Cities Index.
Agenda packet, regular meeting, third session

La Verne City Council
December 16, 2024

Document
Agenda packet, regular meeting, third session
Meeting
December 16, 2024
Body
La Verne City Council
Pages
310
Original file
35.8 MB
Text extracted from the city's file for reading and search. Open the original on www.laverneca.gov. That file is the official record.

December 16, 2024 City Council Meeting Agenda
DEC 16, 24.PDF
December 16, 2024 City Council Meeting Agenda Packet
CC PACKET - DEC 16, 2024.PDF

1. Documents:

1.I.

Documents:

COUNCIL REGULAR MEETING AGENDA

Tim Hepburn, Mayor
Wendy Lau, Council Member
Steven Frank Johnson, Mayor Pro Tem
Rick Crosby, Council Member
Meshal "Kash" Kashifalghita, Council Member

Monday, December 16, 2024
Closed Session at 5:30 PM
Regular Meeting at 6:30 PM
La Verne City Hall - Council Chambers,
3660 D Street, La Verne, CA 91750
In compliance with the American Disabilities Act, any person with a disability who requires a modification or accommodation to participate in a meeting should contact the City Clerk’s Office at (909) 596-8726 at least 48 hours prior to the meeting. Regular Meetings are held on the 1st and 3rd Monday of every month.

Individuals can email their comments to the City Clerk's Office at [email protected] up to noon on the day of the meeting. Those comments will be shared with City Council in advance of the City Council meeting and included as part of the permanent record. Please be advised that public comments submitted by emails or any other format to the City are public records that will be made available for public viewing.

Individuals who wish to share their comments with Council during the meeting may do so in a variety of ways:
• Attend the City Council Meeting in person and fill out a comment card or raise your hand to request to comment on the current agenda item(s).

• Participate via Zoom, by visiting cityoflaverne.org/zoom where you will be automatically redirected to the meeting or call into the meeting via phone 1-669-900-6833 and enter ID 828-4978 4899 when prompted. Public comments via Zoom may be accepted for the agenda items listed within the Consent Calendar, Public Hearing and Other Matters sections of the agenda. Zoom participants who violate decorum protocols will be called to order by the presiding officer and if a violation continues, will be muted by direction of the presiding officer. • Once items are considered by the City Council, no further public comment on that matter will be accepted. A time limit of 3-minutes is set for all public comments.

Council Meeting Decorum: Per the City’s Rules for Decorum, all Speakers and Members of the Audience are to conduct themselves with decorum and not engage in willful conduct which interrupts the meeting or with the orderly conduct of the meeting.

CLOSED SESSION AGENDA - 5:30 PM

CALL TO ORDER
ROLL CALL Council Member Meshal “Kash” Kashifalghita, Council Member Wendy Lau, AGENDA City Council 12/16/2024 Page 2

Council Member Rick Crosby, Mayor Pro Tem Steven F. Johnson, and Mayor Tim Hepburn.

CLOSED SESSION TOPIC(S)
Negotiations Conference with Labor Negotiators, pursuant to Government Code Section 54957.6:

Negotiators: City Manager, Assistant City Manager, and City Attorney.

Employee Organization(s): La Verne City Employees Association, La Verne Firefighters Association, La Verne Police Middle Management Association, La Verne Police Officers Association; and all Unrepresented Employees.

Public Employee Performance Evaluation, Pursuant to Government Code Section 54957(b)(1):

Title: City Manager
Conference with Legal Counsel - Anticipated litigation. Significant exposure to litigation pursuant to paragraph (2) or (3) of subdivision (d) of Section 54956.9 (7 cases) Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Section 54956.9 (7 cases) Conference with Legal Counsel - Existing Litigation pursuant to California Government Code Section 54956.9(d)(1).
• City of Whittier, et al. vs. Los Angeles Superior Court, et al., Los Angeles County Superior Court Case No. 23STCP03579.
• Eisen, Erick v. City of La Verne (CJPIA), Case Number: ADJ14580079, ADJ14580097, ADJ17750468, ADJ17814303. Claim Number: 40210165BGG-0001, 23012700, 23017040. File Number: AA126GVv. Date of Loss: 01/21/2021, CT 03/04/2021, 04/17/2023, CT 05/31/2023 REGULAR CITY COUNCIL MEETING - 6:30 PM
PLEDGE OF ALLEGIANCE - COLE TEAGUE, LIFE SCOUT, TROOP #411 ROLL CALL Council Member Meshal “Kash” Kashifalghita, Council Member Wendy Lau, Council Member Rick Crosby, Mayor Pro Tem Steven F. Johnson, and Mayor Tim Hepburn.

PRESENTATIONS
LVGSA 8U Softball All-Star Team - The 8U All-Star team qualified for the California State Games Regional Tournament where they placed in the top 4, finishing 2 games short of the championship game. The team was managed by Dustin Williams and was coached by Josh Carrillo, Joe Givigliano, Dave Mixon, Angel Tatenco, Nik Reppuhn, and Brett Heslop. The team roster is as follows:

Erisse Amersonis Brynn Blaire Aubrey Carrillo Valissa Diaz Avery Givigliano Riley Heslop Allison Loaiza Charlotte Mixon Ellie Nava Piper Reppuhn Lily Rose Tatenco Jordyn Williams

AGENDA City Council 12/16/2024 Page 3

LVGSA 10U Softball All-Star Team - The 10U Softball All-Star team placed 1st out of 54 teams and won the USA Softball Southern California State Championship. The team then moved on and placed 3rd out of 36 teams in the California State Games Regional Tournament. The team was managed by Dan Keller and coached by Jeremy Juarez, Steve Newton, and Tito Cruz. The team roster is as follows:

Casandra Cruz Ryan Escujuri Audrey Garcia Jullian Huitrado Brynn Juarez Olivia Keller Sammie Lujan Mina Martinez
Randi Newton Valentina Velasco Victoria Velasquez Ryan Villicana Business Assistance Through Crime Reduction Program Overview - The La Verne Police Department will present an overview of the BACR Program. Including the application process, the program progress and the pilot business status.

ANNOUNCEMENTS OF UPCOMING COMMUNITY EVENTS
(Any person who wishes to make a brief announcement of a future community event that is open to the public may do so at this time.)

CONSENT CALENDAR
(All items on the Consent Calendar are routine and will be enacted by one motion unless a member of the Council or member of the audience requests separate discussion.)

1. City Council Minutes of the regular Council Meeting of December 2, 2024.

Recommendation: That the City Council approve the minutes.

2. Register of Audited Demands in the amount of $2,955,445.80, dated 11/20/24, and $457,559.37, dated 11/27/24.

Recommendation: That the City Council approve the audited demands.

3. Award of Contract for the City Hall Roof Project, No. CF2401 to Rite-Way Roof Corporation in the amount of $466,000. This report seeks City Council approval to award a contract for the City Hall Roof Project, No CF2401 to Rite-Way Roofing, lowest responsible bidder, in the amount of $466,000, and authorization for Staff to award up to a 10% contingency.

This project will replace necessary components of the failing roof.

Recommendation: That the City Council:

1. Approve plans and specifications for City Hall Roof Project, CIP Project No. CF2401;

2. Award a public works construction contract to Rite-Way Roof Corporation, the lowest, most responsible bidder, for all base bid and additive items in the amount of $466,000.00 for the La Verne City Hall Roof Project, Project Number CF2401; and

3. Authorize staff to issue change orders not exceeding 10% of the construction budget ($46,600) for a total possible construction contract cost of $512,600.00.

AGENDA City Council 12/16/2024 Page 4

4. Adoption of a Resolution Recertifying the 2024 Sewer System Management Plan. The City is required to updated its Sewer System Management Plan (SSMP) every six years. The adoption of a resolution re-certifying the 2024 SSMP will fulfill the requirements of the State Water Resource Control Board and provide detailed information on the maintenance of the City's sewer system and response and handling of sanitary sewer overflows.

Recommendation: That the City Council adopt a Resolution titled, "A RESOLUTION OF THE

CITY COUNCIL OF THE CITY OF LA VERNE, CALIFORNIA, ADOPTING AND

RECERTIFYING THE CITY OF LA VERNE SEWER SYSTEM MANAGEMENT PLAN

MANDATED BY THE STATE WATER RESOURCES CONTROL BOARD (SWRCB) ORDER NUMBER 2022-0103-DWQ."

5. Amendment to the Professional Services Agreement with WaterTalent. The City entered into a $70,000 agreement with WaterTalent in February 2024 to support the acting Utilities Manager and oversee water and sewer operations. At this time, due to continued need for services, it is proposed to extend the term five months to June 30, 2025, and increase the total contract to $125,000, which exceeds the City Manager’s approval authority. Sufficient funds exist within the Public Works Department.

Recommendation: That the City Council authorize an increase of $50,000 to the existing professional services agreement with WaterTalent, bringing the total not-to-exceed amount to $125,000, and extend the term to June 30, 2025.

PUBLIC HEARINGS - NONE

OTHER MATTERS

6. 2025 Legislative Platform & Legislative Update. The City of La Verne’s Legislative Platform serves as a strategic framework for advocacy efforts, ensuring the City can respond effectively to legislation and communicate its priorities to policymakers. The proposed 2025 Legislative Platform will guide efforts to protect local interests, support critical initiatives, and adapt to the evolving legislative landscape.

Recommendation: That the City Council approve the Legislative Platform for the 2025 legislative session.

7. Youth Sports Facility Use Agreement - La Verne Girls Softball Association (LVGSA). The proposed Youth Sports Facility Use Agreement outlines the terms and conditions for the City of La Verne to grant field and facility use to the La Verne Girls Softball Association (LVGSA). This two-year agreement, effective January 1, 2025, through December 31, 2027, ensures compliance with City policies and sets forth mutual obligations regarding field use, maintenance, safety, programming, and administrative standards.

Recommendation: That the City Council:

1. Approve the attached Youth Sports Facility Use Agreement with the La Verne Girls Softball Association for a term beginning January 1, 2025, and ending December 31, 2027, with options for two, two-year extensions; and,

2. Authorize the City Manager or designee to execute the agreement and any related documents.

AGENDA City Council 12/16/2024 Page 5

8. Film Permit - The Secret Life of the Dean's Wife. A Film Permit being request by production company Goodflix LLC. to film a movie for Lifetime Network at the University of La Verne. To meet the requirements of the City's Municipal Code and requested filming dates desired by Goodflix LLC, the City Council is being asked to authorize the City Manager to execute an agreement and issue a film permit if all required steps are completed to the City’s satisfaction.

Recommendation: That the City Council authorize the City Manager to execute an agreement with Goodflix LLC. and issue a permit for filming if all required steps are completed.

9. Resolutions Amending the Salary Range for Public Works Director and Adding a Class Specification and Salary Range for a Public Works Director/City Engineer. With the announcement of the departure of the City’s Public Works Director, a review was initiated of the compensation and job duties. This review includes the potential of incorporating the duties of City Engineer in order to better represent City needs, conduct a competitive recruitment, and ensure retention of the position. An increase to the annual salary, addition of City Engineer duties if an applicant is qualified, and approval of a Public Works Director/City Engineer job description are recommended for consideration.

Recommendation: That the City Council adopt the attached Resolutions titled, “A

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA VERNE, CALIFORNIA,

APPROVING A NEW CLASS SPECIFICATION AND SALARY RANGE FOR PUBLIC WORKS DIRECTOR/CITY ENGINEER,” and "A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF LA VERNE, CALIFORNIA, AMENDING THE SALARY RANGE FOR PUBLIC WORKS DIRECTOR."

PUBLIC COMMENTS
This is the time set aside for anyone wishing to address the City Council on items not listed in any other place on the agenda. Under the provisions of the Brown Act, the legislative body is prohibited from talking or engaging in discussion on any item not appearing on the posted agenda. However, your concerns may be referred to staff or set for discussion later. Please email your public comment to the City Clerk's Office at [email protected]. Your public comment will be shared with the City Council and included as part of the permanent record. There is a 3-minute time limit on public comments.

COUNCIL COMMENTS AND CONFERENCE/MEETING REPORTS
Each Council Member may address the Council and public on matters of general information and/or concern. This is also the time for Council Members to report on conferences and/or meetings they have attended per Assembly Bill 1234.

ADJOURNMENT
Due to the Martin Luther King Holiday, the next regular meeting of the La Verne City Council is scheduled for TUESDAY, JANUARY 21, 2025, at 5:30 P.M.

Posting Statement: A true and amended copy of this Agenda was posted on December 10, 2024, on the bulletin board at La Verne City Hall, 3660 D Street, La Verne, and on the City’s website at www.cityoflaverne.org.

AGENDA City Council 12/16/2024 Page 6

RESIDENT INFORMATION

UPCOMING EVENTS AND MEETINGS

Tuesday, December 17 - Ad Hoc Water & Sewer Rate Study Committee meeting, 6:00 pm - 7:30 pm

Saturday, December 21 - Household Hazardous Waste Collection, Brackett Field Airport, Fairplex Drive & West McKinley Ave, 9:00 am - 3:00 pm

Monday, December 23 - Friday, January 3, 2025 - Community Center Closed (Holidays Observed)

Wednesday, December 25 - Friday, January 3, 2025 - City Hall Closed (Holidays Observed)

Monday, January 6 - Old Town La Verne Business Improvement District meeting, Café Wang, 8:30 am - 9:30 am

Monday, January 6 - City Council meeting - CANCELED

Tuesday, January 7 - Development Review Committee meeting, City Hall, 9:00 am - 10:00 am

Monday, January 13 - Senior Movie Matinee, La Verne Community Center, 12:30 pm

Tuesday, January 14 - Active Transportation Committee meeting, City Hall, 5:00 pm

Tuesday, January 21 - City Council meeting. City Hall 5:30 pm

Tuesday, January 28 - Ad Hoc Water & Sewer Rate Study Committee meeting, City Hall 6:00 pm - 7:30 pm

Table of Contents
City Council Agenda Packet, Monday, December 16, 2024
Agenda 1
Agenda Items
Presentations (3)
Recognizind the La Verne Girls Softball 8U All-Star Team Recognizind the La Verne Girls Softball 10U All-Star Team Police Department Business Assistance Through Crime Reduction Program Overview

1. Council Minutes of the December 2, 2024, meeting 7

2. Registers of Audited Demands 11

3. Award of Contract for the City Hall Roof Project 20

4. Resolution Recertifing the 2024 Sewer System Management Plan 44

5. Amendment to the Professional Services Agreement with WaterTalent 246

6. 2025 Legislative Platform & Legislative Update 270

7. Youth Sports Facility Use Agreement with La Verne Girls Softball Association 278

8. Film Permit - The Secret Life of the Dean's Wife 300

9. Resolution Amending the Salary Range for Public Works Director and Adding a Class Spec. 302

COUNCIL REGULAR MEETING AGENDA

Tim Hepburn, Mayor
Wendy Lau, Council Member
Steven Frank Johnson, Mayor Pro Tem
Rick Crosby, Council Member
Meshal "Kash" Kashifalghita, Council Member

Monday, December 16, 2024
Closed Session at 5:30 PM
Regular Meeting at 6:30 PM
La Verne City Hall - Council Chambers,
3660 D Street, La Verne, CA 91750
In compliance with the American Disabilities Act, any person with a disability who requires a modification or accommodation to participate in a meeting should contact the City Clerk’s Office at (909) 596-8726 at least 48 hours prior to the meeting. Regular Meetings are held on the 1st and 3rd Monday of every month.

Individuals can email their comments to the City Clerk's Office at [email protected] up to noon on the day of the meeting. Those comments will be shared with City Council in advance of the City Council meeting and included as part of the permanent record. Please be advised that public comments submitted by emails or any other format to the City are public records that will be made available for public viewing.

Individuals who wish to share their comments with Council during the meeting may do so in a variety of ways:
• Attend the City Council Meeting in person and fill out a comment card or raise your hand to request to comment on the current agenda item(s).

• Participate via Zoom, by visiting cityoflaverne.org/zoom where you will be automatically redirected to the meeting or call into the meeting via phone 1-669-900-6833 and enter ID 828-4978 4899 when prompted. Public comments via Zoom may be accepted for the agenda items listed within the Consent Calendar, Public Hearing and Other Matters sections of the agenda. Zoom participants who violate decorum protocols will be called to order by the presiding officer and if a violation continues, will be muted by direction of the presiding officer. • Once items are considered by the City Council, no further public comment on that matter will be accepted. A time limit of 3-minutes is set for all public comments.

Council Meeting Decorum: Per the City’s Rules for Decorum, all Speakers and Members of the Audience are to conduct themselves with decorum and not engage in willful conduct which interrupts the meeting or with the orderly conduct of the meeting.

CLOSED SESSION AGENDA - 5:30 PM

CALL TO ORDER
ROLL CALL Council Member Meshal “Kash” Kashifalghita, Council Member Wendy Lau,

Page 1 of 310 ends

AGENDA City Council 12/16/2024 Page 2

Council Member Rick Crosby, Mayor Pro Tem Steven F. Johnson, and Mayor Tim Hepburn.

CLOSED SESSION TOPIC(S)
Negotiations Conference with Labor Negotiators, pursuant to Government Code Section 54957.6:

Negotiators: City Manager, Assistant City Manager, and City Attorney.

Employee Organization(s): La Verne City Employees Association, La Verne Firefighters Association, La Verne Police Middle Management Association, La Verne Police Officers Association; and all Unrepresented Employees.

Public Employee Performance Evaluation, Pursuant to Government Code Section 54957(b)(1):

Title: City Manager
Conference with Legal Counsel - Anticipated litigation. Significant exposure to litigation pursuant to paragraph (2) or (3) of subdivision (d) of Section 54956.9 (7 cases) Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Section 54956.9 (7 cases) Conference with Legal Counsel - Existing Litigation pursuant to California Government Code Section 54956.9(d)(1).
• City of Whittier, et al. vs. Los Angeles Superior Court, et al., Los Angeles County Superior Court Case No. 23STCP03579.
• Eisen, Erick v. City of La Verne (CJPIA), Case Number: ADJ14580079, ADJ14580097, ADJ17750468, ADJ17814303. Claim Number: 40210165BGG-0001, 23012700, 23017040. File Number: AA126GVv. Date of Loss: 01/21/2021, CT 03/04/2021, 04/17/2023, CT 05/31/2023 REGULAR CITY COUNCIL MEETING - 6:30 PM
PLEDGE OF ALLEGIANCE - COLE TEAGUE, LIFE SCOUT, TROOP #411 ROLL CALL Council Member Meshal “Kash” Kashifalghita, Council Member Wendy Lau, Council Member Rick Crosby, Mayor Pro Tem Steven F. Johnson, and Mayor Tim Hepburn.

PRESENTATIONS
LVGSA 8U Softball All-Star Team - The 8U All-Star team qualified for the California State Games Regional Tournament where they placed in the top 4, finishing 2 games short of the championship game. The team was managed by Dustin Williams and was coached by Josh Carrillo, Joe Givigliano, Dave Mixon, Angel Tatenco, Nik Reppuhn, and Brett Heslop. The team roster is as follows:

Erisse Amersonis Brynn Blaire Aubrey Carrillo Valissa Diaz Avery Givigliano Riley Heslop Allison Loaiza Charlotte Mixon Ellie Nava Piper Reppuhn Lily Rose Tatenco Jordyn Williams

Page 2 of 310 ends

AGENDA City Council 12/16/2024 Page 3

LVGSA 10U Softball All-Star Team - The 10U Softball All-Star team placed 1st out of 54 teams and won the USA Softball Southern California State Championship. The team then moved on and placed 3rd out of 36 teams in the California State Games Regional Tournament. The team was managed by Dan Keller and coached by Jeremy Juarez, Steve Newton, and Tito Cruz. The team roster is as follows:

Casandra Cruz Ryan Escujuri Audrey Garcia Jullian Huitrado Brynn Juarez Olivia Keller Sammie Lujan Mina Martinez
Randi Newton Valentina Velasco Victoria Velasquez Ryan Villicana Business Assistance Through Crime Reduction Program Overview - The La Verne Police Department will present an overview of the BACR Program. Including the application process, the program progress and the pilot business status.

ANNOUNCEMENTS OF UPCOMING COMMUNITY EVENTS
(Any person who wishes to make a brief announcement of a future community event that is open to the public may do so at this time.)

CONSENT CALENDAR
(All items on the Consent Calendar are routine and will be enacted by one motion unless a member of the Council or member of the audience requests separate discussion.)

1. City Council Minutes of the regular Council Meeting of December 2, 2024.

Recommendation: That the City Council approve the minutes.

2. Register of Audited Demands in the amount of $2,955,445.80, dated 11/20/24, and $457,559.37, dated 11/27/24.

Recommendation: That the City Council approve the audited demands.

3. Award of Contract for the City Hall Roof Project, No. CF2401 to Rite-Way Roof Corporation in the amount of $466,000. This report seeks City Council approval to award a contract for the City Hall Roof Project, No CF2401 to Rite-Way Roofing, lowest responsible bidder, in the amount of $466,000, and authorization for Staff to award up to a 10% contingency.

This project will replace necessary components of the failing roof.

Recommendation: That the City Council:

1. Approve plans and specifications for City Hall Roof Project, CIP Project No. CF2401;

2. Award a public works construction contract to Rite-Way Roof Corporation, the lowest, most responsible bidder, for all base bid and additive items in the amount of $466,000.00 for the La Verne City Hall Roof Project, Project Number CF2401; and

3. Authorize staff to issue change orders not exceeding 10% of the construction budget ($46,600) for a total possible construction contract cost of $512,600.00.

Page 3 of 310 ends

AGENDA City Council 12/16/2024 Page 4

4. Adoption of a Resolution Recertifying the 2024 Sewer System Management Plan. The City is required to updated its Sewer System Management Plan (SSMP) every six years. The adoption of a resolution re-certifying the 2024 SSMP will fulfill the requirements of the State Water Resource Control Board and provide detailed information on the maintenance of the City's sewer system and response and handling of sanitary sewer overflows.

Recommendation: That the City Council adopt a Resolution titled, "A RESOLUTION OF THE

CITY COUNCIL OF THE CITY OF LA VERNE, CALIFORNIA, ADOPTING AND

RECERTIFYING THE CITY OF LA VERNE SEWER SYSTEM MANAGEMENT PLAN

MANDATED BY THE STATE WATER RESOURCES CONTROL BOARD (SWRCB) ORDER NUMBER 2022-0103-DWQ."

5. Amendment to the Professional Services Agreement with WaterTalent. The City entered into a $70,000 agreement with WaterTalent in February 2024 to support the acting Utilities Manager and oversee water and sewer operations. At this time, due to continued need for services, it is proposed to extend the term five months to June 30, 2025, and increase the total contract to $125,000, which exceeds the City Manager’s approval authority. Sufficient funds exist within the Public Works Department.

Recommendation: That the City Council authorize an increase of $50,000 to the existing professional services agreement with WaterTalent, bringing the total not-to-exceed amount to $125,000, and extend the term to June 30, 2025.

PUBLIC HEARINGS - NONE

OTHER MATTERS

6. 2025 Legislative Platform & Legislative Update. The City of La Verne’s Legislative Platform serves as a strategic framework for advocacy efforts, ensuring the City can respond effectively to legislation and communicate its priorities to policymakers. The proposed 2025 Legislative Platform will guide efforts to protect local interests, support critical initiatives, and adapt to the evolving legislative landscape.

Recommendation: That the City Council approve the Legislative Platform for the 2025 legislative session.

7. Youth Sports Facility Use Agreement - La Verne Girls Softball Association (LVGSA). The proposed Youth Sports Facility Use Agreement outlines the terms and conditions for the City of La Verne to grant field and facility use to the La Verne Girls Softball Association (LVGSA). This two-year agreement, effective January 1, 2025, through December 31, 2027, ensures compliance with City policies and sets forth mutual obligations regarding field use, maintenance, safety, programming, and administrative standards.

Recommendation: That the City Council:

1. Approve the attached Youth Sports Facility Use Agreement with the La Verne Girls Softball Association for a term beginning January 1, 2025, and ending December 31, 2027, with options for two, two-year extensions; and,

2. Authorize the City Manager or designee to execute the agreement and any related documents.

Page 4 of 310 ends

AGENDA City Council 12/16/2024 Page 5

8. Film Permit - The Secret Life of the Dean's Wife. A Film Permit being request by production company Goodflix LLC. to film a movie for Lifetime Network at the University of La Verne. To meet the requirements of the City's Municipal Code and requested filming dates desired by Goodflix LLC, the City Council is being asked to authorize the City Manager to execute an agreement and issue a film permit if all required steps are completed to the City’s satisfaction.

Recommendation: That the City Council authorize the City Manager to execute an agreement with Goodflix LLC. and issue a permit for filming if all required steps are completed.

9. Resolutions Amending the Salary Range for Public Works Director and Adding a Class Specification and Salary Range for a Public Works Director/City Engineer. With the announcement of the departure of the City’s Public Works Director, a review was initiated of the compensation and job duties. This review includes the potential of incorporating the duties of City Engineer in order to better represent City needs, conduct a competitive recruitment, and ensure retention of the position. An increase to the annual salary, addition of City Engineer duties if an applicant is qualified, and approval of a Public Works Director/City Engineer job description are recommended for consideration.

Recommendation: That the City Council adopt the attached Resolutions titled, “A

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA VERNE, CALIFORNIA,

APPROVING A NEW CLASS SPECIFICATION AND SALARY RANGE FOR PUBLIC WORKS DIRECTOR/CITY ENGINEER,” and "A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF LA VERNE, CALIFORNIA, AMENDING THE SALARY RANGE FOR PUBLIC WORKS DIRECTOR."

PUBLIC COMMENTS
This is the time set aside for anyone wishing to address the City Council on items not listed in any other place on the agenda. Under the provisions of the Brown Act, the legislative body is prohibited from talking or engaging in discussion on any item not appearing on the posted agenda. However, your concerns may be referred to staff or set for discussion later. Please email your public comment to the City Clerk's Office at [email protected]. Your public comment will be shared with the City Council and included as part of the permanent record. There is a 3-minute time limit on public comments.

COUNCIL COMMENTS AND CONFERENCE/MEETING REPORTS
Each Council Member may address the Council and public on matters of general information and/or concern. This is also the time for Council Members to report on conferences and/or meetings they have attended per Assembly Bill 1234.

ADJOURNMENT
Due to the Martin Luther King Holiday, the next regular meeting of the La Verne City Council is scheduled for TUESDAY, JANUARY 21, 2025, at 5:30 P.M.

Posting Statement: A true and amended copy of this Agenda was posted on December 10, 2024, on the bulletin board at La Verne City Hall, 3660 D Street, La Verne, and on the City’s website at www.cityoflaverne.org.

Page 5 of 310 ends

AGENDA City Council 12/16/2024 Page 6

RESIDENT INFORMATION

UPCOMING EVENTS AND MEETINGS

Tuesday, December 17 - Ad Hoc Water & Sewer Rate Study Committee meeting, 6:00 pm - 7:30 pm

Saturday, December 21 - Household Hazardous Waste Collection, Brackett Field Airport, Fairplex Drive & West McKinley Ave, 9:00 am - 3:00 pm

Monday, December 23 - Friday, January 3, 2025 - Community Center Closed (Holidays Observed)

Wednesday, December 25 - Friday, January 3, 2025 - City Hall Closed (Holidays Observed)

Monday, January 6 - Old Town La Verne Business Improvement District meeting, Café Wang, 8:30 am - 9:30 am

Monday, January 6 - City Council meeting - CANCELED

Tuesday, January 7 - Development Review Committee meeting, City Hall, 9:00 am - 10:00 am

Monday, January 13 - Senior Movie Matinee, La Verne Community Center, 12:30 pm

Tuesday, January 14 - Active Transportation Committee meeting, City Hall, 5:00 pm

Tuesday, January 21 - City Council meeting. City Hall 5:30 pm

Tuesday, January 28 - Ad Hoc Water & Sewer Rate Study Committee meeting, City Hall 6:00 pm - 7:30 pm

Page 6 of 310 ends

MINUTES OF THE REGULAR COUNCIL MEETING OF THE LA VERNE
CITY COUNCIL MONDAY, DECEMBER 2, 2024

ACTION MINUTES
“see items in italics”

REGULAR CITY COUNCIL MEETING - 6:30 PM – Meeting called to order at 6:35 PM

PLEDGE OF ALLEGIANCE - DYLAN MERTZ, BOY SCOUT FIRST CLASS, TROOP #411

Council Member Kashifalghita, on behalf of the City Council, presented Mr. Mertz with a Pride of La Verne Certificate of Recognition.

ROLL CALL Council Member Meshal “Kash” Kashifalghita, Council Member Wendy Lau, Council Member Rick Crosby, Mayor Pro Tem Steven Johnson, and Mayor Tim Hepburn.

Council Members present: Kashifalghita, Johnson and Hepburn.

Absent: Crosby and Lau.

Advisory Staff Present: City Manager Ken Domer, Assistant City Manager JR Ranells and City Attorney Kimberly Hall Barlow.

PRESENTATIONS

Recognizing the Bonita High School Chamber Singers - We commend the Bonita High School Chamber Singers for their dedication to musical excellence with an outstanding performance of festive cheer at the Annual Tree Lighting Ceremony.

Performers: Hailey Abbey, Nour Azizeh, Parker Birdseye, Abhaya Brahmkshatri, Rodney Campbell, Carlos Cardona, Grant Cunningham, Ian Egge, Maleek Flournoy, Ksenia Freeborn, Sasha Freeborn, Gianna Frisella, Valeria Geren, Reese Gonzales, Erik Hernholm, Alexander Hill, Bryce Jenkins, Nathaniel Kisaka, Jehvee Lucente, Adalia Martinez, Rylee McCartney, Roxanne Moreno, Zoe Moreno, Elizabeth Navarro, Ryan Oler, Paul Padilla, Xavier Perez, Jared Puente, Maxwell Severson, Kyra Silacci, Zoe Tucker, Christian Weber.

Directed by: Ryan Yoder

Council thanked the Chamber Singers for the wonderful performance. Each member of the group received a Pride of La Verne Certificate of Appreciation and an In-n-Out gift certificate.

Congresswoman Napolitano also provided each member of the group with a certificate.

Recognizing Congresswoman Napolitano - For over 20 years, Congresswoman Napolitano has represented California’s 31st District, where she has advanced vital transportation projects and promoted solutions to Southern California’s water needs. As she comes close to the start of her

Page 7 of 310 ends

Minutes City Council 12/2/2024 Page 2

retirement, the City Council honors Congresswoman Napolitano for her advocacy efforts, which will leave a lasting impact on La Verne and the greater San Gabriel Valley.

Council presented the Congresswoman with a Proclamation recognizing her support for La Verne and her many years of service. The Congresswoman presented Council with a gift of a U.S.

Capitol, House of Representatives commemorative blanket.

Police Department New Hire - The Police Department will introduce newly hired Police Captain Travis Tibbetts, who brings 24 years of experience from the West Covina Police Department.

Police Chief Gonzalez introduced Police Captain Travis Tibbetts, reading his biography. Captain Tibbetts then introduced his family.

ANNOUNCEMENTS OF UPCOMING COMMUNITY EVENTS
(Any person who wishes to make a brief announcement of a future community event that is open to the public may do so at this time.)

Mayor Hepburn announced the La Verne Police K-9 Foundation Fund Raising event with a silent and live auction will be next Saturday. The Downtown Christmas Stroll will be starting at 3:00 pm till 6:00 pm, December 12th will be the La Verne All-Star Softball Game, with LVFD and LVPD.

Saturday, December 7th will be our first ever Brunch with Santa and Friends. December 14th is the 25th Annual Winter Wonderland.

Mayor Pro Tem Johnson announced the La Verne Church of the Brethren Concerts for Christmas on December 14th and December 21st at 4:00 pm.

