Cities Index.

La Quinta City Council
March 21, 2023

Document
Meeting
March 21, 2023
Body
La Quinta City Council
Original file
19.4 MB
Text extracted from the city's file for reading and search. Open the original on www.laquintaca.gov. That file is the official record.

POWER POINTS

CITY COUNCIL

MEETING
MARCH 21, 2023
March 21, 2023
1 City Council Meeting
March 21, 2023
Pledge of Allegiance
1 2
March 21, 2023
2 City Council Meeting
March 21, 2023
Presentations
3 4
March 21, 2023
3 City Council Meeting
March 21, 2023
P1 – Recognition of Members of
Girl Scout Troop 1415
5 6
March 21, 2023
4 City Council Meeting
March 21, 2023
B1 – Approve Converting RCSD Traffic Car Officer
Position to a Traffic Motor Officer Position
Overall Goal of a Motor Officer
• Educate the public through visibility and violator
contact
• Reduction of traffic collisions
• Provide the safest experience possible while
driving on streets within the City.
7 8
March 21, 2023
5 Delineation of Duties
Investigate traffic collisions
Enforce traffic laws
DUI enforcement
Traffic control
Assistance with large
events involving
pedestrians
Focus on collision
prevention
Motor Officer
Investigate traffic collisions
Enforce traffic laws
DUI enforcement
Limited traffic control
Focus on collision
reaction
Traffic Officer
Motor Officer Safety
Department Approved Motor Uniforms
– Full Face Helmets
– Kevlar infused ripstop uniforms
– Kevlar mesh pants
– Motorcycle riding boots
* Patrol cars are always available during inclement weather 9 10
March 21, 2023
6 Fiscal Impact
Recurring annual cost (after less patrol car mileage):
$7,100
Equipment:
motorcycle
and
uniform
$1.95 per
hour
differential
pay
$40,000
first year
Questions?
11 12
March 21, 2023
7 City Council Meeting
March 21, 2023
B2 – Authorize Letter Opposing the
State’s Plan to Close
Chuckwalla Valley State Prison
13 14
March 21, 2023
8 City Council Meeting
March 21, 2023
B3 – Authorize Letter to CVUSD Board Regarding
the Disrespectful Treatment of Mayor Pro Tem
Sanchez at the March 9, 2023 Board Meeting
15 16
March 21, 2023
9 City Council Meeting
March 21, 2023
B4 – 2022 General Plan and
Housing Annual Reports
17 18
March 21, 2023
10 Background
• California requires cities and counties adopt
General Plans
– “Blueprint" for future growth
• La Quinta General Plan adopted February 19, 2013
– Housing and Safety Elements recently updated in 2022
• Seven elements are required
– Land use, Circulation, Conservation, Noise, Open
space, Safety, and Housing
LQ General Plan Chapters
• Community Development
– Land use, Circulation, Livable Community,
Housing, Parks, Economic Development
• Natural Resources
• Environmental Hazards
• Public Infrastructure and Services
19 20
March 21, 2023
11 General Plan APR
• Cities are required to report on their progress
in implementing their General Plans
• General Plan implementation occurs regularly
through City programs and review of
development projects for General Plan
consistency
Housing Element
•6th Cycle adopted 2022
• Required in General Plans to address community
housing needs
• Must include programs that provide opportunities for, and not unduly constrain, housing development
• Contains Regional Housing Needs Allocation
(RHNA)
21 22
March 21, 2023
12 Housing Element
• Department of Housing and Community
Development (HCD) determines regional housing
allocation in coordination with Southern California
Association of Governments (SCAG)
• SCAG is responsible for allocating housing need
within the region (RHNA)
2022-2029 RHNA Progress
6th cycle
Total Above
Moderate Low Moderate Very
Low Reporting Year
0 0 0 66 66 2021 (October
through December)
2022 0 0 0 526 526
Total Units 0 0 0 592 592
420 269 297 544 1,530 Projected Need
(RHNA)
Remaining Need 420 269 297 0 986
23 24
March 21, 2023
13 Questions?
25 26
March 21, 2023
14 City Council Meeting
March 21, 2023
S1 - Discuss La Quinta Cultural Campus Master Planning
and Preliminary Design Progress
Cultural Campus
27 28
March 21, 2023
15 Cultural Campus
• Agreement with HGA approved March 1, 2022.
• HGA presented to Council on June 21, 2022.
• Council provided feedback and directed staff/HGA to
return with a revised concept.

HGA LA QUINTAMUSEUM
&HISTORICAL SOCIETY

CULTURAL CAMPUS PLAN REPORT
29 30
March 21, 2023
16 REPORT CONTENTS
INTRODUCTION ANDPROCESS 1
CULTURAL CAMPUSPLAN 5
BUDGET ANDSCHEDULE 11
APPENDIX 17
COST 16
STRUCTURALREPORT 17
DESIGN RESEARCHAND 17

STUDIES

OVERVIEW

CITY COUNCIL

FEEDBACK

SESSION

STAKEHOLDER

ENGAGMENT

WORKSHOP AND
TOURS

KEY CLIENT

MILESTONES

CITYCOUNCIL

CORETEAM

USERGROUPS

DISCOVERY
REFINEMENT
CONCLUSIONS PHASE 2
NOV
HGA

JUN AUG SEP MAR
31 32
March 21, 2023
17 casita
Parking
Open Lot
Unique Pedestrian Enviornment
!+?
Casita
Museum
Museum Lumberyard Lumberyard
Open Lot
Park
Cove City Center

