Cities Index.
Attachment 3 - Project Exhibits

Laguna Beach City Council
August 12, 2025

Document
Attachment 3 - Project Exhibits
Meeting
August 12, 2025
Body
Laguna Beach City Council
Original file
8.0 MB
Text extracted from the city's file for reading and search. Open the original on lagunabeachcity.primegov.com. That file is the official record.

LAGUNA CANYON ROAD

PROPOSED ROAD SECTIONS & ELEMENTS
OPTION 1: OFF-STREET BIKE PATH (CLASS I) OPTION 2: ON-STREET BIKE PATH (CLASS II)

PROPOSED CORRIDOR ELEMENTS

TEXTURED/COLORED SIDEWALK NATIVE LANDSCAPE &

DECOMPOSED GRANITE

CONCRETE ROLLED CURB WOOD RAILING
OPTION 1: OFF-STREET BIKE PATH (CLASS I) OPTION 2: ON-STREET BIKE LANE (CLASS II) S
I) II
II ROAD SECTIONS AND COMPARSION OPTION I: OFF-STREET BIKE PATH (CLASS I) OPTION II: ON-STREET BIKE LANE (CLASS II) COMPARISON MATRIX A
Attachment 3
10 LAGUNA CANYON ROAD

CANYON ACRES DRIVE TO LCAD
EXISTING CONDITIONS:

Exising Pavement Width = Varies 43’-52’
Proposed Pavement Width = 61’
Proposed Pavement Width = 53’
PROPOSED CONDITIONS:

OPTION I OFF-STREET BIKE PATH (CLASS I)
PROPOSED CONDITIONS:

OPTION II ON-STREET BIKE LANE (CLASS II)
11 LAGUNA CANYON ROAD

LCAD TO BIG BEND
EXISTING CONDITIONS:

PROPOSED CONDITIONS:

OPTION I OFF-STREET BIKE PATH (CLASS I)
PROPOSED CONDITIONS:

OPTION II ON-STREET BIKE LANE (CLASS II)
Exising Pavement Width = Varies 41’-45’
Proposed Pavement Width = 61’
Proposed Pavement Width = 53’
12 LAGUNA CANYON ROAD

BIG BEND TO EL TORO ROAD
EXISTING CONDITIONS:

PROPOSED CONDITIONS:

OPTION I OFF-STREET BIKE PATH (CLASS I)
PROPOSED CONDITIONS:

OPTION II ON-STREET BIKE LANE (CLASS II)
Exising Pavement Width = Varies 46’-51’
Proposed Pavement Width = 61’
Proposed Pavement Width = 53’
13

← All documents from this meeting