Council Member Kashifalghita reminded everyone about the Spark of Love Toy Drive, the La Verne Fire Department is still taking donations of new unwrapped toys and gift cards, donation boxes are located at Fire Stations and City Hall. Also Crazy Bear Bikes is taking donations to provide bikes.

Public Comments: Sherry Best and Kathy Kalousek, LV Historical Society, Adrian Romero, LV Library Manager, and Yvonne Gallegos, CASI Committee.

CONSENT CALENDAR
(All items on the Consent Calendar are routine and will be enacted by one motion unless a member of the Council or member of the audience requests separate discussion.)

It was moved by Johnson seconded by Kashifalghita and approved 3-0, with Crosby and Lau absent.

1. City Council Minutes of the Closed Session & Regular Meeting of November 18, 2024.

Recommendation: That the City Council approve the minutes. Approved

2. Register of Audited Demands in the amount of $1,421,597.41, dated 11/07/24 and $226,280.00 dated 11/13/24.

Page 8 of 310 ends

Minutes City Council 12/2/2024 Page 3

Recommendation: That the City Council approve the audited demands. Approved

3. Development Impact Fee Report for Fiscal Year Ending June 30, 2024 - Pursuant to Government Code Section 66006, this report details the collection, interest earned, expenditures, and balances related to the City's development impact fees as of June 30, 2024.

The Park Development Fund was the only fund with expenditures for the fiscal year. This report complies with State legislative requirements.

Recommendation: That the City Council receive, file, and make available to the public the Development Impact Fee Report for the fiscal year ending June 30, 2024, in accordance with Government Code Section 66006. Approved

4. Resolution Canceling the January 6, 2025, City Council Meeting The first Council Meeting in January 2025 is requested to be canceled due to lack of business and preparation time due to holiday break. This item requires a resolution to cancel the meeting.

Recommendation: That the City Council approve the attached Resolution titled, "A

RESOLUTION OF THE CITY COUNCIL, CITY OF LA VERNE, CALIFORNIA, CANCELING THE JANUARY 6, 2025, CITY COUNCIL MEETING." Approved

PUBLIC HEARINGS - NONE

OTHER MATTERS - NONE

PUBLIC COMMENTS
This is the time set aside for anyone wishing to address the City Council on items not listed in any other place on the agenda. Under the provisions of the Brown Act, the legislative body is prohibited from talking or engaging in discussion on any item not appearing on the posted agenda. However, your concerns may be referred to staff or set for discussion later. Please email your public comment to the City Clerk's Office at [email protected]. Your public comment will be shared with the City Council and included as part of the permanent record. There is a 3-minute time limit on public comments.

Public Comments: Richard Bowen, La Verne resident, on various items and need for mutual respect between all persons regardless of political beliefs.

COUNCIL COMMENTS AND CONFERENCE/MEETING REPORTS
Each Council Member may address the Council and public on matters of general information and/or concern. This is also the time for Council Members to report on conferences and/or meetings they have attended per Assembly Bill 1234.

Council Comments: Council Member Kashifalghita the holiday season is upon us, full of great times when the community can come together to celebrate, be safe, Happy Holidays to all.

Mayor Pro Tem Johnson, Christmas morning is coming up, Santa Claus will be out throughout the entire City. Listen for the sirens in your neighborhood, it’s a tradition to come out and enjoy it.

City Manager Domer let everyone know they can go the City website, cityoflaverne.org/Christmas morning to view the six different route maps, and the estimated time of arrival in your

Page 9 of 310 ends

Minutes City Council 12/2/2024 Page 4

neighborhood.

City Manager Domer, on behalf of Council Member Lau, who received an email from a Hillcrest resident, thanking Fire Department staff for their gentle handling and professionalism during a recent emergency issue.

Mayor Hepburn, kudos to Public Works Director Mc Wade and her staff for their very quick and efficient handling of a recent sewer situation. December is a wonderful, busy, crazy month, enjoy yourselves with family and friends.

ADJOURNMENT – at 7:26 PM.

Respectfully submitted,

Debra Fritz, CMC
Deputy City Clerk

Page 10 of 310 ends

l.

2. J.

4. 5.

6. 7.

8. 9.

10. CITY OF LA VERNE

REGISTER OF AUDITED DEMANDS
l/20/2024
FY 2024-2025
DEMANDS PRESENTED TIAVE BEEN APPROVED CONSISTEI.IT WITH THE CITYS PURCHASING/FT'NDING POLICY AND HAVE BEEN REVIEWED BY THE DIRECTOR FOR ACCURACY AND PROPER APPROVAL.

SUMMARY OF DEMANDS

LARGEST IO CITY DEMAND PAYMENTS OTHER THAN PAYROLL AND RELATED BENEFITS,

AMOUNT ISSUED TO

THREE VALLEY MUNICIPAL WATER DIST

PB LOADER CORPORATION

STRATEGIC CONTRACTING SERVICES
DEPARTMENT OF ruSTICE

GREENSCAPE MAINTENANCE SERVICES INC,
WEST COAST ARBORISTS, INC.

SDI PRESENCE LLC
SAI4SAIL{, INC

RKA CONSULTING GROUP
GENTRY BROT}IERS, INC.

OT}IER DEMANDS
$ 1,360,398.46
DEMANDS OF $ 6,712.63 WERE PAID ON BEHALF OF I.AIMPACT FOR LAW ENFORCEMENT TASK FORCE OPERATIONS.

DEMANDS OF $ 1.588.334.36 WERE PAID FOR PAYROLL AND EMPLOYEE BENEFIT RELATED ITEMS.

IN ACCORDANCE WITH GOVERNMENT CODE SECTION 37202, I HEREBY CERTIFY THAT THIS IS A TRI.JE AND ACCI.]RATE REGISTER OF AUDITED DEMANDS.

CHRISTY LOPEZ

FINANCE DIRECTOR
5t2,389.48
199,149.47
133,649.96
122,249.65
42,635.80
30,734.15
27,687.80
24,51t.42
23,750.50
20,394.33
223,185.90
NFS'PIPTIr)N
OCTOBER 2024 WATER USE
2024 FREIGHTLINER M2 CHASIS WITH 7-8 DUMP TRUCK
PAYROLL PERTOD 10127 n024-lll09l2024 (L.A. CLEAR)
SEPTEMBER LEASE AND AUGUST OT (L.A, CLEAR)
NOVEMBER 2024 MAINTENANCE VAPJOUS LOCATIONS
TREE MAINTENANCE 10/16/2024-1013012024
OCTOBER 2024 LICENSE BILLING AND IT SUPPORT
LICENSE VG34 LIC-VG-PS tllllD024TO llll0D02s
AUGUST/SEPTEMBER 2024 BILLING VARIOUS PROJECTS
EMERGENCY LEAK REPAIR . WILLI.AMS/AM}IERST
Page I of 5

Page 11 of 310 ends

CITY OF LA VERNE

REGISTER OF AUDITED DEMANDS - EXHIBIT A
CHECKNO. AMOTINT
FY 2024-2025
fit20t2024

ISSUED TO
171321
t7 1322
r7 1323
t7 1324
t7 t325
t7 1326
t7 1327
171328
17t329
l 7l 330
17133 1
t7 1332
171333
t7 1334
17133 5
t7 1336
17 1337
171338
t7 1339
t7 1340
t71341
t7 1342
17 1343
17 t344
17 1345
t7 1346
17 1347
171348
t7 1349
17r350
171351
17 t352
I 713 53
t7 1354
1713 55
t7 1356
t7 1357
t7t358
171359
17 I 360
t7 1361
171362
171363
171364
17136s
17 1366
t7 1367
171368
t7 1369
t7 1370
17 137 |
17 1372
t7 1373
t7 1374
t7 137 5
17 1376
t7 1377
l7 1378

47.52 93 5.00
125.31
s00,00
11s.00
349.65
195.00
115.00

45.56 13,604.87

56.2s
495.00
225.00
3 I 3.00
961.92
l,208,88

60.00 775.00
1,638.00
2,400.96
170.00
44t.65

94.00 256.55
4,160.53
5,320.00
1,066.08
107.00
8,7s0.00

50.70 I,6s3.34
826.00

87.00 90.03
50'7.36
5,038.96
250.71
417.06
364.00

94.00 20,394.33
I,004.06
3,793.02
I,81 8.78
311.17
2,042.95
375.00
I,578.00
4,078.00
1,799.00
1,3 1 5.50
2,034.08
1,290.91
2,370.48
2,466.48

14.00 339.00
346.02

ABEL GANDARA
ADVANCED POOL & SPAS,INC.

AETNA

AJ'S ENTERTAINMENT

ALL PURPOSE DOCUMENT DESTRUCTION

ALTAMED HEALTH NETWORK INC

AMERICAN TANK TESTING

ANNIE SUN
ARROW TRAILER SUPPLIES, INC.

ATHENS SERVICES
B & B PLUMBING,INC.

BACKFLOW SOLUTIONS, INC.

BEN'S DOORAND WINDOW

BLUE SHIELD OF CALIFORNIA

BLUE SHIELD OF CALIFORNIA

JOHN BREAUX

BURRO CANYON SHOOTING PARK
CALIFORNIA PEST MANAGEMENT,INC.

STATE OF CALIFORNIA

CHANDLER, ALAN

CLEANTECH ENVIRONMENTAL INC

COLLEY FORD

COREY HENRY

CUMMINS SALES AND SERVICES
DATAPROSE,INC.

DAVID FLUTTS INVESTIGATIONS

DEPARTMENT OF HEALTHCARE SERVICE

DIRECTV

DIVE/CORR,INC

DIVISION OF THE STATE ARCHITECT

EAN SERVICES, LLC,

EMPLOY AMERICA

EMPLOYMENT DEVELOPMENT DEPARTMENT

EWING IRRIGATION PRODUCTS

FACTORY MOTOR PARTS

COLLEEN FLORES

FOOTHILL BUILDING MATERIALS
FOWLKES, JOHN M.

FRESHMOBILECA LLC

GAIL NICHOLSON
GENTRY BROTHERS, INC.

GOLDEN STATE WATER COMPANY

GRAPENTIN, JOHN

HEALTHCARE PARTNERS

HEALTHCARE PARTNERS
HOLLIDAY ROCK CO.

HOMETOWN RENTALS
HOSPITAL ASSOC. OF SOUTHERN CALIF.

HOT WIRE ELECTRIC
IDEMIA IDENTITY & SECUzuTY USA LLC

INGELS, RADFORD

INLAND EMPIRE STAGES, LTD,

YWCA SAN GABRIEL VALLEY

JOHNSON, DON

KOSMONT FINANCIAL SERVICES

KYOCERA DOCUMENT SOLUTIONS WEST

L A CARE

L A CARE

Page 2 of 5 ends
Page 12 of 310 ends

CITY OF LA VERNE

REGISTER OF AUDITED DEMANDS - EXHIBIT A
CHECKNO. AMOUNT
FY 2024-2025
lL120t2024

ISSUED TO
171379
171380
171381
t7 1382
171383
171384
171385
171386
t7 1387
171388
171389
t71390
t7 1391
17 t392
17 1393
17 1394
17 1395
171396
17 1397
171398
t7 1399
t7 1400
t7 1401
t7 1402
t7 t403
171404
l7 1405
17 1406
t7 1407
171408
l7 1409
171410
l7 t4t I
t7 t4t2
l7 t4l3
17 1414
17 t4l5
17 t4t6
17 1417
171418
t7 t4t9
17 1420
t7 t42l
t7 1422
17 1423
17 1424
171425
l7 1426
t7 1427
t7 1428
t7 t429
t7 t430
l7 1431
t7 1432
17 t433
17 t434
17 1435
17 1436
126.90
162.76

14.00 1,432.26
105.10
240.05
6,164.04

55.52 5,178.45
I,079.53
1,463.73

35.00 1,000.00
645.98
298.00

7\.27

49.28 37.55
150.00
199,149.47
4,267.50
I,950. r 2
220.86
2,600.00
3,491.85
642.24
2,728.62
1,124.24
I,I 60.81
220.39
24,57t.42
7,349.13
27,687.80
968.40
237.20

48.00 134.91
4,971.50
997.50

60.00 383.99
r,625. l0
2,85 1.65
127.81
I 98.1 r
802.24
1,075.00
2,217.90

57.00 380.13
1t4.81

94.00 2,332.00
300.00
100.00
100.00
470.40
3,702.59

L A CARE

LA VERNE PETTY CASH

LEEPER, CORY

LIGHTING INSTYLE

LILIA BRINKER

LOGISTICARE
LOS ANGELES COT]NTY TAX COLLECTOR

MALLORY SAFETY AND SUPPLY LLC

MASON, GARY

MOLINA HEALTHCARE OF CALIFORNIA
MR.I.INIFORM

NICOLE VUONG INSURANCE AGENCY

NORA HUIZAR
O.F. WOLFINBARGER

OCTAVIA TUCKER

ORTEGA, JOHN
PARADISE EMBROIDERY & SCREEN PRINT.

PARKHOUSE TIRE,INC.

PAULINA GLAZIER

PB LOADER CORPORATION

PETERSEN, JEFFREY

PICKWITH, SCOTT
FERGUSON ENTERPRISES LLC #3325

POSTMASTER SAN DIMAS
PUMP BROTHERS INC.

REPUBLIC PAVEMENT MAINT

ROYAL , JIMMY

RUSSI, ROBERT
S&JSUPPLYCO.,INC.

SAFETY-KLEEN SYSTEMS, INC.

SAMSARA,INC.

SAN GABRIEL VALLEY COLNCIL OF GOV'T

SDI PRESENCE LLC

SEAWRIGHT, DAN
THE SHERWIN-WILLIAMS CO.

STAR AUTO CHECK
STINLAND TIRE OF LA VERNE,INC.

SUPERIOR COURT OF CA,COUNTY OF L.A.

SWANK, KENNETH

SYBIL WILDER

T-MOBILE

THOMPSON, KEITH

THOMPSON, MICHAEL

TRICARE

TRILOGY MEDWASTE WEST, LLC

TRITECH SOFTWARE SYSTEMS

TRUST ENVIRONMENTAL SOLUTIONS

VETTI, MIKE

VICKY SAIKALI
WAGEWORKS,INC.

WALTERS WHOLESALE ELECTRIC CO.

WENJING FENG

WIGGINS, MIKE

WILLIAMS, CARLTON III

YENNI NORTHUP

YILIP KANG

YOUTH EVOLUTION ACTIVITIES
4IMPRINT,INC

Page 3 of 5 ends
Page 13 of 310 ends

CITY OF LA VERNE

REGISTER OF AUDITED DEMANDS - EXHIBIT A
AMOI"INT
FY 2024-2025
1U2012024

ISSUED TO
17 1437
17 1438
t7 1439
17 t440
17 t44t
t7 1442
t7 1443
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT

47.03 1,740.31
349.99
1,825.09
122,249.65

11.24 36.26
2,296.00
886.41
288.00
1,400.00
2,546.76

14.00 2,696.60
2,437.62
2,307.86
11s.s6
302.20
42,635.80
3,300.00
r,262.93
14,651.00
1,939.70
276.89
710.00
l,556.20
1,500.00
23,750.50
6,662.76
1 85.00
7,060.00
512,389.48
2,697.48
183.90
5,761.00
30,734.15
6,037.13
151.22
133,649.96

CARTER, TANYA

CELL BUSINESS EQUIPMENT

CHARTER COMMUNICATIONS

CHARTER COMMUNICATIONS

DEPARTMENT OF JUSTICE
FEDEX
NI.INEZ, ANTOINETTE
A. UPLAND FIRE PROTECTION
ALL STAR FIRE EQUIPMENT INC.

AM-TEC TOTAL SECURITY INC.

ARAGON, RICHARD

BACA, MARK

BIEDERMANN, REBEKAH
BRENNTAG PACIFIC,INC.

CASTANON, DAVID

COYLE, KEVIN
DETROIT AUTO BODY, INC.

GRAINGER
GREENSCAPE MAINTENANCE SERVICES INC.

GREENWAY, KEVIN

HACH COMPANY

JONES MAYER

KIDS LOVE SOCCER
LA VERNE POWER EQUIPMENT, INC.

MARTIN SCHERER ELECTRIC, INC.

OPLIGER, ROCKY

POMONA VALLEY TRANSPORTATION AUTHORITY

RKA CONSULTING GROUP

SALT WORKS,INC,

STEVE A FILARSKY, ATTORNEY AT LAW
TERRY'S TESTING,INC.

THREE VALLEY MI.INICIPAL WATER DIST
TURBO DATA SYSTEMS, INC.

TINDERGROUND SERVICE ALERT OF SO CAL

WATERTALENT LLC
WEST COAST ARBOzuSTS, INC.

WITTMAN ENTERPRISES, LLC

AMAZON CAPITAL SRVC - LA CLEAR

STRATEGIC CONTRACTING SERVICES
Total Payroll and Employee Benefit Payments
Total LAIMPACT Demands
I,360,398.46
1,588,334.36
6,712.98
Total Demands 2,955,445.80

Page 4 of 5 ends

CHECKNO.

Page 14 of 310 ends

CITY OF LA VERNE

REGISTER OF AUDITED DEMANDS - EXHIBIT A

CHECK NO AMOUNT
FY 2024-202s
1U20t2024

ISSUED TO
Payroll and Employee Benefit Payments:
t7 1450
17 1451
t7 1452
17 1453

BANK DRAFT

BANK DRAFT

BANK DRAFT

BANK DRAFT

BANK DRAFT

BANK DRAFT

BANK DRAFT

BANK DRAFT
EFT
EFT
EFT
EFT
Total
660.00
300.00
209.76

4.00 260,622.71
90,144.19
185,200.79
587.46
25,095.46
7,161.51
7,156.26
1,003,220.83
2,987.75
2,3|.21
2,672.43
1,588,334.36
Break down of standard providers and the benefits they provide Provider Benefits Description
A.C. Newman Co.

Delta Dental
The Hartford
Health Net
Kaiser
Wage Works
US Treasurey
State of Califomia
Mass Mutual A
Mass Mutual B
Mass Mutual Roth
Lincoln National
Fire/Police/La Veme Employee Fund
Accidental Death Life Insurance
Employee dental insurance coverage
Life Insurance Policy
Employee health insurance
Employee health insurance
Flexible Savings Account (FSA) deductions
Employee federal tax withholdings
Employee state income tax, unemployment insurance and child support/gamishments 40lA plan
4578 plan
Roth plan
Replacement Social Security plan
Employee Group Dues
LAIMPACT Law Enforcement Task Force Demands
17 t444
17 1445
17 1446
17 1447
t7 1448
t7 1449
Total
1,099.00
300.00
l r0.00
t 98.56
r65.00
4,840.42

CHARTER COMMIINICATIONS

NUWAY JANITORIAL SERVICES
SOUTHLAND SHREDDING, INC.

T-MOBILE
T-MOBILE USA,INC.

VERIZON WIRELESS
6,712.98
LAIMPACT demands are paid from federal asset forfeiture dollars allocated to LAIMPACT crime prevention activities. These funds are not City funds and are not available for City use outside of LAIMpACT activities.

Page 5 of 5 ends

CITY OF LAVERNE EMPLOYEE FUND
FIDELITY INVESTMENTS #P0754

HEATHER REYES

UNITED WAY CAMPAIGN

UNITED STATES TREASURY

STATE OF CALIFORNIA

STATE OF CALIFORNIA
STATE DISBURSEMENT BDOOO5689
EMPOWER TRUST COMPANY, LLC-457

EMPOWER TRUST COMPANY, LLC-ROTH
EMPOWER TRUST COMPANY, LLC-4OIA

PAYROLL

LA VERNE FIRE ASSOCIATION

LA VERNE POLICE OFFICERS ASSOC,

CHARLES SCHWAB BANK
WAGEWORKS.ADMIN FEE

Page 15 of 310 ends

CITY OF LA VERNE

REGISTER OF AUDITED DEMANDS
|/27n024
FY 24-25
DEMANDS PRESENTED HAVE BEEN APPROVED CONSISTENT WrIH THE CITY'S PURCHASING/FUNDING POLICY AND HAVE BEEN REVIEWED BY T}IE DIRECTOR FOR ACCURACY AND PROPER APPROVAL.

SUMMARY OF DEMANDS
LARGEST IO CITY DEMAND PAYMENTS OTHER THAN PAYROLL AND RELATED BENEFITS.

AMOUNT ISSUEDTO DESCRIPTION
l.
7 3.

4. 5.

6. 7.

8. 9.

10. 80,020.75

78.t 13.90
28, I 29.50
16,852.33
l 5,985.4 I
t5,446.02
14,326.97
t4,067.2s
13,907.08
I 1,235.00
t66,782.82

DE NOVO PLANNINO GROUP

AME ROOFING

BADAWI & ASSOCIATES

ROGER BASS
LSA ASSOCIATES, INC.

MERRIMAC ENERGY GROUP

OWSLEY ENTERPRISES LLC

INLAND VALLEY HUMANE SOCIETY
LIBERry COASTAL LLC
SAN GABRIEL VALLEY PUBLIC SAFEry

OTHER DEMANDS
PROFESSIONAL SERVICE THRU O8II22O24TO I I/06/2024 GENERAL PLAN UPDATE

REPLACEMENT ROOF PUBLIC WORKS YARD
PROGRESS BILLING #2 FOR 2024 AUDIT
NOVEMBER 2024 CONSULTING SERVICE (L.A. CLEAR)
PROFESSIONAL SERVICE THRU IO/3I/2024 BRETHREN HILLCREST AND LUTHERAN HIGH SCHOOL NOVEMBER 2024 CONSULTING SERVICE (L.A. CLEAR)
NOVEMBER 2024 CONSULTING SERVICE (L.A. CLEAR)
OCTOBER 2024 ANIMAL CARE AND CONTROL SERVICES
NOVEMBER 2024 CONSULTING SERVICE (L.A. CLEAR)
SECURITY SERVTCES 7 t06t2024 TO I I t t6t2024
$ 454.867.03
DEMANDS OF S2,692,34 WERE PAID ON BEHALF OF LA IMPACT FOR LAW ENFORCEMENT TASK FORCE OPERATIONS.

IN ACCORDANCE V/ITH GOVERNMENT CODE SECTION 37202, I HEREBY CERTIFY THAT THIS IS A TRUE AND ACCURATE RECISTER OF AUDITED DEMANDS,

CHRISTY LOPEZ

FINANCE DIRECTOR
Page I of4

Page 16 of 310 ends

CITY OF LA VERNE FY 24-25
REGISTER OF AUDITED DEMANDS . EXHIBIT A
CHECK NO. AMOUNT ISSUED TO
tU27t2024
t71454
171455
t7 t456
t7 1457
171458
171459
171460
t7t46l
t7t462
171463
t7 1464
171465
t7 1466
t'71467
t7 1468
t71469
171470
17t47 I
171472
17t473
t7t474
171475
t7 t476
t7 1471
t7 t478
t7 t479
171480
I 71481
171482
t71483
171484
17t485
t7 1486
171487
171488
171489
t't 1490
t7 1491
t7 t492
t7 t493
t7 1494
t7 1495
t7 1496
17 1497
r7 1498
t7 t499
171500
171 501
t7 t502
171503
171504
171505
171506
t7 t507
171508
171509

55.00 234.00
78,113.90
I 83.75
3,409.60
3,164.00
8,127.50

18.40 1,700.05
703.56
80,020.75
8,019.59
408.80
2,734.44
1,011.71
278.04
366.31
1,205.34
290.00
4,400.00
825.28
t,555.92
14,067.25
t,499.05
1,620.82
121.01
l 15.00
100.00

28.00 75.00
207.48
I,000.00
1,829.94
4,725.00

45.00 663.00
253.16
150.00
7,r76.00

46.31 100.00
6,216.25

9.00 108.40
I,500.00
619.94
700.00
l1,235.00
296.2s
2,268.00
302.50
1,071.78
244.37
1,050.00
325.00
610.00

ALL PURPOSE DOCUMENT DESTRUCTION
ALLIANCE LAI.JNDRY SYST. DISTRIBUTION

AME ROOFING

ATKINSON,ANDELSON,LOYA,RUUD & ROMO
BAB STEERING HYDRAULICS, INC.

BURKE, WILLIAMS & SORENSEN, LLP
CIVILTEC ENGINEERING, INC.

COMPASS GROUP
CPAC,INC.

CUSTOM WATER,INC.

DE NOVO PLANNING GROUP

DELCO SERVICE,INC

CALIFORNIA DEPARTMENT OF TAX
DOTY BROS. CONSTRUCTION COMPANY

THE EMBLEM AUTHORITY

EWING IRRIGATION PRODUCTS

FACTORY MOTOR PARTS

FIRST-CITIZENS BANK & TRUST CO

FRONTIER COMMUNICATIONS

HI STANDARD AUTOMOTIVE, LLC

HIRSCH PIPE AND SUPPLY
HOLLIDAYROCK CO.

INLAND VALLEY HUMANE SOCIETY

YWCA SAN GABRIEL VALLEY

JAMES WOLF

JOHNSON CONTROLS

KATIE KINNE

KRISTINE WRIGHT

KYOCERA DOCUMENT SOLUTIONS WEST
L.A. COUNTY CLERK

LA VERNE CARWASH

LA VERNE PETTY CASH

LIFE-ASSIST

LINX AUTOMATION

LOIS DAVIS
LOS ANGELES COUNTY FIRE DEPT.

MALLORY SAFETY AND SLIPPLY LLC

MELISSA MARTINEZ

MY HEALTHY PENGUIN

ODP BUSINESS SOLUTIONS, LLC

PETER PALLESEN

RAFTELIS

RCS SAFETY LLC

REGIONAL TAP SERVICE CENTER

REYES, HAYLEY
S & J SLIPPLY CO., INC.

SALVADOR'S IRON WORKS

SAN GABRIEL VALLEY PUBLIC SATETY
SANDERS TOWING,INC.

SOUTHERN CALIF. REG. RAIL AUTH.

SOUTHLAND MECHANICAL, INC.

SOUTHWEST LIFT & EQUIPMENT,INC.

STNLAND TIRE OF LA VERNE, INC.

TANAKA FARMS, LLC

THE COTINSELING TEAM INTERNATIONAL

TRIPEPI SMITH
Page2of 4
(

Page 17 of 310 ends

CITY OF LA VERNE FY 24.25

REGISTER OF AUDITED DEMANDS - EXHIBIT A
CHECKNO. AMOI.JNT ISSUED TO
11t27t2024
171510
17151 I
t7t5t2
l7l5l3
t7 t5t4
171515
171516
t7 t5t7
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT
EFT

BANK DRAFT
221.64
150.00
1,512.65
250.00
1 ,641 .03
100.00
4,119.55

50.01 1,528.99
s,891 .75
28,129.50
3,985.16
t,288.79
s4s.oo

14.00 46.03
250.94

96.91 I,795.00
8,146.38
6,014.13

33.23 136.53

49.15 I 10.14
625.00
15,985.41
t22.94
t5,446.02
4,496.24

95.19 1 ,199.84
220.79
I 15.30
1,559.00
10,166.67
8,937.50
s,613.50
13,907.08
5,3ss.00
I 1,000.00
t4,326.97
16,852.33
5,53r.23
TURF STAR,INC.

VANESSANUNEZ

VERIZON WIRELESS

WHITE BEAR, DUSTIN
XYLEM DEWATERING SOLUTIONS, INC.

YOLANDA CAMPOS

ZOLL MEDICAL CORPORATION
1975 PUDDINGSTONE DzuVE LLC
ALL STAR FIRE EQUIPMENT, INC.

BABCOCK LABORATORIES, INC.

BADAWI & ASSOCIATES
BRENNTAG PACIFIC, INC.

COLLEGIATE PRESS
COMMERCIAL DOOR COMPANY, INC.

DIOSDADO, MARGARITA

FLORES, ALEXANDRA

GARCIA, SHANTELLE

GRAINGER

GRANICUS LLC
GREENSCAPE MAINTENANCE SERVICES INC.

GRUBERPOWER SERVICES

GUZMAN, ISABELLA

HAAKEREQUIPMENT CO,

JONES MAYER

KRONOS INCORPORATED

LAW ENFORCEMENT MEDICAL SERVICES
LSA ASSOCIATES, INC.

MCJUNKIN, ALEXA

MERRIMAC ENERGY GROUP

MI'NISERVICES

POMONA TRUCK & AUTO SUPPLY
SUN BADGE CO.

ULINE

WAXIE SANITARY SUPPLY
WEST COAST ARBOzuSTS, INC.

CORDRAY ENTERPRISES LLC

DEROIAN VENTURES LLC
GROT]ND ZERO TECHNOLOGIES LLC

LIBERTY COASTAL LLC

MARLYN PACHECO LLC
MICHAEL W. TYNES

OWSLEY ENTERPRISES LLC

ROGER BASS

SO CAL GAS CO
Total LAIMPACT Demands
454,867.03
2,692.34
TotalDemand 457,559.37
LAIMPACT Law Enforcement Task Force Demands
171518 2,692.34 BANK OF AMERICA
Total 2,692.34

Page 3 of 4 ends
Page 18 of 310 ends

CITY OF LA VERNE FY 24-25
REGISTER OF AUDITED DEMANDS - EXHIBIT A tu2712024
CHECKNO. AMOUNT ISSUED TO
LAIMPACT demands are paid from federal asset forfeiture dollars allocated to LAIMPACT crime prevention activities. These funds are not City funds and are not available for City use outside of LAIMPACT activities.

Page 4 of 4 ends
Page 19 of 310 ends

City of La Verne,City Council
Agenda Report

DATE: December 16, 2024
TO: Honorable Mayor and City Council
FROM: Meg McWade, Public Works Director
SUBJECT: AWARD OF CONTRACT FOR THE CITY HALL ROOF PROJECT, NO. CF2401 TO RITE-WAY ROOF CORPORATION IN THE AMOUNT OF $466,000.

SUMMARY
This action will award a construction contract to Rite-Way Roof Corporation in the amount of $466,000.00 for the La Verne City Hall Roof Project, CIP Project No, CF2401. Rehabilitation of the failing City Hall roof is critical for ensuring the long-term integrity and functionality of the building.

RECOMMENDATION
That the City Council:

1. Approve plans and specifications for City Hall Roof Project, CIP Project No. CF2401;

2. Award a public works construction contract to Rite-Way Roof Corporation, the lowest, most responsible bidder, for all base bid and additive items in the amount of $466,000.00 for the La Verne City Hall Roof Project, Project Number CF2401; and

3. Authorize staff to issue change orders not exceeding 10% of the construction budget ($46,600) for a total possible construction contract cost of $512,600.00.

DISCUSSION
The City Hall roof has experienced significant leaks over the last several years and needs to be rehabilitated. The roof is composed of a conventional tile roof system with underlayment on the perimeter exposure that is visible from the street and surrounding properties as an architectural element of the building design. The tile roof terminates at a parapet wall which aids in screening the City Hall Heating Ventilation and Air Conditioning mechanical equipment. The area located behind the parapet wall utilizes a single membrane roof system common for commercial building applications.

The project scope is intended to address the existing leaks that have been encountered by replacing the existing roof materials with similar materials to ensure an abbreviated construction duration and cost efficiency. The tile roof portion of the building will be removed to then remove and replace the existing underlayment materials. The same tile has been identified to be in good condition and will be reused to minimize costs.

On November 13, 2024, the City issued a Public Notification and posted the bid opportunity for

Page 20 of 310 ends

Award of Contract for the City Hall Roof Project, No. CF2401 to Rite-Way Roof Corporation in the amount of $466,000., Page 2

the City Hall Roof Project through the Planet Bids System. A mandatory job walk was conducted on November 20, 2024, where interested contractors had the opportunity to inspect the site and ask questions about the scope of work. On November 26, 2024, ten sealed bids were opened for the project. The engineer’s estimate for the project construction costs was established as $450,000 for the sum of base bid and additive scope items for this project.