PLANNING SCOPE

OBJECTIVES

1. IMPROVE Museum Flow and
Function

2. EXPAND and Enhance Archive/
Exhibit Amenities

3. ACTIVATE neighboring areas to
create cohesive campus

4. CATALYZE planning synergy with
surrounding cultural assets

5. CREATE anchor for arts
destination with enhanced
outdoor exhibits and spaces.

EXISTING STEP 1

IMAGINE
STEP 2

UNDERSTAND LAND
USE
STEP 3

CONNECT TO AN

UPGRADED VISITOR

AND OPERATIONAL

EXPERIENCE
HGA

CHAMPIONS OF VALLEYCULTURE
Past
Heritage ofPlace
Present
Operational Opportunities
and Challenges
Future
Ambitions, Experiences,
Engagment, and Flexibility
?

INNOVATIVE, SOCIAL, GREEN, REALISTIC,

AND JOYFUL

PRESERVATION WITHCHARM

DISOVERY AND DEFINTION

A PROCESS OF COLLABORATION THROUGH THREE LENSES
Ina spiritthat approaches the Museumthrougha number of lenses,and one that complimentsthe mission.Thedevelopmentof the planhas been executed collaborativelywiththe lead La Quintarepresentatives and has been rooted in observation,discussion,listeningthe designemerges fromthe integrationof three concentricrealms of engagement and understanding.

HGA
33 34
March 21, 2023
18 TRANSFORMATIONS
The expanding leisure and tourism industries
mean that museums have been shown
as an increasingly important destination.

Within this context, the museum must be both
accessible and serious; a sanctuary, offering an
environment of concentration and focus, and
a place where people feel comfortable to meet
and explore.

The power of the museum is to make us look
at things we might otherwise overlook and in
taking time we might otherwise think we do
not have.

OUTPOST NOW A CIVIC HEART MUSEUMS TODAY
HGA

BASE PLAN
HGA

DRAINAGECONCERN

GRADECHANGES

SECURITY CIVIC CENTER

CONNECTIONS

SECURITY

UNWELCOMING
FUTURE USE?
MURAL
USEFUL?
RETAIN? LIABILITY?

ENGAGING

OPERATIONS

BURSTING AT THE SEAMS

PEDESTRIANEXPERIENCE
SEISMICNEEDS?
35 36
March 21, 2023
19 ARTS PROMENADE
Animated Streetfront
Activatethe streetfrontand create a clear inviting
arrival. Define a new perimeter and enhance
connectivity and identity with the museum’s
surroundings. The promenade unites pedestrian
movement and collectsvisitorswhoarriveby car.

SWITCH AND STITCH
Internal Connections
Create connection to the expanded property
through an internal stitch and exterior
penetration into the oasis. Compliment this
Easterlyexpansionwithbackof house expansion
potentialsfocused at the southof thesite.

Consolidated line of site, and compression of
arrival,gift,way-finding,and hospitalityelements

FRAME, UNIFY AND FLEX
Edge Definition
A consistencyto the currentopen areas through
fences, and screens that move and rotate,
providingentry and security,allowsthe ecclectic
natureof the collectedcampusstructuresto
co-exist ina cohesiveframe.

La Quinta City Center
Parking
Park

ARTSPROMENADE
MUSEUM
DEMO
CAMPUS STRATEGIES | INSIDE AND OUT

ARCHIVE

LUMBERYARD OASIS
Open Lot
~ 26,000 sf

ARRIVALEXPERIENCE OPERATIONS EXPANSION
HGA
1C-3
1C5
1A-1
1C-4
1C-1
1C-2
1B-1
1A-2
1B-2
1B-3
1C-6

1. CREATE A NEW WELCOMING ARRIVAL

ARRIVALEXPERIENCE OPERATIONS EXPANSION

2. RELOCATE HISTORICAL SOCIETY
AND EXPAND ARCHIVE ABILITY. TREAT

SITE ISSUES AT CURRENT LOADING DOCK

TO ENSURE ENVIORNMENTAL STANDADS
NOTES

REDUCES STAFFSTRAIN

INCREASES PATRON WELCOME

PROVIDES RELIEF FOR THE HISTORICAL SOCIETY

OFFERS A CONTEMPORARY IDENTITY

3. DECOMMISSION SHOP AND

RELOCATE TO ARRIVAL SEQUENCE

AND CONVERT TO OFFICES

5. DEMOLISH EXISTING AUXILIARY

STRUCTURE ESTABLISH A

PERIMETER WITH A NEW LOADING

DOCK AND PEDESTRIAN ACCESS
POIN

4. CONNECT PARCELSAND

SET EXPANSION POTENTIAL

FOR NEAR OR LONG TERM

BUILDING PLANS

OFFICES
(360SF)
ENTRY
(200 SF)

FLEXBIL
E

GALLERY
(700 SF)
FLEX
SHOP

COMMUNITY

ROOM REST
ROOMS

HISTORICAL

SOCIETY/ARCHIVE/
OFFICE
(860 SF)

