1 1100 Corporate Center Drive, Suite 201, Monterey Park, CA 91754 T: (323) 260-4703 | www.koacorp.com

MONTEREY PARK ORANGE ONTARIO SAN DIEGO
Date: October 23, 2025
To: Alpha Santos-Guinto, Project Manager, City of Laguna Beach Public Works and Utility Department From: Hilary Mau, Project Manager, KOA, A Lochner Company Subject: Lower Ocean Avenue One-Way Traffic Study, City of Laguna Beach The City of Laguna Beach (the “City”) is proposing to reconfigure Lower Ocean Avenue between Beach Street and Coast Highway from two-way to one-way operations (the “Project”). This Project was originally evaluated in the Task 3A – Ocean Avenue Supplemental Feasibility Alternative Analysis (One-Way Circulation) Technical Memorandum prepared by KOA Corporation on July 24, 2018 (the “2018 Traffic Study”). However, since the analysis was prepared, Forest Avenue between Glenneyre & Coast Highway has been permanently closed to provide Forest Promenade as a vehicle-free area. Therefore, the City has requested an updated operational analysis that accounts for the changes to vehicle circulation in relationship to the proposed one-way reconfiguration of Lower Ocean Avenue.

PROJECT DESCRIPTION
The Project will reconfigure Lower Ocean Avenue between Beach Street and Coast Highway from two-way to one-way operations. The design will remove existing eastbound through lanes, convert existing parallel parking stalls to angled parking stalls, convert the westbound approach at Coast Highway to include a dedicated right-turn pocket, and implement bulb-outs at intersections and crosswalks. The concept plan is shown in Figure 1 below.

Figure 1 – Lower Ocean Avenue Project Concept
Attachment 2
5 2

OPERATIONAL ANALYSIS METHODOLOGY
The study uses existing traffic counts and assumes a practical pattern of diversions that would take place under the proposed one-way circulation. Currently, all eastbound traffic on Ocean Avenue either enters from the westbound direction on Coast Highway (SR-1) or enters via a driveway. Southbound left turns from Coast Highway are not permitted.

Therefore, all northbound right turns must be diverted to an alternate route.

The 2018 Traffic Study assumed that diverted trips from Coast Highway would use either Forest Avenue (north of Ocean Avenue) or Broadway Street (south of Ocean Avenue). Since the 2018 Traffic Study was completed, the section of Forest Avenue between Coast Highway and Glenneyre Street was closed to vehicles and transformed into Forest Promenade.

Therefore, new diversion distributions were necessary along with the addition of one more study intersection for this analysis. The following four study intersections were analyzed and are shown in Figure 2:

1. Coast Highway & Broadway Street

2. Coast Highway & Ocean Avenue

3. Coast Highway & Park Avenue

4. Coast Highway & Laguna Avenue
Figure 2 – Study Intersections
Using assumptions consistent with the 2018 Traffic Study, approximately two-thirds of the diverted trips were assumed to begin their diversion prior to Ocean Avenue, while one-third of diverted trips would begin their diversion after Ocean Avenue. The previous study assumed that two-thirds of trips would use Forest Avenue as their alternate route. Due to the closure of the segment of Forest Avenue between Glenneyre Street and Coast Highway, it was assumed that these trips would instead use Laguna Avenue and Glenneyre Street as their detour route. It was not assumed that trips would use Park Avenue and Eiler Larsen Lane, as this segment has a small capacity and would require a potentially challenging leftturn onto Glenneyre Street. It is anticipated that with the trip diversion vehicular delays will increase at the surrounding intersections along Glenneyre Street and Forest Avenue. However, the peak additive trips at the surrounding intersections 6 3
are expected to add less than one vehicle per minute and therefore unlikely to cause a major deterioration in operations.

Figure 3 below shows the assumed distribution of diverted trips.

Figure 3 – Distribution of Diverted Trips
Two scenarios were evaluated for a Saturday Midday Peak condition, which is considered the busiest time period for the study area:

1. Existing Year (2025) Without Project

2. Existing Year (2025) With Project
The traffic analysis was performed using the most current version of Trafficware’s Synchro 12. Traffic signal cycle lengths were determined based on review of the existing signal timing at the intersections during the peak conditions. It was assumed that the traffic signal splits and offsets are coordinated, as such, the network was optimized. Two study intersections (Intersection #3 - Coast Highway & Park Avenue and Intersection #4 - Coast Highway & Laguna Avenue) contain an all-pedestrian phase scramble crosswalk. The Highway Capacity Manual (HCM) 2000 methodology is used to calculate the vehicle delay, as this methodology is compatible with the observed geometries and signal patterns.

DATA COLLECTION
Turning movement counts were collected on Saturday, September 13, 2025, over a six-hour period from 10:00 AM to 4:00 PM. The peak hour is considered the highest 60-minute interval for each location. Count collection also included pedestrian and bicycle counts at the four study intersections. The traffic count data is provided in Attachment A. 7 4
EXISTING YEAR (2025) SCENARIO
The Existing Year (2025) Without Project scenario volumes are shown in Figure 4 below.

Figure 4 – Existing Year (2025) Without Project Volumes Using the diversion assumptions presented in Figure 3, the assumed turning movement volumes used in the Existing Year (2025) With Project condition is shown in Figure 5 below. 8 5
Figure 5 – Existing Year (2025) With Project Volumes

LEVEL-OF-SERVICE (LOS) ANALYSIS RESULTS
All four study intersections currently operate at acceptable levels of service of LOS D or better during the Saturday Midday peak. Under the With Project scenario, with the one-way operations on Ocean Avenue, all intersections would continue to operate under acceptable levels of service. The intersections of Coast Highway & Park Avenue and Coast Highway & Laguna Avenue are expected to experience a nominal increase in delay of 0.2 seconds. At the intersection of Coast Highway & Ocean Avenue, operations are expected to experience a reduction in delay of 1.9 seconds under the With Project condition scenario. This would be consistent with the assumption of an overall reduction in northbound volumes with the elimination of the northbound right-turn movements.

The LOS results are summarized in Table 1 below. The Synchro analysis worksheets are included in Attachment B. 9 6
Table 1 – Level of Service (LOS) Results Summary
Intersection
Without Project
Delay (sec)
With Project
Delay (sec)
Change
(sec)
Saturday Peak
1 Coast Highway & Broadway Street 39.8 D 39.8 D 0.0
2 Coast Highway & Ocean Avenue 6.3 A 4.4 A -1.9
3 Coast Highway & Park Avenue 2.4 A 2.6 A 0.2
4 Coast Highway & Laguna Avenue 14.1 B 14.3 B 0.2