Following is a summary of the bid results:

Bid Results
Rite-Way Roof Corporation $466,000.00
AOS Inc. dba Superior Roofing $480,070.00
Best Contracting Services, inc. $585,625.00
Chapman Coast Roof Co., Inc. $625,000.00
AME Builders, Inc. $626,500.00
Letner Roofing Company $685,400.00
C.I. Services, Inc. $708,887.00
FC And Sons Roofing Inc $764,912.00
Pacific Builders & Roofing Inc. dba: WSP Roofing $829,000.00 Eberhard, A Tecta America Company, LLC $847,090.00

The bids ranged from $466,000.00 to $847,090.00 for the total combined sum of the base bid items and additive items. City staff evaluated the bid of the apparent low bidder and found Rite- Way Roof Corporation to be the lowest, most responsible and responsive bid of the 10 bids received. The firm meets the required contractors' licensing and is not listed on the Federal Exclusion List for projects of this type. Staff also verified the Contractor’s Department of Industrial Relations registration as active at the time bids were opened.

The project will replace the roof and provide a 20-year warranty on the flat roofing system and a 20- to 30-year lifespan on the new tile roof underlayment, addressing critical repairs and safeguarding City Hall assets. Should the contract be awarded, it is anticipated the project will be finished by the end of February.

FISCAL ANALYSIS
The construction contract cost, including the base scope of work and additive scope of work is $466,000.00. An additional $46,600 will be potentially utilized for design, project management, and contingencies. The resulting total project cost is $512,600 and is funded with Fund 290 American Rescue Plan Act (ARPA) Funds as follows:

Construction Contract Amount: $ 466,000.00
Design, Management, Contingency (10%): $ 46,600.00 Total Project Cost $ 512,600.00
FY 24-25 City Hall Roof, CIP Proj. No CF2401 - Fund 290 ARPA
$ 512,600.00

ENVIRONMENTAL ANALYSIS

Page 21 of 310 ends

Award of Contract for the City Hall Roof Project, No. CF2401 to Rite-Way Roof Corporation in the amount of $466,000., Page 3

Staff has determined that this project is categorically exempt from the California Environmental Quality Act (CEQA), Section 15301 (existing facilities) and City of La Verne environmental guidelines.

LEGAL REVIEW
The bid process for the roof replacement has been conducted in strict accordance with the California Public Contract Code. Additionally, all contractors involved have been verified for active licensing and Department of Industrial Relations (DIR) registration, ensuring full legal compliance with municipal and state regulations. This item has been reviewed by the City Attorney's Office.

ATTACHMENTS

1. Bid Results - City Hall Roof Project 12 2024

2. Rite Way Roofing Bid Documents Submitted

Report Prepared By: Coordinated with:

Colin Purdy, Maintenance Manager
Nicole Houston, Sr. Management Analyst
Cody Howing, Ci ty Engineer

Page 22 of 310 ends
Page 1 of 3 ends

BID DATE: 11/26/2024 Summary of proposals received for:

PHONE (909) 594-9702 TIME: 10:00 AM La Verne City Hall Roof Replacement Project FAX (909) 594-2658 PLACE: Planet Bids
398 Lemon Creek Drive, Suite E, Walnut, CA 91789
Engineer's Estimate Rite-Way Roof Corporation AOS Inc. dba Superior Roofing Best Contracting Services, inc. Sheet: 1 of 1 Computed By: CAH
Item Description Quantity Unit Unit Price Total Unit Price Total Unit Price Total Unit Price TotalNo.

BASE BID
A-1 Mobilization, Traffic Control, & NPDES 1 LS $ 6,500.00 $ 6,500.00 $ 3,500.00 $ 3,500.00 $ 2,500.00 $ 2,500.00 $ 9,750.00 $ 9,750.00 A-2 Remove Existing Membrane Roof Material to
Deck 1 LS $ 30,000.00 $ 30,000.00 $ 25,000.00 $ 25,000.00 $ 36,640.00 $ 36,640.00 $ 45,710.00 $ 45,710.00 A-3 Clean and Repair Roof Deck and Fascia
Materials 1 LS $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 6,000.00 $ 6,000.00 $ 11,100.00 $ 11,100.00 A-4
Restore, Repair or Install all Required Flashing,
Gutters, Crickets, Coping and Other Related
Features 1
LS $ 30,000.00 $ 30,000.00 $ 32,000.00 $ 32,000.00 $ 32,860.00 $ 32,860.00 $ 38,411.00 $ 38,411.00 A-5 Install New Ketone Ethylene Ester (KEE) Roof
Membrane System 1 LS $ 300,000.00 $ 300,000.00 $ 300,000.00 $ 300,000.00 $ 315,050.00 $ 315,050.00 $ 274,029.00 $ 274,029.00 A-6 Complete Final Site Clean Up and Punch List
Repairs 1 LS $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00

ADDITIVE BID
B-1 Remove Existing Tile Roof, Salvage and Store for
Reinstallation 1 LS $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ 17,220.00 $ 17,220.00 $ 18,400.00 $ 18,400.00 B-2 Remove Existing Underlayment and Battens on
Tile Roof Down to Deck 1 LS $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 14,000.00 $ 14,000.00 B-3 Install New Underlayment and Battens, and
Reset Tile Roof 1 LS $ 40,000.00 $ 40,000.00 $ 71,000.00 $ 71,000.00 $ 55,300.00 $ 55,300.00 $ 166,315.00 $ 166,315.00 B-4
Remove Existing Roof Access Ladder and Install
new Composite Dynarail Safety Ladder with
Hatch Safety Posts 1
LS
$ 5,000.00 $ 5,000.00
$ 4,000.00
$ 4,000.00 $ 7,000.00 $ 7,000.00
$ 6,410.00 $ 6,410.00
Base Bid Amount $380,000.00 $369,000.00 $395,550.00 $380,500.00 Additive Alternate Bid Amount $70,000.00 $97,000.00 $84,520.00 $205,125.00 Sum of Bas and Additive Bid Amounts $450,000.00 $466,000.00 $480,070.00 $585,625.00 Comments

Page 23 of 310 ends
Page 2 of 3 ends

BID DATE: 11/26/2024 Summary of proposals received for:

PHONE (909) 594-9702 TIME: 10:00 AM La Verne City Hall Roof Replacement ProjectFAX (909) 594-2658 PLACE: Planet Bids 398 Lemon Creek Drive, Suite E, Walnut, CA 91789
Chapman Coast Roof Co., Inc. AME Builders, Inc. Letner Roofing Company C. I. Services, Inc. Sheet: 1 of 1 Computed By: CAH
Item Description Quantity Unit Unit Price Total Unit Price Total Unit Price Total Unit Price TotalNo.

BASE BID
A-1 Mobilization, Traffic Control, & NPDES 1 LS $ 15,000.00 $ 15,000.00 $ 10,483.00 $ 10,483.00 $ 10,000.00 $ 10,000.00 $ 4,546.00 $ 4,546.00 A-2 Remove Existing Membrane Roof Material to
Deck 1 LS $ 76,648.00 $ 76,648.00 $ 69,931.00 $ 69,931.00 $ 38,200.00 $ 38,200.00 $ 69,611.00 $ 69,611.00 A-3 Clean and Repair Roof Deck and Fascia
Materials 1 LS $ 5,000.00 $ 5,000.00 $ 419.00 $ 419.00 $ 15,000.00 $ 15,000.00 $ 5,715.00 $ 5,715.00 A-4
Restore, Repair or Install all Required Flashing,
Gutters, Crickets, Coping and Other Related
Features 1
LS $ 92,670.00 $ 92,670.00 $ 65,335.00 $ 65,335.00 $ 52,900.00 $ 52,900.00 $ 50,566.00 $ 50,566.00 A-5 Install New Ketone Ethylene Ester (KEE) Roof
Membrane System 1 LS $ 319,180.00 $ 319,180.00 $ 299,836.00 $ 299,836.00 $ 412,700.00 $ 412,700.00 $ 413,765.00 $ 413,765.00 A-6 Complete Final Site Clean Up and Punch List
Repairs 1 LS $ 5,000.00 $ 5,000.00 $ 2,096.00 $ 2,096.00 $ 5,000.00 $ 5,000.00 $ 6,858.00 $ 6,858.00

ADDITIVE BID
B-1 Remove Existing Tile Roof, Salvage and Store for
Reinstallation 1 LS $ 32,938.00 $ 32,938.00 $ 22,928.00 $ 22,928.00 $ 34,000.00 $ 34,000.00 $ 38,702.00 $ 38,702.00 B-2 Remove Existing Underlayment and Battens on
Tile Roof Down to Deck 1 LS $ 18,400.00 $ 18,400.00 $ 15,285.00 $ 15,285.00 $ 11,900.00 $ 11,900.00 $ 23,897.00 $ 23,897.00 B-3 Install New Underlayment and Battens, and
Reset Tile Roof 1 LS $ 53,664.00 $ 53,664.00 $ 129,475.00 $ 129,475.00 $ 98,700.00 $ 98,700.00 $ 88,007.00 $ 88,007.00 B-4
Remove Existing Roof Access Ladder and Install
new Composite Dynarail Safety Ladder with
Hatch Safety Posts 1
LS
$ 6,500.00 $ 6,500.00
$ 10,712.00
$ 10,712.00 $ 7,000.00 $ 7,000.00
$ 7,220.00 $ 7,220.00
Base Bid Amount $513,498.00 $448,100.00 $533,800.00 $551,061.00 Additive Alternate Bid Amount $111,502.00 $178,400.00 $151,600.00 $157,826.00 Sum of Bas and Additive Bid Amounts $625,000.00 $626,500.00 $685,400.00 $708,887.00 Comments

Page 24 of 310 ends
Page 3 of 3 ends

BID DATE: 11/26/2024 Summary of proposals received for:

PHONE (909) 594-9702 TIME: 10:00 AM La Verne City Hall Roof Replacement ProjectFAX (909) 594-2658 PLACE: Planet Bids 398 Lemon Creek Drive, Suite E, Walnut, CA 91789
F C and Sons Roofing Pacific Builders & Roofings, Inc. Eberhard, A Tecta America Company, LLC Sheet: 1 of 1 Computed By: CAH
Item Description Quantity Unit Unit Price Total Unit Price Total Unit Price TotalNo.

BASE BID
A-1 Mobilization, Traffic Control, & NPDES 1 LS $ 10,000.00 $ 10,000.00 $ 80,000.00 $ 80,000.00 $ 45,549.00 $ 45,549.00 A-2 Remove Existing Membrane Roof Material to
Deck 1 LS $ 50,000.00 $ 50,000.00 $ 63,000.00 $ 63,000.00 $ 52,978.00 $ 52,978.00 A-3 Clean and Repair Roof Deck and Fascia
Materials 1 LS $ 10,000.00 $ 10,000.00 $ 30,000.00 $ 30,000.00 $ 13,682.00 $ 13,682.00 A-4
Restore, Repair or Install all Required Flashing,
Gutters, Crickets, Coping and Other Related
Features 1
LS $ 25,000.00 $ 25,000.00 $ 45,000.00 $ 45,000.00 $ 109,962.00 $ 109,962.00 A-5 Install New Ketone Ethylene Ester (KEE) Roof
Membrane System 1 LS $ 454,900.00 $ 454,900.00 $ 463,000.00 $ 463,000.00 $ 375,240.00 $ 375,240.00 A-6 Complete Final Site Clean Up and Punch List
Repairs 1 LS $ 5,500.00 $ 5,500.00 $ 20,000.00 $ 20,000.00 $ 6,384.00 $ 6,384.00

ADDITIVE BID
B-1 Remove Existing Tile Roof, Salvage and Store for
Reinstallation 1 LS $ 22,000.00 $ 22,000.00 $ 35,000.00 $ 35,000.00 $ 30,113.00 $ 30,113.00 B-2 Remove Existing Underlayment and Battens on
Tile Roof Down to Deck 1 LS $ 16,000.00 $ 16,000.00 $ 22,000.00 $ 22,000.00 $ 17,098.00 $ 17,098.00 B-3 Install New Underlayment and Battens, and
Reset Tile Roof 1 LS $ 163,012.00 $ 163,012.00 $ 60,000.00 $ 60,000.00 $ 179,117.00 $ 179,117.00 B-4
Remove Existing Roof Access Ladder and Install
new Composite Dynarail Safety Ladder with
Hatch Safety Posts 1
LS
$ 8,500.00 $ 8,500.00
$ 11,000.00
$ 11,000.00 $ 16,967.00 $ 16,967.00
Base Bid Amount $555,400.00 $701,000.00 $603,795.00
Additive Alternate Bid Amount $209,512.00 $128,000.00 $243,295.00 Sum of Bas and Additive Bid Amounts $764,912.00 $829,000.00 $847,090.00 Comments

Page 25 of 310 ends
Page 26 of 310 ends
Page 27 of 310 ends
Page 28 of 310 ends
Page 29 of 310 ends
Page 30 of 310 ends
Page 31 of 310 ends
Page 32 of 310 ends
Page 33 of 310 ends
Page 34 of 310 ends
Page 35 of 310 ends
Page 36 of 310 ends
Page 37 of 310 ends
Page 38 of 310 ends
Page 39 of 310 ends
Page 40 of 310 ends
Page 41 of 310 ends
Page 42 of 310 ends
Page 43 of 310 ends

City of La Verne,City Council
Agenda Report

DATE: December 16, 2024
TO: Honorable Mayor and City Council
FROM: Meg McWade, Public Works Director
SUBJECT: ADOPTION OF A RESOLUTION RECERTIFYING THE 2024 SEWER SYSTEM MANAGEMENT PLAN.

SUMMARY
The adoption of a resolution re-certifying the 2024 Sewer System Management Plan will fulfill the requirements of the State Water Resource Control Board and provide detailed information on the maintenance of the City's sewer system and response and handling of sanitary sewer overflows.

RECOMMENDATION
That the City Council adopt a Resolution titled, "A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF LA VERNE, CALIFORNIA, ADOPTING AND RECERTIFYING THE CITY OF LA

VERNE SEWER SYSTEM MANAGEMENT PLAN MANDATED BY THE STATE WATER RESOURCES CONTROL BOARD (SWRCB) ORDER NUMBER 2022-0103-DWQ."

DISCUSSION
In May 2006, the California State Water Resources Control Board adopted Order No. 2006- 0003, entitled "Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems," to regulate public wastewater collection (sewer) systems with the goal of reducing the number and volume of sanitary sewer overflows throughout the state. The WDR required that all public wastewater collection system agencies in California with more than one mile of sewer pipe be regulated and mandated development of a Sewer System Management Plan (SSMP) following WDR guidelines. The CIty developed an SSMP in 2009 in compliance with the regulation.

On December 6, 2022, the State Water Resources Control Board adopted the Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems (Order No. 2022-0103- DWQ) which amended the State Water Resources Control Board (SWRCB) General Order 2006-0003-DWQ and the Monitoring and Reporting Program from Order WQ 2013-0058-EXEC.

Order No. 2022-0103-DWQ. As with the initial order, this change applies to all public collection system agencies in California that own or operate systems comprised of more than one mile of pipe or sewer lines, which convey untreated wastewater to a publicly owned treatment facility.

The updated Order includes the addition of a spill Category 4 and revises the spill Category 3.

Under this current Order, each agency is required to update its SSMP every six years and perform an audit at least every three years after the date of the last SSMP Update.

A Sewer System Management Plan (Plan) is a living planning tool that documents ongoing local sewer system management program activities, procedures, and decision-making based on the

Page 44 of 310 ends

Adoption of a Resolution Recertifying the 2024 Sewer System Management Plan. , Page 2

complexity of the City's sewer system. The 2024 Updated SSMP outlines and documents the activities that the City of La Verne utilizes to manage the sewer collection system effectively.

Effective management of a collection system includes:
• To employ best practices to properly manage, operate, and maintain all parts of the wastewater collection system
• Minimizing the number and impact of sanitary sewer overflows (SSOs) • Providing adequate sewer capacity to convey peak flows, and • Maintaining and improving the condition of the collection system infrastructure to provide reliable service into the future.

The overall goal of the SSMP is to protect water quality, eliminate or substantially reduce preventable SSOs, and to protect public health and the environment. In addition to serving as a best management practices guide, adoption and recertification of the 2024 SSMP is necessary for regulatory compliance.

FISCAL ANALYSIS
There is no fiscal impact with adoption of the SSMP.

ENVIRONMENTAL ANALYSIS
Sewer System Management Plan is exempt from the California Environmental Quality Act (CEQA) pursuant to Title 14, Sections 15061 (b)(3) (common sense exemption). 15301 (existing facilities) and 15308 (regulatory process).

LEGAL REVIEW
The City Attorney has reviewed this item.

ATTACHMENTS

1. Resolution SSMP 2024

2. FINAL SSMP Compliled Dec Draft_2024 SSMP

Coordinated with:

Ryan Ciotti, Acting Utilities Manager

Page 45 of 310 ends

RESOLUTION NO. 24-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LA VERNE,

CALIFORNIA, ADOPTING AND RECERTIFYING THE CITY OF LA VERNE

SEWER SYSTEM MANAGEMENT PLAN MANDATED BY THE STATE
WATER RESOURCES CONTROL BOARD (SWRCB) ORDER NUMBER 2022- 0103-DWQ
WHEREAS, the City of La Verne owns and operates a wastewater collection system covering 8.562 square miles with approximately miles of sewer; and WHEREAS, On December 6, 2022, the State Water Resources Control Board adopted Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems (Order No. 2022-0103-DWQ) which amended the SWRCB General Order 2006- 0003-DWQ and the Monitoring and Reporting Program from Order WQ 2013- 0058- EXEC; and
WHEREAS, Order No. 2022-0103-DWQ applies to all public collection system agencies in California that own or operate collection systems comprised of more than one mile of pipe or sewer lines, which convey untreated wastewater to a publicly owned treatment facility; and
WHEREAS, the current Order includes the addition of a spill Category 4 and revises the spill Category 3; and.

WHEREAS, under this current Order, each agency is required to update its SSMP every six years and perform an audit at least every three years after the date of the last SSMP; and
WHEREAS, the Public Works Department has caused this 2024 update to the City of La Verne’s SSMP and recommends it for adoption by the City Council.

NOW, THEREFORE, BE IT RESOVED by the City Council of the City of La Verne as follows:

Section 1. The above recitals are all true and correct.

Section 2. Adopts and recertifies the City of La Verne Sewer System Management Plan.

PASSED, APPROVED AND ADOPTED this 16th day of December, 2024.

______________________________________
Mayor Tim Hepburn

Page 46 of 310 ends

ATTEST:

_______________________________
Debra Fritz, Deputy City Clerk

CERTIFICATION
I hereby certify that the foregoing [Resolution No. XX-XX] was duly and regularly adopted by the City Council of the City of La Verne at a meeting thereof held on the 16th day of December, 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

____________________________________
Debra Fritz, Deputy City Clerk

Page 47 of 310 ends

2024 Sewer System Management Plan

DRAFTED ON
Dec
em
ber 2024

Prepared For:

City
of La Verne
Public Works
3660 D Street | La Verne, CA 91750
Phone: 909.596.8741

Prepared By:

www.civiltec.com
Project No. 2024309.00
<CI Dliif CC
engineering inc..

Page 48 of 310 ends

DRAFT Table of Contents
City of La Verne

2024 City of La Verne Sewer System Management Plan
i
Table of Contents
Bac
kground ........................................................................................................................... INTRO-1 About the System .............................................................................................................................. INTRO-1 Section 1 – Goals .................................................................................................................................... S1-1 Goals ............................................................................................................................................................... S1-1 Council Resolution Adopting and Recertifying SSMP ................................................................. S1-2 Section 2 - Organization .................................................................................................................................. S2-1 Authorized Representatives .................................................................................................................. S2-1 Section 3 - Legal Authority ............................................................................................................................. S3-1 Title 20 UTILITIES ..................................................................................................................................... S3-2 Section 4 - Operations and Maintenance Program .............................................................................. S4-1 Collection System Maps ........................................................................................................................... S4-1 Prioritized Preventive Maintenance .................................................................................................. S4-1 Rehabilitation and Replacement Program ...................................................................................... S4-1 Training .......................................................................................................................................................... S4-1 Contingency Equipment and Replacement Inventory ................................................................ S4-2 Section 5 - Design and Performance Provisions ................................................................................... S5-1 Section 6 - Sewer Overflow Emergency Response Plan .................................................................... S6-1 I - General ...................................................................................................................................................... S6-1 II - Overflow Response Procedure ...................................................................................................... S6-4 III – Sewer Backup Protocol ............................................................................................................... S6-10 IV - Public Advisory Procedure ......................................................................................................... S6-13 V - Regulatory Agency Notification Plan ....................................................................................... S6-13 VI - Media Notification Procedure ................................................................................................... S6-15 Emergency Public Information Sewer Overflow Design Standard Operating Procedures ...
......................................................................................................................................................... S6-16 Distribution and Maintenance of SORP ......................................................................................... S6-17 Section 7 - Fats, Oils, and Grease Control Program ............................................................................. S7-1 Source Control ............................................................................................................................................. S7-2 Section 8 - System Evaluation and Capacity Assurance Plan .......................................................... S8-1 Section 9 - Monitoring, Measurement, and Program Modifications ............................................. S9-1 Monitor and Measure ............................................................................................................................... S9-1 •
. .
. .

A. Cl~
eug111eer111g i11c

Page 49 of 310 ends

DRAFT Table of Contents
City of La Verne

2024 City of La Verne Sewer System Management Plan
ii
Section 10 - SSMP Program Audits .......................................................................................................... S10-1 Sec
tion 11 - Communication Program ................................................................................................... S11-1

List of Tables
Sewer System Management Plan and Schedule .......................................................................................... 3 Table 3-1 Industrial Waste Disposal Permit Type Fee .................................................................... S3-10 Table 3-2 Plan Review Class Type Fee ................................................................................................... S3-11 Table 3-3 Inspection Fee by Class ............................................................................................................ S3-12 Table 3-4 Plan by Classes ............................................................................................................................ S3-12 Table 3-5 Service Fees ................................................................................................................................. S3-16 Table 3-6 Annual Inspection Fee – Refund Conditions ................................................................... S3-17 Table 4-1 Backup Generators ....................................................................................................................... S4-3 Table 9-1 Current “Hot Spot” Maintenance Locations ....................................................................... S9-1

List of Attachments
Attachment A – Organizational Flow Chart
Attach
ment B – City of La Verne Sewer System Standard Drawings Attachment C – City of La Verne 2022 Wastewater Master Plan Attachment D – City of La Verne SSMP Triennial Audit Report Form Attachment E – Attachment E1 and E2 from General Order 2022-0103-DWQ (Dated December 6, 2022).

•
. .
. .

A. Cl~
eug111eer111g i11c

Page 50 of 310 ends

DRAFT Introduction
City of La Verne

2024 City of La Verne Sewer System Management Plan
INTRO-1
Background
Thi
s Sewer System Management Plan (SSMP) is required under Waste Discharge Requi
rements (WDR) Order No. WQ 2022-0103-DWQ, issued by the State Water Resources Control Board (SWRCB). The WDR stipulates that the permittees, which include the City of La Verne, must develop and implement a Management Plan in order to reduce sanitary sewer overflows. Additionally, the Management Plan provides measures to ensure efficient and effective response to overflows and implement source control measures to minimize the introduction of grease, oils, and other materials that may cause blockages. This Management Plan satisfies the requirements specified in the WDR Order No. 2022-0103-DWQ.

The State Water Resources Control Board (SWRCB) adopted WDR Order No. 2022-0103- DWQ, Statewide General Discharge Requirements for Sanitary Sewer Overflows, (SSOs) on December 6, 2022. The SWRCB developed this WDR to promote uniformity in the management of California’s wastewater collection systems and to reduce SSOs. The SWRCB found that districts that have implemented SSMPs similar to this have been effective not only in improving spill reporting, but also in mitigating SSO impacts. Data also supported the conclusion that better collection system management will benefit water quality and prolong the life of sanitary sewer systems.

The SWRCB may regulate sanitary sewer overflows based on authority in the federal Clean Water Act (EPA 2002) and the Porter-Cologne Water Quality Control Act, Section 13263 (California Water Code of Regulation 2006).

About the System
The City of La Verne was founded in 1887 and incorporated in 1906. The City is 9.09 square mile
s and located in eastern Los Angeles County at the southern base of the Angeles National Forest. The city is bordered to the west by the Cities of San Dimas and the City of Glendora, on the south by the City of Pomona and to the east the City of Claremont. Land use throughout the City is dominated by residential uses with a commercial core along Foothill Boulevard and light industrial uses primarily south of Arrow Highway.

Institutional uses such as universities, public and private schools, and other governmental operations also occupy substantial amounts of land. The City’s 2024 population is estimated at 29,898, which was reported by the U.S. July 1, 2023 Census Bureau. The original sewer system was designed and constructed in 1924. Much of this original system is still in operation today. A wide variety of improvements have been made since the early days as development progressed away from the City center into the foothills and southern reaches of the community. The City now operates and maintains approximately 100 miles of sewer lines, two wastewater lift stations, a brine line, and a number of ancillary facilities providing service to approximately 8,667 lateral connections consisting of 12,741 (2021 LV Rate Study) sewer units. In addition to these public facilities, there are several private community lift stations, force mains, and gravity sewers throughout the service territory (See Attachment C, Exhibit G, City of La Verne 2022 Wastewater Master Plan) that ultimately discharge into the City’s wastewater collection system.

A. Cl~
eug111eer111g i11c

Page 51 of 310 ends

DRAFT Introduction
City of La Verne

2024 City of La Verne Sewer System Management Plan
INTRO-2
The City of La Verne's sewer distribution system consists of approximately 100 miles of vitri
fied clay pipe, and truss pipe ranging in size from 6 inch to 12 inches in diameter. At least 40% of the system has been in operation since the 1930's and has continued to grow as development required to its current size. The majority of the collection system was constructed during the main growth, which occurred in the 1960's and 1970's.

The sewage collection system within the City of La Verne is municipally owned except for some lateral sewers owned by Los Angeles County Department of Public Works (LACDPW).

The city is within the Los Angeles County Sanitation Districts (LACSD) service areas, Numbers 21 and 22. Trunk sewers receive La Verne's sewage for conveyance to their facilities in the Whittier Narrows and Pomona treatment facilities. These trunk systems are owned and maintained by LACSD. The City utilizes GIS for reference documents and system asset mapping. The City also uses the Nobel work order system for tracking maintenance which integrates data into GIS.

The City has five drainage areas:
1) Drainage Area 1is the western-most quarter of the City. Effluent from this area is collected by LACSD’s Puddingstone Trunk, Sections 1 and 2, a 15” VCP pipe. 2) Drainage Area 2is located in the northwest region of the city and drains into the LACSD Sunflower Trunk in Canyon View Drive. The Sunflower Trunk is a 12” non- reinforced concrete pipe.
3) Drainage Area 3 is in the mid-southern region of the City. It is bordered by Foothill Blvd. to the north, B Street to the east, the Metrolink ROW to the south, and the eastern boundary of Drainage Area 1. Sewage flows from this area are discharged into the Puddingstone Trunk, Section 4 located in Palomares Avenue just east of the Puddingstone channel. The Puddingstone Trunk, Section 4 is a 12” VCP pipe. 4) Drainage Area 4 is centrally located in the City and extends in a northeasterly direction to the City limits. This is the largest drainage area of the City and lays between Drainage Area 1 and Drainage Area 3 to the west and Drainage Area 5 to the east. Wastewater from Sub Drainage Area 4 is discharged to either the Emerald Avenue Trunk, a 12” VCP pipe, or the La Verne “B” Street Trunk, a 12” VCP pipe.
5) Drainage Area 5encompasses the southern easternmost corner of the City.

Discharges from this basin are received by the La Verne Trunk, Section 2, a 27” reinforced concrete pipe located southwest of White Avenue on Los Angeles County Fair property.

A. Cl~
eug111eer111g i11c

Page 52 of 310 ends

DRAFT Introduction
City of La Verne

2024 City of La Verne Sewer System Management Plan
INTRO-3
Sewer System Management Plan and Schedule
Development Plan Requirements Adopted Date
Preliminary
Requirements
Reporting of all overflows to a state-
operated electronic database accessible to
the public.

The City of La Verne started
electronic reporting in
January 2007
Sections 1: Goals
Approval of the City's SSMP Development
Plan and schedule for a completed SSMP by
the City Council.
12/16/2024 Adoption of
SSMP by City Council
Section 2: Organization
Approval of the City's SSMP
Development Plan and schedule for a
completed SSMP by the City Council.
12/16/2024 Adoption of
SSMP by City Council
Section 3: Legal Authority
The City must demonstrate through collection
system use ordinances, service agreements,
or other legally binding procedures that it
possesses the necessary legal authority.
12/16/2024 Adoption of
SSMP by City Council
Section 4: Operations and
Maintenance Program
Development of a SSMP and rehabilitation
and replacement plan.
12/16/2024 Adoption of
SSMP by City Council which
includes 2022 Wastewater
Master Plan for the City of
La Verne
Section 5: Design and
Performance Provisions
Adopt proper design and construction
standards for all sewer system infrastructures
including procedures and standards for
inspecting and testing new sewers or repairs.
12/16/2024 Adoption of
SSMP by City Council
Section 6: Emergency
Response Plan
The Sewer System Overflow Plan will identify
measures to protect public health and the
environment.
12/16/2024 Adoption of
SSMP by City Council
Section 7: Fats, Oils, and
Grease Control
The city shall evaluate its service area to
determine whether a FOG control program is
needed.

To be completed by
December 2025
Section 8: System
Evaluation and Capacity
Assurance
The City shall implement a capital
improvement plan (CIP) that will provide
hydraulic capacity of key sanitary system
improvements for dry weather peak flow
conditions, as well as the appropriate design
storm or wet weather event.

Sewer Rate Study underway
to enable implementation
of 2022 Wastewater Master
Plan Recommendations
Section 9: Monitor and
Measure
This element of the SSMP should include the
identification and tracking of performance
indicators.
12/16/2024 Adoption of
SSMP by City Council
Section 10: Program
Audits
The city shall conduct periodic internal audits,
appropriate to the size of the system and the
number of Sewer System Overflows and audit
must occur at least once every two years.

Audit completed in 2024.

Next scheduled internal
audit will be 2027.

A. Cl~
eug111eer111g i11c

Page 53 of 310 ends

DRAFT Introduction
City of La Verne

2024 City of La Verne Sewer System Management Plan
INTRO-4
Development Plan Requirements Adopted Date
Section 11:

Communication
This element of the SSMP can be met
by providing public notification that the
agency is preparing an SSMP.
12/16/2024 Adoption of
SSMP by City Council
A. Cl~
eug111eer111g i11c

Page 54 of 310 ends

DRAFT Section 1 - Goals
City of La Verne

2024 City of La Verne Sewer System Management Plan
S1-1
Section 1 - Goa ls
Goals
The goal of the City of La Verne’s SSMP are:
1) To properly manage, operate and maintain all portions of the city's was
tewater collection system. This goal will be achieved by utilizing Best Management Practices (BMPs), the latest technological equipment available, and well-trained staff.
2) To provide adequate capacity to convey peak wastewater flows. All major collection points will be metered to confirm proper capacities based upon national standards for sewer systems. Any areas found to be deficient will be corrected as necessary.
3) To minimize the frequency of sewer system overflows (SSO). The system will be operated and managed in a fashion that is proactive, utilizing cleaning methods and equipment that mitigates the potential for sewer system overflows.
4) To mitigate the impacts that are associated with any SSO that may occur.

This will be accomplished by utilizing a timely response, installing proper damming and ponding materials and getting any obstruction cleared as quickly as possible. Recovery and cleanup will commence once the aforementioned are completed.
5) To meet all applicable regulatory notification and reporting requirements.

