Cities Index.
Agenda packet

La Palma City Council
April 1, 2025

Document
Agenda packet
Meeting
April 1, 2025
Body
La Palma City Council
Pages
271
Original file
17.9 MB
Text extracted from the city's file for reading and search. Open the original on lapalmaca.api.civicclerk.com. That file is the official record.

April 1, 2025 | 1
AGENDA

REGULAR MEETING

LA PALMA CITY COUNCIL
TUESDAY, APRIL 1, 2025
Mark I. Waldman
Mayor
Nitesh P. Patel
Mayor Pro Tem
Debbie S. Baker
Council Member
Janet Keo Conklin
Council Member
Vikesh P. Patel
Council Member
4:00 PM Closed Session
6:30 PM Open Session
La Palma City Hall
Council Chambers
7822 Walker Street, La Palma

CALL TO ORDER

CLOSED SESSION

CS-1. PUBLIC EMPLOYEE APPOINTMENT/RECRUITMENT
Pursuant to Government Code section 54957(b)(1)
Position Title: Interim City Manager

CS-2. PUBLIC EMPLOYEE APPOINTMENT/RECRUITMENT
Pursuant to Government Code Section 54957(b)(1)
Position Title: City Manager

Page 1 of 271 ends

April 1, 2025 | 2
CS-3. CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code section 54957.6.

Agency Designated Representatives: Conal McNamara, City Manager Ryan Hallett, Assistant City Manager
Employee Organizations: La Palma General Employees
Association
La Palma Police Association
La Palma Professional Employees
Association
Unrepresented Employees: Executive Management
CS-4. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2), (e)(2), (e)(3): (1 case – February 3, 2025 letter from Attorney Joseph McGowan, Jr. [attached])
OPEN SESSION TO BEGIN AT 6:30 P.M.

PLEDGE OF ALLEGIANCE
Council Member Vikesh Patel

INVOCATION
Reverend Nader Hanna, King of the Nation Ministries
Council Member Baker

ROLL CALL

PRESENTATIONS
● Presentation of proclamation in recognition of April as Donate Life Month. ● Recognition of American Martial Arts School Black Belt Acheivement ● Recognition of Gold Presidential Volunteer Service Award Recipient

Page 2 of 271 ends

April 1, 2025 | 3
ORAL COMMUNICATIONS (Time Limit: 5 Minutes Each)
Time has been reserved at this point in the Agenda for persons wishing to speak on any item that is not listed on the Agenda. By law, the City Council is prohibited from taking action on such oral comments. The matter will be automatically referred to staff for appropriate response or action or will be placed on the Agenda of a future meeting.

Matters listed on the Agenda may be addressed either at this time or at the time they are before the City Council for discussion.

CONSENT CALENDAR
All matters listed under Consent Calendar will be acted upon by one motion affirming the action recommended on the Agenda. There will be no separate discussion on these items prior to voting unless members of the City Council, Staff, or the public request that specific items be removed from the Consent Calendar for separate action. Any member of the public who wishes to discuss a Consent Calendar item should come forward to the microphone and, upon recognition by the Mayor, state their name, address, and the item number.

1. Waive the Reading of All Ordinances
It is recommended that the City Council waive the reading of all Ordinances in their entirety and read by title only.

2. Approval of Council Minutes
It is recommended that the City Council approve the Minutes of the March 4, 2025, Regular Meeting, and Minutes of the March 20, 2025, Special Meeting of the City Council.

3. Approval of Register of Demands
It is recommended that the City Council adopt a Resolution approving the Registers of Demands for March 18, 2025, and April 1, 2025.

4. Destruction of Obsolete Departmental Records
It is recommended that the City Council adopt a Resolution authorizing the destruction of obsolete records pursuant to the California Government Code Section 34090.

5. Authorize Agreements for Development of a Cross-Connection Control Plan

Page 3 of 271 ends

April 1, 2025 | 4
It is recommended that the City Council:

1. Approve and authorize the City Manager to execute the Cost Sharing Agreement with 24 Public Water Systems in Orange County to ensure compliance with State regulations for $5,981.65 to the Irvine Ranch Water District; and

2. Authorize the City Manager to execute a professional services agreement with John Robinson Consulting, Inc. to prepare the City's Cross-Connection Control Management Plan for an amount not-toexceed $24,900.

6. Authorize Budget Allocation for Sidewalk Condition Repairs It is recommended that the City Council authorize a budget allocation in the amount not-to-exceed $100,000.00 for Sidewalk Assessment and Repairs to the existing maintenance contract with Precision Concrete Cutting.

7. Authorize a Landscape Maintenance Agreement with Caltrans for SR-91 Right-of-Way at Walker Street (Digital Display Billboard at 6951 Walker Street)
It is recommended that the City Council approve and authorize the execution of a Landscape Maintenance Agreement with the California Department of Transportation for the maintenance of landscape and irrigation for a portion of SR-91 Freeway Right-of-Way at Walker Street (Attachment 1).

8. Authorize the Purchase of Replacement Chlorine Analyzers It is recommended that the City Council authorize the purchase of replacement chlorine analyzers for the amount not to exceed $30,000 from the Hach Company.

9. First Amendment to Professional Services Agreement for the Meadowlark (City Yard) Well Rehabilitation
It is recommended that the City Council authorize the City Manager to execute an amendment to the contract with BESST, Inc. (BESST) for the Meadowlark (City Yard) Well Rehabilitation, increasing the not-to-exceed amount from $320,098 to $440,000, and to amend the budget accordingly.

10. Event Contract for the 4th Annual Festival of Nations Event It is recommended that the City Council authorize the City Manager to execute the event quote and any related documents with James Events Productions, Inc. for the provision of vendor booths, rides, attractions, and game booths at

Page 4 of 271 ends

April 1, 2025 | 5
the Festival of Nations event on April 26, 2025.

PUBLIC HEARINGS
None Scheduled.

REGULAR ITEMS

11. La Palma's 70th Anniversary Commemorative Activities It is recommended that the City Council receive and provide feedback regarding La Palma’s 70th Anniversary Commemorative activities.

12. Review of Land Use Classification for 5962 La Palma Avenue in the Planned Neighborhood Development Zoning District (Clineva Urgent Care)
It is recommended that the City Council uphold the Community Development Manager’s determination that the proposed Clineva Urgent Care Center is defined as a “Medical center/clinic” use, which is explicitly prohibited in the Planned Neighborhood Development (PND) Zoning District.

13. Public Works Department Update and Reclassification Recommendation It is recommended that the City Council adopt a Resolution updating the Salary Schedule and the Comprehensive Listing of Personnel Practices and Benefits for Management Employees to: (1) include the position of Community Development & Public Works Director, (2) establish a new salary for the position, and (3) rescind Resolution No. 2025-07.

COUNCIL MEMBER AB1234 REPORTS, REPORTS FROM CITY-AFFILIATED

COMMITTEES, AND COUNCIL REMARKS

CITY MANAGER REMARKS

CITY ATTORNEY REMARKS

ADJOURNMENT
NOTE: As a general rule, staff reports or other written documentation have been prepared or organized with respect to each item of business listed on the agenda. Copies of these materials and other disclosable public records

Page 5 of 271 ends

April 1, 2025 | 6
distributed to all or a majority of the members of the City Council in connection with an open session item on the agenda are on file and available for inspection with the Office of the City Clerk, City Hall, 7822 Walker Street, during regular business hours 7:30 A.M. to 6:30 P.M., Monday through Thursday. If such writings are distributed to members of the Council on the day of a City Council meeting, the writings will be available at the entrance to the City Council Chambers. If you have any questions regarding any item of business on the agenda for this meeting, any of the staff reports, or other documentation relating to any agenda item, please contact the City Clerk at (714) 690-3334.

In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, you should contact the City Clerk at (714) 690-3334. Notification 48 hours prior to the meeting will enable the City to make reasonable accommodations to ensure accessibility to this meeting.

Page 6 of 271 ends

415.956.2828 (t) Robert Dollar Building
415.956.6457 (f) 311 California Street, 10th Flr.

San Francisco CA 94104
202.777.8950 (t) 1500 K Street, NW, Suite 800
202.347.8429 (f) Washington DC 20005
ROGERS JOSEPH O'DONNELL www.rjo.com
February 3, 2025
Via Email
[email protected]
Matthew C. Slentz
Colantuono, Highsmith, Whatley, PC
7545 Irvine Center Drive, Suite 200
Irvine, CA 92618
RE: City of La Palma/Unispec Construction, Inc.

Dear Mr. Slentz:

As you know, Unispec Construction, Inc. (“Unispec”) entered into this contract on February 6, 2024 with the City of La Palma (the “City”) for the lump sum contract price of $2,533,643.70. Significantly, this price was $1,335,556.80 less than the second lowest bid by KASA Construction, Inc. of $3,870,133.50. Unispec’s price was, therefore, less than two thirds of the price of the next lowest bidder.

Unispec was able to offer this amazingly low price based upon its reasonable understanding that Unispec would perform the complete contract. The General Provisions, Section 1, Intent provides, “(t)he intent of the Contract Documents is to include all work consistent therewith and reasonably inferable therefrom as being necessary for completion of the contract and provide a functionally complete Project.” (Emphasis added).

In particular, Unispec entered into the contract at the low price that it offered with the expectation that the contract would include the procurement and placement of boulders. Question 1 of the pre-bid questions for the project queried, “Are there any boulders on this project, please confirm and clarify?” In response the City wrote, “(t)here are boulders on the project, per Construction Legend, Note 7 of the construction sheets. All boulders shall be paid at the contract bid price and estimated quantity shown on the attached revised bid schedule.”
Based upon these assurances, Unispec bid the project with the expectation that it would be performing the boulder work, and its price for boulders included a considerable portion of its overhead, general conditions expenses and profit. The City wants to decrease the contract amount by $202,800, an amount that would decrease Unispec’s profit and overhead recovery by $147,471.37. This is essentially the majority of Unispec’s profit and overhead costs for the project.

A Professional Law Corporation
Joseph C. McGowan, Jr.
[email protected]

Page 7 of 271 ends

ROGERS JOSEPH O'DONNELL www.rjo.com
Matthew C. Slentz
February 3, 2025

Page 2 ends

582791.1
A Professional Law Corporation
Unispec also believed that it would be required to place 24-inch box trees on Item No. 3 Mood Street-Crescent Ave to Houston Ave-Existing Medians, Item No. 16.

Understanding from the project contract that it would provide a quantity of eight trees for this item, Unispec included profit and overhead in this line item. The City, opportunistically, seeks to deprive Unispec from this profit and overhead, by converting the 24-inch box trees to 15 Gallon Trees, at a savings of $8,700 per tree.

The removal of all boulder work and the conversion of the aforementioned trees on Moody Street would result in a drastic change to the work of Unispec’s contract.

A similar situation was addressed by a California court in Hensler v. City of Los Angeles (1954) 124 Cal.App.3d 71 (“Hensler”), a contract between the City of Los Angeles and a civil contractor. In Hensler, the court found that a deletion of a significant portion of the contract was a breach of contract. The Hensler court, interpreting a similar contract found that a changes provision “may not be invoked to allow deletions from a construction contract which were not made for the purpose of satisfactory completion of the project, but as an attempt by defendant to exculpate itself from its obligations of counter-performance.” In Hensler, the court awarded damages based upon the difference between the unit price and the expected cost of the work.

Your October 22, 2024 letter addresses the “Greenbook,” Standard Specifications for Public Works Construction published by BNi Publications, Inc. The Greenbook at section 3-2.2.1, third paragraph, provides, If a change is ordered in an item of work covered by a Contract Unit Price, and such change does involve a substantial change in the character of the work from that shown on the Plans or specified in the Specifications, an adjustment in payment will be made per 3-2.4.

Greenbook section 3-2.4 provides for the parties to agree upon the prices.

Clearly the deletion of boulders and the conversion of the trees Item No. 3 Mood StreetCrescent Ave to Houston Ave-Existing Medians constitutes a change in the character of the work.

Moreover, because this is a federally funded project, federal precedent also applies. California courts are “strongly persuaded by decisions relating to federal procurement bidding.” Pacific Architects Collaborative v. State of California, 100 Cal. App. 3d 110, 125 (1979).
“When the Government deletes work from contract requirements, the Government is entitled to a downward adjustment in the contract price reflecting the amount

Page 8 of 271 ends

ROGERS JOSEPH O'DONNELL www.rjo.com
Matthew C. Slentz
February 3, 2025

Page 3 ends

582791.1
A Professional Law Corporation
that the contractor saved as a result of that deletion. (Citation). The agency bears the burden of proof to substantiate the amount of the deductive change for deleted work.” Yates-Desbuild Joint Venture v. Department of State (2017) 17-1 BCA P 35870, Emphasis added.

See also, Federal Transit Administration, Best Practices Procurement & Lessons Learned Manual, October 4 2016, section 5.2.5 Basic Pricing Formula, summarizing federal precedent as follows:

When repricing as a result of the change order, courts have limited the repricing to the changed work without altering the original profit or loss position of the contractor. This is known as the “leave them where you find them approach.”
Pricing the Deleted Work—Under the basic pricing formula, the amount of the adjustment for the deleted work is the cost the contractor would have incurred had the change not been issued; i.e. had the work been performed.

Being in the public works contracting business for 34 years, Unispec knew this project is federally funded and that any change orders, additive or deductive, would be with the consent of both parties, and not unilateral.

Another point relevant to this issue is the actual work performed by Unispec.

Unispec installed 24-inch box trees in the locations specified for the cheaper 15-gallon trees, resulting in a clear betterment for the City.

Finally, Unispec has performed the contract in a timely manner to the complete satisfaction of the City. No doubt this performance, and the legal issues described above would shine the best light possible upon my client, should these issues be considered by a judge or jury.

For these reasons, I sincerely suggest that the City honor its contractual obligations by allowing Unispec complete the project that it bid.

Very truly yours,
Joseph C. McGowan, Jr.
/drl

Page 9 of 271 ends

Agenda Item No. 1 April 1, 2025 | 1
City of La Palma
Agenda Item No. 1
MEETING DATE: April 1, 2025
TO: City Council
FROM: City Manager
SUBMITTED BY: Kimberly Kenney, City Clerk
AGENDA TITLE: Waive the Reading of All Ordinances
RECOMMENDED ACTION:

It is recommended that the City Council waive the reading of all Ordinances in their entirety and read by title only.

PURPOSE:

This is a regular agenda item and acts as a reminder of an action that Council Members should take to waive the reading of any Ordinance before them in its entirety, and instead read it by title only. This action helps to expedite the processing of Ordinances and contributes to the efficiency of City Council meetings.

FISCAL IMPACT:

None.

ATTACHMENTS:

None

Page 10 of 271 ends

Agenda Item No. 2 April 1, 2025 | 1
City of La Palma
Agenda Item No. 2
MEETING DATE: April 1, 2025
TO: City Council
FROM: City Manager
SUBMITTED BY: Kimberly Kenney, City Clerk
AGENDA TITLE: Approval of Council Minutes
RECOMMENDED ACTION:

It is recommended that the City Council approve the Minutes of the March 4, 2025, Regular Meeting, and Minutes of the March 20, 2025, Special Meeting of the City Council.

FISCAL IMPACT:

None.

ATTACHMENTS:

1. City Council Minutes 3-20-2025 Special Meeting

2. City Council Minutes 3-4-2025

Page 11 of 271 ends

MINUTES OF THE SPECIAL MEETING

OF THE LA PALMA CITY COUNCIL
March 20, 2025
CALL TO ORDER: Mayor Waldman called the Special Meeting of the La Palma City Council to order at 8:01 a.m. in the Council Chambers at La Palma City Hall, 7822 Walker Street, La Palma, California, with Council Member Keo Conklin being absent.

PLEDGE OF ALLEGIANCE: Mayor Waldman
ROLL CALL: Council and Commission Members
Council Members present: Council Member Baker, Mayor Pro Tem N.

Patel, Council Member V. Patel, and Mayor
Waldman
Council Members absent: None
City Officials present: Conal McNamara, City Manager
Ryan Hallett, Assistant City Manager
Ajit Thind, City Attorney
Council Member Keo Conklin joined the meeting at 8:05 p.m.

CLOSED SESSION
CS-1. CS-1. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED

LITIGATION
Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2), (e)(2), (e)(3): (1 case – February 3, 2025 letter from Attorney Joseph McGowan, Jr. [attached])
CS-2. CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code section 54957.6.

Agency Designated Representatives: Conal McNamara, City Manager Ryan Hallett, Assistant City Manager
Employee Organizations: La Palma General Employees
Association
La Palma Police Association

Page 12 of 271 ends

City Council Special Meeting
March 20, 2025

Page 2 ends

La Palma Professional Employees
Association
Unrepresented Employees: Executive Management
CS-3. PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Pursuant to Government Code Section 54957(B)(1)
Position Title: City Manager
Mayor Waldman reconvened in Open Session at 9:04 a.m. and asked for a report.

Assistant City Manager Hallett announced that there were no reportable actions out of Closed Session.

ADJOURNMENT
Mayor Waldman adjourned the Special Meeting at 9:05 a.m. ____________________________
Mark I. Waldman
Mayor
Attest:
__________________________
Kimberly Kenney, CMC
City Clerk

Page 13 of 271 ends

MINUTES OF THE REGULAR MEETING

OF THE LA PALMA CITY COUNCIL
March 4, 2025
CALL TO ORDER: Mayor Waldman called the Regular Meeting of the La Palma City Council to order at 5:05 p.m. in the Council Chambers of La Palma City Hall, 7822 Walker Street, La Palma, California.

CLOSED SESSION
CS-1. CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code section 54957.6.

Agency Designated Representatives: Conal McNamara, City Manager Ryan Hallett, Assistant City Manager
Employee Organizations: La Palma General Employees
Association
La Palma Police Association
La Palma Professional Employees
Association
Unrepresented Employees: Executive Management
CS-2. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION (Pursuant to Government Code section 54956.9(d)(2), (e)(2)) 1 case – Proposed AT&T Tower at 8415 Meadowlark
CS-3. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION (Pursuant to paragraph (1) of subdivision (d) of California Government Code Section 54956.9)
Claim No. CJP-3053039, regarding driver fatality
Claimant: David Casey
Mayor Waldman recessed to Closed Session at 5:06 p.m.

Mayor Waldman adjourned Closed Session at 6:23 p.m.

OPEN SESSION TO BEGIN AT 6:30PM
Mayor Waldman adjourned Closed Session at 6:27 p.m. and reconvened in Open Session at 6:33 p.m. and asked for a report out of Closed Session.

Page 14 of 271 ends

City Council Meeting
March 4, 2025

Page 2 ends

City Attorney Thind responded that there are no reportable actions on Closed Session Items CS-1 and CS-2; however, on Item CS-3, the City Council voted by unanimous decision to reject the claim.

PLEDGE OF ALLEGIANCE: Mayor Pro Tem Nitesh Patel
INVOCATION: Father Binh Nguyen, St. Ireanus Catholic Church ROLL CALL: Council Members
Council Members present: Council Member Baker, Council Member Conklin, Council Member V. Patel, Mayor Pro Tem N. Patel,
and Mayor Waldman
Council Members absent: None
City Officials present: Conal McNamara, City Manager
Ajit Thind, City Attorney
Joe Cisneros, Deputy City Manager
Belinda Deines, Community Development Manager
Joe Guerrero, Police Chief
Ryan Hallett, Assistant City Manager
Kimberly Kenney, City Clerk
PRESENTATIONS:

Mayor Pro Tem Patel presented a Proclamation to Barb Raabe representing the American Red Cross in recognition of March as Red Cross Month.

Mayor Pro Tem Patel presented a Proclamation to the La Palma Toastmasters Board of Directors in recognition of their 15th Anniversary.

ORAL COMMUNICATIONS
Chloe Janoia, a La Palma resident, addressed the City Council regarding her opposition to the Tiny Tots teacher's departure in the Recreation Department and how that affected the families she represents; noted her support for Misty Torres who ran the Tiny Tot

Page 15 of 271 ends

City Council Meeting
March 4, 2025

Page 3 ends

program; inquired about the reason behind her departure; and opposition to the random closure of the Recreation Department office during business hours.

Karen Zigorski, a La Palma resident, addressed the City Council regarding the Community Center Aerobics class that she attends and her opposition to the floors being waxed to the point they are slippery.

CONSENT CALENDAR

1. Waive the Reading of All Ordinances
Waive the reading of all Ordinances in their entirety and read by title only.

2. Approval of Council Minutes
Minutes of the January 14, 2025, Regular Meeting of the City Council.

3. Approval of Register of Demands
It is recommended that the City Council adopt a Resolution approving the Registers of Demands for February 18, 2025, and March 4, 2025.

4. 2025 Street Closures for Special Events
Recommendation that the City Council adopt a Resolution approving Street Closures for the following special events to be held by the City: the Festival of Nations Parade on Saturday, April 26; the Memorial Day ceremony on Monday, May 26; and the Fitness Run for Fun on Friday, July 4.

5. 2024 Annual Housing Element Progress Report
It is recommended that the City Council receive and file the 2024 Annual Housing Element Progress Report.

6. Notice of Completion and Acceptance of Work for the City Facilities Painting Project, City Project No. 24-BLDG-01
It is recommended that the City Council accept the work and authorize staff to file the Notice of Completion and Acceptance of Work with the Orange County Recorder for the City Facilities Painting Project, City Project No. 24-BLDG-01.

7. First Amendment to Agreement for Construction Services with Musco Sports Lighting, LLC

Page 16 of 271 ends

City Council Meeting
March 4, 2025

Page 4 ends

It is recommended that the City Council authorize the Mayor to sign the First Amendment to Agreement for Construction Services with Musco Sports Lighting, LLC.

8. Resolution Approving the Acceptance of the Fiscal Year 2023 Urban Areas Security Initiative (UASI) Grant
It is recommended that the City Council adopt a Resolution approving the acceptance of the Urban Areas Security Initiative (UASI) Grant and authorize the City Manager, or his designee, to complete and sign all necessary materials to facilitate the grant.

PUBLIC HEARINGS

9. Consideration of a Resolution to Install a Freestanding Wireless Communications Tower and a Resolution to Enter into a Lease Agreement at 8415 Meadowlark Lane (City Yard)
Mayor Waldman opened the Public Hearing at 6:57 p.m.

City Manager McNamara introduced the item and Community Development Manager Deines gave the Staff Report.

John Silverman representing AT & T, presented an overview of the proposal for AT & T's wireless tower.

Public Input:

None.

City Council Member Comments and Questions:

Discussion ensued regarding the outcome of the project if the City Council denies this application; that the City Attorney noted that the City has some control, but the Council’s land use authority and discretion is limited and if it’s denied, the City Council could be in violation of federal law; that the applicant has endeavored to find other locations for the tower, but was unsuccessful; that as a utility, they are required to provide service; that the courts could reverse the City Council’s denial and award the applicant all attorney costs; that the City Attorney ended his comments by noting if the City Council denied this proposal, it puts the City at a risk for significant legal exposure

Page 17 of 271 ends

City Council Meeting
March 4, 2025

Page 5 ends

Motion to adopt Resolution No. 2025-12 approving Conditional Use Permit 389, Precise Plan 287, and Variance 2022-01; and adopt Resolution No. 2025-13 to enter into a Lease Agreement between the City of La Palma and New Cingular Wireless PCS, LLC for the lease of a portion of City-owned property located at 8415 Meadowlark Lane made by Mayor Pro Tem Nitesh Patel.

Public Input:

Charles Navarro, a resident of La Palma, addressed the City Council regarding the length of time for construction of this cell tower.

Mr. Silverman, representing AT & T, responded that it takes a few weeks - usually in about six to eight weeks without any issues; that the physical construction of the site itself would take two to three weeks; that there will need to be some additional time to run power underneath the site location; and that the actual construction of the tower would not be very loud noise or require a crane, and would happen only during business hours.

Karen Zigorski, a La Palma resident, addressed the City Council regarding whether the gap in service has always been there or if this issue came up recently.

Mr. Silverman responded that the current service infrastructure no longer meets the need as data consumption has increased by users - which is having an impact on the existing systems that cannot meet the demand.

Mayor Waldman closed the Public Hearing at 7:23 p.m.

Mayor Waldman asked for second on the motion made by Mayor Pro Tem Nitesh Patel. The motion was seconded by Council Member Vikesh Patel and carried on the following vote:

AYES: Council Member Baker, Council Member
Conklin, Mayor Pro Tem Nitesh Patel, Council
Member Vikesh Patel, and Mayor Waldman
NOES: None

10. Conditional Use Permit 393 to Establish a Massage Establishment Use (Starlight Day Spa) Located at 7951 Valley View Street

Page 18 of 271 ends

City Council Meeting
March 4, 2025

Page 6 ends

Mayor Waldman announced that since he has a business in the same shopping center, he will recuse himself from this item and pass the gavel to Mayor Pro Tem Nitesh Patel.

Mayor Pro Tem Nitesh Patel requested to take a short recess at 7:25 p.m.

Mayor Pro Tem Nitesh Patel reconvened the City Council at 7:30 p.m. and opened the Public Hearing for Item 10.

Community Development Manager Deines gave the Staff Report.

City Council Member Comments and Questions:

None.

Public Input:

Applicant Tom Scott, business owner, noted that the massage business was not his original intent for the business; that his lack of understanding about the license and use process resulted in the code enforcement interaction; that his business plan is to provide beauty treatments with holistic well-being services to the community that includes massage; that following the cease and desist order, he took immediate action to meet all regulatory requirements; and asked that the City Council support his application request.

City Council discussion ensued regarding the original intention of the business license was for a spa with massage as an added service; that Council Member Keo Conklin asked the applicant to clarify the events of the incident that happened at the spa that resulted in the City issuing a cease and desist order; that the applicant was conducting waxing service with a female client when Code Enforcement visited the site and the esthetician fled due to fear as there was a language barrier; that he is licensed for waxing services; that his staff advertised on a variety of sites out of enthusiasm; that Mr. Scott has two other waxing businesses in Anaheim and in Santa Ana; that the site manager is responsible for advertising; that Mayor Pro Tem Patel asked about his advertising on Rub Maps - "where fantasy meets reality"; that he claimed to be unaware that his business was posted on Rub Maps and takes responsibility for his staff's error; that the applicant is willing to undergo a probationary period as a result.

Mayor Pro Tem Nitesh Patel closed the Public Hearing at 7:47 p.m.

Council Member Baker made a motion to adopt Resolution No. 2025-14 denying Conditional Use Permit 394 and making findings of denial for the

Page 19 of 271 ends

City Council Meeting
March 4, 2025

Page 7 ends

operations of a massage establishment use on property located at 7951 Valley View Street.

The motion was seconded by Council Member Conklin and carried on the following vote:

AYES: Council Member Baker, Council Member
Conklin, Mayor Pro Tem Nitesh Patel, and
Council Member Vikesh Patel
NOES: None
RECUSED: Mayor Waldman
After the vote was recorded, Mayor Waldman returned to the dais at 7:48 p.m.

REGULAR ITEMS

11. Mid-Year Budget Update and Adjustments and Resolution amending the Fiscal Year 2024-25 Budget
It is recommended that the City Council receive and file the Mid-Year Budget report and adopt a Resolution amending the Fiscal Year 2024-25 Budget.

12. City of La Palma's 70th Anniversary
It is recommended that the City Council receive a presentation regarding La Palma's 70th Anniversary Celebration, discuss, and provide further direction as needed.

City Manager McNamara introduced the Item and Management Assistant Rivera who gave the Staff Report.

Council Comments and Questions:

Discussion ensued regarding support for the 70th Anniversary logo; suggested to keep the celebration on Sunday; that banners, marketing materials, bags, and give-aways will also be designed with the 70th Anniversary; they staff is working on costing out all those things; that staff will return to Council with costs for the water tank artwork and paint; and support for staff to reach out to the Mac Iver family to request to borrow their historical photos and records that

Page 20 of 271 ends

City Council Meeting
March 4, 2025

Page 8 ends

they've collected over time to incorporate into the City's 70th anniversary celebration.

By consensus, the City Council agreed to receive and file the report.

COUNCIL MEMBER AB1234 REPORTS, REPORTS FROM CITY-AFFILIATED

COMMITTEES, AND COUNCIL REMARKS
Council Member Vikesh Patel attended the La Palma Police Department (LPPD) Badge Pinning ceremony; the Neighborhood Watch Appreciation Banquet; Congressman Derek Tran's Swearing-in Ceremony; the Scouts Blue and Gold Ceremony; and the Young Leaders of Orange County (YLOC) Math Competition and Awards Ceremony.

Council Member Baker attended the Orange County Sanitation District (OC San) Operations Committee Meeting; the Southern California Association of Governments (SCAG) Joint Committee Meeting; the SCAG Regional Council Meeting; the League of California Cities (Cal Cities) Mayors and Council Members Roundtable; the Cal Cities Orange County Division Board of Directors Meeting;the Economic Development & Land Use Ad Hoc Meeting; the OC San Orientation; the Orange County Public Affairs Association’s 2025 State of the County; the LPPD Badge Pinning ceremony; the Neighborhood Watch Appreciation Banquet; the OC Forum's Conversation with new Congressmen, Derek Tran and Dave Min; Congressman Derek Tran's Swearing-in Ceremony; the Orange County Council of Governments (OCCOG) Strategic Plan Group; the Regional Military Affairs Committee Meeting; the SCAG New Member Orientation; the OC San Board of Directors Meeting; the Read Across America event at Los Coyotes Elementary School; the 35th Anniversary & Rebrand/Unveiling for Working Wardrobe; the Orange County Business Council’s (OCBC) Annual Dinner & Installation of the new Board of Directors; the Cal Cities Orange County Division Board Members meeting with Senator Steven Choi; and the YLOC Math Competition and Awards Ceremony.

Council Member Keo Conklin attended the LPPD Badge Pinning ceremony; the Neighborhood Watch Appreciation banquet; Congressman Derek Tran's swearing-in ceremony; invited the public to the community forum for the La Palma Chamber of Commerce with Congressman Derek Tran and Orange County Clerk-Recorder Nguyen.

Mayor Pro Tem Patel attended the Orange County Fire Authority (OCFA) Budget Committee meeting; the Economic Development Land Use Advisory Ad Hoc committee meeting; the Cypress College Foundation's Board meeting; the La Palma Neighborhood Watch Appreciation banquet; Congressman Derek Tran's swearing-in ceremony; the Scouts Blue and Gold ceremony; the OCFA Board of Directors meeting and was appointed Human Resource Committee Chair, the Budget and Finance Committee Vice Chair, and appointed to the Executive Committee; and the YLOC Math Competition and

Page 21 of 271 ends

City Council Meeting
March 4, 2025

Page 9 ends

Awards Ceremony; the John F. Kenney High School Soap Box Competition as their judge; and congratulated Senator Elect Tony Strickland.

Mayor Waldman attended the LPPD Badge Pinning Ceremony and the Neighborhood Watch Appreciation banquet.

CITY MANAGER REMARKS
City Manager McNamara reported on the newly established rose garden out front of City Hall; that the process to continue this rose garden in front of the Library and in front of the Police Department has commenced; that there will be a facade change outside the Civic Center complex in time for the Memorial Day ceremony; and recognized Maintenance Lead Fernandez for his contributions to this project.

CITY ATTORNEY REMARKS
City Attorney Thind had nothing to report.

ADJOURNMENT
Mayor Waldman adjourned the Regular Meeting of the City Council at 8:20 p.m. _________________________
Mark I. Waldman
Mayor
ATTEST:
_________________________
Kimberly Kenney, CMC
City Clerk

Page 22 of 271 ends

Agenda Item No. 3 April 1, 2025 | 1
City of La Palma
Agenda Item No. 3
MEETING DATE: April 1, 2025
TO: City Council
FROM: City Manager
SUBMITTED BY: Ryan Hallett, Assistant City Manager
AGENDA TITLE: Approval of Register of Demands
RECOMMENDED ACTION:

It is recommended that the City Council adopt a Resolution approving the Registers of Demands for March 18, 2025, and April 1, 2025.

SUMMARY:

The laws of the State of California governing General Law Cities and the La Palma Municipal Code provide that the City Council shall approve all payments made by the City.

A Register of Demands is provided at each City Council Meeting describing each payment made or to be made by the City during the specified period.

FISCAL IMPACT:

Sufficient funds are available to process all payments.

ATTACHMENTS:

1. Resolution Approving Warrant Registers

Page 23 of 271 ends

Resolution No. 2025-__

Page 1 of 2 ends

RESOLUTION NO. 2025-__

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

LA PALMA APPROVING THE REGISTERS OF DEMANDS
FOR MARCH 18, 2025, AND APRIL 1, 2025.

WHEREAS, certain financial obligations are due and payable by the City of La Palma, a General Law City, as of March 18, 2025, and April 1, 2025; and WHEREAS, the laws of the State of California governing General Law Cities and the Municipal Code of La Palma provide that the City Council of a General Law City shall approve all payments by said City from the various established funds of said City; and WHEREAS, the City Manager and the City Council of the City of La Palma have ascertained that the following lists of obligations as submitted by the City of La Palma are paid or legally due and payable by the City.

NOW, THEREFORE, BE IT RESOLVED that the City Council of La Palma hereby approves the attached Registers of Demands dated March 18, 2025, and April 1, 2025, and incorporated herein by reference.

