The Agua Caliente Band of Cahuilla Indians responded to the AB 52 consultation letter that although the Project Site is outside of the Agua Caliente Band of Cahuilla Indians territory, it is within the Tribe’s Traditional Use Area and therefore requested that an archaeological monitor be present during ground disturbing activities.
Mitigation Measures TRI-1, TRI-2, and TRI-3 were determined to be required to address all tribes’ requests and ensure that the Project would not cause a substantial adverse change in the significance of a tribal cultural resource.
2023 Proposed Project Analysis
The 2023 Proposed Project occurs on the same site assessed by the 2018 TCLQ Initial Study. Because the 2023 Proposed Project includes a Specific Plan Amendment, the City conducted an SB 18 consultation.
Only one tribe (Agua Caliente) has responded with interest in scheduling an agency-to-agency meeting.
The City responded by sending them a copy of the latest cultural resources information, including the mitigation measures identified in the 2018 TCLQ Initial Study. The Agua Caliente tribe indicated that implementation of Mitigation measures TRI-1, TRI-2 and TRI-3 continued to be sufficient to address their concerns.
4.18.2 Mitigation Measures
2018 TCLQ Initial Study Mitigation Measures Applicable/Not Applicable MM TRI-1 Prior to any ground-disturbing activities, the applicant shall retain the services of a qualified
archaeologist and Tribal Monitor. Copies of
contracts with monitoring archaeologists and
Tribal Monitors shall be provided to the City prior
to the issuance of any ground-disturbing permit.
Full-time archaeological monitoring shall be
conducted by a qualified archaeologist for
excavations that will exceed 3 feet in depth. In
the event that buried cultural resources are
discovered during construction, the
archaeologist shall be permitted to stop
construction operations within 50 feet of the find
and the Applicant and/or the Applicant’s
representative shall immediately notify the City.
The archaeologist shall determine whether the
finding requires further study. The Applicant
shall include a standard inadvertent discovery
clause in every construction contract to inform
contractors of this requirement. The
archaeologist shall make recommendations
concerning appropriate measures that will be
implemented to protect the resource(s),
including but not limited to excavation and
evaluation of the finds in accordance with
Section 15064.5 of the CEQA Guidelines. Any
previously undiscovered resources found during
Applicable. The 2023 Project Site is the
same as analyzed in 2018, and for which,
through tribal consultation, the mitigation
measure was determined to continue to be
necessary to address unanticipated tribal
resources.
520 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
construction within the project area should be
recorded on appropriate Department of Parks
and Recreation (DPR) 523 forms and evaluated
for significance in terms of CEQA criteria. The
archaeologist shall provide the City with a report
of all monitoring activities within 30 days of
completion of these activities.
MM TRI-2 Prior to any ground-disturbing activities, the applicant shall retain the services of a qualified
geologist or paleontologist. Full-time monitoring
shall be conducted for all excavations that
exceed 3 feet in depth. In the event that
paleontological resources are discovered during
construction, the paleontologist shall be
permitted to stop construction operations within
50 feet of the find and the Applicant and/or the
Applicant’s representative shall immediately
notify the City. The paleontologist shall
determine whether the finding requires further
study. The Applicant shall include a standard
inadvertent discovery clause in every
construction contract to inform contractors of
this requirement. The paleontologist shall make
recommendations concerning appropriate
measures that will be implemented to protect
the resource(s), including but not limited to
excavation and evaluation of the finds in
accordance with the Society of Vertebrate
Paleontology Guidelines. Any fossils recovered
during mitigation shall be deposited in an
accredited and permanent scientific institution.
The paleontologist shall provide the City with a
report of all monitoring activities within 30 days
of completion of these activities.
Applicable. The 2023 Project Site is the
same as analyzed in 2018, and for which,
through tribal consultation, the mitigation
measure was determined to continue to be
necessary to address unanticipated tribal
resources.
MM TRI-3 In the event of the accidental discovery of any human remains on the project, CEQA Guidelines
Section 15064.5; Health and Safety Code Section
7050.5; and Public Resources Code (PRC)
Sections 5097.94 and 5097.98 must be followed.
If during the course of project development
there is accidental discovery of any human
remains, the following steps shall be taken:
1. There shall be no further excavation or
disturbance of the site, or any nearby
area reasonably suspected to overlie
adjacent human remains until the
County Coroner is contacted to
determine if the remains are Native
American and if an investigation of the
cause of death is required. If the
Applicable. The 2023 Project Site is the
same as analyzed in 2018, and for which,
through tribal consultation, the mitigation
measure was determined to continue to be
necessary to address unanticipated tribal
resources.
521 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
coroner determines the remains to be
Native American, the coroner shall
contact the Native American Heritage
Commission (NAHC) within 24 hours,
and the NAHC shall identify the person
or persons it believes to be the “most
likely descendant” (MLD) of the
deceased Native American. The MLD
may make recommendations to the
landowner or the person responsible for
the excavation work, for means of
treating or disposing of, with
appropriate dignity, the human
remains, and any associated grave
goods as provided in Public Resource
Code Section 5097.98, Environmental
Issues.
4.18.3 Conclusion
The Proposed Project would not result in any impacts beyond those identified in the previously approved 2018 TCLQ Initial Study. The Proposed Project contains no substantial changes to the implementation of the TCLQ Specific Plan, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time that 2018 TCLQ Initial Study was approved, that would require major revisions to the 2018 TCLQ Initial Study. 522 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
4.19 UTILITIES AND SERVICE SYSTEMS
CEQA THRESHOLDS
Impact
Conclusion in
2018 TCLQ Initial
Study
Do the
Proposed
Changes
Involve New or
More
Severe
Impacts?
New
Circumstances
Involving New
or
More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
XIX. UTILITIES AND SERVICE SYSTEMS:
Would the project:
a)Exceed wastewater treatment requirements of
the applicable Regional Water Quality Control
Board? No Impact
(N/A –
Removed
from
Guidelines)
(N/A –
Removed
from
Guidelines)
(N/A –
Removed
from
Guidelines)
a) Require or result in the relocation or construction
of new or expanded water, or wastewater
treatment or storm water drainage, electric power,
natural gas, or telecommunications facilities or
expansion of existing facilities, the construction or
relocation of which could cause significant
environmental effects?
No Impact
and Less Than
Significant
No No No
b) Require or result in the construction of new
storm water drainage facilities or expansion of
existing facilities, the construction of which could
cause significant environmental effects?
No Impact
(N/A –
Guidelines
Revised)
(N/A –
Guidelines
Revised)
(N/A –
Guidelines
Revised)
b) Have sufficient water supplies available to serve
the project and reasonably foreseeable future
development during normal, dry, and multiple dry
years from existing entitlements and resources, or
are new or expanded entitlements needed?
Less Than
Significant No No No
c) Result in a determination by the wastewater
treatment provider which serves or may serve the
project that it has adequate capacity to serve the
project's projected demand in addition to the
provider's existing commitments?
Less Than
Significant No No No
d) Generate solid waste in excess of State or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment
of solid waste reduction goals? Be served by a
landfill with sufficient permitted capacity to
accommodate the project’s solid waste disposal
needs?
Less Than
Significant No No No
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
No Impact No No No
523 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
4.19.1 Discussion
Summary of 2018 TCLQ Initial Study
Wastewater Facilities and Demand
Sanitary sewer collection and treatment facilities are provided by the CVWD within most of the City. There are existing sewer mains in Adams Street and Auto Center Drive to which the Project would connect to.
The CVWD determined it had sufficient capacity to service the Project. Additionally, the Project would pay a connection fee that would financially assist toward future expansion and upgrading wastewater drainage infrastructure if required. Impacts to wastewater connection and service were determined to be less than significant.
As stated in the General Plan EIR, it is assumed that domestic wastewater flows are equivalent to the potable water demand projections. Therefore, the Project, consisting of 131 residential units and a 125- room hotel would generate 66.04 acre-feet of wastewater per year, or 58,957 gallons per day. The amount of wastewater generated by the Project would account for a nominal 1.47 percent of the remaining capacity of the Mid-Valley Water Reclamation Plant (WRP-4). The impacts would be less than significant.
Stormwater Facilities and Demand
Pursuant to the WQMP, the Project would be required to implement stormwater best management practices that limit the volume and flow of stormwater to the municipal storm sewer system (Appendix F of the 2018 TCLQ Initial Study). Therefore, overall, impacts would be less than significant.
Water Facilities and Demand
The commercial development permitted under the current zoning (Regional Commercial with floor area ratio of 0.35) would be 335,412 square feet in size. The water demand of a corporate building (permitted under the existing Regional Commercial zone) would be 12.78 acre-feet per year (34g/sf/day x 335.412 ksf x 365 = 4,162,462 gallons, or 12.78 acre-feet).
Although the Project would result in increased water usage beyond existing conditions (since the site is currently vacant) and what was planned under the City’s General Plan, the increased water demand only accounts for a negligible amount of CVWD’s water supply. No new or expanded water supply entitlements would be needed. Therefore, potential impacts would be less than significant.
Solid Waste Facilities and Demand
The City has a solid waste service agreement with Burrtec Waste and Recycling Services, LLC for the collection and transport of solid waste to landfill sites. The Edom Hill Transfer Station accepts solid waste from the City. All waste received at the Edom Hill Transfer Station is transferred to one of three landfills:
Lambs Canyon Landfill near Beaumont, Badlands Landfill near Moreno Valley, and El Sobrante Landfill near Corona. According to the CalRecycle Estate Solid Waste Generation rates website, the 125-room hotel would generate 250 pounds of solid waste per day (2pounds/room/day).The residential development would generate 1,602 pounds of solid waste per day (12.23lbs/household/day)33. In total, 524 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
the Project would generate 1,852 pounds of solid waste per day. The three existing landfills described above would have long-term capacity sufficient for expected solid waste generated by the Project, and Burrtec plans to provide service to accommodate future development. Impacts were less than significant.
Solid waste disposal services must follow federal, state, and local statutes and regulations related to the collection of solid waste. Therefore, potential impacts would be less than significant. 2023 Proposed Project Analysis
The Project Site is in the same area as assessed in the 2018 TCLQ Initial Study. The 2023 Proposed Project is related to the hotel element of the 2018 Proposed Project and proposes the same number of rooms as identified in the 2018 TCLQ Initial Study assessment, therefore, the impacts to utilities and service systems are the same as previously analyzed. Impacts would be less than significant.
4.19.2 Mitigation Measures
2018 TCLQ Initial Study Mitigation Measures Applicable/Not Applicable No mitigation measures were required to reduce impacts
because all impacts were less than significant.
Applicable. The 2023 Proposed Project is the same
as 2018 Proposed Project with respect to Utilities
and Service Systems.
4.19.3 Conclusion
The Proposed Project would not result in any impacts beyond those identified in the previously approved 2018 TCLQ Initial Study. The Proposed Project contains no substantial changes to the implementation of the TCLQ Specific Plan, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time that 2018 TCLQ Initial Study was approved, that would require major revisions to the 2018 TCLQ Initial Study. 525 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
4.20 WILDFIRE
CEQA THRESHOLDS
Impact
Conclusion in
2018 TCLQ
Initial Study
Do the
Proposed
Changes
Involve New or
More
Severe
Impacts?
New
Circumstances
Involving New
or
More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
XX. WILDFIRE:
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, Would the project:
a) Substantially impair an adopted emergency
response plan or emergency evacuation plan?
Not
Analyzed No No No
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose
project occupants to, pollutant concentrations from
a wildfire or the uncontrolled spread of wildfire?
Not
Analyzed No No No
c) Require the installation or maintenance of
associated infrastructure (such as roads, fuel breaks,
emergency water sources, power lines or other
utilities) that may exacerbate fire risk or that may
result in temporary or ongoing impacts to the
environment?
Not
Analyzed No No No
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
Not
Analyzed No No No
4.20.1 Discussion
An analysis of the wildfire risk was not required by the CEQA Guidelines at the time the 2018 TCLQ Initial Study was prepared and therefore was not analyzed. However, the wildfire risk was known at the time of the 2018 TCLQ Initial Study and is covered briefly by Guidelines Criterion IX(g) which evaluated a Project’s potential hazard to expose people and structures to wildfire. The 2018 TCLQ Initial Study identified that the Project Site is located within an urban area and not adjacent to wildlands. In addition, according to the CAL FIRE Riverside County Fire Hazard Severity Zone Map, the Project Site is not located within a Very High Fire Hazard Severity Zone. Therefore, Project implementation would not expose people or structures to a significant risk involving wild land fires.
2023 Proposed Project Analysis
The Project Site is in the same area as assessed in the 2018 TCLQ Initial Study. The 2023 Proposed Project is related to the hotel element of the 2018 Proposed Project and proposes the same number of rooms as identified in the 2018 TCLQ Initial Study assessment, therefore, the impacts to utilities and service systems are the same as previously analyzed. Impacts would be less than significant. 526 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
4.20.2 Mitigation Measures
2018 TCLQ Initial Study Mitigation Measures Applicable/Not Applicable No mitigation measures were required to reduce impacts
because all impacts were less than significant.
Applicable. The 2023 Proposed Project is the same
as 2018 Proposed Project with respect to Wildfire.
4.20.3 Conclusion
The Proposed Project would not result in any impacts beyond those identified in the previously approved 2018 TCLQ Initial Study. The Proposed Project contains no substantial changes to the implementation of the TCLQ Specific Plan, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time that 2018 TCLQ Initial Study was approved, that would require major revisions to the 2018 TCLQ Initial Study. 527 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
4.21 MANDATORY FINDINGS OF SIGNIFICANCE
CEQA THRESHOLDS
Impact
Conclusion in
2018 TCLQ Initial
Study
Do the
Proposed
Changes
Involve New or
More
Severe
Impacts?
New
Circumstances
Involving New
or
More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
XXI. MANDATORY FINDINGS OF SIGNIFICANCE:
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the habitat of a
fish or wildlife species, cause a fish or wildlife
population to drop below self-sustaining levels,
threaten to eliminate a plant or animal community,
substantially reduce the number or restrict the
range of a rare or endangered plant or animal or
eliminate important examples of the major periods
of California history or prehistory?
Less Than
Significant
With
Mitigation
Incorporated
No No No
b) Does the project have impacts that are
individually limited, but cumulatively considerable?
("Cumulatively considerable" means that the
incremental effects of a project are considerable
when viewed in connection with the effects of past
projects, the effects of other current projects, and
the effects of probable future projects)?
Less Than
Significant
With
Mitigation
Incorporated
No No No
c) Does the project have environmental effects
which will cause substantial adverse effects on
human beings, either directly or indirectly?
Less Than
Significant
With
Mitigation
Incorporated
No No No
4.21.1 Discussion
Summary of 2018 TCLQ Initial Study
Implementation of the 2018 Proposed Project was determined not degrade the quality of the environment;substantially reduce the habitats of fish or wildlife species; cause a fish or wildlife population to drop below self-sustaining levels; threatens to eliminate a plant or animals; or eliminate important examples of major periods of California history or prehistory with the incorporation of the identified mitigation measures.
The Air Quality and Transportation/Traffic analyses presented in Section 3 and Section 16, respectively, of 2018 TCLQ Initial Study considered cumulative impacts and determined that cumulative air quality and traffic impacts would be less than significant. The 2018 Proposed Project would have less than significant 528 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
impacts to all other resource areas discussed in the analysis section, above. No additional mitigation measures would be required to reduce cumulative impacts to less than significant levels.
Previous sections of this Initial Study/Mitigated Negative Declaration reviewed the Project’s potential impacts related to air quality, geology/soils, hazards/hazardous materials, noise, vibration, and other environmental issue areas that could impact human beings. Implementation would not displace or otherwise significantly impact existing residences. As concluded in these previous discussions, the 2018 Project would result in less than significant environmental impacts with implementation of project design features, conditions, and recommended mitigation measures. Therefore, with implementation of the specified mitigation, the project would cause less than significant adverse effects on human beings. 2023 Proposed Project Analysis
The Project Site is in the same area as assessed in the 2018 TCLQ Initial Study. The 2023 Proposed Project is related to the hotel element of the 2018 Proposed Project and proposes the same number of rooms as identified in the 2018 TCLQ Initial Study assessment.
And though the hotel size and FAR would increase, the impacts would be the same as identified in the 2018 TCLQ Initial Study because the primary environmental categories which would be applicable to the increased FAR include stormwater controls, noise, and aesthetics. This analysis identified that the 2023 Project would comply with the latest stormwater management controls; noise was determined to be the same as the 2018 TCLQ Initial Study because the number of rooms were the same; and the building would be designed using high quality materials and architectural treatments thereby reducing the potential aesthetic impacts. Overall, the 2023 Proposed Project would result in less than significant impacts on humans.
All applicable mitigation measures identified in the 2018 TCLQ Initial Study apply to the 2023 Proposed Project and were determined adequate and feasible to reduce the 2023 Proposed Project impacts.
4.21.2 Conclusions
The 2018 TCLQ Initial Study identified that all resource topics associated with the Project were analyzed in accordance with State CEQA Guidelines and found to pose no impact, less than significant impact, or less than significant impact with mitigation.
The 2023 Proposed Project would not result in any impacts beyond those identified in the previously approved 2018 TCLQ Initial Study. The Proposed Project contains no substantial changes to the implementation of the TCLQ Specific Plan, there have been no substantial changes in circumstances, and no new information has become available, not known and could not have been known, at the time that 2018 TCLQ Initial Study was approved, that would require major revisions to the 2018 TCLQ Initial Study.
Therefore, none of the conditions described in CEQA Guidelines Section 15162 calling for preparation of a subsequent EIR have occurred with respect to any of the Environmental Subject Areas in the most current CEQA Guidelines.
529 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007 June 2023
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1
CEQA Guidelines Section 15164 sets out the conditions in which an adopted MND can be revised or amended:
(a) The lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.
(b) An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred. (c) An addendum need not be circulated for public review but can be included in or attached to the final EIR or adopted negative declaration.
(d) The decision-making body shall consider the addendum with the final EIR or adopted negative declaration prior to making a decision on the project.
(e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead agency's required findings on the project, or elsewhere in the record. The explanation must be supported by substantial evidence.