The city currently reports any spills online and notifies the County Health Department as well. A no spill report will also be sent monthly. The city will comply with Attachment E1 from General Order 2022-0103-DWQ (which is Attachment E of this SSMP)

•-• ----------------------------·
A. Cl~
eug111eer111g i11c

Page 55 of 310 ends

DRAFT Section 1 - Goals
City of La Verne

2024 City of La Verne Sewer System Management Plan
S1-2
Council Resolution Adopting and Recertifying SSMP
Res
olution NO. XXXX

(PLA

CE HOLDER FOR SIGNED COPY OF RESOLUTION)

•-• ----------------------------·
A. Cl~
eug111eer111g i11c

Page 56 of 310 ends

DRAFT Section 2 - Organization
City of La Verne

2024 City of La Verne Sewer System Management Plan
S2-1
Section 2 - Org anization
Authorized Representatives
Organization
a) Admin
istration:

Dire
ctor of Public Works or designee: Leads staff; oversees water/wastewater division and capital improvement project delivery
909-596-8741
Director of Public Works or
designee: Leads staff; oversees
water/wastewater division and
capital improvement project
delivery
Daytime (909) 596-8741
Evening (909) 596-8741
Joe Vieyra, Deputy Director of
Public Works: Leads staff;
oversees water/wastewater
division and capital improvement
project delivery

[email protected]
Daytime (714) 317-4895
Evening (626) 864-2064
b) Legally Responsible Official:

Ryan Ciotti, Acting Utilities
Manager:

Manages field operations and
maintenance activities; prepares
wastewater collection system
planning documents; provides
relevant information to public
works director; prepares and
implements contingency plans;
leads emergency response;
investigates and reports spills;
acts as Legally Responsible
Official (LRO).

rciotti @cityoflaverne.org
Daytime (909) 596-1349
Evening (909) 908-0589

A. Cl~
eug111eer111g i11c

Page 57 of 310 ends

DRAFT Section 2 - Organization
City of La Verne

2024 City of La Verne Sewer System Management Plan
S2-2
c) Contact Information:

Rya
n Ciotti, Water Supervisor –
Production

rciotti @cityoflaverne.org
Daytime (909) 596-1349
Evening (909) 908-0589
Robert Mitchell, Water Supervisor –
Distribution:

Manages field operations and
maintenance activities; trains field
crews; assists with emergency.
[email protected]
Daytime (626) 864-2064
Evening (626) 864-2064

Mark Graciano, Water Utility Lead
Worker:

Conducts preventative and
corrective maintenance activities;
mobilizes and responds to
blockages and spills
[email protected]
Daytime (951) 532-5712
Evening (951) 532-5712
Eugene Perez II, Water Utility
Worker II:

Conducts preventative and
corrective maintenance activities;
mobilizes and responds to
blockages and spills.
[email protected]
Daytime (626) 428-5376
Evening (626) 428-5376
Michael Sandoval, Water Utility
Worker I:

Conducts preventative and
corrective maintenance activities;
mobilizes and responds to
blockages and spills.

[email protected]
Daytime (562)968-6155
Evening (562)968-6155

For Organization Chart see Attachment A.

The chain of communication for reporting spills is outlined in the City’s Spill Emergency Response Plan as outlined in Chapter 6 of this document.

Authorized Representatives to Perform Submittals
All reports required by the WDR and other submittals required by the State Water Resources Control Board shall be signed and certified by a person designated as either a Supervisor or A. Cl~
eug111eer111g i11c

Page 58 of 310 ends

DRAFT Section 2 - Organization
City of La Verne

2024 City of La Verne Sewer System Management Plan
S2-2
Manager, or by a duly authorized representative of that person. An individual is a duly auth
orized representative only if:
1) The authorization is made in writing by the person designated as either an executive officer or ranking elected official.
2) The authorization specifies an individual or a person having responsibility for the overall operation of the regulated facility or activity.

The Utilities Manager or Water Supervisor from the City of La Verne is responsible for signing and certifying reports required by the order. Either Utilities Manager or Water Supervisor is authorized to perform online reporting of Sewer System Overflows (SSO's) as well.

A. Cl~
eug111eer111g i11c

Page 59 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-1
Section 3 - Leg al Authority
The following includes excerpts from the La Verne City Code “Title 13. Public Services.

Divi
sion 2 – Sewers and Industrial Waste. Chapter 13.16 - Adoption of County Sewer and Industrial Waste Code” related to the City’s sewer system and connections as well as adoption of and modifications to Los Angeles County “Title 20. Division 2 Sanitary Sewers and Industrial Waste” which can be found in its entirety on the Los Angeles County website.

Additionally, this Chapter contains excerpts from Los Angeles County Code “Title 20. Division 2 “Sanitary Sewers and Industrial Waste” to connection and enforcement provisions. The final legal authority reference is La Verne City Code “Title 16 Subdivisions. Article 1 – Design Standards Chapter 16.28 - DESIGN AND IMPROVEMENTS. 16.28.180 – Easements Underground Facilities related to sewer easements.

CITY OF LA VERNE MUNICIPAL CODE – Title 13 Public Services. Division 2 – Sewers and Industrial Waste
Chapter 13.16 ADOPTION OF COUNTY SEWER AND INDUSTRIAL WASTE CODE Note: Prior code history: prior code §§ 7310—7315.02.
§ 13.16.010 Adopted. The city adopts by reference, and enacts into law, the amended Los Angeles County Code, Title 20, Utilities, Division 2 entitled "Sanitary Sewers and Industrial Waste" adopted by the board of supervisors of the county of Los Angeles by enactment of Ordinance No. 89-0101, July 27, 1989

§ 13.16.020 Area covered. Whenever in Title 20, Division 2 of the county code, reference is made to the unincorporated area of the county, such reference shall be deemed to refer to the city. (Prior code § 7320; Ord. 666 § 1, 1983)

§ 13.16.030 Definitions. The following terms, when used in Title 20, Division 2 of the county code, shall have the following meanings:
"Board" means the city council.
"County engineer" means the city engineer.
"County health officer" means the city health officer.
"County of Los Angeles" means the city of La Verne, except in instances where the context requires reference to the county of Los Angeles. "County sewer maintenance district" means the city of La Verne, except in the instance where the territory concerned either has been or is proposed to be annexed to a county sewer maintenance district.
"Ordinance" means an ordinance of the city of La Verne, except in such instance where the reference is to a stated ordinance of the county of Los Angeles. "Public sewer" means all sanitary sewers, and appurtenances thereto, lying within streets or easements dedicated to the city which are under the sole jurisdiction of the city. "Trunk sewer" means a sewer under the jurisdiction of a public entity other than the city of La Verne. (Prior code § 7330; Ord. 666 § 1, 1983)

§ 13.16.040 Amendments. The following portions of the Los Angeles Sanitary Sewer and Industrial Waste Ordinance are amended as follows:

A. Section 20.28.050 of Title 20, Division 2 is amended to read as follows:

A. Cl~
eug111eer111g i11c

Page 60 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-2
The City Engineer may recommend that the Council approve an agreement to reimburse or agre
e to reimburse a subdivider, school district, an improvement district formed under special assessment procedures, or person for the cost of constructing sanitary sewers for public use where such sewers can or will be used by areas outside of the proposed development; and to establish a reimbursement district and collection rates as described in the agreement under the provisions of this Ordinance.

B. Section 20.32.130 of Title 20, Division 2 is repealed.

C. Section 20.32.140 of Title 20, Division 2 is repealed.

D. Section 20.32.150 of Title 20, Division 2 is amended to read as follows:

In the event the City Engineer determines that the property described in the application for a permit is included within a sewer reimbursement district which has been formed by the Council in accordance with Section 20.28.050, the charge for connecting to the public sewer shall be as set forth in the agreement.

E. Section 20.32.290 of Title 20, Division 2, is repealed.

F. Sections 20.32.260, 20.32.270, 20.32.280 and 20.32.310 of Title 20, Division 2, are repealed.

G. Section 20.32.690 of Title 20, Division 2, is amended by adding the following paragraph:

In the event the damaged public sewer is not in a sewer maintenance district, the violator shall reimburse the City within 30 days after the City Engineer shall render an invoice for the same. The amount when paid shall be deposited in the City Treasury. (Prior code § 7340; Ord. 666 § 1, 1983)

LOS ANGELES COUNTY CODE OF ORDINANCES – TITLE 20. UTILITIES. DIVISION 2.

SANITARY SEWERS AND INDUSTRIAL WASTE
Title 20 UTILITIES
Chapter 20.36 - INDUSTRIAL WASTE
Part
1 – PERMITS

20.36 .010 - Discharge of offensive or damaging substances prohibited.

A person shall not discharge or deposit or cause or suffer to be discharged or deposited at any time or allow the continued existence of a deposit of any material which may create a public nuisance, or menace to the public health or safety, or which may pollute underground or surface waters, or which may cause damage to any storm-drain channel or public or private property.
(Ord. 6130 Part 6 Ch. 3 § 6301, 1952.)

A. Cl~
eug111eer111g i11c

Page 61 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-3

20.36.015 - Dilution prohibited.

No
person shall discharge or cause to be discharged any water or other substance added for the purpose of diluting any industrial waste to achieve compliance with limitations imposed by the provisions of this Division 2.
(Ord. 89-0101 § 25, 1989.)

20.36.020 - Construction of new industrial buildings—Information required.

Every person applying for a permit pursuant to the provisions of the Building Code, as set out at Title 26 of this code, for construction of a new industrial building or for an addition or alteration to an existing industrial building shall furnish to the county engineer such plans, information, data, statements or affidavits as the county engineer may require for determination of the nature and quantity of industrial waste involved and the facilities to be provided for the disposal thereof.
(Ord. 6130 Part 6 Ch. 3 § 6302, 1952.)

20.36.030 - Construction of new industrial buildings—Building permit issuance prerequisites.

An application for a permit pursuant to the Building Code to construct a new industrial building or for an addition or alteration to an existing industrial building will not be approved until provision has been made for the installation of such pretreatment facilities and disposal methods or both as, in the opinion of the county engineer, are necessary to carry out the provisions and intent of this Division 2.
(Ord. 6130 Part 6 Ch. 3 § 6303, 1952.)

20.36.031 - Construction of facilities connecting to a STEP system—Information and building permit prerequisites.

Every person applying for a permit pursuant to the provisions of the Building Code as set forth in Title 26 of this code, or the Los Angeles County Plumbing Code, as set forth in Title 28 of this code, for the construction of any facility to be connected to a STEP pressure sewer system, shall furnish to the county engineer or his designated agent such plans, information, data, statements or affidavits as the county engineer or his designated agent may require for the determination of the nature and quantity of wastewater involved, the facilities to be provided for the disposal thereof, and the structures or means necessary for the protection of such facilities.

An application for a permit pursuant to the Building or Plumbing Codes for facilities to be connected to a STEP pressure sewer system will not be approved until provision has been made for the installation of such pretreatment facilities, including protective means and structures for those facilities, as in the opinion of the county engineer or his designated agent are necessary to carry out the provisions and intent of this Division 2. The application also will not be approved until a letter of credit, cash deposit, performance bond, or other form of security acceptable to the county engineer or his designated agent, accompanied by a right of A. Cl~
eug111eer111g i11c

Page 62 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-4
entry release, to assure the completion of the pretreatment facilities and their protective mea
ns or structures has been received by the county engineer or his designated agent. (Ord. 89-0006 § 7, 1989.)

20.36.040 - Permit to discharge industrial waste—Issuance conditions.

A. The director may issue a permit containing limitations or conditions, or both, in addition to those recommended by the county health officer, or may modify an existing permit by the addition of or elimination of such conditions and limitations as may be necessary to accomplish the purpose of this Division 2; but in a permit covering the discharge deposit or disposal of wastes other than to the public sewer he shall include all limitations and conditions recommended by the county health officer.

B. Permits for the discharge of industrial wastes to a public sewer shall state the maximum permissible rate of discharge.

C. The director may impose a permit expiration date not to exceed a term of five years where the director determines such a date is necessary to insure compliance with all applicable laws and regulations governing the disposal of industrial wastes.

Application for renewal of such a permit shall be made not later than 180 days prior to the expiration date of the existing permit.
(Ord. 89-0101 § 26, 1989: Ord. 10020 § 3 (part), 1970: Ord. 6130 Part 6 Ch. 3 § 6306, 1952.)

20.36.050 - Change of facts—Notification to county engineer.

Every person having a permit issued pursuant to this chapter either automatically or otherwise within five days shall notify the county engineer in writing of any change in any facts which are required to be stated in an application for a permit. (Ord. 7010 § 2, 1956: Ord. 6130 Part 6 Ch. 3 § 6322, 1952.)

20.36.060 - Revised permit—Application required when.

A permittee shall submit to the county engineer an application for revised industrial waste disposal permit and obtain approval prior to effecting any of the following waste-discharge conditions:

A. Change in method of disposal.

B. Change in disposal point for non-sewered discharge.

C. Change in discharge volume affecting treatment or storage facilities; or D. Change in character of the waste discharge.
(Ord. 11716 § 41, 1978: Ord. 6130 Part 6 Ch. 3 § 6323, 1952.) A. Cl~
eug111eer111g i11c

Page 63 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-5

20.36.065 - Expiration of application.

An
application for an industrial waste disposal permit for which no permit is issued within 180 days following the date of application submittal shall expire by limitation. The application and other information submitted may thereafter be returned to the applicant or destroyed. The director may extend the time for action by the applicant for a period not to exceed 180 days upon written request by the applicant showing that circumstances directly related to the processing of the application but beyond the control of the applicant have prevented action from being taken. In order to renew action on an application after expiration, the applicant shall resubmit all necessary application forms and other data and pay a new application fee and plan review fee. No application shall be extended more than once.
(Ord. 89-0101 § 27, 1989: Ord. 84-0109 § 3, 1984.)

20.36.070 - Grant or denial—Notice to applicant.

A. The county engineer shall either grant or deny a permit within 30 days after all fees, as provided in this Division 2, have been paid and upon the receipt of the application complete with all supplemental data.

B. The county engineer shall immediately notify the applicant whenever he grants a permit, denies a permit, grants a permit subject to special conditions or limitations, or adds to or eliminates any conditions or limitations of an existing permit. (Ord. 7519 § 4 (part), 1959: Ord. 6130 Part 6 Ch. 3 § 6305, 1952.)

20.36.080 - Hearing—Time limit for request.

Within 30 days after receipt of notice of denial of a permit, granting of a permit subject to conditions or limitations, or the addition of conditions or limitations to an existing permit, the applicant or permittee may file with the board a written demand for a public hearing. If he does not do so, he shall be deemed to have consented to the action of the county engineer, and such action shall be final.
(Ord. 6130 Part 6 Ch. 3 § 6308, 1952.)

20.36.090 - Hearing—Notice requirements.

Within 30 days after application for a hearing has been requested, the board shall give notice of the time and place of public hearings to the applicant or permittee, the county engineer, and the county health officer when matters pertaining to public health are involved, at least 10 days in advance of the date set for such hearing.
(Ord. 6130 Part 6 Ch. 3 § 6317, 1952.)

20.36.100 - Hearing—Conduct—Board determination authority.

After a public hearing requested by an applicant or a permittee, the board may:

A. Cl~
eug111eer111g i11c

Page 64 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-6
A. Confirm the action of the county engineer in denying a permit or issuance of a perm
it subject to special conditions and limitations.

B. Instruct the county engineer to issue a permit without conditions or limitations, or with such special conditions and limitations as the board may designate.

C. Continue suspension of an existing permit invoked by the county engineer pending correction of objectionable conditions by the permittee.

D. Remove the suspension of an existing permit invoked by the county engineer pending correction of objectionable conditions by the permittee.

E. Deny that objectionable conditions exist and reinstate an existing permit.

F. Revoke an existing permit on any of the following grounds:

1. Failure of the permittee to correct conditions as required by the county engineer,

2. Conditions which would justify the denial of a permit,

3. Fraud or deceit was employed in the obtaining of a permit,

4. Any other violation of this Division 2 or of any permit, license or exception granted hereunder.
(Ord. 6130 Part 6 Ch. 3 § 6318, 1952.)

20.36.110 - Failure to obtain permit deemed violation when.

A person who is required to but does not have a permit and who has been notified by the county engineer that he is required to obtain a permit pursuant to the provisions of this Division 2 shall immediately submit to the county engineer an application and fee as required by this Division 2 for such permit and shall rectify and cure all such violations. Failure to do so shall constitute a willful violation of this Division 2. (Ord. 7519 § 4 (part), 1959: Ord. 6130 Part 6 Ch. 3 § 6310, 1952.)

20.36.120 - Successor in interest—New permit required.

The successor in title or interest of a premises for which a permit had previously been granted shall file with the director a new permit application, in accordance with the provisions of Section 20.36.320 or Section 20.36.490, within 30 days after assumption of such title or interest, and shall furnish plans and data as may be required by the director. If it appears from the application, data, and/or inspection of the facility that the succeeding operation and disposal practices comply with the provisions of this Division 2, the director, upon receipt of the fees hereinafter required, shall issue such permit. The director may issue an interim permit pursuant to Section 20.36.125 to allow continued operations during the permit processing period.

A. Cl~
eug111eer111g i11c

Page 65 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-7
(Ord. 2002-0074 § 1, 2002: Ord. 89-0101 § 28, 1989.)

20. 36.125 - Interim permit—Ongoing discharge.

Upon determination that any person is discharging industrial wastewater directly or indirectly to a facility regulated by this Division 2 without a valid permit or upon receipt of an application for a permit for an ongoing discharge, an interim permit may be issued by the director to allow the continuation of such discharge during the application review period, subject to such conditions, limitations, restrictions, and other provisions or requirements which the director determines are necessary or advisable to protect the county sewage collection system and to assure compliance with all federal, state and local laws and that the continuation of such discharge will not be detrimental to the public health and safety. An interim permit is revocable by the director at any time. Any person whose interim permit is revoked shall immediately cease and desist all unpermitted discharge of industrial waste.

Unless revoked by the director, the interim permit shall be enforceable until such time as a permit is issued or denied by the director and shall be subject to annual inspection fees pursuant to Section 20.36.250. The discharger shall immediately comply with all of the provisions and requirements of such interim permit, and if the discharger has not already applied for a permit, shall apply for a permit within 30 days from the issuance of the interim permit.
(Ord. 2002-0074 § 2, 2002: Ord. 11716 § 39, 1978: Ord. 7010 § 1 (part), 1956: Ord. 6541 § 5, 1954: Ord. 6130 Part 6 Ch. 3 § 6319.5, 1952.)

20.36.130 - Permit not transferable from one location to another.

Permits issued under this chapter are not transferable from one location to another, and discharge of wastes shall be made strictly in accordance with all provisions contained in the permit, at the location specifically designated therein. (Ord. 6541 § 6, 1954; Ord. 6130 Part 6 Ch. 3 § 6320, 1952.)

20.36.135 - Monitoring and sampling—Pre-notification.

Any permittee required by the director, by permit or otherwise, to engage in periodic monitoring or sampling of a discharge shall notify the director by telephone at least 48 hours in advance of any monitoring or sampling to be done. Prior to the commencement of any sampling or monitoring, the director may request that the permittee furnish the director a split sample and all supporting data. Each permittee shall submit to the director, certified under penalty of perjury by the permittee, its monitoring and sampling reports or other requested data.
(Ord. 89-0101 § 29, 1989.)

20.36.140 - Notice to correct violations.

A. The county engineer may serve notice of violation upon the person owning or operating premises describing the conditions and requiring prompt correction thereof, when he finds that:

A. Cl~
eug111eer111g i11c

Page 66 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-8

1. Industrial waste, effluent, or any other material is being maintained, disc
harged or deposited in such a manner as to create, or if allowed to continue will create, any one or more of the following conditions:
a. A public nuisance,
b. A menace to the public safety,
c. Pollution of underground or surface waters,
d. Adverse effect or damage to any public sewer, storm drain, channel, or public or private property; or that:

2. The permittee has failed to conform with conditions or limitations of any permit issued in accordance with this Division 2;

3. The industrial waste disposal permit was issued in error, or on the basis of incorrect information supplied, or in violation of any ordinance, law or regulation.

B. Failure to comply with such notice shall constitute a willful violation of this Division

2. (Ord. 84-0109 § 4, 1984: Ord. 11716 § 36, 1978: Ord. 7519 § 4 (part), 1959: Ord. 6130 Part 6 Ch. 3 § 6309, 1952.)

20.36.150 - Investigation of complaints—Correction of violations.

Notwithstanding any exception mentioned in this Division 2, the county engineer shall promptly investigate every complaint charging violation of any of the provisions of this Division 2 and shall take action to correct any violation discovered. (Ord. 6130 Part 6 Ch. 3 § 6304, 1952.)

20.36.160 - Suspension of permit—Conditions.

When the conditions described in Section 20.36.140 are so aggravated that immediate cessation of operation is necessary and the county engineer so finds, he shall suspend the permit. He shall serve notice of such suspension on the permittee. The county engineer may also suspend a permit if objectionable conditions listed in a notice to correct, served in accordance with Section 20.36.140, are not corrected within the time specified in such notice. (Ord. 7519 § 4 (part), 1959: Ord. 6130 Part 6 Ch. 3 § 6311, 1952.)

20.36.170 - Suspension of permit—Notice.

The county engineer shall immediately notify the permittee of suspension of permit or recommendation to the board that such permit be revoked, or both. (Ord. 6130 Part 6 Ch. 3 § 6313, 1952.)
A. Cl~
eug111eer111g i11c

Page 67 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-9

20.36.180 - Discontinuance of discharge or deposit required when.

A p
erson whose permit has been suspended, or who has been notified of violation, as provided in this Division 2, shall immediately discontinue the deposit or discharge of industrial waste, sewage, or effluent, or use of any described facility, and shall not resume such deposit or discharge, or use of the described facility, until a permit has been issued or reinstated by the county engineer or board as hereinafter provided. Failure so to do shall constitute willful violation of this Division 2.
(Ord. 7519 § 4 (part), 1959: Ord. 6130 Part 6 Ch. 3 § 6314, 1952.)

20.36.190 - Rights of permittee following notice of violation or suspension.

Within the time specified in the notice of violation or suspension, the permittee shall:

A. Correct and remedy the conditions so specified, to the satisfaction of the county engineer; or
B. File with the board a denial that all of the conditions so specified exist, request a public hearing, and correct the conditions which the permittee admits do exist; or C. File with the board a denial that any of the conditions so specified exist and request a public hearing.
(Ord. 8690 § 12 (part), 1964: Ord. 6130 Part 6 Ch. 3 § 6315, 1952.)

20.36.200 - Reinstatement of suspended permit.

The county engineer shall reinstate a suspended permit when all violations are corrected and all fees required by this Division 2 have been paid.
(Ord. 11716 § 37, 1978: Ord. 6130 Part 6 Ch. 3 § 6316, 1952.)

20.36.210 - Revocation of permit—Recommendation by county engineer.

The county engineer may recommend to the board that a permit be revoked. (Ord. 7519 § 4 (part), 1959: Ord. 6130 Part 6 Ch. 3 § 6312, 1952.)

20.36.220 - Cancellation of permit and facility closure—Conditions.

A. A person owning or operating premises containing industrial waste treatment or disposal facilities operated under a valid permit issued under the provisions of this Division 2 may file a written application with the director to cancel such permit upon termination of operations and/or closure of the permitted facility. Upon receipt of such an application, the director shall investigate and cancel the permit if he determines that:

1. All industrial-waste producing operations have ceased; A. Cl~
eug111eer111g i11c

Page 68 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-10

2. Any industrial waste treatment facilities have been removed or rendered ino
perable to prevent further use.

3. All permits to abandon or disconnect, as may be required by the Plumbing Code, have been obtained.

4. Any industrial wastes remaining on the premises have been removed to a legal point of disposal.

5. All fees required by this Division 2 due up to the date of closure of the facility have been paid.

6. The applicant has demonstrated that no environmental contamination has occurred by the previous operation of the treatment facility or that any contamination found has been mitigated.

B. Should the director deny an application for a permit cancellation or closure of the facility, the owner or operator of any facilities required by the permit shall maintain these facilities in good operating condition and pay all fees required by this Division 2 to maintain a valid permit.
(Ord. 2002-0074 § 3, 2002: Ord. 11716 § 40, 1978: Ord. 6130 Part 6 Ch. 3 § 6321, 1952.)
Part 2 - FEES AND DEPOSITS

20.36.230 - Industrial waste disposal permit—Application fee—Schedule.

The director shall collect a permit application fee, as set forth in the schedule below in Table 3-1, for each application received. Such fee shall be separate and apart from any fee or deposit collected for industrial waste plan review or imposed under provisions of the Plumbing Code, set out in Title 28, or other county ordinance or regulation, or by reason of any license, agreement or contract between the applicant and other public agency. Such application fee shall not be refundable even though the application be denied except as provided in Section

20.28.070.

Table 3-1 Industrial Waste Disposal Permit Type Fee
Industrial Waste
Disposal Permit
New
Permit
Revised
Permit
Sewer Disposal $533 $359
On-site Disposal $649 $533
Off-site Disposal $713 $476
(Ord. 2002-0074 § 4, 2002: Ord. 89-0101 § 30, 1989: Ord. 84-0109 § 5, 1984: Ord. 81-0043 § 6, 1981: Ord. 11716 § 42, 1978: Ord. 8690 § 12 (part), 1964: Ord. 7519 § 4(part), 1959: Ord. 6130 Part 6 Ch. 4 § 6402, 1952.)
A. Cl~
eug111eer111g i11c

Page 69 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-11
* Editor's note: Fe e changes in this section include changes made by the Department of Public Works due to increases in the Consumer Price Index and are effective July 1, 2020.

20.36.240 - Successor in interest or revision—Application fee.

The application fee for a permit application by a successor in interest where the director finds that the succeeding operation is essentially the same as the preceding permitted operation in quantity, strength and method of disposal for industrial wastes generated, shall be the amount set forth in Section 20.36.230 for permit revision. (Ord. 89-0101 § 31, 1989: Ord. 84-0109 § 6, 1984: Ord. 11716 § 48, 1978: Ord. 6130 Part 6 Ch. 4 § 6408, 1952.)

20.36.245 - Industrial waste plan review—Fee schedule.

A. The director shall collect a plan review fee, as set forth in the schedule below, Table 3-2, for each set of plans received for any single site or location. Such fee shall be separate and apart from any fee or deposit collected for any permit or inspection or imposed by any other county ordinance or regulation. Such plan review fee shall be applied to any submittal required by the director pursuant to this Division 2 and shall not be refundable even though the submittal be rejected or the project terminated except as provided in Section 20.28.070.

Table 3-2 Plan Review Class Type Fee
Industrial Waste
Disposal Permit
New
Sewer
Revision
Disposal
On-site
New
On-site
Revision
Off-site
New
Off-site
Revision
1 $ 889 $ 649 $1,007 $ 771 $ 946 $ 713
2 $1,126 $889 $1,243 $1,007 $1,186 $946
3 $1,362 $1,126 $1,478 $1,243 $1,423 $1,186
4 $1,597 $1,362 $1,718 $1,478 $1,658 $1,423
5 $1,837 $1,597 $2,191 $1,718 $1,891 $1,658
6 $2,073 $1,837 $2,543 $2,191 $2,130 $1,891
B. The director may impose a reinstatement fee of one-half of the plan review fee if the applicant fails to correct any plans or submittal upon written notice of correction or request for additional information by the director after three attempts have been made to gain such correction.
(Ord. 2002-0074 § 5, 2002: Ord. 89-0101 § 32, 1989.)
* Editor's note: Fee changes in this section include changes made by the Department of Public Works due to increases in the Consumer Price Index and are effective July 1, 2020.

20.36.250 - Annual inspection fee—Scheduling and billing.

A. For each industrial waste disposal permit issued by the director, an annual inspection fee as determined by the schedule below and Section 20.36.260, Table 3-3, A. Cl~
eug111eer111g i11c

Page 70 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-12
shall be due and payable to the director annually, in advance, on a billing date to be deter
mined by the director.

Table 3-3 Inspection Fee by Class
Class Inspection Fee
A $352
B $689
C $1,034
D $1,370
E $1,611
M $3,399
B. Immediately upon issuance of a new permit, the permittee shall be billed the above inspection fee for the first annual billing period.

C. The annual inspection fee shall be increased by an additional $296.00 for each approved rainwater diversion system.
(Ord. 2002-0074 § 6, 2002: Ord. 89-0101 § 33, 1989: Ord. 84-0109 § 7, 1984: Ord. 81-0043 § 7, 1981: Ord. 11716 § 43, 1978: Ord. 6130 Part 6 Ch. 4 § 6403, 1952.) * Editor's note: Fee changes in this section include changes made by the Department of Public Works due to increases in the Consumer Price Index and are effective July 1, 2020.

20.36.260 - Classes of businesses, processes and industries for plan review and inspection fee.

Plan review and inspection classes shall be established in accordance with Table I. The classes for any business, process, industry or residential STEP system connection not listed in Table I shall be determined by the director using Table 3-4 as a guide.