ARCHIVE

EXPANSION
(2300 SF)
(6000 SF)
(1300 SF)

LUMBERYARD
(1600 SF)
CASITA
(960 SF)

PARKING

OPEN LOT
MECH

VISITOR, FACILITIES, AND FUNCTIONAL FLOW
HGA
37 38
March 21, 2023
20 HISTORIC ASSETS ASSESMENT
CASITA

DESCRIPTION
• 1935
• 964 GSF

CHALLENGES
• ADA, STRUCTURE, SIZE

USE CONSIDERATIONS
• DUE TO ACCESSIBILITY AND COST CONCERNS, WE CONSIDERED THE CASITA FOR

LIGHT SIGNAGE AND LANDSCAPING AS WELL AS CONTINUED LIGHT USE FOR THE

LA QUINTA HISTORICAL SOCIETY, RATHER THAN ANY SIGNIFICANT RENNOVATION WORK.

RECOMMENDATION
• LIGHT STORAGE BY LA QUINTA HISTORICAL SOCIETY OR MUSEUM • UPGRADED LANDSCAPE LIGHTING WITH SIGNAGE AND WAYFINDING

ENHANCEMENTS
• POSSIBLE CONSIDER FOR NON UPUBLIC EVENT SUPPORT.
• $$$

LUMBERYARD

DESCRIPTION
• 1935
• 3,360 GSF

CHALLENGES
• ADA, STRUCTURE, OVERHANG, SIZE

USE CONSIDERATIONS
• DUE TO STRUCTURAL, COST, AND ACCESSIBILITY CONCERNS, WE WOULD CONSIDER USING THE FIRST FLOOR ONLY OF THE LUMBERYARD; FOR THINGS LIKE EDUCATION

PROGRAMMING OR EVENT SUPPORT

RECOMMENDATION
• POSITION LIGHT TI ON GROUND FLOOR, TO BE UTILIZE FOR EVENT SUPPORT IN

OASIS OR SMALL COMMUNITY ENGAGMENT ACTIVITIES
• UTILIZE SIDEWALK WINDOWS FOR POSSIBLE EXHIBITION AND DISPLAY • DEMOLISH BACK SHED STRUCTURE AND DO NOT USE SECOND FLOOR (STRUCTURE

AND ACCESSIBILITY DUE TO STRUCTURE NEEDS)
• $$$
HGA
1C-3
1C5
1C-4
1C-1
1C-2
1B-1
1A-2
1B2
1B-3
1C-6

VISITOR EXPERIENCES
EL
ZONE 1- PUBLIC ARRIVAL ZONE 2- MUSEUM MODIFICAITONS ZONE 3- EXPANSION BAR ZONE 4-FLEXIBLE SCULPTURE GARDEN AND EVENT SPACE ZONE 5-LUMBERYARD AND FRONTAGE DISTRIBUTED ARTSEXPERIENCES Avenida Montezuma
PARK

PERGOLA
PORTAL

CAHUILLA & ARTS

PROMENADE
COVE

OPEN LOT

FUTUREPHASE
utilization of
parking for
planting

PARKING

OFFICES
(360SF)

COMMUNITY
ROOM
REST
ROOMS

HISTORICAL

SOCIETY/ARCHIVE/
OFFICE
(860 SF)

LUMBERYARD

FLEXSPACE
MAIN 1A-1

ROTATING

GALLERY
(700 SF)
MECH

LOADING

LOADING
Avenida Villa
Avenida Mendoza

CULTURE
OASIS
(6000 SF)
HGA
(1300 SF)

ARCHIVE
EXPANSION (2300 SF)
39 40
March 21, 2023
21 l
.
<
.

I \ ,
.....,.-,c,f ;,
I ꞏiꞏ-- j, "
?
-
1C-3
1C5
1A-1
1C-4
1C-1
1C-2
1B-1
1A-2
1B2
1B-3
1C-6
EL

LUMBERYARD GROUND

FLOORIMPROVEMENTS
$360K (461K With new HVAC)

DEMOLITION
$51K
CASITA
$150K
MECH
Avenida Mendoza

COST ESTIMATE SUMMARY
TOTAL ESTIMATE : $5M
PHASE 1 FUNDS :$2.5M

ARCHIVE

STRUCTURE
$2.5M
OASIS

LANDSCAPE &ENCLOSURE
$800k
STITCH
$260k

PROMENDADE

LANDSCAPE
$330k
NEW

PERGOLA
$500k

OPERATIONS INTERIOR

TENANTIMPROVEMENTS
$300k
HGA
41 42
March 21, 2023
22 indigenous contemporary
How could we envision a design
approach and language which
empowered the future while
honoring the past?

LA QUINTA INSPIRATION
HGA

ART&CUTLURE

ART&CUTLURE

ART&CUTLURE

ART&CUTLURE

ART&CUTLURE

LANDSCAPECONCEPT
LAYERS OF TIME | WOVEN ART AND CULTURE
Avenida Montezuma

INDIGENOUS
MODERN

CONTEMPORARY

INTERNAL
Landscape Experience
TEMALPAKH - Interpretive Gardens
The layering of the landscape creates an immersive
experience which will provide a unique and interactive
environmentfor visitorsto explore.Theexperience would
be composed of several layers of movement, structure,
landscape and light.Movement connects to thecity and
civic amenities in the Hexagon. A new structure focuses the visitor’s arrival and Museum Identity. The landscape layer wouldinvolvecreatinga landscape of plants,trees,
and other natural elements that can be explored and
interacted with. The light layer will create atmospheric elements suchas canopy lighting,visualtechnology and
signage, and other light sources that can be used to create a unique atmosphere and enhance the overall experience.