CONCLUSIONS
Based on the results of the analysis, the Project is not anticipated to affect the intersection operations along Coast Highway in the downtown area. All four study intersections are expected to operate at an acceptable level of service under the Without and With Project scenarios. The surrounding roadways may experience increases in delay with the diverted trips, but the additive trips are unlikely to cause major deterioration in operations. Therefore, the reconfiguration of Lower Ocean Avenue from one-way to two-way traffic is not expected to create or contribute to any adverse traffic conditions in downtown Laguna Beach.
10 7
ATTACHMENT A – TURNING MOVEMENT COUNT DATA
11 File Name : 01_LBH_PCH_Bro Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 1
City of Laguna Beach
N/S: Coast Highway
E/W: Broadway Street
Weather: Clear
Groups Printed- Total Volume
Coast Highway
Southbound
Broadway Street
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total 10:00 AM 50 122 172 122 58 180 123 39 162 514
10:15 AM 48 131 179 104 79 183 152 57 209 571
10:30 AM 69 160 229 102 86 188 158 62 220 637
10:45 AM 47 171 218 111 60 171 168 58 226 615
Total 214 584 798 439 283 722 601 216 817 2337
11:00 AM 59 154 213 115 92 207 154 55 209 629
11:15 AM 44 180 224 98 70 168 176 57 233 625
11:30 AM 47 138 185 125 82 207 195 33 228 620
11:45 AM 48 176 224 118 80 198 193 56 249 671
Total 198 648 846 456 324 780 718 201 919 2545
12:00 PM 43 155 198 106 71 177 186 50 236 611
12:15 PM 60 193 253 119 74 193 165 51 216 662
12:30 PM 56 192 248 115 75 190 183 57 240 678
12:45 PM 55 188 243 129 72 201 163 47 210 654
Total 214 728 942 469 292 761 697 205 902 2605
01:00 PM 34 168 202 109 77 186 195 62 257 645
01:15 PM 52 153 205 135 67 202 148 53 201 608
01:30 PM 46 186 232 100 67 167 160 55 215 614
01:45 PM 38 163 201 113 58 171 158 52 210 582
Total 170 670 840 457 269 726 661 222 883 2449
02:00 PM 54 185 239 103 81 184 150 59 209 632
02:15 PM 62 161 223 128 51 179 181 42 223 625
02:30 PM 59 180 239 113 87 200 158 53 211 650
02:45 PM 40 168 208 112 74 186 162 50 212 606
Total 215 694 909 456 293 749 651 204 855 2513
03:00 PM 52 173 225 116 70 186 159 63 222 633
03:15 PM 49 201 250 93 73 166 168 66 234 650
03:30 PM 51 211 262 109 65 174 165 55 220 656
03:45 PM 47 195 242 93 67 160 171 61 232 634
Total 199 780 979 411 275 686 663 245 908 2573
Grand Total 1210 4104 5314 2688 1736 4424 3991 1293 5284 15022 Apprch % 22.8 77.2 60.8 39.2 75.5 24.5
Total % 8.1 27.3 35.4 17.9 11.6 29.5 26.6 8.6 35.2
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
12 File Name : 01_LBH_PCH_Bro Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 2
City of Laguna Beach
N/S: Coast Highway
E/W: Broadway Street
Weather: Clear
Coast Highway
Southbound
Broadway Street
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:15 PM
12:15 PM 60 193 253 119 74 193 165 51 216 662
12:30 PM 56 192 248 115 75 190 183 57 240 678
12:45 PM 55 188 243 129 72 201 163 47 210 654
01:00 PM 34 168 202 109 77 186 195 62 257 645
Total Volume 205 741 946 472 298 770 706 217 923 2639
% App. Total 21.7 78.3 61.3 38.7 76.5 23.5
PHF .854 .960 .935 .915 .968 .958 .905 .875 .898 .973
Coast Highway
Broadway Street
Coast Highway
Thru
741
Left
205
Out In Total
1004 946 1950
Right
298
Left
472
Out Total In
422 770 1192
Thru
706
Right
217
Out In Total
1213 923 2136
Peak Hour Begins at 12:15 PM
Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
13 File Name : 01_LBH_PCH_Bro Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 3
City of Laguna Beach
N/S: Coast Highway
E/W: Broadway Street
Weather: Clear
Coast Highway
Southbound
Broadway Street
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at:
03:00 PM 11:00 AM 11:15 AM
+0 mins. 52 173 225 115 92 207 176 57 233
+15 mins. 49 201 250 98 70 168 195 33 228
+30 mins. 51 211 262 125 82 207 193 56 249
+45 mins. 47 195 242 118 80 198 186 50 236
Total Volume 199 780 979 456 324 780 750 196 946
% App. Total 20.3 79.7 58.5 41.5 79.3 20.7
PHF .957 .924 .934 .912 .880 .942 .962 .860 .950
Coast Highway
Broadway Street
Coast Highway
Thru
780
Left
199
In - Peak Hour: 03:00 PM
979
Right
324
Left
456
In - Peak Hour: 11:00 AM
780
Thru
750
Right
196
In - Peak Hour: 11:15 AM
946
Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
14 Location: Laguna Beach Date: 9/13/2025
N/S: Coast Highway Day: Saturday
E/W: Broadway Street
North Leg East Leg South Leg West Leg
Coast Highway Broadway Street Coast Highway Laguna Public Beach Accs 54 31 0 27 112
87 38 0 30 155
55 30 0 24 109
83 60 0 44 187
68 40 0 49 157
66 65 0 44 175
99 47 0 63 209
90 70 0 51 211
98 67 0 43 208
100 78 0 31 209
107 64 0 65 236
108 80 0 79 267
110 75 1 73 259
126 72 0 60 258
83 113 0 71 267
115 78 0 54 247
90 87 0 77 254
124 86 0 55 265
103 75 0 72 250
101 89 0 76 266
100 68 0 38 206
95 63 0 79 237
108 68 0 59 235
121 65 0 58 244
2291 1609 1 1322 5223

PEDESTRIANS
Time
11:00 AM
10:15 AM
10:45 AM
10:00 AM
10:30 AM
TOTAL VOLUMES:
2:15 PM
2:30 PM
2:45 PM
3:00 PM
3:15 PM
3:30 PM
3:45 PM
1:15 PM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
12:45 PM
1:00 PM
11:15 AM
11:30 AM
1:30 PM
1:45 PM
2:00 PM
TOTAL
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
15 Location: Date: 9/13/2025
N/S: Day: Saturday
E/W:

Left Thru Right Left Thru Right Left Thru Right Left Thru Right 0 7 0 0 0 0 0 2 2 0 0 0 11
2 1 0 0 0 0 0 0 1 0 0 0 4
0 2 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 1 0 0 6 0 0 0 0 7
1 3 0 0 0 0 0 4 0 0 0 0 8
0 1 0 0 0 0 0 0 0 0 0 0 1
1 1 0 0 0 0 0 11 1 0 0 0 14
0 0 0 0 0 0 0 4 1 0 0 0 5
0 0 0 0 0 0 0 13 0 0 0 0 13
0 4 0 0 0 0 0 1 0 0 0 0 5
0 0 0 2 0 0 0 0 0 0 0 0 2
0 0 0 0 0 0 0 1 0 0 0 0 1
0 2 0 0 0 0 0 5 0 0 0 0 7
0 1 0 0 0 0 0 0 0 0 0 0 1
0 6 0 0 0 0 0 0 0 0 0 0 6
1 0 0 0 0 0 0 1 0 0 0 0 2
0 3 0 0 0 0 0 0 0 0 0 0 3
0 0 0 0 0 0 0 2 0 0 0 0 2
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 1 1 0 0 0 2
0 2 0 0 0 0 0 4 0 0 0 0 6
0 1 0 1 0 4 0 0 0 0 0 0 6
1 0 0 0 0 0 0 0 1 0 0 0 2
0 0 0 0 0 0 0 0 1 0 0 0 1
6 34 0 3 1 4 0 55 8 0 0 0 111
Coast Highway
Laguna Beach
Broadway Street
3:15 PM
3:30 PM
3:45 PM
2:00 PM
2:15 PM
2:30 PM
2:45 PM
3:00 PM
12:45 PM
1:00 PM
1:15 PM
1:30 PM
1:45 PM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
10:30 AM
10:45 AM
11:00 AM
11:15 AM
11:30 AM
10:00 AM
10:15 AM
TOTAL VOLUMES:

BICYCLES
Southbound Westbound Northbound Eastbound
Coast Highway Broadway Street Coast Highway Laguna Public Beach Accs Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
16 File Name : 02_LBH_PCH_Oce Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 1
City of Laguna Beach
N/S: Coast Highway
E/W: Ocean Avenue
Weather: Clear
Groups Printed- Total Volume
Coast Highway
Southbound
Ocean Avenue
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total 10:00 AM 1 242 243 11 7 18 146 13 159 420
10:15 AM 0 228 228 16 11 27 203 10 213 468
10:30 AM 0 246 246 7 4 11 207 11 218 475
10:45 AM 0 279 279 13 10 23 213 9 222 524
Total 1 995 996 47 32 79 769 43 812 1887
11:00 AM 0 251 251 10 14 24 201 15 216 491
11:15 AM 0 283 283 10 6 16 213 20 233 532
11:30 AM 1 249 250 16 8 24 235 21 256 530
11:45 AM 0 292 292 12 16 28 223 15 238 558
Total 1 1075 1076 48 44 92 872 71 943 2111
12:00 PM 1 264 265 12 10 22 238 10 248 535
12:15 PM 0 293 293 12 11 23 205 17 222 538
12:30 PM 0 302 302 18 11 29 229 19 248 579
12:45 PM 0 301 301 16 11 27 210 11 221 549
Total 1 1160 1161 58 43 101 882 57 939 2201
01:00 PM 0 301 301 11 14 25 228 13 241 567
01:15 PM 0 258 258 11 11 22 194 22 216 496
01:30 PM 0 281 281 18 19 37 193 10 203 521
01:45 PM 1 275 276 11 9 20 203 22 225 521
Total 1 1115 1116 51 53 104 818 67 885 2105
02:00 PM 0 261 261 17 6 23 199 14 213 497
02:15 PM 0 299 299 7 8 15 226 15 241 555
02:30 PM 0 269 269 14 17 31 202 13 215 515
02:45 PM 0 292 292 9 11 20 199 10 209 521
Total 0 1121 1121 47 42 89 826 52 878 2088
03:00 PM 0 268 268 6 14 20 226 11 237 525
03:15 PM 0 285 285 7 13 20 210 17 227 532
03:30 PM 1 307 308 5 7 12 227 12 239 559
03:45 PM 1 263 264 7 16 23 217 13 230 517
Total 2 1123 1125 25 50 75 880 53 933 2133
Grand Total 6 6589 6595 276 264 540 5047 343 5390 12525 Apprch % 0.1 99.9 51.1 48.9 93.6 6.4
Total % 0 52.6 52.7 2.2 2.1 4.3 40.3 2.7 43
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
17 File Name : 02_LBH_PCH_Oce Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 2
City of Laguna Beach
N/S: Coast Highway
E/W: Ocean Avenue
Weather: Clear
Coast Highway
Southbound
Ocean Avenue
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:15 PM
12:15 PM 0 293 293 12 11 23 205 17 222 538
12:30 PM 0 302 302 18 11 29 229 19 248 579
12:45 PM 0 301 301 16 11 27 210 11 221 549
01:00 PM 0 301 301 11 14 25 228 13 241 567
Total Volume 0 1197 1197 57 47 104 872 60 932 2233
% App. Total 0 100 54.8 45.2 93.6 6.4
PHF .000 .991 .991 .792 .839 .897 .952 .789 .940 .964
Coast Highway
Ocean Avenue
Coast Highway
Thru
1197
Left
0 Out In Total
919 1197 2116
Right
47 Left
57 Out Total In
60 104 164
Thru
872
Right
60 Out In Total
1254 932 2186
Peak Hour Begins at 12:15 PM
Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
18 File Name : 02_LBH_PCH_Oce Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 3
City of Laguna Beach
N/S: Coast Highway
E/W: Ocean Avenue
Weather: Clear
Coast Highway
Southbound
Ocean Avenue
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at:
12:15 PM 12:45 PM 11:15 AM
+0 mins. 0 293 293 16 11 27 213 20 233
+15 mins. 0 302 302 11 14 25 235 21 256
+30 mins. 0 301 301 11 11 22 223 15 238
+45 mins. 0 301 301 18 19 37 238 10 248
Total Volume 0 1197 1197 56 55 111 909 66 975
% App. Total 0 100 50.5 49.5 93.2 6.8
PHF .000 .991 .991 .778 .724 .750 .955 .786 .952
Coast Highway
Ocean Avenue
Coast Highway
Thru
1197
Left
0 In - Peak Hour: 12:15 PM
1197
Right
55 Left
56 In - Peak Hour: 12:45 PM
111
Thru
909
Right
66 In - Peak Hour: 11:15 AM
975
Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
19 Location: Laguna Beach Date: 9/13/2025
N/S: Coast Highway Day: Saturday
E/W: Ocean Avenue
North Leg East Leg South Leg West Leg
Coast Highway Ocean Avenue Coast Highway Laguna Public Beach Accs 100 63 0 35 198
52 54 0 34 140
110 77 0 46 233
119 59 2 73 253
127 83 0 50 260
143 88 0 49 280
139 98 0 65 302
147 103 0 81 331
117 124 0 55 296
187 144 1 95 427
142 96 0 73 311
177 123 0 96 396
167 148 0 118 433
165 144 0 90 399
165 177 3 83 428
145 110 0 95 350
175 147 3 125 450
157 141 0 109 407
172 126 0 108 406
115 105 0 101 321
118 108 0 68 294
166 104 0 93 363
157 98 0 97 352
177 137 0 83 397
3439 2657 9 1922 8027

PEDESTRIANS
Time
11:00 AM
10:15 AM
10:45 AM
10:00 AM
10:30 AM
TOTAL VOLUMES:
2:15 PM
2:30 PM
2:45 PM
3:00 PM
3:15 PM
3:30 PM
3:45 PM
1:15 PM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
12:45 PM
1:00 PM
11:15 AM
11:30 AM
1:30 PM
1:45 PM
2:00 PM
TOTAL
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
20 Location: Date: 9/13/2025
N/S: Day: Saturday
E/W:

Left Thru Right Left Thru Right Left Thru Right Left Thru Right 0 7 0 0 0 0 0 1 0 0 0 0 8
0 1 0 0 0 0 0 1 0 0 0 0 2
0 2 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 1 0 0 7 0 0 0 0 8
0 3 0 0 1 0 0 3 1 0 0 0 8
0 1 0 0 0 0 0 0 0 0 0 0 1
0 1 0 0 0 0 0 13 0 0 0 0 14
0 0 0 1 0 0 0 0 0 0 0 0 1
0 0 0 0 0 0 0 14 0 0 0 0 14
0 2 1 0 0 0 0 1 0 0 0 0 4
0 5 2 0 0 0 0 0 0 0 0 0 7
0 1 0 0 0 3 0 1 2 0 0 0 7
0 0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 1 0 0 0 0 0 0 2
0 6 0 0 0 1 0 1 0 0 0 0 8
0 0 0 0 0 0 0 1 0 0 0 0 1
0 0 0 0 1 1 0 2 0 0 0 0 4
0 1 0 0 0 0 0 2 0 0 0 0 3
0 1 0 0 0 0 0 1 0 0 0 0 2
0 1 0 0 0 0 0 1 1 0 0 0 3
0 2 0 0 0 0 0 3 0 0 0 0 5
0 2 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 0 0 0 2 0 0 0 0 2
0 0 0 0 0 0 0 0 0 0 0 0 0
0 37 3 1 3 6 0 54 4 0 0 0 108
Coast Highway
Laguna Beach
Ocean Avenue
3:15 PM
3:30 PM
3:45 PM
2:00 PM
2:15 PM
2:30 PM
2:45 PM
3:00 PM
12:45 PM
1:00 PM
1:15 PM
1:30 PM
1:45 PM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
10:30 AM
10:45 AM
11:00 AM
11:15 AM
11:30 AM
10:00 AM
10:15 AM
TOTAL VOLUMES:

BICYCLES
Southbound Westbound Northbound Eastbound
Coast Highway Ocean Avenue Coast Highway Laguna Public Beach Accs Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
21 File Name : 03_LBH_PCH_Park Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 1
City of Laguna Beach
N/S: Coast Highway
E/W: Park Avenue
Weather: Clear
Groups Printed- Total Volume
Coast Highway
Southbound
Park Avenue
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total 10:00 AM 9 240 249 0 0 0 161 3 164 413
10:15 AM 11 225 236 0 0 0 223 2 225 461
10:30 AM 13 243 256 0 0 0 207 1 208 464
10:45 AM 15 282 297 0 0 0 225 0 225 522
Total 48 990 1038 0 0 0 816 6 822 1860
11:00 AM 24 238 262 0 0 0 223 0 223 485
11:15 AM 11 273 284 0 0 0 227 3 230 514
11:30 AM 11 260 271 0 0 0 262 0 262 533
11:45 AM 11 293 304 0 0 0 241 2 243 547
Total 57 1064 1121 0 0 0 953 5 958 2079
12:00 PM 10 272 282 0 0 0 247 0 247 529
12:15 PM 12 285 297 0 0 0 221 1 222 519
12:30 PM 20 307 327 0 0 0 249 0 249 576
12:45 PM 18 295 313 0 0 0 221 1 222 535
Total 60 1159 1219 0 0 0 938 2 940 2159
01:00 PM 14 298 312 0 0 0 242 2 244 556
01:15 PM 14 256 270 0 0 0 213 2 215 485
01:30 PM 14 278 292 0 0 0 202 1 203 495
01:45 PM 9 284 293 0 0 0 232 1 233 526
Total 51 1116 1167 0 0 0 889 6 895 2062
02:00 PM 13 250 263 0 0 0 200 0 200 463
02:15 PM 8 301 309 0 0 0 247 0 247 556
02:30 PM 17 269 286 0 0 0 215 2 217 503
02:45 PM 5 293 298 0 0 0 213 1 214 512
Total 43 1113 1156 0 0 0 875 3 878 2034
03:00 PM 7 275 282 0 0 0 242 2 244 526
03:15 PM 8 275 283 0 0 0 218 2 220 503
03:30 PM 11 306 317 0 0 0 247 1 248 565
03:45 PM 11 257 268 0 0 0 223 3 226 494
Total 37 1113 1150 0 0 0 930 8 938 2088
Grand Total 296 6555 6851 0 0 0 5401 30 5431 12282
Apprch % 4.3 95.7 0 0 99.4 0.6
Total % 2.4 53.4 55.8 0 0 0 44 0.2 44.2
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
22 File Name : 03_LBH_PCH_Park Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 2
City of Laguna Beach
N/S: Coast Highway
E/W: Park Avenue
Weather: Clear
Coast Highway
Southbound
Park Avenue
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:15 PM
12:15 PM 12 285 297 0 0 0 221 1 222 519
12:30 PM 20 307 327 0 0 0 249 0 249 576
12:45 PM 18 295 313 0 0 0 221 1 222 535
01:00 PM 14 298 312 0 0 0 242 2 244 556
Total Volume 64 1185 1249 0 0 0 933 4 937 2186
% App. Total 5.1 94.9 0 0 99.6 0.4
PHF .800 .965 .955 .000 .000 .000 .937 .500 .941 .949
Coast Highway
Park Avenue
Coast Highway
Thru
1185
Left
64 Out In Total
933 1249 2182
Right
0 Left
0 Out Total In
68 0 68
Thru
933
Right
4 Out In Total
1185 937 2122
Peak Hour Begins at 12:15 PM
Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
23 File Name : 03_LBH_PCH_Park Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 3
City of Laguna Beach
N/S: Coast Highway
E/W: Park Avenue
Weather: Clear
Coast Highway
Southbound
Park Avenue
Westbound
Coast Highway
Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at:
12:15 PM 10:00 AM 11:15 AM
+0 mins. 12 285 297 0 0 0 227 3 230
+15 mins. 20 307 327 0 0 0 262 0 262
+30 mins. 18 295 313 0 0 0 241 2 243
+45 mins. 14 298 312 0 0 0 247 0 247
Total Volume 64 1185 1249 0 0 0 977 5 982
% App. Total 5.1 94.9 0 0 99.5 0.5
PHF .800 .965 .955 .000 .000 .000 .932 .417 .937
Coast Highway
Park Avenue
Coast Highway
Thru
1185
Left
64 In - Peak Hour: 12:15 PM
1249
Right
0 Left
0 In - Peak Hour: 10:00 AM
0 Thru
977
Right
5 In - Peak Hour: 11:15 AM
982
Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
24 Location: Laguna Beach Date: 9/13/2025
N/S: Coast Highway Day: Saturday
E/W: Park Avenue
North Leg East Leg South Leg West Leg Northwest to Southeast Northeast to Southwest Coast Highway Park Avenue Coast Highway Laguna Public Beach Accs Crosswalk Crosswalk 85 49 14 59 15 0 222
69 81 16 38 4 3 211
82 85 30 78 11 8 294
82 83 32 70 29 12 308
98 86 31 47 26 2 290
105 117 29 74 27 0 352
92 108 47 78 7 5 337
128 128 42 104 28 1 431
123 130 35 93 14 2 397
98 169 44 109 19 4 443
113 221 67 137 32 5 575
147 158 50 114 29 7 505
109 161 67 159 30 9 535
142 157 54 121 19 0 493
128 166 57 106 39 8 504
114 154 75 133 24 6 506
140 149 41 144 37 1 512
119 179 64 158 27 2 549
133 174 63 123 79 2 574
139 140 44 127 27 8 485
133 165 41 103 24 13 479
189 160 43 119 25 2 538
136 179 66 132 41 3 557
160 150 64 118 37 6 535
2864 3349 1116 2544 650 109 10632
10:15 AM
10:45 AM
10:00 AM
10:30 AM
TOTAL VOLUMES:
2:15 PM
2:30 PM
2:45 PM
3:00 PM
3:15 PM
3:30 PM
3:45 PM
2:00 PM
1:15 PM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
12:45 PM
1:00 PM
11:15 AM
11:30 AM
1:30 PM
1:45 PM

PEDESTRIANS
Time
11:00 AM
TOTAL
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
25 Location: Date: 9/13/2025
N/S: Day: Saturday
E/W:

Left Thru Right Left Thru Right Left Thru Right Left Thru Right 1 5 0 0 0 0 0 1 0 0 0 0 7
0 0 0 0 0 0 0 2 0 0 0 0 2
0 2 0 0 0 0 1 0 0 0 0 0 3
1 0 0 0 0 0 0 6 0 0 0 0 7
1 1 0 0 0 0 0 2 0 0 0 0 4
0 2 0 0 0 0 0 0 0 0 0 0 2
0 1 0 0 0 0 0 15 0 0 0 0 16
0 1 0 0 0 0 0 0 0 0 0 0 1
0 1 0 1 1 0 0 16 0 0 0 0 19
2 2 0 0 0 0 0 1 0 0 0 0 5
1 5 0 0 0 0 0 0 0 0 0 0 6
1 1 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 0 0 0 2 0 0 0 0 2
0 1 0 1 0 0 0 0 0 0 0 0 2
3 3 0 0 0 0 0 1 0 0 0 0 7
0 1 0 0 0 0 0 1 0 0 0 0 2
1 1 0 0 0 0 0 1 0 0 0 0 3
0 1 0 0 0 0 0 2 0 0 0 0 3
0 0 0 0 0 1 0 1 0 0 0 0 2
0 1 0 0 0 1 0 1 0 0 0 0 3
0 4 0 0 0 1 0 2 0 0 0 0 7
2 0 0 0 0 0 0 0 0 0 0 0 2
1 0 0 0 0 0 0 2 0 0 0 0 3
0 0 0 0 0 0 0 0 0 0 0 0 0
14 33 0 2 1 3 1 56 0 0 0 0 110
Coast Highway
Laguna Beach
Park Avenue
3:15 PM
3:30 PM
3:45 PM
2:00 PM
2:15 PM
2:30 PM
2:45 PM
3:00 PM
12:45 PM
1:00 PM
1:15 PM
1:30 PM
1:45 PM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
10:30 AM
10:45 AM
11:00 AM
11:15 AM
11:30 AM
10:00 AM
10:15 AM
TOTAL VOLUMES:

BICYCLES
Southbound Westbound Northbound Eastbound
Coast Highway Park Avenue Coast Highway Laguna Public Beach Accs Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
26 File Name : 04_LBH_PCH_Lag Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 1
City of Laguna Beach
N/S: Coast Highway
E/W: Laguna Avenue
Weather: Clear
Groups Printed- Total Volume
Coast Highway
Southbound
Laguna Avenue
Westbound
Coast Highway
Northbound
Laguna Avenue
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 10:00 AM 0 237 3 240 12 0 16 28 0 148 10 158 1 2 0 3 429 10:15 AM 2 227 3 232 13 2 25 40 0 203 18 221 0 2 2 4 497 10:30 AM 0 234 4 238 12 1 24 37 0 184 21 205 1 1 1 3 483 10:45 AM 2 287 1 290 11 3 20 34 0 206 20 226 2 1 2 5 555 Total 4 985 11 1000 48 6 85 139 0 741 69 810 4 6 5 15 1964 11:00 AM 0 236 4 240 7 3 38 48 0 191 12 203 0 3 1 4 495 11:15 AM 1 261 5 267 10 0 20 30 0 200 14 214 0 1 1 2 513 11:30 AM 0 255 7 262 11 1 24 36 0 238 11 249 2 4 3 9 556 11:45 AM 0 284 3 287 13 4 27 44 0 210 9 219 7 3 3 13 563 Total 1 1036 19 1056 41 8 109 158 0 839 46 885 9 11 8 28 2127 12:00 PM 0 275 4 279 8 3 24 35 0 226 22 248 1 1 3 5 567 12:15 PM 2 271 1 274 16 0 24 40 0 202 15 217 1 0 3 4 535 12:30 PM 0 310 4 314 9 1 27 37 0 215 21 236 2 2 2 6 593 12:45 PM 0 286 5 291 12 2 27 41 0 194 20 214 2 2 1 5 551 Total 2 1142 14 1158 45 6 102 153 0 837 78 915 6 5 9 20 2246 01:00 PM 0 294 5 299 16 1 32 49 0 212 16 228 1 1 1 3 579 01:15 PM 0 257 3 260 19 4 22 45 0 190 18 208 4 2 1 7 520 01:30 PM 1 267 3 271 13 3 24 40 0 174 22 196 5 2 1 8 515 01:45 PM 0 281 4 285 15 3 35 53 0 196 20 216 0 3 0 3 557 Total 1 1099 15 1115 63 11 113 187 0 772 76 848 10 8 3 21 2171 02:00 PM 0 242 2 244 11 0 26 37 0 174 11 185 0 2 1 3 469 02:15 PM 1 305 3 309 10 3 31 44 0 215 25 240 2 1 0 3 596 02:30 PM 1 268 5 274 13 1 26 40 0 198 27 225 1 5 2 8 547 02:45 PM 0 286 2 288 17 0 26 43 0 183 28 211 1 2 2 5 547 Total 2 1101 12 1115 51 4 109 164 0 770 91 861 4 10 5 19 2159 03:00 PM 0 275 2 277 13 4 21 38 0 219 13 232 4 1 1 6 553 03:15 PM 0 264 7 271 9 1 26 36 0 192 22 214 4 3 1 8 529 03:30 PM 0 299 3 302 11 0 29 40 1 218 27 246 2 3 1 6 594 03:45 PM 3 249 4 256 9 6 22 37 0 204 26 230 3 0 2 5 528 Total 3 1087 16 1106 42 11 98 151 1 833 88 922 13 7 5 25 2204 Grand Total 13 6450 87 6550 290 46 616 952 1 4792 448 5241 46 47 35 128 12871 Apprch % 0.2 98.5 1.3 30.5 4.8 64.7 0 91.4 8.5 35.9 36.7 27.3 Total % 0.1 50.1 0.7 50.9 2.3 0.4 4.8 7.4 0 37.2 3.5 40.7 0.4 0.4 0.3 1 Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
27 File Name : 04_LBH_PCH_Lag Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 2
City of Laguna Beach
N/S: Coast Highway
E/W: Laguna Avenue
Weather: Clear
Coast Highway
Southbound
Laguna Avenue
Westbound
Coast Highway
Northbound
Laguna Avenue
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:45 AM
11:45 AM 0 284 3 287 13 4 27 44 0 210 9 219 7 3 3 13 563 12:00 PM 0 275 4 279 8 3 24 35 0 226 22 248 1 1 3 5 567 12:15 PM 2 271 1 274 16 0 24 40 0 202 15 217 1 0 3 4 535 12:30 PM 0 310 4 314 9 1 27 37 0 215 21 236 2 2 2 6 593 Total Volume 2 1140 12 1154 46 8 102 156 0 853 67 920 11 6 11 28 2258 % App. Total 0.2 98.8 1 29.5 5.1 65.4 0 92.7 7.3 39.3 21.4 39.3 PHF .250 .919 .750 .919 .719 .500 .944 .886 .000 .944 .761 .927 .393 .500 .917 .538 .952 Coast Highway
Laguna Avenue
Laguna Avenue
Coast Highway
Right
12 Thru
1140
Left
2 Out In Total
966 1154 2120
Right
102
Thru
8 Left
46 Out Total In
75 156 231
Left
0 Thru
853
Right
67 Out In Total
1197 920 2117
Left
11 Thru
6 Right
11 Total Out In
20 28 48
Peak Hour Begins at 11:45 AM
Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
28 File Name : 04_LBH_PCH_Lag Sat
Site Code : 04125894
Start Date : 9/13/2025
Page No : 3
City of Laguna Beach
N/S: Coast Highway
E/W: Laguna Avenue
Weather: Clear
Coast Highway
Southbound
Laguna Avenue
Westbound
Coast Highway
Northbound
Laguna Avenue
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at:
12:15 PM 01:00 PM 11:30 AM 11:30 AM
+0 mins. 2 271 1 274 16 1 32 49 0 238 11 249 2 4 3 9
+15 mins. 0 310 4 314 19 4 22 45 0 210 9 219 7 3 3 13
+30 mins. 0 286 5 291 13 3 24 40 0 226 22 248 1 1 3 5
+45 mins. 0 294 5 299 15 3 35 53 0 202 15 217 1 0 3 4
Total Volume 2 1161 15 1178 63 11 113 187 0 876 57 933 11 8 12 31 % App. Total 0.2 98.6 1.3 33.7 5.9 60.4 0 93.9 6.1 35.5 25.8 38.7 PHF .250 .936 .750 .938 .829 .688 .807 .882 .000 .920 .648 .937 .393 .500 1.000 .596 Coast Highway
Laguna Avenue
Laguna Avenue
Coast Highway
Right
15 Thru
1161
Left
2 In - Peak Hour: 12:15 PM
1178
Right
113
Thru
11 Left
63 In - Peak Hour: 01:00 PM
187
Left
0 Thru
876
Right
57 In - Peak Hour: 11:30 AM
933
Left
11 Thru
8 Right
12 In - Peak Hour: 11:30 AM
31 Total Volume
Peak Hour Data
North
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
(951) 268-6268
29 Location: Laguna Beach Date: 9/13/2025
N/S: Coast Highway Day: Saturday
E/W: Laguna Avenue
North Leg East Leg South Leg West Leg Northwest to Southeast Northeast to Southwest Coast Highway Laguna Avenue Coast Highway Laguna Public Beach Accs Crosswalk Crosswalk 9 43 6 28 4 7 97
11 46 20 34 10 7 128
11 54 35 38 5 0 143
4 71 42 45 17 6 185
20 58 28 41 11 12 170
14 23 56 34 13 13 153
17 81 58 40 7 3 206
7 108 102 38 25 7 287
19 50 70 55 3 7 204
26 103 62 56 7 18 272
16 105 70 58 25 25 299
36 101 68 70 23 8 306
12 104 69 97 15 3 300
21 130 48 67 22 14 302
17 115 58 69 23 10 292
6 83 84 74 9 5 261
37 126 91 90 21 7 372
30 123 66 96 26 7 348
37 120 99 67 24 8 355
6 98 66 66 14 13 263
27 107 68 83 12 5 302
21 90 99 73 16 23 322
17 116 79 74 11 6 303
23 96 82 87 8 16 312
444 2151 1526 1480 351 230 6182
TOTAL
11:15 AM
11:30 AM
1:30 PM
1:45 PM