Table 3-4 Plan by Classes
Plan Review
Class
Inspection
Class
Agricultural Production, Food Processing and Handling
Animal slaughtering (except fowl) 3 D
Bakery plants 2 C
Beverages, canning and bottling 2 C
Breweries, wineries 3 D
Canned and preserved fruits and vegetables 3 B
Cold storage and refrigeration plants 1 A
Dairies and dairy products 2 D
Food markets 1 A
Frozen foods 2 B
Hydroponic farms 2 B
A. Cl~
eug111eer111g i11c

Page 71 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-13
Plan Review
Class
Inspection
Class
Poultry 3 E
Prepared meat, poultry, and fish products 2 C
Public eating places and plant cafeterias (including STEP system connections) 1 A Rendering 3 C
Sugar and confectionery products 1 A
Vegetable fats and oils 2 B
Vegetable packing 3 D
Mining, Manufacturing and Processing
Aircraft 3 C
Aircraft engines, parts, and accessories 3 C
Ammunition and explosives 2 D
Asphalt and asphalt products 4 E
Battery manufacturing, servicing, and reclaiming 3 E
*NCPS facilities 4 M
Blast furnaces, steel works, rolling and finishing mills 4 E *NCPS facilities 5 M
Carpet mills with dyeing 4 D
*NCPS facilities 5 E
Carpet mills without dyeing 1 A
Cement manufacturing 3 B
Ceramics 2 D
Chemical milling 5 E
*NCPS facilities 6 M
Chemical plants 5 E
*NCPS facilities 6 M
Coating, electroplating, engraving and related services 4 E *NCPS facilities 5 M
Concrete batch plants 2 D
Cut stone and stone products 2 A
Electric power generation plants except waste-to-energy facilities 3 B *NCPS facilities 4 E
Enameled products 2 B
*NCPS facilities 4 E
Guided missiles, space vehicles, space vehicle propulsion units and propulsion unit parts
4 D
Iron and steel foundries and heat treating 4 D
*NCPS facilities 5 E
Linoleum, asphalt-felt-base and other hard-surface floor covering 2 B Metal fabrication (no chemical wastes) 1 B
Metals--with chemical wastes (not otherwise classified) 3 D *NCPS facilities 4 E
A. Cl~
eug111eer111g i11c

Page 72 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-14
Plan Review
Class
Inspection
Class
Metals--with no chemical wastes (not otherwise classified) 1 B Motor vehicle parts and accessories 2 B
Motor vehicles, vehicle bodies and trailers 3 B
Musical instruments (metal) 2 C
Non-metals--with chemical wastes (not otherwise classified) 3 D *NCPS facilities 4 E
Non-metals--with chemical wastes (not otherwise classified) 1 A Oil field production 2 C
*NCPS facilities 3 D
Paint manufacturing 3 D
*NCPS facilities 4 E
Paper manufacturing 3 C
*NCPS facilities 4 E
Paper products 2 B
*NCPS facilities 4 E
Pesticides 4 D
*NCPS facilities 5 E
Petroleum refining and processing 5 E
*NCPS facilites 6 M
Pharmaceuticals 4 D
*NCPS facilities 5 E
Photographic equipment and supplies 2 C
Pottery, china, earthenware, porcelain, and related products 2 C Primary smelting and refining of nonferrous metals 3 B
*NCPS facilities 4 E
Printed circuit boards 4 E
*NCPS facilities 5 M
Quarrying and rock crushing 4 D
Railroad equipment 2 B
Rolling, drawing, and extruding nonferrous metals 2 C
*NCPS facilities 3 D
Rubber and plastics products 3 C
*NCPS facilities 4 E
Sand and gravel washing and screening 3 D
Secondary smelting and refining of nonferrous metals 2 C *NCPS facilities 3 D
Semiconductor and related devices 3 D
*NCPS facilities 4 E
Silverware, plated ware, and stainless-steel ware 5 M
*NCPS facilities 5 M
Spray-painting shops 1 A
A. Cl~
eug111eer111g i11c

Page 73 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-15
Plan Review
Class
Inspection
Class
Steel springs manufacturing 3 E
*NCPS facilities 4 M
Tanning and wool pulling 3 D
*NCPS facilities 4 E
Textile mills, treating and dyeing 4 D
*NCPS facilities 5 E
Wood fabrication (no chemical wastes) 1 A
Retail Trade and Services (Including STEP System Connections) Airports, flying fields and airport terminal services 1 B Automotive repair 1 C
Bottle and can washing 2 B
Car wash 1 C
Chemical laboratories 1 B
Cleaners, retail 1 B
Commercial laundries (not coin-operated) 2 B
Cooperages 3 D
Dry cleaning plants 2 D
Film processing plants 2 C
Film processing, retail 1 A
Kennels, dog, and cat hospitals 1 A
Marine service 2 C
Schools, churches, and institutions 1 A
Service stations--incidental car washing, repairs and maintenance 1 A Tank truck interior washing 2 D
*NCPS facilities 3 E
Truck repair and exterior washing 1 C
Waste Disposal Facilities
Cogeneration facilities (not otherwise classified) 2 C
Hazardous waste treatment, recycling, storage, and transfer facilities 6 M Injection wells, non-oilfield wastes (liquids) 3 M
Landfill gas recovery facilities 6 M
Liquid waste storage and transfer facilities, nonhazardous 4 E Solid-waste transfer, recycling, and composting facilities 3 D Solid-waste incinerators 6 M
Waste-to-energy facilities 6 M
Miscellaneous
Groundwater cleanup 1 A
Open facilities, not used 1 A
Storm water monitoring 1 A
Storm water treatment BMP Approval/monitoring 1 A
Sanitary dump station 1 A
A. Cl~
eug111eer111g i11c

Page 74 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-16
Plan Review
Class
Inspection
Class
Residences Connected to STEP Systems
Residences (per septic tank) no charge no charge
* Industries subject to National Categorical Pretreatment Standards (NCPS) and not regulated by a joint permit pursuant to Section 20.36.385, shall have fee amounts governed by the NCPS facility designations. Where an industry or process falls into more than one fee class category, the higher fee shall prevail unless the director determines a lesser amount is appropriate.
(Ord. 2002-0074 § 7, 2002: Ord. 89-0101 § 34, 1989: Ord. 89-0006 § 8, 1989: Ord. 11716 § 44, 1978: Ord. 6130 Part 6 Ch. 4 § 6404, 1952.)

20.36.265 - Wastewater sampling and analysis fee.

The director may charge the discharger a fee of $352.00 for each analysis performed by or on behalf of the director on wastewater samples taken from the discharger. (Ord. 2002-0074 § 8, 2002: Ord. 89-0101 § 35, 1989.)
* Editor's note: Fee changes in this section include changes made by the Department of Public Works due to increases in the Consumer Price Index and are effective July 1, 2020.

20.36.270 - Miscellaneous services—Fees.

The following fees, as set forth in Table 3-5 below, shall be paid before a review is made, approval is granted, inspection is made, operation is allowed, or remedial action is implemented:

Table 3-5 Service Fees
Service Fee
Application for closure and inspection of pretreatment facility pursuant to Section 20.36.220.
$555
Review of site-remedial investigation and cleanup plan, initial deposit $494 Additional site investigation and cleanup plan review and approval, per hour $128 Inspections outside of normal business hours, per hour $274 Inspection for which no fee is specifically indicated $352 Additional plan review or revisions of previously approved plans, per hour $128 (Ord. 2002-0074 § 9, 2002: Ord. 89-0101 § 36, 1989.)
* Editor's note: Fee changes in this section include changes made by the Department of Public Works due to increases in the Consumer Price Index and are effective July 1, 2020.

20.36.280 - Annual inspection fee, wastewater sampling and analysis fee and miscellaneous service fee—Payment time—Penalties for delinquency.

A. Cl~
eug111eer111g i11c

Page 75 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-17
All inspection fees required by Section 20.36.250 or Section 20.36.270 of this code, was
tewater sampling and analysis fees required by Section 20.36.265 and applicable miscellaneous fees required by Section 20.36.270 shall be due and payable on the billing date as established by those sections or by the due date indicated on any invoices issued. Fees not paid within 30 calendar days from the billing date shall be considered delinquent. Delinquent fees shall be subject to a 10-percent penalty fee for each 30-day period beyond the billing date that the fee is due. Permits for which the inspection fee is delinquent for 90 days or more are subject to suspension as provided in Section 20.36.160. (Ord. 89-0101 § 37, 1989: Ord. 11716 § 46, 1978: Ord. 6130 Part 6 Ch. 4 § 6406, 1952.)

20.36.290 - Annual inspection fee—Refund conditions.

Upon cancellation of permit pursuant to Section 20.36.220, and upon written request of the permittee, the county engineer shall refund a portion of the annual inspection fee as determined from Table 3-6 below:

Table 3-6 Annual Inspection Fee – Refund Conditions
Days from Previous Billing Date Percent Required
1 - 60 75%
61 - 150 50%
151 - 240 25%
241 or more 0%
(Ord. 11716 § 47, 1978: Ord. 6130 Part 6 Ch. 4 § 6407, 1952.)

20.36.295 - Annual review of fees.

Beginning on July 1, 2003, and thereafter on each succeeding July 1st, the amount of each fee in this chapter shall be adjusted as follows: calculate the percentage movement between April of the previous year and March of the current year in the Consumer Price Index (CPI) for all urban consumers in the Los Angeles, Anaheim, Riverside areas, as published by the United States Government Bureau of Labor Statistics, adjust each fee by said percentage amount and round off to the nearest $1.00. Notwithstanding the foregoing, no such adjustment shall decrease any fee, and further, no fee shall exceed the reasonable cost of providing the services for which the fee is collected.
(Ord. 2002-0074 § 10, 2002: Ord. 89-0101 § 38, 1989.)
Part 3 – DISCHARGE TO PUBLIC SEWERS

20.36.300 - Application of Part 3 provisions.

The provisions of this Part 3 of Chapter 20.36 shall pertain to the disposal of industrial waste to the public sewer only.
(Ord. 7519 § 3 (part), 1959: Ord. 6130 Part 6 Ch. 1 § 6101, 1952.) A. Cl~
eug111eer111g i11c

Page 76 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-18

20.36.310 - Permit—Required when.

A.

A person shall obtain a permit from the county engineer prior to the discharge of industrial waste to a public sewer.

B. The county engineer shall not grant such a permit unless he finds that sufficient capacity exists in the public sewer to allow for such industrial waste, as determined by the requirements of Section 20.32.080.

C. A separate permit shall be required for each connection discharging industrial wastes to the public sewer.

D. For the purpose of this section, discharges resulting from garbage grinders powered by motors of one horsepower or less, and grease interceptors installed in restaurants in accordance with the provisions of the Los Angeles County Plumbing Code where such facilities are not required by other provisions of this Division 2, are not considered to be industrial waste discharges.

E. A person shall obtain a permit from the county engineer to maintain an existing but nonused industrial waste connection to the public sewer. The annual inspection fee for such permit shall be the same as that for Inspection Fee Class A. The connection shall be removed upon the expiration or revocation of such permit pursuant to the criteria established by Section 20.36.220.
(Ord. 84-0109 § 8, 1984: Ord. 11716 § 28, 1978: Ord. 10020 § 3 (part), 1970: Ord. 7519 § 3 (part), 1959: Ord. 6982 § 11, 1956: Ord. 6130 Part 6 Ch. 1 § 6102, 1952.)

20.36.320 - Permit—Application forms—Information required.

A. The director shall provide printed application forms for the permit required by this Part 3, indicating thereon the information to be furnished by the applicant. In conjunction therewith, the applicant may be required to furnish the following:

1. The name and address of the applicant.

2. The name and address of the discharger.

3. The address or location of the premises where the discharge will take place.

4. The Standard Industrial Classification (SIC) of the discharger.

5. Information with respect to constituents and characteristics of wastewater proposed to be discharged, including but not limited to those referred to in this Part 3. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR, Part 136, as amended, and by laboratories certified by the state of California. In the absence of a state certification process, the director may certify a laboratory to perform necessary sampling and analysis.

6. Time and duration of the proposed discharge or discharges.

A. Cl~
eug111eer111g i11c

Page 77 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-19

7. Average daily and five-minute peak wastewater flow rates, including daily, mon
thly and seasonal variation, if any.

8. Each byproduct waste of the discharges by type, amount and rate of production.

9. Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, storm drains, connections and appurtenances by their size, location and elevation.

10. Description of activities, facilities and plant processes on the applicant's premises, including all pollutants which could be discharged.

11. Detailed plans showing pretreatment facilities, sampling facilities, uncontrolled discharge containment facilities, and operating procedures.

12. Identification of the nature and concentration of any pollutant located at the premises of the discharger (and/or applicant if different) if that pollutant is prohibited from discharge under this Part 3, or any proposed discharge which is regulated by any applicable local limit, plus a statement specifying whether the specific limitations set forth in said local limits are being met, and, if not, what operation and maintenance (O&M) or pretreatment is proposed by the discharger to cause compliance;

13. The shortest time scheduled by which the discharger shall provide the necessary additional pretreatment or O&M, if additional pretreatment or O&M will be required to meet the regulations in this Division 2. Any completion date in such a proposed schedule shall not be later than the compliance date established by the applicable regulations. The schedule shall provide for reporting increments in progress in the form of dates for commencement and completion of major events leading to the construction and operation of additional pretreatment necessary for the discharger to meet the applicable regulation (e.g., hiring an engineer, completing preliminary and final plans, executing contract for major components, commencing construction, completing construction);

14. Each product of the discharger by type, amount, and rate of production.

15. Type and amount of raw materials processed by the discharger (average and maximum per day);

16. Number of employees, hours of operation of plant, and hours of operation of the proposed pretreatment system.

17. Copies of any current NPDES permit, South Coast Air Quality Management District permit, Regional Water Quality Control Board permit, fire department business plan, health department license and State Department of Health Services permit for the subject premises.

A. Cl~
eug111eer111g i11c

Page 78 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-20

18. The name, business address and motor vehicle driver's license number of the
authorized representative.

19. Any other information deemed by the director to be necessary to evaluate the permit application.

The application shall be signed under penalty of perjury by the authorized representative of the discharger.

B. For the purpose of this section, the director may utilize joint permit application forms under agreements established with other public agencies as provided in Section 20.28.090.
(Ord. 89-0101 § 39, 1989: Ord. 11716 § 29, 1978: Ord. 10276 § 1, 1971: Ord. 7010 § 1 (part), 1956: Ord. 6130 Part 6 Ch. 1 § 6104, 1952.)

20.36.330 - Permit—Issuance conditions.

If it appears from the application and supporting information submitted for any permit required by this chapter that the proposed disposal complies with the provisions of this Division 2 and other applicable laws and ordinances, the county engineer, upon receipt of the fees hereinafter required, shall issue such permit.
(Ord. 11716 § 30, 1978: Ord. 6130 Part 6 Ch. 1 § 6105, 1952.)

20.36.340 - Determination of type of liquid waste.

Before granting an industrial waste disposal permit to any applicant, the county engineer shall determine either that the waste is one which will not damage or destroy the public sewer or cause an unwarranted increase in the cost of maintenance of the public sewer, or retard or inhibit the treatment of the sewage, or is one that can be made acceptable by pretreatment.
(Ord. 6130 Part 6 Ch. 1 § 6106, 1952.)

20.36.350 - Pretreatment—Plans prerequisite to permit issuance when.

In event pretreatment or special facilities are required to make the waste acceptable as provided under the provisions of this Division 2, the applicant for an industrial waste disposal permit may be required to furnish plans showing the method of collections and pretreatment proposed to be used, and a permit shall not be issued until said plans or required modification thereof have been checked and approved by the county engineer. (Ord. 6130 Part 6 Ch. 1 § 6107, 1952.)

20.36.360 - Permit—Revocation conditions.

By following the procedure set forth in Part 1 of this chapter, the county engineer may recommend the revocation of and the board may revoke any permit if, after a public hearing, if a public hearing is requested, or otherwise, after due investigation, the board finds:

A. Cl~
eug111eer111g i11c

Page 79 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-21
A. A failure of the permittee to correct conditions as required by the county engineer; or
B.

Conditions which would justify the denial of a permit; or C. Fraud or deceit was employed in obtaining the permit; or D. Any other violation of this Division 2 or of any conditions of any permit including the one to be revoked, license or exception granted hereunder. (Ord. 7519 § 3, 1959: Ord. 6130 Part 6 Ch. 1 § 6103, 1952.)

20.36.365 - Public participation—Notification of significant violations.

At least annually, the director shall provide public notification, in the largest daily newspaper published in the municipality in which a POTW is located, of industrial users of the POTW which, during the previous 12 months, were significantly violating applicable pretreatment standards or other pretreatment requirements, as provided in 40 CFR 403.8. The director need not provide such notification if a notice meeting all applicable EPA requirements has been published by the POTW operator. The cost of such public notification shall be collected by the director from the discharger causing such violation and/or notification. (Ord. 89-0101 § 40, 1989.)

20.36.370 - Disconnection following permit revocation.

If a permit is revoked, the county engineer may disconnect from the public sewer any industrial connection sewer which was connected pursuant to such permit. (Ord. 7519 § 3, 1959: Ord. 6130 Part 6 Ch. 1 § 6103.5, 1952.)

20.36.380 - Pretreatment—Standards and criteria.

The county engineer may establish uniform minimum standards and criteria for the application of such standards for pretreatment of specific industrial waste discharges. The provision of this section shall not prohibit the county engineer from requiring additional pretreatment to accomplish the objective of Section 20.36.340. (Ord. 11716 § 52, 1978: Ord. 6130 Part 6 Ch. 1 § 6107.5, 1952.)

20.36.390 - Rainwater diversion systems—Authorized when.

The county engineer may authorize the installation of a rainwater diversion system in lieu of roofing to prevent the discharge of stormwaters to the sewer system where roofing is impractical, in conflict with existing laws or regulations, may create a hazardous or unsafe working condition, or may cause undue hardship on the applicant, providing the county engineer finds that:

A. The applicant has applied for an industrial waste disposal permit and has submitted all plans and specifications of the proposed system.

A. Cl~
eug111eer111g i11c

Page 80 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-22
B. The system provides for continuous 24-hour protection to the public sewer system.

C.

The system meets minimum operational and component standards as may be established pursuant to Section 20.36.380; and
D. Pollution of underground or surface waters, nor damage to any streets, gutters, storm drains, channels or any public or private property will not be caused by the diverted storm flows.
(Ord. 11716 § 32, 1978: Ord. 6130 Part 6 Ch. 1 § 6111, 1952.)

20.36.400 - Deposit of certain substances prohibited.

A person shall not place, throw or deposit, or cause or permit to be placed, thrown or deposited in any public sewer or main-line sewer any dead animal, offal, or garbage, fish, fruit or vegetable waste, or other solid matters, or materials or obstructions of any kind whatever of such nature as shall clog, obstruct or fill such sewer, or which shall interfere with or prevent the effective use or operation thereof. A person shall not cause or permit to be deposited or discharged into any such sewer any water or sewage, or liquid waste of any kind containing chemicals, greases, oils, tars or other matters in solution or suspension, which may clog, obstruct or fill the same, or which may in any way damage or interfere with or prevent the effective use thereof, or which may necessitate or require frequent repair, cleaning out or flushing of such sewer to render the same operative, or which may obstruct or cause an unwarranted increase in the cost of treatment of the sewage, or which may introduce into a POTW any pollutant(s) which cause pass through or interference. Stormwater runoff shall not be discharged into a sanitary sewer.
(Ord. 89-0101 § 41, 1989: Ord. 83-0092 § 11, 1983: Ord. 6130 Part 6 Ch. 1 § 6108, 1952.)

20.36.402 - National Categorical Pretreatment Standards (NCPS)—Compliance.

Upon the promulgation of mandatory NCPS for any industrial subcategory, the NCPS, if more restrictive than limitations imposed by this division, shall apply. The director may impose a phased compliance schedule to insure that affected industries meet the NCPS. Failure to meet the phased compliance schedule may result in permit suspension or revocation. Those dischargers subject to NCPS shall comply with all reporting requirements in accordance with the General Pretreatment Regulations for Existing and New Sources of Pollution (Title 40, Code of Federal Regulations, Part 403). Facilities subject to this division and regulated by joint permits issued in conjunction with other agencies pursuant to Section 20.28.090 may meet the requirements of this section as set forth in such joint permit and by furnishing such evidence of compliance as may be required by the director. (Ord. 89-0101 § 42, 1989.)

20.36.404 - Compliance with local limits.

No person shall introduce or cause to be introduced wastewater to the sewer system or a POTW that exceeds specific local limits which have been developed by the receiving POTW.

A. Cl~
eug111eer111g i11c

Page 81 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-23
Said local limits shall not apply where more restrictive limitations are imposed by permit or Nati
onal Categorical Pretreatment Standards.
(Ord. 89-0101 § 43, 1989.)

20.36.410 - Toxic substances.

All toxic chemical substances shall be retained or rendered acceptable before discharge into the public sewer.
(Ord. 6130 Part 6 Ch. 1 § 6114, 1952.)

20.36.420 - Control of pH.

No person shall discharge acids or alkali materials into the public sewer until the Ph has been controlled to a level not less than 6.0 nor at or higher than a level which the director finds excessive. No discharge shall have any corrosive or detrimental characteristics that may cause injury to wastewater treatment, inspection or maintenance personnel or may cause damage to structures, equipment or other physical facilities of the public sewer system. (Ord. 89-0101 § 44, 1989: Ord. 6130 Part 6 Ch. 1 § 6113, 1952.)

20.36.430 - Temperature restrictions.

A person shall not discharge into the public sewer effluent exceeding a temperature of 140 degrees Fahrenheit or which will exceed 104 degrees Fahrenheit at the point of entry into the POTW treatment plant.
(Ord. 89-0101 § 45, 1989: Ord. 11716 § 33, 1978: Ord. 6130 Part 6 Ch. 1 § 6112, 1952.)

20.36.440 - Cooling water.

No uncontaminated cooling water shall be discharged into a public sanitary sewer. (Ord. 11716 § 31, 1978: Ord. 10020 § 3 (part), 1970: Ord. 6130 Part 6 Ch. 1 § 6109, 1952.)

20.36.450 - Ground garbage.

Garbage resulting from the preparation of food may be discharged into the public sewer (but not into a STEP sewer system unless as septic tank effluent) if ground to a fineness sufficient to pass through a three-eighths-inch screen. Excessive or unnecessarily large quantities of water shall not be used to flush ground garbage into the sewer. (Ord. 89-0006 § 9, 1989: Ord. 6130 Part 6 Ch. 1 § 6110, 1952.) Part 4 – OTHER METHODS OF DISPOSAL

20.36.460 - Applicability of Part 4 provisions.

A. Cl~
eug111eer111g i11c

Page 82 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-24
The provisions of this Part 4 shall pertain to the disposal, discharge or deposit of all industrial was
te except where such wastes are discharged to a public sewer in accordance with the provisions of Part 3 of this chapter.
(Ord. 11716 § 34, 1978: Ord. 8690 § 3 (part), 1964; Ord. 6130 Part 6 Ch. 2 § 6201, 1952.)

20.36.470 - Depositing or discharging wastes prohibited without permit.

A person shall not maintain a deposit of waste material, or discharge or deposit or cause or suffer to be discharged or deposited, except as otherwise provided in this Division 2, any waste material or effluent in or upon unincorporated territory of the county of Los Angeles, or into streams or bodies of surface or subsurface water, or storm drains, or flood control channels, where the same is deposited upon or may be carried through or upon unincorporated territory of the county without first securing, in the manner provided in this chapter, a permit from the county engineer so to do, and at all times having an unrevoked permit therefor, unless otherwise exempted by the provisions of this chapter. (Ord. 6130 Part 6 Ch. 2 § 6202, 1952.)

20.36.475 - Maintenance of existing, nonused facility for industrial waste deposit, discharge or storage.

A person shall obtain a permit from the county engineer to maintain an existing but nonused facility designed or formerly used for the deposit, discharge or storage of industrial wastes.

The annual inspection fee for such permit shall be the same as that for Inspection Fee Class A.

Exception: Such permit is not required when, to the satisfaction of the county engineer, compliance with the permit cancellation criteria of Section 20.36.220 has been provided. (Ord. 84-0109 § 9, 1984.)

20.36.480 - Permit—Not required when.

No permit shall be required for the disposal of waste which consists only of domestic sewage into septic tanks, cesspools or seepage pits constructed pursuant to the provisions of the Plumbing Code, as set out at Title 28 of this code.
(Ord. 8690 § 12 (part), 1964: Ord. 6130 Part 6 Ch. 2 § 6203, 1952.)

20.36.490 - Permit—Application—Form and contents.

Any person requiring a permit under the provisions of this Part 4 shall make written application therefor to the county engineer, giving such information as the county engineer may require. The county engineer shall provide printed application forms, indicating thereon the information to be furnished by the applicant. The county engineer may require from the applicant, in addition to the information furnished on the printed form, any additional information including detailed plans and specifications which will enable the county engineer to determine that the proposed discharge or deposit and plan of operation complies with the provisions of this Division 2 and other applicable laws and ordinances.

A. Cl~
eug111eer111g i11c

Page 83 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-25
(Ord. 11716 § 35, 1978: Ord. 10276 § 2, 1971: Ord. 7010 § 1 (part), 1956: Ord. 6130 Part 6 Ch.
2 § 6204, 1952.)

20.36.500 - Permit—Plans required with application when.

A. The county engineer may require that an application for a permit to dispose of industrial waste shall be accompanied by suitable plans showing the proposed method of collection, treatment and disposal, and a permit shall not be issued until said plans or required modification thereof have been checked and approved by the county engineer.

B. The county engineer may submit the application or plans, or both, to any public agency for comment or recommendation.
(Ord. 6541 § 4, 1954: Ord. 6130 Part 6 Ch. 2 § 6205, 1952.)

20.36.510 - Use of public property—Permit required when.

Whenever facilities for the discharge of industrial waste connect to structures, or encroach on the property or rights-of-way owned or controlled by a public agency, the county engineer may either:

A. Require that the applicant obtain a property-use permit, license, easement, or other right to use said properties prior to the issuance of a permit to dispose of industrial waste; or
B. Issue such permit subject to the execution of a property-use permit, license, easement, or other right to use said properties.
(Ord. 6130 Part 6 Ch. 2 § 6206, 1952.)

20.36.520 - Notification of public agencies required.

Whenever an application for permit is filed, the county engineer shall notify the county health officer and such other public agencies as in his opinion may be affected and shall request a prompt reply containing their recommendations. Upon request, he shall secure from the applicant and furnish to the affected department or agency such additional plans or information as it may require, relative to such application. (Ord. 6130 Part 6 Ch. 2 § 6207, 1952.)

20.36.530 - Investigation by county officers and departments.

Whenever notified that an application for permit has been filed, the county health officer, the county engineer and other county departments affected shall make such investigations as in their opinions are required. The health officer and such other departments shall, within 20 days of notification of the filing of the application, make and file reports of their investigations with the county engineer. Such reports shall narrate all facts found, and shall recommend that the application be denied, or be granted in whole or in part, and if granted, subject to what conditions, if any. Such report may also disclaim interest in the application.

A. Cl~
eug111eer111g i11c

Page 84 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-26
(Ord. 6130 Part 6 Ch. 2 § 6208, 1952.)

20. 36.540 - Deposits creating menace to public health—Notice requirements.

When the county health officer finds that industrial waste or effluent, or any other material, is being discharged or deposited in such manner as to create a menace to the public health, he may serve notice of violation upon the person owning or operating the premises, describing the conditions, and requiring the prompt correction thereof and shall so notify the county engineer.
(Ord. 6130 Part 6 Ch. 2 § 6209, 1952.)

20.36.550 - Permit—Issuance conditions.

The county engineer shall issue a permit as required by this Division 2 if he determines that all of the following conditions have been met:

A. All fees or deposits hereinafter required have been paid.

B. Recommendations and conditions of the various county departments, as contained in their reports, if any, have been met. The county engineer may waive this provision except as to the requirements of the county health officer.

C. The material to be discharged or deposited does not or will not, in the opinion of the county health officer, constitute a potential public nuisance or menace to the public health and safety, and will not violate other provisions of the Health and Safety Code of the state of California.

D. The material to be discharged or deposited does not or will not involve disposal of any toxic materials or chemicals in such manner as to cause pollution of any stream, watercourse, lake, or other body of water, or underground or surface water storage reservoir, either natural or artificial.

E. The material to be discharged or deposited does not or will not damage or adversely affect any storm drain, channel, or any public or private property.

F. Under existing circumstances and conditions it is necessary and reasonable so to dispose of such waste matter.
(Ord. 6130 Part 6 Ch. 2 § 6210, 1952.)
Part 5 - TREATMENT PLANTS AND FACILITIES

20.36.560 - Installation—Required when.

Industrial waste treatment plants or facilities shall be installed whenever the county engineer shall find as a fact that such facilities are required to safeguard the public health; prevent pollution of streams or bodies of surface or underground water; prevent pollution of water wells or storage reservoirs, either natural or artificial; prevent damage or increased maintenance costs in the sewerage system; prevent damage to public or private property; A. Cl~
eug111eer111g i11c

Page 85 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-27
prevent a public nuisance; or to comply with applicable regulations of any other public age
ncy.
(Ord. 6130 Part 6 Ch. 5 § 6501, 1952.)

20.36.570 - Pretreatment—Standards and criteria.

The county engineer may establish uniform minimum standards and criteria for the application of such standards for pretreatment of specific industrial waste discharges. The provisions of this section shall not prohibit the county engineer from requiring additional pretreatment to accomplish the objective of Section 20.36.340 of this chapter. (Ord. 11716 § 49, 1978: Ord. 6130 Part 6 Ch. 5 § 6501.5, 1952.)

20.36.580 - Facilities not required when.

Installation of industrial waste treatment facilities may not be required if the county engineer determines that:

A. The waste is prohibited for discharge to the available systems by this Division 2 or other applicable ordinances or regulations.

B. The affected industry has guaranteed to separately dispose of any objectionable waste to legal points of disposal.

C. Adequate facilities are to be provided for the collection and containment of such wastes, and that provisions have been made to prevent intentional or accidental discharge of such wastes to the sewer system, ground surface, surface or underground water supplies, rivers, channels, storm drains, public streets or gutters.

D. An application for industrial waste disposal permit has been filed in accordance with Part 4 of this chapter; and
E. All fees required by this Division 2 have been paid. (Ord. 11716 § 50, 1978: Ord. 6130 Part 6 Ch. 5 § 6502, 1952.)

20.36.590 - Installation—Access of inspection and maintenance.

Interceptors or other industrial waste treatment plants or facilities shall be so installed and constructed that they shall be at all times easily accessible for inspection and maintenance. (Ord. 6130 Part 6 Ch. 5 § 6503, 1952.)

20.36.600 - Separation of domestic and industrial wastes.

All domestic wastes from restrooms, showers, drinking fountains, etc., shall be kept separate from all industrial wastes until the industrial wastes have passed through any required pretreatment facilities.
(Ord. 11716 § 51, 1978: Ord. 6130 Part 6 Ch. 5 § 6503.5, 1952.) A. Cl~
eug111eer111g i11c

Page 86 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-28

20.36.610 - Operation and maintenance.

All
industrial waste treatment plants or facilities or water pollution control plants, and all appurtenances thereto, existing as of October 23, 1964, or hereafter constructed under jurisdiction of this Division 2 shall be maintained, by the owner or person having jurisdiction of the property affected, in good operating condition and in a safe and sanitary condition at all times. All devices and safeguards which are required by this Division 2 for the operation thereof, and all records of such operation, shall be maintained in good order. (Ord. 8690 § 3 (part), 1964; Ord. 6130 Part 6 Ch. 5 § 6504, 1952.)

20.36.620 - Inspection and testing.

The county engineer shall make tests of industrial wastes, periodic inspections of water pollution control plants and industrial waste treatment plants or facilities to determine whether such treatment plants or facilities are maintained in accordance with the requirements of this Division 2. The county engineer shall also make periodic tests on samples of sewage, industrial waste or effluents obtained at the point of discharge or deposit to determine whether such discharges or deposits are made in accordance with the provisions of this division.
(Ord. 8690 §§ 3 (part) and 12 (part), 1964; Ord. 6130 Part 6 Ch. 5 § 6505, 1952.)

20.36.630 - Right of entry for inspection authorized when.

A. The county engineer shall be permitted at all reasonable hours to inspect water pollution control plants and industrial waste treatment plants or facilities, and to enter and inspect the place, enclosure or structure where industrial wastes or effluent are discharged or deposited.

B. A person shall not refuse to permit, and shall not hinder or obstruct in any way, any reasonable inspection or investigation of such treatment plant or facilities or deposits or discharges by the county engineer.
(Ord. 8690 § 3 (part), 1964; Ord. 6130 Part 6 Ch. 5 § 6506, 1952.)

20.36.640 - Owner's safety regulations—Compliance by inspector.

Inspector shall comply with any special safety regulations brought to his attention by the owner or operator.
(Ord. 6130 Part 6 Ch. 5 § 6507, 1952.)

20.36.650 - Test manholes or other structures.

The county engineer may require the installation of a test manhole or other structure through which all industrial waste shall pass. Said structure shall be so designed that flows may be measured, and samples readily obtained therefrom.
(Ord. 6130 Part 6 Ch. 5 § 6508, 1952.)
A. Cl~
eug111eer111g i11c

Page 87 of 310 ends

DRAFT Section 3 - Legal Authority
City of La Verne

2024 City of La Verne Sewer System Management Plan
S3-29
The following relates to sewer easements:

CIT
Y OF LA VERNE MUNICIPAL CODE – Title 16 Subdivisions. Article 1 – Design Standards Chapter 16.28 .- DESIGN AND IMPROVEMENTS
§ 16.28.180 Easements—Underground facilities. Sewer lines and underground public utilities shall not be on back or side lot easements unless specifically approved by the city. (Ord. 858 § 3, 1994)

A. Cl~
eug111eer111g i11c

Page 88 of 310 ends

DRAFT Section 4 – Operations and Maintenance Program
City of La Verne

2024 City of La Verne Sewer System Management Plan
S4-1
Section 4 - Ope rations and Maintenance Program
Collection System Maps
Details on Collection System Maps are included electronically on the City’s GIS database with its m
ost recent data as of 2024. State Regulators can contact the Utilities Manager to be provided access to updated information.