By combining these layers, visitors can explore and interact withthe environmentina uniqueand immersiveway.

HGA
43 44
March 21, 2023
23 EXISTING ARRIVAL

EXISTING STREETFRONT CHARACTER
Signals Vehicular Dominance,
Wayfinding Obscure, Not
welcoming.

HISTORIC STRUCTURE
subtly transform and upgrade
presentation of historic structures
as physical artifacts, playfully
animate.

NEED FOR WAYFINDING
HGA
HGA
Promenade
Amplyfying Relationships andConnections
TheMuseum’s arrival experience,the promenade,willprovidevisitorswithopportunities to explore the Valley’s natural beauty and learn about its history and culture, through landscape, movement, andconnection.

Themuseumwillalso feature a variety of interactiveexhibits,educational programs,and eventsthat explorethe history,culture,and ecologyof the Coachella Valley.Additionally, the museum will provide a platform for the Valley’s diverse communities to share their stories andexperiences.
museum
Visitors Locals
Cultural Partners
Civic/Commercial
Connections
MUSEUM
45 46
March 21, 2023
24 HGA

EXISTING ARRIVAL

EXISTING STREETFRONT CHARACTER
significant verticality and scale
distortion from palms

EXISTING ARCHITECTURALCHARACTER
white stucco, tiles, puched windows,
wooden secondary structures, tile roofs,
hexagonal motif

ADD CLARITY AND EXCITEMENT ATARRIVAL
unify, focus, and establish visitor’s experience
through elevation heirarchy, streetfront
activation and promenade

REINFORCE THE PEDESTRIAN EXPERIENCE
focus the inner area of the hexagon with
leisure, landscape, and human scale
activities, move parking to side decomposed
gravel lot, retain ADA with immediate access.

HISTORIC STRUCTURE
subtly transform and upgrade
presentation of historic structures
as physical artifacts, playfully
animate.

HISTORIC STRUCTURE
discuss aspects of lumberyard to
salvage or abandon
Before
HGA

A WELCOMING ARRIVAL

PROMENADE PLANTED WITH

CAHUILLA INTERPRETIVE CONCEPT

SHADE TREES INTRODUCED TO

LOWER SCALE OF PALM ALLEY

SECONDARY ACCESS TO OASIS AND

LUMBERYARD

MAIN MUSEUM ARRIVAL OPERABLE

GATEWAY TRELLIS

NEW PRIMARY MUSEUM SIGN

POTENTIAL LANDSCAPE UPGRADES

ON INTERIOR OF AUTOCOURT

SIGNAGE AND TREATMENT AT
ARRIVAL ‘PORCH’ COVERING TO
MARK ARRIVAL.

SIGNAGE (TBD) INTEGRATE

CAMPUS PUBLIC

ART/MURAL

PROGRAM
O
A SIS
L
Q
47 48
March 21, 2023
25 HGA
Open and Effortless
A New VisitorExperience
The expanded Vistori’s experience at the La Quinta
Museum is expanded to increase ease, comfort, and a
sense of effortlessconnectionfor the city,itscitizen’sand this cultural hub. The design accomplishes this through transformingsitewallsintodynamicareas for gathering,
and providing infrastructure so that the idea of docent, arrival,guideor helpisexpandedto a desk-lessformat.

The aesthetic language of the transforming wall
takes cues fromthedappled palmshadeof the native
oasis and the humble walled pool at the historic La
QuintaHotel.

La Quinta City Center
Parking
Park
MUSEUM

LUMBERYARD
OASIS
DEMO
donor opportunities

HISTORIC HOTEL POOL

CAHUILLA TRIBE

PROMENADE
HGA
49 50
March 21, 2023
26 Multi-Functionality
The Main entrance, framed by the
existing portcochere is animated
throughlight,and a new donor/mural
wall.Familiesgather,just before dusk,
awaiting an event in the Oasis, a
spokenword pieceor musicalscore.