PEDESTRIANS
Time
11:00 AM
2:00 PM
1:15 PM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
12:45 PM
1:00 PM
2:15 PM
2:30 PM
2:45 PM
3:00 PM
3:15 PM
3:30 PM
3:45 PM
TOTAL VOLUMES:
10:15 AM
10:45 AM
10:00 AM
10:30 AM
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
30 Location: Date: 9/13/2025
N/S: Day: Saturday
E/W:

Left Thru Right Left Thru Right Left Thru Right Left Thru Right 0 6 0 0 0 0 0 0 0 0 0 0 6
0 0 0 0 0 0 0 2 0 0 1 0 3
0 2 0 0 0 0 0 1 0 0 0 0 3
0 0 0 0 2 0 0 6 0 0 0 0 8
0 1 0 0 0 0 0 3 0 0 1 0 5
0 2 0 0 0 0 1 0 0 0 0 0 3
0 0 1 0 1 1 0 2 0 0 0 1 6
0 0 0 0 0 0 0 1 0 0 0 0 1
0 0 0 0 0 0 0 16 0 0 0 0 16
0 0 0 0 0 0 0 1 0 0 1 0 2
0 6 0 0 0 0 0 0 0 0 0 0 6
0 0 1 0 0 0 1 0 0 0 0 1 3
0 1 0 0 0 0 0 1 0 0 0 1 3
0 1 0 0 0 0 0 0 0 0 1 0 2
0 3 0 0 0 0 0 1 0 0 0 0 4
0 1 0 0 0 0 0 1 0 0 0 0 2
0 0 0 0 2 0 0 1 0 0 0 0 3
0 0 1 0 2 0 0 2 0 0 0 0 5
0 0 0 0 0 0 0 1 0 0 2 0 3
0 1 0 0 1 0 0 1 0 0 0 0 3
0 2 0 0 0 0 0 3 0 0 1 0 6
0 0 0 0 0 0 0 0 0 0 2 0 2
0 0 0 0 0 0 0 0 0 1 1 1 3
0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL VOLUMES: 0 26 3 0 8 1 2 43 0 1 10 4 98

BICYCLES
Southbound Westbound Northbound Eastbound
Coast Highway Laguna Avenue Coast Highway Laguna Public Beach Accs 10:30 AM
10:45 AM
11:00 AM
11:15 AM
11:30 AM
10:00 AM
10:15 AM
11:45 AM
12:00 PM
12:15 PM
12:30 PM
2:00 PM
2:15 PM
2:30 PM
2:45 PM
3:00 PM
12:45 PM
1:00 PM
1:15 PM
1:30 PM
1:45 PM
3:45 PM
Coast Highway
Laguna Beach
Laguna Avenue
3:15 PM
3:30 PM
Counts Unlimited, Inc.