Prioritized Preventive Maintenance
As discussed in the City’s 2022 Wastewater Master Plan (WWMP) (Attachment C), the City empl
oys the use of hydro jetting and CCTV inspections as its primary maintenance program.

City staff attempts to conduct maintenance on pipe segments at least once every three years as noted in Section 2.4 of the 2022 WWMP.

Rehabilitation and Replacement Program
Future project prioritization is outlined in the 2022 WWMP.

Training
Provide training on a regular basis for staff in sanitary sewer system operations and main
tenance and require contractors to be appropriately trained.

Supervisor
The City is working to require wastewater staff, and Technical Services positions to maintain California Water Environment Association Collection Systems certification relevant to their job classification. All field staff are certified at or above the City-required level.

The City cross-trains all of the field staff to become proficient at both maintenance and construction work processes for collection system operations. Field personnel periodically rotate between maintenance and repair crews, which allows for on-the-job training on a consistent basis. Based on the size of our system, and the ratio of dedicated field positions, cross-trained staff is imperative to achieve consistent success on the maintenance.

Approach to training of overflow response involves preparation on three levels: Technical Skills, Safety, and Procedural Skills. Training is conducted bi-annually and begins with a solid understanding of what causes sewer overflows, such as:
• Foreign matter blocking flow in the sewer mains.
• System failures.
• Storm water infiltration.

The safety of those responding to sewer overflows is critical. Biological risks and possible exposure to harmful pathogens and toxic gases are addressed as well as the importance of staying safe by using personal protective equipment at all times when responding to SSO’s.

Respondents are trained to follow emergency response protocols including documentation A. Cl~
eug111eer111g i11c

Page 89 of 310 ends

DRAFT Section 4 – Operations and Maintenance Program
City of La Verne

2024 City of La Verne Sewer System Management Plan
S4-2
of time called, first on scene, severity of overflow, and securing the affected area using traffic con
trol devices.

In addition to the above training, crew members are trained to identify and clear blockages, damming techniques, flow diversion techniques to minimize damage to the environment and nearby bodies of water as well as the safe and proper use of specialized equipment including a city owned Vactor truck and a closed circuit tv truck.

Communication is key to the success of minimizing overflows. During the trainings communication is stressed to include not only communication between each other at the overflow site but also in communicating events on records that need to be filed with governing agencies and the public as necessary.

Training concludes with post incident evaluation. Ensuring that all required information is reported, and that any response concludes with assurance of clean and safe area where overflow occurred, and that all equipment used is properly cleaned and placed where it belongs.

Training on use of new equipment or for newly established procedures is provided prior to the equipment being put into service and/or procedures being implemented. Additionally, each time crew changes occur, all maintenance workers first review the standard operating practices associated with the crew they are assigned.

Contingency Equipment and Replacement Inventory
Identify Equipment and Critical Replacement Parts
Provi
de equipment and replacement part inventories, including identification of critical replacement parts.

The City maintains critical replacement parts for its lift stations. Included, but not limited to, items such as; force main pipe and mechanical repair couplings for each size/type of pipe; transducers; relays; and fuses. All are clearly labeled for the appropriate application. Audits of critical parts are periodically performed.

The City’s lift stations are equipped with automatic transfer switches to allow for quick connection of emergency stand-by generators. The lift stations can also be de-watered using one of the City’s two (2) combination hydro-vacuum units. In addition to the Vactor Trucks the City is equipped with the following items to ensure SSO’s are maintained and kept from entering the water ways:

1. Rubber Gutter Guard mats to block storm drain opening(s).

2. Sandbags.

3. Chlorine Disinfectant.

4. Traffic Control equipment, delineators, cones, and caution tape.

5. Portable light tower.

6. Portable generator.

A. Cl~
eug111eer111g i11c

Page 90 of 310 ends

DRAFT Section 4 – Operations and Maintenance Program
City of La Verne

2024 City of La Verne Sewer System Management Plan
S4-3

7. Portable Pump.

The
City contracts with Schwalm Generation to provide 24-hour service for lift station control and electrical problems that City staff cannot immediately resolve. On an annual basis generators receive three minor inspections and one major inspection per year, the major inspection includes changing of fluids. In addition to the annual maintenance, on a bi-annual basis load testing is completed on the units.

Table 4-1 Backup Generators
Tank ID Unit
ID Address Year Make
City Yard 1201 Portable Generator Trailer (Smaller One) 2016 Onan/Cummins Street 1307 959 Puddingstone Drive, La Verne 91750;
Franklin Lift Station 2004 Onan/Cummins
Street 1308 2525 White Avenue, La Verne 91750, Booster 2004 Onan/Cummins

A. Cl~
eug111eer111g i11c

Page 91 of 310 ends

DRAFT Section 5 – Design and Performance Provisions
City of La Verne

2024 City of La Verne Sewer System Management Plan
S5-1
Section 5 - Desi gn and Performance Provisions
The City utilizes the 2024 Greenbook: Standard Specifications for Public Works Construction as w
ell as documents in Attachment B including all CAD Standards and additional information. The City’s Public Works Inspector typically handles right-of-way sewer inspections. For on-site private systems, the City’s contracted general engineering firm is responsible for inspections.

A. Cl~
eug111eer111g i11c

Page 92 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-1
Section 6 - Sew er Overflow Emergency Response Plan
I - General
The Sewer Overflow Response Plan (SORP) is designed to ensure that every report of a conf
irmed sewage overflow is immediately dispatched to the appropriate crews so that the effects of the overflow can be minimized with respect to impacts to public health and adverse effects on beneficial uses and water quality of surface waters and customer service. The SORP further includes provisions to ensure safety pursuant to the directions provided by the County of Los Angeles Health Care Agency and the State Regional Water Quality Board and that notification and reporting is made to the appropriate local, state, and federal authorities.

For purposes of this SORP, "confirmed sewage spill" is also sometimes referred to as "sewer overflow," "overflow," or "SSO." The effective date of this plan is December 16, 2024.

A. Goals
The
City’s goals with respect to responding to SSOs are:
• Work safely.
• Respond quickly to minimize the volume of the SSO.
• Eliminate the cause of the SSO.
• Prevent sewage system overflows or leaks from entering the storm drain system or receiving waters to the maximum extent practicable. • Contain the spilled wastewater to the extent feasible. • Minimize public contact with the spilled wastewater.
• Mitigate the impact of the SSO.
• Meet the regulatory reporting requirements.
• Evaluate the causes of failure related to certain SSO’s. • Revise response procedures resulting from the debrief and failure analysis of certain SSOs

B. Objectives
The primary objectives of the SORP are to protect public health and the environment, satisfy regulatory agencies, and waste discharge permit conditions, which address procedures for managing sewer overflows, and minimize risk of enforcement actions against the City of La Verne.

Additional objectives of the SORP are as follows:
• Provide appropriate customer service;
• Protect wastewater treatment plant and collection system personnel; • Protect the collection system, wastewater treatment facilities, and all appurtenances; and
• Protect private and public property beyond the collection and treatment facilities.

This plan shall not supersede existing emergency plans or standard operating procedures (SOPs) unless directed by the Director of Public Works.

A. Cl~
eug111eer111g i11c

Page 93 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-2
C. Organization of Plan
Th
e key elements of the SORP are addressed individually as follows:
• Overflow Response Procedure
• Public Advisory Procedure
• Regulatory Agency Notification Procedure
• Media Notification Procedure
• Distribution and Maintenance of SORP
D. SSO Tracking
A procedure to track the frequency and location of SSOs has been prepared under separate cover. Depending on the completeness of information resulting from implementation of the procedure, it could support the Water Distribution/Sewer Supervisor or the delegated representative's decision process for directing the correction of overflows and prioritizing maintenance activities.

E. Summary of Notification, Monitoring and Reporting Requirements for Spills (per Attachment E1 and E2 of the General Order 2022-0103-DWQ)

As required in Attachment E 1 of the General Order 2022-0103-DWQ, there are four spill categories as summarized below.

Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.

F. Spill Category Chart
On the following page, the chart outlines the spill category definitions which correlate with the notification requirements outlined in Section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of State Water Resources Control Board’s Waste Discharge Requirements (WDR) Order No. WQ 2022-0103-DWQ.

A. Cl~
eug111eer111g i11c

Page 94 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-3
Spill Category Chart
Spill Category Description of Spill
Category 1
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
• A surface water, including a surface water body that
contains no flow or volume of water; or
• A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and
returned to the sanitary sewer system or disposed of
properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated
stormwater infiltration basin or facility.

A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping
Requirements) of this General Order.

Category 2 A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill.

Category 3 A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.

Category 4 A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface.

A. Cl~
eug111eer111g i11c

Page 95 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-4
II - Overflow Response Procedure
The
Overflow Response Procedure presents a strategy for the City of La Verne Public Works staff
to mobilize labor, materials, tools and equipment to correct or repair any condition which may cause or contribute to an un-permitted discharge. The plan considers a wide range of potential system failures that could create an overflow to surface waters, land, or buildings.

A. Receipt of Information Regarding an SSO
An overflow may be detected by system employees or by others. The City of La Verne Police Dispatch and public works department water division is primarily responsible for receiving phone calls from the public of possible sewer overflows from the wastewater collection system.

Generally, telephone calls from the public reporting possible sewer overflows are received by telephone operators at the public works department customer service staff the Police and Fire Dispatch emergency phone line is staffed 24 hours per day, every day of the year. During regular work hours, Monday through Thursday customer service staff will receive calls. The sewer system operator(s) have a program for educating the public to report overflows they observe and the phone number to be called.

1. The telephone operator should obtain all relevant information available regarding the overflow including:
a. Time and date call was received.
b. Specific location.
c. Description of problem.
d. Time overflow was noticed by the caller.
e. Caller’s name and phone number.
f. Observations of the caller (e.g., odor, duration, back or front of property); and
g. Other relevant information that will enable the responding investigator and crews, if required, to quickly locate, assess and stop the overflow.

The telephone operator then records the overflow information and creates a service action Form for assignment to the public works staff.

2. Pump station failures are monitored and received by the public Works department at the water production facility. The water division staff on duty shall immediately convey all information to water division leader worker or supervisor to initiate the investigation.

3. Sewer overflows detected by any personnel in the course of their normal duties shall be reported immediately to the water division lead worker.

Dispatching personnel should record all relevant overflow information and dispatch a sewer investigator and additional response crews, as needed.

A. Cl~
eug111eer111g i11c

Page 96 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-5

4. A water division lead worker shall confirm the overflow. Until verified, the rep
ort of a possible spill will not be referred to as a "sewer overflow.” A California Integrated Water Quality System (CIWQS) SSO form should be completed by the Water/ Sewer maintenance supervisor within 24 hours of the sewer investigator's confirmation. This includes updating and signing the final overflow report.

B. Dispatch of Appropriate Crews to Site of Sanitary Sewer Overflow Failure of any element within the wastewater collection system that threatens to cause or causes an SSO will trigger an immediate response to isolate and correct the problem. Crews and equipment shall be available to respond to any SSO locations. Crews will be dispatched to any site of a reported SSO immediately.

Also, additional maintenance personnel shall be "on call" should extra crews be needed.

1. Dispatching Crews
• Dispatchers should receive notification of sewer overflows as outlined in section A, "Receipt of Information Regarding an SO" and dispatch a sewer representative and/or the appropriate crews and resources as required.
• Dispatchers shall notify the appropriate manager or supervisor by two-way radio or telephones regarding sewer overflows and field crew locations.

2. Crew Instructions and Work Orders
• Responding crews should be dispatched by two-way radio or telephone. Public works staff should receive instructions from water division lead worker or their supervisor regarding appropriate crews, materials, supplies, and equipment needed.
• Dispatchers shall ensure that the entire message has been received and acknowledged by the crews who were dispatched. All standard communications procedures should be followed. All employees being dispatched to the site of an SSO shall proceed immediately to the site of the overflow. Any delays or conflicts in assignments must be immediately reported to the supervisor for resolution.
• Response crews should in all cases report their findings, including possible damage to private and public property, to the water division lead worker or supervisor immediately upon making their investigation. If the lead worker or supervisor has not received findings from the field crew within 60 minutes the lead worker or supervisor shall contact the response crew to determine the status of the investigation.

A. Cl~
eug111eer111g i11c

Page 97 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-6

3. Additional Resources
• Th
e water division lead worker should receive and shall convey to appropriate party’s requests for additional personnel, material, supplies, and equipment from crews working at the site of a sewer overflow.

4. Preliminary Assessment of Damage to Private and Public Property • The focus is to resolve the problem. The response crews should use discretion in assisting the property owner/occupant as reasonably as they can. Be aware that the City of La Verne could face increased liability for any further damages inflicted to private property during such assistance. The response crew shall enter private property for purposes of assessing damage. Appropriate still photographs and video footage, if possible, should be taken of the outdoor area of the sewer overflow and impacted area in order to thoroughly document the nature and extent of impacts. Available photographs are to be forwarded to the public works department for filing with the overflow report.

5. Field Supervision and Inspection
• The supervisor of the lead worker who confirmed the sewer overflow, should visit the site of the overflow, if possible, to ensure that provis
ions of this overflow response plan and other directives are met.
• The supervisor of the sewer investigator is responsible for confirming that the Overflow Report was provided to the Public Works Department within the specified time.

6. Coordination with Hazardous Material Response
• Upon arrival at the scene of a sewer overflow, should a suspicious substance (e.g., oil sheen, foamy residue) be found on the ground surface, or should a suspicious odor (e.g., gasoline) not common to the sewer system be detected, the sewer investigator or response crew should immediately contact the City of La Verne Fire Department before taking further action.
• Should the Fire Department Battalion Chief supervisor determine the need to alert the hazardous material response team, the sewer investigator or crew shall await the arrival of the Haz-Mat team to take over the scene. Remember that any vehicle engine, portable pump or open flame (e.g., cigarette lighter) can provide the ignition for an explosion or fire should flammable fluids or vapors be present. Keep a safe distance and observe caution until assistance arrives.
• Upon arrival of the Haz-Mat team, the sewer lead worker will take direction from the person with the lead authority of that team. Only when that authority determines it is safe and appropriate for the A. Cl~
eug111eer111g i11c

Page 98 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-7
sewer investigator and crew to proceed can they then proceed under the
SORP with the containment, clean-up activities, and correction.

C. Overflow Correction, Containment, and Clean-Up
Sewer overflows (SO) of various volumes occur from time to time in spite of concerted prevention efforts. Spills may result from blocked sewers, pipe failures, or mechanical malfunctions among other natural or man- made causes. The City of La Verne public works staff is constantly on alert and should be ready to respond upon notification and confirmation of an overflow.

This section describes specific actions to be performed by the crews during an SO.

The objectives of these actions are:
• To protect public health, environment and property from sewage overflows and restore surrounding area back to normal as soon as possible.
• To establish perimeters and control zones with appropriate traffic cones and barricades, vehicles or use of natural topography (e.g., hills, berms); • To promptly notify the regulatory agency's communication center of preliminary overflow information and potential impacts. • To contain the sewer overflow to the maximum extent possible including preventing the discharge of sewage into surface waters; and • To minimize The City of La Verne's exposure to any regulatory agency penalties and fines.

Under most circumstances, The City of La Verne public works department will handle all response actions with its own maintenance forces. They have the skills and experience to respond rapidly and in the most appropriate manner. An important issue with respect to an emergency response is to ensure that the temporary actions necessary to divert flows and repair the problem do not produce a problem elsewhere in the system. For example, repair of a force main could require the temporary shutdown of the pump station and diversion of the flow at an upstream location. If the closure is not handled properly, sewage system back-ups may create other overflows.

Circumstances may arise when the city could benefit from the support of private sector construction assistance. This may be true in the case of large diameter pipes buried to depths requiring sheet piling and dewatering should excavation be required. The City of La Verne may also choose to use private contractors for open excavation operations that might exceed one day to complete.

1. Responsibilities of Response Crew Upon Arrival
It is the responsibility of the first personnel who arrive at the site of a sewer overflow to protect the health and safety of the public by mitigating the impact of the overflow to the extent possible.

A. Cl~
eug111eer111g i11c

Page 99 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-8
Should the overflow not be the responsibility of the City of La Verne, but there is imm
inent danger to public health, public or private property, or to the quality of waters of the U. S., then prudent emergency action should be taken until the responsible party assumes responsibility and provides actions. Upon arrival at an SSO, the response crew should do the following:
• Determine the cause of the overflow, e.g. sewer line blockage, pump station mechanical or electrical failure, sewer line break, etc.; • Identify and request, if necessary, assistance or additional resources to correct the overflow or to assist in the determine of its cause; • Determine if private property is impacted. If yes, the dispatcher should be informed so the County of Los Angeles Health care agency will be advised.

Los Angeles County Public Health Care Agency
888.700.9995 (Hotline Weekday, Monday – Friday 8am to 5pm) Dial 211 (Weekends/After Hours)
Los Angeles Regional Water Quality Control Board
213.576.6600 (24-Hour)
California Office of Emergency Services (OES)
800.852.7550 (24-Hour Reporting)
• Take immediate steps to stop the overflow, e.g. relieve pipeline blockage, manually operate pump station controls, repair pipe, etc.

Extraordinary steps may be considered where overflows from private property threaten public health and safety (e.g., an overflow running off of private property into the public right-of-way); and • Request additional personnel, materials, supplies, or equipment that will expedite and minimize the impact of the overflow.

2. Initial Measures for Containment
Initiate measures to contain the overflowing sewage and recover where possible sewage which has already been discharged, minimizing impact to public health or the environment.
• Determine the immediate destination of the overflow, e.g. storm drain, street curb gutter, body of water, creek bed, etc. • Identify and request the necessary materials (poly sheeting, rubbe
rized portable berms and sandbags) and equipment to contain or isolate the overflow, if not readily available; and
• Take immediate steps to contain the overflow, e.g., block or bag storm drains, recover through vacuum truck, or other portable vacuums divert into downstream manhole, etc.

A. Cl~
eug111eer111g i11c

Page 100 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-9

3. Additional Measures Under Potentially Prolonged Overflow Conditions In
the event of a prolonged sewer line blockage or a sewer line collapse, a determination should be made to set up a portable by-pass pumping operation around the obstruction.
• Appropriate measures shall be taken to determine the proper size and number of pumps required to effectively handle the sewage flow. • Continuous or periodic monitoring of the by-pass pumping operation shall be implemented as required.
• Regulatory agency issues shall be addressed in conjunction with emergency repairs.

4. Cleanup
Sewer overflow sites are to be thoroughly cleaned after an overflow. No readily identified residue (e.g., sewage solids, papers, rags, plastics, rubber products) is to remain.
• Where practical, the area is to be thoroughly flushed and cleaned of any sewage or wash-down water. Solids and debris are to be flushed, swept, raked, picked-up, and transported for proper disposal. (sewage treatment plant). The facility located at Humane Way in Pomona should accept these sewer byproducts.
• The overflow site is to be secured to prevent contact by members of the public until the site has been thoroughly cleaned. Posting if required should be undertaken pursuant to Section IV.
• Where appropriate, the overflow site is to be disinfected and deodorized.
• Where sewage has resulted in ponding, the pond should be pumped dry, and the residue disposed in accordance with applicable regulations and policies.
• If a ponded area contains sewage which cannot be pumped dry, it may be treated with bleach. If sewage has discharged into a body of water that may contain fish or other aquatic life, bleach or other appropriate disinfectant should not be applied and the (state fish and wildlife agency) should be contacted for specific instructions.
• Use of portable aerators may be required where complete recovery of sewage is not practical and where severe oxygen depletion in existing surface water is expected.

A. Cl~
eug111eer111g i11c

Page 101 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-10
III – Sewer Backup Protocol
A. Im
mediate Notification
Rece
ive a report of a potential sewer mainline backup from residents, a monitoring system, or routine inspections. Verify the details: Get the exact location, symptoms (e.g., multiple home backups, manhole overflows), and any historical information about the area.

B. Dispatch to the Location
Dispatch a crew with the necessary equipment, including sandbags, sewer jetting truck, and personal protective equipment (PPE). City workers should wear appropriate PPE, including gloves, safety glasses, and protective clothing.

C. Assess the Situation
Locate the nearest manhole to access the mainline. Inspect for visible signs of a backup, such as wastewater overflowing from manholes or slow drainage in surrounding areas. Open the manhole and assess the water levels. A high-water level in the manhole often indicates a blockage downstream. • Isolate the Problem Area
o Conduct an inspection of nearby manholes and lines to isolate the location of the blockage. This may involve opening several manholes upstream and downstream. Check flow rates: If the flow in the line is slow or non-existent, there is likely a blockage.
• Clear the Blockage
o Deploy the appropriate equipment based on the cause and location of the blockage:
o Hydro jetting truck: Uses high-pressure water jets to clear blockages caused by grease, debris, or other
o Run the equipment through the affected sewer mainline, ensuring that the blockage is dislodged, and the flow is restored. • Inspect the Sewer Line
o Once the blockage is cleared, inspect the sewer line using a sewer camera to check for damage, breaks, or additional obstructions. If damage is found, document the location and extent of the damage for further repair.
• Document the Work
o Document all actions taken: Date, time, location, cause of the blockage, equipment used, and results of the inspection. Include photographs, video footage from the sewer camera, and flow measurements before and after the blockage is cleared.

A. Cl~
eug111eer111g i11c

Page 102 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-11
• Disinfect the Area
o If
there was an overflow, city workers should ensure the area around the manhole or public spaces is cleaned and disinfected to prevent contamination. Use disinfectants to clean any areas that were conta
minated during the spill.
• Report to Supervisors
o Submit a report to the supervisor or municipal department with a detailed account of the incident, including the cause of the blockage, actions taken, and recommendations for further action. If any environmental damage occurred, a formal report may need to be filed with the appropriate environmental or regulatory agencies.

D. Monitor the System
Set up ongoing monitoring in the area to ensure that the backup doesn't recur.

Consider adding the location to a list for regular inspections if it's prone to issues (e.g., root intrusion, grease buildup, or poor pipe condition).

E. Sewer Emergency Protocol Training
Set up a Training session with the water department and any new employees going over all the procedures. This will take place a minimum of two times per calendar year (every six months). Employees are also trained in the proper use of the following equipment:
- Sewer Jetting Trucks
- Sewer Camera Inspection Equipment
- PPE (Personal Protective Equipment)
- Manhole Hooks
- Vacuum Trucks (for overflows)
-Rubber Gutter Guard mats to block storm drain opening(s). -Sandbags.
-Chlorine Disinfectant.
-Traffic Control equipment, delineators, cones, and caution tape. -Portable light tower.
-Portable generator.
-Portable Pump.

F. Formal Report Submittal
When an event is significant enough, an Overflow Report shall be completed by the public works department water/sewer supervisor. Information regarding the sewer overflow should include the following:
• Indication that the sewage overflow had reached surface waters, i.e., all overflows where sewage was observed running to surface waters, or A. Cl~
eug111eer111g i11c

Page 103 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-12
there was obvious indication (e.g. sewage residue) that sewage flowed to surf
ace waters; and
• Indication that the sewage overflow had not reached surface waters.

Guidance in characterizing these overflows to include:
a. Sewage overflows to covered storm drains (with no public access) where personnel verify, by inspection, that the entire volume is contained in a sump or impoundment and where complete clean- up occurs leaving no residue.
b. Preplanned or emergency maintenance jobs involving bypass pumping if access by the public to a bypass channel is restricted and subsequent complete clean-up occurs leaving no residue {Any preplanned bypass under these circumstances will not be considered an overflow.); and
c. Overflows where observation or on-site evidence clearly indicates all sewage was retained on land and did not reach a surface water and where complete cleanup occurs leaving no residue.
• Determination of the start time of the sewer overflow by one of the following methods:
a. Date and time information received and/or reported to have begun and later substantiated by a sewer investigator or response crew;
b. Visual observation; or
c. Pump station and lift station flow charts and other recorded data. • Determination of the stop time of the sewer overflow by one of the following methods:
a. When the blockage is cleared or flow is controlled or contained; or
b. The arrival time of the sewer investigator or response crew, if the overflow stopped between the time it was reported and the time of arrival.
• Visual observations
An estimation of the rate of sewer overflow in gallons per minute (GPM) by one of the following criteria:
a. Direct observations of the overflow; or
A. Cl~
eug111eer111g i11c

Page 104 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-13
b. Measurement of actual overflow from the sewer main.
• De
termination of the volume of the sewer overflow:
a. When the rate of overflow is known, multiply the duration of the overflow by the overflow rate; or
b. When the rate of overflow is not known, investigate the surrounding area for evidence of ponding or other indications of overflow volume.
• Photographs of the event, when possible.
• Assessment of any damage to the exterior areas of public/private property. Personnel shall enter private property for purposes of estimating damage to structures, floor and wall coverings, and personal property.

IV - Public Advisory Procedure
This section describes the actions the Public Works Department should take, in cooperation with
the Los Angeles County Health Department to limit public access to areas potentially impacted by unpermitted discharges of pollutants to surface water bodies from the wastewater collection system.

A. Temporary Signage
The Los Angeles County Health Department/Department of Fish and Game/The State Department of Water Resources has primary responsibility for determining when to post notices of polluted surface water bodies or ground surfaces that result from uncontrolled wastewater discharges from its facilities. The postings do not necessarily prohibit use of recreational areas, unless posted otherwise, but provide a warning of potential public health risks due to sewage contamination.

B. Other Public Notification
Should the posting of surface water bodies or ground surfaces subjected to a sewer overflow be deemed necessary by the Los Angeles County Health Care Agency, he/she shall also determine the need for further public notification through the use of pre-scripted notices made available to the printed or electronic news media for immediate publication or airing, or by other measures (e.g., front door hangers).

V - Regulatory Agency Notification Plan
The Regulatory Agency Notification Plan (applies to spills on La Verne’s collection system) estab
lishes procedures, which the City of La Verne in conjunction with the Los Angeles County Health Care Agency shall follow to provide formal notice to the Regional Board as A. Cl~
eug111eer111g i11c

Page 105 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-14
necessary, in the event of SSO. The reporting criteria below explain to whom various forms of
notification should be made, and lists agencies/individuals to be contacted.

Agency notifications will be performed in parallel with other internal notifications. The procedures for providing notification to the media of an SSO is presented in Media Notification Procedure. Internal notification and mobilization of personnel are detailed in Overflow Response Procedure.

Using data supplied during the verification process and updates from the response crew, the public works department water/sewer supervisor shall prepare initial and final overflow reports. This report shall be made available to those desiring additional information or written confirmation.

Written notification in a "hard copy" version should be made within 5 working days. The public works department water/sewer supervisor shall be responsible for meeting the 24 - hour oral or fax notification requirement. The water/sewer supervisor will prepare written notification to the appropriate regulatory agencies and others of any confirmed overflows.

The water/sewer supervisor shall sign these notifications.

A. Immediate Notification
The Water Supervisor should notify the appropriate agency re p resentatives
based on notification guidelines outlined in Attachment E2 to the General Order and keep them abreast of response actions and final corrective actions.

These primary agencies must be notified based on the guidelines as soon as two (2) hours dependent upon the spill volume and type, after an overflow is confirmed. The initial and any updated overflow report should be sent to the appropriate agency based on State Order guidelines:

Los Angeles County Public Health Care Agency
888.700.995 (Hotline Weekday, Monday – Friday 8am to 5pm) Dial 211 (Weekends/After Hours)
Los Angeles Regional Water Quality Control Board
213.576.6600 (24-Hour)

California Office of Emergency Services (OES)
800.852.7550 (24-Hour Reporting)

B. Secondary Notification
After those parties identified in Section A. Immediate Notification have been conta
cted, Public Works Water/Sewer Supervisor shall contact other agencies, as necessary, as well as other interested and possibly impacted parties.

A. Cl~
eug111eer111g i11c

Page 106 of 310 ends

DRAFT Section 6 – Sewer Overflow and Emergency
Respo
nse Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-15
VI - Media Notification Procedure
Whe
n an overflow has been confirmed and is a threat to public health, the following actions shou
ld be taken, if necessary, to notify the media:

A. Sewer investigator or response crew verifies overflow and reports back to the Public Works Water Supervisor.

B. The Utilities Manager or Public Works Director informs the City Manager and the Public Information Office [PIO] – Sr Management Analyst in City Manager’s Office.

The PIO shall be the “first-line” of response to the media for any overflow.

C. After hours and weekend sewer overflows are reported to the Public Works Director, City Manager and the PIO.

D. Calls received by the dispatcher from the media at any time are referred to the PIO.

E. The following positions are authorized to be interviewed by the media and are the designated spokespersons for sewer issues that require media contact:

PIO (Sr. Management Analyst – City Manager’s Office): 909-451-8161 Public Works Director: 909-596-8751
A. Cl~
eug111eer111g i11c

Page 107 of 310 ends

DRAFT Emergency Public Information Checklist
City of La Verne

2024 City of La Verne Sewer System Management Plan

Emergency Public Information Checklist
Bel
ow are the actions to be taken by the Public Information Office. The actions are categorized acco
rding to organizational sections and emergency periods and phases. The checklist is appropriate for response to all major disasters and emergencies.

Public Information Office Responsibilities
 Work with Emergency Services Director to supervise all operations of release of publ
ic information.
 Review all information for clarity and accuracy. Obtain approval of Emergency Servi
ces Director or designee before release to the public.
 Provide sufficient staffing to handle incoming phone calls and to gather status info
rmation.
 Ensure that official spokespersons are thoroughly briefed about all aspects of the emer
gency situation.
 Keep the Emergency Services Director informed of all actions taken or planned.

Norm
al Preparedness Phase
 Ensure that response personnel are aware of the need to promptly inform staff of all respo
nse actions taken during emergencies.
 Maintain Media Conta ct lists. Share details of the plan with local media representatives and be specific about their responsibilities under this plan.  Determine media accreditation and visitor control procedures in coordination with fire/l
aw authorities and the Emergency Services Director.
 Maintain a telephone contact list of Public Information Officers in other jurisdictions and a
t other government levels.
 Ensure that all agencies within the jurisdiction are aware that they must coordinate relea
se of emergency information through the Public Information Officer.  Prepare generalized survival and self-help information for each potential hazard.

Pre-
Impact Phase
 Fully mobilize the Public Information Division, determine shift assignments, and brief
staff on the current situation.
 Request staff support from the next higher level of government, community Public Info
rmation Officers or temporary hire personnel, as necessary.  Arrange for an official spokesperson or serve in this capacity, if appropriate.  Contact cable TV production team to arrange for possible video documentation of the e
mergency, as per mutual agreement.
 Arrange Designated Media Location and communicate to media if a number of reporte
rs and/or visitors arrive in person at the Site and/or Emergency Operating Center (EOC).

Page 108 of 310 ends

DRAFT Section 6 – Overflow and Emergency Response Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-16
Emergency Public Information Sewer Overflow
Stand
ard Operating Procedures
Sewage Material
• If incident is in a heavy traffic area, and alternate routes are available, notify media (radio
) and request frequent announcements of instructions to avoid the area. (Coordinate announcements with responding law agency.)
• Notify media with full explanation as soon as material has been identified. (Clear with Incident Commander/Scene Manager and technical advisor to avoid unduly alarming or confusing to the public.)
• If traffic will not impede response efforts, simply respond to media inquiry, as necessary.

Low Hazard/Confined Incident – No General Evacuation
• Notify media that incident has occurred. Update media regularly. • Notif
y Council, employees, schools, and businesses, as needed. • Indicate alternate routes for traffic and request frequent announcements of instructions to avoid the area.
• Indicate nature of incident and precautions for the public. • Release hotline number for public inquiries (if available and staffed). • Indicate response agencies involved (coordinated with response agency PIOs), clean- up efforts underway, time frame for resumption of normal traffic patterns, if known.