APPROVED AND ADOPTED by the City Council of the City of La Palma at a regular meeting held on the 1st day of April, 2025.
________________________________
Mark I. Waldman
Mayor
ATTEST:
______________________________
Kimberly Kenney, CMC
City Clerk

Page 24 of 271 ends

Resolution No. 2025-__

Page 2 of 2 ends

STATE OF CALIFORNIA )

COUNTY OF ORANGE ) SS

CITY OF LA PALMA )
I, KIMBERLY KENNEY, City Clerk of the City of La Palma, California, DO HEREBY CERTIFY that the foregoing resolution was adopted by the City Council of said City at a regular meeting of said City Council held on the 1st day of April, 2025, and that it was so adopted by called vote as follows:

AYES:

NOES:
________________________________
Kimberly Kenney, CMC
City Clerk

Page 25 of 271 ends

3/13/2025 9:45:21 AM Page 1 of 10
Warrant Register
City of La Palma By Vendor Name
Post Dates 3/5/2025 - 3/18/2025
Approval
Reviewed by
Ryan Hallett Hinton - Administrative Services Director
Conal McNamara - City Manager

Page 26 of 271 ends

Warrant Register Post Dates: 3/5/2025 - 3/18/2025
3/13/2025 9:45:21 AM Page 2 of 10
Payment Date Payment Number Vendor Name Description (Item) Amount Vendor: 01024 - ABLE BUILDING MAINTENANCE CO
FEB'25 JANITORIAL 172.23

SERVICES/CY
03/18/2025 APA002353 ABLE BUILDING MAINTENANC…
FEB'25 JANITORIAL 1,138.83

SERVICES/CH
03/18/2025 APA002353 ABLE BUILDING MAINTENANC…
FEB'25 JANITORIAL 1,827.73

SERVICES/PD
03/18/2025 APA002353 ABLE BUILDING MAINTENANC…
FEB'25 JANITORIAL 3,861.05

SERVICES/CS
03/18/2025 APA002353 ABLE BUILDING MAINTENANC…
Vendor 01024 - ABLE BUILDING MAINTENANCE CO Total: 6,999.84 Vendor: 01037 - ADMIRAL PEST CONTROL INC
03/18/2025 APA002354 ADMIRAL PEST CONTROL INC 2/21 PEST CONTROL/CY 192.00 2/21 PEST CONTROL/5410 LA 58.00
PALMA
03/18/2025 APA002354 ADMIRAL PEST CONTROL INC
03/18/2025 APA002354 ADMIRAL PEST CONTROL INC 2/21 PEST CONTROL/CH & PD 181.00 03/18/2025 APA002354 ADMIRAL PEST CONTROL INC 2/21 PEST CONTROL/WW 115.00 03/18/2025 APA002354 ADMIRAL PEST CONTROL INC 2/21 PEST CONTROL/CS 167.00 03/18/2025 APA002354 ADMIRAL PEST CONTROL INC 2/21 GOPHER CONTROL/EROW 175.00 03/18/2025 APA002354 ADMIRAL PEST CONTROL INC 2/28 GOPHER CONTROL/EROW 175.00 Vendor 01037 - ADMIRAL PEST CONTROL INC Total: 1,063.00 Vendor: 01047 - AFLAC
03/18/2025 APA002355 AFLAC Mar'25 Alfac Ins Prem W/H 133.44 Vendor 01047 - AFLAC Total: 133.44
Vendor: 01064 - ALL CITY MANAGEMENT SVC INC
2/2-2/15 CROSSING GUARD 6,732.97
SVC/PD
03/18/2025 APA002356 ALL CITY MANAGEMENT SVC I…
Vendor 01064 - ALL CITY MANAGEMENT SVC INC Total: 6,732.97 Vendor: 05695 - ANGEL AN
03/18/2025 APA002358 ANGEL AN 2/8-3/1 KOREAN DANCE 156.00 Vendor 05695 - ANGEL AN Total: 156.00
Vendor: 04183 - ANNE WONG
03/18/2025 APA002400 ANNE WONG 4/6 LESS CANCELLATION FEE -11.00 03/18/2025 APA002400 ANNE WONG 4/6 PAVILION RNTL RFD 180.00 03/18/2025 APA002400 ANNE WONG 4/6 PAVILION DEPOSIT RFD 200.00 Vendor 04183 - ANNE WONG Total: 369.00
Vendor: 01015 - AT&T
MAR'25 DISPATCH PHONE 134.64
SERV/PD-BAN 9391084360
03/18/2025 39838 AT&T
DISPATCH PHONE LINES 604.90
INSTALL/PD-BAN 9391084360
03/18/2025 39838 AT&T
3/1#995-1569 WALKER ST 31.83
SYNCH - BAN 9391033976
03/18/2025 39838 AT&T
3/4#523-4309 EOC LINES/PD- 243.92
BAN 9391033970
03/18/2025 39838 AT&T
3/4#523-7351FAX/PD-BAN 34.81
9391033971
03/18/2025 39838 AT&T
Vendor 01015 - AT&T Total: 1,050.10
Vendor: 05784 - BRIANA MILLER
03/18/2025 APA002359 BRIANA MILLER 2/22 GAZEBO DEPOSIT RFD 100.00 Vendor 05784 - BRIANA MILLER Total: 100.00
Vendor: 05610 - CAMILLE VALLEY
03/18/2025 APA002397 CAMILLE VALLEY 2/3-2/24 BALLET & TAP 117.00 03/18/2025 APA002397 CAMILLE VALLEY 2/3-2/24 BALLET 39.00 03/18/2025 APA002397 CAMILLE VALLEY 2/3-2/24 JAZZ 39.00 Vendor 05610 - CAMILLE VALLEY Total: 195.00
Vendor: 05652 - CASC ENGINEERING AND CONSULTING INC
03/18/2025 APA002360 CASC ENGINEERING AND CON… SEP'24 CITY ENGR SVCS/NPDES 494.00

Page 27 of 271 ends

Warrant Register Post Dates: 3/5/2025 - 3/18/2025
3/13/2025 9:45:21 AM Page 3 of 10
Payment Date Payment Number Vendor Name Description (Item) Amount 03/18/2025 APA002360 CASC ENGINEERING AND CON… SEP'24 CITY ENGR SVCS/FOG 2,633.50 Vendor 05652 - CASC ENGINEERING AND CONSULTING INC Total: 3,127.50 Vendor: 03604 - CINTAS CORPORATION
03/18/2025 APA002361 CINTAS CORPORATION 2/20 UNIFORM SVC/PW 55.35 03/18/2025 APA002361 CINTAS CORPORATION 2/20 UNIFORM SVC/PW 55.35 03/18/2025 APA002361 CINTAS CORPORATION 2/20 UNIFORM SVC/PW 61.49 03/18/2025 APA002361 CINTAS CORPORATION 2/27 UNIFORM SVC/PW 55.35 03/18/2025 APA002361 CINTAS CORPORATION 2/27 UNIFORM SVC/PW 55.35 03/18/2025 APA002361 CINTAS CORPORATION 2/27 UNIFORM SVC/PW 61.49 Vendor 03604 - CINTAS CORPORATION Total: 344.38
Vendor: 01356 - CITY OF LA PALMA FLEXIBLE
Flexible Spending 171.15
Contributions - Medical
03/06/2025 39835 CITY OF LA PALMA FLEXIBLE
Vendor 01356 - CITY OF LA PALMA FLEXIBLE Total: 171.15
Vendor: 01368 - CIVICPLUS
FEB'25 CC MTG CLOSED 288.35

CAPTIONING/ADM
03/18/2025 APA002362 CIVICPLUS
Vendor 01368 - CIVICPLUS Total: 288.35
Vendor: 01391 - COP WARE INC
2025 CPO LEGAL 705.00

SOURCEBOOK/PD
03/18/2025 APA002363 COP WARE INC
Vendor 01391 - COP WARE INC Total: 705.00
Vendor: 01395 - COUNTY OF ORANGE
03/18/2025 39839 COUNTY OF ORANGE DEC'24 PARKIN… 479.50 03/18/2025 39839 COUNTY OF ORANGE NOV'24 ELECTION COSTS/GG 24,591.60 Vendor 01395 - COUNTY OF ORANGE Total: 25,071.10
Vendor: 04388 - CROSSTOWN ELECTRICAL & DATA INC
03/18/2025 APA002364 CROSSTOWN ELECTRICAL & D… FEB'25 SIGNAL MAINT/PW 1,260.00 Vendor 04388 - CROSSTOWN ELECTRICAL & DATA INC Total: 1,260.00 Vendor: 01472 - DEPT OF JUSTICE
03/18/2025 APA002376 DEPT OF JUSTICE Jan '25 FINGERPRINT/CD Intern 32.00 03/18/2025 APA002376 DEPT OF JUSTICE Jan '25 FINGERPRINT/ADM FT 32.00 03/18/2025 APA002376 DEPT OF JUSTICE Jan '25 FINGERPRINT/ADM FT 32.00 03/18/2025 APA002376 DEPT OF JUSTICE Jan '25 FINGERPRINT/PD Vol 32.00 Vendor 01472 - DEPT OF JUSTICE Total: 128.00
Vendor: 01504 - DIVISION OF STATE ARCHITECT
03/18/2025 APA002392 DIVISION OF STATE ARCHITECT JAN-DEC'24 SB1186 FEES/CD 380.49 Vendor 01504 - DIVISION OF STATE ARCHITECT Total: 380.49 Vendor: 04387 - DOG WASTE DEPOT
2/28 (4)CASES DOG WASTE 85.87

BAGS/PW
03/18/2025 APA002365 DOG WASTE DEPOT
Vendor 04387 - DOG WASTE DEPOT Total: 85.87
Vendor: 05295 - EFELDA TOKUDA
03/18/2025 APA002394 EFELDA TOKUDA 2/23 PAVILION DEPOSIT RFD 100.00 Vendor 05295 - EFELDA TOKUDA Total: 100.00
Vendor: 04787 - ENTERPRISE FM TRUST
FEB'25 MAINT 66.00

MGMT/PW&WTR
03/18/2025 APA002367 ENTERPRISE FM TRUST
03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 INITIAL REG DMV FEE -31.00 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-63 1,375.74 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-64 1,431.25 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 DMV RENEWAL FEE 360.00 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-60 658.26 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-57 672.79 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-58 679.38 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-56 814.61 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-62 1,220.47

Page 28 of 271 ends

Warrant Register Post Dates: 3/5/2025 - 3/18/2025
3/13/2025 9:45:21 AM Page 4 of 10
Payment Date Payment Number Vendor Name Description (Item) Amount 03/18/2025 APA002367 ENTERPRISE FM TRUST FEB'25 LEASE PMT/LP-61 1,226.70 Vendor 04787 - ENTERPRISE FM TRUST Total: 8,474.20
Vendor: 01611 - FEDERAL EXPRESS CORPORATION
2/19 PRIORITY MAIL LATE 2.92

FEES/PD
03/18/2025 APA002368 FEDERAL EXPRESS CORPORAT…
03/18/2025 APA002368 FEDERAL EXPRESS CORPORAT… 2/19 PRIORITY MAIL/PD 31.28 Vendor 01611 - FEDERAL EXPRESS CORPORATION Total: 34.20 Vendor: 01631 - FRANCHISE TAX BOARD
03/06/2025 DFT0009715 FRANCHISE TAX BOARD State Tax Withholding 10,244.09 Vendor 01631 - FRANCHISE TAX BOARD Total: 10,244.09
Vendor: 05601 - GABRIELA FUNES
03/18/2025 2254 GABRIELA FUNES 3/8 Vision CLM 300.00
Vendor 05601 - GABRIELA FUNES Total: 300.00
Vendor: 01679 - GOVERNMENTAL FINANCIAL SVCS
03/18/2025 2255 GOVERNMENTAL FINANCIAL … FY25 ACCOUNTING SVCS/ADM 4,401.37 03/18/2025 2255 GOVERNMENTAL FINANCIAL … FY25 ACCOUNTING SVCS/ADM 2,800.88 03/18/2025 2255 GOVERNMENTAL FINANCIAL … FY25 ACCOUNTING SVCS/ADM 800.25 Vendor 01679 - GOVERNMENTAL FINANCIAL SVCS Total: 8,002.50 Vendor: 05306 - GREAT WESTERN RECREATION LLC
03/18/2025 APA002370 GREAT WESTERN RECREATION…9/11 TURF SIGN/ERV 1,295.00 Vendor 05306 - GREAT WESTERN RECREATION LLC Total: 1,295.00 Vendor: 05303 - HEALTH AND HUMAN RESOURCES CENTER INC
03/18/2025 APA002371 HEALTH AND HUMAN RESOU… APR'25 EAP 129.60 Vendor 05303 - HEALTH AND HUMAN RESOURCES CENTER INC Total: 129.60 Vendor: 02642 - HOME DEPOT
03/18/2025 APA002372 HOME DEPOT 2/20 SUPPLIES/PW 246.86 03/18/2025 APA002372 HOME DEPOT 2/19 SUPPLIES/PW 39.78
03/18/2025 APA002372 HOME DEPOT 2/20 SUPPLIES/PW 137.64 03/18/2025 APA002372 HOME DEPOT 2/27 SUPPLIES/REC 12.37 03/18/2025 APA002372 HOME DEPOT 2/26 SUPPLIES/FON 118.14 Vendor 02642 - HOME DEPOT Total: 554.79
Vendor: 05170 - ICE MANAGEMENT LLC
03/18/2025 APA002373 ICE MANAGEMENT LLC 2/6-2/27 YOUTH ICE SKATING 57.20 Vendor 05170 - ICE MANAGEMENT LLC Total: 57.20
Vendor: 05649 - INFINITY TECHNOLOGIES
Infinity Technologies - Special 2,555.00
Projects
03/18/2025 APA002374 INFINITY TECHNOLOGIES
03/18/2025 APA002374 INFINITY TECHNOLOGIES FEB'25 IT SVCS 13,083.00 03/18/2025 APA002374 INFINITY TECHNOLOGIES FEB'25 Sentinel One 595.00 03/18/2025 APA002374 INFINITY TECHNOLOGIES FEB'25 Duo 114.00 03/18/2025 APA002374 INFINITY TECHNOLOGIES SSLS Charge 9.99 Vendor 05649 - INFINITY TECHNOLOGIES Total: 16,356.99
Vendor: 01764 - INTERNAL REVENUE SERVICE
03/06/2025 DFT0009714 INTERNAL REVENUE SERVICE Federal Tax Withholding 25,847.81 03/06/2025 DFT0009716 INTERNAL REVENUE SERVICE Medicare 6,786.24 Vendor 01764 - INTERNAL REVENUE SERVICE Total: 32,634.05 Vendor: 05785 - JOSE PACKING
03/18/2025 APA002375 JOSE PACKING 12977 CHESS RFD 70.00 Vendor 05785 - JOSE PACKING Total: 70.00
Vendor: 05537 - KAREN GONZALEZ
3/5 GRAPHIC DESIGN 70TH 300.00

ANN EMBLEM
03/18/2025 APA002369 KAREN GONZALEZ
Vendor 05537 - KAREN GONZALEZ Total: 300.00
Vendor: 05331 - KIDZ TALENT ACADEMY
2/4-2/25 BASKETBALL SKILLS & 102.70
DRILLS
03/18/2025 APA002377 KIDZ TALENT ACADEMY

Page 29 of 271 ends

Warrant Register Post Dates: 3/5/2025 - 3/18/2025
3/13/2025 9:45:21 AM Page 5 of 10
Payment Date Payment Number Vendor Name Description (Item) Amount 1/7-1/28 BASKETBALL SKILLS & 256.75
DRILLS
03/18/2025 APA002377 KIDZ TALENT ACADEMY
2/4-2/25 YOUTH GYMNASTICS 234.00
& TUMBLING
03/18/2025 APA002377 KIDZ TALENT ACADEMY
Vendor 05331 - KIDZ TALENT ACADEMY Total: 593.45
Vendor: 05694 - L N CURTIS & SONS
2/27 UNIFORM/PD (NEW 383.82

DSPTCHER)
03/18/2025 APA002378 L N CURTIS & SONS
Vendor 05694 - L N CURTIS & SONS Total: 383.82
Vendor: 01975 - L P G E A
03/06/2025 39834 L P G E A LPGEA Dues Withheld 234.00
Vendor 01975 - L P G E A Total: 234.00
Vendor: 01988 - LA PALMA POLICE ASSN
03/06/2025 39836 LA PALMA POLICE ASSN LPPA Dues Withheld 1,487.96 Vendor 01988 - LA PALMA POLICE ASSN Total: 1,487.96
Vendor: 04657 - LISA AMSELL
03/18/2025 APA002357 LISA AMSELL 2/1-2/22 MARTIAL ARTS 32.50 Vendor 04657 - LISA AMSELL Total: 32.50
Vendor: 01976 - LPPEA
03/06/2025 39837 LPPEA LPPEA Dues Withheld 60.00
Vendor 01976 - LPPEA Total: 60.00
Vendor: 05782 - LYNNE ARAKAWA
03/18/2025 APA002379 LYNNE ARAKAWA 4/5 LESS CANCELLATION FEE -11.00 03/18/2025 APA002379 LYNNE ARAKAWA 4/5 COMM CTR DEPOSIT RFD 300.00 Vendor 05782 - LYNNE ARAKAWA Total: 289.00
Vendor: 04281 - MARIA EDGE
03/18/2025 APA002366 MARIA EDGE 2/22 PAVILION DEPOSIT RFD 200.00 Vendor 04281 - MARIA EDGE Total: 200.00
Vendor: 05353 - MILISSA SIMOES
03/18/2025 APA002388 MILISSA SIMOES 12731 PICKLEBALL RFD 79.00 Vendor 05353 - MILISSA SIMOES Total: 79.00
Vendor: 01752 - MISSION SQUARE - PLAN 302549
03/06/2025 APA002351 MISSION SQUARE - PLAN 302… Deferred Comp 1,192.30 03/06/2025 APA002351 MISSION SQUARE - PLAN 302… Deferred Comp 1,690.00 03/06/2025 APA002351 MISSION SQUARE - PLAN 302… Deferred Comp 2,507.37 Vendor 01752 - MISSION SQUARE - PLAN 302549 Total: 5,389.67 Vendor: 05783 - NOELLA LEW
03/18/2025 APA002381 NOELLA LEW 2/20 COMM CTR DEPOSIT RFD 300.00 Vendor 05783 - NOELLA LEW Total: 300.00
Vendor: 02248 - OCCUPATIONAL HEALTH CENTERS OF CA
03/18/2025 APA002382 OCCUPATIONAL HEALTH CEN… 1/31 EMPL PHYS/(1)PW FT 669.00 1/30&2/4 EMPL PHYS/(2)PD 181.00
VOL
03/18/2025 APA002382 OCCUPATIONAL HEALTH CEN…
03/18/2025 APA002382 OCCUPATIONAL HEALTH CEN… 1/29 EMPL PHYS/(1) ADM FT 1,077.00 03/18/2025 APA002382 OCCUPATIONAL HEALTH CEN… 2/11 EMPL PHYS/(1)CS PT 577.00 03/18/2025 APA002382 OCCUPATIONAL HEALTH CEN… 2/25 EMPL PHYS/1) PD VOL 181.00 03/18/2025 APA002382 OCCUPATIONAL HEALTH CEN… 2/21 EMPL PHYS/(1)PW FT 208.00 Vendor 02248 - OCCUPATIONAL HEALTH CENTERS OF CA Total: 2,893.00 Vendor: 02290 - PACIFIC TELEMANAGEMENT SVCS
03/18/2025 APA002383 PACIFIC TELEMANAGEMENT S… 3/1#739-9864 PAYPHONE/PD 78.00 Vendor 02290 - PACIFIC TELEMANAGEMENT SVCS Total: 78.00 Vendor: 02279 - PERS RETIREMENT
CalPERS Employee 1,963.51
Contribution
03/06/2025 DFT0009701 PERS RETIREMENT
03/06/2025 DFT0009702 PERS RETIREMENT CalPERS Employer Contribution 3,931.90 CalPERS Employee 1,477.30
Contribution
03/06/2025 DFT0009703 PERS RETIREMENT

Page 30 of 271 ends

Warrant Register Post Dates: 3/5/2025 - 3/18/2025
3/13/2025 9:45:21 AM Page 6 of 10
Payment Date Payment Number Vendor Name Description (Item) Amount 03/06/2025 DFT0009704 PERS RETIREMENT CalPERS Employer Contribution 2,142.09 CalPERS Employee 3,773.60
Contribution
03/06/2025 DFT0009705 PERS RETIREMENT
03/06/2025 DFT0009706 PERS RETIREMENT CalPERS Employer Contribution 3,832.05 CalPERS Employee 1,840.91
Contribution
03/06/2025 DFT0009707 PERS RETIREMENT
03/06/2025 DFT0009708 PERS RETIREMENT CalPERS Employer Contribution 5,993.18 CalPERS Employee 416.83
Contribution
03/06/2025 DFT0009709 PERS RETIREMENT
03/06/2025 DFT0009710 PERS RETIREMENT CalPERS Employer Contribution 1,077.20 CalPERS Employee 9,083.76
Contribution
03/06/2025 DFT0009711 PERS RETIREMENT
03/06/2025 DFT0009712 PERS RETIREMENT CalPERS Employer Contribution 9,060.59 Employee Survivor 48.36
Contribution Amount
03/06/2025 DFT0009713 PERS RETIREMENT
Vendor 02279 - PERS RETIREMENT Total: 44,641.28
Vendor: 05137 - READWRITE EDUCATIONAL SOLUTIONS INC.
2/3-2/26 READING 115.70

DEVELOPMENT
03/18/2025 APA002384 READWRITE EDUCATIONAL SO…
2/3-2/26 READING 57.85

DEVELOPMENT
03/18/2025 APA002384 READWRITE EDUCATIONAL SO…
2/3-2/26 READING 289.25

DEVELOPMENT
03/18/2025 APA002384 READWRITE EDUCATIONAL SO…
Vendor 05137 - READWRITE EDUCATIONAL SOLUTIONS INC. Total: 462.80 Vendor: 05732 - RING CENTRAL INC
Citywide Phone System 2,231.18
Replacement & Support
03/18/2025 APA002385 RING CENTRAL INC
Vendor 05732 - RING CENTRAL INC Total: 2,231.18
Vendor: 03303 - RIO HONDO COLLEGE
03/18/2025 39840 RIO HONDO COLLEGE 4/7-4/11 FTO TRNG/PD 89.00 Vendor 03303 - RIO HONDO COLLEGE Total: 89.00
Vendor: 02456 - S J CONTRACTOR
(2)BOTTLE FILLING 3,834.00

STATIONS/CC
03/18/2025 APA002386 S J CONTRACTOR
Vendor 02456 - S J CONTRACTOR Total: 3,834.00
Vendor: 04859 - SIERRA ANALYTICAL LABS INC
03/18/2025 APA002387 SIERRA ANALYTICAL LABS INC JAN'25 WATER SAMPLES 2,530.80 Vendor 04859 - SIERRA ANALYTICAL LABS INC Total: 2,530.80 Vendor: 02535 - SMART & FINAL
03/18/2025 APA002389 SMART & FINAL 2/21 KITCHEN SUPPLIES/PD 45.76 03/18/2025 APA002389 SMART & FINAL 2/19 SUPPLIES/REC 107.43 03/18/2025 APA002389 SMART & FINAL 3/3 SUPPLIES/INSPOTEEN 31.69 03/18/2025 APA002389 SMART & FINAL 2/24 SUPPLIES/REC 85.95 03/18/2025 APA002389 SMART & FINAL 2/24 SUPPLIES/INSPOTEEN 72.80 03/18/2025 APA002389 SMART & FINAL 2/20 MTG SUPPLIES/PD 17.16 Vendor 02535 - SMART & FINAL Total: 360.79
Vendor: 02809 - SO CAL FIRST AID & SAFETY (FORMERLY ZEE MEDICAL) 03/18/2025 APA002390 SO CAL FIRST AID & SAFETY (F… 2/27 FIRST AID SUPPLIES/PD 184.10 03/18/2025 APA002390 SO CAL FIRST AID & SAFETY (F… 2/27 First Aid Supplies/CH 79.06 Vendor 02809 - SO CAL FIRST AID & SAFETY (FORMERLY ZEE MEDICAL) Total: 263.16 Vendor: 02640 - SO CAL GAS COMPANY
03/11/2025 DFT0009732 SO CAL GAS COMPANY 2/5 6800 WALKER/WW 50.00 03/11/2025 DFT0009732 SO CAL GAS COMPANY 3/7 6800 WALKER/WW 50.35 Vendor 02640 - SO CAL GAS COMPANY Total: 100.35
Vendor: 02556 - SOUTHERN CALIFORNIA EDISON
03/11/2025 DFT0009730 SOUTHERN CALIFORNIA EDIS… 2/25 5712 LA PALMA TC1 77.21

Page 31 of 271 ends

Warrant Register Post Dates: 3/5/2025 - 3/18/2025
3/13/2025 9:45:21 AM Page 7 of 10
Payment Date Payment Number Vendor Name Description (Item) Amount 2/27 8415 9,289.70

MEADOWLARK/BSTR
03/11/2025 DFT0009731 SOUTHERN CALIFORNIA EDIS…
Vendor 02556 - SOUTHERN CALIFORNIA EDISON Total: 9,366.91 Vendor: 02568 - STAPLES BUSINESS ADVANTAGE
03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 1/8 OFFICE SUPPLIES/PD 104.74 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 1/28 OFFICE SUPPLIES/PD 43.03 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 1/29 OFFICE SUPPLIES/PD 25.87 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 1/29 OFFICE SUPPLIES/PD 36.33 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 1/29 OFFICE SUPPLIES/PD 34.25 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 1/30 OFFICE SUPPLIES/PD 21.58 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 1/30 OFFICE SUPPLIES/PD 19.68 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 2/6 OFFICE SUPPLIES/PD 24.52 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 2/6 OFFICE SUPPLIES/PD 21.74 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 2/13 EVIDENCE SUPPLIES/PD 451.49 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 2/13 EVIDENCE SUPPLIES/PD 49.39 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 2/15 PATROL SUPPLIES/PD 73.73 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 2/22 SUPPLIES/PD 68.11 03/18/2025 APA002391 STAPLES BUSINESS ADVANTA… 2/22 SUPPLIES/PD 70.81 Vendor 02568 - STAPLES BUSINESS ADVANTAGE Total: 1,045.27 Vendor: 01620 - STEVE A. FILARSKY ATTORNEY AT LAW
03/18/2025 APA002393 STEVE A. FILARSKY ATTORNEY… 01/28 - 02/26 Labor Atty Svcs 900.00 Vendor 01620 - STEVE A. FILARSKY ATTORNEY AT LAW Total: 900.00 Vendor: 04122 - TAN NGUYEN OR WEST GROVE VOLLEYBALL LLC 03/18/2025 APA002380 TAN NGUYEN OR WEST GROVE…2/2-2/23 ADV VOLLEYBALL 63.70 03/18/2025 APA002380 TAN NGUYEN OR WEST GROVE…2/2-2/23 INT VOLLEYBALL 63.70 Vendor 04122 - TAN NGUYEN OR WEST GROVE VOLLEYBALL LLC Total: 127.40 Vendor: 04630 - T-MOBILE USA INC
1/21-2/20 UAS DATA PLAN/PD 32.80
- Acct. 971557340
03/18/2025 39841 T-MOBILE USA INC
Vendor 04630 - T-MOBILE USA INC Total: 32.80
Vendor: 05525 - TOWNSEND PUBLIC AFFAIRS INC
MAR'25 GRANT 2,200.00

WRITING&FUNDING

ADVOCACY SVCS
03/18/2025 APA002395 TOWNSEND PUBLIC AFFAIRS I…
MAR'25 GRANT 1,925.00

WRITING&FUNDING

ADVOCACY SVCS
03/18/2025 APA002395 TOWNSEND PUBLIC AFFAIRS I…
MAR'25 GRANT 1,375.00

WRITING&FUNDING

ADVOCACY SVCS
03/18/2025 APA002395 TOWNSEND PUBLIC AFFAIRS I…
Vendor 05525 - TOWNSEND PUBLIC AFFAIRS INC Total: 5,500.00 Vendor: 02706 - U S BANK INSTITUTIONAL TRUST-WESTERN REGION PARS Part Time Retirement 715.16
Contributions
03/06/2025 APA002352 U S BANK INSTITUTIONAL TRU…
Vendor 02706 - U S BANK INSTITUTIONAL TRUST-WESTERN REGION Total: 715.16 Vendor: 02712 - UNDERGROUND SERVICE ALERT
03/18/2025 APA002396 UNDERGROUND SERVICE ALE… (140)DIG-ALERT NOTICES/PW 134.50 03/18/2025 APA002396 UNDERGROUND SERVICE ALE… (140)DIG-ALERT NOTICES/PW 134.50 Vendor 02712 - UNDERGROUND SERVICE ALERT Total: 269.00
Vendor: 05555 - UNISPEC CONSTRUCTION INC.
03/18/2025 2256 UNISPEC CONSTRUCTION INC. LESS 5% RETENTION/ST-371 -12,350.62 03/18/2025 2256 UNISPEC CONSTRUCTION INC. MEDIAN ISLANDS PROJ/ST-371 76,725.87 03/18/2025 2256 UNISPEC CONSTRUCTION INC. MEDIAN ISLANDS PROJ/ST-371 170,286.60 03/18/2025 2256 UNISPEC CONSTRUCTION INC. LESS 5% RETENTION/ST-371 -8,728.92 03/18/2025 2256 UNISPEC CONSTRUCTION INC. MEDIAN ISLANDS PROJ/ST-371 120,713.40 03/18/2025 2256 UNISPEC CONSTRUCTION INC. MEDIAN ISLANDS PROJ/ST-371 53,865.15 Vendor 05555 - UNISPEC CONSTRUCTION INC. Total: 400,511.48

Page 32 of 271 ends

Warrant Register Post Dates: 3/5/2025 - 3/18/2025
3/13/2025 9:45:21 AM Page 8 of 10
Payment Date Payment Number Vendor Name Description (Item) Amount Vendor: 02742 - VERIZON WIRELESS
2/11-3/10 DATA ACCESS/ENG 45.01
TECH
03/18/2025 39842 VERIZON WIRELESS
03/18/2025 39842 VERIZON WIRELESS 2/16 CELL PHONES/REC 30.10 03/18/2025 39842 VERIZON WIRELESS 2/16 MACHINE TO MACHINE 150.70 2/17-3/16 SEDARU DATA 46.20

PLAN/WTR
03/18/2025 39842 VERIZON WIRELESS
03/18/2025 39842 VERIZON WIRELESS 2/17-3/16 DATA ACCESS/WTR 140.14 Vendor 02742 - VERIZON WIRELESS Total: 412.15
Vendor: 04196 - WECK LABORATORIES INC
03/18/2025 APA002398 WECK LABORATORIES INC 2/18 WATER SAMPLES/CY 200.00 Vendor 04196 - WECK LABORATORIES INC Total: 200.00
Vendor: 01161 - WESTERN STATES AUTO THEFT INVESTIGATORS 03/18/2025 39843 WESTERN STATES AUTO THEFT…4/16 ATAC AWARDS/(3)PD 40.00 03/18/2025 39843 WESTERN STATES AUTO THEFT…4/16 ATAC AWARDS/(3)PD 40.00 03/18/2025 39843 WESTERN STATES AUTO THEFT…4/16 ATAC AWARDS/(3)PD 40.00 Vendor 01161 - WESTERN STATES AUTO THEFT INVESTIGATORS Total: 120.00 Vendor: 03987 - WEX HEALTH INC
03/18/2025 APA002399 WEX HEALTH INC FEB'25 FLEX ADM SVC 50.00 Vendor 03987 - WEX HEALTH INC Total: 50.00
Vendor: 02801 - YOUNG LEADERS OF ORANGE COUNTY
03/18/2025 APA002401 YOUNG LEADERS OF ORANGE …3/1 MATH COMPETITION 230.75 Vendor 02801 - YOUNG LEADERS OF ORANGE COUNTY Total: 230.75 Grand Total: 612,928.49

Page 33 of 271 ends

3/27/2025 1:56:42 PM Page 1 of 15
Warrant Register
City of La Palma By Vendor Name
Post Dates 3/19/2025 - 4/1/2025
Approval
Reviewed by
Ryan Hallett - Assistant City Manager
Conal McNamara - City Manager

Page 34 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 2 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount Vendor: 01037 - ADMIRAL PEST CONTROL INC
04/01/2025 APA002405 ADMIRAL PEST CONTROL INC 3/7 PEST CONTROL/CH&PD 181.00 3/7 PEST CONTROL/5410 LA 58.00
PALMA
04/01/2025 APA002405 ADMIRAL PEST CONTROL INC
04/01/2025 APA002405 ADMIRAL PEST CONTROL INC 3/7 PEST CONTROL/CS 167.00 04/01/2025 APA002405 ADMIRAL PEST CONTROL INC 3/7 PEST CONTROL/CY 192.00 04/01/2025 APA002405 ADMIRAL PEST CONTROL INC 3/7 PEST CONTROL/CP 175.00 04/01/2025 APA002405 ADMIRAL PEST CONTROL INC 3/7 PEST CONTROL/WW 115.00 Vendor 01037 - ADMIRAL PEST CONTROL INC Total: 888.00
Vendor: 01042 - AETNA US HEALTHCARE
04/01/2025 APA002406 AETNA US HEALTHCARE Apr '25 Dental Premium 5,058.10 Vendor 01042 - AETNA US HEALTHCARE Total: 5,058.10
Vendor: 01046 - AFFORDABLE GENERATOR SVCS INC
04/01/2025 APA002407 AFFORDABLE GENERATOR SV… 2/1 GENERATOR SVC/CY 422.40 Vendor 01046 - AFFORDABLE GENERATOR SVCS INC Total: 422.40 Vendor: 03354 - AIRWAVE COMMUNICATIONS ENTERPRISES
10/3 Vehicle 812.50
Outfitting/#701,732-5
04/01/2025 APA002408 AIRWAVE COMMUNICATIONS…
04/01/2025 APA002408 AIRWAVE COMMUNICATIONS… 10/31 Vehicle Outfitting/#752 8,067.04 04/01/2025 APA002408 AIRWAVE COMMUNICATIONS… 1/31 Vehicle Outfitting/#743 1,617.74 04/01/2025 APA002408 AIRWAVE COMMUNICATIONS… 1/31 Vehicle Outfitting/#751 12,906.11 Vendor 03354 - AIRWAVE COMMUNICATIONS ENTERPRISES Total: 23,403.39 Vendor: 05582 - ALAN BRANDON RIVERA
04/01/2025 2260 ALAN BRANDON RIVERA 3/21 Vision CLM 150.00 04/01/2025 2260 ALAN BRANDON RIVERA 3/21 Vision CLM 150.00 Vendor 05582 - ALAN BRANDON RIVERA Total: 300.00
Vendor: 01064 - ALL CITY MANAGEMENT SVC INC
2/16-3/1 CROSSING GUARD 6,732.97