Based on this analysis, all the conditions of CEQA Guidelines Section 15164 have been met, and an Addendum to the 2018 TCLQ Initial Study is the appropriate document to approve the Proposed Project. 530 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1 June 2023
Appendix A
La Quinta Hampton Inn Air Quality, Global Climate Change, and Energy Impact Analysis
Ganddini Group, Inc
June 13, 2023
531 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1 June 2023
Appendix B-1
Hydrology Study for La Qunita Hampton Inn
Woodard Group
April 2022
532 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1 June 2023
Appendix B-2
Project Specific Water Quality Management Plan for Greens Group APN 600-340-060
Woodard Group
April 2022
533 CLICK HERE to Return to Agenda
Site Development Permit No. SDP2022-0007
The Centre at La Quinta Specific Plan 97-029 Amendment No. 6 - SP2022-0003 The Centre at La Quinta Specific Plan Initial Study Addendum No. 1 June 2023
Appendix C
La Quinta Parking and Traffic Consistency Study (JN 0232-0023) Trames Solutions, Inc
October 26, 2022
534 CLICK HERE to Return to Agenda
RESOLUTION NO. 2024 - XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
LA QUINTA, CALIFORNIA, APPROVING A SPECIFIC
PLAN AMENDMENT AND SITE DEVELOPMENT PERMIT
FOR HAMPTON INN HOTEL LOCATED AT THE
SOUTHWEST CORNER OF AUTO CENTRE DRIVE AND
LA QUINTA DRIVE WITHIN THE CENTRE AT LA QUINTA
SPECIFIC PLAN AREA
CASE NUMBERS:
SPECIFIC PLAN 2022-0003 (SP 1997-029, AMENDMENT 6)
SITE DEVELOPMENT PERMIT 2022-0007
APPLICANT: VERDANT LAQUINTA LLC
WHEREAS, the City Council of the City of La Quinta, California did, on January 16, 2024, hold a duly noticed Public Hearing to consider a request by Verdant LaQuinta LLC, for a 125-room hotel project at the southwest corner of Auto Centre Drive and La Quinta Drive, more commonly described as:
APN 600-340-060
WHEREAS, the Design and Development Department published a public hearing notice in The Desert Sun newspaper on January 5, 2024, as prescribed by the Municipal Code. Public hearing notices were also mailed to all property owners within 500 feet of the site; and
WHEREAS, the Planning Commission of the City of La Quinta, California did, on December 12, 2023, hold a duly noticed Public Hearing to consider this request and recommended adoption of the Addendum to the Mitigated Negative Declaration for Environmental Assessment 2022-0011 and approval of the Specific Plan Amendment and Site Development Permit; and
Specific Plan 2022-0003
WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said City Council did make the following mandatory findings pursuant to Section 9.240.010 of the La Quinta Municipal Code to justify approval of said Specific Plan Amendment, incorporated herewith as Exhibit A:
1. Consistency with General Plan
The proposed Specific Plan Amendment is consistent with the goals and policies of the La Quinta General Plan in that it will result in the development of a 125-room hotel which is permitted in the General Commercial land use 535 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Specific Plan 2022-0003 (SP 1997-029, Amendment 6)
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
designation. The proposed project is consistent with the following Goals and Policies:
Policy LU-2.2 which requires Specific Plans for projects proposing flexible development standards that differ from the Zoning Ordinance.
This project proposes variations from several development standards therefore a Specific Plan Amendment is appropriate for the project.
2. Public Welfare
Approval of the proposed Specific Plan Amendment will not create conditions materially detrimental to public health, safety, and general welfare. The La Quinta Design and Development Department has prepared an addendum to the Mitigated Negative Declaration for Centre at La Quinta Specific Plan Amendment No. 5, EA2017-0009, adopted by the La Quinta City Council on July 3, 2018, Resolution 2018-038, pursuant to Section 15164 of the California Environmental Quality Act (CEQA), in that no substantial changes to the project are proposed that result in new significant environmental effects.
3. Land Use Compatibility
The proposed Specific Plan Amendment incorporates a land use that is compatible with zoning on adjacent properties. The property will continue to be zoned as Regional Commercial which is intended for major retail, professional office restaurants, and hotels.
4. Property Suitability
The uses permitted in the Specific Plan are suitable and appropriate for the subject property in that the site is relatively flat, vacant, and the area can be served by all necessary public services and utilities. The proposed project is located adjacent to other major retailers that could provide synergy between the other commercial uses.
Site Development Permit 2022-0007
WHEREAS, at said Public Hearing, upon hearing and considering all testimony and arguments, if any, of all interested persons desiring to be heard, said City Council did make the following mandatory findings pursuant to Section 9.210.010 of the Municipal Code to justify approval of said Site Development Permit:
1. Consistency with General Plan
The proposed development is consistent with the General Plan land use designation of General Commercial. The proposed project is consistent with the following Goals and Policies:
536 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Specific Plan 2022-0003 (SP 1997-029, Amendment 6)
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
Goal LU-6 and ED-1 as the proposed hotel will contribute to a balanced and varied economic base which provides fiscal stability to the City and a broad range of services to the region.
Program CIR-1.12.a: which encourages land uses that provide jobs and housing near each other to allow the use of alternative modes of travel and produce shorter work commutes. The project will be developed near the existing residential Solterra apartment development directly south of it, providing an opportunity for jobs and housing near each other. Program CIR-1.12.b which encourages mixed use and contiguous commercial development to provide optimum internal connections between uses. The development will provide and be conditioned to provide connections to commercial development on the north, east, and west.
Policy ED-1.5 which states projects proposed on commercial land shall be evaluated for their job creating and revenue generating potential. This project’s scope and operations will create jobs and lead to annual sales tax and generate transient occupancy tax revenue for the City.
2. Consistency with Zoning Code
The proposed development, as conditioned, is consistent with the development standards of the City’s Zoning Code and Centre at La Quinta Specific Plan, as applicable. The Site Development Permit has been conditioned to ensure compliance with the zoning standards and other supplemental standards as established in Title 9 of the La Quinta Municipal Code. The project is consistent with the non-residential development standards and permitted use table, except deviations that include requested increase in the floor area ratio and decreasing the parking minimum standard. These development standards and land use deviations may be approved with the Specific Plan Amendment.
3. Compliance with CEQA
The Design and Development Department has prepared Environmental Assessment 2022-0011 for this project, in compliance with the requirements of the CEQA. The Design and Development Director has determined that although the proposed project could have a significant effect on the environment, there will not be a significant effect because mitigation measures have been incorporated.
4. Architectural Design
The architectural design of the project, including, but not limited to, the architectural style, scale, building mass, materials, colors, architectural details, roof style and other architectural elements are compatible with surrounding development and with the quality of design prevalent in the city. 537 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Specific Plan 2022-0003 (SP 1997-029, Amendment 6)
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
5. Site Design
The site design of the project including, but not limited to, project entries, interior circulation, pedestrian and bicycle access, pedestrian amenities, screening of equipment and trash enclosures, exterior lighting, and other site design elements are compatible with surrounding development and with the quality of design prevalent in the city.
6. Landscape Design
Project landscaping, including, but not limited to, the location, type, size, color, texture and coverage of plant materials, has been designed so as to provide visual relief, complement buildings, visually emphasize prominent design elements and vistas, screen undesirable views, provide a harmonious transition between adjacent land uses and between development and open space, and provide an overall unifying influence to enhance the visual continuity of the project. The proposed project is consistent with the landscaping standards and plant palette and implements the standards for landscaping and aesthetics established in the General Plan and Zoning Code.
The permanent overall site landscaping utilizes various tree and shrub species to enhance the building architecture.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the Findings of the City Council in this case.
SECTION 2. That the above project be determined by the City Council to be consistent with Environmental Assessment 2022-0011, which adopted an Addendum to the Mitigated Negative Declaration under Environmental Assessment 2017-0009.
SECTION 3. That the City Council hereby does approve Specific Plan 2022-0003 and Site Development Permit 2022-0007 for the reasons set forth in this Resolution and subject to the attached Conditions of Approval, incorporated herewith as Exhibits B and C, respectively.
PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City Council held on this 16th day of January 2024, by the following vote:
538 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Specific Plan 2022-0003 (SP 1997-029, Amendment 6)
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________
LINDA EVANS, Mayor
City of La Quinta, California
ATTEST:
_________________________
MONIKA RADEVA, City Clerk
City of La Quinta, California
APPROVED AS TO FORM:
___________________________
WILLIAM H. IHRKE, City Attorney
City of La Quinta, California
539 CLICK HERE to Return to Agenda
Section 3: Development Regulations
3.1.2 Standards
The development requirements for the Specific Plan can be found in Table 3.1: Development Standards - Regional Commercial and Table 3.2: Development Standards- Residential.
Table 3.1: Development Standards - Regional Commercial
Development Element SP Regional Commercial
Maximum development intensity
42,700 SF
FAR .35
FAR .35
Minimum lot size 2.8 Acres -
Maximum structure height* 50' 50'
Maximum number of stories 4 4
Minimum public street setbacks
Auto Centre Drive
20' building/ 20' building/
10' landscape 10' landscape
Auto Center Way South 20' building/ 20' building/
10' landscape 10' landscape
La Quinta 20' building/ 20' building/
10' landscape 10' landscape
Minimum setback adjacent to 50'* 50' building/
residential parcels 10' landscape
Landscape 5% of total site 5% of total site
*Setbacks shall be increased 0.5' for every foot above 35 feet in height SLF-Adams Street La Quinta, LLC
Adopted July 3, 2018
The Centre at La Quinta Specific Plan Amendment No. 6
33 Resolution No. 2024-XXX - Exhibit A
Specific Plan 2022-0003 (SP 1997-029, Amendment 6) & Site Development Permit 2022-0007 Project: Hampton Inn Hotel
Adopted: January 16, 2024
540 CLICK HERE to Return to Agenda
Resolution No. 2024 - XXX
Conditions of Approval – Recommended
Specific Plan 2022-0003 (SP 1997-029, Amendment 6)
Project: Hampton Inn Hotel
Adopted: January 16, 2024
GENERAL
1. The applicant agrees to defend, indemnify, and hold harmless the City of La Quinta (“City”), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Specific Plan. The City shall have sole discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense.
2. Specific Plan 2022-0003 shall be developed in compliance with these conditions, and the approved Specific Plan document. In the event of any conflicts between these conditions and the provisions of SP1997-029 The Centre at La Quinta, these conditions shall take precedence.
3. Specific Plan 2022-0003 shall comply with all applicable terms, conditions and/or mitigation measures for the following related approvals:
Specific Plan Amendment 1997-029 The Centre at La Quinta Amendment 5 Environmental Assessment 2017-0009 and 2022-0011
Tentative Parcel Map 37359
Site Development Permit 2022-0007
4. In the event of any conflict(s) between approval conditions and/or provisions of these approvals, the Design and Development Director shall adjudicate the conflict by determining the precedence.
EXHIBIT B
541 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
GENERAL
1. The applicant agrees to defend, indemnify, and hold harmless the City of La Quinta (“City”), its agents, officers and employees from any claim, action or proceeding to attack, set aside, void, or annul the approval of this Site Development Permit. The City shall have sole discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense.
2. Site Development Permit 2022-0007 shall comply with all applicable conditions and/or mitigation measures for the following related approvals:
Tentative Parcel Map 37359
In the event of any conflict(s) between approval conditions and/or provisions of these approvals, the Planning Manager shall adjudicate the conflict by determining the precedence.
3. The Site Development Permit shall expire two years from the date of approval and shall become null and void in accordance with La Quinta Municipal Code Section
9.200.080, unless a building permit has been issued. A time extension may be requested per LQMC Section 9.200.080.
4. Prior to the issuance of any grading, construction, or building permit by the City, the applicant shall obtain any necessary clearances and/or permits from the following agencies, if required:
Riverside County Fire Marshal
La Quinta Development Services Division: Grading Permit and Green Sheet (Public Works Clearance) for Building Permits, Water Quality Management Plan (WQMP) Exemption Form – Whitewater River Region, Improvement Permit
La Quinta Design and Development Department
Riverside Co. Environmental Health Department
Desert Sands Unified School District (DSUSD)
Coachella Valley Water District (CVWD)
Imperial Irrigation District (IID)
California Regional Water Quality Control Board (CRWQCB) State Water Resources Control Board
SunLine Transit Agency (SunLine)
South Coast Air Quality Management District Coachella Valley (SCAQMD) The applicant is responsible for all requirements of the permits and/or clearances from the above-listed agencies. When these requirements include approval of
EXHIBIT C
542 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
improvement plans, the applicant shall furnish proof of such approvals when submitting those improvements plans for City approval.
5. Coverage under the State of California General Construction Permit must be obtained by the applicant, who then shall submit a copy of the Regional Water Quality Control Board’s (“RWQCB”) acknowledgment of the applicant’s Notice of Intent (“NOI”) and Waste Discharger Identification (WDID) number to the City prior to the issuance of a grading or building permit.
6. The applicant shall comply with applicable provisions of the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; the California Regional Water Quality Control Board – Colorado River Basin Region Board Order No. R7-2013-0011 and the State Water Resources Control Board’s Order No. 2012-0006-DWQ.
A. For construction activities including clearing, grading or excavation of land that disturbs one (1) acre or more of land, or that disturbs less than one (1) acre of land, but which is a part of a construction project that encompasses more than one (1) acre of land, the Permitee shall be required to submit a Storm Water Pollution Protection Plan (“SWPPP”) to the State Water Resources Control Board.
The applicant or design professional can obtain the California Stormwater Quality Association SWPPP template at www.cabmphandbooks.com for use in their SWPPP preparation.
B. The applicant shall ensure that the required SWPPP is available for inspection at the project site at all times through and including acceptance of all improvements by the City.
C. The applicant’s SWPPP shall include provisions for all of the following Best Management Practices (“BMPs”) (LQMC Section 8.70.020 (Definitions)):
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non-Storm Water Management.
6) Waste Management and Materials Pollution Control.
D. The SWPPP and BMPs shall remain in effect for the entire duration of project construction until all improvements are completed and accepted by the City Council.
543 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
E. The inclusion in the Conditions, Covenants, and Restrictions (CC&Rs), a requirement for the perpetual maintenance and operation of all postconstruction BMPs as required.
7. Permits issued under this approval shall be subject to the provisions of the Development Impact Fee and Transportation Uniform Mitigation Fee programs in effect at the time of issuance of building permit(s).
8. Approval of this Site Development Permit shall not be construed as approval for any horizontal dimensions implied by any site plans or exhibits unless specifically identified in the following conditions of approval.
9. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual attorney’s fees incurred by the City Attorney to review, negotiate, and/or modify any documents or instruments required by these conditions, if Developer requests that the City modify or revise any documents or instruments prepared initially by the City to effect these conditions. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval.
10. Developer shall reimburse the City, within thirty (30) days of presentment of the invoice, all costs and actual consultant’s fees incurred by the City for engineering and/or surveying consultants to review and/or modify any documents or instruments required by this project. This obligation shall be paid in the time noted above without deduction or offset and Developer’s failure to make such payment shall be a material breach of the Conditions of Approval.
PROPERTY RIGHTS
11. Prior to issuance of any permit(s), the applicant shall acquire or confer easements and other property rights necessary for the construction or proper functioning of the proposed development. Conferred rights shall include irrevocable offers to dedicate or grant access easements to the City for emergency services and for maintenance, construction, and reconstruction of essential improvements.
12. Pursuant to the aforementioned condition, conferred rights shall include approvals from the master developer over easements and other property rights necessary for construction and proper functioning of the proposed development not limited to access rights over proposed and/or existing private streets that access public streets and open space/drainage facilities of the master development.
13. The applicant shall offer for dedication all public street rights-of-way in conformance with the City's General Plan, Municipal Code, applicable specific plans, and/or as required by the City Engineer.
544 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
14. The public street right-of-way offers for dedication required for this project include:
A. PUBLIC STREETS
1) Auto Centre Drive South – No additional right-of-way dedication is required.
2) La Quinta Drive – No additional right-of-way dedication is required. 3) Auto Centre Way – No additional right-of-way dedication is required.
15. Dedications shall include additional widths as necessary for dedicated right and left turn lanes, bus turnouts, and other features contained in the approved construction plans.
16. When the City Engineer determines that access rights to the proposed street rights-of-way shown on the approved Site Development Permit are necessary prior to approval of the improvements dedicating such rights-of-way, the applicant shall grant the necessary rights-of-way within 60 days of a written request by the City.
17. Where public facilities (e.g., sidewalks) are placed on privately-owned setbacks, the applicant shall offer for dedication blanket easements for those purposes.
18. The applicant shall offer for dedication those easements necessary for the placement of, and access to, utility lines and structures, drainage basins, mailbox clusters, park lands, and common areas.
19. Direct vehicular access to Auto Centre Dr South, La Quinta Drive, and Auto Centre Way is restricted, except for those access points identified on the Site Development Permit, or as otherwise conditioned in these conditions of approval.
20. The applicant shall furnish proof of easements, or written permission, as appropriate, from those owners of all abutting properties on which grading, retaining wall construction, permanent slopes, or other encroachments will occur.
STREET AND TRAFFIC IMPROVEMENTS
21. The applicant shall comply with the provisions of LQMC Sections 13.24.060 (Street Improvements), 13.24.070 (Street Design - Generally) & 13.24.100 (Access for Individual Properties and Development) for public streets; and Section 13.24.080 (Street Design - Private Streets), where private streets are proposed. 545 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
22. Streets shall have vertical curbs or other approved curb configurations that will convey water without ponding and provide lateral containment of dust and residue during street sweeping operations. If a wedge or rolled curb design is approved, the lip at the flowline shall be near vertical with a 1/8" batter and a minimum height of 0.1'. Unused curb cuts on any lot shall be restored to standard curb height prior to final inspection of permanent building(s) on the lot.
23. The applicant shall construct the following street improvements to conform with the General Plan (street type noted in parentheses.)
A. OFF-SITE STREETS
1) La Quinta Drive
a. The applicant shall construct 6-foot-wide sidewalk on the west side.
Other required improvements in the right-of-way and/or adjacent landscape setback area include:
a) All appurtenant components such as, but not limited to curb, gutter, traffic control striping, legends, and signs.
The applicant is responsible for the construction of all improvements mentioned above.
The applicant shall extend improvements beyond the project boundaries to ensure they safely integrate with existing improvements (e.g., grading; traffic control devices and transitions in alignment, elevation or dimensions of streets and sidewalks).
24. The applicant shall design street pavement sections using CalTrans' design procedure for 20-year life pavement, and the site-specific data for soil strength and anticipated traffic loading (including construction traffic). Minimum structural sections shall be as follows:
Parking Lot & Aisles (Low Traffic) 3.0" a.c./4.5" c.a.b.
Parking Lot & Aisles (High Traffic) 4.5" a.c /5.5" c.a.b. or the approved equivalents of alternate materials per the City Engineer.
25. The applicant shall submit current mix designs (less than two years old at the time of construction) for base, asphalt concrete and Portland cement concrete. The submittal shall include test results for all specimens used in the mix design procedure. For mix designs over six months old, the submittal shall include recent (less than six months old at the time of construction) aggregate gradation test results confirming that design gradations can be achieved in current production.
The applicant shall not schedule construction operations until mix designs are approved.
546 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
26. General access points and turning movements of traffic are limited to the following:
Auto Centre Way South and Auto Centre Drive: Full turn movements in and out are allowed.
27. Improvements shall include appurtenances such as traffic control signs, markings, and other devices, raised medians if required, street name signs and sidewalks.
Mid-block street lighting is not required.
28. Improvements shall be designed and constructed in accordance with City adopted standards, supplemental drawings, and specifications, or as approved by the City Engineer. Improvement plans for streets, access gates and parking areas shall be stamped and signed by qualified engineers.
29. Standard knuckles and corner cut-backs shall conform to Riverside County Standard Drawings #801 and #805, respectively, unless otherwise approved by the City Engineer.
PARKING LOT and ACCESS POINTS
30. The design of parking facilities shall conform to LQMC Chapter 9.150 and in particular the following:
A. The parking space and aisle widths and the double hairpin stripe parking space design shall conform to LQMC Chapter 9.150.