INTEGRATED

TECHNOLOGY

PLAYFUL OPPORTUNITIES FOR

GATHERING

DONOR WALL ENHANCED SHADE FOR STAYING

INSTAGRAMMABLE MOMENTS CLEAR NAMING
L Q

PERGOLA PORTAL
HGA
DIAGRAM OF ‘CLOSED’ POSITION
SHADE + SECURITY = A CLEAR GATEWAY

INTEGRATED AUTOMATED OPENING

HYDRAULIC HINGES OR BI-FOLD

DESIGN IMAGERY

PERGOLA PORTAL

TRELLIS
HGA

ARRIVAL
PLAZA

MUSEUM PROMENADE PERGOLA PARK

AROMATICS SHADE TREES EXISTING PALMS
51 52
March 21, 2023
27 ENTRY

DESIGN IMAGERY

DONOR WALL

COMFORTABLE SEATING

MULTIUSE SIGNAGE

POSITON AS FURNITURE

BENCHES SIMPLE SALES

NEW DESK
Before
After
HGA

INTERIORS
Before Before
After After

RETAIL SHOP CONVERTE INTO

OFFICES OR ARCHIVAL SPACE

BACK OF HOUSE LOADING DOCK, AND OFFICES UPGRADED

AND CONVERTED TO OFFICE, WORKSPACE, AND ORARCHIVAL
HGA
53 54
March 21, 2023
28 LUMBERYARD

HIGH-DENISITY STORAGE
MECH

DISCOVERY SPACE COVERED

LOADING

WORKSPACE

FLEXIBLE

GALLERY WELCOME

COMMUNITY ROOM RR
$

DONOR WALL
ELEV

VESTIBULE

FILM SCREENING
GALA

SCULPTURE
SHADE

FOUNTAIN EXTERIOR
MURAL

LIVEMUSIC

OUTDOOR

CLASSROOM
POETRY

READING

PEDESTRIAN CONNECTIONS TO COVE

PARKING

OPERABLE OVERHEAD PERGOLA
OASIS

MUTLI-FUNCTIONAL COURTYARDLANDSCAPE

CAHUILLA

INTERPRETIVE GARDENS

PEDESTRIAN

AND BICYCLECONNECTIONS
PUBLIC

ARTS INTEGRATION

CASITA LANTERN
(NON-PUBLIC)

OFFICES
OASIS | ARCHIVE | LUMBERYARD
HGA

ARCHIVAL STORAGE
HGA
MEETIN
G
SPACE

SERVICES

GALLERY VESTIBULE

WORKSPACE ARCHIVE GALLERY
OASIS

LOADING BAY

BACK ENTRY
55 56
March 21, 2023
29 HGA

ARCHIVE STRUCTURE GARDEN WALL

POSSIBLE DEMISING LINE FOR

PHAS SPLIT CHOICE OF FRONT

OF HOUSE/BACK OF HOUSE

LUMBERYARD

MULTI-PURPOSE EVENT

COURTYARD

LOCAL MATERIAL AND

FORMAL ARTICULATIONS

FOR NARRATIVE, CHARACTER

AND COMFORT

SLOPED FOR HIGH DENSITY STORAGE

PHOTOVOLTAIC

OPTIMIZATION

CONDITIONED CIRCULATION

CONNECTING LOADING,

ARCHIVE, AND MUSEUM

ARCHIVE OASIS
ENERGY
SHADE

BACKDROP FOR ART ANDACTIVITY

DESIGN IMAGERY
Currently there are just over 3,000 items
in the museum’s collection:

PHOTOGRAPHS:Approximately 750 photos of various
sizes (18.5” x 16”, 30” x 30”, 13” x 10”, 4.25” x 3.25”,etc.).

LIBRARY:Approximately 700 items including
hardcover books, softcover books, file folders
including newspaper clippings/handwritten notes,
and publications.

OBJECTS: Approximately 800 items ranging in shape
and size. Items include dinner plates, silverware,
jewelry, clothing, golf balls, posters, shells, oil paintings, taxidermized animals, rabbit pelts, B.B. guns, wrought
iron gates, ball caps, tennis rackets, wine glasses,
baskets, roof tiles, matchbooks, cowboy boots,
branding irons, typewriters, beans, and arrowheads.

Special consideration should be given to the oldest
and most fragile objects which are generally the items
associated with the Cahuilla Tribe such as baskets,
bead necklaces, digging tools, and pottery.

ARTIFACTS:Approximately 675 items including letters,
business cards, maps, contracts, building permits,
newspapers, handwritten notes, certificates, menus,
and invitations.

CRITERIAThe archival space must adequately
house these items and meet any and all museum
requirements regarding temperature and/or humidity
control. We anticipate the La Quinta museum will
follow the industry standard of accessioning and
deaccessioning items, therefore the archival space
must accommodate the growth rate percentage that
is typical of small local community museums.

As far as linear footage is concerned, we are interested in exploring a 750 sq.ft. archive space and a 1500 sq.
ft. archive space. Are you able to provide a preliminary mockup of what a 750 sq.ft. can look like and what a
1500 sq.ft. can potentially look like so we can compare the two?

GARDEN WALL
HGA
57 58
March 21, 2023
30 FENCING PERIMETER

ABLE TO BE CLOSED, OR

OPEN DEPENDING ON

OPERATIONS NEEDS

LUMBERYARD TO BE

DISCUSSED

FLEXIBLE EVENT

CONNETIONS FOR

EXPO YARD

SHADE FROM THE

SOUTHERN SUN

PROVIDES INTIMACY

AND AN INVITATION TO
STAY

BACK WALL FOR

MUSEUM CAN BE USED

FOR MURAL, PLANTING,

OR MOVIE PROJECTION

OASIS (W/LUMBERYARD)
After
Before
HGA

OSASIS EVENTS

SMALL CONCERTS
HGA

BANQUETS

MOVIESHOWINGS

OUTDOORGALLERY &ARTS SHOW
59 60
March 21, 2023
31 HGA
61 62
March 21, 2023
32 1C-3
1C5
1A-1
1C-4
1C-1
1C-2
1B-1
1A-2
1B2
1B-3
1C-6
EL