SVCS/PD
04/01/2025 APA002409 ALL CITY MANAGEMENT SVC I…
Vendor 01064 - ALL CITY MANAGEMENT SVC INC Total: 6,732.97 Vendor: 01067 - ALLIANT INSURANCE SVCS INC
04/01/2025 39852 ALLIANT INSURANCE SVCS INC OCT-DEC'24 LIABILITY INS/REC 244.00 Vendor 01067 - ALLIANT INSURANCE SVCS INC Total: 244.00 Vendor: 05789 - AMAZON.COM SERVICES LLC
03/24/2025 DFT0009847 AMAZON.COM SERVICES LLC 3/17 KITCHEN SUPPLIES/CH 55.20 Vendor 05789 - AMAZON.COM SERVICES LLC Total: 55.20
Vendor: 03530 - AMERICAN TIRE DEPOT - BIG BRAND TIRE AND SERVICE 04/01/2025 APA002410 AMERICAN TIRE DEPOT - BIG … 3/6 REPL(2)TIRES/#747 929.04 Vendor 03530 - AMERICAN TIRE DEPOT - BIG BRAND TIRE AND SERVICE Total: 929.04 Vendor: 05714 - AQUACHECK BACKFLOW TESTING AND SERVICE
12/23 RPR LEAKING 830.00

BACKFLOW DEVICES/WTR
04/01/2025 APA002411 AQUACHECK BACKFLOW TEST…
Vendor 05714 - AQUACHECK BACKFLOW TESTING AND SERVICE Total: 830.00 Vendor: 01016 - AT&T MOBILITY
03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 52.77 03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 38.64 03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 727.34 03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 133.62 03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 624.87 03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 38.81 03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 47.49 03/19/2025 DFT0009822 AT&T MOBILITY 3/8 CELL PHONE BILLS/PD&PW 38.64 Vendor 01016 - AT&T MOBILITY Total: 1,702.18
Vendor: 01015 - AT&T
3/13#339/3342-4813 T1/PD - 74.81
BAN 9391033966
04/01/2025 39853 AT&T

Page 35 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 3 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount 3/13#523-2193 T1/CH - BAN 377.49
9391033969
04/01/2025 39853 AT&T
3/15#690-3922 RV Parking 37.57
Permit - BAN 9391033973
04/01/2025 39853 AT&T
2/20-3/19 800MHZ OCSD/PD - 1,216.40
BAN 9391064973
04/01/2025 39853 AT&T
Vendor 01015 - AT&T Total: 1,706.27
Vendor: 05673 - ATEASE K9 TRAINING
2/4-3/11 OBEDIENCE DOG 178.75

TRAINING
04/01/2025 APA002412 ATEASE K9 TRAINING
Vendor 05673 - ATEASE K9 TRAINING Total: 178.75
Vendor: 01171 - B L WALLACE DISTRIBUTOR INC
3/13 IRRIGATION BOX 79.20

LIDS/PW
04/01/2025 APA002413 B L WALLACE DISTRIBUTOR INC
04/01/2025 APA002413 B L WALLACE DISTRIBUTOR INC 3/13 (100)MTR BOX LIDS/WTR 1,604.40 Vendor 01171 - B L WALLACE DISTRIBUTOR INC Total: 1,683.60 Vendor: 04030 - BRAD STENE
04/01/2025 2261 BRAD STENE 2/18-20 FTO TRNG/PD 77.82
2/3-7 FIREARMS INSTR 178.84

TRNG/PD
04/01/2025 2261 BRAD STENE
Vendor 04030 - BRAD STENE Total: 256.66
Vendor: 03593 - BUCKNAM INFRASTRUCTURE GROUP INC
04/01/2025 APA002414 BUCKNAM INFRASTRUCTURE … PW Scanning Serv #1 1,510.00 04/01/2025 APA002414 BUCKNAM INFRASTRUCTURE … PW Scanning Serv #2 3,518.14 Vendor 03593 - BUCKNAM INFRASTRUCTURE GROUP INC Total: 5,028.14 Vendor: 01251 - C D W GOVERNMENT INC
3YR SVC MAINT NetMotion 5,484.75

MOBILITY/PD
04/01/2025 APA002415 C D W GOVERNMENT INC
Vendor 01251 - C D W GOVERNMENT INC Total: 5,484.75
Vendor: 01252 - C F P INC
04/01/2025 APA002416 C F P INC (1)FEB'25 BLOOD TEST/PD 147.50 Vendor 01252 - C F P INC Total: 147.50
Vendor: 05652 - CASC ENGINEERING AND CONSULTING INC
04/01/2025 APA002417 CASC ENGINEERING AND CON… FEB'25 CITY ENGR SVCS/FOG 168.75 04/01/2025 APA002417 CASC ENGINEERING AND CON… FEB'25 CITY ENGR SVCS/NPDES 908.25 Vendor 05652 - CASC ENGINEERING AND CONSULTING INC Total: 1,077.00 Vendor: 05081 - CATHERINE ROCHA VELEZ
04/01/2025 APA002453 CATHERINE ROCHA VELEZ 2/9-3/16 BALLET BARRE 29.25 Vendor 05081 - CATHERINE ROCHA VELEZ Total: 29.25
Vendor: 01304 - CAVENAUGH & ASSOCIATES
04/01/2025 39856 CAVENAUGH & ASSOCIATES 5/12-16 DUI SEMINAR/PD 620.00 Vendor 01304 - CAVENAUGH & ASSOCIATES Total: 620.00
Vendor: 02669 - CHARTER COMMUNICATIONS
3/11/25-4/10/25 Internet 424.25
SVC/CH-ACCT NO.188679701
03/25/2025 DFT0009850 CHARTER COMMUNICATIONS
Vendor 02669 - CHARTER COMMUNICATIONS Total: 424.25
Vendor: 05455 - CHARTER COMMUNICATIONS
3/11-4/10 INTERNET 1,872.83

SVC/CY&CH-ACCT
NO.188679101
03/19/2025 DFT0009823 CHARTER COMMUNICATIONS
3/11-4/10 INTERNET 802.64

SVC/CY&CH-ACCT
NO.188679101
03/19/2025 DFT0009823 CHARTER COMMUNICATIONS
Vendor 05455 - CHARTER COMMUNICATIONS Total: 2,675.47
Vendor: 05456 - CHARTER COMMUNICATIONS
3/11-4/10 INTERNET SVC/WW- 719.00
ACCT NO. 188678801
03/25/2025 DFT0009852 CHARTER COMMUNICATIONS
Vendor 05456 - CHARTER COMMUNICATIONS Total: 719.00

Page 36 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 4 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount Vendor: 05185 - CHLOE JANOIAN
04/01/2025 APA002439 CHLOE JANOIAN 3/1 GAZEBO DEPOSIT RFD 100.00 Vendor 05185 - CHLOE JANOIAN Total: 100.00
Vendor: 03604 - CINTAS CORPORATION
04/01/2025 APA002419 CINTAS CORPORATION 3/6 UNIFORM SVC/PW 55.35 04/01/2025 APA002419 CINTAS CORPORATION 3/6 UNIFORM SVC/PW 55.35 04/01/2025 APA002419 CINTAS CORPORATION 3/6 UNIFORM SVC/PW 61.49 Vendor 03604 - CINTAS CORPORATION Total: 172.19
Vendor: 03283 - CITY NATIONAL BANK
7/9 CRISIS INTERVENTION & 150.00

BEHAV HEALTH TRNG/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
03/20/2025 DFT0009729 CITY NATIONAL BANK 2/20 MTG SUPPLIES/PD 172.86 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/7 PISTOL COURSE/PD 255.00 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/13 SUPPLIES/PD 163.13 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/27 VEH MAINT SUPPLIES/PD 54.93 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/27 VEH MAINT SUPPLIES/PD 54.93 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/28 VEH MAINT SUPPLIES/PD 54.93 2/6 RET'D VEH MAINT -65.22

SUPPLIES/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
2/28 RET'D VEH MAINT -27.47

SUPPLIES/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
2/28 RET'D VEH MAINT -27.47

SUPPLIES/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
2/26 BADGE 262.00

ENCAPSULATION/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
03/20/2025 DFT0009729 CITY NATIONAL BANK 2/7 PISTOL COURSE/PD 255.00 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/18-2/20 FTO UPDATE/PD 65.00 03/20/2025 DFT0009729 CITY NATIONAL BANK 3/9-3/12 POST SLI TRAVEL/PD 538.97 3/9-3/12 POST SLI CAR 187.86

RENTAL/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
03/20/2025 DFT0009729 CITY NATIONAL BANK 2/13 SUPPLIES/PD 1,377.43 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/13 PATROL SUPPLIES/PD 52.17 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/18 PATROL SUPPLIES/PD 38.29 03/20/2025 DFT0009729 CITY NATIONAL BANK 2/20 SUPPLIES/PD 861.17 03/20/2025 DFT0009729 CITY NATIONAL BANK 4/13 ARMORER COURSE/PD 210.00 3/24-3/26 POWER B1 CRIME 463.76

ANALYSIS/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
5/12-16 CHILD ABUSE&SEX 329.60

ASSAULT TRNG/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
03/20/2025 DFT0009729 CITY NATIONAL BANK 2/27 EVIDENCE SUPPLIES/PD 75.00 2/27 EVIDENCE SUPP SHPNG 41.06

CHRGS/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
3/24-3/26 POWER B1 CRIME 463.76

ANALYSIS/PD
03/20/2025 DFT0009729 CITY NATIONAL BANK
03/20/2025 DFT0009729 CITY NATIONAL BANK 2/13 DSPTCH HEADSETS/PD 138.06 03/20/2025 DFT0009788 CITY NATIONAL BANK 2/27 APWA PWX TRNG/PM 193.92 2/28 Credit Card Annual 50.00
Fee/CD
03/20/2025 DFT0009788 CITY NATIONAL BANK
03/20/2025 DFT0009810 CITY NATIONAL BANK 2/4 MTG SUPPLIES/GG 142.82 2/12 LOCC-OC DIV MTG 30.00

REG/CCMBR
03/20/2025 DFT0009811 CITY NATIONAL BANK
03/20/2025 DFT0009812 CITY NATIONAL BANK 2/21 OC FORUM REG/CCMBR 125.00 4/23-25 LOCC CITY LDRS 650.00

SUMMIT/CCMBR
03/20/2025 DFT0009813 CITY NATIONAL BANK
03/20/2025 DFT0009814 CITY NATIONAL BANK 2/21 OC FORUM REG/CCMBR 125.00 03/20/2025 DFT0009815 CITY NATIONAL BANK 2/12 MTG SUPPLIES/CM 157.00 4/23-25 LOCC CITY LDRS 192.97

SUMMIT/CCMBR
03/20/2025 DFT0009816 CITY NATIONAL BANK
03/20/2025 DFT0009817 CITY NATIONAL BANK 2/17 AWARD SUPPLIES/GG 15.20 03/20/2025 DFT0009818 CITY NATIONAL BANK 2/18 MTG SUPPLIES/GG 126.00 03/20/2025 DFT0009819 CITY NATIONAL BANK 2/19 AWARD SUPPLIE… -15.20

Page 37 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 5 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount 2/21 APPI LDRSHIP 215.26

SUMMIT/CCMBR
03/20/2025 DFT0009820 CITY NATIONAL BANK
03/20/2025 DFT0009821 CITY NATIONAL BANK 2/24 LANDSCAPE SUPPLIES/CH 1,514.75 03/20/2025 DFT0009853 CITY NATIONAL BANK 7/17 EXCURSION/DC 1,119.60 03/20/2025 DFT0009853 CITY NATIONAL BANK 7/2 EXCURSION/DC 1,352.00 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/5 OFFICE SUPPLIES/ADM 19.13 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/19 PRIME REIMB/CITYWIDE -57.44 3/19-3/21 CPRS CONF/REC 417.97
COORD
03/20/2025 DFT0009853 CITY NATIONAL BANK
03/20/2025 DFT0009853 CITY NATIONAL BANK 3/19-3/21 CPRS CONF/CSS 417.97 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/6 REPL BASEBALL PLUGS/REC 299.01 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/12 WRISTBANDS/FON 537.00 03/20/2025 DFT0009853 CITY NATIONAL BANK TRANSACTION FEE/FON 16.11 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/5 SUPPLIES/TT 18.46 03/20/2025 DFT0009853 CITY NATIONAL BANK 6/26 EXCURSION/DC 4,850.00 03/20/2025 DFT0009853 CITY NATIONAL BANK 6/12 EXCURSION/DC 505.35 4/16 2025 SOCAL PWX 193.92

TRNG/ENG TECH
03/20/2025 DFT0009853 CITY NATIONAL BANK
03/20/2025 DFT0009853 CITY NATIONAL BANK 2/6 SUPPLIES/INSPOTEEN 53.25 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/25 SUPPLIES/INSPOTEEN 51.80 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/25 SUPPLIES/INSPOTEEN 29.50 03/20/2025 DFT0009853 CITY NATIONAL BANK 2/25 SUPPLIES/INSPOTEEN 30.44 2/26 AMZN COMMS 23.11

EQUIPMENT/IT
03/20/2025 DFT0009854 CITY NATIONAL BANK
2/3 Ubiquiti Wifi Unit(PMT2/2) 40.23
/REC
03/20/2025 DFT0009854 CITY NATIONAL BANK
2/3 Ubiquiti Wifi Access 422.08
Unit/Rec
03/20/2025 DFT0009854 CITY NATIONAL BANK
2/3 Ubiquiti Wifi Unit (PMT1/2) 40.23
/Rec
03/20/2025 DFT0009854 CITY NATIONAL BANK
2/24 APPLE MOBILE DEVICE 73.45

MGMT PLAN/PD
03/20/2025 DFT0009854 CITY NATIONAL BANK
10/24 RET'D Council Chambers -162.04
A/V Equip
03/20/2025 DFT0009854 CITY NATIONAL BANK
3/7 IPAD EXCEL WTR MTR 4.99

READS APP/WTR
03/20/2025 DFT0009854 CITY NATIONAL BANK
3/7 IPAD EXCEL WTR MTR 4.99

READS APP/WTR
03/20/2025 DFT0009854 CITY NATIONAL BANK
MAR'25 KORE TELEMATICS 514.25
SVC/WW
03/20/2025 DFT0009854 CITY NATIONAL BANK
Vendor 03283 - CITY NATIONAL BANK Total: 20,482.83
Vendor: 01356 - CITY OF LA PALMA FLEXIBLE
Flexible Spending 176.15
Contributions - Medical
03/20/2025 39849 CITY OF LA PALMA FLEXIBLE
Vendor 01356 - CITY OF LA PALMA FLEXIBLE Total: 176.15
Vendor: 01357 - CITY OF LA PALMA PETTY CASH
04/01/2025 39861 CITY OF LA PALMA PETTY CASH STARTING CASH/FON 300.00 04/01/2025 39862 CITY OF LA PALMA PETTY CASH 2/4 OFFICE SUPPLIES/PD 5.66 04/01/2025 39862 CITY OF LA PALMA PETTY CASH 2/6 OFFICE SUPPLIES/PD 6.29 04/01/2025 39862 CITY OF LA PALMA PETTY CASH 2/10 SUPPLIES/PD 66.05 04/01/2025 39862 CITY OF LA PALMA PETTY CASH 3/4 VEH MAINT SUPPLIES/PD 5.15 04/01/2025 39862 CITY OF LA PALMA PETTY CASH 3/10 MTG SUPPLIE/PD 17.99 04/01/2025 39862 CITY OF LA PALMA PETTY CASH 3/11 VEH MAINT SUPPLIES/PD 9.11 Vendor 01357 - CITY OF LA PALMA PETTY CASH Total: 410.25 Vendor: 05747 - CITYGREEN CONSULTING LLC
OWR1 CONSULTING SVCS 1,575.00
#3/PW
04/01/2025 APA002420 CITYGREEN CONSULTING LLC
Vendor 05747 - CITYGREEN CONSULTING LLC Total: 1,575.00 Vendor: 05706 - COLANTUONO HIGHSMITH & WHATLEY PC
04/01/2025 APA002421 COLANTUONO HIGHSMITH &… FEB'25 RETAINER 9,020.00

Page 38 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 6 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount 2/10-28 ATTY SVCS/PITCHESS- 6,112.60

POLICE MATTERS
04/01/2025 APA002421 COLANTUONO HIGHSMITH &…
2/4-26 ATTY SVCS/TELECOM 707.20

MATTERS
04/01/2025 APA002421 COLANTUONO HIGHSMITH &…
2/10-24 ATTY SVCS/LITIGATION 190.40

MATTERS
04/01/2025 APA002421 COLANTUONO HIGHSMITH &…
2/3-28 ATTY SVCS/PW & 3,155.20

UTILITIES
04/01/2025 APA002421 COLANTUONO HIGHSMITH &…
2/4-27 ATTY SVCS/TATARIAN V 264.60

CITY OF LAPALMA
04/01/2025 APA002421 COLANTUONO HIGHSMITH &…
2/24-25 ATTY SVCS/WATER 353.60
ISSUES
04/01/2025 APA002421 COLANTUONO HIGHSMITH &…
Vendor 05706 - COLANTUONO HIGHSMITH & WHATLEY PC Total: 19,803.60 Vendor: 04385 - CONTROL AIR ENTERPRISES LLC
04/01/2025 APA002422 CONTROL AIR ENTERPRISES LLC 11/18 QTRLY PM SVC/PD 608.81 Vendor 04385 - CONTROL AIR ENTERPRISES LLC Total: 608.81 Vendor: 01395 - COUNTY OF ORANGE
FEB'25 OCATS/CLETS PHONE 1,104.51
SVC/PD
04/01/2025 39868 COUNTY OF ORANGE
Vendor 01395 - COUNTY OF ORANGE Total: 1,104.51
Vendor: 04388 - CROSSTOWN ELECTRICAL & DATA INC
04/01/2025 APA002423 CROSSTOWN ELECTRICAL & D… FEB'25 SIGNAL RPR/PW 8,840.06 Vendor 04388 - CROSSTOWN ELECTRICAL & DATA INC Total: 8,840.06 Vendor: 02815 - DANITA HERNANDEZ
04/01/2025 2259 DANITA HERNANDEZ WINTER'25 TEXT REIMB/PD 72.99 04/01/2025 2259 DANITA HERNANDEZ WINTER'25 TUITION REIMB/PD 250.00 Vendor 02815 - DANITA HERNANDEZ Total: 322.99
Vendor: 05394 - DEBBIE YU
04/01/2025 APA002465 DEBBIE YU 12997 PICKLEBALL RFD 59.00 Vendor 05394 - DEBBIE YU Total: 59.00
Vendor: 01472 - DEPT OF JUSTICE
04/01/2025 APA002441 DEPT OF JUSTICE Feb '25 Fingerprint/Adm Intern 32.00 04/01/2025 APA002441 DEPT OF JUSTICE Feb '25 Fingerprint/(3)PD Vol 96.00 04/01/2025 APA002441 DEPT OF JUSTICE Feb '25 Fingerprint/(2)PT REC 64.00 Vendor 01472 - DEPT OF JUSTICE Total: 192.00
Vendor: 04626 - DOCUSIGN INC
04/01/2025 APA002424 DOCUSIGN INC MAR'25 ADDTNL 4 LCS 1,796.13 Vendor 04626 - DOCUSIGN INC Total: 1,796.13
Vendor: 04787 - ENTERPRISE FM TRUST
04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-63 1,375.74 MAR'25 MAINT 54.00

MGMT/PW&WTR
04/01/2025 APA002425 ENTERPRISE FM TRUST
04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-64 1,431.25 04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-60 658.26 04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-57 672.79 04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-61 1,226.70 04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-58 679.38 04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-57 814.61 04/01/2025 APA002425 ENTERPRISE FM TRUST MAR'25 LEASE PMT/LP-62 1,220.47 04/01/2025 APA002425 ENTERPRISE FM TRUST FEB'25 OVERPMT RFD -276.55 Vendor 04787 - ENTERPRISE FM TRUST Total: 7,856.65
Vendor: 01611 - FEDERAL EXPRESS CORPORATION
04/01/2025 APA002426 FEDERAL EXPRESS CORPORAT… 2/27 PRIORITY MAIL/PD 10.00 Vendor 01611 - FEDERAL EXPRESS CORPORATION Total: 10.00 Vendor: 05071 - FLEETCOR TECHNOLOGIES INC - ARCO
03/19/2025 DFT0009846 FLEETCOR TECHNOLOGIES INC…3/3 GASOLINE/PD 219.33 03/19/2025 DFT0009846 FLEETCOR TECHNOLOGIES INC…3/3 GASOLINE/PW 697.17 03/19/2025 DFT0009846 FLEETCOR TECHNOLOGIES INC…3/3 GASOLINE/CD 108.40

Page 39 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 7 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount 03/19/2025 DFT0009846 FLEETCOR TECHNOLOGIES INC…3/3 GASOLINE/WTR 114.04 Vendor 05071 - FLEETCOR TECHNOLOGIES INC - ARCO Total: 1,138.94 Vendor: 05272 - FLEETCOR TECHNOLOGIES INC - VP RACING
03/19/2025 DFT0009845 FLEETCOR TECHNOLOGIES INC…3/15 GASOLINE/PD 1,149.64 03/19/2025 DFT0009845 FLEETCOR TECHNOLOGIES INC…3/15 VOLUME DISCOUNT -7.56 Vendor 05272 - FLEETCOR TECHNOLOGIES INC - VP RACING Total: 1,142.08 Vendor: 01631 - FRANCHISE TAX BOARD
03/20/2025 DFT0009721 FRANCHISE TAX BOARD State Tax Withholding 22.44 03/20/2025 DFT0009727 FRANCHISE TAX BOARD State Tax Withholding 22.44 03/20/2025 DFT0009741 FRANCHISE TAX BOARD State Tax Withholding 4.48 03/20/2025 DFT0009786 FRANCHISE TAX BOARD State Tax Withholding 0.04 03/20/2025 DFT0009802 FRANCHISE TAX BOARD State Tax Withholding 11.76 03/20/2025 DFT0009808 FRANCHISE TAX BOARD State Tax Withholding 11.76 03/20/2025 DFT0009838 FRANCHISE TAX BOARD State Tax Withholding 10,557.05 03/20/2025 DFT0009842 FRANCHISE TAX BOARD State Tax Withholding 483.82 Vendor 01631 - FRANCHISE TAX BOARD Total: 11,113.79
Vendor: 01669 - GLOBALSTAR USA
04/01/2025 APA002427 GLOBALSTAR USA 3/16 #254-241-0048 &49/PD 176.61 Vendor 01669 - GLOBALSTAR USA Total: 176.61
Vendor: 01673 - GOLDEN METERS SERVICE
04/01/2025 APA002428 GOLDEN METERS SERVICE 2/6 (541)MIU UPGRADES/WTR 28,132.00 Vendor 01673 - GOLDEN METERS SERVICE Total: 28,132.00
Vendor: 01676 - GOLDEN WEST PIPE & SUPPLY
04/01/2025 APA002429 GOLDEN WEST PIPE & SUPPLY 3/12 RPR PARTS/CP 144.63 Vendor 01676 - GOLDEN WEST PIPE & SUPPLY Total: 144.63
Vendor: 01684 - GRAINGER
04/01/2025 APA002431 GRAINGER 2/25 JANITORIAL SUPPLIES/PW 1,249.23 2/27 RET'D JANITORIAL -697.49

SUPPLIES/PW
04/01/2025 APA002431 GRAINGER
Vendor 01684 - GRAINGER Total: 551.74
Vendor: 04597 - GREENTECH LANDSCAPE INC
AUG'24 TREE 6,750.00

TRIMMING/CH&CC
04/01/2025 APA002433 GREENTECH LANDSCAPE INC
Vendor 04597 - GREENTECH LANDSCAPE INC Total: 6,750.00
Vendor: 01727 - HINDERLITER DE LLAMAS & ASSOC
04/01/2025 APA002434 HINDERLITER DE LLAMAS & A… JAN-MAR'25 SALES TAX SVCS 1,367.76 Vendor 01727 - HINDERLITER DE LLAMAS & ASSOC Total: 1,367.76 Vendor: 02642 - HOME DEPOT
04/01/2025 APA002435 HOME DEPOT 3/11 TOOLS/PW 18.25
04/01/2025 APA002435 HOME DEPOT 3/11 SUPPLIES/WTR 107.69 04/01/2025 APA002435 HOME DEPOT 3/10 SUPPLIES/PW 45.63
04/01/2025 APA002435 HOME DEPOT 3/10 SUPPLIES/PW 37.60
04/01/2025 APA002435 HOME DEPOT 3/19 SUPPLIES/FON 42.83 04/01/2025 APA002435 HOME DEPOT 3/12 SUPPLIES/PW 26.92
04/01/2025 APA002435 HOME DEPOT 3/5 SUPPLIES/PW 18.41
04/01/2025 APA002435 HOME DEPOT 2/12 SUPPLIES/WTR 17.22 Vendor 02642 - HOME DEPOT Total: 314.55
Vendor: 03521 - INFRASTRUCTURE ENGINEERS A BOWMAN COMPANY 04/01/2025 APA002436 INFRASTRUCTURE ENGINEERS… FEB'25 CITY ENGINEER SVC/PW 1,987.00 04/01/2025 APA002436 INFRASTRUCTURE ENGINEERS… FEB'25 CITY ENGINEER SVC/PW 795.00 04/01/2025 APA002436 INFRASTRUCTURE ENGINEERS… FEB'25 CITY ENGINEER SVC/PW 795.00 04/01/2025 APA002436 INFRASTRUCTURE ENGINEERS… FEB'25 CITY ENGINEER SVC/PW 398.00 Vendor 03521 - INFRASTRUCTURE ENGINEERS A BOWMAN COMPANY Total: 3,975.00 Vendor: 01764 - INTERNAL REVENUE SERVICE
03/20/2025 DFT0009720 INTERNAL REVENUE SERVICE Federal Tax Withholding 74.78 03/20/2025 DFT0009722 INTERNAL REVENUE SERVICE Medicare 9.86 03/20/2025 DFT0009726 INTERNAL REVENUE SERVICE Federal Tax Withholding 74.78

Page 40 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 8 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount 03/20/2025 DFT0009728 INTERNAL REVENUE SERVICE Medicare 9.86 03/20/2025 DFT0009740 INTERNAL REVENUE SERVICE Federal Tax Withholding 10.51 03/20/2025 DFT0009742 INTERNAL REVENUE SERVICE Medicare 0.50 03/20/2025 DFT0009785 INTERNAL REVENUE SERVICE Federal Tax Withholding 0.10 03/20/2025 DFT0009801 INTERNAL REVENUE SERVICE Federal Tax Withholding 25.30 03/20/2025 DFT0009803 INTERNAL REVENUE SERVICE Medicare 3.32 03/20/2025 DFT0009807 INTERNAL REVENUE SERVICE Federal Tax Withholding 25.30 03/20/2025 DFT0009809 INTERNAL REVENUE SERVICE Medicare 3.32 03/20/2025 DFT0009837 INTERNAL REVENUE SERVICE Federal Tax Withholding 27,839.09 03/20/2025 DFT0009839 INTERNAL REVENUE SERVICE Medicare 6,930.06 03/20/2025 DFT0009841 INTERNAL REVENUE SERVICE Federal Tax Withholding 1,125.86 03/20/2025 DFT0009843 INTERNAL REVENUE SERVICE Medicare 178.08 Vendor 01764 - INTERNAL REVENUE SERVICE Total: 36,310.72 Vendor: 01775 - IRON MOUNTAIN
04/01/2025 APA002437 IRON MOUNTAIN MAR'25 RECORDS STORAGE 300.17 Vendor 01775 - IRON MOUNTAIN Total: 300.17
Vendor: 05637 - J SQUARED CONSULTING
04/01/2025 APA002438 J SQUARED CONSULTING OCT'24 CONSULTING SVCS 250.00 Vendor 05637 - J SQUARED CONSULTING Total: 250.00
Vendor: 05140 - JACOB GREEN & ASSOCIATES INC
FY24/25 COUNCIL GOAL 18,562.50
SETTING PMT(2/2)/CC
04/01/2025 APA002432 JACOB GREEN & ASSOCIATES …
2/13&27 Executive Coaching 500.00
Svcs/CS
04/01/2025 APA002432 JACOB GREEN & ASSOCIATES …
Vendor 05140 - JACOB GREEN & ASSOCIATES INC Total: 19,062.50 Vendor: 03559 - JEFF JENKINS SERVICE TECHNICIAN
5/19 CHLORINE 1,315.89

GENERATOR/CY
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
6/11-12 CHLORINE 930.00

GENERATOR/CY
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
9/15 CHLORINE 1,525.00

GENERATOR/WW
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
9/17 CHLORINE 1,729.85

GENERATOR/WW
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
9/18&27 CHLORINE 1,025.19

GENERATOR/CY
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
9/28 CHLORINE 675.00

GENERATOR/WW
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
11/12 CHLORINE 1,281.29

GENERATOR/CY
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
10/15 CHLORINE 845.00

GENERATOR/WW
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
10/21 CHLORINE 1,440.21

GENERATOR/WW
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
10/22 CHLORINE 680.00

GENERATOR/WW
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
12/17 CHLORINE 421.03

GENERATOR/CY
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
12/30 CHLORINE 845.00

GENERATOR/CY
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI…
04/01/2025 39859 JEFF JENKINS SERVICE TECHNI… 1/7 CHLORINE GENERATOR/CY 985.00 Vendor 03559 - JEFF JENKINS SERVICE TECHNICIAN Total: 13,698.46 Vendor: 05472 - JESSICA CHENG
04/01/2025 APA002418 JESSICA CHENG 3/8 PAVILION DEPOSIT RFD 200.00 Vendor 05472 - JESSICA CHENG Total: 200.00
Vendor: 01801 - JHM SUPPLY INC
1/21 IRRIGATION MAINT 234.90

SUPPLIES/CP
04/01/2025 APA002440 JHM SUPPLY INC
Vendor 01801 - JHM SUPPLY INC Total: 234.90

Page 41 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 9 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount Vendor: 05502 - JOSEPH OWENS
04/01/2025 APA002449 JOSEPH OWENS 3/9 GAZEBO DEPOSIT RFD 100.00 Vendor 05502 - JOSEPH OWENS Total: 100.00
Vendor: 03089 - JOSHUA GARCIA
04/01/2025 2258 JOSHUA GARCIA 3/23 ComputerLoan 1,382.12 04/01/2025 2258 JOSHUA GARCIA 3/9-12 POST SLI CLASS 552/PD 301.00 Vendor 03089 - JOSHUA GARCIA Total: 1,683.12
Vendor: 03684 - JUSTIN BRAASCH
04/01/2025 2257 JUSTIN BRAASCH 3/3-5 FTO TRNG/PD 103.02 Vendor 03684 - JUSTIN BRAASCH Total: 103.02
Vendor: 05537 - KAREN GONZALEZ
04/01/2025 APA002430 KAREN GONZALEZ 2/27 BANNERS/FON 1,835.00 Vendor 05537 - KAREN GONZALEZ Total: 1,835.00
Vendor: 01959 - KONICA MINOLTA PREMIER
3/15-4/14 COPIER 598.50

RENTAL/CH,PD,REC
03/25/2025 DFT0009849 KONICA MINOLTA PREMIER
Vendor 01959 - KONICA MINOLTA PREMIER Total: 598.50
Vendor: 01975 - L P G E A
03/20/2025 39848 L P G E A LPGEA Dues Withheld 234.00
Vendor 01975 - L P G E A Total: 234.00
Vendor: 01980 - LA PALMA CAR WASH
04/01/2025 39860 LA PALMA CAR WASH 2/3-3/3 CAR WASH/PD 671.00 Vendor 01980 - LA PALMA CAR WASH Total: 671.00
Vendor: 01984 - LA PALMA INTERCOMMUNITY HOSPITAL
04/01/2025 APA002442 LA PALMA INTERCOMMUNITY…FEB '24 MEALS ON WHEELS 708.00 Vendor 01984 - LA PALMA INTERCOMMUNITY HOSPITAL Total: 708.00 Vendor: 01988 - LA PALMA POLICE ASSN
03/20/2025 39850 LA PALMA POLICE ASSN LPPA Dues Withheld 1,487.96 Vendor 01988 - LA PALMA POLICE ASSN Total: 1,487.96
Vendor: 05515 - LAURA BLAZQUEZ
04/01/2025 39855 LAURA BLAZQUEZ 12355 CAMP TT RFD 223.00 Vendor 05515 - LAURA BLAZQUEZ Total: 223.00
Vendor: 01976 - LPPEA
03/20/2025 39851 LPPEA LPPEA Dues Withheld 60.00
Vendor 01976 - LPPEA Total: 60.00
Vendor: 02070 - M M A S C
2/24 MMASC Spring '25 115.00
Conference/DCM
04/01/2025 APA002443 M M A S C
4/3 MMASC SPRING 115.00