B. Cross slopes should be a maximum of 2% where ADA accessibility is required including accessibility routes between buildings.
C. Building access points shall be shown on the Precise Grading Plans to evaluate ADA accessibility issues.
D. Accessibility routes to public streets and adjacent development shall be shown on the Precise Grading Plan.
E. Parking space lengths shall be according to LQMC Chapter 9.150 and be a minimum of 17 feet in length with a 2-foot overhang for standard parking spaces and 18 feet with a 2-foot overhang for handicapped parking space or as approved by the City Engineer. One (1) van accessible parking space is required per eight (8) accessible parking spaces.
F. Drive aisles between parking spaces shall be a minimum of 26 feet with access drive aisles to Public Streets a minimum of 30 feet or as approved by the City Engineer.
547 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
Entry drives, main interior circulation routes, corner cutbacks, bus turnouts, dedicated turn lanes, ADA accessibility route to public streets and other features shown on the approved construction plans, may require additional street widths and other improvements as may be determined by the City Engineer.
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as “engineer,” “surveyor,” and “architect,” refer to persons currently certified or licensed to practice their respective professions in the State of California.
31. Improvement plans shall be prepared by or under the direct supervision of qualified engineers and/or architects, as appropriate, and shall comply with the provisions of LQMC Section 13.24.040 (Improvement Plans).
32. The following improvement plans shall be prepared and submitted for review and approval by the Development Services Division. A separate set of plans for each line item specified below shall be prepared. The plans shall utilize the minimum scale specified, unless otherwise authorized by the City Engineer in writing. Plans may be prepared at a larger scale if additional detail or plan clarity is desired. Note, the applicant may be required to prepare other improvement plans not listed here pursuant to improvements required by other agencies and utility purveyors.
A. PM10 Plan 1” = 40’ Horizontal
B. Erosion Control Plan 1” = 40’ Horizontal
C. WQMP (Plan submitted in Report Form)
D. Precise Grading Plan 1” = 30’ Horizontal
NOTE: A through D to be submitted concurrently.
(Separate Storm Drain Plans if applicable)
Other engineered improvement plans prepared for City approval that are not listed above shall be prepared in formats approved by the City Engineer prior to commencing plan preparation.
All Off-Site Plan & Profile Street Plans and Signing & Striping Plans shall show all existing improvements for a distance of at least 200-feet beyond the project limits, or a distance sufficient to show any required design transitions.
All On-Site Signing & Striping Plans shall show, at a minimum; Stop Signs, Limit Lines and Legends, No Parking Signs, Raised Pavement Markers (including Blue RPMs at fire hydrants) and Street Name Signs per Public Works Standard Plans and/or as approved by the Engineering Department.
548 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
Precise Grading plans shall normally include all on-site surface improvements including but not limited to finish grades for curbs & gutters, building pad and floor elevations, wall elevations, parking lot improvements and accessibility requirements.
33. The City maintains standard plans, detail sheets and/or construction notes for elements of construction which can be accessed via the “Plans, Notes and Design Guidance” section of the Public Works Department at the City website (www.laquintaca.gov). Please navigate to the Public Works Department home page and look for the Standard Drawings hyperlink.
34. The applicant shall furnish a complete set of all approved improvement plans on a storage media acceptable to the City Engineer.
35. Upon completion of construction, and prior to final acceptance of the improvements by the City, the applicant shall furnish the City with reproducible record drawings of all improvement plans which were approved by the City. Each sheet shall be clearly marked "Record Drawing" and shall be stamped and signed by the engineer or surveyor certifying to the accuracy and completeness of the drawings. The applicant shall have all approved mylars previously submitted to the City, revised to reflect the as-built conditions. The applicant shall employ or retain the Engineer of Record during the construction phase of the project so that the EOR can make site visits in support of preparing "Record Drawing". However, if subsequent approved revisions have been approved by the City Engineer and reflect said "Record Drawing" conditions, the Engineer of Record may submit a letter attesting to said fact to the City Engineer in lieu of mylar submittal.
IMPROVEMENT SECURITY AGREEMENTS
36. Prior to constructing any off-site improvements, the applicant shall deposit securities equivalent to both a Performance and Labor & Material Bonds each valued at 100% of the cost of the off-site improvements, or as approved by the City Engineer.
37. Improvements to be made, or agreed to be made, shall include the removal of any existing structures or other obstructions which are not a part of the proposed improvements; and shall provide for the setting of the final survey monumentation.
38. When improvements are phased through a “Phasing Plan,” or an administrative approval (e.g., Site Development Permits), all off-site improvements and common on-site improvements (e.g., backbone utilities, retention basins, perimeter walls, landscaping and gates) shall be constructed, or secured, prior to the issuance of any permits in the first phase of the development, or as otherwise approved by the City Engineer.
549 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
Improvements and obligations required of each subsequent phase shall either be completed, or secured, prior to the completion of homes or the occupancy of permanent buildings within such latter phase, or as otherwise approved by the City Engineer.
In the event the applicant fails to construct the improvements for the development, or fails to satisfy its obligations for the development in a timely manner, pursuant to the approved phasing plan, the City shall have the right to halt issuance of all permits, and/or final inspections, withhold other approvals related to the development of the project, or call upon the surety to complete the improvements.
39. Depending on the timing of the development of this Site Development Permit, and the status of the off-site improvements at the time, the applicant may be required to:
A. Construct certain off-site improvements.
B. Construct additional off-site improvements, subject to the reimbursement of its costs by others.
C. Reimburse others for those improvements previously constructed that are considered to be an obligation of this Site Development Permit.
D. Secure the costs for future improvements that are to be made by others.
E. To agree to any combination of these actions, as the City may require.
Off-Site Improvements should be completed on a first priority basis. The applicant shall complete Off-Site Improvements in the first phase of construction.
In the event that any of the improvements required for this development are constructed by the City, the applicant shall, prior to the approval of the Site Development Permit, or the issuance of any permit related thereto, reimburse the City for the costs of such improvements.
40. The applicant shall submit detailed construction cost estimates for all proposed onsite and off-site improvements, for checking and approval by the City Engineer.
Such estimates shall conform to the unit cost schedule as approved by the City Engineer.
Estimates for improvements under the jurisdiction of other agencies shall be approved by those agencies and submitted to the City along with the applicant’s detailed cost estimates. Security will not be required for telephone, natural gas, or Cable television improvements.
550 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
GRADING
41. The applicant shall comply with the provisions of LQMC Section 13.24.050 (Grading Improvements).
42. Prior to occupancy of the project site for any construction, or other purposes, the applicant shall obtain a grading permit approved by the City Engineer.
43. To obtain an approved grading permit, the applicant shall submit and obtain approval of all of the following:
A. A grading plan prepared by a civil engineer registered in the State of California,
B. A preliminary geotechnical (“soils”) report prepared by an engineer registered in the State of California,
C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter
6.16, (Fugitive Dust Control), and
D. An Erosion Control Plan showing Best Management Practices prepared in accordance with LQMC Sections 8.70.010 and 13.24.170 (NPDES Stormwater Discharge Permit and Storm Management and Discharge Controls).
E. A final WQMP prepared by an appropriate professional registered in the State of California.
F. A grading bond in a form acceptable to the City, and in an amount sufficient to guarantee compliance with the grading bond requirements.
All grading shall conform with the recommendations contained in the Preliminary Soils Report and shall be certified as being adequate by soils engineer, or engineering geologist registered in the State of California.
The applicant shall furnish security, in a form acceptable to the City, and in an amount sufficient to guarantee compliance with the approved Fugitive Dust Control Plan provisions as submitted with its application for a grading permit. Additionally, the applicant shall replenish said security if expended by the City of La Quinta to comply with the Plan as required by the City Engineer.
44. The applicant shall maintain all open graded, undeveloped land in order to prevent wind and/or water erosion of such land. All open graded, undeveloped land shall either be planted with interim landscaping, or stabilized with such other erosion control measures, as were approved in the Fugitive Dust Control Plan. 551 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
45. Grading within the perimeter setback and parkway areas shall have undulating terrain and shall conform with the requirements of LQMC Section 9.60.240(F) except as otherwise modified by this condition. The maximum slope shall not exceed 3:1 anywhere in the landscape setback area, except for the backslope (i.e., the slope at the back of the landscape lot) which shall not exceed 2:1 if fully planted with ground cover. The maximum slope in the first six (6) feet adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is within six feet (6’) of the curb, otherwise the maximum slope within the right of way shall not exceed 3:1. All unpaved parkway areas adjacent to the curb shall be depressed one and one-half inches (1.5") in the first eighteen inches (18") behind the curb.
46. Building pad elevation on the precise grading plan submitted for City Engineer’s approval shall conform with pad elevations shown on the preliminary grading plan, unless the pad elevations have other requirements imposed elsewhere in these Conditions of Approval, or as approved by the City Engineer.
47. Prior to any site grading or regrading that will raise or lower any portion of the site by more than plus or minus half of a foot (0.5’) from the elevations shown on the approved Site Development Permit, the applicant shall submit the proposed grading changes to the City Engineer for a substantial conformance review.
48. Prior to the issuance of a building permit for any building lot, the applicant shall provide a lot pad certification stamped and signed by a qualified engineer or surveyor with applicable compaction tests and over excavation documentation.
Each pad certification shall list the pad elevation as shown on the approved grading plan, the actual pad elevation, and the difference between the two, if any.
Such pad certification shall also list the relative compaction of the pad soil. The data shall be organized by lot number and listed cumulatively if submitted at different times.
DRAINAGE
49. Stormwater handling shall conform with the approved hydrology and drainage report for the Hampton Inn Hotel project (SDP2022-0007), or as approved by the City Engineer. Nuisance water shall be disposed of in an approved manner.
Nuisance water shall be retained onsite and disposed of via an underground percolation improvement approved by the City Engineer.
50. The applicant shall comply with the provisions of LQMC Section 13.24.120 (Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements. More specifically, stormwater falling on site during the 100- 552 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
year storm shall be retained within the development, unless otherwise approved by the City Engineer. The design storm shall be the 1 hour, 3 hour, 6 hour or 24 hour event producing the greatest total run off.
51. Nuisance water shall be retained on site. Nuisance water shall be disposed of per approved methods contained in Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin Design Requirements.
52. In design of retention facilities, the maximum percolation rate shall be two inches per hour. The percolation rate will be considered to be zero unless the applicant provides site specific data indicating otherwise and as approved by the City Engineer.
53. The project shall be designed to accommodate purging and blowoff water (through underground piping and/or retention facilities) from any on-site or adjacent well sites granted or dedicated to the local water utility authority as a requirement for development of this property.
54. No fence or wall shall be constructed around any retention basin unless approved by the Planning Manager and the City Engineer.
55. For on-site above ground common retention basins, retention depth shall be according to Engineering Bulletin No. 06-16 – Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain Systems. Side slopes shall not exceed 3:1 and shall be planted with maintenance-free ground cover. Additionally, retention basin widths shall be not less than 20 feet at the bottom of the basin.
56. Stormwater may not be retained in landscaped parkways or landscaped setback lots. Only incidental storm water (precipitation which directly falls onto the setback) will be permitted to be retained in the landscape setback areas. The perimeter setback and parkway areas in the street right-of-way shall be shaped with berms and mounds, pursuant to LQMC Section 9.100.040(B)(7).
57. The design of the development shall not cause any increase in flood boundaries and levels in any area outside the development.
58. The development shall be graded to permit storm flow in excess of retention capacity to flow out of the development through a designated overflow and into the historic drainage relief route.
59. Storm drainage historically received from adjoining property shall be received and retained or passed through into the historic downstream drainage relief route. 553 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
60. The applicant shall comply with applicable provisions for post construction runoff per the City’s NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011.
A. For post-construction urban runoff from New Development and Redevelopments Projects, the applicant shall implement requirements of the NPDES permit for the design, construction and perpetual operation and maintenance of BMPs per the approved Water Quality Management Plan (WQMP) for the project as required by the California Regional Water Quality Control Board – Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011.
B. The applicant shall implement the WQMP Design Standards per (CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs approved by the City Engineer. A project specific WQMP shall be provided which incorporates Site Design and Treatment BMPs utilizing first flush infiltration as a preferred method of NPDES Permit Compliance for Whitewater River receiving water, as applicable.
C. The developer shall execute and record a Stormwater Management/BMP Facilities Agreement that provides for the perpetual maintenance and operation of stormwater BMPs.
UTILITIES
61. The applicant shall comply with the provisions of LQMC Section 13.24.110 (Utilities).
62. The applicant shall obtain the approval of the City Engineer for the location of all utility lines within any right-of-way, and all above-ground utility structures including, but not limited to, traffic signal cabinets, electric vaults, water valves, and telephone stands, to ensure optimum placement for practical and aesthetic purposes.
63. Existing overhead utility lines within, or adjacent to the proposed development, and all proposed utilities shall be installed underground.
The 92 KV transmission power poles and all existing utility lines attached to joint use 92 KV transmission power poles are exempt from the requirement to be placed underground.
554 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
64. Underground utilities shall be installed prior to overlying hardscape. For installation of utilities in existing improved streets, the applicant shall comply with trench restoration requirements maintained, or required by the City Engineer.
The applicant shall provide certified reports of all utility trench compaction for approval by the City Engineer. Additionally, grease traps and the maintenance thereof shall be located so as to not conflict with access aisles/entrances.
CONSTRUCTION
65. The City will conduct final inspections of habitable buildings only when the buildings have improved street and (if required) sidewalk access to publicly maintained streets. The improvements shall include required traffic control devices, pavement markings and street name signs. If on-site streets in residential developments are initially constructed with partial pavement thickness, the applicant shall complete the pavement prior to final inspections of the last ten percent of homes within the development or when directed by the City, whichever comes first.
LANDSCAPE AND IRRIGATION
66. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping Setbacks) & 13.24.140 (Landscaping Plans).
67. Landscape and irrigation plans for landscaped lots and setbacks, medians, retention basins, and parks shall be signed and stamped by a licensed landscape architect.
68. All new and modified landscape areas shall have landscaping and permanent irrigation improvements in compliance with the City’s Water Efficient Landscape regulations contained in LQMC Section 8.13 (Water Efficient Landscape).
69. Lighting plans shall be submitted with the final landscaping plans for a recommendation to the Planning Manager for his approval. Exterior lighting shall be consistent with LQMC Section 9.100.150 (Outdoor Lighting). All freestanding lighting shall not exceed 18 feet in height and shall be fitted with a visor if deemed necessary by staff to minimize trespass of light off the property. The illuminated carports shall be included in the photometric study as part of the final lighting plan submittal.
70. All water features shall be designed to minimize “splash” and use high efficiency pumps and lighting to the satisfaction of the Design and Development Director.
They shall be included in the landscape plan water efficiency calculations per Municipal Code Chapter 8.13.
555 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
71. All rooftop mechanical equipment shall be completely screened from view. Utility transformers or other ground mounted mechanical equipment shall be fully screened with a screening wall or landscaping and painted to match the adjacent buildings.
72. The applicant shall submit the final landscape plans for review, processing, and approval to the Community Development Department, in accordance with the Final Landscape Plan application process. Planning Manager approval of the final landscape plans is required prior to issuance of the first building permit unless the Planning Manager determines extenuating circumstances exist which justifies an alternative processing schedule.
NOTE: Plans are not approved for construction until signed by the appropriate City official, including the Planning Manager and/or City Engineer.
73. The applicant or his agent has the responsibility for proper sight distance requirements per guidelines in the AASHTO “A Policy on Geometric Design of Highways and Streets, 5th Edition” or latest, in the design and/or installation of all landscaping and appurtenances abutting and within the private and public street right-of-way.
74. The final design of the perimeter landscaping, particularly the perimeter wall, shall be included with the Final Landscape Plan submittal.
PUBLIC SERVICES
75. The applicant shall provide public transit improvements if required by SunLine Transit Agency and approved by the City Engineer.
MAINTENANCE
76. The applicant shall comply with the provisions of LQMC Section 13.24.160 (Maintenance).
77. The applicant shall make provisions for the continuous and perpetual maintenance of perimeter landscaping up to the curb, common areas, access drives, sidewalks, and stormwater BMPs.
FEES AND DEPOSITS
78. The applicant shall comply with the provisions of LQMC Section 13.24.180 (Fees and Deposits). These fees include all deposits and fees required by the City for plan checking and construction inspection. Deposits and fee amounts shall be those in effect when the applicant makes application for plan check and permits. 556 CLICK HERE to Return to Agenda
Resolution No. 2024-XXX
Conditions of Approval - Recommended
Site Development Permit 2022-0007
Project: Hampton Inn Hotel
Adopted: January 16, 2024
PLANNING
79. The parking light poles along the south project border shall not exceed more than 12 feet in height.
80. The parapet architectural features shall have a minimum depth of 10 feet.
81. No building-mounted signage shall be placed on the south elevation. Signage on the porte-cochere (west or east facing) or ground-mounted signage is acceptable at the south side of the site.
557 CLICK HERE to Return to Agenda
HIGHWAY 111
VICINITY MAP
N
ATTACHMENT 1
558 CLICK HERE to Return to Agenda
ATTACHMENT 2
PROJECT INFORMATION
CASE NUMBER: ENVIRONMENTAL ASSESSMENT 2022-0011, SPECIFIC PLAN 2022-0003 (SP1997-029, AMENDMENT 6), AND SITE
DEVELOPMENT PERMIT 2022-0007
REQUEST: ADOPT RESOLUTIONS TO APPROVE A SPECIFIC PLAN
AMENDMENT 2022-0003, AND SITE DEVELOPMENT PERMIT
2022-0007 FOR A NEW 125 ROOM HAMPTON INN HOTEL AND
ADOPT AN ADDENDUM TO THE PREVIOUSLY ADOPTED
MITIGATED NEGATIVE DECLARATION (EA2017-0009)
LOCATION: SOUTHWEST CORNER OF LA QUINTA DRIVE AND AUTO
CENTRE DRIVE
CEQA: THE DESIGN & DEVELOPMENT DEPARTMENT HAS PREPARED
AN ADDENDUM TO THE PREVIOUSLY ADOPTED MITIGATED
NEGATIVE DECLARATION (EA2017-0009) PURSUANT TO
SECTION 15164 OF THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT IN THAT NO SUBSTANTIAL CHANGES TO THE
PROJECT ARE PROPOSED THAT RESULT IN NEW SIGNIFICANT
ENVIRONMENTAL EFFECTS. THE PLANNING COMMISSION
CONSIDERED THE PROJECT AND FOUND THE PROPOSED
ADDENDUM CONSISTENT WITH THE PREVIOUSLY ADOPTED
MITIGATED NEGATIVE DECLARATION AND RECOMMENDED
THE CITY COUNCIL APPROVE THE PROJECT.