LUMBERYARD GROUND

FLOORIMPROVEMENTS
$360K (461K With new HVAC)

DEMOLITION
$51K
CASITA
$150K
MECH
Avenida Mendoza

COST ESTIMATE SUMMARY
TOTAL ESTIMATE : $5M
PHASE 1 FUNDS :$2.5M

ARCHIVE

STRUCTURE
$2.5M
OASIS

LANDSCAPE &ENCLOSURE
$800k
STITCH
$260k

PROMENDADE

LANDSCAPE
$330k
NEW

PERGOLA
$500k

OPERATIONS INTERIOR

TENANTIMPROVEMENTS
$300k
HGA

APPENDIX
63 64
March 21, 2023
33 Existing CampusConditions
relocate accessibleparking tear out concrete addition ofarchive structure punchture throughwall awning, mural, or ivy wall new local artisan crafted perimeter fence HGA
1C-3
1C5
1A-1
1C-4
1C-1
1C-2
1B-1
1A-2
1B2
1C-6

VISITOR EXPERIENCES
EL
1a
1c
3a
3c
4a
4b
5a
5b
4c
2a
2b
2c
2d
2e
1d 1B-3
ZONE 1- PUBLIC ARRIVAL ZONE 2- MUSEUM MODIFICAITONS ZONE 3- EXPANSION BAR ZONE 4-FLEXIBLE SCULPTURE GARDEN AND EVENT SPACE ZONE 5-LUMBERYARD AND FRONTAGE PARK
Avenida Montezuma

PERGOLA
PORTAL1b

CAHUILLA & ARTS

PROMENADE
COVE

CULTURE
OASIS

OPEN LOT

FUTUREPHASE

PARKING

OFFICES

COMMUNITY
ROOM
REST
ROOMS

HISTORICAL

SOCIETY/ARCHIVE/
OFFICE
3bARCHIVE

EXPANSION

LUMBERYARD

FLEXSPACE
MAIN

ROTATING

GALLERY
MECH

LOADING

LOADING
2f
Avenida Villa
Avenida Mendoza
HGA
65 66
March 21, 2023
34 1 COST MENU PLAN - LEVEL 01
3/64" = 1'-0"
1A
1B
1C
9A
7A 7A
5A
5B
8A 7B
7B
7B 7B
2D 2B 2C 2A
3A
3B
4A 3C
3A
4B
4C
5B
6A
4D
Repaint
Crosswalk
HGA

COST COMPONENTS
COST MODEL | COMPONENTS BYZONE

BREAKDOWN BY ZONE AREA ESTIMATE
1A | ArrivalPromenade 1,000sqft $79,269
2A| Upgraded Arrival Porch 150sqft $26,000
2B| LobbyUpgrades 200sqft $30,000
2C |Flexible Gallery Modifications 300sqft $20,000
ZONE TOTAL $301,179
$411,680
$50,000
$30,000
ZONE TOTAL $461,680-$390,000
3A |Flexible Gallery Modifications 700sqft $168,594
3B | Shop ConversiontoOffice 360sqft $86,705
3C| Loading Dock Conversion 866sqft $208,576
ZONE TOTAL $463,877
5A| Oasis Landscape Courtyard 6,000sqft $359,689
5B | Operable Fencing 100ft $419,689
ZONE 1- PUBLIC ARRIVAL NOTES NOTES
ZONE 2- MUSEUM MODIFICAITONS
7A | Promenade 2,800sqft $118,368
7B | AdditionalLandscape 4.950sqft $209,259
ZONETOTAL 7,750sqft $327,627
8A| AdditionalOffsiteImprovements 5,000+sqft $252,576
9A |Casita 875 sqft $00,000
PHASE
1 ZONETOTAL $252,576
ZONE 4-FLEXIBLE SCULPTURE GARDEN AND EVENT SPACE
GRAND TOTAL = $5.5M SELECTIONS
BUDGET= $2.5M
ZONE 5-LUMBERYARD AND FRONTAGE
6A | Light GroundFloor Tennant Improvement 1,560sqft
6B| Seismic Streghtening 3,200sqft
6C| Demolish 1,560sqft
ZONE 3- EXPANSIONBAR
4A|Archive(highdensitystorageseparate) 2,300sqft $1,459,570 4B| Covered LoadingArea 1,100sqft $769,5335
$
176,278
200
sqft
4C| CoveredOutdoorClassroomandGate
$
200,00
0 4D| BoundingOasisWall 140ft
ZONE
TOTAL
$2,605,383
1B | GatewayStructure 40ft $151,762 HIGHER? 5C |Technical requirements TBD 1C | ArrivalPlaza 1,000sqft $79,269 ZONETOTAL $779,378
PHASE1 ZONETOTAL $310,300
2D| PenetrationandVestibule 120sqft $54,000 6D |Replace 1,560sqft $195,000 PHAS
E1
2E| LoadingDockDrainageRepair 400sqft $70,000 6E| HungFalseFronts x x INPUT
AS WELL AS APPX.
3K SF GROUND