FORUM/MA
04/01/2025 APA002443 M M A S C
Vendor 02070 - M M A S C Total: 230.00
Vendor: 05072 - MASTERLUBE CYPRESS
04/01/2025 APA002444 MASTERLUBE CYPRESS 3/5 OIL CHANGE/#744 55.47 04/01/2025 APA002444 MASTERLUBE CYPRESS 3/7 OIL CHANGE/#739 60.32 04/01/2025 APA002444 MASTERLUBE CYPRESS 3/11 OIL CHANGE/#751 99.81 04/01/2025 APA002444 MASTERLUBE CYPRESS 3/12 OIL CHANGE/#746 99.81 04/01/2025 APA002444 MASTERLUBE CYPRESS 3/12 OIL CHANGE/#741 60.32 04/01/2025 APA002444 MASTERLUBE CYPRESS 3/17 OIL CHANGE/#752 107.08 04/01/2025 APA002444 MASTERLUBE CYPRESS 3/17 OIL CHANGE/#756 121.34 Vendor 05072 - MASTERLUBE CYPRESS Total: 604.15
Vendor: 02183 - MINUTEMAN PRESS
04/01/2025 APA002445 MINUTEMAN PRESS 3/12 (200)FORM TR100/PD 263.33 04/01/2025 APA002445 MINUTEMAN PRESS (885)WTR BILL INSERTS/WTR 307.98 Vendor 02183 - MINUTEMAN PRESS Total: 571.31
Vendor: 01752 - MISSION SQUARE - PLAN 302549
03/20/2025 APA002402 MISSION SQUARE - PLAN 302… Deferred Comp 1,192.30

Page 42 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 10 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount 03/20/2025 APA002402 MISSION SQUARE - PLAN 302… Deferred Comp 1,690.00 03/20/2025 APA002402 MISSION SQUARE - PLAN 302… Deferred Comp 2,520.52 Vendor 01752 - MISSION SQUARE - PLAN 302549 Total: 5,402.82 Vendor: 02201 - MUNICIPAL WATER DISTRICT OF
04/01/2025 39863 MUNICIPAL WATER DISTRICT … FEB'25 CAPACITY CHARGE 593.36 04/01/2025 39863 MUNICIPAL WATER DISTRICT … FEB'25 WTR RTS CHARGE 298.65 JUL'24 MTR ACCURANCY 1,886.00

TESTING
04/01/2025 39864 MUNICIPAL WATER DISTRICT …
DISTRIBUTION SYSYTEM LEAK 5,070.00

DETECTION
04/01/2025 39864 MUNICIPAL WATER DISTRICT …
JUL'24 WTR LOSS CONTROL 40,300.00
TECH
04/01/2025 39864 MUNICIPAL WATER DISTRICT …
04/01/2025 39864 MUNICIPAL WATER DISTRICT … JUL'24 ROLLOVER FUNDS -10,910.00 Vendor 02201 - MUNICIPAL WATER DISTRICT OF Total: 37,238.01 Vendor: 05638 - MUSCO SPORTS LIGHTING LLC
INSTL FOR LP SOFTBALL & 4,070.28

TENNIS/CP
04/01/2025 APA002446 MUSCO SPORTS LIGHTING LLC
INSTL FOR LP SOFTBALL & 5,280.72

TENNIS/CP
04/01/2025 APA002446 MUSCO SPORTS LIGHTING LLC
Vendor 05638 - MUSCO SPORTS LIGHTING LLC Total: 9,351.00 Vendor: 05790 - MV CHENG & ASSOCIATES INC,
FEB'25 ACCTNG CONSULTING 3,300.00

SERVICES/FIN - PAYROLL
04/01/2025 39865 MV CHENG & ASSOCIATES INC,
Vendor 05790 - MV CHENG & ASSOCIATES INC, Total: 3,300.00 Vendor: 02228 - NEXT DAY SIGNS
3/3 (16)TRAF CNTRL SIGN 87.60

DECALS/PW
04/01/2025 APA002447 NEXT DAY SIGNS
Vendor 02228 - NEXT DAY SIGNS Total: 87.60
Vendor: 02248 - OCCUPATIONAL HEALTH CENTERS OF CA
04/01/2025 39866 OCCUPATIONAL HEALTH CEN… 3/6 EMPL PHYS/(1)PD VOL 181.00 04/01/2025 APA002448 OCCUPATIONAL HEALTH CEN… 03/13 EMP PHYS (1) CS PT 577.00 04/01/2025 APA002448 OCCUPATIONAL HEALTH CEN… 03/12 EMP PHYS (1) PD VOL 181.00 Vendor 02248 - OCCUPATIONAL HEALTH CENTERS OF CA Total: 939.00 Vendor: 02270 - ORANGE COUNTY WATER DISTRICT
JUL'24-DEC'24 WTR 4,580.02

PRODUCTION/INTEREST
04/01/2025 39867 ORANGE COUNTY WATER DIS…
Vendor 02270 - ORANGE COUNTY WATER DISTRICT Total: 4,580.02 Vendor: 02277 - PARS
04/01/2025 APA002450 PARS Jan '25 PARS Adm Svcs 405.14
Vendor 02277 - PARS Total: 405.14
Vendor: 02280 - PERS - MEDICAL
Apr '25 Health Premium Adm 128.25
Fee/FT
04/01/2025 DFT0009844 PERS - MEDICAL
Apr '25 Health Plan 11,629.92
Premium/RET
04/01/2025 DFT0009844 PERS - MEDICAL
Apr '25 Health Premium Adm 66.15
Fee/RET
04/01/2025 DFT0009844 PERS - MEDICAL
Apr '25 Health Plan 53,435.82
Premium/FT
04/01/2025 DFT0009844 PERS - MEDICAL
Vendor 02280 - PERS - MEDICAL Total: 65,260.14
Vendor: 02279 - PERS RETIREMENT
CalPERS Employee -26.63
Contribution
03/20/2025 DFT0009737 PERS RETIREMENT
03/20/2025 DFT0009738 PERS RETIREMENT CalPERS Employer Contribution -27.04 CalPERS Employee -0.77
Contribution
03/20/2025 DFT0009782 PERS RETIREMENT
03/20/2025 DFT0009783 PERS RETIREMENT CalPERS Employer Contribution -0.79 CalPERS Employee 1,963.58
Contribution
03/20/2025 DFT0009824 PERS RETIREMENT

Page 43 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 11 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount 03/20/2025 DFT0009825 PERS RETIREMENT CalPERS Employer Contribution 3,932.04 CalPERS Employee 1,477.30
Contribution
03/20/2025 DFT0009826 PERS RETIREMENT
03/20/2025 DFT0009827 PERS RETIREMENT CalPERS Employer Contribution 2,142.10 CalPERS Employee 3,791.15
Contribution
03/20/2025 DFT0009828 PERS RETIREMENT
03/20/2025 DFT0009829 PERS RETIREMENT CalPERS Employer Contribution 3,849.89 CalPERS Employee 1,766.69
Contribution
03/20/2025 DFT0009830 PERS RETIREMENT
03/20/2025 DFT0009831 PERS RETIREMENT CalPERS Employer Contribution 5,751.59 CalPERS Employee 416.83
Contribution
03/20/2025 DFT0009832 PERS RETIREMENT
03/20/2025 DFT0009833 PERS RETIREMENT CalPERS Employer Contribution 1,077.20 CalPERS Employee 8,163.02
Contribution
03/20/2025 DFT0009834 PERS RETIREMENT
03/20/2025 DFT0009835 PERS RETIREMENT CalPERS Employer Contribution 8,142.19 Employee Survivor 48.36
Contribution Amount
03/20/2025 DFT0009836 PERS RETIREMENT
Vendor 02279 - PERS RETIREMENT Total: 42,466.71
Vendor: 02338 - PRINT N COPY CENTER
(4400)MAR/APR'25 SOURCE 617.81

NEWSLETTER/PD
04/01/2025 APA002451 PRINT N COPY CENTER
Vendor 02338 - PRINT N COPY CENTER Total: 617.81
Vendor: 05137 - READWRITE EDUCATIONAL SOLUTIONS INC.
04/01/2025 APA002452 READWRITE EDUCATIONAL SO…3/3-3/19 MAT… 57.85 3/3-3/19 READING 57.85

DEVELOPMENT
04/01/2025 APA002452 READWRITE EDUCATIONAL SO…
3/3-3/19 READING 289.25

DEVELOPMENT
04/01/2025 APA002452 READWRITE EDUCATIONAL SO…
Vendor 05137 - READWRITE EDUCATIONAL SOLUTIONS INC. Total: 404.95 Vendor: 05374 - RIL AUDIO VISUAL
04/01/2025 39869 RIL AUDIO VISUAL 5/26 SOUND/MEM DAY 500.00 Vendor 05374 - RIL AUDIO VISUAL Total: 500.00
Vendor: 02456 - S J CONTRACTOR
WATER REFILL STATIONS & 1,166.00

INSTALLATION
03/26/2025 APA002404 S J CONTRACTOR
Vendor 02456 - S J CONTRACTOR Total: 1,166.00
Vendor: 05204 - SKYHAWKS SPORTS ACADEMY LLC
04/01/2025 APA002454 SKYHAWKS SPORTS ACADEMY…2/7-3/7 SOCCER TOTS 520.65 04/01/2025 APA002454 SKYHAWKS SPORTS ACADEMY…2/7-3/7 SOCCER TOTS 578.50 04/01/2025 APA002454 SKYHAWKS SPORTS ACADEMY…2/7-3/7 SOCCER 289.25 Vendor 05204 - SKYHAWKS SPORTS ACADEMY LLC Total: 1,388.40 Vendor: 02535 - SMART & FINAL
04/01/2025 APA002455 SMART & FINAL 3/10 KITCHEN SUPPLIES/PD 95.26 04/01/2025 APA002455 SMART & FINAL 3/17 SUPPLIES/INSPOTEEN 38.76 04/01/2025 APA002455 SMART & FINAL 3/17 OFFICE SUPPIES/REC 22.96 04/01/2025 APA002455 SMART & FINAL 3/14 KITCHEN SUPPLIES/PD 58.76 Vendor 02535 - SMART & FINAL Total: 215.74
Vendor: 04797 - SMART CIENEGA LLC
04/01/2025 APA002456 SMART CIENEGA LLC APR'25 CAM & INS/5414 LP 508.00 2024 CAM & INS RECON/5414 23.82
LP
04/01/2025 APA002456 SMART CIENEGA LLC
Vendor 04797 - SMART CIENEGA LLC Total: 531.82
Vendor: 02568 - STAPLES BUSINESS ADVANTAGE
04/01/2025 APA002458 STAPLES BUSINESS ADVANTA… 3/1 OFFICE SUPPLIES/PD 83.17 04/01/2025 APA002458 STAPLES BUSINESS ADVANTA… 3/1 OFFICE SUPPLIES/PD 21.19 04/01/2025 APA002458 STAPLES BUSINESS ADVANTA… 3/6 OFFICE SUPPLIES/PD 41.59 04/01/2025 APA002458 STAPLES BUSINESS ADVANTA… 3/6 OFFICE SUPPLIES/PD 15.96 Vendor 02568 - STAPLES BUSINESS ADVANTAGE Total: 161.91

Page 44 of 271 ends

Warrant Register Post Dates: 3/19/2025 - 4/1/2025
3/27/2025 1:56:42 PM Page 12 of 15
Payment Date Payment Number Vendor Name Description (Item) Amount Vendor: 02572 - STATE CONTROLLER'S OFFICE
04/01/2025 39870 STATE CONTROLLER'S OFFICE FY 24/25 ANNUAL ST RPT SVCS 3,260.71 Vendor 02572 - STATE CONTROLLER'S OFFICE Total: 3,260.71 Vendor: 02576 - STEP SAVER INC
3/3 WTR TREATMENT 110.45

SUPPLIES/CY
04/01/2025 APA002459 STEP SAVER INC
3/3 WTR TREATMENT 180.54

SUPPLIES/WW
04/01/2025 APA002459 STEP SAVER INC
3/17 WTR TREATMENT 139.12

SUPPLIES/CY
04/01/2025 APA002459 STEP SAVER INC
3/17 WTR TREATMENT 179.48

SUPPLIES/WW
04/01/2025 APA002459 STEP SAVER INC
Vendor 02576 - STEP SAVER INC Total: 609.59
Vendor: 02590 - SUN BADGE COMPANY
04/01/2025 APA002460 SUN BADGE COMPANY RPR BADGE/PD 450.18 Vendor 02590 - SUN BADGE COMPANY Total: 450.18
Vendor: 02654 - THE STANDARD
Feb '25 LTD Ins Prem/Misc 944.72
Empl
04/01/2025 APA002457 THE STANDARD
04/01/2025 APA002457 THE STANDARD Feb '25 Life Ins Prem/All Empl 856.71 Vendor 02654 - THE STANDARD Total: 1,801.43
Vendor: 04630 - T-MOBILE USA INC
2/16-3/15 INTERNET 21.61

TABLET/CEO
04/01/2025 39871 T-MOBILE USA INC
Vendor 04630 - T-MOBILE USA INC Total: 21.61
Vendor: 02698 - TRUE LINE
04/01/2025 APA002461 TRUE LINE FENCING & STRIPING/CP 78,451.77 04/01/2025 APA002461 TRUE LINE FENCING & STRIPING/CP 4,129.04 Vendor 02698 - TRUE LINE Total: 82,580.81
Vendor: 02706 - U S BANK INSTITUTIONAL TRUST-WESTERN REGION PARS Part Time Retirement 920.64
Contributions
03/20/2025 APA002403 U S BANK INSTITUTIONAL TRU…
Vendor 02706 - U S BANK INSTITUTIONAL TRUST-WESTERN REGION Total: 920.64 Vendor: 03123 - UNIFORM DEPOT INC
04/01/2025 APA002462 UNIFORM DEPOT INC 2/25 UNIFORM/PD VIP 49.22 Vendor 03123 - UNIFORM DEPOT INC Total: 49.22
Vendor: 04008 - VERITIV OPERATING COMPANY
2/27 JANITORIAL 911.62
SUPPLIES/PW`
04/01/2025 APA002463 VERITIV OPERATING COMPANY
04/01/2025 APA002463 VERITIV OPERATING COMPANY 2/24 JANITORIAL SUPPLIES/PW 484.37 Vendor 04008 - VERITIV OPERATING COMPANY Total: 1,395.99 Vendor: 02763 - WEST COAST ARBORISTS INC
04/01/2025 APA002464 WEST COAST ARBORISTS INC 2/28 TREE PRUNING/CH 555.30 Vendor 02763 - WEST COAST ARBORISTS INC Total: 555.30
Vendor: 02788 - WRIGHT EXPRESS
03/19/2025 DFT0009840 WRIGHT EXPRESS 2/28 GASOLINE/PD 5,137.67 03/19/2025 DFT0009840 WRIGHT EXPRESS 2/28 GASOLINE REBATE -28.51 03/19/2025 DFT0009840 WRIGHT EXPRESS 2/28 GASOLINE/PW 473.39 03/19/2025 DFT0009840 WRIGHT EXPRESS 2/28 GASOLINE/WTR 836.46 Vendor 02788 - WRIGHT EXPRESS Total: 6,419.01
Grand Total: 530,160.56

Page 45 of 271 ends

Agenda Item No. 4 April 1, 2025 | 1
City of La Palma
Agenda Item No. 4
MEETING DATE: April 1, 2025
TO: City Council
FROM: City Manager
SUBMITTED BY: Kimberly Kenney, City Clerk
AGENDA TITLE: Destruction of Obsolete Departmental Records RECOMMENDED ACTION:

It is recommended that the City Council adopt a Resolution authorizing the destruction of obsolete records pursuant to the California Government Code Section 34090.

SUMMARY:

Government Code Section 34090 permits the destruction of City records with the written consent of the City Attorney and approval of the City Council. The City’s records retention program, adopted on September 15, 2009, by Resolution No. 2009-45, establishes retention periods for all City records and provides for the systematic destruction of obsolete records.

Attached is the Resolution with Exhibits A, B, and C, which list the records submitted for destruction. The Records Destruction Certificates (Exhibits A, B, and C) have been reviewed and signed by the Department Directors and will be approved for destruction by the City Attorney as well as prior to the destruction of all records.

FISCAL IMPACT:

There is no fiscal impact associated with the destruction of obsolete records.

ATTACHMENTS:

1. Resolution Approving Records Destruction

Page 46 of 271 ends

Resolution No. 2025-__

Page 1 of 2 ends

RESOLUTION NO. 2025-__

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

LA PALMA AUTHORIZING THE DESTRUCTION OF

CERTAIN CITY RECORDS
WHEREAS, Section 34090 of the California Government Code authorizes the destruction of City records upon approval of the legislative body of the City and the written consent of the City Attorney provided that said records do not fall within certain specified categories and are not less than two (2) years old; and WHEREAS, the City Clerk has requested authority for the destruction of certain records, which do not fall within the excepted categories and all of which records are more than two (2) years old.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Palma, that records as listed on Exhibits “A” dated March 17, 2025; Exhibit “B” dated April 1, 2025; and Exhibit “C” dated March 25, 2025, attached hereto and incorporated herein, may be destroyed.

APPROVED AND ADOPTED by the City Council of the City of La Palma at a regular meeting held on the 1st day of April, 2025.
________________________________
Mark I. Waldman
Mayor
ATTEST:
___________________________________
Kimberly Kenney, CMC
City Clerk

Page 47 of 271 ends

Resolution No. 2025-__

Page 2 of 2 ends

STATE OF CALIFORNIA )

COUNTY OF ORANGE ) SS

CITY OF LA PALMA )
I, KIMBERLY KENNEY, City Clerk of the City of La Palma, California, DO HEREBY CERTIFY that the foregoing resolution was adopted by the City Council of said City at a regular meeting of said City Council held on the 1st day of April, 2025, and that it was so adopted by called vote as follows:

AYES:

NOES:
_______________________________
Kimberly Kenney, CMC
City Clerk

Page 48 of 271 ends
Page 49 of 271 ends
Page 50 of 271 ends
Page 51 of 271 ends

Agenda Item No. 5 April 1, 2025 | 1
City of La Palma
Agenda Item No. 5
MEETING DATE: April 1, 2025
TO: City Council
FROM: City Manager
SUBMITTED BY: Belinda Deines, Community Development Manager AGENDA TITLE: Authorize Agreements for Development of a Cross-Connection Control Plan
RECOMMENDED ACTION:

It is recommended that the City Council:

1. Approve and authorize the City Manager to execute the Cost Sharing Agreement with 24 Public Water Systems in Orange County to ensure compliance with State regulations for $5,981.65 to the Irvine Ranch Water District; and

2. Authorize the City Manager to execute a professional services agreement with John Robinson Consulting, Inc. to prepare the City's Cross-Connection Control Management Plan for an amount not-to-exceed $24,900.

SUMMARY:

In December 2023, the California State Water Resources Control Board, Division of Drinking Water (SWRCB DDW), adopted the Cross-Connection Control Policy Handbook (Handbook), replacing previous drinking water regulations effective July 1, 2024. The Handbook strengthens drinking water safety by requiring Public Water Systems (PWSs) to implement enhanced cross-connection control measures in compliance with Title 17 of the California Code of Regulations.

The Handbook mandates that all PWSs prepare and submit a Cross-Connection Control Plan (CCCP) addressing ten specific requirements by July 1, 2025. Submissions must be approved by SWRCB DDW’s Santa Ana Regional Water Quality Control Board office.

To ensure timely compliance with these requirements, the City of La Palma has partnered with Irvine Ranch Water District and 24 other Orange County PWSs in a collaborative effort led by Irvine Ranch Water District (IRWD) (Attachment 1). This partnership has engaged John Robinson Consulting, Inc. (JRC) to develop a Template Cross-Connection Control Plan (Template Plan), which will provide a customizable framework tailored to each PWS, streamline compliance efforts, and establish consistent regional standards. The attached Fee Estimate (Attachment 2) from IRWD does not include all agencies. However, it is anticipated that all 25 agencies will divide the total cost of $111,260 plus an individual agency meeting of $1,531.25. Therefore, the total cost per agency for the Template

Page 52 of 271 ends

Agenda Item No. 5 April 1, 2025 | 2
Plan is estimated at $5,981.65.

Given the City's limited staffing in the Public Works Division at this time, staff recommends that the City hire JRC for professional consulting services to prepare the City's CCCP as detailed in the Proposal (Attachment 3). The Template Plan will be customized to City of La Palma operating procedures and reporting requirements, and a draft Ordinance for the implementation of these regulations will be presented to the City Council by no later than July 1, 2025, as required by State law. JRC prepared the template and is implementing the CCCP for the cities of Orange, Newport Beach, and Huntington Beach. John Robinson was also involved in the original design of the City's Walker Well in the 1980s. The contract fee for the preparation of the City's final CCCP shall not exceed $24,900.

NOTIFICATION AND FOLLOW-UP:

Irvine Ranch Water District
John Robinson Consulting, Inc.

FISCAL IMPACT:

Sufficient funding of $31,000 is available in the FY 2024-25 Budget in the Water Fund’s Professional Contract Services account (050-430-6000-00000).

ATTACHMENTS:

1. Cost Sharing Agreement - IRWD

2. Template CCC Plan Fee Estimate - IRWD

3. CCCMP Implementation Proposal from JRC

Page 53 of 271 ends

1 20877033.10

COST SHARING AGREEMENT
(Development of Template Cross-Connection Control Plan) This Development of Template Cross-Connection Control Plan Cost Sharing Agreement ("Agreement") is effective for each party as of the later date of the two signatures below ("Effective Date") and is between IRVINE RANCH WATER DISTRICT ("IRWD"), CITY OF

ANAHEIM, CITY OF BREA, CITY OF BUENA PARK, CITY OF FOUNTAIN VALLEY,

CITY OF FULLERTON, CITY OF GARDEN GROVE, CITY OF HUNTINGTON BEACH,

CITY OF LA HABRA, CITY OF LA PALMA, CITY OF NEWPORT BEACH, CITY OF SAN

CLEMENTE, CITY OF SANTA ANA, CITY OF SEAL BEACH, CITY OF TUSTIN, CITY OF

WESTMINSTER, EL TORO WATER DISTRICT, LAGUNA BEACH COUNTY WATER

DISTRICT, MESA WATER DISTRICT, MOULTON NIGUEL WATER DISTRICT, SANTA

MARGARITA WATER DISTRICT, SOUTH COAST WATER DISTRICT, TRABUCO CANYON WATER DISTRICT, and YORBA LINDA WATER DISTRICT. Each is referred to individually as a "Party," and collectively as the "Parties." A. The California State Water Resources Control Board ("State Board"), which regulates all Public Water Systems ("PWSs") in California, requires PWSs to protect the public water supply by compliance with Title 17 of the California Code of Regulations. The State Board has adopted the Cross-Connection Control Policy Handbook ("Handbook"), effective July 1, 2024, to establish standards to which each PWS's drinking water distribution system will be subject regarding the backflow of liquids, gases, or other substances. The Handbook requires each PWS, no later than July 1, 2025, to prepare and submit a Control Plan that will describe how the PWS will fulfill the ten requirements identified in the Handbook. Each PWS in Orange County must submit its Control Plan to the Division of Drinking Water at the Santa Ana Regional Water Quality Control Board office for review and approval.

B. The Parties have determined that it will be to their joint advantage to collaborate to develop a template for a control plan ("Template Control Plan") that may, with minor modifications, be adapted for use by each of the Parties. The Parties further agree that a qualified consultant with industry knowledge will be required to assist the Parties in developing the Template Control Plan (the "Work"). The Parties will schedule meetings that will be held approximately monthly with the selected consultant to advance the creation of the Template Control Plan.

C. The Parties intend by this Agreement to provide the framework under which they will share costs for the selected consultant's Work.

The Parties therefore agree as follows:

1. Contract for the Work. On behalf of all of the Parties, IRWD shall serve as the contracting agency and will request proposals from qualified consultants and ultimately select and enter into a Professional Services Agreement (“PSA”) with the successful proposer ("Consultant") to perform the Work. The selection will be made with the assistance of whichever other Parties volunteer to participate in the selection process. IRWD shall promptly pay all invoices submitted by the Consultant for the Work. At the conclusion of the Work and IRWD’s receipt of the Consultant’s final invoice, or by August 1, 2025, whichever occurs first, IRWD

Page 54 of 271 ends

2 20877033.10
shall invoice each of the Parties (including any additional parties hereafter added to this Agreement pursuant to Section 3, below) for their proportional share of the costs of the Work (as further described in Section 4, below).

2. Scope of Work. The Consultant will develop a specific scope for the Work, budget, and schedule necessary to produce a Template Control Plan that the Parties can adapt to meet requirements of the State Board as set forth in the Handbook. The Consultant will perform the Work on a time-and-materials basis for an estimated not-to-exceed amount of $180,000, which includes 20 percent for contingencies above the Consultant’s estimated costs of $150,000.

These costs are subject to the cost-sharing provisions set forth in Section 4, below.

3. Additional Parties. In addition to the Parties listed above, additional parties may be added to this Agreement, subject to all of the covenants, terms, and conditions of the Agreement. Additional parties may join this Agreement at any time before completion of the Work upon written invitation by one or more of the original Parties, by executing the signature page and delivering an electronic version to all then-current Parties. Additional parties will be treated as original parties to this Agreement and equally share in the total cost of the Work, as described in Section 4, below.

4. Cost Sharing. The Parties shall share equally the cost of the Work. Each Party’s share of the cost will be determined by taking the total invoiced amount from Consultant for all completed Work and dividing that amount by the number of Parties at the conclusion of the Work. At the conclusion of the Work, IRWD will invoice each Party for an equal share of the total cost of the Work. Each Party shall pay IRWD its equal share no later than 60 days after receiving the invoice. Upon the request of any Party, IRWD will provide copies of the Consultant's invoices and IRWD's payment records.

5. Meetings. IRWD shall coordinate all aspects of the Work with the selected Consultant. Any Party may participate in meetings with the Consultant to review interim and final results of the Work. IRWD will schedule meetings of the Parties to facilitate review of the Work, and will schedule meetings with the Consultant and the Parties at the reasonable request of any Party for the same purpose.

6. Indemnity. Each Party shall indemnify, defend, and hold the other Parties, and their officers, agents, and employees harmless from any expense, liability, injury, loss, damage or expense to persons or property (collectively, “Claims”) that may arise or may be claimed to have arisen as a result of the development and approval of the Template Control Plan. Each Party's indemnity and defense obligations will not apply to any portion of any Claims determined by a court of competent jurisdiction to have been proximately caused by the negligence, gross negligence or willful misconduct of another Party, its officers, agents, or employees.

Notwithstanding the foregoing sentences in this section, each Party is solely responsible for its own costs and expenses associated with the indemnity and defense obligations set forth in this section, and such costs are not subject to cost sharing under this Agreement. This section shall survive the termination or expiration of this Agreement.

7. Property. All documents, data, and written materials furnished by a Party to Consultant shall remain that Party’s property and shall be returned to that Party upon request. All

Page 55 of 271 ends

3 20877033.10
documents, data, or written material prepared or caused to be prepared by Consultant, its officers, employees, agents, and subcontractors in the course of implementing this Agreement shall become the joint property of the Parties, and each Party shall have the right to use and modify such materials without further approval or compensation to Consultant or the other Parties.

8. Withdrawal. Any Party may withdraw from this Agreement upon 30 days’ written notice to the other Parties. However, the payment obligations of that Party will be pro-rated based on the percent of the Work accomplished up to the withdrawal date.

9. Warranty of Authority. Each person executing this Agreement in a representative capacity represents and warrants that he or she is authorized to execute this Agreement on behalf of and to bind the Party on whose behalf he or she executes the Agreement.

10. Construction. This Agreement will be construed as if the Parties jointly prepared it.

11. No Third Party Beneficiaries. This Agreement is not for the benefit of any person or entity other than the Parties and any additional parties described in Section 3 above.

12. Modification. This Agreement may not be modified by any of the Parties by oral representation made before or after the execution of this Agreement. All modifications must be in writing and signed by the Parties or their successors in interest at the time of modification.

13. Further Documents. The Parties shall execute and deliver all documents and perform all further acts that may be reasonably necessary to effectuate the provisions of this Agreement.

14. Governing Law. This Agreement is entered into and will be construed and interpreted in accordance with the laws of the State of California.

15. Execution of Agreement. This Agreement may be executed in multiple counterparts. The signature page of this Agreement may be executed by way of a manual or electronic or digital signature. Delivery of an executed counterpart of a signature page by electronic transmission will be effective.

16. Incorporation of Recitals. The Recitals set forth above are incorporated herein and made an operative part of this Agreement.

17. Relationship of the Parties. Nothing contained in this Agreement shall be deemed or construed by the Parties or by any third person to create the relationship of principal and agent, or partnership or joint venture, or any association between the Parties, and none of the provisions contained in this Agreement or any act of the Parties shall be deemed to create any relationship other than as specified herein.

18. Severability. If any provision of this Agreement shall be held illegal, invalid, or unenforceable, in whole or in part, by a court of competent jurisdiction, the legality, validity, and enforceability of the remaining provisions shall not be affected thereby.

Page 56 of 271 ends

4 20877033.10

19. Entire Agreement. This Agreement contains the entire agreement of the Parties relating to the subject matter hereof; and the Parties have made no agreements, representations or warranties, either written or oral, relating to the subject matter hereof that are not set forth herein.

Page 57 of 271 ends

5 20877033.10
The Parties are signing this Agreement to be effective as of the Effective Date.

Date:

IRVINE RANCH WATER DISTRICT
By:

Paul A. Cook
General Manager
APPROVED AS TO FORM:

Hanson Bridgett, LLP
By: ____________________________
IRWD Counsel
Date:

CITY OF ANAHEIM
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney
Date:

CITY OF BREA
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney

Page 58 of 271 ends

6 20877033.10
Date:

CITY OF FOUNTAIN VALLEY
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney
Date:

CITY OF FULLERTON
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney
Date:

CITY OF GARDEN GROVE
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney

Page 59 of 271 ends

7 20877033.10
Date:

CITY OF HUNTINGTON BEACH
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney
Date:

CITY OF LA PALMA
By:

Name: Conal McNamara
Title: City Manager
APPROVED AS TO FORM:

By: ____________________________
City Attorney
Date:

CITY OF NEWPORT BEACH
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney

Page 60 of 271 ends

8 20877033.10
Date:

CITY OF SAN CLEMENTE
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney
Date:

CITY OF SANTA ANA
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney
Date:

CITY OF TUSTIN
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
City Attorney

Page 61 of 271 ends

9 20877033.10
Date:

EL TORO WATER DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
District Counsel
Date:

LAGUNA BEACH COUNTY WATER

DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
District Counsel
Date:

MESA WATER DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
District Counsel

Page 62 of 271 ends

10 20877033.10
Date:

MOULTON NIGUEL WATER

DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
District Counsel
Date:

SANTA MARGARITA WATER

DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
District Counsel
Date:

SOUTH COAST WATER DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
District Counsel

Page 63 of 271 ends

11 20877033.10
Date:

TRABUCO CANYON WATER

DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
District Counsel
Date:

YORBA LINDA WATER DISTRICT
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
Andrew B. Gagen
District Counsel
Date:

PARTY NAME
By:

Name:

Title:

APPROVED AS TO FORM:

By: ____________________________
Title:

Page 64 of 271 ends

Task Project Tasks
John Robinson
Project
Manager
Thomas
Holliman, PE
Principal
Planner
Hourly Rate $165 $210

1.0 Meetings
Initial Kick off Meeting 4 4 8 $1,500 $1,500Monthly Group Meetings (18 meetings) - 4 hrs/mtg including pre/post preparation 72 72 144 $27,000 $500 $27,500 SUBTOTAL 76 76 152 $28,500 $500 $29,000

2.0 Meetings with Individual PWS Cross-Connection Control Teams Meetings with each of the 16 PWS (4 hrs/mtg including pre/post preparation) 64 64 128 $24,000 $500 $24,500 SUBTOTAL 64 64 128 $24,000 $500 $24,500

3.0 Create Template Cross Connection Control Plan
Prepare Template CCC Plan - Individual Section 3.1.1 (a) (1) through (10) 80 112 192 $36,720 $36,720 Receive and incorporate comments - Individual Section 3.1.1 (a) (1) through (10) 20 60 80 $15,900 $15,900Prepare Draft Template CCCP 16 40 56 $11,040 $11,040Prepare Final Draft Template CCCP 8 24 32 $6,360 $6,360 SUBTOTAL 124 236 360 $70,020 $0 $70,020

4.0 As Needed Communications with IRWD
Meetings and Coordination with IRWD staff 24 8 32 $5,640 $5,640 SUBTOTAL 24 8 32 $5,640 $0 $5,640

5.0 Project Management
Progress Reports 40 0 40 $6,600 $6,600
SUBTOTAL 40 0 40 $6,600 $0 $6,600

2.0 Meetings with Individual PWS Cross-Connection Control Teams Additional OPTIONAL eight (8) meetings for future PWS 32 32 64 $12,000 $250 $12,250 32 32 64 $12,000 $250 $12,250
TOTAL 360 416 776 $146,760 1,250 $ 148,010 $
COST TO EACH OF THE 24 PUBLIC WATER SYSTEM ENTITIES $ 6,167.08 Not-to-Exceed Fee
Irvine Ranch Water District - Template Cross Connection Control Plan TOTAL
FEES
Total
Hours Total Labor ODCs

Page 1 ends
Page 65 of 271 ends

1055 E. Colorado Blvd, STE 500, Pasadena, CA 91106 TEL (626) 375-9389 www.johnrobinsonconsulting.com March 24, 2025
Ms. Belinda Deines, Community Development Manager
City of La Palma
7822 Walker Street
La Palma, CA 90623
Subject: Letter Proposal to assist City of La Palma to develop a Cross-Connection Control Management Plan
Dear Ms. Deines:

John Robinson Consulting, Inc. (JRC) in association with Thomas R. Holliman Associates (TRHA) are pleased to offer our professional services letter proposal per discussion during the Public Water System meetings. City of La Palma (La Palma or City) are looking for assistant to develop and finalize a Cross-Connection Control Management Plan (CCCMP) that is consistent with the State Water Resource Control Board Division of Drinking Water’s (DDW) Cross Connection Control Policy Handbook (CCCPH).