GENERAL PLAN
DESIGNATION: GENERAL COMMERCIAL
ZONING
DESIGNATION: REGIONAL COMMERCIAL
SURROUNDING
ZONING/
LAND USES: NORTH: REGIONAL COMMERCIAL / CAR DEALERSHIPS
TORRE NISSAN AND LA QUINTA CHEVROLET
SOUTH: MEDIUM DENSITY RESIDENTIAL / SOLTERRA
RENTAL COMMUNITY
EAST: REGIONAL COMMERCIAL / WALMART
SUPERCENTER
WEST: REGIONAL COMMERCIAL / VACANT LAND
559 CLICK HERE to Return to Agenda
Woodard Group
Andrew Woodard
951-907-5077
[email protected]
Sitescapes
3190 B-2 Airport Loop Drive
Costa Mesa CA 92626
Rick Polhamus
949-644-9370
[email protected]
owner:
architect:
civil engineer:
landscape architect
Robert F. Tuttle Architect, Inc.
33533 Pebble Brook Circle
Temecula, CA 92592
Bob Tuttle
951 302-5444
[email protected]
Greens, Inc.
8815 Research Drive
Irvine, CA 92618
Atman Kadakia
949 322-1760
[email protected]
Address
La Quinta Dr and Auto Center Drive
La Quinta CA
APN 630-034-049
Legal Description:
General Plan
Existing General Commercial
Proposed General Commercial
Zone
Existing Regional Commercial
Proposed Regional Commercial
Specific Plan/Land Use
Existing Planning Area II/Vacant
Proposed Planning Area II/Hotel
required provided
Lot area, net acre 2.80 acres
Lot width feet feet
Lot depth feet feet
Auto Centre Dr setback 20' + 4' = 24' building / 10' landscape 36'-6" provided
Auto Center Way setback 20' + 4' = 24' building / 10' landscape 24'-5" provided
La Quinta setback 20' building / 10' landscape
315' provided
Building height max 50 feet 43 feet
*above 35 feet increase setbacks .5 feet per foot
First Floor building area: 24,548.33 sf
site area: 122,075 sf
Lot coverage 20%
total building area: 73,645 sf
F.A.R. .60
Type of Construction VA
Fully Sprinklered NFPA 13
Hampton Inn - 3 Story
first floor 31 rooms
second floor 47 rooms
third floor 47 rooms
Total 125 rooms
parking required:
1.1/room = 137 spaces
parking provided:
1/room 126 spaces (includes 5 ADA)
EVCS 6 spaces
EV Ready 31 spaces
EV Capable 12 spaces
Landscape 36,318.64 sf (29%)
*min 5% of total site
Site Statistics
3/16" = 1'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:20:50 PM A-0
Index Sheet
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 Sheet List
Sheet Number Sheet Name
A-0 Index Sheet
A-1 Preliminary Site Plan
A-2 Floor Plan Level 1
A-3 Floor Plan Level 2
A-4 Floor Plan Level 3
A-5 Roof Plan
A-6 Exterior Elevations
A-7 Exterior Elevations
A-8 Renderings
A-9 Renderings
A-10 Renderings
A-11 Renderings
A-12 Guestrooms
VICINITY MAP
NORTH
SITE
NOT TO SCALE
ATTACHMENT 3
560 CLICK HERE to Return to Agenda
Auto Center Way
NORTH
9 12
20 7
17 10
trash enclosure
Patio Pool
Spa
Proposed
Retention Area 14
Oversize Parking
9' - 0"5' - 0"9' - 0" 9' - 0" 8' - 0" 9' - 0" 9' - 0"5' - 0"9' - 0" 18' - 0" 11' - 0"
82' - 2 1/2"
Hotel
3 story
PROPERTY LINE
PROPERTY LINE
PROPERTY
LINE
PROPERTY LINE
Proposed driveway
Auto Center Drive
BUILDING SETBACK
20' - 0"
LANDSCAPE SETBACK
10' - 0"
BUILDING SETBACK
20' - 0"
LANDSCAPE SETBACK
10' - 0"
BUILDING SETBACK
20' - 0"
LANDSCAPE SETBACK
10' - 0"
5'-0" CMU with tile pool/patio wall
55' - 8 9/32"
44' - 8 7/8"
11' - 0"
30' - 0"
24' - 0"
24' - 0" 54' - 0"
BUILDING SETBACK
50' - 0"
RESIDENTIAL
37 Dog Park
smokers area
22' - 11 1/2"
29' - 9 11/32"
284' - 7 3/16"
30' - 0"30' - 0"
monument
sign
12' - 0" 5' - 0"9' - 0"
18' - 0"
9' - 0"
9' - 0"
18' - 0"
monument
sign
1" = 20'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:20:54 PM A-1
Preliminary Site Plan
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-1 1" = 20'-0"
1 Site
561 CLICK HERE to Return to Agenda
W D
A-7
1 8
8 9
9 11
11 12
12 13
13 14
14 16
16 17
17 18
18 19
19 20
20 D D
E
F
B B
C C
10 10 7
15 7
21 15
21 6
6 5
5 3
A A
J
K
K
L
M
O
P
Q
R
S
U
V
V
Y X W
front
desk
treats
shop
work
area manager
sales
pbx
vestibule
stair
coffee
bar
NORTH
personal nook
maintenance
drinking fountain
food prep
pantry
ice
laundry
linen storage
elev equip
employee
breakroom
employee
rr
linen chute
elev
lobby
breakfast area
fitness center unisex
unisex
guest laundry
AA
6' - 0"
BB
CC
mech
storage
maids
A-12
2 A-12
1 stair
fire riser
boardroom
DD EE
310' - 9"
142' - 10"
---
-
28' - 6"
25' - 11"
14' - 2" 12' - 2"
7' - 8 1/8" 14' - 2"
3' - 11 3/32"
7' - 6"
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:00 PM A-2
Floor Plan Level 1
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-2 1/8" = 1'-0"
1 Level 1
562
CLICK HERE to Return to Agenda
UP
A-6
1 8
8 9
9 11
11 12
12 13
13 14
14 16
16 17
17 18
18 19
19 20
20 D D
E
F
B B
C C
10 10 7
15 7
21 15
21 6
6 5
5 3
A A
J
K
K
L
M
O
P
Q
R
S
U
V
Y X W
stair
elev lobby
storage
ADA double queen w/ tub
stair
ADA king w/ tub
NORTH
AA
BB
CC
storage
storage
maintenance boardroom
DD EE
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:07 PM A-3
Floor Plan Level 2
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-3 1/8" = 1'-0"
1 Level 2
storage
563
CLICK HERE to Return to Agenda
A-7
A-6
1 1
8 8
9 9
11 11
12 12
13 13
14 14
16 16
17 17
18 18
19 19
20 20
D D
E
F
B B
C
10 10 7
15 7
21 15
21 6
6 5
5 3
3 A A
J
K
K
L
M
O
P
Q
R
S
U
V
Y X W
NORTH
AA
BB
CC
stair
elev lobby
storage
ADA double queen w/ tub
stair
ADA king w/ tub
storage
storage
maintenance boardroom
DD EE
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:13 PM A-4
Floor Plan Level 3
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-4 1/8" = 1'-0"
1 Level 3
storage
564
CLICK HERE to Return to Agenda
A-7
A-6
1 1
8 8
9 9
11 11
12 12
13 13
14 14
16 16
17 17
18 18
19 19
20 20
D D
E
F
B B
C C
10 10 7
15 7
21 15
21 6
6 5 3
A A
J
K
K
L
M
O
P
Q
R
S
U
V
Y X W
STAIR TO ROOF ACCESS
SERVICE WALKWAY SERVICE WALKWAY
SERVICE WALKWAY
MECHANICAL EQUIPMENT SCREEN WALL
ELEVATOR SHAFT
LINEN SHAFT
1/2"FT SLOPE1/2"FT SLOPE1/2"FT SLOPE1/2"FT SLOPE
1/2"FT SLOPE
1/2"FT SLOPE
1/2"FT SLOPE
1/2"FT SLOPE
1/2"FT SLOPE1/2"FT SLOPE1/2"FT SLOPE1/2"FT SLOPE
3' - 0"
3' - 0" 3' - 0"
3' - 0"
DOAS UNIT
HVAC UNITS
AA
BB
CC
boiler
DD EE
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:18 PM A-5
Roof Plan
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-5 1/8" = 1'-0"
1 Roof
565
CLICK HERE to Return to Agenda
Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Roof 33' - 0"
STAIR TO ROOF
40' - 0"
4' - 0"
5' - 3" 10' - 0" 10' - 0" 13' - 0"
Level 1
0' - 0"
ROOF EQUIPMENT HEIGHT (8'-9") MECHANICAL ROOF EQUIPMENT SCREEN WALL 38' - 3"
4' - 0"
Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Roof 33' - 0"
46' - 0"
10' - 0" 10' - 0" 13' - 0"
14' - 6"
STAIR TO ROOF
MECHANICAL ROOF EQUIPMENT SCREEN WALL
Level 1
0' - 0"
5' - 3"
38' - 3"
5' - 2"
19' - 0"
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:32 PM A-6
Exterior Elevations
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-6 1/8" = 1'-0"
1 South Elevation
A-6 1/8" = 1'-0"
2 East Elevation
566
CLICK HERE to Return to Agenda
Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Roof 33' - 0"
42' - 3"
STAIR TO ROOF
MECHANICAL ROOF EQUIPMENT SCREEN WALL
5' - 2"
3' - 3"
ROOF EQUIPMENT HEIGHT (8'-9")
1' - 9"
6' - 0"
40' - 0"
Level 1
0' - 0"
Level 2
13' - 0"
Level 3
23' - 0"
Roof 33' - 0"
46' - 0"
14' - 6"
38' - 3"
MECHANICAL ROOF EQUIPMENT SCREEN WALL
Level 1
0' - 0"
19' - 0"
13' - 0" 10' - 0" 10' - 0" 13' - 0"
1' - 9"
1/8" = 1'-0" Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:41 PM A-7
Exterior Elevations
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-7 1/8" = 1'-0"
1 North Elevation
A-7 1/8" = 1'-0"
2 West Elevation
567
CLICK HERE to Return to Agenda
Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:41 PM A-8
Renderings
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922
FRONT PERSPECTIVE
568
CLICK HERE to Return to Agenda
Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:41 PM A-9
Renderings
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922
REAR PERSPECTIVE
569
CLICK HERE to Return to Agenda
570 CLICK HERE to Return to Agenda
571 CLICK HERE to Return to Agenda
Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:42 PM A-10
Renderings
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922
SIDE PERSPECTIVE
572
CLICK HERE to Return to Agenda
Robert F. Tuttle Architects, Inc.
1/8/2024 2:21:43 PM A-11
Renderings
Greens Group La Quinta Hampton Inn January 8, 2024
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922
POOL AND PATIO PERSPECTIVE
573
CLICK HERE to Return to Agenda
8 C
7 11
B
C
10 3/8" = 1'-0" Robert F. Tuttle Architects, Inc.
10/16/2023 1:24:19 PM
A-12
Guestrooms
Greens Group La Quinta Hampton Inn October 12, 2023
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-12 3/8" = 1'-0"
1 King
A-12 3/8" = 1'-0"
2 Double Queen
574 CLICK HERE to Return to Agenda
N LA QUINTA - HAMPTON INN CONCEPTUAL GRADING PLAN CONCEPTUAL GRADING PLAN LA QUINTA - HAMPTON INN APN: 600-340-060 OCTOBER 2023 APN: 600-340-060 Δ Δ Δ C2 A2 E2 F2 D2 B2 ΔΔ 575
CLICK HERE to Return to Agenda
PROP.
HOTEL
FF=70.80
PROP.
HOTEL
FF=70.80
CONCEPTUAL GRADING PLAN
LA QUINTA - HAMPTON INN
APN: 600-340-060
576 CLICK HERE to Return to Agenda
T
La Quinta Drive Auto Center Way
Auto Center Drive
Residential
Hotel - 3 story
NORTH
L1
LANDSCAPE CONCEPTUAL PLAN
CONSTRUCTION LEGEND
Greens Group, Inc. La Quinta Hotel October 06, 2022
9289 Research Drive, Irvine, CA La Quinta Drive and Auto Center Drive La Quinta CA ”
577 CLICK HERE to Return to Agenda
578 CLICK HERE to Return to Agenda
HI-LA QUINTA-EXTERIOR LIGHTING 3/29/2022 3:18 PM
IF THIS SHEET IS NOT 30"x42", IT IS A REDUCED PRINT PROJECT: N O T F O R CONSTRUCTION PRELIMINARY LIGHTING CONSULTANT 535 PRINCELAND COURT CORONA CA 92879 P: 951.340.2475 JSASSOCIATESINC.COM SHEET NO.: SHEET TITLE: SCALE: DRAWN BY: CHECKED BY: I.V. LTG-0.1 AS SHOWN
DATE DESCRIPTION
EXTERIOR LIGHTING DESIGN 2022.03.29 OWNER: SETHI MANAGEMENT, INC. P.O. BOX 23597 ENCINITAS, CA 92023 GAURAV SETHI 760.652.4010 x.2014 COPYRIGHT NOTICE: ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN CONSTITUTE THE ORIGINAL UNPUBLISHED WORK OF JS & ASSOCIATES SERVICES AND THE SAME MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT THE EXPRESS WRITTEN CONSENT OF JS & ASSOCIATES. HAMPTON INN LA QUINTA, CA S.G. (D) DEMO (E) EXISTING (F) FUTURE (N) NEW (R) RELOCATED AC ABOVE COUNTER, 4" ABOVE BACKSPLASH AFF ABOVE FINISH FLOOR AFG ABOVE FINISH GRADE AL ALUMINUM BLG BELOW GRADE BOD BOTTOM OF DEVICE C CONDUIT COD CENTER OF DEVICE CU COPPER EC ELECTRICAL CONTRACTOR GC GENERAL CONTRACTOR GEC GROUNDING ELECTRODE CONDUCTOR GES GROUNDING ELECTRODE SYSTEM GFCI GROUND FAULT CIRCUIT INTERRUPTER GND GROUND MC MECHANICAL CONTRACTOR NL NIGHT LIGHT TYP TYPICAL UG UNDERGROUND UON UNLESS OTHERWISE NOTED UTW UNSHIELDED TWISTED PAIR WP WEATHERPROOF XFMR TRANSFORMER ABBREVIATIONS SHEET INDEX NOTES ABBREVIATIONS & SYMBOLS GENERAL NOTES 1. JS & ASSOCIATES SHALL IN NO WAY ASSUME RESPONSIBILITY FOR THE ELECTRICAL DESIGN OF THIS PROJECT. JSA LIGHTING DESIGN SHALL BE INCORPORATED AND VERIFIED BY ELECTRICAL ENGINEER OF RECORD FOR COMPLIANCE WITH ALL LEGAL, INDUSTRY, AND PROJECT-SPECIFIC REQUIREMENTS & STANDARDS INCLUDING WITHOUT LIMITATION OF THE FOLLOWING: 1.1. ALL APPLICABLE BUILDING CODES. 1.2. ALL APPLICABLE SPECIALTY CODES INCLUDING THE MOST CURRENT ISSUES & SUPPLEMENTS. 1.3. THE PROJECT MANUAL AND ASSOCIATED SPECIFICATIONS. 2. ALL MEASUREMENTS, HEIGHTS, BACKGROUNDS, FINISHES SHALL BE VERIFIED BY INTERIOR DESIGNER AND ARCHITECT OF RECORD. 3. WHEN INTERPRETING THESE DRAWINGS, THE FOLLOWING GENERAL RULES APPLY: 3.1. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DRAWINGS. 3.2. SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE. IT IS THE READER'S RESPONSIBILITY TO VERIFY & FIELD-MEASURE DIMENSIONS BEFORE PROCEEDING WITH ANY AFFECTED PROCUREMENT, FABRICATION OR CONSTRUCTION. 3.3. SPECIFIC NOTES & DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES & TYPICAL DETAILS. 3.4. WORK NOT PARTICULARLY SHOWN OR SPECIFIED SHALL BE THE SAME AS SIMILAR PARTS THAT ARE SHOWN & SPECIFIED. 3.5. PLANS ARE CONSIDERED DIAGRAMMATIC IN NATURE & INTENDED ONLY TO DEMONSTRATE THE RELATIONSHIP AMONG COMPONENT PARTS, AND NOT TO DEPICT SPECIFIC LOCATIONS. 