PO Box 1178
Corona, CA 92878
951-268-6268
31 8
ATTACHMENT B – SYNCHRO ANALYSIS WORKSHEETS
32 Laguna Beach Lower Ocean Avenue One-Way Project
1: Pacific Coast Highway & Broadway Street
Existing Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 472 298 706 217 205 741
Future Volume (vph) 472 298 706 217 205 741
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 10 10 12 12 10 12
Grade (%) 0% 0% -6%
Total Lost time (s) 5.7 6.2 6.2 6.2 6.2
Lane Util. Factor 0.97 0.91 0.95 1.00 0.95
Frpb, ped/bikes 0.91 0.74 0.85 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00
Frt 0.98 0.85 0.96 1.00 1.00
Flt Protected 0.96 1.00 1.00 0.95 1.00
Satd. Flow (prot) 2603 717 2361 1531 3281
Flt Permitted 0.96 1.00 1.00 0.95 1.00
Satd. Flow (perm) 2603 717 2361 1531 3281
Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97
Growth Factor (vph) 100% 100% 100% 100% 100% 100%
Adj. Flow (vph) 487 307 728 224 211 764
RTOR Reduction (vph) 7 5 20 0 0 0
Lane Group Flow (vph) 538 244 932 0 211 764
Confl. Peds. (#/hr) 723 425
Confl. Bikes (#/hr) 2 7
Parking (#/hr) 20 20 20
Turn Type Perm pm+ov NA Prot NA
Protected Phases 1 2 1 6
Permitted Phases 8 8
Actuated Green, G (s) 31.7 62.0 64.4 30.3 99.4
Effective Green, g (s) 30.2 59.0 62.9 28.8 97.9
Actuated g/C Ratio 0.22 0.42 0.45 0.21 0.70
Clearance Time (s) 4.2 4.7 4.7 4.7 4.7
Vehicle Extension (s) 2.5 3.0 4.5 3.0 4.5
Lane Grp Cap (vph) 561 333 1060 314 2294
v/s Ratio Prot c0.15 c0.39 0.14 0.23
v/s Ratio Perm c0.21 0.19
v/c Ratio 0.96 0.73 0.88 0.67 0.33
Uniform Delay, d1 54.3 33.9 35.1 51.2 8.3
Progression Factor 1.00 1.00 0.76 1.00 1.00
Incremental Delay, d2 27.6 8.1 9.7 5.6 0.4
Delay (s) 81.9 42.0 36.4 56.8 8.6
Level of Service F D D E A
Approach Delay (s/veh) 69.4 36.4 19.1
Approach LOS E D B
Intersection Summary
HCM 2000 Control Delay (s/veh) 39.8 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.87
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 16.6 Intersection Capacity Utilization 79.7% ICU Level of Service D Analysis Period (min) 15
33 Laguna Beach Lower Ocean Avenue One-Way Project
1: Pacific Coast Highway & Broadway Street
Existing Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 2
c Critical Lane Group
34 Laguna Beach Lower Ocean Avenue One-Way Project
2: Pacific Coast Highway & Ocean Avenue
Existing Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 57 47 872 60 0 1197
Future Volume (vph) 57 47 872 60 0 1197
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 11 12 11 12 12 11
Total Lost time (s) 6.0 5.7 5.7
Lane Util. Factor 1.00 0.95 0.95
Frpb, ped/bikes 0.75 0.96 1.00
Flpb, ped/bikes 1.00 1.00 1.00
Frt 0.94 0.99 1.00
Flt Protected 0.97 1.00 1.00
Satd. Flow (prot) 894 2930 3079
Flt Permitted 0.97 1.00 1.00
Satd. Flow (perm) 894 2930 3079
Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96
Growth Factor (vph) 100% 100% 100% 100% 100% 100%
Adj. Flow (vph) 59 49 908 63 0 1247
RTOR Reduction (vph) 17 0 2 0 0 0
Lane Group Flow (vph) 91 0 969 0 0 1247
Confl. Peds. (#/hr) 1185 511
Confl. Bikes (#/hr) 3 4
Parking (#/hr) 20 20
Turn Type Perm NA NA
Protected Phases 2 6
Permitted Phases 8
Actuated Green, G (s) 19.5 111.8 111.8
Effective Green, g (s) 18.0 110.3 110.3
Actuated g/C Ratio 0.13 0.79 0.79
Clearance Time (s) 4.5 4.2 4.2
Vehicle Extension (s) 3.0 4.7 4.7
Lane Grp Cap (vph) 114 2308 2425
v/s Ratio Prot 0.33 c0.40
v/s Ratio Perm c0.10
v/c Ratio 0.79 0.42 0.51
Uniform Delay, d1 59.2 4.7 5.3
Progression Factor 1.00 0.10 0.49
Incremental Delay, d2 30.6 0.5 0.7
Delay (s) 89.8 1.0 3.2
Level of Service F A A
Approach Delay (s/veh) 89.8 1.0 3.2
Approach LOS F A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 6.3 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.55
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 10.2 Intersection Capacity Utilization 61.5% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
35 Laguna Beach Lower Ocean Avenue One-Way Project
3: Pacific Coast Highway & Park Avenue
Existing Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 0 0 933 4 64 1185
Future Volume (vph) 0 0 933 4 64 1185
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 12 12 11 12 12 12
Total Lost time (s) 6.7 5.7 6.7
Lane Util. Factor 0.95 1.00 0.95
Frpb, ped/bikes 1.00 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00
Frt 1.00 1.00 1.00
Flt Protected 1.00 0.95 1.00
Satd. Flow (prot) 2769 1593 2907
Flt Permitted 1.00 0.25 1.00
Satd. Flow (perm) 2769 414 2907
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Growth Factor (vph) 100% 100% 100% 100% 100% 100%
Adj. Flow (vph) 0 0 982 4 67 1247
RTOR Reduction (vph) 0 0 0 0 0 0
Lane Group Flow (vph) 0 0 986 0 67 1247
Confl. Bikes (#/hr) 3
Parking (#/hr) 20 20 15
Turn Type NA pm+pt NA
Protected Phases 2 1 6
Permitted Phases 6
Actuated Green, G (s) 100.4 108.7 108.7
Effective Green, g (s) 98.9 107.2 107.2
Actuated g/C Ratio 0.71 0.77 0.77
Clearance Time (s) 5.2 4.2 5.2
Vehicle Extension (s) 4.7 0.2 4.7
Lane Grp Cap (vph) 1956 338 2225
v/s Ratio Prot 0.36 0.00 c0.43
v/s Ratio Perm 0.15
v/c Ratio 0.50 0.20 0.56
Uniform Delay, d1 9.4 5.0 6.7
Progression Factor 0.09 0.39 0.30
Incremental Delay, d2 0.8 0.1 0.9
Delay (s) 1.7 2.1 2.9
Level of Service A A A
Approach Delay (s/veh) 0.0 1.7 2.9
Approach LOS A A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 2.4 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.49
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 16.9 Intersection Capacity Utilization 43.3% ICU Level of Service A Analysis Period (min) 15
c Critical Lane Group
36 Laguna Beach Lower Ocean Avenue One-Way Project
4: Pacific Coast Highway & Laguna Avenue
Existing Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (vph) 11 6 11 46 8 102 0 853 67 0 1142 12 Future Volume (vph) 11 6 11 46 8 102 0 853 67 0 1142 12 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 11 12 12 10 12 12 11 12 12 11 12
Grade (%) 0% 0% -6% 0%
Total Lost time (s) 5.2 5.2 5.2 5.2 5.2
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95
Frpb, ped/bikes 0.99 1.00 1.00 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00
Frt 0.95 1.00 0.85 0.99 1.00
Flt Protected 0.98 0.96 1.00 1.00 1.00
Satd. Flow (prot) 1494 1500 1425 3130 3074
Flt Permitted 0.89 0.74 1.00 1.00 1.00
Satd. Flow (perm) 1350 1150 1425 3130 3074
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Growth Factor (vph) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Adj. Flow (vph) 12 6 12 48 8 107 0 898 71 0 1202 13
RTOR Reduction (vph) 0 0 0 0 0 0 0 0 0 0 0 0
Lane Group Flow (vph) 0 30 0 0 56 107 0 969 0 0 1215 0
Confl. Bikes (#/hr) 1 18
Parking (#/hr) 15 15
Turn Type Perm NA Perm NA Perm NA NA
Protected Phases 4 4 2 6
Permitted Phases 4 4 4
Actuated Green, G (s) 14.8 14.8 14.8 91.7 91.7
Effective Green, g (s) 13.3 13.3 13.3 90.2 90.2
Actuated g/C Ratio 0.10 0.10 0.10 0.64 0.64
Clearance Time (s) 3.7 3.7 3.7 3.7 3.7
Vehicle Extension (s) 2.0 2.0 2.0 4.7 4.7
Lane Grp Cap (vph) 128 109 135 2016 1980
v/s Ratio Prot 0.31 c0.40
v/s Ratio Perm 0.02 0.05 c0.08
v/c Ratio 0.23 0.51 0.79 0.48 0.61
Uniform Delay, d1 58.6 60.3 62.0 12.8 14.6
Progression Factor 1.00 1.00 1.00 1.00 0.24
Incremental Delay, d2 0.3 1.7 24.9 0.8 1.2
Delay (s) 59.0 62.0 86.9 13.7 4.7
Level of Service E E F B A
Approach Delay (s/veh) 59.0 78.4 13.7 4.7
Approach LOS E E B A
Intersection Summary
HCM 2000 Control Delay (s/veh) 14.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.53
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 14.9 Intersection Capacity Utilization 52.8% ICU Level of Service A Analysis Period (min) 15
c Critical Lane Group
37 Laguna Beach Lower Ocean Avenue One-Way Project
1: Pacific Coast Highway & Broadway Street
Existing With Project Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 472 298 706 237 205 741
Future Volume (vph) 472 298 706 237 205 741
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 10 10 12 12 10 12
Grade (%) 0% 0% -6%
Total Lost time (s) 5.7 6.2 6.2 6.2 6.2
Lane Util. Factor 0.97 0.91 0.95 1.00 0.95
Frpb, ped/bikes 0.91 0.74 0.84 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00
Frt 0.98 0.85 0.96 1.00 1.00
Flt Protected 0.96 1.00 1.00 0.95 1.00
Satd. Flow (prot) 2603 713 2328 1531 3281
Flt Permitted 0.96 1.00 1.00 0.95 1.00
Satd. Flow (perm) 2603 713 2328 1531 3281
Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97