Per the CCCPH, La Palma will be required to have standards for backflow protection and crossconnection control which will included general requirements, hazard assessment and backflow prevention assemblies protection. Finally there will be required an establish record keeping, backflow incident response and notification. See Attachment 1 for DDW’s CCCPH which was adopted on December 19, 2023, effective July 1, 2024 and revised in March 2025.

JRC is a California S Corporation, a certified Small Business Enterprise (SBE) with the State of California Department of General Services and Metropolitan Water District of Southern California. Our firm is located in the City of Pasadena and Highland, respectively.

JRC and TRHA offers a strong cross connection control knowledge which is support with the last 30 and 40 years of effort, respectively JRC staff has prepared over twenty cross connection control programs with the last 10 years. Within the last 2 months, JRC completed and submitted the cross connection control program for Jurupa Community Services District located in Riverside and are assisting a number of agencies including cities, private water system and special district with their Cross-Connection Control Management Plans
This letter proposal outlines our scope of services, schedule and compensation to develop and finalize a CCCMP for La Palma.

SCOPE OF SERVICES
Task 1 – Meetings and Coordination
JRC will conduct two meetings with La Palma staff during the course of the development of the CCCMP. JRC will prepare the agenda three (3) days prior to the meeting and provide meeting minutes with specific action items two (2) days after the meeting.

Page 66 of 271 ends

Ms. Belinda Deines, Community Development Manager - 2 - March 24, 2025 1055 E. Colorado Blvd, STE 500, Pasadena, CA 91106 TEL (626) 375-9389 www.johnrobinsonconsulting.com JRC will submit progress reports to La Palma staff by the 1st of each month with the JRC’s invoice.

The Progress Reports will provide updates on the project schedule, deliverables, and activities.

Task 2 - Hazard Assessment
JRC will review the City's current hazard assessment procedures and determine if the current process is acceptable and meets CCCPH's initial hazard assessment requirements. The City currently has water meters and backflow prevention assemblies installed on domestic and fire service lines of commercial, multi-family, institutional, and irrigation customers. Each category of user will require a separate hazard assessment approach. JRC is currently developing a schedule of hazard assessment approaches for each of the user classes and discussing those approaches with the DDW, for twenty-four water agencies in La Palma County, including the City. Assessing residential users may include, but not be limited to, determining if the resident has a pool, gray water system, onsite well, sewer injector pump system, or other feature that would require backflow prevention at the meter. Commercial/Industrial site assessments may focus on the unprotected commercial/industrial sites as Phase 1 of the assessments.

JRC will advise on developing a process and assist with performing initial hazard assessments, including for all of the user classifications. JRC will assist with establishing procedures for conducting hazard reassessments of user premises. Assistance will be in the form of developing the approaches and drafts of assessment forms or flyers. It will not include performing site inspections.

Task 3 – Draft Cross-Connection Control Plan
JRC will develop and provide a Draft CCCMP that includes, at a minimum, all procedures and documentation listed in Section 3.1.4 of the CCCPH. JRC will be responsible for ensuring the approval of the CCCMP from both City’s City Council. JRC will assist the City with the submission of the CCCMP to DDW. JRC responsibility to ensure approval will be limited to addressing needed corrections or adjustments to the CCCMP to ensure final approval from the City’s City Council.

The Draft CCCMP will include draft language to comply with:
• Section 3.1.3(a)(1) of the Handbook: Operating Rules and Ordinances • Section 3.1.3 (a)(2) of the Handbook: Cross- Connection Control Program Coordinator • Section 3.1.3 (a)(3) of the Handbook: Hazard Assessments • Section 3.1.3 (a)(4) of the Handbook: Backflow Prevention • Section 3.1.3 (a)(5) of the Handbook: Certified Backflow Prevention Assembly Testers and Certified Cross-Connection Control Specialists
• Section 3.1.3 (a)(6) of the Handbook: Backflow Prevention Assembly Testing • Section 3.1.3 (a)(7) of the Handbook: Recordkeeping
• Section 3.1.3(a)(8) of the Handbook: Backflow Incident Response, Reporting and Notification
• Section 3.1.3 (a) (9) of the Handbook: Public Outreach and Education • Section 3.1.3 (a) (10) of the Handbook: Local Entity Coordination.

The CCCMP will ensure compliance with relevant state regulations and guidelines focusing on the CCCPH adopted by DDW as the primary State regulation and guideline.

Page 67 of 271 ends

Ms. Belinda Deines, Community Development Manager - 3 - March 24, 2025 1055 E. Colorado Blvd, STE 500, Pasadena, CA 91106 TEL (626) 375-9389 www.johnrobinsonconsulting.com The CCCMP will identify specific requirements applicable to the City’s water system and distribution network. In addition, the CCCMP will outline preventive measures, engineering controls, and appropriate backflow prevention devices for each identified hazard.

Task 4 – Revisions to and finalization of CCCMP
JRC will incorporate comments on the Draft CCCMP from La Palma staff JRC will revise the Draft CCCMP and submit it electronically via Word and PDF as a Final CCCMP Deliverables for Tasks 2 and 3:
• Draft CCCMP, electronically, of the ten (10) Template CCCMP sections for City review. • Final Draft CCCMP, electronically for City review and final approval. • Final CCCMP incorporating City comments for DDW submittal.

Time Schedule
JRC proposed the following schedule for the deliverables and if La Palma has a Draft CCCMP deadline that requires the procedure to be completed sooner then we can discuss and modify the schedule.

1. Complete Task 2 Hazard Assessment review and complete the Draft CCCMP for Task 3 within 30-45 working days from Notice to Proceed.

2. Conduct a meeting with the City to review Task 3 deliverable.

3. Task 4 schedule will be developed in coordination with City staff

4. Conduct a meeting with the City for any CCCMP final wrap up items.

Compensation
JRC will provide the above services to La Palma on a time and material basis. Based on JRC’s present knowledge of the services described above, it is recommended that a not-to-exceed budget of $24,900, with the breakdown show in Table 1 on the next page.

Task Project Tasks
John Robinson
Project
Manager
Thomas
Holliman, PE
Principal
Planner
Hourly Rate $165 $210

1.0 Meetings and Coordination 12 12 24 $4,500 $4,500

2.0 Hazard Assessment 8 4 12 $2,160 $2,160

3.0 Draft Cross-Connection Control Management
Plan 20 60 80 $15,900 $15,900

4.0 Revisions and finalization of CCCMP 4 8 12 $2,340 $2,340 Total Hours and Fee 44 84 128 $24,900 $24,900
Total Not-to-Exceed Fee $24,900
Table 1 - Compensation
City of La Palma - Cross-Connection Control Management Plan Total
Hours
Total
Labor
TOTAL
FEES

Page 68 of 271 ends

Ms. Belinda Deines, Community Development Manager - 4 - March 24, 2025 1055 E. Colorado Blvd, STE 500, Pasadena, CA 91106 TEL (626) 375-9389 www.johnrobinsonconsulting.com JRC commits to timely, responsive services, and to deliver excellence in the offered services to the City of La Palma. We are eager and enthusiastic to complete this scope of services.

If there are any questions, please feel free to contact me at (626) 375-9389 or [email protected].

Very truly yours,
John Robinson, Principal
John Robinson Consulting, Inc.
cc: Carlo Nafarrete, City of La Palma

Page 69 of 271 ends

APPENDIX A
DDW’s ADOPTED CROSS-CONNECTION CONTROL POLICY

HANDBOOK

Page 70 of 271 ends

Changes made to the
Cross­Connection Control Policy Handbook
(CCCPH)
Updated: March 2025
This document will be updated to document any changes made to the CCCPH.  The CCCPH (link to CCCPH) will not include any change­tracking.  The date of this document is the most recent version and includes all previous updates to the CCCPH.

All sections referred to in this document are in the CCCPH – no other regulations or documents are changed in this document.

March 2025
Revisions:

Section 3.2.1(f): Noncommunity water systems must conduct an initial or follow­up hazard assessment within two years of the adoption effective date of the CCCPH.

Section 3.2.2(e): Except as noted below, a PWS must ensure its distribution system is protected with no less than DC protection for a user premises with a fire protection system within ten years of adoption the effective date of the CCCPH.

Section 3.2.2(e)(2): For existing fire protection systems that do not meet Section 3.2.2 (e)(3) or cannot install DC protection within ten years of adoption the effective date of the CCCPH…
Purpose and reason: The State Water Board is changing the use of “Adoption Date” in the CCCPH to “Effective Date”.  When the CCCPH was adopted the State Water Board included a six­month gap between the adoption date and the effective date.  The State Water Board intended for all instances of deadlines associated with “Adoption Date” to be replaced with “Effective Date”, but not all instances were changed prior to CCCPH adoption; this change to the CCCPH will correct those errors.

Page 71 of 271 ends

State Water Resources Control Board
Cross-Connection Control
Policy Handbook
Standards and Principles for California’s
Public Water Systems
Adopted: December 19, 2023
Effective: July 1, 2024
Amended: March 19, 2025
California Environmental Protection Agency

Page 72 of 271 ends

i
Table of Contents
Acronyms and Abbreviations ........................................................................................................1 Chapter 1 – Policy Overview.........................................................................................................2

1.1 Objective .............................................................................................................................2

1.2 Applicability .........................................................................................................................2

1.3 Policy Development Background and Legal Authorities......................................................2

1.3.1 California Safe Drinking Water Act ...............................................................................2 Chapter 2 – Background on Backflow Protection and Cross-Connection Control ........................6

2.1 What is a Cross-Connection?..............................................................................................6

2.2 Purpose of a Cross-Connection Control Program...............................................................7

2.3 Notes on Applicability of the Cross-Connection Control Policy Handbook..........................7 Chapter 3 – Standards for Backflow Protection and Cross-Connection Control.........................10 Article 1 – Definitions and General Requirements ..................................................................10

3.1.1 Definitions ...................................................................................................................10

3.1.2 Applicability.................................................................................................................14

3.1.3 Program for Public Water System Cross-Connection Control ....................................14

3.1.4 Plan for Public Water System Cross-Connection Control...........................................16 Article 2 – Hazard Assessments and Required Protection......................................................19

3.2.1 Hazard Assessments..................................................................................................19

3.2.2 Backflow Protection Required.....................................................................................20 Article 3 – Backflow Prevention Assemblies ...........................................................................23

3.3.1 Standards for Types of Backflow Protection...............................................................23

3.3.2 Installation Criteria for Backflow Protection ................................................................23

3.3.3 Field Testing and Repair of Backflow Prevention Assemblies and Air Gap Inspection .............................................................................................................................................24 Article 4 – Backflow Prevention Assembly Testers and Cross-Connection Control Specialists ................................................................................................................................................26

3.4.1 Backflow Prevention Assembly Tester Certification ...................................................26

3.4.2 Cross-Connection Control Specialist Certification ......................................................30 Article 5 – Recordkeeping, Backflow Incident Response, and Notification .............................33

3.5.1 Recordkeeping............................................................................................................33

3.5.2 Backflow Incident Response Procedure .....................................................................33

3.5.3 Backflow Incident Notification .....................................................................................34 Appendix .....................................................................................................................................36

Page 73 of 271 ends

ii
Appendix
Appendix A: Assembly Bills 1671 (2017, Chapter 533) and 1180 (2019, Chapter 455) Appendix B: ASME A112.1.2-2012(R2017) Table 1, Minimum Air Gaps for Generally used Plumbing Fixtures, page 4
Appendix C: Backflow Prevention Assembly Diagrams
Appendix D: High Hazard Premises
Appendix E: General Range of Knowledge for Cross-Connection Control Specialists Appendix F: Example Backflow Incident Reporting Form
Appendix G: Related Statutes and Regulations

Page 74 of 271 ends

1 Acronyms and Abbreviations
As used in this policy, acronyms and abbreviations reference the following:

Acronym or Abbreviation Meaning
AB Assembly Bill
AG Air Gap separation
BAT Best Available Technology
BPA Backflow Prevention Assembly
Bus. & Prof. Code Business and Professional Code
CA California
CBSC California Building Standards Commission
CCCPH Cross-Connection Control Policy Handbook
CCR California Code of Regulations
C.F.R. Code of Federal Regulations
CHSC California Health and Safety Code
Civ. Code Civil Code
DC Double Check valve backflow prevention assembly
DCDA Double Check Detector backflow prevention Assembly DCDA-II Double Check Detector backflow prevention Assembly – type II
Division Division of Drinking Water
EPA Environmental Protection Agency
Gov. Code Government Code
MCL Maximum Contaminant Level
Pen. Code Penal Code
PVB Pressure Vacuum Breaker backsiphonage prevention
assembly
PWS Public Water System
RP Reduced Pressure principle backflow prevention
assembly
RPDA Reduced Pressure principle Detector backflow
prevention Assembly
RPDA-II Reduced Pressure principle Detector backflow
prevention Assembly – type II
RW Recycled Water
SB Senate Bill
SDWA Safe Drinking Water Act
State Water Board State Water Resources Control Board
SVB Spill-resistant Pressure Vacuum Breaker backsiphonage prevention assembly
U.S. United States

Page 75 of 271 ends

2 Chapter 1 – Policy Overview

1.1 Objective
The primary objective of the Cross-Connection Control Policy Handbook (CCCPH) is the protection of public health through the establishment of standards intended to ensure a public water system’s (PWS) drinking water distribution system will not be subject to the backflow of liquids, gases, or other substances. In addition, by providing basic educational information on backflow prevention, the State Water Resources Control Board (State Water Board) intends to build a foundation of awareness within the regulated community regarding the importance of backflow protection and crossconnection control, leading to the implementation of a robust cross-connection control program for PWSs.

1.2 Applicability
The CCCPH and its standards apply to all California PWSs, as defined in California’s Health and Safety Code (CHSC, section 116275 (h)). Compliance with this CCCPH is mandatory for all California PWSs.

1.3 Policy Development Background and Legal Authorities Through the adoption of the CCCPH, the State Water Board is exercising its authority, under California’s Safe Drinking Water Act0F
1 (SDWA), to establish enforceable standards
applicable to California’s PWSs. Failure to comply with the CCCPH may result in the issuance of compliance, enforcement, or other corrective actions against a PWS.

1.3.1 California Safe Drinking Water Act
On October 6, 2017, Assembly Bill 1671 (AB 1671) was approved and filed with the Secretary of State (see Appendix A). AB 1671 amended California’s SDWA through the establishment of CHSC sections 116407 and 116555.5. AB 1671 also amended section 116810 of the CHSC, which is briefly discussed in Appendix G.

On October 2, 2019, Assembly Bill 1180 (AB 1180) was approved and filed with the Secretary of State. AB 1180 amended Section 116407 of the CHSC and added section 13521.2 to the Water Code. AB 1180 requires that the CCCPH include provisions for the use of a swivel or changeover device (swivel-ell).
1 CHSC, div. 104, pt. 12, ch. 4, section 116270 et seq.

Page 76 of 271 ends

3 AB 1671 and 1180 established the following:
· The State Water Board must adopt standards for backflow protection and crossconnection control by January 1, 2020. · The State Water Board may establish standards for backflow protection and cross-connection control through the adoption of the CCCPH, with the CCCPH not being subject to the requirements of the CA Administrative Procedure Act.1F 2 · If standards for backflow protection and cross-connection control are established via the CCCPH, the State Water Board must:
o Consult with state and local agencies and persons, identified by the State Water Board, as having expertise on the subject of backflow protection and cross-connection control.
o Hold at least two public hearings before adoption of the CCCPH. o Post the CCCPH on the State Water Board website.
· Upon the effective date of the CCCPH, the previous cross-connection control standards2F
3 become inoperative, and are repealed 90 days later, unless the State Water Board determines not to repeal a specific existing regulation. · A PWS must implement a cross-connection control program that complies with the standards adopted by the State Water Board.
· Use of a swivel-ell must be consistent with any notification and backflow protection provisions contained in the CCCPH.

The development of the CCCPH included consultation with stakeholders, including state and local agencies, on an array of subjects related to cross-connection control, consistent with the statutory mandate, as well as consideration of input from other stakeholders and the general public in a February 20, 2020 workshop.

Prior to adoption of the CCCPH, in accordance with the statutory mandate, the State Water Board held two public hearings - one on April 27, 2021, and the other on December 5, 2022. A Board Workshop was held on October 18, 2023.

Pursuant to sections 116407 and 116555.5 of the CHSC, the State Water Board chose to adopt standards for backflow protection and cross-connection control through the adoption of this CCCPH, which became effective July 1, 2024.

Aside from the mandates of AB 1671 related to the State Water Board’s need and authority to develop and adopt an enforceable CCCPH, there are long-standing statutory mandates in California’s SDWA concerning backflow protection and crossconnection control, some of which are summarized below. 2 Gov. Code, tit. 2, div. 3, pt. 1, ch. 3.5, section 11340 et seq. 3 Cal. Code Regs., tit. 17, div. 1, ch. 5, subch. 1, grp. 4, arts. 1 & 2, section 7583 et seq.

Page 77 of 271 ends

4 · The State Water Board is required to adopt regulations for the control of crossconnections that it determines to be necessary for ensuring PWSs “distribute a reliable and adequate supply of pure, wholesome, potable, and healthy water.” (CHSC section 116375, subd. (c).)
· Any person who owns a PWS is required to ensure that the distribution system will not be subject to backflow under normal operating conditions. (CHSC section 116555, subd. (a)(2).)
Prior to AB 1671 and the adoption of this CCCPH, California’s regulations pertaining to cross-connection control were set forth in regulations in CCR Title 17,3F 4 which were
adopted in 1987 with minor revisions in 2000. Although still protective to public health, the CCR Title 17 cross-connection regulations required updating as both the drinking water and cross-connection control industries had evolved. This CCCPH updates those regulations, which as previously noted are no longer operative following the adoption of the CCCPH.

The State Water Board may update its standards for backflow protection and crossconnection control through revisions of the CCCPH. Prior to adopting substantive revisions to the CCCPH, the State Water Board will consult with state and local agencies and persons identified as having expertise on the subject by the State Water Board, and the State Water Board will hold at least one public hearing to consider public comments.
4 Cal. Code Regs., tit. 17, div. 1, ch. 5, subch. 1, grp. 4, arts. 1 & 2, section 7583 et seq.

Page 78 of 271 ends

5 This page intentionally left blank

Page 79 of 271 ends

6 Chapter 2 – Background on Backflow Protection
and Cross-Connection Control

2.1 What is a Cross-Connection?
A cross-connection is an interconnection between a potable water supply and a nonpotable source via any actual or potential connection or structural arrangement between a PWS and any source or distribution system containing liquid, gas, or other substances not from an approved water supply. Bypass arrangements, jumper connections, removable sections, improperly installed swivel or change-over devices and other temporary or permanent devices through which, or because of which backflow can occur are considered to be cross-connections.4F
5 The CCCPH includes acceptable
installation criteria for swivel-ell and other types of backflow prevention assemblies (BPAs) to prevent backflow.

Backflow is the undesired or unintended reversal of flow of water and/or other liquids, gases, or other substances into a PWS’s distribution system or approved water supply.

The presence of a cross-connection represents a location in a distribution system through which backflow of contaminants or pollutants can occur. Backflow occurs when a non-potable source is at a greater pressure than the potable water distribution system.

Backflow can occur from either backsiphonage or backpressure. Backsiphonage occurs when a non-potable source enters the drinking water supply due to negative (i.e., sub-atmospheric) distribution system pressure. Backpressure occurs when the pressure from a non-potable source exceeds the pressure in the potable water distribution system.

Backsiphonage may be caused by a variety of circumstances, such as main breaks, flushing, pump failure, or emergency firefighting water demand. Backpressure may occur when heating, cooling, waste disposal, or industrial manufacturing systems are connected to potable supplies and the pressure in the external system exceeds the pressure in the distribution system. Both situations act to change the direction of water, which normally flows from the distribution system to the customer, so that non-potable substances from industrial, commercial, or residential premises flows back into the distribution system through a cross-connection.

Cross-connections are not limited to industrial or commercial facilities. Submerged inlets are found on many common plumbing fixtures and are sometimes necessary features of the fixtures if they are to function properly. Examples of this type of design are siphon-jet urinals or water closets, flushing rim slop sinks, and dental cuspidors. 5 California Department of Health Services (DHS), Public Water Supply Branch. (1988). Guidance Manual for cross connection Control Program (Green Manual). California Department of Health Services.

Page 80 of 271 ends

7 Older bathtubs and lavatories may have supply inlets below the flood level rims, but modern sanitary design has minimized or eliminated this cross-connection in new fixtures. Chemical and industrial process vats sometimes have submerged inlets where the water pressure is used as an aid in diffusion, dispersion and agitation of the vat contents. Even though a supply pipe may be installed above a vat, backsiphonage can still occur. Siphon action has been shown to raise a liquid in a pipe such as water almost 34 feet. Some submerged inlets are difficult to control, including those which are not apparent until a significant change in water level occurs or where a supply may be conveniently extended below the liquid surface by means of a hose or auxiliary piping. A submerged inlet may be created in numerous ways, and its detection may be difficult.

Chemical and biological contaminants have caused illness and deaths during known incidents of backflow, with contamination affecting several service connections, and the number of incidents reported is believed to be a small percentage of the total number of backflow incidents that actually occur. The public health risk from cross-connections and backflow is a function of a variety of factors including cross-connection and backflow occurrence and type and amount of contaminants.

2.2 Purpose of a Cross-Connection Control Program
The purpose of a cross-connection control program is to prevent the occurrence of backflow into a PWS’s distribution system in order to protect customers from contamination or pollution from any on-site hazards. Properly installed and maintained BPAs, devices or methods provide protection against the threat posed by many conditions typically found on a user’s premise.

The use of approved BPAs ensures that the appropriate performance evaluation of the assembly was conducted. It is important and required by the CCCPH to select and properly install an approved BPA that is capable of protecting the distribution system from the hazard identified. The success of a program depends on individuals that are knowledgeable about cross-connection control to identify actual and potential hazards, apply principles of backflow protection and prevention, and implement cross-connection control policies and procedures. A successful program will have ongoing surveillance of a PWS to ensure BPAs, devices or methods are working, and identify new hazards or changes in the distribution system. Certified specialists are needed to properly evaluate the degree of hazard that exists in the distribution system. Hazards typically identified in distribution systems along with the required level of protection are specified in Chapter 3 of the CCCPH.

2.3 Notes on Applicability of the Cross-Connection Control Policy Handbook
The CCCPH provides the basis for regulating the use and management of crossconnection control programs and BPAs in PWSs, and related requirements for supporting programs and policies. Activities or uses outside of the scope of the

Page 81 of 271 ends

8 authority of the State Water Board to regulate PWSs are not regulated by the CCCPH, including California Plumbing Code requirements and definitions not related to PWSs.

Recycled water cross-connection control installations and programs for the purposes of protecting the recycled water supply are not regulated by the CCCPH, although a PWS that uses recycled water is regulated by the CCCPH to ensure that a PWS’s drinking water system has adequate backflow protection from a recycled water system.

Water systems that do not meet the definition of a PWS (e.g. “State Small Water Systems” under CCR Title 22, Article 3) are not regulated by the CCCPH, although they may need to comply with the California Plumbing Code, local health agencies, and other laws or entities.

Transient noncommunity and nontransient noncommunity systems are PWSs and must comply with both the California Plumbing Code and CCCPH. The California Plumbing Code and the CCCPH will overlap in protection of these user premises. To ensure compliance, these noncommunity water systems may need to have internal crossconnection control programs within the user premises.

Noncommunity water systems must have the ability to enforce backflow protection within the premises. Compliance with the California Plumbing Code can be verified by the PWS and used for compliance with the CCCPH. Compliance with the CCCPH is documented through the hazard assessment and maintenance of an inventory of fieldtestable BPAs and methods. Annual field testing of BPAs is required. Where the minimum backflow protection differs between the California Plumbing Code and the CCCPH, the more protective minimum protection will be required.

Page 82 of 271 ends

9 This page intentionally left blank

Page 83 of 271 ends

10 Chapter 3 – Standards for Backflow Protection
and Cross-Connection Control
Article 1 – Definitions and General Requirements

3.1.1 Definitions
The following definitions apply to the terms used in the CCCPH:
“Air-gap separation” or “AG” means a physical vertical separation of at least two (2) times the effective pipe diameter between the free-flowing discharge end of a potable water supply pipeline and the flood level of an open or non-pressurized receiving vessel, and in no case less than one (1) inch.
“Approved water supply” means a water source that has been approved by the State Water Board for domestic use in a public water system and designated as such in a domestic water supply permit issued pursuant to section 116525 of the CHSC. “Auxiliary water supply” means a source of water, other than an approved water supply, that is either used or equipped, or can be equipped, to be used as a water supply and is located on the premises of, or available to, a water user. “Backflow” means an undesired or unintended reversal of flow of water and/or other liquids, gases, or other substances into a public water system’s distribution system or approved water supply.
“Backflow prevention assembly” or “BPA” means a mechanical assembly designed and constructed to prevent backflow, such that while in-line it can be maintained and its ability to prevent backflow, as designed, can be field tested, inspected and evaluated.
“Backflow prevention assembly tester” means a person who is certified as a backflow prevention assembly tester.
“Community water system” means a public water system that serves at least 15 service connections used by yearlong residents or regularly serves at least 25 yearlong residents of the area served by the system.
“Contact hour” means not less than 50 minutes of a continuing education course. “Continuing education course” means a presentation or training that transmits information related to cross-connection control programs and backflow prevention and protection.

Page 84 of 271 ends

11 “Cross-connection” means any actual or potential connection or structural arrangement between a public water system, including a piping system connected to the public water system and located on the premises of a water user or available to the water user, and any source or distribution system containing liquid, gas, or other substances not from an approved water supply.
“Cross-connection control specialist” means a person who is certified as a crossconnection control specialist. “Distribution system” has the same meaning as defined in section 63750.50 of CCR, Title 22, Division 4, Chapter 2.
“Double check detector backflow prevention assembly” or “DCDA” means a double check valve backflow prevention assembly that includes a bypass with a water meter and double check backflow prevention assembly, with the bypass’s water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. This type of assembly may only be used to isolate low hazard cross-connections. See Diagram 1, Appendix C.
“Double check detector backflow prevention assembly – type II” or “DCDA-II” means a double check valve backflow prevention assembly that includes a bypass around the second check, with the bypass having a single check valve and a water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. This type of assembly may only be used to isolate low hazard cross-connections. See Diagram 2, Appendix C. “Double check valve backflow prevention assembly” or “DC” means an assembly consisting of two independently-acting internally-loaded check valves, with tightly closing shut-off valves located at each end of the assembly (upstream and downstream of the two check valves) and fitted with test cocks that enable accurate field testing of the assembly. This type of assembly may only be used to isolate low hazard crossconnections. See Diagram 3, Appendix C. “Existing public water system” or “existing PWS” means a public water system initially permitted on or before July 1, 2024 as a public water system by the State Water Board.
“Hazard Assessment” means an evaluation of a user premises designed to evaluate the types and degrees of hazard at a user’s premises. “High hazard cross-connection” means a cross-connection that poses a threat to the potability or safety of the public water supply. Materials entering the public water supply through a high hazard cross-connection are contaminants or health hazards.

See Appendix D for some examples.

Page 85 of 271 ends

12 “Low hazard cross-connection” means a cross-connection that has been found to not pose a threat to the potability or safety of the public water supply but may adversely affect the aesthetic quality of the potable water supply. Materials entering the public water supply through a low hazard cross-connection are pollutants or non-health hazards.
“New public water system” or “new PWS” means a public water system permitted after July 1, 2024 as a public water system by the State Water Board. A new public water system includes a public water system receiving a new permit because of a change in ownership.
“Noncommunity water system” means a public water system that is not a community water system.
“Nontransient noncommunity water system” means a public water system that is not a community water system and that regularly serves at least 25 of the same persons over six months per year.
“Premises containment” means protection of a public water system’s distribution system from backflow from a user’s premises through the installation of one or more air gaps or BPAs, installed as close as practical to the user’s service connection, in a manner that isolates the water user’s water supply from the public water system’s distribution system.
“Pressure vacuum breaker backsiphonage prevention assembly” or “PVB” means an assembly with an independently-acting internally-loaded check valve and an independently-acting loaded air inlet valve located on the discharge side of the check valve; with test cocks and tightly closing shutoff valves located at each end of the assembly that enable accurate field testing of the assembly. This type of assembly may only be used for protection from backsiphonage and is not to be used to protect from backpressure. See Diagram 4, Appendix C.
“Public water system” or “PWS” has the same meaning as defined in section 116275(h) of the CHSC.
“Recycled Water" is a wastewater which as a result of treatment is suitable for uses other than potable use.
“Reduced pressure principle backflow prevention assembly” or “RP” means an assembly with two independently acting internally-loaded check valves, with a hydraulically operating mechanically independent differential-pressure relief valve located between the check valves and below the upstream check valve. The assembly shall have shut-off valves located upstream and downstream of the two check-valves, and test cocks to enable accurate field testing of the assembly. See Diagram 5, Appendix C.

Page 86 of 271 ends

13 “Reduced pressure principle detector backflow prevention assembly” or “RPDA” means a reduced pressure principle backflow prevention assembly that includes a bypass with a water meter and reduced pressure principle backflow prevention assembly, with the bypass’s water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. See Diagram 6, Appendix C.
“Reduced pressure principle detector backflow prevention assembly – type II” or “RPDA-II” means a reduced pressure principle backflow prevention assembly that includes a bypass around the second check, with the bypass having a single check valve and a water meter accurately registering flow rates up to two gallons per minute and visually showing a registration for all rates of flow. See Diagram 7, Appendix C. “Spill-resistant pressure vacuum breaker backsiphonage prevention assembly” or “SVB” means an assembly with an independently-acting internally-loaded check valve and an independently-acting loaded air inlet valve located on the discharge side of the check valve; with shutoff valves at each end and a test cock and bleed/vent port, to enable accurate field testing of the assembly. This type of assembly may only be used for protection from backsiphonage and is not to be used to protect from backpressure. See Diagram 8, Appendix C.
“State Water Board”, unless otherwise specified, means the State Water Resources Control Board or the local primacy agency having been delegated the authority to enforce the requirements of the CCCPH by the State Water Resources Control Board. “Swivel-Ell” means a reduced pressure principle backflow prevention assembly combined with a changeover piping configuration (swivel-ell connection) designed and constructed pursuant to this Chapter. See design and construction criteria, as well as Diagrams 9a and 9b, Appendix C.
“Transient noncommunity water system” means a noncommunity water system that does not regularly serve at least 25 of the same persons over six months per year. “User premises” means the property under the ownership or control of a water user and is served, or is readily capable of being served, with water via a service connection with a public water system.
“User’s service connection” means either the point where a water user’s piping is connected to a water system or the point in a water system where the approved water supply can be protected from backflow using an air gap or backflow prevention assembly.
“User Supervisor” means a person designated by a water user to oversee a water use site and responsible for the avoidance of cross-connections.

Page 87 of 271 ends

14 “Water supplier” means a person who owns or operates a public water system. “Water user” means a person or entity who is authorized by the PWS to receive water.

3.1.2 Applicability
A public water system (PWS) must comply with the requirements of the CCCPH.

3.1.3 Program for Public Water System Cross-Connection Control (a) A PWS must protect the public water supply through implementation and enforcement of a cross-connection control program. Unless otherwise specified by this Chapter or directed by the State Water Board, a PWS may implement its crossconnection control program, in whole or in part, either directly or by way of contract or agreement with another party. The PWS, however, shall not be responsible for abatement of cross-connections which may exist within a user's premises. The crossconnection control program must include at a minimum the following elements:
(1) Operating rules or ordinances – Each PWS must have operating rules, ordinances, by-laws or a resolution to implement the cross-connection program.

The PWS must have legal authority to implement corrective actions in the event a water user fails to comply in a timely manner with the PWS’s provisions regarding the installation, inspection, field testing, or maintenance of BPAs required pursuant to this Chapter. Such corrective actions must include the PWS’s ability to perform at least one of the following:
(A) deny or discontinue water service to a water user,
(B) install, inspect, field test, and/or maintain a BPA at a water user’s premises, or
(C) otherwise address in a timely manner a failure to comply with the cross-connection control program.
(2) Cross-Connection Control Program Coordinator – The PWS must designate at least one individual involved in the development of and be responsible for the reporting, tracking, and other administration duties of its cross-connection control program. For PWS with more than 3,000 service connections the Cross-Connection Control Program Coordinator must be a cross-connection control specialist.
(3) Hazard Assessments – The PWS must survey its service area and conduct hazard assessments per Article 2 of this Chapter that identifies actual or potential cross-connection hazards, degree of hazard, and any backflow protection needed.
(4) Backflow Prevention – The PWS must ensure that actual and potential cross-connections are eliminated when possible or controlled by the installation of approved BPAs or AG’s consistent with the requirements of the Article 3 of this Chapter.