3.6. WORK SHOWN AS "NIC" OR "NOT IN SCOPE" IS FOR REFERENCE ONLY. 4. ELECTRONIC VERSIONS OF THESE PLANS ARE SUBJECT TO THE SAME PROVISION AS OTHER INSTRUMENTS OF SERVICE PREPARED BY OR ON THE BEHALF OF JS & ASSOCIATES, INCLUDING WITHOUT LIMITATION THEIR COMMON LAW, STATUTORY OR OTHER RESERVED RIGHTS, INCLUDING COPYRIGHTS. A RECIPIENT IS GRANTED AT MOST A TRANSFERABLE, NON-EXCLUSIVE LICENSE TO REUSE THE PLANS SOLELY FOR PROJECT PURPOSES; AND NO RECIPIENT IS AUTHORIZED TO USE OR TO ALLOW THE USE OF ALL OR ANY PORTION OF THESE PLANS FOR ANY OTHER PURPOSE. ANY OTHER USE FOR ANY OTHER PURPOSE COULD CONSTITUTE ACTIONABLE PLAGIARISM. ANY ELECTRONIC DOCUMENTS WILL BE PROVIDED IN THE RESPONSIBLE DESIGN PROFESSIONAL'S STANDARD FORMATS AND CONVENTIONS WITH NO GUARANTEE OF THE ABSENCE OF VIRUSES OR OTHER HARMFUL MATERIAL, OR OF COMPATIBILITY WITH ANY RECIPIENT'S SOFTWARE OR HARDWARE SO THAT ANY USE WITH OR CONVERSION TO THE OTHER FORMS OR CONVENTIONS, OR THE USE WITH ANY PARTICULAR SOFTWARE OR HARDWARE, IS AT THE RECIPIENT'S SOLE RISK. 5. WHERE ITEMS SHOWN ON THESE DRAWINGS SUCH AS LIGHTS, RECEPTACLES, ETC. ARE TO PENETRATE ANY BUILDING CEILINGS, WALLS, STRUCTURAL FRAMING, ETC., IT IS REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE FURNISHED. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL ITEMS WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF ANY ELECTRICAL WORK. 6. LIGHTING FIXTURES: 6.1. LIGHTING FIXTURES SPECIFIED IN THESE DRAWINGS SHALL NOT BE SUBSTITUTED WITHOUT THE EXPRESSED AUTHORIZATION OF AN APPROPRIATE OWNER REPRESENTATIVE. 6.2. LIGHTING FIXTURES & CONTROLS SHALL BE DELIVERED TO THE SITE IN NEW CONDITION ONLY. 6.3. ALL EXIT SIGNS & EMERGENCY LIGHTING SHALL COMPLY WITH UL 924 AND OPERATE FOR A MINIMUM OF 90 MINUTES IN EMERGENCY MODE. 6.4. ALL LIGHTING FIXTURES SHALL BE UL OR ETL LISTED AND HAVE APPROPRIATE LABORATORY TESTING. ELECTRICAL SYMBOLS LEGEND RECESSED FIXTURE - ROUND RECESSED WALL WASH FIXTURE - ROUND RECESSED FIXTURE - SQUARE RECESSED WALL WASH FIXTURE - SQUARE HATCHING INDICATES EMERGENCY FIXTURE PENDANT FIXTURE WALL MOUNTED FIXTURE 2x2 LAY IN FIXTURE 2x4 LAY IN FIXTURE 1x4 SURFACE-MOUNTED FIXTURE RIBBON LIGHT AT COVE LINEAR PENDANT FIXTURE LINEAR RECESSED FIXTURE ELEVATOR PIT FIXTURE ELECTRIC BACKLIT MIRROR POLE MOUNTED FIXTURE LANDSCAPE UPLIGHT - SPOT, 12V CEILING MOUNTED, UPPER EXIT SIGN SHADED REGION INDICATES FACE WALL MOUNTED, UPPER EXIT SIGN SHADED REGION INDICATES FACE WALL MOUNTED, LOWER EXIT SIGN SHADED REGION INDICATES FACE EMERGENCY LIGHT FIXTURE FLUSH MOUNT J-BOX OCCUPANCY SENSOR POWER PACK POWER RELAY PANELBOARD WALL SWITCH os OCCUPANCY SENSOR 3 THREE WAY m MASTER (CAPTIVE CARD) d 0-10V DIMMER k TAMPER OR KEY OPERATED t TIMER p 4-BUTTON STATION CONTROLLER a SMART 0-10V DIMMING WALLBOX SENSOR b SINGLE-POLE, MOMENTARY SWITCH e SLIDING LINE DIMMER ELECTRIC BATHROOM EXHAUST FAN ##/LTG-# INDICATES VIEW ## ON SHEET LTG-# KEYED NOTED +44" INDICATES MOUNTING HEIGHT ABOVE FINISHED FLOOR OR ABOVE FINISHED GRADE TO CENTER OF DEVICE. DUPLEX RECEPTACLE 1/2 HOT DUPLEX RECEPTACLE GFCI RECEPTACLE QUADPLEX RECEPTACLE 1/2 HOT QUADPLEX RECEPTACLE 208V RECEPTACLE - VTAC/RANGE/OTHER CAT6 TELEPHONE JACK CAT6 DATA JACK COMBINATION TELEPHONE/DATA JACK RG6U COAX FOR TV ABOVE COUNTER RECEPTACLE #'A' R PP1 PP2 JOS1 (CEILING) PRC 'PROVOLT' ROOM CONTROLLER (OCC. SENSING & PHOTOCELL) SHEET INDEX SHEET NO. SHEET TITLE EXTERIOR LIGHTING DESIGN LTG-0.1 SHEET INDEX, NOTES, ABBREVIATIONS & SYMBOLS ● LTG-1.0 EXTERIOR LIGHTING PLAN ● LTG-1.1 EXTERIOR PHOTOMETRICS ● LTG-2.0 EXTERIOR LIGHTING ELEVATIONS ● 579
CLICK HERE to Return to Agenda
UP UP elev lobby laundry linen storage elev equip employee breakroom employee rr front desk treats shop work area boiler manger storage pbx vestibule stair storage stair Electrical pool equip coffee mech linen chute bar food prep game room? pantry breakfast area fitness center unisex unisex guest laundry ice meeting room personal nook maintenance drinking fountain mech La Quinta Drive Auto Center Way trash enclosure Patio Pool Spa Proposed Retention Area Hotel 3 story PROPERTY LINE PROPERTY LINE PROPERTY LINE
PROPERTY LINE
Auto Center Drive
5'-0" CMU with tile pool/patio wall
Dog Park smokers area ORL1(188') P1P1 P1P1 P1 P1 P1 P1 P1P1 P1 P1 P1 P1 P2 P1 P1 P1 P1 P3 P1 P1 P1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 WP1 WP1 WP1 WP1 WP1 OL3OL3 WP1 OL3 OL4 OL3 OL3 OL3 OL3 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 P1 P1 OL3 J OL2 OL2 OL2 OL2 OL2 OL2 HI-LA QUINTA-EXTERIOR LIGHTING 3/29/2022 3:18 PM
IF THIS SHEET IS NOT 30"x42", IT IS A REDUCED PRINT PROJECT: N O T F O R CONSTRUCTION PRELIMINARY LIGHTING CONSULTANT 535 PRINCELAND COURT CORONA CA 92879 P: 951.340.2475 JSASSOCIATESINC.COM SHEET NO.: SHEET TITLE: SCALE: DRAWN BY: CHECKED BY: I.V. LTG-1.0 AS SHOWN
DATE DESCRIPTION
EXTERIOR LIGHTING DESIGN 2022.03.29 OWNER: SETHI MANAGEMENT, INC. P.O. BOX 23597 ENCINITAS, CA 92023 GAURAV SETHI 760.652.4010 x.2014 COPYRIGHT NOTICE: ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN CONSTITUTE THE ORIGINAL UNPUBLISHED WORK OF JS & ASSOCIATES SERVICES AND THE SAME MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT THE EXPRESS WRITTEN CONSENT OF JS & ASSOCIATES. HAMPTON INN LA QUINTA, CA S.G. EXTERIOR LIGHTING PLAN NOT USED. GENERAL NOTES: 1. ALL EXTERIOR LIGHTING SHALL BE CONTROLLED VIA LIGHTING CONTROL PANEL WITH ASTRONOMICAL TIME CLOCK. 2. COORDINATE ALL EXTERIOR LIGHTING FIXTURE MOUNTING HEIGHTS WITH ARCHITECT & OWNER. 3. ALL EMERGENCY SHADED FIXTURES SHALL BE CONNECTED TO EMERGENCY INVERTER FOR EXTERIOR LIGHTING AND PRODUCE A MINIMUM OF 90 MIN EMERGENCY OPERATION. 1KEY NOTES: SCALE: 1 EXTERIOR LIGHTING PLAN 1" = 20'-0" 0 20' 40' 580
CLICK HERE to Return to Agenda
UP UP elev lobby laundry linen storage elev equip employee breakroom employee rr front desk treats shop work area boiler manger storage pbx vestibule stair storage stair Electrical pool equip coffee mech linen chute bar food prep game room? pantry breakfast area fitness center unisex unisex guest laundry ice meeting room personal nook maintenance drinking fountain mech La Quinta Drive Auto Center Way Patio Pool Spa Hotel 3 story PROPERTY LINE PROPERTY LINE PROPERTY LINE
PROPERTY LINE
Auto Center Drive RESIDENTIAL Dog Park ORL1(188') P1P1 P1P1 P1 P1 P1 P1 P1P1 P1 P1 P1 P1 P2 P1 P1 P1 P1 P3 P1 P1 P1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 OL1 WP1 WP1 WP1 WP1 WP1 OL3OL3 WP1 OL3 OL4 OL3 OL3 OL3 OL3 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 OL6 P1 P1 OL3 J OL2 OL2 OL2 OL2 OL2 OL2 0.6 0.5 0.6 0.5 0.6 0.5 0.7 0.5 0.7 0.5 0.7 0.5 0.7 0.5 0.8 0.5 0.8 0.5 0.8 0.5 0.8 0.5 0.8 0.5 0.8 0.5 0.8 0.5 0.8 0.6 0.8 0.6 0.8 0.6 0.8 0.6 0.8 0.6 0.9 0.6 0.9 0.6 0.9 0.6 0.9 0.6 0.9 0.6 0.9 0.6 0.9 0.5 0.8 0.6 0.8 0.6 0.8 0.6 0.8 0.6 0.7 0.6 0.7 0.6 0.7 0.6 0.8 0.7 0.5 0.9 0.8 0.7 0.9 0.8 0.7 1.1 0.9 0.8 1.4 1.1 1.0 1.3 1.2 1.1 1.5 1.4 1.9 1.8 1.7 2.5 2.3 2.9 2.8 2.2 2.1 1.8 1.8 1.5 1.5 1.6 1.4 1.5 1.7 1.6 2.0 2.7 2.4 3.7 5.2 4.5 6.8 7.9 4.6 6.9 8.1 3.8 5.4 2.7 3.6 1.9 2.3 1.4 1.5 1.1 1.1 0.9 0.8 1.1 1.1 1.1 0.8 0.7 1.1 1.1 1.1 0.8 0.7 1.1 1.1 1.1 1.5 1.3 1.1 0.8 0.6 1.3 2.1 1.6 1.4 1.6 1.5 1.3 1.2 1.0 0.8 0.6 4.1 2.5 1.9 0.8 0.6 9.4 4.7 0.8 0.6 18.6 8.7 0.8 0.6 16.7 11.3 0.9 0.6 9.4 8.4 0.9 0.6 7.1 0.9 0.6 13.2 0.9 0.6 11.9 0.9 0.6 13.7 7.9 0.9 0.6 6.5 0.9 0.6 3.3 0.9 0.6 2.1 0.8 0.6 1.4 1.5 0.8 0.6 1.2 0.8 0.7 5.0 0.8 0.7 3.8 0.8 0.7 3.8 2.7 0.8 0.6 2.3 0.8 0.6 1.5 0.9 0.6 1.2 0.9 0.6 0.9 1.1 0.9 0.6 0.8 0.9 0.6 0.8 0.9 0.6 0.8 0.9 0.6 0.9 0.9 0.6 0.7 0.9 0.6 0.9 0.9 0.6 0.9 0.9 0.6 1.1 0.9 0.6 1.0 1.3 0.9 0.7 1.3 0.8 0.7 3.2 2.9 1.4 0.9 0.7 5.8 4.7 3.7 3.1 3.0 3.2 3.4 3.6 3.4 2.9 2.2 1.8 1.5 0.8 0.7 0.8 1.2 2.2 3.8 6.2 8.4 9.0 7.5 5.8 4.5 3.5 3.0 3.0 3.4 3.9 4.2 4.0 3.4 2.5 2.0 1.6 0.8 0.7 7.5 6.3 0.8 0.7 4.9 4.4 0.8 0.7 2.9 2.8 0.8 0.7 1.8 1.9 0.8 0.7 1.3 1.4 0.8 0.7 1.0 1.2 0.8 0.7 0.9 1.2 0.8 0.7 0.9 0.8 0.7 0.7 1.0 0.9 0.7 0.7 1.0 0.9 0.7 0.8 1.2 0.9 0.7 0.8 0.9 0.7 0.6 0.9 0.9 0.6 0.7 1.0 0.9 0.7 0.7 1.1 0.9 0.7 0.8 1.2 0.9 0.7 0.6 0.8 0.9 0.7 0.7 0.9 0.9 0.7 0.7 0.9 0.9 0.7 0.7 1.0 0.9 0.7 0.7 0.8 0.7 0.7 0.8 0.8 0.7 0.7 0.8 0.8 0.7 0.7 0.8 0.8 0.7 0.7 0.9 0.8 0.8 0.8 0.8 0.8 0.9 1.2 1.1 1.1 1.1 1.1 1.1 1.2 7.9 7.7 6.8 2.5 2.5 6.4 5.3 3.7 2.3 1.4 2.4 2.4 6.8 3.8 2.3 1.4 0.9 0.5 8.0 0.5 8.1 7.0 4.8 2.9 1.7 1.1 0.9 4.8 6.7 7.6 6.6 4.8 4.7 6.5 7.5 6.5 5.1 3.6 4.7 5.2 4.5 4.3 2.5 3.1 3.3 2.8 4.2 16.6 13.9 10.9 8.6 7.2 6.2 5.7 5.8 7.0 9.5 12.7 15.1 14.9 12.7 10.2 8.2 7.2 7.5 9.9 14.0 17.4 18.5 14.9 10.8 7.7 5.9 5.0 4.7 5.2 6.8 9.6 13.2 15.7 15.2 12.3 9.2 7.2 6.6 8.1 13.1 21.9 26.8 18.0 14.2 9.9 6.8 4.9 4.1 3.9 4.5 5.9 8.4 11.4 13.4 12.9 10.4 7.9 6.3 6.2 8.8 16.8 32.8 16.5 15.9 12.2 8.4 5.6 4.1 3.3 3.2 3.6 4.7 6.4 8.3 9.6 9.3 7.8 6.2 5.3 5.8 8.6 16.1 30.1 13.5 12.9 9.8 5.5 6.2 6.1 5.4 4.7 4.6 5.6 8.1 13.0 19.5 9.6 9.2 7.1 3.6 3.9 3.9 3.8 3.7 4.3 6.0 9.6 14.5 17.3 5.8 4.7 2.4 2.6 2.7 2.8 3.2 4.4 7.4 14.4 24.5 19.1 3.7 3.1 1.7 1.8 2.0 2.3 2.9 4.5 8.7 18.9 36.4 2.3 2.1 1.3 1.4 1.6 2.0 2.8 4.5 8.5 17.4 31.1 1.6 1.5 1.1 1.2 1.5 1.9 2.9 4.8 8.2 13.7 19.4 1.3 1.2 1.0 1.2 1.4 2.0 3.3 5.8 10.4 15.9 17.5 1.2 1.1 1.0 1.2 1.5 2.2 3.9 7.8 16.2 27.6 1.2 1.1 1.0 1.2 1.5 2.4 4.3 9.2 20.8 38.6 1.4 1.3 1.0 1.2 1.6 2.5 4.5 8.8 17.8 30.1 1.8 1.7 1.1 1.3 1.8 2.8 4.8 8.4 13.6 18.2 2.7 2.5 1.1 1.4 2.0 3.3 6.1 11.1 16.7 4.3 3.8 1.1 1.5 2.3 4.1 8.4 17.6 29.7 6.8 5.9 1.2 1.6 2.5 4.6 9.8 21.9 39.4 10.4 8.7 6.3 4.3 2.9 2.1 1.6 1.3 1.2 1.2 1.3 1.8 2.7 4.8 9.2 18.0 28.9 14.0 11.3 7.9 5.2 1.4 1.3 1.5 2.0 3.1 5.3 9.1 14.0 15.3 12.4 8.7 5.9 1.7 1.5 1.7 2.3 3.8 7.1 12.9 18.7 13.4 11.2 8.3 6.3 2.2 1.9 1.9 2.6 4.5 9.6 20.7 33.2 9.6 8.5 7.2 6.9 7.6 8.0 6.6 4.4 2.7 1.9 1.7 2.3 4.4 10.1 23.3 39.7 6.6 6.5 6.9 9.3 14.3 17.7 14.3 8.1 4.1 2.3 1.8 2.2 3.8 7.9 16.2 12.6 4.7 5.2 7.1 7.4 13.2 18.1 13.7 6.7 5.5 2.7 1.8 1.9 2.9 5.2 8.5 4.0 4.1 4.0 3.8 3.3 2.9 5.5 5.6 5.6 5.3 4.8 4.2 6.4 6.7 6.8 6.4 5.9 5.0 3.7 6.8 7.1 7.2 6.9 6.3 5.4 3.9 6.7 6.9 7.0 6.7 6.1 5.3 3.9 5.9 6.0 6.1 5.8 5.3 4.6 4.5 4.6 4.5 4.3 3.9 3.5 5.1 5.4 5.2 4.7 4.3 4.3 4.7 5.3 5.6 5.4 4.9 4.4 4.2 4.5 5.0 5.4 5.3 4.8 4.1 3.0 1.9 7.9 8.5 7.8 6.6 5.8 5.8 6.7 7.9 8.7 8.3 7.1 6.0 5.7 6.3 7.5 8.4 8.2 7.0 5.6 4.1 3.9 11.4 12.3 11.0 8.9 7.4 7.4 8.9 11.1 12.5 11.7 9.6 7.7 7.2 8.3 10.4 12.1 11.8 9.7 7.2 5.4 5.5 8.2 12.7 15.8 13.8 15.0 13.2 10.3 8.4 8.4 10.4 13.4 15.1 14.1 11.2 8.8 8.2 9.6 12.4 14.7 14.3 11.5 8.4 6.5 7.1 11.9 22.6 32.0 13.5 14.6 13.0 10.2 8.4 8.4 10.3 13.1 14.8 13.8 11.1 8.8 8.2 9.5 12.2 14.4 14.1 11.4 8.5 6.9 8.0 14.1 28.8 21.5 10.7 11.6 10.6 8.7 7.5 7.5 8.7 10.7 11.8 11.1 9.3 7.7 7.3 8.2 10.1 11.6 11.3 9.5 7.5 6.6 7.9 12.7 22.4 6.3 7.6 8.2 7.8 6.9 6.2 6.2 6.9 7.9 8.4 8.0 7.1 6.2 6.1 6.7 7.7 8.4 8.3 7.3 6.4 6.4 8.1 11.8 16.2 4.7 5.4 5.9 5.9 5.6 5.4 5.3 5.5 5.8 6.0 5.8 5.4 5.1 5.2 5.6 6.1 6.4 6.3 5.9 5.7 6.8 10.2 16.0 20.1 3.8 4.3 4.8 5.2 5.4 5.4 5.3 5.1 4.9 4.7 4.6 4.5 4.6 5.0 5.4 5.8 5.8 5.6 5.3 5.7 7.8 14.1 26.5 27.4 3.5 4.0 4.9 5.7 6.4 6.6 6.3 5.5 4.8 4.4 4.2 4.3 4.8 5.6 6.4 6.9 6.7 6.1 5.6 6.0 8.4 15.9 31.7 4.4 5.7 7.3 8.8 9.2 8.4 6.9 5.5 4.6 4.4 4.7 5.6 7.1 8.6 9.4 9.0 7.7 6.6 6.5 8.5 13.9 23.5 5.2 7.0 9.6 12.0 12.8 11.3 8.7 6.4 5.2 4.8 5.4 6.8 9.1 11.6 13.1 12.2 9.9 8.0 7.5 9.3 13.1 17.1 6.2 8.3 11.4 14.5 15.5 13.4 10.0 7.2 5.7 5.4 6.2 8.0 10.8 14.1 15.9 14.7 11.6 9.2 9.1 12.4 18.7 22.2 7.4 9.2 11.9 14.5 15.3 13.2 10.0 7.4 6.2 6.2 7.1 9.0 11.6 14.5 16.0 14.6 11.7 9.6 10.5 17.1 30.8 9.2 10.0 11.2 12.5 12.6 11.0 8.8 7.1 6.5 7.1 8.5 10.2 12.0 13.4 13.8 12.4 10.3 9.0 10.7 18.4 34.2 12.1 11.3 10.6 10.1 9.5 8.4 7.2 6.5 6.9 8.4 10.5 12.2 12.9 12.5 11.5 10.0 8.5 8.1 9.8 15.1 23.7 1.1 1.1 1.1 1.5 1.4 1.4 1.3 2.0 1.7 1.5 1.7 1.9 1.3 1.3 2.1 1.8 1.7 1.8 2.1 1.3 1.2 2.0 1.8 1.7 1.8 2.0 1.3 1.3 2.0 1.8 1.7 1.8 2.0 1.3 1.4 2.2 1.9 1.8 1.9 2.1 1.4 1.4 2.1 1.9 1.7 1.9 2.1 1.4 1.2 1.9 1.7 1.6 1.7 1.8 1.3 1.0 1.5 1.5 1.5 1.5 1.4 1.0 1.5 1.4 1.3 1.6 1.7 1.7 1.6 1.9 2.4 3.1 3.2 2.7 1.0 2.4 3.2 1.1 2.6 3.4 1.1 2.4 3.1 2.1 2.3 2.6 2.7 2.3 1.9 1.7 1.5 1.4 2.1 1.8 1.4 1.2 1.3 2.0 1.7 1.4 1.2 1.2 1.5 1.2 1.7 1.6 1.4 1.3 1.3 1.0 1.0 1.6 1.5 1.5 1.5 1.6 1.1 1.3 1.0 1.6 1.6 1.6 1.7 2.0 1.3 4.6 2.1 