Incident – High Hazard – General Evacuation Requested
• Rele
ase all of the above information.
• Relea
se evacuation instructions to media (radio).
• Release mass care information when known (coordinate with the American Red Cross).
• Have medical/technical spokesperson(s) available to describe the nature of the substance, possible symptoms, precautions for the public to take. • Note: Post information on website/social media for general public and/or media. • Hold media briefing(s) at the scene where Incident Commander/Scene Manager and medical/technical spokesperson can answer media questions. Arrange for Emergency Manager or designee to hold similar media briefings at the EOC if needed.

Post – Incident
• Debrief with internal/external emergency responders.
• Foll
ow-up as necessary with media.

Page 109 of 310 ends

DRAFT Section 6 – Overflow and Emergency Response Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-17
Contact Information
Contact Name Office Mobile
Meg McWade
Public Works Director 909.596.8741 909.596.8751
Ryan Ciotti
Acting Utilities Manager 909.596.8749 909.908.0589
Robert Mitchell
Water Supervisor 909.596.8741 626.864.2064
Erin Beilstein
PIO/Sr Mgmt Anlyst - CM 909.451.8161 909.451.8161

Distribution and Maintenance of SORP
Annual updates to the SORP should be made to reflect all changes in policies and procedures as m
ay be required to achieve its objectives.

A. Submittal and Availability of SORP
Copies of the SORP and any amendments should be distributed to the following departments and functional positions:

Public Works, Fire, Police, Planning, Community Services, EOC Staff.

All other personnel who may become incidentally involved in responding to overflows should be familiar with the SORP.

B. Review and Update of SORP
The SORP should be reviewed annually and amended as appropriate. The City of La Verne should:
• Update the SORP with the issuance of a revised or new NPDES permit or state waste discharge permit;
• Conduct annual training sessions with appropriate personnel; and • Review and update, as needed, the various contact person lists included in the SORP.

C. Practical Resources
The author of a SORP should consider preparing and identifying here such things as the availability of weather-proof overview of the SORP which could fit in a shirt pocket or be kept in a vehicle glove box (i.e., a laminated "pocket guide"), vehicle dashboard stickers providing crews a reminder of key actions in responding to a sewer overflow and essential telephone numbers (e.g., public information officer name and telephone number), and other printed materials for distribution to personnel such as handy quick references for estimating sewer overflow volumes

Page 110 of 310 ends

DRAFT Section 6 – Overflow and Emergency Response Plan
City of La Verne

2024 City of La Verne Sewer System Management Plan
S6-18
and flow rates. The conducting of periodic workshops with managers, supervisors and
other key personnel to review established response activities, and suggestions for new or revised procedures should be considered and recognized here.

Identify Equipment and Critical Replacement Parts
Provide equipment and replacement part inventories, including identification of critical repla
cement parts.

Supervisor
The City maintains critical replacement parts for all of its lift stations. Included, but not limited to, force main pipe and mechanical repair couplings for each size/type of pipe; transducers; relays; and fuses. All are clearly labeled for the appropriate application. Audits of critical parts are periodically performed. In addition, the city is equipped with the following equipment to capture overflows.

Equipment Typically Used by City Workers:
• Sewer Jetting Trucks
• Sewer Camera Inspection Equipment
• PPE (Personal Protective Equipment)
• Manhole Hooks
• Vacuum Trucks (for overflows)
• -Rubber Gutter Guard mats to block storm drain opening(s). • -Sandbags.
• -Chlorine Disinfectant.
• -Traffic Control equipment, delineators, cones, and caution tape. • -Portable light tower.
• -Portable generator.
• -Portable Pump.

The City’s lift stations are equipped with automatic transfer switches. The lift stations can also de-watered using the City’s two (2) combination hydro-vacuum units.

The City contracts with Schwalm Generation to provide 24-hour service for lift station control and electrical problems that City staff cannot immediately resolve. On an annual basis generators receive three minor inspections and one major inspection per year, the major inspection includes changing of fluids. In addition to the annual maintenance, on a bi-annual basis load testing is completed on the units.

Page 111 of 310 ends

DRAFT Section 7 – Fats, Oils, and Grease Control Program City of La Verne

2024 City of La Verne Sewer System Management Plan
S7-1
Section 7 - Fats, Oils, and Grease Control Program
SSSWDR D.13(vii) states:

Each
Enrollee shall evaluate its service area to determine whether a FOG control program is needed. If an Enrollee determines that a FOG program is not needed, the Enrollee must provide justification for why it is not needed. If FOG is found to be a problem, the Enrollee must prepare and implement a FOG source control program to reduce the amount of these substances discharged to the sanitary sewer system. This plan shall include the following as appropriate:
(a). An implementation plan and schedule for a public education outreach program that promotes proper disposal of FOG;
(b). A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of FOG generated within a sanitary sewer system service area;
(c). The legal authority to prohibit discharges to the system and identify measures to prevent SSOs and blockages caused by FOG;
(d). Requirements to install grease removal devices (such as traps or interceptors) and the development of design standards for such devices, maintenance requirements, BMP requirements, record keeping and reporting requirements; (e). Authority to inspect grease producing facilities, enforcement authorities, and whether the District has sufficient staff to inspect and enforce the FOG ordinance; (f). An identification of sewer system sections subject to FOG blockages and establishment of a cleaning maintenance schedule for each section; and (g). Development and implementation of source control measures for all sources of FOG discharged to the sewer system for each section identified in (f) above.

La Verne has approximately one hundred and seven (107) permitted Industrial Waste Establishments in its service area that are inspected regularly by the Los Angeles County Sanitation District to ensure adherence to the FOG program.

The City contracts with L.A. County for inspections related to the F.O.G. program.

Legal Authority
Upon adoption of an ordinance, the City will have legal authority to prohibit discharges to the collection system through the Uniform Wastewater Discharge Regulations, Title III, Chapter 14, 14.10 Article IV Fats, Oils, and Grease Control Program.

Page 112 of 310 ends

DRAFT Section 7 – Fats, Oils, and Grease Control Program City of La Verne

2024 City of La Verne Sewer System Management Plan
S7-2
Source Control
The
City conducts permit plan checks on new construction and tenant improvements of FSEs.

Plan checks include, but are not limited to, identification and proper connection of grease bearing fixtures to a properly sized grease interceptor. The plan check and field inspection, as part of the building permit process, includes an interceptor sizing component and an Interceptor Maintenance Education component, which includes the City’s maintenance requirements, BMP requirements, and record keeping and reporting requirements. A list of all such users is maintained by the City. The City’s Uniform Wastewater Discharge Regulations (UWDR) requires the installation and proper maintenance of interceptors at any facility that has the potential for discharging grease laden wastewater.

Identification and Sewer Cleaning
City of La Verne Sewer System priority is given to areas with a history of problems relating to FOG and roots. Areas with a history of FOG hot spots are investigated and cleaned at least quarterly. FOG hot spots (areas with increased incidence of grease build-up) are cleaned to remove the risk of a blockage occurring and are subsequently inspected frequently. The sewer line is cleaned using either a hydro jet with spinning nozzle or a power rodder. The combo unit/vacuum truck is also used whenever feasible to recover the FOG.

Lines with known poor grade have been prioritized as requiring more frequent CCTV inspection. With information on the causes of grease problems, maintenance activities and schedules can be modified, or sewer repairs made to better control grease buildup and minimize grease-related SSOs

Page 113 of 310 ends

DRAFT Section 8 – System Evaluation and Capacity Assurance Plan

City of La Verne

2024 City of La Verne Sewer System Management Plan
S8-1
Section 8 - Syste m Evaluation and Capacity Assurance Plan Refer to Attachment C, the 2022 Wastewater Master Plan, for details on the City of La Verne's curren
t capital improvement program related to wastewater as well as its criteria for flow depth over capacity.
.

A. Cl~
eug111eer111g i11c

Page 114 of 310 ends

DRAFT Section 9 – Monitoring, Measurement, and Program Modif
ications
City of La Verne

2024 City of La Verne Sewer System Management Plan
S9-1
Section 9 - Moni toring, Measurement, and Program
Modifications
Monitor and Measure
The City of La Verne currently hydro-cleans the sewer system (+/- 99 miles) in its entirety on a th re
e-year cycle and hydro-cleans identified trouble spots on either a 30-day or 90-day schedule interval based upon the type of trouble spot it is. Known areas of fast grease build up areas are done monthly utilizing a special degreaser in order to make the effort more effective. Other areas that have roots are cleaned on 90 days intervals with contracted foaming completed every three years.

Below are the identified trouble spots, or hot spots, where the pipes experience high levels of fats, oils, and grease (FOG). These areas of concern are detailed in Table 9-1.

Table 9-1 Current “Hot Spot” Maintenance Locations
Location/Street Issue From
Manhole
To
Manhole
Foothill Blvd Grease R23-103 R24-106
Foothill Blvd Grease R24-106 Q24-127
Foothill Blvd Grease P24-146 Q24-121
Foothill Blvd Grease O24-104 O24-115
Foothill Blvd Grease O24-104 N24-110
Emerald Ave Grease P23-115 P24-137
Dover Ave Grease P23-125 P23-142
Butterfield Ave Grease P23-136 P23-142
Peyton Rd Grease P22-142 P22-139
Alley north of PSF Grease P20-117 P20-114
Alley north of PSF Grease P20-113 P20-121
Alley e/o D, s/o Bonita Grease Q20-100 Q20-114
White Ave Grease Q23-104 Q23-101
Bianca St Grease P23-109 O23-109
Glenfield Ave Low Flow in Line O20-102 O20-110
Deventer Dr Smell in Line from Low Flow O29-143 O29-140 Landeros Ave Low Flow Stagnant Line Q26-100 Q26-108
The City owns and operates its own sewer camera which allows for inspection to be completed of the entire system once every 3 years (36% annually). Having the city's own staff inspect the system allows for a timelier response to any problems that might require immediate attention.

All hydro cleaning and televising are documented and evaluated by the city's consultant engineering firm.

A. Cl~
eug111eer111g i11c

Page 115 of 310 ends

DRAFT Section 9 – Monitoring, Measurement, and Program Modif
ications
City of La Verne

2024 City of La Verne Sewer System Management Plan
S9-2
All work performed is documented and evaluated on a monthly basis for the Utility Manager’s revi
ew.

The City does not experience overflows on any regular basis.

A. Cl~
eug111eer111g i11c

Page 116 of 310 ends

DRAFT Section 10 – SSMP Program Audits
City of La Verne

2024 City of La Verne Sewer System Management Plan
S10-1
Section 10 - SSMP Program Audits
The City will conduct an internal audit of the SSMP at least once every three years utilizing the S
SMP Triennial Audit Report Form (Attachment D). The audit will result in a report of the findings, including the identification of any deficiencies in the SSMP and proposed steps to correct them.

The three-year frequency is the maximum allowed by the regulation; this frequency is appropriate to the size of the City’s collection system and the historical number of overflows and should be sufficient to identify any necessary improvements to the SSMP.

The City will assess the need to audit its SSMP more frequently based on the performance of its sanitary sewer system using information from the key performance indicators and input from Collection System staff. All elements of the SSMP will be reviewed using an audit report form (Attachment D).

The audit will include comments regarding recently completed program updates and any recommendations for future actions, changes, or adjustments to an element. Upon completion of the audit, the Utilities Manager will keep a copy of the audit report on file for review, and a Change Log will be updated to reflect insertion of the audit report. The City will update its SSMP at least every six years.

• ----
A. Cl~
eug111eer111g i11c

Page 117 of 310 ends

DRAFT Section 11 – Communication Program
City of La Verne

2024 City of La Verne Sewer System Management Plan
S11-1
Section 11 - Com munication Program
The City maintains a website ( https: //www.cityoflaverne.org/) to inform the public about City activities. The City’s website is an effective communication channel for providing alerts and news to the public. The main page of the website provides important announcements, links, agendas and minutes for City Council meetings, and other key information for City residents. The website includes all formal SSMP updates.

A variety of public works information is published on the City’s Public Works Department page of the website, linked from the Departments tab. The City also uses the website to notify the public of important upcoming activities related to sewer system management.

The City is very active on social media such as Facebook, You Tube, Instagram to name a few.

The Public Works Department actively provides La Verne residents notification of public works activities.

Notification of spills to the public as well as private sewer systems is outlined in the City’s Spill Emergency Response Plan included in Chapter 6 of this document.

A. Cl~
eug111eer111g i11c

Page 118 of 310 ends

Attachments
City of La Verne

2024 City of La Verne Sewer System Management Plan

Attac
hment A – Organizational Flow Chart

~
C)V-t~
e11gi11ceri11g l11c

Page 119 of 310 ends

City of La Verne Public Works

Joe Vieyra
Deputy Director of Public Works
Adella Reyes
Administrative Secretary
Lauren Pierini
Administrative Clerk II
Vacant
Public Works Manager
Colin Purdy
Maintenance Manager
VACANT
Fleet Manager

Ryan Ciotti
Acting Utilities Manager
Nicole Houston
Senior Management
Analyst

Kristie Sanchez
Senior Management
Analyst

Raymond
Apodaca
Acting Water
Super
visor
Production

Robert Mitchell
Water Supervisor
Distribution
Ralph
Hernandez
Utilities
Supervisor
Vacant
Maintenance
Supervisor

Jose Salas
Maintenance Lead
Worker - Parks
Customer Service
Representatives
Janelle Gray
Chris
tina Melgar
Zalen Jones Fleet Maintenance
Jarek Guzman
Jared
Hall

Ramiro Nunez
Maintenance
Supervisor
Customer Service
Representatives
Tyke Milliken
Kryst
le Barba
Water Utility Workers
Christopher Cuadras
Javie
r Llamas
Eugene Perez
Micha
el Sandoval
Mark Velasquez

Water System Operators
VACANT
Brand
on Van Veldhuizen
Maintenance Workers
Streets-4
Antonio Guerrero
Kobe
Paddock
Rigo Terriquez
Dustin WhiteBear

Eddie Gaeta
Water System
Specialist

Maintenance Workers
Parks-6
Richard Casados
Migue
l Crespo
Juan Garcia-PT
Chris Vargas-Gudino
Kevin Mellard
Destiny Rocha-PT
Christian Rojas-PT
Austin Walters
Joe Zepeda

Mark Graciano
Water Utility - Water

Brad Stock
Maintenance Lead
Worker - Streets
Devin Lopez
Fleet Analyst
Stuart Havlicek
Sr. Equipment
Mech
anic
Meg McWade
Director of Public Works
I I
I I I

I I I I

I I I I I I
I
I I

I I I I I
I
D
I I I
I
I I
I I

Page 120 of 310 ends

Attachments
City of La Verne

2024 City of La Verne Sewer System Management Plan

Attac
hment B – City of La Verne Sewer System Standard
Draw
ings

~
C)V-t~
e11gi11ceri11g l11c

Page 121 of 310 ends

COVER MARKED 'SEWER'
• 0
I
'...t

SOLDIER COURSE

STRETCHER COURSE
1 /2" PLASTER
r--H~--STEPS SHALL BE 1 /2" GRADE 60 STEEL

REINFORCEMENT ENCASED IN COPOLYMER
POLYPROPYLENE PLASTIC -M.A. INDUSTRIES
INC., {O.A.E.)
V.C.P. SEWER PIPE

SECTION A-A BASE

WHERE POSSIBLE

PLACE STEPS

UPSTREAM-----
4" MIN.
;,•
.. · . .

CONC. ENCASEMENT
{REC'D. ONLY AT

DROP MANHOLES)
DEPARTMENT OF PU8UC WORKS
r---+...,.,.1--1: 12

SHELF' SLOPE
r--i::HII~ 1 /2" CEMENT PLASTER

SECTIONAL PIAN

BRICK AND MORTAR
STANDARD DRAWING:

O£SIGN[I)

STANDARD BRICK MANHOLE DRAWN
CHECl<fl)
500.£:

AS SHOWN
CrTY Of LA VERNE m DA n: OF REVISION:
43296 ./ '9'? RCE No.

APRIL 1997
--·-------···--·---· -..• --------•·· --·-·--
OUTLET
COURSE
SY O,..T!
W.0.8. 4/97
C.G. 4/97
w.o.e. 4/97
~
S-1
$HT. 1 OF 1

Page 122 of 310 ends

I
N ,..,

COVER MARKED 'SEWER'

ALHAMBRA FOUNDRY MANHOLE FRAME &
COVER NO. A-1254 (O.A.E.)
4 1/8"
6"
5 :5/4"
48" 1D!A.

MORTAR
s·-o· 01A.

SECTION A-A
STANDARD DRAWING:
4 1/8"
A
t:i
...J
~
0 SIDE INLET
A

SECTIONAL PLAN
STEPS SHALL BE 1/2" GRADE 60 REINFORCEMENT
ENCASED IN COPOLYMER POLYPROPYLENE PLA.STIC -
M.A. INDUSTRIES INC., (O.A.E.)
*WHERE POSSIBLE PLACE

STEPS UPSTREAM

STATION
(SEE PLAN)
BY 0.-.Tt
DESIGNED W.D.B. 4/97

STANDARD PRECAST CONCRETE

MANHOLE
DRAWN

CHECKED
C.G. 4/97
W.0.8. 4/97
SCALE: ~

AS SHOWN
S-2 DAT£ OF' REVISION:
43296 APRIL 1997
OEPARTME~ OF' PUBLIC WOAl<S ENGINEER RCE No. SIIT. 1 or 1 •

Page 123 of 310 ends

.,... _________ ( _____________ ( ---------.

J
VARIES
I
NOTE:
4" OR 6n

WYE BRANCH
4" OR 6" 1/8 BENO

VERTICAL ANGLE SHALL
BE 45' UNLESS SHOWN
OTHERWISE ON THE PLANS.

DEPTH OF SEWER MAIN SHALL BE SUCH THAT A
4-INCH LATERAL WILL HAVE A MINIMUM COVER
OF 1 -FOOT AT THE REAR PROPERTY LINE WITH
A SLOPE OF NOT LESS THAN 2~.

STANDARD DRAWING:

SEWER LATERAL
OEPAATMENT OF PUill.Jt WORKS
~ -~-.-.,...._, 43296
ENGINEER RCE No.
-·---·--------
VARIES
CURB &: STREIT

SURFACE GUTTER
z <
~
a:: w
~
C/l
w z
:J a::
~
DalCNED
DRAWN

CHECKED
SCALE:

AS SHOWN
OATE OF' REVISION:

APRIL 1997
8Y O,l.TE
W.0.8. 4/97
C.G. 4/97
w.o.e. 4/97
~
S-3
Sin', 1 OF 1

Page 124 of 310 ends

I
SEWER
MAIN
• N
..
... ~. -~~4-.,..L_
·~ • ;~ .... f""')

SECTION A-A T
NOTES:
4" OR 6"

CEMENT MORTAR
CL.ASS 480-C-2000 P.C.C.

1. THE UPPER END OF THE CHIMNEY PIPE SHALL BE 8 FEET
BELOW THE GRADE OF THE LOWEST CURB, UNLESS OTHER­
WISE SPECIFIED.

2. WHERE TWO HOUSE CONNECTIONS ARE TO BE JOINED TO
THE CHIMNEY PIPE, USE A SINGLE 'Y' BRANCH. WHERE

TWO HOUSE CONNECTIONS ARE TO BE JOINED TO THE
CHIMNEY PIPE, USE A SINGLE 'Y' BRANCH. WHERE THREE

HOUSE CONNECTIONS ARE TO BE JOINED, USE A DOUBLE
'y' BRANCH.

3. WHERE THE CHIMNEY PIPE IS TO BE USED FOR A SINGLE
HOUSE CONNECTION, FACE 'y' TOWARD PROPERTY TO BE
SERVED; WHERE USED FOR HOUSE CONNECTIONS ON

BOTH SIDES OF THE SEWER, THE HOUSE CONNECTION ON
THE RIGHT SIDE OF THE SEWER ~LOOKING UP GRADE)
SHALL BE CONNECTED TO THE 'V BRANCH BY A 1 /8

BEND AND THE HOUSE CONNECTION ON THE LEFT SIDE

SHALL BE CONNECTED TO THE UPPER END OF THE
CHIMNEY BY A 4" OR 6" 1/4 BEND UNLESS OTHER­
WISE SPECIFIED.

STANDARD DRAWING:
(
7" OR 8"
14" OR 16"
CL.ASS 480-C-2000 P.C.C.
-.::: = ..:r .::-a-_7\
11 I I II II
II 1111'<
t It • I I II I
w ::::~
"
SECTION 8-B
B't' o,,.n;
DESIGNfJ) W.D.B. 4/97
STANDARD CHIMNEY PIPE CRAWN C.G. 4/97
CHECIC£D W.D.B. 4/97
SCALE: .m....tm...
1'S SHOWN
OATE Of REVISION: S-4
DEPARTMENT OF PUIIUC W<ml<S ENGINEER
43296 4/ -~,,
RCE No. DATE
APRIL 1997 SHT, 1 rl 1
--.

Page 125 of 310 ends

I
I
FLOW
I r------­
c::_-1~-----
1 1 2"
...
. .

NOTES
6 •
• • .. •
4 •
~ 4 .. ...
•
. -.-·-.-..
-J·--4 .

I .

PLAN
•
• •

SECTION
1 . SADDLE SHALL BE INSPECTED PRIOR TO PLACING P .C.C.

AND AGAIN BEFORE BACKFILLING OVER LATERAL.

2. TIE WIRE SHALL BE 12 GA. GALVANIZED.

STANDARD DRAWING:

SEWER SADDLE
Cl'l"f75iAv£RNE ~ ~
(
6" SADDLE
CLASS 460-C-2000 P.C.C.
~<. ,. 4
·• 4
~ ~
~ -:\ . -
• --.-a..;._
--" ~ ----. •
·• 4
18"
-1
4" OR 6" SADDLE
CLASS 480-C-2000 P.C.C.
8V
DE'SIGNED W.D.8.

DRAWN C.G.

CHECKED W.D.B.

DI-IT
4/97
4/97
4/97
SCALE: ~

AS SHOWN
DI-IT Of REVISION: S-5
4~296 APRIL 1997
$HT. 1 or 1 DEPARTMENT OF' PUBLIC WORl<S ENGINEER RCE No.

Page 126 of 310 ends

• t0
(
TAPPED 1k COUNTERSUNK
FOR 1/4" SET SCREW

STREET SURFACE
~ .
~ [ • . • ._· -+---i-....J,...:::J
CLASS 480-C-
2000 P.C.C.

CLASS 480-C-2000 P.C.C.\
. 24" \
• • N
N
• 4
...

NOTES:
12"

TOP YIEW

1. CLEAN-OUT PIPE MUST BE OF THE SAME
DIAMETER AS SEWER MAIN.

2. CASTING SHALL BE ALHAMBRA FOUNDRY
NO. A-1240 (O.A.E.)
STANDARD DRAWING:
(
10"
I

SIPE YIEW

IPP YIEW
W'fE BRANCH
-----

SEWER MAIN
.

N

DESICHEO
/ 4" SET SCREWS
BY 0-.TE
W.O.B. 4/97
SEWER TERMINAL CLEAN-OUT DRAWN C.G. 4/97
CHECKED W.D.B. 4/97
SCALE: ~

AS SHOWN
[);A.TE OF REVISION: S-6
DEPARTMENT ·OF • PUIUC WORKS EHCINE R
43296 APRIL 1997 9HT. 1 OF' 1

Page 127 of 310 ends

(
TRENCH WALL l
l
-. 1 ...
-111-111-
NO. 1

CONCRETE ENCASEMENT
l
CLASS 480-C-2000 P.C.C,
(

TRENCH WALL
CLASS 480-C-2000 P.C.C.

TRENCH WALL

CONCRETE CRADLE
NO. 2
CONCRETE ENCASE~ENT
NOJE;Si

1. WHERE TRENCH WIDTH EXCEEDS THE WIDTH DESCRIBED 2. THE No.2 ENCASEMENT SHALL ONLY BE USED IN THE SPECIF'ICATIONS, THE CONTRACTOR SHALL AS DIRECTED BY THE CITY ENGINEER.

FURNISH AND PLACE AT HIS OWN EXPENSE, A CRADLE
AS SHOWN ABOVE.

STANDARD DRAWING:

SY ~TE
DESICNEtl W.0.8. 4/97
CONCRETE CRADLE & ENCASEMENT l)RAMj C.G. 4/97
---------
CHECKED w.O.B. 4/97
SCALE:
d~ .. _.!2 . AS SHOWN
t;i[..il..~ DATE OF' REVISION:
~
S-7
43296
DEPAA'TMDIT OF PUBLIC WORKS ENGINEER RCE No. 'ff•!_~l APRIL 1997 •

Page 128 of 310 ends

_,,.

A
.. .

L ~-··.

INLET PIPE
.•
I I
I I
I I
I I
I I
I I
I I
I I
I I
4" .____._ B

INLET PIPE
I
IX)
.. .
.•

CAST IN PLACE OR PRECAST VAULT,
CLASS 560-C-3250 P.C.C. ~-~-'
2M X , 2·

REDWOOD

BAFFLES
PLAN

CAST IN PLACE OR PRECAST VAULT,
CLASS 560-C-3250 P.C.C. -----
NOTES:

1. ALL Pt PE AND F'ITTINGS SHALL BE CAST IRON
SOIL PIPE.

2. SLOTS FOR REDWOOD BAFFLES SHALL BE

CONSTRUCTED SO BAFFLES MAY BE
REMOVED FOR CLEANING TRAP.

3. TOP OF' TRAP SHALL BE LEI/EL WITH F'LOOR

IF' CONSTRUCTED INSIDE OF BUILDING

4. REDWOOD BAFFLES SHALL BE SURFACED
ALL SIDES.

STANDARD DRAWING:

I I
I I
I I
I I ,,;:--
I I J _ I1.._.

I I
I I
I I
...
(
.

CCI
I
CCI
4•
2" REDWOOD COVER
SECTION a-·e

SAND AND GREASE TRAP
43296
OEPARTMEh'T or PUBLIC WORKS ENGINEER RCE No.
--·-·····-----· .. ------·--·-----· -----·--···---------·· ---

FERRULE, THREADED

FINISHED
GRADE
IPPLE, VAR. LENGTH
LONG RAD. 90' BEND
BY D,t.TE
DESIGHll> W.0.8. 4/97
CRAWN F.G.K. 4/97
CHECKED W.D.8. 4/97
$CAI.£: ~

AS SHOWN
D,t.TE or REVISION: s-a
APRIL 1997 SHT-1 Of 1

Page 129 of 310 ends

Attachments
City of La Verne

2024 City of La Verne Sewer System Management Plan

Attac
hment C – City of La Verne 2022 Wastewater Master Plan

~
C)V-t~
e11gi11ceri11g l11c

Page 130 of 310 ends

2022 Wastewater Master Plan

March 2023

Prepared For:

City of La Verne
3660 D Street | La Verne, CA 91750
Phone: 909.596.8741

Prepared By:

www.civiltec.com
Project No. 2019101.00

Page 131 of 310 ends

2022 Wastewater Master Plan

March 2023

Prepared For:

City of La Verne
3660 D Street | La Verne, CA 91750
Phone: 909.596.8741

Under the Supervision of:

43296 91903
W. David Byrum, P.E. R.C.E. Gretel D. Ochoa-Nhac, P.E. R.C.E.

C 43296 C 91903

Page 132 of 310 ends

Table of Contents
City of La Verne

2022 Wastewater Master Plan
i

Table of Contents
EXECUTIVE SUMMARY .................................................................................................................................... ES-1 Drainage Areas ............................................................................................................................................ ES-1 Growth and Projected Wastewater Flows ....................................................................................... ES-2 Hydraulic Assessment .............................................................................................................................. ES-3 Recommended Capital Improvement Projects and Rehabilitation Projects ..................... ES-3 BACKGROUND ........................................................................................................................... 1-1

1. 1 Study Purpose, Scope, and Authorization .............................................................................. 1-1

1.1.1 Study Objectives ............................................................................................................... 1-1

1.2 General ................................................................................................................................................. 1-2

1.3 Topography ........................................................................................................................................ 1-2

1.4 Climate .................................................................................................................................................. 1-3

1.5 Glossary of Terms ............................................................................................................................ 1-3

1.6 Abbreviations .................................................................................................................................... 1-4

1.7 Acknowledgements ......................................................................................................................... 1-6 STUDY AREA .............................................................................................................................. 2- 1

2.1 Existing Service Area ...................................................................................................................... 2-1

2.2 Existing Sub Drainage Areas........................................................................................................ 2-2

2.3 Revisions to the Sub Drainage Areas ....................................................................................... 2-3

2.4 Hot Spots/Problem Areas ............................................................................................................. 2-4 PLANNING AND DESIGN CRITERIA ................................................................................. 3- 1

3.1 Design Period ..................................................................................................................................... 3-1

3.2 General Plan ....................................................................................................................................... 3-1

3.2.1 Existing Land Use ............................................................................................................. 3-1

3.2.2 Future Land Use ................................................................................................................ 3-2

3.2.3 Zoning Documents ........................................................................................................... 3-6

3.2.4 Pending Projects ............................................................................................................... 3-7

3.2.5 Other Anticipated Projects ........................................................................................... 3-8

3.2.6 Sphere of Influence Area ............................................................................................... 3-8

3.3 Population Projections .................................................................................................................. 3-8

3.4 Design Criteria ................................................................................................................................ .3-10 EXISTING COLLECTION SYSTEM FACILITIES .............................................................. 4-1

4. 1 Inventory ............................................................................................................................................. 4-1

4.1.1 Gravity Mains ..................................................................................................................... 4-1

4.1.2 Lift Stations ......................................................................................................................... 4-3

4.2 Sanitation Districts of Los Angeles County ............................................................................ 4-3

4.3 Interagency Agreements ............................................................................................................... 4-4

4.3.1 Pomona/Claremont ......................................................................................................... 4-4

4.3.2 San Dimas ............................................................................................................................ 4-5

4.3.3 Los Angeles County. ........................................................................................................ 4-5 COMPUTER MODELING.......... ............................................................................................... 5-1

5.1 O
bjectives of the Analysis ............................................................................................................. 5-1

5.2 Computer Modeling Software ..................................................................................................... 5-1

5.2.1 Sphere of Influence (SOI) .............................................................................................. 5-1

5.3 Data Collection .................................................................................................................................. 5-1 CHAPTER 1-
CHAPTER 2-
CHAPTER 3-
CHAPTER4-
CHAPTER 5-

Page 133 of 310 ends

Table of Contents
City of La Verne

2022 Wastewater Master Plan
ii

5.4 Facilities Modeled ............................................................................................................................ 5-2

5.4.1 Manhole and Cleanout Discussion ............................................................................ 5-2

5.4.2 Pipe Discussion ................................................................................................................. 5-3

5.5 Wastewater System Loads ........................................................................................................... 5-5

5.5.1 Existing Conditions – Dry Weather ........................................................................... 5-5

5.5.2 Ultimate Conditions – Dry Weather.......................................................................... 5-5

5.6 Steady State Model Calibration .................................................................................................. 5-6

5.7 Steady State Model Results .......................................................................................................... 5-6

5.8 Extended Period Simulation Results ........................................................................................ 5-6 CAPITAL IMPROVEMENT PROGRAM .............................................................................. 6-1

6. 1 Existing System Improvements ................................................................................................. 6-1

6.1.1 Flow Depth Over Capacity ............................................................................................ 6-1

6.1.2 Pipes of Old Age ................................................................................................................ 6-1

6.1.3 Manholes Conditions due to Age................................................................................ 6-2

6.2 Ultimate System Improvements ................................................................................................ 6-3

6.2.1 Flow Depth Over Capacity ............................................................................................ 6-3

6.2.2 Supercritical to Subcritical Flow ................................................................................ 6-3

6.3 Project Prioritization ...................................................................................................................... 6-3

6.3.1 Bunnelle Avenue Pipeline Improvements – Medium Priority Project ....... 6-4

6.3.2 Golden Hills Road Pipeline Improvements – Medium Priority Project ..... 6-5

6.3.3 Wheeler Avenue Pipeline Improvements – Low Priority Project ................ 6-6

6.3.4 Manhole Regions with Age Concerns – Low Priority Project......................... 6-7

6.3.5 Wastewater Mains of Old Age – Low Priority Project ....................................... 6-8

CHAPTER 6-

Page 134 of 310 ends

Table of Contents
City of La Verne

2022 Wastewater Master Plan
iii

List of Tables
Table 2.1 – Ownership of Facilities .............................................................................................................. 2-1 Table 2.2 – Revisions to Sub Drainage Areas ........................................................................................... 2-4 Table 2.3 – Current “Hot Spot” Maintenance Locations....................................................................... 2-4 Table 3.1 – Existing Land Usage by Acreage ............................................................................................. 3-2 Table 3.2 – 1998 General Plan Land Use Designations by Acreage ................................................ 3-3 Table 3.3 – 2016 Zoning Map Designations .............................................................................................. 3-6 Table 3.4 – Adopted Specific Plans ............................................................................................................... 3-7 Table 3.5 – Land Use Designations for Supported Communities ..................................................... 3-8 Table 3.6 – Historical City Population and Housing (1990 – 2020) ............................................... 3-9 Table 3.7 – Land Use Designations for Supported Communities ..................................................... 3-9 Table 4.1 – Total Pipe Length by Diameter and Material .................................................................... 4-2 Table 4.2 – Total Pipe Length by Age .......................................................................................................... 4-2 Table 5.1 – Location of Manholes Monitored ........................................................................................... 5-1 Table 5.2 – Dipped Manholes .......................................................................................................................... 5-2 Table 5.3 – Existing Baseflow Demand ....................................................................................................... 5-5 Table 5.4 – Ultimate Baseflow Demand ...................................................................................................... 5-5 List of Figures
Figure 5.1 – Divergence Link Example ........................................................................................................ 5-4 Figure 6.1 – Bunnelle Avenue Pipeline Improvements ........................................................................ 6-4

List of Exhibits
Exhibit A –Sphere of Influence
Exhibit B – 1993 Drainage Areas
Exhibit C – Revised Drainage Areas
Exhibit D – Current Hot Spot Maintenance Locations
Exhibit E – CIP Manhole Age of Concern
Exhibit F – CIP Pi pe Age of Concern
Exhibit G – Tested Manholes with Revised Drainage Areas Exhibit H – Interagency Agreements
Exhibit I – Drainage Area 1 Potential CIPs
Exhibit J – Cost of Pipeline CIPs

Page 135 of 310 ends

Executive Summary
City of La Verne

2022 Wastewater Master Plan
ES-1

Executive Summary
This Executive Summary shares the findings and recommendations for the 2022 Wastewater Master Plan prepared for the City of La Verne. This master plan update catalogs the city’s infrastructure and related agreements, discusses operational system issues, and recommends various improvements to provide adequate hydraulic capacity and improve reliability of the collection system. The last master plans prepared for the wastewater system were completed in 1993 and 2007. As most of the recommended improvements of the 1993 plan were not implemented, much of that document has been disregarded other than the discussion of the five sub drainage areas. The 2007 plan primarily provided an assessment of the collection system’s hydraulic capacity at suspected trouble locations, all of which is updated within this 2022 master plan in addition to recommendations for accommodating future growth and secure reliability of the system.