Page 88 of 271 ends

15 (5) Certified Backflow Prevention Assembly Testers and Certified CrossConnection Control Specialists – The PWS must ensure all BPA testers and cross-connection control specialists used are certified per Article 4 of this Chapter.
(6) Backflow Prevention Assembly Testing – The PWS must develop and implement a procedure for ensuring all BPAs are field tested, inspected, and maintained and AG’s are inspected and maintained in accordance with CCCPH section 3.3.3.
(7) Recordkeeping – The PWS must develop and implement a recordkeeping system in accordance with CCCPH section 3.5.1.
(8) Backflow Incident Response, Reporting and Notification – The PWS must develop and implement procedures for investigating and responding to suspected or actual backflow incidents in accordance with Article 5 of this chapter.
(9) Public Outreach and Education – The PWS must implement a crossconnection control public outreach and education program element that includes educating staff, customers, and the community about backflow protection and cross-connection control. The PWS may implement this requirement through a variety of methods which may include providing information on cross-connection control and backflow protection in periodic water bill inserts, pamphlet distribution, new customer documentation, email, and consumer confidence reports.
(10) Local Entity Coordination – The PWS must coordinate with applicable local entities that are involved in either cross-connection control or public health protection to ensure hazard assessments can be performed, appropriate backflow protection is provided, and provide assistance in the investigation of backflow incidents. Local entities may include but are not limited to plumbing, permitting, or health officials, law enforcement, fire departments, maintenance, and public and private entities.
(b) The cross-connection control program must be developed in consultation with a cross-connection control specialist if:
(1) The PWS has 1,000 or more service connections, or
(2) required by the State Water Board.
(c) A PWS must have at least one cross-connection control specialist as a permanent or contracted employee of the PWS, and that specialist, or their designee, must be able to be contacted within one hour, if:
(1) The PWS has 3,000 or more service connections, or
(2) the PWS has less than 3,000 service connections and is directed by the State Water Board based on hazard assessments conducted pursuant to CCCPH section 3.2.1. or the PWS’s history of backflow incidents.

Page 89 of 271 ends

16 3.1.4 Plan for Public Water System Cross-Connection Control (a) After adoption of the CCCPH, each PWS must submit a written Cross-Connection Control Plan for State Water Board review in accordance with the following schedule:
(1) An Existing PWS must submit the Cross-Connection Control Plan no later than 12 months after the effective date of the CCCPH.
(2) A new PWS must submit the Cross-Connection Control Plan for review and approval prior to issuance of a domestic water supply permit. (3) A PWS may submit a written request to the State Water Board for an extension of the deadline for submittal of its initial Cross-Connection Control Plan. The PWS’s application must include a written description of the need for an extension. Approval of an extension will be at the sole discretion of the State Water Board.
(b) The Cross-Connection Control Plan for a community water system must include, at a minimum, the following cross-connection control program procedures and documentation:
(1) a description of how the community water system will achieve and maintain compliance with each requirement in this Chapter;
(2) a description of the process, personnel, and timeframes for completing initial and ongoing hazard assessments pursuant to CCCPH section 3.2.1; (3) a description of the legal authority pursuant to CCCPH section 3.1.3 to implement corrective actions in the event a water user fails to comply in a timely manner with the provisions of the PWS’s cross-connection control program; (4) a description of the process and timeframes for ensuring each BPA is inspected and field tested, and AG is inspected, at a frequency no less than required by this Chapter;
(5) a description of the process and timeframe for ensuring each non-testable backflow preventer that is under the PWS ownership or administration is installed and maintained according to the California Plumbing Code; (6) a description of the process for ensuring individuals field testing and inspecting BPAs are no less qualified than required by this Chapter, including but not limited to confirmation of the individual’s:
(A) certification as a backflow prevention assembly tester, (B) field test kit or gage equipment accuracy verification, and (C) BPA field test result reports;
(7) a description of the procedures and timeframes of activities for responding to backflow incidents, including notification of customers, and reporting of backflow incidents pursuant to CCCPH section 3.5.2;
(8) contact information for cross-connection control personnel including any cross-connection control program coordinator and specialist; (9) a description of the tracking system that maintains current and relevant information, including:

Page 90 of 271 ends

17 (A) recordkeeping information required pursuant to CCCPH section 3.5.1, (B) location and type of each BPA, and
(C) highest threat potential hazard from which a given BPA is protecting the public water system distribution system;
(10) for user supervisors, if used, the required information pursuant to CCCPH section 3.2.2 (f);
(11) the corrective actions, including timeframes for the corrective actions, that a community water system will implement when:
(A) a cross-connection exists and the BPA installed is not commensurate with the user premises’ hazard or no BPA has been installed, or (B) a BPA needs to be replaced or maintained;
(12) a description of the public outreach and education program to comply with CCCPH section 3.1.3(a)(9); and
(13) the procedures for coordination with local entities (c) The Cross-Connection Control Plan for a noncommunity water system must include, at a minimum, the following cross-connection control program procedures and documentation:
(1) a description of how the noncommunity water system will achieve and maintain compliance with each requirement in this Chapter that is applicable to the noncommunity water system;
(2) a description of the process, personnel, and timeframes for completing initial and ongoing hazard assessments pursuant to CCCPH section 3.2.1; (3) a description of the legal authority pursuant to CCCPH section 3.1.3 to implement corrective actions in the event a water user fails to comply in a timely manner with the provisions of the PWS’s cross-connection control program; (4) a description of the process and timeframes for ensuring each BPA is inspected and field tested and AG is inspected, at a frequency no less than required by this Chapter;
(5) a description of the process and timeframe for ensuring each non-testable backflow preventer for internal protection that is under the PWS ownership or administration is installed and maintained according to the California Plumbing Code;
(6) a description of the process for ensuring individuals field testing and inspecting BPAs are no less qualified than required by this Chapter, including but not limited to confirmation of the individual’s:
(A) certification as a backflow prevention assembly tester, (B) field test kit or gage equipment accuracy verification, and (C) BPA field test result reports;

Page 91 of 271 ends

18 (7) a description of the procedures and timeframes of activities for responding to backflow incidents, including notification of customers, and reporting of backflow incidents pursuant to CCCPH section 3.5.2;
(8) contact information for cross-connection control personnel including the cross-connection control program coordinator;
(9) maintaining a tracking system with current and relevant information, including:
(A) recordkeeping information required pursuant to CCCPH section 3.5.1, (B) location and type of each BPA,
(C) location and type of each non-testable backflow preventer used for internal protection in accordance with the California Plumbing Code, if applicable, and
(D) potential hazard from which a BPA is protecting the public water system distribution system;
(10) for user supervisors, if used, the required information pursuant to CCCPH section 3.2.2(f);
(11) the corrective actions, including timeframes for the corrective actions, that a noncommunity water system will implement when:
(A) a cross-connection exists and the BPA installed is not commensurate with the user premises’ hazard or no BPA has been installed, or (B) a BPA or non-testable backflow preventer needs to be replaced or maintained;
(12) a description of the public outreach and education program to comply with CCCPH section 3.1.3(a)(9); and,
(13) the procedures for coordination with local entities (e.g., local health departments with internal cross-connection control programs, building officials, plumbing officials, etc.).
(d) A PWS must ensure its Cross-Connection Control Plan is, at all times, representative of the current operation of its Cross-Connection Control program. The PWS must make its Cross-Connection Control Plan available to the State Water Board for review upon request. If a PWS makes a substantive revision to its CrossConnection Control Plan, the PWS must submit the revised Cross-Connection Control Plan to the State Water Board for review.

Page 92 of 271 ends

19 Article 2 – Hazard Assessments and Required Protection

3.2.1 Hazard Assessments
(a) To evaluate the potential for backflow into the PWS, each community water system must conduct an initial hazard assessment of the user premises within its service area and each noncommunity water system must conduct an initial hazard assessment of its water distribution system. The hazard assessment must consider:
(1) The existence of cross-connections;
(2) the type and use of materials handled and present, or likely to be, on the user premises;
(3) the degree of piping system complexity and accessibility; (4) access to auxiliary water supplies, pumping systems, or pressure systems; (5) distribution system conditions that increase the likelihood of a backflow event (e.g., hydraulic gradient differences impacted by main breaks and high waterdemand situations, multiple service connections that may result in flow-through conditions, etc.);
(6) user premises accessibility;
(7) any previous backflow incidents on the user premises; and (8) the requirements and information provided in the CCCPH. (b) Each hazard assessment must identify the degree of hazard to the PWS’s distribution system as either a high hazard cross-connection, a low hazard crossconnection, or having no hazard. Examples of some high hazard cross-connection activities may be found in Appendix D.
(c) The hazard assessment must determine whether an existing BPA, if any, provides adequate protection based on the degree of hazard.
(d) Hazard assessments completed prior to the adoption of the CCCPH may be considered as an initial hazard assessment provided that such hazard assessments and associated backflow protection provide protection consistent with the CCCPH and the PWS describes their review of these assessments in the Cross-Connection Control Plan required in CCCPH section 3.1.4.
(e) Subsequent to the initial hazard assessment described in subsection (a), a community water system must perform a hazard assessment under the following criteria:
(1) if a user premises changes account holder, excluding single-family residences;
(2) if a user premises is newly or re-connected to the PWS; (3) if evidence exists of changes in the activities or materials on a user’s premises;
(4) if backflow from a user’s premises occurs;
(5) periodically, as identified in the PWS’s Cross-Connection Control Plan required pursuant to CCCPH section 3.1.4.;

Page 93 of 271 ends

20 (6) if the State Water Board requests a hazard assessment of a user’s premises; and
(7) if the PWS concludes an existing hazard assessment may no longer accurately represent the degree of hazard.
(f) Noncommunity water systems must conduct an initial or follow-up hazard assessment within two years of the effective date of the CCCPH. (g) Noncommunity water system must conduct a follow-up hazard assessment of its water distribution system if any changes are made that could result in a crossconnection or any backflow incidents occur. (h) A cross-connection control specialist must review or conduct each initial and followup hazard assessment pursuant to this section and make a written finding that, in the specialist’s judgment based on cross-connection control principles, the PWS’s hazard assessment properly identified all hazards at the time of the assessment, the appropriate degree of hazards, and the corresponding backflow protection.

3.2.2 Backflow Protection Required
(a) A PWS must ensure its distribution system is protected from backflow from identified hazards through the proper installation, continued operation, and field testing of an approved BPA (see Article 3 for installation and approved BPA criteria). When a DC is required or referenced in the CCCPH, a DCDA or DCDA-II type of assembly may be substituted if appropriate. When an RP is required or referenced in the CCCPH, an RPDA or RPDA-II type of assembly may be substituted if appropriate. (b) The BPA installed must be no less protective than that which is commensurate with the degree of hazard at a user premises, as specified in this Chapter and as determined based on the results of the hazard assessment conducted pursuant to CCCPH section

3.2.1. (c) Unless specified otherwise in this Chapter, a PWS must, at all times, protect its distribution system from high hazard cross-connections (see Appendix D for examples), through premises containment, through the use of AG(s) or RP(s). (1) Following State Water Board review and approval, a PWS may implement an alternate method of premises containment in lieu of a required AG provided that the proposed alternative would not increase the level of risk to protection of public health.
(2) Following State Water Board review and approval, a PWS may accept internal protection in lieu of containment when premises containment is not feasible.

Page 94 of 271 ends

21 (d) Except as otherwise allowed or prohibited in statute or in CCR Title 22, Division 4, Chapter 3, a swivel-ell may be used instead of an AG for premises containment protection when temporarily substituting tertiary recycled water use areas with potable water from a PWS if all the following criteria are met:
(1) the swivel-ell is approved by the State Water Board; (2) the PWS has a cross-connection control program, required pursuant to CCCPH section 3.1.3, and the use and operation of the swivel-ell is described in the Cross-Connection Control Plan required pursuant to CCCPH section 3.1.4; (3) the design and construction-related requirements of the swivel-ell adheres to the criteria in Appendix C;
(4) at least every 12 months, inspections are performed and documented to confirm ongoing compliance with the design and construction-related requirements in Appendix C;
(5) the RP used in conjunction with the swivel-ell is field tested and found to be functioning properly:
(A) immediately upon each switchover to potable water use, a visual inspection of the RP must be completed
(B) within 72 hours of each switchover to potable water use, a field test must be completed, and
(C) at least every 12 weeks the use site is supplied with potable water; and
(6) there is a legally binding agreement between the PWS and the entity supplying the recycled water, signed by those with relevant legal authority, that includes the following requirements:
(A) The State Water Board will be notified within 24 hours of all switchovers to or from potable water, will be given an estimate of the timeframe until the next switchover, and will be provided the results of the field testing required in paragraph (5);
(B) a trained representative of the PWS be present to supervise each switchover; and
(C) within seven days of each switchover, if requested by the State Water Board, the PWS will submit a written report describing compliance with this subsection, as well as potable and recycled water usage information. (e) Except as noted below, a PWS must ensure its distribution system is protected with no less than DC protection for a user premises with a fire protection system within ten years of the effective date of the CCCPH.
(1) A high hazard cross-connection fire protection system, including but not limited to fire protection systems that may utilize chemical addition (e.g., wetting agents, foam, anti-freeze, corrosion inhibitor, etc.) or an auxiliary water supply, must have no less than RP protection.

Page 95 of 271 ends

22 (2) For existing fire protection systems that do not meet Section 3.2.2 (e)(3) or cannot install DC protection within ten years of the effective date of the CCCPH, a PWS may propose in the cross-connection control plan submitted for CCCPH Section 3.1.4:
(A) an alternative date; or
(B) an alternative method of backflow protection that provides at least the same level of protection to public health.
(3) A BPA is not necessary for a low hazard fire protection system on a residential user premises if the following criteria are satisfied:
(A) the user premises has only one service connection to the PWS; (B) a single service line onto the user premises exists that subsequently splits on the property for domestic flow and fire protection system flow, such that the fire protection system may be isolated from the rest of the user premises;
(C) a single, water industry standard, water meter is provided to measure combined domestic flow and fire protection system flow; (D) the fire protection system is constructed of piping materials certified as meeting NSF/ANSI Standard 61; and
(E) the fire protection system’s piping is looped within the structure and is connected to one or more routinely used fixtures (such as a water closet) to prevent stagnant water.
(f) The State Water Board and PWS may, at their discretion, require a water user to designate a user supervisor when the user premises has a multi-piping system that conveys various types of fluids and where changes in the piping system are frequently made. If a user supervisor is designated the following is required:
(1) The user supervisor is responsible for the avoidance of cross-connections during the installation, operation and maintenance of the water user’s pipelines and equipment. The user supervisor must be trained on the fluids used and backflow protection for the premise, and must inform the PWS of changes in piping, and maintain current contact information on file with the PWS; and (2) The PWS must include in the Cross-Connection Control Plan required in CCCPH section 3.1.4 the training and qualification requirements for user supervisors, identify the entity that will provide the user supervisor training, and frequency of any necessary recurring training. The training must adequately address the types of hazards and concerns typically found. (g) Facilities producing, treating, storing, or distributing drinking water that are an approved water supply or water recycling plants as defined by CCR Title 22, Section 60301.710 must have proper internal protection from cross-connections to ensure that all drinking water produced and delivered to customers and workers at those facilities is free from unprotected cross-connections.

Page 96 of 271 ends

23 Article 3 – Backflow Prevention Assemblies

3.3.1 Standards for Types of Backflow Protection
(a) The PWS must ensure that each AG used for its Cross-Connection Control Program meets the requirements in Table 1, Minimum Air Gaps for Generally used Plumbing Fixtures, page 4 of the American Society of Mechanical Engineers (ASME) A112.1.2- 2012(R2017) (See Appendix B).
(b) The PWS must ensure that each replaced or newly installed PVB, SVB, DC, and RP for protection of the PWS is approved through both laboratory and field evaluation tests performed in accordance with at least one of the following:
(1) Standards found in Chapter 10 of the Manual of Cross-Connection Control, Tenth Edition, published by the University of Southern California Foundation for Cross-Connection Control and Hydraulic Research; or
(2) certification requirements for BPAs in the Standards of ASSE International current as of 2022 that include ASSE 1015-2021 for the DC, ASSE 1048-2021 for the DCDA & DCDA-II, ASSE 1013-2021 for the RP, and ASSE 1047-2021 for the RPDA & RPDA-II and must have the 1YT mark.
(c) BPAs must not be modified following approval granted under section 3.3.1 (b). PWS must require BPA testers to notify the PWS if a water user or PWS-owned BPA has been modified from the CCCPH section 3.3.1 (b) approval.

3.3.2 Installation Criteria for Backflow Protection
(a) For AGs, the following is required:
(1) The receiving water container must be located on the water user’s premises at the water user’s service connection unless an alternate location has been approved by the PWS;
(2) all piping between the water user’s service connection and the discharge location of the receiving water container must be above finished grade and be accessible for visual inspection unless an alternative piping configuration is approved by the PWS;
(3) the PWS must ensure that the AG specified in CCCPH section 3.3.1 (a) has been installed; and
(4) any new air gap installation at a user’s service connection must be reviewed and approved by the State Water Board prior to installation. (b) RPs must be installed such that the lowest point of an assembly is a minimum of twelve inches above grade, and a maximum of thirty-six inches above the finished grade, unless an alternative is approved by the PWS.
(c) DCs installed or replaced after the adoption of the CCCPH must be installed according to CCCPH section 3.3.2 (b). Below ground installation can be considered if approved by the PWS where it determines no alternative options are available.

Page 97 of 271 ends

24 (d) A PVB or SVB must be installed a minimum of twelve inches above all downstream piping and outlets.
(e) SVBs may not be used for premises containment. PVBs may only be used for roadway right of way irrigation systems as premises containment where there is no potential for backpressure.
(f) A RP or DC installed after the adoption of the CCCPH must have a minimum side clearance of twelve inches, except that a minimum side clearance of twenty-four inches must be provided on the side of the assembly that contains the test cocks. The PWS may approve alternate clearances providing that there is adequate clearance for field testing and maintenance.
(g) Backflow protection must be located as close as practical to the water user’s service connection unless one or more alternative locations have been approved by the PWS.

If internal protection is provided in lieu of premises containment, the PWS must obtain access to the user premises and must ensure that the on-site protection meets the requirements of this Chapter for installation, field testing, and inspections. (h) Each BPA and air gap separation must be accessible for field testing, inspection, and maintenance.

3.3.3 Field Testing and Repair of Backflow Prevention Assemblies and Air Gap Inspection
(a) PWS must ensure that all BPAs installed for its Cross-Connection Control Program are field tested following installation, repair, depressurization for winterizing, or permanent relocation. All required field testing must be performed by certified backflow prevention assembly testers.
(b) BPAs must be field tested at least annually. The CCCPH does not preclude a PWS, the State Water Board, or a local health agency from requiring more frequent field testing for premises with high hazard cross-connection or BPA at increased risk of testing failure.
(c) Air-gap separations must be visually inspected at least annually to determine compliance with this Chapter by persons certified as backflow prevention assembly testers or certified as a cross-connection control specialist pursuant to this Chapter. (d) PWS must receive passing field tests before providing continuous service to a water user with a newly installed BPA.
(e) PWS must ensure that BPAs that fail the field test are repaired or replaced within 30 days of notification of the failure. Extensions may be allowed by the PWS if included as part of the Cross-Connection Control Plan.

Page 98 of 271 ends

25 (f) PWS must require backflow prevention assembly testers to notify the PWS as soon as possible within 24 hours if a backflow incident or an unprotected cross-connection is observed at the BPA or prior to the user premises during field testing. PWS must immediately conduct an investigation and discontinue service to the user premises if a backflow incident is confirmed, and water service must not be restored to that user premises until the PWS receives a confirmation of a passing BPA field test from a backflow prevention assembly tester and the assembly is protecting the PWS.

Page 99 of 271 ends

26 Article 4 – Backflow Prevention Assembly Testers and CrossConnection Control Specialists

3.4.1 Backflow Prevention Assembly Tester Certification (a) A PWS must ensure that each BPA required by this Chapter to protect the public water system is field tested by a person with valid certification from a certifying organization recognized by the State Water Board pursuant to this Article. (b) A State Water Board-recognized organization certifying backflow prevention assembly testers is one that has a certification process that, at a minimum, includes the following:
(1) A timed and proctored written5F
6 exam, using a closed-book, objective grading
format, consisting of no less than 100 questions for initial certification and no less than 50 questions for recertification. A passing score must be achieved by an examinee as a requirement for certification.
(A) Written exam proctors must:

1. not provide an examinee any assistance in answering exam questions, verbal or otherwise; and

2. be impartial.
(B) Passing scores for the written exams are to be determined prior to exam sessions, such that passing a written exam demonstrates sufficient knowledge of subjects associated with the proper field testing of BPAs, including but not limited to:

1. the hydraulics and theory of backflow;

2. California’s laws, regulations, and requirements related to crossconnection control;

3. types of BPA field test equipment and the need to verify accuracy, at least annually and when otherwise necessary, to ensure accuracy of field test results;

4. field test procedures for an RP, RPDA, RPDA-II, DC, DCDA, DCDA-II, PVB, and SVB using the procedures provided in the Manual of Cross-Connection Control, Tenth Edition, published by the University of Southern California Foundation for CrossConnection Control and Hydraulic Research or equivalent;

5. identification of improperly functioning BPAs (i.e., diagnostics or troubleshooting); and

6. recordkeeping and safety.
6 The requirement for a written exam does not preclude using computerized exams.

Page 100 of 271 ends

27 (2) A performance (i.e., hands-on) exam, using a closed-book, objective grading process and the field test procedures in paragraph (1)(B)(4), designed such that passing the performance exam demonstrates proficiency in accurately determining the operating condition of an RP, DC, PVB, and SVB, when properly or improperly functioning, including but not limited to BPAs with leaks in shutoff valves, and failures in check valves, air inlet valves, or relief valves. A passing score must be achieved by an examinee as a requisite for certification. The performance exam process must include the following:
(A) Performance exam proctors must:

1. be certified as a backflow prevention assembly tester pursuant to this Article;

2. evaluate no more than one examinee at a time;

3. not provide an examinee any assistance in answering exam questions, verbal or otherwise;

4. provide no indication an examinee has erred until completion of a BPA field test, at which time only the fact the examinee has erred may be indicated (i.e., not the nature of the error);

5. be impartial and not affiliated with the certifying organization’s preparation of, or preparatory course for (if applicable), the performance exam; and

6. not evaluate an examinee who was trained by the proctor during the six-month period prior to the exam or other conflict of interest. (B) An examinee is considered to have failed a performance exam if the examinee:

1. makes a field test procedure or recording error that could impact an accurate determination of the operating condition of a BPA,

2. completes the BPA performance exam form with an error,

3. is informed of making an error (see subparagraph (A)(4)) and begins the procedure a second time, and

4. errs a second time and completes the BPA performance exam form accordingly.
(3) recertification requirements of no less frequently than every three years which includes both a written and performance exam;
(4) provisions for revocation of a backflow prevention assembly tester’s certification, including but not limited to, revocation for falsifying field test results or field test reports;

Page 101 of 271 ends

28 (5) a website providing public access to the most recent list of backflow prevention assembly testers:
(A) who hold a valid certification from the certifying organization. At a minimum, the list is to include each backflow prevention assembly tester’s last name, first name, certification number, and the date on which each backflow prevention assembly tester’s certification expires; and (B) whose certification was revoked, pursuant to paragraph (4), in the three years preceding the date of the list. At a minimum, the list is to include each backflow prevention assembly tester’s last name, first name, revoked certification number, the date on which each backflow prevention assembly tester’s certification was revoked, and the reason for revocation. (6) as a prerequisite to sections 3.4.1(b)(1) and (b)(2), completion of an instructional training course accepted by the certifying organization6F 7 that covers
the subjects in subsection (1)(B) and is no less than 30 hours in length over no fewer than four days for:
(A) a backflow prevention assembly tester’s initial certification; (B) a backflow prevention assembly tester’s recertification as a result of revocation; or
(7) In lieu of compliance with section 3.4.1(b)(6) a certifying organization may accept two years prior experience in backflow prevention assembly testing. (c) To be recognized by the State Water Board as a certifying organization for backflow prevention assembly testers, a certifying organization shall:
(1) submit an application with the following information to the State Water Board for review:
(A) written documentation of a certification program that includes a process that is no less stringent than the criteria in subsection (b); (B) evidence that the organization’s certification program and exam process has been reviewed, with concerns adequately addressed, by a credentialed psychometrician proficient in the design of objective exams, experienced in the assessment of certification or licensing organizations, and familiar with the application of the requirements of ISO7F 8 /IEC8F
9 17024:

Conformity Assessment- General Requirements for Bodies Operating Certification of Persons; and
7 But not limited only to training provided by the certifying organization or its affiliates. 8 International Organization for Standardization
9 International Electrotechnical Commission

Page 102 of 271 ends

29 (C) a written statement, signed by the certifying organization’s representative(s) having the authority and legal responsibility for operation of the certifying organization, attesting that the certifying organization will implement its certification program in a manner meeting or exceeding the criteria in subsection (b) and consistent with the application submitted to the State Water Board.
(2) adequately address each State Water Board comment and/or question concerning the application, and
(3) receive written acknowledgment from the State Water Board that the application is complete.
(d) An American National Standards Institute (ANSI)-accredited certifying organization, accredited in accordance with subsection (b) and ISO/IEC 17024, will be considered to be a State Water Board-recognized certifying organization. Beginning three years after the effective date of the CCCPH, only those testers with a valid certification from an ANSI-accredited certifying organization shall satisfy subsection (a) and certifications obtained by organizations in accordance with subsection (c) will be invalid. (e) This Article does not preclude a local health agency from maintaining a backflow prevention assembly tester certification program for the field testing of BPAs within the local health agency’s jurisdiction. Accepting a tester certified by a local health agency does not relieve a PWS from meeting the requirements of this Article. (f) This Article does not preclude a PWS from disallowing the use of an individual tester certified pursuant to this Article if the PWS has reason to believe a certified tester may not be proficient in accurately determining the operating condition of BPA, or for any other reason (e.g., fraud, deceit, negligence, misconduct, etc.). A PWS must report any evidence of a tester falsifying reports to that tester’s certifying organization. (g) This Article is effective July 1, 2025.

Page 103 of 271 ends

30 3.4.2 Cross-Connection Control Specialist Certification (a) A PWS must ensure that cross-connection control specialists, used pursuant to the CCCPH, have valid certification from a certifying organization recognized by the State Water Board pursuant to this Article.
(b) A State Water Board-recognized organization certifying cross-connection control specialists is one that has a certification process that, at a minimum, includes the following:
(1) A timed and proctored, written9F
10 exam, using a closed-book, objective grading
format, consisting of no less than 100 questions for certification. A passing score must be achieved by an examinee as a requirement for certification. (A) Written exam proctors must:

1. not provide an examinee any assistance in answering exam questions, verbal or otherwise; and

2. be impartial.
(B) Passing scores for the exams are to be determined prior to exam sessions, such that passing an exam demonstrates sufficient and comprehensive range of knowledge of the subjects provided in Appendix E, as they may relate to cross-connection control and the causes, effects, and prevention of backflow.
(2) recertification requirements of no less frequently than every three years.

Recertification may be done through at least one of the following:
(A) an exam as required by section 3.4.2 (b)(1),
(B) through 12 contact hours from continuing education courses covering material in Appendix E or,
(C) a combination of exam and continuing education contact hours equivalent to (A) or (B);
(3) provisions for revocation of a specialist’s certification, including but not limited to, falsifying information or providing negligent recommendations inconsistent with industry-standard cross-connection control guidelines; (4) a website providing public access to the most recent list of cross-connection control specialists:
(A) who hold a valid certification from the certifying organization. At a minimum, the list is to include each specialist’s last name, first name, certification number, and the date on which each specialist’s certification expires; or
10 The requirement for a written exam does not preclude using computerized exams.

Page 104 of 271 ends

31 (B) whose certification was revoked, pursuant paragraph (3), in the three years preceding the date of the list. At a minimum, the list is to include each specialist’s last name, first name, revoked certification number, the date on which each specialist’s certification was revoked, and the reason for revocation.
(5) initial certification requirements:
(A) a valid backflow prevention assembly tester certification from a certification organization recognized by the State Water Board pursuant to section 3.4.1; and
(B) completion of an instructional training course (acceptable to the certifying organization10F
11) that covers the subjects in Appendix E and is no
less than 30 hours in length over no fewer than five days (inclusive of an exam, if provided). This paragraph does not preclude a certification organization from providing the instructional training course to the public, including certified specialists.
(C) As an alternative to (A) the certifying organization may accept additional instruction in the subject areas of testing, maintaining and repairing BPAs equivalent in length and scope to the requirements in

3.4.1(b)(6).
(D) As an alternative to (A) the certifying organization may accept a minimum of five (5) years documented experience performing crossconnection control specialist duties, as outlined in Appendix E. (c) To be recognized by the State Water Board as a certifying organization for crossconnection control specialists, a certifying organization shall:
(1)submit an application with the following information to the State Water Board for review:
(A) Written documentation of a certification program that includes a process that is no less stringent than the criteria in subsection (b); (B) evidence that the organization’s certification program and exam process has been reviewed, with concerns adequately addressed, by a credentialed psychometrician proficient in the design of objective exams, experienced in the assessment of certification or licensing organizations, and familiar with the application of the requirements of ISO1F 12/IEC12F13 17024:

Conformity Assessment- General Requirements for Bodies Operating Certification of Persons; and
11 But not limited only to training provided by the certifying organization or its affiliates. 12 International Organization for Standardization
13 International Electrotechnical Commission

Page 105 of 271 ends

32 (C) a written statement, signed by the certifying organization’s representative(s) having the authority and legal responsibility for operation of the certifying organization, attesting that the certifying organization will implement its certification program in a manner meeting or exceeding the criteria in subsection (b) and consistent with the application submitted to the State Water Board.
(2) adequately address each State Water Board comment and question concerning the application, and
(3) receive a written acknowledgment from the State Water Board that the application is complete:
(d) A certifying organization, accredited by the American National Standards Institute (ANSI) in accordance with ISO/IEC 17024, which complies with subsection (b), will be considered to be a State Water Board-recognized certifying organization. Beginning three years after the effective date of the CCCPH, only those specialists with a valid certification from an ANSI-accredited certifying organization shall satisfy subsection (a) and certifications obtained by organizations in accordance with subsection (c) will be invalid.
(e) This Article does not preclude a local health agency from maintaining a crossconnection control specialist certification program for specialists within the local health agency’s jurisdiction. Using a specialist certified by a local health agency does not relieve a PWS from meeting the requirements of this Article. (f) This Article does not preclude a PWS from disallowing the use of an individual crossconnection control specialist certified pursuant to this Article if the PWS has reason to believe a certified specialist may not be proficient in their knowledge of crossconnection control and the causes, effects, and prevention of backflow, or for any other reason (e.g., fraud, deceit, negligence, misconduct, etc.). A PWS must report any evidence of a specialist falsifying reports to that specialist’s certifying organization. (g) This Article is effective July 1, 2025.

Page 106 of 271 ends

33 Article 5 – Recordkeeping, Backflow Incident Response, and Notification

3.5.1 Recordkeeping
(a) Each PWS must maintain the following records:
(1) The two most recent hazard assessments for each user premise, conducted pursuant to CCCPH section 3.2.1 (Hazard Assessment);
(2) for each BPA, the associated hazard or application, location, owner, type, manufacturer and model, size, installation date, and serial number; (3) for each AG installation, the associated hazard or application and the location, owner, and as-built plans of the AG;
(4) results of all BPA field testing, AG inspection, and swivel-ell inspections and field tests for the previous three calendar years, including the name, test date, repair date, and certification number of the backflow prevention assembly tester for each BPA field test and AG and swivel-ell;
(5) repairs made to, or replacement or relocation of, BPAs for the previous three calendar years;
(6) the most current cross-connection tests (e.g. shutdown test, dye test); (7) if a user supervisor is designated for a user premise, the current contact information for the user supervisor and water user, and any applicable training and qualifications as described by CCCPH section 3.2.2(f); (8) descriptions and follow-up actions related to all backflow incidents; (9) if any portion of the cross-connection control program is carried out under contract or agreement, a copy of the current contract or agreement; (10) the current Cross-Connection Control Plan as required in CCCPH section

3.1.4.; and
(11) any public outreach or education materials issued as required in CCCPH section 3.1.3.(a)(9) for the previous three calendar years. (b) All information in subsection (a) must be available to the State Water Board upon request.

3.5.2 Backflow Incident Response Procedure
Each PWS must include backflow incident response procedures in the CrossConnection Control Plan required in CCCPH section 3.1.4. The PWS must describe its procedures for investigating and responding to suspected backflow incidents including, but not limited to, the following:
(a) Consideration of complaints or reports of changes in water quality as possible incidents of backflow;
(b) Water quality sampling and pressure recording; and
(c) Documentation of the investigation, and any response and follow-up activities.

Page 107 of 271 ends

34 3.5.3 Backflow Incident Notification
(a) Each PWS must notify the State Water Board and local health agencies of any known or suspected incident of backflow within 24 hours of the determination. If required by the State Water Board, a PWS must issue a Tier 1 public notification pursuant to CCR, Title 22, Section 64463.1.
(b) If required by the State Water Board, the PWS must submit, by a date specified by the State Water Board, a written incident report describing the details and affected area of the backflow incident, the actions taken by the PWS in response to the backflow incident, and the follow up actions to prevent future backflow incidents. The written report must contain, at a minimum, the information requested in Appendix F.