1.6 1.2 1.7 1.7 1.7 1.8 2.1 1.4 5.4 2.6 2.4 1.9 1.4 2.1 1.9 1.7 1.8 1.9 1.3 2.6 2.1 1.9 1.5 2.3 2.0 1.7 1.7 1.7 1.1 1.9 1.9 1.9 1.4 2.2 1.9 1.8 1.7 1.7 1.1 1.9 1.8 1.6 1.4 2.1 1.9 1.8 1.8 1.9 1.3 1.5 2.0 1.7 1.4 2.2 2.0 1.8 1.9 2.1 1.4 1.7 2.0 1.6 1.5 2.3 2.0 1.8 1.9 2.1 1.4 1.9 1.8 1.4 1.4 2.2 1.9 1.7 1.8 1.8 1.3 1.7 1.6 1.2 1.2 1.8 1.7 1.6 1.6 1.5 1.1 1.6 1.6 1.4 1.0 1.6 1.6 1.5 1.5 1.4 1.0 4.6 4.1 1.9 1.7 1.4 1.0 1.6 1.6 1.5 1.5 1.4 1.0 1.5 1.9 3.2 2.3 2.1 1.3 1.2 1.8 1.7 1.6 1.6 1.7 1.2 1.8 1.9 2.2 2.4 2.6 2.1 1.3 2.0 1.8 1.6 1.7 2.0 1.4 2.2 2.0 2.0 2.3 2.5 1.5 1.3 2.0 1.7 1.6 1.7 2.0 1.4 2.0 1.9 2.0 2.3 2.1 1.2 1.7 1.6 1.5 1.5 1.7 1.3 1.2 1.7 1.7 1.9 2.1 2.2 1.4 1.0 1.5 1.4 1.4 1.3 1.3 1.0 1.1 1.4 1.6 1.8 2.1 2.4 1.2 1.0 1.5 1.4 1.3 1.3 1.3 1.2 1.5 1.6 1.9 2.2 2.3 1.0 1.2 1.7 1.6 1.4 1.5 1.6 1.8 2.0 2.0 1.8 1.8 1.8 2.0 2.3 2.2 1.4 2.0 1.7 1.5 1.4 1.4 1.5 1.6 1.6 1.6 1.6 1.8 2.1 2.5 1.8 1.5 2.2 1.8 1.5 1.3 1.2 1.2 1.3 1.3 1.4 1.5 1.6 2.0 2.3 1.3 1.4 1.9 1.7 1.4 1.3 1.2 1.1 1.2 1.2 1.3 1.4 1.5 1.7 1.7 1.1 1.6 1.5 1.3 1.2 1.2 1.2 1.1 1.2 1.2 1.3 1.4 1.5 1.3 1.0 1.4 1.4 1.3 1.3 1.4 1.4 1.3 1.3 1.2 1.3 1.4 1.4 1.1 1.0 1.4 1.4 1.4 1.5 1.7 1.9 1.8 1.5 1.4 1.4 1.5 1.5 1.1 1.1 1.6 1.5 1.4 1.4 1.4 1.5 1.7 1.9 1.2 1.4 1.9 1.7 1.5 1.5 1.6 1.7 1.7 1.6 1.5 1.7 2.0 2.1 1.1 1.6 2.2 1.9 1.7 1.8 2.0 2.2 2.2 2.0 1.8 1.8 2.0 1.7 1.5 2.1 1.9 1.8 1.8 1.9 2.0 2.0 1.9 1.8 1.8 1.8 1.3 1.3 1.8 1.8 1.9 2.0 2.0 2.0 2.0 2.0 1.9 1.8 1.5 1.0 1.8 2.1 2.3 2.3 2.1 2.2 2.3 2.2 1.8 1.3 1.5 1.6 1.6 1.5 1.5 1.6 1.5 1.2 1.8 2.8 5.4 6.7 14.0 21.1 17.0 8.9 7.4 3.7 2.0 1.6 2.5 4.5 9.2 17.8 25.3 21.3 12.5 6.8 3.4 2.2 1.5 2.1 3.4 5.9 9.5 12.5 12.2 9.4 6.3 4.1 2.7 1.4 1.8 2.7 4.0 6.1 8.6 10.4 11.7 10.1 6.6 3.9 1.6 1.9 2.6 3.6 5.6 8.9 16.2 23.4 20.9 11.8 1.5 1.9 2.5 3.6 5.3 10.9 23.6 38.9 1.6 2.1 2.8 3.4 5.5 10.4 20.8 1.9 2.7 3.9 4.7 6.3 8.8 2.4 3.9 5.9 8.9 10.2 3.1 5.8 11.0 19.1 20.6 3.6 7.1 16.5 32.7 3.7 7.0 16.2 31.5 3.5 5.6 10.6 17.3 3.5 4.6 6.5 5.1 5.8 5.9 10.2 11.5 9.3 21.8 25.2 18.2 34.3 40.3 0.1 0.1 0.3 0.5 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 0.7 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.8 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.1 0.1 0.0 0.0 0.2 0.1 0.0 0.0 0.2 0.1 0.0 0.1 0.2 0.1 0.0 0.1 0.4 0.2 0.0 0.1 0.4 0.2 0.0 0.1 0.3 0.2 0.0 0.1 0.3 0.2 0.0 0.1 0.5 0.3 0.0 0.0 0.5 0.3 0.0 0.0 0.5 0.3 0.0 0.0 0.5 0.3 0.0 0.1 0.9 0.5 0.3 0.1 0.1 0.9 0.4 0.1 0.1 0.8 0.4 0.1 0.1 0.8 0.4 0.1 0.1 0.7 0.3 0.1 0.1 1.2 0.6 0.1 0.1 1.0 0.5 0.1 0.1 0.9 0.4 0.1 0.1 0.7 0.4 0.1 0.1 1.3 0.6 0.1 0.1 1.0 0.5 0.1 0.1 0.8 0.4 0.1 0.1 0.6 0.3 0.1 0.1 0.9 0.4 0.2 0.1 0.1 0.5 0.3 0.1 0.1 0.4 0.3 0.1 0.1 0.6 0.3 0.1 0.1 0.5 0.3 0.1 0.1 1.2 0.5 0.0 0.1 1.0 0.5 0.0 0.0 0.8 0.4 0.0 0.0 0.7 0.4 0.1 0.1 1.4 0.7 0.1 0.1 1.1 0.7 0.1 0.1 0.9 0.7 0.1 0.1 0.8 0.7 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.8 0.8 0.0 0.0 0.6 0.5 0.0 0.0 0.6 0.5 0.0 0.1 1.1 0.6 0.1 0.1 1.1 0.7 0.1 0.1 1.1 0.7 0.1 0.1 1.0 0.7 0.1 0.1 1.2 0.9 0.1 0.1 1.1 0.9 0.1 0.1 1.0 0.8 0.1 0.1 0.9 0.8 0.1 0.0 1.1 0.9 0.7 0.0 0.1 1.0 0.8 0.1 0.1 0.9 0.7 0.1 0.1 0.8 0.7 0.1 0.1 0.7 0.6 0.1 0.1 0.8 0.7 0.1 0.1 0.7 0.6 0.1 0.1 0.6 0.5 0.1 0.1 0.5 0.4 0.1 0.1 0.6 0.5 0.1 0.1 0.5 0.4 0.1 0.1 0.5 0.4 0.1 0.0 0.5 0.3 0.0 0.0 0.5 0.3 0.0 0.1 0.5 0.3 0.1 0.1 0.3 0.2 0.1 0.1 0.2 0.2 0.1 0.1 0.2 0.2 0.1 0.1 0.2 0.2 0.1 0.2 0.4 0.2 0.1 0.2 0.5 0.2 0.2 0.2 0.3 0.2 0.1 0.2 0.7 0.2 0.1 0.2 0.4 0.2 0.1 0.1 0.2 0.2 0.1 0.0 0.2 0.1 0.1 0.1 0.5 0.2 0.1 0.2 0.5 0.3 0.2 0.3 0.5 0.4 0.2 0.3 0.5 0.4 0.3 0.3 0.6 0.5 0.3 0.3 0.3 0.6 0.5 0.3 0.3 0.6 0.4 0.3 0.3 0.6 0.4 0.3 0.3 0.5 0.3 0.3 0.3 0.9 0.4 0.2 0.4 0.8 0.4 0.2 0.2 0.3 0.3 0.2 0.2 0.3 0.2 0.2 0.0 0.3 0.3 0.2 0.2 0.5 0.4 0.2 0.4 0.5 0.4 0.4 0.4 0.5 0.4 0.4 0.5 0.8 0.5 0.4 0.5 0.7 0.5 0.3 0.4 0.7 0.5 0.3 0.4 0.6 0.4 0.3 0.3 0.5 0.4 0.2 0.3 0.5 0.4 0.2 0.2 0.3 0.3 0.1 0.2 0.2 0.2 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 HI-LA QUINTA-EXTERIOR LIGHTING 3/29/2022 3:18 PM
IF THIS SHEET IS NOT 30"x42", IT IS A REDUCED PRINT PROJECT: N O T F O R CONSTRUCTION PRELIMINARY LIGHTING CONSULTANT 535 PRINCELAND COURT CORONA CA 92879 P: 951.340.2475 JSASSOCIATESINC.COM SHEET NO.: SHEET TITLE: SCALE: DRAWN BY: CHECKED BY: I.V. LTG-1.1 AS SHOWN
DATE DESCRIPTION
EXTERIOR LIGHTING DESIGN 2022.03.29 OWNER: SETHI MANAGEMENT, INC. P.O. BOX 23597 ENCINITAS, CA 92023 GAURAV SETHI 760.652.4010 x.2014 COPYRIGHT NOTICE: ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN CONSTITUTE THE ORIGINAL UNPUBLISHED WORK OF JS & ASSOCIATES SERVICES AND THE SAME MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT THE EXPRESS WRITTEN CONSENT OF JS & ASSOCIATES. HAMPTON INN LA QUINTA, CA S.G. EXTERIOR PHOTOMETRICS GENERAL NOTES: 1. CALCULATION ZONE @ DOG PARK IS A 3'x3' GRID. 2. CALCULATION ZONE @ PARKING LOT IS A 10'x10' GRID. 3. CALCULATION ZONE @ PATIO IS A 3'x3' GRID. 4. CALCULATION ZONE @ POOL AREA IS A 3'x3' GRID. 5. CALCULATION ZONE @ PORTE COCHERE IS A 5'x5' GRID. 6. CALCULATION ZONE @ REAR WALKWAY IS A 3'x3' GRID. 7. CALCULATION ZONE @ WAIN WALKWAY IS A 3'x3' GRID. 8. CALCULATION ZONE @ BEYOND PROPERTY LINE IS A 5'x5' GRID. PHOTOMETRIC STATISTICS: PARKING LOT LIGHT HEAD w/ HOUSE SHIELD 48W LED, 4000K, 4050LM 25'-0" TALL, SQUARE STRAIGHT STEEL POLE ON 2'-6" CONCRETE BASE P1P3 EXTERIOR FIXTURE LEGEND: OL2 OL1 OL3 OL4 OL5 P2 SCALE: 1 EXTERIOR PHOTOMETRICS 1" = 20'-0" 0 20' 40' 6" SQUARE, RECESSED DOWNLIGHT 14W LED, 4000K, 1200LM WELL LIGHT w/ DIRECTIONAL SHIELD 22W LED, 4000K, 1445LM 10° SPOT BEAM POST-MOUNTED AREA LIGHT HEAD 34W LED, 4000K, 5100LM 8'-0" TALL, ROUND STRAIGHT STEEL POLE w/ 2-3/8" TENON VAPOR TIGHT UTILITY LIGHT 40W LED, 4000K, 4600LM 2" SQUARE, RECESSED DOWNLIGHT 8W LED, 3000K, 600LM *REFER TO LTG-2.0 FOR LOCATIONS DUAL PARKING LOT LIGHT HEADS @ 180° 48W LED, 4000K, 4050LM 25'-0" TALL, SQUARE STRAIGHT STEEL POLE ON 2'-6" CONCRETE BASE DUAL PARKING LOT LIGHT HEADS @ 90° w/ HOUSE SHIELD 48W LED, 4000K, 4050LM 25'-0" TALL, SQUARE STRAIGHT STEEL POLE ON 2'-6" CONCRETE BASE OL6 PIER-MOUNTED AREA LIGHT HEAD 20W LED, 4000K, 3000LM w/ 4" PIER-MOUNTING BRACKET TO 2-3/8" HEAD ORL1 HARDWIRED IP65-RATED TAPE LIGHT 3.6W/FT, 4000K, 330LM/FT INCLUDE 4'-0" ALUMINUM CHANNEL SEGMENTS AND EXTERNAL SURGE PROTECTOR 581
CLICK HERE to Return to Agenda
OL5 OL5 OL5 OL5 OL5 OL1 WP1 WP1 WP1
10'-0", TYP. OL1 OL1 OL1 OL1 OL1 OL1 WP1 OL5 OL5 OL5 OL5 OL1 WP1 WP1 OL1 OL1 OL1 HI-LA QUINTA-EXTERIOR LIGHTING 3/29/2022 3:18 PM
IF THIS SHEET IS NOT 30"x42", IT IS A REDUCED PRINT PROJECT: N O T F O R CONSTRUCTION PRELIMINARY LIGHTING CONSULTANT 535 PRINCELAND COURT CORONA CA 92879 P: 951.340.2475 JSASSOCIATESINC.COM SHEET NO.: SHEET TITLE: SCALE: DRAWN BY: CHECKED BY: I.V. LTG-2.0 AS SHOWN
DATE DESCRIPTION
EXTERIOR LIGHTING DESIGN 2022.03.29 OWNER: SETHI MANAGEMENT, INC. P.O. BOX 23597 ENCINITAS, CA 92023 GAURAV SETHI 760.652.4010 x.2014 COPYRIGHT NOTICE: ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN CONSTITUTE THE ORIGINAL UNPUBLISHED WORK OF JS & ASSOCIATES SERVICES AND THE SAME MAY NOT BE DUPLICATED, USED OR DISCLOSED WITHOUT THE EXPRESS WRITTEN CONSENT OF JS & ASSOCIATES. HAMPTON INN LA QUINTA, CA S.G. EXTERIOR LIGHTING ELEVATIONS SCALE: 1 NORTH ELEVATION 3/32" = 1'-0" SCALE: 2 WEST ELEVATION 3/32" = 1'-0" SCALE: 3 SOUTH ELEVATION 3/32" = 1'-0" SCALE: 4 EAST ELEVATION 3/32" = 1'-0" GENERAL NOTES: 1. ALL EXTERIOR LIGHTING SHALL BE CONTROLLED VIA LIGHTING CONTROL PANEL WITH ASTRONOMICAL TIME CLOCK. 2. COORDINATE ALL EXTERIOR LIGHTING FIXTURE MOUNTING HEIGHTS WITH ARCHITECT & OWNER. 582
CLICK HERE to Return to Agenda
Trames #0232-0023
4225 Oceanside Blvd., 354H
Oceanside, CA 92056
(760) 291 - 1400
October 26, 2022
Atman Kadakia
Greens Group
9289 Research Dr.
Irvine, CA 92618
Subject: La Quinta Parking and Traffic Consistency Study (JN 0232-0023) Dear Mr. Kadakia:
Trames Solutions Inc. is pleased to submit the following parking and Traffic Consistency study for the proposed La Quinta Hotel project. It is our understanding that the site is proposed to be developed with a 125 room hotel. The project site is located south of Auto Center Dr. and east of Auto Center Way in the City of La Quinta.
INTRODUCTION
The La Quinta Hampton Inn (Project) is a 3 story, 125 room hotel, located on a 2.80- acre site, on the southwest corner of Auto Centre Drive and La Quinta Drive. This Project falls within “The Centre at La Quinta’s Specific Plan” (SP 97-029), as amended by Amendment 5 (2017-0003). The proposed Project site is adjacent to a car dealership on the North, a vacant commercial lot to the west, the Walmart shopping center to the east and residential planned development to the south, which is consistent with the planned development identified within the specific plan.
The Centre at La Quinta’s Specific Plan Amendment 5, as adopted by the City of La Quinta on July 3, 2018, incorporated a 3 story, 125 room hotel, as a part of that specific plan amendment. Since hotel traffic is based upon the number of rooms, the proposed Project would be consistent with the previous traffic assumptions, regardless of the need to revise the Floor Area Ratio (FAR).
The site plan for the project is included in Attachment A. As indicated on the site plan, a total of 125 parking spaces will be provided for the proposed hotel. The parking areas will be accessed by driveways on Auto Center Drive and Auto Center Way.
ATTACHMENT 4
583 CLICK HERE to Return to Agenda
Atman Kadakia
Greens Group.
October 26, 2022
Trames #0232-0023
The purpose of this parking evaluation is to determine the appropriate number of parking spaces that should be provided for the site to adequately serve the proposed project.
CITY OF LA QUINTA PARKING CODE REQUIREMENTS
The following parking rate is based on the City of La Quinta Municipal Zoning Code for the uses associated with the proposed site:
Hotel = 1.1 spaces per room (minimum) plus required parking for other uses on the site The proposed hotel would not have amenities that would require additional parking spaces. Therefore, according to the code requirements, the following number of parking spaces would be required for the proposed use:
Hotel: 125 rooms x (1.1 spaces per room) = 138 spaces
The project is proposing to provide 125 parking spaces. Based on the City’s parking requirements, this would leave a shortfall of 13 spaces.
PARKING EVALUATION
The parking rates for hotels for other Cities in the Coachella Valley have been compared to the City of La Quinta’s rate. The Cities of Palm Springs and Palm Desert parking rates are indicated below:
Palm Springs – 1 parking space for the first 50 hotel rooms and 0.75 spaces for every additional room. Based on this criterion, a total of 107 (107 = 50 + 57) spaces would be required.
584 CLICK HERE to Return to Agenda
Atman Kadakia
Greens Group.
October 26, 2022
Trames #0232-0023
Palm Desert – 1 space per unit plus additional spaces for other on-site uses. This criterion would require a total of 125 spaces.
The Institute of Transportation Engineers (ITE) has published a manual that summarizes parking demand findings for a variety of land uses. The manual entitled Parking Generation (5th Edition, 2019) provides recommended parking rates for uses based on independent variables. For land use code 310 (Hotel), the manual indicates that the average parking rate is 0.74 and the 85th percentile parking rate is 0.99 parking spaces per room for suburban areas (See Attachment B). This rate accounts for hotels that include supporting facilities such as restaurants, lounges, meeting rooms, recreational facilities, and retail/service shops.
Based on the 85th percentile ITE parking rate for a hotel, the proposed project would be required to provide 124 spaces (124 = 0.99 spaces per room x 125 rooms). Since the project is proposing to provide 125 spaces, there would be a surplus of 1 space based on the ITE rate. It should be noted that although the proposed project does include a restaurant, it does not include the other supporting facilities that were included in the ITE sample base.