UP REPLACEMEN

TSTRUCTURE
NOTE: WOULD

CONSUMEALL

AVALIABLE

INITIALFUNDS
PHASE1
PHASE1
PHASE1

RECOMMEND USING

DONOR CAMPAIGNTO

SUPPORT

DEFER UNTIL VISION

FOR EXPANSION

ANDLONGTERMUSE

OF LUMBERYARD IS

UNDERSTOOD

FOR THE LASTTWO ZONES, LOOK FOR PLANNINGAND PUBLIC WORKS

OPPORTUNITIES FORSTREETFRONT LANDSCAPING

RECOMMEND

USINGDONOR

CAMPAIGN TO

SUPPORT

RECOMMEND

USINGDONOR

CAMPAIGN TO

SUPPORT
HGA
67 68
March 21, 2023
35 STRUCTURAL REPORT
HGA
La Quinta Museum – Lumberyard Building
Structural Engineering Assessment
HGA Commission No: 4917-001-00
December 27,2022
Overview
Building Assessment
The structural condition assessment of the Architects and Engineers Building is based on a walk-thru of the building performed on December 21, 2022 by Ethan Fogle, PE (VA) of HGA. The following observations and structural description are based on portions of the structure that were visible at the time of the walk-thru. Other than easily moveable ceiling panels, no materials were removed to observe existing structure and no testing was performed. Floor plans and structural drawings were not available to HGA at the time of the assessment. No structural calculations or analysis were performed as a part of this condition assessment.

General Building Description and Structural System
- Two story CMU bearing wall building. Reinforcing/grouting of wall unobserved. - Level 1 floor structure unobserved.
- Level 2 floor structure consists of approximate 2”x9” (nominal) joists spanning to CMU walls and/or lumber headers over openings. Wood deck above, thickness unobserved - Roof level structure largely unobserved, though one small opening in ceiling indicates wood roof trusses. Truss information unobserved.
- Exterior stair structure unobserved.
- CMU bearing walls act as lateral system along with retrofit moment frame at front entrance.

General Building Condition
Minor signs of distress were observed including small cracks in CMU walls and uneven floors on Level 2.

Observed distress is nothing beyond what would be expected for a building of this age and construction type. Overall building condition is good with no visible signs of water or other damage at time of observation.

Observation indicates that seismic retrofit has occurred throughout building. Anchorage of existing CMU bearing walls to floor/roof diaphragm noted in Level 2 and Roof framing. Retrofit moment frame observed at front door, likely added to increase stiffness along front wall with significant number of openings. See Photos 1 – 7 for retrofit observations. See remainder of photos for general conditions.

Recommendations
General (apply to all Options below)
These recommendations are suggested as they would help to avoid intensive and costly investigation, design, and construction.
- Verify prior occupancy is not permitted as Group S or Group U - Do no change nature of occupancy such that Risk Category (RC) is increased to RC III. See table below for RC III triggers.
- Further investigation of extent of seismic retrofit details. - No additional wall openings cut in CMU bearing walls. - Third party testing of CMU bearing walls to determine extent of grouting/reinforcing.

RC III Triggers Occupant Load
Primary occupancy is public assembly > 300
Containing Group E occupancy > 250
Containing educational occupancies above 12th grade >500 Group I-2, Condition 1 > 50
Group I-2, Condition 2 having emergency surgery or treatment GroupI-3
Any other occupancy > 5000
Power-generating stations, water treatment facility, etc.

Containing quantities of toxic or explosive materials
Change from Group S or Group U to any other Option 1
Unoccupied Level 2.
- Results in minimal investigation, design, and construction. - Typical open office MEP/ceiling/finish materials.

Option 2
Occupied Level 2 with Office usage.
- Results in some level of investigation, design, and construction. - Assumed increase in Level 2 live load from 40 psf to 50 psf + 15 psf partition load. - Requires additional members at Level 2
o Option 2a: add new joists in between existing floor joists o Option 2b: support existing joists at mid-span point with new beam underneath o Likely a combination of Option 2a and 2b would be ideal. Option 2a at shorter span conditions where required, Option 2b at longer span conditions. - Reinforcing/grouting of existing CMU cells as required.

Option 3
Occupied Level 2 with usage other than Office (does not trigger RC III). - Results in some level of investigation, design, and construction. - Increase in live load dependent on occupancy.
- Requires additional members at Level 2 similar to Option 2 with the potential for total replacement of floor framing dependent on magnitude of live load.
- Reinforcing/grouting of existing CMU cells as required.

Option 4
Demolition of existing building and build new.
- HGA does not recommend this option as it has the most significant cost and carbon impacts.

Structural Photographs
Photo 1: Retrofit Diaphragm Anchorage Level 2 Photo 2: Retrofit Diaphragm Anchorage Level 2 Photo 3: Location of Retrofit Anchorage Roof Level Photo 4: Retrofit Diaphragm Anchorage Roof Photo 5: Retrofit Diaphragm Anchorage Roof
HGA
Photo 6: Location of Retrofit Moment Frame in Box-out
Photo 7: Retrofit Moment Frame Connection
69 70
March 21, 2023
36 HGA