Page 108 of 271 ends

35 This page intentionally left blank

Page 109 of 271 ends

36 Appendix
Appendix A: Assembly Bill 1671 (2017, Chapter 533) and Assembly Bill 1180 (2019, Chapter 455).

Appendix B: ASME A112.1.2-2012(R2017) Table 1, Minimum Air Gaps for Generally used Plumbing Fixtures, page 4
Appendix C: Backflow Prevention Assembly Diagrams
Appendix D: High Hazard Premises
Appendix E: General Range of Knowledge for Cross-Connection Control Specialists Appendix F: Example Backflow Incident Reporting Form
Appendix G: Related Statutes and Regulations

Page 110 of 271 ends

This page intentionally left blank

Page 111 of 271 ends

Appendix A
Assembly Bill 1671 (2017, Chapter 533)
Assembly Bill 1180 (2019, Chapter 455)

Page 112 of 271 ends

This page intentionally left blank

Page 113 of 271 ends

PLACEHOLDER – ADD PDFs HERE OF AB 1671 (3 PAGES) AND AB 1180 (3 PAGES) AND DELETE THIS PAGE. NEXT PAGE INTENTIONALLY BLANK.

Page 114 of 271 ends

This page intentionally left blank

Page 115 of 271 ends

Appendix B
ASME A112.1.2-2012(R2017) Table 1,
Minimum Air Gaps for Generally used Plumbing
Fixtures, page 4

Page 116 of 271 ends

This page intentionally left blank

Page 117 of 271 ends

B-1
Appendix B
ASME A112.1.2-2012(R2017) Table 1, Minimum Air Gaps for Generally used Plumbing Fixtures,13F
1 page 4
TABLE 1
Minimum Air Gaps for Generally used Plumbing Fixtures4

FIXTURES WHERE NOT AFFECTED
BY SIDEWALLS1
(inches)

WHERE AFFECTED BY
SIDEWALLS2
(inches)
Effective opening3 not
greater than ½ of an inch
in diameter
1 1
1 /2
Effective openings3 not
greater than ¾ of an inch
in diameter
1 1
/2 2
1 /4
Effective openings3 not
greater than 1 inch in
diameter
2 3
Effective openings3
greater than 1 inch in
diameter
Two times the diameter of
effective opening
Three times the diameter of
effective opening
For SI units: 1 inch = 25.4 mm
Notes:
1 Sidewalls, ribs, or similar obstructions do not affect air gaps where spaced from the inside edge of the spout opening at a distance exceeding three times the diameter of the effective opening for a single wall, or at a distance exceeding four times the effective opening for two intersecting walls. 2 Vertical walls, ribs, or similar obstructions extending from the water surface to or above the horizontal plane of the spout opening other than specified in Footnote 1 above. The effect of three or more such vertical walls or ribs has not been determined. In such cases, the air gap shall be measured from the top of the wall.
3 The effective opening shall be the minimum cross-sectional area at the seat of the control valve or the supply pipe or tubing that feeds the device or outlet.

Where two or more lines supply one outlet, the effective opening shall be the sum of the cross-sectional areas of the individual supply lines or the area of the single outlet, whichever is smaller.
4 Air gaps less than 1 inch (25.4 mm) shall be approved as a permanent part of a listed assembly that has been tested under actual backflow conditions with vacuums of 0 to 25 inches of mercury (85 kPa).
1 Reprinted from ASME A112.1.2-2012(R2017), by permission of The American Society of Mechanical Engineers. All rights reserved

Page 118 of 271 ends

B-2
This page intentionally left blank

Page 119 of 271 ends

Appendix C
Backflow Prevention Assembly Diagrams

Page 120 of 271 ends

This page intentionally left blank

Page 121 of 271 ends

C-1
Appendix C
Diagram 1
Double check detector backflow prevention assembly14F
1 1 © 2023 University of Southern California. Used with permission.

Page 122 of 271 ends

C-2
Appendix C
Diagram 2
Double check detector backflow prevention assembly – type II 15F 2 2 © 2023 University of Southern California. Used with permission.

Page 123 of 271 ends

C-3
Appendix C
Diagram 3
Double check valve backflow prevention assembly16F
3 3 © 2023 University of Southern California. Used with permission

Page 124 of 271 ends

C-4
Appendix C
Diagram 4
Pressure vacuum breaker backsiphonage prevention assembly 17F 4 4 © 2023 University of Southern California. Used with permission

Page 125 of 271 ends

C-5
Appendix C
Diagram 5
Reduced pressure principle backflow prevention assembly 18F 5 5 © 2023 University of Southern California. Used with permission

Page 126 of 271 ends

C-6
Appendix C
Diagram 6
Reduced pressure principle detector backflow prevention assembly 19F 6 6 © 2023 University of Southern California. Used with permission

Page 127 of 271 ends

C-7
Appendix C
Diagram 7
Reduced pressure principle detector backflow prevention assembly – type II 20F 7 7 © 2023 University of Southern California. Used with permission

Page 128 of 271 ends

C-8
Appendix C
Diagram 8
Spill-resistant pressure vacuum breaker backsiphonage prevention assembly 21F 8 8 © 2023 University of Southern California. Used with permission

Page 129 of 271 ends

C-9
Appendix C
Swivel-Ell Design and Construction Criteria
The criteria below, in conjunction with the swivel-ell diagrams that follow (Diagrams 9a and 9b), are minimum acceptable design and construction-related requirements for utilizing a swivel-ell. For restrictions and allowances for utilizing a swivel-ell, see CCCPH section 3.2.2.

A. Prior to operation of a swivel-ell, the PWS will receive approval for the design and construction plans of that swivel-ell from the State Water Board.

B. The drinking water supply must not, under any circumstances, be directly connected to the recycled water supply, nor be designed such that the recycled water use site could be supplied concurrently by a recycled water supply and a drinking water supply.

C. The drinking water supply line and the recycled water supply line must be offset (see Diagram 9b) in a manner that ensures a tee-connection, spool, or other prefabricated mechanical appurtenance(s) could not be readily utilized in lieu of the swivel-ell connection, nor result in the recycled water use site being supplied concurrently by recycled water and drinking water.

D. The recycled water supply line used in conjunction with the swivel-ell must be the only recycled water supply to the recycled water use area.

E. The swivel-ell must be located as close as practical to the public water system service connection, with the swivel-ell connection being located as close as practical to the RP upstream of the swivel-ell.

F. The swivel-ell must:

1. be located above ground;

2. be color-coded pursuant to section 116815 of the CHSC and its implementing regulations;

3. include appropriate signage, as required by regulation and the State Water Board;

4. be provided the security necessary to prevent interconnections, vandalism, unauthorized entry, etc.; and

5. be provided with meters on both the recycled water service and drinking water service connections.

Page 130 of 271 ends

C-10
Legend for Diagram 9a and 9b (also see next page)
RP = Reduced pressure principle backflow prevention assembly RW = Tertiary-treated recycled water originating from wastewater treatment facility DW = Drinking water originating from a public water system W = Water (tertiary recycled water or drinking water) to use site. As pictured, configured for supplemental drinking water to the use site.

M = Meter (next page)
PE = Plain End (next page)
GRV = Groove (next page)
PWS = Public Water System (next page)
Diagram 9a: Example Swivel-Ell Pictorial (also see Plan View Schematics) Note: The RP, a required component of an acceptable swivel-ell, is not shown in the picture.

Page 131 of 271 ends

C-11
Diagram 9b: Swivel-Ell Typical Plan View Schematics
(not intended to be an exact portrayal of the pictorial)

Page 132 of 271 ends

C-12
This page intentionally left blank

Page 133 of 271 ends

Appendix D
High Hazard Premises

Page 134 of 271 ends

This page intentionally left blank

Page 135 of 271 ends

D-1

APPENDIX D

HIGH HAZARD CROSS-CONNECTION CONTROL PREMISES
The list below identifies premises that require backflow protection provided by an air gap or a reduced pressure principle backflow prevention assembly, unless noted otherwise. The list below is not intended to be all-inclusive. A PWS, State Water Board, or local health agency may require an AG, RP, or both to protect a PWS from other hazards not listed below and identified in premises through the hazard assessment completed in CCCPH Chapter 3, section 3.2.1. A PWS may reduce or increase the minimum protection required for a previously hazard-assessed user premise following a hazard reassessment as described in CCCPH Chapter 3, section 3.2.1.

1. Sewage handling facilities

2. Wastewater lift stations and pumping stations

3. Wastewater treatment processes, handling, or pumping equipment that is interconnected to a piping system connected to a PWS (+)

4. Petroleum processing or storage plants

5. Radioactive material storage, processing plants or nuclear reactors

6. Mortuaries

7. Cemeteries

8. Sites with an auxiliary water supply interconnected with PWS (+)

9. Sites with an auxiliary water supply not interconnected with PWS

10.Premises with more than one connection to the PWS (++++)

11.Recycled water (++)(+++)

12.Recycled water interconnected to piping system that contains water received from a PWS (+)

13.Graywater systems, as defined in California Water Code Section 14876, that are interconnected to a piping system that is connected to a PWS

14.Medical facilities

15.Kidney dialysis facilities

16.Dental office with water-connected equipment

17.Veterinarian facilities

18.Chemical plants

19.Laboratories

20.Biotech facilities

21.Electronics manufacture

22.Dry cleaner facilities

23.Industrial or commercial laundry facilities

24.Metal-plating facilities

25.Business park with a single meter serving multiple businesses

26.Marine-port facilities

27.Car wash facilities

28.Mobile home park, RV park, or campgrounds with RV hookups

Page 136 of 271 ends

D-2

29.Hotels/motels

30.Gas stations

31.Fire stations

32.Solid waste disposal facilities

33.Pet groomers

34.Agricultural premises

35.Hazard assessment access denied or restricted

36.Railroad maintenance facilities

37.Incarceration facilities (e.g. prisons)

38.Temporary connections to fire hydrants for miscellaneous uses, including construction

39.Private water distribution mains

40.Drinking water storage tank overflow connected to a sump or storm drain (+)

41.Airports
(+) Premise isolated by air gap only except as allowed through CCCPH Section 3.2.2(c) (++) Dual-plumbed use areas established per CCR Title 22, Section 60313 through 60316.
(+++) Residences using recycled water for landscape irrigation as part of an approved dual plumbed use area established pursuant to CCR Title 22, sections 60313 through 60316 shall use, at a minimum, a DC. If the water supplier is also the supplier of the recycled water, then the recycled water supplier may obtain approval of the local public water supplier or the State Water Board, to utilize an alternative backflow protection plan that includes an annual inspection of both the recycled water and potable water systems and an annual cross-connection test of the recycled water and potable water systems pursuant to subsection 60316(a) in lieu of any BPA. (++++) All connections must receive at least the same level of protection excluding fire protection when connected to the PWS distribution system (e.g. if one connection requires an RP then all connections must have RPs installed).

Page 137 of 271 ends

Appendix E
General Range of Knowledge for CrossConnection Control Specialists

Page 138 of 271 ends

This page intentionally left blank

Page 139 of 271 ends

E-1

APPENDIX E
General Range of Knowledge for Cross-Connection Control Specialists To effectively prevent unintended backflow into a PWS’s distribution system, it is necessary for a cross-connection control specialist to have an understanding of a range of subjects related to cross-connection control. This appendix provides a list of such subjects.

This appendix is not meant to preclude instruction of additional subjects that may be necessary or beneficial to the goal of a prospective or existing cross-connection control specialist in being proficient in protecting public health from backflow through crossconnection control measures. Emphasis on particular subjects should be in a manner that best achieves that goal.
(a) GENERAL
(1) Cross-connection control terminology.
(2) The history leading to the need for cross-connection control, including causes, impacts, including but not limited to:
(A) potable water distribution systems;
(B) examples of backflow incidents and actual or potential public health impacts; and
(C) evolution of methods of cross-connection control and backflow prevention assemblies.
(3) Hydraulics (general) – An understanding of hydraulic gradients, pressure variations, flow rates, temperature, the properties of water, backsiphonage, backpressure, and other elements necessary to understand the causes for backflow.
(4) Public outreach – How to appropriately convey the value of cross-connection control to PWS personnel and the public.
(b) LAWS, REGULATIONS, AND GUIDANCE
(1) Federal – Applicable federal laws, regulations, and guidance. (2) State – California laws and regulations, including, but not limited to, the State Water Resources Control Board’s most recent edition of its Cross-Connection Control Policy Handbook and other requirements related to cross-connection control.
(3) Local – An understanding of the need to ensure local requirements are considered and how best to find such requirements.

Page 140 of 271 ends

E-2
(c) HAZARD ASSESSMENTS AND METHODS TO PREVENT BACKFLOW
A comprehensive understanding of how to conduct cross-connection surveys of water systems for the purpose of identifying cross-connections, assessing hazards, and identifying the most effective and legally appropriate methods for protection from backflow. At a minimum, the following topics should be considered to achieve such an understanding:
(1) Surveys:
(A) Preparation (e.g., authority, notification, prioritizing customers/premises, coordinating with public water systems, etc.); (B) Design and as-built drawings related to water supply and crossconnection control; (C) Public water system schematics;
(D) How to identify existing and new construction, with an understanding of how construction may impact backflow protection;
(E) How to identify cross-connections (actual and potential); (F) How to identify and differentiate between high hazard and low hazard cross-connections; and
(G) Problems associated with multi-story buildings, multiple service connections at a premises, typical water-use equipment, etc., and varying types of water service, including irrigation, recycled water, gray water, fire prevention systems, and dual plumbed premises.
(2) Assessing Hazards:
(A) Identifying and differentiating between premises activities leading to high hazard cross-connections and low hazard cross-connections (for examples of high hazard activities, see Appendix D); and (B) Understanding potential public health impacts from backflow associated with the problems in section (c)(1)(G) of this appendix. (3) Assemblies and Methods for Backflow Prevention:
(A) A comprehensive understanding of approved methods for crossconnection control and preventing backflow with respect to an assessed hazard;
(B) Identifying unapproved methods for cross-connection control and preventing backflow;
(C) An understanding of components, design and operation, proper installation and location of backflow prevention assemblies, including air gaps, and backflow prevention assembly field test methods, field test results, and the assessment of air gaps; and
(D) Identifying unapproved assemblies, as well as those assemblies whose operation and/or state of repair necessitates replacement with an approved assembly.

Page 141 of 271 ends

E-3
(d) CROSS-CONNECTION CONTROL PROGRAMS
A comprehensive understanding of the development, elements, and administration of cross-connection control programs, including, but not limited to:
(1) An ability to assess the federal, state, and local requirements applicable to a public water system’s cross-connection control program, such that adherence to the cross-connection control program would result in compliance with the requirements;
(2) The roles, responsibilities, and authority of individuals and entities involved in the critical elements of a successful plan for cross-connection control (see CCCPH section 3.1.4); and
(3) The ability to assess the components of a public water system’s CrossConnection Control Plan (see CCCPH section 3.1.4) that best assures the prevention of undesired backflow into the public water system’s distribution system, and to communicate deficiencies to public water system personnel. (e) CROSS-CONNECTION TESTS
A comprehensive understanding of:
(1) The purpose of a cross-connection test and when a cross-connection test should be performed;
(2) The ability to develop protocols and make arrangements for cross-connection tests, and subsequently oversee and/or perform such cross-connection tests, in a manner that determines whether interconnections exist between unapproved sources and approved water supplies; and
(3) Follow-up actions and notifications if a cross-connection test indicates an interconnection.
(f) RECORDKEEPING AND INCIDENT RESPONSE
A comprehensive understanding of:
(1) The agencies and authorities to be notified in the event of a backflow incident;
(2) How to determine the cause of a backflow incident and the actions necessary to prevent similar incidents in the future;
(3) How to properly document a backflow incident, including but not limited to the information in the example backflow incident response form in Appendix F; and (4) How to properly document the elements associated with surveys and hazard assessments, including those identified in section (c) of this appendix.

Page 142 of 271 ends

E-4
This page intentionally left blank

Page 143 of 271 ends

Appendix F
Example Backflow Incident Reporting Form

Page 144 of 271 ends

This page intentionally left blank

Page 145 of 271 ends

F-1

BACKFLOW INCIDENT REPORT FORM
Water System: _______________________________________________________ Water System Number: _________________________________________________ Incident Date: ________________________________________________________ Incident Time (if known):________________________________________________ Incident Location: _____________________________________________________ How was the incident discovered?
____________________________________________________________________ Backflow Originated from:

Premise Location: ________________________________________________ Address: ______________________________________________________________ Premise Contact Person: _______________________ Title:____________________ Phone:_______________ Email: ________________________________ Connection Type: (please check one)
Industrial   Commercial   Single-Family Residential   Multi-Family Residential Irrigation   Recycled Water   Water System Facility
Other: _______________________________________
Description and source of backflow substance (please be as descriptive as possible):
_____________________________________________________________________ ______________________________________________________________________ If available, please attach an MSDS or other chemical description form Was the backflow fluid contained within the user side? YES   NO Estimated Number of Affected Persons: ______________________________________

Page 146 of 271 ends

F-2
Number and description of consumer complaints received:
______________________________________________________________________ ______________________________________________________________________ Did any consumers report illness? Please describe.
______________________________________________________________________ ______________________________________________________________________ If applicable, please describe the consumer notification:
_____________________________________________________________________ ______________________________________________________________________

INVESTIGATION
Please describe the water system investigation including time frames:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ What was the area system pressure? _______________________________________ Is this within typical range: YES   NO   - typical pressure: _____________ Was a sample of the water contaminated by the backflow incident collected and stored before flushing? YES   NO
Please describe all sampling:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ DDW recommends laboratory or field sampling for the following parameters: total coliform, E. coli, free and total chlorine residual, pH, odor, turbidity, temperature, and color. Additional sampling should be collected at the PWS and regulatory agency’s discretion.

Page 147 of 271 ends

F-3

CORRECTIVE ACTIONS
Please describe the corrective actions taken by the water system:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ Was the chlorine residual increased after discovery of backflow incident? YES   NO Date of the last cross-connection control hazard assessment of the premise with the backflow incident conducted: ______________________________________________ Did the premise have backflow prevention assemblies? YES   NO Date of most recent backflow prevention assembly test(s): _______________________ When was the Division of Drinking Water or Local County Health office notified? Date: __________________Time: __________ Contact Person: __________________ Was the Division or Local County Health notified within 24 hours? YES   NO Other agencies or organizations contacted?

CERTIFICATION
Name: _________________________________ Job Title: _______________________ Certification(s): _________________________________________________________ ______________________________________________________________________ Please list all cross-connection control related certifications including number and expiration date

Page 148 of 271 ends

F-4
I certify that the forgoing information is true and correct to the best of my ability.

Signature: ____________________________ Date: ___________________________ Attach the following applicable documentation

1. Laboratory Test Results

2. Sketch of the cross-connection and modifications

3. MSDS or chemical information forms if chemical hazard is known

4. Applicable backflow assembly test reports including the most recent test before the incident

5. Other relevant supporting documentation

Page 149 of 271 ends

Appendix G
Related Statutes and Regulations

Page 150 of 271 ends

This page intentionally left blank

Page 151 of 271 ends

G-1
The following laws and regulations are considered related or tangential to the CCCPH, and are included in a descriptive format to provide additional, relevant background information
California Laws and Regulations
In addition to the California SDWA statutory requirements cited in CCCPH Chapter 1, section 1.3.1, California has statutes addressing certain authorities and requirements that may have influenced the CCCPH or may otherwise be of interest. ▪ Urban and community water systems must have a written policy on discontinuation of residential service for nonpayment and must not discontinue residential service for nonpayment if certain conditions are met. (CHSC sections 116900 – 116926) ▪ Senate Bill 1263 (2017) requires that before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report which must include a cost comparison of a new public water system and consolidations with an existing system. (CHSC section 116527) ▪ Effective June 24, 2015, Senate Bill 88 (SB 88) (Statutes 2015, Chapter 27) added sections 116680-116684 to the CHSC, allowing the State Water Board to require certain water systems that consistently fail to provide safe drinking water to consolidate with, or receive an extension of service from, another public water system. The consolidation can be physical or managerial. ▪ Local health officers may maintain programs for the control of cross-connections by water users, within water users’ premises, where public exposure to backflow may occur. Such programs may include water user premises inspections, collection of fees, certification of backflow prevention assembly2F
1 (BPA) testers, and other
discretionary elements. Local health officer BPA tester certification standards must be consistent with the standards prescribed in the CCCPH. Water users are required to comply with all orders, instructions, regulations, and notices from the local health officer regarding installation, testing, and maintenance of a BPA. (CHSC sections 116800 - 116820).
▪ Pursuant to the California Building Standards Law (CHSC sections 18901 - 18949.31), the California Building Standards Commission (CBSC) must administer the processes related to the adoption, approval, and publication of regulations referred to as the California Building Standards Code (Title 24, California Code of Regulation). Title 24 serves as the basis for the minimum design and construction 1 California statutes use a variety of terms when referencing a ‘backflow prevention assembly’ (e.g., backflow protective device, backflow protection equipment, backflow prevention device, backflow or back siphonage protection device, backflow preventer, or backflow device). For consistency with industry terminology, ‘backflow prevention assembly’ is used in the CCCPH, unless directly quoted otherwise.

Page 152 of 271 ends

G-2
of buildings in California and includes the California Plumbing Code (Part 5 of Title 24), which contains requirements pertaining to cross-connection control and backflow prevention.
▪ A BPA intended to convey or dispense water for human consumption via drinking or cooking must meet California’s “lead free” requirements. (CHSC section 116875)
▪ Limits are established for the installation of backflow protection equipment where automatic fire sprinkler systems are utilized. (CHSC section 13114.7)23F 2 ▪ Cross-connection control must be addressed in engineering reports that are required (CCR Title 22, section 60323) for recycled water projects. (Wat. Code section 13552.8)
▪ If a public agency requires the use of recycled water for toilet and urinal flushing in a structure (except certain mental health facilities), the public health agency must prepare an engineering report that addresses cross-connection control. (Wat.

Code section 13554)
▪ Prior to indoor use of recycled water in a condominium project, the entity delivering the recycled water must submit a report, for State Water Board24F 3 approval, and
include the following related to cross-connection control (Wat. Code section 13553(d)(1)):
▫ The condominium project must be provided with a backflow prevention assembly approved by the State Water Board.
▫ The backflow prevention assembly must be inspected and tested annually by a certified tester.
▫ The condominium project must be tested by the recycled water agency or local agency at least once every four years for indications of possible crossconnections between the condominium’s potable and non-potable systems. ▪ California’s Department of Water Resources was required to convene a task force, known as the 2002 Recycled Water Task Force, to identify constraints, impediments, and opportunities for the increased use of recycled water and report 2 CHSC section 13114.7 historically provided potential limits for backflow prevention assemblies on fire sprinklers. Even though current standards differ from the language stated in CHSC section 13114.7, it is still being provided as a historical reference as there may still be installations with the now outdated limits established in section 13114.7
3 The California Department of Public Health’s authority and responsibility pertaining to this reference was transferred to the State Water Board via Senate Bill 861 (2014, Chapter 35). As such, applicable statutory mandates that may refer to “California Department of Public Health” or “Department” may be referred to as “State Water Board” in this document.

Page 153 of 271 ends

G-3
to the Legislature by July 1, 2003. The task force was also asked to advise and make recommendations concerning cross-connection control, including the applicability of visual inspections instead of pressure tests for cross-connections between potable and non-potable water systems. (Wat. Code section 13578(b)(1).

The final report25F
4 provided the following recommendations to the State Water Board – Division of Drinking Water (Division):
▫ Prepare guidance on dual plumbed regulations (22 CCR sections 60313-60316) consistent with Appendix J of plumbing code (Chapter 15 of 2019 California Plumbing Code, formerly Chapter 16A).
▫ Support thorough assessment of risk associated with cross-connections between disinfection tertiary recycled water and potable water. ▫ Ensure uniform interpretation of cross-connection control requirement of Title 22 regulations (recycled water) and Title 17 (cross-connection control regulations)
▫ Recommend stakeholders to review draft Title 17 regulations. ▪ A person engaged in the salvage, purchase, or sale of scrap metal who knowingly possesses a backflow prevention assembly (or connections to the assembly or any part of the assembly), or who failed to report the possession of such items, which was previously owned by a utility or public agency, is guilty of a crime. (Pen. Code section 496e)
▪ Junk dealers or recyclers who possess a backflow prevention assembly (or connections to that assembly or any part of the assembly) without a written certification from the agency or utility owning or previously owning the assembly will be liable to the agency or utility for the wrongful possession. (Civ. Code section 3336.5 and, similarly, Bus. & Prof. Code section 21609.1) Please note that a number of the codes, regulations, and statutes cited above are implemented under the authority of regulatory entities other than the State Water Board and would therefore be beyond the scope of this CCCPH. The intent of providing such citations is to increase general awareness with respect to other potential statutory requirements associated with cross-connection control. The list is not exhaustive and does not include other requirements that may exist, including those via regulations that may have been adopted by an appropriate regulatory entity.

Federal Laws and Regulations
4 California Department of Water Resources. (2003). Water Recycling 2030: Recommendations of California’s Recycled Water Task Force

Page 154 of 271 ends

G-4
All suppliers of domestic water to the public are subject to regulations adopted by the U.S. Environmental Protection Agency (EPA) under the U.S. Safe Drinking Water Act (SDWA) of 1974, as amended (42 U.S.C. section 300f et seq.), as well as by the State Board under the California SDWA (Health & Saf. Code, div. 104, pt. 12, ch. 4, section 116270 et seq.). Additionally, the State Water Board has been delegated primacy - the responsibility and authority to administer U.S. EPA's drinking water regulations within California – on the condition that California adopt enforceable requirements no less stringent than U.S. EPA's.

The U.S. EPA currently has no distinct cross-connection control requirements that apply broadly to public water systems (PWS); however, the importance of cross-connection control is evident by the issue papers and guidance documents developed by U.S. EPA and their recognition that cross-connections and backflow represent a significant public health risk (see discussion in Chapter 2). Although U.S. EPA currently has no distinct cross-connection control requirements, the subject of cross-connection or backflow prevention assemblies is included in the U.S. SDWA and the Code of Federal Regulations (C.F.R.) in relation to PWS, including the following:26F 5 ▪ If used exclusively for non-potable services, a backflow prevention assembly (BPA) is exempt from the federal lead prohibitions. (42, U.S.C. section 300g) ▪ Allows increasing disinfectant concentrations in a PWS distribution system in the event of a cross-connection (backflow) event. (40 C.F.R. section 141.130(d)) ▪ Proper maintenance of the distribution system, including cross-connection control, is identified as a best available technology (BAT) for microbial contaminant control. (40 C.F.R. section 141.63(e))
▪ Under the federal Revised Total Coliform Rule, a PWS having a cross-connection control program is one of the enhancements necessary to reduce monitoring for a PWS that had been under an increased monitoring frequency. (40 C.F.R. section 141.854(h)(2))
▪ Under the federal Revised Total Coliform Rule, a PWS having a cross-connection control program is a criterion for a state to allow a reduced monitoring frequency (40 C.F.R. section 141.855(d)(1))
▪ If a state allows the monitoring frequency reductions previously mentioned under the federal Revised Total Coliform Rule, a state is required to include in its primacy package to U.S. EPA how a PWS will be required to demonstrate cross-connection control. (40 C.F.R. section 142.16(q))
5 For requirements unrelated to cross-connection control, please consult California’s laws and regulations specific to the topic of interest. California may have more stringent requirements (e.g., reduced monitoring allowed via federal regulations may be prohibited in California).

Page 155 of 271 ends

Agenda Item No. 6 April 1, 2025 | 1
City of La Palma
Agenda Item No. 6
MEETING DATE: April 1, 2025
TO: City Council
FROM: City Manager
SUBMITTED BY: Carlo Nafarrete, Public Works Supervisor
AGENDA TITLE: Authorize Budget Allocation for Sidewalk Condition Repairs RECOMMENDED ACTION:

It is recommended that the City Council authorize a budget allocation in the amount not-to-exceed $100,000.00 for Sidewalk Assessment and Repairs to the existing maintenance contract with Precision Concrete Cutting.

SUMMARY:

On May 2, 2023, the City Council awarded a Five-Year Maintenance Contract to Precision Concrete Cutting for sidewalk condition repairs for Fiscal Years 2023-28. Since 2023, Precision has successfully assessed, cut, and profiled trip hazards in several areas of the City in recent years, including Zones 5 and 6, as well as along all arterial streets and the Edison right-of way.

The proposed sidewalk trip hazard assessment and repairs includes prioritizing Zone 4, to compliment the upcoming Zone 4 Residential Slurry Seal Project this summer, as well as Zones 1 and 2. Should funds remain after the completion of Zones 4, 1, and 2, repairs will then extend into Zone 3 up to the extent of the budgeted project funds.

FISCAL IMPACT:

There is adequate funding in the FY 2024-25 Capital Improvement Plan under the Broken/Settled Curb & Gutter account (035-900-8140-00000).

ATTACHMENTS:

1. Precision Concrete Cutting - Proposal

2. CJPIA Master Services Agreement

3. CJPIA Master Services Agreement - CPI Increase - February 15, 2024

Page 156 of 271 ends

SIDEWALK PROPOSAL:

Presented to:

City of La Palma
7822 Walker Street,
La Palma, California 90623
CONTACT: Carlo Nafarrette
March 2025
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project. Any copying or unauthorized disclosure of this information is prohibited.

Page 157 of 271 ends

ENVIRONMENTAL IMPACT EXAMPLE: As a member of the U.S. Green Building Council (USGBC) we are proud of the fact that we reduce the impact to landfills and the environment as a result of our service.Removing and replacing 100 panels would result in approximately 118,500 pounds or 59 tons of concrete being removed (average panel weight of 1185 pounds) Using Precision Concrete Cutting for 100 trip hazards results in 0.3 tons of concrete removed and recycled, approximately 141 gallons of gasoline saved, and a reduction of 1.3 metric tons of Co2.

COST SAVINGS
We’ll repair your sidewalks for 70-90% less than sidewalk replacement, which means you can do more for your
community for less.

A.D.A. COMPLIANCE
Patented technology that brings sidewalks into ADA compliance CLEAN
Our patented containment system captures dust and debris to bring you the cleanest process available.

SAFE
Decrease liability on your pedestrian walkways

DETAILED REPORTING
We track our jobs with honesty and integrity. Invoices show measurements, locations and cost for each hazard.

LOW IMPACT
Efficient systems with an average removal time of 20 minutes, no sidewalk closures.

FULL SERVICE CONTRACTOR
Complete GIS integration, mapping, etc.

COMMITMENT SUMMARY

Page 158 of 271 ends

The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

PROGRAM
Scope of Work Summary: City of La Palma Sidewalk Assessment and Repair Project Objective: Precision Concrete Cutting will assess and repair sidewalk trip hazards in the City of La Palma, adhering to the budget and following the California Joint Powers Insurance Authority (CJPIA) recommended approach.

Approach:
• We will conduct a assessment of the city’s sidewalks, building on past efforts where we assessed and repaired Zone 6 and select major streets tied to prior projects.
• For this year, we will prioritize assessments and repairs in the following order: Zone 4, Zone 1, Zone 2, and potentially Zone 3, if budget allows.
• Utilizing CJPIA pricing, the cost is bundled with sidewalk repairs, enabling us to monitor expenses in real-time as assessments progress.

Execution:
• We will begin with Zone 4, proceeding to Zone 1 and Zone 2, tracking sidewalk conditions and repair costs to ensure we remain within budget.
• If assessments indicate sidewalks are in good condition and funds remain, we will extend repairs into Zone 3. • We anticipate completing Zones 4,1,2 while staying under budget, with the flexibility to adjust based on findings and available resources.

Goal: Deliver a safe, ADA-compliant sidewalk network by efficiently targeting priority zones, leveraging past work, and maintaining fiscal responsibility.

DO NOT EXCEED $100,000.00

Page 159 of 271 ends

Sidewalk Inspection Services and Responsibilities
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

1. CONTRACTOR shall inspect public right-of-ways designated on the maps.

2. CONTRACTOR shall determine tripping hazards, which shall include, but not be limited to:
a. Differential displacement between sidewalk sections ½” inch 2 ½” b. Spall surfaces, holes in surfaces, and cracks above 1 inch wide or greater c. Deteriorated joints that have an eroded condition and are ½” wide or greater

3. CONTRACTOR shall record location of damaged sections in a GPS device.

4. Data entered into the GPS device shall be provided.

5. CONTRACTOR shall provide written inspection report that shall include, but not be limited to:
a. Identification and description of each problem condition b. Physical address and location including GPS location data c. Size of hazards in height, length, and square foot
d. Probable cause of hazard, if evident
e. Pictures of damaged areas
f. Recommended action to be taken

PROGRAM

1. CONTRACTOR shall be paid a fee for specialized trip-hazard repair service on lifted sidewalk with a difference in vertical elevation above ¼” to 2 ½”.

2. The fee paid to CONTRACTOR for trip-hazard removal shall be charged on a cost per hazard category per 5 lineal feet location.

DO NOT EXCEED $100,000.00
Sidewalk Trip Hazard Removal and Responsibilities

Page 160 of 271 ends

THE PRECISION CONCRETE CUTTING DIFFERENCE
Our patented technology and innovative sidewalk repairs process leaves you with a beautiful, smooth surface that is ADA compliant — a result you can’t get with grinding. Plus, our method saves you money! The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

Page 161 of 271 ends

PRECISION CONCRETE CUTTING REPAIRS
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

Page 162 of 271 ends

PRECISION CONCRETE CUTTING REPAIRS
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

Page 163 of 271 ends

MASTER SERVICE AGREEMENT
This Master Services Agreement (AGREEMENT) made as of this date, February, 15, 2023, by and between Precision Concrete Cutting (“CONTRACTOR”) and The California Joint Powers Insurance Authority (“AUTHORITY”).

This AGREEMENT is created for the sole purpose of establishing an agreed-upon set of services and related costs in order to allow California JPIA members (“MEMBER”) access to professional sidewalk inspection and maintenance services.