PARKING REDUCTION MEASURES
Ridesharing
Ridesharing allows patrons to be dropped off and picked up at the site without their own vehicle. Rather than renting a vehicle, it would be more convenient and cost effective to use a ride sharing application.
Public Transit
Public bus service in the study area is provided by SunLine Routes 1 and 7. SunLine has stops along Highway 111 and Adams Street.
585 CLICK HERE to Return to Agenda
Atman Kadakia
Greens Group.
October 26, 2022
Trames #0232-0023
CONCLUSIONS/RECOMMENDATIONS
Parking Summary
Based on the City’s parking code, a total of 138 on-site parking spaces would be required for the proposed project. However, due to the studies performed by the Institute of Transportation Engineers and parking rates from other nearby cities, the parking demands for the 125 room hotel would range from 107 to 125 parking spaces. Furthermore, due to the convenience and cost savings of ride sharing, a further reduction in the parking demand can be assumed. Therefore, it is recommended that a minimum of 125 spaces be provided for the site.
If you have any questions, please contact me directly at (949) 244-2436.
Respectfully submitted,
Trames Solutions Inc.
Scott Sato, P.E.
Vice President
Attachment A – Site Plan
Attachment B – ITE Parking Generation, 5th Edition - Hotel 586 CLICK HERE to Return to Agenda
Trames #0232-0023
ATTACHMENT A
SITE PLAN
587 CLICK HERE to Return to Agenda
Auto Center Way
NORTH
8 9
22 7
17 10
trash enclosure
Patio
Pool
Spa
Proposed
Retention Area
14 Oversize Parking
9' - 0"5' - 0"9' - 0" 9' - 0" 8' - 0" 9' - 0" 9' - 0"5' - 0"9' - 0" 18' - 0"
11' - 0"
82' - 2 1/2"
Hotel
3 story
PROPERTY LINE
PROPERTY LINE
PROPERTY
LINE
PROPERTY LINE
Proposed driveway
Auto Center Drive
BUILDING SETBACK
20' - 0"
LANDSCAPE SETBACK
10' - 0"
BUILDING
SETBACK
20' - 0"
LANDSCAPE
SETBACK
10' - 0"
BUILDING SETBACK
20' - 0"
LANDSCAPE SETBACK
10' - 0"
5'-0" CMU with tile pool/patio wall
55' - 8 9/32"
44' - 8 7/8"
11' - 0"
30' - 0"
24' - 0"
24' - 0"
54' - 0"
B
UILDIN
G
S
E
T
B
A
C
K
50' - 0"
RESIDENTIAL
38 Dog Park
smokers area
24' - 5 1/2"
30' - 0
29/32"
304' - 10 27/32"
30' - 0"30' - 0"
1" = 20'-0" Robert F. Tuttle Architects, Inc.
9/30/2022 4:27:17 PM
A-1
Preliminary Site Plan
Greens Group La Quinta Hampton Inn August 31, 2022
8815 Research Dr Irvine CA 92618 La Quinta Drive and Auto Center Drive La Quinta CA 922 A-1 1" = 20'-0"
1 Site
588 CLICK HERE to Return to Agenda
Trames #0232-0023
ATTACHMENT B
ITE Parking Generation - Hotel
589 CLICK HERE to Return to Agenda
590 CLICK HERE to Return to Agenda
FINANCIAL ADVISORY COMMISSION MINUTES Page 1 of 2 NOVEMBER 8, 2023
SPECIAL MEETING
FINANCIAL ADVISORY COMMISSION
SPECIAL MEETING
MINUTES
WEDNESDAY, NOVEMBER 8, 2023
CALL TO ORDER
A special meeting of the La Quinta Financial Advisory Commission (Commission) was called to order at 3:00 p.m. by Chair Dorsey.
PRESENT: Commissioners Anderson, Batavick, Mast, Mills, and Chair Dorsey ABSENT: Commissioner Way
VACANCY: One (1)
PLEDGE OF ALLEGIANCE
Commissioner Mills led the audience in the Pledge of Allegiance.
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA – None
CONFIRMATION OF AGENDA – Confirmed
ANNOUNCEMENTS, PRESENTATIONS, AND WRITTEN COMMUNICATIONS – None
CONSENT CALENDAR ITEMS
1. APPROVE MEETING MINUTES DATED OCTOBER 4, 2023
2. RECEIVE AND FILE REVENUE AND EXPENDITURE REPORT DATED AUGUST 31, 2023
Motion – A motion was made and seconded by Commissioners Mills/Mast to approve the Consent Calendar as submitted. Motion passed: ayes – 5, noes – 0, abstain – 0, absent – 1 (Way), vacancy – 1.
BUSINESS SESSION – None
STUDY SESSION – None
DEPARTMENTAL REPORTS – All reports are on file in the Finance Department.
1. FINANCE DEPARTMENT CURRENT AND FUTURE INITIATIVES
Staff provided an update on current and upcoming Finance Department projects and City events; explained the purpose for a land-based financing policy; said that an update for REPORTS AND INFORMATIONAL ITEM NO. 26
591 CLICK HERE to Return to Agenda
FINANCIAL ADVISORY COMMISSION MINUTES Page 2 of 2 NOVEMBER 8, 2023
SPECIAL MEETING
both the Highway 111 Corridor project current expenditures and damages incurred by Hurricane Hiliary in August 2023 and subsequent storm to the City will be added to a special Commission meeting in December; and that staff anticipates the completion of the City’s Annual Comprehensive Financial Report for year ending June 30, 2023 on or before January 30, 2024.
2. SECOND QUARTER 2023 (APRIL-JUNE) SALES TAX UPDATE FOR THE
CITY OF LA QUINTA
The Commission and staff discussed fiscal year 2022/23 budget; changes in sales tax; and sales tax trends based on HDL Companies September 2023 California forecast found on attachment 2 of staff report.
COMMISSIONERS’ ITEMS – None
ADJOURNMENT
There being no further business, it was moved and seconded by Commissioners Batavick/Mills to adjourn this meeting at 3:29 p.m. Motion passed: ayes – 5, noes – 0, abstain – 0, absent – 1 (Way), vacancy – 1.
Respectfully submitted,
Jessica Delgado, Administrative Technician/Commission Secretary City of La Quinta, California
592 CLICK HERE to Return to Agenda
AIRPORT COMMISSION MEETING AGENDA
Airport Conference Room, Palm Springs International Airport 3400 E. Tahquitz Canyon Way, Palm Springs, CA 92262
Wednesday, December 20, 2023 - 5:30 P.M.
Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference. There will be in-person public access to the meeting location.
To submit your public comment to the Airport Commission electronically. Material may be emailed to: [email protected] - Transmittal prior to the start of the meeting is required. Any correspondence received during or after the meeting will be distributed to the Airport Commission and retained for the official record.
This is a hybrid in-person and virtual meeting. To virtually observe the meeting or to virtually provide public comments, please use the following Zoom link
https://us02web.zoom.us/j/86019815290?pwd=ZitOZDIyeGZhNUNEQTVkU29nTUdPdz09 or call (669) 900-6833 and enter Meeting ID: 860 1981 5290 - Passcode: 583916 City of Palm Springs: Riverside County:
Margaret Park
City of Cathedral City:
Tony Michaelis
City of Palm Desert:
Aftab Dada - Kevin Wiseman
Chair
David Feltman
Kevin J. Corcoran
Vice Chair J Craig Fong City of Indian Wells:
Robert Berriman
City of Coachella:
Denise Delgado
City of Rancho Mirage:
Keith Young Vacant Tracy Martin
Todd Burke M. Guillermo Suero City of La Quinta:
Kathleen Hughes
City of Desert Hot Springs:
Jan Pye
City of Indio:
Daniel Caldwell Dave Banks Rick Wise
Palm Springs City Staff
Scott C. Stiles Harry Barrett Jr., A.A.E. Jeremy Keating City Manager Airport Executive Director Assistant Airport Director
1. CALL TO ORDER – PLEDGE OF ALLEGIANCE
2. POSTING OF AGENDA
3. ROLL CALL
4. ACCEPTANCE OF AGENDA
5. PUBLIC COMMENTS: Limited to three minutes on any subject within the purview of the Commission
6. APPROVAL OF MINUTES: Minutes of the Airport Commission Regular Meeting of July 19, 2023
REPORTS AND INFORMATIONAL ITEM NO. 27
593 CLICK HERE to Return to Agenda
Airport Commission Meeting Agenda
December 20, 2023 – Page 2
_______________________________________________________________________________________
7. DISCUSSION AND ACTION ITEMS:
7.A Follow-up to Strategic Planning Session Update
7.B Master Plan Update
7.C Financial Summary Update
7.D Marketing Update
7.E Concessions Update
7.F Projects and Airport Capital Improvement Program Update
8. EXECUTIVE DIRECTOR REPORT
9. COMMISSIONERS REQUESTS AND REPORTS
10. REPORT OF COUNCIL ACTIONS:
10.A Past City Council Actions
10.B Future City Council Actions
11. RECEIVE AND FILE:
11.A Airline Activity Report November 2023
11.B Airline Activity Report Fiscal Year Comparison
12. COMMITTEES:
12.A Future Committee Meetings
12.B Updated Committee’s Roster
ADJOURNMENT:
The Airport Commission will adjourn to a Regular Meeting on January 17, 2024, at 5:30 P.M.
AFFIDAVIT OF POSTING
I, Harry Barrett, Jr., Airport Executive Director, City of Palm Springs, California, hereby certify this agenda was posted on December 14, 2023, in accordance with established policies and procedures.
PUBLIC NOTICES
Pursuant to G.C. Section 54957.5(b)(2) the designated office for inspection of records in connection with the meeting is the Office of the City Clerk, City Hall, 3200 E. Tahquitz Canyon Way. Complete Agenda Packets are available for public inspection at: City Hall Office of the City Clerk. Agenda and staff reports are available on the City’s website www.palmspringsca.gov. If you would like additional information on any item appearing on this agenda, please contact the Office of the City Clerk at
(760) 323-8204.
It is the intention of the City of Palm Springs to comply with the Americans with Disabilities Act (ADA) in all respects. If, as an attendee or a participant at this meeting, or in meetings on a regular basis, you will need special assistance beyond what is normally provided, the City will attempt to accommodate you in every reasonable manner. Please contact the Department of Aviation, (760) 318-3800, at least 48 hours prior to the meeting to inform us of your particular needs and to determine if accommodation is feasible.
594 CLICK HERE to Return to Agenda
Palm Springs Airport Commission Report – December 20, 2023 Meeting This meeting was the single most important meeting that I have participated in for the term I have served. My report will concentrate on the two options of the master plan update and why the commission made the decision that we did. Either plan will have a significant impact on the future of the Palm Springs airport which is an essential driver of tourism to the valley and also a necessity for residents in the Coachella Valley. The December commission meeting was a lengthy evaluation of both concepts and will now be presented to the February City Council.
Discussion and Action Items: Airport Master Plan: It has been narrowed down to two plans after having public meetings and gaining more public buy-in. - Alternative 1A is more conservative with renovating and adding wings on each side of the current airport terminal which is deemed a national historical building and the other plan, Alternative 3 is much more aggressive and will build an entire new airport on the south side.
Alternative 1A - Significantly lower total and Phase 1 ROM costs and likely lower costs to be passed along to airlines.
ADVANTAGES:
▪Maintains existing character of PSP by preserving major elements including the Wexler headhouse, the Bono concourse, the fountain, the Tahquitz Canyon Way connection, the outdoor courtyard, the mountain view corridors and the minimal walk distances. ▪Conveniently locates CONRAC immediately adjacent to the baggage claim. ▪Conveniently locates FIS near the existing baggage claim. ▪Eases construction phasing with multiple and entirely separate and modern concourses. ▪Estimated timeframe from end of Master Plan to ribbon cutting is 3.5 to 5 years. ▪Provides PSP opportunities for stopping points during construction of the four program phases in the event of an economic downtown or unforeseen demand reduction.
DISADVANTAGES:
Long term walking distance increases for south concours that would likely require moving walkways.
Requires significant renovation of existing spaces including Wexler headhouse and Bono concourse and associated energy efficiently impacts.
Operational challenges during construction include likely having to shuttle rental car passengers.
Alternative 3 - A state of the art airport which would be more energy efficient but much more costly and depend on federal grants and possible loans to complete all four phases
ADVANTAGES:
Creates brand new terminal and vehicle parking facilities. 595 CLICK HERE to Return to Agenda
New terminal systems would likely be more energy efficient and reduce annual operations and maintenance costs.
Minimizes terminal phasing disruptions to existing operations during construction.
Provides a larger landside area for the CONRAC.
Maintains historic Wexler terminal and allows the community to determine a future non-terminal related use for this important facility.
DISADVANTAGES:
Significantly higher ROM costs, particularly in Phase 1 that would need to be passed along to the airlines.
Phase 1 only results in a net gate of 2 gates from 18 currently to 20 total gates.
Minimal landside vehicle parking space is available given the need to relocate Kirk Douglas Way.
Currently, the Airport does not own much of the property between KDW & Ramon Road.
Gating operations on the RJ concourse would likely be reduced to three parking positions during construction—placing gate demand in a larger deficit from what it currently is today Disrupts the connection of the terminal to downtown Palm Springs via Tahquitz Canyon Way.
Requires a longer timeline from end of Master Plan to ribbon cutting.
Once construction of Phase 1 begins, the Airport is essentially committed to the significant investment of the overall program.
Operational challenges during construction include likely having to shuttle public parking passengers.
OUTCOME OF COMMISSION VOTE: After tense conversation, the majority of the commission voted to support the 1A plan. The cost of phase one for 1A is $879,427,910 and the total of the four phases is $2,207,886,262. The cost of phase one for 3 is $2,226,513,141 and the total of the four phases is $2,786,979,408. If the economy downturns or we have another pandemic, the 1A plan can take pause between phases. Unfortunately, with plan 3, once you start there is no turning back. One must complete the four phases. To me, this was the deal-breaker. My second concern was the ability to gain underwriting and grants for billions of dollars. The airport may need to reach out to private industry for support and that always comes with a cost. The fact that the baggage claim system which is new can be utilized in the 1A plan. Plan 3 would require a completely new system which means that the millions spent one year ago is completely wasted.
Lastly, as we all know, no construction ever goes as planned and there are always overruns in budget.
There is also no guarantee that the airlines would support financially the cost accessed to them in plan
3. Regardless of what PSP may think – it is a small airport that is seasonal. Airlines always have options and an airport that can support service throughout the air will always be more desirable.
The next Airport Commission Meeting will be January 17, 2024 at 5:30 pm.
596 CLICK HERE to Return to Agenda
Palm Springs Airport
Master Plan
Airport Commission Briefing
December 20, 2023
597 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Agenda
Alt 1A and Alt 3 Phases and Cost Estimates
Updated Timeline
Terminal Project Benchmarking
Feedback and Questions from Airport Commissioners
Questions and Discussion
598 CLICK HERE to Return to Agenda
Alt 1A and Alt 3 Phases
and Cost Estimates
599 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Refined Alternatives 1A and 3
Alternative 1A – Renovate and Expand
Signficant expansion of Wexler building with two new concourse located north and south
Alternative 3 – Replace
New terminal facilities to the south and eventually repurpose the Wexler building
600 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternatives Summary
601 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative Phase Cost Estimate
Alternative 1A TOTAL $2,207,886,262
1A - Phase 1 $879,427,910
1A - Phase 2 $1,145,490,054
1A - Phase 3 $93,188,731
1A - Phase 4 $89,779,568
Alternative 3 TOTAL $2,786,979,408
3 - Phase 1 $2,226,513,141
3 - Phase 2 $349,194,794
3 - Phase 3 $95,783,136
3 - Phase 4 $115,488,337
Source: Leyland Saylor
Cost Estimates by Phase
602 CLICK HERE to Return to Agenda
Updated Timeline
603 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Estimated Schedule
604 CLICK HERE to Return to Agenda
Terminal Project
Benchmarking
605 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Airport 2022 Enplanements Number of
Gates Cost of Program Cost per Gate
MCI (Kansas City, MO) 4,796,476 39 $1,500,000,000 $39,000,000 BUR (Burbank, CA) 3,054,729 14 $1,240,100,000 $53,000,000 CMH (Columbus, OH) 3,618,555 35 $2,000,000,000 $58,000,000 MOB (Mobile, AL)** 262,048 5 $330,000,000 $66,000,000
MSY (New Orleans, LA) 5,931,899 35 $1,300,000,000 $38,000,000 DSM (Des Moines, IA)*** 1,368,130 6 $448,125,000 $75,000,000 Notes:*These cost estimates were obtained from public online sources. The programs of each of these projects vary in scope and located in different parts of the country ultimately affecting total program cost. They shall not be considered an exact comparison to PSP’s proposed terminal program. **The program cost estimate for MOB reflects the cost of Phase 1 which includes a terminal processor and 5 gates. The ultimate buildout includes a concourse expansion of 12 gates. ***DSM’s terminal program cost estimates is divided into three phases. The cost estimate depicted above includes only Phase 1A which includes a terminal processor, 6-gate concourse, and landside development.
Terminal Benchmarking
606 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A Cost per Gate
Phase Number of
Gates** Cost of Program Cost per Gate
Phase 1*** 7 $346,016,000 $50,000,000
Phase 2 9 $1,145,491,000 $128,000,000
Phase 3 5 $93,189,000 $19,000,000
Phase 4 5 $89,780,000 $18,000,000
Total Constructed
Gates 26 $1,674,474,000 $64,403,000
Notes:
*The scope of each phase differs causing a wide range of costs per gate in each phase (i.e. some phases include apron, roadwork, baggage handling systems, etc. while others do not).
**Number of gates constructed in that phase
***Cost Estimate does not include CONRAC and contingencies along with the CONRAC PSP Cost per Gate by Phase
Alternative 3 Cost per Gate
Phase Number of
Gates** Cost of Program Cost per Gate
Phase 1*** 20 $1,705,102,000 $83,000,000
Phase 2 4 $349,195,000 $88,000,000
Phase 3 4 $95,784,000 $24,000,000
Phase 4 4 $115,489,000 $29,000,000
Total Constructed
Gates 32 $2,265,568,000 $70,799,000
Notes:
*The scope of each phase differs causing a wide range of costs per gate in each phase (i.e. some phases include apron, roadwork, baggage handling systems, etc. while others do not).