Growth Factor (vph) 100% 100% 100% 100% 100% 100%
Adj. Flow (vph) 487 307 728 244 211 764
RTOR Reduction (vph) 7 5 23 0 0 0
Lane Group Flow (vph) 538 244 949 0 211 764
Confl. Peds. (#/hr) 723 425
Confl. Bikes (#/hr) 2 7
Parking (#/hr) 20 20 20
Turn Type Perm pm+ov NA Prot NA
Protected Phases 1 2 1 6
Permitted Phases 8 8
Actuated Green, G (s) 31.7 61.0 65.4 29.3 99.4
Effective Green, g (s) 30.2 58.0 63.9 27.8 97.9
Actuated g/C Ratio 0.22 0.41 0.46 0.20 0.70
Clearance Time (s) 4.2 4.7 4.7 4.7 4.7
Vehicle Extension (s) 2.5 3.0 4.5 3.0 4.5
Lane Grp Cap (vph) 561 326 1062 304 2294
v/s Ratio Prot c0.15 c0.41 0.14 0.23
v/s Ratio Perm c0.21 0.19
v/c Ratio 0.96 0.75 0.89 0.69 0.33
Uniform Delay, d1 54.3 34.8 34.9 52.1 8.3
Progression Factor 1.00 1.00 0.71 1.00 1.00
Incremental Delay, d2 27.6 9.0 11.0 6.7 0.4
Delay (s) 81.9 43.8 35.6 58.9 8.6
Level of Service F D D E A
Approach Delay (s/veh) 70.0 35.6 19.5
Approach LOS E D B
Intersection Summary
HCM 2000 Control Delay (s/veh) 39.8 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.89
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 16.6 Intersection Capacity Utilization 80.5% ICU Level of Service D Analysis Period (min) 15
38 Laguna Beach Lower Ocean Avenue One-Way Project
1: Pacific Coast Highway & Broadway Street
Existing With Project Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 2
c Critical Lane Group
39 Laguna Beach Lower Ocean Avenue One-Way Project
2: Pacific Coast Highway & Ocean Avenue
Existing With Project Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 57 47 892 0 0 1197
Future Volume (vph) 57 47 892 0 0 1197
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 11 12 11 12 12 11
Total Lost time (s) 4.7 4.7 5.7 5.7
Lane Util. Factor 1.00 1.00 0.95 0.95
Frpb, ped/bikes 1.00 0.46 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00
Frt 1.00 0.85 1.00 1.00
Flt Protected 0.95 1.00 1.00 1.00
Satd. Flow (prot) 1232 522 3079 2925
Flt Permitted 0.95 1.00 1.00 1.00
Satd. Flow (perm) 1232 522 3079 2925
Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96
Growth Factor (vph) 100% 100% 100% 100% 100% 100%
Adj. Flow (vph) 59 49 929 0 0 1247
RTOR Reduction (vph) 0 44 0 0 0 0
Lane Group Flow (vph) 59 5 929 0 0 1247
Confl. Peds. (#/hr) 1185
Confl. Bikes (#/hr) 3
Parking (#/hr) 20 20 0
Turn Type Perm Perm NA NA
Protected Phases 2 6
Permitted Phases 8 8
Actuated Green, G (s) 16.8 16.8 115.8 115.8
Effective Green, g (s) 15.3 15.3 114.3 114.3
Actuated g/C Ratio 0.11 0.11 0.82 0.82
Clearance Time (s) 3.2 3.2 4.2 4.2
Vehicle Extension (s) 2.0 2.0 4.7 4.7
Lane Grp Cap (vph) 134 57 2513 2388
v/s Ratio Prot 0.30 c0.43
v/s Ratio Perm c0.05 0.01
v/c Ratio 0.44 0.09 0.37 0.52
Uniform Delay, d1 58.3 56.1 3.4 4.1
Progression Factor 1.00 1.00 0.00 0.49
Incremental Delay, d2 0.8 0.3 0.4 0.7
Delay (s) 59.2 56.4 0.4 2.7
Level of Service E E A A
Approach Delay (s/veh) 57.9 0.4 2.7
Approach LOS E A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 4.4 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.51
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 8.9 Intersection Capacity Utilization 62.9% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
40 Laguna Beach Lower Ocean Avenue One-Way Project
3: Pacific Coast Highway & Park Avenue
Existing With Project Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 0 0 893 4 64 1185
Future Volume (vph) 0 0 893 4 64 1185
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 12 12 11 12 12 12
Total Lost time (s) 6.7 5.7 6.7
Lane Util. Factor 0.95 1.00 0.95
Frpb, ped/bikes 1.00 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00
Frt 1.00 1.00 1.00
Flt Protected 1.00 0.95 1.00
Satd. Flow (prot) 2769 1593 2907
Flt Permitted 1.00 0.26 1.00
Satd. Flow (perm) 2769 437 2907
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Growth Factor (vph) 100% 100% 100% 100% 100% 100%
Adj. Flow (vph) 0 0 940 4 67 1247
RTOR Reduction (vph) 0 0 0 0 0 0
Lane Group Flow (vph) 0 0 944 0 67 1247
Confl. Bikes (#/hr) 3
Parking (#/hr) 20 20 15
Turn Type NA pm+pt NA
Protected Phases 2 1 6
Permitted Phases 6
Actuated Green, G (s) 100.4 108.7 108.7
Effective Green, g (s) 98.9 107.2 107.2
Actuated g/C Ratio 0.71 0.77 0.77
Clearance Time (s) 5.2 4.2 5.2
Vehicle Extension (s) 4.7 0.2 4.7
Lane Grp Cap (vph) 1956 356 2225
v/s Ratio Prot 0.34 0.00 c0.43
v/s Ratio Perm 0.14
v/c Ratio 0.48 0.19 0.56
Uniform Delay, d1 9.2 4.9 6.7
Progression Factor 0.08 0.51 0.37
Incremental Delay, d2 0.8 0.1 0.9
Delay (s) 1.5 2.6 3.4
Level of Service A A A
Approach Delay (s/veh) 0.0 1.5 3.4
Approach LOS A A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 2.6 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.49
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 16.9 Intersection Capacity Utilization 62.9% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
41 Laguna Beach Lower Ocean Avenue One-Way Project
4: Pacific Coast Highway & Laguna Avenue
Existing With Project Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (vph) 11 6 11 46 8 102 0 813 107 0 1142 12 Future Volume (vph) 11 6 11 46 8 102 0 813 107 0 1142 12 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 11 12 12 10 12 12 11 12 12 11 12
Grade (%) 0% 0% -6% 0%
Total Lost time (s) 5.2 5.2 5.2 5.2 5.2
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95
Frpb, ped/bikes 0.99 1.00 1.00 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00
Frt 0.95 1.00 0.85 0.98 1.00
Flt Protected 0.98 0.96 1.00 1.00 1.00
Satd. Flow (prot) 1494 1500 1425 3105 3074
Flt Permitted 0.89 0.74 1.00 1.00 1.00
Satd. Flow (perm) 1350 1150 1425 3105 3074
Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Growth Factor (vph) 100% 100% 100% 100% 100% 100% 300% 100% 100% 100% 100% 100% Adj. Flow (vph) 12 6 12 48 8 107 0 856 113 0 1202 13
RTOR Reduction (vph) 0 0 0 0 0 0 0 0 0 0 0 0
Lane Group Flow (vph) 0 30 0 0 56 107 0 969 0 0 1215 0
Confl. Bikes (#/hr) 1 18
Parking (#/hr) 15 15
Turn Type Perm NA Perm NA Perm NA NA
Protected Phases 4 4 2 6
Permitted Phases 4 4 4
Actuated Green, G (s) 14.8 14.8 14.8 91.7 91.7
Effective Green, g (s) 13.3 13.3 13.3 90.2 90.2
Actuated g/C Ratio 0.10 0.10 0.10 0.64 0.64
Clearance Time (s) 3.7 3.7 3.7 3.7 3.7
Vehicle Extension (s) 2.0 2.0 2.0 4.7 4.7
Lane Grp Cap (vph) 128 109 135 2000 1980
v/s Ratio Prot 0.31 c0.40
v/s Ratio Perm 0.02 0.05 c0.08
v/c Ratio 0.23 0.51 0.79 0.48 0.61
Uniform Delay, d1 58.6 60.3 62.0 12.9 14.6
Progression Factor 1.00 1.00 1.00 1.00 0.26
Incremental Delay, d2 0.3 1.7 24.9 0.8 1.2
Delay (s) 59.0 62.0 86.9 13.7 5.0
Level of Service E E F B A
Approach Delay (s/veh) 59.0 78.4 13.7 5.0
Approach LOS E E B A
Intersection Summary
HCM 2000 Control Delay (s/veh) 14.3 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.53
Actuated Cycle Length (s) 140.0 Sum of lost time (s) 14.9 Intersection Capacity Utilization 52.9% ICU Level of Service A Analysis Period (min) 15
c Critical Lane Group
42 Laguna Beach Lower Ocean Avenue One-Way Project
5: Pacific Coast Highway & Legion Street
Existing With Project Saturday Peak HCM Signalized Intersection Capacity Analysis 10/16/2025 Page 6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0
Future Volume (vph) 0 0 0 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width 11 11 11 12 10 11
Grade (%) 0% 0% 6%
Total Lost time (s)
Lane Util. Factor
Frpb, ped/bikes
Flpb, ped/bikes
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Peak-hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Growth Factor (vph) 104% 104% 104% 104% 104% 104%
Adj. Flow (vph) 0 0 0 0 0 0
RTOR Reduction (vph) 0 0 0 0 0 0
Lane Group Flow (vph) 0 0 0 0 0 0
Confl. Peds. (#/hr) 302 192
Confl. Bikes (#/hr) 1
Turn Type Prot Perm Prot
Protected Phases 8 2 1 6
Permitted Phases 8
Actuated Green, G (s)
Effective Green, g (s)
Actuated g/C Ratio
Clearance Time (s)
Vehicle Extension (s)
Lane Grp Cap (vph)
v/s Ratio Prot
v/s Ratio Perm
v/c Ratio
Uniform Delay, d1
Progression Factor
Incremental Delay, d2
Delay (s)
Level of Service
Approach Delay (s/veh) 0.0 0.0 0.0
Approach LOS A A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 0.0 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.00
Actuated Cycle Length (s) 70.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 48.2% ICU Level of Service A Analysis Period (min) 15