LAQUINTAMUSEUMCULTURALCAMPUS LA QUINTA, CALIFORNIA

PLANNING,DISCOVERY, AND CONCEPTDESIGN

LA QUINTA MUSEUM &HISTORICALSOCIETY

CULTURAL CAMPUS PLAN PREPARED FOR THE CITY OF LAQUINTA
71 72
March 21, 2023
37 City Council Meeting
March 21, 2023
S2 – Public Safety Camera System
Phase 2
73 74
March 21, 2023
38 Background
• March 2021: Policies and procedures passed
• August 2021: Public Safety Camera System
(PSCS) Phase 1 work completed
• September 2021: Phase 1 Camera System live
• March 2022: PSCS Phase 2 voted #3
priority at Community Workshop
• Phase 2 funding appropriated in FY
2022/23 CIP: $1,797,000
Background
75 76
March 21, 2023
39 Phase 2 Proposed Locations
• Maintenance and Operations Yard (3 cameras)
• City Owned Parking Lot (1 camera)
• Eisenhower/Montezuma Fiber
• La Quinta Park (3 cameras)
• Adams Park (2 cameras)
• Eisenhower Park (1 camera)
• Velasco Park (1 camera)
• Top of Cove Trailheads/Parking Lot (7 cameras)
• SilverRock Venue Site (4 cameras)
• Project Underway: X Park (6 cameras)
Phase 2 Proposed Locations
• Initial Phase 2 estimate included
fiber installation from Avenida
Bermudas to top of Cove
• Looking into alternative options for
fiber connection/use
77 78
March 21, 2023
40 Village
Locations
LEGEND:

Public Safety Camera
(Proposed Location)
Fiber Installation
Cove
Locations
79 80
March 21, 2023
41 North
La Quinta
Locations
SilverRock
Venue Site
81 82
March 21, 2023
42 Proposed
Phase 2
Cost
Estimate

DESCRIPTION COST ESTIMATE
Mobilization $75,000
Museum and Montezuma Parking - Fiber $350,000
Maintenance and Operations Yard $15,000
La Quinta and Adams Park $35,000
SilverRock Venue Site $20,000
Velasco and Eisenhower (Colima) Parks $35,000
Top of Cove (Radio Cameras) $20,000
Server, Storage and Licenses $48,500
Sub Total Construction: $598,500
Design Contingency: $60,500
Construction: $659,000
Design: $120,000
Professional: $75,000
Insp/Test/Survey: $65,000
Contingency: $150,000
Total Preliminary Estimate: $1,069,000
Phase 2 Cost Estimate
$1,069,000 Total Preliminary Estimate
$60,000 2022-22X-Park Safety Cameras
$90,000 2022-18SilverRock Venue Wifi and Fiber Backbone TOTAL PHASE 2 COST ESTIMATE: $1,219,000
83 84
March 21, 2023
43 Project Budget
Construction: $659,000
Design: $120,000
Professional: $75,000
Insp/Test/Survey: $65,000
Contingency: $150,000
Projects 2022-18 and 2022-23: $150,000
Total Preliminary Estimate: $1,219,000
Optional Location
• Fiber installation: Jefferson Street from
Ave 52 to Ave 54
• Cameras: Ave 52, Ave 53, and Ave 54
• Estimated Cost: $1,089,000
• Currently proposed in Phase 3 PSCS
85 86
March 21, 2023
44 Questions?
87 88
March 21, 2023
45 City Council Meeting
March 21, 2023
S3 – Chapter 3.25 STVR Code Amendments
Background
• February 21, 2023 – update on STVR program
characteristics, performance, and enforcement for
2022 calendar year and comparison to 2021
• Public comments in support and opposition of the
STVR program regulations
• Proposed STVR program code amendments to
Chapter 3.25 for consideration, discussion, and
direction
89 90
March 21, 2023
46 A. Section 3.25.055 Non-issuance of new STVR
permits (ban); periodic review
• Add a provision requiring 4/5 majority vote of
the Council to adopt future code amendments
to this section
• Add a provision to exempt Homeshare STVR
permits in non-exempt areas from the ban
STVR Program Code Amendments
A. Section 3.25.055 Non-issuance of new STVR
permits (ban); periodic review
• Executive Order 10 – Aug. 4, 2020 to May 19, 2021 –
moratorium
• Section 3.25.055 added to LQMC – May 20, 2021 –
permanent ban currently in effect
• Measure A (Nov. 2022) seeking permanent ban did not
include Homeshare STVR permits
STVR Program Code Amendments
91 92
March 21, 2023
47 B. Develop and add a process by which a residential dwelling in non-exempt areas would be able to apply for and be
considered, at a public meeting, to be exempted from the ban if specified criteria are met
• Notification of properties within 500 feet
• Decision-making body to review the request
• Criteria – large lot size (25,000 sq. ft.), bedrooms verification, onsite parking, physical distance from adjacent residential properties, evaluate active STVR units within 500 ft.
• Limit total number of exemptions allowed within the City and number of exemptions that can be approved within a calendar year (for example, no more than 20 total, and no more than 3 per calendar year)
STVR Program Code Amendments
93 94
March 21, 2023
48 C. Develop and add an exemption from the ban for
qualifying residential projects governed by HOAs
where STVRs are authorized under the CC&Rs
• Voting membership of the HOA approves by 50%+1 to
be exempted from the ban
• HOA certifies that it has complied with any other voting requirements pursuant to the CC&Rs
STVR Program Code Amendments
• Community Outreach
• Recreational Vehicles Regulations
• Bedrooms Verification Process
STVR Program Code Amendments
95 96
March 21, 2023
49 97
98

← All documents from this meeting