**Number of gates constructed in that phase
***Cost Estimate does not include CONRAC and contingencies along with the CONRAC 607 CLICK HERE to Return to Agenda
Feedback and Questions
from Airport Commissioners
608 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Commissioner Feedback
609 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Commissioner Questions
610 CLICK HERE to Return to Agenda
Questions/Discussion
611 CLICK HERE to Return to Agenda
Backup Slides
612 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A – Phase 1 Phase ROM Cost ≈ $900M
613 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A – Phase 2 Phase ROM Cost ≈ $1.1B ($2B Total) 614 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A – Phase 3 Phase ROM Cost ≈ $100M ($2.1B Total) 615 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A – Phase 4 Phase ROM Cost ≈ $100M ($2.2B Total) 616 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A
“Northeast View”
Source: Gensler 2023
617 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A
“Southwest View”
Source: Gensler 2023
618 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 1A
“Tahquitz View”
Source: Gensler 2023
619 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 3 – Phase 1 Phase ROM Cost ≈ $2.2B
620 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 3 – Phase 2 Phase ROM Cost ≈ $400M ($2.6B Total) 621
CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 3 – Phase 3 Phase ROM Cost ≈ $100M ($2.7B Total) 622
CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 3 – Phase 4 Phase ROM Cost ≈ $100M ($2.8B Total) 623
CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 3
“Northeast View”
Source: Gensler 2023
624 CLICK HERE to Return to Agenda
AIRPORT MASTER PLAN
Alternative 3
“Southeast View”
Source: Gensler 2023
625 CLICK HERE to Return to Agenda
WRITTEN
PUBLIC
COMMENT
CITY COUNCIL
MEETING
JANUARY 16, 2024
CLICK HERE to Return to Agenda
1 From: Francis Fernandez <[email protected]>
Sent: Tuesday, January 16, 2024 9:57 AM
Subject: Written Public Comment Submission: South Coast AQMD Clean Air Awards + WAIRE Reporting Deadlines
Attachments: WAIRE Reporting Notice_January2024.pdf; Clean Air Awards Nominations.pdf Follow Up Flag: Follow up
Flag Status: Flagged
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening attachments, clicking links or responding to requests for information. ** Good morning,
On behalf of the South Coast AQMD, I would like to submit the following 2 attachments as part of the written public comment portion of the next city council meeting.
The first attachments highlights our open nomination period for South Coast AQMD's Clean Air Awards through January 19th to honor those across the region who have helped to improve the air we breathe. The 34th Annual Clean Air Awards will recognize achievements in the following categories:
S. Roy Wilson Award for Leadership in Government
Robert M. Zweig, M.D., Memorial Award
Dr. William A. Burke Award for Leadership in Environmental Justice John J. and Ben J. Benoit Award for Innovative Clean Air Technology Leadership in Air Quality
Youth Leadership in Air Quality
The second attachment highlights our January 31st Deadline for owners and operators of warehouses located in South Coast AQMD’s jurisdiction with greater than or equal to 100,000 square feet of indoor floor space to submit reporting info in accordance to Rule 2305 – Warehouse Actions and Investments to Reduce Emissions (WAIRE) Program to reduce emissions of nitrogen oxides and diesel particulate matter from warehouses.
Thank you,
Francis Fernandez
Sr. Public Affairs Specialist / Social Media Coordinator Legislative, Public Affairs and Media Department
_____________________________________
South Coast Air Quality Management District
21865 Copley Drive, Diamond Bar, CA 91765
(909) 396-3265 | [email protected]
@SouthCoastAQMD: Facebook | Twitter | Instagram
Please consider the environment before you print this email.
Some people who received this message don't often get email from [email protected]. Learn why this is important CITY COUNCIL MEETING - JANUARY 16, 2024 - WRITTEN PUBLIC COMMENTS BY SOUTH COAST AIR QUALITY
MANAGEMENT DISTRICT - MATTERS NOT ON THE AGENDA - CLEAN AIR AWARD NOMINATIONS & WAIRE DEADLINES CLICK HERE to Return to Agenda
Event details coming soon!
34th
Annual Clean Air Awards
Inspiring
an
Equitable
Clean Air Futur Clean Air Future
Nominations are Now Open
Apply online! Applications accepted
until January 19, 2024, 11:59 p.m., PST
For over three decades, South Coast AQMD has honored those across the region who have helped to improve the air we breathe. The 34th Annual Clean Air Awards will recognize achievements in the following categories:
S. Roy Wilson Award for Leadership in Government
Robert M. Zweig, M.D., Memorial Award
Dr. William A. Burke Award for Leadership in Environmental Justice John J. and Ben J. Benoit Award for Innovative Clean Air Technology Leadership in Air Quality
Youth Leadership in Air Quality
Submit at www.aqmd.gov/clean-air-awards/nominations
Save the Date | Friday, April 5, 2024
CLICK HERE to Return to Agenda
WAIRE
Rule 2305 - Warehouse Actions and
Investments to Reduce Emissions
(WAIRE) Program Reporting Notice
PURPOSE:
In May 2021, the South Coast Air Quality Management District (South Coast AQMD) Governing Board adopted Rule 2305 – Warehouse Actions and Investments to Reduce Emissions (WAIRE) Program to reduce emissions of nitrogen oxides and diesel particulate matter from warehouses.
APPLICABILITY:
Rule 2305 applies to owners and operators of warehouses located in South Coast AQMD’s jurisdiction with greater than or equal to 100,000 square feet of indoor floor space within a single building. Both warehouse facility owners and operators are subject to reporting requirements pursuant to Rule 2305. Warehouse facility owners were required to submit a Warehouse Operations Notification by September 1, 2021 and subsequently when certain conditions occur such as a change in tenant (please refer to Rule 2305 (d)(7)). Warehouse operators are required to submit an Initial Site Information Report (ISIR) and Annual WAIRE Report (AWR) based on the warehouse size of their operations according to the implementation schedule in the rule.
REQUIREMENTS FOR WAREHOUSE OPERATORS:
Rule 2305 specifies a phase-in schedule for warehouse operators. The 2023 calendar year is the first compliance period for Phase 2 warehouse operators, and the second compliance period for Phase 1 warehouse operators. The following report must be submitted by January 31, 2024, pursuant to Rule 2305:
Report Warehouse Size
(square feet) Due Date Information Required
Annual
WAIRE
Report
(AWR)
Phase 1
(≥250,000)
&
Phase 2
(≥150,000 and
<250,000)
January 31,
2024
• Number of truck trips during the
compliance period (calendar year 2023)
• WAIRE Menu actions and/or investments
completed by operator to earn WAIRE
Points
• WAIRE Points earned must offset the
operator’s WAIRE Points Compliance
Obligation (WPCO)
Phase 1 warehouse operators were required to submit an ISIR by July 5, 2022 and their first AWR by March 2, 2023 for the 2022 compliance period. Phase 2 warehouse operators were required to submit an ISIR by July 5, 2023. If these reports have not yet been submitted, they are PAST DUE and complete reports should be submitted as soon as possible.
WHO IS A WAREHOUSE OPERATOR?
Rule 2305 defines a warehouse operator as the entity who conducts day-to-day operations at a warehouse, either with its employees or through contracting out services for all or part of the warehouse operations. A warehouse operator can also be the warehouse owner.
HOW DO I SUBMIT REPORTS?
Reports shall be submitted through the WAIRE Program Online Portal (WAIRE POP):
https://xappp.aqmd.gov/isr
For more information or compliance assistance, please visit www.aqmd.gov/waire, call our hotline at 909-396-3140, or email us [email protected].
January 2024
CLICK HERE to Return to Agenda
1 From: Cynthia Kramer <[email protected]>
Sent: Monday, January 15, 2024 5:25 PM
To: City Clerk Mail
Cc: Jennifer Nelson
Subject: Written comments-The Chuckwalla National Monument [Some people who received this message don't often get email from [email protected]. Learn why this is important at https://aka.ms/LearnAboutSenderIdentification ] ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening attachments, clicking links or responding to requests for information. ** Monday Jan. 15, 2024
To The City Clerk of La Quinta,
My name is Cindy kramer and I am a resident of La Quinta. I grew up on the east coast. My husband and I fell in love with this enchanting Cochella Valley years ago and bought our home here. We enjoy the breathtaking nature and healthy lifestyle.
I want to share my support and ask for your support for efforts to preserve public lands and our local natural desert landscapes in eastern Riverside and Imperial counties. I deeply support the proposed designation of the Chuckwalla National Monument and expansion of the Joshua Tree National Park.
Designation as a national monument will be protecting these incredible wild lands, indigenous homelands, protecting the vast desert ecosystem, protecting the wildlife habitat and their movement corridors for many species like the Chuckwalla lizards, big horn sheep and desert tortoise.
This is important to me, many of the local residents & visitors that enjoy our breathtaking natural environment.
We need to ensure to preserve the land for our next generations to enjoy as well.
I ask you and the La Quinta City Council to promote this proposal with a resolution of support. Thankyou for your consideration and your leadership.
Wishing you the best,
Cindy kramer
53030 Del Gato Dr.
La Quinta, Ca. 92253
CITY COUNCIL MEETING - JANUARY 16, 2024 - WRITTEN PUBLIC COMMENTS BY RESIDENT CINDY KRAMER PRESENTATION ITEM NO. 3 - CHUCKWALLA NATIONAL MONUMENT SUPPORT CLICK HERE to Return to Agenda
1 From: Kay Wolff <[email protected]>
Sent: Sunday, January 14, 2024 4:49 PM
To: City Clerk Mail
Cc: Jennifer Nelson
Subject: PROPOSED CHUCKWALLA NATIONAL MONUMENT
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening attachments, clicking links or responding to requests for information. ** I am writing to support the Chuckwalla National Monument that is proposed for designation in the near future. We in La Quinta know the value of having a national monument on our doorstep. The Santa Rosa and San Jacinto National Monument has greatly enhanced the “brand” of the City.
Both residents and tourists enjoy the hiking trails, the vistas and the assurance that these miles of mountains are truly preserved for coming generations of residents and tourists. It’s a magnet for hikers, bikers, photographers and painters. I live a stone’s throw from the Santa Rosa National Monument. Over the years my friends and family have enjoyed hiking up the mountain side and using the Bear Creek Trail. Now, most of us just sit and admire the dramatic views, sunrises and sunsets and the absence of hillside development. It’s a treasure.
A Chuckwalla National Monument would broaden the attraction that the Coachella Valley has for nature lovers and boost the economies of other nearby communities. The proposal is a balance of preservation and thoughtful use of the terrain: allowing limited hiking and off-road activities for a wide range of outdoors people.
The national monument designation will not only protect the natural spaces encompassed in the boundaries, but also the natural habitat of many desert creatures.
Please give your support to this project by creating a Resolution that expresses the wishes of the residents and the City government. Your quick action would remind our lawmakers that we are following this project and urge them to make a final decision.
Kay Wolff
77227 Calle Ensenada
760-564-4070
CITY COUNCIL MEETING - JANUARY 16, 2024 - WRITTEN PUBLIC COMMENTS BY RESIDENT KAY WOLFF PRESENTATION ITEM NO. 3 - CHUCKWALLA NATIONAL MONUMENT SUPPORT CLICK HERE to Return to Agenda
1 From: Sam and Sharon Dickinson <[email protected]> Sent: Saturday, January 13, 2024 5:55 PM
To: City Clerk Mail
Subject: Written comments
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening attachments, clicking links or responding to requests for information. ** HOA’s and flag poles
Sam Dickinson
58218 Aracena
La quinta Ca.
First I would like to thank the Mayor and the entire council for unanimously approving the changes to flag pole location to 5’ and 5’. Hopefully that will get more Flags Flying in La Qunita.
Council Member McGarrey
I loved your comments at the Nov 7th council meeting, you said “You fly that flag where you want to fly that flag” and you also said, “This is America let them fly their flags”.
I also would like to thank you for your many family members who have served in the the United States armed forces, especially your husband in the Air Force.
Afterwards I felt bad I did not mention my Dad Sherman Dickinson and his brother Larry Dickinson, my uncles Robert loffer and Charles Warner all served during WWII My Aunt’s Lee Loffer and Elizabeth Warner served in the red cross during WWII. My uncle Jerry Rutledge not only served in WWII but also Korea and Vietnam, all oversea. He retired from the Air Force as a Chief Master Sargent after 31 years of service to our country. My brother Storm Dickinson was wounded while serving in Vietnam.
Council Member Sanchez
I would like to thank you for your service in the US Marine Corps.
I also liked your comment during the Nov. 7th meeting when talking about the flag pole ordinance you said, “I agree HOA’s are better suited to govern themselves”, thank you for that comment.
Mayor Pro Tem Pena
I would again like to thank you and our city manager Jon McMillen for taking the time to come out to Andalusia and see things for yourself. During the Nov 7th council meeting you commented that you did not have a problem with the three poles location, and that they were all professionally installed and to let the HOA’s deal with the home owners. Thank you for your insight.
Council Member Fitzpatrick
As you known HOA’s have all kind of rules and regulations. Unlike your HOA in mine you can plant a palm tree right next to your neighbors property, but the trunk must be at least 9ft.. The palm leaves will hang 6ft. over your neighbors property 24-7. So if a flag and pole are located close to your neighbors property it may occasionally fly over theirs. Every HOA has different rules and regulations.
Mayor Evans
CITY COUNCIL MEETING - JANAURY 16, 2024 - WRITTEN PUBLIC COMMENTS BY RESIDENT SAM DICKINSON PUBLIC HEARING ITEM NO. 1 - FLAGPOLE REGULATIONS
CLICK HERE to Return to Agenda
2 I loved your statement on Nov. 7th, you said “ I Love the flag too and I wish we could see more of them”.
As you found out that night only 3 flag pole permits have been issued. You also noted there are probably many more out there that did not apply for a permit. I talked to one of those 3 permitted homeowners he said that it cost him about $6,000 to buy and install a 20ft. pole in his yard. He had to pay $1,200 just to get an engineering report. A 30ft. palm tree that weighs at least twenty times more doesn’t need an engineering report to plant it. If you want to see more Flags Flying in La Quinta and have them permitted you need make it easier and less expense to do so. There are professional companies that flags and poles are their only business, like Jon’s Flags and Poles in Riverside. We used them and our cost was under $2,000 for a 15 ft. pole, flag and a professional installation.
I would like to thank you for your time and all your help going forward on this matter.
Happy New Year.
Sam Dickinson
USAF Retired
CLICK HERE to Return to Agenda
1 From: Steve Grocott <[email protected]>
Sent: Tuesday, January 16, 2024 10:27 AM
To: City Clerk Mail
Cc: Jon McMillen; Danny Castro
Subject: FW: Flagpole letter to City Council for review WRITTEN COMMENTS from Steve Grocott , La Quinta
Attachments: Council Letter.pdf
** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening attachments, clicking links or responding to requests for information. ** Resending with corrected subject line
From: Steve Grocott
Sent: Tuesday, January 16, 2024 10:23 AM
To: [email protected]
Cc: Jon McMillen <[email protected]>; Danny Castro <[email protected]> Subject: Flagpole letter to City Council for review
Please distribute
Thank you
Some people who received this message don't often get email from [email protected]. Learn why this is important CITY COUNCIL MEETING - JANAURY 16, 2024 - WRITTEN PUBLIC COMMENTS BY RESIDENT STEVE GROCOTT PUBLIC HEARING ITEM NO. 1 - FLAGPOLE REGULATIONS
CLICK HERE to Return to Agenda
1/13/24
Flagpoles
Steve Grocott
La Quinta
Letter to the La Quinta City Council, Jon McMillan, and Danny Castro I understand the City Council is moving forward to let HOA’s be free of any city setback limitations and make their own decisions for flagpole placements.
A little history here on this issue and what happened to me and my wife that could happen to anyone when there are no “checks or balances” to poorly run HOA’s and poorly run city compliance departments.
My dispute and noncompliance of a flagpole location started over 9 months ago when my HOA in Andalusia made the mistake of allowing a 15 foot lighted flagpole location 18 inches from my property line which allowed a 5 foot flag to fly over our property line and in view of our bedroom, living room, looming over our patio and lowering our property value.
The current boilerplate HOA CCR rules and regulations are over 20 years old, vague and do not have any specific limits for setbacks or standards to a neighbor’s adjacent property. Progressive HOA’s in the La Quinta area have limited and controlled conflicts with flags and flagpoles by requiring them to be closer to the house or on the house itself.
Our HOA also did not know of the city’s compliance codes requiring permits and the “then” 10X10 setback limits. This mistake by the HOA started this whole dispute within the Andalusia community.
The city was informed and from here a compliance inspector was sent out, Officer Woods, and he noted that he could not believe the HOA would allow this location. At this point enforcement letters were sent for City compliance enforcement of the current setback codes to the neighbors involved with the out of compliance flagpoles.
Then magically something happened. The city proposed amending the current 10 X 10 code to 10 X 5 setbacks and all enforcement stopped. This 10 X 10 setback code had been on the books for some 4 years and all of a sudden somebody in the city compliance department decided it needed to be changed?? CLICK HERE to Return to Agenda
Most probably somebody got to an ear in the city that these setbacks would put these pole locations in the pool area. But wait, this would be good solution because the flagpoles would be on the other side of the pool , closer to the house and not have this great impact on the adjacent neighbors and still be able to have a flag and flagpole.
This logical step was not taken and the next step was a 10 X 5 amendment that went to the city planning commission and they asked the same questions I had , “Why is this current compliance regulation (10X10) being changed that has been in place for 4 years”?
Nobody had a good answer other than it created more “flexibility” and nobody knew who was pushing this amendment. The planning commission rejected changing the current setbacks and provided that recommendation to the city council.
When the city council met on this change the 10X5 magically changed again to 5X5 setbacks (this is in the city records). I guess someone did not measure correctly from the pole to the pool. And still nobody knew why this was being changed and who was driving the amendment.
After a “patriot” meeting the City Council adopted the new setbacks for the 3 flagpole houses to 5X5 which puts a 5 foot flag right on a neighbor’s property line and a 6 foot flag would be flying over a property line. So at this point the city has enforced nothing after 9 months and has changed the codes and are now looking at giving the same HOA the decision making authority to make the same mistakes. THIS MAKES NO COMMON SENSE.
I feel we have been unfairly treated by the city with the changes to the codes in midstream of compliance enforcement. The community is also not getting a fair shake from the city because with only 3 flagpoles out of 250 homes in Andalusia it is fairly obvious that the majority of residents do not want flag poles not to mention that the 3 that were put up were disputed. The city is making these decisions to the minority and not to the sediment of the majority of people that want to see the natural beauty of La Quinta without 15 foot flagpoles up in front of property lines that affect others.
I know the mayor stated she wanted to see more flagpoles in La Quinta?? It is one thing to see these lighted flagpoles from afar, 300 yards away but when they are 30 feet away from your bedroom and living room windows and looming above your patio I think you would take a different perspective. Do any of the council members have a 15 foot flagpole?? I don’t think so and you may wonder to yourselves why not? Jon McMillan and John Pena said they came out to Andalusia and took a look at the flag pole locations?? Don’t know what far away fairway they looked down, but they did not come to our house and stood in our patio to see our perspective. I sent letters to the city manager Jon McMillan in October inviting him to come by with no response CLICK HERE to Return to Agenda
other than they are looking at changing the compliance setbacks in which the city conveniently did for the out of compliance residents who had the flag poles.
I value our country, the flag and have family members that have served in past wars and have been wounded in these wars and friends who have died in Vietnam. I very much value their service but my patriotism lies in my heart, and I do not need to project this patriotism in the form of a 15’ flagpole especially when it impacts others.
Who does that?
As most residents do, I came to La Quinta for the natural beauty of the desert, the mountains, and the sunsets. I guess it may be time to look to find another “Gem in the Desert” somewhere that prioritizes that belief.
Take care and enjoy your council meeting.
Regards
Steve Grocott and Carol Shaw
CLICK HERE to Return to Agenda