Further, this AGREEMENT creates no obligation or expectation that any work will result from this agreement. The CONTRACTOR’s specific services are defined below, and are available to members on as as-needed basis; the exact terms and conditions of such services are to be arranged between CONTRACTOR and MEMBER. MEMBERS are responsible for initiating and requesting any work of CONTRACTOR.

Service Option 1

SIDEWALK ASSESSMENT SERVICES
CONTRACTOR will inspect sidewalks and provide a written inspection report in the format approved by the MEMBER (optional curbs and gutters can be included in the scope of work).

The inspection reports shall include the identification, location, and description of each problem and recommended action to be taken. The format and information required may be changed at the request of MEMBER with the agreement of both parties.

Sidewalk Assessment Fee Schedule
Cost Per
Sidewalk Mile
Total Sidewalk
Miles
Estimated Cost
per Day
Estimated
Man Days
Total Estimate
Assessment Cost
$455.00 TBD $1,000 TBD $ TBD
Sample Services and Responsibilities

1. MEMBER shall provide maps of specified areas to CONTRACTOR.

2. CONTRACTOR shall inspect public right-of-ways designated on the maps.

3. CONTRACTOR shall use current ADA standards and Member standards in determining tripping hazards. These hazards shall include, but not be limited to:
a) Differential displacement between sidewalk sections 3/8 inch or greater b) Spall surfaces, holes in surfaces, and cracks above 1 inch wide or greater c) Deteriorated joints that have an eroded condition and are 1/2 inch wide or greater

4. CONTRACTOR shall record location of damaged sections in a GPS device.

Page 164 of 271 ends

5. Data entered into the GPS device shall be provided in writing to the MEMBER.

6. CONTRACTOR shall provide written inspection report that shall include, but not be limited to:
a. Identification and description of each problem condition b. Physical address and location including GPS location data c. Size of the hazards in height, length, and square foot d. Probable cause of the hazard, if evident
e. Pictures of damaged areas
f. Priority for repair; high, medium, low
g. Recommended action to be taken.

7. CONTRACTOR shall report to the MEMBER the results of the inspection upon completion.

Service Option 2

SIDEWALK TRIP HAZARD REMOVAL
Hazard Class Small
3/8” to 1/2”
Medium
>1/2” to 1”
Large
>1”
Lineal Foot
per Location
Square Foot
per Location
Price per Hazard $31.00 $62.00 $125.00 5 lin. feet 25 sq. ft.

CONTRACTOR shall be paid a fee for specialized trip-hazard repair service on lifted sidewalk with a difference in vertical elevation above ¼” to 2 ½”.

The fee paid to CONTRACTOR for trip-hazard removal shall be charged on a cost per hazard category per 5 lineal feet location. A removal of a trip hazard greater than 5 lineal feet shall be charged incremental cost per 5 feet location for the hazard class as follows:

Example: A less severe hazard (3/8” to 1/2” high) that is 7 lineal feet long shall be charged 2 locations (7 lineal feet = 5 feet + 2 feet) = $31 x 2 locations = $62.00 Sample Services and Responsibilities

1. CONTRACTOR shall repair sidewalk trip hazards above ¼” and up to 2 ½” in designated work areas as determined by the MEMBER.

2. CONTRACTOR shall remove hazards completely, from one end of the raised sidewalk joint to the other, if applicable, leaving a zero point of differential between slabs.

3. CONTRACTOR shall not cause any damage to landscaping, trees, retaining walls, curbs, sprinkler heads, utility covers or other objects adjacent to sidewalks. If CONTRACTOR and/or CONTRACTOR’s equipment does cause damage to above, the MEMBER must

Page 165 of 271 ends

be notified immediately and damages must be repaired at the CONTRACTOR’s expense within 24 hours of the time the damage occurred.

4. CONTRACTOR shall completely and immediately clean up all debris after each hazard is repaired. All costs incurred for disposal of waste material shall be included in unit cost and not paid for separately.

5. CONTRACTOR shall repair each sidewalk trip hazard without damage to adjacent slab(s) or curb(s).

6. CONTRACTOR shall cut dry with dust abatement mechanism. No water-cooling is allowed, which creates slurry and contaminates storm drains or causes excessive environmental impact.

7. CONTRACTOR shall submit an itemized summary of all repaired hazards which includes:
a. The specific hazard height – both high side and low side measurement – in 8ths of an inch
b. The actual length of the repair to the nearest ½ foot c. The total width of actual repair to the nearest ½ foot d. The square feet of the effective panel from joint to nearest joint or score line e. The calculated unit for measurement shall be the square foot of the effected panel f. The physical location (address) of each repair
g. Pictures of each repair as requested
h. Itemized cost of each repaired trip hazard

8. CONTRACTOR shall submit a detailed invoice setting forth the services performed, in accordance with the formula for saw-cutting calculations. All invoices must show the cut depth, size, length, width, square feet, address, the number of locations, and the date repaired for each hazard removal.

The billing unit for invoice calculation shall be the number of locations where one (1) location is up to 5 lineal feet.

9. CONTRACTOR shall guarantee specified repair slope (1:12 or 1:8 based upon requirements outlined by the Americans with Disabilities Act) is achieved. If defined slope is not achieved, CONTRACTOR must repair to specification at no additional charge within 24 hours of discovery.

10. CONTRACTOR shall guarantee that the removed trip hazard will have a uniform appearance and texture. The finished surface shall have a co-efficient of friction of at least 0.6.

11. Method of trip-hazard removal shall entail precise saw-cutting performed with hand-held, electric-powered equipment, using a machined hub and flush-mounted, diamond-tipped blades. Must be capable of cutting at any angle and perform trip-hazard removal in hardto-reach areas, around obstacles, on narrow walkways, and next to fences and retaining walls or buildings.

Page 166 of 271 ends

12. CONTRACTOR shall make its best effort to notify residents 3 days in advance of any work and schedule the operations so as to cause a minimum of interruption, interference or disturbance to the operation of stores, businesses, office buildings, hotels, churches, etc., and allow access by pedestrians and emergency, delivery and service vehicles at all times.

Sidewalk repair equipment and all other items incidental to the work shall not be left or stored on the sidewalk or on private property while not in use.

13. CONTRACTOR shall take precautions during saw-cutting operations not to disfigure, scar, or impair the health of any tree on public or private property.

Service Option 3

SIDEWALK ASSESSMENT AND TRIP HAZARD REMOVAL
Hazard Class Small
3/8” to 1/2”
Medium
>1/2” to 1”
Large
>1”
Lineal Foot
per Location
Square Foot
per Location
Price per Hazard $37.00 $74.00 $148.00 5 lin. Feet 25 sq. ft.

See sample services and responsibilities under respective sections in Service Option 1 and Service Option 2.

Service Option 4

FIVE-YEAR MAINTENANCE PROGRAM
Hazard Class Small
3/8” to 1/2”
Medium
>1/2” to 1”
Large
>1”
Lineal Foot
per Location
Square Foot
per Location
Price per Hazard $37.00 $74.00 $148.00 5 lin. Feet 25 sq. ft.

Sample Sidewalk Survey Services and Responsibilities

1. CONTRACTOR shall perform annual, semi-annual, or quarterly sidewalk inspection as determined by the scope of services to be defined by terms mutually set between the MEMBER and CONTRACTOR.

2. CONTRACTOR shall specify problems and recommend action to be taken.

3. CONTRACTOR shall prioritize the areas and problems to be resolved.

4. CONTRACTOR shall identify repairs to be accomplished by saw cutting.

5. CONTRACTOR shall identify spall surfaces, holes in surfaces, and cracks above 1” wide or greater.

6. CONTRACTOR shall recommend areas to be demolished and replaced.

7. CONTRACTOR shall provide written inspection report that shall include, but not be limited to:
a. Identification and description of each problem condition

Page 167 of 271 ends

b. Physical address and location including GPS location data c. Size of the hazards in height, length, and square foot d. Probable cause of the hazard, if evident
e. Pictures of damaged areas
f. Priority for repair; high, medium, low
g. Recommended action to be taken.
h. CONTRACTOR shall report to the MEMBER the results of the inspection upon completion.

Sample Sidewalk Trip Hazard Removal Services and Responsibilities

1. CONTRACTOR shall make repairs and recommendations to achieve the lowest overall cost to the MEMBER.

2. CONTRACTOR shall remove the existing trip hazards by saw cutting changes in elevation between adjacent panels from above ¼ inch up to 2 ½ inches in height as specified in the scope of work defined by mutually set terms between the MEMBER and CONTRACTOR.

3. The MEMBER shall set a fixed budget “not to exceed” per month, per quarter, or per year.

4. CONTRACTOR shall provide in-depth report, audit-able for maintenance and risk management
Sample Remove/Replacement Survey Reporting Services and Responsibilities

1. CONTRACTOR shall survey and report all areas not recommended for saw cutting.

2. CONTRACTOR shall identify remove and replacement locations to maximize the repair of locations that truly need to be replaced.

3. CONTRACTOR shall provide a written report that identifies the location, length, width, and square foot measurement of the effected panels to be replaced.

4. CONTRACTOR shall provide GPS locations, maps and photographs of areas recommended for removal and replacement.

5. CONTRACTOR shall provide monthly an in-depth report, audit-able for maintenance and risk management.

Bonding Requirements
Direct cost associated with any specific bonding requirements beyond the required Contractors License Bond including the cost of Performance Bond, Payment Bond, or any other additional bonding requirements are not included in the fee schedule listed above and will be added to the cost of the project.

Page 168 of 271 ends

CPI Escalation
The fees charged by Precision Concrete Cutting which are expressed as stated dollar amounts in this schedule shall be increased annually commencing on the one-year anniversary date of the Effective Date. Any increase must include written justification such as CPI figures and is subject to approval if it exceeds the annual 3% allowable increase.

Authorization
CONTRACTOR shall inspect and report only those sidewalk conditions andtriphazards as specified in the performance in this AGREEMENT, and therefore makes no representation that other trip hazards outside the scope of work have been identified. CONTRACTOR shall not be responsible for conditions outsidethecontrol of CONTRACTOR that havechanged after completion ofthe inspections due to tree roots, water, settling, and other causes, and shall not be liable for any claims, losses, or damages arising from known or unknown trip hazards. Additionally, CONTRACTOR shall carry out authorized remediation and repair work asspecified in the performance ofthis AGREEMENT, and based on locations either identified through theirinspection process or identified separately fromthe CONTRACTOR'S inspection process. CONTRACTOR shall be responsible for removal of all trip hazardsthat have been identified and authorized through the performance ofthis AGREEMENT. CONTRACTOR shall not be responsible fortrip hazards that arise after completion of the remediation and repair work asspecified in the performance ofthis AGREEMENT due to conditions outside the control of the CONTRACTOR, such astree roots, water, settling, and other causes.

FOR AUTHORITY: FOR CONTRACTOR:

Jonathan Shull Gary Beneduci

NAME NAME
Chief Executive Officer General Manager

TITLE TITLE
________________________________ ________________________________

SIGNATURE SIGNATURE
_____________ _____________

DATE DATE
February 7, 2023 February 7, 2023

Page 169 of 271 ends

Precision Concrete Cutting, Los Angeles-Central CA, Inland Empire Office, 5737 Kanan Road, #718, Agoura Hills, CA 91301
1 Los Angeles/Central California
P: (888) 881-9816 F: (818) 698-8280
www.SafeSidewalks.com
ADA Compliant Safe Sidewalks - Sidewalk Assessment Service – Uneven Sidewalk Repair May 1, 2024
Abraham Han
Senior Risk Manager
California JPIA
8081 Moody Street
La Palma, CA 90623
Hello Abraham:

For your reference, we have implemented the annual 3% allowable price increase in the Master Service Agreement to offset the increase in the CPI, Prevailing Wage, fuel, and other costs incurred over the past year. This price increase will help us continue to provide the highest quality service to you and your members.

Please see the breakdown below of the changes to our Schedule of Rates over the previous period. As per the agreement, this price increase is in effect for all quotations, contracts, and amendments beyond the one-year anniversary date of February 15, 2024.

Uneven Sidewalk Repair with Sidewalk Assessment
Uneven Sidewalk Repair Only
Survey Only Per mile
CJPIA MSA 2023 455
CJPIA MSA 2024 468
I have attached a copy of the current 2023 Master Services Agreement for your reference.

Hazard Class Less Severe
1/4" > to 1/2"
Severe 5/8" -
1"
Most Severe
Above 1"
Lineal Ft.
per LOC
Sq. Ft.
per LOC
CJPIA MSA 2023 $37.00 $74.00 $148.00 5 25 Sq Ft
CJPIA MSA 2024 $38.11 $76.22 $152.44 5 25 Sq Ft
Hazard Class Less Severe
1/4" > to 1/2"
Severe 5/8" -
1"
Most Severe
Above 1"
Lineal Ft.
per LOC
Sq. Ft.
per LOC
CJPIA MSA 2023 $31.00 $62.00 $125.00 5 25 Sq Ft
CJPIA MSA 2024 $31.93 $63.86 $128.75 5 25 Sq Ft

Page 170 of 271 ends

Precision Concrete Cutting, Los Angeles-Central CA, Inland Empire Office, 5737 Kanan Road, #718, Agoura Hills, CA 91301
2 Los Angeles/Central California
P: (888) 881-9816 F: (818) 698-8280
www.SafeSidewalks.com
We are very grateful to work with the CJPIA as your strategic partner and deeply appreciate your continued support and opportunity to work with you and your members. We look forward to continued progress in the coming year.

Please contact me immediately with any questions or concerns at 858-699-1089.

Yours sincerely;
Gary Beneduci
General Manager
Precision Concrete Cutting
Los Angeles, Central Coast, Riverside, OC
888-881-9816 Office
858 699 1089 Cell

Page 171 of 271 ends

Agenda Item No. 7 April 1, 2025 | 1
City of La Palma
Agenda Item No. 7
MEETING DATE: April 1, 2025
TO: City Council
FROM: City Manager
SUBMITTED BY: Belinda Deines, Community Development Manager AGENDA TITLE: Authorize a Landscape Maintenance Agreement with Caltrans for SR-91 Right-of-Way at Walker Street (Digital Display Billboard at 6951 Walker Street)
RECOMMENDED ACTION:

It is recommended that the City Council approve and authorize the execution of a Landscape Maintenance Agreement with the California Department of Transportation for the maintenance of landscape and irrigation for a portion of SR-91 Freeway Right-of-Way at Walker Street (Attachment 1).

ANALYSIS:

On December 12, 2023, the City Council approved a double-sided digital display billboard to be located on a portion of real property at 6951 Walker Street (APN 276-071-11). Pursuant to Resolution 2023-46 for Conditional Use Permit 390, Condition #8 states that prior to commencement of construction of the Digital Display Billboard, the Applicant shall obtain all required permits and approvals, including, but not limited to, securing a permit from the California Department of Transportation (Caltrans) and any encroachment permits as deemed necessary. The Applicant, Outfront Foster Interstate, proposes a similar landscape project that was completed in 2017 to increase visibility for the City's existing billboards and enhance the landscape frontage within the Caltrans public right-of-way.

To facilitate the Caltrans permit process, City staff submitted an encroachment permit application (Attachment 3) on behalf of Outfront Foster Interstate. On July 15, 2024, Caltrans noted that a Landscape Maintenance Agreement (LMA) between the City of La Palma and Caltrans is required (Attachment 4). In the previous landscape project from 2017, Caltrans did not require an LMA for the work. Following receipt of the denial letter, City staff met and discussed regularly with Caltrans staff to evaluate the scope of work and whether the LMA requirement could be waived with an alternative utilizing Adopt-a-Highway guidelines. Ultimately, Caltrans staff determined that the LMA is required.

A separate agreement between the City of La Palma and Outfront Foster Interstate will be executed for the removal and installation of landscaping and irrigation along the westbound SR-91 between Post Mile R0.15 to R0.49, on both sides of Walker Street as shown on Exhibit A of the draft LMA (Attachment 2). Maintenance responsibilities include inspection, repair, and replacement of

Page 172 of 271 ends

Agenda Item No. 7 April 1, 2025 | 2
landscape and irrigation components. The City shall ensure that landscaped areas are provided with the routine maintenance necessary to sustain the conditions of the improvements for the life of the agreement.

FISCAL IMPACT:

There is no direct fiscal impact from executing the agreement. All costs associated with the removal, installation, and maintenance tasks outlined in the agreement will be borne by the Applicant.

ATTACHMENTS:

1. Draft Landscape Maintenance Agreement

2. EXHIBIT A - SR 91 AT Walker Street

3. Caltrans Encroachment Permit Application

4. Caltrans Denial Letter

Page 173 of 271 ends

7.11.2024
12-24-N-LT-0533
SR 91/PM R0.28
1 LANDSCAPE MAINTENANCE AGREEMENT

WITH THE CITY OF LA PALMA
THIS AGREEMENT is made effective this ______ day of ____________, 20__, by and between the State of California, acting by and through the Department of Transportation, hereinafter referred to as “STATE” and the CITY of La Palma; hereinafter referred to as “CITY” and collectively referred to as “PARTIES.”

1. This Agreement addresses CITY responsibility for the removal, abatement, and replacement of trees (collectively the “LANDSCAPING”) placed within State Highway right of way on State Route 91, as shown on Exhibit A, attached to and made a part of this Agreement.

2. Maintenance responsibilities that include, but are not limited to, inspection, providing emergency repair, replacement, and maintenance, (collectively hereinafter “MAINTAIN/MAINTENANCE”) of LANDSCAPING as shown on said Exhibit “A.”

3. The degree or extent of maintenance work to be performed, and the standards, therefore, shall be in accordance with the provisions of Section 27 of the Streets and Highways Code and the then current edition of the State Maintenance Manual.

4. When a planned future improvement is constructed and/or a minor revision has been effected with STATE’s consent or initiation within the limits of the STATE’s right of way herein described which affects PARTIES’ division of maintenance responsibility as described herein, PARTIES will agree upon and execute a new dated and revised Exhibit “A” which will be made a part hereof and will thereafter supersede the attached original Exhibit “A” to thereafter become a part of this Agreement.

4.1.The new exhibit can be executed only upon written consent of the PARTIES hereto acting by and through their authorized representatives. No formal amendment to this Agreement will be required.

5. CITY agrees, at CITY expense, to do the following:

5.1.CITY will MAINTAIN or have authorized licensed contractor with appropriate class of license in the State of California, to MAINTAIN LANDSCAPING conforming to those plans and specifications (PS&E) pre-approved by STATE.

CITY will have in place a valid necessary encroachment permits prior to the start of any work within STATE’S right of way.

Page 174 of 271 ends

7.11.2024
12-24-N-LT-0533
SR 91/PM R0.28
2 5.1.1. An Encroachment Permit rider may be required for any changes to the scope of work allowed by this Agreement prior to the start of any work within STATE's right of way

5.2.CITY shall ensure that LANDSCAPED areas designated on Exhibit “A” are provided with adequate scheduled routine MAINTENANCE necessary to MAINTAIN a neat and attractive appearance including providing for water, and fertilizer necessary to sustain healthy plant growth during the entire life of this Agreement.

5.2.1.To prune shrubs, tree plantings, and trees to control extraneous growth and ensure STATE standard lines of sight to signs and corner sight distances are always maintained for the safety of the public.

5.2.2.To replace unhealthy or dead plantings when observed or within 30 days when notified in writing by STATE that plant replacement is required.

5.2.3.To expeditiously MAINTAIN, replace, repair or remove from service any components of LANDSCAPING system that has become unsafe or unsightly.

5.3.To furnish electricity for irrigation system controls, and lighting system controls for all street lighting systems installed by CITY.

5.4.To MAINTAIN, repair and operate the irrigation systems in a manner that prevents water from flooding or spraying onto STATE highway, spraying parked and moving automobiles, spraying pedestrians on public sidewalks/bike paths, or leaving surface water that becomes a hazard to vehicular or pedestrian/bicyclist travel.

5.5.To control weeds at a level acceptable to the STATE. Any weed control performed by chemical weed sprays (herbicides) shall comply with all laws, rules, and regulations established by the California Department of Food and Agriculture. All chemical spray operations shall be reported quarterly (Form LA17) to the STATE to: District 12 Maintenance at 1750 E. 4th Street, Suite 100, Santa Ana, CA 92705.

5.6.CITY shall ensure LANDSCAPING within the Agreement limits provide an acceptable walking and riding surface, and will provide for the repair and removal of dirt, debris, graffiti, weeds, and any deleterious item or material on or about the LANDSCAPING in an expeditious manner.

Page 175 of 271 ends

7.11.2024
12-24-N-LT-0533
SR 91/PM R0.28
3 5.7.To MAINTAIN all parking or use restrictions signs encompassed within the area of the LANDSCAPING.

5.8.To remove LANDSCAPING and appurtenances and restore STATE owned areas to a safe and attractive condition acceptable to STATE in the event this Agreement is terminated as set forth herein.

6. STATE may provide CITY with timely written notice of unsatisfactory conditions that require correction by the CITY. However, the non-receipt of notice does not excuse CITY from maintenance responsibilities assumed under this Agreement.

7. STATE shall Issue encroachment permits to CITY at no cost to it.

8. LEGAL RELATIONS AND RESPONSIBILITIES:

8.1.Nothing within the provisions of this Agreement is intended to create duties or obligations to or rights in third parties not party to this Agreement, or affect the legal liability of either PARTY to this Agreement by imposing any standard of care respecting the design, construction and maintenance of these STATE highway improvements or CITY facilities different from the standard of care imposed by law.

8.2.If during the term of this Agreement, CITY should cease to MAINTAIN the LANDSCAPING to the satisfaction of STATE as provided by this Agreement, STATE may either undertake to perform that MAINTENANCE on behalf of CITY at CITY’s expense or direct CITY to remove or itself remove LANDSCAPING at CITY’s sole expense and restore STATE’s right of way to its prior or a safe operable condition. CITY hereby agrees to pay said STATE expenses, within thirty (30) days of receipt of billing by STATE. However, prior to STATE performing any MAINTENANCE or removing LANDSCAPING, STATE will provide written notice to CITY to cure the default and CITY will have thirty (30) days within which to affect that cure.

8.3.Neither CITY nor any officer or employee thereof is responsible for any injury, damage or liability occurring by reason of anything done or omitted to be done by STATE under or in connection with any work, authority or jurisdiction arising under this Agreement. It is understood and agreed that STATE shall fully defend, indemnify and save harmless CITY and all of its officers and employees from all claims, suits or actions of every name, kind and description brought forth under, including, but not limited to, tortious, contractual, inverse condemnation and other theories or assertions of liability occurring by reason of anything done or omitted to be done by STATE under this Agreement with

Page 176 of 271 ends

7.11.2024
12-24-N-LT-0533
SR 91/PM R0.28
4 the exception of those actions of STATE necessary to cure a noticed default on the part of CITY.

8.4.Neither STATE nor any officer or employee thereof is responsible for any injury, damage or liability occurring by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction arising under this Agreement. It is understood and agreed that CITY shall fully defend, indemnify and save harmless STATE and all of its officers and employees from all claims, suits or actions of every name, kind and description brought forth under, including, but not limited to, tortious, contractual, inverse condemnation or other theories or assertions of liability occurring by reason of anything done or omitted to be done by CITY under this Agreement.

8.5.PREVAILING WAGES:

8.5.1.Labor Code Compliance- If the work performed under this Agreement is done under contract and falls within the Labor Code section 1720(a)(1) definition of a "public works" in that it is construction, alteration, demolition, installation, or repair; or maintenance work under Labor Code section 1771. CITY must conform to the provisions of Labor Code sections 1720 through 1815, and all applicable provisions of California Code of Regulations found in Title 8, Chapter 8, Subchapter 3, Articles 1-

7. CITY agrees to include prevailing wage requirements in its contracts for public works. Work performed by CITY'S own forces is exempt from the Labor Code's Prevailing Wage requirements.

8.5.2.Requirements in Subcontracts - CITY shall require its contractors to include prevailing wage requirements in all subcontracts when the work to be performed by the subcontractor under this Agreement is a "public works" as defined in Labor Code Section 1720(a)(1) and Labor Code Section 1771. Subcontracts shall include all prevailing wage requirements set forth in CITY's contracts.

8.6. SELF-INSURED - CITY is self-insured. CITY agrees to deliver evidence of selfinsured coverage providing general liability insurance, coverage of bodily injury liability and property damage liability, naming STATE, its officers, agents and employees as the additional insured in an amount of $1 million per occurrence and $2 million in aggregate and $5 million in excess. Coverage shall be evidenced by a certification of self-insurance letter (“Letter of SelfInsurance”), satisfactory to STATE, certifying that CITY meets the coverage requirements of this section. This Letter of Self-Insurance shall also identify the SR 91/PM 0.28 location as depicted in EXHIBIT A. CITY shall deliver to STATE the Letter of Self-Insurance with a signed copy of this AGREEMENT. A copy

Page 177 of 271 ends

7.11.2024
12-24-N-LT-0533
SR 91/PM R0.28
5 of the executed Letter of Self-Insurance shall be attached hereto and incorporate as Exhibit B.

8.7. SELF-INSURED using Contractor - If the work performed under this AGREEMENT is done by CITY‘s contractor(s), CITY shall require its contractor(s) to maintain in force, during the term of this AGREEMENT, a policy of general liability insurance, including coverage of bodily injury liability and property damage liability, naming STATE, its officers, agents and employees as the additional insured in an amount of $1 million per occurrence and $2 million in aggregate and $5 million in excess. Coverage shall be evidenced by a certificate of insurance in a form satisfactory to the STATE that shall be delivered to the STATE with a signed copy of this Agreement.

9. TERMINATION - This Agreement may be terminated by timely mutual written consent by PARTIES, and CITY’s failure to comply with the provisions of this Agreement may be grounds for a Notice of Termination by STATE.

10.TERM OF AGREEMENT -This Agreement shall become effective on the date first shown on its face sheet and shall remain in full force and effect until amended or terminated at any time upon mutual consent of the PARTIES or until terminated by STATE for cause.

PARTIES are empowered by Streets and Highways Code Section 114 & 130 to enter into this Agreement and have delegated to the undersigned the authority to execute this Agreement on behalf of the respective agencies and covenants to have followed all the necessary legal requirements to validly execute this Agreement.

Page 178 of 271 ends

7.11.2024
12-24-N-LT-0533
SR 91/PM R0.28
6 IN WITNESS WHEREOF, the PARTIES hereto have set their hands and seals the day and year first above written.

THE CITY OF LA PALMA STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION
By: __________________________
Mayor/Chairmen
Initiated and Approved
By: ___________________________
CITY Manager
By: ___________________________

ANDREW CHUAH, PE
Deputy District Director
Maintenance District
ATTEST:

By: __________________________
CITY Clerk
By: __________________________
CITY Attorney

Page 179 of 271 ends

EXHIBIT A
1 (Plan map identifying the applicable STATE Routes (Freeway proper) and CITY road(s) and facilities)

Page 180 of 271 ends

EXHIBIT B – LETTER OF CERTIFICATE OF CITY___________ STATEMENT OF SELF

INSURANCE
1 CALTRANS DISTRICT 12
1750 E. 4TH STREET, SUITE 100
SANTA ANA, CA 92705 MARCH 10, 2025
ATTN: Sarah Rodriguez
RE: Statement of Self Insurance for CITY OF HUNTINGTON BEACH Related to Project Specific Maintenance Agreement with State of California Department of Transportation (“STATE”) for the maintenance of the removal, abatement, and replacement of trees along Highway 91 at PM 0.28.

Dear Sarah Rodriguez
The purpose of this letter is to certify that the CITY is self-insured and self-funded covering third-party claims arising out of its general operations (for example, commercial general liability and automobile liability insurance). Further the CITY is self-insured covering workers’ compensation claims and has received the consent of the State Department of Industrial Relations to do so.

Each fiscal year, as a part of its budgetary process, the CITY appropriates funds specifically to satisfy valid third-party claims and workers’ compensation claims, which may be brought against the CITY.

The CITY certifies its self-insured, general liability coverage for bodily injury liability and property damage liability, meets the required coverage amounts in section

6.1 (INSURANCE) of the Maintenance Agreement, specifically general liability insurance, coverage of bodily injury liability and property damage liability in an amount of $1 million per occurrence and $2 million in aggregate and $5 million in excess. The CITY further represents that regarding any claims made in connection with the Maintenance Agreement by the STATE, the STATE will be first-in-line regarding the reserved, self-insured amounts.

If you need any additional information regarding this letter, please direct those inquires through my office.

Sincerely,

FINANCE MANAGER

Page 181 of 271 ends

EXHIBIT C
1

Page 182 of 271 ends

EXHIBIT D
1 (Individual maintenance items that are not provided for in the body of the Agreement.)

Page 183 of 271 ends

EXHIBIT A
LEGEND

LANDSCAPE AREA TO BE MAINTAINED BY CITY STATE OF CALIFORNIA NOTE: FOR SPECIFIC LANDSCAPE & IRRIGATION DETAILS DEPARTMENT OF TRANSPORTATION REFER TO CALTRANS PROJECT I.D. NO. 12-24-N-LT-0533 SR 91/PM R0.28 SR-91 FREEWAY LANDSCAPE MAINTENANCE

AGREEMENT AT WALKER STREET

NOT TO SCALE
R/W
R/W
LIMIT OF AGREEMENT SR 91 227 LIMIT OF AGREEMENT SR 91 235

Page 184 of 271 ends
Page 185 of 271 ends
Page 186 of 271 ends
Page 187 of 271 ends
Page 188 of 271 ends

DOT TR-0425
"Provide a safe and reliable transportation network that serves all people and respects the environment" DISTRICT 12 ENCROACHMENT PERMITS OFFICE
1750 East 4th. Street, MS– | Santa Ana, CA 92705
(657) 328-6246 | (657) 328-6504 | TTY 711
www.dot.ca.gov
7/15/2024
Tracking #: 12-24-N-LT-0533
Applicant Ref. No. N/A
12-ORA-91-PM R0.28
City of La Palma
C/O: Kanwal Singh
34 Monserrat Place
Foothill Ranch CA 92610
Dear Kanwal Singh:

This letter is in response to your request for an encroachment permit received by the Department on June 19, 2024, requesting to perform removal, abatement, and replacement trees within the State’s highway right-of-way.

The encroachment request is hereby denied, for the following reasons:

It has been determined that your request is in conflict with _ Missing requested Landscape Maintenance Agreement (LMA) between the City of La Palma and Caltrans. The city cannot remove the trees and add new plants in Caltrans ROW without a Maintenance Agreement. Please inform the City of La Palma Official to contact Caltrans Maintenance Personnel Sarah Rodriguez via email address: [email protected] to have LMA in place.

You may request an appeal in writing to the Department Director, on the decision of denial.

If you appeal, it is your responsibility to provide the necessary justification (additional information, pictures, etc.) in writing and in triplicate (unless using iPermits), within the allotted time of sixty (60) calendar days from the date of this denial letter, to the Department Director. The applicant and the Department may mutually agree, in writing, to extend the time for the appeal process or any part of the appeal process.

Page 189 of 271 ends

7/15/2024
Kanwal Singh
Tracking #: 12-24-N-LT-0533

Page 2 ends

The written appeal package must be submitted to:

ENCROACHMENT PERMITS APPEAL

DIRECTOR, CALIFORNIA DEPARTMENT OF TRANSPORTATION

C/O HEADQUARTERS DIVISION OF TRAFFIC OPERATIONS
1120 N STREET, MS 36
SACRAMENTO, CA 95814
A written appeal package is deemed a complete submittal on the date the Department Director receives all of the items listed below:

1. An appeal letter to the Department Director specifically requesting an appeal of the denied encroachment permit application and containing a detailed explanation of why the Department should issue an encroachment permit for the proposed project or activity sought by the application; and

2. Denial letter issued by the district or a statement in the appeal letter that a denial letter was not issued by the district within sixty (60) calendar days after the district's receipt of a complete encroachment permit application package; and

3. Applicant's name, company or organization, mailing address, and telephone number, and the same information for any person or entity designated by the applicant to represent applicant in the appeal; and

4. Identification of all locations, including district, county, route, and post mile, at which the applicant and/or person or entity acting on behalf of the applicant proposes to encroach onto Department property as described in section 660 of the Streets and Highways Code or to perform any act or activity described in sections 670 or 670.1 of the Streets and Highways Code; and

5. Description of the proposed encroachment onto Department property as described in section 660 of the Streets and Highways Code and/or the proposed act or activity described in sections 670 or 670.1 of the Streets and Highways Code, which the applicant and/or person or entity acting on behalf of the applicant proposes to perform or conduct under the denied encroachment permit being appealed, including three (3) complete sets of plans (unless using iPermits) and any applicable specifications, calculations, maps, and other supporting documents; and

6. A $2,000 deposit towards the applicant's fifty percent (50%) share of the administrative costs of conducting the appeal. The deposit shall be made by check or money order made payable to the California Department of Transportation; and

7. Notice of whether the applicant requests to make a presentation to the Department Director or the Department Director's designee.

Page 190 of 271 ends

7/15/2024
Kanwal Singh
Tracking #: 12-24-N-LT-0533

Page 3 ends

A final accounting of the Administrative Costs will be made following the resolution of the appeal. At that time the balance of your deposit will be returned, or you will be notified of any additional costs that may be owed. You must pay your share of the Administrative Costs regardless of whether your appeal is successful or not.

The Administrative Costs of the appeal process will begin accruing on the date your complete appeal package is received by the Departments Director and will stop accruing after the final decision on the appeal is served by the Department.

CHARLES Y MAKSOUDIAN
District Permit Engineer
Sincerely,
{{Sig_es_:signer1:signature }}
Should you have any questions, please contact CALVIN DAO at (714)713-5532 or via email at [email protected]. c: City of La Palma
Charles Maksoudian (Jul 18, 2024 11:02 PDT)
Charles Maksoudian

Page 191 of 271 ends
← All documents from this meeting