bi-Monthly Base Charge
(applies to all customer accounts)
$45.84 $48.65 $51.09
Charge per 100 cubic feet (CF) of water
100 CF = 1 unit = 748 gallons
*A bi-monthly billing cap of 28 units applies to single family residences.

SECTION 3. This ordinance shall be effective 30 days after its adoption and the City Clerk shall certify to the adoption of this Ordinance and cause the same to be published at least once in the newspaper of general circulation within 15 days of its adoption.

INTRODUCED AND READ at a Regular meeting of the City Council of the City of La Mesa, California, held the 8
th day of July 2025, and thereafter PASSED AND ADOPTED at a Regular meeting of said City Council held the 22nd day of July 2025, by the following vote, to wit:

AYES:

NOES:

ABSENT:

APPROVED:
__________________________
MARK ARAPOSTATHIS, Mayor
ATTEST:
___________________________________
MEGAN WIEGELMAN, CMC, City Clerk

Page 272 of 274 ends

CERTIFICATE OF CITY CLERK
I, MEGAN WIEGELMAN, City Clerk of the City of La Mesa, California, do hereby certify the foregoing to be a true and correct copy of Ordinance No. 2025- , duly passed and adopted by the City Council of said City on the date and by the vote therein recited and that the same has been duly published according to law.

MEGAN WIEGELMAN, CMC, City Clerk
(SEAL OF CITY)

Page 273 of 274 ends

DATE: July 22, 2025
TO: Mayor and Members of the City Council
FROM: Vice Mayor Patricia Dillard and Councilmember Lauren Cazares SUBJECT: CONSIDERATION OF REINSTATING AND APPOINTING MEMBERS TO

THE COUNCIL CLIMATE ACTION PLAN UPDATE AD HOC

SUBCOMMITTEE TO REVIEW AND RECOMMEND UPDATES TO THE

CLIMATE ACTION PLAN

Page 274 of 274 ends
← All documents from this meeting