The City of La Verne was founded in 1887 and incorporated in 1906. The City is 9.09 square miles and located in eastern Los Angeles County at the southern base of the Angeles National Forest. Land use throughout the City is dominated by residential uses with a commercial core along Foothill Boulevard and light industrial uses primarily south of Arrow Highway.

Institutional uses such as universities, public and private schools, and other governmental operations also occupy substantial amounts of land. The City’s 2022 population is estimated at 33,491, which was projected from the California DOF Population Estimates.

The original sewer system was designed and constructed in 1924. Much of this original system is still in operation today and generally serves the area bounded by Wheeler Avenue and I Street, and Seventh Street and Walnut Avenue. A wide variety of improvements have been made since the early days as development progressed away from the City center into the foothills and southern reaches of the com munity. The City now operates and maintains more than 100 miles of sewer lines, two wastewater lift stations, a brine line, and a number of ancillary facilities providing service to approximately 8,667 lateral connections consisting of 12,741 (2021 LV Rate Study) sewer units. In addition to these public facilities, there are several private community lift stations, force mains, and gravity sewers throughout the service territory that ultimately discharge into the City’s wastewater collection system.

Drainage Areas
The City provides wastewater services to approximately 5,139 acres (8.0 3 square miles) or roughly 88 percent of the City’s total 9.09 square mile area. The service area is divided into five separate Sub Drainage areas. These areas are as follows:

Sub Drainage Area 1. This sub drainage basin basically includes the western third of the City for a total of 2. 84 square miles. Its western boundary of the sub drainage areas generally follows the physical barrier of the Puddingstone Flood Control Channel while the southeastern boundary essentially bisects the City from the southwest to the northeast. The basin includes nearly all of north La Verne as well as Puddingstone Village located in the southwestern corner of the City. Revisions to this drainage include the addition of Marshall Canyon Estates tract, Rancho Esperanza tract, La Verne Oak Tree Estates tract, and a section of Sub Area 3 bounded by Damien/ Bonita/ Wheeler/ and Metro Light rail ROW. Deletions to

Page 136 of 310 ends

Executive Summary
City of La Verne

2022 Wastewater Master Plan
ES-2

this sub drainage area include Creekside Tract (to Sub Area 2) and remaining area west of the bluff along San Dimas Canyon Flood Control Channel (to Sub Area 2).

Sub Drainage Area 2. This basin is generally bounded by Foothill Boulevard on the south and the Puddingstone channel on the east , totaling 0.32 square miles. It drains the Foxglen neighborhood and picks up flows from the City of San Dimas, which also includes flows from La Verne’s Creekside development along San Dimas Canyon Road. Adjustments made to this drainage area include the addition of the Creekside Tract (from Sub Area 1) and the remaining area west of the bluff along San Dimas Canyon Flood Control Channel (from Sub Area 1).

Sub Drainage Area 3 . Sub area 3 is bordered by Foothill Blvd. to the north, B Street to the east, the Metrolink ROW to the south, and the eastern boundary of Sub Drainage Area 1.

Revisions to Sub Area 3 include the addition of the Puddingstone Hill region (Puddingstone La Venture), Park La Verne tract, and San Polo Business Park. Sub area 3 is a total of 1. 09 square miles.

Sub Drainage Area 4. This drainage area is centrally located and includes a large part of the community. Its northern half may be defined by Golden Hills Road to the north, the eastern City limit/prolongation of Williams Avenue to the east, the boundary of Sub Drainage Area 1 to the west and Foothill Blvd. separating the north and south halves of the sub area. The southern half is bounded by Foothill Blvd. in the north, White Avenue in the east, Puddingstone Drive to the south, and the eastern boundary of Sub Drainage area 3 to the west. Per Table 2.2, the changes made to Sub Area 4 include the addition of the Brassie Lane tract. Sub drainage are 4 contains a total of 3.01 square miles.

Sub Drainage Area 5 . The easternmost side of the City is served by Sub Drainage Area 5, which encompasses 0.77 square miles . It includes a small triangular area north of Foothill bounded by the Live Oak Flood Control Channel and the City limits. However, most of Sub Area 5 lies below Foothill Blvd. with Fulton Road/city limits the eastern boundary, White Avenue its western boundary, and Arrow Highway its southern boundary. No changes have been proposed for Sub Area 5.

Effluent flows from each of the Sub Areas are conveyed to a network of “trunk” lines own ed and operated by the Sanitation Districts of Los Angeles County. These trunk lines collect City effluent and ultimately convey wastewater to either the LACSD’s San Jose Creek Water Reclamation Plant or the Pomona Water Reclamation Plant for treatment and reclamation.

Growth and Projected Wastewater Flows
The City of La Verne’s 2022 population is estimated to be 33,491 and is expected to increase to 37,430 by 2040. Concurrently, the City’s number of housing units is expected to increase from 12,278 to 13,062 during this same time period. This population growth represents a

12.3 percent increase, much of which can be translated to increased wastewater flows.

However, the location of these increased flows is more important than the total flow volume itself. T o accurately determine these future wastewater flows, a computer model was employed. The computer modeling was completed on Bentley Systems, Inc. SewerGEMS software platform Version 8i. This wastewater collection system model is designed to perform hydraulic calculations within a wastewater collection system network and perform fundamental database management of input and output data associated with those

Page 137 of 310 ends

Executive Summary
City of La Verne

2022 Wastewater Master Plan
ES-3

calculations. Using this process, we are able to identify pipelines that are or will be exceeding their design capacity.

Hydraulic Assessment
The hydraulic assessment was based upon hydraulic modeling of the City’s collection system for both existing and future design scenarios. Flow projections were based upon flow monitoring data, manhole data, the City’s 1998 General Plan along with information from the City’s ongoing General Plan update, the City’s 2021 Water Master Plan and 2021 Urban Water Management Plan (UWMP). The vast majority of growth is anticipated to be infill and redevelopment of existing uses with more intense land uses. Existing and ultimate base flows can be found in Tables 5.3 and 5.4.

Recommended Capital Improvement Projects and Rehabilitation Projects
Based on the analysis performed, a list of recommended projects has been identified. These projects address existing issues, as well as issues when the population is at its projected maximum (using project population per the 2020 UWMP). A breakdown of each recommended project and its associated cost estimated is provided in detail in 6.3 - Project Prioritization.

Pipeline CIPs
Pipeline segments on Bunnelle Avenue, Golden Hills Road, and Wheeler Avenue all have a flow capacity over the City’s design criteria. It is recommended that these segments of pipes to be replaced with a larger size for a bigger capacity and smaller flow depth capacity.

Location
Manhole #
From
Manhole #
To Length (ft)
Estimated Cost $
(in 2023)
CIP 1: Bunnelle Avenue N-28144 N-28133 275 $117,844
CIP 2: Golden Hills Road P-33119 P-33117 350 $147,938
CIP 3: Wheeler Avenue O-32110 O-32106 305 $139,511

Manhole Rehabilitation
The City of La Verne currently has a wastewater maintenance program but no rehabilitation program. Its maintenance program consists of removing debris and other such materials that could cause restriction of flow of waste, hydro -jetting wastewater mains, removing roots within the mains, performing video inspections and other preventative maintenance measures. Along with this maintenance program, a rehabilitation program should be in place.

Presence of hydrogen sulfide trapped within the system can affect not only manholes, but the wastewater network it belongs to. This gas erodes brick, mortar, and concrete construction.

An assessment program geared towards manhole rehabilitation would benefit the overall condition of the City’s waste water system. There are numerous benefits of implementing a manhole rehabilitation program such that it would provide safer and faster solutions compared to replacing manholes in general, eliminate possible infiltration/exfiltration problems, save capital cost of conventional replacement and much more.

Page 138 of 310 ends

Chapter 1 - Background
City of La Verne

2022 Wastewater Master Plan
1-1

Background
This introductory chapter provides background information on the City of La Verne, outlines the purpose of the study, scope of work, and authorization for development of the 2022 Wastewater Master Plan.

1.1 Study Purpose, Scope, and Authorization
The purpose of this wastewater master plan is to evaluate the capacity of the C ity’s existing wastewater system, identify deficiencies in meeting current and future flow demands, and recommend appropriate and feasible capital improvements. In addition, cost estimates for the recommended capital improvements are included.

Specifically, the scope of work includes:
• Data collection, review, and analysis of City of La Verne documents • Conduct flow monitoring where required
• Project wastewater flows within the City’s service area • Create a new wastewater model to evaluate current and future wastewater flow conditions
• Analyze the wastewater collection system under existing conditions • Analyze the wastewater collection system under future conditions to support the City’s 2040 General Plan build out
• Document pertinent service agreements with other agencies • Develop and/or update relevant system maps
• Identify necessary system improvements and develop a Capital Improvement Plan Preparation of the study and master plan were authorized by the Director of Public Works in 2019

1.1.1 Study Objectives
The most recent wastewater master plan was prepared in 2007 by RKA Consulting Group .

This 2007 plan identified numerous syste m improvements necessary to accommodate the City’s intended growth . However, only a few of the wastewater system capacity improvements identified in the 2007 plan have been implemented to date. Since that time, the City has experienced significant growth, added new infrastructure, relocated pipes, redirected flows, and implemented a policy change toward higher density land use (La Verne General Plan 1998). As a result, the data and recommendations of the 2007 Wastewater Master Plan are not used or referenced in this master plan.

The primary goal of this 2022 Wastewater Master Plan is to ensure the City’s ability to deliver safe, cost effective, and uninterrupted wastewater services to the community. This is accomplished by the following objectives:
• Development of a new wastewater system model to evaluate the city’s wastewater system under both existing and projected Year 2040 flow conditions. This effort will aid in determining the system’s hydraulic capacities, structural conditions, and needed capital improvements for both immediate and 2040 build out requirements.

Chapter 1-

Page 139 of 310 ends

Chapter 1 - Background
City of La Verne

2022 Wastewater Master Plan
1-2

• Assessing the risk imposed by the limited pipe crossings of the 210 freeway and railroads that bisect the city.
• Master plan the City’s wastewater system to meet ultimate build out conditions within the identified service area.
• Creation of a Wastewater System Capital Improvement Plan.

The study boundaries include all area within the incorporated city limits as well as flows from specific areas serving portions of the City of San Dimas, City of Pomona, and unincorporated Los Angeles County that discharge into the C ity’s collection system. This plan does not, however, include any evaluation of the Sanitation Districts of Los Angeles County’s (LACSD) wastewater trunk system capacities, other than note them as outfall points for the C ity’s wastewater system. All wastewater transported through the City’s wastewater system is ultimately directed to LACSD trunk sewers and treated at LACSD wastewater treatment plants.

1.2 General
The City of La Verne was founded in 1887 and incorporated in 1906. The City is 9.09 square miles and located in eastern Los Angeles County at the southern base of the Angeles National Forest. Land use throughout the City is dominated by residential uses with a commercial core along Foothill Boulevard and light industrial uses pri marily south of Arrow Highway.

Institutional uses such as universities, public and private schools, and other governmental operations also occupy large amounts of land. The City’s 2022 population is estimated at 33,491, which was projected from the California DOF Population Estimates.

The original wastewater system was designed and constructed in 1924. Much of this original system is still in operation today and generally serves the area bounded by Wheeler Avenue and I Street, and Seventh Street and Walnut Avenue. A wide variety of improvements have been made since the early days as development progressed away from the City center into the foothills and southern reaches of the community. The City now operates and maintains more than 100 miles of wastewater lines, two wastewater lift stations, a brine line, and a number of ancillary facilities providing service to approximately 8,667 lateral connections consisting of 12,741 (2021 LV R ate Study) wastewater units. In addition to these public facilities, there are several private community lift stations, force mains, and gravity sewers throughout the service territory that ultimately discharge into the City’s wastewater collection system.

1.3 Topography
The City’s topography is varied ranging from 1,014 feet above me an sea level ( MSL) at Brackett Airport in the south to more than 1,800 feet above MSL in the northernmost residential neighborhoods. The area is characterized by gently sloping terrain south of Baseline Road with more drastic elevation changes as you travel north, particularly to the northeast. The sloping topography generally favors the use of gravity sewer systems as a result.

Page 140 of 310 ends

Chapter 1 - Background
City of La Verne

2022 Wastewater Master Plan
1-3

1.4 Climate
La Verne’s climate is warm and temperate consistent with that of the inland southern California region. Summers are warm, and occasionally reach into the 100s. Spring and fall are generally mild with temperatures averaging about 67 degrees Fahrenheit. The winter months of December, January, and February are much cooler and produce the most rainfall.

Temperatures December through February average about 55.8 degrees and with an average rainfall of 4.7 inches during this time. The annual average rainfall for the City is about 8.1 inches with an average of 51 days of measurable precipitation. The amount of precipitation is important in development of the computer model. Wastewater flows during dry weather are generally not under the influence of inflow and infiltration. However, inflow and infiltration can occur during wet weather flows, which impact wastewater system capacities from sources such as groundwater flows into flawed pipe joints, connections, manholes, and improperly connected roof and area drains.

1.5 Glossary of Terms
For the purposes of this report, the following defined terms are used:

Average Dry Weather Flow (ADWF) – The average non-storm flow over 24 hours during the dry months of the year, May through September. The ADWF is composed of the average sewage flow and the average dry weather inflow/infiltration.

Average Wet Weather Flo w (AWWF) – The average flow over 24 hours during the wet months of the year, October through April, on days when no rainfall occurred on that or the preceding day.

Best Management Practice – A method, activity of procedure for reducing the number of pollutants that may enter a water body.

Clean Water Act – Also known as the Federal Water Pollution Control Act (33U.S.C. 1251 et seq.).

Connection Fees – Charges assessed to join or expand an existing wastewater system. Such fees are used to fund capital improvements to the system.

Collecti
on System - A system g
ravity wastewater pipelines, manholes, sewage lift stations, force mains, and privately owned wastewater service laterals that transport wastewater, generally to an outfall connection to a trunk system or wastewater treatment plant.

Flow - The vo
lume of wastewater moving within the pipeline at a particular time.

Geogr
aphic Information System (GIS) – A database that includes geographical data that can be visually represented as maps.

Infilt
ration - The wat
er entering a wastewater system and service connections from groundwater, through such means as defective pipes, pipe joints, connections, or manhole walls. Infiltration does not include inflow and is typically relatively constant over a period of days, weeks, or even months as high groundwater conditions persist.

Page 141 of 310 ends

Chapter 1 - Background
City of La Verne

2022 Wastewater Master Plan
1-4

Inflow - The water discharged into a wastewater system a nd service connections from such sources as roof drains, cellar, yard and area drains, foundation drains, cooling water discharges, drains from springs and swampy areas, manhole covers, cross connections from storm drains, catch basins, storm water, surface runoff, or drainage. Inflow does not include infiltration and varies rapidly with rainfall conditions, with flows rising an d falling in response to a storm event.

Lift S
tation – a facility used to pump wastewater uphill, against gravity through a force main.

Outfall – any pipe or conduit used to carry either raw sewage or treated effluent to a final point of discharge into a body of water . As used in this report, it is the discharge point to another collection system.

Peak Hour Dry Weather Flow (PHDWF) – The maximum sewage flows the collection system will experience during dry weather; typically defined as being sustained for one hour.

Peak Hou
r Wet Weather Flow (PHWWF) - The ma
ximum sewage flows the collection
system will experience during wet weather; defined as being sustained for one hour. PHWWF is used to size pipelines and lift stations.

SDR-35. St
andard Definition Ratio 35 is a classification of PVC pipe and represents the ratio of the outside diameter of the pipe divided by the wall thickness.

Wastewater Unit. Each residential dwelling in duplexes, triplexes, apartments, mobile home spaces and separate houses if each has kitchen facilities; each occupancy in a multiple unit professional, commercial or industrial development shall be considered a separate unit; each four (4) guest rooms or fraction thereof, in any motel, hotel, rooming or lodging house other than the owner's principal residence; e ach institutional use with living quarters having kitchen facilities.

1.6 Abbreviations
AACE Association for the Advancement of Cost Engineering ABS Acrylonitrile-Butadiene-Styrene
ac Acre
ADDF Average Daily Dry Weather Flows
ADWF Average Dry Weather Flow
Ave. Avenue
Blvd. Boulevard
CCTV Closed Conduit Television
CDPH California Department of Public Health
CIP Cast Iron Pipe
CIP Capital Improvement Program
CIPP Cured-in-place Pipe
COP Certificates of Participation
CWSRF Clean Water State Revolving Fund
DI Ductile Iron
DIP Ductile Iron Pipe
DU Dwelling Unit
DWF Dry Weather Flow

Page 142 of 310 ends

Chapter 1 - Background
City of La Verne

2022 Wastewater Master Plan
1-5

DWR Department of Water Resources
EDU Equivalent Dwelling Unit
EIFD Enhanced Infrastructure Financing District
EPA Environmental Protection Agency
ESRI Environmental Systems Research Institute, Inc.

FAR Floor Area Ratio
FM Flow Monitor
fps Feet per Second
GIS Geographic Information System
gpcd Gallons per Capita per Day
gpd Gallons per Day
gpm Gallons per Minute
GP General Plan
gpd/acre Gallons per Day per Acre
GVF Gradually Varied Flow
ID Identification
In. Inch
II Infiltration/Inflow
IRWMP Integrated Regional Water Management Plan
IS Initial Study
lf. Linear feet
Ln. Lane
MG Million Gallons
MGD Million Gallons per Day
MH Manhole
NASSCO National Association of Sewer Service Companies PACP Pipeline Assessment Certification Program
PDWF Peak Dry Weather Flow
pvc Polyvinyl Chloride
QA Quality Assurance
QC Quality Control
rcp Reinforced Concrete Pipeline
Rd. Road
RDII Rainfall-Derived Infiltration and Inflow
ROW Right of Way
SCAG Southern California Association of Governments
SRF State Revolving Fund
SSMP Sewer System Management Plan
St. Street
UNK Unknown
US United States
USEPA United States Environmental Protection Agency
VCP Vitrified Clay Pipe
WIFIA Water Infrastructure Finance and Innovation Act
WWF Wet Weather Flow

Page 143 of 310 ends

Chapter 1 - Background
City of La Verne

2022 Wastewater Master Plan
1-6

1.7 Acknowledgements
Civiltec Engineering, Inc. would like to acknowledge the valuable assistance of all City staff, Civiltec Engineering, Inc . staff, and others for their respective contributions to the preparation of this document including:

City Staff

Anthony Ciotti, Interim Director of Public Works
Richard Martinez, Utility Manager

Civiltec Staff

W. David Byrum, President, Principal Engineer
Gretel Ochoa-Nhac, Project Engineer
Timothy Kwan, Staff Engineer
Daniel W. Keesey, Senior Project Coordinator

GIS Consultant

Balaji KG, Nobel Systems

Page 144 of 310 ends

Chapter 2 - Study Area
City of La Verne

2022 Wastewater Master Plan
2-1
Study Area
The study boundaries of this master plan encompass all land within the incorporated city limits of La Verne. It also includes area acknowledged as the City’s Sphere of Influence as well as the drainage potential from neighboring communities of San Dimas and Pomona.

2.1 Existing Service Area
The City of La Verne’s existing service area includes the entire incorporated area of the community as well as several areas located beyond the City’s boundaries. These “outside” service areas include unincorporated Los Angeles County, portions of the City of San Dimas, and a small neighborhood located in the City of Pomona. In each case, these outside entities provide and maintain their own individual wastewater systems serving their respective areas; the City only accepts wastewater from these providers and conveys it through the City’s system to LACSD’s regional trunk system. It should also be noted that the areas served by Los Angeles County Public Works are also included within the City’s Sphere of Influence.

The City’s existing wastewater service area is shown in Exhibit A.

The City provides wastewater collection via its wastewater system network. All wastewater received is conveyed t hrough the City system and ultimately discharged into LACSD’s regional trunk lines and treated at LACSD reclamation facilities. The City is only responsible for maintenance of its owned facilities. City staff provide general maintenance using hydro jetting of the pipelines on a regular basis and utilize remote cameras to inspect the integrity of the lines following cleaning.

Table 2.1 – Ownership of Facilities
Facility Location Ownership
Lift Station Brackett Field City of Pomona
Franklin Sewage Lift Station Puddingstone Drive City of La Verne Sewer Lift Station Van Dusen Road Private
Lift Station and Grinder De Anza Heights Rd Private
Lift Station Ridgeview Drive Private
Lift Station Crestview Drive Private
Sewer Lift Station Creekside City of La Verne
Williams Avenue Lift Station Williams Avenue City of
Claremont
LACO Afflerbaugh – Paige Grinder Steven’s Ranch Road County Owned

Chapter 2 -
4,- ---------

Page 145 of 310 ends

Chapter 2 - Study Area
City of La Verne

2022 Wastewater Master Plan
2-2

2.2 Existing Sub Drainage Areas
The service area of the City’s wastewater collection system is separated into sub drainage areas or wastewater shed areas. Each of these sub drainage areas convey wastewater to a different connection to a trunk line owed by the LACSD. The five sub drainage areas were previously determined in earlier master plans based upon geography, flow demands, and available trunk lines. The sub drainage areas are shown in Exhibit B and can mostly be described as:

Sub Drainage Area 1. This sub drainage basin basically includes the western third of the City. Its western boundary of the sub drainage areas generally follows the physical barrier of the Puddingstone Flood Control Channel while the southeastern boundary essentially bisects the City from the southwest to the nor theast. The basin includes nearly all of north La Verne as well as Puddings tone Village located in the southwestern corner of the City. The area is comprised of a mix of land uses with residential being dominate. Most of the residential land use is single family with densities ranging from 2 - 4.5 units per acre. There is some commercial use along Foothill Boulevard and Arrow Highway. Wastewater collected within this basin is conveyed to LACSD’s Ramona Avenue Trunk, a 12” non reinforced concrete pipe and beginning near the intersection of Foothill Boulevard and Baseline Road and points southerly along Ramona Avenue. In the City’s southern reaches wastewater is discharged into LACSD’s Puddingstone Trunk, Sections 1 and 2, a 15” VCP pipe.

Sub Drainage Area 2. This basin is generally bounded by Foothill Boulevard on the south and the Puddingstone channel on the east. It drains the Foxglen neighborhood and picks up flows from the City of San Dimas, which also includes flows from La Verne’s Creekside development along San Dimas Canyon Road. The area is strictly characterized as residential with densities ranging from 2 – 4.5 units per acre. Flows are conveyed to the Sunflower Trunk in Canyon View Drive. The Sunflower Trunk is a 12” non-reinforced concrete pipe.

Sub Drainage Area 3. Sub area 3 is bordered by Foothill Blvd. to the north, B Street to the east, the Metrolink ROW to the south, and the eastern boundary of Sub Drainage Area 1. This drainage area contains a mix of land uses including single family and multifamily residential, a large mobile home park, a senior living community, commercial, public facilities, and some light industrial. Residential densities vary widely from 4.5 to 10 units per acre. Residential uses make up the largest land use in the area, but public facilities are a close second with the Metropolitan Water District’s Weymouth Treatment plant, various parks, and public and private schools occupying wide swaths of land. Flows from Sub Drainage Area 3 are discharged into the Puddingstone Trunk, Section 4 located in Palomares Avenue just east of the Puddingstone channel. The Puddingstone Trunk, Section 4 is a 12” VCP pipe.

Sub Drainage Area 4. This drainage area is centrally located and includes a large part of the community. Its northern half may be defined by Golden Hills Road to the north, the eastern City limit/prolongation of Williams Avenue to the east, boundary of Sub Drainage Area 1 to the west and Foothill Blvd. separating the north and south halves of the sub area. The southern ha lf is bounded by Foothill Blvd. in the north, White Avenue in the east, Puddingstone Drive to the south, and the eastern boundary of Sub Drainage area 3 to the west. The vast majority of the area includes single family

Page 146 of 310 ends

Chapter 2 - Study Area
City of La Verne

2022 Wastewater Master Plan
2-3
residential land use with some multifamily, some commercial along Foothill Blvd and in the Oldtown core, the University of La Verne, parks, elementary and secondary schools, business park, and other public facilities. Residential densities range from 2 – 10 units per acre. Wastewater from Sub Drainage Area 4 is carried to either the Emerald Avenue Trunk, a 12” VCP pipe, or the La Verne “B” Street Trunk, a 12” VCP pipe.

Sub Drainage Area 5 . The easternmost side of the City is served by Sub Drainage Area 5. It includes a small triangular area north of Foothill bounded by the Live Oak Flood Control Channel and the City limits. However, most of Sub Area 5 lies below Foothill Blvd. with Fulton Road/city limits the eastern boundary, White Avenue its western boundary, and Arrow Highw ay its southern boundary. The area primarily includes single family with some multifamily land uses, as well as some commercial and light industrial uses. Some City of Pomona flows also contribute to this drainage area. Discharges from this basin are received by the La Verne Trunk, Section 2, a 27” reinforced concrete pipe located southwest of White Avenue on Los Angeles County Fair property.

The five sub drainage areas as they currently exist do not incorporate all properties within La Verne’s incorporated City limits. For example, most of the San Polo business park uses south of Arrow Highway are outside of these drainage areas as they are currently defined as are the Puddingstone Hill region and the Park La Verne neighborhood. The San Polo area discharges into the La Verne Trunk, Sections 2 and 3 of LACSD. This trunk line ranges in size from 12” VCP to 24” reinforced concrete pipe. Wastewater from the Puddingstone Hill region and Park La Verne neighborhood is transported through the City’s system and event ually discharged into the LACSD’s Puddingstone Trunk, Sections 1 and 2, which is a 15” non reinforced concrete pipe. As for Brackett Air Field, much of this area presently flows into the LACSD’s La Verne Trunk, Section 2. Segments of this pipe range from 1 2” VCP to 24” reinforced concrete pipe.

2.3 Revisions to the Sub Drainage Areas
The most recent revisions to the drainage sub areas occurred during preparation of the 1993 Wastewater Master Plan. Since that time though, the City has expanded in territory and development has extended beyond the original sub basins boundaries. Each of the five sub basins will be revised to reflect current conditions and anticipated development. A summary of these revisions is included Table 2.2.

Page 147 of 310 ends

Chapter 2 - Study Area
City of La Verne

2022 Wastewater Master Plan
2-4
Table 2.2 – Revisions to Sub Drainage Areas
Drainage Area Description
Sub Area 1
Addition of Marshall Canyon Estates
Addition of Rancho Esperanza Tract
Addition of La Verne Oak Tree Estates Tract
Relocate region bounded by Damien, Bonita, Wheeler, and Metro Light Rail ROW from Sub Area 3 to Sub Area 1
Sub Area 2
Relocation of Creekside Development from Sub Area 1 to Sub Area 2
Relocation of Remaining Area West of Bluff along San Dimas Canyon Flood Channel from Sub Area 1 to Sub Area 2
Sub Area 3
Addition of Puddingstone Hill Region (Puddingstone La
Venture)
Addition of Park La Verne Tract
Addition of San Polo Business Park
Sub Area 4 Addition of Brassie Lane Subdivision (LA County Area)

Proposed revisions to the sub drainage areas are shown in Exhibit C.

Brackett Airfield is a Los Angeles County property located within the City limits of La Verne.

It is currently served by an internal wastewater system network and discharges directly into a LACSD Trunk line. Therefore, it is not included within any of the current or proposed sub drainage areas.

2.4 Hot Spots/Problem Areas
As noted previously, the City employs the use of hydro jetting and CCTV inspections as its primary maintenance program. With more than 100 miles of wastewater pipelines throughout the City’s service area, per City staff, the City attempts to conduct such maintenance on each pipe segment at least once every two years. There are exceptions though for areas referred to as “hot spots.” These are pipe segments that are subject to high amounts of fats, oils, and grease (FOG) and require more frequent cleaning. Current hot spots are noted in Table 2.3 below and shown in Exhibit D.

Table 2.3 – Current “Hot Spot” Maintenance Locations
Location/Street Issue From
Manhole To Manhole
Foothill Blvd Grease R23-103 R24-106
Foothill Blvd Grease R24-106 Q24-127
Foothill Blvd Grease P24-146 Q24-121
Foothill Blvd Grease O24-104 O24-115
Foothill Blvd Grease O24-104 N24-110
Emerald Ave Grease P23-115 P24-317
Dover Ave Grease P23-125 P23-142
Butterfield Ave Grease P23-136 P23-142

Page 148 of 310 ends
← All documents from this meeting